Operating Statistics (1)(2)(3) Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Gold ounces produced (thousands): CC&V 45 47 134 125 Musselwhite 48 44 130 115 Porcupine 64 74 190 201 Éléonore 50 57 164 148 Peñasquito (4) — 182 123 440 Merian 83 87 219 284 Cerro Negro 71 67 186 209 Yanacocha 87 53 208 186 Boddington 181 174 589 589 Tanami 123 122 312 355 Ahafo 133 155 398 397 Akyem 75 99 195 298 Nevada Gold Mines (5) 300 267 848 845 Total Consolidated Newmont 1,260 1,428 3,696 4,192 Yanacocha (—% and 5%, respectively) (6) — — — (14) Merian (25%) (21) (22) (55) (72) Pueblo Viejo (7) 52 81 163 220 Total Attributable Newmont 1,291 1,487 3,804 4,326 Other metals produced: Peñasquito silver ounces (thousands) (4) — 7,460 13,786 23,273 Peñasquito lead pounds (millions) (4) — 33 86 112 Peñasquito zinc pounds (millions) (4) — 89 180 297 Boddington copper pounds (millions) 23 16 75 59 (1) In January 2023, the Company determined that its reportable segments were each of its 12 mining operations and its 38.5% interest in Nevada Gold Mines, which has been reflected in the presentation of this report for all periods presented. (2) Gold equivalent ounces (GEOs) are calculated as pounds or ounces produced or sold multiplied by the ratio of the other metals’ price to the gold price. In 2023, the Company updated the metal prices utilized for this calculation to align with reserve metal price assumptions; Gold ($1,400/oz.), Copper ($3.50/lb.), Silver ($20.00/oz.), Lead ($1.00/lb.) and Zinc ($1.20/lb.) pricing for 2023 and Gold ($1,200/oz.), Copper ($3.25/ lb.), Silver ($23.00/oz.), Lead ($0.95/lb.) and Zinc ($1.15/lb.) pricing for 2022. (3) Per ounce and GEO measures may not recalculate due to rounding. (4) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. (5) Newmont has a 38.5% interest in Nevada Gold Mines in the U.S., which is accounted for using the proportionate consolidation method. (6) The Company acquired the remaining interest in Yanacocha in the second quarter of 2022, resulting in 100% ownership. The Company recognized amounts attributable to non-controlling interests for Yanacocha during the nine months ended September 30, 2022 for the period prior to acquiring 100% ownership. (7) Newmont has a 40% interest in Pueblo Viejo, which is accounted for as an equity method investment. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 1 -- 1 of 17 -- Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Gold ounces sold (thousands): CC&V 46 48 135 130 Musselwhite 47 42 132 114 Porcupine 61 73 189 201 Éléonore 46 54 165 151 Peñasquito (1) (1) 144 103 408 Merian 83 86 219 285 Cerro Negro 65 66 176 208 Yanacocha 85 53 204 190 Boddington 186 177 588 616 Tanami 123 127 312 358 Ahafo 137 153 401 396 Akyem 71 100 198 299 Nevada Gold Mines (2) 301 267 847 845 Total Consolidated Newmont 1,250 1,391 3,669 4,202 Yanacocha (—% and 5%, respectively) (3) — — — (16) Merian (25%) (21) (22) (55) (71) Total Attributable Newmont 1,229 1,369 3,614 4,115 Other metals sold: Peñasquito silver ounces (thousands) (1) 55 6,805 12,178 22,523 Peñasquito lead pounds (millions) (1) — 30 72 107 Peñasquito zinc pounds (millions) (1) (2) 85 187 290 Boddington copper pounds (millions) 25 17 76 63 (1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Sales activity recognized in the third quarter of 2023 is related to adjustments on provisionally priced concentrate sales subject to final settlement. (2) Newmont has a 38.5% interest in Nevada Gold Mines in the U.S., which is accounted for using the proportionate consolidation method. (3) The Company acquired the remaining interest in Yanacocha in the second quarter of 2022, resulting in 100% ownership. The Company recognized amounts attributable to non-controlling interests for Yanacocha during the nine months ended September 30, 2022 for the period prior to acquiring 100% ownership. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 2 -- 2 of 17 -- CAS (1)(2) Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Gold Costs Applicable to Sales ($/ounce) CC&V $ 1,253 $ 1,325 $ 1,165 $ 1,265 Musselwhite 1,045 1,113 1,230 1,257 Porcupine 1,189 970 1,160 1,038 Éléonore 1,338 1,171 1,280 1,305 Peñasquito (3) N.M. 757 1,196 791 Merian 1,261 1,041 1,231 947 Cerro Negro 1,216 1,068 1,317 986 Yanacocha 1,057 1,415 1,102 1,130 Boddington 848 839 821 798 Tanami 655 637 783 641 Ahafo 969 1,011 957 984 Akyem 1,032 776 958 737 Nevada Gold Mines 992 1,104 1,049 1,010 Total Newmont $ 1,019 $ 968 $ 1,033 $ 931 Co-product GEO Costs Applicable to Sales ($/GEO) Peñasquito (3) N.M. $ 699 $ 1,183 $ 815 Boddington $ 816 776 797 768 Total Newmont $ 1,636 $ 712 $ 1,056 $ 807 (1) Costs applicable to sales per ounce/GEO, included at the consolidated, regional and site level, are non-GAAP metrics and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov. (2) Consolidated Costs applicable to sales (CAS) excludes Depreciation and amortization and Reclamation and remediation. (3) For the three months ended September 30, 2023, Peñasquito had no production due to the Peñasquito labor strike. As such, the per ounce metrics are not meaningful ("N.M.") for the current quarter. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 3 -- 3 of 17 -- AISC (1) Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Gold All-In Sustaining Costs ($/ounce) CC&V $ 1,819 $ 1,750 $ 1,603 $ 1,661 Musselwhite 1,715 1,533 1,869 1,619 Porcupine 1,644 1,199 1,545 1,271 Éléonore 2,107 1,570 1,855 1,675 Peñasquito (2) N.M. 982 1,569 1,002 Merian 1,652 1,252 1,580 1,131 Cerro Negro 1,438 1,411 1,556 1,248 Yanacocha 1,187 1,676 1,290 1,362 Boddington 1,123 1,001 1,039 921 Tanami 890 925 1,066 930 Ahafo 1,208 1,161 1,269 1,167 Akyem 1,332 930 1,260 900 Nevada Gold Mines 1,307 1,358 1,364 1,232 Total Newmont $ 1,426 $ 1,271 $ 1,425 $ 1,209 Co-product GEO All-In Sustaining Costs ($/GEO) Peñasquito (2) N.M. $ 982 $ 1,648 $ 1,092 Boddington $ 1,108 873 1,033 879 Total Newmont $ 2,422 $ 999 $ 1,511 $ 1,098 (1) All-in sustaining costs (AISC), included at the consolidated, regional and site level, is a non-GAAP metric and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov. (2) For the three months ended September 30, 2023, Peñasquito had no production due to the Peñasquito labor strike. As such, the per ounce metrics are not meaningful ("N.M.") for the current quarter. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 4 -- 4 of 17 -- CAPITAL EXPENDITURES Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Consolidated Capital Expenditures ($ millions) CC&V $ 21 $ 12 $ 44 $ 30 Musselwhite 29 15 74 33 Porcupine 37 36 95 112 Éléonore 29 19 74 42 Peñasquito 9 44 81 132 Merian 26 13 61 37 Cerro Negro 44 36 118 96 Yanacocha 81 112 209 258 Boddington 54 23 128 58 Tanami 98 78 287 256 Ahafo 73 52 240 189 Akyem 9 7 31 27 Nevada Gold Mines (1) 132 75 339 213 Corporate and other 10 13 37 35 Accrual basis $ 652 $ 535 $ 1,818 $ 1,518 Decrease (increase) in non-cash adjustments (48) (6) (72) (33) Cash basis $ 604 $ 529 $ 1,746 $ 1,485 (1) Newmont has a 38.5% interest in Nevada Gold Mines in the U.S., which is accounted for using the proportionate consolidation method. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 5 -- 5 of 17 -- CC&V Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore 6,783 5,601 19,960 14,886 Open pit waste 3,372 2,933 8,910 8,314 Total open pit 10,155 8,534 28,870 23,200 Tons milled/processed (000 tonnes): Mill (1) — — — 64 Leach 6,671 4,787 19,666 13,527 Average ore grade (g/tonne): Mill (1) — — — 1.568 Leach 0.473 0.553 0.442 0.405 Average mill recovery rate (1) — % — % — % 38.2 % Gold produced (koz): Mill (1) — — — 3 Leach 45 47 134 122 Consolidated/Attributable 45 47 134 125 Gold sold (koz): Consolidated/Attributable 46 48 135 130 Gold production costs ($M): Costs applicable to sales (2) $ 57 $ 64 $ 157 $ 165 Depreciation and amortization $ 6 $ 19 $ 19 $ 51 Reclamation accretion $ 3 $ 1 $ 8 $ 4 Gold production costs (per oz sold): Direct mining and production costs $ 1,325 $ 1,111 $ 1,305 $ 1,186 By-product credits (2) (5) (8) (8) Royalties and production taxes 154 103 116 80 Inventory change, write-downs, and other (224) 116 (248) 7 Costs applicable to sales (per oz sold) (2) $ 1,253 $ 1,325 $ 1,165 $ 1,265 Depreciation and amortization $ 126 $ 387 $ 142 $ 391 Reclamation accretion $ 56 $ 27 $ 56 $ 30 All-in sustaining costs (per oz sold) $ 1,819 $ 1,750 $ 1,603 $ 1,661 (1) CC&V transitioned to leach only operations in the second quarter of 2022. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 6 -- 6 of 17 -- MUSSELWHITE Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Total underground ore (000 tonnes) 244 254 758 735 Tons milled/processed (000 tonnes): Mill 246 260 760 737 Average ore grade (g/tonne): Mill 6.345 5.710 5.554 5.121 Average mill recovery rate 96.0 % 95.8 % 95.7 % 95.7 % Gold produced (koz): Consolidated/Attributable 48 44 130 115 Gold sold (koz): Consolidated/Attributable 47 42 132 114 Gold production costs ($M): Costs applicable to sales (1) $ 50 $ 47 $ 163 $ 143 Depreciation and amortization $ 21 $ 19 $ 58 $ 55 Reclamation accretion $ — $ 1 $ 2 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 985 $ 1,130 $ 1,166 $ 1,243 By-product credits (2) (2) (2) (3) Royalties and production taxes 46 33 54 33 Inventory change, write-downs, and other 16 (48) 12 (16) Costs applicable to sales (per oz sold) (1) $ 1,045 $ 1,113 $ 1,230 $ 1,257 Depreciation and amortization $ 441 $ 451 $ 439 $ 479 Reclamation accretion $ 17 $ 13 $ 18 $ 15 All-in sustaining costs (per oz sold) $ 1,715 $ 1,533 $ 1,869 $ 1,619 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 7 -- 7 of 17 -- PORCUPINE Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore 526 888 2,161 2,406 Open pit waste 981 1,080 3,692 3,403 Total open pit 1,507 1,968 5,853 5,809 Total underground ore (000 tonnes) 205 174 625 550 Tons milled/processed (000 tonnes): Mill 793 836 2,176 2,468 Average ore grade milled (g/tonne): Mill 2.838 2.903 2.939 2.734 Average mill recovery rate 90.5 % 93.2 % 91.5 % 92.8 % Gold produced (koz): Consolidated/Attributable 64 74 190 201 Gold sold (koz): Consolidated/Attributable 61 73 189 201 Gold production costs ($M): Costs applicable to sales (1) $ 73 $ 72 $ 220 $ 209 Depreciation and amortization $ 29 $ 26 $ 85 $ 73 Reclamation accretion $ 2 $ 1 $ 6 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 1,161 $ 970 $ 1,224 $ 1,056 By-product credits (4) (2) (4) (4) Royalties and production taxes 25 24 25 29 Inventory change, write-downs, and other 7 (22) (85) (43) Costs applicable to sales (per oz sold) (1) $ 1,189 $ 970 $ 1,160 $ 1,038 Depreciation and amortization $ 473 $ 364 $ 447 $ 364 Reclamation accretion $ 34 $ 8 $ 33 $ 9 All-in sustaining costs (per oz sold) $ 1,644 $ 1,199 $ 1,545 $ 1,271 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 8 -- 8 of 17 -- ÉLÉONORE Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Total underground ore (000 tonnes) 382 361 1,181 1,088 Tons milled/processed (000 tonnes): Mill 393 363 1,185 1,093 Average ore grade (g/tonne): Mill 4.569 5.167 4.776 4.560 Average mill recovery rate 91.3 % 92.6 % 91.0 % 91.7 % Gold produced (koz): Consolidated/Attributable 50 57 164 148 Gold sold (koz): Consolidated/Attributable 46 54 165 151 Gold production costs ($M): Costs applicable to sales (1) $ 63 $ 64 $ 212 $ 197 Depreciation and amortization $ 22 $ 28 $ 73 $ 84 Reclamation accretion $ — $ — $ 2 $ 1 Gold production costs (per oz sold): Direct mining and production costs $ 1,369 $ 1,128 $ 1,251 $ 1,251 By-product credits (2) (1) (2) (1) Royalties and production taxes 42 38 44 41 Inventory change, write-downs, and other (71) 6 (13) 14 Costs applicable to sales (per oz sold) (1) $ 1,338 $ 1,171 $ 1,280 $ 1,305 Depreciation and amortization $ 478 $ 517 $ 441 $ 559 Reclamation accretion $ 16 $ 7 $ 14 $ 8 All-in sustaining costs (per oz sold) $ 2,107 $ 1,570 $ 1,855 $ 1,675 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 9 -- 9 of 17 -- PEÑASQUITO Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore — 9,364 13,825 24,813 Open pit waste — 33,647 58,470 107,311 Total open pit — 43,011 72,295 132,124 Tons milled/processed (000 tonnes): Mill — 9,365 15,806 27,133 Average ore grade milled: Gold (g/tonne) — 0.851 0.450 0.711 Silver (g/tonne) — 31.274 37.031 32.800 Zinc 0.00 % 0.66 % 0.78 % 0.72 % Lead 0.00 % 0.23 % 0.37 % 0.26 % Average mill recovery rate: Gold 0.0 % 76.9 % 59.8 % 76.4 % Silver 0.0 % 85.7 % 81.2 % 88.4 % Zinc 0.0 % 80.1 % 79.7 % 82.7 % Lead 0.0 % 73.0 % 70.7 % 76.4 % Gold produced (koz): Consolidated/Attributable (1) — 182 123 440 Gold sold (koz): Consolidated/Attributable (1) (1) 144 103 408 Co-product GEO produced (k): Consolidated/Attributable (1) — 254 413 819 Co-product GEO sold (k): Consolidated/Attributable (1) (2) 234 385 793 Gold production costs ($M): Costs applicable to sales (2) $ 16 $ 109 $ 123 $ 323 Depreciation and amortization $ 12 $ 38 $ 47 $ 111 Reclamation accretion $ 1 $ 1 $ 3 $ 3 Gold production costs (per oz sold): (1) Direct mining and production costs (1) N.M. $ 808 $ 1,296 $ 761 By-product credits (1) N.M. (7) (6) (6) Royalties and production taxes (1) N.M. 31 34 31 Inventory change, write-downs, and other (1) N.M. (75) (128) 5 Costs applicable to sales (per oz sold) (1)(2) N.M. $ 757 $ 1,196 $ 791 Depreciation and amortization (1) N.M. $ 260 $ 458 $ 272 Reclamation accretion (1) N.M. $ 10 $ 29 $ 9 All-in sustaining costs (per oz sold) (1) N.M. $ 982 $ 1,569 $ 1,002 Co-product production costs ($M): Costs applicable to sales $ 48 $ 164 $ 456 $ 647 Depreciation and amortization $ 41 $ 53 $ 173 $ 214 Reclamation accretion $ 3 $ 2 $ 10 $ 7 Co-product production costs (per GEO sold): (1) Direct mining and production costs (1) N.M. $ 731 $ 1,196 $ 772 By-product credits (1) N.M. (6) (6) (5) Royalties and production taxes (1) N.M. 27 31 31 Inventory change, write-downs, and other (1) N.M. (53) (38) 17 Costs applicable to sales (per GEO sold) (1)(2) N.M. $ 699 $ 1,183 $ 815 Depreciation and amortization (1) N.M. $ 227 $ 449 $ 270 Reclamation accretion (1) N.M. $ 8 $ 27 $ 8 All-in sustaining costs (per GEO sold) (1) N.M. $ 982 $ 1,648 $ 1,092 (1) For the three months ended September 30, 2023, Peñasquito had no production due to the Peñasquito labor strike. Sales activity recognized in the third quarter of 2023 is related to adjustments on provisionally priced concentrate sales subject to final settlement. As such, the per ounce metrics are not meaningful ("N.M.") for the current quarter. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 10 -- 10 of 17 -- MERIAN Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore 2,929 3,256 6,422 9,089 Open pit waste 9,047 6,072 21,736 17,490 Total open pit 11,976 9,328 28,158 26,579 Tons milled/processed (000 tonnes): Mill 3,680 3,130 10,381 10,234 Average ore grade (g/tonne): Mill 0.775 0.922 0.746 0.900 Average mill recovery rate 90.5 % 93.8 % 91.6 % 94.2 % Gold produced (koz): Consolidated 83 87 219 284 Attributable 62 65 164 212 Gold sold (koz): Consolidated 83 86 219 285 Attributable 62 64 164 214 Gold production costs ($M): Costs applicable to sales (1) $ 104 $ 89 $ 269 $ 270 Depreciation and amortization $ 23 $ 19 $ 56 $ 61 Reclamation accretion $ 1 $ 1 $ 2 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 1,010 $ 992 $ 1,168 $ 839 By-product credits — (1) (1) (1) Royalties and production taxes 116 103 115 109 Inventory change, write-downs, and other 135 (53) (51) — Costs applicable to sales (per oz sold) (1) $ 1,261 $ 1,041 $ 1,231 $ 947 Depreciation and amortization $ 279 $ 214 $ 258 $ 212 Reclamation accretion $ 9 $ 6 $ 10 $ 6 All-in sustaining costs (per oz sold) $ 1,652 $ 1,252 $ 1,580 $ 1,131 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 11 -- 11 of 17 -- CERRO NEGRO Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Total underground ore (000 tonnes) 276 260 823 699 Tons milled/processed (000 tonnes): Mill 264 250 827 671 Average ore grade (g/tonne): Mill 9.339 8.728 7.589 10.177 Average mill recovery rate 91.5 % 94.1 % 92.5 % 93.4 % Gold produced (koz): Consolidated/Attributable 71 67 186 209 Gold sold (koz): Consolidated/Attributable 65 66 176 208 Gold production costs ($M): Costs applicable to sales (1) $ 79 $ 71 $ 232 $ 205 Depreciation and amortization $ 34 $ 32 $ 99 $ 113 Reclamation accretion $ 1 $ 1 $ 3 $ 2 Gold production costs (per oz sold): Direct mining and production costs $ 1,273 $ 1,112 $ 1,361 $ 1,015 By-product credits (90) (83) (111) (95) Royalties and production taxes 93 78 92 84 Inventory change, write-downs, and other (60) (39) (25) (18) Costs applicable to sales (per oz sold) (1) $ 1,216 $ 1,068 $ 1,317 $ 986 Depreciation and amortization $ 529 $ 487 $ 564 $ 542 Reclamation accretion $ 14 $ 10 $ 16 $ 9 All-in sustaining costs (per oz sold) $ 1,438 $ 1,411 $ 1,556 $ 1,248 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 12 -- 12 of 17 -- YANACOCHA Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore 6,390 4,698 15,532 16,194 Open pit waste 10,652 10,686 32,082 32,401 Total open pit 17,042 15,384 47,614 48,595 Tons milled/processed (000 tonnes): Leach 6,390 4,698 15,532 16,194 Average ore grade (g/tonne): Leach 0.417 0.416 0.460 0.441 Gold produced (koz): Consolidated 87 53 208 186 Attributable (1) 87 53 208 172 Gold sold (koz): Consolidated 85 53 204 190 Attributable (1) 85 53 204 174 Gold production costs ($M): Costs applicable to sales (2) $ 90 $ 74 $ 225 $ 214 Depreciation and amortization $ 27 $ 21 $ 65 $ 67 Reclamation accretion $ 1 $ 1 $ 4 $ 4 Gold production costs (per oz sold): Direct mining and production costs $ 910 $ 1,433 $ 1,106 $ 1,117 By-product credits (14) (13) (14) (12) Royalties and production taxes 57 54 58 57 Inventory change, write-downs, and other 104 (59) (48) (32) Costs applicable to sales (per oz sold) (2) $ 1,057 $ 1,415 $ 1,102 $ 1,130 Depreciation and amortization $ 314 $ 395 $ 318 $ 355 Reclamation accretion $ 16 $ 28 $ 20 $ 24 All-in sustaining costs (per oz sold) $ 1,187 $ 1,676 $ 1,290 $ 1,362 (1) The Company recognized amounts attributable to noncontrolling interest for Yanacocha during the period prior to acquiring Sumitomo Corporation's 5% interest in the second quarter of 2022. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 13 -- 13 of 17 -- BODDINGTON Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore 8,206 8,330 24,993 27,366 Open pit waste 7,189 5,337 20,411 16,855 Total open pit 15,395 13,667 45,404 44,221 Tons milled/processed (000 tonnes): Mill 9,097 8,977 27,848 27,729 Average ore grade milled: Gold (g/tonne) 0.728 0.737 0.776 0.798 Copper 0.14 % 0.11 % 0.16 % 0.13 % Average mill recovery rate: Gold 84.8 % 84.0 % 85.5 % 84.3 % Copper 84.1 % 80.9 % 84.1 % 80.8 % Gold produced (koz): Consolidated/Attributable 181 174 589 589 Gold sold (koz): Consolidated/Attributable 186 177 588 616 Co-product GEO produced (k): Consolidated/Attributable 58 45 189 160 Co-product GEO sold (k): Consolidated/Attributable 61 47 190 171 Gold production costs ($M): Costs applicable to sales (1) $ 157 $ 148 $ 483 $ 491 Depreciation and amortization $ 28 $ 28 $ 83 $ 89 Reclamation accretion $ 3 $ 2 $ 7 $ 6 Gold production costs (per oz sold): Direct mining and production costs $ 795 $ 878 $ 775 $ 748 By-product credits (18) (10) (17) (12) Royalties and production taxes 52 44 49 46 Inventory change, write-downs, and other 19 (73) 14 16 Costs applicable to sales (per oz sold) (1) $ 848 $ 839 $ 821 $ 798 Depreciation and amortization $ 147 $ 156 $ 141 $ 144 Reclamation accretion $ 12 $ 11 $ 11 $ 10 All-in sustaining costs (per oz sold) $ 1,123 $ 1,001 $ 1,039 $ 921 Co-product production costs ($M): Costs applicable to sales (1) $ 50 $ 36 $ 151 $ 131 Depreciation and amortization $ 8 $ 7 $ 26 $ 24 Reclamation accretion $ 1 $ 1 $ 2 $ 2 Co-product production costs (per GEO sold): Direct mining and production costs $ 736 $ 814 $ 731 $ 696 By-product credits (17) (10) (17) (11) Royalties and production taxes 70 41 68 56 Inventory change, write-downs, and other 27 (69) 15 27 Costs applicable to sales (per GEO sold) (1) $ 816 $ 776 $ 797 $ 768 Depreciation and amortization $ 144 $ 153 $ 140 $ 143 Reclamation accretion $ 12 $ 11 $ 11 $ 9 All-in sustaining costs (per GEO sold) $ 1,108 $ 873 $ 1,033 $ 879 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 14 -- 14 of 17 -- TANAMI Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Total underground ore (000 tonnes) 643 653 1,778 1,942 Tons milled/processed (000 tonnes): Mill 701 654 1,752 1,961 Average ore grade (g/tonne): Mill 5.566 5.939 5.644 5.775 Average mill recovery rate 98.0 % 98.7 % 98.2 % 97.9 % Gold produced (koz): Consolidated/Attributable 123 122 312 355 Gold sold (koz): Consolidated/Attributable 123 127 312 358 Gold production costs ($M): Costs applicable to sales (1) $ 81 $ 81 $ 244 $ 230 Depreciation and amortization $ 30 $ 26 $ 80 $ 74 Reclamation accretion $ — $ — $ 1 $ 1 Gold production costs (per oz sold): Direct mining and production costs $ 559 $ 590 $ 737 $ 600 By-product credits (2) (1) (2) (2) Royalties and production taxes 50 44 50 46 Inventory change, write-downs, and other 48 4 (2) (3) Costs applicable to sales (per oz sold) (1) $ 655 $ 637 $ 783 $ 641 Depreciation and amortization $ 243 $ 207 $ 257 $ 206 Reclamation accretion $ 4 $ 3 $ 4 $ 3 All-in sustaining costs (per oz sold) $ 890 $ 925 $ 1,066 $ 930 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 15 -- 15 of 17 -- AHAFO Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore 2,010 1,197 4,353 2,026 Open pit waste 5,082 5,965 16,016 21,034 Total open pit 7,092 7,162 20,369 23,060 Total underground ore (000 tonnes): 556 449 1,718 1,234 Tons milled/processed (000 tonnes): Mill 1,573 2,663 6,149 8,130 Average ore grade (g/tonne): Mill 2.748 1.889 2.174 1.638 Average mill recovery rate 94.4 % 93.1 % 93.6 % 92.0 % Gold produced (koz): Consolidated/Attributable 133 155 398 397 Gold sold (koz): Consolidated/Attributable 137 153 401 396 Gold production costs ($M): Costs applicable to sales (1) $ 133 $ 155 $ 384 $ 390 Depreciation and amortization $ 47 $ 43 $ 128 $ 116 Reclamation accretion $ 2 $ 1 $ 5 $ 3 Gold production costs (per oz sold): Direct mining and production costs $ 849 $ 790 $ 872 $ 859 By-product credits (1) (1) (2) (1) Royalties and production taxes 146 112 136 114 Inventory change, write-downs, and other (25) 110 (49) 12 Costs applicable to sales (per oz sold) (1) $ 969 $ 1,011 $ 957 $ 984 Depreciation and amortization $ 338 $ 278 $ 319 $ 292 Reclamation accretion $ 12 $ 7 $ 12 $ 8 All-in sustaining costs (per oz sold) $ 1,208 $ 1,161 $ 1,269 $ 1,167 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 16 -- 16 of 17 -- AKYEM Three Months Ended September 30, Nine Months Ended September 30, 2023 2022 2023 2022 Open pit tons mined (000 tonnes): Open pit ore 1,088 1,445 2,376 3,936 Open pit waste 4,601 6,622 17,193 17,917 Total open pit 5,689 8,067 19,569 21,853 Tons milled/processed (000 tonnes): Mill 1,896 2,064 5,678 6,225 Average ore grade milled (g/tonne): Mill 1.394 1.766 1.165 1.645 Average mill recovery rate 89.4 % 88.9 % 89.2 % 89.1 % Gold produced (koz): Consolidated/Attributable 75 99 195 298 Gold sold (koz): Consolidated/Attributable 71 100 198 299 Gold production costs ($M): Costs applicable to sales (1) $ 72 $ 77 $ 189 $ 220 Depreciation and amortization $ 31 $ 32 $ 86 $ 95 Reclamation accretion $ 3 $ 1 $ 9 $ 4 Gold production costs (per oz sold): Direct mining and production costs $ 848 $ 680 $ 914 $ 641 By-product credits (3) (3) (6) (3) Royalties and production taxes 121 90 111 95 Inventory change, write-downs, and other 66 9 (61) 4 Costs applicable to sales (per oz sold) (1) $ 1,032 $ 776 $ 958 $ 737 Depreciation and amortization $ 438 $ 323 $ 433 $ 318 Reclamation accretion $ 42 $ 15 $ 45 $ 15 All-in sustaining costs (per oz sold) $ 1,332 $ 930 $ 1,260 $ 900 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2023 | OPERATING STATISTICS 17 -- 17 of 17 --