Click to edit Master title style fcx.com FCX Conference Call 4th Quarter 2020 Results January 26, 2021 -- 1 of 39 -- Click to edit Master title style Cautionary Statement Regarding Forward-Looking Statements This presentation contains forward-looking statements in which FCX discusses its potential future performance. Forward-looking statements are all statements other than statements of historical facts, such as plans, projections, or expectations relating to ore grades and milling rates; business outlook; production and sales volumes; unit net cash costs; cash flows; capital expenditures; liquidity; operating costs; operating plans; FCX's financial policy; FCX's expectations regarding PT-FI's ramp-up of underground mining activities and future cash flows through 2022; PT-FI's development, financing, construction and completion of a new smelter in Indonesia and possible expansion of the smelter at PT Smelting; FCX’s commitments to deliver responsibly produced copper, including plans to implement and validate all of its operating sites under specific frameworks; improvements in operating procedures and technology; exploration efforts and results; development and production activities, rates and costs; tax rates; export quotas and duties; the impact of copper, gold and molybdenum price changes; the impact of deferred intercompany profits on earnings; mineralization and reserve estimates; execution of the settlement agreements associated with the Louisiana coastal erosion cases and talc-related litigation; and future dividend payments, share purchases and sales. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” "targets," “intends,” “likely,” “will,” “should,” “could,” “to be,” ”potential," “assumptions,” “guidance,” “future” and any similar expressions are intended to identify those assertions as forward-looking statements. The declaration of future dividends is at the discretion of the Board of Directors (Board) and will depend on FCX's financial results, cash requirements, future prospects, global economic conditions, and other factors deemed relevant by the Board. In accordance with the June 2020 amendment to the revolving credit facility, FCX is currently restricted from declaring or paying common stock dividends through December 31, 2021, unless FCX, at its option, reverts to the previous covenant requirements, which would eliminate the restriction on the declaration or payment of common stock dividends. FCX cautions readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, expected, projected or assumed in the forward-looking statements. Important factors that can cause FCX's actual results to differ materially from those anticipated in the forward-looking statements include, but are not limited to, changes in the credit ratings of FCX; changes in FCX's cash requirements, financial position, financing plans or investment plans; changes in general market, economic, tax, regulatory or industry conditions; the duration and scope of and uncertainties associated with the COVID-19 pandemic, and the impact thereof on commodity prices, FCX’s business and the global economy and any related actions taken by governments and businesses; FCX’s ability to contain and mitigate the risk of spread or major outbreak of COVID-19 at its operating sites, including at PT-FI’s remote operating site in Papua; supply of and demand for, and prices of, copper, gold and molybdenum; mine sequencing; changes in mine plans or operational modifications, delays, deferrals or cancellations; production rates; timing of shipments; results of feasibility studies; potential inventory adjustments; potential impairment of long-lived mining assets; the potential effects of violence in Indonesia generally and in the province of Papua; the Indonesia government's extension of PT-FI's export license after March 15, 2021; risks associated with underground mining; satisfaction of requirements in accordance with PT-FI's special mining license to extend mining rights from 2031 through 2041; the Indonesia government's approval of a deferred schedule for completion of the new smelter in Indonesia; expected results from improvements in operating procedures and technology, including innovation initiatives; industry risks; regulatory changes; political and social risks; labor relations, including labor-related work stoppages; weather- and climate-related risks; environmental risks; litigation results; cybersecurity incidents; changes in general market, economic and industry conditions; financial condition of FCX’s customers, suppliers, vendors, partners and affiliates, particularly during weak economic conditions and extended periods of volatile commodity prices; reductions in liquidity and access to capital; FCX’s ability to comply with its responsible production commitments under specific frameworks and any changes to such frameworks; and other factors described in more detail under the heading “Risk Factors” in FCX's Annual Report on Form 10-K for the year ended December 31, 2019, and Quarterly Reports on Form 10-Q for the quarters ended March 31, 2020, June 30, 2020, and September 30, 2020, each filed with the U.S. Securities and Exchange Commission (SEC), as updated by FCX's subsequent filings with the SEC. Investors are cautioned that many of the assumptions upon which FCX's forward-looking statements are based are likely to change after the forward-looking statements are made, including for example commodity prices, which FCX cannot control, and production volumes and costs, some aspects of which FCX may not be able to control. Further, FCX may make changes to its business plans that could affect its results. FCX cautions investors that it does not intend to update forward-looking statements more frequently than quarterly notwithstanding any changes in its assumptions, changes in business plans, actual experience or other changes, and FCX undertakes no obligation to update any forward-looking statements. This presentation also includes forward-looking statements regarding mineralized material not included in proven and probable mineral reserves. Mineralized material is a mineralized body that has been delineated by appropriately spaced drilling and/or underground sampling to support the estimated tonnage and average metal grades. Such a deposit cannot qualify as recoverable proven and probable reserves until legal and economic feasibility are confirmed based upon a comprehensive evaluation of development costs, unit costs, grades, recoveries and other material factors. Significant additional drilling is required and no assurance can be given that the potential quantities of metal will be produced. Accordingly, no assurances can be given that estimated mineralized material not included in reserves will become proven and probable mineral reserves. This presentation also contains certain financial measures such as unit net cash costs per pound of copper, net debt and adjusted EBITDA (earnings before interest, taxes, depreciation and amortization), which are not recognized under U.S. generally accepted accounting principles. As required by SEC Regulation G, FCX's calculation and reconciliation of unit net cash costs per pound of copper to amounts reported in FCX's consolidated financial statements is in the supplemental schedules of FCX's 4Q20 press release, which is available on FCX's website, "fcx.com”. Net debt equals consolidated debt less consolidated cash. A reconciliation of adjusted EBITDA to amounts reported in FCX’s consolidated financial statements is included on slide 38. 2 -- 2 of 39 -- Click to edit Master title style 2020 Highlights – Strong Execution Freeport Team Demonstrated Strong Resilience in Managing the Uncertain Business Environment ▪ Effective global response to COVID-19 pandemic • Protected health of workforce / supported communities / served customers • Collaboration & engagement increased during COVID ▪ Strong cash flow generation ▪ Meaningful reduction in net debt(1) ▪ Attractive foundation for future growth ▪ Strong execution of operating plans ▪ Solid cost and capital management ▪ Significant milestones achieved • Grasberg Underground reached 68% of annual targeted metal run rate • Lone Star copper leach project complete and ramp-up on track 3 (1) Net debt equals consolidated debt less consolidated cash. See Cautionary Statement. OPERATIONAL FINANCIAL COVID-19 -- 3 of 39 -- Click to edit Master title styleSeasoned & Motivated Team Met the Challenge Excellent performance in a year of challenge - comparison to January 2020 guidance Op. Cash Flow CAPEX $8.8 $6.1 NOTE: January 2020 estimates based on copper and gold sales of 3.5 bn lbs and 0.8 mm ozs and average prices of $2.85/lb copper, $1,500/oz gold and $10/lb molybdenum. 2020 actuals included copper and gold sales of 3.2 bn lbs and 0.86 mm ozs and realized prices of $2.95/lb copper, $1,832/oz gold and $10/lb molybdenum. (1) A reconciliation of 2020 adjusted EBITDA to amounts reported in FCX’s consolidated financial statements is included on slide 38. (2) Net debt equals consolidated debt less consolidated cash. See Cautionary Statement. ($ bns) ($ bns) Unit Net Cash Costs ~15% Lower Adjusted EBITDA ~27% Higher Net Debt(2) ~ $2.7 Bn Lower ($ per lb) $1.75 $1.48 $3.3 $4.2 $2.4 $3.0 $2.8 $2.0 Jan. 2020 Estimate Jan. 2020 Estimate 2020 Actual 2020 Actual Jan. 2020 Estimate 2020 Actual (1) Jan. 2020 Estimate 2020 Actual Operating Cash Flow ~25% Higher CAPEX ~29% Lower ($ bns) ($ bns) 2020 Actual Jan. 2020 Estimate 4 -- 4 of 39 -- Click to edit Master title style 5 ✓ Copper Mark awarded at Cerro Verde, El Abra, Atlantic Copper (first in their respective countries) & Miami ✓ Ranked 2nd in North America in Corporate Human Rights Benchmark Assessment (1st among extractives in North America) ✓ Investments exceeded $100 million in our global communities ✓ Strengthened inclusion & diversity policy; established new dedicated team and enhanced disclosures ✓ Wildlife Habitat Council re-certified PT-FI biodiversity programs at the Gold Tier ✓ Reached more than 100K women in our women’s empowerment programs, including our DreamBuilder Program ✓ Established 2030 climate target and formalized climate strategy in inaugural report ✓ Leadership role in development of the new Global Industry Standard on Tailings Management ✓ Published Water Report ESG Achievements – 2020 Highlights -- 5 of 39 -- Click to edit Master title style 1.80 2.00 2.20 2.40 2.60 2.80 3.00 3.20 3.40 3.60 3.80 - 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 1,600,000 1,800,000 2,000,000 Jan-16 Jul-16 Jan-17 Jul-17 Jan-18 Jul-18 Jan-19 Jul-19 Jan-20 Jul-20 Jan-21 Copper Accelerating Copper Price metric tons $/lb Global Copper Exchange Inventories* Currently Approximate 3.3 Days of Consumption * Includes LME, COMEX and Shanghai exchanges Source: Bloomberg as of 1/25/21 ▪ Favorable fundamentals ▪ Chinese demand exceptionally strong ▪ Stimulus and pandemic recovery to support economic growth ▪ Policy driven decarbonization targets accelerating ▪ Supply is limited • Base supply aging • Limited number of in-progress and planned expansion projects • Significant expansion projects face challenges and lengthy time to execute 27% below 2011 high 6 Market Commentary -- 6 of 39 -- Click to edit Master title style 2020 2025e * International Copper Association ** CRU; January 2021 e=estimate. See Cautionary Statement. 7 Copper – “The” Metal for the Future Copper Expected to Benefit from Acceleration in Decarbonization Initiatives 4-5x more copper vs. fossil fuel power generation* ~0.6 Copper Consumption Associated with EV/ Renewables Expected to More than Double over next 5 Years** ~1.6 EV/Renewable Demand Expected to Approximate Size of US Refined Copper Market in the Next 5 Years (mm metric tons) >70% of the world’s copper is used in applications that deliver electricity* EVs Renewables Renewables US Refined ~1.7 Mt Estimated Copper Consumption in 2025** Global EV/Renewable Demand ~1.6 Mt Up to 4x more copper vs. internal combustion engines* Copper Utilization Key to Global Decarbonization Electrical Vehicles (EV) -- 7 of 39 -- Click to edit Master title style Grasberg Underground Ramp-up Accelerating e = estimate. See Cautionary Statement. Note: Includes production from Grasberg Block Cave, DMLZ, DOZ and Big Gossan Quarterly Production Annualized as % of Targeted Average 2021e -2023e 0% 25% 50% 75% 100% 4Q19 4Q20 4Q21e 2022e 2021e-2023e Annual Average 1.55 bn lbs Cu & 1.6 mm ozs Au 8 -- 8 of 39 -- Click to edit Master title style Indonesian Smelter Update ▪ PT-FI committed in 2018 IUPK to construct new smelter by December 2023 • Development commenced for 1.7 mm metric ton per annum greenfield copper concentrate smelter near Gresik in East Java • Project has been delayed by COVID-19 ▪ Recent discussions to consider an alternative new smelter developed by a third-party ▪ Also advancing discussions for 30% expansion of existing smelter (PT Smelting) Gresik 9 See Cautionary Statement. Various Options Being Evaluated -- 9 of 39 -- Click to edit Master title style 2021 Priorities – “Charging Ahead” Responsibly. Reliably. Relentlessly. Deliver on Environmental, Social and Governance (ESG) commitments Initiate new financial policy to balance debt reduction, investments and shareholder returns Advance evaluations for future organic growth Ongoing cost and capital management; automation and innovation initiatives Continue momentum of underground ramp-up at Grasberg 10 sponsibly. Reliably. Relentlessly. See Cautionary Statement. PURSUING VALUE FOR ALL STAKEHOLDERS -- 10 of 39 -- Click to edit Master title style Expanding Margins & Cash Flow 2022e/2023e AVG >$10 >$11 ($ in billions) Annual EBITDA Estimates (1) (1) Based on January 2021e sales estimates. (2) Based on EBITDA of $4.2 bn in 2020 and assumes ~$8 bn in 2021e at $3.50/lb copper. Note: Consolidated copper sales include 608 mm lbs in 2020 and 732 mm lbs in 2021e for noncontrolling interest; excludes purchased copper. EBITDA equals operating income plus depreciation, depletion and amortization. A reconciliation of 2020 adjusted EBITDA to amounts reported in FCX’s consolidated financial statements is included on slide 38. See Cautionary Statement e = estimate. Assuming $1,850/oz Gold and $9/lb Molybdenum 2020 $4.2 ~$2.95/lb Cu Realized Price $3.50/lb Cu $3.75/lb Cu Gold Revenues ~$3.2 bn per annum at $1,850/oz Gold Each $100/oz change = ~$160 mm ▪ Volume Growth (2021e v. 2020) • Copper ~20% • Gold +50% ▪ Declining unit net cash costs • 2021e expected to decline by ~16% to $1.25/lb ▪ Expanding Margins • EBITDA/Cash Flows to nearly double (2) in 2021e compared to 2020 ▪ Laser Focused on Execution 11 -- 11 of 39 -- Click to edit Master title style Indonesia 29% North America 42% Long-Lived Reserve Base 30+ year implied reserve life for copper, excluding mineralized material Copper (bn lbs) 113 120 Gold (mm ozs) 29 58 Molybdenum (bn lbs) 3.7 3.6 Reserves (1) (recoverable) Mineralized Material (2) (contained) (2) Estimate of consolidated mineralized material (contained copper) using a long-term average copper price of $3.00/lb, gold price of $1,200/oz and molybdenum price of $12/lb. Mineralized material is not included in reserves and will not qualify as reserves until comprehensive engineering studies establish legal and economic feasibility. Accordingly, no assurance can be given that the estimated mineralized material will become proven and probable reserves. (1) Estimate of recoverable proven and probable consolidated reserves using long-term average prices of $2.50/lb for copper, $1,200/oz for gold and $10/lb for molybdenum; FCX’s net equity interest of copper reserves totaled 82 bn lbs as of 12/31/2020. Consolidated As of 12/31/2020 South America 29% Copper Reserves (1) By Region 12 See Cautionary Statement. -- 12 of 39 -- Click to edit Master title style Optionality in Project Pipeline Disciplined approach to new investments ▪ Bagdad Expansion • Current ~80-year reserve life • Reviewing +100K st/d mill expansion with +0.2 bn lbs Cu per year ▪ Lone Star • Oxide project advances opportunity for development of potentially massive sulfide resource (mill project) • Potential 50+ bn lb Cu resource* ▪ Other U.S. brownfield projects ▪ El Abra Mill Project - Chile • 17+ bn lb Cu resource • Reviewing potential 240K mt/d mill project with +0.7 bn lbs Cu per year • Ongoing optimization at Cerro Verde – Peru ▪ CirCular Project – Spain • ESG project (Circular Economy); recycle electronic material ▪ Kucing Liar – Grasberg District • Reserves: 6 bn lbs Cu & 6 mm ozs Au • Leverage existing infrastructure • 90K mt/d block cave; optimize value with focus on lower pyrite areas of deposit • Proceeding with studies, test work & drilling 13 NORTH AMERICA Kucing Liar Grasberg Minerals District Grasberg INDONESIA SOUTH AMERICA Atlantic Copper Lone Star El Abra EUROPE * Potential resources are not included in reserves and will not qualify as reserves until comprehensive engineering studies establish legal and economic feasibility. Accordingly, no assurance can be given that the potential resources will become proven and probable reserves. See Cautionary Statement. -- 13 of 39 -- Click to edit Master title style The Freeport Edge Attractive portfolio difficult to replicate Global Industry Leader Trusted Operator World-Class Developer Responsible Producer Block Cave Leader Long-standing commitment to all of our stakeholders including our employees, communities, host countries, customers and suppliers Industry leading track record for major project execution in complex jurisdictions Industry leading technical capabilities; Decades of block caving experience Strong reputation and franchise in 4 countries; Synergistic operation of all assets One of the world’s largest publicly traded copper producers; Seasoned and value-driven global team; 30+ year reserve life with substantial additional resources 14 -- 14 of 39 -- Click to edit Master title style Financial Review & Outlook -- 15 of 39 -- Click to edit Master title style 4Q 2020 Operations Update Continue to focus on strong execution ▪ Lone Star - Arizona • Production continues to ramp-up on schedule • Remains on track to produce +200 mm lbs of cu during 2021e • Plan to advance studies for potential expansions/long-term development options ▪ Chino - New Mexico • In Jan 2021, restarted mining activities • Reduced rate of ~100 mm lbs (~50% of capacity) ▪ Grasberg Underground • 4Q20 annualized metal sales reached 68% of post ramp-up targets; expected to approach 90% by mid-2021e • 56 new drawbells added; over 370 cum. • DMLZ/Grasberg Block Cave Operating Rates - 4Q Avg: ~85k t/d; 42% above 3Q rates - 4Q Exit Rate: 95k t/d ▪ Cerro Verde - Peru • Mill avg: 373k mt/d (+22k mt/d higher than 3Q20) • 2021e plan assumes 360k mt/d with potential to increase to 400k mt/d as COVID-19 restrictions are lifted ▪ El Abra - Chile • Plans to increase operating rates during 2021e to pre-COVID-19 levels, subject to public health conditions in Chile • Incremental copper production: 70 mm lbs per annum* beginning in 2022e *~50% of increase is expected in 2021e with full rates to be achieved in 2022e 16 e = estimate. See Cautionary Statement. SOUTH AMERICA NORTH AMERICA INDONESIA Cu Sales: 320 mm lbs Cu Sales: 260 mm lbs Cu Sales: 286 mm lbs Au Sales: 293 k ozs -- 16 of 39 -- Click to edit Master title style 2021e Outlook ▪ Copper: 3.8 billion lbs ▪ Gold: 1.3 million ozs ▪ Molybdenum: 85 million lbs Sales Outlook Unit Net Cash Cost of Copper Operating Cash Flows (2) Capital Expenditures ▪ Site prod. & delivery • 2021e: $1.78/lb • 1Q21e: $1.89/lb ▪ After by-product credits (1) • 2021e: $1.25/lb • 1Q21e: $1.37/lb ▪ ~$5.5 billion @ $3.50/lb copper for 2021e ▪ Each 10¢/lb change in copper in 2021e = $380 million ▪ $2.3 billion (3) (1) Assumes average prices of $1,850/oz gold and $9/lb molybdenum in 2021e. (2) Assumes average prices of $1,850/oz gold and $9/lb molybdenum in 2021e; each $100/oz change in gold would have an approximate $120 mm impact and each $2/lb change in molybdenum would have an approximate $80 mm impact. (3) PT Inalum scheduled contributions in 2021e approximate $0.2 bn; excludes capital expenditures for new smelter in Indonesia. e = estimate. See Cautionary Statement. 17 • $1.4 billion for major projects • $0.9 billion for other mining -- 17 of 39 -- Click to edit Master title style Annual Sales Profile January 2021 estimate (1) Consolidated copper sales include 608 mm lbs in 2020, 732 mm lbs in 2021e and 860 mm lbs in 2022e and 1,460 mm lbs in 2023e for noncontrolling interest; excludes purchased copper. (2) Consolidated gold sales include 158k ozs in 2020, 248k ozs in 2021e and 300k ozs in 2022e and 810k ozs in 2023e for noncontrolling interest. e = estimate. See Cautionary Statement. 0 1 2 3 4 5 2020 2021e 2022e 2023e 3.2 3.8 4.3 4.4 0 1 2 2020 2021e 2022e 2023e 0.9 1.3 1.6 1.8 0 25 50 75 100 2020 2021e 2022e 2023e 80 85 80 80 18 (million ozs) (billion lbs)Copper Sales(1) Gold Sales(2) (million lbs)Molybdenum Sales -- 18 of 39 -- Click to edit Master title style 2021e Quarterly Sales 0 250 500 750 1,000 1,250 1Q21e 2Q21e 3Q21e 4Q20e 825 955 1,025 1,015 Note: Consolidated gold sales include approximately 52k ozs in 1Q21e, 58k ozs in 2Q21e, 67k ozs in 3Q21e and 71k ozs in 4Q21e for noncontrolling interests. e = estimate. See Cautionary Statement. Note: Consolidated copper sales include approximately 162 mm lbs in 1Q21e, 175 mm lbs in 2Q21e, 195 mm lbs in 3Q21e and 200 mm lbs in 4Q21e for noncontrolling interests; excludes purchased copper. 0 5 10 15 20 25 1Q21e 2Q21e 3Q21e 4Q21e 20 20 23 22 0 100 200 300 400 1Q21e 2Q21e 3Q21e 4Q21e 275 310 360 380 (millions lbs)Copper Sales (thousand ozs) Gold Sales (million lbs)Molybdenum Sales 19 -- 19 of 39 -- Click to edit Master title style NOTE: EBITDA equals operating income plus depreciation, depletion and amortization. e = estimate. See Cautionary Statement. (1) U.S. Dollar Exchange Rates: 743 Chilean peso, 14,100 Indonesian rupiah, $0.74 Australian dollar, $1.21 Euro, 3.57 Peruvian Nuevo Sol base case assumption. Each +10% equals a 10% strengthening of the U.S. dollar; a strengthening of the U.S. dollar against forecasted expenditures in these foreign currencies equates to a cost benefit of noted amounts. $0 $3 $6 $9 $12 $15 Cu $3.50/lb Cu $3.75/lb Cu $4.00/lb Average ’22e/’23e $0 $2 $4 $6 $8 $10 Cu $3.50/lb Cu $3.75/lb Cu $4.00/lb Average ’22e/’23e ($ in bns except copper, gold and molybdenum prices) Operating cash flow l Excludes working capital changes ($1,850/oz gold, $9/lb molybdenum) EBITDA l ($1,850/oz gold, $9/lb molybdenum) EBITDA and Cash Flow at Various Copper Prices Sensitivities Average ’22e/’23e (US$ in mms) EBITDA Operating Cash Flow Copper +/-$0.10/lb $325 Molybdenum +/-$1.00/lb $ 35 Gold +/-$50/oz $ 55 Currencies (1) +/-10% $135 Diesel +/-10% $ 30 Copper +/-$0.10/lb $425 Molybdenum +/-$1.00/lb $ 45 Gold +/-$50/oz $ 80 Currencies(1) +/-10% $185 Diesel +/-10% $ 45 20 -- 20 of 39 -- Click to edit Master title style 2020 2021e 2022e Consolidated Capital Expenditures Estimates excluding potential Indonesian smelter CAPEX (1) Major Projects (1) See page 9 regarding alternatives under consideration; smelter investments expected to be funded by PT-FI with debt financing. (2) Net of scheduled contributions from PT Inalum for expansion capital spending that will be reflected in financing on the cash flow statement. (3) Major projects include CAPEX associated with Grasberg underground development and supporting mill and power capital costs ($1.0 bn in 2020, $1.3 bn in 2021e, and $0.9 bn in 2022e) and Lone Star ($0.2 bn in 2020). NOTE: Amounts include capitalized interest. e= estimate. See Cautionary Statement. $1.2(3) $2.0 $0.8 Other $1.4(3) $2.3 $0.9 Net of Scheduled Contributions $1.8(2) ($ in bns) $2.1(2) 21 $1.8(2) $2.0 $1.0(3) $1.0 $ -- 21 of 39 -- Click to edit Master title style Strong Financial Position & Liquidity (US$ bns) * Net debt equals consolidated debt less consolidated cash. ** Based on $3.50/lb copper, $1,850/oz gold and $9/lb moly for 2021e. e = estimate. See Cautionary Statement. $7.8 $6.1 12/31/2019 12/31/2020 Consolidated Cash $3.7 Undrawn Credit Facility $3.5 Total Liquidity $7.2 Liquidity Position as of 12/31/20 Net Debt* $ 1.5x 2020 EBITDA < 1.0x 2021e EBITDA** 22 Liquidity -- 22 of 39 -- Click to edit Master title style Financial Policy ▪ Strong financial position and outlook for substantial cash flow generation ▪ Board to review resumption of common stock dividends in 2021 ▪ Priorities include further debt reduction, shareholder returns and disciplined investments in value enhancing organic growth ▪ Considering policy to set a pay out target for use of available cash flow for shareholder returns NOTE: The declaration and payment of future dividends is at the discretion of the Board and will depend on FCX’s financial results, cash requirements, future prospects, global economic conditions and other factors deemed relevant by the Board. See Cautionary Statement. PRIORITIES Organic Growth Balance Sheet Strength Cash Returns to Shareholders 23 -- 23 of 39 -- Click to edit Master title style 24 World’s Premier Publicly Traded Copper Producer Industry Leader with Size, Scale and Durability Copper Supported by Positive Long-Term Fundamentals Strong Track Record and Commitment to Communities / Environmental Responsibility Growing Production and Cash Flow Profile Portfolio of High-Quality Copper / Gold Assets Difficult to Replicate Technically Proficient Proven Capabilities Experienced Management Team -- 24 of 39 -- Click to edit Master title style Reference Slides -- 25 of 39 -- Click to edit Master title style 26 Our COVID-19 Response Providing monetary and in-kind contributions of medical supplies & food in areas where we operate Active & preventive management, through the implementation of global health guidelines, including testing, screening and tracking As a leading supplier of copper to the global economy, FCX continues to meet the needs of its customers WE ARE IN THIS TOGETHER Serving Our Customers Supporting Our Communities Prioritizing the Health & Well-Being of Our Workforce -- 26 of 39 -- Click to edit Master title style ▪ Focused on advancing responsibility in our value chains by: 1) managing risks in our own supply chain; 2) managing risks of our products and by-products in use; and 3) understanding life cycle impacts of our products along the value chain ▪ Recently published a Responsible Sourcing of Minerals Policy and inaugural OECD* Step 5 Due Diligence Report ▪ FCX is committed to achieving the Copper Mark • 4 sites awarded to date; application in process for 2 additional sites Responsible Value Chains Dedicated to delivering responsibly produced copper to markets around the world The Copper Mark is a new assurance framework developed to demonstrate the copper industry’s responsible production practices 27 The Copper Life Cycle * The Organisation for Economic Co-operation and Development (OECD) -- 27 of 39 -- Click to edit Master title style 28 Financial Highlights Copper Consolidated Volumes (mm lbs) 866 3,202 Average Realization (per lb) $3.40 $2.95 Site Production & Delivery Costs (per lb) $1.78 $1.88 Unit Net Cash Costs (per lb) $1.28 $1.48 Gold Consolidated Volumes (000’s ozs) 293 855 Average Realization (per oz) $1,870 $1,832 Molybdenum Consolidated Volumes (mm lbs) 21 80 Average Realization (per lb) $9.96 $10.20 4Q20 (1) Excludes charges totaling $0.06/lb of copper associated with the COVID-19 pandemic and our April 2020 revised operating plans. (2) Includes working capital sources of $0.3 bn for 4Q20 and less than $0.7 bn for 2020 Revenues $4.5 $14.2 Net Income Attributable to Common Stock $0.7 $0.6 Diluted Net Income Per Share $0.48 $0.41 Operating Cash Flows $1.3 $3.0 Capital Expenditures $0.4 $2.0 Total Debt $9.7 $9.7 Consolidated Cash $3.7 $3.7 (2) (in billions, except per share amounts) Sales Data Financial Results 2020 (1) -- 28 of 39 -- Click to edit Master title style 29 4Q20 Mining Operating Summary (1) Includes 5 mm lbs in 4Q20 and 8 mm lbs in 4Q19 from South America. (2) Silver sales totaled 0.9 mm ozs in 4Q20 and 1.3 mm ozs in 4Q19. (3) Silver sales totaled 1.3 mm ozs in 4Q20 and 0.8 mm ozs in 4Q19. NOTE: For a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in FCX’s consolidated financial statements, refer to “Product Revenues and Production Costs” in the supplemental schedules of FCX’s 4Q20 press release, which is available on FCX’s website. Cash Unit Costs Site Production & Delivery $1.85 $1.93 $1.57 $1.78 By-product Credits (0.18) (0.22) (2.05) (0.80) Treatment Charges 0.09 0.16 0.27 0.17 Royalties & Export Duties - 0.01 0.39 0.13 Unit Net Cash Costs $1.76 $1.88 $0.18 $1.28 North South America America Indonesia Consolidated (per lb of Cu) 4Q20 Unit Production Costs North America 22 21 (1) (1) Mo mm lbs 4Q20 4Q19 358 320 4Q20 4Q19 Cu mm lbs Indonesia (3) 203 286 4Q20 4Q19 314 293 4Q20 4Q19 South America (2) 4Q20 4Q19 260 345 by Region Au 000 ozs Sales From Mines for 4Q20 & 4Q19 -- 29 of 39 -- Click to edit Master title style 1,035 2020 and 2021e Sales by Region (1) Includes molybdenum produced in South America. (2) Includes gold produced in North America. 85 (1) Mo mm lbs 1,465 Cu mm lbs Note: e = estimate. See Cautionary Statement. 1,320 1.3 (2) Au mm ozs 80 (1) Mo mm lbs 1,422 Cu mm lbs 804 0.86 (2) Au mm ozs 976 North America Indonesia South America by Region 2020 Sales North America Indonesia South America by Region 2021e Sales 30 -- 30 of 39 -- Click to edit Master title style North South America America Indonesia Consolidated 2020 and 2021e Unit Production Costs by Region (1) Production costs include profit sharing in South America and severance taxes in North America (2) Excludes charges totaling $0.06/lb of copper associated with the COVID-19 pandemic and our April 2020 revised operating plans. (3) Estimates assume average prices of $3.50/lb for copper, $1,850/oz for gold and $9/lb for molybdenum for 2021e. Quarterly unit costs will vary significantly with quarterly metal sales volumes. (per lb of Cu) North South America America Indonesia Consolidated Cash Unit Costs Site Production & Delivery (1) $1.90 $1.86 $1.88 $1.88 By-product Credits (0.19) (0.17) (2.03) (0.64) Treatment Charges 0.10 0.15 0.27 0.16 Royalties & Export Duties - 0.01 0.31 0.08 Unit Net Cash Costs $1.81 $1.85 $0.43 $1.48 2020 Unit Production Costs e = estimate. See Cautionary Statement. (per lb of Cu) Cash Unit Costs (3) Site Production & Delivery (1) $2.01 $1.96 $1.40 $1.78 By-product Credits (0.25) (0.19) (1.93) (0.81) Treatment Charges 0.10 0.14 0.24 0.16 Royalties & Export Duties - 0.01 0.35 0.12 Unit Net Cash Costs $1.86 $1.92 $0.06 $1.25 2021e Unit Production Costs 31 (2) NOTE: For a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in FCX’s consolidated financial statements, refer to “Product Revenues and Production Costs” in the supplemental schedules of FCX’s 4Q20 press release, which is available on FCX’s website. -- 31 of 39 -- Click to edit Master title style 32 Plan View PB1S N PB2N 100 meters PB1N 1 2 Plan View N 100 meters PB2N PB1S PB1N PB3 Current Cave 1 2 3 PB2S Grasberg - World Class Block Cave Design 9 31 67 98 127 129 130 Ramp-up Schedule (000’s t/d of Ore) 10 29 59 74 72 77 80 5 Production Blocks, 3 Currently Active 3 Production Blocks, 2 Currently Active ▪ Continuation of Ore Mined in Open Pit (300 meters below) ▪ 874 mm t @ 1.08% Copper & 0.73 g/t Gold ▪ YE 2020 Reserves: 17 bn lbs Copper; 13 mm ozs Gold ▪ By 2023: 335,000 Sq Meter Footprint (over 80 acres) ▪ Life of Mine: 725,000 Sq Meter Footprint (180 acres) ▪ Fully Autonomous Underground Rail System ▪ Annual Production @ Avg. Reserve Grade(1) • 950 mm lbs Copper & 700,000 ozs Gold ▪ Located Below DOZ Underground Block Cave Mine ▪ 1,500 meters below surface ▪ 439 mm t @ 0.89% Copper & 0.72 g/t Gold ▪ YE 2020 Reserves: 7 bn lbs Copper; 8 mm ozs Gold ▪ By 2022: 200,000 Sq Meter Footprint (~ 50 acres) ▪ Life of Mine: 450,000 Sq Meter Footprint (110 acres) ▪ Annual Production @ Avg. Reserve Grade(1) • 500 mm lbs Copper & 540,000 ozs Gold Grasberg Block Cave DMLZ 2019 2020 2021e 2022e 2023e 2024e 2025e Ramp-up Schedule (2) (000’s t/d of Ore) (1) Access to higher ore grades expected in early years of production. (2) DMLZ ramp-up adjustments in April 2020 plan reflect one year deferral in SAG mill installation. e = estimate. See Cautionary Statement. Substantial Infrastructure in Place to Support Large-Scale Production 3 Cave Fronts 2 Cave Fronts 2019 2020 2021e 2022e 2023e 2024e 2025e -- 32 of 39 -- Click to edit Master title style Project Update Grasberg Transition Remains on Track Deep MLZ (DMLZ) & Grasberg Block Cave (GBC) averaged 84,900 t/d in 4Q20: 42% above 3Q20 rates and 2% above October 2020 forecast e = estimate. See Cautionary Statement. 4 10 12 12 15 15 15 0 10 20 30 40 1Q 4Q 1Q 2Q 4Q 1Qe Qtr Avg 2 2 3 3 DMLZ 10 24 37 34 34 25 0 10 20 30 40 1Q 4Q 1Q 2Q 4Q 1Qe Qtr Avg GBC 90 143 201 266 0 100 200 300 400 2019 2020 2021e 2022e * Includes planned 20-day outage for modification of ore flow system. * Active Production Blocks 76 229 330 0 100 200 300 400 2019 2020 2021e 2022e 3 3 4 5 GBC DMLZ * DMLZ GBC 2021e Exit Rate: 80 2021e Exit Rate: 72 Forecast Drawbelling Open drawbells provide scale – cumulative blasted Ore Extraction (000 t/d) 7 15 28 39 47 0 20 40 60 1Q19 4Q19 2Q20 4Q20 1Q21e 5 11 27 46 0 20 40 60 1Q19 4Q19 2Q20 4Q20 1Q21e 2021e 2020 2019 2021e 2020 2019 402 41 56 33 -- 33 of 39 -- Click to edit Master title stylePT-FI Underground Metal Ramp-up Production Rates 1Q20 2Q20 3Q20 4Q20 140 181 222 266 (thousand ozs) (million lbs)Copper Gold 1Q20 2Q20 3Q20 4Q20 152 189 236 271 Achieved ~68% of Annualized Metal Target of 1.55 bn lbs of Copper and 1.6 mm ozs of Gold per Annum in 4Q 2020 34 -- 34 of 39 -- Click to edit Master title style 35 PT-FI Mine Plan Metal Sales, 2020 – 2025e Note: Amounts are projections. Timing of annual sales will depend on a number of factors, including mine sequencing, operational performance, timing of shipments, export quotas, and other factors. See Cautionary Statement. e = estimate FCX's economic interest in PT-FI approximates 81.27% through 2022 and 48.76% thereafter. 0.8 1.32 1.6 1.7 1.6 1.5 0.84 1.3 1.6 1.8 1.7 1.6 2020 2021e 2022e 2023e 2024e 2025e Transition Year Cu bn lbs Au mm ozs Total: 7.7 billion lbs copper Annual Average: 1.54 billion lbs 2021e – 2025eCopper Total: 8.0 million ozs gold Annual Average: 1.6 million ozs 2021e – 2025eGold -- 35 of 39 -- Click to edit Master title style $0 $2 $4 $6 $8 2021 2022 2023 2024 2025 2026 Thereafter FCX Debt Maturities as of 12/31/20 (US$ bns) $6.9 5.00%, 4.125%, 4.375%, 5.25%, 4.25%, 4.625%, 5.40% & 5.45% Sr. Notes and FMC Sr. Notes $1.0 $1.0 3.875% Sr. Notes 3.55% Sr. Notes $0.8 4.55% Sr. Notes CV Non-recourse FCX Revolver $ - Senior Notes 9.1 Cerro Verde Credit Facility 0.5 Other 0.1 Total Debt $ 9.7 Consolidated Cash $ 3.7 Undrawn Credit Facility 3.5 Total Liquidity $ 7.2 $ - at 12/31/20 Total Debt & Cash (1) For purposes of this schedule, maturities of uncommitted lines of credit and other short term lines are included in FCX’s revolver balance, which matures in 2024. (1) (1) $ - $ - 36 -- 36 of 39 -- Click to edit Master title style 37 4Q20 Copper Realization & 1Q21e Guidance $3.25/lb 4Q20 LME Average Copper Price 3-Mo. Fwd Price for Copper at the End of December FCX 4Q20 Consolidated Copper Price Realization FCX 4Q20 Prior Period Open Lb Adj. (aka Provisional Price Adj.) $3.52/lb $3.40/lb(1) (Generally, 50/50 weight of qtrly avg and 3-mo forward price at end of period) Revenue/EBITDA: $113 mm Net income: $41 mm Earnings/share: $0.03 (1) Note that when quarter end forward pricing is above the average quarterly spot price, FCX’s consolidated quarterly copper realization can be expected to be above the quarterly average spot pricing. Conversely, the quarterly copper realization would be below the quarterly spot price average if quarter end forward curve pricing is below the quarterly average spot price. Quarterly copper realizations by region may vary from the consolidated average. e = estimate. See Cautionary Statement. ▪ Open lbs priced at $3.52/lb on 12/31/20 ▪ Each $0.05 change in avg copper price in 1Q21 = $10 mm impact to 2021e net income ▪ LME copper settled at $3.62/lb on 1/25/21 1Q21e Open Pound Guidance -- 37 of 39 -- Click to edit Master title style 38 Adjusted EBITDA Reconciliation (1) Other net charges primarily include a talc-related litigation accrual, partly offset by net favorable adjustments to environmental obligations ($91 mm for 4Q20 and $113 mm for YE 2020) and costs directly associated with the COVID-19 pandemic and revised operating plans, including employee separation costs ($226 mm for YE 2020). For further discussion of net charges, refer to "Adjusted Net Income" beginning on page VII in the supplemental schedules of FCX’s 4Q20 press release, which is available on FCX’s website. (2) Adjusted EBITDA is a non-GAAP financial measure that is frequently used by securities analysts, investors, lenders and others to evaluate companies’ performance, including, among other things, profitability before the effect of financing and similar decisions. Because securities analysts, investors, lenders and others use Adjusted EBITDA, management believes that our presentation of Adjusted EBITDA affords them greater transparency in assessing our financial performance. Adjusted EBITDA should not be considered as a substitute for measures of financial performance prepared in accordance with GAAP. Adjusted EBITDA may not necessarily be comparable to similarly titled measures reported by other companies, as different companies calculate such measures differently. ($ in mm) 4Q20 YE 2020 Net income attributable to common stock $708 $599 Interest expense, net 236 598 Income tax provision 611 944 Depreciation, depletion and amortization 435 1,528 Metals inventory adjustments 4 96 Net gain on sales of assets (486) (473) Accretion and stock-based compensation 62 192 Other net charges (1) 132 395 Loss on early extinguishment of debt 1 101 Other expense (income), net 3 (59) Net income attributable to noncontrolling interests 150 266 Equity in affiliated companies’ net earnings - (12) FCX Adjusted EBITDA (2) $1,856 $4,175 -- 38 of 39 -- Click to edit Master title style -- 39 of 39 --