Newmont Third Quarter 2024 Operating Statistics DENVER, October 23, 2024 Newmont has developed gold equivalent ounces ("GEO") metrics to provide a comparable basis for analysis and understanding of our operations and performance related to copper, silver, lead, and zinc. Gold equivalent ounces are calculated as pounds or ounces produced or sold multiplied by the ratio of the other metals’ price to the gold price using Gold ($1,400/oz.), Copper ($3.50/lb.), Silver ($20.00/oz.), Lead ($1.00/lb.), and Zinc ($1.20/lb.) pricing for 2024 and 2023. Per unit measures may not recalculate due to rounding. PRODUCTION VOLUMES Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Gold ounces produced (thousands): CC&V 38 45 101 134 Musselwhite 52 48 155 130 Porcupine 67 64 219 190 Éléonore 54 50 171 164 Red Chris (1)(2) 9 — 24 — Brucejack (1) 89 — 186 — Peñasquito (3) 63 — 172 123 Merian 58 83 195 219 Cerro Negro 60 71 160 186 Yanacocha 93 87 262 208 Boddington 137 181 426 589 Tanami 102 123 291 312 Cadia (1) 115 — 354 — Telfer (1)(7) 6 — 51 — Lihir (1) 129 — 451 — Ahafo 213 133 587 398 Akyem 47 75 163 195 Nevada Gold Mines (4) 242 300 759 848 Total Consolidated Newmont 1,574 1,260 4,727 3,696 Merian (25%) (15) (21) (49) (55) Pueblo Viejo (5) 66 52 173 163 Fruta Del Norte (1)(6) 43 — 99 — Total Attributable Newmont 1,668 1,291 4,950 3,804 NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 1 -- 1 of 31 -- PRODUCTION VOLUMES Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Other metals produced: Red Chris copper tonnes (thousands) (1)(2) 6 — 17 — Boddington copper tonnes (thousands) 9 10 28 34 Cadia copper tonnes (thousands) (1) 21 — 64 — Telfer copper tonnes (thousands) (1)(7) 1 — 2 — Total copper tonnes (thousands) 37 10 111 34 Peñasquito silver ounces (millions) (3) 7 — 24 14 Peñasquito lead tonnes (thousands) (3) 19 — 67 39 Peñasquito zinc tonnes (thousands) (3) 58 — 181 82 (1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. (4) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method. (5) Newmont has a 40% interest in Pueblo Viejo, which is accounted for as an equity method investment. (6) Newmont has a 31.9% interest in Lundin Gold, who wholly owns and operates the Fruta del Norte mine, which is accounted for as an equity method investment on a quarter lag. (7) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily ceased placing new tailings on the facility. Production resumed at the end of the third quarter. In September 2024, the Company entered into a binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 2 -- 2 of 31 -- SALES VOLUMES Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Gold ounces sold (thousands): CC&V 38 46 100 135 Musselwhite 50 47 155 132 Porcupine 70 61 218 189 Éléonore 52 46 171 165 Red Chris (1)(2) 8 — 24 — Brucejack (1) 101 — 181 — Peñasquito (3) 56 (1) 164 103 Merian 64 83 199 219 Cerro Negro 60 65 161 176 Yanacocha 89 85 257 204 Boddington 124 186 402 588 Tanami 100 123 290 312 Cadia (1) 113 — 350 — Telfer (1)(5) 5 — 64 — Lihir (1) 127 — 457 — Ahafo 221 137 585 401 Akyem 46 71 169 198 Nevada Gold Mines (4) 244 301 763 847 Total Consolidated Newmont 1,568 1,250 4,710 3,669 Merian (25%) (17) (21) (50) (55) Total Attributable Newmont 1,551 1,229 4,660 3,614 Other metals sold: Red Chris copper tonnes (thousands) (1)(2) 6 — 18 — Boddington copper tonnes (thousands) 8 11 26 34 Cadia copper tonnes (thousands) (1) 21 — 64 — Telfer copper tonnes (thousands) (1)(5) — — 2 — Total copper tonnes (thousands) 35 11 110 34 Peñasquito silver ounces (millions) (3) 6 — 24 12 Peñasquito lead tonnes (thousands) (3) 17 — 66 33 Peñasquito zinc tonnes (thousands) (3) 61 (1) 174 85 (1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. (4) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method. (5) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily ceased placing new tailings on the facility. Production resumed at the end of the third quarter. In September 2024, the Company entered into a binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 3 -- 3 of 31 -- COSTS APPLICABLE TO SALES (1)(2) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Gold Costs Applicable to Sales ($/ounce) CC&V $ 1,416 $ 1,253 $ 1,391 $ 1,165 Musselwhite $ 993 $ 1,045 $ 1,050 $ 1,230 Porcupine $ 1,114 $ 1,189 $ 1,076 $ 1,160 Éléonore $ 1,344 $ 1,338 $ 1,398 $ 1,280 Red Chris (3) $ 2,228 $ — $ 1,411 $ — Brucejack (3) $ 970 $ — $ 1,302 $ — Peñasquito (4) $ 985 N.M. $ 888 $ 1,196 Merian $ 1,795 $ 1,261 $ 1,504 $ 1,231 Cerro Negro $ 1,535 $ 1,216 $ 1,393 $ 1,317 Yanacocha $ 1,072 $ 1,057 $ 1,015 $ 1,102 Boddington $ 1,098 $ 848 $ 1,043 $ 821 Tanami $ 979 $ 655 $ 968 $ 783 Cadia (3) $ 723 $ — $ 664 $ — Telfer (3)(5) N.M. $ — $ 2,996 $ — Lihir (3) $ 1,619 $ — $ 1,179 $ — Ahafo $ 867 $ 969 $ 900 $ 957 Akyem $ 2,051 $ 1,032 $ 1,491 $ 958 Nevada Gold Mines $ 1,311 $ 992 $ 1,234 $ 1,049 Total Newmont - Gold $ 1,207 $ 1,019 $ 1,138 $ 1,033 Co-product GEO Costs Applicable to Sales ($/GEO) Red Chris (3) $ 2,231 $ — $ 1,372 $ — Peñasquito (4) $ 990 N.M. $ 905 $ 1,183 Boddington $ 1,017 $ 816 $ 994 $ 797 Cadia (3) $ 685 $ — $ 609 $ — Telfer (3)(5) N.M. $ — $ 2,795 $ — Total Newmont - Co-product GEO $ 1,015 $ 1,636 $ 887 $ 1,056 Co-product by metal Costs Applicable to Sales ($/unit) Red Chris - copper ($/tonne) (3) $ 12,296 $ — $ 7,564 $ — Boddington - copper ($/tonne) $ 5,605 $ 4,497 $ 5,481 $ 4,392 Cadia - copper ($/tonne) (3) $ 3,774 $ — $ 3,358 $ — Telfer - copper ($/tonne) (3)(5) N.M. $ — $ 15,404 $ — Total Copper CAS ($/tonne) $ 5,748 $ 4,497 $ 4,768 $ 4,392 Peñasquito - silver ($/oz) (4) $ 13 N.M. $ 12 $ 16 Peñasquito - lead ($/tonne) (4) $ 1,555 N.M. $ 1,343 $ 1,905 Peñasquito - zinc ($/tonne) (4) $ 1,944 N.M. $ 1,858 $ 2,287 (1) Costs applicable to sales (CAS) per unit, included at the consolidated and site level, are non-GAAP metrics and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov. (2) Consolidated CAS excludes Depreciation and amortization and Reclamation and remediation. (3) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (4) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are not meaningful ("N.M."). (5) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary suspension of production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 4 -- 4 of 31 -- ALL-IN SUSTAINING COSTS (1) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Gold All-In Sustaining Costs ($/ounce) CC&V $ 1,712 $ 1,819 $ 1,715 $ 1,603 Musselwhite $ 1,574 $ 1,715 $ 1,570 $ 1,869 Porcupine $ 1,451 $ 1,644 $ 1,422 $ 1,545 Éléonore $ 1,924 $ 2,107 $ 1,914 $ 1,855 Red Chris (2) $ 2,633 $ — $ 1,882 $ — Brucejack (2) $ 1,197 $ — $ 1,642 $ — Peñasquito (3) $ 1,224 N.M. $ 1,112 $ 1,569 Merian $ 2,153 $ 1,652 $ 1,926 $ 1,580 Cerro Negro $ 1,878 $ 1,438 $ 1,725 $ 1,556 Yanacocha $ 1,285 $ 1,187 $ 1,207 $ 1,290 Boddington $ 1,398 $ 1,123 $ 1,289 $ 1,039 Tanami $ 1,334 $ 890 $ 1,256 $ 1,066 Cadia (2) $ 1,078 $ — $ 1,044 $ — Telfer (2)(4) N.M. $ — $ 3,823 $ — Lihir (2) $ 1,883 $ — $ 1,416 $ — Ahafo $ 1,043 $ 1,208 $ 1,057 $ 1,269 Akyem $ 2,230 $ 1,332 $ 1,716 $ 1,260 Nevada Gold Mines $ 1,675 $ 1,307 $ 1,645 $ 1,364 Total Newmont $ 1,611 $ 1,426 $ 1,537 $ 1,425 Co-product GEO All-In Sustaining Costs ($/GEO) Red Chris (2) $ 2,714 $ — $ 1,885 $ — Peñasquito $ 1,286 N.M. $ 1,175 $ 1,648 Boddington $ 1,168 $ 1,108 $ 1,166 $ 1,033 Cadia (2) $ 880 $ — $ 977 $ — Telfer (2)(4) N.M. $ — $ 3,811 $ — Total Newmont $ 1,338 $ 2,422 $ 1,225 $ 1,511 Co-product by metal All-In Sustaining Costs ($/unit) Red Chris - copper ($/tonne) (2) $ 14,960 $ — $ 10,390 $ — Boddington - copper ($/tonne) $ 6,436 $ 6,105 $ 6,424 $ 5,696 Cadia - copper ($/tonne) (2) $ 4,849 $ — $ 5,386 $ — Telfer - copper ($/tonne) (2)(4) N.M. $ — $ 21,007 $ — Total Copper AISC ($/tonne) $ 7,423 $ 6,501 $ 6,818 $ 6,029 Peñasquito - silver ($/oz) (3) $ 17 N.M. $ 15 $ 22 Peñasquito - lead ($/tonne) (3) $ 1,879 N.M. $ 1,626 $ 2,463 Peñasquito - zinc ($/tonne) (3) $ 2,614 N.M. $ 2,493 $ 3,358 (1) All-in sustaining costs (AISC) per unit, included at the consolidated and site level, is a non-GAAP metric and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov. (2) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (3) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are not meaningful ("N.M."). (4) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary suspension of production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 5 -- 5 of 31 -- CAPITAL EXPENDITURES Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Consolidated Capital Expenditures ($ millions) CC&V $ 7 $ 21 $ 20 $ 44 Musselwhite 27 29 74 74 Porcupine 64 37 159 95 Éléonore 27 29 77 74 Red Chris (1)(2) 41 — 125 — Brucejack (1) 17 — 52 — Peñasquito 32 9 90 81 Merian 14 26 64 61 Cerro Negro 58 44 135 118 Yanacocha 21 81 54 209 Boddington 34 54 91 128 Tanami 108 98 298 287 Cadia (1) 155 — 400 — Telfer (1) 15 — 39 — Lihir (1) 44 — 139 — Ahafo 102 73 273 240 Akyem 4 9 20 31 Nevada Gold Mines (3) 103 132 347 339 Corporate and other 7 10 15 37 Accrual basis $ 880 $ 652 $ 2,472 $ 1,818 Decrease (increase) in non-cash adjustments (3) (48) 55 (72) Cash basis $ 877 $ 604 $ 2,527 $ 1,746 (1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 6 -- 6 of 31 -- CC&V Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 4,866 6,783 15,972 19,960 Open pit waste 4,212 3,372 10,949 8,910 Total open pit 9,078 10,155 26,921 28,870 Tons milled/processed (000 tonnes): Leach 5,077 6,671 16,041 19,666 Average ore grade (g/tonne): Leach 0.440 0.473 0.445 0.442 Gold ounces produced (thousands): Consolidated/Attributable 38 45 101 134 Gold ounces sold (thousands): Consolidated/Attributable 38 46 100 135 Gold production costs ($ millions): Costs applicable to sales (1) $ 54 $ 57 $ 139 $ 157 Depreciation and amortization $ 3 $ 6 $ 10 $ 19 Reclamation accretion $ 3 $ 3 $ 8 $ 8 Gold production costs ($/ounce): Direct mining and production costs $ 1,471 $ 1,325 $ 1,670 $ 1,305 By-product credits (11) (2) (17) (8) Royalties and production taxes 117 154 133 116 Inventory change, write-downs, and other (161) (224) (395) (248) Costs applicable to sales ($/ounce) (1) $ 1,416 $ 1,253 $ 1,391 $ 1,165 Depreciation and amortization $ 85 $ 126 $ 99 $ 142 Reclamation accretion $ 73 $ 56 $ 82 $ 56 All-in sustaining costs ($/ounce) $ 1,712 $ 1,819 $ 1,715 $ 1,603 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 7 -- 7 of 31 -- MUSSELWHITE Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 261 244 780 758 Tons milled/processed (000 tonnes): Mill 260 246 779 760 Average ore grade (g/tonne): Mill 6.716 6.345 6.487 5.554 Average mill recovery rate 96.6 % 96.0 % 96.3 % 95.7 % Gold ounces produced (thousands): Consolidated/Attributable 52 48 155 130 Gold ounces sold (thousands): Consolidated/Attributable 50 47 155 132 Gold production costs ($ millions): Costs applicable to sales (1) $ 50 $ 50 $ 163 $ 163 Depreciation and amortization $ — $ 21 $ 18 $ 58 Reclamation accretion $ 1 $ — $ 3 $ 2 Gold production costs ($/ounce): Direct mining and production costs $ 1,019 $ 985 $ 1,000 $ 1,166 By-product credits (3) (2) (3) (2) Royalties and production taxes 61 46 55 54 Inventory change, write-downs, and other (84) 16 (2) 12 Costs applicable to sales ($/ounce) (1) $ 993 $ 1,045 $ 1,050 $ 1,230 Depreciation and amortization $ — $ 441 $ 119 $ 439 Reclamation accretion $ 17 $ 17 $ 16 $ 18 All-in sustaining costs ($/ounce) $ 1,574 $ 1,715 $ 1,570 $ 1,869 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 8 -- 8 of 31 -- PORCUPINE Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 3 526 482 2,161 Open pit waste — 981 663 3,692 Total open pit 3 1,507 1,145 5,853 Total underground ore (000 tonnes) 200 205 648 625 Tons milled/processed (000 tonnes): Mill 721 793 2,183 2,176 Average ore grade milled (g/tonne): Mill 2.982 2.838 3.322 2.939 Average mill recovery rate 92.7 % 90.5 % 93.2 % 91.5 % Gold ounces produced (thousands): Consolidated/Attributable 67 64 219 190 Gold ounces sold (thousands): Consolidated/Attributable 70 61 218 189 Gold production costs ($ millions): Costs applicable to sales (1) $ 78 $ 73 $ 235 $ 220 Depreciation and amortization $ 2 $ 29 $ 34 $ 85 Reclamation accretion $ 2 $ 2 $ 7 $ 6 Gold production costs ($/ounce): Direct mining and production costs $ 931 $ 1,161 $ 976 $ 1,224 By-product credits (9) (4) (6) (4) Royalties and production taxes 51 25 38 25 Inventory change, write-downs, and other 141 7 68 (85) Costs applicable to sales ($/ounce) (1) $ 1,114 $ 1,189 $ 1,076 $ 1,160 Depreciation and amortization $ 31 $ 473 $ 158 $ 447 Reclamation accretion $ 33 $ 34 $ 32 $ 33 All-in sustaining costs ($/ounce) $ 1,451 $ 1,644 $ 1,422 $ 1,545 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 9 -- 9 of 31 -- ÉLÉONORE Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 423 382 1,345 1,181 Tons milled/processed (000 tonnes): Mill 408 393 1,330 1,185 Average ore grade (g/tonne): Mill 4.741 4.569 4.492 4.776 Average mill recovery rate 91.8 % 91.3 % 91.2 % 91.0 % Gold ounces produced (thousands): Consolidated/Attributable 54 50 171 164 Gold ounces sold (thousands): Consolidated/Attributable 52 46 171 165 Gold production costs ($ millions): Costs applicable to sales (1) $ 70 $ 63 $ 239 $ 212 Depreciation and amortization $ — $ 22 $ 21 $ 73 Reclamation accretion $ 1 $ — $ 3 $ 2 Gold production costs ($/ounce): Direct mining and production costs $ 1,384 $ 1,369 $ 1,377 $ 1,251 By-product credits (3) (2) (2) (2) Royalties and production taxes 55 42 53 44 Inventory change, write-downs, and other (92) (71) (30) (13) Costs applicable to sales ($/ounce) (1) $ 1,344 $ 1,338 $ 1,398 $ 1,280 Depreciation and amortization $ — $ 478 $ 125 $ 441 Reclamation accretion $ 18 $ 16 $ 16 $ 14 All-in sustaining costs ($/ounce) $ 1,924 $ 2,107 $ 1,914 $ 1,855 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 10 -- 10 of 31 -- RED CHRIS - GOLD (1)(2) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 2,847 — 7,895 — Open pit waste 1,758 — 7,023 — Total open pit 4,605 — 14,918 — Tonnes milled/processed (000 tonnes): Mill 1,397 — 4,610 — Average ore grade (g/tonne): Mill 0.365 — 0.309 — Average mill recovery rate 57.3 % — % 54.3 % — % Gold ounces produced (thousands): Consolidated/Attributable 9 — 24 — Gold ounces sold (thousands): Consolidated/Attributable 8 — 24 — Gold production costs ($ millions): Costs applicable to sales (3) $ 21 $ — $ 35 $ — Depreciation and amortization $ 7 $ — $ 11 $ — Reclamation accretion $ — $ — $ — $ — Gold production costs ($/ounce): Direct mining and production costs $ 1,493 $ — $ 1,397 $ — By-product credits (3) — (5) — Royalties and production taxes 33 — 33 — Inventory change, write-downs, and other 705 — (14) — Costs applicable to sales ($/ounce) (3) $ 2,228 $ — $ 1,411 $ — Depreciation and amortization $ 723 $ — $ 436 $ — Reclamation accretion $ 12 $ — $ 12 $ — All-in sustaining costs ($/ounce) $ 2,633 $ — $ 1,882 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 11 -- 11 of 31 -- RED CHRIS - COPPER (1)(2) Three Months Ended March 31, Three Months Ended March 31, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 2,847 — 7,895 — Open pit waste 1,758 — 7,023 — Total open pit 4,605 — 14,918 — Tonnes milled/processed (000 tonnes): Mill 1,397 — 4,610 — Average ore grade: Mill 0.50 % — % 0.47 % — % Average mill recovery rate 85.6 % — % 83.2 % — % Copper tonnes produced (thousands): Consolidated/Attributable 6 — 17 — Copper tonnes sold (thousands): Consolidated/Attributable 6 — 18 — Co-product GEO produced (thousands): Consolidated/Attributable 32 — 95 — Co-product GEO sold (thousands): Consolidated/Attributable 31 — 98 — Co-product production costs ($ millions): Costs applicable to sales (3) $ 71 $ — $ 135 $ — Depreciation and amortization $ 22 $ — $ 41 $ — Reclamation accretion $ — $ — $ 1 $ — Copper production costs ($/tonne): Direct mining and production costs $ 8,241 — $ 7,751 $ — By-product credits (16) — (27) — Royalties and production taxes 180 — 185 — Inventory change, write-downs, and other 3,891 — (345) — Costs applicable to sales ($/tonne) (3) $ 12,296 — $ 7,564 $ — Depreciation and amortization $ 3,991 — $ 2,323 $ — Reclamation accretion $ 68 — $ 68 $ — All-in sustaining costs ($/tonne) $ 14,960 $ — $ 10,390 $ — Copper production costs ($/GEO): Direct mining and production costs $ 1,495 $ — $ 1,407 $ — By-product credits (3) — (5) — Royalties and production taxes 33 — 33 — Inventory change, write-downs, and other 706 — (63) — Costs applicable to sales ($/GEO) (3) $ 2,231 $ — $ 1,372 $ — Depreciation and amortization $ 724 $ — $ 421 $ — Reclamation accretion $ 12 $ — $ 12 $ — All-in sustaining costs ($/GEO) $ 2,714 $ — $ 1,885 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 12 -- 12 of 31 -- BRUCEJACK (1) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 284 — 789 — Tonnes milled/processed (000 tonnes): Mill 278 — 773 — Average ore grade (g/tonne): Mill 10.104 — 7.808 — Average mill recovery rate 97.1 % — % 96.7 % — % Gold ounces produced (thousands): Consolidated/Attributable 89 — 186 — Gold ounces sold (thousands): Consolidated/Attributable 101 — 181 — Gold production costs ($ millions): Costs applicable to sales (2) $ 98 $ — $ 236 $ — Depreciation and amortization $ 70 $ — $ 141 $ — Reclamation accretion $ 1 $ — $ 2 $ — Gold production costs ($/ounce): Direct mining and production costs $ 817 $ — $ 1,345 $ — By-product credits (36) — (34) — Royalties and production taxes 31 — 30 — Inventory change, write-downs, and other 158 — (39) — Costs applicable to sales ($/ounce) (2) $ 970 $ — $ 1,302 $ — Depreciation and amortization $ 689 $ — $ 777 $ — Reclamation accretion $ 5 $ — $ 9 $ — All-in sustaining costs ($/ounce) $ 1,197 $ — $ 1,642 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 13 -- 13 of 31 -- PEÑASQUITO - GOLD Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 10,498 — 30,300 13,825 Open pit waste 23,265 — 77,051 58,470 Total open pit 33,763 — 107,351 72,295 Tons milled/processed (000 tonnes): Mill 7,483 — 23,963 15,806 Average ore grade (g/tonne): Mill 0.520 — 0.459 0.450 Average mill recovery rate 58.0 % — % 56.2 % 59.8 % Gold ounces produced (thousands): Consolidated/Attributable (1) 63 — 172 123 Gold ounces sold (thousands): Consolidated/Attributable (1) 56 (1) 164 103 Gold production costs ($ millions): Costs applicable to sales (2) $ 54 $ 16 $ 145 $ 123 Depreciation and amortization $ 22 $ 12 $ 59 $ 47 Reclamation accretion $ 1 $ 1 $ 3 $ 3 Gold production costs ($/ounce): Direct mining and production costs (1) $ 1,079 N.M. $ 905 $ 1,296 By-product credits (1) (8) N.M. (8) (6) Royalties and production taxes (1) 42 N.M. 38 34 Inventory change, write-downs, and other (1) (128) N.M. (47) (128) Costs applicable to sales ($/ounce) (1)(2) $ 985 N.M. $ 888 $ 1,196 Depreciation and amortization (1) $ 396 N.M. $ 363 $ 458 Reclamation accretion (1) $ 20 N.M. $ 17 $ 29 All-in sustaining costs ($/ounce) (1) $ 1,224 N.M. $ 1,112 $ 1,569 (1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are not meaningful ("N.M."). (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 14 -- 14 of 31 -- PEÑASQUITO - SILVER Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 10,498 — 30,300 13,825 Open pit waste 23,265 — 77,051 58,470 Total open pit 33,763 — 107,351 72,295 Tons milled/processed (000 tonnes): Mill 7,483 — 23,963 15,806 Average ore grade (g/tonne): Mill 37.350 — 42.820 37.030 Average mill recovery rate 79.5 % — % 81.1 % 81.2 % Silver ounces produced (millions): Consolidated/Attributable (1) 7 — 24 14 Silver ounces sold (millions): Consolidated/Attributable (1) 6 — 24 12 Co-product production costs ($ millions): Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456 Depreciation and amortization $ 85 $ 41 $ 267 $ 173 Reclamation accretion $ 4 $ 3 $ 12 $ 10 Silver production costs ($/ounce): Direct mining and production costs (1) $ 14 N.M. $ 11 $ 17 By-product credits (1) — N.M. — — Royalties and production taxes (1) 1 N.M. 1 — Inventory change, write-downs, and other (1) (2) N.M. — (1) Costs applicable to sales ($/ounce) (1)(2) $ 13 N.M. $ 12 $ 16 Depreciation and amortization (1) $ 5 N.M. $ 5 $ 6 Reclamation accretion (1) $ — N.M. $ — $ — All-in sustaining costs ($/ounce) (1) $ 17 N.M. $ 15 $ 22 (1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are not meaningful ("N.M."). (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 15 -- 15 of 31 -- PEÑASQUITO - ZINC Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 10,498 — 30,300 13,825 Open pit waste 23,265 — 77,051 58,470 Total open pit 33,763 — 107,351 72,295 Tons milled/processed (000 tonnes): Mill 7,483 — 23,963 15,806 Average ore grade: Mill 1.12 % — % 1.09 % 0.78 % Average mill recovery rate 83.8 % — % 82.4 % 79.7 % Zinc tonnes produced (thousands): Consolidated/Attributable (1) 58 — 181 82 Zinc tonnes sold (thousands): Consolidated/Attributable (1) 61 (1) 174 85 Co-product production costs ($ millions): Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456 Depreciation and amortization $ 85 $ 41 $ 267 $ 173 Reclamation accretion $ 4 $ 3 $ 12 $ 10 Zinc production costs ($/tonne): Direct mining and production costs (1) $ 1,933 N.M. $ 1,901 $ 2,155 By-product credits (1) (12) N.M. (15) (10) Royalties and production taxes (1) 66 N.M. 71 53 Inventory change, write-downs, and other (1) (43) N.M. (99) 89 Costs applicable to sales ($/tonne) (1)(2) $ 1,944 N.M. $ 1,858 $ 2,287 Depreciation and amortization (1) $ 714 N.M. $ 659 $ 821 Reclamation accretion (1) $ 31 N.M. $ 31 $ 46 All-in sustaining costs ($/tonne) (1) $ 2,614 N.M. $ 2,493 $ 3,358 (1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are not meaningful ("N.M."). (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 16 -- 16 of 31 -- PEÑASQUITO - LEAD Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 10,498 — 30,300 13,825 Open pit waste 23,265 — 77,051 58,470 Total open pit 33,763 — 107,351 72,295 Tons milled/processed (000 tonnes): Mill 7,483 — 23,963 15,806 Average ore grade: Mill 0.36 % — % 0.40 % 0.37 % Average mill recovery rate 76.7 % — % 74.5 % 70.7 % Lead tonnes produced (thousands): Consolidated/Attributable (1) 19 — 67 39 Lead tonnes sold (thousands): Consolidated/Attributable (1) 17 — 66 33 Co-product production costs ($ millions): Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456 Depreciation and amortization $ 85 $ 41 $ 267 $ 173 Reclamation accretion $ 4 $ 3 $ 12 $ 10 Lead production costs ($/tonne): Direct mining and production costs (1) $ 1,735 N.M. $ 1,353 $ 2,029 By-product credits (1) (13) N.M. (12) (10) Royalties and production taxes (1) 68 N.M. 57 55 Inventory change, write-downs, and other (1) (235) N.M. (55) (169) Costs applicable to sales ($/tonne) (1)(2) $ 1,555 N.M. $ 1,343 $ 1,905 Depreciation and amortization (1) $ 636 N.M. $ 557 $ 758 Reclamation accretion (1) $ 32 N.M. $ 26 $ 48 All-in sustaining costs ($/tonne) (1) $ 1,879 N.M. $ 1,626 $ 2,463 (1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are not meaningful ("N.M."). (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 17 -- 17 of 31 -- PEÑASQUITO - CO-PRODUCT GEO Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 10,498 — 30,300 13,825 Open pit waste 23,265 — 77,051 58,470 Total open pit 33,763 — 107,351 72,295 Tons milled/processed (000 tonnes): Mill 7,483 — 23,963 15,806 Average ore grade milled: Silver (g/tonne) 37.350 — 42.820 37.030 Zinc 1.12 % — % 1.09 % 0.78 % Lead 0.36 % — % 0.40 % 0.37 % Average mill recovery rate: Silver 79.5 % — % 81.1 % 81.2 % Zinc 83.8 % — % 82.4 % 79.7 % Lead 76.7 % — % 74.5 % 70.7 % Co-product GEO produced (thousands): Consolidated/Attributable (1) 229 — 785 413 Co-product GEO sold (thousands): Consolidated/Attributable (1) 222 (2) 766 385 Co-product production costs ($ millions): Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456 Depreciation and amortization $ 85 $ 41 $ 267 $ 173 Reclamation accretion $ 4 $ 3 $ 12 $ 10 Co-product production costs ($/GEO): Direct mining and production costs (1) $ 1,037 N.M. $ 917 $ 1,196 By-product credits (1) (7) N.M. (8) (6) Royalties and production taxes (1) 38 N.M. 37 31 Inventory change, write-downs, and other (1) (78) N.M. (41) (38) Costs applicable to sales ($/GEO) (1)(2) $ 990 N.M. $ 905 $ 1,183 Depreciation and amortization (1) $ 382 N.M. $ 348 $ 449 Reclamation accretion (1) $ 18 N.M. $ 16 $ 27 All-in sustaining costs ($/GEO) (1) $ 1,286 N.M. $ 1,175 $ 1,648 (1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are not meaningful ("N.M."). (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 18 -- 18 of 31 -- MERIAN Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 2,740 2,929 8,227 6,422 Open pit waste 9,951 9,047 30,473 21,736 Total open pit 12,691 11,976 38,700 28,158 Tons milled/processed (000 tonnes): Mill 3,231 3,680 10,714 10,381 Average ore grade (g/tonne): Mill 0.605 0.775 0.596 0.746 Average mill recovery rate 94.3 % 90.5 % 92.6 % 91.6 % Gold ounces produced (thousands): Consolidated 58 83 195 219 Attributable 43 62 146 164 Gold ounces sold (thousands): Consolidated 64 83 199 219 Attributable 47 62 149 164 Gold production costs ($ millions): Costs applicable to sales (1) $ 113 $ 104 $ 299 $ 269 Depreciation and amortization $ 24 $ 23 $ 63 $ 56 Reclamation accretion $ 1 $ 1 $ 3 $ 2 Gold production costs ($/ounce): Direct mining and production costs $ 1,437 $ 1,010 $ 1,341 $ 1,168 By-product credits (1) — (1) (1) Royalties and production taxes 151 116 138 115 Inventory change, write-downs, and other 208 135 26 (51) Costs applicable to sales ($/ounce) (1) $ 1,795 $ 1,261 $ 1,504 $ 1,231 Depreciation and amortization $ 374 $ 279 $ 315 $ 258 Reclamation accretion $ 17 $ 9 $ 16 $ 10 All-in sustaining costs ($/ounce) $ 2,153 $ 1,652 $ 1,926 $ 1,580 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 19 -- 19 of 31 -- CERRO NEGRO (1) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 239 276 579 823 Tons milled/processed (000 tonnes): Mill 239 264 578 827 Average ore grade (g/tonne): Mill 8.351 9.339 9.067 7.589 Average mill recovery rate 93.8 % 91.5 % 94.2 % 92.5 % Gold ounces produced (thousands): Consolidated/Attributable 60 71 160 186 Gold ounces sold (thousands): Consolidated/Attributable 60 65 161 176 Gold production costs ($ millions): Costs applicable to sales (1) $ 91 $ 79 $ 224 $ 232 Depreciation and amortization $ 31 $ 34 $ 83 $ 99 Reclamation accretion $ 1 $ 1 $ 3 $ 3 Gold production costs ($/ounce): Direct mining and production costs $ 1,472 $ 1,273 $ 1,436 $ 1,361 By-product credits (118) (90) (111) (111) Royalties and production taxes 122 93 115 92 Inventory change, write-downs, and other 59 (60) (47) (25) Costs applicable to sales ($/ounce) (1) $ 1,535 $ 1,216 $ 1,393 $ 1,317 Depreciation and amortization $ 532 $ 529 $ 519 $ 564 Reclamation accretion $ 19 $ 14 $ 21 $ 16 All-in sustaining costs ($/ounce) $ 1,878 $ 1,438 $ 1,725 $ 1,556 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 20 -- 20 of 31 -- YANACOCHA Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 8,613 6,390 17,566 15,532 Open pit waste 6,806 10,652 26,723 32,082 Total open pit 15,419 17,042 44,289 47,614 Tons milled/processed (000 tonnes): Leach 8,613 6,390 17,566 15,532 Average ore grade (g/tonne): Leach 0.397 0.417 0.383 0.460 Gold ounces produced (thousands): Consolidated/Attributable 93 87 262 208 Gold ounces sold (thousands): Consolidated/Attributable 89 85 257 204 Gold production costs ($ millions): Costs applicable to sales (1) $ 96 $ 90 $ 261 $ 225 Depreciation and amortization $ 23 $ 27 $ 74 $ 65 Reclamation accretion $ 2 $ 1 $ 6 $ 4 Gold production costs ($/ounce): Direct mining and production costs $ 1,100 $ 910 $ 943 $ 1,106 By-product credits (21) (14) (18) (14) Royalties and production taxes 75 57 69 58 Inventory change, write-downs, and other (82) 104 21 (48) Costs applicable to sales ($/ounce) (1) $ 1,072 $ 1,057 $ 1,015 $ 1,102 Depreciation and amortization $ 255 $ 314 $ 289 $ 318 Reclamation accretion $ 21 $ 16 $ 22 $ 20 All-in sustaining costs ($/ounce) $ 1,285 $ 1,187 $ 1,207 $ 1,290 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 21 -- 21 of 31 -- BODDINGTON - GOLD Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 6,307 8,206 18,777 24,993 Open pit waste 7,997 7,189 30,443 20,411 Total open pit 14,304 15,395 49,220 45,404 Tons milled/processed (000 tonnes): Mill 8,439 9,097 25,412 27,848 Average ore grade (g/tonne): Mill 0.600 0.728 0.616 0.776 Average mill recovery rate 84.8 % 84.8 % 85.4 % 85.5 % Gold ounces produced (thousands): Consolidated/Attributable 137 181 426 589 Gold ounces sold (thousands): Consolidated/Attributable 124 186 402 588 Gold production costs ($ millions): Costs applicable to sales (1) $ 136 $ 157 $ 419 $ 483 Depreciation and amortization $ 25 $ 28 $ 77 $ 83 Reclamation accretion $ 2 $ 3 $ 7 $ 7 Gold production costs ($/ounce): Direct mining and production costs $ 1,192 $ 795 $ 1,132 $ 775 By-product credits (26) (18) (23) (17) Royalties and production taxes 65 52 60 49 Inventory change, write-downs, and other (133) 19 (126) 14 Costs applicable to sales ($/ounce) (1) $ 1,098 $ 848 $ 1,043 $ 821 Depreciation and amortization $ 203 $ 147 $ 191 $ 141 Reclamation accretion $ 19 $ 12 $ 17 $ 11 All-in sustaining costs ($/ounce) $ 1,398 $ 1,123 $ 1,289 $ 1,039 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 22 -- 22 of 31 -- BODDINGTON - COPPER Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 6,307 8,206 18,777 24,993 Open pit waste 7,997 7,189 30,443 20,411 Total open pit 14,304 15,395 49,220 45,404 Tons milled/processed (000 tonnes): Mill 8,439 9,097 25,412 27,848 Average ore grade: Mill 0.13 % 0.14 % 0.14 % 0.16 % Average mill recovery rate 82.6 % 84.1 % 83.5 % 84.1 % Copper tonnes produced (thousands): Consolidated/Attributable 9 10 28 34 Copper tonnes sold (thousands): Consolidated/Attributable 8 11 26 34 Co-product GEO produced (thousands): Consolidated/Attributable 48 58 152 189 Co-product GEO sold (thousands): Consolidated/Attributable 43 61 141 190 Co-product production costs ($ millions): Costs applicable to sales (1) $ 44 $ 50 $ 141 $ 151 Depreciation and amortization $ 9 $ 8 $ 27 $ 26 Reclamation accretion $ 1 $ 1 $ 3 $ 2 Copper production costs ($/tonne): Direct mining and production costs $ 6,265 $ 4,058 $ 6,016 $ 4,028 By-product credits (142) (94) (130) (92) Royalties and production taxes 439 384 434 375 Inventory change, write-downs, and other (957) 149 (839) 81 Costs applicable to sales ($/tonne) (1) $ 5,605 $ 4,497 $ 5,481 $ 4,392 Depreciation and amortization $ 1,085 $ 794 $ 1,043 $ 772 Reclamation accretion $ 106 $ 64 $ 98 $ 62 All-in sustaining costs ($/tonne) $ 6,436 $ 6,105 $ 6,424 $ 5,696 Copper production costs ($/GEO): Direct mining and production costs $ 1,137 $ 736 $ 1,091 $ 731 By-product credits (26) (17) (24) (17) Royalties and production taxes 80 70 79 68 Inventory change, write-downs, and other (174) 27 (152) 15 Costs applicable to sales ($/GEO) (1) $ 1,017 $ 816 $ 994 $ 797 Depreciation and amortization $ 197 $ 144 $ 189 $ 140 Reclamation accretion $ 19 $ 12 $ 18 $ 11 All-in sustaining costs ($/GEO) $ 1,168 $ 1,108 $ 1,166 $ 1,033 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 23 -- 23 of 31 -- TANAMI Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Total underground ore (000 tonnes) 595 643 1,790 1,778 Tons milled/processed (000 tonnes): Mill 590 701 1,760 1,752 Average ore grade (g/tonne): Mill 5.458 5.566 5.201 5.644 Average mill recovery rate 98.2 % 98.0 % 98.4 % 98.2 % Gold ounces produced (thousands): Consolidated/Attributable 102 123 291 312 Gold ounces sold (thousands): Consolidated/Attributable 100 123 290 312 Gold production costs ($ millions): Costs applicable to sales (1) $ 98 $ 81 $ 281 $ 244 Depreciation and amortization $ 30 $ 30 $ 88 $ 80 Reclamation accretion $ 1 $ — $ 2 $ 1 Gold production costs ($/ounce): Direct mining and production costs $ 944 $ 559 $ 934 $ 737 By-product credits (2) (2) (2) (2) Royalties and production taxes 65 50 60 50 Inventory change, write-downs, and other (28) 48 (24) (2) Costs applicable to sales ($/ounce) (1) $ 979 $ 655 $ 968 $ 783 Depreciation and amortization $ 299 $ 243 $ 303 $ 257 Reclamation accretion $ 5 $ 4 $ 5 $ 4 All-in sustaining costs ($/ounce) $ 1,334 $ 890 $ 1,256 $ 1,066 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 24 -- 24 of 31 -- CADIA - GOLD (1) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Total underground ore (000 tonnes): 7,996 — 22,420 — Tonnes milled/processed (000 tonnes): Mill 7,559 — 21,915 — Average ore grade (g/tonne): Mill 0.613 — 0.645 — Average mill recovery rate 79.5 % — % 79.8 % — % Gold ounces produced (thousands): Consolidated/Attributable 115 — 354 — Gold ounces sold (thousands): Consolidated/Attributable 113 — 350 — Gold production costs ($ millions): Costs applicable to sales (2) $ 80 $ — $ 231 $ — Depreciation and amortization $ 30 $ — $ 91 $ — Reclamation accretion $ — $ — $ 1 $ — Gold production costs ($/ounce): Direct mining and production costs $ 757 $ — $ 669 $ — By-product credits (80) — (93) — Royalties and production taxes 84 — 80 — Inventory change, write-downs, and other (38) — 8 — Costs applicable to sales ($/ounce) (2) $ 723 $ — $ 664 $ — Depreciation and amortization $ 271 $ — $ 261 $ — Reclamation accretion $ 3 $ — $ 3 $ — All-in sustaining costs ($/ounce) $ 1,078 $ — $ 1,044 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 25 -- 25 of 31 -- CADIA - COPPER (1) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Total underground ore (000 tonnes): 7,996 — 22,420 — Tonnes milled/processed (000 tonnes): Mill 7,559 — 21,915 — Average ore grade: Mill 0.36 % — % 0.36 % — % Average mill recovery rate 84.4 % — % 84.5 % — % Copper tonnes produced (thousands): Consolidated/Attributable 21 — 64 — Copper tonnes sold (thousands): Consolidated/Attributable 21 — 64 — Co-product GEO produced (thousands): Consolidated/Attributable 120 — 355 — Co-product GEO sold (thousands): Consolidated/Attributable 116 — 351 — Co-product production costs ($ millions): Costs applicable to sales (2) $ 80 $ — $ 214 $ — Depreciation and amortization $ 31 $ — $ 91 $ — Reclamation accretion $ — $ — $ 1 $ — Copper production costs ($/tonne): Direct mining and production costs $ 4,098 $ — $ 3,509 $ — By-product credits (444) — (511) — Royalties and production taxes 353 — 324 — Inventory change, write-downs, and other (233) — 36 — Costs applicable to sales ($/tonne) (2) $ 3,774 $ — $ 3,358 $ — Depreciation and amortization $ 1,497 $ — $ 1,433 $ — Reclamation accretion $ 18 $ — $ 17 $ — All-in sustaining costs ($/tonne) $ 4,849 $ — $ 5,386 $ — Copper production costs ($/GEO): Direct mining and production costs $ 743 $ — $ 636 $ — By-product credits (80) — (93) — Royalties and production taxes 64 — 59 — Inventory change, write-downs, and other (42) — 7 — Costs applicable to sales ($/GEO) (2) $ 685 $ — $ 609 $ — Depreciation and amortization $ 272 $ — $ 260 $ — Reclamation accretion $ 3 $ — $ 3 $ — All-in sustaining costs ($/GEO) $ 880 $ — $ 977 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 26 -- 26 of 31 -- TELFER - GOLD (1)(2) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 3,012 — 10,416 — Open pit waste 2,770 — 11,335 — Total open pit 5,782 — 21,751 — Total underground ore (000 tonnes): 134 — 541 — Tonnes milled/processed (000 tonnes): Mill 293 — 1,969 — Average ore grade (g/tonne): Mill 0.560 — 0.849 — Average mill recovery rate 90.0 % — % 92.4 % — % Gold ounces produced (thousands): Consolidated/Attributable 6 — 51 — Gold ounces sold (thousands): Consolidated/Attributable 5 — 64 — Gold production costs ($ millions): Costs applicable to sales (3) $ 39 $ — $ 192 $ — Depreciation and amortization $ 1 $ — $ 13 $ — Reclamation accretion $ 5 $ — $ 9 $ — Gold production costs ($/ounce): (2) Direct mining and production costs N.M. $ — $ 5,034 $ — By-product credits N.M. — (9) — Royalties and production taxes N.M. — 57 — Inventory change, write-downs, and other N.M. — (2,086) — Costs applicable to sales ($/ounce) (3) N.M. $ — $ 2,996 $ — Depreciation and amortization N.M. $ — $ 212 $ — Reclamation accretion N.M. $ — $ 145 $ — All-in sustaining costs ($/ounce) N.M. $ — $ 3,823 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary suspension of production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 27 -- 27 of 31 -- TELFER - COPPER (1)(2) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tonnes mined (000 tonnes): Open pit ore 3,012 — 10,416 — Open pit waste 2,770 — 11,335 — Total open pit 5,782 — 21,751 — Total underground ore (000 tonnes): 134 — 541 — Tonnes milled/processed (000 tonnes): Mill 293 — 1,969 — Average ore grade: Mill 0.11 % — % 0.12 % — % Average mill recovery rate 63.2 % — % 73.8 % — % Copper tonnes produced (thousands): Consolidated/Attributable 1 — 2 — Copper tonnes sold (thousands): Consolidated/Attributable — — 2 — Co-product GEO produced (thousands): Consolidated/Attributable 1 — 9 — Co-product GEO sold (thousands): Consolidated/Attributable — — 11 — Co-product production costs ($ millions): Costs applicable to sales (2) $ 4 $ — $ 31 $ — Depreciation and amortization $ — $ — $ 3 $ — Reclamation accretion $ 1 $ — $ 1 $ — Copper production costs ($/tonne): Direct mining and production costs N.M. $ — $ 24,374 $ — By-product credits N.M. — (41) — Royalties and production taxes N.M. — 342 — Inventory change, write-downs, and other N.M. — (9,271) — Costs applicable to sales ($/tonne) (2) N.M. $ — $ 15,404 $ — Depreciation and amortization N.M. $ — $ 1,248 $ — Reclamation accretion N.M. $ — $ 693 $ — All-in sustaining costs ($/tonne) N.M. $ — $ 21,007 $ — Copper production costs ($/GEO): Direct mining and production costs N.M. $ — $ 4,422 $ — By-product credits N.M. — (7) — Royalties and production taxes N.M. — 62 — Inventory change, write-downs, and other N.M. — (1,682) — Costs applicable to sales ($/GEO) (2) N.M. $ — $ 2,795 $ — Depreciation and amortization N.M. $ — $ 226 $ — Reclamation accretion N.M. $ — $ 126 $ — All-in sustaining costs ($/GEO) N.M. $ — $ 3,811 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary suspension of production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024. (3) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 28 -- 28 of 31 -- LIHIR (1) Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 3,079 — 8,828 — Open pit waste 4,862 — 17,732 — Total open pit 7,941 — 26,560 — Tonnes milled/processed (000 tonnes): Mill 2,551 — 8,082 — Average ore grade (g/tonne): Mill 1.997 — 2.241 — Average mill recovery rate 73.6 % — % 76.0 % — % Gold ounces produced (thousands): Consolidated/Attributable 129 — 451 — Gold ounces sold (thousands): Consolidated/Attributable 127 — 457 — Gold production costs ($ millions): Costs applicable to sales (2) $ 206 $ — $ 539 $ — Depreciation and amortization $ 37 $ — $ 115 $ — Reclamation accretion $ 1 $ — $ 3 $ — Gold production costs ($/ounce): Direct mining and production costs $ 2,233 $ — $ 1,579 $ — By-product credits (2) — (1) — Royalties and production taxes 61 — 56 — Inventory change, write-downs, and other (673) — (455) — Costs applicable to sales ($/ounce) (2) $ 1,619 $ — $ 1,179 $ — Depreciation and amortization $ 292 $ — $ 252 $ — Reclamation accretion $ 9 $ — $ 8 $ — All-in sustaining costs ($/ounce) $ 1,883 $ — $ 1,416 $ — (1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023. (2) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 29 -- 29 of 31 -- AHAFO Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 2,288 2,010 5,224 4,353 Open pit waste 4,492 5,082 14,194 16,016 Total open pit 6,780 7,092 19,418 20,369 Total underground ore (000 tonnes): 635 556 1,906 1,718 Tons milled/processed (000 tonnes): Mill 2,370 1,573 7,098 6,149 Average ore grade (g/tonne): Mill 3.045 2.748 2.778 2.174 Average mill recovery rate 94.1 % 94.4 % 94.0 % 93.6 % Gold ounces produced (thousands): Consolidated/Attributable 213 133 587 398 Gold ounces sold (thousands): Consolidated/Attributable 221 137 585 401 Gold production costs ($ millions): Costs applicable to sales (1) $ 192 $ 133 $ 527 $ 384 Depreciation and amortization $ 55 $ 47 $ 161 $ 128 Reclamation accretion $ 2 $ 2 $ 5 $ 5 Gold production costs ($/ounce): Direct mining and production costs $ 589 $ 849 $ 655 $ 872 By-product credits (2) (1) (2) (2) Royalties and production taxes 211 146 189 136 Inventory change, write-downs, and other 69 (25) 58 (49) Costs applicable to sales ($/ounce) (1) $ 867 $ 969 $ 900 $ 957 Depreciation and amortization $ 249 $ 338 $ 275 $ 319 Reclamation accretion $ 8 $ 12 $ 9 $ 12 All-in sustaining costs ($/ounce) $ 1,043 $ 1,208 $ 1,057 $ 1,269 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 30 -- 30 of 31 -- AKYEM Three Months Ended September 30, Nine Months Ended September 30, 2024 2023 2024 2023 Open pit tons mined (000 tonnes): Open pit ore 145 1,088 698 2,376 Open pit waste 6,860 4,601 17,261 17,193 Total open pit 7,005 5,689 17,959 19,569 Tons milled/processed (000 tonnes): Mill 2,135 1,896 6,120 5,678 Average ore grade milled (g/tonne): Mill 0.742 1.394 0.921 1.165 Average mill recovery rate 90.1 % 89.4 % 89.1 % 89.2 % Gold ounces produced (thousands): Consolidated/Attributable 47 75 163 195 Gold ounces sold (thousands): Consolidated/Attributable 46 71 169 198 Gold production costs ($ millions): Costs applicable to sales (1) $ 95 $ 72 $ 252 $ 189 Depreciation and amortization $ 10 $ 31 $ 51 $ 86 Reclamation accretion $ 3 $ 3 $ 10 $ 9 Gold production costs ($/ounce): Direct mining and production costs $ 1,304 $ 848 $ 1,038 $ 914 By-product credits (8) (3) (7) (6) Royalties and production taxes 490 121 327 111 Inventory change, write-downs, and other 265 66 133 (61) Costs applicable to sales ($/ounce) (1) $ 2,051 $ 1,032 $ 1,491 $ 958 Depreciation and amortization $ 214 $ 438 $ 300 $ 433 Reclamation accretion $ 75 $ 42 $ 62 $ 45 All-in sustaining costs ($/ounce) $ 2,230 $ 1,332 $ 1,716 $ 1,260 (1) Excludes Depreciation and amortization and Reclamation and remediation. NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 31 -- 31 of 31 --