Operating Statistics (1)(2) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Gold ounces produced (thousands): CC&V 35 41 63 89 Musselwhite 54 41 103 82 Porcupine 91 60 152 126 Éléonore 61 48 117 114 Red Chris (3)(4) 9 — 15 — Brucejack (3) 60 — 97 — Peñasquito 64 38 109 123 Merian 61 54 137 136 Cerro Negro 19 48 100 115 Yanacocha 78 65 169 121 Boddington 147 209 289 408 Tanami 99 126 189 189 Cadia (3) 117 — 239 — Telfer (3) 14 — 45 — Lihir (3) 141 — 322 — Ahafo 184 137 374 265 Akyem 47 49 116 120 Nevada Gold Mines (5) 253 287 517 548 Total Consolidated Newmont 1,534 1,203 3,153 2,436 Merian (25%) (15) (14) (34) (34) Pueblo Viejo (6) 53 51 107 111 Fruta Del Norte (3)(7) 35 — 56 — Total Attributable Newmont 1,607 1,240 3,282 2,513 Other metals produced: Red Chris copper tonnes (thousands) (3)(4) 6 — 11 — Boddington copper tonnes (thousands) 10 12 19 24 Cadia copper tonnes (thousands) (3) 22 — 43 — Telfer copper tonnes (thousands) (3) — — 1 — Total copper tonnes (thousands) 38 12 74 24 Peñasquito silver ounces (millions) 8 6 17 14 Peñasquito lead tonnes (thousands) 20 20 48 39 Peñasquito zinc tonnes (thousands) 65 35 123 82 (1) Gold equivalent ounces (GEOs) are calculated as pounds or ounces produced or sold multiplied by the ratio of the other metals’ price to the gold price using Gold ($1,400/oz.), Copper ($3.50/lb.), Silver ($20.00/oz.), Lead ($1.00/lb.) and Zinc ($1.20/lb.) pricing for 2024 and 2023. (2) Per unit measures may not recalculate due to rounding. (3) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (4) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (5) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method. (6) Newmont has a 40% interest in Pueblo Viejo, which is accounted for as an equity method investment. (7) Newmont has a 32.0% interest in Lundin Gold, who wholly owns and operates the Fruta del Norte mine, which is accounted for as an equity method investment on a quarter lag. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 1 -- 1 of 30 -- Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Gold ounces sold (thousands): CC&V 33 41 62 89 Musselwhite 56 41 105 85 Porcupine 87 63 148 128 Éléonore 63 51 119 119 Red Chris (1)(2) 9 — 16 — Brucejack (1) 46 — 80 — Peñasquito 64 48 108 104 Merian 61 53 135 136 Cerro Negro 27 50 101 111 Yanacocha 78 66 168 119 Boddington 136 204 278 402 Tanami 99 124 190 189 Cadia (1) 123 — 237 — Telfer (1) 33 — 59 — Lihir (1) 148 — 330 — Ahafo 180 133 364 264 Akyem 48 49 123 127 Nevada Gold Mines (3) 252 288 519 546 Total Consolidated Newmont 1,543 1,211 3,142 2,419 Merian (25%) (15) (14) (33) (34) Total Attributable Newmont 1,528 1,197 3,109 2,385 Other metals sold: Red Chris copper tonnes (thousands) (1)(2) 6 — 12 — Boddington copper tonnes (thousands) 9 11 18 23 Cadia copper tonnes (thousands) (1) 23 — 43 — Telfer copper tonnes (thousands) (1) 1 — 2 — Total copper tonnes (thousands) 39 11 75 23 Peñasquito silver ounces (millions) 8 6 18 12 Peñasquito lead tonnes (thousands) 20 16 49 33 Peñasquito zinc tonnes (thousands) 52 41 113 86 (1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 2 -- 2 of 30 -- CAS (1)(2) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Gold Costs Applicable to Sales ($/ounce) CC&V $ 1,361 $ 1,186 $ 1,376 $ 1,120 Musselwhite $ 993 $ 1,356 $ 1,077 $ 1,333 Porcupine $ 1,068 $ 1,225 $ 1,058 $ 1,146 Éléonore $ 1,404 $ 1,477 $ 1,422 $ 1,256 Red Chris (3) $ 951 $ — $ 945 $ — Brucejack (3) $ 1,390 $ — $ 1,723 $ — Peñasquito $ 827 $ 831 $ 838 $ 1,028 Merian $ 1,546 $ 1,501 $ 1,368 $ 1,212 Cerro Negro $ 2,506 $ 1,655 $ 1,310 $ 1,376 Yanacocha $ 1,000 $ 1,187 $ 985 $ 1,134 Boddington $ 1,022 $ 777 $ 1,019 $ 809 Tanami $ 1,018 $ 829 $ 962 $ 866 Cadia (3) $ 624 $ — $ 636 $ — Telfer (3)(4) $ 2,548 $ — $ 2,585 $ — Lihir (3) $ 1,101 $ — $ 1,010 $ — Ahafo $ 976 $ 910 $ 920 $ 951 Akyem $ 1,716 $ 1,087 $ 1,280 $ 917 Nevada Gold Mines $ 1,220 $ 1,055 $ 1,198 $ 1,081 Total Newmont - Gold $ 1,152 $ 1,054 $ 1,103 $ 1,040 Co-product GEO Costs Applicable to Sales ($/GEO) Red Chris (3) $ 915 $ — $ 959 $ — Peñasquito $ 904 $ 1,162 $ 870 $ 1,055 Boddington $ 1,031 $ 766 $ 985 $ 788 Cadia (3) $ 552 $ — $ 572 $ — Telfer (3)(4) $ 1,940 $ — $ 2,387 $ — Total Newmont - Co-product GEO $ 836 $ 1,062 $ 832 $ 988 Co-product by metal Costs Applicable to Sales ($/unit) Red Chris - copper ($/tonne) (3) $ 5,043 $ — $ 5,287 $ — Boddington - copper ($/tonne) $ 5,680 $ 4,220 $ 5,427 $ 4,343 Cadia - copper ($/tonne) (3) $ 3,044 $ — $ 3,153 $ — Telfer - copper ($/tonne) (3)(4) $ 10,692 $ — $ 13,158 $ — Total Copper CAS ($/tonne) $ 4,184 $ 4,220 $ 4,314 $ 4,343 Peñasquito - silver ($/oz) $ 12 $ 16 $ 12 $ 15 Peñasquito - lead ($/tonne) $ 1,355 $ 2,047 $ 1,271 $ 1,682 Peñasquito - zinc ($/tonne) $ 1,867 $ 2,215 $ 1,811 $ 2,050 (1) Costs applicable to sales (CAS) per unit, included at the consolidated and site level, are non-GAAP metrics and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov. (2) Consolidated CAS excludes Depreciation and amortization and Reclamation and remediation. (3) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (4) During the second quarter, milling operations at Telfer were temporarily ceased beginning on April 14, 2024, as remediation work on the tailings storage facility is progressed. Per unit metrics were impacted as a result of lower sales volumes. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 3 -- 3 of 30 -- AISC (1) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Gold All-In Sustaining Costs ($/ounce) CC&V $ 1,700 $ 1,631 $ 1,716 $ 1,494 Musselwhite $ 1,397 $ 2,254 $ 1,568 $ 1,955 Porcupine $ 1,366 $ 1,587 $ 1,408 $ 1,498 Éléonore $ 1,900 $ 2,213 $ 1,910 $ 1,756 Red Chris (2) $ 1,613 $ — $ 1,453 $ — Brucejack (2) $ 1,929 $ — $ 2,206 $ — Peñasquito $ 1,038 $ 1,078 $ 1,055 $ 1,325 Merian $ 2,170 $ 2,010 $ 1,820 $ 1,537 Cerro Negro $ 3,010 $ 1,924 $ 1,635 $ 1,625 Yanacocha $ 1,217 $ 1,386 $ 1,166 $ 1,362 Boddington $ 1,237 $ 966 $ 1,240 $ 1,000 Tanami $ 1,276 $ 1,162 $ 1,215 $ 1,182 Cadia (2) $ 1,064 $ — $ 1,028 $ — Telfer (2)(3) $ 3,053 $ — $ 3,037 $ — Lihir (2) $ 1,212 $ — $ 1,236 $ — Ahafo $ 1,123 $ 1,237 $ 1,066 $ 1,301 Akyem $ 1,952 $ 1,461 $ 1,523 $ 1,220 Nevada Gold Mines $ 1,689 $ 1,388 $ 1,631 $ 1,396 Total Newmont $ 1,562 $ 1,472 $ 1,500 $ 1,424 Co-product GEO All-In Sustaining Costs ($/GEO) Red Chris (2) $ 1,560 $ — $ 1,486 $ — Peñasquito $ 1,164 $ 1,581 $ 1,130 $ 1,463 Boddington $ 1,254 $ 977 $ 1,165 $ 998 Cadia (2) $ 1,024 $ — $ 1,025 $ — Telfer (2)(3) $ 2,742 $ — $ 3,218 $ — Total Newmont $ 1,207 $ 1,492 $ 1,176 $ 1,405 Co-product by metal All-In Sustaining Costs ($/unit) Red Chris - copper ($/tonne) (2) $ 8,599 $ — $ 8,192 $ — Boddington - copper ($/tonne) $ 6,914 $ 5,385 $ 6,419 $ 5,503 Cadia - copper ($/tonne) (2) $ 5,644 $ — $ 5,651 $ — Telfer - copper ($/tonne) (2)(3) $ 15,112 $ — $ 17,739 $ — Total Copper AISC ($/tonne) $ 6,675 $ 5,687 $ 6,537 $ 5,806 Peñasquito - silver ($/oz) $ 15 $ 21 $ 15 $ 20 Peñasquito - lead ($/tonne) $ 1,601 $ 2,598 $ 1,540 $ 2,144 Peñasquito - zinc ($/tonne) $ 2,498 $ 3,177 $ 2,427 $ 3,009 (1) All-in sustaining costs (AISC) per unit, included at the consolidated and site level, is a non-GAAP metric and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov. (2) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (3) During the second quarter, milling operations at Telfer were temporarily ceased beginning on April 14, 2024, as remediation work on the tailings storage facility is progressed. Per unit metrics were impacted as a result of lower sales volumes. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 4 -- 4 of 30 -- CAPITAL EXPENDITURES Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Consolidated Capital Expenditures ($ millions) CC&V $ 8 $ 13 $ 13 $ 23 Musselwhite 21 31 47 45 Porcupine 55 36 95 58 Éléonore 29 31 50 45 Red Chris (1)(2) 49 — 84 — Brucejack (1) 19 — 35 — Peñasquito 26 37 58 72 Merian 32 21 50 35 Cerro Negro 31 39 77 74 Yanacocha 9 65 33 128 Boddington 29 37 57 74 Tanami 105 115 190 189 Cadia (1) 134 — 245 — Telfer (1) 14 — 24 — Lihir (1) 40 — 95 — Ahafo 81 77 171 167 Akyem 7 12 16 22 Nevada Gold Mines (3) 126 123 244 207 Corporate and other 4 21 8 27 Accrual basis $ 819 $ 658 $ 1,592 $ 1,166 Decrease (increase) in non-cash adjustments (19) (42) 58 (24) Cash basis $ 800 $ 616 $ 1,650 $ 1,142 (1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 5 -- 5 of 30 -- CC&V Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 5,718 7,387 11,106 13,177 Open pit waste 3,314 2,038 6,737 5,538 Total open pit 9,032 9,425 17,843 18,715 Tons milled/processed (000 tonnes): Leach 5,678 7,240 10,964 12,995 Average ore grade (g/tonne): Leach 0.435 0.433 0.447 0.426 Gold produced (koz): Consolidated/Attributable 35 41 63 89 Gold sold (koz): Consolidated/Attributable 33 41 62 89 Gold production costs ($M): Costs applicable to sales (1) $ 45 $ 49 $ 85 $ 100 Depreciation and amortization $ 4 $ 6 $ 7 $ 13 Reclamation accretion $ 3 $ 2 $ 5 $ 5 Gold production costs (per oz sold): Direct mining and production costs $ 1,711 $ 1,427 $ 1,790 $ 1,294 By-product credits (32) (8) (21) (10) Royalties and production taxes 149 106 143 96 Inventory change, write-downs, and other (467) (339) (536) (260) Costs applicable to sales (per oz sold) (1) $ 1,361 $ 1,186 $ 1,376 $ 1,120 Depreciation and amortization $ 97 $ 146 $ 107 $ 150 Reclamation accretion $ 82 $ 60 $ 88 $ 56 All-in sustaining costs (per oz sold) $ 1,700 $ 1,631 $ 1,716 $ 1,494 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 6 -- 6 of 30 -- MUSSELWHITE Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 264 261 519 514 Tons milled/processed (000 tonnes): Mill 264 260 519 514 Average ore grade (g/tonne): Mill 6.607 5.017 6.372 5.175 Average mill recovery rate 96.4 % 95.6 % 96.1 % 95.6 % Gold produced (koz): Consolidated/Attributable 54 41 103 82 Gold sold (koz): Consolidated/Attributable 56 41 105 85 Gold production costs ($M): Costs applicable to sales (1) $ 56 $ 55 $ 113 $ 113 Depreciation and amortization $ — $ 18 $ 18 $ 37 Reclamation accretion $ 1 $ 1 $ 2 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 903 $ 1,258 $ 991 $ 1,269 By-product credits (3) (3) (3) (3) Royalties and production taxes 60 76 52 59 Inventory change, write-downs, and other 33 24 37 9 Costs applicable to sales (per oz sold) (1) $ 993 $ 1,356 $ 1,077 $ 1,333 Depreciation and amortization $ 10 $ 448 $ 176 $ 438 Reclamation accretion $ 15 $ 19 $ 16 $ 19 All-in sustaining costs (per oz sold) $ 1,397 $ 2,254 $ 1,568 $ 1,955 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 7 -- 7 of 30 -- PORCUPINE Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 236 775 479 1,635 Open pit waste 339 1,251 663 2,711 Total open pit 575 2,026 1,142 4,346 Total underground ore (000 tonnes) 227 199 448 420 Tons milled/processed (000 tonnes): Mill 764 719 1,462 1,383 Average ore grade milled (g/tonne): Mill 4.006 2.734 3.489 2.996 Average mill recovery rate 94.5 % 92.4 % 93.3 % 92.1 % Gold produced (koz): Consolidated/Attributable 91 60 152 126 Gold sold (koz): Consolidated/Attributable 87 63 148 128 Gold production costs ($M): Costs applicable to sales (1) $ 94 $ 77 $ 157 $ 147 Depreciation and amortization $ 9 $ 27 $ 32 $ 56 Reclamation accretion $ 2 $ 2 $ 5 $ 4 Gold production costs (per oz sold): Direct mining and production costs $ 860 $ 1,331 $ 998 $ 1,256 By-product credits (4) (5) (4) (5) Royalties and production taxes 22 25 31 24 Inventory change, write-downs, and other 190 (126) 33 (129) Costs applicable to sales (per oz sold) (1) $ 1,068 $ 1,225 $ 1,058 $ 1,146 Depreciation and amortization $ 107 $ 415 $ 217 $ 435 Reclamation accretion $ 26 $ 33 $ 31 $ 33 All-in sustaining costs (per oz sold) $ 1,366 $ 1,587 $ 1,408 $ 1,498 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 8 -- 8 of 30 -- ÉLÉONORE Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 461 348 922 799 Tons milled/processed (000 tonnes): Mill 462 342 922 792 Average ore grade (g/tonne): Mill 4.477 4.642 4.382 4.879 Average mill recovery rate 91.0 % 91.1 % 91.0 % 90.9 % Gold produced (koz): Consolidated/Attributable 61 48 117 114 Gold sold (koz): Consolidated/Attributable 63 51 119 119 Gold production costs ($M): Costs applicable to sales (1) $ 89 $ 74 $ 169 $ 149 Depreciation and amortization $ 2 $ 24 $ 21 $ 51 Reclamation accretion $ 1 $ 1 $ 2 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 1,285 $ 1,414 $ 1,375 $ 1,203 By-product credits (2) (2) (2) (2) Royalties and production taxes 53 47 51 45 Inventory change, write-downs, and other 68 18 (2) 10 Costs applicable to sales (per oz sold) (1) $ 1,404 $ 1,477 $ 1,422 $ 1,256 Depreciation and amortization $ 31 $ 475 $ 180 $ 427 Reclamation accretion $ 15 $ 15 $ 16 $ 13 All-in sustaining costs (per oz sold) $ 1,900 $ 2,213 $ 1,910 $ 1,756 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 9 -- 9 of 30 -- RED CHRIS - GOLD (1)(2) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 2,440 — 5,048 — Open pit waste 2,288 — 5,265 — Total open pit 4,728 — 10,313 — Tonnes milled/processed (000 tonnes): Mill 1,743 — 3,213 — Average ore grade (g/tonne): Mill 0.302 — 0.284 — Average mill recovery rate 51.8 % — % 52.6 % — % Gold produced (koz): Consolidated/Attributable 9 — 15 — Gold sold (koz): Consolidated/Attributable 9 — 16 — Gold production costs ($M): Costs applicable to sales (3) $ 7 $ — $ 14 $ — Depreciation and amortization $ 2 $ — $ 4 $ — Reclamation accretion $ — $ — $ — $ — Gold production costs (per oz sold): Direct mining and production costs $ 1,263 $ — $ 1,341 $ — By-product credits (8) — (6) — Royalties and production taxes 39 — 34 — Inventory change, write-downs, and other (343) — (424) — Costs applicable to sales (per oz sold) (3) $ 951 $ — $ 945 $ — Depreciation and amortization $ 299 $ — $ 273 $ — Reclamation accretion $ 12 $ — $ 12 $ — All-in sustaining costs (per oz sold) $ 1,613 $ — $ 1,453 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 10 -- 10 of 30 -- RED CHRIS - COPPER (1)(2) Three Months Ended March 31, Three Months Ended March 31, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 2,440 — 5,048 — Open pit waste 2,288 — 5,265 — Total open pit 4,728 — 10,313 — Tonnes milled/processed (000 tonnes): Mill 1,743 — 3,213 — Average ore grade: Mill 0.47 % — % 0.45 % — % Average mill recovery rate 81.1 % — % 82.1 % — % Copper produced (ktonne): Consolidated/Attributable 6 — 11 — Copper sold (ktonne): Consolidated/Attributable 6 — 12 — Co-product GEO produced (k): Consolidated/Attributable 35 — 63 — Co-product GEO sold (k): Consolidated/Attributable 36 — 67 — Co-product production costs ($M): Costs applicable to sales (3) $ 33 $ — $ 64 $ — Depreciation and amortization $ 11 $ — $ 19 $ — Reclamation accretion $ — $ — $ 1 $ — Copper production costs (per tonne sold): Direct mining and production costs $ 6,701 — $ 7,516 $ — By-product credits (42) — (33) — Royalties and production taxes 205 — 187 — Inventory change, write-downs, and other (1,821) — (2,383) — Costs applicable to sales (per tonne sold) (3) $ 5,043 — $ 5,287 $ — Depreciation and amortization $ 1,586 — $ 1,520 $ — Reclamation accretion $ 63 — $ 68 $ — All-in sustaining costs (per tonne sold) $ 8,599 $ — $ 8,192 $ — Copper production costs (per GEO sold): Direct mining and production costs $ 1,216 $ — $ 1,363 $ — By-product credits (8) — (6) — Royalties and production taxes 37 — 34 — Inventory change, write-downs, and other (330) — (432) — Costs applicable to sales (per GEO sold) (3) $ 915 $ — $ 959 $ — Depreciation and amortization $ 288 $ — $ 276 $ — Reclamation accretion $ 11 $ — $ 12 $ — All-in sustaining costs (per GEO sold) $ 1,560 $ — $ 1,486 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 11 -- 11 of 30 -- BRUCEJACK (1) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 274 — 505 — Tonnes milled/processed (000 tonnes): Mill 274 — 495 — Average ore grade (g/tonne): Mill 7.329 — 6.518 — Average mill recovery rate 96.5 % — % 96.3 % — % Gold produced (koz): Consolidated/Attributable 60 — 97 — Gold sold (koz): Consolidated/Attributable 46 — 80 — Gold production costs ($M): Costs applicable to sales (2) $ 64 $ — $ 138 $ — Depreciation and amortization $ 36 $ — $ 71 $ — Reclamation accretion $ 1 $ — $ 1 $ — Gold production costs (per oz sold): Direct mining and production costs $ 1,814 $ — $ 2,014 $ — By-product credits (34) — (31) — Royalties and production taxes 26 — 28 — Inventory change, write-downs, and other (416) — (288) — Costs applicable to sales (per oz sold) (2) $ 1,390 $ — $ 1,723 $ — Depreciation and amortization $ 773 $ — $ 889 $ — Reclamation accretion $ 11 $ — $ 13 $ — All-in sustaining costs (per oz sold) $ 1,929 $ — $ 2,206 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 12 -- 12 of 30 -- PEÑASQUITO - GOLD Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 9,107 3,899 19,802 13,825 Open pit waste 26,907 24,612 53,786 58,470 Total open pit 36,014 28,511 73,588 72,295 Tons milled/processed (000 tonnes): Mill 8,598 6,523 16,480 15,806 Average ore grade (g/tonne): Mill 0.474 0.376 0.431 0.450 Average mill recovery rate 56.5 % 54.5 % 55.2 % 59.8 % Gold produced (koz): Consolidated/Attributable 64 38 109 123 Gold sold (koz): Consolidated/Attributable 64 48 108 104 Gold production costs ($M): Costs applicable to sales (1) $ 53 $ 40 $ 91 $ 107 Depreciation and amortization $ 22 $ 15 $ 37 $ 35 Reclamation accretion $ 1 $ 1 $ 2 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 801 $ 776 $ 815 $ 1,130 By-product credits (7) (4) (8) (6) Royalties and production taxes 39 24 36 34 Inventory change, write-downs, and other (6) 35 (5) (130) Costs applicable to sales (per oz sold) (1) $ 827 $ 831 $ 838 $ 1,028 Depreciation and amortization $ 354 $ 297 $ 346 $ 335 Reclamation accretion $ 15 $ 15 $ 15 $ 19 All-in sustaining costs (per oz sold) $ 1,038 $ 1,078 $ 1,055 $ 1,325 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 13 -- 13 of 30 -- PEÑASQUITO - SILVER Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 9,107 3,899 19,802 13,825 Open pit waste 26,907 24,612 53,786 58,470 Total open pit 36,014 28,511 73,588 72,295 Tons milled/processed (000 tonnes): Mill 8,598 6,523 16,480 15,806 Average ore grade (g/tonne): Mill 40.460 41.175 45.310 37.031 Average mill recovery rate 80.9 % 80.8 % 81.8 % 81.2 % Silver produced (Moz): Consolidated/Attributable 8 6 17 14 Silver sold (Moz): Consolidated/Attributable 8 6 18 12 Co-product production costs ($M): Costs applicable to sales (1) $ 218 $ 218 $ 473 $ 408 Depreciation and amortization $ 88 $ 76 $ 182 $ 132 Reclamation accretion $ 4 $ 4 $ 8 $ 7 Silver production costs (per oz sold): Direct mining and production costs $ 11 $ 15 $ 12 $ 16 By-product credits — — — — Royalties and production taxes 1 — — — Inventory change, write-downs, and other — 1 — (1) Costs applicable to sales (per oz sold) (1) $ 12 $ 16 $ 12 $ 15 Depreciation and amortization $ 5 $ 6 $ 5 $ 5 Reclamation accretion $ — $ — $ — $ — All-in sustaining costs (per oz sold) $ 15 $ 21 $ 15 $ 20 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 14 -- 14 of 30 -- PEÑASQUITO - ZINC Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 9,107 3,899 19,802 13,825 Open pit waste 26,907 24,612 53,786 58,470 Total open pit 36,014 28,511 73,588 72,295 Tons milled/processed (000 tonnes): Mill 8,598 6,523 16,480 15,806 Average ore grade: Mill 1.12 % 0.81 % 1.08 % 0.78 % Average mill recovery rate 81.2 % 79.6 % 81.7 % 79.7 % Zinc produced (ktonne): Consolidated/Attributable 65 35 123 82 Zinc sold (ktonne): Consolidated/Attributable 52 41 113 86 Co-product production costs ($M): Costs applicable to sales (1) $ 218 $ 218 $ 473 $ 408 Depreciation and amortization $ 88 $ 76 $ 182 $ 132 Reclamation accretion $ 4 $ 4 $ 8 $ 7 Zinc production costs (per tonne sold): Direct mining and production costs $ 2,138 $ 1,822 $ 1,883 $ 1,926 By-product credits (16) (9) (16) (9) Royalties and production taxes 94 51 74 52 Inventory change, write-downs, and other (349) 351 (130) 81 Costs applicable to sales (per tonne sold) (1) $ 1,867 $ 2,215 $ 1,811 $ 2,050 Depreciation and amortization $ 679 $ 743 $ 628 $ 631 Reclamation accretion $ 36 $ 32 $ 31 $ 30 All-in sustaining costs (per tonne sold) $ 2,498 $ 3,177 $ 2,427 $ 3,009 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 15 -- 15 of 30 -- PEÑASQUITO - LEAD Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 9,107 3,899 19,802 13,825 Open pit waste 26,907 24,612 53,786 58,470 Total open pit 36,014 28,511 73,588 72,295 Tons milled/processed (000 tonnes): Mill 8,598 6,523 16,480 15,806 Average ore grade: Mill 0.33 % 0.46 % 0.41 % 0.37 % Average mill recovery rate 73.6 % 71.5 % 73.6 % 70.7 % Lead produced (ktonne): Consolidated/Attributable 20 20 48 39 Lead sold (ktonne): Consolidated/Attributable 20 16 49 33 Co-product production costs ($M): Costs applicable to sales (1) $ 218 $ 218 $ 473 $ 408 Depreciation and amortization $ 88 $ 76 $ 182 $ 132 Reclamation accretion $ 4 $ 4 $ 8 $ 7 Lead production costs (per tonne sold): Direct mining and production costs $ 1,272 $ 1,958 $ 1,223 $ 1,809 By-product credits (11) (11) (12) (9) Royalties and production taxes 63 62 54 55 Inventory change, write-downs, and other 31 38 6 (173) Costs applicable to sales (per tonne sold) (1) $ 1,355 $ 2,047 $ 1,271 $ 1,682 Depreciation and amortization $ 595 $ 735 $ 530 $ 568 Reclamation accretion $ 24 $ 39 $ 23 $ 32 All-in sustaining costs (per tonne sold) $ 1,601 $ 2,598 $ 1,540 $ 2,144 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 16 -- 16 of 30 -- PEÑASQUITO - CO-PRODUCT GEO Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 9,107 3,899 19,802 13,825 Open pit waste 26,907 24,612 53,786 58,470 Total open pit 36,014 28,511 73,588 72,295 Tons milled/processed (000 tonnes): Mill 8,598 6,523 16,480 15,806 Average ore grade milled: Silver (g/tonne) 40.460 41.175 45.310 37.031 Zinc 1.12 % 0.81 % 1.08 % 0.78 % Lead 0.33 % 0.46 % 0.41 % 0.37 % Average mill recovery rate: Silver 80.9 % 80.8 % 81.8 % 81.2 % Zinc 81.2 % 79.6 % 81.7 % 79.7 % Lead 73.6 % 71.5 % 73.6 % 70.7 % Co-product GEO produced (k): Consolidated/Attributable 268 189 556 413 Co-product GEO sold (k): Consolidated/Attributable 241 188 544 387 Co-product production costs ($M): Costs applicable to sales (1) $ 218 $ 218 $ 473 $ 408 Depreciation and amortization $ 88 $ 76 $ 182 $ 132 Reclamation accretion $ 4 $ 4 $ 8 $ 7 Co-product production costs (per GEO sold): Direct mining and production costs $ 935 $ 1,040 $ 868 $ 1,070 By-product credits (7) (5) (8) (5) Royalties and production taxes 44 31 36 31 Inventory change, write-downs, and other (68) 96 (26) (41) Costs applicable to sales (per GEO sold) (1) $ 904 $ 1,162 $ 870 $ 1,055 Depreciation and amortization $ 365 $ 405 $ 335 $ 341 Reclamation accretion $ 17 $ 20 $ 15 $ 18 All-in sustaining costs (per GEO sold) $ 1,164 $ 1,581 $ 1,130 $ 1,463 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 17 -- 17 of 30 -- MERIAN Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 2,482 1,746 5,487 3,493 Open pit waste 8,746 6,700 20,522 12,689 Total open pit 11,228 8,446 26,009 16,182 Tons milled/processed (000 tonnes): Mill 3,663 3,305 7,483 6,701 Average ore grade (g/tonne): Mill 0.537 0.693 0.592 0.730 Average mill recovery rate 91.7 % 91.4 % 91.8 % 92.2 % Gold produced (koz): Consolidated 61 54 137 136 Attributable 46 40 103 102 Gold sold (koz): Consolidated 61 53 135 136 Attributable 46 39 102 102 Gold production costs ($M): Costs applicable to sales (1) $ 96 $ 80 $ 186 $ 165 Depreciation and amortization $ 20 $ 15 $ 39 $ 33 Reclamation accretion $ 1 $ 1 $ 2 $ 1 Gold production costs (per oz sold): Direct mining and production costs $ 1,475 $ 1,709 $ 1,297 $ 1,262 By-product credits (1) (1) (1) (1) Royalties and production taxes 140 119 131 115 Inventory change, write-downs, and other (68) (326) (59) (164) Costs applicable to sales (per oz sold) (1) $ 1,546 $ 1,501 $ 1,368 $ 1,212 Depreciation and amortization $ 317 $ 296 $ 287 $ 245 Reclamation accretion $ 18 $ 14 $ 16 $ 11 All-in sustaining costs (per oz sold) $ 2,170 $ 2,010 $ 1,820 $ 1,537 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 18 -- 18 of 30 -- CERRO NEGRO (1) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 73 254 340 547 Tons milled/processed (000 tonnes): Mill 75 265 339 563 Average ore grade (g/tonne): Mill 8.420 5.920 9.572 6.768 Average mill recovery rate 92.7 % 92.4 % 94.5 % 93.1 % Gold produced (koz): Consolidated/Attributable 19 48 100 115 Gold sold (koz): Consolidated/Attributable 27 50 101 111 Gold production costs ($M): Costs applicable to sales (2) $ 70 $ 83 $ 133 $ 153 Depreciation and amortization $ 22 $ 34 $ 52 $ 65 Reclamation accretion $ 1 $ 1 $ 2 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 2,649 $ 1,601 $ 1,416 $ 1,413 By-product credits (150) (109) (107) (123) Royalties and production taxes 120 93 111 91 Inventory change, write-downs, and other (113) 70 (110) (5) Costs applicable to sales (per oz sold) (2) $ 2,506 $ 1,655 $ 1,310 $ 1,376 Depreciation and amortization $ 805 $ 676 $ 511 $ 584 Reclamation accretion $ 41 $ 18 $ 22 $ 16 All-in sustaining costs (per oz sold) $ 3,010 $ 1,924 $ 1,635 $ 1,625 (1) In the second quarter of 2024, the Company suspended operations at Cerro Negro to conduct a full investigation into the tragic fatalities of two members of the Newmont workforce on April 9, 2024. The site ramped up to full operations in June 2024. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 19 -- 19 of 30 -- YANACOCHA Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 5,453 4,285 8,953 9,142 Open pit waste 10,852 11,727 19,917 21,430 Total open pit 16,305 16,012 28,870 30,572 Tons milled/processed (000 tonnes): Leach 5,453 4,285 8,953 9,142 Average ore grade (g/tonne): Leach 0.261 0.355 0.370 0.490 Gold produced (koz): Consolidated/Attributable 78 65 169 121 Gold sold (koz): Consolidated/Attributable 78 66 168 119 Gold production costs ($M): Costs applicable to sales (1) $ 77 $ 79 $ 165 $ 135 Depreciation and amortization $ 23 $ 22 $ 51 $ 38 Reclamation accretion $ 2 $ 1 $ 4 $ 3 Gold production costs (per oz sold): Direct mining and production costs $ 999 $ 1,181 $ 860 $ 1,244 By-product credits (22) (13) (16) (14) Royalties and production taxes 69 59 65 59 Inventory change, write-downs, and other (46) (40) 76 (155) Costs applicable to sales (per oz sold) (1) $ 1,000 $ 1,187 $ 985 $ 1,134 Depreciation and amortization $ 305 $ 341 $ 307 $ 320 Reclamation accretion $ 24 $ 21 $ 22 $ 23 All-in sustaining costs (per oz sold) $ 1,217 $ 1,386 $ 1,166 $ 1,362 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 20 -- 20 of 30 -- BODDINGTON - GOLD Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 6,416 8,548 12,470 16,787 Open pit waste 10,677 6,956 22,446 13,222 Total open pit 17,093 15,504 34,916 30,009 Tons milled/processed (000 tonnes): Mill 8,553 9,608 16,973 18,751 Average ore grade (g/tonne): Mill 0.634 0.804 0.624 0.799 Average mill recovery rate 85.4 % 85.3 % 85.7 % 85.9 % Gold produced (koz): Consolidated/Attributable 147 209 289 408 Gold sold (koz): Consolidated/Attributable 136 204 278 402 Gold production costs ($M): Costs applicable to sales (1) $ 139 $ 159 $ 283 $ 326 Depreciation and amortization $ 26 $ 27 $ 52 $ 55 Reclamation accretion $ 2 $ 2 $ 5 $ 4 Gold production costs (per oz sold): Direct mining and production costs $ 1,101 $ 725 $ 1,107 $ 766 By-product credits (26) (16) (22) (16) Royalties and production taxes 64 50 58 48 Inventory change, write-downs, and other (117) 18 (124) 11 Costs applicable to sales (per oz sold) (1) $ 1,022 $ 777 $ 1,019 $ 809 Depreciation and amortization $ 190 $ 135 $ 186 $ 138 Reclamation accretion $ 17 $ 11 $ 17 $ 11 All-in sustaining costs (per oz sold) $ 1,237 $ 966 $ 1,240 $ 1,000 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 21 -- 21 of 30 -- BODDINGTON - COPPER Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 6,416 8,548 12,470 16,787 Open pit waste 10,677 6,956 22,446 13,222 Total open pit 17,093 15,504 34,916 30,009 Tons milled/processed (000 tonnes): Mill 8,553 9,608 16,973 18,751 Average ore grade: Mill 0.15 % 0.16 % 0.14 % 0.16 % Average mill recovery rate 84.2 % 85.4 % 83.9 % 84.1 % Copper produced (ktonne): Consolidated/Attributable 10 12 19 24 Copper sold (ktonne): Consolidated/Attributable 9 11 18 23 Co-product GEO produced (k): Consolidated/Attributable 55 67 104 131 Co-product GEO sold (k): Consolidated/Attributable 47 63 98 129 Co-product production costs ($M): Costs applicable to sales (1) $ 49 $ 48 $ 97 $ 101 Depreciation and amortization $ 9 $ 9 $ 18 $ 18 Reclamation accretion $ 1 $ 1 $ 2 $ 1 Copper production costs (per tonne sold): Direct mining and production costs $ 6,174 $ 3,908 $ 5,907 $ 4,014 By-product credits (151) (92) (125) (91) Royalties and production taxes 506 324 432 371 Inventory change, write-downs, and other (849) 80 (787) 49 Costs applicable to sales (per tonne sold) (1) $ 5,680 $ 4,220 $ 5,427 $ 4,343 Depreciation and amortization $ 1,088 $ 762 $ 1,025 $ 762 Reclamation accretion $ 101 $ 62 $ 95 $ 61 All-in sustaining costs (per tonne sold) $ 6,914 $ 5,385 $ 6,419 $ 5,503 Copper production costs (per GEO sold): Direct mining and production costs $ 1,120 $ 710 $ 1,073 $ 728 By-product credits (27) (17) (23) (16) Royalties and production taxes 92 59 78 67 Inventory change, write-downs, and other (154) 14 (143) 9 Costs applicable to sales (per GEO sold) (1) $ 1,031 $ 766 $ 985 $ 788 Depreciation and amortization $ 197 $ 138 $ 186 $ 138 Reclamation accretion $ 18 $ 11 $ 17 $ 11 All-in sustaining costs (per GEO sold) $ 1,254 $ 977 $ 1,165 $ 998 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 22 -- 22 of 30 -- TANAMI Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 563 581 1,195 1,135 Tons milled/processed (000 tonnes): Mill 642 662 1,170 1,051 Average ore grade (g/tonne): Mill 4.906 5.943 5.072 5.695 Average mill recovery rate 98.4 % 98.5 % 98.6 % 98.3 % Gold produced (koz): Consolidated/Attributable 99 126 189 189 Gold sold (koz): Consolidated/Attributable 99 124 190 189 Gold production costs ($M): Costs applicable to sales (1) $ 101 $ 102 $ 183 $ 163 Depreciation and amortization $ 33 $ 31 $ 58 $ 50 Reclamation accretion $ 1 $ — $ 1 $ 1 Gold production costs (per oz sold): Direct mining and production costs $ 876 $ 677 $ 929 $ 853 By-product credits (2) (2) (2) (2) Royalties and production taxes 61 51 57 50 Inventory change, write-downs, and other 83 103 (22) (35) Costs applicable to sales (per oz sold) (1) $ 1,018 $ 829 $ 962 $ 866 Depreciation and amortization $ 331 $ 251 $ 305 $ 266 Reclamation accretion $ 5 $ 4 $ 5 $ 5 All-in sustaining costs (per oz sold) $ 1,276 $ 1,162 $ 1,215 $ 1,182 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 23 -- 23 of 30 -- CADIA - GOLD (1) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Total underground ore (000 tonnes): 7,270 — 14,424 — Tonnes milled/processed (000 tonnes): Mill 7,199 — 14,356 — Average ore grade (g/tonne): Mill 0.647 — 0.662 — Average mill recovery rate 80.0 % — % 79.9 % — % Gold produced (koz): Consolidated/Attributable 117 — 239 — Gold sold (koz): Consolidated/Attributable 123 — 237 — Gold production costs ($M): Costs applicable to sales (2) $ 77 $ — $ 151 $ — Depreciation and amortization $ 33 $ — $ 61 $ — Reclamation accretion $ — $ — $ 1 $ — Gold production costs (per oz sold): Direct mining and production costs $ 609 $ — $ 627 $ — By-product credits (96) — (99) — Royalties and production taxes 81 — 78 — Inventory change, write-downs, and other 30 — 30 — Costs applicable to sales (per oz sold) (2) $ 624 $ — $ 636 $ — Depreciation and amortization $ 265 $ — $ 256 $ — Reclamation accretion $ 3 $ — $ 3 $ — All-in sustaining costs (per oz sold) $ 1,064 $ — $ 1,028 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 24 -- 24 of 30 -- CADIA - COPPER (1) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Total underground ore (000 tonnes): 7,270 — 14,424 — Tonnes milled/processed (000 tonnes): Mill 7,199 — 14,356 — Average ore grade: Mill 0.36 % — % 0.36 % — % Average mill recovery rate 84.5 % — % 84.6 % — % Copper produced (ktonne): Consolidated/Attributable 22 — 43 — Copper sold (ktonne): Consolidated/Attributable 23 — 43 — Co-product GEO produced (k): Consolidated/Attributable 117 — 235 — Co-product GEO sold (k): Consolidated/Attributable 123 — 235 — Co-product production costs ($M): Costs applicable to sales (2) $ 67 $ — $ 134 $ — Depreciation and amortization $ 33 $ — $ 60 $ — Reclamation accretion $ — $ — $ 1 $ — Copper production costs (per tonne sold): Direct mining and production costs $ 3,104 $ — $ 3,220 $ — By-product credits (532) — (545) — Royalties and production taxes 313 — 310 — Inventory change, write-downs, and other 159 — 168 — Costs applicable to sales (per tonne sold) (2) $ 3,044 $ — $ 3,153 $ — Depreciation and amortization $ 1,466 $ — $ 1,402 $ — Reclamation accretion $ 16 $ — $ 17 $ — All-in sustaining costs (per tonne sold) $ 5,644 $ — $ 5,651 $ — Copper production costs (per GEO sold): Direct mining and production costs $ 562 $ — $ 584 $ — By-product credits (96) — (99) — Royalties and production taxes 57 — 56 — Inventory change, write-downs, and other 29 — 31 — Costs applicable to sales (per GEO sold) (2) $ 552 $ — $ 572 $ — Depreciation and amortization $ 266 $ — $ 254 $ — Reclamation accretion $ 3 $ — $ 3 $ — All-in sustaining costs (per GEO sold) $ 1,024 $ — $ 1,025 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 25 -- 25 of 30 -- TELFER - GOLD (1)(2) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 4,136 — 7,404 — Open pit waste 3,568 — 8,565 — Total open pit 7,704 — 15,969 — Total underground ore (000 tonnes): 169 — 407 — Tonnes milled/processed (000 tonnes): Mill 301 — 1,676 — Average ore grade (g/tonne): Mill 0.936 — 0.899 — Average mill recovery rate 113.3 % — % 92.6 % — % Gold produced (koz): Consolidated/Attributable 14 — 45 — Gold sold (koz): Consolidated/Attributable 33 — 59 — Gold production costs ($M): Costs applicable to sales (2) $ 83 $ — $ 153 $ — Depreciation and amortization $ 4 $ — $ 12 $ — Reclamation accretion $ 2 $ — $ 5 $ — Gold production costs (per oz sold): Direct mining and production costs $ 3,497 $ — $ 3,710 $ — By-product credits (9) — (8) — Royalties and production taxes 62 — 58 — Inventory change, write-downs, and other (1,002) — (1,175) — Costs applicable to sales (per oz sold) (2) $ 2,548 $ — $ 2,585 $ — Depreciation and amortization $ 146 $ — $ 216 $ — Reclamation accretion $ 73 $ — $ 78 $ — All-in sustaining costs (per oz sold) $ 3,053 $ — $ 3,037 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) During the second quarter, milling operations at Telfer were temporarily ceased beginning on April 14, 2024, as remediation work on the tailings storage facility is progressed. Per unit metrics were impacted as a result of lower sales volumes. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 26 -- 26 of 30 -- TELFER - COPPER (1)(2) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 4,136 — 7,404 — Open pit waste 3,568 — 8,565 — Total open pit 7,704 — 15,969 — Total underground ore (000 tonnes): 169 — 407 — Tonnes milled/processed (000 tonnes): Mill 301 — 1,676 — Average ore grade: Mill 0.14 % — % 0.12 % — % Average mill recovery rate 65.8 % — % 75.5 % — % Copper produced (ktonne): Consolidated/Attributable — — 1 — Copper sold (ktonne): Consolidated/Attributable 1 — 2 — Co-product GEO produced (k): Consolidated/Attributable 2 — 8 — Co-product GEO sold (k): Consolidated/Attributable 6 — 11 — Co-product production costs ($M): Costs applicable to sales (2) $ 12 $ — $ 27 $ — Depreciation and amortization $ 1 $ — $ 3 $ — Reclamation accretion $ — $ — $ 1 $ — Copper production costs (per tonne sold): Direct mining and production costs $ 11,614 $ — $ 16,892 $ — By-product credits (31) — (36) — Royalties and production taxes 368 — 344 — Inventory change, write-downs, and other (1,259) — (4,042) — Costs applicable to sales (per tonne sold) (2) $ 10,692 $ — $ 13,158 $ — Depreciation and amortization $ 601 $ — $ 1,242 $ — Reclamation accretion $ 240 $ — $ 352 $ — All-in sustaining costs (per tonne sold) $ 15,112 $ — $ 17,739 $ — Copper production costs (per GEO sold): Direct mining and production costs $ 2,107 $ — $ 3,065 $ — By-product credits (6) — (7) — Royalties and production taxes 67 — 62 — Inventory change, write-downs, and other (228) — (733) — Costs applicable to sales (per GEO sold) (2) $ 1,940 $ — $ 2,387 $ — Depreciation and amortization $ 109 $ — $ 225 $ — Reclamation accretion $ 44 $ — $ 64 $ — All-in sustaining costs (per GEO sold) $ 2,742 $ — $ 3,218 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) During the second quarter, milling operations at Telfer were temporarily ceased beginning on April 14, 2024, as remediation work on the tailings storage facility is progressed. Per unit metrics were impacted as a result of lower sales volumes. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 27 -- 27 of 30 -- LIHIR (1) Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 3,194 — 5,749 — Open pit waste 5,915 — 12,870 — Total open pit 9,109 — 18,619 — Tonnes milled/processed (000 tonnes): Mill 2,660 — 5,531 — Average ore grade (g/tonne): Mill 2.197 — 2.354 — Average mill recovery rate 78.6 % — % 76.9 % — % Gold produced (koz): Consolidated/Attributable 141 — 322 — Gold sold (koz): Consolidated/Attributable 148 — 330 — Gold production costs ($M): Costs applicable to sales (2) $ 162 $ — $ 333 $ — Depreciation and amortization $ 43 $ — $ 78 $ — Reclamation accretion $ 1 $ — $ 2 $ — Gold production costs (per oz sold): Direct mining and production costs $ 1,471 $ — $ 1,328 $ — By-product credits (1) — (1) — Royalties and production taxes 58 — 54 — Inventory change, write-downs, and other (427) — (371) — Costs applicable to sales (per oz sold) (2) $ 1,101 $ — $ 1,010 $ — Depreciation and amortization $ 289 $ — $ 236 $ — Reclamation accretion $ 8 $ — $ 7 $ — All-in sustaining costs (per oz sold) $ 1,212 $ — $ 1,236 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 28 -- 28 of 30 -- AHAFO Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 1,561 1,678 2,936 2,343 Open pit waste 4,429 4,632 9,702 10,934 Total open pit 5,990 6,310 12,638 13,277 Total underground ore (000 tonnes): 635 575 1,271 1,162 Tons milled/processed (000 tonnes): Mill 2,218 2,071 4,728 4,576 Average ore grade (g/tonne): Mill 2.726 2.261 2.645 1.977 Average mill recovery rate 94.1 % 94.0 % 94.0 % 93.3 % Gold produced (koz): Consolidated/Attributable 184 137 374 265 Gold sold (koz): Consolidated/Attributable 180 133 364 264 Gold production costs ($M): Costs applicable to sales (1) $ 176 $ 121 $ 335 $ 251 Depreciation and amortization $ 55 $ 42 $ 106 $ 81 Reclamation accretion $ 2 $ 2 $ 4 $ 3 Gold production costs (per oz sold): Direct mining and production costs $ 711 $ 847 $ 694 $ 883 By-product credits (2) (2) (2) (2) Royalties and production taxes 198 142 176 131 Inventory change, write-downs, and other 69 (77) 52 (61) Costs applicable to sales (per oz sold) (1) $ 976 $ 910 $ 920 $ 951 Depreciation and amortization $ 303 $ 317 $ 290 $ 309 Reclamation accretion $ 10 $ 12 $ 10 $ 13 All-in sustaining costs (per oz sold) $ 1,123 $ 1,237 $ 1,066 $ 1,301 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 29 -- 29 of 30 -- AKYEM Three Months Ended June 30, Six Months Ended June 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 59 300 553 1,288 Open pit waste 6,117 5,650 10,401 12,592 Total open pit 6,176 5,950 10,954 13,880 Tons milled/processed (000 tonnes): Mill 2,111 1,899 3,985 3,782 Average ore grade milled (g/tonne): Mill 0.780 0.816 1.017 1.051 Average mill recovery rate 90.0 % 89.6 % 88.7 % 89.0 % Gold produced (koz): Consolidated/Attributable 47 49 116 120 Gold sold (koz): Consolidated/Attributable 48 49 123 127 Gold production costs ($M): Costs applicable to sales (1) $ 81 $ 54 $ 157 $ 117 Depreciation and amortization $ 11 $ 26 $ 41 $ 55 Reclamation accretion $ 3 $ 3 $ 7 $ 6 Gold production costs (per oz sold): Direct mining and production costs $ 1,196 $ 1,155 $ 937 $ 951 By-product credits (7) (6) (6) (8) Royalties and production taxes 488 116 266 106 Inventory change, write-downs, and other 39 (178) 83 (132) Costs applicable to sales (per oz sold) (1) $ 1,716 $ 1,087 $ 1,280 $ 917 Depreciation and amortization $ 232 $ 525 $ 333 $ 430 Reclamation accretion $ 73 $ 60 $ 56 $ 46 All-in sustaining costs (per oz sold) $ 1,952 $ 1,461 $ 1,523 $ 1,220 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT SECOND QUARTER 2024 | OPERATING STATISTICS 30 -- 30 of 30 --