ANNUAL REPORT
FY 2022 — Annual report (Form 10-K)
FY 2022PDF · 363 pages25.5 MB
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
FORM 10-K
(Mark One)
☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 2022
OR
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from _______ to _______
Commission File Number 1-37816
ALCOA CORPORATION
(Exact name of registrant as specified in its charter)
Delaware
(State or other jurisdiction of
incorporation or organization)
81-1789115
(I.R.S. Employer
Identification No.)
201 Isabella Street, Suite 500,
Pittsburgh, Pennsylvania
(Address of principal executive offices)
15212-5858
(Zip Code)
(Registrant’s telephone number, including area code): 412-315-2900
Securities registered pursuant to Section 12(b) of the Act:
Title of each class Trading Symbol(s) Name of each exchange on which registered
Common Stock, par value $0.01 per share AA New York Stock Exchange
Securities registered pursuant to Section 12(g) of the Act: None
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☑ No ☐
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act. Yes ☐ No ☑
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter
period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes ☑ No ☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the
preceding 12 months (or for such shorter period that the registrant was required to submit such files). Yes ☑ No ☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large
accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer ☒ Accelerated filer ☐
Non-accelerated filer ☐ Smaller reporting company ☐
Emerging growth company ☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided
pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the
Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. ☑
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously
issued financial statements. ☐
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the
relevant recovery period pursuant to §240.10D-1(b). ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act). Yes ☐ No ☑
The aggregate market value of the registrant’s voting stock held by non-affiliates at June 30, 2022 was approximately $8.2 billion, based on the closing price per share of Common Stock on June 30, 2022 of
$45.58 as reported on the New York Stock Exchange.
As of February 17, 2023, there were 178,349,345 shares of the registrant’s common stock, par value $0.01 per share, outstanding.
DOCUMENTS INCORPORATED BY REFERENCE
Part III of this Form 10-K incorporates by reference certain information from the registrant’s Definitive Proxy Statement for its 2023 Annual Meeting of Stockholders to be filed pursuant to Regulation 14A.
-- 1 of 363 --
TABLE OF CONTENTS
Page
Part I
Item 1. Business 1
Item 1A. Risk Factors 14
Item 1B. Unresolved Staff Comments 28
Item 2. Properties 28
Item 3. Legal Proceedings 40
Item 4. Mine Safety Disclosures 40
Part II
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities 41
Item 6. [RESERVED] 42
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations 43
Item 7A. Quantitative and Qualitative Disclosures About Market Risk 64
Item 8. Financial Statements and Supplementary Data 65
Item 9. Changes in and Disagreements With Accountants on Accounting and Financial Disclosure 123
Item 9A. Controls and Procedures 123
Item 9B. Other Information 123
Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections 123
Part III
Item 10. Directors, Executive Officers and Corporate Governance 123
Item 11. Executive Compensation 123
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters 124
Item 13. Certain Relationships and Related Transactions, and Director Independence 124
Item 14. Principal Accountant Fees and Services 124
Part IV
Item 15. Exhibit and Financial Statement Schedules 125
Item 16. Form 10-K Summary 128
Signatures 129
Note on Incorporation by Reference
In this Form 10-K, selected items of information and data are incorporated by reference to portions of Alcoa Corporation’s Definitive Proxy Statement for its 2023
Annual Meeting of Stockholders (Proxy Statement), which will be filed with the Securities and Exchange Commission within 120 days after the end of Alcoa
Corporation’s fiscal year ended December 31, 2022. Unless otherwise provided herein, any reference in this Form 10-K to disclosures in the Proxy Statement shall
constitute incorporation by reference of only that specific disclosure into this Form 10-K.
-- 2 of 363 --
PART I
Item 1. Business.
(dollars in millions, except per-share amounts, average realized prices, and average cost amounts)
The Company
Alcoa Corporation, a Delaware corporation (the Company), is active in all aspects of the upstream aluminum industry with bauxite mining, alumina refining, and
aluminum smelting and casting. The Company has direct and indirect ownership of 27 locations across nine countries on six continents.
The Company’s operations in 2022 comprised three reportable business segments: Bauxite, Alumina, and Aluminum. The Bauxite and Alumina segments primarily
consist of a series of affiliated operating entities held in Alcoa World Alumina and Chemicals, a global, unincorporated joint venture between Alcoa and Alumina
Limited (described below). The Aluminum segment consists of the Company’s aluminum smelting and casting operations along with most of the Company’s energy
production assets. Beginning in January 2023, the Company changed its operating segments, by combining the Bauxite and Alumina segments, and will report its
financial results in the following two segments: (i) Alumina and (ii) Aluminum.
Aluminum, as an element, is abundant in the earth’s crust, but a multi-step process is required to make finished metal. Aluminum metal is produced by refining alumina
oxide from bauxite into alumina, which is then smelted into aluminum and can be cast into many shapes and forms.
Alcoa smelts and casts aluminum in various shapes and sizes for global customers, including developing and creating various alloy combinations for specific
applications.
Aluminum metal is a commodity traded on the London Metal Exchange (LME) and priced daily. Additionally, alumina is subject to market pricing through the Alumina
Price Index (API), which is calculated by the Company based on the weighted average of a prior month’s daily spot prices published by the following three indices:
CRU Metallurgical Grade Alumina Price, Platts Metals Daily Alumina PAX Price, and FastMarkets Metal Bulletin Non-Ferrous Metals Alumina Index. As a result, the
prices of both aluminum and alumina are subject to significant volatility and, therefore, influence the operating results of Alcoa.
Alcoa Corporation became an independent, publicly traded company on November 1, 2016, following its separation (the Separation Transaction) from its former parent
company, Alcoa Inc. References herein to “ParentCo” refer to Alcoa Inc. and its consolidated subsidiaries through October 31, 2016, at which time it was renamed
Arconic Inc. (Arconic) and since has been subsequently renamed Howmet Aerospace Inc.
Business Strategy
Alcoa has three strategic priorities: reduce complexity, drive returns and advance sustainably. The Company strives to operate with lean overhead and manage its
portfolio of assets with the goal of profitability through all market cycles. Alcoa aims to drive margin-focused growth and innovate and create low-carbon solutions.
Alcoa works to be a responsible and reliable producer, which includes engagement with communities in which it operates to bring shared value.
Today, Alcoa has a comprehensive suite of SustanaTM brand products, which includes EcoDuraTM aluminum, EcoLumTM aluminum, and EcoSourceTM alumina.
Further, Alcoa has active research and development projects that have the potential to drive value by reducing costs, improving efficiency, and reducing greenhouse gas
emissions in both alumina refining and aluminum smelting. The roadmap of technologies include:
• The ELYSISTM joint venture uses an aluminum smelting technology that eliminates all direct greenhouse gas emissions from the traditional smelting
process, instead emitting pure oxygen as a byproduct. The research and development program is being ramped up to commercial scale and commercial-grade
research and development scale quantities of the metal have been used by top-tier brands including Apple Inc. and Audi AG.
• The Refinery of the Future initiative aims to achieve alumina refining with no direct greenhouse gas emissions through adapting various processes and new
technologies under development for alumina refining, such as mechanical vapor recompression (MVR) and electric calcination.
• The ASTRAEATM process is a proprietary technology under development that can purify post-consumer aluminum scrap, regardless of alloy combination,
and beneficiate it up to high purity levels that exceed what is produced at most primary aluminum smelters operating today, permitting use in high tolerance
applications, such as aerospace.
Alcoa has received annual recognition from S&P Dow Jones Sustainability Indices and has also earned certifications from the Aluminium Stewardship Initiative (ASI),
a comprehensive third-party program to verify responsible production in the aluminum industry. Alcoa has certified 17 operating sites and can market globally ASI-
certified bauxite, alumina, and aluminum.
1
-- 3 of 363 --
In 2019, the Company announced a five year strategic portfolio review of smelting and refining capacity to improve cost positioning, including curtailment, closure or
divestiture. Through 2021, Alcoa reached approximately 75 and 58 percent of its target to improve, curtail, close, or divest 1.5 and 4 million metric tons of smelting and
refining capacity, respectively. While no actions were taken in 2022 related to these targets, the Company took actions in response to market conditions, and the
strategic portfolio review is continuing.
The Company has the goal of being the lowest emitter of carbon dioxide among all global aluminum companies, per ton of emissions in both smelting and refining, and
aims to move its aluminum asset portfolio to a first quartile cost position relative to other aluminum producers upon completion of our portfolio review. In 2022, Alcoa
exceeded its target of 85 percent of its smelting portfolio being powered by renewable energy, attaining 86 percent. Renewable energy is derived from natural processes
that are replenished constantly, such as sunlight, wind, and hydropower.
See Part II Item 7 of this Form 10-K in Management’s Discussion and Analysis of Financial Condition and Results of Operations under caption Business Update.
Joint Ventures
Alcoa World Alumina and Chemicals (AWAC)
AWAC is an unincorporated global joint venture between Alcoa Corporation and Alumina Limited, a company incorporated under the laws of the Commonwealth of
Australia and listed on the Australian Securities Exchange. AWAC consists of a number of affiliated entities that own, operate, or have an interest in bauxite mines and
alumina refineries, as well as an aluminum smelter, in seven countries. Alcoa Corporation owns 60% and Alumina Limited owns 40% of these entities, directly or
indirectly, with such entities being consolidated by Alcoa Corporation for financial reporting purposes. The scope of AWAC generally includes the mining of bauxite
and other aluminous ores; the refining, production, and sale of smelter grade and non-metallurgical alumina; and the production of certain primary aluminum products.
Alcoa provides the operating management for AWAC, which is subject to direction provided by the Strategic Council of AWAC. The Strategic Council consists of five
members, three of whom are appointed by Alcoa (of which one is the Chair) and two of whom are appointed by Alumina Limited (of which one is the Deputy Chair).
Matters are decided by a majority vote with certain matters requiring approval by at least 80% of the members, including: changes to the scope of AWAC; changes in
the dividend policy; equity calls in aggregate greater than $1,000 in any year; sales of all or a majority of the AWAC assets; loans from AWAC companies to Alcoa or
Alumina Limited; certain acquisitions, divestitures, expansions, curtailments or closures; certain related-party transactions; financial derivatives, hedges or swap
transactions; a decision by AWAC entities to file for insolvency; and changes to pricing formula in certain offtake agreements which may be entered into between
AWAC entities and Alcoa or Alumina Limited.
AWAC Operations
AWAC entities’ assets include the following interests:
• 100% of the bauxite mining, alumina refining, and aluminum smelting operations of Alcoa’s affiliate, Alcoa of Australia Limited (AofA);
• 100% of the Juruti bauxite deposit and mine in Brazil;
• 45% interest in Halco (Mining) Inc., a bauxite consortium that owns a 51% interest in Compagnie des Bauxites de Guinée (CBG), a bauxite mine in Guinea;
• 9.62% interest in the bauxite mining operations in Brazil of Mineração Rio Do Norte (MRN), a Brazilian company, until the sale of its interest in April 2022;
• 39.96% interest in the São Luís refinery in Brazil;
• 55% interest in the Portland, Australia smelter that AWAC manages on behalf of the joint venture partners;
• 25.1% interest in the mine and refinery in Ras Al Khair, Saudi Arabia;
• 100% of the refinery and alumina-based chemicals assets at San Ciprián, Spain;
• 100% of Alcoa Steamship Company LLC, a company that procures ocean freight and commercial shipping services for Alcoa in the ordinary course of
business;
• 100% of the refinery assets at the closed facility in Point Comfort, Texas, United States; and,
• 100% interest in various assets formerly used for mining and refining in the Republic of Suriname (Suriname).
Exclusivity
Under the terms of their joint venture agreements, Alcoa and Alumina Limited have agreed that, subject to certain exceptions, AWAC is their exclusive vehicle for their
investments, operations or participation in the bauxite and alumina business, and they will not compete with AWAC in those businesses. In the event of a change of
control of either Alcoa or Alumina Limited, this exclusivity and non-compete restriction will terminate, and the partners will then have opportunities to unilaterally
pursue bauxite or alumina projects outside of or within AWAC, subject to certain conditions provided in the Amended and Restated Charter of the Strategic Council.
2
-- 4 of 363 --
Equity Calls
The cash flow of AWAC and borrowings are the preferred sources of funding for the needs of AWAC. An equity call can be made on 30 days’ notice, subject to certain
limitations, in the event the aggregate annual capital budget of AWAC requires an equity contribution from Alcoa and Alumina Limited.
Dividend Policy
AWAC will generally be required to distribute at least 50% of the prior calendar quarter’s net income of each AWAC entity, and certain AWAC entities will also be
required to pay a distribution every three months equal to the amount of available cash above specified thresholds and subject to the forecast cash needs of the AWAC
entity.
Leveraging Policy
Debt of AWAC is subject to a limit of 30% of total capital (defined as the sum of debt (net of cash) plus any minority interest plus shareholder equity). The AWAC joint
venture has raised a limited amount of debt to fund growth projects as permitted under Alcoa’s revolving credit line and in accordance with the joint venture partnership
agreements.
Saudi Arabia Joint Venture
In December 2009, Alcoa entered into a joint venture with the Saudi Arabian Mining Company (Ma’aden), which was formed by the government of Saudi Arabia to
develop its mineral resources and create a fully integrated aluminum complex in Saudi Arabia. Ma’aden is listed on the Saudi Stock Exchange (Tadawul). The joint
venture complex includes a bauxite mine with estimated capacity of 5 million dry metric tons per year; an alumina refinery with a capacity of 1.8 million metric tons per
year (mtpy); and an aluminum smelter with a capacity of 780,000 mtpy.
The joint venture is currently comprised of two entities: the Ma’aden Bauxite and Alumina Company (MBAC) and the Ma’aden Aluminium Company (MAC). Ma’aden
owns a 74.9% interest in the MBAC and MAC joint venture. Alcoa owns a 25.1% interest in MAC, which holds the smelter; AWAC holds a 25.1% interest in MBAC,
which holds the mine and refinery. The refinery and smelter are located within the Ras Al Khair industrial zone on the east coast of Saudi Arabia.
In accordance with the June 2019 amended joint venture agreement, Ma’aden’s put option and Alcoa Corporation’s call option, relating to additional interests in the
joint venture, were exercisable for a period of six months after October 1, 2021. On March 31, 2022, Ma’aden’s and Alcoa’s put and call options, respectively, expired
with neither party exercising their options.
The amended joint venture agreement defined October 1, 2021 as the date after which Alcoa is permitted to sell all of its shares in both MBAC and MAC collectively,
for which Ma’aden has a right of first refusal. Prior to this date, Ma’aden and Alcoa Corporation could not sell, transfer, or otherwise dispose of, pledge, or encumber
any interests in the joint venture. Under the amended joint venture agreement, upon the occurrence of an unremedied event of default by Alcoa, Ma’aden may purchase,
or, upon the occurrence of an unremedied event of default by Ma’aden, Alcoa may sell, its interest in the joint venture for consideration that varies depending on the
time of the default.
ELYSIS
ELYSIS Limited Partnership is a joint venture between wholly-owned subsidiaries of Alcoa (48.235%) and Rio Tinto Alcan Inc. (Rio Tinto) (48.235%), respectively,
and Investissement Québec (3.53%), a company wholly-owned by the Government of Québec, Canada. The purpose of the ELYSIS joint venture is to advance larger
scale development and commercialization of its patent-protected technology that produces oxygen and eliminates all direct greenhouse gas emissions from the
traditional aluminum smelting process. Alcoa invented the inert anode technology for the aluminum smelting process that serves as the basis for the ELYSIS joint
venture. Batches of aluminum produced by ELYSIS have been sold for use by such companies as Apple Inc. and Audi AG, as the joint venture continues working
toward an industrial scale with a technology package planned for sale beginning in 2024.
Others
The Company is party to several other joint ventures and consortia. See additional details within each business segment discussion below.
The Aluminerie de Bécancour Inc. (ABI) smelter is a joint venture between Alcoa and Rio Tinto located in Bécancour, Québec. Alcoa owns 74.95% of the joint venture
through the equity investment in Pechiney Reynolds Quebec, Inc., which owns a 50.1% share of the smelter, and two wholly-owned Canadian subsidiaries, which own
49.9% of the smelter. Rio Tinto owns the remaining 25.05% interest in the joint venture.
3
-- 5 of 363 --
CBG is a joint venture between Boké Investment Company (51%) and the Government of Guinea (49%) for the operation of a bauxite mine in the Boké region of
Guinea. Boké Investment Company is owned 100% by Halco (Mining) Inc.; AWA LLC holds a 45% interest in Halco. AWA LLC is part of the AWAC group of
companies and is ultimately owned 60% by Alcoa and 40% by Alumina Limited.
Until the sale of Alcoa’s interest in April 2022, MRN was a joint venture between Alcoa Alumínio (8.58%), AWA Brasil (AWAB) (4.62%), and AWA LLC (5%), each a
subsidiary of Alcoa, and affiliates of Rio Tinto (12%), Companhia Brasileira de Alumínio (10%), Vale S.A. (Vale) (40%), South32 Limited (South32) (14.8%), and
Norsk Hydro ASA (5%) for the operation of a bauxite mine in Porto Trombetas in the state of Pará in Brazil. AWAB and AWA LLC are part of the AWAC group of
companies and are ultimately owned 60% by Alcoa and 40% by Alumina Limited.
On April 30, 2022, Alcoa completed the sale of its investment in MRN for proceeds of $10. An additional $30 in cash could be paid to the Company in the future if
certain post-closing conditions related to future MRN mine development are satisfied. Related to this transaction, the Company recorded an asset impairment of $58 in
the first quarter of 2022 in Restructuring and other charges, net on the Statement of Consolidated Operations. In addition, the Company entered into several bauxite
offtake agreements with South32 Minerals S.A. to provide bauxite supply for existing long-term supply contracts.
Alumar is an unincorporated joint venture for the operation of a refinery, smelter, and casthouse in Brazil. The refinery is owned by AWAB (39.96%), Rio Tinto (10%),
Alcoa Alumínio (14.04%), and South32 (36%). AWAB is part of the AWAC group of companies and is ultimately owned 60% by Alcoa and 40% by Alumina Limited.
With respect to Rio Tinto and South32, the named company or an affiliate thereof holds the interest. The smelter and casthouse are owned by Alcoa Alumínio (60%) and
South32 (40%).
Strathcona calciner is a joint venture between affiliates of Alcoa and Rio Tinto. Calcined coke is used as a raw material in aluminum smelting. The calciner is owned by
Alcoa (39%) and Rio Tinto (61%); Alcoa’s capacity is currently idled in connection with the curtailment of the Intalco aluminum smelter.
Hydropower
Machadinho Hydro Power Plant (HPP) is a consortium located on the Pelotas River in southern Brazil in which the Company has a 25.7% ownership interest through
Alcoa Alumínio. The remaining ownership interests are held by unrelated third parties.
Barra Grande HPP is a joint venture located on the Pelotas River in southern Brazil in which the Company has a 42.2% ownership interest through Alcoa Alumínio. The
remaining ownership interests are held by unrelated third parties.
Estreito HPP is a consortium between Alcoa Alumínio, through Estreito Energia S.A. (25.5%) and unrelated third parties located on the Tocantins River, northern Brazil.
Serra do Facão HPP is a joint venture between Alcoa Alumínio (35%) and unrelated third parties located on the Sao Marcos River, central Brazil.
Manicouagan Power Limited Partnership (Manicouagan) is a joint venture between affiliates of Alcoa and Hydro-Québec. Manicouagan owns and operates the 335
megawatt McCormick hydroelectric project, which is located on the Manicouagan River in the Province of Québec, Canada. Alcoa owns 40% of the joint venture.
Bauxite
This segment consists of the Company’s global bauxite mining operations. Bauxite is the principal raw material used to produce alumina and contains various aluminum
hydroxide minerals, the most important of which are gibbsite and boehmite. Bauxite is refined using the Bayer process, the principal industrial chemical process for
refining bauxite to produce alumina, a compound of aluminum and oxygen that is the raw material used by smelters to produce aluminum metal. The Company obtains
bauxite from its own resources, including those belonging to AWAC, as well as through long-term and short-term contracts and mining leases. Tons of bauxite are
reported on a zero-moisture basis in millions of dry metric tons (mdmt) unless otherwise stated.
In 2022, Alcoa-operated mines supplied 92 percent of their volume to Alcoa refineries and sold the remaining 8 percent to third-party customers. Alcoa-operated mines
produced 36.7 mdmt of bauxite and mines operated by partnerships in which Alcoa, including AWAC, has equity interests produced 5.4 mdmt of bauxite on a
proportional equity basis, for a total Company bauxite production of 42.1 mdmt.
On April 30, 2022, Alcoa completed the sale of its investment in MRN. The Company entered into several bauxite offtake agreements with South32 to provide bauxite
supply for existing long-term supply contracts.
Based on the terms of its bauxite supply contracts, the amount of bauxite AWAC purchases from its minority-owned joint ventures, MRN (until its sale in April 2022)
and CBG, differ from its proportional equity in those mines. Therefore, in 2022, Alcoa had access to 43.0 mdmt of production from its portfolio of bauxite interests and
bauxite offtake and supply agreements and sold 3.5 mdmt of bauxite to third parties; 39.5 mdmt of bauxite was delivered to Alcoa refineries.
4
-- 6 of 363 --
Beginning in January 2023, financial information for the activities of the bauxite mines and the alumina refineries will be combined and the Company will report its
financial results in the following two segments: (i) Alumina, and (ii) Aluminum. Accordingly, segment information for all prior periods presented will be updated to
reflect the new segment structure in future Quarterly Report on Form 10-Q and Annual Report on Form 10-K filings.
Information regarding the Company’s bauxite mining properties and bauxite mineral resources and reserves is included in Part 1 Item 2 of this Form 10-K.
Alumina
This segment consists of the Company’s worldwide refining system, which processes bauxite into alumina. Alcoa’s alumina sales are made to customers globally and
are typically priced by reference to published spot market prices. The Company produces smelter grade alumina and non-metallurgical grade alumina. The Company’s
largest customer for smelter grade alumina is its own aluminum smelters, which in 2022 accounted for approximately 30% of its total alumina shipments. A small
portion of the alumina (non-metallurgical grade) is sold to third-party customers who process it into industrial chemical products. This segment also includes AWAC’s
25.1% share of MBAC.
The Company primarily sells alumina through fixed price spot sales and contracts containing two pricing components: (1) the API price basis and (2) a negotiated
adjustment basis that takes into account various factors, including freight, quality, customer location, and market conditions. In 2022, approximately 96% of the
Company’s smelter grade alumina shipments to third parties were sold on a fixed price spot basis or adjusted API price basis.
Alcoa’s alumina refining facilities and its worldwide alumina capacity stated in metric tons per year (mtpy) are shown in the following table:
Country Facility
Nameplate
Capacity1
(000 mtpy)
Alcoa
Corporation
Consolidated
Capacity1
(000 mtpy)
Australia (AofA) Kwinana 2,190 2,190
Pinjarra 4,700 4,700
Wagerup 2,879 2,879
Brazil Poços de Caldas 390 390
São Luís (Alumar) 3,860 2,084
Spain San Ciprián 1,600 1,600
TOTAL 15,619 13,843
Equity Interests:
Country Facility
Nameplate
Capacity1
(000 mtpy)
Alcoa
Corporation
Consolidated
Capacity1
(000 mtpy)
Saudi Arabia Ras Al Khair (MBAC) 1,800 452
(1) Nameplate Capacity is an estimate based on design capacity and normal operating efficiencies and does not necessarily represent maximum possible production.
Alcoa Corporation Consolidated Capacity represents our share of production from these facilities. For facilities wholly-owned by AWAC, Alcoa takes 100% of
the production.
As of December 31, 2022, Alcoa had approximately 1,014,000 mtpy of idle capacity relative to total Alcoa consolidated capacity of 13,843,000 mtpy. Idle capacity of
800,000 mtpy at the San Ciprián refinery is due to the partial curtailment of the refinery in 2022 and 214,000 mtpy of idle capacity at the Poços de Caldas facility is a
result of the previous full curtailment of the Poços de Caldas smelter.
In October 2019, the Company announced a five-year review of our production assets that includes a range of potential outcomes for these facilities to improve cost
positioning, including curtailment, closure, or divestiture. The review includes 4 million metric tons of global refining capacity, of which 2,305,000 mtpy of capacity
has been permanently closed since the announced review.
In 2022, production at the San Ciprián refinery was reduced to approximately 50 percent of the 1.6 million metric tons of annual capacity to mitigate the financial
impact of high natural gas costs. The Company is actively reviewing the location’s operating levels given the ongoing volatility in European energy markets.
5
-- 7 of 363 --
In January 2023, the Company reduced production at the Kwinana (Australia) refinery by approximately 30 percent in response to a domestic natural gas shortage in
Western Australia due to production challenges experienced by key gas suppliers.
Aluminum
This segment currently consists of (i) the Company’s worldwide smelting and casthouse system and (ii) a portfolio of energy assets in Brazil, Canada, and the United
States. The smelting operations produce molten primary aluminum, which is then formed by the casting operations into either common alloy ingot (e.g., t-bar, sow,
standard ingot) or into value add ingot products (e.g., foundry, billet, rod, and slab). The energy assets supply power to external customers in Brazil and the United
States, as well as internal customers in the Aluminum segment (Baie-Comeau (Canada) smelter and Warrick (Indiana) smelter) and, to a lesser extent, the Alumina
segment (Brazilian refineries). This segment also includes Alcoa’s 25.1% share of MAC, the smelting joint venture company in Saudi Arabia.
Smelting and Casting Operations
Contracts for primary aluminum vary widely in duration, from multi-year supply contracts to spot purchases. Pricing for primary aluminum products is typically
comprised of three components: (i) the published LME aluminum price for commodity grade P1020 aluminum, (ii) the published regional premium applicable to the
delivery locale, and (iii) a negotiated product premium that accounts for factors such as shape and alloy.
Alcoa’s primary aluminum facilities and its global smelting capacity stated in metric tons per year (mtpy) are shown in the following table:
Country Facility
Nameplate
Capacity1
(000 mtpy)
Alcoa
Corporation
Consolidated
Capacity1
(000 mtpy)
Australia Portland 358 197
Brazil Poços de Caldas2 N/A N/A
São Luís (Alumar) 447 268
Canada Baie Comeau, Québec 314 314
Bécancour, Québec 413 350
Deschambault, Québec 287 287
Iceland Fjarðaál 351 351
Norway Lista 95 95
Mosjøen 200 200
Spain San Ciprián 228 228
United States Massena West, NY 130 130
Ferndale, WA (Intalco) 279 279
Evansville, IN (Warrick) 269 269
TOTAL 3,371 2,968
Equity Interests:
Country Facility
Nameplate
Capacity1
(000 mtpy)
Alcoa
Corporation
Consolidated
Capacity1
(000 mtpy)
Saudi Arabia Ras Al Khair (MAC) 804 202
(1) Nameplate Capacity is an estimate based on design capacity and normal operating efficiencies and does not necessarily represent maximum possible
production. Alcoa Corporation’s consolidated capacity is its share of Nameplate Capacity based on its ownership interest in the respective smelter.
(2) The Poços de Caldas facility is a casthouse and does not include a smelter.
6
-- 8 of 363 --
The Company’s five-year review of our production assets first announced in October 2019 includes 1.5 million metric tons of smelting capacity. The portfolio review
includes evaluations to improve cost positioning, including curtailments, closures, or divestitures. As of December 31, 2022, the Company had approximately 868,000
mtpy of idle smelting capacity relative to total Alcoa consolidated capacity of 2,968,000 mtpy. The idle capacity includes the capacity at the fully curtailed Intalco
smelter, 228,000 mtpy of idle capacity at the San Ciprián smelter, 162,000 mtpy of idle capacity at the Warrick smelter, 157,000 mtpy of idle capacity at the Alumar
smelter, 31,000 mtpy of idle capacity at the Lista smelter, and 11,000 mtpy of idle capacity at the Portland smelter.
On August 30, 2022, the Company announced the curtailment of one-third of its production capacity (31 kmt) at the Lista (Norway) smelter. The site’s exposure to spot
energy pricing during the third quarter of 2022 caused significant cost increases. In July 2022, the Company entered into a fixed price power agreement effective for the
fourth quarter of 2022 through December 31, 2023. In February 2023, the agreement was amended with improved fixed pricing and lower volume commitments.
On July 1, 2022, the Company announced curtailment of approximately 54,000 mtpy at the Warrick smelter in the state of Indiana.
In January 2022, Alcoa completed the curtailment of the San Ciprián aluminum smelter’s 228,000 mtpy of annual capacity while the casthouse continues to operate.
The curtailment is a result of an agreement that was reached with the workers’ representatives in December 2021 to suspend production due to exorbitant energy prices
in Spain and to begin the restart process in January 2024. On February 3, 2023, the Company reached an updated agreement with the workers’ representatives to
commence the restart process in phases beginning in January 2024. Alcoa plans that all pots will be restarted by October 1, 2025, and from October 1, 2025 until the end
of 2026, the minimum production will be 75 percent of the nominal capacity of 228,000 mtpy.
On September 20, 2021, the Company announced its plan to restart its 268,000 mtpy per year share of capacity at the Alumar smelter in São Luís, Brazil, which had
been fully curtailed since 2015. The first metal sales occurred in the second quarter of 2022 and the Company continues to progress the restart of the smelter.
In October 2022, the Company completed the restart of 35,000 mtpy (19,000 mtpy Alcoa share) of previously curtailed annual capacity at the Portland aluminum
smelter in Australia that was previously announced in November 2021. With the restart complete, the plant is operating at approximately 95 percent of its total capacity
and Alcoa has approximately 186,000 mtpy of consolidated annual capacity operating at Portland.
Energy Facilities and Sources
In 2022, energy comprises approximately 30% of the Company’s total alumina refining production costs and electric power comprises approximately 25% of the
Company’s primary aluminum production costs.
Electricity markets are regional and are limited by physical and regulatory constraints, including the physical inability to transport electricity efficiently over long
distances, the design of the electric grid, including interconnections, and the regulatory structure imposed by various federal and state entities.
Electricity contracts may be short-term (real-time or day ahead) or years in duration, and contracts can be executed for immediate delivery or years in advance. Pricing
may be fixed, indexed to an underlying fuel source or other index such as LME, cost-based or based on regional market pricing. In 2022, Alcoa generated
approximately 11% of the power used at its smelters worldwide and generally purchased the remainder under long-term arrangements.
The following table sets forth the electricity generation capacity and 2022 generation of facilities in which Alcoa Corporation has an ownership interest. See also the
Joint Ventures section above.
Country Facility
Alcoa Corporation
Consolidated
Capacity (MW)
2022 Generation
(MWh)
Brazil Barra Grande 150 1,108,364
Estreito 155 1,075,678
Machadinho 119 1,343,885
Serra do Facão 60 176,617
Canada Manicouagan 133 1,160,170
United States Warrick 657 4,072,355
TOTAL 1,274 8,937,069
The figures in this table are presented in megawatts (MW) and megawatt hours (MWh), respectively.
7
-- 9 of 363 --
Each facility listed above generates hydroelectric power except the Warrick facility, which generates substantially all of the power used by the Warrick smelting facility
from the co-located Warrick power plant using coal purchased from third parties at nearby coal reserves. During 2022, approximately 37% of the generation from the
Warrick power plant was sold into the market under its current operating permits. Alcoa Power Generating Inc., a subsidiary of the Company, also owns certain Federal
Energy Regulatory Commission (FERC)-regulated transmission assets in Indiana, Tennessee, New York, and Washington.
The consolidated capacity of the Brazilian energy facilities shown above in megawatts (MW) is the assured energy, representing approximately 52% of hydropower
plant nominal capacity. Since May 2015 (after curtailment of the Poços de Caldas and São Luís smelters in Brazil), the excess generation capacity from the Brazilian
hydroelectric facilities has been sold into the market.
Below is an overview of our external energy for our smelters and refineries.
External Energy Source
Region Electricity Natural Gas
North
America
Québec, Canada
Alcoa’s smelter located in Baie-Comeau, Quebec, purchases approximately one-quarter of its
electricity needs from Manicouagan Power Limited Partnership. Otherwise, all electricity consumed
by the three smelters in Québec is purchased under contracts with Hydro-Québec that expire on
December 31, 2029.
Massena, New York (Massena West)
The Massena West smelter in New York receives power from the New York Power Authority (NYPA)
pursuant to a contract between Alcoa and NYPA that expires in March 2026.
Alcoa generally procures natural gas on a
competitive bid basis from a variety of sources,
including producers in the gas production areas and
independent gas marketers. Contract pricing for gas
is typically based on a published industry index
such as the New York Mercantile Exchange
(NYMEX).
Australia
Portland
This smelter purchases power from the National Electricity Market (NEM) variable spot market in the
state of Victoria. During 2021, the smelter entered into fixed-for-floating swap contracts with AGL
Hydro Partnership, Origin Energy Electricity Limited and Alinta Energy CEA Trading Pty Ltd, at a
combined level of 515 MW. In addition, in November 2021 the Portland Aluminium joint venture
announced the planned restart of 35,000 mtpy of idle capacity (19,000 mtpy Alcoa share) which was
underpinned by an additional fixed-for-floating swap contract with AGL Hydro Partnership for 72
MW. These swap contracts manage exposure to the variable energy rates from the NEM spot market.
The swap contracts will expire on June 30, 2026.
Western Australia
AofA uses gas to co-generate steam and electricity
for its alumina refining processes at the Kwinana,
Pinjarra and Wagerup refineries. In 2015, AofA
secured a significant portion of gas supplies to
2032, covering more than 95 percent of the
refineries’ gas requirements through 2023 and
decreasing percentages thereafter. In 2020 and 2022,
AofA contracted for additional gas supplies starting
in 2024. On a combined basis, these gas supply
arrangements are expected to cover approximately
80% of the refineries’ gas requirements through
2027.
In January 2023, the Company reduced production
at the Kwinana (Australia) refinery by
approximately 30 percent in response to a domestic
natural gas shortage in Western Australia due to
production challenges experienced by key gas
suppliers.
8
-- 10 of 363 --
External Energy Source
Region Electricity Natural Gas
Europe
San Ciprián, Spain
The Company completed the temporary curtailment of its 228,000 mtpy smelting capacity at the
San Ciprián smelter in January 2022 pursuant to the agreement reached with the workers’
representatives on December 29, 2021. The smelter purchases its reduced electricity requirements
under a bilateral spot power contract that expired on June 30, 2022.
In anticipation of a phased restart beginning in 2024 as agreed with workers’ representatives (see
above), up to approximately 75 percent of the smelter’s future power needs have been secured
under long-term agreements with renewable energy providers to date. The Company continues to
negotiate with other generators to secure the remaining power supply needs for the smelter. The
supply of energy will depend on the permitting and development of the windfarms.
Lista and Mosjøen, Norway
Beginning in 2017, Alcoa entered into several long-term power purchase agreements, which secured
approximately 50 percent of the necessary power for the Norwegian smelters for the period of 2020 to
2035. The remaining 50 percent was purchased under short-term contracts. In 2022, approximately 25
percent of the necessary power at the Mosjøen (Norway) smelter was purchased at spot rates.
Financial compensation of the indirect carbon emissions costs passed through in the electricity bill is
received in accordance with EU Commission Guidelines and the Norwegian compensation regime.
During 2022, the Company acted to mitigate spot energy pricing at the Lista (Norway) smelter. In July
2022, the Company entered into a fixed price power agreement effective for the fourth quarter of 2022
through December 31, 2023. In February 2023, the agreement was amended with improved fixed
pricing and lower volume commitments. The Company is continuing to review operating levels with
changes in market conditions.
Iceland
Landsvirkjun, the Icelandic national power company, supplies competitively priced electricity
from a hydroelectric facility to Alcoa’s Fjarðaál smelter under a 40-year power contract, which
will expire in 2047 with a price renegotiation effective from 2027.
Spain
In January 2022, Naturgy terminated its contract
supplying 50 percent of the refinery’s natural gas
demand until June 2022 and 25 percent from July to
December 2022. Subsequent to February 2022, the
Company has access to adequate supply at spot gas
rates.
South
America
Alumar
On September 20, 2021, the Company announced its plan to restart its 268 kmt per year share of
capacity at the Alumar smelter in São Luís, Brazil, which had been fully curtailed since 2015. The
first metal sales occurred in the second quarter of 2022 and the Company continues to progress the
restart of the smelter. Alcoa entered into several short-term power purchase agreements which
secured substantially all of the necessary power for its share of the Alumar smelter for the restart
period in 2022 through the end of 2023. Alcoa also entered into multiple long-term power
purchase agreements which collectively secured all of the necessary power for its share of the
Alumar smelter for the period of 2024 through 2038. All power secured for short and long term is
from renewable sources.
Sources and Availability of Raw Materials
The Company believes that the raw materials necessary to its business are and will continue to be available and that the sources and availability of such raw materials
are currently adequate. Generally, materials are purchased from third-party suppliers under competitively priced supply contracts or bidding arrangements. Substantially
all of the raw materials required to manufacture our products are available from more than one supplier. Some sources of these raw materials are located in countries
that may be subject to unstable political and economic conditions, which could disrupt supply or affect the price of these materials.
Certain raw materials, such as caustic soda and calcined petroleum coke, may be subject to significant price volatility which could impact our financial results.
9
-- 11 of 363 --
Alcoa sources bauxite from its own resources, including AWAC entities, and believes its present sources of bauxite on a global basis are sufficient to meet the forecasted
requirements of its alumina refining operations for the foreseeable future.
For each metric ton (mt) of alumina produced, Alcoa consumes the following amounts of the identified raw material inputs (approximate range across relevant
facilities):
Raw Material Units Consumption per mt of Alumina
Bauxite mt 2.2 – 4.1
Caustic soda kg 60 – 100
Electricity kWh 170 to 260 total consumed (0 to 230 imported)
Fuel oil and natural gas GJ 6 – 13.5
Lime (CaO) kg 6 – 60
For each metric ton of aluminum produced, Alcoa consumes the following amounts of the identified raw material inputs (approximate range across relevant facilities):
Raw Material Units Consumption per mt of Primary Aluminum
Alumina mt 1.92 ± 0.02
Aluminum fluoride kg 17.0 ± 2.6
Calcined petroleum coke mt 0.38 ± 0.03
Cathode blocks mt 0.005 ± 0.001
Electricity kWh 13.27 – 16.69
Liquid pitch mt 0.09 ± 0.02
Natural gas mcf 3.0 ± 1.0
Certain aluminum we produce includes alloying materials. Because of the number of different types of elements that can be used to produce various alloys, providing a
range of such elements would not be meaningful. With the exception of a very small number of internally used products, Alcoa produces its aluminum alloys in
adherence to an Aluminum Association (of which Alcoa is an active member) standard, which uses a specific designation system to identify alloy types. In general, each
alloy type has a major alloying element other than aluminum but will also include lesser amounts of other constituents.
Competition
Alcoa is subject to highly competitive conditions in all aspects of the aluminum supply chain in which it competes. With our business segments operating in close
proximity to our broad, worldwide customer base, we endeavor to meet customer demand in key markets in North America, South America, Europe, the Middle East,
Australia, and China.
We compete with a variety of both U.S. and non-U.S. companies in all major markets across the aluminum supply chain. Competitors include bauxite miners who
supply to the third-party bauxite market, alumina suppliers, refiners and producers, commodity traders, aluminum producers, and producers of alternative materials such
as steel, titanium, copper, carbon fiber, composites, plastic, and glass.
By having an integrated aluminum value chain, we are able to offer our Sustana line of products manufactured through low-carbon emitting processes, which includes:
EcoSource alumina, Ecolum aluminum, and EcoDura aluminum.
Bauxite
We are among the world’s largest bauxite miners. The majority of bauxite mined globally is converted to alumina for the production of aluminum. In 2022,
approximately 8% of Alcoa’s bauxite shipments were sold to third-party customers and Alcoa-operated mines supply approximately 92% of their volume to Alcoa
refineries.
Alcoa’s share of mines operated by partnerships in which Alcoa, including AWAC, has equity interests, supply approximately 55% of their volume to Alcoa refineries.
Our principal competitors in the third-party bauxite market include Rio Tinto and multiple suppliers from Guinea, Australia, Indonesia, and Brazil, among other
countries. We compete largely based on bauxite quality, price, and proximity to customers, as well as strategically located long-term bauxite resources in Australia,
Brazil, and Guinea, which is home to the world’s largest reserves of high-quality metallurgical grade bauxite.
Alumina
We are the world’s largest alumina producer outside of China. The alumina market is global and highly competitive, with many active suppliers, producers, and
commodity traders. Our main competitors in the third-party alumina market are Aluminum Corporation of China, South32, Hangzhou Jinjiang Group, Rio Tinto, and
Norsk Hydro ASA. In recent years, there has been significant growth in alumina refining in China and India. The majority of our product is sold in the form of smelter
grade alumina.
10
-- 12 of 363 --
Key factors influencing competition in the alumina market include cost position, price, reliability of bauxite supply, quality, and proximity to customers and end
markets. We had an average cost position in the first quartile of global alumina production in 2022. Our refineries are strategically located near low-cost bauxite mines,
which provide a long-term supply of bauxite to our refining portfolio. Our alumina refineries include sophisticated refining technology to maximize efficiency with the
bauxite grades from these internal mines.
The Company anticipates continuing growth in its EcoSource low carbon smelter-grade alumina from smelting customers. Alumina-associated emissions are generally
the third largest component of aluminum’s carbon footprint.
Aluminum
In our Aluminum segment, competition is dependent upon the type of product we are selling.
The market for primary aluminum is global, and demand for aluminum varies widely from region to region. We compete with commodity traders, such as Glencore,
Trafigura, J. Aron and Gerald Group, and aluminum producers such as Emirates Global Aluminum, Norsk Hydro ASA, Rio Tinto, Century Aluminum, Vedanta
Aluminum Ltd., and United Company RUSAL Plc.
Several of the most critical competitive factors in our industry are product quality, production costs (including source, reliability of supply, and cost of energy), price,
access and proximity to raw materials, customers and end markets, timeliness of delivery, customer service (including technical support), product innovation, and
breadth of offerings. Where aluminum products compete with other materials, the characteristics of aluminum are also a significant factor, particularly its light weight,
strength, and recyclability.
Increasingly, Alcoa is seeing higher demand for its Sustana line of products by customers focused on low carbon inputs throughout their supply chain.
The strength of our position in the primary aluminum market is largely attributable to: our integrated supply chain; long-term energy arrangements; the ability of our
casthouses to provide customers with a diverse product portfolio in terms of shapes and alloys; and our decreasing demand for fossil fuels, as approximately 86% of the
aluminum smelting portfolio operated by the Company was powered by renewable (primarily hydropower) energy sources in 2022. The Company intends to continue to
focus on optimizing capacity utilization.
Patents, Trade Secrets and Trademarks
The Company believes that its domestic and international patent, trade secret and trademark assets provide it with a competitive advantage. The Company’s rights under
its intellectual property, as well as the technology and products made and sold under them, are important to the Company as a whole and, to varying degrees, important
to each business segment. Alcoa’s business as a whole is not, however, materially dependent on any single patent, trade secret or trademark. As a result of product
development and technological advancement, the Company continues to pursue patent protection in jurisdictions throughout the world. As of December 31, 2022,
Alcoa’s worldwide patent portfolio consisted of approximately 400 granted patents and 180 pending patent applications. The Company also has a number of domestic
and international registered trademarks that have significant recognition within the markets that are served, including the name “Alcoa” and the Alcoa symbol.
In connection with the Separation Transaction, Alcoa Corporation and ParentCo entered into certain intellectual property license agreements that provide for a license of
certain patents, trademarks, and know-how from ParentCo or Alcoa Corporation, as applicable, to the other, on a perpetual, royalty-free, and non-exclusive basis,
subject to certain exceptions.
Government Regulations and Environmental Matters
Alcoa’s global operations subject it to compliance with various types of government laws, regulations, permits, and other requirements which often provide discretion to
government authorities and could be interpreted, applied, or modified in ways to make the Company’s operations or compliance activities more costly. These laws and
regulations include those relating to safety and health, environmental protection and compliance, tailings management, data privacy and security, anti-corruption, human
rights, competition, and trade, such as tariffs or other import or export restrictions that may increase the cost of raw material or cross-border shipments and impact our
ability to do business with certain countries or individuals. Though we cannot predict the collective potential adverse impact of the expanding body of laws, regulations,
and interpretations, we believe that we are in compliance with such laws and regulations in all material respects and do not expect that continued compliance with such
regulations will have a material effect upon capital expenditures, earnings, or our competitive position. For a discussion of the risks associated with certain applicable
laws and regulations, see Part I Item 1A of this Form 10-K.
11
-- 13 of 363 --
Environmental
Alcoa is subject to extensive federal, state/provincial, and local environmental laws and regulations and other requirements, in the U.S. and abroad, including those
relating to the release or discharge of materials into the air, water and soil, waste management, pollution prevention measures, the generation, storage, handling, use,
transportation and disposal of hazardous materials, and the exposure of persons to hazardous materials. Alcoa is working towards the implementation of the Global
Industry Standard on Tailings Management (GISTM), an integrated approach to the management and operations of our tailings storage facilities to enhance the safety of
these facilities. Additionally, we are and may become subject to various laws and regulations related to climate change, particularly related to the reduction of
greenhouse gas emissions.
We maintain remediation and reclamation plans for various sites, and we manage environmental assessments and cleanups at approximately 60 locations, which include
currently owned or operated facilities and adjoining properties, previously owned or operated facilities and adjoining properties, and waste sites, such as U.S. Superfund
(Comprehensive Environmental Response, Compensation and Liability Act (CERCLA)) sites. In 2022, capital expenditures for new or expanded facilities for
environmental control were approximately $136 and approximately $162 is expected in 2023. See Part II Item 8 of this Form 10-K in Note S to the Consolidated
Financial Statements under caption Contingencies for additional information.
Safety and Health
We are subject to a broad range of foreign, federal, state, and local laws and regulations relating to occupational health and safety, and our safety program includes
measures required for compliance. We have incurred, and will continue to incur, capital expenditures to meet our health and safety compliance requirements, as well as
to continually improve our safety systems.
For a discussion of the risks associated with certain applicable laws and regulations, see Part I Item 1A of this Form 10-K.
Human Capital Resources
Our core values – Act with Integrity, Operate with Excellence, Care for People, and Lead with Courage – guide us as a company, including our approach to human
capital management. We believe that our people are our greatest asset. The success and growth of our business depend in large part on our ability to attract, develop, and
retain a diverse population of talented, qualified, and highly skilled employees at all levels of our organization, including the individuals who comprise our global
workforce, our executive officers and other key personnel.
Our Company policies, including the Code of Conduct and Ethics, Harassment and Bullying Free Workplace Policy, and EHS Vision, Values, Mission, and Policy,
support our mission to advance our Company culture and core values. Alcoa maintains a Human Rights Policy that applies globally to the Company, its partnerships,
and other business associates, which incorporates international human rights principles encompassed in the Universal Declaration of Human Rights, the International
Labor Organization’s Declaration on Fundamental Principles and Rights at Work, the United Nations Global Compact, and the United Nations Guiding Principles on
Business and Human Rights.
Employees
As of December 31, 2022, Alcoa had approximately 13,100 employees in 17 countries. Approximately 9,600 of our global employees are covered by collective
bargaining agreements with certain unions and varying expiration dates, including approximately 1,000 employees in the U.S., 1,900 employees in Europe, 1,400
employees in Canada, 2,500 employees in South America, and 2,800 employees in Australia. Approximately 900 U.S. employees are covered by a collective bargaining
agreement in place with the United Steelworkers (USW). There are also U.S. collective bargaining agreements in place, with varying expiration dates, with the
International Association of Machinists and Aerospace Workers (IAM) and the International Brotherhood of Electric Workers (IBEW).
In 2022, the Company continued the process of hiring employees for the restart of the Alumar smelter in Brazil and approximately 420 additional employees were hired.
Safety and Health
The safety and health of our employees, contractors, temporary workers, and visitors are top priorities and key to our ability to attract and retain talent. We aspire to
work safely, all the time, everywhere. We strive to foster a culture of hazard and risk awareness, the effective understanding and use of our safe systems of work,
proactive incident reporting, and knowledge sharing.
Our safety programs and systems are designed to prevent loss of life and serious injury at our locations and include rigorous safety standards and controls, periodic risk-
based audits, a formal and standardized process for investigating fatal and serious injury incidents (including potential incidents), management of critical risks and
safety hazards, and efforts to eliminate hazards or implement controls to prevent and mitigate risks. We have operating standards based on human performance, which
teach employees how to anticipate and recognize situations where errors are likely to occur, which help enable us to predict, reduce, manage, and prevent fatalities and
injuries.
12
-- 14 of 363 --
We strive to maintain a culture of speaking up, where incidents are reported and ideas are shared. We integrate our temporary workers, contractors, and visitors into our
safety programs and data.
We have included a safety metric focused on reducing fatalities and serious injuries in our annual incentive program for the past several years.
Inclusion, Diversity, and Equity
Alcoa's vision is to provide trusting workplaces that are safe, respectful, and inclusive of all individuals and that reflect the diversity of the communities in which we
operate. Our mission is to build a stronger Everyone Culture – a more inclusive culture where inclusion, diversity, and equity (IDE) is embedded in our actions and
employees feel valued, empowered, and respected.
As of December 31, 2022, women comprised approximately 18 percent of our global workforce. To support our efforts to increase employee diversity, for the past
several years, we have included a metric in our annual incentive plan focused on increasing the gender diversity of our global workforce as well as other
underrepresented groups. We also recognize the benefits and importance of diversity among our senior management. Of the eight executive team members, 50 percent
are women and 12 percent are racially/ethnically diverse.
In 2022, we continued our IDE strategic efforts with leadership from our Global Inclusion & Diversity Council and three inclusion groups: AWARE – Alcoans working
actively for racial-ethnic equality; EAGLE, our LGBT+ Equality inclusion group; and AWN – Alcoa Women’s Network. At the end of 2022, we announced the
expansion of our inclusion groups for 2023, by adding ABLE – Alcoans moving beyond limited expectations, for those with disabilities.
Available Information
The Company’s internet website address is www.alcoa.com. Alcoa makes available free of charge on or through its website its Annual Reports on Form 10-K, Quarterly
Reports on Form 10-Q, Current Reports on Form 8-K, and amendments to those reports as soon as reasonably practicable after the Company electronically files such
material with, or furnishes it to, the Securities and Exchange Commission (the SEC). These documents can be accessed on the investor relations portion of our website
www.alcoa.com/investors. This information can also be found on the SEC’s internet website, www.sec.gov. The information on the Company’s website is included as an
inactive textual reference only and is not a part of, or incorporated by reference in, this Annual Report on Form 10-K.
Dissemination of Company Information
Alcoa Corporation intends to make future announcements regarding Company developments and financial performance through its website, www.alcoa.com, as well as
through press releases, filings with the SEC, conference calls, and webcasts.
Information about our Executive Officers
The names, ages, positions, and areas of responsibility of the executive officers of the Company as of the filing date of this Form 10-K are listed below.
Roy C. Harvey, 49, is President and Chief Executive Officer of Alcoa Corporation. He became Chief Executive Officer in November 2016 and assumed the role of
President in May 2017. Mr. Harvey served as Executive Vice President of ParentCo and President of ParentCo’s Global Primary Products (GPP) division from October
2015 to November 2016. From June 2014 to October 2015, he was Executive Vice President, Human Resources and Environment, Health, Safety and Sustainability at
ParentCo. Prior to that time, Mr. Harvey served as Chief Operating Officer, and was also Chief Financial Officer, for GPP at ParentCo. In addition to these roles,
Mr. Harvey served in the roles of Director of Investor Relations and Director of Corporate Treasury at ParentCo. Mr. Harvey joined ParentCo in 2002.
Molly S. Beerman, 59, has served as Executive Vice President and Chief Financial Officer of Alcoa Corporation since February 1, 2023. Prior to this, Ms. Beerman
was Senior Vice President and Controller of the Company from November 2019 to January 2023 and Vice President and Controller from December 2016 through
October 2019. Ms. Beerman was Director, Global Shared Services Strategy and Solutions from November to December 2016. In 2016, Ms. Beerman held a consulting
role with the Finance Department of ParentCo. From 2012 to 2015, Ms. Beerman served as Vice President, Finance and Administration for a non-profit organization
focused on community issues. Prior to that, Ms. Beerman was employed by ParentCo from 2001 to 2012, having held several roles in the finance function and
eventually becoming the director of global procurement center of excellence from 2008 to 2012. Ms. Beerman is a certified public accountant.
13
-- 15 of 363 --
Renato Bacchi, 46, has served as Executive Vice President and Chief Strategy and Innovation Officer of Alcoa Corporation since February 1, 2023. Mr. Bacchi is
responsible for strategy, corporate and business development, energy, non-operated joint ventures, and curtailed and closed sites, and he oversees the Company’s
innovations and technologies, including the Company’s Technical Center for research and development (R&D) activities. Previously, he was Executive Vice President
and Chief Strategy Officer from February 2022 through January 2023, Senior Vice President and Treasurer from November 2019 through January 2022, and Vice
President and Treasurer from November 2016 through October 2019. Prior to the Separation Transaction, Mr. Bacchi served as the Assistant Treasurer of ParentCo from
October 2014 through October 2016 and the Director, Corporate Treasury from 2012 to 2014. Prior to this time, Mr. Bacchi held various roles of increasing
responsibility in areas including finance, strategy, procurement, energy and sales. Mr. Bacchi joined ParentCo in Brazil in 1997.
Sonya Elam Harden, 58, has served as Executive Vice President and Chief External Affairs Officer of Alcoa Corporation since August 2020. In this role, Ms. Elam
Harden is responsible for global government affairs, community relations, and sustainability, and she oversees the Alcoa Foundation. Ms. Elam Harden was the Interim
Head of External Affairs of Alcoa Corporation from March 2020 through July 2020 and served as the Vice President, Government Affairs for the Western Hemisphere
from November 2016 through July 2020. Prior to the Separation Transaction, Ms. Elam Harden held various roles of increasing responsibility in communications,
marketing, and government affairs at ParentCo, including as Director of Communications for the GPP division from November 2010 through October 2016 and as
Director of Marketing from October 2009 to November 2010. Ms. Elam Harden initially joined ParentCo in 1989, and rejoined in 2001, after having left ParentCo in
1998.
Jeffrey D. Heeter, 57, has served as Executive Vice President and General Counsel of Alcoa Corporation since November 2016. In this role, Mr. Heeter has overall
responsibility for the Company’s global legal, compliance, governance, and security matters. He previously also served as the Secretary of Alcoa Corporation from
November 2016 to December 2019. Mr. Heeter served as Assistant General Counsel and an Assistant Officer of ParentCo from 2014 to November 2016. Mr. Heeter was
Group Counsel for the GPP division of ParentCo from 2010 to 2014. From 2008 to 2010, Mr. Heeter was General Counsel of Alcoa of Australia in Perth, Australia. Mr.
Heeter joined ParentCo in 1998.
Tammi A. Jones, 43, has served as Executive Vice President and Chief Human Resources Officer of Alcoa Corporation since April 2020. Ms. Jones oversees all aspects
of human resources management, including talent and recruitment, compensation and benefits, inclusion and diversity, training and development, and labor relations.
Ms. Jones served as Vice President, Compensation and Benefits from January 2019 through March 2020 and was the Director, Organizational Effectiveness from April
2017 to December 2018. From April 2015 through March 2017, Ms. Jones served as Human Resources Director, Aluminum (including of GPP at ParentCo until the
Separation Transaction), and she served as Human Resources Director for ParentCo Wheels and Transportation Products from April 2013 to April 2015. Ms. Jones
joined ParentCo in 2006 and held a variety of human resource positions at ParentCo, including Human Resources Director, Europe Building & Construction and Human
Resources Director, UK and Ireland in ParentCo’s Building and Construction Systems division.
William F. Oplinger, 56, has served as Executive Vice President and Chief Operations Officer of Alcoa Corporation since February 1, 2023. In this role, Mr. Oplinger
is responsible for the daily operations of the Company’s bauxite, alumina, and aluminum assets. From November 2016 to January 2023, Mr. Oplinger was Executive
Vice President and Chief Financial Officer of the Company. Prior to this, Mr. Oplinger served as Executive Vice President and Chief Financial Officer of ParentCo from
April 1, 2013 to November 2016. Mr. Oplinger joined ParentCo in 2000, and through 2013 held key corporate positions in financial analysis and planning and also
served as Director of Investor Relations. Mr. Oplinger also held principal positions in the ParentCo’s GPP division, including as Controller, Operational Excellence
Director, Chief Financial Officer, and Chief Operating Officer.
Kelly R. Thomas, 53, has served as Executive Vice President and Chief Commercial Officer of Alcoa Corporation since February 14, 2022. In this role, Ms. Thomas is
responsible for leading the Company’ commercial function, including sales and trading, marketing, supply chain, commercial operations, and procurement. Prior to
joining Alcoa, Ms. Thomas was the Vice President, Finance at Vista Metals Corporation, an aluminum products company, from October 2015 to February 2022 and the
Chief Operating Officer at Electronic Recyclers International, an electronics recycler, from June 2014 through September 2015. Prior to this time, from 2010 to 2014,
Ms. Thomas held various positions of increasing responsibility at Aleris Corporation, including Senior Vice President and General Manager of North American Rolled
Products. Ms. Thomas joined Reynolds Metals in 1999, later acquired by ParentCo, and held various roles in sales, risk management, and marketing at ParentCo from
2001 to 2009.
Item 1A. Risk Factors.
There are inherent risks associated with Alcoa’s business and industry. In addition to the factors discussed elsewhere in this report, the following risks and uncertainties
could have a material adverse effect on our business, financial condition, or results of operations, including causing Alcoa’s actual results to differ materially from those
projected in any forward-looking statements. Although the risks are organized by heading, and each risk is described separately, many of the risks are interrelated. You
should not interpret the disclosure of any risk factor to imply that the risk has not already materialized. While we believe we have identified and discussed below the key
risk factors affecting our business, there may be additional risks and uncertainties that are not presently known to Alcoa or that Alcoa currently deems immaterial that also
may materially adversely affect us in future periods. See Part II Item 7 of this Form 10-K in Management’s Discussion and Analysis of Financial Condition and Results of
Operations under caption Forward-Looking Statements.
14
-- 16 of 363 --
Industry and Global Market Risks
The aluminum industry and aluminum end-use markets are highly cyclical and are influenced by several factors, including global economic conditions, the
Chinese market, and overall consumer confidence.
The nature of the industries in which our customers operate causes demand for our products to be cyclical, creating potential uncertainty regarding future profitability.
The demand for aluminum is sensitive to, and impacted by, demand for the finished goods manufactured by our customers in industries, such as the commercial
construction, transportation, and automotive industries, which may change as a result of changes in the global economy, foreign currency exchange rates, energy prices,
or other factors beyond our control. The demand for aluminum is also highly correlated to economic growth, and we could be adversely affected by large or sudden
shifts in the global inventory of aluminum and the resulting market price impacts.
We believe the long-term prospects for aluminum and aluminum products are positive; however, we are unable to predict the future course of industry variables or the
strength of the global economy and the effects of government intervention. Our business, financial condition, and results of operations may be materially affected by the
conditions in the global economy generally, including inflationary and recessionary conditions, and in global capital markets, including in the end markets and
geographic regions in which we and our customers operate. Many of the markets in which our customers participate are also cyclical in nature and experience
significant fluctuations in demand for their products based on economic conditions, consumer demand, raw material and energy costs, and government actions. Many of
these factors are beyond our control.
The Chinese market is a significant source of global demand for, and supply of, commodities, including aluminum. Chinese production rates of aluminum, both from
new construction and installed smelting capacity, can fluctuate based on Chinese government policy, such as the level of enforcement of capacity limits and/or licenses
and environmental policies. In addition, industry overcapacity, a sustained slowdown in Chinese aluminum demand, or a significant slowdown in other markets, that is
not offset by decreases in supply of aluminum or increased aluminum demand in emerging economies, such as India, Brazil, and several Southeast Asian countries,
could have an adverse effect on the global supply and demand for aluminum and aluminum prices. Also, changes in the aluminum market can cause changes in the
alumina and bauxite markets, which could also materially affect our business, financial condition, or results of operations. As a result of these factors, our profitability is
subject to significant fluctuation.
A decline in consumer and business confidence and spending, severe reductions in the availability and cost of credit, and volatility in the capital and credit markets
could adversely affect the business and economic environment in which we operate and the profitability of our business. We are also exposed to risks associated with
the creditworthiness of our suppliers and customers. If the availability of credit to fund or support the continuation and expansion of our customers’ business operations
is curtailed or if the cost of that credit is increased, the resulting inability of our customers or of their customers to either access credit or absorb the increased cost of
that credit could adversely affect our business by reducing our sales or by increasing our exposure to losses from uncollectible customer accounts. These conditions and
a disruption of the credit markets could also result in financial instability of some of our suppliers and customers. The consequences of such adverse effects could
include the interruption of production at the facilities of our customers, the reduction, delay or cancellation of customer orders, delays or interruptions of the supply of
raw materials we purchase, and bankruptcy of customers, suppliers, or other creditors. Any of these events could adversely affect our business, financial condition, and
results of operations.
Market-driven balancing of global aluminum supply and demand may be disrupted by non-market forces.
In response to market-driven factors relating to the global supply and demand of aluminum and alumina, including energy prices and environmental policies, other
industry producers have independently undertaken to reduce or increase production. Changes in production may be delayed or impaired by the ability to secure, or the
terms of long-term contracts, to buy energy or raw materials.
The impact of non-market forces on global aluminum industry capacity, such as political instability or pressures or governmental policies in certain countries relating to
employment, the environment, or maintaining or further developing industry self-sufficiency, may affect overall supply and demand in the aluminum industry. For
example, the ongoing active conflict between Russia and Ukraine could adversely impact macroeconomic conditions and result in heightened economic sanctions from
the U.S. and the international community in a manner that adversely affects our industry. The disruption of the market-driven balancing of the global supply and
demand of aluminum, a resulting weak pricing environment and margin compression may adversely affect our business, financial condition, and results of operations.
15
-- 17 of 363 --
We could be materially adversely affected by volatility and declines in aluminum and alumina, including global, regional, and product-specific prices, or by
significant changes in production costs which are linked to LME or other commodities.
The overall price of primary aluminum consists of several components: (i) the underlying base metal component, which is typically based on quoted prices from the
LME; (ii) the regional premium, which comprises the incremental price over the base LME component that is associated with the physical delivery of metal to a
particular region (e.g., the Midwest premium for metal sold in the United States); and (iii) the product premium, which represents the incremental price for receiving
physical metal in a particular shape (e.g., foundry, billet, slab, rod, etc.) and/or alloy. Each of the above three components has its own drivers of variability.
The LME price volatility is typically driven by macroeconomic factors (including political instability), global supply and demand of aluminum (including expectations
for growth, contraction, and the level of global inventories), and trading activity of financial investors. LME cash prices reached the highest level in over a decade in
March 2022 at $3,985 per metric ton, with the low point of the year in September 2022 at $2,080 per metric ton.
While global inventories declined in 2022, high LME inventories could lead to a reduction in the price of aluminum and declines in the LME price have had a negative
impact on our business, financial condition, and results of operations. Regional premiums tend to vary based on the supply of and demand for metal in a particular
region, associated transportation costs, and import tariffs. Product premiums generally are a function of supply and demand for a given primary aluminum shape and
alloy combination in a particular region. Periods of industry overcapacity may also result in a weak aluminum pricing environment.
A sustained weak LME aluminum pricing environment, deterioration in LME aluminum prices, or a decrease in regional premiums or product premiums could have a
material adverse effect on our business, financial condition, or results of operations. Similarly, our operating results are affected by significant changes in key costs of
production that are commodity or LME-linked.
Most of our alumina contracts contain two pricing components: (1) the API price basis and (2) a negotiated adjustment basis that takes into account various factors,
including freight, quality, customer location, and market conditions. Because the API component can exhibit significant volatility due to market exposure, revenues
associated with our alumina operations are exposed to market pricing.
Our participation in increasingly competitive and complex global markets exposes us to risks, including legal and regulatory risks and changes in conditions
beyond our control, that could adversely affect our business, financial condition, or results of operations.
We have operations or activities in numerous countries and regions outside the United States, including Australia, Brazil, Canada, Europe, Guinea, and the Saudi Arabia.
The risks associated with the Company’s global operations include:
• Geopolitical risks, such as political instability, coups d’états, civil unrest, strikes and work stoppages, expropriation, nationalization of properties by a
government, imposition of sanctions, changes to import or export regulations and fees, renegotiation, revocation or nullification of existing agreements,
leases, licenses, and permits, and changes to mining royalty rules or laws;
• Economic and commercial instability risks, including those caused by sovereign and private debt default, corruption, and changes in local government laws,
regulations, and policies, such as those related to tariffs and trade barriers, trade tensions, taxation, exchange controls, employment regulations, and
repatriation of earnings;
• Weakening macroeconomic conditions;
• Contracting manufacturing activity, especially in the global automotive sector;
• War or terrorist activities;
• Major public health issues, such as an outbreak of a pandemic or epidemic, which could cause disruptions in our operations, supply chain, or workforce;
• Information systems failures or disruptions, including due to cyber attacks;
• Difficulties enforcing intellectual property and contractual rights, or limitations in the protection of technology, data, and intellectual property, in certain
jurisdictions; and,
• Unexpected events, accidents, or environmental incidents, including natural disasters.
We have experienced some of these events, and while the impact of any of the foregoing factors is difficult to predict, any one or more of them could adversely affect
our business, financial condition, or results of operations. Existing insurance arrangements may not provide sufficient coverage or reimbursement for significant costs
that may arise from such events.
Unexpected or uncontrollable events or circumstances in any of the foreign markets in which we operate, including actions by foreign governments such as changes in
foreign policy or fiscal regimes, termination of our leases or agreements with such foreign governments, increased government regulation, or forced curtailment or
continuation of operations, could materially and adversely affect our business, financial condition, or results of operations.
16
-- 18 of 363 --
We may be unable to obtain, maintain, or renew permits or approvals necessary for our mining operations, which could materially adversely affect our operations
and profitability.
Our mining operations are subject to extensive permitting and approval requirements. These include permits and approvals issued by various government agencies and
regulatory bodies at the federal, state, and local levels of governments in the countries in which we operate. The permitting and approval rules are complex, are often
subject to interpretations by regulators, which may change over time, and may be impacted by heightened levels of regulatory oversight and stakeholder focus on
addressing environmental and social impacts of mining activities. Changing expectations and increased information required by regulators could make our ability to
comply with the applicable requirements more difficult, inhibit or delay our ability to timely obtain the necessary approvals, if at all, result in approvals being
conditioned in a manner that may restrict the Company’s ability to efficiently and economically conduct its mining activities, require us to adjust our mining plans, or
preclude the continuation of certain ongoing operations and mining activities or the development of future mining operations. Failure to obtain, maintain, or renew
permits or approvals, or permitting or approval delays, restrictions, or conditions may impact the quality of the bauxite we are able to mine and could increase our costs
and affect our ability to efficiently and economically conduct our operations, potentially having a materially adverse impact on our results of operations and
profitability.
In addition, the permitting processes, restrictions, and requirements imposed by conditional permits or approvals, and associated costs and liabilities, may be extensive
and may delay or prevent commencing or continuing exploration or production operations, which could adversely affect the Company’s mining operations and
production, and consequently our refining and smelting operations, and could require us to curtail, close, or otherwise modify our production, operations, and sites.
Additionally, the Company’s mining permits may be rescinded or modified, or our mining plans may be adjusted, to mitigate against adverse impacts to sites within or
near our mining areas that have environmental, biodiversity, or cultural significance, potentially having a materially adverse impact on our results of operations and
profitability. Due to mining plan approval delays in Western Australia, the Company is currently mining and processing lower grade bauxite, which has caused
increased production costs.
Our operations and profitability have been and could continue to be adversely affected by unfavorable changes in the cost, quality, or availability of raw materials
or other key inputs, or by disruptions in the supply chain.
Our business, financial condition, and results of operations have been and could continue to be negatively affected by unfavorable changes in the cost, quality, or
availability of energy, raw materials, including carbon products, caustic soda, and other key inputs, such as bauxite, as well as freight costs associated with
transportation of raw materials and key inputs to refining and smelting locations. We may not be able to fully offset the effects of higher raw material or energy costs
through price increases, productivity improvements, cost reduction programs, or reductions or curtailments to production at our operations. A decrease in the quality of
raw materials or key inputs has in the past and could continue to cause increased production costs, which also has in the past and could continue to result in lower
production volumes. For example, the Company is currently mining and processing lower grade bauxite in Western Australia, which has caused increased production
costs. Changes in the costs of bauxite, alumina, energy and other inputs during a particular period may not be adequate to offset concurrent sharper decreases in the
price of alumina or aluminum and could have a material adverse effect on our operating results.
In addition, due to global supply chain disruptions, we may not be able to obtain sufficient supply of our raw materials, energy, or other key inputs in a timely manner,
including due to shortages, inflationary cost pressures, or transportation delays, which could cause disruption in our operations or production curtailments. Though we
have been able to source our raw materials and other key inputs in adequate amounts from other suppliers or our own stockpiles to date, there can be no guarantee that
our operations or profitability will not be adversely affected in the future. Our suppliers, vendors, and customers could experience similar constraints that could impact
our operations and profitability.
Our operations consume substantial amounts of energy and could be disrupted, and our profitability could decline, if energy costs rise or if energy supplies are
interrupted or become uncertain.
Our refineries and smelters consume substantial amounts of natural gas and electricity in the production of alumina and aluminum. The prices for and availability of
energy are subject to volatile market conditions that can be affected by factors beyond our control such as weather, political, regulatory, and economic conditions. For
example, significantly higher market power prices in Europe in 2022 have caused competitors’ smelters to announce production cuts, as well as the production cuts
announced by Alcoa in 2022 due to rising energy costs (see Part 1 Item 1 of this Form 10-K).
Though we have ownership in certain hydroelectricity assets, we rely on third parties for our supply of energy resources consumed in the manufacture of our products.
Energy supply contracts for our operations vary in length and market exposure, and we could be, and have been, negatively impacted by:
• Significant increases in LME prices, or spot electricity, fuel oil and/or natural gas prices;
• Unavailability of or interruptions or uncertainty in energy supply or unplanned outages due to political instability, droughts, hurricanes, wildfires, other
natural disasters, equipment failure, or other causes;
• Unavailability of long-term energy from renewable sources in particular locations or at competitive rates;
17
-- 19 of 363 --
• Curtailment of one or more refineries or smelters due to the inability to extend energy contracts upon expiration or negotiate new arrangements on cost-
effective terms, the unavailability of energy at competitive rates; and,
• Curtailment of one or more facilities due to high energy costs that render their continued operation uneconomic, discontinuation of power supply
interruptibility rights granted to us under a regulatory regime in the country in which the facility is located, or due to a determination that energy
arrangements do not comply with applicable laws, thus rendering the operations that had been relying on such country’s energy framework uneconomic.
Events, such as those listed above, can result in high energy costs, the disruption of an energy source, finding a replacement energy source at a higher cost, the
requirement to repay all or a portion of the benefit we received under a power supply interruptibility regime, or the requirement to remedy any non-compliance of an
energy framework to comply with applicable laws. These events could disrupt our operations or result in production curtailments that could have a material adverse
effect on our business, financial condition or results of operations.
Business Strategy Risks
We have incurred, and may incur in the future, significant costs associated with our strategy to be a lower cost, competitive, and integrated aluminum production
business and we may not be able to realize the anticipated benefits from announced plans, programs, initiatives relating to our portfolio, capital investments, and
developing technologies.
We are executing a strategy to be a low cost, competitive, and integrated aluminum production business by implementing productivity and cost-reduction initiatives,
optimizing our portfolio of assets, and investing in technology to advance sustainably. We have been taking decisive actions to lower the cost base of our operations
through procurement strategies for raw materials, labor productivity, improving operating performance, deploying Company-wide business process models, and
reducing overhead costs. In 2019, the Company announced a five year strategic portfolio review of smelting and refining capacity. Through 2021, Alcoa reached
approximately 75 and 58 percent of its target to improve cost positioning, including curtailment, closure or divestiture of 1.5 and 4 million metric tons of smelting and
refining capacity, respectively. While no actions were taken in 2022 related to these targets, the Company took actions in response to market conditions, and the
strategic portfolio review is continuing. Though we have made progress on this strategy, we may not be able to realize the expected benefits or cost savings from this
strategy.
We have made and may continue to plan and execute other actions to grow or streamline our portfolio. There is no assurance that anticipated benefits of our strategic
actions will be realized. With respect to portfolio optimization actions such as divestitures, curtailments, closures, and restarts, we may face barriers to exit from
unprofitable businesses or operations, including high exit costs or objections from various stakeholders, the lack of availability of buyers willing to purchase such assets
at prices acceptable to us, delays due to any regulatory approvals or government intervention, continuing environmental obligations, and third parties unwilling to
release us from guarantees or other credit support provided in connection with the sale of assets. In addition, we may retain liabilities from such transactions, have
ongoing indemnification obligations, and incur unforeseen liabilities for divested entities if a buyer fails to honor all commitments.
Our business operations are capital intensive, and portfolio optimization actions such as the curtailment or closure of operations or facilities may include significant
costs and charges, including asset impairment charges and other measures. There can be no assurance that such actions will be undertaken or completed in their entirety
as planned at the anticipated cost or will result in being beneficial to the Company. The effect of closures, curtailments, and divestitures over time will reduce the
Company’s cash flow and earnings capacity and result in a less diversified portfolio of businesses, and we will have a greater dependency on remaining businesses for
our financial results. Additionally, curtailing certain existing facilities, whether temporarily or permanently, may require us to incur curtailment and carrying costs
related to those facilities, as well as further increased costs should production be resumed at any curtailed facility, which could have an adverse effect on our business,
financial results, and results of operations.
Our announced multi-year portfolio review of Company assets includes evaluating our portfolio to assess each facility’s strategic benefits, competitiveness, and
viability. Following this review, we expect to be a low cost, first quartile producer across our product segments of bauxite, alumina, and aluminum, and have up to 85%
of smelting production from renewable energy sources, which aligns with our long-term goal of having the lowest carbon-producing refineries and smelters in the
industry. Our announced roadmap of technologies under development to support our long-term goal of having the lowest carbon-producing alumina refineries and
aluminum smelters includes investments to develop, implement, and commercialize new technologies to reduce carbon emissions in the aluminum production process.
We may not be able to implement, fully or in a cost-effective or timely way, the actions necessary to achieve this strategy and goal, which actions could include
capturing, maintaining and/or expanding margins from new products, continued product innovation investment in research and development projects and new
technologies, successful deployment and commercialization of effective new technologies, and cost-effective long-term energy solutions. We may not achieve the
expected results from technology innovation or other benefits, including certain emissions or environmental-related goals, or expected profitability associated with this
strategy. In addition, even if we are able to cost effectively develop our technologies, alternatives to technologies may be more acceptable to the market. Executing these
actions also diverts senior management time and resources from our regular business operations, each of which could adversely affect the Company’s business, financial
condition, and results of operations.
18
-- 20 of 363 --
Joint ventures, other strategic alliances, and strategic business transactions may not achieve intended results. We may experience operational challenges in
integrating or segregating assets for such a venture or transaction, and such a venture or transaction could increase the number of our outstanding shares or
amount of outstanding debt and affect our financial position.
We participate in joint ventures, have formed strategic alliances, and may enter into other similar arrangements in the future. For example, AWAC is an unincorporated
global joint venture between Alcoa and Alumina Limited. AWAC consists of a number of affiliated entities, which own, operate, or have an interest in, bauxite mines
and alumina refineries, as well as an aluminum smelter, in seven countries. In addition, Alcoa is minority owner of a joint venture with the Saudi Arabian Mining
Company (Ma’aden). Although the Company has, in connection with these and our other existing joint ventures and strategic alliances, sought to protect our interests,
joint ventures, and strategic alliances inherently involve special risks. Whether or not the Company holds majority interests or maintains operational control in such
arrangements, our joint venture and other business partners may take certain actions and positions, or experience difficulties, that may negatively impact the Company
and/or its reputation, such as:
• Advancing economic, political, social, or business interests or goals that are inconsistent with, or opposed to those of, the Company and our stakeholders;
• Exercising veto rights to block actions that we believe to be in our or the joint venture’s or strategic alliance’s best interests;
• Taking action contrary to our policies or objectives with respect to our investments; and,
• As a result of financial or other difficulties, be unable or unwilling to fulfill their obligations under the joint venture, strategic alliance, or other agreements,
such as contributing capital to expansion or maintenance projects.
We continuously evaluate and may in the future enter into additional strategic business transactions. Any such transactions could happen at any time, could be material
to our business, and could take any number of forms, including, for example, an acquisition, merger, sale or distribution of certain assets, refinancing, or other
recapitalization or material strategic transaction. There can be no assurance that our joint ventures, strategic alliances, or additional strategic business transactions will
be beneficial to us, whether due to the above-described risks, unfavorable global economic conditions, increases in costs, foreign currency fluctuations, political risks,
government interventions, retained liabilities, indemnification obligations, or other factors. Evaluating potential transactions and integrating completed ones may divert
the attention of our management from ordinary operating matters. In addition, to the extent we consummate an agreement for the sale and disposition of an asset or asset
group we may experience operational difficulties segregating them from our retained assets and operations, which could impact the execution or timing of such
dispositions and could result in disruptions to our operations and/or claims for damages, among other things.
If we engage in a strategic transaction, we may require additional financing that could result in an increase in the number of our outstanding shares of stock or the
aggregate amount and/or cost of our debt, which may result in an adverse impact to our credit ratings or adversely impact our business, financial condition, or results of
operations. The number of shares of our stock or the aggregate principal amount of our debt that we may issue in connection with such a transaction could be
significant.
Global Operational Risks
Our global operations expose us to risks related to economic, political, and social conditions, including the impact of trade policies and adverse industry publicity,
which may negatively impact our business and our ability to operate in certain locations.
We are subject to risks associated with doing business internationally, including foreign or domestic government fiscal and political crises, political and economic
disputes and sanctions, social requirements and conditions, and adverse industry publicity. These factors, among others, bring uncertainty to the markets in which we
compete, and may adversely affect our business, financial condition, and results of operations.
In addition, we operate in communities around the world, and social issues in the communities where we operate could affect our ability to maintain our operations;
furthermore, incidents related to our industry could generate negative publicity and impact the social acceptability of our operations in such locations, including by
damaging our reputation, our relationships with stakeholders, and our competitive position. Growing expectations of hosting communities as well as increasing social
activism pose additional challenges to us maintaining our social license to operate and expand our business. For example, community and stakeholder concerns in
Juruti, Brazil have affected our ability to access certain mining areas at times. In certain jurisdictions, there are increasing regulatory developments to protect minority
groups, such as Indigenous People in Australia. This could have an adverse effect on our ability to secure expansions to our operations at all or in the expected
timeframe, could significantly increase our cost of doing business, and could disrupt our operations.
19
-- 21 of 363 --
In the United States, in recent years, the U.S. government has taken actions with respect to the implementation of significant changes to certain trade policies, including
import tariffs and quotas, modifications to international trade policy, the withdrawal from or renegotiation of certain trade agreements, and other changes that have
affected U.S. trade relations with other countries, any of which may require us to significantly modify our current business practices or may otherwise materially and
adversely affect our business or those of our customers. The U.S. government continues to review trade policies and negotiate new agreements with countries globally
that could impact the Company. For example, the U.S. government is negotiating agreements with countries in relation to the tariffs initially applied under Section 232
of the Trade Expansion Act of 1962 (Section 232) in 2018. In 2021, the U.S. and European Union (EU) reached agreement whereby the U.S. lifted the Section 232
duties and applied a tariff-rate-quota allowing duty-free importation of aluminum from the EU based on historical volumes, and the EU suspended its retaliatory tariffs
that had been in place on certain U.S. products. To the extent that further agreements are reached on a broader range of imports, or these tariffs and other trade actions
result in a decrease in international demand for aluminum produced in the United States or otherwise negatively impact demand for our products, our business may be
adversely impacted, and could further exacerbate aluminum and alumina price volatility and overall market uncertainty.
We are exposed to fluctuations in foreign currency exchange rates and interest rates, as well as inflation and other economic factors in the countries in which we
operate.
Economic factors, including inflation and fluctuations in foreign currency exchange rates and interest rates, competitive factors in the countries in which we operate,
and volatility or deterioration in the global economic and financial environment, could affect our business, financial condition, and results of operations. Changes in the
valuation of the U.S. dollar against other currencies, particularly the Australian dollar, Brazilian real, Canadian dollar, euro, and Norwegian kroner, which are the
currencies of certain countries in which we have operations, may affect our profitability, as some important inputs are purchased in other currencies, while our products
are generally sold in U.S. dollars. As the U.S. dollar strengthens, the cost curve shifts down for smelters outside the United States, but costs for our U.S. smelting
portfolio may not decline.
Changes in tax laws or exposure to additional tax liabilities could affect our future profitability.
We are subject to income taxes in both the United States and various non-U.S. jurisdictions. Changes in foreign and domestic tax laws, regulations, or policies, or their
interpretation and application by regulatory bodies, or exposure to additional tax liabilities could affect our future profitability. For example, in October 2021, a new
framework for international tax was agreed to by 137 member countries and jurisdictions of the Organisation for Economic Co-operation and Development (OECD),
with rules targeted to be finalized in 2023 and implemented by participating jurisdictions as early as 2024. The impact to the Company of such an agreement is
uncertain until applicable rules are promulgated and implemented by the participating jurisdictions. In December 2022, the European Union Council formally adopted
the Global Minimum Tax portion of this framework, requiring member states to implement certain tax rules for tax years beginning in 2024. Our domestic and
international tax liabilities are dependent upon the distribution of profits among these different jurisdictions. Our tax expense includes estimates of additional tax that
may be incurred for tax exposures and reflects various estimates and assumptions. The assumptions include assessments of future earnings of the Company that could
impact the valuation of our deferred tax assets. Our future results of operations could be adversely affected by changes in the effective tax rate as a result of a change in
the mix of earnings in countries with differing statutory tax rates, changes in the overall profitability of the Company, changes in tax legislation and rates, changes in
generally accepted accounting principles, and changes in the valuation of deferred tax assets and liabilities. Significant changes to tax laws or regulations and the
positions of taxing authorities could have a substantial impact, positive or negative, on our effective tax rate, cash tax expenditures and cash flows, and deferred tax
assets and liabilities.
We are subject to tax audits by various tax authorities in many jurisdictions, such as Australia, Brazil, Canada, and Spain. For example, in July 2020, AofA received
Notices of Assessment (the Notices) from the Australian Taxation Office (ATO) related to the pricing of certain historic third-party alumina sales. The Notices asserted
claims for income tax payable by AofA of approximately $143 (A$214), exclusive of interest and penalties. The Notices also include claims for compounded interest on
the tax amount totaling approximately $474 (A$707). In accordance with the ATO’s dispute resolution practices, AofA paid 50% of the assessed income tax amount
exclusive of interest and any penalties to the ATO during the third quarter of 2020, and the ATO is not expected to seek further payment prior to final resolution of the
matter. If AofA is ultimately successful, any amounts paid to the ATO as part of the 50% payment would be refunded. The ATO has also issued a position paper with its
preliminary view on the imposition of administrative penalties related to the tax assessment, proposing penalties of approximately $86 (A$128). AofA disagrees with
the ATO’s proposed position on penalties and submitted a response to the position paper in the fourth quarter of 2020. After the ATO completes its review of AofA’s
response, the ATO could issue a penalty assessment. The Company does not agree with the ATO’s positions, and AofA will continue to defend this matter in the
Australian Courts. We regularly assess the potential outcomes of examinations by tax authorities in determining the adequacy of our provision for income taxes. The
results of tax audits and examinations of previously filed tax returns or related litigation and continuing assessments of our tax exposures could materially affect our
financial results. See Part II Item 8 of this Form 10-K in Notes Q and S to the Consolidated Financial Statements under captions Unrecognized Tax Benefits and
Contingencies, respectively.
20
-- 22 of 363 --
On August 16, 2022, the U.S. enacted the Inflation Reduction Act of 2022, which includes a 15% minimum tax on book income of certain large corporations, a 1%
excise tax on net stock repurchases after December 31, 2022 and several tax incentives to promote clean energy. This legislation did not have a material impact on the
Company’s Consolidated Financial Statements as of December 31, 2022.
We face significant competition globally within and beyond the aluminum industry, which may have an adverse effect on profitability.
We compete with a variety of both U.S. and non-U.S. aluminum industry competitors as well as with producers of other materials, such as steel, titanium, plastics,
composites, ceramics, and glass, among others. Use of such materials could reduce the demand for aluminum products, which may reduce our profitability and cash
flow. Factors affecting our ability to compete include increased competition from overseas producers, our competitors’ pricing strategies, the introduction or
advancement of new technologies and equipment by our competitors or our customers, changes in our customers’ strategy or material requirements, and our ability to
maintain the cost-efficiency of our facilities. Certain competitors possess financial, technical and management resources to develop and market products that may
compete favorably against our products, and consolidation among our competitors may also allow them to compete more effectively. In addition, our competitive
position depends, in part, on our ability to operate as an integrated aluminum value chain, leverage innovation expertise across businesses and key end markets, and
access an economical power supply to sustain our operations in various countries. See Business—Competition.
We may not be able to obtain or maintain adequate insurance coverage.
We maintain various forms of insurance, including insurance covering claims related to our properties and risks associated with our operations. Our existing property
and liability insurance coverages contain exclusions and limitations on coverage. In connection with renewals of insurance, we have experienced, or could experience in
the future, additional exclusions and limitations on coverage, significantly increased self-insured retentions and deductibles, and significantly higher premiums. We may
not be able to procure adequate insurance coverage for certain risks, if at all, and existing insurance arrangements may not provide sufficient coverage or reimbursement
for significant costs that may arise. As a result, in the future our insurance coverage may not cover claims to the extent that it has in the past and the costs that we incur
to procure insurance may increase significantly, either of which could have an adverse effect on our results of operations.
Our business, financial condition and results of operations could be adversely affected by disruptions in the global economy caused by the ongoing conflict between
Russia and Ukraine.
The global economy has been negatively impacted by the conflict between Russia and Ukraine. Such adverse and uncertain economic conditions have exacerbated
supply chain disruptions and increased our costs for energy, particularly in Spain, and for certain raw materials. During the first quarter of 2022, in response to the
conflict, we ceased purchasing raw materials from and selling our products to Russian businesses. To date, these actions have not had a material adverse impact on the
Company’s business, financial condition and results of operations, but they could have material negative impacts if the conflict continues and global sales of our
products are impacted. Furthermore, governments in the U.S., United Kingdom and European Union have each imposed export controls on certain products and
financial and economic sanctions on certain industry sectors and parties in Russia. Although we have no operations in Russia or Ukraine and our sales into these regions
were historically minimal and have recently been discontinued, we will continue to monitor the conflict between Russia and Ukraine and the potential impact of
financial and economic sanctions on the regional and global economy.
Increased trade barriers or restrictions on global trade, or retaliatory measures taken by Russia, or other countries in response, as well as the destabilizing effects of the
conflict, could also adversely affect our business, financial condition and results of operations by limiting sales, restricting access to required raw materials, or raising
costs thereof. Destabilizing effects that the ongoing conflict may pose for the global oil and natural gas markets could also adversely impact our operations by further
increasing our energy costs. In addition, further escalation of geopolitical tensions related to the conflict could result in loss of property, cyberattacks, additional supply
disruptions, an inability to obtain key supplies and materials, reduced production and sales, and/or operational curtailments, and adversely affect our business and our
supply chain.
21
-- 23 of 363 --
Legal and Regulatory Risks
We may be exposed to significant legal proceedings, investigations, or changes in foreign and/or U.S. federal, state, or local laws, regulations, or policies.
Our results of operations or liquidity in a particular period could be affected by new or increasingly stringent laws, regulatory requirements or interpretations, or
outcomes of significant legal proceedings or investigations adverse to the Company. We may become subject to unexpected or rising costs associated with business
operations, compliance measures, or provision of health or welfare benefits to employees due to changes in laws, regulations, or policies. We are also subject to a
variety of legal and compliance risks, including, among other things, potential claims relating to health and safety, environmental matters, intellectual property rights,
product liability, data privacy, taxes and compliance with U.S. and foreign export, anti-bribery, and competition laws, and sales and trading practices. We could be
subject to fines, penalties, interest, or damages (in certain cases, treble damages). In addition, if we violate the terms of our agreements with governmental authorities,
we may face additional monetary sanctions and other remedies as a court deems appropriate.
While we believe we have adopted appropriate risk management and compliance programs to address and reduce these risks, the global and diverse nature of our
operations means that these risks continue to exist, and additional legal proceedings and contingencies may arise from time to time. In addition, various factors or
developments can lead the Company to change current estimates of liabilities or make estimates for matters previously not susceptible of reasonable estimates, such as a
significant judicial ruling, judgment, or settlement, or significant regulatory developments or changes in applicable law. A future adverse ruling or settlement or
unfavorable changes in laws, regulations or policies, or other contingencies that the Company cannot predict with certainty could have a material adverse effect on our
results of operations or cash flows in a particular period. See Part I Item 3 of this Form 10-K and Part II Item 8 of this Form 10-K in Note S to the Consolidated
Financial Statements under caption Contingencies.
Climate change, climate change legislation or regulations, and efforts to reduce greenhouse gases and build operational resilience to extreme weather conditions
may adversely impact our operations and markets.
Energy is a significant input in a number of our operations and there is growing recognition that consumption of energy derived from fossil fuels is a contributor to
climate change. Several governments or regulatory bodies in areas where we operate, such as in Canada and the EU, have introduced or are contemplating legislative
and regulatory change in response to the potential impacts of climate change, which could result in changes to the margins of greenhouse gas (GHG) intensive assets
and energy-intensive assets. These regulatory mechanisms relating to carbon may be either voluntary or legislated and the inconsistency of associated regulations may
impact our operations directly or indirectly through customers or our supply chain. Assessments of the potential impact of future climate change legislation, regulation,
and international treaties and accords are uncertain, given the wide scope of potential regulatory change in countries in which we operate and the diversity in the scope
and development of such regulations. For example, in 2021, the European Commission proposed a Carbon Border Adjustment Mechanism (CBAM) as a levy on
carbon-intensive imports, which was provisionally approved in December 2022 and would include aluminum in the first phase of implementation beginning in 2023.
We may realize increased capital expenditures, costs, or taxes resulting from required compliance with revised or new legislation or regulations, including costs to
purchase or profits from sales of allowances or credits under a carbon credit/pricing or “cap and trade” system, increased insurance premiums and deductibles as new
actuarial tables are developed to reshape coverage, a change in competitive position relative to industry peers, and changes to profit or loss arising from increased or
decreased demand for goods produced by the Company and, indirectly, from changes in costs of goods sold.
Though we are investing in technology to reduce the production of greenhouse gases in the manufacture of our products, such as our ELYSIS joint venture aluminum
smelting technology and other technologies that limit the production of carbon in alumina refining, in certain aspects of our operations, our ability to reduce our
greenhouse gas emissions is also dependent on the actions of third parties, especially energy providers, and our ability to make significant changes in our greenhouse
gas emissions. As a result, we could face additional costs associated with any new regulation of GHG emissions, and our ability to modify our operations to avoid these
costs may be limited in the near term.
In addition, regulations to combat climate change could impact the competitiveness of the Company, including the attractiveness of the locations of some of the
Company’s assets. The global focus on climate is raising awareness in all countries, such as the agreement at the 26th United Nations Climate Change Conference of the
Parties (COP26) by many governments of countries where the Company operates to combat deforestation, which could adversely affect our ability to mine and operate
in sensitive areas like the Jarrah Forest and the Amazon.
22
-- 24 of 363 --
The potential physical impacts of climate change or extreme weather conditions on the Company’s operations are highly uncertain and will be particular to the
geographic circumstances. These may include changes in rainfall patterns, wildfires, heat waves, shortages of water or other natural resources, changing sea levels,
changing storm patterns, flooding, increased frequency and intensities of storms, and changing temperature levels. Any of these may disrupt our operations, hinder
transportation of products to us or of our products to customers, prevent access to our facilities, negatively impact our suppliers’ or customers’ operations and their
ability to fulfill contractual obligations to us, and/or cause damage to our facilities, all of which may increase our costs, reduce production, and adversely affect our
business, financial condition, or results of operations.
From time to time, we establish strategies and expectations related to climate change and other environmental matters. Our ability to achieve any such strategies or
expectations is subject to numerous factors and conditions, many of which are outside of our control. Examples of such factors include, but are not limited to, evolving
legal, regulatory, and other standards, processes, and assumptions, the pace of scientific and technological developments, increased costs, the availability of requisite
financing, and changes in carbon markets. Failures or delays (whether actual or perceived) in achieving our strategies or expectations related to climate change and
other environmental matters could adversely affect our business, operations, and reputation, and increase the risk of litigation.
We are subject to a broad range of health, safety and environmental laws, regulations, and other requirements in the jurisdictions in which we operate that may
expose us to substantial claims, costs, and liabilities.
Our operations worldwide are subject to numerous complex and increasingly stringent federal, state, local and foreign laws, regulations, policies, and permitting,
licensing, and other requirements, including those related to health, safety, environmental, and waste management and disposal matters, which may expose us to
substantial claims, costs, and liabilities. We may be subject to fines, penalties, and other damages, such as natural resource or community damages and the costs
associated with the investigation and cleanup of soil, surface water, groundwater, and other media under laws such as CERCLA (commonly known as Superfund) or
similar U.S. and foreign regulations. These laws, regulations, policies, and permitting, licensing, and other requirements could change or could be, and have been,
applied or interpreted in ways that could (i) require us to enjoin, curtail, close or otherwise modify our operations and sites, including the implementation of corrective
measures, the installation of additional equipment or structures, or the undertaking of other remedial actions, or (ii) subject us to enforcement risk or impose on or
require us to incur additional capital expenditures, compliance or other costs, fines, penalties, or damages, any of which could adversely affect our results of operations,
cash flows and financial condition, and the trading price of our common stock.
The costs of complying with such laws, regulations, policies, and other requirements, including participation in assessments, remediation activities, and cleanups of
sites, as well as internal voluntary programs, are significant and will continue to be so for the foreseeable future. Environmental laws may impose cleanup liability on
owners and occupiers of contaminated property, including previously owned, non-operational, or divested properties, regardless of whether the owners and occupiers
caused the contamination or whether the activity that caused the contamination was lawful at the time it was conducted. As a result, we may be subject to claims arising
from current or former conditions at sites that we own or operate currently, as well as at sites that we owned or operated in the past, and at contaminated sites that have
always been owned or operated by third parties, regardless of whether we caused the contamination or whether the activity that caused the contamination was lawful at
the time it was conducted. Liability may be without regard to fault and may be joint and several, so that we may be held responsible for more than our share of the
contamination or other damages, or even for the entire share.
In addition, because environmental laws, regulations, policies, and other requirements are constantly evolving, we will continue to incur costs to maintain compliance
and such costs could increase materially and prove to be more limiting and costly than we anticipate. Evolving standards and expectations can result in increased
litigation and/or increased costs, all of which can have a material and adverse effect on our business operations, earnings, and cash flows. Future compliance with
environmental, health and safety legislation and other regulatory requirements or expectations may prove to be more limiting and costly than we anticipate and may
disrupt our business operations and require significant expenditures. Our business, financial condition, or results of operations in a particular period could be materially
affected by certain health, safety, or environmental matters, including remediation costs and damages related to certain sites.
Our operations include impoundment structures, which could impact the environment or cause exposure to hazardous substances or other damage, which could
result in material liabilities to us.
Some of our operations generate hazardous waste and other byproducts, which we contain in tailing facilities, residue storage areas, and other structural impoundments
that are subject to extensive regulation and increasingly strict industry standards. Overtopping of storage areas caused by extreme weather events, erosion, or
unanticipated structural failure of impoundments could result in severe, and in some cases catastrophic, damage to the environment, natural resources, or property, or
personal injury and loss of life. These and other similar impacts that our operations may have on the environment, as well as exposures to hazardous substances or
wastes associated with our operations, could result in significant costs, civil or criminal damages, fines or penalties, and enforcement actions issued by regulatory or
judicial authorities enjoining, curtailing, or closing operations or requiring corrective measures, any of which could materially and adversely affect us.
23
-- 25 of 363 --
Cybersecurity Risks
Cyber attacks, security breaches, system failures, software or application vulnerabilities, or other cyber incidents may threaten the integrity of our information
technology infrastructure and other sensitive business information, disrupt our operations and business processes, expose us to potential liability, and result in
reputational harm and other negative consequences that could have a material adverse effect on our business, financial condition, and results of operations.
We depend on information and communications technology, networks, software, and related systems to operate our business, including production controls and
operating systems at our facilities and systems for recording and processing transactions, interfacing with customers, financial reporting, and protecting the personal
data of our employees and other confidential information. Our global operations require increased reliance on technology, which expose us to risks of theft of
proprietary information, including trade secrets and other intellectual property that could have a material adverse effect on our business, financial condition, and results
of operations. The protection of such information, as well as sensitive customer information, personal data of our employees, and other confidential information, is
critical to us. We face global cybersecurity threats, which may range from uncoordinated individual attempts to sophisticated and targeted measures, known as advanced
persistent threats, directed at the Company. In addition, a greater number of our employees are working remotely since the COVID-19 pandemic, which has increased
cybersecurity vulnerabilities and risk to our information technologies systems.
Cyber attacks and other cyber incidents are becoming more frequent and sophisticated, are constantly evolving, and are being made by groups and individuals with
significant resources and a wide range of expertise and motives. Cyber attacks and security breaches may include, but are not limited to, unauthorized attempts to access
information or digital infrastructure, efforts to direct payments to fictitious parties, viruses, ransomware, malicious codes, hacking, phishing (including through social
engineering), denial of service, human error, and other electronic security breaches, any of which could have a material adverse effect on our business, financial
condition, and results of operations. As techniques used in cyber attacks change frequently and may not be immediately detectable, we may be unable to anticipate or
detect these techniques, such as use of a zero-day exploit or unknown malware, immediately identify the scope and impact of an incident, contain the incident within
our systems, or implement preventative or remediation measures. In addition, we utilize third-party vendors for certain software applications, storage systems, and cloud
computing services. Cyber attacks, security breaches, or other incidents on the information technology systems of our service providers or business partners could
materially impact us. We have in the past experienced attempts and incidents by external parties to penetrate our and our service providers or business partners networks
and systems. Such attempts and incidents to date have not resulted in any material breaches, disruptions, or loss of information.
We continue to assess potential cyber threats and invest in our information technology infrastructure to address these threats, including by monitoring networks and
systems, training employees on cyber threats, and enhancing security policies of the Company and its third-party providers. While the Company continually works to
strengthen our systems and security measures, safeguard information, and mitigate potential risks, there is no assurance that such actions will be sufficient to prevent or
timely detect cyber attacks or security breaches. Such intrusions could manipulate or improperly use our systems or networks, disclose, or compromise confidential or
protected information, destroy, or corrupt data, or otherwise disrupt our operations, any of which could have a material adverse effect on our business, financial
condition, and results of operations.
In addition, cybersecurity incidents could negatively impact our reputation and competitive position, and could result in litigation with third parties, regulatory action,
loss of business, theft of assets, and significant remediation costs, any of which could have a material adverse effect on our financial condition and results of
operations. Such security breaches could also result in a violation of applicable U.S. and international privacy and other laws, and subject us to litigation and
governmental investigations and proceedings, any of which could result in our exposure to material civil or criminal liability. For example, the European Union’s
General Data Privacy Regulation subjects companies to a range of compliance obligations regarding the handling of personal data. In the event our operations are found
to be in violation of the GDPR’s requirements, we may be subject to significant civil penalties, business disruption and reputational harm, any of which could have a
material adverse effect on our business, financial condition, or results of operations. Cyber attacks or breaches could require significant management attention and
resources and result in the diminution of the value of our investment in research and development, which could have a material adverse effect on our business, financial
condition, or results of operations.
Though we have disaster recovery and business continuity plans in place, if our information technology systems, or those of our third-party providers, are damaged,
breached, interrupted, or cease to function properly for any reason, and, if the disaster recovery and business continuity plans do not effectively resolve the incident on a
timely basis, we may suffer interruptions in our ability to manage or conduct business and we may be exposed to reputational, competitive and business harm as well as
litigation and regulatory action, which may materially and adversely impact our business, financial condition, or results of operations.
24
-- 26 of 363 --
Available Capital and Credit-Related Risks
Our business and growth prospects may be negatively impacted by limits on our ability to fund capital expenditures.
We require substantial capital to invest in growth opportunities and to maintain and prolong the life and capacity of our existing facilities. Our ability to generate cash
flows is affected by many factors, including market and pricing conditions. Insufficient cash generation or capital project overruns may negatively impact our ability to
fund as planned our sustaining and return-seeking capital projects, and such postponement in funding capital expenditures or inadequate funding to complete projects
could result in operational issues. For 2023, we project capital expenditures of $600 million, of which $485 million is for sustaining capital and $115 million for return-
seeking capital. If our technology research and development projects prove feasible with an acceptable expected rate of return, our capital expenditures for return-
seeking projects would increase significantly over the next several years. To the extent our access to competitive financial, credit, capital, and/or banking markets
becomes impaired, our operations, financial results, and cash flows could be adversely impacted. We may also need to address commercial, political, and social issues in
relation to capital expenditures in certain of the jurisdictions in which we operate. If our interest in our joint ventures is diluted or we lose key concessions, our growth
could be constrained. Any of the foregoing could have a material adverse effect on our business, results of operations, financial condition, and prospects.
We cannot guarantee that we will continue to return capital to our stockholders through the payment of cash dividends and/or the repurchase of our common stock.
The reduction or discontinuation of the payment of cash dividends to our stockholders or the repurchase of our shares of common stock could adversely affect the
market price or liquidity of our shares.
In October 2021, the Company’s Board of Directors initiated a quarterly cash dividend program, at $0.10 per share and authorized a $500 share repurchase program,
which was fully used with the completion of $150 in repurchases during the third quarter of 2022. In July 2022, the Board of Directors approved an additional common
stock repurchase program under which the Company may purchase shares of its outstanding common stock up to an aggregate transactional value of $500, depending
on the Company’s continuing analysis of market, financial, and other factors (the New Repurchase Program). This share repurchase authorization does not have a
predetermined expiration date. The Company is under no obligation to pay any cash dividends to stockholders or to repurchase our outstanding shares of common stock
at any particular price or at all, and the payment of dividends and/or repurchases of stock may be limited, suspended, or discontinued at any time in our discretion and
without notice. The Company set each of the current dividend and new share repurchase program authorizations at a level it believes is sustainable throughout the
commodity cycle, based on our current financial position and reasonable expectations of cash flow. In addition, as described elsewhere in this “Risk Factors” section,
the Company’s Revolving Credit Facility (as defined below) could inhibit the Company’s ability to make certain restricted payments, including the amount of dividends
and payments to redeem, repurchase, or retire equity securities or other indebtedness, if the Company does not maintain certain financial ratios.
The Company intends to pay dividends on a quarterly basis. Dividends on Alcoa Corporation common stock are subject to authorization by the Company’s Board of
Directors. The payment, amount, and timing of dividends, if any, depends upon matters deemed relevant by the Company’s Board of Directors, such as Alcoa
Corporation’s financial position, results of operations, cash flows, capital requirements, business condition, future prospects, any limitations imposed by law, credit
agreements or senior securities, and other factors deemed relevant and appropriate.
Declines in asset values or increases in liabilities, including liabilities associated with benefit plans or taxes, can reduce stockholders’ equity. A deficit in stockholders’
equity could limit our ability under Delaware law to pay dividends and repurchase shares in the future.
The reduction, suspension, or elimination of our cash dividend or our share repurchase program could adversely affect the market price of our stock and/or significantly
increase its trading price volatility. The payment of any future dividends and the existence of a share repurchase program could cause our stock price to be higher than it
would otherwise be and could potentially reduce the market liquidity for our stock. Additionally, any future payment of dividends or repurchases of our common stock
could negatively impact our financial position and our ability to fund ordinary and existing operations, capital expenditures, the payment of taxes, and growth or other
opportunities.
25
-- 27 of 363 --
Deterioration in our credit profile or increases in interest rates could increase our costs of borrowing money and limit our access to the capital markets and
commercial credit.
The major credit rating agencies evaluate our creditworthiness and give us specified credit ratings. These ratings are based on a number of factors, including our
financial strength and financial policies as well as our strategies, operations, and execution of announced actions. These credit ratings are limited in scope and do not
address all material risks related to an investment in us, but rather reflect only the view of each rating agency at the time its rating is issued. Nonetheless, the credit
ratings we receive impact our borrowing costs as well as our access to sources of capital on terms advantageous to our business. Failure to obtain or maintain
sufficiently high credit ratings could adversely affect our interest rates in financings, our liquidity, or our competitive position, and could also restrict our access to
capital markets. In addition, our credit ratings could be lowered or withdrawn entirely by a rating agency if, in its judgment, the circumstances warrant. If a rating
agency were to downgrade our rating, our borrowing costs could increase, our funding sources could decrease, and we would need to rely on our cash flows from
operations. As a result of these factors, a downgrade of our credit ratings could have a materially adverse impact on our future operations, cash flows, and financial
position.
Our indebtedness restricts our current and future operations, which could adversely affect our ability to respond to changes in our business and manage our
operations, and failure to comply with the agreements relating to our outstanding indebtedness, including due to events beyond our control, could result in an event
of default that could materially and adversely affect our business, financial condition, results of operations, or cash flows.
Alcoa and Alcoa Nederland Holding B.V. (ANHBV), a wholly-owned subsidiary of Alcoa, are party to a revolving credit agreement with a syndicate of lenders and
issuers named therein (as subsequently amended, the Revolving Credit Facility). The terms of the Revolving Credit Facility and the indentures governing our
outstanding notes contain covenants that could impose significant operating and financial restrictions on us upon non-compliance with them, including on our ability to,
among other things:
• Make investments, loans, advances, and acquisitions;
• Amend certain material documents;
• Dispose of assets;
• Incur or guarantee additional debt and issue certain disqualified equity interests and preferred stock;
• Make certain restricted payments, including limiting the amount of dividends on equity securities and payments to redeem, repurchase or retire equity
securities or other indebtedness;
• Engage in transactions with affiliates;
• Materially alter the business we conduct;
• Enter into certain restrictive agreements;
• Create liens on assets to secure lenders and issuers;
• Consolidate, merge, sell or otherwise dispose of all or substantially all of Alcoa’s, ANHBV’s or a subsidiary guarantor’s assets; and,
• Take any actions that would reduce our ownership of AWAC entities below an agreed level.
The Revolving Credit Facility requires us to comply with financial covenants which includes maintaining an interest expense coverage ratio of not less than 4.00 to
1.00, and a debt to capitalization ratio not to exceed .60 to 1.00 (replaced the maximum leverage ratio upon a ratings upgrade to investment grade by Moody’s Investor
Service (Moody’s) on July 26, 2022). The results of the calculation of these ratios, when considering the Company’s existing debt obligations, affects and could restrict
the amount of additional borrowing capacity under the Company’s Revolving Credit Facility or other credit facilities, and ANHBV’s ability to make restricted
payments, to make investments and to incur indebtedness.
The Revolving Credit Facility released the collateral package that had previously secured the Revolving Credit Facility, which will continue so long as certain credit
ratings are maintained. If Alcoa Corporation or ANHBV, as applicable, fails to have a rating of at least Ba1 from Moody’s and BB+ from S&P, then the Company would
be required to execute all security documents to re-secure collateral under the Revolving Credit Facility by, subject to certain exceptions, a first priority security interest
in substantially all assets of Alcoa Corporation, ANHBV, the material domestic wholly-owned subsidiaries of Alcoa Corporation, and the material foreign wholly-owned
subsidiaries of Alcoa Corporation located in Australia, Brazil, Canada, Luxembourg, the Netherlands, Norway, and Switzerland including equity interests of certain
subsidiaries that directly hold equity interests in AWAC entities. Our ability to comply with these agreements may be affected by events beyond our control, including
prevailing economic, financial, and industry conditions. These covenants could have an adverse effect on our business by limiting our ability to take advantage of
financing, merger and acquisition, or other opportunities. The breach of any of these covenants or restrictions could result in a default under the Revolving Credit
Facility or the indentures governing our notes and other outstanding indebtedness, including such indebtedness for which the Company is a guarantor.
See Part II Item 7 of this Form 10-K in Management’s Discussion and Analysis of Financial Condition and Results of Operations under caption Liquidity and Capital
Resources – Financing Activities for more information on the restrictive covenants in the Revolving Credit Facility.
26
-- 28 of 363 --
If an event of default were to occur under any of the agreements relating to our outstanding indebtedness, including the Revolving Credit Facility and the indenture
governing our notes, we may not be able to incur additional indebtedness under the Revolving Credit Facility and the holders of the defaulted debt could cause all
amounts outstanding with respect to that debt to be due and payable immediately. We cannot assure that our assets or cash flow would be sufficient to fully repay
borrowings under our outstanding debt instruments if accelerated upon an event of default, which could have a material adverse effect on our ability to continue to
operate as a going concern. Further, if we are unable to repay, refinance, or restructure our secured indebtedness, the holders of such indebtedness could proceed against
the collateral securing that indebtedness. In addition, any event of default or declaration of acceleration under one debt instrument also could result in an event of
default under one or more of our other debt instruments.
Labor- and Pension-Related Risks
Union disputes and other employee relations issues, as well as labor market conditions, could adversely affect our business, financial condition, or results of
operations.
A significant portion of our employees are represented by labor unions in a number of countries under various collective bargaining agreements with varying durations
and expiration dates. Union disputes and other employee relations issues could, and have, adversely affected our business, financial condition, or results of operations.
For example, in 2022, a strike at the Mosjøen (Norway) smelter commenced, after negotiations for a nationwide collective labor agreement between Industri Energi, a
federation of Norwegian industries that includes Alcoa and Norsk Industri, which represents workers reached an impasse. The strike affected numerous industrial plants
representing the Norwegian electrochemical industry. The strike ended on August 24, 2022, with a solution reached on the labor dispute, and normal operations resumed
at the Mosjøen smelter with no material impact on the Company.
We may not be able to satisfactorily renegotiate collective bargaining agreements when they expire. In addition, existing collective bargaining agreements may not
prevent strikes, work stoppages, work slowdowns, union organizing campaigns, or lockouts at our facilities in the future. We may also be subject to general country
strikes or work stoppages unrelated to our business or collective bargaining agreements. A labor dispute or work stoppage of employees could have a material adverse
effect on production at one or more of our facilities, and depending on the length of work stoppage, on our business, financial condition, or results of operations.
Additionally, in the current competitive labor market, if we lose critical or a significant number of workers to attrition, it may be difficult or costly to find and recruit
replacement employees, which could have a material adverse effect on our business, financial condition, and results of operations.
A decline in the liability discount rate, lower-than-expected investment return on pension assets and other factors could affect our business, financial condition,
results of operations, or amount of pension funding contributions in future periods.
Our results of operations may be negatively affected by the amount of expense we record for our pension and other postretirement benefit plans, reductions in the fair
value of plan assets, and other factors. We calculate income or expense for our plans using actuarial valuations in accordance with accounting principles generally
accepted in the United States of America (GAAP).
These valuations reflect assumptions about financial market and other economic conditions, which may change based on changes in key economic indicators. The most
significant year-end assumptions used by the Company to estimate pension or other postretirement benefit income or expense for the following year are the discount
rate applied to plan liabilities and the expected long-term rate of return on plan assets. In addition, the Company is required to make an annual measurement of plan
assets and liabilities, which may result in a significant charge to stockholders’ equity. See Part II Item 7 of this Form 10-K in Management’s Discussion and Analysis of
Financial Condition and Results of Operations under caption Critical Accounting Policies and Estimates—Pension and Other Postretirement Benefits and Part II Item 8
of this Form 10-K in Note O to the Consolidated Financial Statements. Although GAAP expense and pension funding contributions are impacted by different
regulations and requirements, the key economic factors that affect GAAP expense would also likely affect the amount of cash or securities we would contribute to the
pension plans.
Potential pension contributions include both mandatory amounts required under federal law and discretionary contributions to improve the plans’ funded status. While
the Company took several actions in 2022 to improve the funded status of its pension plans and adjust its asset allocation to reduce variance risk, declines in the
discount rate or lower-than-expected investment returns on plan assets could have a material negative effect on our cash flows. Adverse capital market conditions could
result in reductions in the fair value of plan assets and increase our liabilities related to such plans, adversely affecting our liquidity and results of operations.
27
-- 29 of 363 --
Item 1B. Unresolved Staff Comments.
None.
Item 2. Properties.
Alcoa Corporation’s principal executive office, located at 201 Isabella Street, Suite 500, Pittsburgh, Pennsylvania 15212-5858, is leased. Alcoa also leases several office
facilities and sites, both domestically and internationally. In addition, Alcoa owns or has an ownership interest in its production sites, both domestically and
internationally. Alcoa owns active mines and plants classified under the Bauxite, Alumina, and Aluminum segments of its business. These include facilities and assets
around the world used for Alcoa’s bauxite mining, alumina refining, aluminum smelting, and casting production and energy generation. Capacity and utilization of these
facilities varies by segment and the level of demand for each product. See Part I Item 1 of this Form 10-K for additional information, including the ownership, capacity,
and utilization of these facilities, used in the Alumina and Aluminum segments. A discussion of our bauxite mining properties is below.
The following map shows the locations of our operations as of December 31, 2022:
Alcoa Locations and Properties.
Although Alcoa’s facilities vary in terms of age and condition, management believes that its facilities are suitable and generally adequate to support the current and
projected operations of the business. See Part II Item 8 of this Form 10-K in Notes B and K to the Consolidated Financial Statements for more information on
properties, plants, and equipment.
Bauxite Mining Properties
Alcoa has access to large bauxite deposit areas with mining rights that extend in many cases more than 15 years from the date of this Form 10-K. The Company obtains
bauxite from its own resources and from those belonging to AWAC, located in the countries listed in the table below, as well as pursuant to both long-term and short-
term contracts and mining leases. Tons of bauxite are reported on a zero-moisture basis in millions of dry metric tons (mdmt) unless otherwise stated.
As of December 31, 2022, the Company’s individually material mining properties, as determined in accordance with subpart 1300 of Regulation S-K, are our bauxite
mining properties in the Darling Range of Western Australia (Darling Range) and Juruti, Brazil (Juruti).
28
-- 30 of 363 --
As used in this Form 10-K, the terms “mineral resource,” “measured mineral resource,” “indicated mineral resource,” “inferred mineral resource,” “mineral reserve,”
“proven mineral reserve” and “probable mineral reserve” are defined and used in accordance with subpart 1300 of Regulation S-K. Under subpart 1300 of Regulation S-
K, mineral resources may not be classified as “mineral reserves” unless the determination has been made by a qualified person (as defined under subpart 1300 of
Regulation S-K) that the mineral resources can be the basis of an economically viable project. Part or all of the mineral deposits (including any mineral resources) in
these categories may never be converted into mineral reserves. Further, except for the portion of mineral resources classified as mineral reserves, mineral resources do
not have demonstrated economic value. Estimates of inferred mineral resources have too high of a degree of uncertainty as to their existence and may not be converted
to a mineral reserve. Therefore, it should not be assumed that all or any part of an inferred mineral resource exists, that it can be the basis of an economically viable
project, or that it will ever be upgraded to a higher category. Likewise, it should not be assumed that all or any part of measured or indicated mineral resources will ever
be converted to mineral reserves. Management relies on estimates of our recoverable mineral reserves, which estimation is complex due to geological characteristics of
the properties and the number of assumptions made and variable factors, some of which are beyond our control.
The following table shows the AWAC and/or Alcoa share (proportion) of annual production tonnage at each of our bauxite mining properties and in the aggregate for
each of the last three fiscal years.
Summary of Attributable Annual Bauxite Production (mdmt) for the years ended December 31, 2022, 2021, and 2020, respectively:
Country Property (Region) 2022 2021 2020
Australia Darling Range (Western Australia, WA) 31.4 34.7 34.8
Brazil Juruti (Pará State) 4.9 5.8 6.1
Brazil Trombetas (Pará State) (1) 0.5 2.0 2.1
Brazil Poços de Caldas (Minas Gerais) 0.4 0.4 0.2
Guinea Boké (Sangaredi) 3.6 3.5 3.6
Saudi Arabia Al Ba’itha (Al Qassim) 1.3 1.2 1.2
42.1 47.6 48.0
(1) Represents production prior to the Company’s sale of its interest in the MRN property on April 30, 2022. Related mining operations are not material to the
Company’s business or financial condition after consideration of both quantitative and qualitative factors assessed in the context of the Company’s overall
business and financial condition.
The following tables summarize certain information regarding our bauxite mining properties. The information that follows relating to Darling Range and Juruti is
derived, for the most part, from the technical report summaries relating to such properties prepared in compliance with Item 601(b)(96) and subpart 1300 of Regulation
S-K. Portions of the following information are based on assumptions, qualifications, and procedures that are not fully described herein. Reference should be made to the
full text of the Technical Report Summary for Darling Range, Western Australia, dated February 23, 2023, with an effective date of December 31, 2022, filed as Exhibit
96.1 to this Form 10-K (the Darling Range TRS), and the Technical Report Summary for Juruti, Brazil, dated February 24, 2022, with an effective date of December 31,
2021, incorporated by reference as Exhibit 96.2 to this Form 10-K (the Juruti TRS), which are incorporated by reference herein.
29
-- 31 of 363 --
Bauxite Interests and Operators:
Property
(Region) Access/Transportation Operator
Owners’ Mining
Rights(1)
Expiration Date
of Mining
Rights Titles, Rights, Leases or Options
Area
(hectares)
Darling Range(2)
(WA)
Accessed by road. Ore transported via long-distance
conveyor and rail to refineries. AofA 100% 2024(5) Mining lease from the WA Government. ML1SA. 702,261
Juruti(3)
(Pará State)
Accessed by road from Juruti town, by boat along the
Amazon River, or by air from Juruti Airport. Ore
transported from the mine to Juruti port by company-
operated rail.
AWAB 100% 2100(4)
Mining licenses from the Government of Brazil and Pará.
Mining rights do not have a legal expiration date.
Operating licenses for the mine, washing plant, and
exploration are in the process of being renewed.
227,276
Poços de Caldas
(Minas Gerais)
Accessed by road. Ore transported from the mine to the
refinery by road. Alcoa Alumínio 100% 2031(4)
Mining licenses from the Government of Brazil and Minas
Gerais. Company claims and third-party leases. Operation
licenses were renewed and unified and now expires in 2032.
7,424
Boké
(Sangaredi)
Accessed by road from Sangaredi and public airports.
Ore transported by company-operated rail to Kamsar
port.
CBG 22.95% 2038
Mining lease from Government of Guinea. The lease is
renewable in 25-year increments. CBG’s rights are
specified within the Basic Agreement and Amendment 1 to
the Basic Agreement with the Government of Guinea.
293,900
Al Ba’itha
(Al Qassim)
Accessed by road. Ore is transported to the refinery by
rail and truck. MBAC 25.1% 2037
Mining lease granted to Ma’aden by Kingdom of Saudi
Arabia Ministry of Petroleum and Mineral Resources, with
a duration of 30 years. Exclusive rights to utilize bauxite
and annexed minerals.
14,776
(1) Owners’ Mining Rights reflects AWAC’s and/or Alcoa’s ownership interest(s) in the properties and related share (proportion) of the mineral resources and
reserves and annual production.
(2) For more information, see “Individual Property Disclosure—Darling Range” below.
(3) For more information, see “Individual Property Disclosure—Juruti” below.
(4) Brazilian mineral legislation does not limit the duration of mining concessions; rather, the concession remains in force until the deposit is exhausted. These
concessions may be extended later or expire earlier than estimated, based on the rate at which these deposits are exhausted and on obtaining any additional
governmental approval, as necessary.
(5) Prior to September 24, 2024, Alcoa will notify the State Government of Western Australia of its intention to exercise its right to renew for a further 21-year
period to extend the concession to 2045. Subject to Alcoa having complied with the Alumina Refinery Agreement Act, 1961, the State Government will grant
Alcoa the renewal.
30
-- 32 of 363 --
Bauxite Mine Types and Facilities:
Property
(Region) Development Stage
Type of Mine
and Mineralization Processing Plant Other Facilities
Darling Range(1)
(WA) Production/ Operating Open-cut mines. Bauxite is lateritic formed through
weathering of Archean granites and gneisses
N/A
Ore crushing only.
Administrative buildings and workshops, crushers, long-distance conveyors.
Power supplied from natural gas.
Juruti(2)
(Pará State) Production/ Operating
Open-cut mines. Bauxite is lateritic formed through
weathering of Cretaceous Alter do Chao Formation
sedimentary sequence.
Fixed plant for ore crushing
and washing.
Mine: Administrative buildings and workshops, water supply pumps and
pipeline from Juruti Grande, ore stockpiles, railroad, tailings thickening and
settling ponds.
Port: Administrative buildings, port control, ore stockpiles, rail siding, and
ship loader.
Power supplied by thermoelectric units at the mine and port.
Poços de Caldas
(Minas Gerais) Production/ Operating Open-cut mines. Bauxite derived from the weathering of
nepheline syenite and phonolite.
N/A
Run of mine (ROM) trucked
to refinery stockpiles.
Mining offices and services are located at the refinery.
Power supplied by commercial grid.
Boké
(Sangaredi) Production/ Operating
Open-cut mines: The bauxite deposits within the CBG
lease are of two general types.
TYPE 1: In-situ laterization of Ordovician and Devonian
plateau sediments locally intruded by dolerite dikes and
sills.
TYPE 2: Sangaredi type deposits are derived from clastic
deposition of material eroded from the TYPE 1 laterite
deposits and possibly some of the proliths from the TYPE
1 plateaus deposits.
N/A
Ore crushed and dried at
Kamsar port facilities.
Mine: Administrative buildings, workshops, and water/power supply are in
Sangaredi.
Port: Administrative buildings, port control, ore stockpiles, ore drying
facilities, rail siding, and ship loader.
Power supplied by fuel oil generators at the mine and port.
Al Ba’itha
(Al Qassim) Production/ Operating
Open-cut mine. Bauxite occurs as a paleolaterite profile
developed at an angular unconformity between underlying
late Triassic to early Cretaceous sediments (parent rock
sequence Biyadh Formation) and the overlying late
Cretaceous Wasia Formation (overburden sequence).
Fixed plant for ore crushing
and train loading
The mine includes fixed plants for crushing and train loading; workshops
and ancillary services; power plant; and water supply.
There is a company village with supporting facilities
(1) For more information, see “Individual Property Disclosure—Darling Range Mines” below.
(2) For more information, see “Individual Property Disclosure—Juruti” below.
Bauxite Mineral Resources and Mineral Reserves
In accordance with subpart 1300 of Regulation S-K, management engaged SLR International Corporation as the qualified persons to prepare technical report summaries
for the disclosure of mineral resources and reserves at Darling Range and Juruti. The tables shown below of resources and reserves by mining property were prepared
using the results of the procedures performed by the qualified persons, which have no affiliation with or interest in Alcoa or our mining properties.
Summary of Attributable Bauxite Mineral Resources at December 31, 2022:
Measured Indicated Measured + Indicated Inferred
Property
(Region)
Tonnage
(mdmt)
(1)
Alumina
(%)
Silica
(%)
Tonnage
(mdmt)(1)
Alumina
(%)
Silica
(%)
Tonnage
(mdmt)(1)
Alumina
(%)
Silica
(%)
Tonnage
(mdmt)
(1)
Alumina
(%)
Silica
(%)
Darling Range (WA)(2) 44.9 31.2 1.2 51.8 31.4 1.2 96.7 31.3 1.2 140.3 32.9 1.3
Juruti (Pará State)(3) 5.7 44.5 5.3 58.6 45.3 4.4 64.2 45.3 4.5 563.7 45.7 4.7
Poços de Caldas (Minas Gerais)(4) 2.5 38.3 4.7 10.7 36.9 5.6 13.2 37.1 5.5 21.4 35.2 5.9
Boké (Sangaredi)(5) — — — 1,350.7 46.6 2.3 1,350.7 46.6 2.3 168.1 45.8 2.4
Al Ba’itha (Al Qassim)(6) — — — — — — — — — 0.7 48.3 11.7
(1) This table shows only the AWAC and/or Alcoa share (proportion) of mineral resources. The reference point for the mineral resource is the in situ predicted
dry tonnage and grade of material to be delivered to the refinery stockpile following the application of mining design parameters. Certain totals may not sum
due to rounding.
(2) Alumina for the Darling Range is stated as Available Alumina (as A.Al2O3) and Silica is stated as Reactive Silica (as R.SiO2). Further, mineral resources are
estimated using a reasonable market expectation of arms-length sales of bauxite from Darling Range, approximately $21 per ton. Darling Range mineral
resources are estimated at a ≥ 27.5% A.Al2O3 and ≤3.5% R.SiO2 cut-off grade and at a minimum mining thickness of 1.5 m.
(3) Alumina for Juruti is stated as Available Alumina (as A.Al2O3) and Silica is stated as Reactive Silica (as R.SiO2). Juruti mineral resources are estimated at a
pit discard cut-off value based on a benefit calculation that determines whether a block is economically viable. Further, mineral resources are estimated using
a long-term bauxite price of approximately $35 (wet-base) per ton, representing a 30% increase over the mineral reserve bauxite price.
31
-- 33 of 363 --
(4) Alumina for Poços de Caldas is stated as Available Alumina (as A.Al2O3) and Silica is stated as Reactive Silica (as R.SiO2). Poços de Caldas mineral
resources are estimated at a pit discard cut-off value based on a benefit calculation that determines whether a block is economically viable.
(5) Alumina for Boké is stated as Total Alumina (as T.Al2O3) and Silica is stated as Total Silica (as T.SiO2). Boké resources are estimated at a ≥ 41% T.Al2O3
and ≤10% T.SiO2 cut-off grade. Tonnage reported on a 3% moisture basis.
(6) Alumina for Al Ba’itha is stated as Total Available Alumina (as TAA) and Silica is stated as Total Silica (as T.SiO2). Al Ba’itha mineral resources are
estimated at a ≥ 40% TAA cut-off grade and a minimum mining thickness of 1.0 m.
The following table shows only the AWAC and/or Alcoa share (proportion) of mineral reserves. These estimates are periodically updated to reflect past bauxite
production, updated mine plans, new exploration information, and other geologic or mining data. Given the Company’s extensive bauxite resources, the abundant
supply of bauxite globally, and the length of the Company’s rights to bauxite, it is not cost-effective to establish bauxite reserves that reflect the total size of the bauxite
resources available to the Company. Certain totals may not sum due to rounding.
Summary of Attributable Bauxite Mineral Reserves at December 31, 2022:
Proven Probable Total
Property (Region)
Tonnage
(mdmt)(1)
Alumina
(%)
Silica
(%)
Tonnage
(mdmt)(1)
Alumina
(%)
Silica
(%)
Tonnage
(mdmt)(1)
Alumina
(%)
Silica
(%)
Darling Range(2) 145.8 31.4 1.2 255.8 32.4 1.2 401.6 32.1 1.2
Juruti (Pará State)(3) 48.6 47.6 3.5 36.8 46.4 3.4 85.4 47.1 3.5
Poços de Caldas (Minas Gerais)(4) 1.1 39.6 3.7 1.8 38.8 4.0 3.0 39.1 3.9
Boké (Sangaredi)(5) 79.0 47.0 1.9 4.1 49.3 2.5 83.1 47.1 1.9
Al Ba’itha (Al Qassim)(6) 17.2 50.0 8.1 31.0 46.7 10.4 48.2 47.9 9.5
(1) The reference point for the mineral reserve is the refinery processing plant gate, with crushing, washing (as applicable), and transportation being the only
process employed. Metallurgical recovery factors are not applicable to the mineral reserve estimate.
(2) Alumina for the Darling Range is stated as Available Alumina (as A.Al2O3) and Silica is stated as Reactive Silica (as R.SiO2). Darling Range mineral
reserves are estimated at variable cut-off grades, dependent on operating costs and ore quality for blending to meet refinery target grades. Mineral reserves
are estimated using a reasonable market expectation of arms-length sales of bauxite from Darling Range, approximately $21 per ton.
(3) Alumina for Juruti is stated as Available Alumina (as A.Al2O3) and Silica is stated as Reactive Silica (as R.SiO2). Juruti mineral reserves are estimated at a
pit discard cut-off value based on a benefit calculation that determines whether a block is economically viable. Further, mineral reserves are estimated using
a one-year weighted average bauxite price of approximately $27 per ton, based on contractual agreements with an Alumina segment refinery.
(4) Alumina for Poços de Caldas is stated as Available Alumina (as A.Al2O3) and Silica is stated as Reactive Silica (as R.SiO2). Poços de Caldas mineral
reserves are estimated at a pit discard cut-off value based on a benefit calculation that determines whether a block is economically viable.
(5) Alumina for Boké is stated as Total Alumina (as T.Al2O3) and Silica is stated as Total Silica (as T.SiO2). Boké reserves are estimated at a ≥ 45% T.Al2O3
and ≤10% T.SiO2 cut-off grade. Tonnage reported on a 3% moisture basis.
(6) Alumina for Al Ba’itha is stated as Total Available Alumina (as TAA) and Silica is stated as Total Silica (as T.SiO2). Al Ba’itha mineral reserves are
estimated at a ≥ 40% TAA cut-off grade.
Individual Property Disclosure—Darling Range
Property Location and Description
The Darling Range bauxite deposits comprise the mining centers of (i) Huntly, located approximately 80 kilometers (km) to the southeast of Perth and 30 km east of
Pinjarra, Western Australia, Australia, and (ii) Willowdale, located approximately 100 km south-southeast of Perth and 15 km east of Waroona, Western Australia,
Australia. The Huntly and Willowdale mining centers/regions are separate open pit, surface mines and are both located within Mining Lease ML1SA. Darling Range is
owned and operated by Alcoa through AofA.
32
-- 34 of 363 --
All spatial data used for mineral resource and reserve estimation are reported using a local grid based on Australian Map Grid 1984 system (Zone 50) and using the
Australian Geodetic Datum 1984 coordinate set. The approximate coordinates of the mining areas are 410,000 meters (m) East and 6,390,000 m North (Huntly) and
410,000 m East and 6,365,000 m North (Willowdale).
33
-- 35 of 363 --
Darling Range Location, Lease Area, Mining Centers, and Mining Regions
Refer to the Darling Range TRS in Sections 2.0 through 5.0 for more information on the Darling Range mining centers – their history, location, accessibility, and other
relevant details.
Infrastructure
The figure above illustrates the relative location of each of the individual mining areas within the Huntly and Willowdale centers. These areas include, but are not
limited to, Myara, Larego, Orion, and Arundel.
Mining infrastructure in the Darling Range is generally concentrated in the Myara area in the northwest of the Huntly mining center, and at the Larego area (20 km
southeast of the Wagerup refinery) in the center of the Willowdale mining center. Both infrastructure areas include:
• Ore crushing and handling facilities;
• Ore stockpile stacker/reclaimer;
• Maintenance facilities;
• Sampling stations;
• Site offices including a production tracking room;
• Haul road networks;
• Overland conveyors, as illustrated on the above map;
• Water supplies consisting of abstraction from licensed surface water sources supplemented with treated wastewater from vehicle washdowns, stormwater
runoff, and maintenance workshops; and,
• Power supply lines direct from certain of the Company’s refineries.
Personnel are sourced from the area around Perth, Western Australia, which benefits from a skilled workforce due to the relatively large number of operating mines in
the region.
Huntly is accessible from the South Western Highway via Del Park Road, which connects the town of North Dandalup in the north with Dwellingup in the south. From
Del Park Road, a 3 km road following the route of the bauxite conveyor to the Pinjarra refinery provides access to the Huntly site administration offices. Willowdale is
similarly accessible, 19 km from the South Western Highway via Willowdale Road, a road to the south of Waroona. There are several airstrips in the region, although
the closest major airport is in Perth, approximately 70 km north of North Dandalup. The nearest commercial port is at the Kwinana refinery, approximately 40 km south
of Perth.
While an extensive haul road network and overland conveyors transport crushed bauxite from the main mining hub to the Wagerup and Pinjarra refineries, bauxite is
also transferred to the Kwinana refinery via the Kwinana freight railway system, using the Kwinana–Mundijong line.
Alcoa’s Darling Range mining operations do not produce mine waste in the same manner as conventional mining operations and waste dumps are not constructed.
Alcoa’s Darling Range facilities are in a well-maintained condition. Net book value of these facilities for the year-ended 2022 is $434 million included in Properties,
plants, and equipment, net on the Consolidated Balance Sheet.
Refer to the Darling Range TRS in Sections 14.0 and 15.0 for more information on the surface infrastructure and facilities of the Darling Range.
Land Tenure and Permitting
Bauxite occurrences were first recorded in the Darling Range in 1902, with studies and exploration subsequently conducted by the Geological Survey of Western
Australia until the 1950s. Commercial exploration took place from 1957 by Western Mining Corporation Ltd (WMC, later WANL), across a large portion of southwest
Western Australia within a Special Mineral Lease (ML1SA) granted in 1961. Commercial mining first took place within the Darling Range in 1963 at the former
Jarrahdale mining center with WANL having joined with Alcoa. The Huntly and Willowdale mines commenced commercial production in 1972 and 1984, respectively.
Huntly supplies bauxite to the Kwinana and Pinjarra refineries (approximately 25 Mtpa), while Willowdale supplies the Wagerup refinery (approximately 10 Mtpa).
34
-- 36 of 363 --
The ML1SA lease allows for exploration and mining of bauxite within the tenement boundaries. ML1SA was granted in 1961, by the State Government of Western
Australia under the Alumina Refinery Act, 1961, for four 21-year periods, and the current lease expires on September 24, 2024. Prior to September 24, 2024, Alcoa will
notify the State Government of Western Australia of its intention to exercise its right to renew for a further 21-year period to extend the concession to 2045. The State
Government concession agreement includes the provision for conditional renewal beyond 2045. Alcoa pays rent for each square mile of ML1SA in accordance with the
Alumina Refinery Agreement Act 1961 (WA), providing exclusive rights to explore for and mine bauxite on all Crown Land within the ML1SA. The current lease
covers an area of 702,261 hectares (ha).
There are certain annual requirements to maintain the existing permits and approvals associated with ML1SA, including:
• Submission of annual mine plans for mining associated with the Wagerup refinery;
• Maintain public Completion Criteria documentation for its bauxite mining operations;
• Annual submission and approval of Mining and Management Programs (MMPs) that include five-year mining schedules;
• Annual reporting of bauxite processed and any non-compliances to maintain environmental operational licenses; and,
• Maintain compliance with environmental protection orders.
The ML1SA area includes sub-lease arrangements made between Alcoa and the Worsley Alumina joint venture participants. The agreements, made in August 2001 and
September 2016, provide bauxite mining concessions to the Worsley Participants. No mineral resources or mineral reserves attributable to the Darling Range mining
areas have been declared within these sub-lease areas.
Constraints on mining activities within the ML1SA concession are in place, among others, which prevent mining within: 200 m of the top water level of drinking water
reservoirs; National Parks; Aboriginal Heritage Sites; Old Growth Forest; formal Conservation Areas; and 50 m of granite outcrop (greater than 1 ha). Mineral resources
and mineral reserves have not been defined in these restricted areas.
Mining on a day-only basis is conducted in “noise zones” where noise from the mining operations will potentially exceed allowable levels. The operation actively seeks
to maintain lower noise levels than those mandated, thus mining in these areas is undertaken by contract miners using smaller equipment on day shifts only.
The Company has all environmental permits and operating licenses required for current mining activities. Outcomes of and compliance with the management and
monitoring programs are tracked within Alcoa’s Environmental Management System and reported within the Annual Environmental Review report.
Refer to the Darling Range TRS in Section 3.0 for more information on Land Permitting and Tenure for the Darling Range.
Geology and Exploration
The Darling Range comprises a low incised plateau formed by uplift along the north-south trending Darling Fault, a major structural lineament that extends for over 250
km, from Bindoon in the north to Collie in the south. Bauxite deposits have been identified throughout the Darling Range and generally occur as erratically distributed
alumina-rich lenses. Lateralization and subsequent periodic activity of the Darling Fault has resulted in the current landform of scarps and deeply incised valleys on the
western edge of the Darling Range.
Systematic exploration for bauxite within the region commenced in the 1960s and is currently conducted on a continuous basis to establish optimal mine plans to
achieve a uniform quality of bauxite production. Current mine plans include further exploration throughout all areas where Alcoa has mining permits to sustain future
production.
Refer to the Darling Range TRS in Sections 6.0 through 11.0 for more information on the geology, mineralization, and exploration history of the Darling Range,
including Quality Assurance / Quality Control (QA/QC) procedures and data used in the current mineral resource estimate.
Mining and Processing
The Huntly and Willowdale mines employ conventional open pit surface mining practices and equipment. Following definition of mineral reserve blocks, vegetation is
cleared after which Alcoa operations commence stripping topsoil and secondary overburden removal using small excavators, scrapers, and trucks. Soil is stockpiled at
the site, away from the proposed pit, for rehabilitation purposes. After completion of mining, overburden is progressively backfilled into adjacent exhausted pits,
topsoiled, and rehabilitated by re-establishment of native vegetation, creating a stable post-mining landform that replicates the pre-existing environment.
35
-- 37 of 363 --
The process plant for the Darling Range operations consists of two separate crushing facilities at the Huntly and Willowdale mines, respectively. Both facilities crush
the run of mine (ROM) ore and convey the crushed ore to three separate refineries located at Pinjarra, Kwinana, and Wagerup. The Pinjarra refinery is located adjacent
to the east of the town of Pinjarra and is approximately 25 km southwest of the Huntly mining areas. The Kwinana refinery, also supplied by Huntly, is approximately
50 km northwest of Huntly in the city of Kwinana, approximately 40 km south of Perth. The Wagerup refinery, supplied by Willowdale, is located immediately adjacent
to the west of the South Western Highway, approximately 8 km south of Waroona and 20 km west of the Willowdale mining area.
The process plant is a dry crushing operation and therefore water is not required as a consumable for the plant. Alcoa’s Darling Range mining operations do not produce
mine waste in the same manner as conventional mining operations and waste dumps are not constructed.
Refer to the Darling Range TRS in Sections 12.0 and 13.0 for a detailed description of the mineral reserves and mining methods used in the Darling Range.
Environmental and Social
Alcoa’s mine sites are monitored in accordance with the conditions of Government authorizations and its operational licenses at Huntly and Willowdale. Outcomes of
and compliance with the management and monitoring programs are tracked within Alcoa’s Environmental Management System and reported within a Triennial
Environmental Review report.
Alcoa works proactively with key regulatory agencies to address operational incidents and implement operational improvements to reduce releases to the environment.
Refer to the Darling Range TRS in Section 17.0 for more information on the environmental, social, compliance, and permitting aspects of the Darling Range.
Mineral Resources and Mineral Reserves
For information on Darling Range mineral resources and mineral reserves, refer to the tables above. For comparative purposes, measured and indicated mineral
resources were 96.7 mdmt and 82.8 mdmt for the years ended 2022 and 2021, respectively, representing an increase of 17 percent. Inferred mineral resources were
140.3 mdmt and 320.0 mdmt for the years ended 2022 and 2021, respectively, representing a decrease of 56 percent. Probable reserves were 255.8 mdmt and 132.7
mdmt for the years ended 2022 and 2021, respectively, representing an increase of 93 percent, and proven reserves were 145.8 mdmt and 108.6 mdmt for the years
ended 2022 and 2021, respectively, representing an increase of 34 percent. The decrease in inferred mineral resources from 2021 is partially reflected in the increase in
measured and indicated mineral resources (and the subsequent conversion to mineral reserves). The decrease is mostly attributable to the change to a 3D modelling
method and the continued increased confidence through the continuous drilling program. Further mine planning work has allowed subsequent conversion of mineral
resources to mineral reserves. The mineral reserves increase is mostly attributable to the conversion from mineral resources to mineral reserves, partially offset by
mining depletion in 2022. Additionally, refer to the Darling Range TRS for more information on the mineral resources and mineral reserves of the Darling Range mines.
Individual Property Disclosure—Juruti
Property Location and Description
The Juruti bauxite mine is located in the west of Para State in northern Brazil. The mine is approximately 55 km south from the town of Juruti on the southern shore of
the Amazon River. The mine is owned and operated by Alcoa through AWAB. The Juruti bauxite mine represents an established mining operation which commenced
commercial production of bauxite in 2009.
36
-- 38 of 363 --
All spatial data used for the mineral resource and mineral reserve estimation are reported using a local grid based on SIRGAS 2000 (21S). The approximate coordinates
of the mining area for the Capiranga Central, Mauari, São Francisco, Mutum and Santarém plateaus are 618,879 m East and 9,721,768 m North, and for the Nhamundá
plateau are 521,657 m East and 9,773,299 m North.
Juruti Location and Bauxite Mine Permit Areas
Refer to the Juruti TRS in Sections 2.0 through 5.0 for more information on the Juruti mine – history, location, accessibility, and other relevant details.
Infrastructure
Infrastructure required for bauxite mining operations is well-established and available, the majority of which is located within the area of the Juruti bauxite mine. The
required infrastructure includes the following:
• Rail siding and loading equipment;
• Bauxite beneficiation plant for ore crushing and washing;
• Mine waste facilities including tailings thickening lagoons and tailings disposal ponds;
• ROM and product stockpiles and materials handling conveyors;
• Ancillary buildings (offices, warehouses, laboratory, workshops);
• Fuel station;
• Water supply intake raft, pumps, and approximate 9 km pipeline from the Juruti Grande stream;
• Power generation via thermoelectric units at the mine and port;
• Surface water management including drainage channels and pumps;
• Off-site rail corridor between the mine and port; and,
• Port facilities including rail siding, material handling equipment, ship loader.
The Juruti mining area is connected to Juruti town and port facilities by a road that joins to the PA-257 road near the town, and a dedicated railway between the mining
area and port. There are very few major roads across the region and the only major road in this area is the PA-257.
The nearest major city to Juruti is Santarem, approximately 160 km to the east and is only accessible by boat or by air from Juruti Airport (JRT) to Santarem-Maestro
Wilson Fonseca Airport (STM). National roads connect Santarem to wider Para State including the port city of Belem on Brazil’s northern coast, approximately 1,300
km by road via the 230 and PA-151 roads.
Juruti began production in 2009 and the facilities are in a well-maintained condition. Net book value of these facilities for the year-ended 2022 is $464 million included
in Properties, plants, and equipment, net on the Consolidated Balance Sheet.
Refer to the Juruti TRS in Sections 14.0 and 15.0 for more information on the surface infrastructure and facilities of the Juruti mine.
37
-- 39 of 363 --
Land Tenure and Permitting
All exploration and mining activities are managed by the National Mining Agency, Agencia Nacional de Mineracao (ANM), under the Mining Code (1967). Permits are
granted by the ANM falls into two categories:
• Exploration Permits: granted to support ongoing exploration activities. On submittal of an approved Exploration Report, the holder is then granted one year
to present a Mining Plan as a precursor to obtaining a Mining Concession. Exploration Permits require:
o Initial application fee and submission by a registered professional geologist or mining engineer;
o Annual fee payment to the ANM;
o Declaration of exploration expenditures on an annual basis; and,
o Survey visit fee payment to the ANM.
• Mining Concession: following a successful Mining Plan submission, enabling exploitation once Environmental Licenses are granted. Concession holders are
required to:
o Commence mining activities within 6 months of being granted;
o Submit annual reports on all mining / processing activities (Relatorio Annual de Lavra, or RAL) to the ANM;
o Make compensation payments to landowners in line with the agreements made for mining easement; and,
o Make Brazilian Mineral Royalty payments (Compensacao Financeira pela Exploracao de Recursos Minerais, or CFEM).
At Juruti there are three continuous mining concessions for an aggregated 29,410 hectares (ha), where current mineral reserves are determined. Brazilian mineral
legislation does not limit the duration of mining concessions and instead the concession remains in force until the deposit is exhausted. These concessions may be
extended later or expire earlier than estimated, based on the rate at which the deposits are exhausted and on obtaining any additional governmental approval, as
necessary, such as operational licenses and environmental approvals.
In addition to the mining rights, there are thirteen requests for mining concessions, fourteen exploration permits, and two requests for exploration permits. The
aggregated area for these permits is 197,866 ha.
The mining operations at Juruti take place on third-party land and, in accordance with the Mining Concession requirements, Alcoa currently has agreements in place
with respective landowners. Agreements form a “mining easement,” which grants Alcoa access to the mining areas in exchange for compensation payments. As a result,
there are no other titles, claims, leases, or options applicable to the exploration or mining permit areas which may limit Alcoa’s rights. Similarly, there are no liens or
encumbrances.
The Company has all environmental permits and operating licenses required for current mining activities; there are no liens or encumbrances.
Refer to the Juruti TRS in Sections 3.0 and 17.0 for more information on Land Permitting and Tenure for the Juruti mine.
Geology and Exploration
The bauxite deposit of the Juruti bauxite mine consist of several lateritic bauxite plateaus which exist over a large lateral extent (several km) in comparison to the total
thickness of the deposit (typically up to 20 m below surface).
Systematic exploration for bauxite within the region has persisted since Alcoa’s ownership and is currently conducted on a continuous basis to establish optimal mine
plans to achieve a uniform quality of bauxite production. Current mine plans include further exploration throughout all areas where Alcoa has mining permits to sustain
future production.
Refer to the Juruti TRS in Sections 6.0 through 11.0 for more information on the geology, mineralization, and exploration history of the Juruti mine, including QA/QC
procedures and data used in the current mineral resource estimate.
Mining and Processing
Juruti is an active mining operation using surface strip mining methods over a total of eight plateaus whereby land clearance, topsoil removal, and overburden stripping
is followed by bauxite deposit excavation and stockpiling. Waste is subsequently backfilled, and overburden and topsoil are re-instated for surface rehabilitation.
Juruti produces both a washed and unwashed bauxite product; however, all tonnage is presented on a zero-moisture basis. Bauxite processing takes place at a dedicated
plant facility located at the Juruti mine site which has been operating since 2009 and comprises a simple comminution (crushing, screening) and washing circuit
designed to remove fine particles from the ore.
Fine materials removed from ore are deposited in a thickening pond for settling and water reclamation, after which solid tailings are discarded into separate tailings
ponds. There is currently one thickening pond and seven disposal ponds.
38
-- 40 of 363 --
Refer to the Juruti TRS in Sections 12.0 and 13.0 for a detailed description of the mineral reserves and mining methods used in the Juruti mine.
Environmental and Social
Alcoa submits an Annual Environmental Report in compliance with the Juruti operating licenses and approvals. This report includes detailed descriptions of activities
undertaken for the year and environmental and social monitoring. No significant compliance issues were identified in the 2020/2021 and 2021/2022 Annual
Environmental Reports, although certain environmental incidents were recorded in December 2020 and February 2021 which involved siltation of downstream
watercourses following extreme rainfall events.
Additionally, Alcoa works proactively with key regulatory agencies to address operational non-compliances and implement operational improvements to reduce releases
to the environment. None of the reportable non-compliances represent a risk that could adversely affect its license to operate.
Refer to the Juruti TRS in Section 17.0 for more information on the environmental, social, compliance, and permitting aspects of the Juruti mine.
Mineral Resources and Mineral Reserves
For information on Juruti mineral resources and mineral reserves, refer to the tables above. For comparative purposes, probable reserves were 36.8 mdmt and 37.7
mdmt for the years ended 2022 and 2021, respectively, representing a decrease of 2 percent. Proven reserves were 48.6 mdmt and 50.9 mdmt for the years ended 2022
and 2021, respectively, representing a decrease of 5 percent. The decrease in mineral reserves from 2021 reflects mining depletion during 2022. Mineral resources were
unchanged from 2021. Additionally, refer to the Juruti TRS for more information on the mineral resources and mineral reserves of the Juruti mine.
Internal Controls
Alcoa has a long history of mining bauxite, with the majority of bauxite production having been used to supply Alcoa refineries. Despite having longstanding and robust
processes for sampling, analysis, ore definition, and grade control, it is only within the last ten years that structured and documented QA/QC practices have spread
beyond the laboratories of many of the operations.
Internal controls used by the Company are informed by internal reviews, representation on Technical Committees of Joint Venture operations, and by reviews, audits,
and studies performed by third-party mining consultants. The controls include: surveying of drillhole collar locations, drill sample logging, collection and security,
database verification and security, QA/QC programs, internal and third-party qualified person statistical analysis, internal and third-party qualified person model
validation, and reconciliation. Modelling and analysis of the Company’s resources is completed internally and reviewed by a qualified person, with the exception of Al
Ba’itha where modelling and analysis is completed by a third-party consultant.
As the ore bodies are shallow and generally horizontal, two-dimensional seam modelling has been the standard practice; however, many operations are implementing
more conventional 3D block modelling using geostatistical interpolation methods. Mineral resource estimation is validated internally through visual comparison of
drillholes and model blocks as well as through the use of swath plots and statistical distributions. Mineral resource estimation is reviewed and adopted by a qualified
person. Mineral reserve estimation is completed internally and reviewed by a qualified person, with the exception of Boké and Al Ba’itha where reserve estimation is
completed by a third-party consultant.
Labelled samples from the drill site are securely transported for logging or temporary storage by the drilling contractor or Alcoa personnel. Additional transport to
internal or external laboratories is controlled and completed, as necessary, by Alcoa personnel or by courier.
Drillhole databases are all site specific; most sites use industry standard drillhole database software, applications, and processes with security and backup protocols in
place. Prior to modelling, secondary validation and cleansing of the modelling datasets is performed. Wherever possible, data collection is digital to allow direct loading
into the database.
The Company has well-established QA/QC programs that are site specific and range from in-development to mature. Although some programs are limited to laboratory
protocols only covering analysis of duplicate pulps and standards, others involve, to varying degrees, the range of activities from twin hole drilling and collection of
field duplicates, submission of blind duplicates and standards and submission of duplicate samples to umpire laboratories. Regardless of the level of QA/QC, all sites
have well established and documented sampling and analysis regimes. QA/QC practices and available data is reviewed by a qualified person.
As discussed above, management relies on estimates for our mineral reserves and these estimates could change due to a number of factors, including future changes in:
permitting requirements, geological conditions, ongoing mine planning, macroeconomic and industry conditions, and regulatory disclosure requirements. See Part I
Item 1A of this Form 10-K for more information on risks.
39
-- 41 of 363 --
Item 3. Legal Proceedings.
In the ordinary course of its business, Alcoa is involved in a number of lawsuits and claims, both actual and potential. Proceedings that were previously disclosed may
no longer be reported because, as a result of rulings in the case, settlements, changes in our business, or other developments, in our judgment, they are no longer
material to Alcoa’s business, financial position or results of operations. See Part II Item 8 of this Form 10-K in Note S to the Consolidated Financial Statements for
additional information.
In addition to the matters discussed below, various other lawsuits, claims, and proceedings have been or may be instituted or asserted against Alcoa Corporation,
including those pertaining to environmental, safety and health, commercial, tax, product liability, intellectual property infringement, employment, employee and retiree
benefit matters, and other actions and claims arising out of the normal course of business. While the amounts claimed in these other matters may be substantial, the
ultimate liability is not readily determinable because of the considerable uncertainties that exist. Accordingly, it is possible that the Company’s liquidity or results of
operations in a particular period could be materially affected by one or more of these other matters. However, based on facts currently available, management believes
that the disposition of these other matters that are pending or asserted will not have a material adverse effect, individually or in the aggregate, on the financial position
of the Company.
Environmental Matters
Alcoa is involved in proceedings under CERCLA and analogous state or other statutory or jurisdictional provisions regarding the usage, disposal, storage, or treatment
of hazardous substances at a number of sites. The Company has committed to participate, or is engaged in negotiations with authorities relative to its alleged liability for
participation, in clean-up efforts at several such sites. The most significant of these matters are discussed in Part II Item 8 of this Form 10-K in Note S to the
Consolidated Financial Statements under the caption Contingencies.
In August 2005, Dany Lavoie, a resident of Baie-Comeau in the Canadian Province of Québec, filed a Motion for Authorization to Institute a Class Action and for
Designation of a Class Representative against Alcoa Canada Ltd., Alcoa Limitée, Société Canadienne de Metaux Reynolds Limitée, and Canadian British Aluminum in
the Superior Court of Québec in the District of Baie-Comeau, alleging that defendants, as the present and past owners and operators of an aluminum smelter in Baie-
Comeau, had negligently allowed the emission of certain contaminants from the smelter on the lands and houses of the St. Georges neighborhood and its environs
causing property damage and personal injury. In May 2007, the court authorized a class action suit on behalf of all people who suffered property or personal injury
damages caused by the emission of polycyclic aromatic hydrocarbons from the Company’s aluminum smelter in Baie-Comeau. In September 2007, plaintiffs filed the
claim against the original defendants. The Soderberg smelting operations that plaintiffs allege to be the source of emissions of concern ceased operations in 2013 and
have been dismantled. A court appointed expert, engaged to perform analysis of the potential impacts from the emissions in accordance with a sampling protocol agreed
to by the parties, submitted its report to the court in May 2019. In 2021, plaintiffs filed their amended claim and expert reports, and defendants filed their amended
defense and expert reports. In October 2021, the parties participated in mediation. In March 2022, the parties reached a settlement for damages that is subject to court
approval. On May 31, 2022, the court entered a judgement approving the settlement and formally concluding the litigation. The settlement does not have a material
impact on the Company’s financial results.
Intalco (Washington) Notice of Violation—In May 2022, the Company received a Notice of Violation (NOV) from the U.S. Environmental Protection Agency (the
EPA). The NOV alleges violations under the Clean Air Act at the Company’s curtailed Intalco (Washington) smelter from when the smelter was operational. The EPA
has referred the matter to the U.S. Department of Justice, Environment and Natural Resources Division (the DOJ). The DOJ and the Company are engaged in
discussions with respect to a resolution of this matter.
Asbestos Litigation
Some of our subsidiaries as premises owners are defendants in active lawsuits filed in various jurisdictions on behalf of persons seeking damages for alleged personal
injury as a result of occupational exposure to asbestos at various facilities. Our subsidiaries and acquired companies all have had numerous insurance policies over the
years that provide coverage for asbestos based claims. Many of these policies provide layers of coverage for varying periods of time and for varying locations. We have
significant insurance coverage and believe that our reserves are adequate for known asbestos exposure related liabilities. The costs of defense and settlement have not
been and are not expected to be material to the results of operations, cash flows, and financial position of Alcoa Corporation.
Item 4. Mine Safety Disclosures.
Not applicable.
40
-- 42 of 363 --
PART II
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters, and Issuer Purchases of Equity Securities.
Shares of the Company’s common stock are listed on the New York Stock Exchange and trade under the symbol “AA.”
On October 14, 2021, Alcoa Corporation announced the initiation of a quarterly cash dividend program and the Board of Directors declared the first quarterly cash
dividend of $0.10 per share of the Company’s common stock, which was paid during the fourth quarter of 2021. Alcoa Corporation paid quarterly cash dividends of
$0.10 per share in 2022. The Company intends to pay cash dividends on a quarterly basis. Dividends on Alcoa Corporation common stock are subject to authorization
by the Company’s Board of Directors. The payment, amount, and timing of dividends, if any, depends upon matters deemed relevant by the Company’s Board of
Directors, such as Alcoa Corporation’s financial position, results of operations, cash flows, capital requirements, business condition, future prospects, any limitations
imposed by law, credit agreements or senior securities, and other factors deemed relevant and appropriate. See Part II Item 7 of this Form 10-K in Management’s
Discussion and Analysis of Financial Condition and Results of Operations under caption Liquidity and Capital Resources – Financing Activities for more information.
As of February 17, 2023, there were approximately 8,000 holders of record of shares of the Company’s common stock. Because many of Alcoa Corporation’s shares are
held by brokers and other institutions on behalf of stockholders, the Company is unable to estimate the total number of stockholders represented by these holders.
Stock Performance Graph
The following graph compares Alcoa Corporation’s cumulative total stockholder return (i.e., stock price change plus reinvestment of dividends) with the cumulative
total stockholder returns of (1) the S&P MidCap 400® Index, and (2) the S&P Metals & Mining Select Industry Index. This comparison was based on an initial
investment of $100, including the reinvestment of any dividends, on December 31, 2017 through December 31, 2022.
The stock performance information included in this graph is based on historical results and is not necessarily indicative of future stock price performance.
December 31, 2017 2018 2019 2020 2021 2022
Alcoa Corporation $ 100 $ 49 $ 40 $ 43 $ 111 $ 85
S&P Metals & Mining Select Industry Index 100 74 85 99 134 152
S&P 400 Midcap Index 100 89 112 128 159 138
41
-- 43 of 363 --
Issuer Purchases of Equity Securities
Fourth Quarter 2022
Total Number of Shares
Purchased
Weighted Average Price Paid
Per Share
Total Number of Shares
Purchased as Part of Publicly
Announced Program
Approximate Dollar Value of
Shares that May Yet be
Purchased Under the
Program(1)
October 1 to October 31 - $ - - $ 500,000,000
November 1 to November 30 - - - 500,000,000
December 1 to December 31 - - - 500,000,000
Total - - -
(1) On July 20, 2022, Alcoa Corporation announced that its Board of Directors approved an additional common stock repurchase program under which the Company
may purchase shares of its outstanding common stock up to an aggregate transactional value of $500, depending on the Company’s continuing analysis of market,
financial, and other factors (the New Repurchase Program).
As of the date of this report, the Company is currently authorized to repurchase up to a total of $500, in the aggregate, of its outstanding shares of common stock
under the New Repurchase Program. Repurchases under this program may be made using a variety of methods, which may include open market purchases,
privately negotiated transactions, or pursuant to a Rule 10b5-1 plan. This program may be suspended or discontinued at any time and does not have a
predetermined expiration date. Alcoa Corporation intends to retire repurchased shares of common stock.
Item 6. [RESERVED]
42
-- 44 of 363 --
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
(dollars in millions, except per-share amounts, average realized prices, and average cost amounts;
dry metric tons in millions (mdmt); metric tons in thousands (kmt))
Forward-Looking Statements
This report contains statements that relate to future events and expectations and as such constitute forward-looking statements within the meaning of the Private
Securities Litigation Reform Act of 1995. Forward-looking statements include those containing such words as “aims,” “ambition,” “anticipates,” “believes,” “could,”
“develop,” “endeavors,” “estimates,” “expects,” “forecasts,” “goal,” “intends,” “may,” “outlook,” “potential,” “plans,” “projects,” “reach,” “seeks,” “sees,”
“should,” “strive,” “targets,” “will,” “working,” “would,” or other words of similar meaning. All statements by Alcoa Corporation that reflect expectations,
assumptions or projections about the future, other than statements of historical fact, are forward-looking statements, including, without limitation, forecasts concerning
global demand growth for bauxite, alumina, and aluminum, and supply/demand balances; statements, projections or forecasts of future or targeted financial results, or
operating or sustainability performance (including our ability to execute on strategies related to environmental, social and governance matters); statements about
strategies, outlook, and business and financial prospects; and statements about capital allocation and return of capital. These statements reflect beliefs and assumptions
that are based on Alcoa Corporation’s perception of historical trends, current conditions, and expected future developments, as well as other factors that management
believes are appropriate in the circumstances.
Forward-looking statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties, and changes in circumstances that
are difficult to predict. Although Alcoa Corporation believes that the expectations reflected in any forward-looking statements are based on reasonable assumptions, it
can give no assurance that these expectations will be attained and it is possible that actual results may differ materially from those indicated by these forward-looking
statements due to a variety of risks and uncertainties. Such risks and uncertainties include, but are not limited to: (a) current and potential future impacts to the global
economy and our industry, business and financial condition caused by various worldwide or macroeconomic events, such as the COVID-19 pandemic and the ongoing
conflict between Russia and Ukraine, and related regulatory developments; (b) material adverse changes in aluminum industry conditions, including global supply and
demand conditions and fluctuations in London Metal Exchange-based prices and premiums, as applicable, for primary aluminum and other products, and fluctuations
in indexed-based and spot prices for alumina; (c) changes in global economic and financial market conditions generally, such as inflation, recessionary conditions, and
interest rate increases, which may also affect Alcoa Corporation’s ability to obtain credit or financing upon acceptable terms or at all; (d) unfavorable changes in the
markets served by Alcoa Corporation; (e) the impact of changes in foreign currency exchange and tax rates on costs and results; (f) unfavorable changes in cost,
quality, or availability of key inputs, including energy and raw materials, or uncertainty of or disruption to the supply chain including logistics; (g) the inability to
execute on strategies related to or achieve improvement in profitability and margins, cost savings, cash generation, revenue growth, fiscal discipline, environmental-
and social-related goals and targets (including due to delays in scientific and technological developments), or strengthening of competitiveness and operations
anticipated from portfolio actions, operational and productivity improvements, technology advancements, and other initiatives; (h) the inability to realize expected
benefits, in each case as planned and by targeted completion dates, from acquisitions, divestitures, restructuring activities, facility closures, curtailments, restarts,
expansions, or joint ventures; (i) political, economic, trade, legal, public health and safety, and regulatory risks in the countries in which Alcoa Corporation operates or
sells products; (j) labor disputes and/or work stoppages and strikes; (k) the outcome of contingencies, including legal and tax proceedings, government or regulatory
investigations, and environmental remediation; (l) the impact of cyberattacks and potential information technology or data security breaches; (m) risks associated with
long-term debt obligations; (n) the timing and amount of future cash dividends and share repurchases; (o) declines in the discount rates used to measure pension and
other postretirement benefit liabilities or lower-than-expected investment returns on pension assets, or unfavorable changes in laws or regulations that govern pension
plan funding; and, (p) the other risk factors discussed in Part 1 Item 1A of this Form 10-K and other reports filed by Alcoa Corporation with the U.S. Securities and
Exchange Commission, including those described in this report.
Alcoa Corporation disclaims any obligation to update publicly any forward-looking statements, whether in response to new information, future events or otherwise,
except as required by applicable law. Market projections are subject to the risks described above and other risks in the market.
43
-- 45 of 363 --
Overview
Our Business
Alcoa Corporation (Alcoa or the Company) is a vertically integrated aluminum company comprised of bauxite mining, alumina refining, aluminum production
(smelting and casting), and energy generation. Aluminum is a commodity that is traded on the London Metal Exchange (LME) and priced daily. Additionally, alumina is
subject to market pricing through the Alumina Price Index (API), which is calculated by the Company based on the weighted average of a prior month’s daily spot
prices published by the following three indices: CRU Metallurgical Grade Alumina Price, Platts Metals Daily Alumina PAX Price, and FastMarkets Metal Bulletin Non-
Ferrous Metals Alumina Index. As a result, the price of both aluminum and alumina is subject to significant volatility and, therefore, influences the operating results of
Alcoa Corporation.
Through direct and indirect ownership, Alcoa Corporation has 27 operating locations in nine countries around the world, situated primarily in Australia, Brazil, Canada,
Iceland, Norway, Spain, and the United States. Governmental policies, laws and regulations, and other economic factors, including inflation and fluctuations in foreign
currency exchange rates and interest rates, affect the results of operations in these countries.
Business Update
In 2022, world events, including the on-going conflict between Russia and Ukraine, influenced costs for raw materials and created a global energy crisis, particularly in
Europe. The Company saw significant decreases in market pricing for alumina and aluminum between the first and the second half of the year.
Despite the significant change in alumina and aluminum prices during 2022, the alumina and aluminum markets ended 2022 balanced or in a slight volume deficit,
respectively, while the cost for raw materials remained high throughout the year. All direct material costs increased since the end of 2021, driven by inflation pressures
and multiple supply chain disruptions.
Alcoa worked to offset negative market impacts, including the high costs of energy in Europe. The Company partially curtailed two facilities, adjusting production rates
to approximately 50 percent of the 1.6 million metric tons of annual capacity at the San Ciprián alumina refinery in Spain due to high costs of natural gas, and curtailing
one of three potlines at the Lista aluminum smelter in Norway due to high electricity costs. Additionally, in July, the Company curtailed one aluminum potline at
Warrick Operations in the U.S. due to workforce shortages in the region, and sold the excess power into the market.
The Company also continued its work to support the planned restart of the San Ciprián smelter in Spain. Alcoa signed two power purchase agreements for wind-based
electricity for up to approximately 75 percent of the smelter’s power needs.
The Company continued to progress the full restart at the Alumar smelter in Brazil and in the fourth quarter 2022 completed the restart of some modest capacity at the
Portland Aluminium joint venture in Australia. Those sites have competitive, multi-year energy agreements; with fully renewable power sources (hydropower) for the
Alumar smelter.
Lower bauxite quality in areas where the Company is currently mining in Australia impacted production levels in 2022 at certain of the Australia refineries.
During 2022, the Company maintained a strong balance sheet and further reduced pension liabilities by completing a $1,000 transfer of obligations and related assets
for certain U.S. retirees and their beneficiaries.
In 2019, the Company announced a five year strategic portfolio review of smelting and refining capacity to improve cost positioning, including curtailment, closure, or
divestiture. Through 2021, Alcoa reached approximately 75 and 58 percent of its target to improve, curtail, close, or divest 1.5 and 4 million metric tons of smelting and
refining capacity, respectively. While no actions were taken in 2022 related to these targets, the Company took actions in response to market conditions as noted above,
and the strategic portfolio review is continuing.
Although 2022 was an unusual year with global events influencing energy and raw material costs, the Company continues to project strong long-term demand for
aluminum, as a key material for a global economy with a growing focus on lower carbon dioxide emissions, including renewable energy infrastructure and transmission,
electric and electric-intensive vehicles and packaging markets.
Even in a challenging market, the Company saw continued evidence of the growth of aluminum demand. In 2022, Alcoa saw a significant increase in year-over-year
demand for its EcoLum aluminum, which is part of our Sustana brand, through both increased margins and deliveries while still a relatively small portion of the
Company’s overall sales volume. The year-over-year volume increase for EcoLum, which is aluminum produced with no more than 4.0 metric tons of carbon dioxide
equivalents per metric ton of aluminum produced, grew more than four times over 2021, driven mostly by the European market.
Due to renewable energy sources and low carbon dioxide intensity in our operations, Alcoa believes that it is well positioned as a supplier of choice, especially in a
world that is working to further reduce greenhouse gas emissions. The Company has a global refining system with the industry’s lowest carbon dioxide intensity (per
CRU Group’s 2021 results published in third quarter 2022), and 86 percent of the Company’s smelting portfolio was powered by renewable energy sources in 2022.
44
-- 46 of 363 --
San Ciprián Smelter
In January 2022, Alcoa completed the curtailment of the San Ciprián aluminum smelter’s 228 kmt of annual capacity while the casthouse continues to operate. The
curtailment is a result of an agreement that was reached with the workers’ representatives in December 2021 to suspend production until January 2024 due to exorbitant
energy prices in Spain. In 2022, cash payments of $26 were made to reduce the related reserve for certain employee and contractual obligations that was recorded in
December 2021. In connection with the agreement, the Company has restricted cash of $103 to be made available for $68 in capital improvements at the site and $35 in
smelter restart costs.
During 2022, Alcoa signed two long-term power purchase agreements for wind-based electricity for up to approximately 75 percent of the San Ciprián smelter’s power
needs upon restart, although permitting approvals are required by the regional and national Spanish governments before construction can begin.
On February 3, 2023, the Company reached an updated agreement with the workers’ representatives to commence the restart process in phases beginning in January
2024. Alcoa plans that all pots will be restarted by October 1, 2025, and from October 1, 2025 until the end of 2026, the minimum production will be 75 percent of the
annual capacity of 228 kmt. Under the terms of the updated agreement, the Company is responsible for certain employee obligations during the extended curtailment
period. As a result, the Company will record charges of approximately $50 (pre- and after-tax) in the first quarter of 2023 in Restructuring and other charges, net on the
Statement of Consolidated Operations. Cash outlays related to these obligations are expected in 2024 and 2025. In connection with the updated agreement, the
Company made additional commitments of $78 for capital improvements at the site to be spent primarily between 2024 and 2025.
During the second quarter of 2022, the Company repaid carbon dioxide credits related to the San Ciprián smelter. Spain has a compensatory mechanism for the indirect
cost of carbon dioxide and provides associated credits. Upon receipt of the credits in each of the applicable years, the Company recorded the cash received as deferred
income (liability) due to a three-year clawback provision based on continued operations and employment. In June 2021, the Spanish Ministry of Industry, Trade and
Tourism (the Ministry) initiated the process to request repayment of 2018 and 2019 credits due to Alcoa’s decision to implement the collective dismissal process and its
potential impact on operations and employment at San Ciprián. Alcoa disagreed with the Ministry’s position as the collective dismissal process was not concluded and
qualifying operations and employment at San Ciprián were maintained during the relevant three-year period. The Company requested to suspend the payment of the
claimed credits (and interest) in exchange for a bank guarantee. On April 26, 2022, the Spanish National Court rejected the Company’s request and the Company made a
repayment of approximately $41 (€37) for the 2018 and 2019 compensation credits and interest.
Alumar Smelter
On September 20, 2021, the Company announced its plan to restart its 268 kmt per year share of capacity at the Alumar smelter in São Luís, Brazil, which had been
fully curtailed since 2015. Alcoa incurred restart expenses of $75 during 2022. The first metal sales occurred in the second quarter of 2022 and the Company continues
to progress the restart of the smelter.
The restart leverages the site’s integration with an alumina refinery, new long-term contracts for renewable energy and an available skilled workforce, as well as tax
efficiencies and a strong U.S. dollar. With the completion of the planned restart, Alcoa will have approximately 76 percent of its 2.97 million metric tons of global
aluminum smelting capacity operating.
Other Portfolio Actions
Kwinana—In January 2023, the Company reduced production at the Kwinana (Australia) refinery by approximately 30 percent in response to a domestic natural gas
shortage in Western Australia due to production challenges experienced by key gas suppliers.
Portland—In October 2022, the Company completed the restart of 35 kmt (19 kmt Alcoa share) of previously curtailed annual capacity at the Portland aluminum
smelter in Australia that was previously announced in November 2021. With the restart complete, the plant is operating at approximately 95 percent of its total capacity
and Alcoa has approximately 186 kmt of consolidated annual capacity at Portland.
Lista—On August 30, 2022, the Company announced the curtailment of one third of the production capacity (31 kmt) at the Lista smelter in Norway to mitigate high
energy costs for the site. The site was exposed to spot energy pricing, which had increased to above $600 per megawatt hour. In July 2022, the Company entered into a
fixed price power agreement effective for the fourth quarter of 2022 through December 31, 2023. In February 2023, the agreement was amended with improved fixed
pricing and lower volume commitments.
Warrick—On July 1, 2022, Alcoa curtailed one of the three operating smelting potlines (54 kmt) at its Warrick Operations site due to operational challenges stemming
from labor shortages in the region.
45
-- 47 of 363 --
Addy, Washington—In July 2022, Alcoa made the decision to permanently close the previously curtailed magnesium smelter in Addy (Washington). The facility has
been fully curtailed since 2001. The Company recorded a charge of $29 to establish reserves for environmental and demolition obligations in Restructuring and other
charges, net on the Statement of Consolidated Operations in the third quarter of 2022. Associated cash outlays are expected to be paid over the next three to five years.
MRN—On April 30, 2022, Alcoa completed the sale of its investment in MRN for proceeds of $10. An additional $30 in cash could be paid to the Company in the
future if certain post-closing conditions related to future MRN mine development are satisfied. Related to this transaction, the Company recorded an asset impairment of
$58 in the first quarter of 2022 in Restructuring and other charges, net on the Statement of Consolidated Operations. In addition, the Company entered into several
bauxite offtake agreements with South32 to provide bauxite supply for existing long-term supply contracts.
Capital Returns
On July 20, 2022, Alcoa Corporation announced that its Board of Directors approved a new common stock repurchase program under which the Company may
purchase shares of its outstanding common stock up to an aggregate transactional value of $500, depending on the Company’s continuing analysis of market, financial,
and other factors (the New Repurchase Program). The Company had $500 available for share repurchases at the end of 2021 from a prior authorization in October 2021.
The share repurchase programs may be suspended or discontinued at any time and do not have predetermined expiration dates.
In 2022, the Company repurchased 8,565,200 shares of its common stock for $500 under the previously authorized program; the shares were immediately retired. As of
the date of this report, the Company is currently authorized to repurchase up to a total of $500, in the aggregate, of its outstanding shares of common stock under the
New Repurchase Program. Refer to Liquidity and Capital, for more information.
In each quarter of 2022, the Board of Directors declared a quarterly cash dividend of $0.10 per share of the Company’s common stock, totaling $72 for the year.
Balance Sheet Actions
In the third quarter of 2022, the Company purchased group annuity contracts to transfer the obligation to pay remaining retirement benefits for approximately 4,400
retirees and beneficiaries from its U.S. defined benefit pension plans. The transfer of approximately $1,000 in both plan obligations and plan assets was completed in
August 2022. As a result, Alcoa recognized a non-cash settlement loss of $617 (pre- and after-tax) in Restructuring and other charges, net on the Statement of
Consolidated Operations. See Part II Item 2 of this Form 10-K in Note O to the Consolidated Financial Statements for additional information.
On June 27, 2022, the Company successfully amended and restated its Revolving Credit Facility, which includes terms that provide improved flexibility to execute on
Alcoa’s long-term strategies. Among other improvements, the Revolving Credit Facility released the collateral package that had previously secured the Revolving
Credit Facility, which will continue so long as certain credit ratings are maintained, and provides a debt to capitalization ratio not to exceed .60 to 1.00 to replace the
maximum leverage ratio upon a ratings upgrade to investment grade by Moody’s or S&P. On July 26, 2022, Moody’s upgraded the rating of ANHBV’s senior unsecured
notes to Baa3 (investment grade) from Ba1 and set the current outlook to stable. Refer to Liquidity and Capital, for more information.
Other Matters
During the fourth quarter of 2022, the Norwegian government approved a 2023 budget proposal that sets a floor for the carbon dioxide compensation to be paid in 2023
based on 2022 power purchased. The Company recorded an adjustment of $25 in the fourth quarter of 2022 to Cost of goods sold to reverse amounts accrued for 2022
credits earned through September 30, 2022 under the prior carbon dioxide compensation program.
On August 16, 2022, the U.S. enacted the Inflation Reduction Act of 2022, which includes a 15% minimum tax on book income of certain large corporations, a 1%
excise tax on net stock repurchases after December 31, 2022, and several tax incentives to promote clean energy. This legislation did not have a material impact on the
Company’s Consolidated Financial Statements.
In the first quarter of 2022, the Company recorded a charge of $77 in Restructuring and other charges, net to reflect its estimate for the agreement reached with the
workers of the divested Avilés and La Coruña facilities (Spain) to settle various legal disputes related to the 2019 divestiture. In April 2022, the Company received
unanimous acceptance of the offer from all active workers of the divested Avilés and La Coruña facilities and a Global Settlement Agreement (GSA) was fully executed.
The Company recorded a charge of $2 in Restructuring and other charges, net in second quarter of 2022 to reflect an update to its estimated liability for the GSA. The
Company expects to make cash payments in 2023 upon completion of certain administrative and judicial approvals (See Note S).
On March 31, 2022, Ma’aden’s put option and the Company’s call option, relating to additional interests in the joint venture, expired with neither party exercising their
options. In accordance with the joint venture agreement, the call and put options were exercisable for a period of six months after October 1, 2021.
46
-- 48 of 363 --
In March 2022, in response to the conflict between Russia and Ukraine, Alcoa announced that it would cease the purchase of raw materials from, or the selling of
products to, Russian businesses. The Company identified alternate sources for securing the limited number of materials that would have been purchased from Russian
suppliers without any supply interruption or material financial impact on the Company.
See the below sections for additional details on the above-described actions.
Basis of Presentation
The Consolidated Financial Statements of Alcoa Corporation are prepared in conformity with accounting principles generally accepted in the United States of America
(GAAP). In accordance with GAAP, certain situations require management to make estimates based on judgments and assumptions, which may affect the reported
amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements. They also may affect the reported amounts
of revenues and expenses during the reporting periods. Actual results could differ from those estimates upon subsequent resolution of identified matters.
Results of Operations
The discussion that follows includes a comparison of our results of operations and liquidity and capital resources for the fiscal years ended December 31, 2022 and
2021. For a comparison of changes for the fiscal years ended December 31, 2021 and 2020, refer to Management’s Discussion and Analysis of Financial Condition and
Results of Operation in Part II Item 7 of Alcoa Corporation’s Annual Report on Form 10-K for the year ended December 31, 2021 (filed February 24, 2022).
For the year ended December 31,
Statement of Operations 2022 2021
Sales $ 12,451 $ 12,152
Cost of goods sold (exclusive of expenses below) 10,212 9,153
Selling, general administrative, and other expenses 204 227
Research and development expenses 32 31
Provision for depreciation, depletion, and amortization 617 664
Restructuring and other charges, net 696 1,128
Interest expense 106 195
Other income, net (118) (445)
Total costs and expenses 11,749 10,953
Income before income taxes 702 1,199
Provision for income taxes 664 629
Net income 38 570
Less: Net income attributable to noncontrolling interest 161 141
Net (loss) income attributable to Alcoa Corporation $ (123) $ 429
Selected Financial Metrics 2022 2021
Diluted (loss) income per share attributable to Alcoa
Corporation common shareholders $ (0.68) $ 2.26
Third-party shipments of alumina (kmt) 9,169 9,629
Third-party shipments of aluminum products (kmt) 2,570 3,007
Average realized price per metric ton of alumina $ 384 $ 326
Average realized price per metric ton of primary aluminum $ 3,457 $ 2,879
Average Alumina Price Index (API)(1) $ 365 $ 324
Average London Metal Exchange (LME) 15-day lag(2) $ 2,726 $ 2,443
(1) API (Alumina Price Index) is a pricing mechanism that is calculated by the Company based on the weighted average of a prior month’s daily spot prices
published by the following three indices: CRU Metallurgical Grade Alumina Price, Platts Metals Daily Alumina PAX Price, and FastMarkets Metal Bulletin
Non-Ferrous Metals Alumina Index.
(2) LME (London Metal Exchange) is a globally recognized exchange for commodity trading, including aluminum. The LME pricing component represents the
underlying base metal component, based on quoted prices for aluminum on the exchange.
47
-- 49 of 363 --
Earnings Summary
Annual Comparison
Overview
Net (loss) income attributable to Alcoa Corporation decreased $552 primarily as a result of:
• Higher raw material costs due to inflation pressures and multiple supply chain disruptions
• Higher energy costs, primarily in Europe
• Higher costs primarily associated with maintenance, transportation, direct material usage, and labor
• Absence of gains on the sale of non-core assets
• Valuation allowance recorded against the deferred tax assets of Alcoa Alumínio
• Lower shipments across all segments
Partially offset by:
• Higher average realized prices of aluminum and alumina
• Lower restructuring charges
• Favorable mark-to-market results on derivative instruments
• Favorable currency impacts
• Increase in value add product sales
Sales
Sales increased $299 primarily as a result of:
• Higher average realized prices of aluminum and alumina
• Increase in value add product sales
• Higher shipments from the Alumar smelter and Portland smelter due to the restarts
• Favorable changes to customer mix in the Alumina segment
Partially offset by:
• Lower trading activities
• Lower shipments across all segments
• Absence of sales from the divested Warrick Rolling Mill
• Decreased sales from the San Ciprián smelter due to the smelter curtailment
• Lower pricing at the Brazil hydro-electric facilities as 2021 drought conditions elevated prices in the prior year period
Cost of goods sold
Cost of goods sold as a percentage of sales increased 7% primarily as a result of:
• Higher raw material costs due to inflation pressures and multiple supply chain disruptions
• Higher energy costs, primarily in Europe
• Higher costs primarily associated with maintenance, transportation, direct material usage, and labor
Partially offset by:
• Higher average realized prices of aluminum and alumina
• Increase in value add product sales
Selling, general administrative, and other expenses
Selling, general administrative, and other expenses decreased $23 primarily as a result of:
• Lower variable compensation
Provision for depreciation, depletion, and amortization
The Provision for depreciation, depletion, and amortization decreased $47 primarily as a result of:
• Currency translation impacts
Interest expense
Interest expense decreased $89 primarily as a result of:
• Absence of interest on $750 6.75% Senior Notes redeemed early in April 2021 and early redemption costs
• Absence of interest on $500 7.00% Senior Notes redeemed early in September 2021 and early redemption costs
Partially offset by:
• Interest on $500 4.125% Senior Notes issued in March 2021
48
-- 50 of 363 --
Other income, net
Other income, net decreased $327 primarily as a result of:
• Absence of gains on the sale of the former Rockdale site, the former Eastalco site, and the Warrick Rolling Mill
• Decrease in equity earnings from the Ma’aden bauxite and alumina joint venture and aluminum joint venture primarily due to higher raw material and energy costs
primarily driven by inflation, partially offset by higher alumina and aluminum prices
Partially offset by:
• Favorable mark-to-market results on derivative instruments primarily due to higher power prices in the current year
Restructuring and other charges, net
In 2022, Restructuring and other charges, net of $696, primarily related to:
• $632 for U.S. pension group annuity contracts and lump sum settlements
• $79 for the agreement reached with the workers of the divested Avilés and La Coruña facilities
• $58 for an asset impairment related to the sale of the Company’s interest in the MRN mine
• $29 for the permanent closure of the previously curtailed magnesium smelter in Addy (Washington)
Partially offset by:
• $83 reversal of Brazil state VAT valuation allowance associated with the restart of the Alumar smelter
In 2021, Restructuring and other charges, net of $1,128, primarily related to:
• $858 for U.S. pension group annuity contracts and lump sum settlements
• $80 for the permanent closure of the previously curtailed Wenatchee (Washington) smelter
• $63 for Suriname pension group annuity contract
• $62 for the temporary curtailment of the San Ciprián (Spain) smelter
• $47 for the settlement of certain pension benefits
• $27 for the permanent closure of the anode portion of the Lake Charles (Louisiana) facility
• $9 in settlements and curtailments of certain other postretirement benefits related to the sale of the Warrick Rolling Mill
Partially offset by:
• $22 of reversals for environmental and asset retirement obligation reserves at previously closed locations
• $17 for the reversal of a reserve related to the divested Avilés and La Coruña entities
Provision for income taxes
The Provision for income taxes in 2022 was $664 on income before taxes of $702 or 94.6%. In comparison, the 2021 Provision for income taxes was $629 on income
before taxes of $1,199 or 52.5%.
The increase in tax expense is primarily attributable to a charge to record a full valuation allowance of $217 against the deferred tax assets of Alcoa Alumínio
(Alumínio), and a charge of $30 primarily to write off the deferred tax assets of Alcoa Norway ANS due to a legal entity restructuring in 2022. This increase was
partially offset by a tax benefit of $33 recognized due to changes in the utilization of the tax holiday rate in AWAB, lower income in some of the jurisdictions where the
Company records taxes, and a valuation allowance of $103 recorded in 2021 against the net deferred tax assets of Alúmina Española, S.A (Española).
The 2022 full valuation allowance for Alumínio was a result of Alumínio’s three-year cumulative loss position for the period ended December 31, 2022. Although the
Company entered into aluminum contracts to manage exposures associated with the restart, these contracts were held by another legal entity, and the associated realized
gains are not available to Alumínio to offset the restart losses. While management believes Alumínio will return to profitability in the future with the restart of the
Alumar smelter, current volatility in the market does not provide a reliable basis for concluding that it is more likely than not that Alumínio’s net deferred tax assets,
which consist primarily of tax loss carryforwards with indefinite life, will be realized. Alumar smelter profitability in future periods could prompt the Company to
evaluate the realizability of the deferred tax asset and assess the possibility of a reversal of the valuation allowance, which could have a significant impact on net
income in the quarter the valuation allowance is reversed.
In 2021, a valuation allowance of $103 was recorded against the net deferred tax assets of Española. Management concluded that it was more likely than not that
Española’s net deferred tax assets, which consist primarily of tax loss carryforwards, would not be realized as the entity’s sole operating asset, the San Ciprián refinery,
was in a three-year cumulative loss position for the period ended December 31, 2021.
Noncontrolling interest
Net income attributable to noncontrolling interest was $161 in 2022 compared with $141 in 2021. These amounts are entirely related to Alumina Limited’s 40%
ownership interest in several affiliated operating entities.
The increase is primarily a result of higher average realized prices of alumina, lower elimination of intercompany profit in inventory, higher other income primarily
related to favorable mark-to-market results on derivative instruments, lower taxes on lower profits before taxes and the absence of the Española valuation allowance,
lower restructuring charges primarily due to lower pension actions, and a decrease in equity earnings from the Ma’aden bauxite and alumina joint venture, partially
offset by higher raw material costs, energy prices and production costs.
49
-- 51 of 363 --
Segment Information
Alcoa Corporation is a producer of bauxite, alumina, and aluminum products. The Company’s operations consist of three worldwide reportable segments: Bauxite,
Alumina, and Aluminum. Segment performance under Alcoa Corporation’s management reporting system is evaluated based on a number of factors; however, the
primary measure of performance is the Adjusted EBITDA (Earnings before interest, taxes, depreciation, and amortization) of each segment. The Company calculates
Segment Adjusted EBITDA as Total sales (third-party and intersegment) minus the following items: Cost of goods sold; Selling, general administrative, and other
expenses; and Research and development expenses. Alcoa Corporation believes that the presentation of Adjusted EBITDA is useful to investors because such measure
provides both additional information about the operating performance of Alcoa Corporation and insight on the ability of Alcoa Corporation to meet its financial
obligations. The presentation of Adjusted EBITDA is not intended to be a substitute for, and should not be considered in isolation from, the financial measures reported
in accordance with GAAP. Alcoa Corporation’s Adjusted EBITDA may not be comparable to similarly titled measures of other companies.
Segment Adjusted EBITDA totaled $2,275 in 2022, $3,053 in 2021, and $1,317 in 2020. The following information provides production, shipments, sales, and Segment
Adjusted EBITDA data for each reportable segment, as well as certain realized price and average cost data, for each of the three years in the period ended December 31,
2022. See Part II Item 8 of this Form 10-K in Note E to the Consolidated Financial Statements for additional information.
Bauxite
2022 2021
Production (mdmt) 42.1 47.6
Third-party shipments (mdmt) 3.5 5.7
Intersegment shipments (mdmt) 39.5 42.4
Total shipments (mdmt) 43.0 48.1
Third-party sales $ 204 $ 236
Intersegment sales 680 711
Total sales $ 884 $ 947
Segment Adjusted EBITDA $ 82 $ 172
Operating costs $ 919 $ 912
Average cost per dry metric ton of bauxite shipped $ 21 $ 19
Production in the above table can vary from Total shipments due primarily to differences between the equity allocation of production, offtake agreements with the
respective equity investment, and other supply agreements. Additionally, Total shipments include dry metric tons that were not produced by the Bauxite segment. Such
bauxite was purchased to satisfy certain customer commitments. The Bauxite segment bears the risk of loss of the purchased bauxite until control of the product has
been transferred to this segment’s customers. Operating costs in the table above includes all production-related costs: conversion costs, such as labor, materials, and
utilities; depreciation, depletion, and amortization; and plant administrative expenses.
Overview. This segment represents the Company’s global bauxite mining operations. A portion of this segment’s production represents the offtake from equity method
investments in Brazil (prior to the MRN sale in April 2022) and Guinea, as well as AWAC’s share of production related to the equity investment in Saudi Arabia. The
bauxite mined by this segment is sold primarily to internal customers within the Alumina segment; a portion of the bauxite is sold to external customers. Bauxite mined
by this segment and used internally is transferred to the Alumina segment at negotiated terms that are intended to approximate market prices; sales to third-parties are
conducted on a contract basis. Generally, this segment’s sales are transacted in U.S. dollars while costs and expenses are transacted in the local currency of the
respective operations, which are the Australian dollar and the Brazilian real. Most of the operations that comprise the Bauxite segment are part of AWAC (see
Noncontrolling Interest in Earnings Summary above).
Business Update. Total shipments decreased 5.1 million dry metric tons compared to 2021 primarily due to lower demand from certain Alumina segment refineries, the
cessation of bauxite sales to Russian aluminum businesses, decreased demand in the Atlantic bauxite market, and the expiration of the Company’s license to export
bauxite from Australia.
On April 30, 2022, Alcoa completed the sale of its investment in MRN for proceeds of $10. An additional $30 in cash could be paid to the Company in the future if
certain post-closing conditions related to future MRN mine development are satisfied. Related to this transaction, the Company recorded an asset impairment of $58 in
the first quarter of 2022 in Restructuring and other charges, net on the Statement of Consolidated Operations. In addition, the Company entered into several bauxite
offtake agreements with South32 Minerals S.A. to provide bauxite supply for existing long-term supply contracts.
Mining operations are relocated periodically in support of optimizing the value extracted from bauxite reserves. In 2022, the Company continued the process of moving
the Juruti mining operations, which is scheduled to be completed in the first quarter of 2023. During 2022, the Company incurred $41 in capital expenditures related to
the Juruti mining operation relocation.
50
-- 52 of 363 --
Annual Comparison
Production
Production decreased 12% primarily as a result of:
• Lower demand from certain Alumina segment refineries
• Sale of the Company’s interest in the MRN mine
• Cessation of bauxite sales to Russian aluminum businesses
• Expiration of the Company’s license to export bauxite from Australia
Third-party sales
Third-party sales decreased $32 primarily as a result of:
• Lower shipments primarily due to lower customer demand from Juruti and the cessation of bauxite sales to Russian aluminum businesses, decreased demand in
the Atlantic bauxite market, and the expiration of the Company’s license to export bauxite from Australia
Partially offset by:
• Higher volumes from offtake and supply agreements caused by the shift to third-party sales due to reduced production at the San Ciprián refinery
Intersegment sales
Intersegment sales decreased $31 primarily as a result of:
• Lower intersegment shipments primarily due to lower demand from certain Alumina segment refineries
Partially offset by:
• Higher average internal prices on sales to the Alumina segment
Segment Adjusted EBITDA
Segment Adjusted EBITDA decreased $90 primarily as a result of:
• Lower shipments as discussed above
• Higher production costs primarily due to inefficiencies at lower production rates
• Higher energy costs, primarily diesel costs in Australia
• Lower average margins on sales to the Alumina segment
Partially offset by:
• Favorable currency impacts
• Higher earnings from equity investments
Forward-Look. Beginning in January 2023, financial information for the activities of the bauxite mines and the alumina refineries will be combined and the Company
will report its financial results in the following two segments: (i) Alumina, and (ii) Aluminum. Accordingly, segment information for all prior periods presented will be
updated to reflect the new segment structure in future Quarterly Report on Form 10-Q and Annual Report on Form 10-K filings.
In Australia, the Company seeks annual approvals from relevant state government agencies for a rolling five-year mine plan and related forest clearing activities that are
needed to sustain bauxite mining. The Company’s annual mine plan approvals process for the Huntly and Willowdale mines is currently taking longer than it has
historically. Alcoa will mine bauxite with a lower bauxite grade from April 2023 through December 2023 at the Huntly mine to extend operations permitted under
existing approvals, providing more time to work through the approvals process. See Alumina Forward Look below.
Alumina
2022 2021
Production (kmt) 12,544 13,259
Third-party shipments (kmt) 9,169 9,629
Intersegment shipments (kmt) 3,958 4,287
Total shipments (kmt) 13,127 13,916
Third-party sales $ 3,520 $ 3,139
Intersegment sales 1,754 1,586
Total sales $ 5,274 $ 4,725
Segment Adjusted EBITDA $ 701 $ 1,002
Average realized third-party price per metric ton of alumina $ 384 $ 326
Operating costs $ 4,406 $ 3,678
Average cost per metric ton of alumina shipped $ 336 $ 264
51
-- 53 of 363 --
In the above table, total shipments include metric tons that were not produced by the Alumina segment. Such alumina was purchased to satisfy certain customer
commitments. The Alumina segment bears the risk of loss of the purchased alumina until control of the product has been transferred to this segment’s customers.
Additionally, operating costs in the table above includes all production-related costs: raw materials consumed; conversion costs, such as labor, materials, and utilities;
depreciation and amortization; and plant administrative expenses.
Overview. This segment represents the Company’s worldwide refining system, which processes bauxite into alumina. The alumina produced by this segment is sold
primarily to internal and external aluminum smelter customers; a portion of the alumina is sold to external customers who process it into industrial chemical products.
Approximately two-thirds of Alumina’s production is sold under supply contracts to third parties worldwide, while the remainder is used internally by the Aluminum
segment. Alumina produced by this segment and used internally is transferred to the Aluminum segment at prevailing market prices. A portion of this segment’s third-
party sales are completed through the use of alumina traders. Generally, this segment’s sales are transacted in U.S. dollars while costs and expenses are transacted in the
local currency of the respective operations, which are the Australian dollar, the Brazilian real, and the euro. Most of the operations that comprise the Alumina segment
are part of AWAC (see Noncontrolling Interest in Earnings Summary above). This segment also includes AWAC’s 25.1% ownership interest in the mining and refining
joint venture company in Saudi Arabia.
Business Update. During 2022, the average API of $365 per metric ton trended favorably compared to 2021 reflecting a 13% sequential increase.
Alumina production decreased 5% in 2022 compared to 2021 primarily due to the reduced production at the Australian refineries, and the reduction in the daily
production rate at the San Ciprián refinery, partially offset by increased production at the Alumar refinery due to the non-recurrence of the ship unloader outage in 2021.
Australian refinery production in 2022 was less than 2021 due to extended and unplanned maintenance periods and lower bauxite quality impacting production levels.
During 2022, the Alumina segment experienced higher raw material costs, higher energy costs predominantly related to the San Ciprián refinery, and higher caustic
usage at certain Australian refineries related to lower bauxite quality, due to the location of mining areas.
In the third quarter of 2022, the Company reduced production at the San Ciprián refinery to 50 percent of the 1.6 million metric tons of annual capacity to lessen the
financial impact from rising natural gas prices in Spain.
In December 2022, the Company recorded a charge of $25 to Cost of goods sold to increase the AROs at the Alumar refinery when updated estimates became available
for improvements required on closed bauxite residue areas.
During the second quarter of 2022, the Company recorded the reversal of a valuation allowance on Brazil state VAT of $46 in Cost of goods sold. In the fourth quarter
of 2018, after an assessment of the future realizability of the state VAT credits, Alcoa established an allowance on the accumulated state VAT credit balances and
stopped recording any future credit benefits. With the restart of the Alumar smelter in Brazil and the first metal sales in June 2022, the Company has the ability to
monetize these credits and reversed the valuation allowance in the second quarter of 2022.
During 2022, the Company recorded a charge of $48 to Cost of goods sold and an increase to the capitalized asset retirement cost of $9 to increase the AROs at the
Poços de Caldas refinery for improvements required on both operating and closed bauxite residue areas to comply with updated impoundment regulations in the region.
Capacity. The Alumina segment had a base annual capacity of 13,843 kmt with 1,014 kmt of curtailed refining capacity. In the third quarter of 2022, curtailed capacity
increased 800 kmt, due to the partial curtailment of the San Ciprián refinery (see above).
Annual Comparison
Production
Production decreased 5% primarily as a result of:
• Reduced alumina production at the Australian refineries due to extended and unplanned equipment maintenance and lower bauxite quality impacting production
levels
• Decreased production at the San Ciprián refinery due to the partial curtailment in the third quarter of 2022
Partially offset by:
• Increased production at Alumar refinery due to non-recurrence of ship unloader outage in 2021
Third-party sales
Third-party sales increased $381 primarily as a result of:
• Higher average realized price of $58/ton principally driven by a higher average API
• Favorable changes to customer mix
52
-- 54 of 363 --
Partially offset by:
• Lower shipments due to decreased production at the Australian refineries
Intersegment sales
Intersegment sales increased $168 primarily as a result of:
• Higher average realized prices on sales to the Aluminum segment
Partially offset by:
• Lower shipments due to the San Ciprián smelter curtailment
Segment Adjusted EBITDA
Segment Adjusted EBITDA decreased $301 primarily as a result of:
• Higher raw material costs primarily due to higher market prices for caustic and lime
• Higher energy costs, primarily in Europe
• Higher costs primarily associated with increased maintenance costs, direct material usage, and higher transportation costs
• Higher costs associated with impoundments
• Lower shipments primarily from Australian refineries due to decreased production
Partially offset by:
• Higher average realized price of $58/ton principally driven by a higher average API
• Favorable changes to customer mix
• Favorable currency impacts
• Reversal of a valuation allowance on Brazil VAT associated with the restart of the Alumar smelter
Forward-Look. Beginning in January 2023, financial information for the activities of the bauxite mines and the alumina refineries will be combined and the Company
will report its financial results in the following two segments: (i) Alumina, and (ii) Aluminum. Accordingly, segment information for all prior periods presented will be
updated to reflect the new segment structure in future Quarterly Report on Form 10-Q and Annual Report on Form 10-K filings.
In January 2023, the Company reduced production at the Kwinana (Australia) refinery by approximately 30 percent in response to a domestic natural gas shortage in
Western Australia due to production challenges experienced by key gas suppliers.
Alcoa will mine bauxite with a lower bauxite grade from April 2023 through December 2023 to provide additional time for an extended mining approvals process. This
change is isolated to the Huntly mine that supplies the Pinjarra and Kwinana refineries. Operating those refineries with lower quality bauxite decreases alumina output
and increases caustic usage.
The Company projects total alumina shipments to range between 12.7 and 12.9 million metric tons in 2023, down from 2022 primarily due to the full year impact of the
partial curtailment of the San Ciprián refinery and the reduction of bauxite grade at the Huntly mine.
As discussed above, in the third quarter of 2022, the Company reduced production at the San Ciprián refinery to 50 percent of the 1.6 million tons of annual capacity in
an effort to reduce the refinery’s losses related to natural gas prices. The Company is actively reviewing the refinery’s operating levels, commercial options, and other
support, given the ongoing volatility in European energy markets. Commercial actions taken in late 2022 to mitigate the impact of energy and raw material costs at the
San Ciprián refinery are expected to improve segment profitability in 2023.
Aluminum
Total Aluminum information 2022 2021
Third-party aluminum shipments (kmt) 2,570 3,007
Third-party sales $ 8,735 $ 8,766
Intersegment sales 27 18
Total sales $ 8,762 $ 8,784
Segment Adjusted EBITDA $ 1,492 $ 1,879
Primary aluminum information 2022 2021
Production (kmt) 2,010 2,193
Third-party shipments (kmt) 2,570 2,924
Third-party sales $ 8,887 $ 8,420
Average realized third-party price per metric ton $ 3,457 $ 2,879
Total shipments (kmt) 2,570 2,949
Operating costs $ 7,278 $ 6,593
Average cost per metric ton of primary aluminum shipped $ 2,831 $ 2,235
53
-- 55 of 363 --
In the above table, total aluminum third-party shipments and total primary aluminum shipments include metric tons that were not produced by the Aluminum segment.
Such aluminum was purchased by this segment to satisfy certain customer commitments. The Aluminum segment bears the risk of loss of the purchased aluminum until
control of the product has been transferred to this segment’s customer. Until the sale of the Warrick Rolling Mill on March 31, 2021, total aluminum information
includes flat-rolled aluminum while primary aluminum information does not. Primary aluminum third-party sales exclude realized gains and losses related to embedded
derivative instruments designated as cash flow hedges of forward sales of aluminum. Operating costs includes all production-related costs: raw materials consumed;
conversion costs, such as labor, materials, and utilities; depreciation and amortization; and plant administrative expenses.
The average realized third-party price per metric ton of primary aluminum includes three elements: a) the underlying base metal component, based on quoted prices
from the LME; b) the regional premium, which represents the incremental price over the base LME component that is associated with the physical delivery of metal to a
particular region (e.g., the Midwest premium for metal sold in the United States); and c) the product premium, which represents the incremental price for receiving
physical metal in a particular shape (e.g., billet, slab, rod, etc.) or alloy.
Overview. This segment consists of the Company’s (i) worldwide smelting and casthouse system, which processes alumina into primary aluminum, and the (ii) portfolio
of energy assets in Brazil, Canada, and the United States.
Aluminum’s combined smelting and casting operations produce primary aluminum products, virtually all of which are sold to external customers and traders. The
smelting operations produce molten primary aluminum, which is then formed by the casting operations into either common alloy ingot (e.g., t-bar, sow, standard ingot)
or into value add ingot products (e.g., foundry, billet, rod, and slab). A variety of external customers purchase the primary aluminum products for use in fabrication
operations, which produce products primarily for the transportation, building and construction, packaging, wire, and other industrial markets. Results from the sale of
aluminum powder and scrap are also included in this segment, as well as the impacts of embedded aluminum derivatives related to energy supply contracts.
The energy assets supply power to external customers in Brazil and, to a lesser extent, in the United States, as well as internal customers in the Aluminum (Canadian
smelters and Warrick (Indiana) smelter) and Alumina segments (Brazilian refineries).
Generally, this segment’s aluminum sales are transacted in U.S. dollars while costs and expenses of this segment are transacted in the local currency of the respective
operations, which are the U.S. dollar, the euro, the Norwegian krone, the Icelandic króna, the Canadian dollar, the Brazilian real, and the Australian dollar.
This segment also includes Alcoa Corporation’s 25.1% ownership interest in the smelting joint venture company in Saudi Arabia.
Business Update. During 2022, third-party sales were flat compared to 2021 on higher LME and regional premiums, partially offset by lower trading activities, as well
as lower shipments. Metal prices increased with LME prices on a 15-day lag averaging $2,726 per metric ton. The Aluminum segment also experienced higher raw
material and energy costs during 2022.
During the fourth quarter of 2022, the Norwegian government approved a 2023 budget proposal that sets a floor for the carbon dioxide compensation to be paid in 2023
based on 2022 power purchased. The Company recorded an adjustment of $25 in the fourth quarter of 2022 to Cost of goods sold to reverse amounts accrued for 2022
credits earned through September 30, 2022 under the prior carbon dioxide compensation program.
On December 29, 2021, the Company and workers’ representatives at the San Ciprián, Spain aluminum facility reached an agreement for the two-year curtailment of the
smelter’s 228 kmt of annual capacity due to exorbitant energy prices in Spain. The curtailment was completed in January 2022 while the casthouse continues to operate.
During 2022, $26 of payments were made to reduce the employee leave compensation and take or pay contractual obligations of $62 recorded in the fourth quarter of
2021. The Company incurred $5 of capital investment expenditures against the commitments for capital investments of $68 and restart costs of $35. In October 2022,
the Company signed an agreement with a renewable energy provider for approximately 30 percent of the smelter’s power needs upon restart and continues to negotiate
with other generators to secure the remaining power supply needs for the smelter. When combined with the 45 percent of the smelter’s power needs secured in the
second quarter of 2022, up to approximately 75 percent of the smelter’s power needs have been secured under long-term agreements with renewable energy providers to
date. On February 3, 2023, the Company reached an updated agreement with the workers’ representatives to commence the restart process in phases beginning in
January 2024. Alcoa plans that all pots will be restarted by October 1, 2025, and from October 1, 2025 until the end of 2026, the minimum production will be 75 percent
of the annual capacity of 228 kmt. See Part II Item 8 of this Form 10-K in Note V to the Consolidated Financial Statements.
In conjunction with the previously announced restart of the Alumar smelter in São Luís, Brazil, Alcoa incurred restart expenses of $75 during 2022. The first metal sales
occurred in the second quarter of 2022 and the Company continues to progress the restart of the Alumar smelter.
In October 2022, the Company completed the previously announced restart of 19 kmt (Alcoa share) of previously curtailed capacity at the Portland (Australia) smelter.
Alcoa incurred restart expenses of $12 during 2022.
54
-- 56 of 363 --
On August 30, 2022, the Company announced the curtailment of one third of the production capacity (31 kmt) at the Lista (Norway) smelter to mitigate high energy
costs for the site. The site was exposed to spot energy pricing, which had increased to above $600 per megawatt hour. In July 2022, the Company entered into a fixed
price power agreement effective for the fourth quarter 2022 through December 31, 2023.
On July 1, 2022, Alcoa curtailed one of the three operating smelting potlines (54 kmt) at the Warrick Operations site due to operational challenges stemming from labor
shortages in the region.
Capacity. At December 31, 2022, the Aluminum segment had 868 kmt of idle smelting capacity on a base capacity of 2,968 kmt, an increase from 2021 of 183 kmt in
idle capacity due to the San Ciprián smelter curtailment and partial curtailment of the Warrick and Lista smelters, partially offset by the Alumar and Portland smelter
restarts in 2022.
Annual Comparison
Production
Production decreased 8% primarily as a result of:
• Curtailment of the San Ciprián smelter, completed in January 2022
• Partial curtailment of the Warrick smelter in July 2022
• Partial curtailment of the Lista smelter in August 2022
Partially offset by:
• Alumar smelter restart
• Portland smelter restart
Third-party sales
Third-party sales decreased $31 primarily as a result of:
• Lower trading activities
• Absence of sales from the divested Warrick Rolling Mill
• Decreased sales from the San Ciprián smelter due to the smelter curtailment, partially offset by increased price
• Lower pricing at the Brazil hydro-electric facilities as 2021 drought conditions elevated prices in the prior year period
• Lower shipments mainly due to the partial curtailments of the Warrick smelter and the Lista smelter and maintenance at European smelters, partially offset by
higher shipments from the Alumar smelter and Portland smelter due to the restarts
Partially offset by:
• Higher average realized price of $578/ton driven by a higher average LME (on a 15-day lag) and regional premiums
• Increase in value add product sales
Segment Adjusted EBITDA
Segment Adjusted EBITDA decreased $387 primarily as a result of:
• Unfavorable raw material costs, primarily on higher market prices for carbon and average alumina input costs
• Higher costs primarily associated with higher transportation costs, increased maintenance costs, and higher labor expenses
• Lower pricing at the Brazil hydro-electric facilities
• Higher energy costs, primarily in Europe
• Lower shipments mainly related to the partial curtailment of the Warrick smelter
Partially offset by:
• Higher average realized price driven by higher average LME (on a 15-day lag) and regional premiums
• Increase in value add product sales
• Favorable currency impacts
Forward-Look. The Company projects total aluminum shipments to range between 2.5 and 2.6 million metric tons in 2023, consistent with 2022 as the restarts at the
Alumar and Portland smelters offset the partial curtailments at the Warrick and Lista smelters. Additionally, the Company engages in trading activity when favorable
market conditions allow. Availability of trading opportunities in 2023 may impact the Company’s shipment projection.
Further, in 2023, the Aluminum segment expects to benefit from lower energy costs in Europe.
55
-- 57 of 363 --
Reconciliations of Certain Segment Information
Reconciliation of Total Segment Third-Party Sales to Consolidated Sales
2022 2021
Bauxite $ 204 $ 236
Alumina 3,520 3,139
Aluminum:
Primary aluminum 8,887 8,420
Other(1) (152) 346
Total segment third-party sales 12,459 12,141
Other (8) 11
Consolidated sales $ 12,451 $ 12,152
(1) Other includes third-party sales of flat-rolled aluminum (prior to the sale of the Warrick Rolling Mill on March 31, 2021), and energy, as well as realized gains
and losses related to embedded derivative instruments designated as cash flow hedges of forward sales of aluminum.
Reconciliation of Total Segment Operating Costs to Consolidated Cost of Goods Sold
2022 2021
Bauxite $ 919 $ 912
Alumina 4,406 3,678
Primary aluminum 7,278 6,593
Other(1) 533 737
Total segment operating costs 13,136 11,920
Eliminations(2) (2,604) (2,214)
Provision for depreciation, depletion, and amortization(3) (595) (639)
Other(4) 275 86
Consolidated cost of goods sold $ 10,212 $ 9,153
(1) Prior to the sale of the Warrick Rolling Mill on March 31, 2021, Other largely relates to the Aluminum segment’s flat-rolled aluminum product division.
(2) Represents the elimination of Cost of goods sold related to intersegment sales between Bauxite and Alumina and between Alumina and Aluminum.
(3) Provision for depreciation, depletion, and amortization is included in the operating costs used to calculate average cost for each of the bauxite, alumina, and
primary aluminum product divisions (see Bauxite, Alumina, and Aluminum above). However, for financial reporting purposes, Provision for depreciation,
depletion, and amortization is presented as a separate line item on Alcoa Corporation’s Statement of Consolidated Operations.
(4) Other includes costs related to Transformation, and certain other items that are not included in the operating costs of segments (see footnotes 1 and 3 in the
Reconciliation of Total Segment Adjusted EBITDA to Consolidated Net (Loss) Income Attributable to Alcoa Corporation below).
56
-- 58 of 363 --
Reconciliation of Total Segment Adjusted EBITDA to Consolidated Net (Loss) Income Attributable to Alcoa Corporation
2022 2021
Net (loss) income attributable to Alcoa Corporation:
Total Segment Adjusted EBITDA $ 2,275 $ 3,053
Unallocated amounts:
Transformation(1) (66) (44)
Intersegment eliminations 143 (101)
Corporate expenses(2) (128) (129)
Provision for depreciation, depletion, and amortization (617) (664)
Restructuring and other charges, net (696) (1,128)
Interest expense (106) (195)
Other income, net 118 445
Other(3) (221) (38)
Consolidated income before income taxes 702 1,199
Provision for income taxes (664) (629)
Net income attributable to noncontrolling interest (161) (141)
Consolidated net (loss) income attributable to Alcoa
Corporation $ (123) $ 429
(1) Transformation includes, among other items, the Adjusted EBITDA of previously closed operations.
(2) Corporate expenses are composed of general administrative and other expenses of operating the corporate headquarters and other global administrative facilities,
as well as research and development expenses of the corporate technical center.
(3) Other includes certain items that are not included in the Adjusted EBITDA of the reportable segments.
Environmental Matters
See Part II Item 8 of this Form 10-K in Note S to the Consolidated Financial Statements under caption Contingencies—Environmental Matters.
Liquidity and Capital Resources
Alcoa Corporation’s primary future cash flows are centered on operating activities, particularly working capital, as well as capital expenditures and capital returns.
Alcoa’s ability to fund its cash needs depends on the Company’s ongoing ability to generate and raise cash in the future.
In 2022, the Company generated lower profitability due to higher raw material, energy and production costs, partially offset by higher prices for aluminum and alumina
and lower restructuring charges. Despite the challenging year, the Company maintained a strong cash position and successfully completed the following actions:
• Returned capital to stockholders of $572, including $500 for the repurchase of common stock and $72 of dividends;
• Funded $480 in capital expenditures to sustain and grow our operations;
• Purchased group annuity contracts to transfer the obligation to pay remaining retirement benefits for approximately 4,400 retirees and beneficiaries from its
U.S. defined benefit pension plans. Transferred approximately $1,000 in both plan obligations and plan assets;
• Amended and restated the Company’s Revolving Credit Facility to provide additional flexibility to the Company and ANHBV by (i) extending the maturity
date of the Revolving Credit Facility from November 2023 to June 2027, (ii) reducing the aggregate commitments under the facility from $1,500 to $1,250,
(iii) releasing the collateral package that had previously secured the Revolving Credit Facility, which will continue so long as certain credit ratings are
maintained, (iv) increasing the maximum leverage ratio from 2.75 to 1.00 to 3.25 to 1.00, which increases following material acquisitions for four
consecutive fiscal quarters following an acquisition, (v) providing a debt to capitalization ratio not to exceed .60 to 1.00 to replace the maximum leverage
ratio upon a ratings upgrade to investment grade by Moody’s or S&P, and (vi) providing flexibility for dividends and other restricted payments, to make
investments, and to incur additional indebtedness. The Revolving Credit Facility implements a sustainability adjustment to the applicable margin and
commitment fee that may result in a positive or negative adjustment based on two of the Company’s existing sustainability metrics;
• Achieved investment grade credit rating. On July 26, 2022, Moody’s upgraded the rating of ANHBV’s senior unsecured notes to Baa3 (investment grade)
from Bal and set the current outlook to stable; and,
• Renewed $79 term loan in Australia with extended maturity date to 2024.
57
-- 59 of 363 --
On January 31, 2023, a wholly-owned subsidiary of the Company entered into a one-year Receivables Purchase Agreement to sell up to $150 of certain customer
receivables without recourse on a revolving basis. The unsold portion of the specified receivable pool is pledged as collateral to the purchasing bank to secure the sold
receivables. Alcoa Corporation will guarantee the performance obligations of the wholly-owned subsidiary under the facility; however no assets (other than the
receivables) will be pledged as collateral.
Management believes that the Company’s cash on hand, future operating cash flows, and liquidity options, combined with its strategic actions, are adequate to fund its
short term and long term operating and investing needs for at least twelve months and the foreseeable future thereafter. Further, the Company has flexibility related to its
use of cash; the Company has no significant debt maturities until 2027 and no significant cash contribution requirements related to its U.S. pension plan obligations for
the foreseeable future (refer to Material Cash Requirements, below, for more information).
Although management believes that Alcoa’s future cash from operations and other liquidity options will provide adequate resources to fund operating and investing
needs, the Company’s access to, and the availability of, financing on acceptable terms in the future will be affected by many factors, including: (i) Alcoa Corporation’s
credit rating; (ii) the liquidity of the overall capital markets; (iii) the current state of the economy and commodity markets, and (iv) short- and long-term debt ratings.
There can be no assurances that the Company will continue to have access to capital markets on terms acceptable to Alcoa Corporation.
Changes in market conditions caused by global or macroeconomic events, such as the ongoing conflict between Russia and Ukraine, high inflation, and changing global
monetary policies could have adverse effects on Alcoa’s ability to obtain additional financing and cost of borrowing. Inability to generate sufficient earnings could
impact the Company’s ability to meet the financial covenants in our outstanding debt and revolving credit facility agreements and limit our ability to access these
sources of liquidity or refinance or renegotiate our outstanding debt or credit agreements on terms acceptable to the Company. Additionally, the impact on market
conditions from such events could adversely affect the liquidity of Alcoa’s customers, suppliers, and joint venture partners and equity method investments, which could
negatively impact the collectability of outstanding receivables and our cash flows.
At December 31, 2022, the Company’s cash and cash equivalents were $1,363, of which $1,280 was held outside the United States. Alcoa Corporation has a number of
commitments and obligations related to the Company’s operations in various foreign jurisdictions, resulting in the need for cash outside the United States. Alcoa
Corporation continuously evaluates its local and global cash needs for future business operations, which may influence future repatriation decisions. See Part II Item 8
of this Form 10-K in Note Q to the Consolidated Financial Statements for additional information related to undistributed net earnings.
Cash from Operations
Cash provided from operations was $822 in 2022 compared with $920 in 2021. Notable changes to the sources and (uses) of cash include:
• ($964) lower net income generation, excluding the impacts from restructuring charges, primarily due to higher raw materials, energy and production costs,
partially offset by higher aluminum and alumina pricing;
• ($372) in income taxes paid on prior year earnings, as well as on higher current year earnings in jurisdictions where the Company pays taxes;
• $282 in certain working capital accounts, primarily a lower increase in receivables relating to higher aluminum and alumina prices than in 2021, a lower
increase in inventories on higher raw material volumes in 2021, and a lower increase in accounts payable as raw material and energy costs increased less
than in 2021; and,
• $562 in lower pension contributions to the Company’s defined benefit pension plans.
In the third quarter of 2020, AofA paid approximately $74 (A$107) to the ATO related to the tax dispute described in Note S to the Consolidated Financial Statements in
Part II Item 8 of this Form 10-K. Upon payment, AofA recorded a noncurrent prepaid tax asset, as the Company continues to believe it is more likely than not that
AofA’s tax position will be sustained and therefore is not recognizing any tax expense in relation to this matter. In accordance with Australian tax laws, the initial
interest assessment and additional interest are deductible against AofA’s taxable income resulting in approximately $169 (A$219) in 2020, $14 (A$19) in 2021, and
$15 (A$22) in 2022 in lower cash tax payments. If AofA is ultimately successful, the interest deduction would become taxable as income in the year the dispute is
resolved. In addition, should the ATO decide in the interim to reduce any interest already assessed, the reduction would be taxable as income at that point in time.
During 2022, AofA continued to record its tax provision and tax liability without effect of the ATO assessment, since it expects to prevail. The tax payable will remain
on AofA’s balance sheet as a noncurrent liability, increased by the tax effect of subsequent periods’ interest deductions, until dispute resolution, which is expected to
take several years. At December 31, 2022, the noncurrent liability resulting from the cumulative interest deductions was approximately $174 (A$260).
Financing Activities
Cash used for financing activities was $768 in 2022 compared with $1,158 in 2021.
The use of cash in 2022 was primarily $165 of net cash paid to Alumina Limited (see Noncontrolling interest in Results of Operations above), $500 for the repurchase
of common stock, and $72 of dividends paid.
58
-- 60 of 363 --
The use of cash in 2021 was primarily $775 for the full, early repayment of $750 aggregate principal amount of 2024 Notes (including $25 redemption premium) in
April 2021, $518 for the full, early repayment of $500 aggregate principal amount of 2026 Notes (including $18 redemption premium) in September 2021, $194 in net
cash paid to Alumina Limited, $150 for the repurchase of common stock, $19 for dividends paid on common stock, and $17 in financial contributions primarily related
to the divested Spanish facilities. The uses of cash were partially offset by the issuance of $500 aggregate principal amount 2029 Notes by ANHBV in March 2021 with
net proceeds of approximately $493.
Credit Facilities. On June 27, 2022, Alcoa Corporation and ANHBV, a wholly owned subsidiary of Alcoa Corporation and the borrower, entered into an amendment
and restatement agreement (the Third Amendment and Restatement) (as amended and restated, the Revolving Credit Facility) that provides additional flexibility to the
Company and ANHBV by (i) extending the maturity date of the Revolving Credit Facility from November 2023 to June 2027, (ii) reducing the aggregate commitments
under the facility from $1,500 to $1,250, (iii) releasing the collateral package that had previously secured the Revolving Credit Facility, which will continue so long as
certain credit ratings are maintained, (iv) increasing the maximum leverage ratio from 2.75 to 1.00 to 3.25 to 1.00, which increases following material acquisitions for
four consecutive fiscal quarters following an acquisition, (v) providing a debt to capitalization ratio not to exceed .60 to 1.00 to replace the maximum leverage ratio
upon a ratings upgrade to investment grade by Moody’s or S&P, and (vi) providing flexibility for dividends and other restricted payments, to make investments, and to
incur additional indebtedness. The Revolving Credit Facility implements a sustainability adjustment to the applicable margin and commitment fee that may result in a
positive or negative adjustment based on two of the Company’s existing sustainability metrics.
If Alcoa Corporation or ANHBV, as applicable, fails to have a rating of at least Ba1 from Moody’s and BB+ from S&P, then the Company would be required to execute
all security documents to re-secure collateral under the Revolving Credit Facility.
As of December 31, 2022, the Company was in compliance with all covenants. There were no borrowings outstanding at December 31, 2022 and 2021, and no amounts
were borrowed during 2022 and 2021 under the Revolving Credit Facility.
The Company may draw on the facility periodically to ensure working capital needs are met. See Part II Item 8 of this Form 10-K in Note M to the Consolidated
Financial Statements for additional information related to the Revolving Credit Facility.
Guarantees of Third Parties. As of December 31, 2022 and 2021, the Company had no outstanding potential future payments for guarantees issued on behalf of a
third-party.
Bank Guarantees and Letters of Credit. Alcoa Corporation has outstanding bank guarantees and letters of credit related to, among others, energy contracts,
environmental obligations, legal and tax matters, leasing obligations, workers compensation, and customs duties. The total amount committed under these instruments,
which automatically renew or expire at various dates between 2023 and 2024, was $293 (includes $131 issued under a standby letter of credit agreement —see below)
at December 31, 2022. Additionally, ParentCo has outstanding bank guarantees and letters of credit related to the Company of $14 at December 31, 2022. In the event
ParentCo would be required to perform under any of these instruments, ParentCo would be indemnified by Alcoa Corporation in accordance with the Separation and
Distribution Agreement. Likewise, the Company has outstanding bank guarantees and letters of credit related to ParentCo of $8 at December 31, 2022. In the event
Alcoa Corporation would be required to perform under any of these instruments, the Company would be indemnified by ParentCo in accordance with the Separation
and Distribution Agreement.
In August 2017, Alcoa Corporation entered into a standby letter of credit agreement, which expires on June 27, 2024 (extended in August 2018, May 2019, May 2021,
and June 2022), with three financial institutions. The agreement provides for a $200 facility used by the Company for matters in the ordinary course of business. Alcoa
Corporation’s obligations under this facility are secured in the same manner as obligations under the Company’s revolving credit facility. Additionally, this facility
contains similar representations and warranties and affirmative, negative, and financial covenants as the Company’s revolving credit facility. See Part II Item 8 of this
Form 10-K in Note M to the Consolidated Financial Statements for additional information related to the Company’s debt. As of December 31, 2022, letters of credit
aggregating $131 were issued under this facility.
Surety Bonds. Alcoa Corporation has outstanding surety bonds primarily related to tax matters, contract performance, workers compensation, environmental-related
matters, and customs duties. The total amount committed under these bonds, which automatically renew or expire at various dates between 2023 and 2027, was $174 at
December 31, 2022. Additionally, ParentCo has outstanding surety bonds related to the Company of $11 at December 31, 2022. In the event ParentCo would be
required to perform under any of these instruments, ParentCo would be indemnified by Alcoa Corporation in accordance with the Separation and Distribution
Agreement. Likewise, the Company has outstanding surety bonds related to ParentCo of $3 at December 31, 2022. In the event Alcoa Corporation would be required to
perform under any of these instruments, the Company would be indemnified by ParentCo in accordance with the Separation and Distribution Agreement.
59
-- 61 of 363 --
Debt. As of December 31, 2022, Alcoa Corporation had three outstanding Notes maturing at varying times. A summary of the Notes and other long-term debt is shown
below. See Part II Item 8 of this Form 10-K in Note M to the Consolidated Financial Statements for additional information related to the Company’s debt.
December 31, 2022 2021
5.500% Notes, due 2027 750 $ 750
6.125% Notes, due 2028 500 500
4.125% Notes, due 2029 500 500
Other 84 5
Unamortized discounts and deferred financing costs (27) (28)
Total 1,807 1,727
Less: amount due within one year 1 1
Long-term debt, less amount due within one year $ 1,806 $ 1,726
Ratings. Alcoa Corporation’s cost of borrowing and ability to access the capital markets are affected not only by market conditions but also by the short- and long-term
debt ratings assigned to Alcoa Corporation’s debt by the major credit rating agencies.
On July 26, 2022, Moody’s upgraded the rating of ANHBV’s senior unsecured notes to Baa3 (investment grade) from Ba1 and set the current outlook to stable.
Dividend. In each quarter of 2022, the Board of Directors declared and paid a quarterly cash dividend of $0.10 per share of the Company’s common stock, totaling $72
for the year.
The details of any future cash dividend declaration, including the amount of such dividend and the timing and establishment of the record and payment dates, will be
determined by the Board of Directors. The decision of whether to pay future cash dividends and the amount of any such dividends will be based on the Company's
financial position, results of operations, cash flows, capital requirements, business conditions, the requirements of applicable law, and any other factors the Board of
Directors may deem relevant.
Common Stock Repurchase Program.
In October 2021, Alcoa Corporation’s Board of Directors approved a common stock repurchase program under which the Company may purchase shares of its
outstanding common stock up to an aggregate transactional value of $500, depending on cash availability, market conditions, and other factors.
On July 20, 2022, Alcoa Corporation announced that its Board of Directors approved an additional common stock repurchase program under which the Company may
purchase shares of its outstanding common stock up to an aggregate transactional value of $500, depending on the Company’s continuing analysis of market, financial,
and other factors (the New Repurchase Program). Prior to this authorization, $150 remained available for share repurchases at the end of the second quarter of 2022
from a prior authorization in October 2021 of $500 which was fully exhausted in 2022 with the Company’s repurchase activity (see below).
In 2022, the Company repurchased 8,565,200 shares of its common stock for $500, under the previously authorized program; the shares were immediately retired. As of
the date of this report, the Company is currently authorized to repurchase up to a total of $500, in the aggregate, of its outstanding shares of common stock under the
New Repurchase Program. Repurchases under this program may be made using a variety of methods, which may include open market purchases, privately negotiated
transactions, or pursuant to a Rule 10b5-1 plan. This program may be suspended or discontinued at any time and does not have a predetermined expiration date. Alcoa
Corporation intends to retire repurchased shares of common stock.
In 2021, the Company repurchased 3,184,300 shares of its common stock for $150; the shares were immediately retired.
Investing Activities
Cash used for investing activities was $495 in 2022 compared with cash provided from investing activities of $565 in 2021.
In 2022, the use of cash was primarily attributable to $480 of capital expenditures and $32 of cash contributions to the ELYSIS joint venture, partially offset by the sale
of the Company’s interest in the MRN mine of $10.
In 2021, the source of cash was primarily attributable to proceeds from the sale of assets of $966, primarily the Warrick Rolling Mill, Rockdale, and Eastalco site sales,
partially offset by $390 in capital expenditures.
In 2023, Alcoa expects capital expenditures of approximately $600 related to sustaining capital projects and growth projects. The timing and amount of capital
expenditures may fluctuate as a result of the Company’s normal operations.
60
-- 62 of 363 --
Material Cash Requirements
As discussed above, the Company relies primarily on operating cash flows to fund its cash commitments and management believes its operating cash flows, cash on
hand, and liquidity options will be adequate to fund its cash needs for at least 12 months and the foreseeable future thereafter. We have committed cash outflows related
to pension and postretirement benefit obligations and operating lease agreements. See Part II Item 8 of this Form 10-K in Notes O and T, respectively, to the
Consolidated Financial Statements for additional information. As of December 31, 2022, a summary of Alcoa Corporation’s outstanding material cash requirements are
as follows:
Total 2023 2024-2025 2026-2027 Thereafter
Operating activities:
Energy-related purchase obligations $ 13,911 $ 1,563 $ 2,400 $ 2,241 $ 7,707
Raw material purchase obligations 8,639 2,516 1,872 943 3,308
Other purchase obligations 794 382 186 133 93
Interest related to debt 513 97 185 185 46
Financing activities:
Long-term debt 1,834 1 81 751 1,001
Totals $ 25,691 $ 4,559 $ 4,724 $ 4,253 $ 12,155
Purchase obligations—Energy-related purchase obligations consist primarily of electricity and natural gas contracts with expiration dates ranging from 1 year to 25
years. Raw material obligations consist mostly of bauxite (relates to AWAC’s bauxite mine interests in Guinea and Brazil), caustic soda, lime, alumina, aluminum
fluoride, calcined petroleum coke, anodes and cathode blocks with expiration dates ranging from less than 1 year to 13 years. Other purchase obligations consist
principally of freight for bauxite and alumina with expiration dates ranging from 1 to 10 years. Many of these purchase obligations contain variable pricing components,
and, as a result, actual cash payments may differ from the estimates provided in the preceding table. In accordance with the terms of several of these supply contracts,
obligations may be reduced as a result of an interruption to operations, such as a plant curtailment or a force majeure event.
Interest related to total debt—Interest is based on interest rates in effect as of December 31, 2022 and is calculated on debt with maturities that extend to 2029.
Long-term debt—Total debt amounts in the preceding table represent the principal amounts of all outstanding long-term debt, which have maturities that extend to
2029.
Critical Accounting Policies and Estimates
The preparation of the Company’s Consolidated Financial Statements in accordance with GAAP requires management to make certain estimates based on judgments
and assumptions regarding uncertainties that affect the amounts reported in the Consolidated Financial Statements and disclosed in the Notes to the Consolidated
Financial Statements. Areas that require such estimates include the review of properties, plants, and equipment and goodwill for impairment, and accounting for each of
the following: asset retirement and environmental obligations; litigation matters; pension plans and other postretirement benefits obligations; derivatives and hedging
activities; and income taxes.
Management uses historical experience and all available information to make these estimates; actual results may differ from those used to prepare the Company’s
Consolidated Financial Statements at any given time. Despite these inherent limitations, management believes that the amounts recorded in the financial statements
related to these items are based on its best estimates and judgments using all relevant information available at the time.
A summary of the Company’s significant accounting policies is included in Part II Item 8 of this Form 10-K in Note B to the Consolidated Financial Statements.
Properties, Plants, and Equipment. Properties, plants, and equipment are reviewed for impairment whenever events or changes in circumstances indicate that the
carrying amount of such assets (asset group) may not be recoverable, including in the period when assets have met the criteria to be classified as held for sale. The
model used to determine recoverability of an asset or asset group would leverage the model that management uses for planning and strategic review of the entire
business, including related inputs and assumptions. Management’s impairment assessment process is described in Part II Item 8 of this Form 10-K in Note B to the
Consolidated Financial Statements. Refer to Part II Item 8 of this Form 10-K in Note K to the Consolidated Financial Statements for more information regarding
properties, plants, and equipment.
Goodwill. Goodwill is reviewed for impairment annually (in the fourth quarter) or more frequently if indicators of impairment exist or if a decision is made to sell or
exit a business. A significant amount of judgment is involved in determining if an indicator of impairment has occurred. Such indicators may include, among others,
deterioration in general economic conditions, negative developments in equity and credit markets, adverse changes in the markets in which an entity operates, increases
in input costs that have a negative effect on earnings and cash flows, or a trend of negative or declining cash flows over multiple periods. The fair value that could be
realized in an actual transaction may differ from that used to evaluate goodwill for impairment.
61
-- 63 of 363 --
Under the qualitative impairment test, management considers a number of factors in its assessment, such as: general economic conditions, equity and credit markets,
industry and market conditions, and earnings and cash flow trends.
Under the quantitative impairment test, management uses a discounted cash flow (DCF) model to estimate the current fair value of its reporting units. A number of
significant assumptions and estimates are involved in the application of the DCF model to forecast operating cash flows, including markets and market share, sales
volumes and prices, production costs, production capability, tax rates, capital spending, discount rate, and working capital changes. The model used for the goodwill
impairment test leverages the model, including related inputs and assumptions, that management uses for planning and strategic review of the entire business.
Management will test goodwill on a qualitative or quantitative basis. Refer to Part II Item 8 of this Form 10-K in Note B to the Consolidated Financial Statements for
more information regarding management’s impairment assessment process.
Management performed a quantitative assessment for the Bauxite and Alumina reporting units in 2022. As a result of the assessments, the estimated fair values of the
Bauxite and Alumina reporting units were substantially in excess of their carrying values, resulting in no impairment. The impact on the estimated fair values of an
increase in the discount rate of 1% would not result in a change in the conclusions reached, the estimated fair values would remain in excess of carrying values.
Further, in all years presented, there have been no triggering events that necessitated an impairment test for either the Bauxite or Alumina reporting units. Refer to Part
II Item 8 of this Form 10-K in Note L to the Consolidated Financial Statements for more information regarding goodwill.
Asset Retirement and Environmental Obligations. Estimates are used to record environmental remediation and asset retirement obligation (ARO) reserves based on
the best available information at the time of recognition. Several assumptions are used to estimate the costs required to demolish, environmentally remediate, or reclaim
the site, including:
• Engineering estimates and benchmarks to other similar projects;
• Mining area to be reclaimed and estimated restoration costs;
• Volume of regulated materials to be removed (asbestos, PCB fluids, spent potlining);
• Disposition of materials;
• Extent of contamination based on available data;
• Scope of remediation to mitigate human health or environmental risks and/or to meet likely regulatory requirements; and,
• Commercial availability and pricing for off-site treatment or disposal applications.
As the site is demolished, remediated, or reclaimed, the assumptions and estimates used to record the reserve may change to account for:
• Actual site conditions that require more or less remediation or reclamation;
• Legislation that becomes more or less stringent;
• Regulative authorities requiring updates to final design prior to completion;
• Alternative disposal methods for waste;
• Technological changes which allow remediation to be more efficient;
• Market factors; and,
• Variances in work that is atypical from prior work experience.
Changes to the estimates may result in material changes to the reserve that may require an increase to or a reversal of a previously recorded reserve. Historically, the
Company has not had material changes in established reserves. Refer to Part II Item 8 of this Form 10-K in Note R and Note S to the Consolidated Financial Statements
for more information regarding current reserves.
Litigation Matters. For asserted claims and assessments, liabilities are recorded when an unfavorable outcome of a matter is deemed to be probable and the loss is
reasonably estimable. Management determines the likelihood of an unfavorable outcome based on many factors such as, among others, the nature of the matter,
available defenses and case strategy, progress of the matter, views and opinions of legal counsel and other advisors, applicability and success of appeals processes, and
the outcome of similar historical matters. Once an unfavorable outcome is deemed probable, management weighs the probability of estimated losses, and the most
reasonable loss estimate is recorded. If an unfavorable outcome of a matter is deemed to be reasonably possible, then the matter is disclosed, and no liability is recorded.
With respect to unasserted claims or assessments, management must first determine that the probability that an assertion will be made is likely, then, a determination as
to the likelihood of an unfavorable outcome and the ability to reasonably estimate the potential loss is made. Legal matters are reviewed on a continuous basis to
determine if there has been a change in management’s judgment regarding the likelihood of an unfavorable outcome or the estimate of a potential loss. Refer to Part II
Item 8 of this Form 10-K in Note B to the Consolidated Financial Statements for more information regarding management’s litigation matters policy.
62
-- 64 of 363 --
Pension and Other Postretirement Benefits. Liabilities and expenses for pension and other postretirement benefits are determined using actuarial methodologies and
incorporate significant assumptions, including the interest rate used to discount the future estimated liability, the expected long-term rate of return on plan assets, and
several assumptions relating to the employee workforce (salary increases, health care cost trend rates, retirement age, and mortality).
The yield curve model used to develop the discount rate parallels the plans’ projected cash flows and has a weighted average duration of 11 years. The underlying cash
flows of the high-quality corporate bonds included in the model exceed the cash flows needed to satisfy the Company’s plan obligations multiple times. If a deep market
of high-quality corporate bonds does not exist in a country, then the yield on government bonds plus a corporate bond yield spread is used. The impact on the combined
pension and other postretirement liabilities of a change in the weighted average discount rate of ¼ of 1% would be approximately $75 and either a charge or credit of
approximately $1 to pretax earnings in the following year.
The expected long-term rate of return on plan assets is generally applied to a five-year market-related value of plan assets (a four-year average or the fair value at the
plan measurement date is used for certain non-U.S. plans). The process used by management to develop this assumption is one that relies on forward-looking
investment returns by asset class. Management incorporates expected future investment returns on current and planned asset allocations using information from various
external investment managers and consultants, as well as management’s own judgment. A change in the assumption for the weighted average expected long-term rate of
return on plan assets of ¼ of 1% would impact pretax earnings by approximately $7 for 2023.
Mortality rate assumptions are based on mortality tables and future improvement scales published by third parties, such as the Society of Actuaries, and consider other
available information including historical data as well as studies and publications from reputable sources.
Refer to Part II Item 8 of this Form 10-K in Note O to the Consolidated Financial Statements for more information regarding pension and other postretirement benefits
including accounting impacts of current year actions.
Derivatives and Hedging. To calculate the fair value of certain derivatives, management uses discounted cash flow (DCF) and other simulation models that consider
the following inputs and assumptions: quoted market prices (e.g., aluminum prices on the 10-year London Metal Exchange (LME) forward curve and energy prices),
information concerning time premiums and volatilities for certain option type embedded derivatives and regional premiums for aluminum contracts, aluminum and
energy prices beyond those quoted in the market, and the estimated credit spread between Alcoa and the counterparty. The quoted market prices used in the valuation
models are dependent on market fundamentals, the relationship between supply and demand at any point in time, seasonal conditions, inventories, and interest rates. For
periods beyond the term of quoted market prices, management estimates the price of aluminum by extrapolating the 10-year LME forward curve and estimates the
Midwest premium based on recent transactions.
Changes in estimates can have a material impact on the derivative valuations. Refer to Part II Item 8 of this Form 10-K in Note P to the Consolidated Financial
Statements for more information regarding derivatives and hedging and related activity during the period.
Income Taxes. Valuation allowances are recorded to reduce deferred tax assets when it is more likely than not (greater than 50%) that a tax benefit will not be realized.
In evaluating the need for a valuation allowance, management applies judgment in assessing all available positive and negative evidence and considers all potential
sources of taxable income, including income available in carryback periods, future reversals of taxable temporary differences, projections of taxable income, and
income from tax planning strategies. Positive evidence includes factors such as a history of profitable operations, projections of future profitability within the
carryforward period, including from tax planning strategies, and Alcoa Corporation’s experience with similar operations. Existing favorable contracts and the ability to
sell products into established markets are additional positive evidence. Negative evidence includes items such as cumulative losses, projections of future losses, or
carryforward periods that are not long enough to allow for the utilization of a deferred tax asset based on existing projections of income. In certain jurisdictions,
deferred tax assets related to cumulative losses may exist without a valuation allowance where in management’s judgment the weight of the positive evidence more than
offsets the negative evidence of the cumulative losses. Upon changes in facts and circumstances, management may conclude that deferred tax assets for which no
valuation allowance is currently recorded may not be realized, resulting in a future charge to establish a valuation allowance. Financial information utilized in this
analysis leverages the same financial information, including related inputs and assumptions, that management uses for planning and strategic review of the entire
business.
Tax benefits related to uncertain tax positions taken or expected to be taken on a tax return are recorded when such benefits meet a more likely than not threshold.
Otherwise, these tax benefits are recorded when a tax position has been effectively settled, which means that the statute of limitations has expired, or the appropriate
taxing authority has completed their examination even though the statute of limitations remains open.
Changes in estimates can have a material impact on the deferred taxes and uncertain tax positions. Refer to Part II Item 8 of this Form 10-K in Note Q to the
Consolidated Financial Statements for more information regarding income taxes and deferred tax assets and related activity during the period.
63
-- 65 of 363 --
Related Party Transactions
Alcoa Corporation buys products from and sells products to various related companies, consisting of entities in which Alcoa Corporation retains a 50% or less equity
interest, at negotiated prices between the two parties. These transactions were not material to the financial position or results of operations of Alcoa Corporation for all
periods presented.
Recently Adopted Accounting Guidance
See Part II Item 8 of this Form 10-K in Note B to the Consolidated Financial Statements under caption Recently Adopted Accounting Guidance.
Recently Issued Accounting Guidance
See Part II Item 8 of this Form 10-K in Note B to the Consolidated Financial Statements under caption Recently Issued Accounting Guidance.
Item 7A. Quantitative and Qualitative Disclosures About Market Risk.
See Part II Item 8 of this Form 10-K in Note P to the Consolidated Financial Statements under caption Derivatives.
64
-- 66 of 363 --
Item 8. Financial Statements and Supplementary Data.
Management’s Reports to Alcoa Corporation Stockholders
Management’s Report on Financial Statements and Practices
The accompanying Consolidated Financial Statements of Alcoa Corporation and its subsidiaries (the Company) were prepared by management, which is responsible for
their integrity and objectivity, in accordance with accounting principles generally accepted in the United States of America (GAAP) and include amounts that are based
on management’s best judgments and estimates. The other financial information included in the Company’s Annual Report on Form 10-K for the year ended December
31, 2022 is consistent with that in the Consolidated Financial Statements.
Management recognizes its responsibility for conducting the Company’s affairs according to the highest standards of personal and corporate conduct. This responsibility
is characterized and reflected in key policy statements issued from time to time regarding, among other things, conduct of its business activities within the laws of the
host countries in which the Company operates and potentially conflicting outside business interests of its employees. The Company maintains a systematic program to
assess compliance with these policies.
Management’s Report on Internal Control over Financial Reporting
Management is responsible for establishing and maintaining adequate internal control over financial reporting, as defined in Rules 13a-15(f) and 15d-15(f) of the U.S.
Securities Exchange Act of 1934 (as amended), for the Company. The Company’s internal control over financial reporting is a process designed to provide reasonable
assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with GAAP. The Company’s
internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and
fairly reflect the transactions and dispositions of the assets of the Company, (ii) provide reasonable assurance that transactions are recorded as necessary to permit
preparation of financial statements in accordance with GAAP, and that receipts and expenditures of the Company are being made only in accordance with authorizations
of management and directors of the Company, and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or
disposition of the Company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness
to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or
procedures may deteriorate.
Management conducted an assessment to evaluate the effectiveness of the Company’s internal control over financial reporting as of December 31, 2022 using the
criteria in Internal Control—Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this
assessment, management concluded that the Company maintained effective internal control over financial reporting as of December 31, 2022.
PricewaterhouseCoopers LLP, the independent registered public accounting firm that audited the Company’s financial statements included in this Annual Report on
Form 10-K for the year ended December 31, 2022, has audited the Company’s internal control over financial reporting as of December 31, 2022 and has issued an
attestation report, which is included herein.
/s/ Roy C. Harvey
Roy C. Harvey
President and
Chief Executive Officer
/s/ Molly S. Beerman
Molly S. Beerman
Executive Vice President and
Chief Financial Officer
February 23, 2023
65
-- 67 of 363 --
Report of Independent Registered Public Accounting Firm
To the Board of Directors and Shareholders of Alcoa Corporation
Opinions on the Financial Statements and Internal Control over Financial Reporting
We have audited the accompanying consolidated balance sheets of Alcoa Corporation and its subsidiaries (the “Company”) as of December 31, 2022 and 2021, and the
related consolidated statements of operations, comprehensive income, changes in equity and cash flows for each of the three years in the period ended December 31,
2022, including the related notes (collectively referred to as the “consolidated financial statements”). We also have audited the Company’s internal control over financial
reporting as of December 31, 2022, based on criteria established in Internal Control—Integrated Framework (2013) issued by the Committee of Sponsoring
Organizations of the Treadway Commission (COSO).
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of December 31,
2022 and 2021, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2022 in conformity with accounting
principles generally accepted in the United States of America. Also in our opinion, the Company maintained, in all material respects, effective internal control over
financial reporting as of December 31, 2022, based on criteria established in Internal Control—Integrated Framework (2013) issued by the COSO.
Basis for Opinions
The Company’s management is responsible for these consolidated financial statements, for maintaining effective internal control over financial reporting, and for its
assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Report on Internal Control over Financial
Reporting. Our responsibility is to express opinions on the Company’s consolidated financial statements and on the Company’s internal control over financial reporting
based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be
independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange
Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audits to obtain reasonable assurance
about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud, and whether effective internal control over financial
reporting was maintained in all material respects.
Our audits of the consolidated financial statements included performing procedures to assess the risks of material misstatement of the consolidated financial statements,
whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the
amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by
management, as well as evaluating the overall presentation of the consolidated financial statements. Our audit of internal control over financial reporting included
obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and testing and evaluating the design and
operating effectiveness of internal control based on the assessed risk. Our audits also included performing such other procedures as we considered necessary in the
circumstances. We believe that our audits provide a reasonable basis for our opinions.
Definition and Limitations of Internal Control over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the
preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial
reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and
dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in
accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of
management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or
disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness
to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or
procedures may deteriorate.
66
-- 68 of 363 --
Critical Audit Matters
The critical audit matter communicated below is a matter arising from the current period audit of the consolidated financial statements that was communicated or
required to be communicated to the audit committee and that (i) relates to accounts or disclosures that are material to the consolidated financial statements and (ii)
involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the
consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit
matter or on the accounts or disclosures to which it relates.
U.S. Pension Annuitizations
As described in Notes B and O to the consolidated financial statements, the Company had a projected benefit obligation related to its defined pension plans of $2,518
million as of December 31, 2022, including $1,113 million of benefit obligations in the U.S. In the third quarter of 2022, the Company purchased group annuity
contracts to transfer the obligation to pay remaining retirement benefits of certain retirees and beneficiaries from its U.S. defined benefit pension plans and transferred
approximately $1,000 million in both benefit obligations and plan assets. As a result, the Company remeasured its U.S. defined benefit pension plans and recognized a
$617 million settlement loss. As disclosed by management, the remeasurement of its U.S. defined benefit pension plans was performed using actuarial methodologies
and incorporated significant assumptions, including the discount rate, expected long-term rate of return on plan assets, and several assumptions relating to the employee
workforce (salary increases, retirement age, and mortality rate).
The principal considerations for our determination that performing procedures relating to the U.S. pension annuitizations is a critical audit matter are (i) the significant
judgment by management in determining the valuation of the U.S. pension annuitizations, as well as their consideration of the accounting for the non-recurring nature of
the U.S. pension annuitizations; (ii) a high degree of auditor judgment, subjectivity, and effort in performing procedures and evaluating audit evidence relating to the
accounting for the U.S. pension annuitizations, participants transferred, and significant assumptions related to the discount rate, expected long-term rate of return on
plan assets, and mortality rate used in determining the valuation of the U.S. pension annuitizations; and (iii) the audit effort involved the use of professionals with
specialized skill and knowledge.
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial
statements. These procedures included testing the effectiveness of controls relating to management’s accounting for and valuation of the U.S. pension annuitizations,
including controls over management’s methodology and significant assumptions. These procedures also included, among others, (i) testing management’s process for
determining the valuation of the U.S. pension annuitizations; (ii) testing the participants transferred, the settlement loss recognized, and the completeness and accuracy
of the underlying data used in the valuation of the U.S. pension annuitizations; and (iii) the involvement of professionals with specialized skill and knowledge to assist
in (a) evaluating the appropriateness of the actuarial methodology used by management; and (b) evaluating the reasonableness of the discount rate, expected long-term
rate of return on plan assets, and mortality rate assumptions.
/s/ PricewaterhouseCoopers LLP
Pittsburgh, Pennsylvania
February 23, 2023
We have served as the Company’s auditor since 2015.
67
-- 69 of 363 --
Alcoa Corporation and Subsidiaries
Statement of Consolidated Operations
(in millions, except per-share amounts)
For the year ended December 31, 2022 2021 2020
Sales (E) $ 12,451 $ 12,152 $ 9,286
Cost of goods sold (exclusive of expenses below) 10,212 9,153 7,969
Selling, general administrative, and other expenses 204 227 206
Research and development expenses 32 31 27
Provision for depreciation, depletion, and amortization 617 664 653
Restructuring and other charges, net (D) 696 1,128 104
Interest expense (U) 106 195 146
Other (income) expenses, net (U) (118) (445) 8
Total costs and expenses 11,749 10,953 9,113
Income before income taxes 702 1,199 173
Provision for income taxes (Q) 664 629 187
Net income (loss) 38 570 (14)
Less: Net income attributable to noncontrolling interest 161 141 156
Net (loss) income attributable to Alcoa Corporation (123) 429 (170)
Earnings per share attributable to Alcoa Corporation common
shareholders (F):
Basic $ (0.68) $ 2.30 $ (0.91)
Diluted $ (0.68) $ 2.26 $ (0.91)
The accompanying notes are an integral part of the consolidated financial statements.
68
-- 70 of 363 --
Alcoa Corporation and Subsidiaries
Statement of Consolidated Comprehensive Income
(in millions)
Alcoa Corporation
Noncontrolling
interest Total
For the year ended December 31, 2022 2021 2020 2022 2021 2020 2022 2021 2020
Net (loss) income $ (123) $ 429 $ (170) $ 161 $ 141 $ 156 $ 38 $ 570 $ (14)
Other comprehensive income
(loss), net of tax (G):
Change in unrecognized net
actuarial loss and prior
service cost/benefit
related to pension and other
postretirement benefits 944 1,654 (254) 8 54 (11) 952 1,708 (265)
Foreign currency translation
adjustments (71) (229) (225) (103) (93) (10) (174) (322) (235)
Net change in unrecognized
gains/losses on cash flow
hedges 180 (388) (176) 2 — (21) 182 (388) (197)
Total Other comprehensive
income (loss), net of tax 1,053 1,037 (655) (93) (39) (42) 960 998 (697)
Comprehensive income (loss) $ 930 $ 1,466 $ (825) $ 68 $ 102 $ 114 $ 998 $ 1,568 $ (711)
The accompanying notes are an integral part of the consolidated financial statements.
69
-- 71 of 363 --
Alcoa Corporation and Subsidiaries
Consolidated Balance Sheet
(in millions)
December 31, 2022 2021
Assets
Current assets:
Cash and cash equivalents (P) $ 1,363 $ 1,814
Receivables from customers 778 757
Other receivables 131 127
Inventories (J) 2,427 1,956
Fair value of derivative instruments (P) 134 14
Prepaid expenses and other current assets 417 358
Total current assets 5,250 5,026
Properties, plants, and equipment, net (K) 6,493 6,623
Investments (H) 1,122 1,199
Deferred income taxes (Q) 296 506
Fair value of derivative instruments (P) 2 7
Other noncurrent assets (U) 1,593 1,664
Total Assets $ 14,756 $ 15,025
Liabilities
Current liabilities:
Accounts payable, trade $ 1,757 $ 1,674
Accrued compensation and retirement costs 335 383
Taxes, including income taxes 230 374
Fair value of derivative instruments (P) 200 274
Other current liabilities 481 517
Long-term debt due within one year (M & P) 1 1
Total current liabilities 3,004 3,223
Long-term debt, less amount due within one year (M & P) 1,806 1,726
Accrued pension benefits (O) 213 417
Accrued other postretirement benefits (O) 480 650
Asset retirement obligations (R) 711 622
Environmental remediation (S) 226 265
Fair value of derivative instruments (P) 1,026 1,048
Noncurrent income taxes (Q) 215 191
Other noncurrent liabilities and deferred credits (U) 486 599
Total liabilities 8,167 8,741
Contingencies and commitments (S)
Equity
Alcoa Corporation shareholders’ equity:
Common stock (N) 2 2
Additional capital 9,183 9,577
Accumulated deficit (570) (315)
Accumulated other comprehensive loss (G) (3,539) (4,592)
Total Alcoa Corporation shareholders’ equity 5,076 4,672
Noncontrolling interest (A) 1,513 1,612
Total equity 6,589 6,284
Total Liabilities and Equity $ 14,756 $ 15,025
The accompanying notes are an integral part of the consolidated financial statements.
70
-- 72 of 363 --
Alcoa Corporation and Subsidiaries
Statement of Consolidated Cash Flows
(in millions)
For the year ended December 31, 2022 2021 2020
Cash from Operations
Net income (loss) $ 38 $ 570 $ (14)
Adjustments to reconcile net income (loss) to cash from operations:
Depreciation, depletion, and amortization 617 664 653
Deferred income taxes (Q) 219 147 (26)
Equity loss (earnings), net of dividends (H) 4 (138) 20
Restructuring and other charges, net (D) 696 1,128 104
Net loss (gain) from investing activities—asset sales (U) 10 (354) (173)
Net periodic pension benefit cost (O) 54 47 138
Stock-based compensation (N) 40 39 25
Premium paid on early redemption of debt — 43 —
(Gain) loss on mark-to-market derivative financial contracts (44) (24) 5
Other 53 49 29
Changes in assets and liabilities, excluding effects of divestitures and
foreign currency translation adjustments:
(Increase) decrease in receivables (59) (414) 16
(Increase) decrease in inventories (J) (547) (639) 122
Decrease (increase) in prepaid expenses and other current assets 44 (41) 17
Increase in accounts payable, trade 189 354 25
Decrease in accrued expenses (173) (38) (153)
(Decrease) increase in taxes, including income taxes (152) 301 119
Pension contributions (O) (17) (579) (343)
Increase in noncurrent assets (87) (160) (82)
Decrease in noncurrent liabilities (63) (35) (88)
Cash provided from operations 822 920 394
Financing Activities
Additions to debt (original maturities greater than three months) (M) 4 495 739
Payments on debt (original maturities greater than three months) (M) (1) (1,294) (1)
Proceeds from the exercise of employee stock options (N) 22 25 1
Repurchase of common stock (N) (500) (150) —
Dividends paid on Alcoa common stock (N) (72) (19) —
Payments related to tax withholding on stock-based compensation awards (19) (1) (1)
Financial contributions for the divestiture of businesses (C) (33) (17) (38)
Contributions from noncontrolling interest (A) 214 21 24
Distributions to noncontrolling interest (379) (215) (207)
Other (4) (3) (3)
Cash (used for) provided from financing activities (768) (1,158) 514
Investing Activities
Capital expenditures (480) (390) (353)
Proceeds from the sale of assets and businesses (C) 5 966 198
Additions to investments (H) (32) (11) (12)
Sale of investments (H) 10 — —
Other 2 — —
Cash (used for) provided from investing activities (495) 565 (167)
Effect of exchange rate changes on cash and cash
equivalents and restricted cash (9) (13) (14)
Net change in cash and cash equivalents and restricted cash (450) 314 727
Cash and cash equivalents and restricted cash at beginning of year 1,924 1,610 883
Cash and cash equivalents and restricted cash at end of
year $ 1,474 $ 1,924 $ 1,610
The accompanying notes are an integral part of the consolidated financial statements.
71
-- 73 of 363 --
Alcoa Corporation and Subsidiaries
Statement of Changes in Consolidated Equity
(in millions)
Alcoa Corporation shareholders
Common
stock
Additional
capital
Retained
(deficit)
earnings
Accumulated
other
comprehensive (loss)
income
Noncontrolling
interest
Total
equity
Balance at December 31, 2019 $ 2 $ 9,639 $ (555) $ (4,974) $ 1,774 $ 5,886
Net (loss) income — — (170) — 156 (14)
Other comprehensive loss (G) — — — (655) (42) (697)
Stock-based compensation (N) — 25 — — — 25
Common stock issued:
Compensation plans (N) — 1 — — — 1
Contributions — — — — 24 24
Distributions — — — — (207) (207)
Other — (2) — — — (2)
Balance at December 31, 2020 2 9,663 (725) (5,629) 1,705 5,016
Net income — — 429 — 141 570
Other comprehensive income (loss) (G) — — — 1,037 (39) 998
Stock-based compensation (N) — 39 — — — 39
Common stock issued:
Compensation plans (N) — 25 — — — 25
Repurchase of common
stock (N) — (150) — — — (150)
Dividends paid on Alcoa
common stock ($0.10 per share) (N) — — (19) — — (19)
Contributions — — — — 21 21
Distributions — — — — (215) (215)
Other — — — — (1) (1)
Balance at December 31, 2021 2 9,577 (315) (4,592) 1,612 6,284
Net (loss) income — — (123) — 161 38
Other comprehensive income (loss) (G) — — — 1,053 (93) 960
Stock-based compensation (N) — 40 — — — 40
Common stock issued:
Compensation plans (N) — 3 — — — 3
Repurchase of common
stock (N) — (440) (60) — — (500)
Dividends paid on Alcoa
common stock ($0.10 per share) (N) — — (72) — — (72)
Contributions — — — — 214 214
Distributions — — — — (379) (379)
Other — 3 — — (2) 1
Balance at December 31, 2022 $ 2 $ 9,183 $ (570) $ (3,539) $ 1,513 $ 6,589
The accompanying notes are an integral part of the consolidated financial statements.
72
-- 74 of 363 --
Alcoa Corporation and subsidiaries
Notes to the Consolidated Financial Statements
(dollars in millions, except per-share amounts; metric tons in thousands (kmt))
A. Basis of Presentation
Alcoa Corporation (or the Company) is a vertically integrated aluminum company comprised of bauxite mining, alumina refining, aluminum production (smelting and
casting), and energy generation. Through direct and indirect ownership, the Company has 27 operating locations in nine countries around the world, situated primarily
in Australia, Brazil, Canada, Iceland, Norway, Spain, and the United States.
Alcoa Corporation became an independent, publicly traded company on November 1, 2016, following its separation (the Separation Transaction) from its former parent
company, Alcoa Inc. References herein to “ParentCo” refer to Alcoa Inc. and its consolidated subsidiaries through October 31, 2016, at which time it was renamed
Arconic Inc. (Arconic) and since has been subsequently renamed Howmet Aerospace Inc.
Basis of Presentation. The Consolidated Financial Statements of Alcoa Corporation are prepared in conformity with accounting principles generally accepted in the
United States of America (GAAP). In accordance with GAAP, certain situations require management to make estimates based on judgments and assumptions, which
may affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements. They also may
affect the reported amounts of revenues and expenses during the reporting periods. Management uses historical experience and all available information to make these
estimates. Management regularly evaluates the judgments and assumptions used in its estimates, and results could differ from those estimates upon future events and
their effects or new information. Certain amounts in previously issued financial statements were reclassified to conform to the current period presentation.
Principles of Consolidation. The Consolidated Financial Statements of the Company include the accounts of Alcoa Corporation and companies in which Alcoa
Corporation has a controlling interest, including those that comprise the Alcoa World Alumina & Chemicals (AWAC) joint venture (see below). Intercompany
transactions have been eliminated. The equity method of accounting is used for investments in affiliates and other joint ventures over which the Company has
significant influence but does not have effective control. Investments in affiliates in which Alcoa Corporation cannot exercise significant influence are accounted at cost
less any impairment, a measurement alternative in accordance with GAAP.
AWAC is an unincorporated global joint venture between Alcoa Corporation and Alumina Limited and consists of several affiliated operating entities, which own, have
an interest in, or operate the bauxite mines and alumina refineries within the Company’s Bauxite and Alumina segments (except for the Poços de Caldas mine and
refinery, portions of the São Luís refinery and investment in Mineração Rio do Norte S.A. (MRN) until its sale in April 2022, all in Brazil) and a portion (55%) of the
Portland smelter (Australia) within the Company’s Aluminum segment. Alcoa Corporation owns 60% and Alumina Limited owns 40% of these individual entities,
which are consolidated by the Company for financial reporting purposes and include Alcoa of Australia Limited (AofA), Alcoa World Alumina LLC (AWA), Alcoa
World Alumina Brasil Ltda. (AWAB), and Alúmina Española, S.A. (Española). Alumina Limited’s interest in the equity of such entities is reflected as Noncontrolling
interest on the accompanying Consolidated Balance Sheet.
Management evaluates whether an Alcoa Corporation entity or interest is a variable interest entity and whether the Company is the primary beneficiary. Consolidation is
required if both of these criteria are met. Alcoa Corporation does not have any variable interest entities requiring consolidation.
Related Party Transactions. Alcoa Corporation buys products from and sells products to various related companies, consisting of entities in which the Company
retains a 50% or less equity interest, at negotiated prices between the two parties. These transactions were not material to the financial position or results of operations
of Alcoa Corporation for all periods presented.
B. Summary of Significant Accounting Policies
Cash Equivalents. Cash equivalents are highly liquid investments purchased with an original maturity of three months or less.
Restricted Cash. Restricted cash is included with Cash and cash equivalents when reconciling the Cash and cash equivalents and restricted cash at beginning of year
and Cash and cash equivalents and restricted cash at end of year on the accompanying Statement of Consolidated Cash Flows. Current restricted cash amounts are
reported in Prepaid expenses and other current assets on the accompanying Consolidated Balance Sheet. Noncurrent restricted cash amounts are reported in Other
noncurrent assets on the accompanying Consolidated Balance Sheet (see Note U for a reconciliation of Cash and cash equivalents and restricted cash).
Inventory Valuation. Inventories are carried at the lower of cost or net realizable value, with the cost of inventories principally determined under the average cost
method.
73
-- 75 of 363 --
Properties, Plants, and Equipment. Properties, plants, and equipment are recorded at cost. Interest related to the construction of qualifying assets is capitalized as part
of the construction costs. Depreciation is recorded principally on the straight-line method over the estimated useful lives of the assets. Depreciation is recorded on
temporarily idled facilities until such time management approves a permanent closure. The following table details the weighted average useful lives of structures and
machinery and equipment by type of operation (numbers in years):
Structures
Machinery
and
equipment
Bauxite mining 33 17
Alumina refining 29 29
Aluminum smelting and casting 37 22
Energy generation 33 24
Repairs and maintenance are charged to expense as incurred while costs for significant improvements that add productive capacity or that extend the useful life are
capitalized. Gains or losses from the sale of assets are generally recorded in Other (income) expenses, net.
Properties, plants, and equipment are reviewed for impairment whenever events or changes in circumstances indicate that the carrying amount of such assets (asset
group) may not be recoverable. Recoverability of assets is determined by comparing the estimated undiscounted net cash flows of the operations related to the assets
(asset group) to their carrying amount. An impairment loss would be recognized when the carrying amount of the assets (asset group) exceeds the fair value. The
amount of the impairment loss to be recorded is calculated as the excess of the carrying value of the assets (asset group) over their fair value, with fair value determined
using the best information available, which generally is a discounted cash flow (DCF) model. The determination of what constitutes an asset group, the associated
estimated undiscounted net cash flows, and the estimated useful lives of assets also require significant judgments.
Leases. The Company determines whether an arrangement is a lease at the inception of the arrangement based on the terms and conditions in the contract. A contract
contains a lease if there is an identified asset which the Company has the right to control. Lease right-of-use (ROU) assets are included in Properties, plants, and
equipment with the corresponding operating lease liabilities included within Other current liabilities and Other noncurrent liabilities and deferred credits.
Operating lease ROU assets and liabilities are recognized at the lease commencement date based on the present value of lease payments over the lease term. The
Company uses its incremental borrowing rate at the commencement date in determining the present value of lease payments unless a rate is implicit in the lease. Lease
terms include options to extend the lease when it is reasonably certain that those options will be exercised. Leases with an initial term of 12 months or less, including
anticipated renewals, are not recorded on the Consolidated Balance Sheet.
The Company made a policy election not to record any non-lease components of a lease agreement in the lease liability. Variable lease payments are not presented as
part of the ROU asset or liability recorded at the inception of a contract. Lease expense for operating lease payments is recognized on a straight-line basis over the lease
term.
Equity Investments. Alcoa invests in a number of privately-held companies, primarily through joint ventures and consortia, which are accounted for using the equity
method. The equity method is applied in situations where the Company has the ability to exercise significant influence, but not control, over the investee. Management
reviews equity investments for impairment whenever certain indicators are present suggesting that the carrying value of an investment is not recoverable.
Deferred Mining Costs. Alcoa incurs deferred mining costs during the development stage of a mine life cycle. Such costs include the construction of access and haul
roads, detailed drilling and geological analysis to further define the grade and quality of the known bauxite, and overburden removal costs. These costs relate to sections
of the related mines where the Company is currently extracting bauxite or preparing for production in the near term. These sections are outlined and planned
incrementally and generally are mined over periods ranging from one to five years, depending on specific mine plans. The amount of geological drilling and testing
necessary to determine the economic viability of the bauxite deposit being mined is such that the reserves are considered to be proven. Deferred mining costs are
amortized on a units-of-production basis and included in Other noncurrent assets on the accompanying Consolidated Balance Sheet.
Goodwill and Other Intangible Assets. Goodwill is not amortized but is reviewed for impairment annually (in the fourth quarter) or more frequently if indicators of
impairment exist or if a decision is made to sell or exit a business.
Goodwill is allocated among and evaluated for impairment at the reporting unit level, which is defined as an operating segment or one level below an operating
segment. The Company has four reporting units, of which two are included in the Aluminum segment (smelting/casting and energy generation). The remaining two
reporting units are the Bauxite and Alumina segments. Of these four reporting units, only Bauxite and Alumina contain goodwill (see Note L).
74
-- 76 of 363 --
Goodwill is tested for impairment by assessing qualitative factors to determine whether it is more likely than not (greater than 50%) that the fair value of the reporting
unit is less than its carrying amount or performing a quantitative assessment using a discounted cash flow model. If the qualitative assessment indicates a possible
impairment, then a quantitative impairment test is performed to determine the fair value of the reporting unit using a discounted cash flow method. Otherwise, no
further analysis is required.
Under the quantitative assessment, the evaluation of impairment involves comparing the current fair value of each reporting unit to its carrying value, including
goodwill. In the event the estimated fair value of a reporting unit is less than the carrying value, an impairment loss equal to the excess of the reporting unit’s carrying
value over its fair value not to exceed the total amount of goodwill applicable to that reporting unit would be recognized.
Alcoa’s policy for its annual review of goodwill is to perform the quantitative impairment test for each of its two reporting units that contain goodwill at least once
during every three-year period.
Intangible assets with finite useful lives are amortized generally on a straight-line basis over the periods benefited. The following table details the weighted average
useful lives of software and other intangible assets by type of operation (numbers in years):
Software
Other intangible
assets
Bauxite mining 3 —
Alumina refining 7 25
Aluminum smelting and casting 3 40
Energy generation 3 29
Asset Retirement Obligations. Alcoa recognizes asset retirement obligations (AROs) related to legal obligations associated with the standard operation of bauxite
mines, alumina refineries, and aluminum smelters. These AROs consist primarily of costs associated with mine reclamation, closure of bauxite residue areas, spent pot
lining and regulated waste materials disposal, and landfill closure. Additionally, costs are recorded as AROs upon management’s decision to permanently close and
demolish certain structures and for any significant lease restoration obligations. The fair values of these AROs are recorded on a discounted basis at the time the
obligation is incurred and accreted over time for the change in present value; related accretion is recorded as a component of Cost of goods sold. Additionally, the
Company capitalizes asset retirement costs by increasing the carrying amount of the related long-lived assets and depreciating these assets over their remaining useful
life. Certain conditional asset retirement obligations related to alumina refineries, aluminum smelters, and energy generation facilities have not been recorded in the
Consolidated Financial Statements due to uncertainties surrounding the ultimate settlement date. The fair value of these asset retirement obligations will be recorded
when a reasonable estimate of the ultimate settlement date can be made. Subsequent adjustments to estimates of previously established AROs for current operations are
capitalized by increasing the carrying amount of the related long-lived assets and depreciating these assets over their remaining useful life. Adjustments to estimates of
AROs for closed locations are charged to Restructuring and other charges, net on the accompanying Statement of Consolidated Operations (see Note R).
Environmental Matters. Environmental related expenditures for current operations are expensed as a component of Cost of goods sold or capitalized, as appropriate.
Expenditures relating to existing conditions caused by past operations, generally for closed locations which will not contribute to future revenues, are charged to
Restructuring and other charges, net. Liabilities are recorded when remediation costs are probable and can be reasonably estimated. In instances where the Company has
ongoing monitoring and maintenance responsibilities, it is Alcoa’s policy to maintain a reserve equal to five years of expected costs. The liability is continuously
reviewed and adjusted to reflect current remediation progress, rate and pricing changes, actual volumes of material requiring management, changes to the original
assumptions regarding how the site was to be remediated, and other factors that may be relevant, including changes in technology or regulations. The estimates may
also include costs related to other potentially responsible parties to the extent that Alcoa has reason to believe such parties will not fully pay their proportionate share.
Litigation Matters. For asserted claims and assessments, liabilities are recorded when an unfavorable outcome of a matter is deemed to be probable and the loss is
reasonably estimable. With respect to unasserted claims or assessments, liabilities are recorded when the probability that an assertion will be made is likely, an
unfavorable outcome of the matter is deemed to be probable, and the loss is reasonably estimable. Legal matters are reviewed on a continuous basis to determine if there
has been a change in management’s judgment regarding the likelihood of an unfavorable outcome or the estimate of a potential loss. Legal costs, which are primarily for
general litigation, environmental compliance, tax disputes, and general corporate matters, are expensed as incurred.
Revenue Recognition. The Company recognizes revenue when it satisfies a performance obligation(s) in accordance with the provisions of a customer order or
contract. This is achieved when control of the product has been transferred to the customer, which is generally determined when title, ownership, and risk of loss pass to
the customer, all of which occurs upon shipment or delivery of the product. The shipping terms vary across all businesses and depend on the product, the country of
origin, and the type of transportation. Accordingly, the sale of Alcoa’s products to its customers represent single performance obligations for which revenue is
recognized at a point in time, except for the Company’s Energy product division in which the customer simultaneously receives and consumes electricity (see Note E).
Revenue is based on the consideration the Company expects to receive in exchange for its products. Returns and other adjustments have not been material. Based on the
foregoing, no significant judgment is required to determine when control of a product has been transferred to a customer.
75
-- 77 of 363 --
The Company considers shipping and handling activities as costs to fulfill the promise to transfer the related products. As a result, customer payments of shipping and
handling costs are recorded as a component of revenue. Taxes collected (e.g., sales, use, value added, excise) from its customers related to the sale of its products are
remitted to governmental authorities and excluded from Sales.
Cost of goods sold. The Company includes the following in Cost of goods sold: operating costs of our three segments, excluding depreciation, depletion, and
amortization, but including all production related costs: raw materials consumed; purchases of metal for consumption or trade; conversion costs, such as labor,
materials, and utilities; equity earnings of certain investments integral to the Company’s supply chain; and plant administrative expenses. Also included in Cost of goods
sold are: costs related to the Transformation function, which focuses on the management of expenses and obligations of previously closed operations; pension and other
postretirement benefit service cost for employees maintaining closed locations; and other costs not included in the operating costs of the segments.
Selling, general administrative, and other expenses. The Company includes the costs of corporate-wide functional support in Selling, general administrative, and
other expenses. Such costs include: executive; sales; marketing; strategy; operations administration; finance; information technology; legal; human resources; and
government affairs and communications.
Stock-Based Compensation. Compensation expense for employee equity grants is recognized using the non-substantive vesting period approach, in which the expense
is recognized ratably over the requisite service period based on the grant date fair value. Forfeitures are accounted for as they occur. The fair value of performance stock
units containing a market condition is valued using a Monte Carlo valuation model. There were no stock options granted in 2022 or 2021. In 2020, the fair value of
stock options was estimated on the date of grant using a lattice pricing model. Determining the fair value at the grant date requires judgment, including estimates for the
average risk-free interest rate, dividend yield, volatility, annual forfeiture rate, and exercise behavior. These assumptions may differ significantly between grant dates
because of changes in the actual results of these inputs that occur over time.
Refer to Note N for more information regarding stock-based compensation.
Pension and Other Postretirement Benefits. Alcoa sponsors several defined benefit pension plans and health care postretirement benefit plans. The Company
recognizes on a plan-by-plan basis the net funded status of these pension and postretirement benefit plans as either an asset or a liability on its Consolidated Balance
Sheet. The net funded status represents the difference between the fair value of each plan’s assets and the benefit obligation of the respective plan. The benefit
obligation represents the present value of the estimated future benefits the Company currently expects to pay to plan participants based on past service. Unrecognized
gains and losses related to the plans are deferred in Accumulated other comprehensive loss on the Consolidated Balance Sheet until amortized into net income.
The plan assets and benefit obligations are measured at the end of each year or more frequently, upon the occurrence of certain events such as a significant plan
amendment, settlement, or curtailment. For interim plan remeasurements, it is the Company’s policy to record the related accounting impacts within the same quarter as
the triggering event.
Liabilities and expenses for pension and other postretirement benefits are determined using actuarial methodologies and incorporate significant assumptions, including
the interest rate used to discount the future estimated liability, the expected long-term rate of return on plan assets, and several assumptions relating to the employee
workforce (salary increases, health care cost trend rates, retirement age, and mortality).
The yield curve model used to develop the discount rate parallels the plans’ projected cash flows and has a weighted average duration of 11 years. The underlying cash
flows of the high-quality corporate bonds included in the model exceed the cash flows needed to satisfy the Company’s plan obligations multiple times. If a deep market
of high-quality corporate bonds does not exist in a country, then the yield on government bonds plus a corporate bond yield spread is used.
The expected long-term rate of return on plan assets is generally applied to a five-year market-related value of plan assets (a four-year average or the fair value at the
plan measurement date is used for certain non-U.S. plans). The process used by management to develop this assumption is one that relies on forward-looking
investment returns by asset class. Management incorporates expected future investment returns on current and planned asset allocations using information from various
external investment managers and consultants, as well as management’s own judgment.
Mortality rate assumptions are based on mortality tables and future improvement scales published by third parties, such as the Society of Actuaries, and consider other
available information including historical data as well as studies and publications from reputable sources.
A change in one or a combination of these assumptions, or the effects of actual results differing from assumptions, could have a material impact on Alcoa’s projected
benefit obligation. These changes or differences are recorded in Accumulated other comprehensive loss and are amortized into net income as a component of the net
periodic benefit cost (income) over the average future working lifetime or average remaining life expectancy, as appropriate, of the plan’s participants.
76
-- 78 of 363 --
One-time accounting impacts, such as curtailment and settlement losses (gains), are recognized immediately and are reclassified from Accumulated other
comprehensive loss to Restructuring and other charges, net on the accompanying Statement of Consolidated Operations.
Refer to Note O for more information regarding pension and other postretirement benefits including accounting impacts of current year actions.
Derivatives and Hedging. Derivatives are held for purposes other than trading and are part of a formally documented risk management program.
Alcoa accounts for hedges of firm customer commitments for aluminum as fair value hedges. The fair values of the derivatives and changes in the fair values of the
underlying hedged items are reported as assets and liabilities in the Consolidated Balance Sheet. Changes in the fair values of these derivatives and underlying hedged
items generally offset and are recorded each period in Sales, consistent with the underlying hedged item.
The Company accounts for hedges of foreign currency exposures and certain forecasted transactions as cash flow hedges. The fair values of the derivatives are recorded
as assets and liabilities in the Consolidated Balance Sheet. The changes in the fair values of these derivatives are recorded in Other comprehensive income (loss) and are
reclassified to Sales, Cost of goods sold, or Other (income) expenses, net in the period in which earnings are impacted by the hedged items or in the period that the
transaction no longer qualifies as a cash flow hedge. These contracts cover the same periods as known or expected exposures, generally not exceeding five years.
If no hedging relationship is designated, the derivative is marked to market through Other (income) expenses, net.
Cash flows from derivatives are recognized in the Statement of Consolidated Cash Flows in a manner consistent with the underlying transactions.
Income Taxes. The provision for income taxes is determined using the asset and liability approach of accounting for income taxes. Under this approach, the provision
for income taxes represents income taxes paid or payable (or received or receivable) for the current year plus the change in deferred taxes during the year. Deferred
taxes represent the future tax consequences expected to occur when the reported amounts of assets and liabilities are recovered or paid, result from differences between
the financial and tax bases of Alcoa’s assets and liabilities and are adjusted for changes in tax rates and tax laws when enacted.
Valuation allowances are recorded to reduce deferred tax assets when it is more likely than not (greater than 50%) that a tax benefit will not be realized. In evaluating
the need for a valuation allowance, management applies judgement in assessing all available positive and negative evidence and considers all potential sources of
taxable income. Deferred tax assets for which no valuation allowance is recorded may not be realized upon changes in facts and circumstances, resulting in a future
charge to establish a valuation allowance. Existing valuation allowances are re-examined under the same standards of positive and negative evidence. If it is determined
that it is more likely than not that a deferred tax asset will be realized, the appropriate amount of the valuation allowance, if any, is released. Deferred tax assets and
liabilities are also re-measured to reflect changes in underlying tax rates due to law changes and the granting and lapse of tax holidays.
Tax benefits related to uncertain tax positions taken or expected to be taken on a tax return are recorded when such benefits meet a more likely than not threshold.
Otherwise, these tax benefits are recorded when a tax position has been effectively settled, which means that the statute of limitation has expired or the appropriate
taxing authority has completed their examination even though the statute of limitations remains open. Interest and penalties related to uncertain tax positions are
recognized as part of the provision for income taxes and are accrued in the period that such interest and penalties would be applicable under relevant tax law until such
time that the related tax benefits are recognized.
Foreign Currency. The local currency is the functional currency for Alcoa’s significant operations outside the United States, except for certain operations in Canada
and Iceland, and a holding and trading company in the Netherlands, where the U.S. dollar is used as the functional currency. The determination of the functional
currency for Alcoa’s operations is made based on the appropriate economic and management indicators. Where local currency is the functional currency, assets and
liabilities are translated into U.S. dollars using year-end exchange rates and income and expenses are translated using the average exchange rates for the reporting
period. Unrealized foreign currency translation gains and losses are deferred in Accumulated other comprehensive loss on the Consolidated Balance Sheet.
Recently Adopted Accounting Guidance. In March 2020 and January 2021, the FASB issued ASU No. 2020-04 and ASU No. 2021-01, respectively. Together, the
ASUs provide temporary optional expedients and exceptions to the U.S. GAAP guidance on contract modifications and hedge accounting to ease the financial reporting
burdens related to the expected market transition from the London Interbank Offered Rate (LIBOR) and other interbank offered rates to alternative reference rates. The
Company adopted this guidance in 2022, and there was no material impact on the Company's financial statements.
77
-- 79 of 363 --
Recently Issued Accounting Guidance. In September 2022, the FASB issued ASU 2022-04 which requires a buyer in a supplier finance program to disclose
qualitative and quantitative information about its supplier finance programs, including the key terms of the program, the amount of obligations outstanding at the end of
the reporting period, a description of where those obligations are presented in the balance sheet, and a roll-forward of such amounts during the annual period. The new
guidance is effective for fiscal years beginning after December 15, 2022, including interim periods within those fiscal years, except for roll-forward information, which
is effective for fiscal years beginning after December 15, 2023. Early adoption is permitted. The adoption of this guidance will provide enhanced disclosures regarding
these programs and will not have a material impact on the Company’s financial statements.
C. Divestitures
Rockdale Site
During the fourth quarter of 2021, the Company completed the sale of land and industrial assets at the previously closed Rockdale smelter site in the state of Texas in a
transaction valued at $240. Upon closing of the transaction, the Company received $230 in cash and recorded a net gain of $202 in Other (income) expenses, net (pre-
and after-tax; see Note U) on the Statement of Consolidated Operations.
Eastalco Site
During the second quarter of 2021, the Company completed the sale of land at the previously closed Eastalco smelter site in the state of Maryland in a transaction
valued at $100. Upon closing of the transaction, the Company received $94 in cash and recorded a gain of $90 in Other (income) expenses, net ($90 pre- and $89 after-
tax; see Note U) on the Statement of Consolidated Operations.
Warrick Rolling Mill
In November 2020, Alcoa entered into an agreement to sell its rolling mill located at Warrick Operations (Warrick Rolling Mill), an integrated aluminum manufacturing
site near Evansville, Indiana (Warrick Operations), to Kaiser Aluminum Corporation (Kaiser).
In March 2021, Alcoa completed the sale for total consideration of approximately $670, which included the assumption of $69 in other postretirement benefit liabilities.
The Company recorded a net gain of $30 in Other (income) expenses, net (pre- and after-tax, see Note U) on the Statement of Consolidated Operations. Upon the
closing of the transaction, the Company recorded estimated liabilities for future site separation commitments and remaining transaction costs associated with the sales
agreement. The Company recorded a charge of $8 in 2022 in Other (income) expenses, net related to additional costs of existing site separation commitments. In 2022,
the Company spent $37 against the reserve. The remaining balance of $46 at December 31, 2022 is expected to be spent in 2023.
In connection with the transaction, Alcoa and Kaiser entered into a market-based metal supply agreement. The remaining Warrick Operations results are included within
the Aluminum segment.
Gum Springs Waste Treatment Business
During the first quarter of 2020, the Company sold Elemental Environmental Solutions LLC (EES), a wholly-owned Alcoa subsidiary that operated the waste
processing facility in Gum Springs, Arkansas, to a global environmental firm in a transaction valued at $250. Related to this transaction, the Company received $200 in
cash and recorded a gain of $181 (pre- and after-tax; see Note U). Further, an additional $50 is held in escrow to be paid to Alcoa if certain post-closing conditions are
satisfied, which would result in additional gain being recorded.
D. Restructuring and Other Charges, Net
Restructuring and other charges, net were comprised of the following:
2022 2021 2020
Settlements and/or curtailments related to retirement benefits (O) $ 632 $ 977 $ 58
Severance and employee termination costs 1 1 16
Loss on divestitures 79 — —
Asset impairments 58 75 2
Asset retirement obligations (R) 34 23 2
Environmental remediation (S) 21 15 1
Other (7) 82 36
Reversals of previously recorded charges (122) (45) (11)
Restructuring and other charges, net $ 696 $ 1,128 $ 104
78
-- 80 of 363 --
Severance and employee termination costs were recorded based on approved detailed action plans submitted by the operating locations that specified positions to be
eliminated, benefits to be paid under existing severance plans, union contracts or statutory requirements, and the expected timetable for completion of the plans.
2022 Actions. In 2022 Alcoa Corporation recorded Restructuring and other charges, net, of $696 which were primarily comprised of the following components:
• Non-cash settlement charges related to pension benefits (see Note O):
o $635 related to the purchase of group annuity contracts to transfer approximately $1,000 of pension obligations and assets associated with defined
benefit pension plans for approximately 4,400 United States retirees and beneficiaries, as well as lump sum settlements;
• Charges related to portfolio actions:
o $79 for the agreement reached with the workers of the divested Avilés and La Coruña facilities to settle various legal disputes related to the 2019
divestiture (see Note S);
o $58 for an asset impairment related to the sale of the Company’s interest in MRN (see Note H);
o $29 related to the closure of the previously curtailed magnesium smelter facility in Addy (Washington) (see below);
• Other charges and credits:
o $26 to record additional environmental and asset retirement related reserves at previously closed sites (see Note R and Note S);
o $7 net credit for revaluation of adjustments to take-or-pay contract reserves related to the closed Wenatchee (Washington) and curtailed Intalco
(Washington) smelters;
• Reversals:
o $83 for the release of a valuation allowance on Brazil value added taxes (VAT) (see Note Q); and,
o $34 due to lower costs for demolition and remediation at previously closed sites (see Note S).
In July 2022, Alcoa made the decision to permanently close the previously curtailed magnesium smelter in Addy (Washington). The facility has been fully curtailed
since 2001. The Company recorded a charge of $29 to establish reserves for environmental and demolition obligations in Restructuring and other charges, net on the
Statement of Consolidated Operations in the third quarter of 2022. Associated cash outlays are expected to be paid over the next three to five years.
2021 Actions. In 2021 Alcoa Corporation recorded Restructuring and other charges, net, of $1,128 which were comprised of the following components:
• Non-cash settlement charges related to pension and certain other postretirement benefits (see Note O):
o $858 related to the purchase of group annuity contracts to transfer approximately $1,500 of pension obligations and assets associated with defined
benefit pension plans for approximately 14,000 United States retirees and beneficiaries, as well as lump sum settlements;
o $63 related to the purchase of a group annuity contract to transfer approximately $55 of pension obligations and assets associated with a
Suriname pension plan for approximately 800 retirees and beneficiaries;
o $47 related to lump sum settlements;
o Net $9 related to the settlement and curtailment of certain other postretirement benefits resulting from the sale of the Warrick Rolling Mill;
• Charges related to portfolio actions taken as part of the Company’s ongoing strategic review (see details below):
o $80 related to the closure of the previously curtailed aluminum smelter facility in Wenatchee (Washington);
o $62 related to the agreement reached with the workers at the San Ciprián (Spain) aluminum smelter to curtail smelting capacity;
o $27 related to the closure of the previously curtailed anode facility in Lake Charles (Louisiana);
• Other charges:
o $13 for additional take-or-pay contract costs related to the curtailed Wenatchee (Washington) and Intalco (Washington) smelters;
o $11 to record additional environmental and asset retirement related reserves (see Note R and Note S);
o $3 for several other insignificant items;
• Reversals:
o $6 for a take-or-pay energy-related obligation at the Alumar smelter no longer required due to the announced restart;
o $17 related to the divestiture of the Avilés and La Coruña entities (see below); and,
o $22 due to lower costs for demolition and remediation related to previously established reserves (see Note R and Note S).
79
-- 81 of 363 --
In December 2021, the Company announced the two-year curtailment of 228 kmt of smelting capacity at the San Ciprián (Spain) aluminum smelter. The temporary
curtailment, which began at the end of January 2022, was the result of an agreement reached with the workers at the site to suspend production due to exorbitant energy
prices in Spain. Under the terms of the agreement, the Company is responsible for certain employee and contractual obligations during the curtailment period. As a
result, the Company recorded charges of $62 in the fourth quarter of 2021 in Restructuring and other charges, net on the Statement of Consolidated Operations to
establish the related reserve. In 2022, cash payments of $26 were made to reduce the reserve. Additionally, in connection with the agreement, the Company committed
to restart the smelter beginning in January of 2024 and has restricted cash of $103 to be made available in the future to cover $68 in capital improvements at the site and
$35 in smelter restart costs. Restricted cash is included in Prepaid expenses and other current assets and Other noncurrent assets on the Consolidated Balance Sheet (see
Note U). The San Ciprián smelter continues to incur operating costs for the casthouse as well as resources to maintain and improve the smelter for restart.
During the fourth quarter of 2021, as part of the Company’s ongoing strategic portfolio review, the Company announced the permanent closure of the Wenatchee
(Washington) aluminum smelter. The smelter has been fully curtailed since 2015. Charges related to the closure totaled $90 in the fourth quarter of 2021 and included a
charge of $10 for the write down of remaining inventories to net realizable value recorded in Cost of goods sold on the Statement of Consolidated Operations and a
charge of $80 recorded in Restructuring and other charges, net on the Statement of Consolidated Operations. The restructuring charges were comprised of: $30 to write-
off the remaining net book value of various assets; $23 of asset impairments; $21 to establish reserves related to environmental and demolition obligations; $5 related to
take-or-pay contractual obligations; and $1 of severance and employee termination costs from the separation of approximately 10 employees. Cash outlays related to
demolition and environmental related activities are expected to be spread over approximately 5 years.
During the third quarter of 2021, as part of the Company’s ongoing strategic portfolio review, the Company announced the decision to permanently close the previously
curtailed anode facility in Lake Charles (Louisiana). The anode facility within the Lake Charles site has been fully curtailed since 2015. The Company recorded charges
of $27 in the third quarter of 2021, which were recorded in Restructuring and other charges, net on the Statement of Consolidated Operations, comprised of asset
impairments of $22 and cash-based charges for closure and asset retirement obligations of $5. The closure was completed in September 2022. The decision to
permanently close the facility was made as part of the Company’s on-going portfolio review. The Company’s petroleum coke calciner located at the same site in Lake
Charles remains in operation, unaffected by the closure of the anode facility.
2020 Actions. In 2020, Alcoa Corporation recorded Restructuring and other charges, net, of $104 which were comprised of the following components: $59 related to
settlements and curtailments of certain pension and other postretirement benefits (see Note O); $28 (net) for costs related to the curtailment of the Intalco (Washington)
smelter; $20 for additional contract costs related to the then curtailed Wenatchee (Washington) smelter; and several other insignificant items.
In April 2020, as part of the Company’s portfolio review, Alcoa Corporation announced the curtailment of the remaining 230 kmt of uncompetitive smelting capacity at
the Intalco (Washington) smelter amid declining market conditions. The full curtailment, which included 49 kmt of earlier-curtailed capacity, was completed during the
third quarter of 2020. The $28 net restructuring charge recorded during 2020 was comprised of $13 for severance and employee termination costs from the separation of
approximately 685 employees, $16 for contract termination costs, and a net curtailment gain of $1 related to the U.S. hourly defined benefit pension and retiree life
plans (see Note O). Additional contract termination costs related to take-or-pay agreements may recur during the curtailment period.
Alcoa Corporation does not include Restructuring and other charges, net in the results of its reportable segments. The impact of allocating such charges to segment
results would have been as follows:
2022 2021 2020
Bauxite $ 58 $ — $ 1
Alumina (85) 1 5
Aluminum 82 184 53
Segment total 55 185 59
Corporate 641 943 45
Total Restructuring and other charges, net $ 696 $ 1,128 $ 104
80
-- 82 of 363 --
Activity and reserve balances for restructuring charges were as follows:
Severance
and
employee
termination
costs
Other
costs Total
Balances at December 31, 2019 $ 35 $ 102 137
Restructuring charges, net 16 36 52
Cash payments (41) (79) (120)
Reversals and other (4) (2) (6)
Balances at December 31, 2020 6 57 63
Restructuring charges, net 1 80 81
Cash payments (4) (25) (29)
Reversals and other — (22) (22)
Balances at December 31, 2021 3 90 93
Restructuring charges, net 1 73 74
Cash payments (2) (37) (39)
Reversals and other (1) (10) (11)
Balances at December 31, 2022 $ 1 $ 116 $ 117
The activity and reserve balances include only Restructuring and other charges, net that impact the reserves for Severance and employee termination costs and Other
costs. Restructuring and other charges, net that affected other liability accounts such as Environmental remediation (see Note S), Asset retirement obligations (see Note
R), and Accrued pension benefits and Accrued other postretirement benefits (see Note O) are excluded from the above activity and balances. Reversals and other
include reversals of previously recorded liabilities and foreign currency translation impacts.
The current portion of the reserve balance is reflected in Other current liabilities on the Consolidated Balance Sheet and the noncurrent portion of the reserve balance is
reflect in Other noncurrent liabilities and deferred credits on the Consolidated Balance Sheet. The noncurrent portion of the reserve was $3 and $43 at December 31,
2022 and 2021, respectively.
E. Segment and Related Information
Segment Information
Alcoa Corporation is a producer of bauxite, alumina, and aluminum products. The Company has three operating and reportable segments, which are organized by
product on a global basis: Bauxite, Alumina, and Aluminum. Segment performance under Alcoa Corporation’s management reporting system is evaluated based on a
number of factors; however, the primary measure of performance is the Adjusted EBITDA (Earnings before interest, taxes, depreciation, and amortization) of each
segment. The Company calculates Segment Adjusted EBITDA as Total sales (third-party and intersegment) minus the following items: Cost of goods sold; Selling,
general administrative, and other expenses; and Research and development expenses. Alcoa Corporation’s Adjusted EBITDA may not be comparable to similarly titled
measures of other companies. The chief operating decision maker function regularly reviews the financial information, including Sales and Adjusted EBITDA, of these
three operating segments to assess performance and allocate resources. Beginning in January 2023, the Company changed its operating segments by combining the
Bauxite and Alumina segments, and will report its financial results in the following two segments: (i) Alumina, and (ii) Aluminum (see Note V).
Segment assets include, among others, customer receivables (third-party and intersegment), inventories, properties, plants, and equipment, and equity investments. The
accounting policies of the segments are the same as those described in the Summary of Significant Accounting Policies (see Note B). Transactions among segments are
established based on negotiation among the parties. Differences between segment totals and Alcoa Corporation’s consolidated totals for line items not reconciled are in
Corporate.
The following are detailed descriptions of Alcoa Corporation’s reportable segments:
Bauxite. This segment represents the Company’s global bauxite mining operations. A portion of this segment’s production represents the offtake from equity method
investments in Brazil (prior to the MRN sale in April 2022) and Guinea, as well as AWAC’s share of bauxite production related to an equity investment in Saudi Arabia.
The bauxite mined by this segment is sold primarily to internal customers within the Alumina segment; a portion of the bauxite is sold to external customers. Bauxite
mined by this segment and used internally is transferred to the Alumina segment at negotiated terms that are intended to approximate market prices; sales to third-parties
are conducted on a contract basis. Generally, this segment’s sales are transacted in U.S. dollars while costs and expenses are transacted in the local currency of the
respective operations, which are the Australian dollar and the Brazilian real. Most of the operations that comprise the Bauxite segment are part of AWAC (see Principles
of Consolidation in Note A).
81
-- 83 of 363 --
Alumina. This segment represents the Company’s worldwide refining system, which processes bauxite into alumina. The alumina produced by this segment is sold
primarily to internal and external aluminum smelter customers; a portion of the alumina is sold to external customers who process it into industrial chemical products.
Approximately two-thirds of Alumina’s production is sold under supply contracts to third parties worldwide, while the remainder is used internally by the Aluminum
segment. Alumina produced by this segment and used internally is transferred to the Aluminum segment at prevailing market prices. A portion of this segment’s third-
party sales are completed through the use of alumina traders. Generally, this segment’s sales are transacted in U.S. dollars while costs and expenses are transacted in the
local currency of the respective operations, which are the Australian dollar, the Brazilian real, and the euro. Most of the operations that comprise the Alumina segment
are part of AWAC (see Principles of Consolidation in Note A). This segment also includes AWAC’s 25.1% ownership interest in a mining and refining joint venture
company in Saudi Arabia (see Note H).
Aluminum. This segment consists of the Company’s (i) worldwide smelting and casthouse system, which processes alumina into primary aluminum, and (ii) portfolio
of energy assets in Brazil, Canada, and the United States.
Aluminum’s combined smelting and casting operations produce primary aluminum products, nearly all of which are sold to external customers and traders. The
smelting operations produce molten primary aluminum, which is then formed by the casting operations into either common alloy ingot (e.g., t-bar, sow, standard ingot)
or into value-add ingot products (e.g., foundry, billet, rod, and slab). A variety of external customers purchase the primary aluminum products for use in fabrication
operations, which produce products primarily for the transportation, building and construction, packaging, wire, and other industrial markets. Results from the sale of
aluminum powder and scrap are also included in this segment, as well as the impacts of embedded aluminum derivatives (see Note P) related to energy supply contracts.
The energy assets supply power to external customers in Brazil and the United States, as well as internal customers in the Aluminum segment (Canadian smelters and
Warrick (Indiana) smelter) and, to a lesser extent, the Alumina segment (Brazilian refineries).
On March 31, 2021, Alcoa completed the sale of its rolling mill located at Warrick Operations (Warrick Rolling Mill) an integrated aluminum manufacturing site near
Evansville, Indiana (Warrick Operations), to Kaiser Aluminum Corporation (Kaiser) (see Note C). Results from the Warrick Rolling Mill are included in this segment
through the first quarter of 2021. Alcoa continues to own and operate the site’s aluminum smelter and the power plant. On July 1, 2022, Alcoa curtailed one of the three
operating smelting potlines (54 kmt) at its Warrick Operations site due to operational challenges stemming from labor shortages in the region.
Generally, this segment’s aluminum sales are transacted in U.S. dollars while costs and expenses of this segment are transacted in the local currency of the respective
operations, which are the U.S. dollar, the euro, the Norwegian krone, the Icelandic króna, the Canadian dollar, the Brazilian real, and the Australian dollar.
This segment also includes Alcoa Corporation’s 25.1% ownership interest in a smelting joint venture company in Saudi Arabia (see Note H).
82
-- 84 of 363 --
The operating results, capital expenditures, and assets of Alcoa Corporation’s reportable segments were as follows:
Bauxite Alumina Aluminum Total
2022
Sales:
Third-party sales $ 204 $ 3,520 $ 8,735 $ 12,459
Intersegment sales 680 1,754 27 2,461
Total sales $ 884 $ 5,274 $ 8,762 $ 14,920
Segment Adjusted EBITDA $ 82 $ 701 $ 1,492 $ 2,275
Supplemental information:
Depreciation, depletion, and amortization $ 130 $ 182 $ 283 $ 595
Equity (loss) income — (39) 48 9
2021
Sales:
Third-party sales $ 236 $ 3,139 $ 8,766 $ 12,141
Intersegment sales 711 1,586 18 2,315
Total sales $ 947 $ 4,725 $ 8,784 $ 14,456
Segment Adjusted EBITDA $ 172 $ 1,002 $ 1,879 $ 3,053
Supplemental information:
Depreciation, depletion, and amortization $ 153 $ 198 $ 289 $ 640
Equity loss — 4 116 120
2020
Sales:
Third-party sales $ 272 $ 2,627 $ 6,365 $ 9,264
Intersegment sales 941 1,268 12 2,221
Total sales $ 1,213 $ 3,895 $ 6,377 $ 11,485
Segment Adjusted EBITDA $ 495 $ 497 $ 325 $ 1,317
Supplemental information:
Depreciation, depletion, and amortization $ 135 $ 172 $ 322 $ 629
Equity loss — (23) (7) (30)
2022
Assets:
Capital expenditures $ 104 $ 216 $ 153 $ 473
Equity investments 188 234 685 1,107
Total assets 1,474 4,447 6,358 12,279
2021
Assets:
Capital expenditures $ 95 $ 178 $ 107 $ 380
Equity investments 234 270 678 1,182
Total assets 1,430 4,385 6,251 12,066
The following tables reconcile certain segment information to consolidated totals:
2022 2021 2020
Sales:
Total segment sales $ 14,920 $ 14,456 $ 11,485
Elimination of intersegment sales (2,461) (2,315) (2,221)
Other (8) 11 22
Consolidated sales $ 12,451 $ 12,152 $ 9,286
83
-- 85 of 363 --
2022 2021 2020
Net (loss) income attributable to Alcoa Corporation:
Total Segment Adjusted EBITDA $ 2,275 $ 3,053 $ 1,317
Unallocated amounts:
Transformation(1) (66) (44) (45)
Intersegment eliminations 143 (101) (8)
Corporate expenses(2) (128) (129) (102)
Provision for depreciation, depletion, and amortization (617) (664) (653)
Restructuring and other charges, net (D) (696) (1,128) (104)
Interest expense (U) (106) (195) (146)
Other income (expenses), net (U) 118 445 (8)
Other(3) (221) (38) (78)
Consolidated income before income taxes 702 1,199 173
Provision for income taxes (Q) (664) (629) (187)
Net income attributable to noncontrolling interest (161) (141) (156)
Consolidated net (loss) income attributable to
Alcoa Corporation $ (123) $ 429 $ (170)
(1) Transformation includes, among other items, the Adjusted EBITDA of previously closed operations.
(2) Corporate expenses are composed of general administrative and other expenses of operating the corporate headquarters and other global administrative facilities,
as well as research and development expenses of the corporate technical center.
(3) Other includes certain items that are not included in the Adjusted EBITDA of the reportable segments.
December 31, 2022 2021
Assets:
Total segment assets $ 12,279 $ 12,066
Elimination of intersegment receivables (197) (261)
Unallocated amounts:
Cash and cash equivalents 1,363 1,814
Corporate fixed assets, net 364 374
Corporate goodwill 141 140
Deferred income taxes 296 506
Pension assets 146 164
Other 364 222
Consolidated assets $ 14,756 $ 15,025
Product Information
Alcoa Corporation has four product divisions and one divested product division as follows:
Bauxite—Bauxite is a reddish clay rock that is mined from the surface of the earth’s terrain. This ore is the basic raw material used to produce alumina and is the
primary source of aluminum.
Alumina—Alumina is an oxide that is extracted from bauxite and is the basic raw material used to produce primary aluminum. This product can also be consumed for
non-metallurgical purposes, such as industrial chemical products.
Primary aluminum—Primary aluminum is metal in the form of a common alloy ingot or a value-add ingot (e.g., foundry, billet, rod, and slab). These products are sold
primarily to customers, that produce products for the transportation, building and construction, packaging, wire, and other industrial markets, and traders.
Energy—Energy is the generation of electricity, which is sold in the wholesale market to traders, large industrial consumers, distribution companies, and other
generation companies.
Flat-rolled aluminum—Flat-rolled aluminum is metal in the form of sheet, which is sold primarily to customers that produce beverage and food cans, including body,
tab, and end stock. As noted above, the Company sold the Warrick Rolling Mill in the first quarter of 2021 which represented the Company’s only Flat-rolled aluminum
asset. The results of the Warrick Rolling Mill are included in this product division through the first quarter of 2021.
84
-- 86 of 363 --
The following table represents the general commercial profile of the Company’s Bauxite, Alumina, and Primary aluminum product divisions (see text below table for
Energy):
Product division Pricing components Shipping terms(3) Payment terms(4)
Bauxite Negotiated FOB/CIF LC Sight
Alumina:
Smelter-grade API(1)/spot/fixed FOB/CIF LC Sight/CAD/Net 30 days
Non-metallurgical Negotiated FOB/CIF Net 30 days
Primary aluminum:
Common alloy ingot LME + Regional premium(2) DAP/CIF Net 30 to 45 days
Value-add ingot LME + Regional premium + Product premium(2) DAP/CIF Net 30 to 45 days
(1) API (Alumina Price Index) is a pricing mechanism that is calculated by the Company based on the weighted average of a prior month’s daily spot prices
published by the following three indices: CRU Metallurgical Grade Alumina Price, Platts Metals Daily Alumina PAX Price, and FastMarkets Metal Bulletin
Non-Ferrous Metals Alumina Index.
(2) LME (London Metal Exchange) is a globally recognized exchange for commodity trading, including aluminum. The LME pricing component represents the
underlying base metal component, based on quoted prices for aluminum on the exchange. The regional premium represents the incremental price over the base
LME component that is associated with the physical delivery of metal to a particular region (e.g., the Midwest premium for metal sold in the United States). The
product premium represents the incremental price for receiving physical metal in a particular shape or alloy.
(3) CIF (cost, insurance, and freight) means that the Company pays for these items until the product reaches the buyer’s designated destination point related to
transportation by vessel. DAP (delivered at place) means the same as CIF related to all methods of transportation. FOB (free on board) means that the Company
pays for costs, insurance, and freight until the product reaches the seller’s designated shipping point.
(4) The net number of days means that the customer is required to remit payment to the Company for the invoice amount within the designated number of days. LC
Sight is a letter of credit that is payable immediately (usually within five to ten business days) after a seller meets the requirements of the letter of credit (i.e.
shipping documents that evidence the seller performed its obligations as agreed to with a buyer). CAD (cash against documents) is a payment arrangement in
which a seller instructs a bank to provide shipping and title documents to the buyer at the time the buyer pays in full the accompanying bill of exchange.
For the Company’s Energy product division, sales of electricity are based on current market prices. Electricity is provided to customers on demand through a national or
regional power grid; the customer simultaneously receives and consumes the electricity. Payment terms are generally within 10 days related to the previous 30 days of
electricity consumption.
The following table details Alcoa Corporation’s Third-party sales by product division:
2022 2021 2020
Sales:
Primary aluminum $ 8,887 $ 8,420 $ 5,190
Alumina 3,478 3,125 2,624
Flat-rolled aluminum(1) — 320 1,115
Energy 201 286 141
Bauxite 168 207 238
Other(2) (283) (206) (22)
$ 12,451 $ 12,152 $ 9,286
(1) Flat-rolled aluminum represented sales of the Warrick Rolling Mill through the sale of the facility on March 31, 2021 (see Note C).
(2) Other includes realized gains and losses related to embedded derivative instruments designated as cash flow hedges of forward sales of aluminum (see Note P).
85
-- 87 of 363 --
Geographic Area Information
Geographic information for Third-party sales was as follows (based upon the country where the point of sale originated):
2022 2021 2020
Sales:
United States(1) $ 5,462 $ 5,290 $ 4,246
Netherlands(2) 3,031 2,644 —
Australia 2,742 2,092 1,884
Spain(3) 618 1,465 2,766
Brazil 527 610 346
Canada 1 11 31
Other 70 40 13
$ 12,451 $ 12,152 $ 9,286
(1) Sales of a portion of the alumina from refineries in Australia and Brazil and most of the aluminum from smelters in Canada occurred in the United States.
Additionally, sales of aluminum off-take related to an interest in the Saudi Arabia joint venture (see Note H) occurred in the United States beginning at the end of
the third quarter of 2021.
(2) Sales of the aluminum produced from smelters in Iceland and Norway occurred in the Netherlands beginning at the end of the first quarter of 2021.
(3) Sales of the aluminum produced from smelters in Iceland and Norway occurred in Spain through most of the first quarter of 2021 and in the Netherlands
thereafter. Sales of aluminum off-take related to an interest in the Saudi Arabia joint venture (see Note H), occurred in Spain through most of the third quarter of
2021 and in the United States thereafter.
Geographic information for long-lived assets was as follows (based upon the physical location of the assets):
December 31, 2022 2021
Long-lived assets:
Australia $ 1,944 $ 2,091
Brazil 1,298 1,118
Iceland 1,002 1,048
Canada 919 958
United States 830 874
Norway 304 338
Spain 194 193
Other 2 3
$ 6,493 $ 6,623
F. Earnings Per Share
Basic earnings per share (EPS) amounts are computed by dividing Net (loss) income attributable to Alcoa Corporation by the average number of common shares
outstanding. Diluted EPS amounts assume the issuance of common stock for all potentially dilutive share equivalents outstanding.
The share information used to compute basic and diluted EPS attributable to Alcoa Corporation common shareholders was as follows (shares in millions):
2022 2021 2020
Average shares outstanding—basic 181 186 186
Effect of dilutive securities:
Stock options — — —
Stock units — 4 —
Average shares outstanding—diluted 181 190 186
In 2022, basic average shares outstanding and diluted average shares outstanding were the same because the effect of potential shares of common stock was anti-
dilutive. Had Alcoa generated net income in 2022, three million common share equivalents related to five million outstanding stock units and stock options combined
would have been included in diluted average shares outstanding for the period.
86
-- 88 of 363 --
In 2021, options to purchase less than two hundred thousand shares of common stock outstanding as of December 31, 2021 at a weighted average exercise price of
$38.67 per share were not included in the computation of diluted EPS because the exercise prices of these options were greater than the annual average market price of
Alcoa Corporation’s common stock.
In 2020, basic average shares outstanding and diluted average shares outstanding were the same because the effect of potential shares of common stock was anti-
dilutive. Had Alcoa generated net income in 2020, one million common share equivalents related to five million outstanding stock units and stock options combined
would have been included in diluted average shares outstanding for the respective period. Options to purchase two million shares of common stock outstanding at
December 31, 2020 had a weighted average exercise price of $26.85 per share which was greater than the annual average market price per share of Alcoa Corporation’s
common stock.
G. Accumulated Other Comprehensive Loss
The following table details the activity of the three components that comprise Accumulated other comprehensive loss for both Alcoa Corporation’s shareholders and
noncontrolling interest:
Alcoa Corporation Noncontrolling interest
2022 2021 2020 2022 2021 2020
Pension and other postretirement benefits (O)
Balance at beginning of period $ (882) $ (2,536) $ (2,282) $ (13) $ (67) $ (56)
Other comprehensive income (loss):
Unrecognized net actuarial gain (loss) and prior
service cost/benefit 263 550 (545) 7 30 (19)
Tax (expense) benefit (42) (37) 31 — (6) 3
Total Other comprehensive income
(loss) before reclassifications,
net of tax 221 513 (514) 7 24 (16)
Amortization of net actuarial loss and prior
service cost/benefit(1) 723 1,144 269 1 30 6
Tax expense(2) — (3) (9) — — (1)
Total amount reclassified from
Accumulated other comprehensive
loss, net of tax(6) 723 1,141 260 1 30 5
Total Other comprehensive income (loss) 944 1,654 (254) 8 54 (11)
Balance at end of period $ 62 $ (882) $ (2,536) $ (5) $ (13) $ (67)
Foreign currency translation
Balance at beginning of period $ (2,614) $ (2,385) $ (2,160) $ (937) $ (844) $ (834)
Other comprehensive loss (71) (229) (225) (103) (93) (10)
Balance at end of period $ (2,685) $ (2,614) $ (2,385) $ (1,040) $ (937) $ (844)
Cash flow hedges (P)
Balance at beginning of period $ (1,096) $ (708) $ (532) $ (1) $ (1) $ 20
Other comprehensive loss:
Net change from periodic revaluations (119) (782) (345) 2 (2) (36)
Tax benefit 43 140 74 — 1 10
Total Other comprehensive (loss)
income before reclassifications, net
of tax (76) (642) (271) 2 (1) (26)
Net amount reclassified to earnings:
Aluminum contracts(3) 316 288 66 — — —
Financial contracts(4) — 2 15 — 1 6
Foreign exchange contracts(3) (5) (3) 20 — — —
Interest rate contracts(5) 5 8 5 — 1 —
Sub-total 316 295 106 — 2 6
Tax expense(2) (60) (41) (11) — (1) (1)
Total amount reclassified
from Accumulated other
comprehensive loss, net of
tax(6) 256 254 95 — 1 5
Total Other comprehensive income (loss) 180 (388) (176) 2 — (21)
Balance at end of period $ (916) $ (1,096) $ (708) $ 1 $ (1) $ (1)
Total Accumulated other comprehensive loss $ (3,539) $ (4,592) $ (5,629) $ (1,044) $ (951) $ (912)
(1) These amounts were included in the computation of net periodic benefit cost for pension and other postretirement benefits. The amounts related to settlements
and/or curtailments of certain pension and other postretirement benefits for Alcoa Corporation include $633, $952, and $55 for the years ended December 31,
2022, 2021, and 2020, respectively. The amounts related to settlements and/or curtailments of certain pension and other postretirement benefits for
Noncontrolling interest include ($1), $25, and $3 for the years ended December 31, 2022, 2021, and 2020, respectively (see Note O).
87
-- 89 of 363 --
(2) These amounts were reported in Provision for income taxes on the accompanying Statement of Consolidated Operations.
(3) These amounts were reported in Sales on the accompanying Statement of Consolidated Operations.
(4) These amounts were reported in Cost of goods sold on the accompanying Statement of Consolidated Operations.
(5) These amounts were included in Other (income) expenses, net on the accompanying Statement of Consolidated Operations.
(6) A positive amount indicates a corresponding charge to earnings and a negative amount indicates a corresponding benefit to earnings.
H. Investments
December 31, 2022 2021
Equity investments $ 1,112 $ 1,189
Other investments 10 10
$ 1,122 $ 1,199
Equity Investments. The following table summarizes information of Alcoa Corporation’s equity investments as of December 31, 2022 and 2021. In 2022, 2021, and
2020, Alcoa Corporation received $127, $50, and $44, respectively, in dividends from these equity investments. Each of the investees either owns the facility listed or
has an ownership interest in an entity that owns the facility listed:
Investee Country Nature of investment
Income Statement Location
of Equity Earnings
Ownership
interest
Ma’aden Aluminum Company Saudi Arabia Aluminum smelter and casthouse Other (income) expenses, net 25.1%
Ma’aden Bauxite and Alumina Company Saudi Arabia Bauxite mine and alumina refinery Other (income) expenses, net 25.1%
Halco Mining, Inc. Guinea Bauxite mine Cost of goods sold 45%
Energética Barra Grande S.A. Brazil Hydroelectric generation facility Cost of goods sold 42.18%
Pechiney Reynolds Quebec, Inc. Canada Aluminum smelter Cost of goods sold 50%
Consorcio Serra do Facão Brazil Hydroelectric generation facility Cost of goods sold 34.97%
Mineração Rio do Norte S.A. (1) Brazil Bauxite mine Cost of goods sold 18.2%
Manicouagan Power Limited Partnership Canada Hydroelectric generation facility Cost of goods sold 40%
ElysisTM Limited Partnership Canada Aluminum smelting technology Other (income) expenses, net 48.235%
(1) On April 30, 2022, Alcoa completed the sale of its 18.2% interest in Mineração Rio do Norte S.A. to South32 Minerals S.A.
Saudi Arabia Joint Venture—Alcoa Corporation and Ma’aden have a 30-year (from December 2009) joint venture shareholders agreement (automatic extension for
an additional 20 years, unless the parties agree otherwise or unless earlier terminated) setting forth the terms for the development, construction, ownership, and
operation of an integrated aluminum complex in Saudi Arabia. The project developed by the joint venture consists of a bauxite mine from the Al Ba’itha bauxite deposit
in the northern part of Saudi Arabia, an alumina refinery, a primary aluminum smelter, and an aluminum rolling mill.
The joint venture is owned 74.9% by Ma’aden and 25.1% by Alcoa Corporation and originally consisted of three separate companies as follows: the bauxite mine and
alumina refinery (MBAC), the smelter (MAC), and the rolling mill (MRC). In June 2019, Alcoa Corporation and Ma’aden amended the joint venture agreement that
governs the operations of each of the three companies that comprise the joint venture. Under the terms of the agreement, Alcoa Corporation transferred its 25.1%
interest in MRC to Ma’aden and, as a result, has no further direct or indirect equity interest in MRC. In accordance with the June 2019 amended joint venture
agreement, Ma’aden’s put option and Alcoa Corporation’s call option, relating to additional interests in the joint venture, were exercisable for a period of six months
after October 1, 2021. On March 31, 2022, Ma’aden’s and Alcoa’s put and call options, respectively, expired with neither party exercising their options.
The results for the joint venture for the year ended December 31, 2022 include a charge related to a dispute with an industrial utility for periods in 2021 and 2022 that progressed
in early 2023. Alcoa’s share of this charge is $21 which is included in Other (income) expenses, net on the Statement of Consolidated Operations for the year ended December
31, 2022. As of December 31, 2022 and 2021, the carrying value of Alcoa’s investment in this joint venture was $710 and $687, respectively.
ELYSIS Limited Partnership—In June 2018, Alcoa Corporation, Rio Tinto Alcan Inc. (Rio Tinto), and Investissement Québec, a company wholly-owned by the
Government of Québec, Canada, launched the ELYSIS Limited Partnership (ELYSIS). The purpose of this partnership is to advance larger scale development and
commercialization of its patent-protected technology that produces oxygen and eliminates all direct greenhouse gas emissions from the traditional aluminum smelting
process. Alcoa and Rio Tinto plc, as general partners, each own a 48.235% stake in ELYSIS, and the Québec provincial government, as a limited partner, owns a 3.53%
stake. The federal government of Canada and Apple Inc., as well as the Québec provincial government, are providing initial financing to the partnership.
Through December 31, 2022, the Company has contributed $55 (C$71) toward its investment commitment in ELYSIS. The Company’s basis in the investment has been
reduced to zero for its share of losses incurred to date. As a result, the Company has $69 in unrecognized losses as of December 31, 2022 that will be recognized upon
additional contributions into the partnership.
88
-- 90 of 363 --
The following table summarizes the profit and loss data for the respective periods ended December 31, as it relates to Alcoa Corporation’s equity investments.
Information shown for the Saudi Arabia Joint Venture for all periods presented includes the combined balances for MAC and MBAC. The investments are grouped
based on the nature of the investment. The Mining investments are part of the Bauxite segment, while the Energy and Other investments are primarily part of the
Aluminum segment.
Saudi Arabia
Joint Venture Mining Energy Other
2022
Sales $ 3,317 $ 763 $ 252 $ 488
Cost of goods sold 2,696 488 120 445
Net income (loss) 42 110 109 (75)
Equity in net income (loss) of affiliated companies, before
reconciling adjustments 11 39 41 (36)
Other (7) (2) (3) 15
Alcoa Corporation’s equity in net income (loss) of
affiliated companies 4 37 38 (21)
2021
Sales $ 3,127 $ 794 $ 264 $ 404
Cost of goods sold 2,083 571 135 365
Net income (loss) 495 30 114 (42)
Equity in net income (loss) of affiliated companies, before
reconciling adjustments 124 18 45 (20)
Other (8) 5 (1) 25
Alcoa Corporation’s equity in net income of
affiliated companies 116 23 44 5
2020
Sales $ 2,279 $ 841 $ 238 $ 316
Cost of goods sold 1,829 543 107 283
Net (loss) income (108) 46 74 (24)
Equity in net (loss) income of affiliated companies, before
reconciling adjustments (27) 23 31 (11)
Other (7) (1) 2 14
Alcoa Corporation’s equity in net (loss) income of
affiliated companies (34) 22 33 3
The following table summarizes the balance sheet data for the respective periods ended December 31, as it relates to Alcoa Corporation’s equity investments.
Saudi Arabia
Joint Venture Mining (1) Energy Other
2022
Current assets $ 1,769 $ 5 $ 114 $ 134
Noncurrent assets 6,993 363 301 757
Current liabilities 1,255 3 13 114
Noncurrent liabilities 4,314 24 26 84
2021
Current assets $ 1,748 $ 142 $ 96 $ 246
Noncurrent assets 7,330 852 316 755
Current liabilities 956 158 17 95
Noncurrent liabilities 5,018 331 27 73
(1) The assets and liabilities of MRN were excluded from the December 31, 2022 balances in the table above due to the sale of Alcoa’s interest in the investment.
On February 15, 2022, the Company signed an agreement to sell its share of its investment in MRN in Brazil for $10 to South32 Minerals S.A. Related to this
transaction, the Company recorded an asset impairment of $58 in the first quarter of 2022 in Restructuring and other charges, net on the Statement of Consolidated
Operations. On April 30, 2022, Alcoa completed the sale of its investment in MRN. An additional $30 in cash could be paid to the Company in the future if certain post-
closing conditions related to future MRN mine development are satisfied.
I. Receivables
On October 25, 2019, a wholly-owned subsidiary of the Company entered into a $120 three-year revolving credit facility agreement secured by certain customer
receivables. Alcoa Corporation guaranteed the performance obligations of the wholly-owned subsidiary under the facility; however no assets (other than the receivables)
were pledged as collateral.
89
-- 91 of 363 --
On April 20, 2020, the Company amended this agreement converting it to a Receivables Purchase Agreement to sell up to $120 of the receivables previously secured by
the credit facility without recourse on a revolving basis. The unsold portion of the specified receivable pool is pledged as collateral to the purchasing bank to secure the
sold receivables.
On November 8, 2021, the Company terminated the Receivables Purchase Agreement. No receivables were sold under this agreement.
On January 31, 2023, a wholly-owned subsidiary of the Company entered into a one-year Receivables Purchase Agreement to sell up to $150 of certain customer
receivables without recourse on a revolving basis. The unsold portion of the specified receivable pool is pledged as collateral to the purchasing bank to secure the sold
receivables. Alcoa Corporation will guarantee the performance obligations of the wholly-owned subsidiary under the facility; however no assets (other than the
receivables) will be pledged as collateral.
J. Inventories
December 31, 2022 2021
Finished goods $ 385 $ 529
Work-in-process 350 257
Bauxite and alumina 584 376
Purchased raw materials 923 619
Operating supplies 185 175
$ 2,427 $ 1,956
The Finished goods, Work-in-process and Bauxite and alumina balances as of December 31, 2021 reported above reflect an adjustment related to a misclassification of
an intercompany profit reserve previously presented in Work-in-process. This resulted in an increase in Work-in-process of $172 and reductions of $9 and $163 in
Finished goods and Bauxite and alumina, respectively. This adjustment had no impact on the total Inventories balance as of December 31, 2021.
K. Properties, Plants, and Equipment, Net
December 31, 2022 2021
Land and land rights, including mines $ 253 $ 264
Structures (by type of operation):
Bauxite mining 1,234 1,148
Alumina refining 2,281 2,400
Aluminum smelting and casting 3,265 3,298
Energy generation 354 339
Other 346 340
7,480 7,525
Machinery and equipment (by type of operation):
Bauxite mining 569 565
Alumina refining 3,658 3,946
Aluminum smelting and casting 5,813 5,877
Energy generation 851 836
Other 461 452
11,352 11,676
19,085 19,465
Less: accumulated depreciation, depletion, and amortization 13,112 13,130
5,973 6,335
Construction work-in-progress 520 288
$ 6,493 $ 6,623
90
-- 92 of 363 --
L. Goodwill and Other Intangible Assets
Goodwill, which is included in Other noncurrent assets on the accompanying Consolidated Balance Sheet, was as follows:
December 31, 2022 2021
Bauxite $ 2 $ 2
Alumina 2 2
Aluminum — —
Corporate(1) 141 140
$ 145 $ 144
(1) The carrying value of Corporate’s goodwill is net of accumulated impairment losses of $742 as of both December 31, 2022 and 2021. As of December 31, 2022, the
$141 of goodwill reflected in Corporate is allocated to two of Alcoa Corporation’s three reportable segments ($48 to Bauxite and $93 to Alumina) for purposes of
impairment testing (see Note B). This goodwill is reflected in Corporate for segment reporting purposes because it is not included in management’s assessment of
performance by the two reportable segments. Changes in the carrying amount of goodwill were attributable to foreign currency translation as of December 31, 2022
and 2021.
Management performed a quantitative assessment for the Bauxite and Alumina reporting units in 2022. The estimated fair values of the Bauxite and Alumina reporting
units in both assessments were substantially in excess of the reporting units’ carrying values, resulting in no impairment.
Other intangible assets, which are included in Other noncurrent assets on the accompanying Consolidated Balance Sheet, were as follows:
2022 2021
December 31,
Gross
carrying
amount
Accumulated
amortization
Net
carrying
amount
Gross
carrying
amount
Accumulated
amortization
Net
carrying
amount
Computer software $ 206 $ (202) $ 4 $ 214 $ (204) $ 10
Patents and licenses 25 (9) 16 25 (9) 16
Other intangibles 20 (11) 9 19 (10) 9
Total other intangible assets $ 251 $ (222) $ 29 $ 258 $ (223) $ 35
Computer software consists primarily of software costs associated with the enterprise business solution within Alcoa to drive common systems among all businesses.
Amortization expense related to the intangible assets in the table above for the years ended December 31, 2022, 2021, and 2020 was $7, $11, and $9, respectively, and is
expected to be approximately $10 annually from 2023 to 2027.
M. Debt
Short-term borrowings.
December 31, 2022 2021
Short-term borrowings $ — $ 75
Short-term borrowings are reported in Other current liabilities on the accompanying Consolidated Balance Sheet.
Long-Term Debt.
December 31, 2022 2021
5.500% Notes, due 2027 750 $ 750
6.125% Notes, due 2028 500 500
4.125% Notes, due 2029 500 500
Other 84 5
Unamortized discounts and deferred financing costs (27) (28)
Total 1,807 1,727
Less: amount due within one year 1 1
Long-term debt, less amount due within one year $ 1,806 $ 1,726
91
-- 93 of 363 --
The principal amount of long-term debt maturing in each of the next five years is: $1 in 2023, $80 in 2024, $1 in each of 2025 and 2026, and $750 in 2027. At
December 31, 2022, Other includes $79 related to a term loan that was extended to 2024.
144A Debt.
2029 Notes. In March 2021, Alcoa Nederland Holding B.V. (ANHBV), a wholly-owned subsidiary of Alcoa Corporation, completed a Rule 144A (U.S. Securities Act
of 1933, as amended) debt issuance for $500 aggregate principal amount of 4.125% Senior Notes due 2029 (the 2029 Notes) with the following terms:
• Net proceeds were approximately $493, reflecting a discount to the initial purchasers as well as issuance costs. The discount, as well as costs to complete the
financing, were deferred and are being amortized to interest expense over the term;
• Interest is paid semi-annually in March and September, which commenced September 30, 2021;
• Indenture contains customary affirmative and negative covenants, see below;
• Option to redeem on at least 10 days, but not more than 60 days, prior notice to the holders under multiple scenarios, including, in whole or in part, at any
time, or from time to time after March 31, 2024, at a redemption price up to 102.063% of the principal amount, plus any accrued and unpaid interest; and,
• Subject to repurchase upon the occurrence of a change in control repurchase event (as defined in the indenture) at a repurchase price in cash equal to 101%
of the aggregate principal amount of the notes repurchased, plus any accrued and unpaid interest.
The Company used the net proceeds of the 2029 Notes, together with cash on hand, to contribute $500 to its U.S. defined benefit pension plans applicable to salaried
and hourly employees on April 1, 2021 (see Note O), to redeem in full $750 aggregate principal amount of the Company’s outstanding 6.75% Senior Notes due 2024
(the 2024 Notes) on April 7, 2021, and to pay transaction-related fees and expenses.
2027 Notes. In July 2020, ANHBV completed a Rule 144A debt issuance for $750 aggregate principal amount of 5.500% Senior Notes due 2027 (the 2027 Notes) with
the following terms:
• Net proceeds were approximately $736, reflecting a discount to the initial purchasers as well as issuance costs. The discount, as well as costs to complete the
financing, were deferred and are being amortized to interest expense over the term;
• Interest is paid semi-annually in June and December, which commenced on December 15, 2020;
• Indenture contains customary affirmative and negative covenants, see below;
• Option to redeem on at least 15 days, but not more than 60 days, prior notice to the holders under multiple scenarios, including, in whole or in part, at any
time, or from time to time after June 15, 2023, at a redemption price up to 102.750% of the principal amount, plus any accrued and unpaid interest; and,
• Subject to repurchase upon the occurrence of a change in control repurchase event (as defined in the indenture) at a repurchase price in cash equal to 101%
of the aggregate principal amount of the notes repurchased, plus any accrued and unpaid interest.
The Company used the net proceeds of the 2027 Notes for general corporate purposes, including adding cash to its balance sheet.
2028 Notes. In May 2018, ANHBV completed a Rule 144A debt issuance for $500 aggregate principal amount of 6.125% Senior Notes due 2028 (the 2028 Notes) with
the following terms:
• Net proceeds were approximately $492, reflecting a discount to the initial purchasers as well as issuance costs. The discount, as well as costs to complete the
financing, were deferred and are being amortized to interest expense over the term;
• Interest is paid semi-annually in November and May, which commenced November 15, 2018;
• Indenture contains customary affirmative and negative covenants, see below;
• Option to redeem on at least 30 days, but not more than 60 days, prior notice to the holders under multiple scenarios, including, in whole or in part, at any
time, or from time to time after May 2023, at a redemption price up to 103.063% of the principal amount, plus any accrued and unpaid interest; and,
• Subject to repurchase upon the occurrence of a change in control repurchase event (as defined in the indenture) at a repurchase price in cash equal to 101%
of the aggregate principal amount of the notes repurchased, plus any accrued and unpaid interest.
The Company used the net proceeds of the 2028 Notes, together with cash on hand, to make discretionary contributions to certain U.S. defined benefit pension plans.
The indentures of the 2027 Notes, 2028 Notes, and 2029 Notes contain customary affirmative and negative covenants, such as limitations on liens, limitations on sale
and leaseback transactions, and a prohibition on a reduction in the ownership of AWAC entities below an agreed level. The negative covenants in the indentures are less
extensive than those in the Revolving Credit Facility (see below). For example, the indentures do not include a limitation on restricted payments, such as repurchases of
common stock and dividends to stockholders.
92
-- 94 of 363 --
The 2027 Notes, the 2028 Notes, and the 2029 Notes are senior unsecured obligations of ANHBV and do not entitle the holders to any registration rights pursuant to a
registration rights agreement. ANHBV does not intend to file a registration statement with respect to resales of or an exchange offer for the notes. The notes are
guaranteed on a senior unsecured basis by Alcoa Corporation and its subsidiaries that are guarantors under the Facility (the “subsidiary guarantors” and, together with
Alcoa Corporation, the “guarantors”). Each of the subsidiary guarantors will be released from their guarantees upon the occurrence of certain events, including the
release of such guarantor from its obligations as a guarantor under the Facility.
The 2027 Notes, the 2028 Notes, and the 2029 Notes rank equally in right of payment with each other and with all of ANHBV’S existing and future senior unsecured
indebtedness; rank senior in right of payment to any future subordinated obligations of ANHBV; and are effectively subordinated to ANHBV’s existing and future
secured indebtedness, including under the Facility, to the extent of the value of property and assets securing such indebtedness. The guarantees of the notes rank equally
in right of payment with each other and with all the guarantors’ existing and future senior unsecured indebtedness; rank senior in right of payment to any future
subordinated obligations of the guarantors; and are effectively subordinated to the guarantors’ existing and future secured indebtedness, including under the Facility, to
the extent of the value of property and assets securing such indebtedness.
Redemption events. On April 7, 2021, the Company redeemed in full $750 aggregate principal amount notes due in 2024 at a redemption price equal to 103.375% of the
principal amount, plus accrued and unpaid interest. The issuance of the 2029 Notes and this redemption were determined to be an issuance of new debt and an
extinguishment of existing debt. As a result, the Company recorded a loss of $32 on the extinguishment of debt in the second quarter of 2021 in Interest expense, which
was comprised of the redemption premium and the write-off of deferred financing fees and unamortized debt issuance costs. The cash flows related to the transaction
were classified as financing cash flows.
On September 30, 2021, the Company redeemed in full $500 aggregate principal amount notes due in 2026 at a redemption price equal to 103.5% of the principal
amount, plus accrued and unpaid interest. As a result, the Company recorded a loss of $22 on the extinguishment of debt in the third quarter of 2021 in Interest expense,
which was comprised of the redemption premium and the write-off of deferred financing fees and unamortized debt issuance costs. The cash flows related to the
transaction were classified as financing cash flows.
Credit Facilities.
Revolving Credit Facility
On June 27, 2022, Alcoa Corporation and Alcoa Nederland Holding B.V. (ANHBV), a wholly owned subsidiary of Alcoa Corporation and the borrower, entered into an
amendment and restatement agreement (the Third Amendment and Restatement) (as amended and restated, the Revolving Credit Facility) that provides additional
flexibility to the Company and ANHBV by (i) extending the maturity date of the Revolving Credit Facility from November 2023 to June 2027, (ii) reducing the
aggregate commitments under the facility from $1,500 to $1,250, (iii) releasing the collateral package that had previously secured the Revolving Credit Facility, which
will continue so long as certain credit ratings are maintained, (iv) increasing the maximum leverage ratio from 2.75 to 1.00 to 3.25 to 1.00, which increases following
material acquisitions for four consecutive fiscal quarters following an acquisition, (v) providing a debt to capitalization ratio not to exceed .60 to 1.00 to replace the
maximum leverage ratio upon a ratings upgrade to investment grade by Moody’s Investor Service (Moody’s) or Standard and Poor’s Global Ratings (S&P), and
(vi) providing flexibility for dividends and other restricted payments, to make investments, and to incur additional indebtedness. The Revolving Credit Facility
implements a sustainability adjustment to the applicable margin and commitment fee that may result in a positive or negative adjustment based on two of the
Company’s existing sustainability metrics.
If Alcoa Corporation or ANHBV, as applicable, fails to have a rating of at least Ba1 from Moody’s and BB+ from S&P, then the Company would be required to execute
all security documents to re-secure collateral under the Revolving Credit Facility.
On July 26, 2022, Moody’s upgraded the rating of ANHBV’s senior unsecured notes to Baa3 (investment grade) from Ba1 and set the current outlook to stable.
In addition to the financial covenants, the Revolving Credit Facility includes several customary affirmative and negative covenants (applicable to Alcoa Corporation and
certain subsidiaries described as restricted), that, subject to certain exceptions, include limitations on (among other things): indebtedness, liens, investments, sales of
assets, restricted payments, entering into restrictive agreements, a covenant prohibiting reductions in the ownership of AWAC entities, and certain other specified
restricted subsidiaries of Alcoa Corporation, below an agreed level. The Revolving Credit Facility also contains customary events of default, including failure to make
payments under the Revolving Credit Facility, cross-default and cross-judgment default, and certain bankruptcy and insolvency events.
As of December 31, 2022, the Company was in compliance with all financial covenants. There were no borrowings outstanding at December 31, 2022 and 2021, and no
amounts were borrowed during 2022 and 2021 under the Revolving Credit Facility.
93
-- 95 of 363 --
Alcoa Norway ANS
On October 2, 2019, Alcoa Norway ANS, a wholly-owned subsidiary of Alcoa Corporation, entered into a one-year, multicurrency revolving credit facility agreement
for NOK 1.3 billion (approximately $149) which was fully and unconditionally guaranteed on an unsecured basis by Alcoa Corporation. The maturity date of the
facility was subsequently extended by one year.
On April 8, 2020, Alcoa Norway ANS drew $100 against this facility. Repayment of the drawn amount, including interest accrued at 2.93%, occurred upon maturity on
June 29, 2020.
In September 2021, Alcoa Norway ANS made the decision not to extend the maturity of the facility allowing it to expire, effective October 4, 2021. During
2021, no amounts were drawn related to this credit facility. In all periods, Alcoa Norway ANS was in compliance with related covenants.
N. Preferred and Common Stock
Preferred Stock. Alcoa Corporation is authorized to issue 100,000,000 shares of preferred stock at a par value of $0.01 per share. At December 31, 2022 and 2021, the
Company had no issued preferred stock.
Common Stock. Alcoa Corporation is authorized to issue 750,000,000 shares of common stock at a par value of $0.01 per share. As of December 31, 2022 and 2021,
Alcoa Corporation had 176,969,091 and 184,099,748, respectively, issued and outstanding shares of common stock.
Under its employee stock-based compensation plan, the Company issued shares of 1,434,543 in 2022, 1,305,979 in 2021, and 397,903 in 2020. The Company issues
new shares to satisfy the exercise of stock options and the conversion of stock units. As of December 31, 2022, 22,028,804 shares of common stock were available for
issuance.
Share Repurchase
In October 2021, Alcoa Corporation’s Board of Directors approved a common stock repurchase program under which the Company may purchase shares of its
outstanding common stock up to an aggregate transactional value of $500, depending on cash availability, market conditions, and other factors.
In July 2022, Alcoa Corporation announced that its Board of Directors approved an additional common stock repurchase program under which the Company may
purchase shares of its outstanding common stock up to an aggregate transactional value of $500, depending on the Company’s continuing analysis of market, financial,
and other factors (the New Repurchase Program).
In 2022, the Company repurchased 8,565,200 shares of its common stock for $500, which fully exhausted the October 2021 authorization; the shares were immediately
retired. As of the date of this report, the Company is currently authorized to repurchase up to a total of $500, in the aggregate, of its outstanding shares of common stock
under the New Repurchase Program. Repurchases under this program may be made using a variety of methods, which may include open market purchases, privately
negotiated transactions, or pursuant to a Rule 10b5-1 plan. This program may be suspended or discontinued at any time and does not have a predetermined expiration
date. Alcoa Corporation intends to retire repurchased shares of common stock.
In 2021, the Company repurchased 3,184,300 shares of its common stock for $150; the shares were immediately retired.
No shares were repurchased in 2020.
Dividend
Dividends on common stock are subject to authorization by Alcoa Corporation’s Board of Directors.
In October 2021, the Company announced the initiation of a quarterly cash dividend on its common stock and the Board of Directors declared the first quarterly cash
dividend of $0.10 per share of the Company’s common stock. Dividends paid totaled $19 in 2021.
Quarterly dividends paid were $0.10 per share in 2022, totaling $72.
The Company did not declare any dividends in 2020.
The details of any future cash dividend declaration, including the amount of such dividend and the timing and establishment of the record and payment dates, will be
determined by the Board of Directors. The decision of whether to pay future cash dividends and the amount of any such dividends will be based on the Company's
financial position, results of operations, cash flows, capital requirements, business conditions, the requirements of applicable law, and any other factors the Board of
Directors may deem relevant.
94
-- 96 of 363 --
Stock-based Compensation
Restricted stock units are generally granted in either January or February each calendar year to eligible employees (the Company’s Board of Directors also receive
certain stock units; however, these amounts are not material). Time-based restricted stock units (RSUs) generally cliff vest on the third anniversary of the award grant
date. The Company also grants performance restricted stock units (PRSUs), which are subject to performance conditions. Prior to 2021, stock options were historically
granted at the closing market price of Alcoa Corporation’s common stock on the date of grant and grade vested over a three-year service period (1/3 each year) with a
ten-year contractual term. As of January 1, 2021, the Company no longer grants stock options.
The final number of PRSUs earned is dependent on Alcoa Corporation’s achievement of certain targets over a three-year measurement period for grants. For PRSUs
granted in 2020, the award was earned after the end of the measurement period of January 1, 2020 through December 31, 2022 based on performance against four
measures: (1) the Company’s total shareholder return measured against the ranked total shareholder return of the Standard & Poor’s Metals and Mining Select Industry
Index components; (2) a pre-established return-on-equity target; (3) an improvement in proportional net debt; and (4) a reduction in carbon intensity in both refining
(through reduced carbon dioxide emissions) and smelting (through increased production from renewable energy) operations. For PRSUs granted in 2021, the award will
be earned after the end of the measurement period of January 1, 2021 through December 31, 2023 based on performance against four measures: (1) the Company’s total
shareholder return measured against the ranked total shareholder return of the Standard & Poor’s Metals and Mining Select Industry Index components; (2) a pre-
established return-on-equity target; (3) an improvement in proportional net debt; and (4) a reduction in carbon intensity in both refining (through reduced carbon dioxide
emissions) and smelting (through increased production from renewable energy) operations. For PRSUs granted in 2022, the award will be earned after the end of the
measurement period of January 1, 2022 through December 31, 2024 based on performance against three measures: (1) the Company’s total shareholder return measured
against the ranked total shareholder return of the Standard & Poor’s Metals and Mining Select Industry Index components; (2) a pre-established return-on-equity target;
and (3) a reduction in carbon intensity in both refining (through reduced carbon dioxide emissions) and smelting (through increased production from renewable energy)
operations.
In 2022, 2021, and 2020, Alcoa Corporation recognized stock-based compensation expense of $40, $39, and $25, respectively, of which approximately 85% to 100%
was related to stock units in each period. There was no stock-based compensation expense capitalized in 2022, 2021, or 2020.
Stock-based compensation expense is based on the grant date fair value of the applicable equity grant. For both RSUs and PRSUs, the fair value was equivalent to the
closing market price per share of Alcoa Corporation’s common stock on the date of grant in the respective periods. For stock units with a market condition, the fair
value was estimated on the date of grant using a Monte Carlo simulation model, which generated a result of $126.86, $39.88, and $21.43 per unit in 2022, 2021, and
2020, respectively. The Monte Carlo simulation model uses certain assumptions to estimate the fair value of a market-based stock unit, including volatility (65.25%,
60.19%, and 41.65% in 2022, 2021, and 2020, respectively, for the Company) and a risk-free interest rate (1.71%, 0.22%, and 1.38% in 2022, 2021, and 2020,
respectively), to estimate the probability of satisfying market conditions. For stock options, the fair value was estimated on the date of grant using a lattice pricing
model, which generated a result of $6.12 per option in 2020. There were no stock options granted in 2022 and 2021. The lattice pricing model uses several assumptions
to estimate the fair value of a stock option, including an average risk-free interest rate, dividend yield, volatility, annual forfeiture rate, exercise behavior, and
contractual life.
The activity for stock units and stock options during 2022 was as follows:
Stock units Stock options
Number of
units
Weighted
average FMV
per unit
Number of
options
Weighted
average
exercise price
Outstanding, January 1, 2022 4,702,546 $ 22.23 910,420 $ 29.61
Granted 624,441 67.50 — —
Exercised — — (686,097) 31.50
Converted (1,056,571) 30.07 — —
Expired or forfeited (100,726) 26.63 (3,727) 21.13
Performance share adjustment 436,525 18.00 — —
Outstanding, December 31, 2022 4,606,215 26.08 220,596 23.88
The number of Converted units includes 308,125 shares withheld to meet the Company’s statutory tax withholding requirements related to the income earned by the
employees as a result of vesting in the units.
95
-- 97 of 363 --
As of December 31, 2022, the 220,596 outstanding stock options had a weighted average remaining contractual life of 5.23 years and a total intrinsic value of $5.
Additionally, 131,546 of the total outstanding stock options were fully vested and exercisable and had a weighted average remaining contractual life of 4.75 years, a
weighted average exercise price of $29.02, and a total intrinsic value of $2 as of December 31, 2022. Cash received from stock option exercises was $22, $25, and $1 in
2022, 2021, and 2020, respectively. The total intrinsic value of stock options exercised during 2022, 2021, and 2020 was $22, $17, and $0, respectively. The total fair
value of stock units converted during 2022, 2021 and 2020 was $32, $19 and $17, respectively.
At December 31, 2022, there was $34 (pretax) of combined unrecognized compensation expense related to non-vested grants of both stock units and stock options. This
expense is expected to be recognized over a weighted average period of 1.77 years.
O. Pension and Other Postretirement Benefits
Defined Benefit Plans
Alcoa sponsors several defined benefit pension plans covering certain employees in the U.S. and foreign locations. Pension benefits generally depend on length of
service, job grade, and remuneration. Substantially all benefits are paid through pension trusts that are sufficiently funded to ensure that all plans can pay benefits to
retirees as they become due. Most salaried and non-bargaining hourly U.S. employees hired after March 1, 2006 and most bargaining hourly U.S. employees hired after
January 1, 2020 participate in a defined contribution plan instead of a defined benefit plan.
The Company also maintains health care postretirement benefit plans covering certain eligible U.S. retired employees and certain retirees from foreign locations.
Generally, the medical plans are unfunded and pay a percentage of medical expenses, reduced by deductibles and other coverage. The Company retains the right, subject
to existing agreements, to change or eliminate these benefits. All salaried and certain non-bargaining hourly U.S. employees hired after January 1, 2002 and certain
bargaining hourly U.S. employees hired after July 1, 2010 are not eligible for postretirement health care benefits.
As of January 1, 2022, the pension benefit plans and the other postretirement benefit plans covered an aggregate of approximately 22,000 and approximately 22,000
participants, respectively.
2022 Plan Actions. In 2022, management initiated the following actions to certain pension plans:
Action #1 – In the third quarter of 2022, settlement accounting and related plan remeasurements were triggered within Alcoa’s U.S. pension plans as a result of the
Company’s purchase of group annuity contracts to transfer the obligation to pay the remaining retirement benefits of approximately 4,400 retirees and beneficiaries
from its U.S. defined benefit pension plans. The transfer of approximately $1,000 in both plan obligations and plan assets was completed in August 2022. As a result,
Alcoa recorded a $5 increase to Accrued pension benefits and a $27 increase to Other noncurrent assets and recognized a non-cash settlement loss of $617 (pre- and
after-tax) in Restructuring and other charges, net on the Statement of Consolidated Operations.
Action #2 – In the third quarter of 2022, settlement accounting and related plan remeasurements were triggered within Alcoa’s U.S. pension plans as a result of
participants electing lump sum payments. Alcoa recognized a non-cash settlement loss of $11 (pre- and after-tax) in Restructuring and other charges, net on the
Statement of Consolidated Operations.
Action #3 – In the third quarter of 2022, settlement accounting and a related plan remeasurement was triggered within Alcoa’s U.S. salaried pension plan as a result of
participants electing lump sum payments. Alcoa recorded a $23 increase to Accrued pension benefits and a $12 decrease to Other noncurrent assets and recognized a
non-cash settlement loss of $1 (pre- and after-tax) in Restructuring and other charges, net on the Statement of Consolidated Operations.
Action #4 – In the third quarter of 2022, settlement accounting and a related plan remeasurement was triggered within Alcoa’s Australian pension plan as a result of
participants electing lump sum payments. Alcoa recorded a $21 increase to Other noncurrent assets and recognized a non-cash settlement gain of $3 (pre- and after-tax)
in Restructuring and other charges, net on the Statement of Consolidated Operations.
Action #5 – In the fourth quarter of 2022, settlement accounting was triggered within Alcoa’s U.S. pension plans as a result of participants electing lump sum
payments. Alcoa recorded a $3 increase to Accrued pension benefits and recognized a non-cash settlement loss of $6 (pre- and after-tax) in Restructuring and other
charges, net on the Statement of Consolidated Operations.
96
-- 98 of 363 --
The following table presents certain information and the financial impacts of these actions on the accompanying Consolidated Financial Statements:
Action #
Number of affected plan
participants
Weighted average
discount rate
as of prior plan
remeasurement
date Plan remeasurement date
Weighted average
discount rate as of
plan remeasurement
date
Increase to accrued
pension benefits
liability(1)
Increase (decrease) to
other noncurrent
assets(1)
Settlement loss
(gain)(2)
1 ~4,400 2.90% July 31, 2022 4.63% $ 5 $ 27 $ 617
2 ~45 2.90% July 31, 2022 4.63% — — 11
3 ~5 4.57% September 30, 2022 5.71% 23 (12) 1
4 ~25 2.46% September 30, 2022 4.99% — 21 (3)
5 ~20 N/A December 31, 2022 N/A 3 — 6
~4,495 $ 31 $ 36 $ 632
(1) Actions 1-4 caused interim plan remeasurements, including an update to the discount rates used to determine the benefit obligations of the affected plans. These
amounts include impacts due to interim plan remeasurements.
(2) These amounts represent the net actuarial loss (gain) and were reclassified from Accumulated other comprehensive loss to Restructuring and other charges, net
(see Note D) on the accompanying Statement of Consolidated Operations.
2021 Plan Actions. In 2021, management initiated the following actions to certain pension and other postretirement benefit plans:
Action #1 – On March 31, 2021, Alcoa completed the sale of the Warrick Rolling Mill to Kaiser Aluminum Corporation for total consideration of $670, which included
the assumption of $69 in other postretirement benefit liabilities. Approximately 1,150 employees at the rolling operations, which includes the casthouse, hot mill, cold
mills, and coating and slitting lines, became employees of Kaiser. As a result, the affected plan was remeasured, including an update to the discount rate used to
determine the benefit obligation of the plan. Accrued other postretirement benefits reflects a decrease of $40 related to the remeasurement in addition to the $69
assumed by Kaiser. Further, Alcoa recognized a curtailment gain of $17 (pre- and after-tax) and a settlement loss of $26 (pre- and after-tax).
Action #2 – In the second quarter of 2021, settlement accounting and a related plan remeasurement was triggered within Alcoa’s U.S. salaried pension plan as a result
of a high number of participants electing lump sum payments. This includes former employees of the Warrick Rolling Mill, as well as other Alcoa employees making
this election at retirement. Alcoa recorded a $90 decrease to Accrued pension benefits related to this remeasurement and recognized a settlement loss of $39 (pre- and
after-tax).
Action #3 – In the third quarter of 2021, settlement accounting and a related plan remeasurement was triggered within Alcoa’s U.S. salaried pension plan as a result of
participants electing lump sum payments. Alcoa recorded a $7 increase to Accrued pension benefits related to this remeasurement and recognized a settlement loss of $7
(pre- and after-tax).
Action #4 – In the third quarter of 2021, settlement accounting and a related plan remeasurement was triggered within Alcoa’s Australian pension plan as a result of
participants electing lump sum payments. Alcoa recorded a $38 decrease to Accrued pension benefits related to this remeasurement and recognized a settlement loss of
$1 (pre- and after-tax).
Action #5 – In the fourth quarter of 2021, the Company purchased a group annuity contract to transfer the obligation to pay the remaining retirement benefits of
approximately 800 retirees and deferred vested participants from one of its Suriname pension plans to an insurance company. The transfer of $55 in both plan
obligations and plan assets were completed on October 19, 2021. As a result, the Company recorded a settlement loss of $63 (pre- and after-tax) in Restructuring and
other charges, net on the Statement of Consolidated Operations in the fourth quarter of 2021.
Action #6 – In the fourth quarter of 2021, settlement accounting and related plan remeasurements were triggered within Alcoa’s U.S. pension plans as a result of the
Company purchasing group annuity contracts to transfer the obligation to pay remaining retirement benefits of approximately 14,000 retirees and beneficiaries from its
U.S. defined benefit pension plans and transferred approximately $1,540 in both plan obligations and plan assets. The transfers were completed on November 23, 2021
and December 16, 2021. As a result, the Company recorded a $84 decrease to Accrued pension benefits related to this remeasurement and recognized a non-cash
settlement loss of $848 (pre- and after-tax) in Restructuring and other charges, net on the Statement of Consolidated Operations in the fourth quarter of 2021.
Action #7 – In the fourth quarter of 2021, settlement accounting and related plan remeasurements were triggered within Alcoa’s U.S. pension plans as a result of
participants electing lump sum payments (and the group annuity contracts discussed in Action 6 above). Alcoa recorded a $1 decrease to Accrued pension benefits
related to this remeasurement and recognized a settlement loss of $10 (pre- and after-tax).
97
-- 99 of 363 --
The following table presents certain information and the financial impacts of these actions on the accompanying Consolidated Financial Statements:
Action #
Number of affected
plan participants
Weighted average
discount rate
as of prior plan
remeasurement
date
Plan remeasurement
date
Weighted average
discount rate as of
plan remeasurement
date
Increase (decrease)
to accrued pension
benefits liability
Decrease to accrued
other postretirement
benefits liability
Curtailment
gain(1)
Settlement
loss(1)
1 ~840 2.45% March 31, 2021 3.06% $ — $ (106) $ (17) $ 26
2 ~120 2.38% June 30, 2021 2.71% (90) — — 39
3 ~20 2.71% September 30, 2021 2.74% 7 — — 7
4 ~20 1.34% September 30, 2021 1.53% (38) — — 1
5 ~800 N/A N/A N/A N/A — — 63
6 ~14,000 2.59% November 30, 2021 2.79% (84) — — 848
7 ~60 2.59% November 30, 2021 2.79% (1) — — 10
$ (206) $ (106) $ (17) $ 994
(1) These amounts primarily represent the accelerated amortization of a portion of the existing prior service benefit for curtailments and net actuarial loss for
settlements and were reclassified from Accumulated other comprehensive loss to Restructuring and other charges, net (see Note D) on the accompanying
Statement of Consolidated Operations.
2020 Plan Actions. In 2020, management initiated the following actions to certain pension and other postretirement benefit plans:
Action #1 – In February 2020, the Company entered into a new, six-year collective bargaining agreement with the Union of Professional and Office Workers of the
Alcoa Smelter of Baie-Comeau in Canada. Under the agreement, all unionized office employees that are participants in one of the Company’s defined benefit pension
plans ceased accruing retirement benefits for future service effective January 1, 2021. This change affected approximately 20 employees, who were transitioned to a
target benefit plan, where the funding risk is assumed by the employees. The Company will contribute approximately 12% of these participants’ eligible earnings to the
new plan on an annual basis. Participants already collecting benefits or who terminated with a vested benefit under the defined benefit pension plan were not affected by
these changes.
Action #2 – In February 2020, the Company notified all non-unionized hourly employees of Aluminerie de Deschambault, who are participants in one of the
Company’s defined benefit pension plans, that they will cease accruing retirement benefits for future service effective January 1, 2021. This change affected
approximately 430 employees, who were transitioned to a to a member-funded pension plan, where the funding risk is assumed by the employees. The Company will
contribute approximately 12% of these participants’ eligible earnings to the new plan on an annual basis. Participants already collecting benefits or who terminated with
a vested benefit under the defined benefit pension plan were not affected by these changes.
Action #3 – In April 2020, as part of the Company’s portfolio review, Alcoa announced that it will curtail the remaining capacity at its Intalco smelter in Ferndale,
Washington amid declining market conditions. The full curtailment was completed during the third quarter of 2020, and the workforce was reduced by approximately
685 people. As a result, curtailment accounting was triggered in the U.S. hourly defined benefit pension and retiree life plans (3a and 3b in the below table,
respectively).
Action #4 – In September 2020, the Company and the United Steelworkers jointly notified certain U.S. retirees that their medical and prescription drug coverage will be
provided through an insured group Medicare Advantage and Prescription Drug plan and will include an increase to participant contributions, effective January 1, 2021.
These changes affected approximately 8,600 participants. Although the plan change and related remeasurement increased the other postretirement benefit liability by
$74, the plan change lowered the Company’s expected cash requirements for the program over the next five years.
Action #5 – In October 2020, the Company offered lump sum buyouts to specific participants in its U.S. defined benefit pension plans. As a result, the Company paid
approximately $33 from plan assets on December 31, 2020 to approximately 430 participants, was relieved of the corresponding pension obligation of $35, and
recognized a settlement loss of $44 (pre- and after-tax).
Action #6 – On November 30, 2020, Alcoa announced an agreement to sell the Warrick Rolling Mill to Kaiser. The sale closed on March 31, 2021. Approximately
1,170 employees at the rolling operations, which includes the casthouse, hot mill, cold mills, and coating and slitting lines, will become employees of Kaiser once the
transaction is complete. As a result, Alcoa recognized a pension curtailment loss of $5 (pre- and after-tax) in the fourth quarter of 2020.
98
-- 100 of 363 --
The following table presents certain information and the financial impacts of these actions on the accompanying Consolidated Financial Statements:
Action #
Number of affected
plan participants
Weighted average
discount rate as of
December 31, 2019
Plan remeasurement
date
Weighted average
discount rate as of
plan remeasurement
date
Increase (decrease)
to accrued pension
benefits liability(1)
Increase to accrued
other postretirement
benefits liability(1)
Curtailment
loss (gain)(2)
Settlement
loss(2)
1 ~20 3.15% January 31, 2020 2.75% $ 18 $ — $ 1 $ —
2 ~430 3.20% January 31, 2020 2.75% 28 — 2 —
3a ~300 3.25% April 30, 2020 2.92% 156 — 1 —
3b ~600 3.75% April 30, 2020 3.44% — — (2) —
4 ~8,600 3.11% August 31, 2020 2.65% — 74 — —
5 ~430 N/A December 31, 2020 N/A (2) — — 44
6 ~900 N/A December 31, 2020 N/A 5 — 5 —
~11,280 $ 205 $ 74 $ 7 $ 44
(1) Actions 1-4 caused interim plan remeasurements, including an update to the discount rates used to determine the benefit obligations of the affected plans. These
amounts include impacts due to interim plan remeasurements
(2) These amounts primarily represent the accelerated amortization of a portion of the existing prior service benefit for curtailments and net actuarial loss for
settlements and were reclassified from Accumulated other comprehensive loss to Restructuring and other charges, net (see Note D) on the accompanying
Statement of Consolidated Operations.
99
-- 101 of 363 --
Obligations and Funded Status
Pension benefits
Other
postretirement benefits
December 31, 2022 2021 2022 2021
Change in benefit obligation
Benefit obligation at beginning of year $ 4,594 $ 6,904 $ 710 $ 892
Service cost 13 22 4 4
Interest cost 107 120 15 15
Actuarial gains (803) (305) (140) (78)
Settlements (1,090) (1,763) — —
Benefits paid, net of participants’ contributions (211) (362) (53) (56)
Medicare Part D subsidy receipts — — — 2
Divestitures — — — (69)
Foreign currency translation impact (92) (22) — —
Benefit obligation at end of year $ 2,518 $ 4,594 $ 536 $ 710
Change in plan assets
Fair value of plan assets at beginning of year $ 4,306 $ 5,356 $ — $ —
Actual return on plan assets (528) 513 — —
Employer contributions 18 581 — —
Participant contributions 4 5 — —
Benefits paid (204) (356) — —
Administrative expenses (6) (4) — —
Settlements (1,090) (1,763) — —
Annuity purchase premium refund 22 — — —
Foreign currency translation impact (88) (26) — —
Fair value of plan assets at end of year $ 2,434 $ 4,306 $ — $ —
Funded status $ (84) $ (288) $ (536) $ (710)
Less: Amounts attributed to joint venture partners (6) (25) — —
Net funded status $ (78) $ (263) $ (536) $ (710)
Amounts recognized in the Consolidated Balance
Sheet consist of:
Noncurrent assets $ 146 $ 164 $ — $ —
Current liabilities (11) (10) (55) (60)
Noncurrent liabilities (213) (417) (481) (650)
Net amount recognized $ (78) $ (263) $ (536) $ (710)
Amounts recognized in Accumulated Other
Comprehensive Loss consist of:
Net actuarial loss $ 1,016 $ 1,877 $ 95 $ 253
Prior service cost (benefit) 2 2 (111) (125)
Total, before tax effect 1,018 1,879 (16) 128
Less: Amounts attributed to joint venture partners 27 38 — —
Net amount recognized, before tax effect $ 991 $ 1,841 $ (16) $ 128
Other Changes in Plan Assets and Benefit Obligations
Recognized in Other Comprehensive Income (Loss)
consist of:
Net actuarial benefit $ (141) $ (527) $ (140) $ (74)
Amortization of accumulated net actuarial loss (720) (1,159) (18) (47)
Amortization of prior service benefit — — 14 31
Total, before tax effect (861) (1,686) (144) (90)
Less: Amounts attributed to joint venture partners (11) (19) — —
Net amount recognized, before tax effect $ (850) $ (1,667) $ (144) $ (90)
At December 31, 2022, the benefit obligation, fair value of plan assets, and funded status for U.S. pension plans were $1,113, $1,064, and ($49), respectively. At
December 31, 2021, the benefit obligation, fair value of plan assets, and funded status for U.S. pension plans were $2,712, $2,681, and ($31), respectively.
100
-- 102 of 363 --
Pension Plan Benefit Obligations
Pension benefits
2022 2021
The aggregate projected benefit obligation and accumulated benefit obligation
for all defined benefit pension plans was as follows:
Projected benefit obligation $ 2,518 $ 4,594
Accumulated benefit obligation 2,453 4,438
The aggregate projected benefit obligation and fair value of plan assets for
pension plans with projected benefit obligations in excess of plan assets
was as follows:
Projected benefit obligation 1,465 3,031
Fair value of plan assets 1,232 2,579
The aggregate accumulated benefit obligation and fair value of plan assets for
pension plans with accumulated benefit obligations in excess of plan assets
was as follows:
Accumulated benefit obligation 1,458 2,918
Fair value of plan assets 1,232 2,579
Components of Net Periodic Benefit Cost
Pension benefits(1) Other postretirement benefits
2022 2021 2020 2022 2021 2020
Service cost $ 13 $ 22 $ 54 $ 4 $ 4 $ 5
Interest cost(2) 104 116 164 15 15 19
Expected return on plan assets(2) (151) (281) (292) — — —
Recognized net actuarial loss(2) 88 190 212 18 21 20
Amortization of prior service cost (benefit)(2) — — — (14) (14) (15)
Settlements(3) 632 968 51 — 26 —
Curtailments(4) — — 9 — (17) (2)
Net periodic benefit cost(5) $ 686 $ 1,015 $ 198 $ 23 $ 35 $ 27
(1) In 2022, 2021, and 2020, net periodic benefit cost for U.S pension plans was $698, $962, and $154, respectively.
(2) These amounts were reported in Other (income) expenses, net on the accompanying Statement of Consolidated Operations.
(3) These amounts were reported in Restructuring and other charges, net on the accompanying Statement of Consolidated Operations (see Note D). In 2022 and
2021, settlements were due to management actions (see Plan Actions above). In 2020, settlements were due to management actions ($44) (see Plan Actions
above) and payment of additional lump sum benefits ($7).
(4) These amounts were reported in Restructuring and other charges, net on the accompanying Statement of Consolidated Operations (see Note D). In 2021 and
2020, curtailments were due to management actions (see Plan Actions above).
(5) Amounts attributed to joint venture partners are not included.
Assumptions. Liabilities and expenses for pension and other postretirement benefits are determined using actuarial methodologies and incorporate significant
assumptions, including the interest rate used to discount the future estimated liability, the expected long-term rate of return on plan assets, and several assumptions
relating to the employee workforce (salary increases, health care cost trend rates, retirement age, and mortality).
Weighted average assumptions used to determine benefit obligations for pension and other postretirement benefit plans were as follows:
December 31, 2022 2021
Discount rate—pension plans 5.41% 2.99%
Discount rate—other postretirement benefit plans 5.54 2.82
Rate of compensation increase—pension plans 3.21 3.11
101
-- 103 of 363 --
The yield curve model used to develop the discount rate parallels the plans’ projected cash flows and has a weighted average duration of 11 years. The underlying cash
flows of the high-quality corporate bonds included in the model exceed the cash flows needed to satisfy the Company’s plan obligations multiple times. If a deep market
of high-quality corporate bonds does not exist in a country, then the yield on government bonds plus a corporate bond yield spread is used.
Weighted average assumptions used to determine net periodic benefit cost for pension and other postretirement benefit plans were as follows:
2022 2021 2020
Discount rate—pension plans 2.66% 1.91% 3.02%
Discount rate—other postretirement benefit plans 2.46 1.99 2.84
Expected long-term rate of return on plan assets—pension plans 4.94 5.66 6.28
Rate of compensation increase—pension plans 3.11 2.58 3.25
For 2022, 2021, and 2020, the expected long-term rate of return used by management was based on the prevailing and planned strategic asset allocations, as well as
estimates of future returns by asset class. For 2023, management anticipates that 6.21% will be the weighted average expected long-term rate of return.
Assumed health care cost trend rates for U.S. other postretirement benefit plans were as follows (non-U.S. plans are not material):
2022 2021 2020
Health care cost trend rate assumed for next year 7.0% 5.5% 5.5%
Rate to which the cost trend rate gradually declines 5.0% 4.5% 4.5%
Year that the rate reaches the rate at which it is assumed to remain 2028 2026 2026
The assumed health care cost trend rate is used to measure the expected cost of gross eligible charges covered by the Company’s other postretirement benefit plans. For
2023, a 7.0% trend rate will be used, reflecting management’s best estimate of the change in future health care costs covered by the plans.
Plan Assets. Alcoa’s pension plan weighted average target and actual asset allocations at December 31, 2022 and 2021, by asset class, were as follows:
Target asset allocation
Plan assets at
December 31,
Asset class 2022 2021 2022 2021
Equities 20% 25% 29% 28%
Fixed income 65 65 57 64
Other investments 15 10 14 8
Total 100% 100% 100% 100%
The principal objectives underlying the investment of the pension plan assets are to ensure that the Company can properly fund benefit obligations as they become due
under a broad range of potential economic and financial scenarios, maximize the long-term investment return with an acceptable level of risk based on such obligations,
and broadly diversify investments across and within various asset classes to protect asset values against adverse movements. Investment risk is controlled by
rebalancing to target allocations on a periodic basis and ongoing monitoring of investment manager performance.
The portfolio includes an allocation to investments in long-duration corporate credit and government debt, public and private market equities, intermediate duration
corporate credit and government debt, global-listed infrastructure, high-yield bonds and bank loans, real estate, and securitized credit.
In late 2022, management began restructuring the asset portfolios of certain non-U.S. pension plans. The new strategy will increase the amount and duration of the fixed
income asset portfolios to reduce exposure to interest rates and will be substantially implemented by the end of the first quarter in 2023.
Investment practices comply with the requirements of applicable laws and regulations in the respective jurisdictions, including the Employee Retirement Income
Security Act of 1974 (ERISA) in the United States.
The following section describes the valuation methodologies used by the trustees to measure the fair value of pension plan assets. For plan assets measured at net asset
value, this refers to the net asset value of the investment on a per share basis (or its equivalent) as a practical expedient. Otherwise, an indication of the level in the fair
value hierarchy in which each type of asset is generally classified is provided (see Note P for the definition of fair value and a description of the fair value hierarchy).
Equities—These securities consist of: (i) direct investments in the stock of publicly traded U.S. and non-U.S. companies and are valued based on the closing price
reported in an active market on which the individual securities are traded (generally classified in Level 1); (ii) the plans’ share of commingled funds that are invested in
the stock of publicly traded companies and are valued at net asset value; and (iii) direct investments in long/short equity hedge funds and private equity (limited
partnerships and venture capital partnerships) and are valued at net asset value.
102
-- 104 of 363 --
Fixed income—These securities consist of: (i) U.S. government debt and are generally valued using quoted prices (included in Level 1); (ii) cash and cash equivalents
invested in publicly-traded funds and are valued based on the closing price reported in an active market on which the individual securities are traded (generally
classified in Level 1); (iii) publicly traded U.S. and non-U.S. fixed interest obligations (principally corporate bonds and debentures) and are valued through consultation
and evaluation with brokers in the institutional market using quoted prices and other observable market data (included in Level 2); and (iv) cash and cash equivalents
invested in institutional funds and are valued at net asset value.
Other investments—These investments include, among others: (i) real estate investment trusts valued based on the closing price reported in an active market on which
the investments are traded (included in Level 1); (ii) the plans’ share of commingled funds that are invested in real estate partnerships and are valued at net asset value;
(iii) direct investments in private real estate (includes limited partnerships) and are valued at net asset value; and (iv) absolute return strategy funds and are valued at net
asset value.
The fair value methods described above may not be indicative of net realizable value or reflective of future fair values. Additionally, while Alcoa believes the valuation
methods used by the plans’ trustees are appropriate and consistent with other market participants, the use of different methodologies or assumptions to determine the fair
value of certain financial instruments could result in a different fair value measurement at the reporting date.
The following table presents the fair value of pension plan assets classified under either the appropriate level of the fair value hierarchy or net asset value:
December 31, 2022 Level 1 Level 2 Level 3
Net Asset
Value Total
Equities:
Equity securities $ 71 $ — $ — $ 480 $ 551
Long/short equity hedge funds — — — 8 8
Private equity — — — 145 145
$ 71 $ — $ — $ 633 $ 704
Fixed income:
Intermediate and long-duration government/credit $ 390 $ 426 $ — $ 420 $ 1,236
Cash and cash equivalent funds 38 — — 118 156
Other — — — — -
$ 428 $ 426 $ — $ 538 $ 1,392
Other investments:
Real estate $ 20 $ — $ — $ 282 $ 302
Other — — — 28 28
$ 20 $ — $ — $ 310 $ 330
Total(1) $ 519 $ 426 $ — $ 1,481 $ 2,426
December 31, 2021 Level 1 Level 2 Level 3
Net Asset
Value Total
Equities:
Equity securities $ 210 $ — $ — $ 671 $ 881
Long/short equity hedge funds — — — 4 4
Private equity — — — 281 281
$ 210 $ — $ — $ 956 $ 1,166
Fixed income:
Intermediate and long-duration government/credit $ 827 $ 1,027 $ — $ 651 $ 2,505
Cash and cash equivalent funds 64 — — 172 236
Other — — — — -
$ 891 $ 1,027 $ — $ 823 $ 2,741
Other investments:
Real estate $ 63 $ — $ — $ 263 $ 326
Other — — — 31 31
$ 63 $ — $ — $ 294 $ 357
Total(2) $ 1,164 $ 1,027 $ — $ 2,073 $ 4,264
(1) As of December 31, 2022, the total fair value of pension plan assets excludes a net receivable of $8, which primarily represents securities not yet settled plus
interest and dividends earned on various investments.
(2) As of December 31, 2021, the total fair value of pension plan assets excludes a net receivable of $42, which primarily represents securities not yet settled plus
interest and dividends earned on various investments.
103
-- 105 of 363 --
Funding and Cash Flows. It is Alcoa’s policy to fund amounts for defined benefit pension plans sufficient to meet the minimum requirements set forth in applicable
country benefits laws and tax laws, including ERISA for U.S. plans. From time to time, the Company contributes additional amounts as deemed appropriate.
In 2022, 2021, and 2020, cash contributions to Alcoa’s defined benefit pension plans were $17, $579, and $343.
During 2020, the Company initially deferred approximately $200 in pension contributions under provisions in the U.S. Government’s Coronavirus Aid, Relief, and
Economic Security (CARES) Act. With ample cash on hand and having achieved its objective to hold cash during uncertain times in 2020, the Company made a $250
pension contribution to its U.S. pension plans in late December to cover both the deferred contributions due on January 4, 2021 and a discretionary prepayment. During
2021, Alcoa made $500 in unscheduled contributions to certain U.S. defined benefit pension plans. The additional contributions were discretionary in nature and were
funded with net proceeds from a March 2021 debt issuance (see Note M) plus available cash on hand. There were no discretionary contributions made in 2022.
Alcoa’s minimum required contribution to defined benefit pension plans in 2023 is estimated to be $75, of which approximately $55 is for U.S. plans. Under ERISA
regulations, a plan sponsor that establishes a pre-funding balance by making discretionary contributions to a U.S. defined benefit pension plan may elect to apply all or a
portion of this balance toward its minimum required contribution obligations to the related plan in future years. In 2023, management intends to make such election
related to the Company’s U.S. plans.
Benefit payments expected to be paid to pension and other postretirement benefit plan participants are as follows:
Year ending December 31,
Pension
benefits
Other
postretirement
benefits
2023 $ 195 $ 55
2024 190 55
2025 190 50
2026 190 50
2027 195 45
2028 through 2032 915 210
$ 1,875 $ 465
Defined Contribution Plans
The Company sponsors savings and investment plans in several countries, primarily in Australia and the United States. In the United States, employees may contribute a
portion of their compensation to the plans, and Alcoa matches a specified percentage of these contributions in equivalent form of the investments elected by the
employee. Also, the Company makes contributions to a retirement savings account based on a percentage of eligible compensation for certain U.S. employees that are
not able to participate in Alcoa’s defined benefit pension plans. The Company’s expenses related to all defined contribution plans were $71 in 2022, $72 in 2021, and
$73 in 2020.
Member-funded Pension Plans
The Company contributes to member-funded pension plans for the employees of Aluminerie de Bécancour Inc. and Aluminerie de Deschambault in Canada. Alcoa
makes contributions to the plans based on a percentage of the employees’ eligible compensation. The Company’s expenses related to the member-funded pension plans
were $17 in 2022, $17 in 2021, and $10 in 2020.
Target Benefit Plan
The Company contributes to a target benefit plan for the employees of Baie-Comeau in Canada. Alcoa makes contributions to the plan based on a percentage of the
employees’ eligible compensation. The Company’s expenses related to the target benefit plan were $9 in 2022, and $9 in 2021.
104
-- 106 of 363 --
P. Derivatives and Other Financial Instruments
Fair Value. The Company follows a fair value hierarchy to measure its assets and liabilities. As of December 31, 2022 and 2021, respectively, the assets and liabilities
measured at fair value on a recurring basis were primarily derivative instruments. In addition, the Company measures its pension plan assets at fair value (see Note O).
Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the
measurement date. The fair value hierarchy distinguishes between (i) market participant assumptions developed based on market data obtained from independent
sources (observable inputs) and (ii) an entity’s own assumptions about market participant assumptions developed based on the best information available in the
circumstances (unobservable inputs). The fair value hierarchy consists of three broad levels, which gives the highest priority to unadjusted quoted prices in active
markets for identical assets or liabilities (Level 1) and the lowest priority to unobservable inputs (Level 3). The three levels of the fair value hierarchy are described
below:
• Level 1—Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities;
• Level 2—Inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly, including quoted
prices for similar assets or liabilities in active markets; quoted prices for identical or similar assets or liabilities in markets that are not active; inputs other
than quoted prices that are observable for the asset or liability (e.g., interest rates); and inputs that are derived principally from or corroborated by observable
market data by correlation or other means; and,
• Level 3—Inputs that are both significant to the fair value measurement and unobservable.
Derivatives. Alcoa Corporation is exposed to certain risks relating to its ongoing business operations, including the risks of changing commodity prices, foreign
currency exchange rates and interest rates. Alcoa Corporation’s commodity and derivative activities include aluminum, energy, foreign exchange, and interest rate
contracts, which are held for purposes other than trading. They are used to mitigate uncertainty and volatility, and to cover underlying exposures. While Alcoa does not
generally enter into derivative contracts to mitigate the risk associated with changes in aluminum price, the Company may do so in isolated cases to address discrete
commercial or operational conditions. Alcoa is not involved in trading activities for energy, weather derivatives, or other nonexchange commodities.
Alcoa Corporation’s commodity and derivative activities are subject to the management, direction, and control of the Strategic Risk Management Committee (SRMC),
which consists of at least three members, including the chief executive officer, the chief financial officer, and the chief commercial officer. The remaining member(s)
are other officers and/or employees of the Company as the chief executive officer may designate from time to time. The SRMC meets on a periodic basis to review
derivative positions and strategy and reports to the Audit Committee of Alcoa Corporation’s Board of Directors on the scope of its activities.
Alcoa Corporation’s aluminum and foreign exchange contracts are predominately classified as Level 1 under the fair value hierarchy. All of the Level 1 contracts are
designated as either fair value or cash flow hedging instruments (except as described below). Alcoa Corporation also has several derivative instruments classified as
Level 3 under the fair value hierarchy, which are either designated as cash flow hedges or undesignated. Alcoa includes the changes in its equity method investee’s
Level 2 derivatives in Accumulated other comprehensive loss.
The following tables present the detail for Level 1 and 3 derivatives (see additional Level 3 information in further tables below):
2022 2021
Balance at December 31, Assets Liabilities Assets Liabilities
Level 1 derivative instruments $ 84 $ 14 $ 19 $ 29
Level 3 derivative instruments 52 1,212 2 1,293
Total $ 136 $ 1,226 $ 21 $ 1,322
Less: Current 134 200 14 274
Noncurrent $ 2 $ 1,026 $ 7 $ 1,048
2022 2021
Year ended December 31,
Unrealized loss recognized in
Other comprehensive loss
Realized loss reclassed from
Other comprehensive loss to
earnings
Unrealized loss recognized in
Other comprehensive loss
Realized loss reclassed from
Other comprehensive loss
Level 1 derivative instruments $ 116 $ 35 $ (28) $ (10)
Level 3 derivative instruments (247) (345) (759) (279)
Noncontrolling and equity interest (Level 2) 12 (6) 5 (6)
Total $ (119) $ (316) $ (782) $ (295)
The 2022 realized gain of $35 on Level 1 cash flow hedges was comprised of a $40 gain recognized in Sales and a $5 loss recognized in Cost of goods sold. The 2021
realized loss of $10 on Level 1 cash flow hedges was comprised of a $7 loss recognized in Sales and a $3 loss recognized in Cost of goods sold.
105
-- 107 of 363 --
The following table presents the outstanding quantities of derivative instruments classified as Level 1:
Classification December 31, 2022 December 31, 2021
Aluminum (in kmt) Commodity buy forwards 176 166
Aluminum (in kmt) Commodity sell forwards 337 485
Foreign currency (in millions of euro) Foreign exchange buy forwards 60 92
Foreign currency (in millions of Norwegian krone) Foreign exchange buy forwards 302 —
Foreign currency (in millions of Brazilian real) Foreign exchange buy forwards 1,008 1,318
Foreign currency (in millions of Brazilian real) Foreign exchange sell forwards 7 —
Alcoa routinely uses Level 1 aluminum derivative instruments to manage exposures to changes in the fair value of firm commitments for the purchases or sales of
aluminum. Additionally, Alcoa uses Level 1 aluminum derivative instruments to manage exposures to changes in the LME associated with the Alumar (Brazil) restart
(April 2022 through December 2023) and the San Ciprián (Spain) strike (expired October 2022). As a result of a delay with the Alumar restart, it became probable that
certain of the original forecasted transactions would not occur by the end of the originally specified time period and Alcoa dedesignated certain aluminum sell forwards.
The Company reclassified the related unrealized gain of $20 included in Accumulated other comprehensive loss to Sales during the year ended December 31, 2022. In
conjunction with the dedesignations, the Company entered into aluminum buy forwards in 2022 for the same volume and periods which were also not designated. The
unrealized and realized gains and losses on the aluminum buy and sell forwards that are not designated will offset resulting in no impact to Alcoa’s earnings.
Alcoa Corporation uses Level 1 foreign exchange forward contracts to mitigate the risk of foreign exchange exposure related to euro power purchases in Norway
(expires December 2026), krone capital expenditures in Norway (expires June 2025), and U.S. dollar alumina and aluminum sales in Brazil (expires December 2024).
Derivative instruments classified as Level 3 in the fair value hierarchy represent those in which management has used at least one significant unobservable input in the
valuation model. Alcoa Corporation uses a discounted cash flow model to fair value all Level 3 derivative instruments. Inputs in the valuation models for Level 3
derivative instruments are composed of the following: (i) quoted market prices (e.g., aluminum prices on the 10-year LME forward curve and energy prices),
(ii) significant other observable inputs (e.g., information concerning time premiums and volatilities for certain option type embedded derivatives and regional premiums
for aluminum contracts), and (iii) unobservable inputs (e.g., aluminum and energy prices beyond those quoted in the market, and estimated credit spread between Alcoa
and the counterparty). For periods beyond the term of quoted market prices for aluminum, Alcoa Corporation estimates the price of aluminum by extrapolating the 10-
year LME forward curve. For periods beyond the term of quoted market prices for the Midwest premium, management estimates the Midwest premium based on recent
transactions. Where appropriate, valuations are adjusted for various factors such as liquidity, bid/offer spreads, and credit considerations. Such adjustments are generally
based on available market evidence (Level 2). In the absence of such evidence, management’s best estimate is used (Level 3). If a significant input that is unobservable
in one period becomes observable in a subsequent period, the related asset or liability would be transferred to the appropriate classification (Level 1 or 2) in the period
of such change (there were no such transfers in the periods presented). There were no sales or settlements of Level 3 derivative instruments in the periods presented.
Level 3 derivative instruments outstanding as of December 31, 2022 are described in the table below:
Description Designation Contract Termination
Unobservable Inputs
Impacting Valuation Sensitivity to Inputs
Power contracts
Embedded derivative that indexes the price of power
to the LME price of aluminum plus the Midwest
premium
Cash flow hedge of forward
sales of aluminum
March 2026
December 2029
February 2036
LME price, Midwest
premium and MWh per
year
Increase in LME price and/or the Midwest premium
results in a higher cost of power and an increase to
the derivative liability
Embedded derivative that indexes the price of power
to the LME price of aluminum
Cash flow hedge of forward
sales of aluminum
September 2027 LME price and MWh
per year
Increase in LME price results in a higher cost of
power and an increase to the derivative liability
Embedded derivative that indexes the price of power
to the credit spread between the Company and the
counterparty
Not designated October 2028 Estimated credit spread Wider credit spread results in a higher cost of power
and increase in the derivative liability
Financial contracts
Hedge power prices Not designated June 2026 LME price and power
price
Lower prices in the power market or higher LME
prices result in an increase in the derivative liability
Hedge power prices Cash flow hedge of forward
sales of power
March 2023 Power price Higher prices in the power market results in an
increase in the derivative liability
106
-- 108 of 363 --
In December 2022, Alcoa entered into a financial contract (Financial contract, below) with a counterparty to hedge power price exposure through March 31, 2023. The
Financial contract is designated as a cash flow hedge of future sales of power. Unrealized gains and losses are recognized in Accumulated other comprehensive loss on
the accompanying Consolidated Balance Sheet, and realized gains and losses are recognized in Cost of goods sold on the accompanying Statement of Consolidated
Operations.
In addition to the instruments presented above, Alcoa had a financial contract that expired in July 2021 that hedged the anticipated power requirements at one of its
smelters and was designated as a cash flow hedge of future purchases of electricity. In March 2021, Alcoa
entered into four financial contracts (Financial contracts (undesignated), below) with three counterparties to hedge the anticipated power requirements at this
smelter for the period from August 1, 2021 through June 30, 2026. A fifth financial contract (undesignated) was entered into in November 2021, with an effective date of
September 30, 2022 through June 30, 2026. Two of these financial contracts include LME-linked pricing components and do not qualify for hedge accounting
treatment. Management elected not to apply hedge accounting treatment for the other three financial contracts. Unrealized and realized gains and losses on these
financial contracts are included in Other (income) expenses, net on the accompanying Statement of Consolidated Operations.
At December 31, 2022, the outstanding Level 3 instruments are associated with eight smelters. At December 31, 2022 and 2021, the power contracts with embedded
derivatives designated as cash flow hedges hedge forecasted aluminum sales of 1,683 kmt and 1,905 kmt, respectively.
The following table presents quantitative information related to the significant unobservable inputs described above for Level 3 derivative instruments (megawatt hours
in MWh):
December 31, 2022 Unobservable input Unobservable input range
Asset Derivatives
Financial contracts $ 32 Interrelationship of Electricity (per MWh) 2023: $56.79
(undesignated) forward energy price, LME 2023: $75.71
forward price and the LME (per mt) 2023: $2,350
Consumer Price Index 2023: $2,406
Financial contract 20 Interrelationship of Electricity (per MWh) 2023: $196.85
forward energy price and the contract
price
Total asset derivatives $ 52
Liability Derivatives
Power contract $ 237 MWh of energy needed LME (per mt) 2023: $2,350
to produce the forecasted 2027: $2,791
mt of aluminum Electricity Rate of 4 million MWh per year
Power contracts 975 MWh of energy needed
to produce the forecasted
mt of aluminum
LME (per mt) 2023: $2,350
2029: $2,886
2036: $3,182
Midwest premium
(per pound)
2023: $0.240
2029: $0.265
2036: $0.265
Electricity Rate of 18 million MWh per year
Power contract — MWh of energy needed
to produce the forecasted
LME 2023: $2,350
2023: $2,372
mt of aluminum Midwest premium 2023: $0.240
2023: $0.253
Electricity Rate of 2 million megawatt hours per year
Power contract (undesignated) — Estimated spread between
the 30-year debt yield of
Alcoa and the counterparty
Credit spread 1.10%: 30-year debt yield spread
6.63%: Alcoa (estimated)
5.53%: counterparty
Total liability derivatives $ 1,212
107
-- 109 of 363 --
The fair values of Level 3 derivative instruments recorded in the accompanying Consolidated Balance Sheet were as follows:
Asset Derivatives
December 31,
2022
December 31,
2021
Derivatives designated as hedging instruments:
Current—financial contract $ 20 $ —
Total derivatives designated as hedging instruments $ 20 $ —
Derivatives not designated as hedging instruments:
Current—financial contracts $ 32 $ 2
Total derivatives not designated as hedging instruments $ 32 $ 2
Total asset derivatives $ 52 $ 2
Liability Derivatives
Derivatives designated as hedging instruments:
Current—power contracts $ 195 $ 262
Noncurrent—power contracts 1,017 1,028
Total derivatives designated as hedging instruments $ 1,212 $ 1,290
Derivatives not designated as hedging instruments:
Current—embedded credit derivative $ — $ 1
Noncurrent—embedded credit derivative — 2
Total derivatives not designated as hedging instruments $ — $ 3
Total liability derivatives $ 1,212 $ 1,293
The following table shows the net fair values of the Level 3 derivative instruments at December 31, 2022 and the effect on these amounts of a hypothetical change
(increase or decrease of 10%) in the market prices or rates that existed as of December 31, 2022:
Fair value
asset (liability)
Index change
of + / -10%
Power contracts $ (1,212) $ 329
Embedded credit derivative - -
Financial contracts 52 6
The following tables present a reconciliation of activity for Level 3 derivative instruments:
Assets Liabilities
2022
Financial
contracts Power contracts
Embedded
credit
derivative
January 1, 2022 $ 2 $ 1,290 $ 3
Total gains or losses included in:
Sales (realized) — (345) —
Other income, net (unrealized) 171 — (3)
Other comprehensive (income) loss (unrealized) 20 267 —
Settlements and other (141) — —
December 31, 2022 $ 52 $ 1,212 $ —
Change in unrealized gains or losses included in earnings for
derivative instruments held at December 31, 2022:
Other income, net $ 171 $ — $ (3)
Assets Liabilities
2021
Financial
contract Power contracts
Financial
contract
Embedded
credit
derivative
January 1, 2021 $ — $ 814 $ 1 $ 23
Total gains or losses included in:
Sales (realized) — (277) — —
Cost of goods sold (realized) (6) — (8) —
Other (income) expenses, net (unrealized/realized) 7 — — (20)
Other comprehensive loss (unrealized) — 753 6 —
Other 1 — 1 —
December 31, 2021 $ 2 $ 1,290 $ — $ 3
Change in unrealized gains or losses included in earnings for
derivative instruments held at December 31, 2021:
Other (income) expenses, net $ 5 $ — $ (1) $ (19)
108
-- 110 of 363 --
Derivatives Designated As Hedging Instruments—Cash Flow Hedges
Assuming market rates remain constant with the rates at December 31, 2022, a realized loss of $195 related to power contracts is expected to be recognized in Sales
over the next 12 months.
Material Limitations
The disclosures with respect to commodity prices and foreign currency exchange risk do not consider the underlying commitments or anticipated transactions. If the
underlying items were included in the analysis, the gains or losses on the futures contracts may be offset. Actual results will be determined by several factors that are not
under Alcoa Corporation’s control and could vary significantly from those factors disclosed.
Alcoa Corporation is exposed to credit loss in the event of nonperformance by counterparties on the above instruments, as well as credit or performance risk with
respect to its hedged customers’ commitments. Alcoa Corporation does not anticipate nonperformance by any of these parties. Contracts are with creditworthy
counterparties and are further supported by cash, treasury bills, or irrevocable letters of credit issued by carefully chosen banks. In addition, various master netting
arrangements are in place with counterparties to facilitate settlement of gains and losses on these contracts.
Other Financial Instruments. The carrying values and fair values of Alcoa Corporation’s other financial instruments were as follows:
2022 2021
December 31,
Carrying
value
Fair
value
Carrying
value
Fair
value
Cash and cash equivalents $ 1,363 $ 1,363 $ 1,814 $ 1,814
Restricted cash 111 111 110 110
Short-term borrowings — — 75 75
Long-term debt due within one year 1 1 1 1
Long-term debt, less amount due within one year 1,806 1,744 1,726 1,865
Cash and cash equivalents and Restricted cash. The carrying amounts approximate fair value because of the short maturity of the instruments. The fair value amounts
for Cash and cash equivalents and Restricted cash were classified in Level 1 of the fair value hierarchy.
Short-term borrowings and Long-term debt, including amounts due within one year. The fair value of Long-term debt, less amount due within one year was based
on quoted market prices for public debt and on interest rates that are currently available to Alcoa Corporation for issuance of debt with similar terms and maturities for
non-public debt. The fair value amounts for all Short-term borrowings and Long-term debt were classified in Level 2 of the fair value hierarchy.
Q. Income Taxes
Provision for income taxes. The components of Income before income taxes were as follows:
2022 2021 2020
Domestic $ (652) $ (663) $ (328)
Foreign 1,354 1,862 501
Total $ 702 $ 1,199 $ 173
Provision for income taxes consisted of the following:
2022 2021 2020
Current:
Federal $ — $ 8 $ 2
Foreign 445 473 211
State and local — 1 —
$ 445 $ 482 $ 213
Deferred:
Federal (3) 6 —
Foreign 222 141 (26)
State and local — — —
$ 219 $ 147 $ (26)
Total $ 664 $ 629 $ 187
109
-- 111 of 363 --
Federal includes U.S. income taxes related to foreign income.
A reconciliation of the U.S. federal statutory rate to Alcoa’s effective tax rate was as follows:
2022 2021 2020
U.S. federal statutory rate 21.0% 21.0% 21.0%
Changes in valuation allowances 76.7 23.4 168.3
Taxes on foreign operations—rate differential 9.9 10.8 34.5
Tax on foreign operations—other 1.3 1.7 (0.7)
Noncontrolling interest 0.8 0.5 1.6
Uncertain tax positions 0.4 — (21.5)
Impacts of the TCJA — 2.0 (88.8)
Adjustment of prior year income taxes — — (2.5)
Equity (loss) income (2.0) (2.5) 2.0
Tax holidays (5.2) (2.8) (1.9)
Internal legal entity reorganizations (9.0) — —
Other 0.7 (1.6) (3.9)
Effective tax rate 94.6% 52.5% 108.1%
In the fourth quarter of 2020, the Supreme Court of Spain ruled in favor of Alcoa regarding the 2006 through 2009 tax year assessment. As a result, the reserve for
Uncertain tax positions that was established in 2018 was released in 2020.
On December 22, 2017, U.S. tax legislation known as the U.S. Tax Cuts and Jobs Act of 2017 (the TCJA) was enacted. In 2018, the Company made an accounting
policy election to include as a period cost the tax impact generated by including Global Intangible Low-Taxed Income provisions (GILTI) in U.S. taxable income.
During 2020, the U.S. Treasury Department finalized regulations implementing the GILTI provisions of the TCJA. Included in these regulations is an exclusion from
GILTI for income subject to a high rate of foreign tax, which permits taxpayers to elect to apply the exception to previously filed tax returns. During 2020, an amended
tax return was filed for 2018 to make this election. As a result, the Company recorded a tax benefit of ($138) in 2020 to reflect the re-establishment of certain U.S.
Federal net operating loss carryforwards and a corresponding tax charge of $138 to record a full valuation allowance against the increased deferred tax asset.
Certain income earned by AWAB is eligible for a tax holiday, which decreases the tax rate on this income from 34% to 15.25%, which will result in future cash tax
savings. The holiday related to production at the Alumar refinery will end on December 31, 2027, and the holiday related to the operation of the Juruti (Brazil) bauxite
mine will end on December 31, 2026. In 2020, deferred tax assets expected to reverse in the holiday period were revalued at the holiday rate. This resulted in a discrete
income tax charge of $15 in 2020. In 2021, it was determined that the deferred taxes associated with the tax holiday would be fully exhausted within the holiday period
and the amounts were therefore maintained on the balance sheet at the holiday tax rate. In 2022, the Company’s projection of the reversal of deferred tax assets during
the holiday tax period was lowered, and as a result, the remainder was revalued at the statutory rate of 34%, resulting in a discrete income tax benefit of $33, which is
included in Tax holidays, above.
In October 2022, Alcoa completed the liquidation of Alcoa Saudi Rolling Inversiones S.L. (ASRI), a wholly owned subsidiary that previously held the Company’s
investment in the Ma’aden Rolling Company. This liquidation resulted in a deductible loss in the Netherlands and a tax benefit of $94 was recognized in 2022, however,
this tax benefit was substantially offset by a valuation allowance.
In December 2022, Alcoa commenced an internal reorganization to reduce its number of legal entities in Norway from four to one to simplify accounting and treasury
functions and reduce external costs. As a result of the simplification, the Company recorded a deferred tax expense of $30 in 2022.
110
-- 112 of 363 --
Deferred income taxes. The components of deferred tax assets and liabilities based on the underlying attributes without regard to jurisdiction were as follows:
2022 2021
December 31,
Deferred
tax
assets
Deferred
tax
liabilities
Deferred
tax
assets
Deferred
tax
liabilities
Tax loss carryforwards $ 1,781 $ — $ 1,554 $ —
Employee benefits 297 — 409 —
Derivatives and hedging activities 283 24 345 —
Loss provisions 174 — 214 —
Depreciation 128 336 128 425
Interest 127 2 105 1
Investment basis differences 75 — 117 —
Lease assets and liabilities 24 23 26 22
Tax credit carryforwards 23 — 26 —
Deferred income/expense 10 153 2 135
Other 36 — 38 —
$ 2,958 $ 538 $ 2,964 $ 583
Valuation allowance (2,333) — (2,062) —
Total $ 625 $ 538 $ 902 $ 583
The following table details the expiration periods of the deferred tax assets presented above:
December 31, 2022
Expires
within
10 years
Expires
within
11-20
years
No
expiration Other Total
Tax loss carryforwards $ 298 $ 364 $ 1,119 $ — $ 1,781
Tax credit carryforwards 23 — — — 23
Other — — 142 1,012 1,154
Valuation allowance (321) (363) (1,141) (508) (2,333)
Total $ — $ 1 $ 120 $ 504 $ 625
Deferred tax assets with no expiration may still have annual limitations on utilization. Other represents deferred tax assets whose expiration is dependent upon the
reversal of the underlying temporary difference.
The total deferred tax asset (net of valuation allowance) is supported by projections of future taxable income exclusive of reversing temporary differences and taxable
temporary differences that reverse within the carryforward period. The composition of Alcoa’s net deferred tax asset by jurisdiction as of December 31, 2022 was as
follows:
Domestic Foreign Total
Deferred tax assets $ 964 $ 1,994 $ 2,958
Valuation allowance (897) (1,436) (2,333)
Deferred tax liabilities (67) (471) (538)
Total $ — $ 87 $ 87
The Company has several income tax filers in various foreign countries. Of the $87 net deferred tax asset included under the Foreign column in the table above,
approximately 85% relates to five of Alcoa’s income tax filers (the “Foreign Filers”) as follows: a $108 net deferred tax asset for Alcoa Canada Company in Canada; a
$96 net deferred tax asset for AWAB in Brazil; a $43 net deferred tax asset for Alcoa Lauralco Management Company in Canada; a $33 net deferred tax asset for Alcoa
Wolinbec Company in Canada; and, a $207 net deferred tax liability for AofA in Australia.
The future realization of the net deferred tax asset for each of the Foreign Filers was based on projections of the respective future taxable income (defined as the sum of
pretax income, other comprehensive income, and permanent tax differences), exclusive of reversing temporary differences and carryforwards. The realization of the net
deferred tax assets of the Foreign Filers is not dependent on any future tax planning strategies.
111
-- 113 of 363 --
The Foreign Filers do not have a history of tax loss carryforwards expiring unused. Additionally, tax loss carryforwards have an infinite life under the income tax code
in Brazil. However, utilization of an existing tax loss carryforward is limited to 30% of taxable income in a particular year in Brazil.
Accordingly, management concluded that the net deferred tax assets of the Foreign Filers referenced above will more likely than not be realized in future periods,
resulting in no need for a partial or full valuation allowance as of December 31, 2022.
In December 2022, Alcoa recorded a valuation allowance of $217 against the net deferred tax assets of Alumínio, of which $150 related to the balance as of December
31, 2021. The 2022 full valuation allowance for Alumínio was a result of Alumínio’s three-year cumulative loss position for the period ended December 31, 2022.
Although the Company entered into aluminum contracts to manage exposures associated with the restart, these contracts were held by another legal entity, and the
associated realized gains are not available to Alumínio to offset the restart losses. While management believes Alumínio will return to profitability in the future with the
restart of the Alumar smelter, current volatility in the market does not provide a reliable basis for concluding that it is more likely than not that Alumínio’s net deferred
tax assets, which consist primarily of tax loss carryforwards with indefinite life, will be realized. Alumar smelter profitability in future periods could prompt the
Company to evaluate the realizability of the deferred tax asset and assess the possibility of a reversal of the valuation allowance, which could have a significant impact
on net income in the quarter the valuation allowance is reversed.
The Company’s subsidiaries in Iceland have a full valuation allowance recorded against deferred tax assets, which was established in 2015 and 2017, as the Company
believed it was more likely than not that these tax benefits would not be realized. Strong market conditions in the first half of 2022 prompted management to reevaluate
the realizability of the deferred tax asset and assess the possibility of a reversal of the valuation allowance. However, after weighing all available positive and negative
evidence as of December 31, 2022, management’s position continues to be that it is more likely than not that Alcoa Corporation would not realize the benefit of these
deferred tax assets and continues to have a full valuation allowance recorded against Iceland deferred tax assets.
In 2021, Alcoa recorded a valuation allowance of $103 against the net deferred tax assets of Alúmina Española, S.A. (Española). Management concluded that it was
more likely than not that Española’s net deferred tax assets, which consisted primarily of tax loss carryforwards, would not be realized as the entity’s sole operating
asset, the San Ciprián refinery, was in a three-year cumulative loss position for the period ended December 31, 2021. This cumulative loss position was the result of
recent operating losses due to the high energy costs in Spain and the impact of the refinery workers’ strike on the fourth quarter of 2021. After weighing all available
positive and negative evidence as of December 31, 2022, management’s position continues to be that it is more likely than not that Alcoa Corporation would not realize
the benefit of these deferred tax assets and continues to have a full valuation allowance recorded against the deferred tax assets.
The following table details the changes in the valuation allowance:
December 31, 2022 2021 2020
Balance at beginning of year $ (2,062) $ (2,127) $ (1,778)
Establishment of new allowances(1) (150) (103) —
Net change to existing allowances(2) (151) 139 (315)
Foreign currency translation 30 29 (34)
Balance at end of year $ (2,333) $ (2,062) $ (2,127)
(1) This line item reflects valuation allowances initially established as a result of a change in management’s judgment regarding the realizability of deferred tax
assets.
(2) This line item reflects movements in previously established valuation allowances, which increase or decrease as the related deferred tax assets increase or
decrease. Such movements occur as a result of remeasurement due to a tax rate change and changes in the underlying attributes of the deferred tax assets,
including expiration of the attribute and reversal of the temporary difference that gave rise to the deferred tax asset.
Undistributed net earnings. Certain earnings of Alcoa’s foreign subsidiaries are deemed to be permanently reinvested outside the United States. The cumulative
amount of Alcoa’s foreign undistributed net earnings deemed to be permanently reinvested was approximately $2,794 as of December 31, 2022. Alcoa Corporation has
several commitments and obligations related to the Company’s operations in various foreign jurisdictions; therefore, management has no plans to distribute such
earnings in the foreseeable future. Alcoa Corporation continuously evaluates its local and global cash needs for future business operations and anticipated debt facilities,
which may influence future repatriation decisions. If these earnings were distributed in the form of dividends or otherwise, we could be subject to foreign income or
withholding taxes and state income taxes. Due to the uncertainty of the manner in which the undistributed earnings would be brought back to the United States and the
tax laws in effect at that time, it is not practicable to estimate the tax liability that might be incurred if such earnings were remitted to the U.S.
112
-- 114 of 363 --
Unrecognized tax benefits. Alcoa and its subsidiaries file income tax returns in the U.S. federal jurisdiction and various foreign and U.S. state jurisdictions. With few
exceptions, the Company is not subject to income tax examinations by tax authorities for years prior to 2014. The U.S. federal income tax filings of the Company’s U.S.
consolidated tax group have been examined through the 2018 tax year. Foreign jurisdiction tax authorities are in the process of examining income tax returns of several
of Alcoa’s subsidiaries for various tax years. Excluding the Australia tax matter discussed in Note S, the period under foreign examination includes the income tax years
from 2012 through 2021. For U.S. state income tax purposes, the Company and its subsidiaries remain subject to income tax examinations for the 2017 tax year and
forward.
In the third quarter of 2020, AofA paid approximately $74 (A$107) to the ATO related to the tax dispute described in Note S. Upon payment, AofA recorded a
noncurrent prepaid tax asset, as the Company continues to believe it is more likely than not that AofA’s tax position will be sustained and therefore is not recognizing
any tax expense in relation to this matter. In accordance with Australian tax laws, the initial interest assessment and additional interest are deductible against AofA’s
taxable income resulting in approximately $169 (A$219) in 2020, $14 (A$19) in 2021, and $15 (A$22) in 2022 in lower cash tax payments. Interest compounded in
future years is also deductible against AofA’s income in the respective periods. If AofA is ultimately successful, the interest deduction would become taxable as income
in the year the dispute is resolved. In addition, should the ATO decide in the interim to reduce any interest already assessed, the reduction would be taxable as income at
that point in time. During 2022, AofA continued to record its tax provision and tax liability without effect of the ATO assessment, since it expects to prevail. The tax
payable will remain on AofA’s balance sheet as a noncurrent liability, increased by the tax effect of subsequent periods’ interest deductions, until dispute resolution,
which is expected to take several years. The noncurrent liability resulting from the cumulative interest deductions was approximately $174 (A$260) and $174 (A$238)
at December 31, 2022 and 2021, respectively.
The reserve balance for unrecognized tax benefits is included in Noncurrent income taxes on the Consolidated Balance Sheet. A reconciliation of the beginning and
ending amount of unrecognized tax benefits (excluding interest and penalties) was as follows:
December 31, 2022 2021 2020
Balance at beginning of year $ 4 $ 4 $ 29
Additions for tax positions of prior years 2 — —
Reductions for tax positions of prior years — — (26)
Expiration of the statute of limitations (1) — —
Foreign currency translation — — 1
Balance at end of year $ 5 $ 4 $ 4
For all periods presented, a portion of the balance at end of year pertains to state tax liabilities, which are presented before any offset for federal tax benefits. The effect
of unrecognized tax benefits, if recorded, that would impact the annual effective tax rate for 2022, 2021, and 2020 would be 1%, 0%, and 3%, respectively, of Income
before income taxes. In 2018, the Company recorded a charge of $30 (€26), including $10 (€9) for interest, in Provision for income taxes on the accompanying
Statement of Consolidated Operations to establish a liability for its 49% share of the estimated loss on a disputed income tax matter (see Spain in the Tax section of
Note S). In 2020, the Company received a favorable final ruling in the Supreme Court of Spain on the Spain tax matter and recorded income of $32 (€26) from the
reversal of the 2018 entry and the interest expense accrued through 2019. This change is reflected in the above table as Reductions for tax positions of prior years in the
amount of $21 (€17), which is exclusive of interest previously charged to expense. The remainder of the change in Reductions for tax positions of prior years is
primarily related to changes in Brazil income tax positions. There were no material changes in Reductions for tax positions of prior years in 2021 or 2022. Alcoa does
not anticipate that changes in its unrecognized tax benefits will have a material impact on the Statement of Consolidated Operations during 2023.
It is the Company’s policy to recognize interest and penalties related to income taxes as a component of the Provision for income taxes on the accompanying Statement
of Consolidated Operations. In 2022, 2021, and 2020 Alcoa recognized $1, $0, and $0, in interest and penalties, respectively. Due to the expiration of the statute of
limitations, settlements with tax authorities, and refunded overpayments, the Company also recognized interest income of $1, $0, and $13 in 2022, 2021, and 2020,
respectively. As of December 31, 2022 and 2021, the amount accrued for the payment of interest and penalties was $3 and $2, respectively.
On August 16, 2022, the U.S. enacted the Inflation Reduction Act of 2022, which includes a 15% minimum tax on book income of certain large corporations, a 1%
excise tax on net stock repurchases after December 31, 2022, and several tax incentives to promote clean energy. This legislation did not have a material impact on the
Company’s Consolidated Financial Statements as of December 31, 2022.
R. Asset Retirement Obligations
Alcoa records AROs related to legal obligations associated with the standard operation of bauxite mines, alumina refineries, and aluminum smelters. These AROs
consist primarily of costs associated with mine reclamation, closure of bauxite residue areas, spent pot lining disposal, and landfill closures. The Company also
recognizes AROs for the disposal of regulated waste materials related to the demolition of facilities and for any significant lease restoration obligations, if required by a
lease agreement.
113
-- 115 of 363 --
The following table details the carrying value of recorded AROs by major category, of which $117 and $116 was classified as a current liability as of December 31,
2022 and 2021, respectively:
December 31, 2022 2021
Closure of bauxite residue areas $ 342 $ 274
Mine reclamation 279 255
Spent pot lining disposal 115 107
Demolition 61 72
Landfill closure 31 30
Balance at end of year $ 828 $ 738
The following table details the changes in the total carrying value of recorded AROs:
December 31, 2022 2021
Balance at beginning of year $ 738 $ 753
Accretion expense 20 20
Liabilities incurred 224 101
Payments (114) (101)
Reversals of previously recorded liabilities (12) (6)
Foreign currency translation and other (28) (29)
Balance at end of year $ 828 $ 738
Liabilities incurred in 2022 include:
• $81 related to improvements required on both operating and non-operating bauxite residue areas at the Poços de Caldas and Alumar (Brazil) refineries for changes in
closure estimates and to comply with updated impoundment regulations in the regions;
• $79 for new mining areas opened during the year and higher estimated mine reclamation costs;
• $28 related to spent pot lining treatment and disposal;
• $18 for bauxite residue areas related to water management at non-operating bauxite residue areas and changes in engineering designs for closure of operating
bauxite residue areas;
• $15 related to the closure of the previously curtailed magnesium smelter in Addy (Washington). The facility has been fully curtailed since 2001; and,
• $3 related to accruals for demolition projects at closed sites.
The additional accruals were primarily recorded with corresponding capitalized asset retirement costs (see Note B) except for $72 related to non-operating bauxite
reside areas which were recorded to Cost of Goods Sold at Poços de Caldas and Alumar and $34 related to the closure of the smelter in Addy (Washington) and
adjustments to other previously closed sites which were recorded to Restructuring and other charges, net on the accompanying Statement of Consolidated Operations
(see Note D).
Liabilities incurred in 2021 include:
• $30 for new mine areas opened during the year and higher estimated mine reclamation costs, partially driven by increased complexity of reclamation areas
due to steeper mine pits and grades;
• $28 for bauxite residue areas, including new bauxite residue areas as well as changes in engineering designs for both operating and non-operating bauxite
residue areas;
• $17 related to spent pot lining treatment and disposal;
• $16 related to the closure of the Wenatchee smelter announced in the fourth quarter of 2021;
• $5 related to the closure of the Lake Charles anode facility announced in the third quarter of 2021; and,
• $5 related to changes in scope for landfill closures.
The additional accruals were primarily recorded with corresponding capitalized asset retirement costs (see Note B) except for $23 related to closed sites which were
recorded to Restructuring and other charges, net on the accompanying Statement of Consolidated Operations (see Note D).
In 2022, reversals of previously recorded liabilities included a reversal of $12 due to the completion of demolition projects at numerous permanently closed sites. In
2021, reversals of previously recorded liabilities included a reversal of $5 due to the determination that previously estimated demolition costs were not required at the
previously closed Tennessee site.
114
-- 116 of 363 --
S. Contingencies and Commitments
Contingencies
Environmental Matters
Alcoa Corporation participates in environmental assessments and cleanups at several locations. These include currently or previously owned or operated facilities and
adjoining properties, and waste sites, including Superfund (Comprehensive Environmental Response, Compensation and Liability Act (CERCLA)) sites.
Alcoa Corporation’s environmental remediation reserve balance reflects the most probable costs to remediate identified environmental conditions for which costs can be
reasonably estimated. The following table details the changes in the carrying value of recorded environmental remediation reserves:
Balance at December 31, 2019 $ 335
Liabilities incurred 7
Cash payments (19)
Reversals of previously recorded liabilities (1)
Balance at December 31, 2020 322
Liabilities incurred 21
Cash payments (23)
Reversals of previously recorded liabilities (17)
Foreign currency translation and other 6
Balance at December 31, 2021 309
Liabilities incurred 32
Cash payments (26)
Reversals of previously recorded liabilities (30)
Foreign currency translation and other (1)
Balance at December 31, 2022 $ 284
At December 31, 2022 and 2021, the current portion of the remediation reserve balance was $58 and $44, respectively.
In 2022, the Company incurred liabilities of $32 primarily related to $14 for the closure of the previously curtailed magnesium smelter in Addy (Washington), $6 for
estimates for environmental remediation at the Point Henry site, $4 for a new phase of work at the former East St. Louis site and $9 for environmental activities at
various sites. These charges are recorded in Cost of goods sold and Restructuring and other charges, net (see Note D) on the accompanying Statement of Consolidated
Operations. Payments related to remediation expenses applied against the reserve were $26 in 2022. These amounts include mandated expenditures as well as those not
required by any regulatory authority or third party. Further, the Company recorded a reversals of reserves of $30 during 2022, primarily related to changes in estimates
for site remediation at Massena East of $18 and Suralco of $5, and completion of remediation at a previously closed site in Brazil of $6.
In 2021, the Company incurred liabilities of $21 primarily related to remediation design considerations at the Longview site in Washington, closure of the Wenatchee
aluminum smelter in Washington, environmental activities at the Point Comfort site in Texas, closure of the anode plant at the Lake Charles site in Louisiana, and
wetlands mitigation at the Longview site in Washington, as well as other increases for ongoing monitoring and maintenance at various sites. These charges are primarily
recorded in Cost of goods sold and Restructuring and other charges, net on the accompanying Statement of Consolidated Operations. These amounts include mandated
expenditures as well as those not required by any regulatory authority or third-party. Further, the Company recorded reversals of reserves of $17 related to:
• $7 due to the determination that previously estimated site remediation is not required at the previously closed Tennessee site;
• $5 due to lower costs for waste treatment at a previously closed Suriname site; and,
• $5 due to lower costs for site remediation related to a previously closed site in Brazil.
In 2020, the Company incurred liabilities of $7 which were primarily related to ongoing remediation work at various sites. The additional accruals were recorded to
Cost of goods sold except for $1 which was recorded to Restructuring and other charges, net on the accompanying Statement of Consolidated Operations (see Note D).
115
-- 117 of 363 --
The estimated timing of cash outflows from the environmental remediation reserve at December 31, 2022 is as follows:
2023 $ 58
2024 - 2027 169
Thereafter 57
Total $ 284
Reserve balances at December 31, 2022 and 2021, associated with significant sites with active remediation underway or for future remediation were $234 and $247,
respectively. In management’s judgment, the Company’s reserves are sufficient to satisfy the provisions of the respective action plans. Upon changes in facts or
circumstances, a change to the reserve may be required. The Company’s significant sites include:
Poços de Caldas, Brazil—The reserve associated with the 2015 closure of the Alcoa Alumínio S.A. smelter in Poços de Caldas, Brazil, is for remediation of historic
smelting operations, spent potlining storage and disposal areas.
Fusina and Portovesme, Italy—Alcoa Corporation’s subsidiary Alcoa Trasformazioni S.r.l. has remediation projects underway for its closed smelter sites at Fusina and
Portovesme which have been approved by the Italian Ministry for Ecologic Transition (MET). Soil remediation at the Fusina site was mostly completed in the first half
of 2022, however, the scope of the project was changed to include the northwest area of the site; approval of the change is expected in the second half of 2023 with
completion by the end of 2024. Soil remediation at the Portovesme site was completed in the first half of 2022.
Suriname—The reserve associated with the 2017 closure of the Suralco refinery and bauxite mine is for treatment and disposal of refinery waste and soil remediation.
The work began in 2017 and is expected to be completed at the end of 2025.
Hurricane Creek, Arkansas—The reserve associated with the 1990 closure of two mining areas and refineries near Hurricane Creek, Arkansas is for ongoing
monitoring and maintenance for water quality surrounding the mine areas and residue disposal areas.
Massena, New York—The reserve associated with the 2015 closure of the Massena East smelter by the Company’s subsidiary, Reynolds Metals Company, is for
subsurface soil remediation to be performed after demolition of the structures. Remediation work commenced in 2021 and will take four to eight years to complete.
Point Comfort, Texas—The reserve associated with the 2019 closure of the Point Comfort alumina refinery is for disposal of industrial wastes contained at the site,
subsurface remediation, and post-closure monitoring and maintenance. The final remediation plan is currently under review, which may result in a change to the existing
reserve.
Sherwin, Texas—In connection with the 2018 settlement of a dispute related to the previously-owned Sherwin alumina refinery, the Company’s subsidiary, Copano
Enterprises LLC, accepted responsibility for the final closure of four bauxite residue waste disposal areas (known as the Copano facility). Work commenced on the first
residue disposal area in 2018 and will take up to three additional years to complete, depending on the nature of its potential re-use. Other than ongoing maintenance and
repair activities, work on the next three areas has not commenced but is expected to be completed by 2048, depending on its potential re-use.
Longview, Washington— In connection with a 2018 Consent Decree and Cleanup Action Plan with the State of Washington Department of Ecology, the Company’s
subsidiary, Northwest Alloys as landowner, accepted certain responsibilities for future remediation of contaminated soil and sediments at the site located near Longview,
Washington. In December 2020, the lessee of the land, who was a partner in the remediation of the site, filed for bankruptcy and exited the site in January 2021.
Remediation design changes for consolidation and remediation of the onsite industrial waste landfills, groundwater remediation, and post-closure monitoring and
maintenance at the site was completed in 2021.
Addy, Washington—The reserve associated with the 2022 closure of the Addy magnesium smelter facility is for site-wide remediation and investigation and post-
closure monitoring and maintenance. Remediation work is not expected to begin until 2024 and will take three to five years to complete. The final remediation plan is
currently being developed, which may result in a change to the existing reserve.
Other Sites—The Company is in the process of decommissioning various other plants and remediating sites in several countries for potential redevelopment or to
return the land to a natural state. In aggregate, there are approximately 30 remediation projects at these other sites that are planned or underway. These activities will be
completed at various times in the future with the latest expected to be in 2026, after which ongoing monitoring and other activities may be required. At December 31,
2022 and 2021, the reserve balance associated with these activities was $50 and $62, respectively.
116
-- 118 of 363 --
Tax
Brazil (AWAB)— In March 2013, AWAB was notified by the Brazilian Federal Revenue Office (RFB) that approximately $110 (R$220) of value added tax credits
previously claimed were being disallowed and a penalty of 50% was assessed. Of this amount, AWAB received $41 (R$82) in cash in May 2012. The value added tax
credits were claimed by AWAB for both fixed assets and export sales related to the Juruti bauxite mine and São Luís refinery expansion for tax years 2009 through
2011. The RFB has disallowed credits they allege belong to the consortium in which AWAB owns an interest and should not have been claimed by AWAB. Credits have
also been disallowed as a result of challenges to apportionment methods used, questions about the use of the credits, and an alleged lack of documented proof. AWAB
presented defense of its claim to the RFB on April 8, 2013. In February 2022, the RFB notified AWAB that it had inspected the value added tax credits claimed for 2012
and disallowed $4 (R$19). In its decision, the RFB allowed credits of $14 (R$65) that were similar to those previously disallowed for 2009 through 2011. In July 2022,
the RFB notified AWAB that it had inspected the value added tax credits claimed for 2013 and disallowed $13 (R$70). In its decision, the RFB allowed credits of
$16 (R$84) that were similar to those previously disallowed for 2009 through 2011. The decisions on the 2012 and 2013 credits provide positive evidence to support
management’s opinion that there is no basis for these credits to be disallowed. AWAB received the 2012 allowed credits with interest of $9 (R$44) in March 2022 and
the 2013 allowed credits with interest of $6 (R$31) in August 2022. AWAB will continue to dispute the credits that were disallowed for 2012 and 2013. If AWAB is
successful in this administrative process, the RFB would have no further recourse. If unsuccessful in this process, AWAB has the option to litigate at a judicial level.
Separately from AWAB’s administrative appeal, in June 2015, a new tax law was enacted repealing the provisions in the tax code that were the basis for the RFB
assessing a 50% penalty in this matter. As such, the estimated range of reasonably possible loss for these matters is $0 to $45 (R$239). It is management’s opinion that
the allegations have no basis; however, at this time, the Company is unable to reasonably predict an outcome for this matter.
Australia (AofA)— In December 2019, AofA received a statement of audit position (SOAP) from the Australian Taxation Office (ATO) related to the pricing of certain
historic third-party alumina sales. The SOAP proposed adjustments that would result in additional income tax payable by AofA. During 2020, the SOAP was the subject
of an independent review process within the ATO. At the conclusion of this process, the ATO determined to continue with the proposed adjustments and issued Notices
of Assessment (the Notices) that were received by AofA on July 7, 2020. The Notices asserted claims for income tax payable by AofA of approximately $143 (A$214).
The Notices also included claims for compounded interest on the tax amount totaling approximately $474 (A$707).
On September 17, 2020, the ATO issued a position paper with its preliminary view on the imposition of administrative penalties related to the tax assessment issued to
AofA. This paper proposed penalties of approximately $86 (A$128).
AofA disagreed with the Notices and with the ATO’s proposed position on penalties. In September 2020, AofA lodged formal objections to the Notices. In the fourth
quarter of 2020, AofA provided a submission on the ATO’s imposition of interest and also submitted a response to the ATO’s position paper on penalties. After the ATO
completes its review of AofA’s response to the penalties position paper, the ATO could issue a penalty assessment.
To date, AofA has not received a response to its submission on the ATO’s imposition of interest or its response to the ATO’s position paper on penalties.
Through February 1, 2022, AofA did not receive a response from the ATO on AofA’s formal objections to the Notices and, on that date, AofA submitted statutory
notices to the ATO requiring the ATO to make decisions on AofA’s objections within a 60-day period. On April 1, 2022, the ATO issued its decision disallowing the
Company’s objections related to the income tax assessment, while the position on penalties and interest remains outstanding.
On April 29, 2022, AofA filed proceedings in the Australian Administrative Appeals Tribunal (AAT) against the ATO to contest the Notices, a process which could last
several years. The AAT held the first directions hearing on July 25, 2022 ordering AofA to file its evidence and related materials by November 4, 2022, ATO to file its
materials by April 14, 2023 and AofA to file reply materials by May 26, 2023. AofA filed its evidence and related materials on November 4, 2022. The Company
maintains that the sales subject to the ATO’s review, which were ultimately sold to Aluminium Bahrain B.S.C., were the result of arm’s length transactions by AofA over
two decades and were made at arm’s length prices consistent with the prices paid by other third-party alumina customers.
In accordance with the ATO’s dispute resolution practices, AofA paid 50% of the assessed income tax amount exclusive of interest and any penalties, or approximately
$74 (A$107), during the third quarter 2020, and the ATO is not expected to seek further payment prior to final resolution of the matter. If AofA is ultimately successful,
any amounts paid to the ATO as part of the 50% payment would be refunded. AofA funded the payment with cash on hand and recorded the payment within Other
noncurrent assets as a noncurrent prepaid tax asset; the related December 31, 2022 balance is $72 (A$107).
Further interest on the unpaid tax will continue to accrue during the dispute. The initial interest assessment and the additional interest accrued are deductible against
taxable income by AofA but would be taxable as income in the year the dispute is resolved if AofA is ultimately successful. AofA applied this deduction beginning in
the third quarter of 2020 which reduced cash tax payments by approximately $169 (A$219) in 2020, $14 (A$19) in 2021, and $15 (A$22) in 2022. This amount has
been reflected within Other noncurrent liabilities and deferred credits as a noncurrent accrued tax liability; the related December 31, 2022 balance is $174 (A$260).
117
-- 119 of 363 --
The Company continues to believe it is more likely than not that AofA’s tax position will be sustained and therefore is not recognizing any tax expense in relation to this
matter. However, because the ultimate resolution of this matter is uncertain at this time, the Company cannot predict the potential loss or range of loss associated with
the outcome, which may materially affect its results of operations and financial condition. References to any assessed U.S. dollar amounts presented in connection with
this matter have been converted into U.S. dollars from Australian dollars based on the exchange rate in the respective period.
AofA is part of the Company’s joint venture with Alumina Limited, an Australian public company listed on the Australian Securities Exchange. The Company and
Alumina Limited own 60% and 40%, respectively, of the joint venture entities, including AofA.
Other
Spain— In July 2019, the Company completed the divestiture of the Avilés and La Coruña (Spain) aluminum facilities to PARTER Capital Group AG (PARTER) in a
sale process endorsed by the Spanish government and supported by the workers’ representatives following a collective dismissal process.
In connection with the divestiture, Alcoa committed to make financial contributions to the divested entities of up to $95; a total of $78 was paid through December 31,
2021.
In early 2020, PARTER sold a majority stake in the facilities to an unrelated party. Alcoa had no knowledge of the subsequent transaction prior to its announcement
and on August 28, 2020, Alcoa filed a lawsuit with the Court of First Instance in Madrid, Spain asserting that the sale was in breach of the sale agreement between
Alcoa and PARTER.
Related to this subsequent sale transaction, certain proceedings and investigations have been initiated by or at the request of the employees of the facilities against their
current employers, the new owners of the current employers, and Alcoa, alleging that certain agreements from the 2019 collective dismissal process remain in force and
that, under such agreements, Alcoa remains liable for certain related employment benefits. One such proceeding is a collective case before the Spanish National Court,
filed on November 10, 2020, wherein the workers’ representatives and employees are seeking to have the terms of a Collective Dismissal Agreement signed between
Alcoa and the workers in January 2019 be fulfilled. Other proceedings include: a second collective claim filed in National Court on behalf of employees that were not
affected by the 2019 collective dismissal process, numerous individual labor claims filed in the labor courts of Avilés and La Coruña and the initiation of a separate
criminal investigation by the National Court.
On June 15, 2021, the Spanish National Court ruled that the collective dismissal agreement for the divested Avilés and La Coruña aluminum facilities should be applied
to the situation of the claimant workers, and that Alcoa should be liable for the severance of those employees to the extent they were affected by the 2019 collective
dismissal process. Alcoa appealed this ruling to the Supreme Court of Spain.
In July 2021, the Spanish National Court appointed a judicial director to oversee the facilities and later declared the facilities insolvent. In early 2022, the insolvency
administrators appointed by the courts (one for each facility) announced their intention to collectively dismiss all employees at the two facilities.
In the first quarter of 2022, the Company recorded a charge of $77 in Restructuring and other charges, net to reflect its estimate for the agreement reached with the
workers of the divested Avilés and La Coruña facilities (Spain) to settle various legal disputes related to the 2019 divestiture.
In April 2022, the Company received unanimous acceptance of the offer from all active workers of the divested Avilés and La Coruña facilities and a Global Settlement
Agreement (GSA) was fully executed. The Company recorded a charge of $2 in Restructuring and other charges, net in the quarter ended June 30, 2022 to reflect an
update to its estimated liability for the GSA. The Company expects to make cash payments in 2023 upon completion of certain administrative and judicial approvals.
General
In addition to the matters discussed above, various other lawsuits, claims, and proceedings have been or may be instituted or asserted against Alcoa Corporation,
including those pertaining to environmental, safety and health, commercial, tax, product liability, intellectual property infringement, employment, and employee and
retiree benefit matters, and other actions and claims arising out of the normal course of business. While the amounts claimed in these other matters may be substantial,
the ultimate liability is not readily determinable because of the considerable uncertainties that exist. Accordingly, it is possible that the Company’s liquidity or results of
operations in a particular period could be materially affected by one or more of these other matters. However, based on facts currently available, management believes
that the disposition of these other matters that are pending or asserted will not have a material adverse effect, individually or in the aggregate, on the financial position
of the Company.
118
-- 120 of 363 --
Commitments
Purchase Obligations. Alcoa Corporation is party to unconditional purchase obligations for energy that expire between 2040 and 2041. Commitments related to these
contracts total $59 in 2023, $62 in 2024, $64 in 2025, $66 in 2026, $68 in 2027, and $716 thereafter. Expenditures under these contracts totaled $58 in 2022, $86 in
2021, and $79 in 2020. Additionally, the Company has entered into other purchase commitments for energy, raw materials, and other goods and services, which total
$4,402 in 2023, $2,328 in 2024, $2,004 in 2025, $1,665 in 2026, $1,518 in 2027, and $10,392 thereafter.
AofA has a gas supply agreement to power its three alumina refineries in Western Australia which began in July 2020 for a 12-year period. The terms of this agreement
required AofA to make a prepayment of $500 in two installments, the first of which was made in June 2015 for $300. The second installment of $200 was made in April
2016. At December 31, 2022, Alcoa Corporation had a total asset of $348 (A$519), which was included in Prepaid expenses and other current assets ($37) and Other
noncurrent assets ($311) (see Note U) on the accompanying Consolidated Balance Sheet related to these prepayments. At December 31, 2021, Alcoa Corporation had a
total asset of $417 (A$571), which was included in Prepaid expenses and other current assets ($40) and Other noncurrent assets ($377) (see Note U) on the
accompanying Consolidated Balance Sheet.
Guarantees of Third Parties. As of December 31, 2022 and 2021, the Company had no outstanding potential future payments for guarantees issued on behalf of a
third-party.
Bank Guarantees and Letters of Credit. Alcoa Corporation has outstanding bank guarantees and letters of credit related to, among others, energy contracts,
environmental obligations, legal and tax matters, leasing obligations, workers compensation, and customs duties. The total amount committed under these instruments,
which automatically renew or expire at various dates between 2023 and 2024, was $293 (includes $131 issued under a standby letter of credit agreement —see below)
at December 31, 2022. Additionally, ParentCo has outstanding bank guarantees and letters of credit related to the Company of $14 at December 31, 2022. In the event
ParentCo would be required to perform under any of these instruments, ParentCo would be indemnified by Alcoa Corporation in accordance with the Separation and
Distribution Agreement. Likewise, the Company has outstanding bank guarantees and letters of credit related to ParentCo of $8 at December 31, 2022. In the event
Alcoa Corporation would be required to perform under any of these instruments, the Company would be indemnified by ParentCo in accordance with the Separation
and Distribution Agreement.
In August 2017, Alcoa Corporation entered into a standby letter of credit agreement, which expires on June 27, 2024 (extended in August 2018, May 2019, May 2021,
and June 2022), with three financial institutions. The agreement provides for a $200 facility used by the Company for matters in the ordinary course of business. Alcoa
Corporation’s obligations under this facility are secured in the same manner as obligations under the Company’s revolving credit facility. Additionally, this facility
contains similar representations and warranties and affirmative, negative, and financial covenants as the Company’s revolving credit facility (see Note M). As of
December 31, 2022, letters of credit aggregating $131 were issued under this facility.
Surety Bonds. Alcoa Corporation has outstanding surety bonds primarily related to tax matters, contract performance, workers compensation, environmental-related
matters, and customs duties. The total amount committed under these bonds, which automatically renew or expire at various dates between 2023 and 2027, was $174 at
December 31, 2022. Additionally, ParentCo has outstanding surety bonds related to the Company of $11 at December 31, 2022. In the event ParentCo would be
required to perform under any of these instruments, ParentCo would be indemnified by Alcoa Corporation in accordance with the Separation and Distribution
Agreement. Likewise, the Company has outstanding surety bonds related to ParentCo of $3 at December 31, 2022. In the event Alcoa Corporation would be required to
perform under any of these instruments, the Company would be indemnified by ParentCo in accordance with the Separation and Distribution Agreement.
T. Leasing
Management records a right-of-use asset and lease liability for several types of operating leases, including land and buildings, alumina refinery process control
technology, plant equipment, vehicles, and computer equipment. These amounts are equivalent to the aggregate future lease payments on a discounted basis. The leases
have remaining terms of less than one to 35 years. The discount rate applied to these leases is the Company’s incremental borrowing rate based on the information
available at the commencement date in determining the present value of lease payments, unless there is a rate implicit in the lease agreement. The Company does not
have material financing leases.
Lease expense and operating cash flows include:
2022 2021
Costs from operating leases $ 54 $ 70
Variable lease payments $ 16 $ 13
Short-term rental expense $ 2 $ 3
119
-- 121 of 363 --
The weighted average lease term and weighted average discount rate were as follows:
December 31, 2022 2021
Weighted average lease term for operating leases (years) 5.1 4.9
Weighted average discount rate for operating leases 5.6% 5.2%
The following represents the aggregate right-of-use assets and related lease obligations recognized in the Consolidated Balance Sheet:
December 31, 2022 2021
Properties, plants, and equipment, net $ 89 $ 97
Other current liabilities 30 35
Other noncurrent liabilities and deferred credits 59 64
Total operating lease liabilities $ 89 $ 99
New leases of $26 and $24 were added during the years ended December 31, 2022 and 2021, respectively.
The future cash flows related to the operating lease obligations as of December 31, 2022 were as follows:
Year Ending December 31,
2023 $ 37
2024 25
2025 14
2026 11
2027 8
Thereafter 16
Total lease payments (undiscounted) 111
Less: discount to net present value (22)
Total $ 89
U. Other Financial Information
Interest Cost Components
2022 2021 2020
Amount charged to expense $ 106 $ 195 $ 146
Amount capitalized 3 6 9
$ 109 $ 201 $ 155
Other (Income) Expenses, Net
2022 2021 2020
Equity loss (gain) $ 27 $ (105) $ 46
Foreign currency losses, net 9 3 20
Net loss (gain) from asset sales 10 (354) (173)
Net (gain) loss on mark-to-market derivative instruments (P) (174) (25) 11
Non-service costs – pension and OPEB (O) 60 47 108
Other, net (50) (11) (4)
$ (118) $ (445) $ 8
In 2021, Net loss (gain) from asset sales of $354 was primarily related to the sales of the Rockdale site, the Eastalco site, and the Warrick Rolling Mill (see Note C). In
2020, Net gain from asset sales included a $181 gain related to the sale of EES (see Note C).
In 2022, Other, net of $50 was primarily related to interest income for the Brazil value added tax credits (see Note S).
120
-- 122 of 363 --
Other Noncurrent Assets
December 31, 2022 2021
Gas supply prepayment (S) $ 311 $ 377
Prepaid gas transmission contract 285 304
Value added tax credits 294 215
Deferred mining costs, net 161 149
Prepaid pension benefit (O) 146 164
Goodwill (L) 145 144
Noncurrent restricted cash (see below) 56 106
Noncurrent prepaid tax asset (S) 72 78
Intangibles, net (L) 29 35
Other 94 92
$ 1,593 $ 1,664
Prepaid gas transmission contract—As part of a previous sale transaction of an equity investment, Alcoa maintained access to approximately 30% of the Dampier to
Bunbury Natural Gas Pipeline transmission capacity in Western Australia for gas supply to three alumina refineries. At December 31, 2022 and 2021, AofA had an
asset of $285 and $304, respectively, representing prepayments made under the agreement for future gas transmission services.
Value added tax credits—The Value added tax (VAT) credits (federal and state) relate to two of the Company’s subsidiaries in Brazil, AWAB and Alumínio,
concerning the São Luís smelter and refinery and the Juruti mine. This refinery pays VAT on the purchase of goods and services used in the alumina production process.
The credits generally can be utilized to offset the VAT charged on domestic sales of alumina and aluminum.
In March 2021, the Brazil Federal Supreme Court provided clarification on an earlier ruling that found the inclusion of state VAT within the federal VAT tax base to be
unconstitutional. After receiving further clarification from the court in August 2021, the Company finalized the amount of its recovery claim and submitted the claim to
the tax authorities in the fourth quarter and received acknowledgment of the claim in January 2022. As a result, in the fourth quarter of 2021, the Company recorded $95
of additional VAT credits in Other noncurrent assets, $47 payable to Arconic Corporation within Other noncurrent liabilities, $34 in Sales, and $14 of interest income
within Other (income) expenses, net. The amount due to Arconic Corporation represents VAT payments related to an Arconic subsidiary previously owned by Alumínio
for a portion of the claim years and covered under agreements related to the Separation Transaction (see Note A).
In the fourth quarter of 2018, after an assessment of the future realizability of the state VAT credits, the Company established an allowance on the accumulated state
VAT credit balances and recorded a $107 charge in Restructuring and other charges, net, on the accompanying Statement of Consolidated Operations. With the restart of
the Alumar smelter in São Luís, Brazil and its first metal sales in June 2022, the Company now has the ability to monetize these credits. In June 2022, the Company
reversed the allowance with a credit of $83 to Restructuring and other charges, net and reversed the subsequent additions to the valuation allowance with a credit of
$46 to Cost of goods sold (same accounts as when incurred).
Other Noncurrent Liabilities and Deferred Credits
December 31, 2022 2021
Noncurrent accrued tax liability (S) $ 174 $ 174
Accrued compensation and retirement costs 95 120
Operating lease obligations (T) 59 64
Deferred energy credits 37 54
Value added tax credits payable to Arconic Corporation 51 47
Noncurrent restructuring reserve (D) 3 43
Deferred alumina sales revenue 28 36
Noncurrent site separation reserve (C) — 26
Other 39 35
$ 486 $ 599
121
-- 123 of 363 --
Deferred energy credits—Deferred energy credits relate to cash received for 2018 and 2019 carbon dioxide emissions related to the San Ciprián smelter ($40) and
refinery ($6), as well as the divested Avilés and La Coruña facilities ($7), from a governmental agency in Spain. During 2022, these credits were repaid and cash was
received for 2021 San Ciprián smelter carbon dioxide emission credits ($30). The terms of the credits require the Company to comply with certain conditions for a
period of three years. These deferred credits will be recognized as a reduction to Cost of goods sold once it is determined to be probable the Company will satisfy all
conditions. Should the Company not meet all conditions during the three-year period, the credits will be repaid to the governmental agency.
During the fourth quarter of 2022, the Norwegian government approved a 2023 budget proposal that sets a floor for the carbon dioxide compensation to be paid in 2023
based on 2022 power purchased. The Company recorded an adjustment of $25 in the fourth quarter of 2022 to Cost of goods sold to reverse amounts accrued for 2022
credits earned through September 30, 2022 under the prior carbon dioxide compensation program.
Value added tax credits payable to Arconic Corporation—See, Other noncurrent assets—Value added tax credits, above.
Cash and Cash Equivalents and Restricted Cash
December 31, 2022 2021
Cash and cash equivalents $ 1,363 $ 1,814
Current restricted cash 55 4
Noncurrent restricted cash 56 106
$ 1,474 $ 1,924
On December 29, 2021, the Company announced the two-year curtailment of the San Ciprián aluminum smelter in Spain. As a result of the agreement reached between
Alcoa and the San Ciprián workers’ representatives, the Company has restricted cash of $103 to be made available in the future to cover capital expenditures and future
restart costs associated with the planned restart at the end of the curtailment period.
Cash Flow Information
Cash paid for interest and income taxes was as follows:
2022 2021 2020
Interest, net of amount capitalized $ 100 $ 191 $ 135
Income taxes, net of amount refunded 504 152 183
V. Subsequent Events
On February 23, 2023, the Board of Directors declared a quarterly cash dividend of $0.10 per share of the Company’s common stock, to be paid on March 23, 2023 to
stockholders of record as of the close of business on March 7, 2023.
On February 3, 2023, the Company reached an updated agreement with the workers’ representatives to commence the restart process of the San Ciprián (Spain)
aluminum smelter in phases beginning in January 2024. Alcoa plans that all pots will be restarted by October 1, 2025, and from October 1, 2025 until the end of 2026,
the minimum production will be 75 percent of the annual capacity of 228 kmt. Under the terms of the updated agreement, the Company is responsible for certain
employee obligations during the extended curtailment period. As a result, the Company will record charges of approximately $50 (pre- and after-tax) in the first quarter
of 2023 in Restructuring and other charges, net on the Statement of Consolidated Operations. Cash outlays related to these obligations are expected in 2024 and 2025. In
connection with the updated agreement, the Company made additional commitments of $78 for capital improvements at the site to be spent primarily between 2024 and
2025.
In January 2023, the Company reduced production at the Kwinana (Australia) refinery by approximately 30 percent in response to a domestic natural gas shortage in
Western Australia due to production challenges experienced by key gas suppliers.
Beginning in January 2023, the financial information provided to the chief operating decision maker (CODM) for the activities of the bauxite mines and the alumina
refineries was combined, and accordingly the Company changed its operating segments. Beginning with the first quarter of 2023, the Company will report its financial
results in the following two segments: (i) Alumina, and (ii) Aluminum. Segment information for all prior periods presented will be updated to reflect the new segment
structure.
122
-- 124 of 363 --
Item 9. Changes in and Disagreements with Accountants on Accounting and Financial Disclosure.
None.
Item 9A. Controls and Procedures.
(a) Evaluation of Disclosure Controls and Procedures
Alcoa Corporation’s Chief Executive Officer and Chief Financial Officer have evaluated the Company’s disclosure controls and procedures, as defined in Rules 13a-
15(e) and 15d-15(e) of the U.S. Securities Exchange Act of 1934, as amended, as of the end of the period covered by this report, and they have concluded that these
controls and procedures were effective as of December 31, 2022.
(b) Management’s Annual Report on Internal Control over Financial Reporting
Management’s Report on Internal Control over Financial Reporting is included in Part II Item 8 of this Form 10-K.
(c) Attestation Report of the Registered Public Accounting Firm
The effectiveness of Alcoa Corporation’s internal control over financial reporting as of December 31, 2022 has been audited by PricewaterhouseCoopers LLP (PCAOB
ID No. 238), an independent registered public accounting firm, as stated in their report, which is included in Part II Item 8 of this Form 10-K.
(d) Changes in Internal Control over Financial Reporting
There have been no changes in internal control over financial reporting during the fourth quarter of 2022 that have materially affected, or are reasonably likely to
materially affect, the Company’s internal control over financial reporting.
Item 9B. Other Information.
None.
Item 9C. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections.
Not applicable.
PART III
Item 10. Directors, Executive Officers and Corporate Governance.
The information required by Item 401 of Regulation S-K regarding executive officers is set forth in Part I Item 1 of this Form 10-K under the caption “Information
about our Executive Officers.” The information required by Item 401 of Regulation S-K regarding directors is contained under the caption “Item 1 Election of 9
Director Nominees to Serve for One-Year Terms Expiring in 2024” of Alcoa Corporation’s Definitive Proxy Statement for the 2023 Annual Meeting of Stockholders
(Proxy Statement), which will be filed with the SEC within 120 days of the end of Alcoa Corporation’s fiscal year ended December 31, 2022 (Proxy Statement) and is
incorporated herein by reference.
The Company’s Code of Conduct and Ethics (Code of Conduct), which incorporates a code of ethics that applies to our principal executive officer, principal financial
officer, principal accounting officer or controller, is publicly available on the Company’s website at www.alcoa.com under the section “Investors—Governance—
Governance Documents—Code of Conduct.” Alcoa Corporation will post any amendments to, or waivers of, its Code of Conduct that apply to its principal executive
officer, principal financial officer, principal accounting officer or controller on its website at www.alcoa.com.
The information required by Items 407(c)(3), (d)(4) and (d)(5) of Regulation S-K is included under the captions “Item 1 Election of 9 Director Nominees to Serve for
One-Year Terms Expiring in 2024—Nominating Board Candidates—Procedures and Director Qualifications,” “Corporate Governance—Board Information—Meetings,
Attendance and Committee Composition” and “Corporate Governance—Board Information—Committees of the Board” of the Proxy Statement and is incorporated
herein by reference.
Item 11. Executive Compensation.
The information required by Item 402 and Item 407(e)(4) and (e)(5) of Regulation S-K is contained under the captions “Item 1 Election of 9 Director Nominees to
Serve for One-Year Terms Expiring in 2024—Non-Employee Director Compensation Program,” “Executive Compensation,” “Corporate Governance—Board
Information—The Board’s Role in Risk Oversight,” “Corporate Governance—Board Information—Committees of the Board,” and “Corporate Governance—
Compensation Matters” of the Proxy Statement. Such information (other than the Compensation Committee Report, which shall not be deemed to be filed) is
incorporated herein by reference.
123
-- 125 of 363 --
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters.
The information required by Item 201(d) of Regulation S-K is contained under the caption “Equity Compensation Plan Information” of the Proxy Statement and is
incorporated herein by reference.
The information required by Item 403 of Regulation S-K is contained under the caption “Beneficial Ownership” of the Proxy Statement and is incorporated herein by
reference.
Item 13. Certain Relationships and Related Transactions, and Director Independence.
The information required by Item 404 of Regulation S-K is contained under the caption “Corporate Governance —Related Person Transactions” of the Proxy Statement
and is incorporated herein by reference.
The information required by Item 407(a) of Regulation S-K is contained under the caption “Corporate Governance—Board Information” of the Proxy Statement and is
incorporated herein by reference.
Item 14. Principal Accountant Fees and Services.
The information required by Item 9(e) of Schedule 14A is contained under the caption “Item 2 Ratification of the Appointment of PricewaterhouseCoopers LLP as the
Company’s Independent Auditor for 2023—Audit Committee Pre-Approval Policy” and “Item 2 Ratification of the Appointment of PricewaterhouseCoopers LLP as the
Company’s Independent Auditor for 2023—Auditor Fees” of the Proxy Statement and is incorporated herein by reference.
124
-- 126 of 363 --
PART IV
Item 15. Exhibit and Financial Statement Schedules.
(a) The consolidated financial statements and exhibits listed below are filed as part of this report.
(1) The Company’s consolidated financial statements, the notes thereto and the report of the Independent Registered Public Accounting Firm are
included in Part II Item 8 of this report.
(2) Financial statement schedules have been omitted because they are not applicable, not required, or the required information is included in the
consolidated financial statements or notes thereto.
(3) Exhibits.
Exhibit
No.
Description of Exhibit
3.1 Amended and Restated Certificate of Incorporation of Alcoa Corporation (incorporated by reference to Exhibit 3.1 to the Company’s Current
Report on Form 8-K filed November 3, 2016 (File No. 1-37816))
3.2 Amended and Restated Bylaws of Alcoa Corporation, as adopted on December 6, 2017 (incorporated by reference to Exhibit 3.1 to the Company’s
Current Report on Form 8-K filed December 8, 2017 (File No. 1-37816))
4.1 Indenture, dated May 17, 2018, among Alcoa Nederland Holding B.V., Alcoa Corporation, certain subsidiaries of Alcoa Corporation, and the Bank
of New York Mellon Trust Company, N.A., as trustee (incorporated by reference to Exhibit 4.1 to the Company’s Current Report on Form 8-K filed
May 17, 2018 (File No. 1-37816))
4.2 Supplemental Indenture, dated as of December 9, 2019, among Alcoa Corporation, Alcoa Treasury S.à r.l, Alcoa Nederland Holding B.V., and The
Bank of New York Mellon Trust Company, N.A. under the Indenture dated May 17, 2018 (incorporated by reference to Exhibit 4.5 to the
Company’s Annual Report on Form 10-K for the year ended December 31, 2019, filed February 21, 2020 (File No. 1-137816))
4.3 Indenture, dated July 13, 2020, among Alcoa Nederland Holding B.V., Alcoa Corporation, certain subsidiaries of Alcoa Corporation, and The Bank
of New York Mellon Trust Company, National Association, as trustee (incorporated by reference to Exhibit 4.1 to the Company’s Current Report on
Form 8-K filed July 13, 2020 (File No. 1-37816))
4.4 Indenture, dated as of March 24, 2021, among Alcoa Nederland Holding B.V., Alcoa Corporation, certain subsidiaries of Alcoa Corporation, and
The Bank of New York Mellon Trust Company, N.A., as trustee (incorporated by reference to Exhibit 4.1 to the Company’s Current Report on
Form 8-K filed March 24, 2021 (File No. 1-37816))
4.5 Description of Securities (incorporated by reference to Exhibit 4.6 to the Company’s Annual Report on Form 10-K for the year ended December 31,
2019, filed February 21, 2020 (File No. 1-137816))
10.1 Separation and Distribution Agreement, dated as of October 31, 2016, by and between Arconic Inc. and Alcoa Corporation (incorporated by
reference to Exhibit 2.1 to the Company’s Current Report on Form 8-K filed November 4, 2016 (File No. 1-37816))
10.2 Tax Matters Agreement, dated as of October 31, 2016, by and between Arconic Inc. and Alcoa Corporation (incorporated by reference to Exhibit
2.3 to the Company’s Current Report on Form 8-K filed November 4, 2016 (File No. 1-37816))
10.3 Alcoa Corporation to Arconic Inc. Patent, Know-How, and Trade Secret License Agreement, dated as of October 31, 2016, by and between Alcoa
USA Corp. and Arconic Inc. (incorporated by reference to Exhibit 2.5 to the Company’s Current Report on Form 8-K filed November 4, 2016 (File
No. 1-37816))
10.4 First Amendment to Alcoa Corporation to Arconic Inc. Patent, Know-How, and Trade Secret License Agreement, dated January 5, 2017, by and
between Alcoa USA Corp. and Arconic Inc. (incorporated by reference to Exhibit 10.4 to the Company’s Annual Report on Form 10-K for the year
ended December 31, 2021, filed February 24, 2022 (File No. 1-137816))
10.5 Second Amendment to Alcoa Corporation to Arconic Inc. Patent, Know-How, and Trade Secret License Agreement, effective as of October 18,
2021, by and between Alcoa USA Corp. and Howmet Aerospace Inc. (f/k/a Arconic Inc.) (incorporated by reference to Exhibit 10.5 to the
Company’s Annual Report on Form 10-K for the year ended December 31, 2021, filed February 24, 2022 (File No. 1-137816))
10.6 Arconic Inc. to Alcoa Corporation Patent, Know-How, and Trade Secret License Agreement, dated as of October 31, 2016, by and between Arconic
Inc. and Alcoa USA Corp. (incorporated by reference to Exhibit 2.6 to the Company’s Current Report on Form 8-K filed November 4, 2016 (File
No. 1-37816))
125
-- 127 of 363 --
Exhibit
No.
Description of Exhibit
10.7 Amended and Restated Alcoa Corporation to Arconic Inc. Trademark License Agreement, dated as of June 25, 2017, by and between Alcoa USA
Corp. and Arconic Inc. (incorporated by reference to Exhibit 2 to the Company’s Quarterly Report on Form 10-Q filed August 3, 2017 (File No. 1-
37816))
10.8 First Amendment to the Amended and Restated Alcoa Corporation to Arconic Inc. Trademark License Agreement, dated as of April 1, 2022, by and
between Alcoa USA Corp and Howmet Aerospace Inc. (f/k/a Arconic Inc.) (incorporated by reference to Exhibit 10.2 to the Company’s Quarterly
Report on Form 10-Q filed July 25, 2022 (File No. 1-37816))
10.9 Third Amendment and Restatement Agreement, dated as of June 27, 2022, which includes, as Exhibit A thereto, the Revolving Credit Agreement,
dated as of September 16, 2016, as amended as of October 26, 2016, as amended and restated as of November 14, 2017, as amended and restated as
of November 21, 2018, as amended as of August 16, 2019, as amended as of April 21, 2020, as amended as of June 24, 2020, as amended as of
March 4, 2021 and as amended and restated as of June 27, 2022, among Alcoa Corporation, Alcoa Nederland Holding B.V., the lenders and issuers
from time to time party thereto, and JPMorgan Chase Bank N.A., as administrative agent for the lenders and issuers (incorporated by reference to
Exhibit 10.1 to the Company’s Current Report on Form 8-K filed June 29, 2022 (File No. 1-37816))
10.10 Amended and Restated Charter of the Strategic Council for the AWAC Joint Venture (incorporated by reference to Exhibit 10.1 to the Company’s
Current Report on Form 8-K filed November 4, 2016 (File No. 1-37816))
10.11 Side Letter of November 1, 2016, between Alcoa Corporation and Alumina Limited clarifying transfer restrictions (incorporated by reference to
Exhibit 10.3 to the Company’s Current Report on Form 8-K filed November 4, 2016 (File No. 1-37816))
10.12 Third Amended and Restated Limited Liability Company Agreement of Alcoa World Alumina LLC, dated as of November 1, 2016, by and among
Alcoa USA Corp., ASC Alumina, Alumina International Holdings Pty Ltd, Alumina (USA) Inc., Reynolds Metals Company, LLC and Reynolds
Metals Exploration, Inc. (incorporated by reference to Exhibit 10.2 to the Company’s Current Report on Form 8-K filed November 4, 2016 (File
No. 1-37816))
10.13 Shareholders’ Agreement between Alcoa of Australia Limited, Alcoa Australian Holdings Pty Ltd and Alumina Limited, originally dated as of
May 10, 1996 (incorporated by reference to Exhibit 10.13 to Amendment No. 2 to the Company’s Registration Statement on Form 10 filed
September 1, 2016 (File No. 1-37816))
10.14 Kwinana State Agreement of 1961 (incorporated by reference to Exhibit 10.7 to Amendment No. 2 to the Company’s Registration Statement on
Form 10 filed September 1, 2016 (File No. 1-37816))
10.15 Pinjarra State Agreement of 1969 (incorporated by reference to Exhibit 10.8 to Amendment No. 2 to the Company’s Registration Statement on
Form 10 filed September 1, 2016 (File No. 1-37816))
10.16 Wagerup State Agreement of 1978 (incorporated by reference to Exhibit 10.9 to Amendment No. 2 to the Company’s Registration Statement on
Form 10 filed September 1, 2016 (File No. 1-37816))
10.17 Alumina Refinery Agreement of 1987 (incorporated by reference to Exhibit 10.10 to Amendment No. 2 to the Company’s Registration Statement
on Form 10 filed September 1, 2016 (File No. 1-37816))
10.18 Framework Agreement, dated June 26, 2019, between Saudi Arabian Mining Company (Ma’aden) and Alcoa Corporation (incorporated by
reference to Exhibit 10.1 to the Company’s Quarterly Report on Form 10-Q filed July 31, 2019 (File No. 1-37816))
10.19 Amendment and Restatement Deed dated June 26, 2019 relating to the Aluminium Project Framework Shareholders’ Agreement originally dated
December 20, 2009 between Saudi Arabian Mining Company (Ma’aden) and Alcoa Corporation (incorporated by reference to Exhibit 10.2 to the
Company’s Quarterly Report on Form 10-Q filed July 31, 2019 (File No. 1-37816))
10.20 Alcoa Corporation 2016 Stock Incentive Plan (as Amended and Restated as of May 9, 2018), (incorporated by reference to Exhibit 99.1 to the
Company’s Current Report on Form 8-K filed May 15, 2018 (File No. 1-37816))*
10.21 Alcoa USA Corp. Deferred Compensation Plan, effective August 1, 2016, as amended November 15, 2021 (incorporated by reference to Exhibit
10.24 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2021, filed February 24, 2022 (File No. 1-137816))*
10.22 Alcoa USA Corp. Nonqualified Supplemental Retirement Plan C (incorporated by reference to Exhibit 10.3 to Amendment No. 1 to the Company’s
Registration Statement on Form 10 filed August 12, 2016 (File No. 1-37816))*
10.23 Amendment 1 to Alcoa USA Corp. Nonqualified Supplemental Retirement Plan C, effective January 1, 2021 (incorporated by reference to Exhibit
10.9 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2017, filed February 23, 2018 (File No. 1-37816))*
126
-- 128 of 363 --
Exhibit
No.
Description of Exhibit
10.24 Form of Amended and Restated Indemnification Agreement by and between Alcoa Corporation and individual directors or officers, effective
August 1, 2017 (incorporated by reference to Exhibit 10.5 to the Company’s Quarterly Report on Form 10-Q filed August 3, 2017 (File No. 1-
37816))*
10.25 Alcoa Corporation Annual Cash Incentive Compensation Plan (as Amended and Restated), effective February 21, 2018 (incorporated by referenced
to Exhibit 10 to the Company’s Quarterly Report on Form 10-Q filed May 9, 2018 (File No. 1-37816))*
10.26 Alcoa Corporation Amended and Restated Change in Control Severance Plan, dated July 30, 2019 (incorporated by reference to Exhibit 10.5 to the
Company’s Quarterly Report on Form 10-Q filed October 31, 2019 (File No. 1-37816))*
10.27 Amendment No. 1, dated as of January 8, 2023 to the Alcoa Corporation Amended and Restated Change in Control Severance Plan, dated July 30,
2019 (filed herewith)*
10.28 Amended and Restated Form of Alcoa Corporation Chief Executive Officer and Chief Financial Officer Executive Severance Agreement, effective
as of July 30, 2019 (incorporated by reference to Exhibit 10.6 to the Company’s Quarterly Report on Form 10-Q filed October 31, 2019 (File No. 1-
37816))*
10.29 Amendment No. 1 to Amended and Restated Executive Severance Agreement, between William F. Oplinger and Alcoa Corporation, effective
February 1, 2023 (filed herewith)*
10.30 Amended and Restated Form of Alcoa Corporation Corporate Officer Executive Severance Agreement, effective as of July 30, 2019 (incorporated
by reference to Exhibit 10.7 to the Company’s Quarterly Report on Form 10-Q filed October 31, 2019 (File No. 1-37816))*
10.31 Terms and Conditions for Employee Stock Option Awards (incorporated by reference to Exhibit 10.30 to the Company’s Registration Statement on
Form S-1 filed January 18, 2017 (File No. 333-215606))*
10.32 Terms and Conditions for Employee Stock Option Awards, dated January 24, 2018 (incorporated by reference to Exhibit 10.30 to the Company’s
Annual Report on Form 10-K for the year ended December 31, 2017, filed February 23, 2018 (File No. 1-37816))*
10.33 Terms and Conditions for Employee Restricted Share Units, effective October 1, 2019 (incorporated by reference to Exhibit 10.2 to the Company’s
Quarterly Report on Form 10-Q filed October 31, 2019 (File No. 1-37816))*
10.34 Terms and Conditions for Employee Stock Option Awards, effective October 1, 2019 (incorporated by reference to Exhibit 10.3 to the Company’s
Quarterly Report on Form 10-Q filed October 31, 2019 (File No. 1-37816))*
10.35 Terms and Conditions for Employee Special Retention Awards, effective October 1, 2019 (incorporated by reference to Exhibit 10.4 to the
Company’s Quarterly Report on Form 10-Q filed October 31, 2019 (File No. 1-37816))*
10.36 Terms and Conditions for Employee Restricted Share Units, effective December 8, 2021 (incorporated by reference to Exhibit 10.37 to the
Company’s Annual Report on Form 10-K for the year ended December 31, 2021, filed February 24, 2022 (File No. 1-137816))*
10.37 Terms and Conditions for Employee Special Retention Awards, effective December 8, 2021 (incorporated by reference to Exhibit 10.38 to the
Company’s Annual Report on Form 10-K for the year ended December 31, 2021, filed February 24, 2022 (File No. 1-137816))*
10.38 Alcoa Corporation Non-Employee Director Compensation Policy, effective September 28, 2022 (incorporated by reference to Exhibit 10.1 to the
Company’s Quarterly Report on Form 10-Q filed October 27, 2022))*
10.39 Terms and Conditions for Deferred Fee Restricted Share Units Director Awards, effective December 1, 2016 (incorporated by reference to Exhibit
10.34 to the Company’s Registration Statement on Form S-1 filed January 18, 2017 (File No. 333-215606))*
10.40 Terms and Conditions for Deferred Fee Restricted Share Units Director Awards, effective May 4, 2022 (incorporated by reference to Exhibit 10.3 to
the Company’s Quarterly Report on Form 10-Q filed July 25, 2022 (File No. 1-37816))*
10.41 Terms and Conditions for Restricted Share Units Annual Director Awards, effective December 1, 2016 (incorporated by reference to Exhibit 10.35
to the Company’s Registration Statement on Form S-1 filed January 18, 2017 (File No. 333-215606))*
10.42 Terms and Conditions for Restricted Share Units Annual Director Awards, effective May 9, 2017 (incorporated by reference to Exhibit 10.3 to the
Company’s Quarterly Report Form 10-Q filed August 3, 2017 (File No. 1-37816))*
127
-- 129 of 363 --
Exhibit
No.
Description of Exhibit
10.43 Terms and Conditions for Restricted Share Units Annual Director Awards, effective May 4, 2022 (incorporated by reference to Exhibit 10.4 to the
Company’s Quarterly Report on Form 10-Q filed July 25, 2022 (File No. 1-37816))*
10.44 Alcoa Corporation 2016 Deferred Fee Plan for Directors, effective November 1, 2016, as amended and restated on December 5, 2018 (incorporated
by reference to Exhibit 10.37 to the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2018, filed February 26, 2019
(1-37816))*
21.1 List of Subsidiaries (filed herewith)
23.1 Consent of PricewaterhouseCoopers LLP (filed herewith)
23.2 Consent of SLR International Corporation (filed herewith)
31.1 Certification of Principal Executive Officer required by Securities and Exchange Commission Rule 13a-14(a) or 15d-14(a) (filed herewith)
31.2 Certification of Principal Financial Officer required by Securities and Exchange Commission Rule 13a-14(a) or 15d-14(a) (filed herewith)
32.1 Certification of Principal Executive Officer, required by Rule 13a-14(b) or Rule 15d-14(b) and Section 1350 of Chapter 63 of Title 18 of the United
States Code (furnished herewith)
32.2 Certification of Principal Financial Officer, required by Rule 13a-14(b) or Rule 15d-14(b) and Section 1350 of Chapter 63 of Title 18 of the United
States Code (furnished herewith)
96.1 Technical Report Summary for Darling Range, Western Australia (filed herewith)
96.2 Technical Report Summary for Juruti, Brazil (incorporated by reference to Exhibit 96.2 to the Company’s Annual Report on Form 10-K for the year
ended December 31, 2021, filed February 24, 2022 (File No. 1-137816))
99.1 Amended and Restated Grantor Trust Agreement by and between Alcoa Corporation and Wells Fargo Bank, National Association, effective
October 24, 2017 (incorporated by reference to Exhibit 99.1 to the Company’s Annual Report on Form 10-K for the year ended December 31, 2017,
filed February 23, 2018 (File No. 137816))
101.INS Inline XBRL Instance Document
101.SCH Inline XBRL Taxonomy Extension Schema Document
101.CAL Inline XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF Inline XBRL Taxonomy Extension Definition Linkbase Document
101.LAB Inline XBRL Taxonomy Extension Label Linkbase Document
101.PRE Inline XBRL Taxonomy Extension Presentation Linkbase Document
104 Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
Certain schedules exhibits, and appendices have been omitted in accordance with to Item 601(a)(5) of Regulation S-K. The Company hereby undertakes to
furnish copies of any omitted schedule, exhibit, or appendix to the Commission upon request.
* Denotes management contracts or compensatory plans or arrangements required to be filed as Exhibits to this Form 10-K.
Item 16. Form 10-K Summary.
Not applicable.
128
-- 130 of 363 --
SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the
undersigned, thereunto duly authorized.
ALCOA CORPORATION
By: /s/ Molly S. Beerman
Molly S. Beerman
Executive Vice President and Chief Financial Officer
February 23, 2023
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the
capacities indicated and as of February 23, 2023.
/s/ Roy C. Harvey /s/ Molly S. Beerman
Roy C. Harvey
President, Chief Executive Officer and Director
(Principal Executive Officer and Director)
Molly S. Beerman
Executive Vice President and Chief Financial Officer
(Principal Financial Officer and Principal Accounting Officer)
/s/ Steven W. Williams
Steven W. Williams
Director, Chairman of the Board of Directors
/s/ Mary Anne Citrino
Mary Anne Citrino
Director
/s/ Pasquale Fiore
Pasquale Fiore
Director
/s/ Thomas J. Gorman
Thomas J. Gorman
Director
/s/ James A. Hughes
James A. Hughes
Director
/s/ Carol L. Roberts
Carol L. Roberts
Director
/s/ Jackson P. Roberts
Jackson P. Roberts
Director
/s/ Ernesto Zedillo
Ernesto Zedillo
Director
129
-- 131 of 363 --
Exhibit 10.27
ALCOA CORPORATION
AMENDED AND RESTATED CHANGE IN CONTROL SEVERANCE PLAN
AMENDMENT NO. 1
The Company hereby adopts, as of January 8, 2023, this first amendment of the Alcoa Corporation Amended and Restated Change in
Control Severance Plan which was most recently amended and restated on July 30, 2019 (“the Plan”). This Plan is amended as follows:
DEFINITIONS, Section 1.24, is amended to read as follows:
1.24 “Tier I Employee” means the Chief Executive Officer, the Chief Financial Officer, the General Counsel of the Company
and such other person or position so designated by the Board or Committee from time to time; provided, however, that such person will
cease to be a Tier I Employee for all purposes under this Plan, if such person ceases to serve as the Chief Executive Officer, Chief Financial
Officer, General Counsel of the Company or, as to such other persons or positions, if the Board or Committee determines such persons or
positions cease to be a Tier I Employee prior to a Change in Control under circumstances other than as described in Section 1.21 hereof and;
provided further that such person or position may thereafter be a Tier II Employee under this Plan if the Board or Committee designates
such person a corporate officer (other than an assistant officer) of the Company as described in Section 1.25 hereof.
-- 132 of 363 --
Exhibit 10.29
AMENDMENT NO. 1 TO
AMENDED AND RESTATED EXECUTIVE SEVERANCE AGREEMENT
WHEREAS, Alcoa Corporation (the “Company”) currently employs William F. Oplinger (“Executive”) as Executive Vice
President and Chief Financial Officer;
WHEREAS, the Company and Executive executed an Amended and Restated Executive Severance Agreement dated and
effective as of July 30, 2019 (the “Agreement”);
WHEREAS, the Company has offered Executive an appointment to the position of Chief Operations Officer, which Executive
accepted;
WHEREAS, contemporaneous with the commencement of Executive’s duties as the Company’s Chief Operations Officer
effective February 1, 2023 (the “Effective Date”), Executive will cease acting as Chief Financial Officer; and
WHEREAS, the Company and Executive desire to have their respective rights and obligations under the Agreement remain in
full force and effect while Executive serves as the Company’s Chief Operations Officer;
NOW, by this Amendment No. 1 to the Agreement, the Company and Executive, intending to be legally bound, and for good and
valuable consideration, agree as follows:
The section in the Agreement titled “Termination of Officer Status and Agreement” is amended to read as follows:
You hereby acknowledge and agree that, in the event you cease to be the Chief Executive Officer, Chief
Financial Officer or Chief Operations Officer of the Company, as the case may be, as designated by the Board or
a committee thereof, and remain employed with the Company in another continuing role thereafter, this
Agreement shall immediately terminate and become null and void upon such Board determination date, and you
shall not have any right to payments or benefits provided hereunder.
All other provisions of the Agreement shall remain in full force and effect.
[remainder of page intentionally left blank]
-- 133 of 363 --
IN WITNESS WHEREOF, the Company, by its duly authorized representative, and the Executive have executed this Amendment
No. 1 to the Agreement on the dates stated below, effective as of the Effective Date.
ALCOA CORPORATION
By: /s/ Tammi A. Jones
Name: Tammi A. Jones
Title: Executive Vice President and Chief Human Resources
Officer
Date: February 10, 2023
WILLIAM F. OPLINGER
/s/ William F. Oplinger
Date: February 10, 2023
-- 134 of 363 --
Exhibit 21.1
SUBSIDIARIES OF THE REGISTRANT
Name
State or
Country of
Organization
Alcoa Alumínio S.A. Brazil
Alcoa Australian Holdings Pty Ltd Australia
Alcoa Nederland Holding B.V. Netherlands
Alcoa of Australia Limited1 Australia
Alcoa USA Corp. Delaware
Alcoa USA Holding Company Delaware
Aluminerie Lauralco B.V. Netherlands
The names of particular subsidiaries have been omitted because, considered in the aggregate as a single subsidiary, they would not constitute, as of the end of the year
covered by this report, a “significant subsidiary” as defined in Regulation S-X under the Securities Exchange Act of 1934, as amended.
1 Part of the AWAC joint venture.
-- 135 of 363 --
Exhibit 23.1
CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
We hereby consent to the incorporation by reference in the Registration Statement on Form S-8 (Nos. 333-214420, 333-214423, 333-218038, and 333-228258) of Alcoa
Corporation of our report dated February 23, 2023 relating to the financial statements and the effectiveness of internal control over financial reporting, which appears in
this Form 10-K.
/s/ PricewaterhouseCoopers LLP
PricewaterhouseCoopers LLP
Pittsburgh, Pennsylvania
February 23, 2023
-- 136 of 363 --
SLR Consul ng Ltd
7 Wornal Park, Menmarsh Road, Worminghall, HP18 9PH
Exhibit 23.2
February 23, 2023
CONSENT OF QUALIFIED PERSON
Re: Form 10-K of Alcoa Corporation (the “Company”)
SLR Consulting Limited (“SLR”), in connection with the Company’s Annual Report on Form 10-K for the year ended December 31, 2022 (the “Form 10-K”),
consents to:
• the public filing by the Company and use of the technical report summary tled “Technical Report Summary on the Darling Range, Western
Australia,” with an effec ve date of December 31, 2022 and dated February 23, 2023, and the technical report summary tled “Technical
Report Summary for Juru , Brazil,” with an effec ve date of December 31, 2021 and dated February 24, 2022 (together, the “Technical
Report Summaries”), that were prepared in accordance with Subpart 1300 of Regula on S-K promulgated by the U.S. Securi es and
Exchange Commission, as exhibits to and referenced in the Form 10-K;
• the incorpora on by reference of the Technical Report Summaries into the Company’s Registra on Statements on Form S-8 (Nos. 333-
214420, 333-214423, 333-218038, and 333-228258) (collec vely, the “Registra on Statements”);
• the use of and references to our name, including our status as an expert or “qualified person” (as defined in Subpart 1300 of Regula on S-K
promulgated by the U.S. Securi es and Exchange Commission), in connec on with the Form 10-K, the Registra on Statements, and the
Technical Report Summaries; and
• any extracts from or a summary of the Technical Report Summaries in the Form 10-K and incorporated by reference in the Registra on
Statements and the use of any informa on derived, summarized, quoted, or referenced from the Technical Report Summaries, or por ons
thereof, that was prepared by us, that we supervised the prepara on of, and/or that was reviewed and approved by us, that is included or
incorporated by reference in the Form 10-K and the Registra on Statements.
SLR is responsible for authoring, and this consent pertains to, the Technical Report Summaries. SLR certifies that it has read the Form 10-K and that it fairly
and accurately represents the information in the Technical Report Summaries for which it is responsible.
SLR Consulting Limited
Per:
/s/ John R. Walker
John R. Walker, FGS, MIMMM, FIQ
Technical Director, Mining Advisory Europe
www.slrconsul ng.com
-- 137 of 363 --
Exhibit 31.1
CERTIFICATIONS
I, Roy C. Harvey, certify that:
1. I have reviewed this annual report on Form 10-K of Alcoa Corporation;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange
Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the
registrant and have:
(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within
those entities, particularly during the period in which this report is being prepared;
(b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
(c) Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
(d) Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most
recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely
to materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are
reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
(b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal
control over financial reporting.
Date: February 23, 2023
/s/ Roy C. Harvey
Name: Roy C. Harvey
Title: President and
Chief Executive Officer
-- 138 of 363 --
Exhibit 31.2
CERTIFICATIONS
I, Molly S. Beerman, certify that:
1. I have reviewed this annual report on Form 10-K of Alcoa Corporation;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange
Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f)) for the
registrant and have:
(a) Designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within
those entities, particularly during the period in which this report is being prepared;
(b) Designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
(c) Evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
(d) Disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most
recent fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely
to materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
(a) All significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are
reasonably likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
(b) Any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal
control over financial reporting.
Date: February 23, 2023
/s/ Molly S. Beerman
Name: Molly S. Beerman
Title: Executive Vice President and
Chief Financial Officer
-- 139 of 363 --
Exhibit 32.1
CERTIFICATION PURSUANT TO
18 U.S.C. SECTION 1350
AS ADOPTED PURSUANT TO
SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002
In connection with the Annual Report of Alcoa Corporation (the “Company”) on Form 10-K for the period ended December 31, 2022 as filed with the Securities and
Exchange Commission on the date hereof (the “Report”), the undersigned, in the capacity and on the date indicated below, hereby certifies pursuant to 18 U.S.C.
Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that to his knowledge:
1. The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
2. The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.
Date: February 23, 2023 /s/ Roy C. Harvey
Roy C. Harvey
President and Chief Executive Officer
A signed original of this written statement required by Section 906, or other document authenticating, acknowledging, or otherwise adopting the signature that appears
in typed form within the electronic version of this written statement required by Section 906, has been provided to the Company and will be retained by the Company
and furnished to the Securities and Exchange Commission or its staff upon request.
The foregoing certification is being furnished solely pursuant to 18 U.S.C. Section 1350 and is not being filed as part of this report.
-- 140 of 363 --
Exhibit 32.2
CERTIFICATION PURSUANT TO
18 U.S.C. SECTION 1350
AS ADOPTED PURSUANT TO
SECTION 906 OF THE SARBANES-OXLEY ACT OF 2002
In connection with the Annual Report of Alcoa Corporation (the “Company”) on Form 10-K for the period ended December 31, 2022 as filed with the Securities and
Exchange Commission on the date hereof (the “Report”), the undersigned, in the capacity and on the date indicated below, hereby certifies pursuant to 18 U.S.C.
Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that to her knowledge:
1. The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
2. The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.
Date: February 23, 2023 /s/ Molly S. Beerman
Molly S. Beerman
Executive Vice President and
Chief Financial Officer
A signed original of this written statement required by Section 906, or other document authenticating, acknowledging, or otherwise adopting the signature that appears
in typed form within the electronic version of this written statement required by Section 906, has been provided to the Company and will be retained by the Company
and furnished to the Securities and Exchange Commission or its staff upon request.
The foregoing certification is being furnished solely pursuant to 18 U.S.C. Section 1350 and is not being filed as part of this report.
-- 141 of 363 --
Exhibit 96.1
Technical Report Summary on the
Darling Range, Western Australia
S-K 1300 Report
Alcoa Corpora on
SLR Project No: 410.064663.00001
February 23, 2023
-- 142 of 363 --
-- 143 of 363 --
Technical Report Summary on the Darling Range, Western Australia
SLR Project No: 410.064663.00001
Prepared by
SLR Interna onal Corpora on
22118 20th Ave SE, Suite G202, Bothell, WA 98021 USA
for
Alcoa Corpora on
201 Isabella Street, Suite 500
Pi sburgh, Pennsylvania
15212-5858
Effec ve Date – December 31, 2022
Signature Date – February 23, 2023
Distribu on:
1 copy – Alcoa Corpora on
1 copy – SLR Interna onal Corpora on
1 copy – SLR Consul ng Ltd
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 ii
-- 144 of 363 --
CONTENTS
1.0 EXECUTIVE SUMMARY 1-1
1.1 Summary 1-1
1.2 Economic Analysis 1-7
1.3 Technical Summary 1-9
2.0 INTRODUCTION 2-1
2.1 Site Visits 2-1
2.2 Sources of Informa on 2-3
2.3 List of Abbrevia ons 2-4
3.0 PROPERTY DESCRIPTION 3-1
3.1 Loca on 3-1
3.2 Land Tenure 3-1
3.3 Naming Conven ons 3-6
3.4 Encumbrances 3-7
3.5 Royal es 3-8
3.6 Required Permits and Status 3-8
3.7 Other Significant Factors and Risks 3-9
4.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 4-1
4.1 Accessibility 4-1
4.2 Climate 4-1
4.3 Local Resources 4-2
4.4 Infrastructure 4-2
4.5 Physiography 4-3
5.0 HISTORY 5-1
5.1 Prior Ownership 5-1
5.2 Explora on and Development History 5-1
6.0 GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT 6-1
6.1 Bauxite Deposits 6-1
6.2 Regional Geology 6-1
6.3 Local Geology 6-4
6.4 Mineraliza on 6-4
6.5 Property Geology 6-5
7.0 EXPLORATION 7-1
7.1 Explora on 7-1
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 i
-- 145 of 363 --
7.2 Resource Defini on Drilling 7-1
7.3 Drilling Methods 7-5
7.4 Drill Sampling 7-7
7.5 Topography 7-11
7.6 Surveying 7-13
7.7 Sampling Conclusions 7-15
7.8 Hydrogeology Data 7-15
7.9 Geotechnical Data 7-16
8.0 SAMPLE PREPARATION, ANALYSES, AND SECURITY 8-1
8.1 Sample Security 8-1
8.2 Sample Prepara on 8-1
8.3 Assaying 8-4
8.4 Quality Assurance and Quality Control 8-9
8.5 Conclusions 8-27
9.0 DATA VERIFICATION 9-1
9.1 Data Structures 9-1
9.2 Data Verifica on Measures 9-2
9.3 QP Opinion 9-3
10.0 MINERAL PROCESSING AND METALLURGICAL TESTING 10-1
10.1 QP Opinion 10-3
11.0 MINERAL RESOURCE ESTIMATES 11-1
11.1 Summary 11-1
11.2 Resource Database 11-4
11.3 Geological Interpreta on 11-4
11.4 Sta s cal Checks 11-9
11.5 Treatment of High-Grade Assays 11-13
11.6 Composi ng 11-15
11.7 Trend Analysis - Variography 11-15
11.8 Bulk Density 11-16
11.9 Resource Models 11-19
11.10 Block Model Valida on 11-22
11.11 Cut-off Grade and Mining Constraints 11-27
11.12 Reconcilia on 11-28
11.13 Mineral Resource Es ma on Risk 11-30
11.14 Classifica on 11-32
11.15 Mineral Resource Repor ng 11-35
11.16 QP Opinion 11-37
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 ii
-- 146 of 363 --
12.0 MINERAL RESERVE ESTIMATES 12-1
12.1 Summary 12-1
12.2 Modifying Factors 12-2
12.3 Basis of Es mate 12-4
12.4 Dilu on and Ore Loss 12-4
12.5 Extrac on and Mine Planning 12-6
12.6 Cut-off Grade 12-11
12.7 Metallurgical Factors 12-11
12.8 QP Opinion 12-12
13.0 MINING METHODS 13-1
13.1 General Descrip on of Opera ons 13-1
13.2 Haul Roads and Infrastructure 13-4
13.3 Geotechnical and Hydrogeology Considera ons 13-7
13.4 Mine Equipment 13-10
13.5 Personnel 13-13
14.0 PROCESSING AND RECOVERY METHODS 14-1
14.1 Process Descrip on 14-1
14.2 Primary Equipment List 14-4
14.3 Consumables and Power 14-5
14.4 QP Opinion 14-6
15.0 INFRASTRUCTURE 15-1
15.1 Access Roads 15-3
15.2 Power 15-3
15.3 Water 15-3
15.4 Accommoda on Camp 15-4
15.5 Mine Waste Management 15-4
16.0 MARKET STUDIES 16-1
16.1 Overview 16-1
16.2 Market: Darling Range 16-2
16.3 Contracts 16-3
17.0 ENVIRONMENTAL STUDIES, PERMITTING, AND PLANS, NEGOTIATIONS, OR AGREEMENTS WITH LOCAL INDIVIDUALS
OR GROUPS 17-1
17.1 Environmental Studies 17-1
17.2 Waste and Tailings Disposal, Site Monitoring, and Water Management 17-2
17.3 Project Permi ng 17-5
17.4 Social or Community Requirements 17-6
17.5 Mine Closure Requirements 17-7
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 iii
-- 147 of 363 --
17.6 Local Procurement and Hiring 17-8
18.0 CAPITAL AND OPERATING COSTS 18-1
18.1 Capital Costs 18-1
18.2 Opera ng Costs 18-1
19.0 ECONOMIC ANALYSIS 19-1
19.1 Economic Criteria 19-1
19.2 Cash Flow Analysis 19-2
19.3 Sensi vity Analysis 19-3
20.0 ADJACENT PROPERTIES 20-1
21.0 OTHER RELEVANT DATA AND INFORMATION 21-1
22.0 INTERPRETATION AND CONCLUSIONS 22-1
22.1 Geology and Mineral Resources 22-1
22.2 Mining and Mineral Reserves 22-2
22.3 Mineral Processing 22-2
22.4 Infrastructure 22-2
22.5 Environment 22-3
23.0 RECOMMENDATIONS 23-1
23.1 Geology and Mineral Resources 23-1
23.2 Mining and Mineral Reserves 23-2
23.3 Mineral Processing 23-2
23.4 Infrastructure 23-2
23.5 Environment 23-2
24.0 REFERENCES 24-1
25.0 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT 25-1
26.0 DATE AND SIGNATURE PAGE 26-1
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 iv
-- 148 of 363 --
TABLES
Table 1-1: LOM Technical-Economic Assump ons 1-7
Table 1-2: LOM Indica ve Economic Results 1-8
Table 1-3: 10 Year LOM Sustaining Capital Costs by Area 1-18
Table 1-4: LOM On-site Mine Opera ng Costs by Category* 1-19
Table 3-1: ML1SA License Details 3-2
Table 4-1: Historical Climate Data 4-1
Table 6-1: Alcoa’s Darling Range Deposit Typical Stra graphic Column 6-5
Table 6-2: Summary of Typical (Modal) Stra graphic Horizons Within Each Area 6-5
Table 7-1: Drill Quan es by Year and Loca on 7-2
Table 7-2: Logging Codes for Material Type 7-10
Table 8-1: Assaying Methodologies for Resource Es ma on Samples 8-6
Table 8-2: Standards Used for Drilling and REF Monitoring (IRMs) 8-11
Table 9-1: Count of Records by Database Table for Two Database Extracts 9-2
Table 10-1: Product Grades of Darling Range Opera on (Willowdale – Wagerup refinery feed) 10-1
Table 10-2: Product Grades of Darling Range Opera ons (Huntly–Pinjarra refinery feed) 10-2
Table 10-3: Product Grades of Darling Range Opera ons (Huntly– Kwinana refinery feed) 10-2
Table 11-1: Summary of Darling Range Mineral Resources exclusive of Mineral Reserves – 31st December 2022 11-3
Table 11-2: Summary of Density Test Data (t/m3) from 1980 to 1992 (Senini, 1993) 11-17
Table 11-3: Ordinary Kriging Search Parameters 11-21
Table 11-4: Tonnage and Grade Informa on Between the Original Resource Model and the 3D Block Model 11-22
Table 11-5: Summary of Darling Range Mineral Resources exclusive of Mineral Reserves by Mining Region – 31st December 2022 11-36
Table 12-1: Summary of Darling Range Mineral Reserves – Effec ve 31st December 2022 12-1
Table 13-1: Darling Range Opera ons Equipment List 13-11
Table 13-2: Darling Range Personnel 13-14
Table 14-1: Primary Equipment List (Willowdale) 14-4
Table 14-2: Primary Equipment List (Huntly) 14-4
Table 15-1: Water Abstrac on License Volumes 15-4
Table 18-1: LOM Sustaining Capital Costs by Area 18-1
Table 18-2: LOM Mine Opera ng Costs by Category* 18-2
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 v
-- 149 of 363 --
Table 18-3: Workforce Summary 18-2
Table 19-1: Technical-Economic Assump ons 19-1
Table 19-2: LOM Produc on Summary 19-2
Table 19-3: LOM Indica ve Economic Results 19-3
FIGURES
Figure 3-1: ML1SA Lease Extents (Alcoa, 2022) 3-3
Figure 3-2: Map of Mining Repor ng Centers, Mining Regions, and Produc on Sheets (Alcoa, 2022) 3-4
Figure 3-3: Map of Current Mineral Resource and Mineral Reserve Extents (Alcoa, 2022) 3-5
Figure 3-4: Explora on Sheet, Produc on Sheet, and Map Sheet Conven ons (SRK, 2021) 3-7
Figure 5-1: Bauxite Explora on in the Southwest of Western Australia 1961 (adapted from Hickman, 1992) 5-2
Figure 6-1: Regional Geology (adapted from SRK, 2021) 6-2
Figure 6-2: Surface Geology Showing Laterite Over Granite (Alcoa, 2015) 6-3
Figure 6-3: Bauxite Deposit Forma on Schema c – Relief Exaggerated (Alcoa, 2021) 6-4
Figure 6-4: Typical Alcoa Darling Range Mineralogy Profile (Hickman et al, 1992) 6-6
Figure 6-5: Typical Alcoa Darling Range Grade Profile (Alcoa, 2015) 6-6
Figure 6-6: Typical Alcoa Darling Range Mining Sequence and Ver cal Profile (SLR, 2021) 6-7
Figure 7-1: Chart of Resource Drill Holes by Year (Alcoa, 2022) 7-4
Figure 7-2: Example Geological Sec on – F55 N 6,325,500 (SRK, 2021) 7-5
Figure 7-3: Resource Drilling Tractor Accessing the Forest (SLR, 2021) 7-5
Figure 7-4: Drill Bits, Reverse Circula on Drill String and Par cle Size of the Sample Residue (SLR, 2021)
7-7
Figure 7-5: Sample Catching and Riffle Spli ng Prac ces (SLR, 2021) 7-9
Figure 7-6: Barcode Reader and Digital Recorder Mounted on the Drill Rig (SLR, 2021) 7-10
Figure 7-7: Topographic Data Coverage of the 2015, 2016 and 2018 LiDAR Surveys (Alcoa, 2022) 7-12
Figure 7-8: Error in Actual Collar Loca on from the Nominal (planned) Posi on is Monitored for the Three Drill Rig Types (Alcoa, 2021) 7-14
Figure 7-9: Possible Lateral and Ver cal Sample Loca on Error on 15° Sloping Ground (SLR, 2021) 7-15
Figure 8-1: The Bella Robo c Sample Prepara on using Rocklabs Ring Mills (SLR, 2021) 8-2
Figure 8-2: The Pulverized Sample is Stored in a Barcoded Dedicated Receptacle for Assay (SLR, 2021)8-3
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 vi
-- 150 of 363 --
Figure 8-3: The Pulverized Sample is Tracked Digitally Through the Bella Prepara on and Assaying (SLR, 2021) 8-3
Figure 8-4: Sample Prepara on Monitoring: Grind Sizes for the Robo c Sample Prepara on Unit Tested by Bella and by KWI (Alcoa, 2022) 8-4
Figure 8-5: The Robo c FTIR Assaying Equipment (RHS shows the sampling scoop arm and pulp dish with the lid elevated) (SLR, 2021) 8-5
Figure 8-6: Diges on and Assay Equipment used for REF Samples at the KWI Clockwise from top le : BD, MD, TICTOC, ICP, XRF, GC (SLR, 2021) 8-8
Figure 8-7: KH14 Control Chart of AL, SI and Fe from Batch P181 8-13
Figure 8-8: KH20 Control Chart of AL, SI and Fe from Batch P183 8-15
Figure 8-9: KH10 Control Chart of AL, SI and Fe from Batch P188 8-16
Figure 8-10: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Umpire Laboratory Checks – KWI Mining Lab and Bureau Veritas 8-18
Figure 8-11: Sca er Plot, Quan le-Quan le Plot and Sta s cs of SI Umpire Laboratory Checks – KWI Mining Lab and Bureau Veritas 8-19
Figure 8-12: Sca er Plot, Quan le-Quan le Plot and Sta s cs of FE Umpire Laboratory Checks – KWI Mining Lab and Bureau Veritas 8-20
Figure 8-13: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Umpire Laboratory Checks – Bella and Bureau Veritas 8-21
Figure 8-14: Sca er Plot, Quan le-Quan le Plot and Sta s cs of SI Umpire Laboratory Checks – Bella and Bureau Veritas 8-22
Figure 8-15: Sca er Plot, Quan le-Quan le Plot and Sta s cs of FE Umpire Laboratory Checks – Bella and Bureau Veritas 8-23
Figure 8-16: Quan le-Quan le Plot of Parent and Individual Daughters’ Analysis of "A.Al2O" 3 (on the le ) and of O2" (on the right) 8-25
Figure 8-17: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Historic and Holyoake Results 8-26
Figure 8-18: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Historic and Holyoake Results 8-27
Figure 9-1: Visual Display of Hole Status (logged and assayed) for Hole G39150224 in Serpen ne (Alcoa, 2021) 9-1
Figure 11-1: Circle Charts Showing the Tonnage (external circle) and Number of Models (internal Circle) and Bar Charts Showing the Tonnage by
Mineral Resource Categories. Charts on the Top Refer to all the Tonnage of the Darling Range Project, and on the Bo om to the
Exclusive Mineral Resources 11-2
Figure 11-2: Plan View of Polygonal Approach (Pass = red, pass open = green, marginal = yellow, fail = blue) (Alcoa, 2022) 11-6
Figure 11-3: Example Sec on Showing Domain (DOMAF) and Wireframed Surfaces (top), and Regions where the Bauxite Layer was not Penetrated
(bo om) (SLR, 2022) 11-8
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 vii
-- 151 of 363 --
Figure 11-4: Plan View of Bauxite Zone and (A) Drill Holes Flagged as Dykes in yellow, and (B) Interpreted Ver cal Dykes from the Drill Holes (Alcoa,
2022 – Modified by SLR) 11-9
Figure 11-5: Histograms of AL by DOMAF at Serpen ne 11-10
Figure 11-6: Histograms of SI by DOMAF at Serpen ne 11-11
Figure 11-7: Sca erplots of SI versus ST for DOMAF 50 at Serpen ne 11-12
Figure 11-8: Sca erplots of AL versus SI by Domain at Serpen ne 11-12
Figure 11-9: Cumula ve Log Probability Plots for Serpen ne Composites 11-14
Figure 11-10: AL, SI, FE, and ST Direc onal Variogram Models at Serpen ne 11-16
Figure 11-11: Example Sec on showing Bauxite Zone and Mining Solid (SLR, 2021) 11-21
Figure 11-12: Resource Comparison Sca erplots for Huntly (Tonnage, AL, SI, OX) (SLR, 2021) 11-24
Figure 11-13: Example Sec ons showing DOMAF, AL, and SI Block Es mates (SLR, 2021) 11-24
Figure 11-14: AL Swath Plots by DOMAF at Serpen ne (SLR, 2021) 11-25
Figure 11-15: Sca erplots of AL versus SI by DOMAF at Serpen ne (SLR, 2021) 11-26
Figure 11-16: AL Grade-tonnage DG Curves versus Serpen ne Block Model 11-27
Figure 11-17: Resource versus Sample Plant Reconcilia on – Huntly (SLR, 2022) 11-29
Figure 11-18: Resource versus Sample Plant Reconcilia on – Willowdale (SLR, 2022) 11-29
Figure 11-19: Plan View of Resource Classifica on (SLR, 2021) 11-35
Figure 12-1: Undula ng Hanging Wall Hardcap Surface; and Footwall (white clay, lower right in the floor) (Le : Pearman, 2015 & Right: SLR, 2021)
12-5
Figure 12-2: Willowdale Fi een-Year Mine Plan Resource Confidence (drill hole spacing in meters shown in brackets) (Alcoa, 2022) 12-6
Figure 12-3: Huntly Fi een Year Mine Plan Resource Confidence (drill hole spacing in meters shown in brackets) (Alcoa, 2022) 12-7
Figure 12-4: Example of Reconcilia on Between Mineral Resource and Grade Control Models for Tonnage, Al, Si, and OX (Alcoa, 2022) 12-10
Figure 13-1: SOBR (SLR, 2022) 13-2
Figure 13-2: Topsoil Removal (Background), Blas ng of Hardcap and Marking of Ore (foreground) (SLR, 2021) 13-3
Figure 13-3: Contour Mining (SLR, 2021) 13-4
Figure 13-4: Truck on Haul Road (SLR, 2021) 13-5
Figure 13-5: Haul Roads with Berms (SLR, 2021) 13-6
Figure 13-6: Covered Conveyor (SLR, 2021) 13-7
Figure 13-7: Contour Mining (SLR, 2021) 13-8
Figure 13-8: Soil Being Returned for Backfilling and Landscaping the Pit (Alcoa, 2018) 13-9
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 viii
-- 152 of 363 --
Figure 13-9: Landscaped Mining Area, Prior to Replan ng of Forest (SLR, 2021) 13-9
Figure 13-10: Rehabilitated Pit Through Re-planta on of Na ve Vegeta on (SLR, 2021) 13-10
Figure 13-11: Ore Mining at Darling Range (SLR, 2021) 13-11
Figure 13-12: Blasthole Drill Working on Hardcap (SLR, 2021) 13-13
Figure 14-1: Simplified Block Flow Diagram of the Willowdale Opera on 14-2
Figure 14-2: Simplified Block Flow Diagram of the Huntly Opera on 14-3
Figure 15-1: Infrastructure Layout (Alcoa, 2022) 15-2
Figure 19-1: Sensi vity Analysis (NPV) 19-4
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 ix
-- 153 of 363 --
1.0 EXECUTIVE SUMMARY
1.1 Summary
SLR Interna onal Corpora on (SLR) was appointed by Alcoa Corpora on (Alcoa) to prepare an independent Technical Report Summary on the Darling
Range bauxite mines, located in Western Australia. The purpose of this report is to support the Mineral Resource and Mineral Reserve es mates for the
mines as of December 31, 2022. This Technical Report Summary (TRS) conforms to the United States Securi es and Exchange Commission’s (SEC)
Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 1300 of Regula on S-K, Disclosure by Registrants Engaged
in Mining Opera ons (S-K 1300), and Item 601(b)(96) of Regula on S-K, Technical Report Summary.
1.1.1 Conclusions
1.1.1.1 Geology and Mineral Resources
• The QP is independently declaring the 31 December 2022 Mineral Resources for the defined bauxites located within Alcoa’s Darling Range
deposits. The Mineral Resource models were prepared by Alcoa using their in-house es ma on procedures and reviewed extensively by the
QP.
• As of December 31, 2022, exclusive of Mineral Reserves, as summarized in Table 11-5 at an appropriate level of precision reflec ng
confidence, the Measured Mineral Resources are es mated to be 44.9 Mt at a grade of 31.2% available alumina (A.Al2O3) and 1.15%
reac ve silica (R.SiO2). Similarly, the Indicated Mineral Resources are es mated to be 51.8 Mt at 31.4% A.Al2O3 and 1.17% R.SiO2, and the
Inferred Mineral Resources are es mated to be 140.3 Mt at 32.9% A.Al2O3 and 1.26% R.SiO2.
• Drill sampling and sample control procedures at Alcoa’s Darling Range Bauxite Opera ons are adequate and appropriate for use in the
es ma on of Mineral Resources. The defined volumes and grades of mineraliza on are not expected to be systema cally impacted (biased)
by errors in either the collar loca on or the 3D sample loca on.
• In the QP’s opinion, the QA/QC of sample prepara on and assaying is adequate, and the assay results are suitable for use in Mineral
Resource es ma on.
• Analy cal procedures used for the Alcoa Mineral Resource comprises part of conven onal industry prac ce. FTIR is not widely used yet in
the bauxite industry but is becoming more widely accepted and applied to more opera ons. At Alcoa the method has been consistently
applied successfully for a decade and is rou nely validated by industry standard XRF and wet chemical procedures as discussed in Sec on
8.3 and 8.4. It is the opinion of the QP based on the studies on FTIR repeatability that the overall precision and accuracy of the FTIR
assaying is acceptable.
• The database is adequate, and the data is appropriate for the purpose of Mineral Resource es ma on.
• The con nuous improvements in the geological modelling, es ma on techniques, and block model migra on to the 3D approach are
appropriate and constantly improve the confidence level and precision of the Mineral Resources.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 1
-- 154 of 363 --
• The dry bulk density data is less well controlled than other analytes, although different a empts were taken since 1980. However, based on
the different reconcilia on approaches and on the fact that the polygonal and GSM model have lower confidence level, the density values
are acceptable for the Resource es ma on.
• The condi on of Reasonable Prospects for Economic Extrac on is met by constraining the Mineral Resource model using the ArcGIS system,
by ensuring that the model defines key parameters for the refinery, and by sound reconcilia on prac ces providing feedback that the
modelling is appropriate for the purpose.
1.1.1.2 Mining and Mineral Reserves
• As of December 31, 2022, Proven Mineral Reserves are es mated to total 145.8Mt at 31.4% A.Al2O3 and 1.2% R.SiO2 and Probable Mineral
Reserves are es mated to total 255.8Mt at 32.4% A.Al2O3 and 1.2% R.SiO2.
• The QP has used the December 31, 2022 Mineral Resource es mate as the basis for its Mineral Reserve es mate, applying Modifying
Factors only to those Resources classified as Measured Mineral Resources and Indicated Mineral Resources.
• The bauxite opera ons are opera ng mining projects with a long history of produc on for which establishment capital has been repaid and
for which sustaining capital and supported opera ng costs have been observed to be applied in economic analysis. The review of the Capex
FEL 2 report for the Myara North Crusher move has provided further support. Consequently, the QP considers that support by a Feasibility
Study is demonstrated by the history of profitable opera on and the level of technical support for the Modifying Factors. The QP has
reviewed the opera ng and planning procedures and parameters for the opera ons.
• The QP considers that the accuracy and confidence in the Mineral Reserve es mate to be appropriate for the classifica on applied, which is
supported by both the conserva ve opera onal processes and the long opera onal history.
• The QP is not aware of any risk factors associated with, or changes to, any aspects of the Modifying Factors such as mining, metallurgical,
infrastructure, permi ng, or other relevant factors that could materially affect the Mineral Reserve es mate.
1.1.1.3 Mineral Processing
• The opera ng data between 2010 to 2021 indicates that the product from the Darling Range opera ons consisted of an average A.Al2O3
grade of 33%, with R.SiO2 below the target for refinery feed.
• The QP is of the opinion that the Darling Range opera on demonstrated that ore can be effec vely crushed and supplied to a refinery for
further upgrading to produce alumina. The historical opera onal data confirmed that the ore consistently met refinery specifica ons
without any deleterious elements.
o Based on this, and addi onal informa on provided by Alcoa regarding the mine plan, it is reasonable to assume that the ore
from Darling range can be economically processed for the next 10 years.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 2
-- 155 of 363 --
1.1.1.4 Infrastructure
• The Darling Range mining opera ons have established and opera onal infrastructure, with mining hubs that host administra ve offices, as
well as crushing facili es and maintenance facili es.
o Hubs are relocated periodically as produc on moves away from the hub and transporta on costs increase. These reloca ons
are well-understood with planning and associated budge ng occurring well in advance of reloca ons; produc on restarted
seven days a er the shutdown.
• An extensive haul road network, rail, and overland conveyors transport crushed bauxite from the Hub to the refineries.
o Bauxite is transferred from each mine to the refineries primarily via long distance conveyor belt, apart from the Kwinana
refinery which receives bauxite via railway.
o Alumina produced by the three refineries is then shipped to external and internal smelter customers through the Kwinana and
Bunbury ports.
• The Huntly and Willowdale mines are located near the towns of Pinjarra and Waroona respec vely. These are easily accessible via the
na onal South Western Highway, a sealed single carriageway road, spanning almost 400 km from the southern side of Perth to the
southwest corner of Western Australia.
• Sealed access roads to the main hubs have been established, connec ng Huntly and Willowdale to the road network.
• Major haul roads have been established to each mining area, while secondary haul roads, cross-cut each individual mining plateau. Roads
are unsealed and require con nuous maintenance.
• The Darling Range’s Pinjarra refinery receives power from the South West Interconnected System (SWIS), but also has internal genera on
capacity of 100 MW from four steam driven turbine alternators, with steam produced by gas fired boilers and a gas turbine Heat Recovery
Steam Generator (HRSG).
o The refinery supplies power to the Huntly Mine by a 33,000 volt power supply line and two 13,800 volt lines.
• The Wagerup refinery is a net exporter of power to the SWIS, with internal genera on capacity of 108 MW from three steam driven turbine
alternators and one gas turbine; steam being generated by gas fired boilers.
o The refinery supplies power to the Willowdale Mine by a single 22,000 volt power supply.
• Water is used on the mines for dust suppression, dieback washdown, vehicle washdown, workshops, conveyor belt wash, construc on, and
domes c purposes.
o The water supplies for mining consist of licensed surface water sources supplemented with treated wastewater from vehicle
washdowns, stormwater runoff and maintenance workshops.
o In 2020, water abstrac on comprised approximately 74% of the total Department of Water and Environmental Regula on
license alloca on (for those sites where
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 3
-- 156 of 363 --
abstrac on occurred). An addi onal 336,105kL was also abstracted from South Dandalup Dam under the agreement with Water
Corpora on.
• On site facili es include offices, ablu ons, crib-rooms, and workshops, however there are no Alcoa accommoda on facili es, as the Huntly
and Willowdale mining areas are close to established popula on centers.
• No tailings are generated within the boundaries of the mining opera ons. The management of tailings generated downstream at the
refineries is beyond the boundaries of the Darling Range mining opera ons and are therefore not considered in this TRS. Waste rock is used
to backfill shallow completed pits before covering with topsoil and refores ng.
1.1.1.5 Environment
• Alcoa has established processes to facilitate conformance with environmental requirements, while iden fying sensi ve areas ahead of me
enables them to be managed ahead of disturbance.
• Overburden is carefully segregated for later contouring and rehabilita on of adjacent, completed mining opera ons. Caprock and other
non-viable rock is used to backfill these shallow, completed pits and the viable topsoil spread on top, contoured, and revegetated.
• Bauxite processing residue is only generated at the Refineries, with no tailings generated within the boundaries of the mining opera ons.
Absence of mine waste prevents the need for waste dump construc on and monitoring.
• Site monitoring is completed in accordance with condi ons of government authoriza ons and opera onal licenses at Huntly and
Willowdale.
• Alcoa implements a comprehensive water management and monitoring program in accordance with the requirements of its abstrac on
and opera onal licenses.
• A groundwater monitoring program commenced in H2 2022 across the Darling Range opera ons to support approvals and opera onal
monitoring.
o Alcoa will con nue to expand its monitoring program, as necessary, if groundwater quality or quan ty has been iden fied as
poten ally at risk due to opera onal or mining ac vi es, or poten al exists for mining to impact offsite/private groundwater
supply quan ty or quality.
o Alcoa has a long-term groundwater research project within the Intermediate Rainfall Zone to evaluate poten al impacts of
clearing on groundwater saliniza on.
• Outcomes of and compliance with the management and monitoring programs have most recently been reported within the 2021 Annual
Environmental Review report. Consistent with the outcomes reported between 2018 and 2020:
o Review of the most recent report, published for 2021 largely reported compliance with environmental commitments and
success of opera onal controls to managed environmental objec ves.
• Only a small number of reportable environmental incidents were noted; none of which represent a risk that could adversely affect its
license to operate.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 4
-- 157 of 363 --
1.1.2 Recommenda ons
1.1.2.1 Geology and Mineral Resources
It is apparent to the QP that the long history of explora on, development and mining of Alcoa’s Darling Range bauxite tenements have established
sound knowledge and understanding of the geology and mineral endowment. The QP has not iden fied any fatal flaws in the current prac ces of
mapping (based on the ArcGIS system), drill sampling (based on progressive con nuous improvement), assaying (based on calibrated and validated
FTIR, with reasonable quality control), es ma on (3DBM), database management (using acQuire), the applica on of mining criteria that assure
Reasonable Prospects for Economic Extrac on (RPEE), and the applica on of constraints establishing forestry, heritage and noise limits to the Mineral
Resource defini on. The following recommenda ons are offered as sugges ons for further improvement, aligned with Alcoa’s comprehensive approach
to research and development (seen for example in the evolu on of their drilling, sampling and assaying technologies). These recommenda ons are
priori zed in terms of their perceived value to the overall opera on:
• Con nuing to replace the GSM and polygonal areas to the 3D block modelling methodology, using a script-based semi-automated
approach, which enables more robust rapid model building. The valida on of interpola on parameters using risk-based (condi onal
simula on) techniques to quan fy confidence should be considered.
• To improve the repor ng of recoverable resources, a re-blocked block model to a minimum prac cal mining scale or single mining unit
(SMU) should be considered. Economical parameters considering more flexible costs and bauxite prices related to the Mineral Reserves can
also be implemented in the Mineral Resources workflow, aiming to op mize the bauxite mineable por on including poten al marginal
grades.
• Inves gate whether the 5% bias in the tonnage between the As Mined and sampling tower weightometers is persistent in the 3D block
models.
• Further redrilling or where viable re-assaying of pulps
• Implementa on of a mine wide reconcilia on system should be considered as a way to overcome the issue of density es ma on. This could
be integrated with the extensive produc on tracking data already available from the current fleet management system and opera onal
control system (covering the mining equipment, crushers, conveyors, sampling towers, stockpile stackers and reclaimers).
• To include volume surveys using drones and truck gantry scanning, wet mass measurement using weightometers on conveyors and
LoadRite sensors on mining equipment, and infra-red moisture determina on, mean that be er in situ dry density es ma on may become
possible if the opera on requires it for be er refinery feedstock control.
• The QP considers that twinned hole studies are of limited value and should only be implemented once the sample spli ng and prepara on
demonstrates good repeatability, using field duplicates (or the equivalent STE samples). They may be of value to inves gate specific issues
under closely supervised condi ons.
• While the STE procedure could be retained for specific studies, in the QP’s opinion, the reintroduc on of field duplicates using appropriate
riffle spli ers under supervision should be considered.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 5
-- 158 of 363 --
• The QP is of the opinion that the grade characteris cs of the bauxite profile could be reproduced in the model, which enables op miza on
techniques to be used for the defini on of mining floors and boundaries, be er support for ore loss and dilu on studies, and more accurate
reconcilia on studies.
1.1.2.2 Mining and Mineral Reserves
• Currently a dilu on and mining recovery factor is applied to the final Reserves to reconcile the tonnes and grade. The QP recommends
applying dilu on and ore loss at the re-blocked model level before performing the op miza on and repor ng these values independently.
• The life-of-mine scheduling requires further refinement with regards to sequencing of the different mining areas and assigning the
scheduled years back to the OreBest model (the mining output that defines Reserves).
• The QP recommends detailed haulage analysis focusing on haulage profiles and cycle mes to provide more accurate opera ng costs.
• The QP noted the mining models were in both a 2D grid and 3D model system. Aligning all the mining models within the same 3D mining
model system will provide clarity and consistency across Darling Range project with regards to evalua on and repor ng processes.
1.1.2.3 Mineral Processing
The historical opera onal data for the Darling Range demonstrates that ore consistently met refinery specifica ons.
• Ideally, independent verifica on of sample analysis is conducted, by a cer fied laboratory, on a structured program, to ensure the QA/QC
aspects of the internal analysis. Within this process a propor on of samples from each batch could be sent to the independent laboratory
for analysis and the results can be compared with the internal analysis.
• The QP is apprecia ve that the mine is opera onal, meaning a trade-off versus logis cs / prac cality would need to be carried out.
1.1.2.4 Infrastructure
The Darling Range mining opera ons have well established infrastructure, with mining hubs that are periodically moved to reduce transporta on
distances between mining opera ons and the hubs. The QP make no recommenda ons regarding infrastructure.
1.1.2.5 Environment
Alcoa has established systems to facilitate adherence to environmental commitments. The QP recommends that the following ac ons are taken to
monitor previously enacted correc ve ac ons, made in response to minor environmental incidents:
• Addi onal monitoring should be undertaken post-implementa on of correc ve ac ons to demonstrate their effec veness, in par cular:
o following drainage failures related to significant rainfall events, which resulted in surface water flow from dieback areas into
dieback free areas.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 6
-- 159 of 363 --
o following recordings of elevated turbidity for a period exceeding the compliance criteria (25 NTU).
o in response to incidents involving PFAS and AFFF contamina on.
1.2 Economic Analysis
1.2.1 Economic Criteria
An un-escalated technical-economic model was prepared on an a er-tax discounted cash flow (DCF) basis, the results of which are presented in this
subsec on.
Annual es mates of mine produc on with associated cash flows are provided for years 2023 to 2031, based on Proven and Probable Reserves only.
Key criteria used in the analysis are discussed elsewhere throughout this TRS. General assump ons used are summarized in Table 1-1. All values are
presented in United States Dollars ($) unless otherwise stated.
Table 1-1: LOM Technical-Economic Assump ons
Descrip on Value
Start Date January 1, 2023
Mine Life based on Mineral
Reserves 9 years
Average LOM Price Assump on $21.00
Total Opera ng Costs $4,330.6 million
Capital over nine years $603.2 million
Income tax $472.5 million
Discount Rate 12.25%
Discoun ng Basis End of Period
Infla on 0%
Corporate Income Tax Rate 30%
1.2.2 Cash Flow Analysis
The indica ve economic analysis results, presented in Table 19-3, indicate an a er-tax NPV of $463.9 million at a 12.25% discount rate and an average
bauxite price of $21.00/t over LOM.
Capital iden fied in the economics is for major mine moves, conveyor replacements, haul roads, and other sustaining opera ons.
The cashflow is presented on a 100% a ributable basis.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 7
-- 160 of 363 --
The economic analysis was performed using the es mates presented in this TRS and confirms that the opera ons have a posi ve cash flow that
supports the statement of Mineral Reserves.
Table 1-2: LOM Indica ve Economic Results
Descrip on Units Total LOM
LOM Years 9
LOM Bauxite Produc on Mt 327.8
Average LOM Price $/t 21.00
Gross Revenue $ million 6,895.3
Labor $ million 1,597.4
Service $ million 617.0
Other $ million 722.8
PAE – Corporate Chargebacks $ million 194.4
Energy $ million 119.7
Fuel $ million 218.9
Supplies $ million 225.1
Maintenance $ million 547.6
On-site Mine Opera ng Costs $ million 4,242.9
Off-site Mine Opera ng Costs $ million 87.7
Corporate Income Tax $ million 472.5
Net Income a er Taxes $ million 1,102.5
Deprecia on Tax Savings $ million 989.7
Sustaining Capital (2023 to 2031 inclusive) $ million $602.8
Closure Costs $ million Included in ARO under
opera ng costs
Free Cash Flow $ million 882.7
NPV @ 12.25% $ million 463.9
1.2.3 Sensi vity Analysis
Project risks can be iden fied in both economic and non-economic terms. Key economic risks were examined by running cash flow sensi vi es. The
opera on is nominally most sensi ve to market prices (revenues) followed by opera ng costs.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 8
-- 161 of 363 --
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 9
-- 162 of 363 --
1.3 Technical Summary
1.3.1 Property Descrip on
The Mineral Resource es mates declared in this Report were derived for bauxite deposits located within the Darling Range in the southwest of Western
Australia. The mining center of Huntly is located approximately 80 km to the southeast of Perth, and approximately 30 km east of the township of
Pinjarra. Willowdale is located 100 km south-southeast of Perth, and approximately 15 km east of the township of Waroona.
The Pinjarra refinery is located adjacent to the east of the town of Pinjarra and is approximately 25 km southwest of the Huntly mining areas. The
Kwinana refinery, also supplied by Huntly, is approximately 50 km northwest of Huntly in the city of Kwinana, a suburb approximately 40 km south of
Perth. The Wagerup refinery, supplied by Willowdale, is located immediately adjacent to the east of the South Western Highway, approximately 8 km
south of Waroona and 20 km west of the Willowdale mining area.
1.3.2 Land Tenure
The bauxite deposits are all located within ML1SA. The Agreement permits the explora on and mining of bauxite within the tenement boundaries.
ML1SA was granted on 24 September 1961, for four 21-year periods, and the current lease expires on 24 September 2024, with provision for renewal
extending beyond 2045. The current lease covers an area of 7,022.61 km², and extends from just north of Perth, to Collie in the south. The legisla on
under which Alcoa operates is overseen by the Mining and Management Program Liaison Group, which comprises representa ves from several State
Government departments.
A number of environmental and statutory constraints exist within ML1SA, and Alcoa is not permi ed to access bauxite from the areas covered under
these constraints. Mineral Resources have not been defined in the constrained areas. In August 2001, Alcoa entered a sub-lease arrangement with a
consor um referred to as the Worsley Par cipants. This arrangement permits the Worsley Par cipants to mine and process bauxites within the sub-
lease area. Alcoa has not declared Mineral Resources within the sub-lease area.
1.3.3 Ownership
The mining rights and assets involved with bauxite mining and alumina refining in Australia are 100% owned by Alcoa of Australia Limited (AofA), an
affiliate of Alcoa owned by Alcoa World Alumina and Chemicals (AWAC). AWAC is an unincorporated global joint venture between Alcoa and Alumina
Limited, a company incorporated under the laws of the Commonwealth of Australia and listed on the Australian Securi es Exchange. AWAC consists of
a number of affiliated en es that own, operate or have an interest in bauxite mines and alumina refineries, as well as an aluminum smelter, in seven
countries. Alcoa Corpora on owns 60% and Alumina Limited owns 40% of these en es, directly or indirectly, with such en es being consolidated by
Alcoa Corpora on for financial repor ng purposes.
1.3.4 History
Bauxite occurrences were first recorded in the Darling Range in 1902. Bauxite was detected as a result of analyzing laterite from Wongan Hills, and
subsequently through examina on of lateri c road gravels from several locali es in the Darling Range. The Geological Survey of Western Australia
(Geological
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 10
-- 163 of 363 --
Survey) produced studies and publica ons, driving the bauxite explora on, though most a en on was focused on locali es in the Darling Range close
either to Perth or to railway lines servicing towns such as Toodyay and York. By 1938 bauxite deposits were known to be common throughout the
Darling Range over an area of 560 km long by 40 km to 80 km) wide. The Geological Survey maintained interest in Darling Range laterite as an
economic source of aluminum un l the 1950s. However, by the late 1950s explora on had been taken over by mining companies. The earliest non-
government explora on for bauxite was carried out in 1918 by the Electroly c Zinc Co. of Australia Pty Ltd, deeming the deposits to be generally low
grade and not of commercial value, though like earlier explorers, did not focus upon the underlying friable units.
No further private explora on took place un l 1957 when Western Mining Corpora on Ltd (WMC) began to explore for bauxite in the Darling Range.
Following a regional reconnaissance, a joint venture company, Western Aluminum NL (WANL), formed by WMC with North Broken Hill Ltd and Broken
Hill South Ltd, explored temporary reserves over a large por on of the southwest. These areas were part of a Special Mineral Lease (ML1SA) granted to
WANL in 1961.
By 1961, WANL had delineated 37 Mt of bauxite at an average grade of 33% A.Al2O3. Also in 1961, WANL joined with the Aluminum Company of
America Ltd (Alcoa US), allowing addi onal systema c explora on of lease ML1SA. Commercial mining was finally started in 1963 at Jarrahdale and
con nued un l 1998, supplying bauxite to the Kwinana refinery.
The Huntly and Willowdale mines commenced commercial produc on in 1972 and 1984 respec vely. In 1977 WANL became Alcoa. As of December
2022, the Huntly and Willowdale mining opera ons remain ac ve. Huntly supplies bauxite to the Kwinana and Pinjarra refineries (approximately 25
million tonnes per annum, Mtpa) while Willowdale supplies the Wagerup refinery (approximately 10 Mtpa).
1.3.5 Geological Se ng, Mineraliza on, and Deposit
The Mineral Resource es mates declared in this Technical Report Summary were derived for bauxite deposits located within the Darling Range in the
southwest of Western Australia. The Darling Range comprises a low incised plateau formed by upli along the north-south trending Darling Fault,
which is a major structural lineament that separates the Pinjarra Orogen to the west, from the Yilgarn Craton to the east. The range extends for over
250 km, from Bindoon in the north to Collie in the south.
Bauxite deposits have been iden fied throughout the Darling Range and generally occur as erra cally distributed alumina-rich lenses within the eroded
laterites that mantle the granites to the east of the scarp line. The bauxites are thought to have formed from the lateri za on of the peneplained
surface of the Western Gneiss Terrane rocks. Lateri za on is thought to have commenced during the Cretaceous and con nued through to the Eocene,
with the subsequent periodic ac vity of the Darling Fault resul ng in the current landform of scarps and deeply incised valleys on the western edge of
the Darling Range.
Most of the bauxites display a typical profile comprising the following sequence, from the top down:
• Overburden: A mix of soils, clays, rock fragments and humus that is typically 0.5 m deep, but deeper pockets are common.
• Hardcap: An indurated iron-rich layer that is usually 1 m to 2 m thick. It is generally high in available alumina (A.Al2O3) and low in reac ve
silica (R.SiO2).
• Friable Zone: A par ally leached horizon that usually contains a mix of caprock fragments, clasts, nodules, pisolites, and clays. It is usually a
few meters thick but can exceed several meters in places. It is generally high in A.Al2O3 and low in R.SiO2.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 11
-- 164 of 363 --
• Basal Clay: A kaolini c clay horizon that represents the transi on zone between the Friable Zone and the underlying saproli c material. It is
generally high in R.SiO2 and low in A.Al2O3.
The Hardcap and Friable Zone are targeted as the ore horizon. Selec ve mining prac ces are applied to minimize the inclusion of Overburden, because
of its elevated organic carbon levels, and Basal Clay because of its elevated R.SiO2 concentra ons. Within the Hardcap and Friable Zone, the dominant
minerals, in order of abundance, are gibbsite, quartz, goethite, kaolinite, and hema te, with lesser amounts of anatase and muscovite.
1.3.6 Explora on
Systema c explora on for bauxite within the region commenced in the 1960s and is conducted on a con nuous basis to maintain sufficient Resources
and Reserves to meet refinery supply. Alcoa systema cally drills the laterite areas on a regular grid spacing of 60 × 60 m, followed by successive infill
programs in selected areas that reduce the spacing to 30 × 30 m, and finally to 15 × 15 m. The 2022 Mineral Resource es mates were derived from data
acquired from a total of 332,017 holes, drilled between 1981 and 2022, with almost 80% of the holes drilled a er 2009.
The planned drill hole collar loca ons are pegged by Alcoa surveying staff using real me kinema c differen al global posi oning system (RTK DGPS).
Prior to mid-2015, theodolite/ total sta ons and DGPS were used to posi on the 60 m spaced holes, and the 30 m and 15 m grids were posi oned by
taping and op cal square sigh ng between the 60 m pegs. If the drill rig cannot be setup within 2 m of the peg, the offset distance is measured and
marked on the driller’s log. Alcoa has recently introduced the prac ce of resurveying all drill hole loca ons a er drilling. However, the planned
coordinates are used for subsequent modelling ac vi es.
All holes are assumed to be ver cal. However, the drill rigs have limited levelling capability, and most holes are orthogonal to the local surface gradient,
resul ng in devia ons of several degrees from ver cal.
A digital eleva on model represen ng the natural surface was prepared from a combina on of collar survey data, LiDAR data, and satellite imagery.
The drilling is conducted using a fleet of tractor-mounted vacuum rigs, which have been modified to operate in forested areas with minimal clearing or
ground prepara on. In 2015, Alcoa added aircore drilling rigs to the fleet. These rigs are also tractor-mounted and are fi ed with a similar sample
collec on system to that used on the vacuum rigs. The rigs are fi ed with hollow-bladed bits that have a nominal cu ng diameter of 45 mm and an
internal retrieval tube diameter of 22–25 mm.
All samples are collected on 0.5 m intervals, with the material extracted via the hollow drill stem into a collector flask a ached to the cyclone
underflow. Each sample, which weighs approximately 1.5 kg, is repeatedly passed through a riffle spli er to yield a retained split weighing
approximately 200 g. This material is placed into barcode-labelled sample packets for dispatch to the test laboratory. The remaining material is
discarded.
For each hole, the drillers prepare a log sheet that contains survey, drilling, geological logging, and sample submission informa on.
1.3.7 Mineral Resource Es mates
The long produc on history of Alcoa’s ML1SA opera ons has resulted in the development of an integrated approach for data collec on, bauxite
delinea on, and produc on planning, aimed at
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 12
-- 165 of 363 --
providing feedstock that meets the technical specifica on requirements of the local refineries. In the past few years, Alcoa recognized that some of its
procedures required op miza on and upda ng to be more consistent with best prac ce approaches within the industry. They commenced a process of
inves ga on and revision of many of these procedures but recognized that this must be implemented in a staged manner to ensure that the Mineral
Resources and Mineral Reserves delinea on procedures remain consistent with, and do not result in significant disrup on to, current mining prac ces.
In 2019, they began introduc on 3D block modelling techniques to replace the polygon and gridded seam modelling resource es ma on procedures.
Approximately 38% of the tonnages that contribute to the current Mineral Resource (exclusives Mineral Reserves) have been prepared using the new
3D block modelling procedures.
The majority of the es mates that make up the current Mineral Resource inventory were prepared using techniques that Alcoa has developed since the
commencement of mining in 1963. Over the period, Alcoa developed an integrated approach to data collec on, resource defini on, and mining that
has proven effec ve in mee ng the refineries’ feedstock requirements.
The development of the resource es ma on procedures largely predates the wider industry move to block modelling and geosta s cal es ma on
techniques that occurred in the 1990s. Although there have been numerous changes and refinements to Alcoa’s procedures, these systems are
essen ally a semi-automated implementa on of the tradi onal 2D polygonal es ma on techniques.
A legacy of the development history of the resource es ma on system is that different procedures were used to delineate Mineral Resources using the
30 m and 60 m spaced data, termed the ResTag procedures, compared to those defined using the 15 m spaced data, termed the Gridded Seam Model
(GSM) procedures.
The es mates defined using the 15 m spaced data are limited to the material that is planned to be mined. The parameters used by Alcoa meant that
the resultant es mates were essen ally nearest neighbor polygonal es mates.
In 2019, Alcoa introduced 3D block modelling and geosta s cal es ma on techniques, which they term the 3D Block Model (3DBM) procedures, to
replace the polygonal and gridded seam modelling techniques.
In essence, all techniques largely rely upon the defini on of a resource floor based on A.Al2O3 and R.SiO2 cut-off grade criteria applied to both
individual and accumulated sample grades (for the tradi onal approaches) or individual and accumulated model grades (for the 3DBM approach).
Minimum thickness criteria are also considered. For the models defined using the 15 m spaced data, prac cal mining constraints are also included in
floor defini on, including stripping ra os, and the floor heights in surrounding holes. The sample grades in each drill hole or column of model cells are
composited over the interval between the base of overburden and the resource floor.
The lateral constraints are ini ally defined using A.Al2O3 and R.SiO2 grade thresholds, and then modified to include minimum area, minimum
composite numbers, and maximum internal waste criteria. Addi onal constraints are applied for the resources defined using 15 m spaced data. These
include maintaining equipment transit corridors and including minimum buffer distances around environmental exclusion zones and bedrock outcrop.
The resource outlines are divided into resource blocks that delineate sub-regions containing material with similar grade characteris cs, and contain
tonnages that can be used for long-term, medium-term, and short-term scheduling ac vi es (80 kt to 100 kt for 60 m spacing, down to 20 kt to 40 kt
for 15 m
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 13
-- 166 of 363 --
spacing). For the 30 m and 60 m areas, the resource blocks are assigned the length-weighted average grades of the enclosed composites.
The model contains es mates for a range of cons tuents that are of prime importance for Bayer processing including A.Al2O3, R.SiO2, oxalate,
sulphate, boehmite, and iron. Valida on included visual and sta s cal checks between the input data and resource block es mates, comparisons of the
es mates derived from different data spacings, and comparisons of the es mates with produc on data.
The annual reconcilia on data for the past 19 years indicate the presence of grade and tonnage biases which, although some show long-term trends,
appear to be rela vely consistent and predictable on a year-to-year basis. The As Mined tonnage es mates are consistently biased high by
approximately 5%. The As Mined A.Al2O3 is biased low but has shown a gradual improvement from 5% to 1%, rela ve over the past decade. The As
Mined R.SiO2 is biased low but has shown a gradual improvement from around 30% to 10% rela ve over the past decade. Most other cons tuents
exhibit similar bias reduc ons over the past decade.
The Mineral Resource classifica ons have been applied to the resource es mates based on considera on of the confidence in the geological
interpreta on, the quality and quan ty of the input data, the confidence in the es ma on technique, and the likely economic viability of the material.
There are limited quality assurance data to enable a thorough assessment of the reliability of the es ma on datasets, and nowadays the minority of
the Mineral Resource es mates (inclusive Mineral Reserves) have been prepared using tradi onal 2D es ma on techniques which have known
limita ons when used to prepare local es mates. However, the long produc on history and significant amount of reconcilia on data indicate that past
es mates prepared using these techniques have been rela vely reliable and predictable.
Based on the above considera ons, the main controlling factors for Mineral Resource classifica on are deemed to be sample spacing, geological
modelling and block model criteria, and data quality.
1.3.8 Mineral Reserve Es mates
A Mineral Reserve has been es mated for Alcoa’s Darling Range bauxite mining opera ons in accordance SEC S–K 1300 which are consistent with the
guidelines of the Australasian Code for Repor ng of Explora on Results, Mineral Resources and Mineral Reserves (the JORC 2012 Code).
The QP inspected the Alcoa Huntly and Willowdale opera ons and Mine Planning Department between October 27th and 1st November 2022 and
visited Alcoa’s Mine Planning department on November 2nd and 3rd 2022, interviewing relevant personnel on these dates and on other occasions. The
QP has prior knowledge of the asset being involved in the previous Mineral Reserve Statement in the preceding year (2021/22).
The Mineral Reserve is classified with reference to the classifica on of the underlying Mineral Resource and with reference to confidence in the
informing Modifying Factors. The QP considers the Proven and Probable classifica on to be appropriate to the deposit and associated mining
opera ons.
The reference point for the Mineral Reserve is prior to the processing plant at the refinery.
The Proven Mineral Reserve is a subset of Measured Resources only. The Proven Mineral Reserve is within a current mining region and is included in
the Ten-Year Mine Plan.
The Probable Mineral Reserve is es mated from that part of the Mineral Resource that has been classified as Indicated or from Measured resources
that are outside the current mining regions.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 14
-- 167 of 363 --
Variable cut-off grades are applied in es ma on of the Mineral Reserve, and these are related to opera ng cost and the nature of the Mineral Resource
in rela on to blending requirements. The Mineral Reserve es mate is expressed in rela on to available aluminum oxide (A.Al2O3) and reac ve silica
(R.SiO2), this being the cri cal contaminant in rela on to the Refinery.
1.3.9 Mining Methods
The Huntly and Willowdale mines employ conven onal open pit mining prac ces and equipment. The fleet is mixed between contract and owner-
operator, depending on the nature of the task at hand. Owner operator equipment is used for mining the bulk of the Mineral Reserve, opera ng in
areas away from those subject to environmental restric ons. Contract mining operates smaller equipment, day shi only, in environmentally (noise)
sensi ve areas and at the perimeter of the mining area.
Following defini on of Mineral Reserve blocks, vegeta on is cleared ahead of mining by the Western Australian State Forest Products Commission
(FPC), saleable mber being harvested for use. On receipt of clearance to proceed from the FPC, Alcoa opera ons commence stripping topsoil and
secondary overburden removal (SOBR) using small excavators, scrapers, and trucks. Soil is stockpiled at the site, away from the proposed pit, for
rehabilita on purposes.
Mining progresses on 4 m benches, u lizing a contour-mining sequence, cu ng benches across the topography, working from top to bo om,
maintaining the fla est floor obtainable to a maximum gradient of 1:10. This is most pronounced in steep areas. Most of the mineraliza on lies
beneath a gently undula ng topography and contour mining is minimal.
A er comple on of mining, overburden is progressively backfilled into adjacent exhausted pits, topsoiled and rehabilitated by re-establishment of
na ve vegeta on, crea ng a stable post-mining landform that replicates the pre-exis ng environment.
1.3.10 Processing and Recovery Methods
The QP notes in accordance with the mine planning reviewed, total (T.SiO2) and R.SiO2 contents, on an annual average basis, remains below the target
for refineries for the next 10 years. This means, there are no evidence of any deleterious element’s presence in the Darling Range ore within the next
10 years of produc on.
The process plant for the Darling Range opera ons consists of two separate crushing facili es at the Huntly and Willowdale mines. Both facili es crush
the Run-of-Mine (ROM) and convey the crushed ore to three separate refineries located at Pinjarra, Kwinana and Wagerup.
The power consump on of the Huntly opera on is approximately 8,000 Megawa -hour (MWh) to 9,000 MWh per month. The Willowdale power
consump on is approximately 2,000 MWh per month.
The process plant is a dry crushing opera on and therefore water is only required for dust suppression and is included as part of mine water
consump on. Water is not required as a consumable for the plant.
1.3.11 Infrastructure
The infrastructure for the mining opera ons is established and opera onal. During 2021, the infrastructure hub for Willowdale was relocated 16 km
southwards from Orion (a er having been based there for 21 years) to the Larego Hub which is located about 20 km north-east of the town of Harvey.
The hub hosts new administra ve offices, as well as crushing facili es and maintenance facili es. The Orion Hub site has been decommissioned.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 15
-- 168 of 363 --
Extensive haul road networks, rail, and overland conveyors transport crushed bauxite from the Hubs to the refineries (namely Kwinana, Wagerup and
Pinjarra). Bauxite is transferred from each mine to the refineries primarily via long distance conveyor belt, apart from the Kwinana refinery which
receives bauxite via railway. The Alumina produced by the three refineries is then shipped to external and internal smelter customers through the
Kwinana and Bunbury ports.
The Darling Range’s Pinjarra refinery receives power from the South West Interconnected System (SWIS). The refinery also has internal genera on
capacity of 100 MW from four steam driven turbine alternators, with steam produced by gas fired boilers and a gas turbine Heat Recovery Steam
Generator (HRSG). The refinery supplies power to the Huntly Mine by three different power supply lines (a single 33 kV and two 13.8 kV). Willowdale
Mine has a single 22 kV power supply fed from the Wagerup refinery. The Wagerup refinery is a net exporter of power to the SWIS, with internal
genera on capacity of 108 MW from three steam driven turbine alternators and one gas turbine. The steam is produced by gas fired boilers.
The WA mines are licensed by the Department of Water and Environmental Regula on (DWER) to draw surface water from five loca ons to meet their
water supply requirements. The Huntly mine draws water from Banksiadale Dam and Boronia Waterhole. Huntly mine also holds a license to draw
water from Pig Swamp and Marrinup, however these resources are retained as a backup water supply and have not been u lized in recent years.
Huntly mine is also permi ed to draw water from South Dandalup Dam under an agreement with the Water Corpora on. A pumpback facility from
South Dandalup Dam to Banksiadale Dam is used to raise levels in Banksiadale Dam during periods of low rainfall runoff. Willowdale Mine draws water
from Samson Dam.
There are no Alcoa accommoda on facili es within the Darling Range. As described above, the Huntly and Willowdale mining areas are within
proximity to established popula on centers including Pinjarra approximately 25 km to the West of Huntly and Waroona approximately 20 km West of
Willowdale. On site facili es includes offices, ablu ons, crib-rooms and workshops, all of which were observed to be in excellent condi on.
No tailings are generated within the boundaries of the mining opera ons. The management of tailings generated downstream at the refineries is
beyond the boundaries of the Darling Range mining opera ons and are therefore not considered in this TRS. Alcoa’s Darling Range mining opera ons
do not produce mine waste or “mullock” in the same manner as conven onal mining opera ons and waste dumps are not constructed.
1.3.12 Market Studies
Alcoa Corpora on is a ver cally integrated aluminum company comprising bauxite mining, alumina refining, aluminum produc on (smel ng and
cas ng), and energy genera on.
Through direct and indirect ownership, during 2022 Alcoa Corpora on had 27 loca ons in nine countries around the world, situated primarily in
Australia, Brazil, Canada, Iceland, Norway, Spain, and the United States. Governmental policies, laws and regula ons, and other economic factors,
including infla on and fluctua ons in foreign currency exchange rates and interest rates, affect the results of opera ons in these countries.
There are three commodi es in the ver cally integrated system: bauxite, alumina, and aluminum, with each having their own market and related price
and impacted by their own market fundamentals. Bauxite, which contains various aluminum hydroxide minerals, is the principal raw material used to
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 16
-- 169 of 363 --
produce alumina. Bauxite is refined using the Bayer process to produce alumina, a compound of aluminum and oxygen, which in turn is the raw
material used by smelters to produce aluminum metal.
Alcoa obtains bauxite from its own resources and processes over 85% of its combined bauxite produc on into alumina. The remainder is sold to the
third-party market. In 2022, total Alcoa produc on was 42.1 million dmt (dry metric tonne) of bauxite.
China is the largest third-party seaborne bauxite market and accounts for more than 90% of all bauxite traded. Bauxite is sourced primarily from
Australia, Guinea, and Indonesia on the third-party market. In the long run, China is expected to con nue to be the largest consumer of third-party
bauxite with Guinea expected to be the majority supplier. Further, third-party traded bauxite is expected to be in surplus over the next decade, with
most new mining projects announced recently being located in Guinea.
Bauxite characteris cs and varia ons in quality heavily impact the selec on of refining technology and refinery opera ng cost. A market bauxite with
high impuri es could limit the customer volume an exis ng refinery could use, resul ng in a discount applied to the value-in-use price basis.
Besides quality and geography, market fundamentals, including macroeconomic trends – the prices of raw materials, like caus c soda and energy, the
prices of Alumina and Aluminum, and the cost of freight – will also play a role in bauxite prices.
In 2016, Darling Range entered into a 5-year third-party sales contract with a major alumina producer in China. Following the expira on of the third-
party sales contract at the end of 2021, all bauxite produc on from Huntly and Willowdale was consumed internally by the Darling Range.
The pricing mechanism of the third-party sales contract was based on a value-in-use methodology (as described in Sec on 16-1) that was anchored to
the customer’s other bauxite sources at the me of execu on, with a market adjustment factor linked to the Alumina price.
A price of $19/t has been u lized for 2022 with an es mate for economic market-based factors applied throughout the LOM.
1.3.13 Environmental Studies, Permi ng and Plans, Nego a ons, or Agreements with Local Individuals or Groups
Alcoa has established prac ces and processes for ensuring conformance to environmental requirements. Sensi ve areas are iden fied and managed
ahead of disturbance. Environmental factors are taken into account prior to infill drilling; hence, mining blocks carrying environmental risks do not
feature in the Mineral Reserves (for example, areas around granite outcrops and water courses have a buffer applied and are essen ally no-go areas
from a mining perspec ve).
Baseline studies completed in 2021 (16) and 2022 (3) for the revised mining proposal areas are available to support the Environmental Protec on Act
1986 (WA) and the Environment Protec on and Biodiversity Conserva on Act 1999 (Commonwealth) approvals for future extensions to the mining
footprint. Baseline studies for future mining areas are guided by the requirements of the Environmental Protec on Authority (WA) and are well
understood.
No tailings are generated within the boundaries of the mining opera ons as bauxite processing residue is only generated at the Refineries. Similarly,
Alcoa’s Darling Range mining opera ons do not produce mine waste or “mullock” in the same manner as conven onal mining opera ons and as such
waste dumps are not constructed. Overburden from Darling Range ore blocks is carefully segregated for later
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 17
-- 170 of 363 --
contouring and rehabilita on of adjacent, completed mining opera ons. Caprock and other non-viable rock is used to backfill these shallow, completed
pits and the viable topsoil spread on top, contoured, and revegetated. As such, there is no requirement for the monitoring of any tailings or mine waste
dumps associated within the mining opera ons as all tailings are processed outside the mine lease boundary.
Alcoa’s mine sites are monitored in accordance with the condi ons of Government authoriza ons and its opera onal licenses at Huntly
(L6210/1991/10) and Willowdale (L6465/1989/10). Outcomes of and compliance with the management and monitoring programs are tracked within
Alcoa’s Environmental Management System and reported within the Annual Environmental Review report.
The environmental reviews and approvals form part of the Mining and Management Program Liaison Group (MMPLG) approvals process. Compliance
with the MMPLG is demonstrated through an annual report submi ed to the Department of Jobs, Tourism, Science, and Innova on (DJTSI).
Opera onal ma ers at the Willowdale and Huntly mines are licensed by the Department of Water and Environmental Regula on via instruments
L6465/1989/10 and L6210/1991/10, respec vely. These licenses condi on the processing of ore and repor ng is required annually to DWER describing
the total volume of bauxite crushed and any non-compliance. The latest available repor ng at the me of wri ng is for calendar year 2020. Compliance
with the Alcoa ISO14001 accredited Environmental Management System (EMS) was audited in December 2021, with results reported in August 2022,
indica ng compliance with environmental commitments and success of opera onal controls to managed environmental objec ves, with only four (4)
reportable incidents noted.
Alcoa has established systems and processes for maintaining its social license to operate and was admi ed to ICMM in 2019, aligning to its social
performance requirements. Related to the requirements of the MMPLG, Alcoa’s ac ons in rela on to social performance include an annual
consulta on process aligned with the 5 Year Mine Plan. The consulta on process involves engaging with affected landowners. Alcoa’s consulta on
extends to shires, as well as state and local government members. Where appropriate, the mine plan accommodates community requirements, in
par cular, concerns related to noise, dust, etc., and allows for buffer zones and modified working hours.
Alcoa’s Closure Planning group for Darling Range (located within the Global Planning Team) is responsible for developing the closure planning process
as well as the subsequent Long-Term Mine Closure Plans (LTMCPs) of Alcoa’s WA Mining Opera ons (Huntly and Willowdale). Closure Strategies,
Schedules and Cost Es mates are being developed across organiza onal divisions and includes mul disciplinary inputs from Opera ons, Mid- and
Short-term Planning, Finance, Centre for Excellence, Environment and Asset Management (both Fixed and Mobile Plant). The agreed closure
requirements for Darling Range centers around the return of Jarrah Forest across the site. End land uses are required to comply with the State’s Forest
Management Plan and include water catchment protec on, mber produc on and biodiversity conserva on.
The Alcoa procurement system defines “local” as the locali es of Dwellingup, Harvey, Pinjarra, Waroona, Coolup, North Dandalup, Jarrahdale and
Yarloop. Within Alcoa’s guidelines of safe, ethical, and compe ve business prac ces, they state they will:
• Invite capable local business to bid on locally supplied or manufactured goods or services.
• Give preference to local business in a compe ve situa on.
• Work with local business interest groups to iden fy and u lize local suppliers.
• Where possible, structure bids to enable local supplier par cipa on.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 18
-- 171 of 363 --
1.3.14 Capital and Opera ng Cost Es mates
Alcoa forecasts its capital and opera ng costs es mates based on annual budgets and historical capital and opera ng costs over the long life of the
current opera on.
1.3.14.1 Capital Costs
The opera on is well-established, and the LOM plan does not envisage any significant change of the produc on rate over the LOM. An cipated future
major capital expenditure is related to major mine moves and sustaining the on-going opera ons.
Projected capital expenditure over the next nine years of mine life is es mated to total $603 million. Of this total, $158 million is associated to
complete the mine move to the Myara North site. Capital for the Holyoake move is es mated to be $241 million.
A breakdown of the major expenditure areas and total expenditure over the Mine Plan is shown in Table 1-3.
Table 1-3: 10 Year LOM Sustaining Capital Costs by Area
Project Cost
$ Million Percentage of Total
Mine Moves 399 66.2%
Conveyor Belt Replacements 69 11.4%
Haul Road Improvements 55 9.1%
Other Sustaining capital 80 13.3%
Total 603 100%
Other capital costs are for replacement of conveyors, haul road improvements and other sustaining capital needed to con nue the opera ons.
Alcoa’s sustaining capital es mates for Darling Range are derived from annual budgets and historical actuals over the long life of the current opera on.
According to the American Associa on of Cost Engineers (AACE) Interna onal, these es mates would generally be classified as Class 1 or Class 2 with
an expected accuracy range of -3% to -10% to +3% to +15%.
1.3.14.2 Opera ng Costs
The main produc on mining opera ons are primarily Owner-operated using Alcoa equipment and employees. Contractors are also used for certain
ac vi es on site.
Opera ng costs for the current LOM of nine years are based on the 2023 budget.
No items have been iden fied that would significantly impact opera ng costs either posi vely or nega vely over the life of mine. Minor year-to-year
varia ons should be expected based upon maintenance outages and produc on schedules. Forecast costs for 2023 and average mine opera ng costs
for the nine-year LOM are shown below in Table 1-4.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 19
-- 172 of 363 --
Table 1-4: LOM On-site Mine Opera ng Costs by Category*
Cost Centre 2023
($/wmt)
Average LOM
($/wmt)
Percentage of
Opera ng Cost
Direct Labor $3.43 $4.87 38%
Services $2.07 $1.88 15%
Other $1.45 $2.21 17%
Corporate Chargebacks for support
services $0.53 $0.59 5%
Energy $0.34 $0.37 3%
Fuel $0.37 $0.67 5%
Opera ng Supplies and Spare Parts $0.44 $0.69 5%
Maintenance (fixed plant and mobile
fleet $1.06 $1.67 13%
Mine Opera ng Cash Cost ($/wmt) $9.70 $12.95 100%
Off-site Costs
G & A, selling and other expenses $0.28 $0.24
R & D Corporate Chargebacks $0.03 $0.03
Total Cash Opera ng Costs $10.01 $13.21
*Due to rounding, numbers presented may not add up precisely to the totals provided.
Services costs includes contractor costs for certain mining ac vi es such as in noise sensi ve areas and for haul road construc on services, in select
areas of pit development, and during landscaping ac vi es for rehabilita on a er mining.
As of December 2022, the Huntly and Willowdale opera ons together employ a total of 887 employees consis ng of 48 technical, 77 management and
762 opera ons employees. Addi onally, 67 employees are centrally employed on the combined opera ons.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 20
-- 173 of 363 --
2.0 INTRODUCTION
SLR Interna onal Corpora on (SLR) was appointed by Alcoa Corpora on (Alcoa) to prepare an independent Technical Report Summary (TRS) on the
Darling Range bauxite mines, located in Western Australia. The purpose of this report is to support the Mineral Resource and Mineral Reserve
es mates for the mines as of December 31, 2022. This Technical Report Summary conforms to the United States Securi es and Exchange Commission’s
(SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 1300 of Regula on S-K, Disclosure by Registrants
Engaged in Mining Opera ons (S-K 1300), and Item 601(b)(96) of Regula on S-K. This Technical Report Summary updates the TRS tled “Technical
Report Summary for Darling Range, Western Australia,” with an effec ve date of December 31, 2021, that was prepared in accordance with S-K 1300
and Item 601(b)(96) by SLR for Alcoa.
Alcoa is one of the world’s largest aluminum producers and is a publicly traded company on the New York Stock Exchange (NYSE). The company owns
and operates integrated bauxite mining, alumina refining and aluminum smel ng opera ons at numerous assets globally across nine countries. Alcoa is
also a Joint Venture partner for several other integrated opera ons in Brazil, Canada, Guinea, and Saudi Arabia.
The Darling Range, located south of Perth in Western Australia, comprises two ac ve bauxite mining areas – the Huntly and Willowdale mines – owned
and operated by Alcoa of Australia Limited, which is 60% owned by Alcoa Corpora on and 40% owned by Alumina Limited. The Huntly and Willowdale
opera ons collec vely represent one of the world’s largest bauxite mines which supplies Alcoa’s three aluminum refineries in the region: Kwinana,
Pinjarra, and Wagerup. On the basis that both mining areas supply ore to the same local refineries which are also operated by Alcoa, and that both
mining areas are located within the same mining lease boundary, SLR considers the mines a single property for the purposes of this report.
Alcoa has a long history of mining in the Darling Range with Huntly and Willowdale commencing commercial produc on in 1972 and 1984 respec vely.
These mining areas were preceded by the Jarrahdale bauxite mine which was opera onal between 1963 and 1998. The Huntly mine currently supplies
bauxite to the Pinjarra and Kwinana refineries, while the Willowdale mine supplies the Wagerup refinery. The mines collec vely produce approximately
35 Mtpa of bauxite, with approximately 25 Mtpa from Huntly and 10 Mtpa from Willowdale.
2.1 Site Visits
SLR Qualified Persons (QPs) visited the sites between October 27th to November 3rd, 2022. The SLR Geologist and SLR Mining Engineer were
accompanied by Alcoa’s Principal Geologist Global Planning to undertake site visits and inspec ons of various aspects of the Huntly and Willowdale
mining areas.
The site visit commenced with a general induc on and opera ons overview at Alcoa’s Pinjarra office (Bindjareb). SLR’s mining engineer was provided a
general overview of the transi onal process used to develop the 3d block models from the historical gridded data. The process was developed in the
DeepLime pla orm, a scripted pla orm to facilitate the transi on. Following the overview, the visit moved to the Pinjarra refinery for a discussion with
management regarding the Capex planning and opera onal costs.
The following day, 28th October, SLR’s Geologist joined the visit team. The group undertook an inspec on of the Huntly mine site. A review of the
drilling opera ons was ini ally undertaken, this
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 1
-- 174 of 363 --
incorporated confirma on of sample selec on process from the drilling and generally to review the QA/QC procedures. Drilling rig 9011 was opera ng,
and three holes were observed being drilled and sampled. The restora on, rehabilita on of a mine out hill area was then reviewed. This was followed
with the inspec on of the procedures for organic stripping to review the interface of the domains to the upper bauxite layer as related to confirm the
dilu on assump ons as appropriate.
Occasional areas of steriliza on were observed as small protec ve circular islands approximately 30m-50m diameter. The full sec on profile of the
opera on could be surveyed in this sterilized island. Restora on a er stripping on steeply inclined fills was also noted, confirming the ability to mine at
the gradients noted in the Reserve es ma on.
A further mining hill pod was inspected, opera ons were cu ng the pre-stripped organic layer to provide the main bauxite excava on. EX 1021
excavator was stopped, and the excavated face inspected. Poten al for dilu on was reviewed and confirmed as suitable. Visit then stopped at the main
Myara (Huntly) crusher sta on to review the primary crushing opera on. The twin hopper sta on was observed from distance as four number 200t
trucks pped. The trucking was not u lizing the surge area at the me.
Haul roads were in excellent condi on and of suitable design and width to accommodate the Cat 789c (190t) trucks. Segrega on and right-angle
crossing points for light vehicles were at high standard. Infrastructure for plant and water management was of a very high standard.
Discussions with Huntly site engineering team took place over the 4 hour visit to the various mining areas. The Digital fleet management system (FMS)
was reviewed at the Myara site. The mine dispatch office was reviewed. Controls for the Myara main surge area before the Primary Crusher, the
Primary Crusher itself and the controls for the conveyors and stackers downstream were also viewed. The 17 No trucks all have telemetry data, as do all
excavators and dozers, 10 dozers (D11 to D10 size), 4 No Cat 993 size front load shovels, 5 No prime excavators (EX 2600, PC 3000), plus various other
ancillary equipment to operate one of the world’s largest bauxite mines.
Site visit on the Monday 31st of October started in the Pinjarra mine office (Bindjareb). The Geological team provided an overview of
H07_Holyoake_Central modelling approach. Op miza on, deple on related to constraints, cut off grades etc. were all reviewed. This model was also
taken forward to the mining review and reconcilia on by QPs as part of the audit review process. The model was also reviewed at Alcoa Head Office on
the 2nd of November.
Inspec on was then undertaken of the lab facili es at Kwinana refinery and the independent labs (Bella Analy cal Systems PTY Ltd) used for the ore
sample prepara on and tes ng. The drilled packet samples are brought to this lab for prepara on and tes ng. Sample ID system was reviewed, and a
number of online tests were reviewed by the audit review team. Sample ID J661503 was witnessed. The team then went to the main refinery to review
tes ng procedures for other criteria and reference tes ng to the Bella Lab. Bomb Digest systems QXRD, XRF systems etc. were all reviewed. Historical
control charts and procedures were all reviewed during the visit to gain an understanding of Alcoa’s QA/QC procedures and exceeded the standard
tes ng approach expected.
On the 1st of November and following a review of the Ore Best GIS model at Pinjarra office, the team visited Willowdale mine site (specifically, the new
mine office near the Larego crusher) as well as various loca ons on Larego accompanied by Alcoa’s Short Term Planning Superintendent. A rela vely
new black top access road has been constructed from the main highway to the Larego office complex. Larego consists of a new mine office and Mine
infrastructure area. Black top car parking exists for the mine staff and personnel. An overview of the mine planning ac vi es was provided. New and
exis ng haul roads
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 2
-- 175 of 363 --
were all in excellent condi on. The organic stripping opera on, and drilling of hard cap was reviewed. Mine water treatment facili es were seen by
drive by. Komatsu 730e trucks were witnessed on the haul roads. Ore loading opera ons were reviewed. The Mine Infrastructure Area (MIA) was noted
to be very well kept order. Larego Primary Crusher was inspected (at the me down for standard repairs), conveyor sec ons and route to the stacker
reclaimer were reviewed.
The QPs then inspected the Darling Scarp including the covered downhill conveyor, sampling sta on, ore stockpile stacker/reclaimer, and Wagerup
refinery.
The QPs interviewed several senior Alcoa staff at the opera onal sites.
Alcoa provided permission to document the site visit with video, photos and audio which were shared with the other SLR team members.
QPs visited the Alcoa’s Mine Planning department at Booragoon on November 2nd, 2022, for discussions about Alcoa’s mine planning systems. Both of
SLR’s QPs carried out inspec ons of the Kwinana laboratory facili es, in par cular the FTIR assaying procedures on 31st October 2022. Drilling methods
were inspected on site on October 28th, 2022, along with an examina on of the database management procedures.
The SLR Metallurgist QP did not visit the site, however, the site was visited by the Mining and Geology QPs who reviewed all Modifying Factors.
2.2 Sources of Informa on
During the prepara on of this Technical Report Summary, discussions were held with personnel from Alcoa Corpora on and the Huntly and Willowdale
Mines, including:
• Mr Alex Hatch, Principal Geologist, Alcoa Global Planning
• Mr Thomas Green, Resource Development Manager, Alcoa Global Planning
• Mr Quen n Swart, Senior Resource Geologist, Alcoa Global Planning
• Mr Lucas Tuckwell, Senior Resource Geologist, Alcoa Global Planning
• Mr Peter Hill, Explora on Superintendent, Alcoa Global Planning
• Mr Levi Barnes, Explora on Geologist, Alcoa Global Planning
• Mr Francois Vorster, Senior Project Manager, Capital, Alcoa
• Mr Masud Hosain, Senior Mine Planning Engineer, Alcoa Global Planning
• Mr Neylor Aguiar, Principal Mining Engineer, Alcoa Global Planning
• Mr Sco Hann, Short Term Planning Superintendent Willowdale Mine, Alcoa
• Mr Mohammad Babei Fardvatan, Mine Engineer, Huntly Mine, Alcoa
• Mr John Greenwood, Director of Bella Analy cal Services
• Mr Andrew Richardson, Senior Environmental Scien st – Approvals and Compliance – WA Mining, Alcoa
This Technical Report Summary was prepared by QPs and updates the Technical Report Summary for Darling Range, Western Australia, dated February
24, 2022, with an effec ve date of December 31, 2021
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 3
-- 176 of 363 --
prepared by SLR. The documenta on reviewed, and other sources of informa on, are listed at the end of this report in Sec on 24.0 References.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 4
-- 177 of 363 --
2.3 List of Abbrevia ons
Units of measurement used in this report conform to the metric system. All currency in this report is United States dollars (US$), unless otherwise
noted.
Abbrevia on Descrip on
°C degree Celsius
°F degree Fahrenheit
2D 2-dimensional
3D 3-dimensional
3DBM 3D Block Model
a annum
A ampere
A.Al2O3 available alumina
AACE American Associa on of Cost Engineers
AFFF Aqueous Film Forming Foams
AGD Australian Geode c Datum
Alcoa Alcoa Corpora on
Alcoa US Aluminum Company of America Ltd
AMG Australian Map Grid
AMPD Absolute Mean Percentage Difference
AMSL above mean sea level
AMWU Australian Metal Workers Union
AofA Alcoa of Australia Ltd
API Alumina Price Index
ARO Asset Re rement Obliga ons
AWAC Alcoa World Alumina and Chemicals
AWU Australian Workers Union
B&P Bias and Precision
bbl barrels
BD Bomb digest
BD-GC bomb digest gas chromatography
BD-ICP bomb digest induc vely coupled plasma
BD-NDIR bomb digest non-dispersive infrared
Bella Bella Analy cal Systems
Btu Bri sh thermal units
BV Bureau Veritas
C$ Canadian dollars
cal calorie
CalVal calibra on and valida on for FTIR
cfm cubic feet per minute
CIM CIM (2014)
cm cen meter
cm² square cen meter
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 5
-- 178 of 363 --
Abbrevia on Descrip on
CRM cer fied reference material
CV Coefficient of Varia on
d Day
DBCA Water Corpora on, Department of Biodiversity, Conserva on and A rac ons
DCF Discounted Cash Flow
DEM Digital Terrain Model
DG Discrete Gaussian
DGPS (Differen al) Global Posi oning System
dia Diameter
DIBD dry in situ bulk density (t/m3)
DJTSI Department of Jobs, Tourism, Science and Innova on
DMIRS Department of Mines Industry Regula on and Safety
dmt dry metric tonne
DWER Department of Water and Environment Regula on
dwt dead-weight ton
EMS Environmental Management System
ETU Electrical Trades Union
EWR Ecological water requirements
FMS Fleet Management System
FPC Forest Products Commission
foot
/s foot per second
² square foot
³ cubic foot
FTIR fourier transform infrared spectrometry
g gram
G giga (billion)
g/L gram per liter
g/t gram per tonne
Gal Imperial gallon
GC gas chromatography
Geological Survey Geological Survey of Western Australia
GIS Geographical Informa on System
Gpm Imperial gallons per minute
gr/ ³ grain per cubic foot
gr/m³ grain per cubic meter
GSM gridded seam model
ha hectare
HARD Half Absolute Rela ve Difference
hp horsepower
hr hour
HRSG Heat Recovery Steam Generator
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 6
-- 179 of 363 --
Abbrevia on Descrip on
Hz Hertz
ICP-OES induc vely coupled plasma op cal emission spectrometry
IDW inverse distance weigh ng
in. inch
in² square inch
IRM internal reference material
IRR Internal Rate of Return
ISO Interna onal Standardiza on Organiza on
J Joule
JORC JORC Code (2012)
k kilo (thousand)
kcal kilocalorie
kg kilogram
km kilometer
km/h kilometer per hour
km² square kilometer
kPa kilopascal
kV kilovolt
kVA kilovolt-amperes
kW kilowa
kWh kilowa -hour
KWI Kwinana Mining Laboratory
L liter
L/s liters per second
lb pound
LiDAR Light Detec ng and Ranging
LIMS laboratory informa on management system
LME London Metal Exchange
LOM Life of Mine
LTMCPs Long-Term Mine Closure Plans
m micron
m meter
M mega (million); molar
m² square meter
m³ cubic meter
m³/h cubic meters per hour
Ma Million years ago
MALSI microwave available alumina (AL) and reac ve silica (SI)
MASL meters above sea level
MD microwave digest
MD-ICP microwave digest induc vely coupled plasma op cal emission spectrometry
mg microgram
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 7
-- 180 of 363 --
Abbrevia on Descrip on
mi mile
min minute
mL milliliters
ML Mineral Lease
mm millimeter
MMPLG Mining and Management Program Liaison Group
MMPs Mining and Management Programs
mph miles per hour
MS Ministerial Statement or Magne c Suscep bility
Mtpa Million tonnes per annum
MVA megavolt-amperes
MW megawa
MWh megawa -hour
NATA Australian Na onal Associa on of Tes ng Authori es
NI 43-101 Na onal Instrument 43-101 (2014)
NPC Net Present Cost
NPV Net Present Value
NTU Nephelometric Turbidity Units
NYSE New York Stock Exchange
OK ordinary kriging
oz Troy ounce (31.1035g)
oz/st, opt ounce per short ton
PFAS per- and polyfluoroalkyl substances
ppb part per billion
ppm part per million
psia pound per square inch absolute
psig pound per square inch gauge
QA Quality Assurance
QA/QC Quality Assurance / Quality Control
QC Quality Control
QP(s) Qualified Person(s)
R.SiO2 reac ve silica
RC Reverse Circula on
REF reference method
ResTag mineral resource es ma on system
RL rela ve eleva on
ROM Run of Mine
RTK real me kinema c
s second
SEC Securi es and Exchange Commission
S-K 1300 Subpart 1300 of Regula on S-K
SLR SLR Interna onal Corpora on
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 8
-- 181 of 363 --
Abbrevia on Descrip on
SMU Single Mining Unit
Snowden Snowden Mining Consultants
SOBR stripping topsoil and secondary overburden removal
SPU sample presenta on unit
SRK SRK Consul ng (Australasia) Pty Ltd
st short ton
STE sample to ex nc on
stpa short ton per year
stpd short ton per day
SWIS South West Interconnected System
t metric tonne
T.Al2O3 Total Alumina
T.SiO2 Total silica
TICTOC Total Inorganic Carbon and Extractable Organic Carbon
tpa metric tonne per year
tpd metric tonne per day
TRS Technical Report Summary
US$ United States dollar
USg United States gallon
USgpm United States gallon per minute
V volt
W wa
WA Western Australia
WANL Western Aluminum NL
WMC Western Mining Corpora on Ltd
wmt wet metric tonne
wt% weight percent
XRD x-ray diffrac on
XRF x-ray fluorescence
Xstract Xstract Resources
yd³ cubic yard
yr Year
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 2023 9
-- 182 of 363 --
3.0 PROPERTY DESCRIPTION
3.1 Loca on
The Darling Range is located in the southwest of Western Australia and comprises an extensive upli ed plateau of bauxite deposits which is host to
several mining opera ons including the Huntly and Willowdale mining areas, approximately 80 km and 100 km southeast of Perth, respec vely. The
nearest towns to the mining centers are North Dandalup (approximately 15 km west of Huntly) and Waroona (approximately 15 km west of
Willowdale). Both towns are within the Peel Region of southwest Western Australia and are on the route of the South Western Highway, a major
na onal road connec ng Perth with the south coast.
All spa al data used for Mineral Resource es ma on are reported using a local grid based on Australian Map Grid 1984 (AMG84) system (Zone 50) and
using Australian Geode c Datum 1984 (AGD84) coordinate set. The approximate coordinates of the mining areas are 410000 m East and 6390000 m
North (Huntly) and 410000 m East and 6365000 m North (Willowdale). The Huntly and Willowdale mining areas are separated by approximately 35 km
(Figure 3-1).
The Pinjarra refinery is located adjacent to the east of the town of Pinjarra and is approximately 25 km southwest of the Huntly mining areas. The
Kwinana refinery, also supplied by Huntly, is approximately 50 km northwest of Huntly in the city of Kwinana, a suburb approximately 40 km south of
Perth. The Wagerup refinery, supplied by Willowdale, is located immediately adjacent to the east of the South Western Highway, approximately 8 km
south of Waroona and 20 km west of the Willowdale mining area.
3.2 Land Tenure
The Huntly and Willowdale bauxite mines are covered by a single mineral concession referred to as Mineral Lease (ML) 1SA. The concession was
originally granted on September 25, 1961, by the State Government of Western Australia under the Alumina Refinery Agreement Act, 1961, permi ng
the explora on and extrac on of bauxite. ML1SA was granted for a period of four, 21-year periods the third period of which is due to expire on
September 24, 2024. Prior to September 24, 2024, Alcoa will no fy the State Government of Western Australia of its inten on to exercise its right to
renew for a further 21-year period to extend the concession to 2045. Subject to Alcoa having complied with the Alumina Refinery Agreement Act,
1961, the State Government will grant Alcoa the renewal. The State Government concession agreement includes the poten al for condi onal renewal
beyond 2045. This will require nego a on between Alcoa and the State Government prior to this date to agree on an extension of the agreement, and
is therefore not guaranteed.
Condi ons which must be fulfilled by Alcoa to retain ML1SA include annual repor ng requirements under several State Agreement Acts, Ministerial
Statements, and Environmental Protec on Acts. These are described in Sec on 3.6 below.
The current concession of ML1SA covers an area of 7,022.61 km², extending from the north of Perth on the eastern side to the town of Collie in the
south (Table 3-1). Alcoa has the exclusive right to explore for and mine bauxite on all Crown Land within the ML1SA. This area includes sub-lease
arrangements made between Alcoa and the Worsley Alumina joint venture par cipants which include South32, Japan Alumina Associates (Australia)
Pty Ltd and Sojitz Alumina Pty Ltd (Worsley Par cipants). The agreements, made in August 2001 and September 2016, provide bauxite mining
concessions to the
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 183 of 363 --
Worsley Par cipants. No Mineral Resources or Mineral Reserves a ributable to the Darling Range mining areas have been declared within these sub-
lease areas.
Table 3-1: ML1SA License Details
Concession Name Title Holder Expiry Date Area (km²)
ML1SA Alcoa of Australia 24/09/2024 7,022.61
Alcoa pays rental for each square mile of ML1SA in accordance with the Alumina Refinery Agreement Act 1961 (WA). In 2022, this amounted to
A$13,560.
The boundary of the ML1SA concession area, including the limit of the Worsley Par cipants’ area, is illustrated in Figure 3-1. The contained Mining
Regions are shown in Figure 3-4, while the extents of the mined areas and Mineral Resources and Mineral Reserves are shown in Figure 3-3:
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 184 of 363 --
Figure 3-1: ML1SA Lease Extents (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 185 of 363 --
Figure 3-2: Map of Mining Repor ng Centers, Mining Regions, and Produc on Sheets (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 186 of 363 --
Figure 3-3: Map of Current Mineral Resource and Mineral Reserve Extents (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 187 of 363 --
3.3 Naming Conven ons
Alcoa has developed a terminology to refer to various parts of the Mineral Lease. There are three major Mining Repor ng Centers exist in ML1SA:
North (previously Jarrahdale), Huntly in the central area, and Willowdale in the south. The boundaries are nominal and may change to match the
planned ore des na on. The southernmost region of the North mining center was reallocated to Huntly in 2017 and named Myara North.
Mining Regions subdivisions of the Repor ng Centers that cover several years of mining ac vi es, focused on a specific crusher loca on. The
boundaries are named a er forestry blocks. A total of 12 Mining Regions is represented in the current resource es mate: 1 in North, 7 in Huntly, and 4
in Willowdale.
Mining Pits are named based on their sequence along haul roads. These names are used by the mining fleet when referring to local short-term
produc on. The map reference system outlined below is used for drilling, es ma on, and long-term planning.
The Mineral Lease is divided into a grid of Explora on Sheets being rectangles 4.2 km (north) by 3.6 km (east). Each 15.12 km² Explora on Sheet is
assigned a name and coded using le ers A to V (west to east), and numbers 10 to 80 (north to south), e.g., G45.
Each Explora on Sheet is divided into 28 Produc on Sheets 900 m (east) by 600 m (north), an area of 0.54 km². The Produc on Sheets are assigned a
number (1 to 28), sequen ally 4 across (towards the east) and 7 down (towards the south), e.g., G4520.
Each Produc on Sheet is divided using a 15 m by 15 m grid resul ng in 2,400 grid cells (40 north by 60 east). Each of these is regarded as a point and
assigned a numeric code 1 to 40 towards the south and 1 to 60 towards the east. These are appended to the Produc on Sheet name to provide a grid
point label, e.g., G4520 1430 and used on 1:1000 Map Sheets to define drill hole loca ons.
The Explora on Sheet, Produc on Sheet, and Map Sheet conven ons are shown in Figure 3-4:
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 188 of 363 --
Figure 3-4: Explora on Sheet, Produc on Sheet, and Map Sheet Conven ons (SRK, 2021)
3.4 Encumbrances
Constraints on mining ac vi es within the ML1SA concession are in place which prevent bauxite mining in these areas including:
• Within 200 m from the Top Water Level of Drinking Water Reservoirs
• Na onal Parks
• Aboriginal Heritage Sites
• Old Growth Forest
• Formal Conserva on Areas
• Within a 50 m buffer of Granite Outcrop (greater than 1 ha).
Mineral Resources and Mineral Reserves have not been defined in these restricted areas. Opera ng rights are obtained by Alcoa through annual
submission and approval of the Mining and Management Programs (MMPs) which include mining schedules and the authoriza ons provided by the
Mining and Management Program Liaison Group (MMPLG).
Mining on a day-only basis is conducted in “noise zones” where noise from the mining opera ons will poten ally exceed allowable levels. The
opera on ac vely seeks to maintain lower noise levels than
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 189 of 363 --
those mandated, thus mining in these areas is undertaken by contract miners using smaller equipment on day shi s only.
3.5 Royal es
Alcoa is the holder of ML1SA. For bauxite that is mined and processed in Alcoa’s Western Australian alumina refineries, Alcoa pays royal es on the
alumina produced in accordance with the Alumina Refinery Agreement Act 1961 (WA). For bauxite that is mined and exported, Alcoa pays royal es in
accordance with the Mining Act 1978 (WA).
3.6 Required Permits and Status
Alcoa operates under several State Agreement Acts as well as Ministerial Statements and environmental opera ng licenses issued under the
Environmental Protec on Act 1986 (WA) including:
• Alumina Refinery Agreement Act 1961 (WA)
• Alumina Refinery (Pinjarra) Agreement Act 1969 (WA)
• Alumina Refinery (Wagerup) Agreement Act 1978 and Acts Amendment Act 1978 (WA), which provided for the crea on of the MMPLG
• Alumina Refinery Agreements (Alcoa) Amendment Act 1987 (WA)
• Ministerial Statement 728 (as amended by Ministerial Statements 897, 1069 and 1157) (MS728)
• Ministerial Statement 646
• Environmental Protec on (Alcoa – Huntly and Willowdale Mine Sites) Exemp on Order 2004 (Exemp on Order)
• Environmental licenses L6210/1991/10 and L6465/1989/10 granted under Part V of the Environmental Protec on Act 1986 (WA)
The MMPLG is chaired by the Department of Jobs, Tourism, Science and Innova on. The MMPLG was first established in 1978 and consists of
representa ves of the Department of Jobs, Tourism, Science and Innova on (DJTSI), Department of Water and Environment Regula on (DWER), Water
Corpora on, Department of Biodiversity, Conserva on and A rac ons (DBCA), and the Department of Mines Industry Regula on and Safety (DMIRS).
The MMPLG is recognized by the Minster for Environment in Ministerial Statements (95, 390, 564, 728, 897 and 1069) regarding expansion of Alcoa
opera ons. The management and oversight of all Darling Range opera ons by the MMPLG involves:
• Provide oversight to mining, infrastructure, processing and related opera ons within ML1SA
• Advise on the environmental and social adherence of the 5-year MMPs developed by Alcoa on a recurring annual basis.
• Provide six-monthly authoriza ons for ground clearance for mining in accordance with the submi ed and approved MMPs.
• Provide oversight to ongoing rehabilita on of mined areas
The permi ng and approval processes, as provided by Alcoa, are summarized below:
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20238
-- 190 of 363 --
• Clause 9 (1) of the 1961 State Agreement provides Alcoa the sole rights to explore and mine the bauxite deposits within ML1SA.
• Clause 5 of the Wagerup State Agreement specifies that Alcoa must consult with the DBCA in rela on to the requirement to submit annual
mine plans for mining associated with the Wagerup refinery.
• Under Clause 6 (1) of the Wagerup State Agreement, Alcoa has submi ed several environmental review documents to the State
Government for subsequent approvals of the Wagerup refinery construc on and expansions. Within these environmental assessment
documents, significant informa on on Alcoa’s bauxite mining opera ons associated with the Wagerup refinery was included, resul ng in
several condi ons in rela on to Alcoa’s bauxite mining opera ons associated with the Wagerup refinery being incorporated in the
Ministerial Statements of which the current one is Ministerial Statement 728 (as amended). Procedure 3 of MS728 outlines Alcoa’s
requirements to have a publicly available Comple on Criteria document for its bauxite mining opera ons, developed in consulta on with
the MMPLG. Procedure 4 of MS728 outlines the MMPLG’s authority to review and approve Alcoa’s mining opera ons through the five-year
Mine Plan process. To the extent the condi ons on bauxite mining opera ons in Ministerial Statement 728 and the predecessor Ministerial
Statements did not cover bauxite mining unrelated to the Wagerup refinery, Alcoa agreed to extend the condi ons to the rest of its bauxite
mining.
• Through the Wagerup State Agreement, MS728, and agreement between the State Government and Alcoa, the MMPLG is responsible for
reviewing and providing a recommenda on to the Minister for Environment and the Minister for State Development to approve Alcoa’s
five-year Mine Plans.
• Alcoa’s mining opera ons within ML1SA are also conducted in accordance with the Environmental Protec on (Alcoa – Huntly and
Willowdale Mine Sites) Exemp on Order 2004 (Exemp on Order) made by the Minister for the Environment. The Exemp on Order is
consistent with the Wagerup State Agreement that established the MMPLG and MMP processes and it also reflects the procedures of
MS728 that sets out the MMPLG’s responsibility to review annual rolling 5-year mine plans for Alcoa’s opera ons.
Alcoa reports that all licenses and permissions for the mining opera ons are currently valid. However, Alcoa is seeking formal environmental impact
assessment and approval from the State and Federal Government, which is required prior to mining within the Myara North and Holyoake regions of
the Huntly mine. These approvals will be through the current process under the Environmental Protec on Act 1986 (WA) and the Environment
Protec on and Biodiversity Conserva on Act 1999 (Commonwealth). Alcoa is seeking these approvals to facilitate the transi on of the mine from
Huntly to Myara North and Holyoake and a 5% increase in produc on at the Pinjarra refinery. The process also seeks to modernize aspects of the
regulatory framework for the Huntly mine.
3.7 Other Significant Factors and Risks
SLR is not aware of any environmental liabili es on the property. Alcoa has all required permits to conduct the proposed work on the property. SLR is
not aware of any other significant factors and risks that may affect access, tle, or the right or ability to perform the proposed work program on the
property.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20239
-- 191 of 363 --
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202310
-- 192 of 363 --
4.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND
PHYSIOGRAPHY
4.1 Accessibility
As described in previous sec ons, the Darling Range Huntly and Willowdale opera ons are located approximately 150 km south of Perth. The Darling
Range is readily accessible via road from Perth and surrounding areas. The mines are near the towns of Pinjarra and Waroona. Both towns are easily
accessible via the na onal South Western Highway, a sealed single carriageway road, which starts on the southern side of Perth and con nues for
almost 400 km to the southwest corner of Western Australia.
Huntly is accessible from the South Western Highway via Del Park Road, a sealed single carriageway road which connects the town of North Dandalup
in the north with Dwellingup in the south. From Del Park Road, a 3km sealed road following the route of the bauxite conveyor to the Pinjarra refinery
provides access to the Huntly site administra on offices.
Willowdale is similarly accessible 19 km from the South Western Highway via Willowdale Road, a sealed single carriageway road to the south of
Waroona.
There are several airstrips in the region, although the closest major airport is in Perth, approximately 70 km north of North Dandalup. The nearest
commercial port is at the Kwinana refinery, approximately 40 km south of Perth (as illustrated on Figure 15-1).
While an extensive haul road network and overland conveyors transport crushed bauxite from the main mining hub to the Wagerup and Pinjarra
refineries, bauxite is also transferred to the Kwinana refinery via the Kwinana freight railway system, using the Kwinana–Mundijong line.
4.2 Climate
The southwest region of Western Australia exhibits a temperate climate, with very hot and dry summers (December to February) and mild winters
(June to August). Rainfall is generally low and variable, ranging from an average rainfall of 25 mm during the three summer months and exceeding
200 mm during the three winter months (Australian Government, Bureau of Meteorology). Local climate condi ons generally do not interrupt the
mining schedule, which con nues throughout the year. Occasionally however, significant rainfall inhibits access and can impact mining ac vi es.
Table 4-1: Historical Climate Data
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
°C Mean Max 29.7 29.7 27.1 22.6 18.6 16.1 15.1 15.8 17.4 20.1 23.8 27.4
°C Mean Min 14.3 14.6 13.0 10.4 7.7 6.5 5.5 5.5 6.5 8.1 10.5 12.6
mm Mean Rainfall 16.5 22.0 26.8 65.1 156.4 233.7 234.9 193.4 130.1 79.2 46.2 20.6
Notes:
1. Temperature and rainfall data sourced from the Australian Government Bureau of Meteorology, collected from the weather sta on at Dwellingup
h p://www.bom.gov.au/climate/averages/tables/cw_009538.shtml
2. Data includes that collected from 1935 to 2021.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 193 of 363 --
4.3 Local Resources
The Darling Range is located in an easily accessible region of southwest Western Australia with the Huntly and Willowdale mining areas both within
15 km of well-established towns which act as residen al and commercial centers. Several other towns and smaller se lements are posi oned along the
South Western Highway which acts as a major connec on for the Darling Range to the city of Perth where a far greater range of general services is
available.
4.4 Infrastructure
The following sec on refers to several named mining areas within the Huntly and Willowdale mining centers, including Myara, Larego, Orion, and
Arundel, each of which is illustrated in Figure 3-2 above.
Mining infrastructure in the Darling Range is generally concentrated in the Myara site in the northwest of the Huntly mining center, and at the Larego
area in the center of the Willowdale mining area (20 km southeast of Wagerup) having been relocated 16 km southwards from the Orion Hub during
2021). Both opera ons include various ancillary facili es that are not listed exhaus vely here, however both infrastructure areas include:
• Ore crushing and handling facili es
• Ore stockpile stacker/reclaimer
• Maintenance facili es
• Sampling sta ons
• Site offices including a produc on tracking room
• Haul road networks
• Overland conveyors, as illustrated on Figure 15-1.
• Water supplies consis ng of abstrac on from licensed surface water sources supplemented with treated wastewater from vehicle
washdowns, stormwater runoff, and maintenance workshops. Water sources are illustrated on Figure 15-1.
o The Huntly mine draws water from Banksiadale Dam and Boronia Waterhole. The mine also holds a license to draw water from
Pig Swamp and Marrinup, although these are reported as being rarely u lized, and it is permi ed to draw water from South
Dandalup Dam under an agreement with the Water Corpora on.
o Willowdale Mine draws water from Samson Dam, approximately 10 km southeast of Waroona.
The Willowdale five-year mining plan recently included the reloca on of the crusher from the former Orion infrastructure area in the north to Larego in
the south. This included suppor ng infrastructure construc on ac vi es including:
• Overland conveyor construc on from Arundel to Larego, as illustrated in Figure 151.
• Haul road development into new mining areas
• Establishment of produc on office facili es
• Access routes between gated mining areas and fire-figh ng tracks
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 194 of 363 --
• Water o ake points for Larego (along the Samson Dam)
Personnel are sourced from the area around Perth, Western Australia, which benefits from a skilled workforce due to the rela vely large number of
opera ng mines in the region. Personnel typically have private accommoda on in the nearby city of Mandurah (60 km from the mine) and towns
(Waroona, Hamel, Yarloop, Harvey and Wagerup).
Huntly Mine has three power supplies fed from the Pinjarra refinery. A single 33 kilovolt (KV) supply and two 13.8 kV supplies. The Pinjarra refinery is a
net importer of power from the South West Interconnected System (SWIS), with internal genera on capacity of 100 Megawa (MW) from 4 steam
driven turbine alternators. The steam is produced by gas fired boilers and a non-Alcoa gas turbine Heat Recovery Steam Generator (HRSG).
Willowdale Mine has a single power supply fed from the Wagerup refinery. A single 22 kV supply. The Wagerup refinery is a net exporter of power to
the SWIS, with internal genera on capacity of 108 MW from three steam driven turbine alternators and one gas turbine. The steam is produced by gas
fired boilers.
4.5 Physiography
The western edge of the Darling Range is characterized by scarps and incised valleys, landforms which are a ributed to tectonic ac vity along the
Darling Fault, the dominant structural feature in the region which acts as the western boundary of the deposits. This feature is observable in regional
topographical survey informa on and satellite imagery to roughly follow the coastline of southwest Western Australia and is approximately demarcated
by the extent of Jarrah Forest, a recognized bioregion.
The topography of the ML1SA concession generally comprises wide valleys and undula ng hills separated by minor surface water drainage channels
and streams. Vegeta on across the ML1SA is dominated by several areas of State Forest including Dwellingup, Lane Poole, and Youraling. These include
dis nct areas of old growth forest within which mining is prohibited.
The typical eleva on ranges from 300 m to 400 m in the mining areas, however the highest points of the region (outside of the mining areas) are
approximately 550 m.
Topography data was acquired from:
• Drill hole collar survey data
• Light Detec ng and Ranging (LiDAR) surveys
• Landgate satellite data.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 195 of 363 --
5.0 HISTORY
5.1 Prior Ownership
Prior to 1961, there were no records of ownership of the Darling Range mines. A Special Mineral Lease (ML1SA) was granted to Western Aluminum NL
(WANL) in 1961. In the same year WANL joined Aluminum Company of America Ltd (Alcoa US). In 1977 WANL became Alcoa.
5.2 Explora on and Development History
The following text is sourced and modified from Hickman, et al, 1992.
Bauxite occurrences were first recorded in the Darling Range in 1902. Bauxite was detected as a result of analyzing laterite from Wongan Hills, and
subsequently through examina on of lateri c road gravels from several locali es in the Darling Range. The Geological Survey of Western Australia
(Geological Survey) produced studies and publica ons, driving the bauxite explora on, though most a en on was focused on locali es in the Darling
Range close either to Perth or to railway lines servicing towns such as Toodyay and York. The Geological Survey mapped the extent of laterite in the
Darling Range (close to Perth) to determine whether it contained commercial deposits of iron or aluminum ore.
The earliest non-government explora on for bauxite was carried out in 1918 by the Electroly c Zinc Co. of Australia Pty Ltd, deeming the deposits to be
generally low grade and not of commercial value, though like earlier explorers, did not focus upon the underlying friable units.
Of 46 early samples of laterite analyzed in 1919, 26 contained 35% or more available alumina. It was then assumed that bauxite in the Darling Range
was confined to the duricrust part of the profile, and not considered in the underlying friable units. By 1938 bauxite deposits were known to be
common throughout the Darling Range over an area of 560 km long by 40 km to 80 km wide.
The Geological Survey maintained an interest in Darling Range laterite as an economic source of aluminum un l the 1950s. However, by the late 1950s
explora on had been taken over by mining companies.
No further private explora on took place un l 1957 when Western Mining Corpora on Ltd (WMC) began to explore for bauxite in the Darling Range.
Following a regional reconnaissance, a joint venture company, WANL, formed by WMC with North Broken Hill Ltd and Broken Hill South Ltd, explored
temporary reserves over a large por on of the southwest. Profiles were sampled from road cu ngs, with samples collected at 400 m intervals along
main roads. Selected lateri c ridges and plateaus were sampled at 90 m intervals. These areas were part of a Special Mineral Lease (ML1SA) granted to
WANL in 1961.
By 1961, WANL had delineated 37 Mt of bauxite at an average grade of 33% A.Al2O3. Also in 1961, WANL joined with the Alcoa US, allowing addi onal
systema c explora on of lease ML1SA (Figure 5-1). Holes were drilled ini ally on 370 m by 185 m centers. Progressive in-fill drilling down to a spacing
of 45 m by 45 m blocked out the ore at Jarrahdale and was followed by grade-control drilling. Commercial mining was finally started in 1963 at the
former Jarrahdale mining center and con nued un l 1998, supplying bauxite to the Kwinana refinery.
The Huntly and Willowdale mines commenced commercial produc on in 1972 and 1984, respec vely. In 1977 WANL became Alcoa. As of 2022, the
Huntly and Willowdale mining opera ons remain ac ve.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 196 of 363 --
Huntly supplies bauxite to the Kwinana and Pinjarra refineries (approximately 27 Mtpa) while Willowdale supplies the Wagerup refinery (approximately
10 Mtpa).
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 197 of 363 --
Figure 5-1: Bauxite Explora on in the Southwest of Western Australia 1961 (adapted from Hickman, 1992)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 198 of 363 --
6.0 GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT
6.1 Bauxite Deposits
Bauxite deposits, economic concentra ons of aluminum oxide, represent the world’s major source of aluminum and consist primarily of the minerals
gibbsite, boehmite, and diaspore. These are commonly found alongside iron oxide minerals including goethite and hema te, kaolinite clay minerals,
and minor accessory minerals.
Lateri c bauxite deposits such as those in the Darling Range of WA generally formed in tropical (hot and humid) environments through chemical
weathering. As a result, lateri c bauxite deposits are known to exist across Central and South America, West Africa, Central Asia, and Australia.
With its large available resources, access to a stable workforce, infrastructure (comprising conveyors, rail, road, and port access), and three cap ve
(mine-to-mill) dedicated alumina refineries, Alcoa’s Darling Range Bauxite opera ons near Perth WA, has been one of the world’s leading alumina
producing regions for at least 30 years (Hickman et al, 1992), or approximately 60 years as of 2022.
6.2 Regional Geology
The bauxite deposits of the Huntly and Willowdale opera ons are located in the Darling Range region of southwest Western Australia. The
predominant topographic feature of the region is the Darling Range Fault, a north-south trending scarp which extends approximately 220 km from
Bindoon (70 km north-northeast of Perth) to Collie (160 km south-southeast of Perth).
The Darling Range Fault is the structural boundary between two geological terranes: the Pinjarra Orogen to the west, now the sedimentary Swan
Coastal Plain, and the Yilgarn Craton to the east, a gneissic granite complex with greenstones. To the east of the Darling Range Fault intense weathering
and erosion of exposed Archean basement rocks of the Western Gneiss Terrane, the western por on of the Yilgarn Craton, formed widespread lateri c
bauxite deposits by the intense weathering, accumula on and leaching of the aluminosilicate rich material of the bedrock granites (Hickman et al,
1992).
Alcoa’s current bauxite mining areas of Huntly and Willowdale are on the eastern side of the Darling Range Fault, as low-lying plateaus separated by
valleys in which alluvial deposits have accumulated. Figure 6-1 shows the regional geology of the southwest region of Western Australia and Alcoa’s
ML1SA lease boundary in rela on to Perth, while Figure 6-2 shows the distribu on of surficial deposits across the region.
The Jarrahdale, Del Park, Huntly and Willowdale areas that have been mined by Alcoa are on laterite within the Western Gneiss Terrane (Figure 6-2),
formed over granites that have been intruded by numerous north trending tholeii c, quartz dolerite dykes, of early to late Proterozoic age, with
thicknesses ranging from 1 m to 200 m.
Lateri c bauxite developed from the Late Cretaceous (65 million years ago, Ma) to the Eocene (40 Ma), with several periods of erosion and intense
weathering of the basement granites and dolerites. Subsequent reac va on of the Darling Fault combined with periods of erosion led to the
establishment of plateaus and incised valleys, trending to wider valleys and low hills to the east which now characterize the physiography of the region.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 199 of 363 --
Figure 6-1: Regional Geology (adapted from SRK, 2021)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 200 of 363 --
Figure 6-2: Surface Geology Showing Laterite Over Granite (Alcoa, 2015)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 201 of 363 --
6.3 Local Geology
Laterite remnants are thickest and most extensive over a 150 km long region between the Avon and Harris Rivers, and within about 50 km of the
Darling Scarp. The laterite occupies gently sloping (3° to horizontal) upland areas with an average eleva on of 280 to 300 meters above sea level
(MASL), and high annual rainfall. Steeper slopes may have a thin cover of partly transported laterite with bedrock near the surface. Above 340 m the
laterite is penetrated by bedrock which rises above the general topographic level. Below 200 m drainage has removed pre-exis ng laterite. Blocks of
laterite, released by headward erosion of streams, decay to lateri c gravels on the lower slopes of valleys, which pass laterally into alluvial sands and
silt in the valley floors (Hickman et al, 1992).
Bauxite deposits typically occur as irregularly shaped lenses on the flanks of plateaus. Cri cal to this is the laterite posi on on the slopes (Figure 6-3):
erosion generally dominates on steeper slopes which prevent accumula on and effec ve bauxite forma on, whereas flat areas lack the necessary sub-
surface water flows which drive the removal of clays and the enrichment of soluble silicate minerals.
Figure 6-3: Bauxite Deposit Forma on Schema c – Relief Exaggerated (Alcoa, 2021)
6.4 Mineraliza on
Weathering, altera on and leaching of the granite bedrock has developed the bauxite mineraliza on which principally occurs as 65% microcrystalline
gibbsite Al(OH)3 with minor to rare boehmite ALO(OH), and accessory minerals of 18% goethite FeO(OH), 7% hema te Fe2O3, 9% quartz SiO2, 1%
kaolinite/halloysite Al2Si2O5(OH)4, and 0.5% anatase/ru le TiO2.
Other minerals within the bauxite that may influence the alumina refinery performance include:
• Boehmite: generally occurring below 1%, this can cause premature precipita on of dissolved gibbsite resul ng in alumina being lost to the
red mud residues.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 202 of 363 --
• Organic Carbon: as oxalate, typically less than 0.2%, (2.0 kg/t, measured as Na2C2O4) this can result in reduced diges on efficiencies and
cause crystal growth issues during precipita on.
• Sulphate: generally occurring at 0.25%, this can consume caus c soda during diges on resul ng in lower yields.
6.5 Property Geology
Table 6-1 provides a summary of the typical stra graphy defined by Alcoa across their Darling Range deposits. The Hardcap and Friable Zones represent
the primary horizons of economic interest due to their concentra ons of alumina. A generalized mineralogical profile through these horizons is
provided in Figure 6-4 and a typical grade profile in Figure 6-5 showing the alumina and iron-rich Hardcap, with increasing silica and decreasing alumina
through the Friable Zone.
Table 6-1: Alcoa’s Darling Range Deposit Typical Stra graphic Column
Stra graphic horizon Typical thickness
range (m) Descrip on
Overburden 0 to 0.5 Mixed soils and clays, high in organic ma er, generally forming a thin layer which can penetrate deeper if the underlying
Hardcap surface is variable.
Hardcap
(Caprock) 1 to 3
Ferricrete formed by the remobiliza on of iron into a layer comprising iron and alumina-rich nodules which can exhibit
the highest alumina concentra ons across the deposit. Highly variable in thickness but generally 1 m to 3 m with a sharp
contact against the underlying Friable Zone.
Friable Zone 3 to 5
Leached horizon resul ng in the accumula on and enrichment of bauxite minerals. The Friable Zone comprises a mixture
of the overlying Hardcap, clasts, Al and Fe rich nodules, and clays. Upper contact with the Hardcap is variable, found as a
sharp or transi onal boundary in places. Available Alumina (A.Al2O3) typically reduces with depth as Reac ve Silica
(R.SiO2) increases, defining the lower boundary with the Basal Clay.
Basal Clay - Kaolini c clay horizon which, transi ons into a saproli c zone above unweathered basement. This horizon is typically
used as a marker indica ng the full bauxite zone has been intersected and where drilling is o en stopped.
Alcoa’s bauxite deposits across the Darling Range show high variability in both the thickness and rela ve propor on of each horizon. Table 6-2 provides
an extract from the acQuire database for the Mining Centres of Huntly (in the north) and Willowdale (more southerly) showing the most common
(modal) Depth To Top and Thickness of the four stra graphic horizons, based on logged drill holes from 2016 to 2020.
Table 6-2: Summary of Typical (Modal) Stra graphic Horizons Within Each Area
Area Descrip on (m) Overburden Hardcap Friable Zone Basal Clay
Huntly Depth to top - 0.64 1.51 4.54
Thickness 0.64 0.87 3.04 -
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 203 of 363 --
Area Descrip on (m) Overburden Hardcap Friable Zone Basal Clay
Willowdale Depth to top - 0.58 1.51 4.91
Thickness 0.58 0.93 3.40 -
North Depth to top - 0.64 1.78 4.45
Thickness 0.64 1.14 2.67 -
Figure 6-4: Typical Alcoa Darling Range Mineralogy Profile (Hickman et al, 1992)
Figure 6-5: Typical Alcoa Darling Range Grade Profile (Alcoa, 2015)
Typical photos of the bauxite profile in current mining areas observed on 14 October 2021 are provided in Figure 6-6.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 204 of 363 --
Le : Vegeta on cleared prior to mining. Right: Top soil and oxalate removed leaving Hardcap
Le : Blastholes on Hardcap a er shee ng with low grade. Right: Hardcap (hard brown) Friable (so yellow),
relict fresh remnant Dolerite dyke boulder
Sandy topsoil, Hardcap (hard brown), Friable (so yellow), Basal Clay (white clay, lower right in the floor).
Figure 6-6: Typical Alcoa Darling Range Mining Sequence and Ver cal Profile (SLR, 2021)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 205 of 363 --
7.0 EXPLORATION
7.1 Explora on
WANL, which became Alcoa (in 1977), carried out explora on over much of the ML1SA lease area in the 1960s as men oned in Sec on 5.2. Samples
were assayed for Total Al2O3 only and the data, referred to as the Imperial Drilling, is s ll retained comprising approximately 104,400 holes and
approximately 670,000 samples.
The Imperial Drilling has not been used to prepare the current Mineral Resource es mate because the sample collec on, prepara on, and assaying
techniques were not consistent with current prac ces and can no longer be validated.
7.2 Resource Defini on Drilling
Resource defini on drilling is ini ally done on a nominal regular grid spacing of 60 by 60 m. Infill drilling programs are then scheduled as required to
reduce the drill spacing to 30 by 30 m, and then 15 by 15 m.
The planned drill hole collars are assigned a hole iden fier (Hole ID) using the code of the 15 by 15 m grid point on the 1:1,000 Map Sheets (Sec on
3.3).
A total of 332,017 holes were used to the resource es mate, and theses holes were drilled between 1981 to 2022, with approximately 80% drilled a er
2009.
A tabula on of the drill quan es by year and loca on is presented in Table 7-1, and a graphical summary is shown in Figure 7-1.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 206 of 363 --
Table 7-1: Drill Quan es by Year and Loca on
Year Holes Meters Assay
Huntly North Willowdale Total Huntly North Willowdale Total Huntly North Willowdale Total
1981 656 656 5,574 5,574 10,415 10,415
1983 199 199 1,090 1,090 1,899 1,899
1984 995 995 7,083 7,083 12,119 12,119
1985 393 393 2,815 2,815 4,971 4,971
1990 13 13 58 58 101 101
1991 2,900 1,073 3,973 16,145 8,335 24,480 28,170 15,066 43,236
1992 6,169 1,512 7,681 34,156 10,868 45,024 59,442 19,632 79,074
1993 2,264 546 2,810 13,022 3,502 16,525 22,723 6,424 29,147
1994 6,527 632 1,168 8,327 36,032 4,019 6,453 46,504 62,083 7,103 11,224 80,410
1995 4,354 79 1,843 6,276 25,841 477 10,543 36,861 45,064 871 19,021 64,956
1996 4,673 336 641 5,650 26,196 1,522 4,025 31,743 45,771 2,667 7,300 55,738
1997 808 2,908 3,716 4,868 18,422 23,290 8,603 33,146 41,749
1998 7 835 842 61 5,149 5,209 111 9,339 9,450
1999 18 906 924 137 4,325 4,462 239 7,603 7,842
2000 22 174 196 187 1,022 1,210 344 1,852 2,196
2001 538 317 855 4,893 2,087 6,980 9,038 3,805 12,843
2002 1,104 252 1,356 9,187 1,440 10,627 16,789 2,551 19,340
2003 287 1,221 1,508 1,973 8,032 10,005 3,557 14,727 18,284
2004 272 272 1,413 1,413 2,569 2,569
2005 783 1,641 2,424 5,655 9,588 15,243 10,248 17,503 27,751
2006 1,357 508 1,865 9,815 3,212 13,027 18,090 5,936 24,026
2007 4,241 2,832 7,073 29,312 19,353 48,665 53,795 35,473 89,268
2008 2,975 739 3,714 18,299 4,524 22,823 32,639 8,101 40,740
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 207 of 363 --
Year Holes Meters Assay
Huntly North Willowdale Total Huntly North Willowdale Total Huntly North Willowdale Total
2009 4,468 324 4,792 25,928 1,901 27,829 45,870 3,451 49,321
2010 9,027 1,568 10,595 52,706 10,755 63,460 92,198 19,778 111,976
2011 10,072 925 10,997 54,908 6,404 61,313 95,665 11,696 107,361
2012 10,507 1,198 11,705 59,552 9,352 68,903 103,654 17,326 120,980
2013 11,656 2,629 14,285 69,457 21,002 90,459 121,176 38,816 159,992
2014 8,977 9,406 18,383 50,588 64,736 115,324 88,452 119,187 207,639
2015 14,737 9,987 24,724 82,480 61,418 143,897 144,552 111,469 256,021
2016 14,738 330 15,068 88,714 1,737 90,451 156,269 3,019 159,288
2017 7,245 6,317 13,562 39,253 37,467 76,720 68,540 66,311 134,851
2018 11,027 10,596 21,623 59,764 55,857 115,620 105,317 98,614 203,931
2019 15,437 10,949 26,386 89,967 72,144 162,111 158,019 129,773 287,792
2020 22,487 16,278 38,765 118,632 102,516 221,147 206,952 184,609 391,561
2021 19,418 12,677 32,095 123,602 96,872 220,474 218,276 176,705 394,981
2022 19,637 7,682 27,319 120,056 57,600 177,656 214,432 104,561 318,993
Total 220,716 1,047 110,254 332,017 1,288,008 6,018 722,050 2,016,076 2,265,582 10,641 1,306,587 3,582,810
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 208 of 363 --
Figure 7-1: Chart of Resource Drill Holes by Year (Alcoa, 2022)
The Darling Range deposits contain more than three million drillholes distributed across a lease of over 7,000 km², making it unfeasible to show a plan
view of the property with the loca ons of all drill holes and other samples. Figure 3-3, however, shows the lateral extent of Alcoa’s mined areas and
Mineral Resources and Mineral Reserves within the ML1SA lease. The Darling Range bauxite project is considered to be in the process of sustaining
Mineral Reserve from already defined mineraliza on, rather than in Explora on mode, looking for new, broader targets. Resource Defini on drilling is
planned to con nue throughout all areas where Alcoa has mining permits as described, to sustain the Mineral Reserves and future produc on. Figure
7-2 shows a typical sec on through 30 m spaced Resource defini on drillholes:
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 209 of 363 --
Figure 7-2: Example Geological Sec on – F55 N 6,325,500 (SRK, 2021)
7.3 Drilling Methods
The methods currently used for drill sampling in the Darling Range by Alcoa have been consistently used since the 1980s. Drilling is done using
dedicated drills mounted on a fleet of tractors which can be driven off tracks into the forest, causing minimal damage or disturbance and obvia ng the
need to clear drilling pads. Planned hole posi ons are located by the driller using Global Posi oning System (GPS). The ar culated tractors are highly
maneuverable and there is only minor disrup on to groundcover vegeta on and saplings which may be eased out of the way (Figure 7-3).
Figure 7-3: Resource Drilling Tractor Accessing the Forest (SLR, 2021)
Drilling is completed by; Alcoa using vacuum drill rigs, by contractor Wallis Drilling using their patented reverse circula on (RC) aircore rigs, and by
contractor JSW using a similar RC method. Wallis and JSW holes are both referred to as aircore drilling. In 2021 there were 5 Alcoa rigs, 3 Wallis rigs,
and 4 JSW rigs.
In recent years the drilling period has been extended from 9 to 10 months. More wet ground is now encountered and, where required, vacuum drilling
is either deferred un l the ground condi ons improve, or is re-assigned for aircore drilling.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 210 of 363 --
Drilling is rapid with holes typically completed every 15 minutes from loca ng the collar posi on to comple ng the drilling, cleaning the sampling
equipment and readying the samples for dispatch. While 12 rigs are currently used, the procedure is consistent across all rigs and virtually unchanged
since the early 1990s at Jarrahdale. Minor modifica ons to the drilling procedures that have occurred include (in order of importance for their impact
on the resource database):
• Drilling ini ally was done by vacuum rigs but this has been supplemented by the aircore rigs.
• GPS methods have been introduced to locate the drill hole collar posi ons in 3D space, providing more precision on the hole and sample
loca ons (no ng that hole posi ons are assigned to the planned posi on, see Sec on 7.6.
• The sample catching, spli ng and logging procedures have been progressively upgraded, following review by various independent consultants
(Holmes, 2018; Snowden, 2015; SRK, 2017, 2018, 2019b, 2021a; Xstract, 2016). The riffle spli ng system has been enhanced through simple
changes to provide a be er, more robust method.
• The logging system has changed from manual paper plods to a completely digital recording system, albeit with paper backup where needed.
Barcodes are now used on samples and matching these to the logs is now semi-automa c.
• The spli ng and logging equipment on the drill rig has been progressively improved to make setup and pack-down more efficient and to
protect the logging equipment during site moves.
• Rollover bars, guards, shields, lockouts and other safety protec ons have been added and safety procedures enhanced with industry norms.
• Environmental protec ons and repor ng have been enhanced to best prac ce in SLR’s opinion.
Samples used for Mineral Resource es ma on are only acquired using vacuum drilling or aircore reverse circula on. Both methods generally drill dry
holes in that water is not added. Water ingress into vacuum holes destroys the sample circula on and wet holes are abandoned. Alcoa commenced
aircore drilling in 2015, with the ini al plan being to phase out vacuum drilling. The prime advantage of aircore over vacuum is sample recovery when
holes do encounter groundwater.
For the 2022 Mineral Resource inventory, 12% of the es ma on dataset is derived from aircore holes. In the 2019-2021 drilling for which assay data is
available, 79% was performed using aircore (71% for Huntly and 89% for Willowdale).
In vacuum drilling the sample is finely ground and sucked up from the bo om of the hole by a top-mounted vacuum pump. In aircore drilling,
compressed air is blown down the annulus between the inner and outer drill string tubes, pushed out through ports on the face of the bit and then
blows the sample through the center of the bit and up the drill string.
In both methods, the sample material is extracted from inside the bit, avoiding sample delinea on error (contamina on), and carried up the center of
the drill string into the sampling container, avoiding sample extrac on error (sample material le down the hole or lost as dust).
The aircore drilling uses a blade bit with a nominal cu ng diameter of 45 mm and an internal retrieval tube diameter of 22 mm (Figure 7-4). Alcoa
increased the internal diameter to 25 mm in 2018 to reduce blockages. The par cle size of drilled material is sufficiently small (less than 10 mm) to
promote good sample spli ng in dry condi ons.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 211 of 363 --
Figure 7-4: Drill Bits, Reverse Circula on Drill String and Par cle Size of the Sample Residue (SLR, 2021)
Scale pen diameter 13 mm
7.4 Drill Sampling
7.4.1 Procedure
The sample catching, spli ng and logging procedures are the same for both vacuum and aircore drilling (Figure 7-5).
The drilling and logging are controlled by the driller with minimal supervision by geologists. This has been observed and is deemed reasonable by the
QP due to the combina on of very simple logging, experienced personnel, employment con nuity and con nual review by geologists.
Sampling commences at the base of the overburden and con nues un l the driller considers that the basal clays have been penetrated for at least 1 m
or for infill holes at a 15 m spacing to the depth defined on the drill hole plan from surrounding data. Alcoa es mates that between 10% and 15% of the
limited depth holes terminate in bauxite.
Samples are collected at 0.5 m intervals, measured using a laser gauge mounted on the rig. At the end of each 0.5 m interval, the drilling is paused and
the sample passes from the cyclone (for aircore) into the collec on flask. For vacuum drilling the collec on flask is at the end of the vacuum system.
The sample, nominally 1.5 kg, is poured from the flask into a feed tray, distributed evenly, then on the vacuum rigs the tray is pivoted to feed a small
12-vane riffle spli er (the rota ng tray is excellent but
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 212 of 363 --
not yet fi ed to the aircore rigs). Where (usually) required, the spli ng is repeated to give a retained split of 150 to 200 g, small enough to be collected
into a 120 mL measuring cup with minimal spillage. The riffle split subsample is poured into a barcoded Kra packet and boxed for dispatch to the assay
laboratory. The sample retrieval and spli ng systems are cleaned with compressed air a er each hole.
During the site inspec on, the JSW RC sampling procedures were observed closely. It was found that the principles of correct sampling were
understood by all personnel at the rig and the equipment and prac ces were observed to be sa sfactory.
Over the period 2015 to 2021 the drill sampling procedures have been externally reviewed (Snowden, 2015; Holmes, 2018; and others) and various
improvements have been made such as using riffle spli ers with more vanes, using a pivo ng tray to consistently feed the spli er, training in the
correct spli ng and reten on of all the subsample, digital recording of logging, monitoring of accuracy with Standards, and monitoring of precision
with duplicates.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20238
-- 213 of 363 --
Figure 7-5: Sample Catching and Riffle Spli ng Prac ces (SLR, 2021)
7.4.2 Recording Sampling Data
The drill hole and sample informa on are recorded digitally onto a tablet at the rig during drilling (Figure 7-6). The data is automa cally loaded into an
acQuire database. In previous years the same informa on was all recorded in a cket book and manually transferred to the database. This approach
remains as a backup method when needed. Data recorded includes hole number, drill rig number, driller name, offsider name, depth of overburden,
depth of Caprock, map reference, material type code, and comments on the reason for ending the hole, e.g. if bedrock or water was encountered.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20239
-- 214 of 363 --
Figure 7-6: Barcode Reader and Digital Recorder Mounted on the Drill Rig (SLR, 2021)
7.4.3 Sample Logging
The geology of the Darling Range bauxite is well understood. The Material Type codes have been simplified to meet the produc on needs of the
opera on and the drill crew has been trained in their iden fica on, which is primarily based on color and hardness.
This results in logging of a reasonably consistent regolith profile formed by surface weathering of the few bedrock types (granite or dolerite). A
comprehensive geological log is not produced but the Material Type codes can be ra fied by the assay results. The Material Type codes are provided in
Table 7-2.
Table 7-2: Logging Codes for Material Type
Material Type Descrip on Comment
HB Hard brown
Hardcap and Friable
Zone
HSB Hard / so brown
SB So brown
SY So yellow
CLB Clayish brown
CLY Clayish yellow
Basal Clay Zone
BC Brown clay
YC Yellow clay
WC White clay
DOL Dolerite Intrusion
GR Granite
WET Wet Other
ROD Broken rod
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202310
-- 215 of 363 --
7.5 Topography
Topography data was acquired from:
• Drill hole collar survey data and check surveys performed using Trimble R10 real me kinema c differen al global posi oning system (RTK
DGPS) equipment.
• LiDAR surveys conducted in April 2015, November 2016, and June 2018 (no further surveys have been required). A plan showing the LiDAR
coverage for each survey is provided in Figure 7-7.
• Landgate satellite data collected in the late 1990s.
A digital eleva on model represen ng the natural surface was prepared by combining (in order of priority) the collar survey data, the LiDAR data and
the satellite data.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202311
-- 216 of 363 --
Figure 7-7: Topographic Data Coverage of the 2015, 2016 and 2018 LiDAR Surveys (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202312
-- 217 of 363 --
7.6 Surveying
Alcoa has consistently drilled the Darling Range bauxite deposit on a 60 by 60 m grid (with infills to 30 by 30 m and 15 by 15 m) since the 1970s. Ini ally
collar peg posi ons were surveyed using either a theodolite or Total Sta on. The 30 m and 15 m pegs were posi oned between the 60 m pegs using
tape and an op cal square. Alcoa commenced using GPS survey control (RTK DGPS) in mid-2015.
Drilling is conducted before any forest clearing ac vi es, which are only carried out for mine development. Posi oning the drill rigs is thus imperfect. If
the actual coordinates are within 2 m of the planned coordinates, the hole is considered to be correctly located, and the planned coordinates are used
in in all subsequent processing. Holes that are collared more than 2 m away from the planned loca on are flagged accordingly in the database, but the
planned coordinates are s ll used in preference to the actual loca ons. In 2015, Alcoa commenced check surveying of collar posi ons a er drilling.
Most of the holes drilled in 2016 and 2017 were check surveyed. Major discrepancies, such as large differences between the actual coordinates and the
coordinates defined by the hole iden fier, are inves gated and corrected in the database.
The planned coordinates at the 15 by 15 m grid points on Map Sheets (see Sec on 3.3) are used in preference to the actual coordinates because the
original resource delinea on systems (Polygonal and GSM, see Sec on 11.3) were based on the use of regularly gridded data. The use of planned
instead of actual coordinates does introduce some uncertainty in the local sample posi on and consequently the local es mates. However, it is noted
that:
• The lateral error is random, small in magnitude compared to the smallest drill grid spacing (15 m) and monitored (Figure 7-8) with devia ons
from plan greater than 7 m redrilled.
• The error affects few holes (for 2020 of the 52,546 holes drilled, 65.0% were within 2 m, and 99.7% within 5 m).
• The long range of the grade con nuity of mineraliza on as shown by the variograms is several hundred meters.
• The local small-scale varia ons on the grade of mineraliza on due to varia ons in the amount of lateraliza on are uncontrolled and
unpredictable (see discussions of drill hole twinning in Sec on 8.5.3.3).
• The effect is a controlled ‘random stra fied grid’, given that the nominal collar posi on is always used for es ma on and there is no evident
bias.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202313
-- 218 of 363 --
Figure 7-8: Error in Actual Collar Loca on from the Nominal (planned) Posi on is Monitored for the Three Drill Rig Types (Alcoa, 2021)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202314
-- 219 of 363 --
Downhole surveys are not performed in drill holes because of their generally shallow depth and narrow diameter, so all holes are assumed to be
ver cal.
The drill rigs have limited capacity to be levelled and cannot drill angled holes, so in some circumstances the holes may be drilled perpendicular to the
natural surface. The rigs are designed to safely operate on gradients of up to 15°, so holes could be drilled up to 15° off the ver cal. For a 6 m hole
drilled at the planned collar posi on, the offset may be up to 1.55 m horizontally and 0.2 m ver cally (Figure 7-8).
Figure 7-9: Possible Lateral and Ver cal Sample Loca on Error on 15° Sloping Ground (SLR, 2021)
The impact of differences between the actual loca ons of samples in 3D space compared to their nominal loca on on the mine plan is considered to
not materially impact on the Mineral Resource because the errors in the spa al controls on mining are likely to be of the same magnitude as the spa al
errors in mining (±2 m laterally and ±0.3 m ver cally). Mining is locally controlled by DGPS on mining equipment to meet short-term plans and visually
for indica ons of the base of ore (e.g., WC white clay).
7.7 Sampling Conclusions
In the QP’s opinion, the drill sampling and sample control procedures at Alcoa’s Darling Range Bauxite Opera ons are adequate and appropriate for use
in the es ma on of Mineral Resources. The defined volumes and grades of mineraliza on are not expected to be systema cally impacted (biased) by
errors in either the collar loca on or the 3D sample loca on.
7.8 Hydrogeology Data
Historically, no site-specific hydrogeological data was available on the basis that no hydrogeological considera ons are required for the defini on of
mining plans in Alcoa’s Darling Range opera ons. However, extension of mining ac vi es into the proposed Myara North and Holyoake development
envelopes was recently considered to poten ally pose a risk to the mul ple uses of groundwater in the area including drinking water produc on,
mber harves ng, pine planta on and recrea on.
Alcoa has collected groundwater level and groundwater quality data within the Myara North mine region since the 1970s, with available groundwater
data typically concentrated within the eastern areas
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202315
-- 220 of 363 --
of the mine region. In contrast, only limited water level and water quality data had been obtained within the Holyoake mine area. As part of the 2020
to 2021 baseline monitoring program, the monitoring network and program was expanded to include:
• 18 new groundwater bores at 16 loca ons within the Myara North mine region, to supplement 25 exis ng Alcoa groundwater bores. Two sites
included installa on of a shallow and deep paired bores, providing data on groundwater for the upper ‘perched’ unit and the underlying more
regional groundwater.
• 17 new groundwater monitoring bores were installed in 2020 within the Holyoake mine region, to supplement 8 exis ng Alcoa groundwater
bores.
• The baseline groundwater monitoring program comprised monthly water level dips and physico-chemical parameter measurements from
October 2020, with groundwater samples collected for laboratory analysis of a broader suite of parameters in October 2020 and February
2021.
In considera on of the data obtained from the expanded monitoring network, several hydrogeologic and hydrologic inves ga ons were undertaken by
GHD Pty Ltd (GHD) throughout 2021 and into 2022, including:
• Implementa on of a baseline surface and groundwater monitoring program including installa on of a monitoring network
• Groundwater modelling for Myara North and Holyoake mine regions
• Drinking water risk assessment for Serpen ne, Serpen ne Pipehead, South Dandalup and Wungong Brook catchments.
The results of these inves ga ons will be assessed as part of the Pinjarra Alumina Refinery Revised Proposal (Assessment No. 2253), which includes the
Huntly Bauxite Mine transi on to Myara North and Holyoake (See Sec on 17.1.2).
7.9 Geotechnical Data
No site-specific geotechnical data is available; however, as the slopes are so shallow, no geotechnical considera ons are required for the defini on of
mining plans in Alcoa’s Darling Range opera ons.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202316
-- 221 of 363 --
8.0 SAMPLE PREPARATION, ANALYSES, AND SECURITY
Sample prepara on is performed by Bella Analy cal Systems (Bella). Although the laboratory is located within Alcoa’s Kwinana Refinery complex and
only processes Alcoa material, it is independently owned and operated by Bella. A link exists between the Bella and Alcoa Laboratory Informa on
Management System (LIMS) for the two-way exchange of data. Bella does not have Australian Na onal Associa on of Tes ng Authori es (NATA)
accredita on.
All assays produced by Bella are monitored and controlled by Alcoa at the Kwinana Mining Laboratory (KWI), which, although it has a QA/QC system
based on ISO 9001 protocols, only has one sec on of the laboratory cer fied to ISO 9001 for the purpose of cer fica on of shipment assays of alumina.
A robo c processing system is used to prepare each sample for Fourier Transform Infrared Spectrometry (FTIR) and Reference Method (REF) tes ng.
This entails pulverizing each sample in a flow-through ring mill to a nominal grind size of 85% passing 180 μm, and then spli ng off sufficient material
to fill a barcoded scanning flask (20 mm high with an 80 mm diameter). The material from the ring mill is discharged through a rotary spli er, with
approximately 80–100 g of material retained for geochemical tes ng, and the remainder discarded. A duplicate sample is collected from 1% of the
samples via a rotary spli er fi ed with twin select chutes. These samples are used for Reference Methods tes ng.
8.1 Sample Security
Subsamples are collected by the drillers, sealed into Kra packets with barcodes and submi ed for assay. Cardboard boxes holding 50 packets are
delivered at the end of each shi , by the drilling crew, to secure sample storage facili es. Unfilled boxes are stored in the drill support vehicle and
completed in the next shi .
The filled sample boxes are stacked onto pallets in batches of 40 (i.e., 2,000 samples), wrapped with plas c and dispatched by courier to the Bella assay
facility at the Kwinana Refinery.
8.2 Sample Prepara on
Upon receipt by Bella, the sample barcodes are scanned and checked against the submission data in the Bella LIMS. Each sample packet is then split
open at the top, placed in a cardboard drying tray and oven-dried at 100°C for 10 hours. The packets are transferred to a customized holder in batches
of about 60, with a control between each batch, and automa cally fed to a bank of 10 Rocklabs flow-through ring mills, (Figure 8-1), each of which have
three concentric milling rings. The barcode is read, the sample is pulverized, a subsample is rotary split, captured in a single-use plas c Petri dish with
the barcode printed on the lid, then sent to the spectral analyzer for assay. The ring mills are air flushed and vacuumed between samples.
Each sample is pulverized to a nominal grind size of 85% passing 180 μm. The ring mill discharges through a chute and rotary spli er, retaining 80 to
100 g and discarding the rest. One of the ring mills is set up to take two splits and these are used for pulp duplicate assays and to generate the
Reference (REF) samples. These are sent to the KWI for wet chemical assay checking of the spectral assay. Pulverized samples are stored in a barcoded
dedicated receptacle for assay (Figure 8-2).
The robo c system can run 24 hours a day handling approximately 3,000 samples per day. Only the Mineral Resource es ma on samples are processed
at Bella with all other stockpile and processing control samples processed using the same methods as the REF samples.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 222 of 363 --
Figure 8-1: The Bella Robo c Sample Prepara on using Rocklabs Ring Mills (SLR, 2021)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 223 of 363 --
Figure 8-2: The Pulverized Sample is Stored in a Barcoded Dedicated Receptacle for Assay (SLR, 2021)
A LIMS system controls the progress of the sample packet through the whole of the sample prepara on and assay procedure enabling digital tracking of
all stages (Figure 8-3). This ensures inter alia that the sample is valid, not previously assayed, and the assay looks like one for a bauxite sample. It also
generates pulp duplicates at a frequency of 1 in 100 which are also the REF samples.
Figure 8-3: The Pulverized Sample is Tracked Digitally Through the Bella Prepara on and Assaying (SLR, 2021)
Grind size monitoring is carried out with the advantage of the robo c sample prepara on being consistent grind size. A risk with all such systems is the
possibility of contamina on between samples. This is usually avoided by inser ng blank samples of zero grade into the sample processing stream. The
difficulty is that the blank samples may themselves contaminate the next sample being assayed. Blank sample submission is discussed in Sec on 8.4.2.
Quality control (QC) procedures were developed and implemented to monitor the Bella robo c sample prepara on system (Franklin, 2019) and they
include:
• Temperature tes ng on the ovens. These are recorded between 2 and 5 mes a year since 2017 at 8 posi ons for each of 4 ovens and
demonstrate consistent safe drying temperatures below 100oC (average 97.9°C for 352 readings).
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 224 of 363 --
• Daily grind size checks. The percentage passing 180 microns and percentage exceeding 300 microns is recorded at Bella on all 10 ring mills
at a rate of 1:200 for the resource drill samples, with independent checks by the KWI on a random selec on of all samples milled for the
week. These demonstrate sa sfactory sample prepara on, and the consistency of the Bella robo c system, which is cri cal for effec ve
FTIR assaying (Figure 8-4).
Figure 8-4: Sample Prepara on Monitoring: Grind Sizes for the Robo c Sample Prepara on Unit Tested by Bella and by KWI (Alcoa, 2022)
8.3 Assaying
Assaying of the drill samples is based on a spectral method, using a Nicolet 6700 FTIR Spectrometer with a robo c feeder (Figure 8-5). FTIR obtains an
infrared absorp on spectrum from the sample. The FTIR spectrometer simultaneously collects high-resolu on spectral data over a wide spectral range.
A mathema cal process (Fourier transforma on) converts the raw data into the actual spectrum for subsequent determina on of the component
analytes.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 225 of 363 --
All drill samples are currently assayed using a customized, bespoke FTIR method, with the final corrected results used for Mineral Resource es ma on.
Calibra on and monitoring of the FTIR results are done using the Reference Method assay results.
Bella generates the raw FTIR spectral dataset for each sample, which is transferred to the Alcoa LIMS system for post-processing. Alcoa performs all the
Reference Method analyses at KWI.
The FTIR spectra are determined using a robo c scoop arm that collects an approximately 5 g aliquot of the pulp from the Petri dish and presents it to a
pla num crucible. The material in the crucible is pressed flat to ensure an even surface for scanning. The crucible is then rotated several mes through
the spectrometer and 20 scans are conducted on the aliquot. The scans are processed and validated by the Bella system and when accepted, they are
then transferred to the Alcoa LIMS system for post-processing and further valida on.
Figure 8-5: The Robo c FTIR Assaying Equipment
(RHS shows the sampling scoop arm and pulp dish with the lid elevated) (SLR, 2021)
8.3.1 FTIR Method Assays and the CalVal Dataset
The FTIR Method for bauxite assay uses infrared absorp on spectra to characterize the presented sample for mul ple analytes as element, compound,
or mineral percentages. The approach has been developed using an extensive calibra on and valida on (CalVal) dataset, constant monitoring of
Reference samples and Standards, and periodic revision of the predic on algorithms.
In 1990, an ini al set of approximately 2,300 CalVal samples was collected covering the Darling Range tenement. A subset of approximately 700
samples was used to develop the ini al FTIR predic on model. Extra CalVal samples have been added to help predic ons in areas of low Reac ve Silica
(less than 0.5% R.SiO2) and high Total Iron (greater than 50% Fe). The CalVal samples are run randomly through the FTIR equipment in triplicate, under
differing condi ons ( me of day, season, operator, order, etc.) to test for external factors. The FTIR results based on the predic on model algorithm are
monitored using the REF assays (Franklin, 2019).
Ini ally some FTIR analytes (Available Alumina, Total Iron, Carbonate, Sulphate, Total Silica, Total Phosphorus and Magne c Suscep bility) were all
determined using a ‘common’ algorithm, whereas Reac ve Silica, Oxalate, Extractable Organic Carbon, Total Alumina and Boehmite each used a specific
algorithm. Since 2017 specific algorithms have been used for all analytes. The algorithms are periodically updated, typically if there has been a change
in equipment or Reference Method. Retaining all FTIR
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 226 of 363 --
spectra now means addi onal analytes can be determined using specific algorithms, with three new analytes being added to Method Set MIC#00005 in
2021 (Potassium, Titanium and Gallium).
8.3.2 Reference Method (REF) Assays
The REF assaying is done by Alcoa in the KWI to validate and calibrate the FTIR assays. This is a suite of assays and tests that are carried out by wet
chemical and other means and has included:
• XRFx-ray fluorescence spectroscopy
• ICP-OESinduc vely coupled plasma op cal emission spectrometry
• XRDx-ray diffrac on
• MSmagne c suscep bility, a proxy for grindability
• BD-ICPbomb digest in a caus c solu on, with an ICP-OES finish
• BD-GCbomb digest in a caus c solu on, with a gas chromatography finish
• BD-NDIRbomb digest in a caus c solu on, with a non-dispersive infrared finish
• MD-ICPmicrowave digest in a caus c solu on, with ICP-OES finish
There are differences in the nature of these tests. Both XRF and ICP methods are instrument-based methods designed to replicate wet chemical
analysis results, either total or par al assays depending on the diges on. Both XRD and MS methods are used to inves gate mineralogy contents so are
regarded as proxies for assays. Bomb digest (BD) methods have been developed by the alumina refining industry to determine the expected yield of
bauxite ore during processing. They are the basis for ‘metallurgical assays’ that are designed to replicate the physicochemical reac ons in the refinery
and accordingly may be customized for a par cular ore type or process plant. At Alcoa some BD assaying has been replaced with a microwave digest
(MD) method.
8.3.2.1 REF Assaying Methods
A summary of the assaying used for the REF samples, which are used to calibrate and validate the FTIR Method, is provided in Table 8-1.
Table 8-1: Assaying Methodologies for Resource Es ma on Samples
Name Analyte Code Units Reference Method
Available Alumina A.Al2O3 AL % MD – ICP (MALSI)
Reac ve Silica R.SiO2 SI % MD – ICP (MALSI)
Total Iron Fe2O3 FE % XRF and FTIR
Oxalate Na2C2O4 OX kg/t BD – GC
Carbonate Na2C2O3 CO kg/t BD – NDIR (TICTOC)
Extractable Organic Carbon C EO kg/t BD – NDIR (TICTOC)
Total Phosphorous P2O5 PT % XRF
Sulphate Na2SO4 SU kg/t XRF
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 227 of 363 --
Name Analyte Code Units Reference Method
Total Silica SiO2 ST % XRF
Magne c Suscep bility MagSus MS None MS (CGS system)
Total Alumina Al2O3 AT % XRF
Boehmite ALO(OH) BO % XRD
The bomb digest (BD) method involves adding a measured amount of carbonate free 52% caus c soda to the sample aliquot (1 g), sealing it in a small
10 mL pressure vessel and then cooking it at 145°C. A er cooling, the solu on is assayed by tra on or other methods to determine the alumina and
silica contents. As the diges on of these elements by the hot caus c solu on is determined by the physical condi ons during diges on (mainly
temperature and pressure) the results provide a proxy for the expected performance of ore of that nature in the alumina refinery plant. The resul ng
assays are termed available alumina (A.Al2O3) and reac ve silica (R.SiO2), measured as percentages.
The MD method was introduced in 1996 to supplant the BD methods for assaying of the Mineral Resource drill samples. Atmospheric diges on is done
in a microwave oven using a 13% caus c solu on. The advantage of this is that it is faster, more repeatable and uses a bigger aliquot (0.5 g). The MD
assays are collec vely named ‘microwave available alumina and reac ve silica’ (MALSI). The BD methods are s ll used for the refinery monitoring
samples including those taken from the sampling towers prior to the feed stockpiles of crushed ore.
Following diges on using either MD, BD, or wet chemical methods, the analytes are assayed (Table 8-1) using the following methods (Figure 8-6):
• For ICP the diges on liquor is read using a PerkinElmer Op ma 8300 machine.
• For XRF an aliquot of 0.7 g is combined with a lithium borate flux, fused in pla num crucibles on a dedicated Phoenix 8-bank burner, and
batches are assayed on an Axios Max PW4400 machine.
• For gas chromatography (GC) a 1.00 g aliquot is used and assayed on an Agilent 7890B machine.
• For Total Inorganic Carbon and Extractable Organic Carbon (TICTOC) a 1.00 g aliquot is digested and assayed using an Analy cal Aurora 1030
Total Organic Carbon Analyzer with carousel.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 228 of 363 --
Figure 8-6: Diges on and Assay Equipment used for REF Samples at the KWI
Clockwise from top le : BD, MD, TICTOC, ICP, XRF, GC (SLR, 2021)
Details on the assaying method used for the final (Best) assay value for every sample interval are carried in the acQuire database.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20238
-- 229 of 363 --
For resource es ma on, the Reference Method results are used to monitor the performance of the FTIR assaying, and to calibrate (adjust) the FTIR
results on a batch-by-batch basis. The Reference Method is also used for all monitoring of the refinery performance including the grades of ore
presented to the sampling towers at Pinjarra and Wagerup prior to stockpiling and reclaiming of the ore feed.
A consistent approach to sample collec on, prepara on and assaying for Mineral Resource es ma on has been used since 1980. Refinements to the
assaying methods have comprised:
• 1996 Microwave diges on was introduced instead of bomb diges on for the REF samples
• 1999 The collec on of the FTIR spectral data was outsourced to Bella, with direct control of processing and predic on s ll done by Alcoa
• 2006 Robo c sample prepara on was introduced at Bella
• 2006 Digital reten on of all FTIR spectral data was introduced, enabling addi onal post-processing of assayed samples for new analytes
• 2017 The calibra on sets were rescanned with FTIR and an updated Method Set (MIC#00005), was developed
• 2018 Original wet chemical assays were replaced by FTIR for approximately 73,000 samples (drilled in Myara North from 1992 to 2002)
• 2019 Original wet chemical or FTIR assays were replaced by FTIR for approximately 251,000 samples (drilled in Myara North from 1991 to
1997).
The impact of these changes and valida on of the results were inves gated by Alcoa personnel and independently by SRK (2021a). It was concluded
that the assaying precision (i.e. repeatability) and accuracy (lack of bias, as demonstrated by quan le-quan le plots) did not show significant
differences between the pre-2018 and post-2018 data sets.
Since comple on of the 2021 Mineral Resource inventory, an addi onal 56,825 vacuum and aircore holes have been drilled and approximately 640,000
rou ne FTIR analyses performed. These represent holes drilled between September 2021 and June 2022.
8.4 Quality Assurance and Quality Control
Quality assurance (QA) consists of evidence that the assay data has been prepared to a degree of precision and accuracy within generally accepted
limits for the sampling and analy cal method(s) to support its use in a Mineral Resource es mate. Quality control (QC) consists of procedures used to
ensure that an adequate level of quality is maintained in the process of collec ng, preparing, and assaying the drilling samples.
8.4.1 QA/QC Protocols
The following QA/QC protocols are implemented and managed by Alcoa’s team, and QA/QC samples are not blind to the laboratory, with the excep on
of STE samples. Batches of samples are submi ed to the Bella laboratory daily. Internal standards created from the stockpile of the Darling Range
bauxite are introduced by the Bella Laboratory every 50 samples during the FTIR analysis to check the chain of process. All standard sample inser ons
and batches maintain consecu ve numerical order. Calibra on is done at first to generate the reference mean of the standard as well as the acceptable
minimum and maximum values totaling three standard devia ons.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20239
-- 230 of 363 --
A er the boxes of drill samples are received at Bella, packets of Reference Method samples (REF) are split out by the robo c sample prepara on, based
on a random selec on by Alcoa LIMS, at a frequency of 1 in 100 (1%). These are submi ed to the KWI in batches of 19 for REF assaying to calibrate and
validate the quality of the FTIR Bella assays. As the FTIR assays are adjusted to match the REF assays (using a ‘broken s ck’ curve adjustment to remove
bias and maintain precision, see Figure 8-13) it is expected that there should be minimal bias between REF and FTIR corrected results (FTIR_corr).
However, the repeatability between the two methods is an important a ribute of the quality of the assay results used for Mineral Resource es ma on.
Each batch of REF samples includes 1 Blank and 1 Standard. The REF samples are considered to serve the same purpose as pulp repeats in defining the
repeatability of the assays. Alcoa also sends checks of REF samples assayed at Bella and KWI to an independent laboratory, Bureau Veritas (BV).
Alcoa introduced in 2018 an alterna ve procedure to field duplicates, termed Sample To Ex nc on (STE). This involves taking the normal 0.5 m drill
sample (referred to as the Parent) and collec ng all the residue from that drilled interval (i.e. the riffle split reject, and previously any material le in
the sampling cup). This residue is collected once per shi from each rig under supervision by the geologist. The residue is pulverized and homogenized,
then two equal splits (referred to as the “Daughters”) are assayed.
Following receipt of results from the laboratories, Alcoa geologists review the values, and sample batches iden fied as anomalous are repeated by the
laboratory. QA/QC reports are produced monthly upon receiving new results. The QP recommends the prepara on of quarterly and yearly QA/QC
reports to track possible issues that might arise over me.
The following are the exis ng wri en QA/QC procedures available to all staff:
• Franklin (2019) describing the FTIR process.
• Use of the customized in-house Explora on PowerApps digital module to record and document field inspec ons by the geologist at the drill
rigs (documen ng visible contamina on, Sample ID, Hole ID, spli ng, chip size of sample, split volume, depth measurement, collec on of
Sample To Ex nc on (STE) samples, collec on of further FTIR calibra on and valida on (CalVal) samples, as well as other prestart, safety,
risk and EHS inspec ons.
• Procedures for genera ng STE samples.
• Various PowerPoint presenta ons providing an overview of the laboratory procedures.
QP reviewed QA/QC informa on compiled in the previous report (SLR, 2022) and analyzed the new QA/QC data compiled by Alcoa between February
2021 and October 2022. The results of this analysis are summarized in the following sub-sec ons.
8.4.2 Blanks
Blanks are not rou nely introduced in FTIR submission batches into the robo c mills at Bella and there is no check on cross-contamina on during
sample prepara on. Given the style of mineraliza on, the ore grades being assayed, and the volume of material milled compared to the final aliquot
assayed, the absence of sample prepara on blanks is not considered material. There is also no available blank sample on the market that would not
introduce contamina on of the mills by very low-grade samples at Bella. KWI laboratory submits blanks with a frequency of 1 to 19 in the REF samples
sets compiled and dispatched regularly by Bella, however that informa on was not available for review.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202310
-- 231 of 363 --
8.4.3 Standards
Standards evaluate accuracy of the assaying by detec ng the differences between a result and an expected value, also known as a bias. Alcoa has used
a series of specially prepared Internal Reference Material (IRM) samples derived from Darling Range bauxite, pulverized and homogenized by Gannet
Holdings, labelled KH09 to KH18. Between 2021 and 2022, only IRM KH14 and KH20 have been used at the Bella Laboratory and KH10 at the mining
laboratory. Monitoring using these IRM samples provides arguably be er assurance of assaying accuracy than commercial Cer fied Reference Material
(CRM) samples. The IRMs have generally been sourced from stockpile material and used in both coarse-crushed and pulp form. The IRMs have not
been externally cer fied. A summary of the IRMs is provided in Table 8-2.
Table 8-2: Standards Used for Drilling and REF Monitoring (IRMs)
Standard Date Comment
KH09 May 1999 to present Boehmite analysis, FTIR, MD-ICP, and XRF analysis Mining reference analysis
(IRM)
KH10 May 2012 to present Mining reference analysis (IRM)
KH11 July 2008 to March 2015 FTIR analysis (IRM)
KH12 July 2008 to April 2014 Grind size control (IRM)
KH13 April 2014 to present Grind size control (IRM)
KH14 March 2015 to October 2021 FTIR analysis (IRM)
KH15 October 2015 to September 2017 Prepara on and analy cal control – introduced at the drill rig (IRM)
KH16 September 2017 to December 2018 Prepara on and analy cal control – introduced at the drill rig (IRM)
KH17 September 2017 to December 2018 Prepara on and analy cal control – introduced at the drill rig (IRM)
KH18 September 2017 to December 2018 Prepara on and analy cal control – introduced at the drill rig (IRM)
KH20 October 2021 to present FTIR analysis (IRM)
Control of the accuracy of FTIR samples is currently monitored at the Bella laboratory using IRMs KH14 and KH20. The IRMs are inserted every 50 FTIR
samples. FTIR batches totaling 21,983 samples of KH14 and KH20 analyzed between February 2021 to October 2022 and using Priority Codes P177 to
P193 were sent to SLR for review. Priority Codes represent batches assayed by the FTIR Method using the same batch correc on factors.
The QP selected six batches; three to review KH14 and three for KH20. The QP prepared control charts for available Al, reac ve Si and Fe and analyzed
temporal and grade trends, reviewed the data for low and high biases, and the failure rate of each standard. The failure rate was defined as a value
repor ng more than three standard devia ons (SD) from the expected value.
Results of Alcoa’s KH14 for batches P177, P179 and P181 were reviewed. Available Al (A.Al2O3) results are well behaved, have a very low failure rate
(0.09% in batch P181 only) and present no bias. The
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202311
-- 232 of 363 --
plo ed values of A.Al2O3 of KH14 from batch P181 can be visualized in Figure 8-7. Conversely, reac ve Si (R.SiO2) presents either a high or a low bias,
with a failure rate ranging between 0.25% to 1.92%. Temporal trends are also dis nguishable in P177 and P181. Results of R.SiO2 from batch P181 are
also presented in Figure 8-7. The analysis of KH14 Fe2O3 results show variability by showing some high biases, a local temporal trend and a failure rate
located between 0% and 1.15% (P181). The Fe2O3 values of batch P181 are too pictured in Figure 8-7. Values of A.Al2O3 for KH14 reviewed ranged
between 35.86% and 36.61%, which is comparable to the extents of the average grade of the deposit. The values of R.SiO2 were also similar to the
average grade of the deposit, ranging between 0.91% and 0.94%. The overall take on the analysis of KH14 indicates a rela vely good and consistent
precision at the laboratory. The QP recommends inves ga ng these local biases with the Bella Laboratory.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202312
-- 233 of 363 --
Figure 8-7: KH14 Control Chart of AL, SI and Fe from Batch P181
Batches P183, P186 and P191 were examined for standards KH20. Its A.Al2O3 expected values in percent are between 33.14% and 35.68% while R.SiO2
range between 1.00% and 1.09%. For Fe2O3, the average expected results are between 15.16% and 16.07%. This standard is representa ve of the
average grades of the deposit. The control charts for KH20 of batch P183 is shown in Figure 8-8. Overall, A.Al2O3 values are generally well behaved and
are found between the acceptable low and high limits of three SD, with the excep on of one sample in batch P183 and P191, causing low failure rates
ranging between 0.07% and 0.1%. Results for R.SiO2 indicates generally good accuracy at the Bella Laboratory. A failure rate between 0.7% and 2.47%
was observed for batch P183 and P186, respec vely, and there are temporal low grade biases in all batches reviewed. All Fe2O3 samples returned
values within the three SD range, and only one batch (P191) showed values mostly distributed below the mean a er the first quarter, possibly
indica ng a low bias. The QP recommends inves ga ng the bias observed to ensure that economic areas are not incorrectly excluded from the Mineral
Resource domains.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202313
-- 234 of 363 --
Figure 8-8: KH20 Control Chart of AL, SI and Fe from Batch P183
The frequency of inser on of IRMs at the mining laboratory of standard KH10 is 1 in every 19 samples (one REF batch). The frequency of re-assaying
the FTIR results (if rejected by a REF assay) has an expected rate of less than 1.5%. Actual performance depends on the total number of FTIR assayed
samples, the area where they were drilled and whether there were issues with the Sample Presenta on Unit (SPU) in the FTIR process.
The QP selected three batches, P184, P188 and P193, to examine the values of A.Al2O3, R.SiO2 and Fe2O3 analytes in KH10 standards used in 2021 and
2022 for addi onal review. KH10 expected values are close to the average grade of the deposit. Results from the analyte A.Al2O3 of standard KH10
from the three revised batches indicate mostly good laboratory accuracy and precision. No failure was observed although a slight low bias was
dis nguished in P188.
Standards performance overall is excellent for Al, good for Fe and generally reasonable for Si analytes.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202314
-- 235 of 363 --
Figure 8-9: KH10 Control Chart of AL, SI and Fe from Batch P188
Historically, from October 2015 to December 2018, IRMs KH15 to KH18 were introduced by the driller at the drill rig to monitor sample prepara on
(grinding and cross-contamina on) and assaying. This material was sourced from the Kwinana Refinery stockpile crushed to nominal 3 mm,
homogenized, and split into 200 g lots by Gannet Holdings, a commercial preparer of Standards.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202315
-- 236 of 363 --
8.4.4 Duplicates
8.4.4.1 Measures Of Precision
There are a number of approaches to defining the repeatability of an assay result, and they are generally controlled by a framework first developed by
Pierre Gy, now referred to as the Theory of Sampling. Accepted approaches used here for determining the repeatability of sampling and assay results
are:
• Sca er plots with the same X and Y axes, showing the overall distribu on of the paired samples, and obvious outliers, with perfect
repeatability shown by the 45o line of equality.
• Measures based on the robust Half Absolute Rela ve Difference (HARD) bivariate sta s c (Shaw, 1997; Abzalov, 2016). These include the
precision (as Coefficient of Varia on (CV) with a confidence interval of 68%) and the correla on coefficient.
• Other bivariate measures, that may be influenced by outliers, such as the slope of regression, variance and CV.
With all measures, trimming the data (excluding outliers, obvious errors, incorrect values, out of range values, and those near the Limit of Detec on)
can impact on sta s cal measures of precision, which is why sca er plots are helpful in interpre ng results.
8.4.4.2 Field Duplicates
It is generally considered best prac ce to collect field duplicates in resource drill sampling programs. They should be a second split collected with the
first split in exactly the same way (i.e. from the same drilled interval, using the same spli er, generally from the reject side of the spli er, some mes by
re-spli ng all of the reject a second me). Alcoa discon nued the rou ne collec on of field duplicates in January 2018 due to limita ons to the benefit
of collec ng field duplicates because the sample spli ng procedure was problema c (SLR, 2022). Therefore, no addi onal data is currently available to
review for field duplicates. The process was superseded by the Sample to Ex nc on process, described in Sec on 8.4.4.5.
8.4.4.3 Check Assays - Umpire Laboratory Checks
Alcoa sends checks of REF samples assayed at the KWI to an independent laboratory, Bureau Veritas Minerals (BV) in Canning Vale, Western Australia
for an impar al review. BV holds NATA accredita on No.626 and it is accredited for compliance with ISO/IEC 17025 – Tes ng. SLR was handed out a
spreadsheet to examine with a total of 6,284 samples that covered the original Bella and REF values as well as the results from the analytes re-assay by
FTIR at BV. Results from the REF comparison with BV can be visualized in the form of sca er plots and quan le-quan le plots in Figure 8-10, Figure 8-11
and Figure 8-12 for A.Al2O3, R.SiO2 and Fe2O3 respec vely. The associated method of analysis for each REF analytes are listed in Sec on 8.3.2.1.
It is apparent that there is a bias with the Alcoa KWI repor ng higher for AL, notably for values found between 0% and 10% AL. Sta s cs indicate an
overall good repeatability at Bureau Veritas with a correla on coefficient of 0.984 for 6,284 pairs. Results for SI are similar, with a low bias for Bureau
Veritas at grades between 0.7% and 1.2%. The tendency changes for grades between 2% and 6% where a slight high bias is observed with the BV
values. The correla on coefficient for SI is excellent, at 0.989 for 6,284 pairs. KWI REF Fe2O3 values between grades of 0-2.5% are repor ng lower, but
generally presents an excellent correla on with a coefficient of 0.985 for 6,253 pairs.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202316
-- 237 of 363 --
Given the good repeatability of the REF assays from KWI, the precision can be considered higher than expected, especially knowing that the KWI
laboratory analy cal method is be er customized to the Alcoa bauxite than the umpire laboratories.
Sca er Plot – A.Al2O3 Quan le-Quan le Plot – A.Al2O3
Figure 8-10: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Umpire Laboratory Checks – KWI Mining Lab and Bureau Veritas
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202317
-- 238 of 363 --
Sca er Plot – R.SiO2 Quan le-Quan le Plot – R.SiO2
Figure 8-11: Sca er Plot, Quan le-Quan le Plot and Sta s cs of SI Umpire Laboratory Checks – KWI Mining Lab and Bureau Veritas
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202318
-- 239 of 363 --
Sca er Plot – Fe2O3 Quan le-Quan le Plot – Fe2O3
Figure 8-12: Sca er Plot, Quan le-Quan le Plot and Sta s cs of FE Umpire Laboratory Checks – KWI Mining Lab and Bureau Veritas
A similar comparison was also done between Bella original sample results and Bureau Veritas on A.Al2O3, R.SiO2 and Fe2O3 analytes and the
outcomes are shown in Figure 8-13 to Figure 8-15. Results for A.Al2O3 present a slight low bias for the Bureau Veritas values below 2%, however the
analysis shows an overall great correla on and precision between the two data set, especially with grade above 20%. The Quan le-Quan le plot
suggests great grade correspondence between the original value and its checked value at BV. The coefficient of correla on is 0.985 for 6,280 pairs. The
analysis of R.SiO2 showed a few acceptable biases across the popula on. Bureau Veritas is repor ng slightly higher values between 0-0.4%, marginally
lower from 0.6% to 1.2% and slightly higher between 1.5% and 5%. Another minor low bias for values above 10% is observable, but overall, the
correla on is good which is reflected by a correla on coefficient of 0.989 for 6,280 pairs assessed. The results of Fe2O3 demonstrated a good
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202319
-- 240 of 363 --
correla on, with a coefficient of 0.986 and no discernible bias. The Fe2O3 values showed that the precision is be er above 10%.
Sca er Plot – A.Al2O3 Quan le-Quan le Plot – A.Al2O3
Figure 8-13: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Umpire Laboratory Checks – Bella and Bureau Veritas
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202320
-- 241 of 363 --
Sca er Plot – R.SiO2 Quan le-Quan le Plot – R.SiO2
Figure 8-14: Sca er Plot, Quan le-Quan le Plot and Sta s cs of SI Umpire Laboratory Checks – Bella and Bureau Veritas
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202321
-- 242 of 363 --
Sca er Plot – Fe2O3 Quan le-Quan le Plot – Fe2O3
Figure 8-15: Sca er Plot, Quan le-Quan le Plot and Sta s cs of FE Umpire Laboratory Checks – Bella and Bureau Veritas
8.4.4.4 Twinned Hole Studies
Since the last report (SLR, 2022), the twin hole studies campaign has been suspended because of its limited value and therefore, no addi onal data is
available for an updated analysis.
8.4.4.5 Sample To Ex nc on (STE) Samples
A er a few reviews of the data sets between 2018 and 2021 by independent consultants, biases and poor repeatability were reported. The issue was
inves gated, and it demonstrated that perhaps the spli ng at the drill rig was incorrect, and also illustrated the sampling principle that pulverizing
(reducing the par cle size) before spli ng will always reduce the error. On the basis of these studies and external review, modifica ons to the spli ng
procedure at the rig were carried out.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202322
-- 243 of 363 --
Since 2020, Alcoa refined the STE sampling procedure to now collect one sample per shi from each drill rig and assay three Daughters a er pulverizing
and spli ng. The 2022 STE clean dataset examined by SLR contained results for 550 pairs. SLR has used this data set to prepare bivariate sta s cs,
sca er plots and precision plots.
Comparisons were carried out for the analytes AL, SI, and FE between:
• Daughter 1 vs the Parent
• Daughter 2 vs the Parent
• Daughter 3 vs the Parent
• Daughter 2 vs Daughter 1
• The average of the Daughters vs the Parent
Studies of the Parent-Daughter sets showed good repeatability for the residue pulp repeats (i.e. between the Daughters) even though the correla on
coefficients were rela vely low, ranging between 0.921 and 0.948. The daughter values show sta s cal consistency with the parent, which indicates
acceptable pulverizing and correct spli ng of the residue offsite. The daughter analyte Al is showing higher values, or a high bias, for the three set of
daughters. The biases are mostly observed at grades between 0-8% and values are more sca ered in general between 0-5%. Correla on coefficient for
A.Al2O3 for Daughter one (D1) is 0.937, Daughter two(D2) is 0.929 and Daughter three(D3) is 0.921. Results for R.SiO2 show an alternance of low and
high bias, the first low bias ranging from 0-5%, the slight high bias from 5% to 12% and the last low bias from 12-45%. The correla on coefficient is also
in the same bracket, varying between 0.93 and 0.94. As for the results of Fe2O3, a low bias was iden fied for each parent-daughter set but is most
prominent between 0 and 10-15%. The correla on coefficients varied between 0.935 and 0.948. Examples are provided in Figure 8-16 for A.Al2O3, and
R.SiO2.
As expected, similar repeatability with the individual daughter analysis was reported between the residue results (the average of the Daughters) and
the normal drill sample (the Parent), with comparable bias sugges ons. It is therefore reasonable to say that split taken at the drill rig (Parent, taken by
spli ng down to 150 g) is as good a representa on of the drill interval grade as collec ng the whole of the residue and carrying out pulverizing,
homogeniza on and spli ng.
Parent-D1 Parent-D1
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202323
-- 244 of 363 --
Parent-D2 Parent-D2
Parent-D3 Parent-D3
Figure 8-16: Quan le-Quan le Plot of Parent and Individual Daughters’ Analysis of A.Al2O3 (on the le ) and of R.SiO2 (on the right)
While the STE procedure could be retained for specific studies, in the QP’s opinion, the reintroduc on of field duplicates using appropriate riffle
spli ers under supervision should be considered.
8.4.4.6 Holyoake Program
Submi ng historic assays to be re-evaluated is a method that helps monitor the quality of the historical data to guide daily produc on. A set of 33,224
historic and recent assays was provided to SLR, which was cleaned up to produce a total of 15,412 perfectly match pairs. The QP prepared an analysis
which included a comparison of the original historic FTIR Al and SI assay and recent Holyoake duplicate assay results. Alcoa implemented the Holyoake
check assay in 2021.
The large pool of samples facilitated the interpreta on of accuracy and precision. The analysis of both AL historic versus Holyoake results indicates
clearly that recent values are higher above 10% in grade, confirming a clear high bias. Below 10%, the values are lower, showing a low bias, and mostly
outside the acceptable limit of 20% difference. Both affirma ons can be visualized in Figure 8-17. Values of SI are behaving similarly, as observed in
Figure 8-18, with a low bias between grade of 0 and 5%, and a strong high bias for values above 5%. The percent difference between the means are
quite high for both analytes, at 5.3% for Al and 13.5% for SI.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202324
-- 245 of 363 --
These differences can be the results of an improvement of the analysis method and procedure since 2005 reflec ng a be er geochemical
understanding of the deposit. The QP recommends addressing these biases by limi ng the use of historic data when possible and con nuing the re-
assay program of assays collected before 2005.
Sca er Plot – A.Al2O3 Quan le-Quan le Plot – A.Al2O3
Figure 8-17: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Historic and Holyoake Results
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202325
-- 246 of 363 --
Sca er Plot – R.SiO2 Quan le-Quan le Plot – R.SiO2
Figure 8-18: Sca er Plot, Quan le-Quan le Plot and Sta s cs of AL Historic and Holyoake Results
8.4.4.7 Stockpile Feed and Sampling
Refinery feed grade is monitored at Huntly and Willowdale using material collected at the Pinjarra and Wagerup sample plants. At each opera on, the
sample plants are located at the refinery end of the overland conveyors, just prior to the stockpile stackers.
The stockpile area at the Pinjarra refinery is fed by two conveyor belts (SP-171 and SP-271) that derive their ore from the same crusher (currently at
Myara). Prior to the ore being combined from the belts and fed to the stockpile area, it passes through a sampling tower that alterna vely takes a
primary cut from each belt, dries, crushes, subsamples and combines them into two parallel samples for 12 hour shi s.
A comparison of these paired samples (SLR, 2022) found no material issues and no new data was presented for this review.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202326
-- 247 of 363 --
8.5 Conclusions
It is the QPs opinion that the large data sets collected over a long meframe, the sa sfactory mine produc on shown by reconcilia on results (see
Sec on 11.12), and the QC data sets examined, all provide sufficient confidence in the available data for resource es ma on.
Specifically:
• Sampling, prepara on, and analyses are appropriate for the style of mineraliza on and are sufficient to support Mineral Resources.
• Sample and data security are consistent with industry best prac ces.
• There are poten al biases in both reac ve silica and available alumina analy cal results of the check assays but given the overall decent
repeatability of the REF and original FTIR assays at Bureau Veritas, the precision can be considered higher than expected, especially
knowing that the KWI and Bella laboratory analy cal method is be er customized to the Alcoa bauxite than the umpire laboratories.
• Both available alumina and reac ve silica present some minor biases in the analysis of the internal reference material (standards), while
failure rates a very low and Fe is generally be er behaved. Addi onal analysis is required to confirm these biases.
• Analytes reviewed for the Holyoake program results show poor precision between the historic and recent assay analysis.
• The STE method is as good a representa on of the drill interval grade as collec ng the whole of the residue and carrying out pulverizing,
homogeniza on and spli ng.
It is the opinion of the QP that the analy cal procedures used for the Alcoa Mineral Resource comprises part of conven onal industry prac ce. FTIR is
not widely used yet in the bauxite industry but is becoming more widely accepted and applied to more opera ons. At Alcoa the method has been
consistently applied successfully for a decade and is rou nely validated by industry standard XRF and wet chemical procedures as discussed in Sec ons
8.3 and 8.4.
It is the opinion of the QP from the studies on FTIR repeatability discussed above that the overall precision and accuracy of the FTIR assaying is
acceptable.
In the QP’s opinion, the QA/QC program as designed and implemented by Alcoa is adequate and the assay results within the database are suitable for
use in a Mineral Resource es mate.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202327
-- 248 of 363 --
9.0 DATA VERIFICATION
9.1 Data Structures
Wherever possible the transfer of geological, sampling and assaying data is now carried out digitally.
The use of rugged field tablets was introduced a er an external review (Snowden, 2015). The data recorded at the drill rig is uploaded daily via WiFi for
valida on prior to impor ng into the acQuire database. This allows the data to be captured, checked, approved, and then loaded without any further
manual keystroke entry.
The sample prepara on and assaying data are all recorded at the Bella facility (see Figure 8-3) allowing all aspects of the sample prepara on to be
tracked and transferred to KWI through direct connec on to their Laboratory Informa on Management System (LIMS). A er calibra on, valida on and
checking of the FTIR and REF assays they are transferred digitally to the acQuire database.
Within the database, scripts are run to priori ze the results and to define the BEST value for each analyte (e.g. AL_BEST, SI_BEST, etc.). The downhole
accumula ons of all grades are calculated, and the base of mineraliza on is determined. Other values are also calculated such as the Density using a
regression equa on (see Sec on 11.8.5).
An events table is used to change the status of each hole at all stages as it progresses through the valida on process from designed, to drilled, to
dispatched, to lab pending, to validated.
The various downhole geological features (LithCode, Seam, Geol Floor, etc.) are all verified spa ally, validated by geologists using the ver cal posi on
and assays (e.g. Figure 7-7), and where appropriate metadata (e.g. Status Flag) is added to record the basis of the interpreta on.
The required modelling files are exported from the acQuire database by the geosta s cians using queries. The final Mineral Resource models are then
imported into the over-arching ArcMap environment for mine planning, and integra on with the environmental and other planning protocols.
Figure 9-1: Visual Display of Hole Status (logged and assayed) for Hole G39150224 in Serpen ne (Alcoa, 2021)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 249 of 363 --
9.2 Data Verifica on Measures
The QP interrogated the data extracted from the acQuire database for two areas (Serpen ne and Millars). For these two areas the count of records in
each Table is summarized in Table 9-1.
Table 9-1: Count of Records by Database Table for Two Database Extracts
Data type Table Serpen ne Millars
Collars tblass 6,362 8,298
Surveys tblsur 6,362 8,298
Assays tblass 59,622 70,905
REF Assays tblassrefs 611 711
Lithology tblgeoLithology 69,564 82,762
Geology Floor tblgeoGeolFloor 69,561 82,761
Seam tblgeoSeam 69,564 82,762
Extensive checks were run to validate the integrity. These included searching for duplicate records, downhole gaps¸ interval overlaps, missing collar or
survey records, etc.
The following observa ons were made:
• As expected, the Valida on Tables ensure that there are no anomalous codes.
• Checks for assay closure (adding all assays to 100%) are done by Alcoa when the assay data is prepared for resource es ma on. The
availability of total oxide assays (e.g. AT and ST) has progressively increased over me.
• In a few cases (156 for Serpen ne, drilled from October 2019 to December 2019, and 114 for Millars) there were blank values for LithCode
in the table geoLithology at the top of the hole, followed by a zero-length interval (e.g. From 1.2 m and To 1.2 m) with a valid LithCode. This
is due to the prac ce of not sampling the overburden but instead discarding it, crea ng in some cases a short interval with no assay or
LithCode. This type of database error is usually picked up by a valida on check looking for zero length drill segments. In this deposit,
because the geological logging is expected to follow a ver cal sequence (which is used for some of the interpreta on scripts), such zero
length intervals are not uncommon to allow for pinching and swelling of some horizons.
Some calcula on and range checks were run that highlighted gaps or anomalies in the scripts used to validate that data before resource es ma on:
• There are 19 records with ST_BEST values greater than 100% in Serpen ne and 2 in Millars. Such values should be inves gated, trimmed,
and flagged.
• There are a number of records (107 for Serpen ne and 165 for Millars) where AL (available alumina) is greater than AT (total alumina).
There are also records (1,273 for Serpen ne and 2,029 for Millars) where SI (reac ve silica) is greater than ST (total silica). These should be
further inves gated, flagged in the database, and future instances flagged during data loading so that when such results (infrequently)
occur there is recogni on during the data loading that
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 250 of 363 --
this is due to FTIR assays outside the normal calibra on range, rather than due to sample mix-up or contamina on.
• Checks on the regression calcula on for density were run on the Serpen ne database. There were 1,187 records not flagged as Seam=CAP,
that had density values ranging from 2.04 to 2.28. These were either 20% or 40% CAP and had a density value reflec ng the length
weighted average of the two domains assigned. Of the total 6,399 records with valid seam and iron data, SLR found that 5,566 (87%) were
within ±0.1 of the database density value. The remaining 833 records with Seam=CAP and an FE_BEST assay, were either 60% or 80% CAP
and had a density value reflec ng the length weighted average of the two domains assigned.
9.3 QP Opinion
The database extracts that were provided proved very robust to scru ny, except for a small number of anomalies noted, none of which are considered
material in view of the vast number of drill holes, assays and other records.
The QP is of the opinion that the database is adequate, and the data is appropriate for the purpose of Mineral Resource es ma on.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 251 of 363 --
10.0 MINERAL PROCESSING AND METALLURGICAL TESTING
Mineral processing and metallurgical test work samples represen ng the Darling Range opera ons are not available; however, this is an opera ng mine
and consistent opera ng data demonstrates that the ore is directly transported to the refineries following size reduc on. SLR understands that these
opera ng data represent all material mined for ten years and sourced from four mining regions and as such represent the various types and styles of
mineraliza on within the Darling Range opera ons.
It is important to note that there is no upgrading involved in the processing and therefore the processing recovery can be considered above 99%
allowing for any losses in produc on.
The opera ng data between 2010 to 2021 for the Willowdale opera on and 2010 to 2020 for the Huntly opera ons1 indicates that the product from
the Darling Range opera ons consisted of an average Al2O3 grade of 33% and average SiO2 grade of 20%. It is important to note that higher grades of
reac ve SiO2 is poten ally deleterious but that remained below 1.2% throughout the 10 years of opera on. SLR understands that according to the
mine plan the Total SiO2 content on an annual average basis remains below 20%, and that reac ve SiO2, on the same basis, remains at or below 1.25%
for the next 10 years. This means there is no evidence of any deleterious elements present in the Darling Range ore within the next 10 years of
produc on.
A summary of the product grades from the Darling Range opera ons are shown in Table 10-1, Table 10-2 and Table 10-3.
Table 10-1: Product Grades of Darling Range Opera on (Willowdale – Wagerup refinery feed)
1 2022 opera ng data was not available for the Huntly opera on at the me of the report.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 252 of 363 --
Year Moisture (%) LOI (%) Total Al2O3 (%) Total SiO2 (%) Fe2O3 (%) TiO2 (%) A.Al2O3 (%) R.SiO2 (%)
2010 7.959 22.34 38.10 21.76 17.49 1.431 32.81 1.134
2011 7.930 20.89 40.57 22.28 17.64 1.466 32.75 1.141
2012 7.990 21.02 38.13 21.12 18.06 1.577 32.96 1.164
2013 7.745 21.15 36.80 18.57 19.48 1.607 32.72 1.209
2014 7.853 21.24 37.21 18.09 19.34 1.624 33.10 1.170
2015 7.484 21.48 37.01 18.01 19.03 1.719 33.16 1.112
2016 7.816 21.63 37.56 16.73 20.63 1.746 33.06 1.139
2017 7.817 21.75 37.93 16.01 21.37 1.825 33.03 1.103
2018 7.952 21.64 38.29 15.89 21.34 1.880 33.02 1.131
2019 7.611 21.28 37.33 16.76 21.34 1.851 32.29 1.153
2020 7.835 21.50 37.40 14.12 23.25 2.098 32.45 1.074
2021 8.296 21.52 37.53 17.95 21.03 1.728 32.37 1.061
2022 7.815 21.13 37.45 17.94 21.31 1.846 32.29 1.018
Table 10-2: Product Grades of Darling Range Opera ons (Huntly–Pinjarra refinery feed)
Year Moisture (%) LOI (%) Total Al2O3 (%) Total SiO2 (%) Fe2O3 (%) TiO2 (%) A.Al2O3 (%) R.SiO2 (%)
2010 7.4 20.8 38.6 20.8 17.4 1.34 33.1 1.05
2011 7.8 21.0 38.8 20.0 18.0 1.41 33.0 1.04
2012 8.2 21.4 39.4 20.2 17.1 1.37 33.6 1.13
2013 8.1 21.5 39.8 19.5 17.1 1.35 33.9 1.12
2014 8.2 21.5 39.6 18.6 17.7 1.45 33.8 1.16
2015 8.0 21.6 39.3 19.5 17.3 1.41 33.8 1.08
2016 8.2 21.4 39.2 20.3 17.0 1.38 33.8 1.13
2017 8.3 21.3 39.3 19.6 17.5 1.42 33.9 1.11
2018 8.3 21.4 39.1 19.5 17.6 1.42 33.7 1.07
2019 8.1 21.3 38.9 20.1 17.2 1.38 33.5 1.12
2020 8.4 21.4 39.1 18.4 18.6 1.52 33.5 1.20
2021 8.9 21.1 38.8 19.7 18.3 1.48 33.0 1.24
2022 8.5 20.8 37.9 19.3 19.9 1.62 31.9 1.31
Table 10-3: Product Grades of Darling Range Opera ons (Huntly– Kwinana refinery feed)
Year Moisture (%) LOI (%) Total Al2O3 (%) Total SiO2 (%) Fe2O3 (%) TiO2 (%) A.Al2O3 (%) R.SiO2 (%)
2006 7.8 21.7 39.3 18.7 18.0 1.37 33.9 1.10
2007 8.0 21.6 39.2 19.5 17.6 1.33 33.7 1.11
2008 7.9 21.3 39.1 20.1 17.3 1.34 33.8 1.09
2009 7.8 21.3 39.0 20.7 17.3 1.29 33.5 1.02
2010 7.5 21.4 38.6 20.8 17.4 1.26 33.1 1.04
2011 7.6 21.3 38.7 20.1 18.2 1.30 32.8 1.03
2012 8.2 21.5 39.4 20.3 17.0 1.25 33.5 1.13
2013 8.1 21.8 39.8 19.5 17.1 1.26 33.9 1.11
2014 8.2 22.0 39.6 18.8 17.7 1.37 33.7 1.17
2015 8.0 22.0 39.4 19.7 17.2 1.31 33.8 1.08
2016 8.2 21.7 39.1 21.3 16.1 1.32 33.8 1.03
2017 8.3 22.2 38.9 20.6 16.5 1.34 33.8 1.03
2018 8.3 22.1 38.6 20.8 16.7 1.33 33.9 1.05
2019 8.0 21.8 38.9 21.2 16.4 1.32 33.5 1.12
2020 8.4 21.7 39.1 19.8 17.6 1.44 33.5 1.16
-- 253 of 363 --
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 254 of 363 --
Year Moisture (%) LOI (%) Total Al2O3 (%) Total SiO2 (%) Fe2O3 (%) TiO2 (%) A.Al2O3 (%) R.SiO2 (%)
2021 8.9 21.0 38.7 20.9 17.6 1.39 33.0 1.20
2022 8.5 20.8 37.6 20.7 18.6 1.50 31.9 1.26
10.1 QP Opinion
SLR is of the opinion that the Darling Range opera on demonstrates that ore can be effec vely crushed and supplied to a refinery for further upgrading
to produce Alumina. The historical opera onal data confirms that the ore consistently meets refinery specifica ons without any deleterious elements.
Based on this, and the addi onal informa on about the mine plan provided by Alcoa, it is reasonable to assume that the ore from Darling Range can be
economically processed for the next 10 years.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 255 of 363 --
11.0 MINERAL RESOURCE ESTIMATES
11.1 Summary
The Darling Range resource comprises over 13,000 resource blocks, with a combined area of approximately 10,870 ha, averaging 50 kt of Mineral
Resource per block. The lateri c bauxites occur as surficial coverings of limited thickness, typically between 4 m to 8 m, but with significant lateral
extent. Historically, resource es ma on was by 2D plan-polygonal methods (Polygonal) referred to by Alcoa informally as the ResTag procedure. More
recently, resource es ma on by Alcoa has evolved to include gridded seam (GSM) and 3D block (3DBM) models using geosta s cal techniques.
Mineral Resource es mates based on GSM and 3DBM models (and some Polygonal models) consider prac cal mining constraints.
The delinea on of Mineral Resources using 3D methods has focused on well drilled areas that fall within the 10-year mine plan and approximately 76%
of the total tonnage, including Mineral Resources and Mineral Reserves (MRMR), of the Darling Range project is already in 3D block models. GSM
models were typically constructed in areas with 15 m spaced drilling, which comprises 10 models. Approximately 60% of the Mineral Resources are
based on Polygonal (ResTag) es mates which are mostly located in areas of wider-spaced (30 m and 60 m) drilling and are of lower confidence. All new
resource updates employ the 3DBM methods irrespec ve of drill hole spacing.
Figure 11-1 illustrates the tonnages and number of models for each model type that are being discussed in this sec on.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 256 of 363 --
Figure 11-1: Circle Charts Showing the Tonnage (external circle) and Number of Models (internal Circle) and Bar Charts Showing the Tonnage by
Mineral Resource Categories. Charts on the Top Refer to all the Tonnage of the Darling Range Project, and on the Bo om to the Exclusive Mineral
Resources
Mineral Resource es ma on was carried out by Alcoa and resources are defined for 92 sheets in 70 mining regions. There are 13,467 discrete zones of
mineraliza on that comprise the resource, each split ver cally into 4 domains for which 11 elements were es mated. SLR carried out audits on
representa ve models selected in conjunc on with Alcoa and comprising:
• Models to be mined in the short to medium term (less than 5 years)
• Models with significant amounts of resource material
• Models represen ng the three es ma on methods used by Alcoa.
The models audited were:
• ResTag es ma on method: Teesdale
• GSM es ma on method: Larego (F54 and F55)
• 3DBM es ma on method: Serpen ne (R25) and Millars (R22).
The audit process by SLR comprised examina on of the procedures used by Alcoa, independent review and discussion with staff, normal valida on
checks (e.g., sta s cs, swath plots, visual examina on, change of support analysis and genera on of grade-tonnage curves). The two 3DBM models
were examined in detail. The other models were examined and interrogated to ensure that the documented procedures were followed and that results
were consistent with QP expecta ons based on the data inputs.
The process used by Alcoa involves an integrated approach to data collec on, bauxite delinea on, and produc on planning aimed at the provision of
feedstock that meets the requirements of the local alumina refineries.
For all 3 es ma on methods drill holes were flagged with geological units using mul -pass geochemical scripts that included thickness constraints. The
GSM flagging process incorporated some addi onal mining constraints. Geological interpreta ons in both 2D and 3D were constructed with the flagged
drill hole composite data, which constrain the spa al es ma on of bauxite mineraliza on. Subsequent to
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 257 of 363 --
block grade es ma on, mining constraints are applied to the 3DBM models to restrict Mineral Resources to areas of poten ally economic bauxite
mineraliza on.
AL, SI, FE, ST, PT, OX, EO, CO, and SU are es mated for all models, but only AL and SI are reported for the Mineral Resource. GSM uses inverse distance
weigh ng methods to assign grades to the bauxite profile, and 3DBMs rely on ordinary kriging block grade es mates. Valida on methods differ slightly
for the different model types, but all models are reported by Alcoa to validate well against the input drill hole data.
Mineral Resources have been classified in accordance with the defini ons for Mineral Resources in S-K 1300, which are consistent with Australasian
JORC Code (2012) and Canadian Ins tute of Mining Metallurgy and Petroleum (CIM) (2014) defini ons in NI 43-101 and are determined primarily on
drill hole spacing. Models constructed primarily with pre-2010 drill holes are downgraded as this informa on is considered to be of lower confidence.
Mineral Resource es mates exclusive of Mineral Reserves Darling Range deposit are shown in Table 11-1, and include a 5% reduc on factor in tonnage,
based on the results of annual reconcilia ons (see discussion on density in Sec on 11.13).
Table 11-1: Summary of Darling Range Mineral Resources exclusive of Mineral Reserves – 31st December 2022
Category Tonnage (Mt) A.Al2O3 (%) R.SiO2 (%)
Measured 44.9 31.17 1.15
Indicated 51.8 31.40 1.17
Measured + Indicated 96.7 31.29 1.16
Inferred 140.3 32.93 1.26
Notes:
1. The defini ons for Mineral Resources in S-K 1300 were followed, which are consistent with JORC (2012) defini ons.
2. Mineral Resources are 100% a ributable to AWAC.
3. Mineral Resources are es mated at a geological cut-off grade, which generally approximates to nominal cut-off grades of 27.5% A.Al2O3with less than 3.5% R.SiO2. Locally
the cut-off grade may vary, dependent on opera ng costs and ore quality for blending. The target grade for mine planning is 32.7% available aluminum oxide (A.Al2O3)
and 1.0% reac ve silica (R.SiO2).
4. Mineral Resources have been es mated using a bauxite transfer price of USD16/t, as described in Sec on 11.11.
5. A minimum total mining thickness of 1.5 m was used.
6. In situ dry bulk density is variable and is defined for each block in the Mineral Resource model.
7. A global downwards adjustment of tonnes by 5% is made to account for density differences based on historic mining performance.
8. Mineral Resources are reported exclusive of Mineral Reserves.
9. The reference point for the Mineral Resource is the in situ predicted dry tonnage and grade of material to be delivered to the refinery stockpile following the applica on of
mining design parameters.
10. Metallurgical recovery has not been directly considered in the es ma on of Mineral Resources as the Darling Range opera ons do not include a conven onal processing
plant, only crushing as described in Sec on 14.0. The metallurgical recovery of the three refineries (Kwinana, Pinjarra and Wagerup) are beyond the boundaries of the
mining opera ons being the subject of the TRS.
11. Numbers may not add due to rounding.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 258 of 363 --
11.2 Resource Database
11.2.1 Drill Hole Data
Drill hole collar, survey, and assay data are exported from the acQuire database for resource es ma on.
Data exports from acQuire currently u lize Python scripts and the Spyder open-source plugin for valida on and ini al processing, including:
• Assigning 999 as the Domain code where drill hole intervals lack AL, SI and Fe assays
• Removing holes from the database if located greater than 7 m horizontally from the planned loca on
• Iden fying and removing duplicate or repeat holes based on a set of criteria
• Rese ng AL to AT where AL exceeds AT
• Rese ng SI to ST where SI exceeds ST
• Calcula ng Assay Total = AT (AL if AT absent) + ST + BO + FE + SU + CO
• Dele ng assays for samples where the Assay Total is below 70% or greater than 100%.
The output is a set of CSV files for collar, survey, assay, and geology.
The valida on checks have been implemented progressively over me as drill hole data for some project areas includes some samples where AL
exceeds AT and SI exceeds ST.
Other than collar eleva on adjustments, no further data transforma ons are applied prior to resource es ma on.
A summary of the drillhole database is outlined in Figure 7-1.
11.2.2 Topographic Data
Digital eleva ons models (DEMs) were generated from (in order of priority) drill collar survey data, LiDAR survey data, and Landgate satellite data. A
7.5 m by 7.5 m mesh is used for the DEMs. Drill hole collar eleva ons were registered to the DEM for resource es ma on.
11.3 Geological Interpreta on
11.3.1 Polygonal Models
For Polygonal resource es mates, grade-based ‘geological’ codes are assigned to drill hole intervals. These codes are used to define the top and bo om
of the ‘bauxite’ horizon in each hole, which is then used to es mate the bauxite volumes and average grades within polygons.
The top of the bauxite usually coincides with the base of the overburden, as defined in the drillers’ logs. The base of the Bauxite Zone (termed the
geological floor) is defined within the acQuire database using a mul -pass script that applies the following hierarchical set of rules to the sample
grades:
Pass 1
• Uphole search for two consecu ve samples with individual AL values ≥27.0%
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 259 of 363 --
• Record depth of the lower of the two samples
• Check that the cumula ve AL at that depth is ≥27.5%
• Check that the individual SI at that depth is ≤3.5%
• Check that the cumula ve SI at that depth is ≤3.0%
• Check that the cumula ve OX at that depth is ≤4 kg/t
• Check that the sampled depth is ≥2.0 m, but less than hole depth (if equal, see pass 3)
• If all criteria are met, set flag to “pass”, set geological floor depth to lower sample depth
• Proceed to pass 2.
Pass 2
• Uphole search for two consecu ve samples with individual AL values ≥25.5%
• Record depth of the lower of the two samples
• Check that the cumula ve AL at that depth is ≥27.5%
• Check that the individual SI at that depth is ≤3.5%
• Check that the cumula ve SI at that depth is ≤3.0%
• Check that the cumula ve OX at that depth is ≤4 kg/t
• Check that the sampled depth is ≥2.0 m, but less than hole depth (if equal, see Pass 3)
• If all criteria are met, set flag to “pass”, set geological floor depth to lower sample depth
• If any criteria fail, geological floor defined in Pass 1 is retained.
Pass 3
• Uphole search for two consecu ve samples with individual AL values ≥27.0%
• Record depth of the lower of the two samples
• Check that the cumula ve AL at that depth is ≥27.5%
• Check that the individual SI at that depth is ≤3.5%
• Check that the cumula ve SI at that depth is ≤3.0%
• Check that the cumula ve OX at that depth is ≤4 kg/t
• Check that sampled depth = hole depth
• If all criteria are met, set flag to “pass – open”, set geological floor depth to lower sample depth.
Pass 4
• Uphole search for two consecu ve samples with individual AL values ≥24.5%
• Record depth of the lower of the two samples
• Check that the cumula ve AL at that depth is ≥25.0%
• Check that the individual SI at that depth is ≤3.5%
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 260 of 363 --
• Check that the cumula ve SI at that depth is ≤3.0%
• Check that the cumula ve OX at that depth is ≤4 kg/t
• Check that the sampled depth is ≥2.0 m, but less than hole depth (if equal, see pass 3)
• If all criteria are met, set flag to “marginal”, set geological floor depth to lower sample depth.
The applica on of these rules assigns a geological floor depth to each hole, along with a Pass, Pass-Open, Marginal, or Fail flag. Holes flagged as
Marginal or Fail are inspected by Alcoa staff members, with manual adjustments applied if warranted. For areas infilled to 15 m spaced holes, the
geological floor model is replaced by a mining floor model, which is discussed in the following sec on.
Results of geological floor flagging are used to subjec vely define the lateral extents of the Mineral Resource. Outlines are manually interpreted by
Alcoa geologists in ArcGIS or MineSight, and are guided by consistency in thickness, depth, and grade, minimum limits on the number of enclosed
samples and the enclosed area, and local geomorphology. The polygons delineate separate areas that typically range in size from 10 ha to 100 ha, with
most being around 30 ha. An example plan view is shown below.
Figure 11-2: Plan View of Polygonal Approach (Pass = red, pass open = green, marginal = yellow, fail = blue) (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 261 of 363 --
11.3.2 Gridded Seam Models
GSM models are located in areas of 15 m spaced infill drilling and include prac cal mining constraints as part of the ‘geological’ interpreta on used for
resource models.
The base of overburden and the base of caprock is iden fied in each drill hole as 3D points and wireframed as surfaces. The geological bauxite zone
floor, which is defined for the wider drill spacings used for Polygonal es mates, is replaced by a mining floor for GSMs. The mining floor is interpreted
directly from the drill hole data presented on the 15 m spaced east-west cross sec ons, digi zed in MineSight as strings, then linked to form wireframe
surfaces.
The interpreta on of the mining floor is a manual process performed by the site geologist, with the objec ve of achieving acceptable grades and
prac cal mining outlines. The mining floors are defined using a set of guidelines instead of prescribed rules, including:
• Nominal cut-off grades of ≥27.5% AL and ≤3.5% SI are used for mining floor defini on;
• If the SI grade in the sample immediately below the floor exceeds 5.0%, the floor is raised 0.5 m;
• A minimum face height (distance from mining floor to the base of overburden) is targeted;
• Face heights exceeding 4 m will require mul ple cuts or bench mining;
• The overburden to face height ra o should not exceed 1;
• A maximum floor gradient of 1 in 7 is required between 15 m spaced holes (the gradient can be increased to 1 in 5 for second and third
cuts);
• Benching should be invoked where the gradient constraints cannot be maintained; and
• The floor interpreta ons should be extended laterally into at least one of the surrounding waste holes.
The base of overburden and mining floor surfaces are used to flag the drill hole samples. For each drill hole, the samples located below the base of the
overburden and above the mining floor are composited into a single interval, with composite grades length- and density-weighted. Addi onal drill hole
composites are generated for second and third pass mining floors.
The composite data are examined in plan view, and polygons are digi zed around the interpreted lateral extents of the mining zones using the
following guidelines:
• Nominal cut-off grades of ≥27.5% AL and ≤3.5% SI for lateral boundary defini on
• The boundary is posi oned at least 15 m away from holes with SI grades exceeding 5%
• Buffer zones are placed around environmental constraints, and around bedrock outcrop
• Internal waste zones should contain at least three drill holes
• Individual polygons should have an area of at least 1 ha
• A width of at least 45 m should be retained for mining equipment movement.
The resul ng polygons are divided into typically smaller ‘mining’ blocks that each contain approximately 20 kt to 40 kt of Mineral Resource.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 262 of 363 --
11.3.3 3D Block Models
Similar to the Polygon and GSM interpreta on approaches, a set of rules wri en in Python scripts are used to assign ini al domain codes to individual
samples. These Domain codes are then modified in several subsequent passes that take into account the grades and coding of other intervals in the
hole.
The ini al script is used to assign a Domain code to each interval based on various combina ons of major analyte threshold grades. A total of 6 main
material type Domains (DOMAF) is defined, namely overburden (DOMAF=99), caprock waste (10), caprock bauxite (20), bauxite (30), low-grade bauxite
(40), and clay (50), as shown in Figure 11. Each of these material types (apart from overburden) is divided into up to five grade-based sub-domains.
Three subsequent coding passes are conducted that itera vely adjust the codes to combine the sub-domain into the 6 main Domains while ensuring
that strict stra graphic ordering is maintained. A further two passes are coded to assign Domain codes that denote whether the material is derived
from granite or dolerite.
The base of each Domain is generated on a 7.5 m by 7.5 m grid using an automated modelling process in DeepLime so ware package. To ensure a
be er fit of the wireframes, when the collar of the drill holes do not match with the topography, they are adjusted according to the topography
surface. Where drill holes do not penetrate the full bauxite profile or the Domain contact is not defined exactly due to missing assays, a condi onal
simula on algorithm is used to es mate the Domain thickness from adjacent drill holes. The simula on algorithm employs a Matern variogram and
selects the average of 10 simula ons for the missing data point. The grid mesh is then wireframed in MineSight to provide 3D surfaces. The base of
Domain 50 (Clay) is set at 10 m below the top of that Domain.
Figure 11-3: Example Sec on Showing Domain (DOMAF) and Wireframed Surfaces (top), and Regions where the Bauxite Layer was not Penetrated
(bo om) (SLR, 2022)
Poten al dolerite dyke intervals are flagged for samples where FE exceeds 25% and ST is below 10%, and the en re hole is flagged as poten al dyke if 3
or more samples are flagged in this manner. The interpreta on of dykes is carried out manually using local orienta on trends and may be based on one
or more holes (see Figure 11-4). They are assumed to be ver cal, are extended laterally half-way between drill holes, and can represent up to 15% of
material in some areas but unweathered material
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20238
-- 263 of 363 --
can generally be screened out in the pit or prior to crushing as oversize boulders. The dykes tend to be well defined only when drill hole spacings are
reduced to 15 m by 15 m.
Figure 11-4: Plan View of Bauxite Zone and (A) Drill Holes Flagged as Dykes in yellow, and (B) Interpreted Ver cal Dykes from the Drill Holes (Alcoa,
2022 – Modified by SLR)
While the dolerite dykes are delimitated in the geological modelling workflow and flagged in the block models, there is not a separated es ma on
workflow to different lithologies, being the current workflow used to the whole bauxite layer. A lateral boundary is interpreted to constrain the
resource model and the 3D surfaces are extended where required. The lateral boundary, domain surfaces, and dolerite dyke interpreta ons are
converted to wireframe solids. All the constraints where mining is not allowed (federal reserves, indigenous heritage sites, and rivers and protec on
buffers associated) are delimitated and removed a er the geological modelling step. This way all the mineable reminiscent area is included in the final
orebody perimeters.
11.4 Sta s cal Checks
Sta s cal checks by Alcoa and independent reviewers are typically carried out by univariate sta s cal comparisons and histogram, grade trend, sca er,
and cumula ve log probability plots.
Univariate sta s cs by Domain are calculated pre- and post-composi ng for valida on, and for checks against the resul ng resource models. For areas
with mul ple drilling campaigns carried out at significant me lags, SRK (2021a) previously noted that there were no material or unexpected
differences between subsets of the dataset grouped by drilling period or drilling grid.
Histograms show that most analytes have distribu ons that are close to normal, as shown in Figure 11-5 for AL. The excep on being SI, which is
moderately to strongly posi vely skewed, as shown in Figure 11-6.
Marked grade trends with depth exist for most analytes but are consistent with the mineraliza on style and have been adequately accounted for by the
geological interpreta on and the use of unfolding methods during block grade es ma on.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20239
-- 264 of 363 --
DOMAF = 20 DOMAF = 30
DOMAF = 40 DOMAF = 50
Figure 11-5: Histograms of AL by DOMAF at Serpen ne
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202310
-- 265 of 363 --
DOMAF = 20 DOMAF = 30
DOMAF = 40 DOMAF = 50
Figure 11-6: Histograms of SI by DOMAF at Serpen ne
Figure 11-7 plots SI versus ST for the clay zone at Serpen ne. Note that reac ve silica (SI) was greater than total silica (ST) for some composites (le -
hand plot), and these rela onships were carried through to the block model (right-hand plot). In the datasets reviewed, this issue was most common
for SI in the clay zone, but there were also small numbers of bauxite zone samples with available alumina (AL) greater than total alumina (AT). This issue
is not considered to be material for the Mineral Resource es mate, and adequate checks are now in place for future resource models.
Figure 11-8 shows the rela onship between AL and SI for the bauxite and clay zones at Serpen ne. Note the progressive increase in SI as the bauxite
profile changes with depth from Hardcap (20), through friable bauxite, and to Clay (50), which was supported by grade trend plots.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202311
-- 266 of 363 --
Composites blocks
Figure 11-7: Sca erplots of SI versus ST for DOMAF 50 at Serpen ne
Figure 11-8: Sca erplots of AL versus SI by Domain at Serpen ne
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202312
-- 267 of 363 --
Missing values are kept as missing values in the database, as well as results below the detec on limit are changed to values that are half of the
detec on limit.
11.5 Treatment of High-Grade Assays
High-grade caps for all analytes were applied to individual composites by Alcoa on a domain-by-domain basis following inspec on of the data
distribu on. The QP confirmed that high-grade caps were typically greater than the 99th cumula ve sample percen le, as shown by horizontal lines in
the plots in Figure 11-9.
No high-grade spa al restric ons were used by Alcoa in the resource es ma on process.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202313
-- 268 of 363 --
Figure 11-9: Cumula ve Log Probability Plots for Serpen ne Composites
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202314
-- 269 of 363 --
11.6 Composi ng
Drill holes were sampled at 0.5 m intervals in the bauxite zone below the base of the overburden, with a residual some mes present at Domain
contacts. The Polygon and GSM es ma on approaches used the original drill hole data intervals. Prior to the interpreta on of geological surfaces, holes
used in the 3DBM resource es mates were composted to 0.5 m with residuals calculated to ensure their length was 0.25 m to 0.75 m.
Following the interpreta on of geological surfaces, drill holes used for Polygonal and GSM resource models were composited to:
• Polygonal – a single interval for samples located below the base of the overburden and above the geological floor.
• GSM - a single interval for samples located below the base of the overburden and above the mining floor. Addi onal composites were
generated in areas where second and third pass mining floors were iden fied.
All grade composi ng for drill holes employs length-weighted linear averages.
11.7 Trend Analysis - Variography
Only some variogram analysis was carried out for Polygonal and GSM models as variogram parameters were not required to generate the resource
models. Variogram analysis is rou ne for 3DBMs. Experimental variograms are calculated in unfolded space, with bauxite Domains 20, 30 and 40
unfolded to the 10/20 Domain contact and the clay Domain (50) unfolded to the 40/50 Domain contact.
Experimental variograms are calculated for AL, SI, ST, and FE for the bauxite zone, standardized to a sill of one, and modelled with 3-structure spherical
models, as shown in Figure 11-10. A single variogram model is selected that provides a best fit to these four variables. Variogram models tend to
display nugget values of less than 20% and total ranges of several hundred meters, but 80% of the sill is generally reached within 100 m laterally. As
expected, horizontal to ver cal anisotropy ra os are high (typically exceeding 50:1), but there is li le lateral anisotropy. Only minor differences in
Huntly and Willowdale variogram models were noted by SRK (2021a). This good defini on of con nuity compared to the 15 m drill spacing is
considered by SLR to be a benefit of the unfolding approach.
Independent variogram models for each bauxite domain and analyte are not used for grade es ma on to enable correla ons between analytes to be
maintained during the change in support from drill hole samples to blocks, which is important for mine planning considera ons.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202315
-- 270 of 363 --
Figure 11-10: AL, SI, FE, and ST Direc onal Variogram Models at Serpen ne
11.8 Bulk Density
For Mineral Resource es ma on purposes, density can be regarded as another analyte, and tests can be evaluated for repeatability (precision) and
accuracy (bias). The determina on of the metal content of a specified volume of ore is as sensi ve to density as it is to grade, and this is certainly the
case for gold mining with high value, low concentra on assays. For bulk commodi es there is usually much more emphasis on grade since product
tonnages are measured by weightometer.
Alcoa does not rou nely collect density data but relies on produc on records to define averages. This is due to the broad geological consistency of the
ore zones and the local chemical and physical nature of the lateri zed ore. Porosity and permeability in par cular show high lateral and ver cal
variability, rendering repeatability of density test work meaningless. Even if large numbers of data points were available (for example by developing a
density algorithm from the FTIR assaying of every drill sample, and then modelling it) the resul ng model would s ll need to be factored by the actual
mining results for local porosity.
For 3DBM resource es ma on, each drill hole bauxite composite is assigned a dry in situ bulk density (DIBD) value based on the logged material type
and the FTIR iron grade using the regression equa on defined below in Sec on 11.8.5.
The available density test work data is summarized as follows.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202316
-- 271 of 363 --
11.8.1 1980 to 1992
Senini (1993) collated and reviewed all previous bauxite density data, including that by Sadleir done in 1986, and modified Sadleir’s algorithm used for
computa on of density from individual 0.5 m sample assays of Fe2O3. Results are summarized in Table 11-2.
Table 11-2: Summary of Density Test Data (t/m3) from 1980 to 1992 (Senini, 1993)
Year Source Material Count Mean Min Max Fe Mean Regression On Fe2O3
Slope Intercept
1980 DOSCO Hardcap 18 2.200 1.98 2.52 19.35 0.0089 2.032
1986 Sadleir
(in Senini) Hardcap 14 2.364 2.08 2.75 20.88 0.0092 2.172
1992 Senini Hardcap 67 2.409 1.81 3.10 21.00 0.0103 2.192
1986 Sadleir
(in Senini) Friable 11 1.846 1.64 2.12 8.80 0.0015 1.830
1992 Senini Friable 27 2.225 1.88 2.79 14.30 0.0045 2.289
1980 - 1992 reported above Granitic 67 2.327 1.81 3.10 16.71
1980 - 1992 reported above Doleritic 32 2.444 2.07 2.96 28.96
While the approach used has merit, there are some obvious challenges:
• There are very few data points, unevenly distributed by material type and mining area
• Methodologies for collec ng and tes ng the samples varied (sand replacement method for Hardcap, driven cylinder for Friable, water
displacement are all noted)
• There is some lack of clarity on moisture, but it is assumed that the values are all in situ dry bulk density reported as t/m³.
The differences between hardcap (caprock) and friable (other material) and between grani c or doleri c deriva on are however clear.
Senini (1993) concluded that the dry in situ bulk density (DIBD) should be es mated using a regression equa on which is s ll used.
11.8.2 2013 to 2018 Drill Samples
Various further test programs have been a empted including collec on of all material from drill samples (assuming the drill hole volume is constant)
and then taking wet and dry weights and assaying for iron. There were 51 samples from 8 holes at Huntly and 93 samples from 24 holes at Willowdale.
Sca er plots produced by SRK 2021a showed significant sca er of all available data for both Hardcap and Friable (other) material.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202317
-- 272 of 363 --
11.8.3 2016 to 2017 Pit Samples
Alcoa collected 2 kg to 5 kg grab samples from 16 Huntly pits (76 samples) and 10 Willowdale pits (41 samples). Water immersion density tes ng was
done by Bureau Veritas. The average of 2.01 t/m³ is significantly lower than that from the 2015 study of 2.23 t/m³. The drill samples did not account for
porosity and voids and were not adequately sealed.
FTIR assays for Fe2O3 were compared to sealed and unsealed density es mates and it was found that Senini’s regression equa on be er predicted the
unsealed densi es. Thus, it appears that the current regression equa on based on Fe2O3 assays overes mates the in situ dry tonnage.
11.8.4 2018 Downhole Density Es mates
In December 2018 Alcoa contracted downhole geophysical measurements in 54 aircore holes drilled in the Larego area. The data from this study is s ll
being evaluated and is not used for Mineral Resource es ma on.
11.8.5 Density Es ma on
Ore grades range from 28 to 38% A.Al2O3 for paired belt sample data (see Sec on 8.5.3.8) whereas test work densi es range from 1.5 t/m³ to 3.2 t/m³,
but the data is sparse and unreliable.
For resource es ma on, each 0.5 m drill hole sample is assigned a dry in situ bulk density (DIBD) value based on the logged material type and the FTIR
iron grade, using Senini’s 1993 regression equa on:
Hardcap (caprock) = 2.19 + 0.0103*Fe
Friable (other) = 2.00 (used for all non-Hardcap material)
If the sample is logged as comprising a mix of Hardcap and Friable, the assigned value for that 0.5 m interval represents a volume-weighted average.
There is no differen a on between grani c and dolerite derived bauxite, due to the rela vely small propor on of the la er (less than 15%).
In resource es mates prior to 2017 a moisture content of 9% was assumed and used to es mate wet tonnes. Since the implementa on of 3D block
modelling in 2018, densi es are assigned a er grade es ma on, based on the regression equa on and Fe grade of Hardcap, and using 2.0 t/m³ for all
other material, weighted by the propor on of Hardcap or other material.
11.8.6 Reconcilia on of Density
Alcoa uses comparisons between the As Mined tonnages and the sampling tower weightometers to apply adjustment factors to mine design es mates,
scheduling and stockpile planning. Such adjustments are not applied directly to the Mineral Resource es mate as they vary locally.
Reconcilia on of Huntly and Willowdale mined produc on (see discussion on density in Sec on 11.13) indicates that the density es mates are biased,
with the long-term average As Mined tonnages being approximately 5% higher than the actual produc on measured on calibrated weightometers.
11.8.7 Density Conclusions
The density data is limited in coverage and there is significant uncertainty regarding the methodology used for some sampling programs. A simple
regression algorithm is used to es mate the DIBD for Hardcap from the FTIR assays of Fe2O3. This does not account for voids or porosity, nor does it
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202318
-- 273 of 363 --
differen ate between Hardcap derived from grani c or doleri c material. All other material is assigned a density of 2.0 t/m³. A constant moisture
content of 9% is assumed for wet tonnages.
11.8.8 QP Opinion
In the QP’s opinion the dry bulk density data is less well controlled than other analytes, but the long history of mining produc on and stockpile
reconcilia on means that the assumed values are adequate for resource es ma on.
11.9 Resource Models
11.9.1 Polygonal
For each drill hole contained within a polygon, the samples located below the base of the overburden and above the geological floor are composited
into a single interval. The following quan es are assigned to each polygon:
• Thickness = average length of contained composites
• Grade = length-weighted average grade of contained composites (density weigh ng is not applied)
• Density = average density of contained composites
• Volume = Polygon area by Thickness
• Tonnage = Volume by Density.
11.9.2 Gridded Seam Modelling
GSM employs 15 m by 15 m cells centered on the nominal drill hole loca ons. Separate seams are created for overburden, and for the interpreted
Bauxite Zone (BXZ) between the overburden and the mining floor. BXZ is subdivided into separate seams where second and third mining cuts have been
interpreted. Interpreted wireframe surfaces are used to assign a seam thickness to each cell (effec vely the seam thickness of drill hole at the cell
centroid).
Cell grade es ma on used inverse distance weigh ng (IDW) techniques as follows:
• Hard boundaries, with each seam cell only es mated using nearby composite drill hole data within the corresponding seam
• IDW weigh ng factor of 1.2 for SI and 2 for all other variables
• 1 by 1 by 1 cell discre za on
• Isotropic search distance of 180 m
• Minimum of 2 and maximum of 8 composites with a maximum of 2 composites per quadrant
Where drill holes are located at the centroid of cells the resul ng cell grade es mates are essen ally nearest neighbor es mates. In other words, the
GSM outcomes are equivalent to 2D polygon es mates, with the usual constraint of that method, i.e. that the block variances are not smaller than the
composite variances.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202319
-- 274 of 363 --
The GSM is constrained to the interpreted lateral extents of the mining zones. For each mining zone the following a ributes are determined:
• Seam Thickness = average seam thickness of the contained GSM cells
• Grade – weighted average grade of contained cells (density weigh ng is not applied)
• Density = average density of contained cells
• Volume = mining zone area by Seam Thickness
• Tonnage = Volume by Density
11.9.3 3D Block Modelling
In 2019, Alcoa commenced preparing Mineral Resource es mates using 3DBM techniques, with the aim to progressively replace all Polygonal and GSM
models. To date, Alcoa has prepared a total of 98 3DBM represen ng around 76% of the Mineral Resource and Mineral Reserves (MRMR) tonnage.
This sec on describes the current 3DBM procedures, which have evolved over me, with some parts now automated or semi-automated. Changes in
the 3DBM procedures have generally been minor and are not considered material to the resul ng resource models.
Block models are ini ally generated:
• using the ML1SA lease area grid
• with an origin that ensures that the majority of the drill holes are located nearer to the block corners rather than the centroids
• with a parent block size of 15 m by 15 m by 0.5 m and a sub-block size of 3 m by 3 m by 0.25 m (XYZ)
• flagged with a Domain (DOMAF) code based on the domain surface interpreta ons.
Block grade es ma on:
• includes es ma on of AL, SI, ST, FE, EO, PT, CO, SU, OX, BO, and AT
• is done by ordinary kriging (OK) for parent blocks, with parent grade es mates assigned to all sub-blocks within the parent block
• uses the same unfolding surfaces as used for variogram analysis
• hard boundaries between the bauxite domains (DOMAF 20, 30 and 40) started to be implemented in 2022. The previous block models were
es mated using so boundaries between the bauxite domains.
• uses a 3-pass search strategy for bauxite Domains and only one pass for the clay zone (parameters listed in Table 11-3), with:
o the major and semi-major orienta ons in the unfolded horizontal plane
o a minimum of 4 or 12 samples and a maximum of 27, with a maximum of 3 samples from any one drill hole. Thus, a minimum of
4 holes is required for Pass 3 and 2 holes for Passes 2 and 1
• uses the same variogram for all analytes
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202320
-- 275 of 363 --
• DIBD (density) is not es mated into individual parent and sub blocks but is a post-es ma on calcula on based on the block domain
composi ons (see 11.8.5).
The OK es ma on approach is designed to maintain correla ons between analytes and assist in ensuring that es ma on totals are consistent with the
input drill hole data.
Table 11-3: Ordinary Kriging Search Parameters
Domain Pass Search Distance (m) Number of Samples
Major Semi-major Minor Min Max Max Per Hole
20, 30, 40
3 300 300 50 4 27 3
2 100 100 20 4 27 3
1 55 55 20 12 27 3
50 1 300 300 50 4 27 3
A set of wireframe solids represen ng the mining outlines are generated using a similar grade accumula on and threshold approach to those used for
the GSM model, as shown in Figure 11. The sub-block model is then regularized to the parent block size (15 m by 15 m by 0.5 m), with blocks located
within the mining solids flagged for repor ng Mineral Resources. Block tonnages are factored to reflect the propor on of the block contained below
the topographic surface and within the mining solid.
Figure 11-11: Example Sec on showing Bauxite Zone and Mining Solid (SLR, 2021)
Notes:
1. Ver cal to horizontal exaggera on is 3:1
2. Drill holes colored by DOMAF variable
The QP summarized the informa on of 10 block models, showed in Table 11-4, where there is available the comparison between the es ma on using
so and hard boundaries for the bauxite layer. In overall, the AL grades increased 7% and SI grades decreased 23%, and the tonnage is higher in most of
the cases, reflec ng the addi onal drilling.
Table 11-4: Tonnage and Grade Informa on Between the Original Resource Model and the 3D Block Model
Model
Original Resource Model3DBM - Resource Model Difference
Tonnage
('000 t)
A.Al2O3
(%)
R.SiO2
(%)
Tonnage
('000 t)
A.Al2O3
(%)
R.SiO2
(%)
Tonnage
('000 t)
A.Al2O3
(%)
R.SiO2
(%)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202321
-- 276 of 363 --
Model
Original Resource Model 3DBM - Resource Model Difference
Tonnage ('000 t) A.Al2O3
(%)
R.SiO2
(%) Tonnage ('000 t) A.Al2O3
(%)
R.SiO2
(%) Tonnage ('000 t) A.Al2O3
(%)
R.SiO2
(%)
Holyoake Central 25,211 31.97 1.94 25,919 34.12 1.23 3% 7% -36%
Windsor 8,935 32.82 2.67 8,798 33.69 2.38 -2% 3% -11%
Cooke 15,421 30.85 2.22 18,976 31.99 1.95 23% 4% -12%
Serpen ne 16,444 32.00 1.96 20,299 32.75 1.72 23% 2% -12%
Gleneagle 26,333 31.58 1.67 35,144 34.69 1.14 33% 10% -32%
Buckley 17,998 33.74 1.68 27,435 35.39 1.27 52% 5% -24%
Cobiac 23,498 31.15 1.70 30,865 34.81 1.18 31% 12% -31%
Frolle 12,556 30.07 1.68 18,587 33.59 1.31 48% 12% -22%
Yarri 10,044 30.90 2.04 30,362 32.51 1.62 202% 5% -20%
Millars 26,156 30.64 2.21 24,987 32.32 1.88 -4% 5% -15%
Total 182,596 31.55 1.93 241,372 33.71 1.48 32% 7% -23%
11.10 Block Model Valida on
11.10.1 Polygonal and Gridded Seam Modelling
Alcoa uses a similar general approach to validate both the Polygonal and GSM resource models which includes:
1. Visual valida on of cell es mated grades versus seam composited data
2. Comparison between composite and block model global sta s cs
3. Swath plots comparing cell grades against seam composite grades
4. Comparison between models when upgraded with new informa on.
Es mated cell grades were compared visually to the drill hole composite grades to ensure that the cell grade es mates appeared consistent with the
drill hole seam composite data.
As GSMs were effec vely nearest neighbor es mates, checks by SRK (2021a) on several GSM models indicated excellent global and local correla on
between the es mated cell grades and the input seam composite grades.
The QP undertook some independent checks on datasets and GSMs for the F54 and F55 blocks to confirm that the modelling procedures had
performed as intended. Results were consistent with those observed by SRK (2021a) and no material issues were noted.
Polygonal resource models were updated by Alcoa when drill hole data is infilled from 60 m and 30 m spacings, and then GSM models were previously
produced by Alcoa a er 15 m infill drilling (3DBM models are now produced rou nely at this stage). Changes in tonnages and average grades (AL, SI,
OX) are presented as sca erplots in Figure 11-11 for map sheets at Huntly where such infill drilling has occurred. It is noted that:
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202322
-- 277 of 363 --
• material differences in tonnages are evident for individual map sheets, represented by the sca er around the 45o line in the top le -hand
plot in Figure 11-11
• globally, there is only a 3% change in resource tonnage when infilling from 60 m to 30 m, but a 22% drop in tonnage when the deposit is
further infilled to 15 m drill centers. The la er is mainly due to a change in the geological interpreta on from a geological to a mining floor
• decreasing the drill spacings from 60 m to 15 m results in an average reduc on in SI of 10%, an increase in OX of 5%, but li le change to AL.
These grade changes are likely due to the preferen al loss of deeper DOMAF 40 material that is high-in SI and low in OX when mining
constraints are considered (see Figure 11-10)
• similar grade-tonnage rela onships related to infill drilling were noted at Willowdale by SLR.
Applying a global correc on factor to Polygonal resource model tonnages generated from 30 m and 60 m spaced drill hole datasets is not considered
appropriate as local differences are highly variable and not considered to be predictable, as shown by the red dots in the top le -hand plot in Figure
11-12.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202323
-- 278 of 363 --
Figure 11-12: Resource Comparison Sca erplots for Huntly (Tonnage, AL, SI, OX) (SLR, 2021)
11.10.2 3D Block Modelling
Model valida on checks by Alcoa include:
1. Volume checks between the geological interpreta on solids and sub-block model
2. Visual valida on of block model coding and es mated grades versus composite data
3. Comparison between composite and block model global sta s cs
4. Swath plots comparing block grades against composite grades.
SLR undertook some independent checks on datasets and block models for Serpen ne and Millars and obtained results that were consistent with those
provided by Alcoa. Example screen captures of coded block models and AL and SI block es mates are shown in Figure 11-13.
Figure 11-13: Example Sec ons showing DOMAF, AL, and SI Block Es mates (SLR, 2021)
3:1 ver cal to horizontal exaggera on
Most global checks indicate generally good correla on between the es mated model grades and the input composite grades. However, Domain swath
plots suggest that the use of a single unfolding surface and so boundaries for the Bauxite Zone (DOMAF 20, 30, and 40) has led to grade smoothing.
For example, Figure 11-14 indicates overes ma on of DOMAF 20 and 40 for AL, and underes ma on for DOMAF 30. As Alcoa generally mines the
majority of the bauxite profile this issue is not considered material and any es mated bauxite that is le behind would likely be DOMAF 40 (low-grade
bauxite). Consequently, the impact of grade smoothing for AL would introduce some conserva sm into the model. Bauxite Zone block es mates could
be improved by unfolding each Domain independently and using semi-so boundaries.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202324
-- 279 of 363 --
20+30+40 20
30 40
Figure 11-14: AL Swath Plots by DOMAF at Serpen ne (SLR, 2021)
As discussed previously, the inequality constraint AL ≤ AT and SI ≤ ST was not met for all blocks due to:
• the inequality constraints not being honored in the input data
• incomplete assaying of AT and ST.
Sca erplots for some key analytes were spot checked by SLR to ensure that correla ons iden fied for composite data were maintained during block
grade es ma on. In most instances there was good reproduc on of the correla ons during the change in support from 0.5 m composites to 15 m by
15 m by 0.5 m blocks. However, there were commonly artefacts related to a small number of blocks that were generally located in the periphery of the
deposit. These are shown as ver cal lines in Figure 11.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202325
-- 280 of 363 --
Figure 11-15: Sca erplots of AL versus SI by DOMAF at Serpen ne (SLR, 2021)
A discrete Gaussian (DG) change-of-support check is appropriate to assess smoothing in resource es ma on models. A range of variance reduc on F
factors from 0.20 through to 0.7 in 0.1 increments were also chosen to represent the results that may be achieved through various mining selec vi es.
Higher F values result in grade-tonnage distribu ons that could be achieved through more selec ve mining and high-quality grade control prac ces.
Conversely, lower F values result in grade-tonnage distribu ons that would result from less selec ve mining and/or poorer-quality grade control
prac ces.
The DG approach was used by SLR to determine the theore cal AL grade-tonnage curves for the Bauxite Zone at Serpen ne by considering various F
factors for the 0.5 m composite data (Figure 11-16). This Figure also shows the actual grade-tonnage curve for the Serpen ne 3DBM resource model.
The resource model tonnage curves are consistent with the F=0.4 DG curves for all cut-offs likely to be considered at Serpen ne for open pit mining.
This provides further support that any grade smoothing present in the Serpen ne model is unlikely to be material to the Mineral Resource es mate.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202326
-- 281 of 363 --
Figure 11-16: AL Grade-tonnage DG Curves versus Serpen ne Block Model
11.11 Cut-off Grade and Mining Constraints
Darling Range uses a historically accepted economic Mineral Resource cut-off grade of ≥27.5% A.Al2O3, ≤3.5% R.SiO2, and ≤4kg/t OX, that is implicit in
the delinea on of the bauxite layer in the geological modelling stage. A minimum thickness of 2 m is also used to improve the Mineral Resource
defini on.
In addi on to the geological modelling cut-offs criteria, the constraints described below are applied to the GSM and 3DBM Mineral Resource defini on:
• a minimum area of 1 ha.
• a minimum face height of 1.5 m (distance from mining floor to the base of overburden).
• face heights exceeding 4 m are treated as mul ple benches.
• an overburden to face height ra o ≤1.
• a maximum floor gradient of 1 in 7 over a minimum of 15 m for the first cut, and 1 in 5 for second and third cuts.
• a minimum access corridor of 45 m for mining equipment.
However, bauxite resources can include material outside the geological modelling grade cut-offs that may also be considered as mineable, and a cut-off
depth basis is used when A.Al2O3 grade is lower to define whether or not a block is economic. Mineral Resources have been es mated using a LOM
price of
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202327
-- 282 of 363 --
$21/t represen ng an average arms-length sale of bauxite from Darling Range. The price that constrains the es mate for op miza on was discounted
to exclude export logis cs costs, i.e. the base price was $21/t, and the discounted price was $16/t.
The grade cut-off criteria to report the Mineral Resources is a common approach to the bauxite mines, and the QP is of the opinion that to improve the
recoverable resources repor ng, a reblocked block model to a minimum prac cal mining scale or single mining unit should be considered. Economical
parameters considering more flexible costs and bauxite prices related to the Mineral Reserves can also be implemented in the Mineral Resources
workflow, aiming to op mize the bauxite mineable por on including poten al marginal grades.
11.12 Reconcilia on
11.12.1 Sampling Tower Data
Refinery feed grade is monitored for the Huntly and Willowdale mining regions using material collected just prior to the stockpile stackers at the
Pinjarra and Wagerup sampling towers respec vely.
Alcoa mine planning personnel rely upon historical comparisons between the As Mined es mates and the sampling tower data to apply adjustment
factors to mine design es mates, to assist with scheduling and stockpile planning ac vi es. The adjustments are not applied to the reported global
Mineral Resource es mates as they are considered to be local factors.
Sampling tower performance was discussed in SLR, 2022.
11.12.2 Resource to Sampling Tower Comparison
Alcoa reconciles the resource (mine design) es mates with the sampling tower es mates once mining is completed for each mining zone. It is
important to note that the majority of the Mineral Resources are prepared using 30 m or 60 m spaced data, whereas As Mined to sampling tower
reconcilia on is based on mine planning models constructed from 15 m spaced data that include addi onal mining constraints.
Figure 11-16 and Figure 11-17 show the annual rela ve grade differences for both Huntly and Willowdale respec vely. These plots indicate:
• A clear reac ve silica trend from higher differences (above 20%) to lower differences (around 10%) from 2011 to 2021 and 2011.
• The most variable pa ern of reac ve silica compared with the other elements.
• That most As Mined grades are currently within 10% of the sample grades.
The sources of the reconcilia on differences shown in Figure 11-17 and Figure 11-18 are not known, but the following factors could contribute:
• Resource models were prepared using FTIR assay data, whereas the sampling tower samples are assayed using the same techniques as the
REF Method (see Table 81 in 8.3.2.1) but with BD rather than MD. Alcoa assumes that this is more accurate, but that is difficult to confirm
for par al diges on methods such as AL, SI, and OX.
• Changes in the resource modelling procedures from Polygonal, to GSM, to 3DBM. The la er method has only recently been introduced and
represents limited material processed in recent years.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202328
-- 283 of 363 --
• The As Mined grades and tonnages could include some addi onal dilu on and ore loss rela ve to the planned mine design.
• Differences between the Pinjarra (inspected and validated by SLR, see Sec on 8.5.3.8) and Wagerup sampling towers.
Incremental reconcilia on improvements appear to have commenced around 2010, which may reflect an improvement in data quality (drilling and
assaying procedures) around this me. Consequently, Mineral Resources using data collected prior to approximately 2010 are considered to be of lower
confidence and the classifica on of resource models constructed from this data has been downgraded accordingly.
Reconcilia on data in recent years falls within acceptable limits on an annual basis to support the classifica ons used for repor ng of Alcoa’s Darling
Range Mineral Resource.
Figure 11-17: Resource versus Sample Plant Reconcilia on – Huntly (SLR, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202329
-- 284 of 363 --
Figure 11-18: Resource versus Sample Plant Reconcilia on – Willowdale (SLR, 2022)
11.13 Mineral Resource Es ma on Risk
The es ma on of Mineral Resources for any commodity, including bauxite, is subject to significant risks, including those described below and
elsewhere in the discussion of risks associated with mining and processing of bauxite to produce alumina (see Sec on 12.8). An investor should
carefully consider these risks. If any of the described risks occur, the Darling Range bauxite mining and processing business, financial posi on and
opera onal results could be materially affected adversely.
The purpose of Technical Report Summaries issued under S-K 1300 and other similarly purposed Interna onal Codes (JORC, 2012; NI 43-101, 2014) is to
ensure that known risks are disclosed by the QP subject to expecta ons of Transparency, Materiality and Competency. This Technical Report Summary
addresses the technical risks associated with the Geology, Sampling, Assaying, Data Management in Sec ons 6.0 to 9.0 and Mineral Resource
Es ma on in Sec on 11.0. The QP considers that no material technical risks are iden fied in those Sec ons.
The risks described below are not comprehensive and there may be addi onal risks and uncertain es not presently known, for example due to market
or technology changes, that are currently deemed immaterial but may also affect the business. The QP considers that the following risks specifically
pertain to the Mineral Resources declared for Alcoa’s Darling Rang opera ons.
11.13.1 Specific Iden fied Risks
• Con nuous improvement of all aspects of Alcoa’s resource delinea on programs means that, changes have been incremental as refinement
to previous procedures. Thus, es mates for the majority of the Mineral Resources are essen ally variants of those devised in the late 1980s
and early 1990s and are not consistent with current conven onal prac ces. This is reflected in the large tonnage of Inferred Resources
declared. The demonstrated successful opera on of the Alcoa opera ons over an extended period indicates that it is unlikely that any
aspects of the data collec on and resource delinea on process are significantly flawed, although there are recognized shortcomings.
• Drill sampling is essen ally the extrac on of small volumes of material taken to be representa ve of the large tonnages being es mated.
There are always local errors of precision and may be bias that is not recognized. Robust sample prepara on and geosta s cal es ma on
are used to iden fy and overcome these errors, backed up by closed-loop reconcilia on with the stockpile tower samplers. These systems
may not iden fy changes in the underlying geology or other data as the area to be delineated expands over me.
• The Mineral Resource es mates may not contain adequate or relevant data if the bauxite is supplied to other refineries, or if processing
methods change, or some new analyte is required.
• The older ResTag and GSM es ma on procedures, which represent the bulk of the Inferred Mineral Resources, are rela vely inflexible, and
may not contain the level of detail necessary to adequately support mining op miza on studies. This has been largely addressed by the
recent move to 3DBM resource es ma on techniques, which more easily enable the prepara on of models that contain sufficient
resolu on and detail to support conven onal mining op miza on studies. These models will allow incremental improvements to address
any challenges in mee ng target grade specifica on, resolving reconcilia on issues, or tailoring the es ma on
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202330
-- 285 of 363 --
parameters and procedures to prepare models that be er reflect local changes in mineraliza on characteris cs. The 3DBM modelling
procedures offer more flexibility in modera ng any adverse effects of sampling imprecision compared to the older procedures and in
producing grade tonnage curves to meet various impurity constraints (when modelled).
• Further advances in geosta s cal es ma on may be expected including more use of direc onal anisotropy (through variograms), and
condi onal simula on to quan fy es ma on risk and op mize drill sampling grids.
• A comprehensive program is required to resolve the issue of density es ma on. Es mates in the resource models use a simplis c linear
regression algorithm for iron rich material based on very few data, and otherwise assumed values. This deficiency is overcome by
reconcilia on of tonnages of material fed to stockpiles and the subsequent adop on of a downgrading factor (currently 5%) to account for
differences to the model es mated density. Technology now becoming available, including volume surveys using drones and truck gantry
scanning, wet mass measurement using weightometers on conveyors and LoadRite sensors on mining equipment, and infra-red moisture
determina on, mean that be er in situ dry density es ma on may become possible if the opera on requires it for be er refinery feedstock
control.
• The grade characteris cs of the bauxite profile could be reproduced in the model, enabling op miza on techniques to be used for the
defini on of mining floors and boundaries, be er support for ore loss and dilu on studies, and more accurate reconcilia on studies.
• There is currently significant reliance upon the sample plant results for produc on scheduling and blending, as well as for assessing the
reliability of the Mineral Resource es mates.
The current drill sampling methods have been improved over me, based on independent review, and the requirements for minimum impact on the
Darling Range. The assaying methods, including the use of FTIR, have been comprehensively reviewed and validated. The geosta s cal es mates of in
situ dry tonnages and grades are reasonable and validated by comprehensive reconcilia on. The SLR QP considers that these methods are appropriate
to produce the declared Mineral Resources and Mineral Reserves.
11.13.2 Generic Mineral Resource Uncertainty
• Es mates of Measured and Indicated Mineral Resources are uncertain. The volume and grade of ore actually defined from these as Mineral
Reserves is not predictable un l mine planning is done to account for all the iden fied Modifying Factors. Forecasts based on the current
transfer price of bauxite, current interpreta ons of geological data obtained from drill holes, and other informa on regarding the Modifying
Factors, may not necessarily be indica ve of future results. A significantly lower bauxite transfer price as a result of a decrease in aluminum
prices, increases in opera ng costs, reduc ons in metallurgical recovery, or other changes to the Modifying Factors, could result in material
write-downs of the value of the Darling Range mines.
• Should changes be required due to exigent circumstances, it may take some years from explora on un l commencement of produc on,
during which me the economic feasibility of produc on may change.
• Alcoa cannot be certain that any part or parts of a deposit or Mineral Resource es mate will ever be confirmed or converted into
Regula on S-K Subpart 1300 compliant Mineral Reserves or that mineraliza on can in the future be economically or legally extracted.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202331
-- 286 of 363 --
To ameliorate such risks the Mineral Reserves declara on is limited to material for which extrac on is currently planned within the next ten-year
planning cycle. The Mineral Resources excluding Mineral Reserves indicate the likely poten al beyond that me frame, given all the limita ons on
future knowledge outlined above.
11.14 Classifica on
11.14.1 Considera on of Classifica on by the QP
Defini ons for resource categories used in this report are those defined by the SEC in S-K 1300. Mineral Resources are classified into Measured,
Indicated, and Inferred categories.
Mineral Resource classifica ons have been applied to the various resource models based on considera on of the quality and quan ty of the input data,
confidence in the geological interpreta on, and confidence in the outcomes from the various es ma on methods. Factors that impact the Mineral
Resource classifica ons are summarized below.
• Sampling: Alcoa has introduced incremental improvements to their drilling, sampling, sample prepara on and assaying procedures since
2015. The sample collec on procedures are efficient and op mized to rou nely produce large numbers of drill samples and assays
consistently that are considered to be fit for purpose.
• Sample prepara on: rou ne sample prepara on using a robo c facility which rou nely provides an appropriate grind size for samples.
• Assays: the FTIR spectral method is rou nely used for all analytes, calibrated and validated with wet chemical Reference Method samples at
a frequency of 1:100. The QP has inves gated this procedure and considers that appropriate assays and controls are used for the purpose
of Public Repor ng of a Mineral Resource es mate.
• QA/QC: Quality assurance and quality control procedures have been incrementally improved since 2015. Further systema c refinements of
these are expected to enable more data to be rou nely collected, but the accuracy and precision demonstrated in Sec ons 8.5.2 and 8.5.3
respec vely are not expected to change.
• Density data: The dry in situ bulk density test work data is sparse and not appropriate for the reliable es ma on of tonnages. Based on test
work from 1992 a simple algorithm using the Fe2O3 grade for Caprock and an assumed value of 2.0 t/m³ for all other ore fed to the
refineries has been used. Reconcilia ons have determined a consistent overes ma on of 5%, and a moisture content of 9% provide reliable
predicted tonnage es mates over an extended period of opera on. In the opinion of the QP the variable nature of the bauxite, especially
the porosity, means that any alterna ve sampling method is unlikely to produce be er es mates. Accordingly, the density values applied
are not considered a limi ng factor for resource classifica on.
• Drill spacing: Drill hole spacings in the Darling Range vary from 15 m by 15 m up to 120 m by 120 m, with Mineral Resources only declared
where drill hole spacings are ≤60 m by 60 m.
• Geological interpreta on: The regional geology of the Darling Range project is well understood with bauxite mineraliza on suppor ng
mining and processing opera ons since the 1960s. Controls on the mineraliza on and the mineralogical and physical proper es of the
Bauxite Zone
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202332
-- 287 of 363 --
are well understood and have been adequately incorporated into the Mineral Resource modelling procedures.
• Grade con nuity: Grade and lithological con nuity studies are rou nely conducted by Alcoa for the 3D block models. Variography studies
conducted by Alcoa were supported by independent review (Xstract, 2016; SRK 2021a) and indicate that grade and lithological con nuity
can be demonstrated at the drill spacings suppor ng the Mineral Resource classifica on.
• Grade es ma on: 64% exclusive Mineral Resource has been defined using polygonal techniques that can be prone to es ma on bias.
Consequently, irrespec ve of the drill hole spacing all es mates based on the Polygonal Method are considered to be of low confidence for
local es mates and have been downgraded rela ve to 3DBM es mates. GSMs are only constructed using 15 m by 15 m spaced drill hole
data, and although previously used to support Measured Mineral Resources, has been replaced by the 3DBM method, which as
implemented by Alcoa aligns with industry best prac ce.
• Reconcilia on data: Annual reconcilia on between mined ore based on the Mineral Resource es mates and received material on the
refinery stockpiles (sampled by the sampling towers) show rela ve differences for both Huntly and Willowdale of within ± 15% for tonnes
and all analytes (except SI) since 2010. Reconcilia on performance prior to 2010 for some analytes exceeded ± 15%, cas ng doubt on the
reliability of some data and models prior to that date. It is not possible to reconcile blended produc on data to individual resource models.
• Produc on history: The integrated bauxite mining and alumina refining is based on appropriate data to ensure long-term supply and short-
term management of the ore feed to the mine mouth refineries. The long produc on history demonstrates effec ve predic on and control
of refinery performance.
The QP considers the primary controlling factors for the classifica on of the Mineral Resource es mates for the Darling Range Bauxite to be drill hole
sample spacing, the quality of data collected, and the resource modelling technique. A 5% tonnage reduc on factor is used in the repor ng of Mineral
Resource tonnages to account for the consistent annual reconcilia on outcomes.
11.14.2 Methodology
The primary considera on for classifica on is confidence in the resource es mate. The Mineral Resource es mate for Darling Range is produced by
aggrega ng many different models, produced using data of different quali es at different drilling densi es, modelled using different es ma on
procedures.
A drill hole spacing study aimed at quan fying the differences in the reliability of local es mates with different drill spacings was undertaken by SRK
(2019a) using a similar approach to Alcoa’s 3DBM procedures. The SRK study concluded that drill spacings of 30 m by 30 m and 60 m by 60 m were
adequate to support the delinea on of Measured and Indicated Resources respec vely, provided that none of the other limi ng factors discussed
above were applicable.
The QP considers, on the basis of the previously discussed acceptable sampling and assaying quality, that this drill hole spacing study and other
knowledge jus fies:
• The classifica on of Measured where such data is on a 30 by 30 m grid. However where the es ma on method is gridded seam modelling
(GSM) rather than current industry standard 3D block modelling (3DBM) the Measured material is downgraded to Indicated, unless it is on
a ghter drilling grid of 15 by 15 m. The addi onal data density overcomes any deficiency of the
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202333
-- 288 of 363 --
GSM method. Some of the defined Measured material es mated using a significant amount of older (pre-2010) drill sampling was also
downgraded to Indicated, reflec ng the lower confidence in that older drilling data, since data quality (due to drilling, sampling and
assaying procedures) has been upgraded since then.
• Furthermore, based on the same principles (data quality, drilling study, es ma on procedures), 60 by 60 m drilling and 3DBM es ma on is
the basis for classifica on as Indicated. Es ma on using the GSM or Polygonal method was allowed as Indicated where the drill spacing was
on a ghter grid of at most 30 by 30 m. The addi onal data density is considered to overcome the similar deficiency of both these
es ma on methods, which because of the data configura on are similar to a nearest neighbor es mate.
• All Measured and Indicated material already has mining constraints applied, effec vely ensuring that reasonable prospects for economic
extrac on are assured should other required economic viability constraints obtain.
• Where the data spacing is 60 by 60 m and the es ma on method is Polygonal the resource es mate is classed as Inferred.
There is a large tonnage es mated of Inferred Resources, partly due to the sufficiency of the current Proven and Probable Mineral Reserves for the ten
year mine planning horizon and the immediate availability of addi onal Measured and Indicated Mineral Resources (reported exclusive of Reserves) to
replace them. Further Measured and Indicated Resources may be defined when required from the established Inferred Resource in me, given more
closely spaced drilling, es ma on using 3DBM techniques, and the further applica on of cut-off grade and mining criteria.
Resource classifica on criteria are applied in the horizontal plane and so are consistent for the en re Bauxite Zone ver cal profile. Thus, interpreta on
of the roof and floor of the Bauxite Zone are implicitly assumed to be of similar confidence. In some areas the geological floor may be erra c for
Polygonal models and of lower confidence than the roof, but these areas are typically excluded when mining constraints are applied to the GSM and
3DBM resource models.
An example of the resource classifica on approach is shown in Figure 11-19. Resource classifica on polygons are created for areas of 15 m, 30 m, 60 m
and >60 m parts of the deposit. Note that these polygons can include small areas where the gaps between drill holes are at the next spacing increment.
These polygons are then used to assign resource classifica ons for the full ver cal profile of the Bauxite Zone.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202334
-- 289 of 363 --
Classification Polygons block classifications
Figure 11-19: Plan View of Resource Classifica on (SLR, 2021)
11.14.3 Applica on of Classifica on Criteria by the QP
The following classifica on criteria have been applied to the Mineral Resource es mates:
• Measured Resources - areas es mated using:
o 15 m by 15 m drill data and GSM or 3DBM es ma on procedures; and
o 30 m by 30 m drill data and 3DBM es ma on procedures.
• Indicated Resources - areas es mated using
o 30 m by 30 m drill data and es mated using GSM, or Polygonal procedures;
o 60 m by 60 m drill data and es mated using 3DBM procedures; or
o mee ng the Measured criteria but es mated using a significant amount of pre-2010 drilling data.
• Inferred Resources - areas es mated using:
o 60 m by 60 m drill data and es mated using Polygonal procedures.
11.15 Mineral Resource Repor ng
Key refinery target grade requirements for AL, SI, and OX along with prac cal mining considera ons have been taken into account when defining
resource blocks using GSM and 3DBM modelling methods. Polygonal resource models do not account for mining constraints other than a 1.5 m
minimum thickness.
ML1SA contains some sub-regions for which mining permission has not been granted, due to forestry, environmental, social or other constraints, and
Mineral Resources have not been defined in these areas by constraining the Mineral Resource model using the ArcGIS system.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202335
-- 290 of 363 --
For Mineral Resource repor ng, the block tonnage es mates have all been reduced by 5% on the basis that:
• the reconcilia on data at both Huntly and Willowdale indicate that the As Mined tonnage es mates over the past 20 years have been
consistently higher than the stockpile received tonnages a er the sampling tower by approximately 5%; and
• the stockpile es mates are derived from weightometer readings, and the weightometers are regularly checked and calibrated.
11.15.1 Mineral Resource Es ma on
A summary of the Mineral Resource es mates (exclusive of Mineral Reserves) for the three ML1SA mining regions is shown below.
Table 11-5: Summary of Darling Range Mineral Resources exclusive of Mineral Reserves by Mining Region – 31st December 2022
Category Mine Tonnage (Mt) A.Al2O3
(%) R.SiO2 (%)
Measured
Huntly 26.2 30.48 1.19
North 0.0 0.00 0.00
Willowdale 18.7 32.15 1.09
Sub-total 44.9 31.17 1.15
Indicated
Huntly 44.4 31.59 1.16
North 0.8 32.26 1.38
Willowdale 6.6 29.95 1.25
Sub-total 51.8 31.40 1.17
Measured +
Indicated
Huntly 70.6 31.18 1.17
North 0.8 32.26 1.38
Willowdale 25.2 31.58 1.13
Sub-total 96.7 31.29 1.16
Inferred
Huntly 44.5 34.74 1.39
North 15.1 31.62 1.00
Willowdale 80.6 32.17 1.24
Sub-total 140.3 32.93 1.26
Notes:
1. The defini ons for Mineral Resources in S-K 1300 were followed, which are consistent with JORC (2012) defini ons
2. Mineral Resources are 100% a ributable to AWAC
3. Mineral Resources are es mated at a geological cut-off grade, which generally approximates to nominal cut-off grades of 27.5% A.Al2O3 with less than 3.5% R.SiO2.
Locally the cut-off grade may vary, dependent on opera ng costs and ore quality for blending. The target grade for mine planning is 32.7% available aluminum oxide
(A.Al2O3) and 1.0% reac ve silica (R.SiO2)
4. Mineral Resources have been es mated using a bauxite transfer price of USD16/t, as described in Sec on 11.11.
5. A minimum total mining thickness of 1.5 m was used
6. In situ dry bulk density is variable and is defined for each block in the Mineral Resource model
7. A global downwards adjustment of tonnes by 5% is made to account for density differences based on historic mining performance
8. Mineral Resources are reported exclusive of Mineral Reserves
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202336
-- 291 of 363 --
9. The reference point for the Mineral Resource is the in situ predicted dry tonnage and grade of material to be delivered to the refinery stockpile following the applica on of
mining design parameters
10. Metallurgical recovery has not been directly considered in the es ma on of Mineral Resources as the Darling Range opera ons do not include a conven onal processing
plant, only crushing as described in Sec on 14.0. The metallurgical recovery of the three refineries (Kwinana, Pinjarra and Wagerup) are beyond the boundaries of the
mining opera ons being the subject of the TRS.
11. Numbers may not add due to rounding.
Compared with December 31, 2021, the Measured and Indicated Mineral Resources (exclusive of Mineral Reserves) increased 17%, from 82.8 Mt, and
the Inferred Mineral Resources decreased 56%, from 320 Mt. Changes from 2021 are due to the migra on from polygonal and GSM models to the 3D
block models, which upgraded the Resources category from Inferred to Measured and Indicated, and consequently it was converted to Reserves by the
mine planning work. The A.Al2O3 average grade decreased 4% to the Measured and Indicated Resources and had a slight decrease for the Inferred
Resource. R.SiO2 increased 4% and 5% in the Measured and Indicated Resources, and in the Inferred Resource, respec vely.
11.16 QP Opinion
In the opinion of the QP the Mineral Resource classifica on scheme adopted by Alcoa and accepted by the QP is appropriate in defining expected
rela ve confidence of the Mineral Resource in compliance with the S-K 1300 defini ons as follows:
• All sampling, sampling prepara on, assaying and database management prac ces are compliant with current industry good prac ce and no
fatal flaws were iden fied for all material classed as Mineral Resource
• Appropriate industry good prac ce geological modelling techniques and variography are used to establish geological and grade con nuity
from appropriately spaced drill holes
• Industry standard es ma on techniques (3D block modelling or seam block modelling) are used for all Measured and Indicated Mineral
Resources using appropriate drill spacings
• Appropriate drill spacings, grade con nuity and geological con nuity are used to define higher confidence material as Measured Mineral
Resource.
In the QP’s opinion the modelling work completed to date is appropriate for purpose, and that following considera on of various technical and
economic factors the condi ons of Reasonable Prospects For Economic Extrac on are met, including in par cular through constraining the Mineral
Resource model using the ArcGIS system, by ensuring that the model defines key parameters for the refinery, and by sound reconcilia on prac ces
reincorpora ng feedback into the geological model.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202337
-- 292 of 363 --
12.0 MINERAL RESERVE ESTIMATES
12.1 Summary
A Mineral Reserve has been es mated for Alcoa’s Darling Range bauxite mining opera ons in accordance SEC S-K 1300 defini ons which are consistent
with the guidelines of the Australasian Code for Repor ng of Explora on Results, Mineral Resources and Mineral Reserves (The JORC 2012 Code).
The QP inspected the Alcoa Huntly opera ons on October 28th, 2022 and Willowdale on November 1st, 2022. Alcoa’s Mine Planning department was
visited November 2nd, 2022, interviewing relevant personnel on these dates and on other occasions. A full account of the site visit to the mines, offices
and the refineries is provided in Sec on 2.1.
The Mineral Reserve is classified with reference to the classifica on of the underlying Mineral Resource and with reference to confidence in the
informing Modifying Factors. The QP considers the Proven and Probable classifica on to be appropriate to the deposit and associated mining
opera ons.
The reference point for the Mineral Reserve is prior to the processing plant at the refinery.
The Proven Mineral Reserve is a subset of Measured Resources only. The Proven Mineral Reserve is within a current mining region and is included in
the Ten-Year Mine Plan.
The Probable Mineral Reserve is es mated from that part of the Mineral Resource that has been classified as Indicated or from Measured Resources
that are outside the current mining regions.
Variable cut-off grades are applied in es ma on of the Mineral Reserves, and these are related to opera ng cost and the nature of the Mineral
Resource in rela on to blending requirements. The Mineral Reserve es mate is expressed in rela on to available aluminum oxide (A.Al2O3) and
reac ve silica (R.SiO2), this being the cri cal contaminant in rela on to the Refinery.
Table 12-1: Summary of Darling Range Mineral Reserves – Effec ve 31st December 2022
Region Class Tonnage (Mt) A.Al2O3 (%) R.SiO2 (%)
Huntly
Proven 71.2 30.0 1.36
Probable 180.3 32.4 1.20
Total 251.5 31.7 1.25
Willowdale
Proven 74.7 32.7 0.98
Probable 75.4 32.5 1.02
Total 150.1 32.6 1.00
Total
Proven 145.8 31.4 1.17
Probable 255.8 32.4 1.15
Total 401.6 32.1 1.15
Notes:
1. The defini ons for Mineral Reserves in S-K 1300 were followed, which are consistent with JORC defini ons.
2. Mineral Reserves are stated on a 100% ownership basis for AWAC although Alcoa Corpora on’s share is 60%.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 293 of 363 --
3. Mineral Reserves are es mated at variable cut-off grades, dependent on opera ng costs and ore quality for blending. The target grade for mine planning is generally 32.7%
available aluminum oxide (A.Al2O3) and around 1.0% reac ve silica (R.SiO2) but this may vary locally.
4. Mineral Reserves have been es mated using a LOM price of $21/t represen ng an average arms-length sale of bauxite from Darling Range. The price that constrains the
es mate for op miza on was discounted to exclude export logis cs costs, i.e. the base price was $21/t, and the discounted price was $16/t.
5. Minimum mining widths are not used due to the surficial nature of the Mineral Resource, rather a minimum mining block size of 15m by 15m by 1m deep is applied.
6. The reference point for the Mineral Reserve is the refinery processing plant gate, with crushing, washing (as applicable), and transporta on being the only process
employed. As such metallurgical recovery factors are not applicable to the Mineral Reserve es mate.
7. Bulk density is variable, dependent on the nature of the Mineral Resource and is separately es mated in the Mineral Resource model.
8. Numbers may not add due to rounding.
The QP is not aware of any risk factors associated with, or changes to, any aspects of the Modifying Factors such as mining, metallurgical,
infrastructure, permi ng, or other relevant factors that could materially affect the Mineral Reserve es mate.
The QP considers that the accuracy and confidence in the Mineral Reserve es mate to be appropriate for the classifica on applied, which is supported
by both the conserva ve opera onal processes and the long opera onal history.
The Modifying Factors are summarized as follows:
• Only Measured and Indicated Mineral Resources are considered.
• Only mineraliza on defined in mine planning work has been considered. This includes Measured and Indicated material, subject to the
applica on of mining Modifying Factors.
• Mineral Resources not scheduled for mining in the current Ten-Year Mine Plan are not considered.
• Indicated Mineral Resources are classified as Probable Mineral Reserves, subject to the Modifying Factors and mine scheduling constraints.
• Measured Mineral Resources are classified as Proven Mineral Reserves or Probable Mineral Reserves, subject to the Modifying Factors and
mine scheduling constraints.
12.2 Modifying Factors
A Mineral Reserve is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes dilu ng materials and allowances
for losses, which may occur when the material is mined or extracted and is defined by applica on of Modifying Factors that demonstrate that, at the
me of repor ng, extrac on could reasonably be jus fied.
• Mining – Alcoa’s Darling Range mining opera ons are conven onal open pit mines and have been opera ng for a long me. The
prac cali es of mining and associated sustaining capital and opera ng costs are well understood and have been incorporated in Alcoa’s
technical assessments to the sa sfac on of the QP. For a more substan ve descrip on of Alcoa’s Darling Range mining opera ons, refer to
Sec on 13.0. The mining schedule is discussed further in Sec on 12.5.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 294 of 363 --
• Processing – This Mineral Reserve is stated with reference to the refinery processing plant gate, with crushing and conveying being the sole
processes employed. Bauxite is refined to alumina in the refinery using the Bayer process, which has been employed at the Darling Range
opera ons for many years and a transfer price is used by Alcoa in its assessment of its mining opera ons. The QP is sa sfied that the
transfer price reasonably incorporates the costs associated with processing of the bauxite ore. For a more substan ve descrip on of Alcoa’s
Darling Range processing opera ons, refer to Sec on 14.0.
• Metallurgy – The mining opera ons are given an ore specifica on by the sole customers, the refineries. Blending is undertaken at the pit,
before the crusher, to ensure that these specifica ons are met. The QP is sa sfied that the procedures employed by mining technical staff
have been developed over a lengthy period and are appropriate for the suppression of metallurgically deleterious material in ore sent to
the refineries. For a more substan ve descrip on of Alcoa’s Darling Range metallurgy, refer to Sec on 10.0.
• Infrastructure – The QP has observed the Darling Range infrastructure to be well established, maintained and to a high standard. The
opera ons are located near a major city, with excellent transporta on, facili es, and workforce. Provision is made in Alcoa’s Life of Mine
(LOM) plans for sustaining capital for infrastructure replacement. For a more substan ve descrip on of Alcoa’s Darling Range infrastructure,
refer to Sec on 15.0.
• Economic – Revenue for the mines is premised on a transfer price for bauxite ore at the refinery gate. Mining costs are well understood, as
the mines have been operated for a long me. The QP is sa sfied that the pit op miza on, scheduling, and analysis undertaken by mine
technical staff is appropriate to the opera on and that the costs are well understood. For a more substan ve descrip on of Alcoa’s Darling
Range economics, refer to Sec on 19.0.
• Marke ng – All bauxite is sold to Alcoa’s Darling Range refineries, the sole customer for the mines. The refineries produce alumina, which is
variously further refined into aluminum metal at Alcoa’s aluminum plants or exported. Alumina and aluminum are interna onally traded
commodi es and subject to normal market forces and cycles. For a more substan ve descrip on of Darling Range’s market aspects, refer to
Sec on 16.0.
• Legal – The QP observes that the Darling Range opera ons have been in opera on for a long me and are licensed in rela on to obliga ons
under Western Australian legisla on. Mining approval for the Darling Range opera ons is given by the statutory Mining and Management
Program Liaison Group (MMPLG). The MMPLG consists of representa ves from across government and is responsible for reviewing mine
plans and associated ac vi es and making recommenda ons to the Western Australian Minister for State Development.
• Environmental - The QP observes that the Darling Range opera ons have a long history of progressive rehabilita on of mined-out areas.
There are restric ons placed on some mining areas that are related to proximity to water catchments, places of social importance and
fauna habitat. Opera on under these condi ons is by approval of the MMPLG. For a more substan ve descrip on of Alcoa’s Darling Range
environmental obliga ons, refer to Sec on 17.0.
• Social – The QP observes that the Darling Range opera ons have long been a major employer and economic contributor to the region and
that the opera ons have numerous well-established community and social ini a ves. A skilled workforce resides in the area, as do many
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 295 of 363 --
service industries. The QP does not consider social risk to be material to the Darling Range opera ons.
• Governmental – Western Australia and Australia in general are stable, developed democracies with an advanced economy. Governmental
rela ons with the Darling Range opera ons are managed by the MMPLG, which has representa on from the relevant government
departments. The QP does not consider governmental risk to be material to the Darling Range opera ons.
12.3 Basis of Es mate
Historically, Alcoa did not report material in the Measured Mineral Resource category, repor ng mineraliza on in areas of 15 m by 15 m spaced drilling
as Mineral Reserves reported to the prior SEC standard. Alcoa has subsequently incorporated S-K 1300 and JORC Modifying Factor considera ons into
its mine planning processes and this was observed and confirmed on site.
The QP has used the December 31, 2022 Mineral Resource es mate as the basis for its Mineral Reserve es mate. The bauxite opera ons are opera ng
mining projects with a long history of produc on for which establishment capital has been repaid and for which sustaining capital and supported
opera ng costs have been observed to be applied in economic analysis. Consequently, the QP considers that support by a Feasibility Study is
demonstrated by the demonstrable history of profitable opera on and the level of technical support for the Modifying Factors and Front-End Loading
(FEL 2), or pre-project planning study, for the recent major Myara capital crusher move. The QP has reviewed the opera ng and planning procedures
and parameters for the opera ons, and considers that the work completed is sufficient to allow defini on of Mineral Reserves.
Proven Mineral Reserves are derived from scheduled Measured Mineral Resources which are located within the current mining regions of Myara and
Larego. Probable Mineral Reserves are derived from scheduled Measured Mineral Resources which are located outside the current mining regions, or
from scheduled Indicated Mineral Resources. The Mineral Resource es mate reported in this document (Sec on 11.0) is exclusive of the Mineral
Reserve.
Consequently, Modifying Factors that relate to community and environmental considera ons are formally assessed. The QP considers that as a result
there is low risk to not establishing Proven Reserves rela ng to the project.
The Probable Mineral Reserve has been defined by 15 m by 15 m drilling. Applica on of the Modifying Factors is consistent with Proven Reserves.
The QP has formed an independent view of the Modifying Factors applied in the es ma on of the Mineral Reserve. This view is supported by
examina on and verifica on of mine planning data and procedures and historic reconcilia on informa on. The QP has interviewed technical staff
responsible for Alcoa’s opera ons and reviewed the opera ng, planning and forecast reports for the opera ons supplied by Alcoa.
The mine planning process excludes mineraliza on that is not considered recoverable due to various constraints, defining no Mineral Resource or
Mineral Reserve within these zones. Such constrained zones include Aboriginal heritage sites and old-growth forest; however, are proac vely and
dynamically updated by Alcoa through engagement with stakeholders, such as the community, and in response to government requests.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 296 of 363 --
12.4 Dilu on and Ore Loss
Dilu on and ore loss are not reported separately to the Mineral Reserve. Internal and edge dilu on is modelled at the mine planning stage through the
applica on of 15 m by 15 m mining blocks to the Mineral Resource model. These regularized blocks contain propor onal es mates of ore and
contaminants and are op mized through the applica on of a Lerchs-Grossman algorithm developed specifically for the opera on. This varia on of the
conven onal Lerchs-Grossman algorithm is applied ver cally, given that the shallow nature of the mineraliza on precludes geotechnical
considera ons. Blocks that do not sa sfy grade and contaminant parameters against revenue are thus excluded from the mine plan.
Mining dilu on is controlled by excava on of dilu on at the top of the mineraliza on (a source of oxalate or organic contamina on) and the pit floor
(R.SiO2 contamina on). The upper contact is a sharp geological contact on an undula ng surface. GPS-controlled machinery is used to locate these
intersec ons.
Figure 12-1: Undula ng Hanging Wall Hardcap Surface; and Footwall (white clay, lower right in the floor) (Le : Pearman, 2015 & Right: SLR, 2021)
Organic material reacts with sodium hydroxide in the refinery to form oxalate, which is considered to be a contaminant. Alcoa has developed a process
known as Secondary Overburden Removal (SOBR) whereby the soil and clay on top of the hardcap that covers the mineraliza on and contains this
organic material is removed by either scraper, surface miner or small excavator. This removes as much carbonaceous material overlying the undula ng
hardcap layer as possible. Further descrip on of SOBR is given in Sec on 13.1.
A surface miner is employed as required at the Huntly mine to cut highly contaminated overburden to the hardcap contact. Historically, this results in a
2.9% ore loss, which is considered in the Mineral Reserve es ma on.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 297 of 363 --
The lower mineraliza on contact is grada onal, and dilu on is minimal on contaminants other than R.SiO2. This contact is defined through drilling and
chemical analysis and excava on is controlled by GPS to modelled surfaces.
The Grade Control process checks the accuracy of excava on and assesses adherence to excava on of the target floor.
12.5 Extrac on and Mine Planning
12.5.1 Ten-Year Mine Plan
Alcoa prepares a Ten-Year Mine plan annually. The first five years of this plan is submi ed to the statutory MMPLG for approval of mining areas. The
Ten-Year Mine Plan includes a mine produc on schedule that demonstrates scheduling of mineraliza on classified as Mineral Resources for es ma on
as Mineral Reserves. This schedule contemplates higher confidence Mineral Resources during the early produc on periods, with lower confidence
mineraliza on planned in subsequent periods (Figure 12-2 and Figure 12-3).
The schedule has several opera onal parameters in addi on to statutory limita ons (refer Sec on 12.2 above):
• The mineraliza on lies under haul roads and extrac on is delayed un l the road is no longer required.
• Mineraliza on is near a planned crusher loca on and mining has been delayed un l the crusher is installed.
• Contaminants exclude a parcel from blending in the schedule.
• The mining areas are small and demonstrate low mining efficiency and mining has been delayed.
Confidence in the Mineral Reserves is predicated on confidence in the underlying Mineral Resources in the mining schedule. Con nuous Mineral
Resource defini on drilling maintains an inventory of sufficient confidence to maintain Mineral Reserves.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 298 of 363 --
Figure 12-2: Willowdale Fi een-Year Mine Plan Resource Confidence (drill hole spacing in meters shown in brackets) (Alcoa, 2022)
Figure 12-3: Huntly Fi een Year Mine Plan Resource Confidence (drill hole spacing in meters shown in brackets) (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 299 of 363 --
12.5.2 Mine Planning
Alcoa has been ac vely refining the mine planning process in such a way that the Mineral Resource and Mineral Reserve Models are updated
con nuously using various scripts and a ra onalizing of computer so ware. This process is mostly complete, the QP observed its progress both on the
mine sites and at the Booragoon mine planning office.
The mine planning process commences with receipt by the mine planning department of the regularized and classified electronic Mineral Resource
model from the geologists. The regulariza on process sees the Mineral Resource blocks agglomerated into blocks of 15 m by 15 m by 0.5 m ver cally.
Grade, bulk density and contaminant parameters are es mated into the model, which is expressed as a percentage model. This model is then manually
checked and validated.
Electronic files are centrally stored, and the master versions are copied by relevant personnel for manipula on.
Op miza on of the pits is undertaken using a bespoke variant of the Lerchs-Grossman algorithm designed to operate ver cally. The algorithm
accumulates blocks ver cally on 0.5 m increments to find the pit floor.
The op miza on is driven by Net Present Cost (NPC), rather than the conven onal Net Present Value (NPV) due to the presence of a flat transfer price
for product at the refinery gate.
Geotechnical constraints are not relevant, given that the pits are generally around 4 m in depth and placed on gently undula ng country (Sec on 7.9).
Contour mining is applied in areas of greater topographic relief, whereby mining progresses across the contour, maintaining as consistent a pit floor as
possible.
Op miza on parameters are calculated for each block, including costs associated with drilling, blas ng and ripping and haulage cost, which is
es mated from major haulage roads and minor pit access roads against gradient. Electronic surface models are prepared to constrain the op miza on;
these are informed by LiDAR radar surveys and model the topography, the base of overburden and the base of mineraliza on, derived from chemical
analysis of resource defini on drilling samples. Caprock requires drilling and blas ng, and modelled surfaces are contoured for thickness, which is
derived from examina on of drill logs and high-Fe assays.
Pit shells are visually assessed for prac cality and minimum mining widths and any imprac cal pit shells removed. Minimum mining widths vary
according to topography and material type.
Individual areas are op mized separately, and the resultant pit shells are combined to provide grade and contaminant specifica ons for Life of Mine
(LOM) scheduling. Haul roads are divided into 50 m segments with appropriate cost increments applied to each segment using commercial haul road
op miza on so ware. This process electronically tags each block with haulage cost informa on as a func on of distance of the relevant node (haul
road) from the nearest crusher. The so ware then normalizes the data by calcula ng the equivalent flat haul distance, maintaining a gradient of less
than 8% for all nodes.
The model is then depleted for mined material and blocks that have been otherwise commi ed for development or have been mined out and also for
environmental constraints.
Environmental constraints include proximity to streams, designated heritage areas (both Aboriginal and European) and the water catchment offset. GIS
so ware is used to con nuously generate electronic
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20238
-- 300 of 363 --
shape files that are converted daily to string files for import into the mine design so ware. These are then used to deplete the model in rela on to
environmental constraints.
Mineraliza on that has been iden fied as being under infrastructure is scheduled for mining only a er that infrastructure has been removed in the
LOM plan.
Noise zones are those where noise from the mining opera ons will poten ally exceed allowable levels and the opera on ac vely seeks to maintain
lower noise levels than those mandated. Mining in these areas is undertaken by contract miners using smaller equipment on day shi only and a racts
higher costs than conven onal owner-operator mining, which is applied to most of the opera on.
The regularized model is then coded for the above parameters and checked. All the above processes are logged, checked and validated both
electronically and visually. Electronic scripts are then run in the mine planning so ware, resul ng in the repor ng of Mineral Reserves.
Revenue for the Lerchs-Grossman op miza on is applied as a transfer price obtained from Alcoa’s Financial Department. This revenue is related to the
export price gained for refined alumina and is related to penal es for reac ve silica content. Current revenue is around $21/t. The op miza on uses
$0.48 per unit alumina based on the average grades that are agreed with the refineries. A discount rate of 12.25% is mandated by the Finance
Department and applied to the NPV scheduler during the mine planning process. The price that constrains the es mate for op miza on was
discounted to exclude export logis cs costs, i.e., the base price was $21/t (updated annually to reflect a reasonable market expecta on of arms-length
sales of bauxite from Darling Range), and the discounted price was $16/t.
The QP notes that costs and revenues used in this process demonstrate a slow movement over me and that revenue has remained constant over the
past year.
In prac ce, the Grade Control Model is used to direct mining at the bench scale, because it has more up-to-date drilling data than the Mineral Resource
Model. Reconcilia on is undertaken between the Mineral Resource, Mineral Reserve and Grade Control Models, with the QP observing the
reconcilia ons between Mineral Resource and Grade Control Models to be within acceptable parameters. Reconcilia on of the Mineral Reserve model
has not been regularly undertaken in the past and this process was observed to be in development.
Figure 12-4 shows an example of the reconcilia on between Resource and Grade Control models undertaken regularly by Alcoa.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20239
-- 301 of 363 --
Figure 12-4: Example of Reconcilia on Between Mineral Resource and Grade Control Models for Tonnage, Al, Si, and OX (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202310
-- 302 of 363 --
The resultant pit shells are scheduled using specialist automated mine scheduling so ware. A text file containing the model and its parameters is
exported to the scheduling so ware, which is programmed with current wait mes and the current mining capacity of 26.5 Mtpa (Huntly) & 11 Mtpa
(Willowdale). The so ware calculates and defers, as much as possible, capital haul road development costs for each block and iden fies an op mal
schedule.
Sustaining capital is calculated and added for haul road maintenance and equipment replacement. Not all machinery is capitalized, some being leased,
and this is included the opera ng cost. Review of ownership costs against leasing is constant and appropriate factors applied to the model.
The resultant model is coded for grade and contaminants and blocks are flagged with the appropriate mining sequence. Mineral Reserve blocks are
contained within the ten-year schedule. The model is then re-exported as a text file to the mine planning so ware and distributed to the relevant mine
planning departments and mine closure engineers for detailed planning.
12.5.3 Abandoned Resources
Some planned mining areas that are included in the schedule are unable to be totally mined for a variety of opera onal reasons. These reasons usually
relate to issues with rock outcrops, hard ground, contamina on and access difficul es that are encountered when developing a new mining area. This
process drives the con nuous development of new mining areas to maintain produc on capacity.
Alcoa’s recorded average abandoned mineraliza on between 2016 to 2019 (inclusive) is es mated at an average of 1.5% of Huntly and 2.0% of
Willowdale planned produc on but can vary materially. These factors are applied to forecast produc on in the Mineral Reserve es ma on process.
12.6 Cut-off Grade
The cut-off grade used for mine produc on planning is a floa ng cut-off grade, dependent on capital and opera ng costs against a fixed product
revenue at the refinery gate. These revenues are updated at least annually by Alcoa’s Finance Department and are observed by the QP to be updated
annually to reflect a reasonable market expecta on of arms-length sales of bauxite from the Darling Range.
The cut-off grade is thus cost-driven rather than revenue driven. Opera ng costs are observed to be driven by haulage distance and the use of contract
mining in areas where mining is undertaken on day shi only due to environmental restric ons. Haulage distance is related to the presence or absence
of capital haul roads and their maintenance costs.
The current nominal cut-off grades for Alcoa’s Darling Range opera ons are 27.5% for A.Al2O3 and 3.5% for R.SiO2. Commodity pricing is described
previously in Sec on 12.5.2.
12.7 Metallurgical Factors
The Huntly and Willowdale Darling Range mining opera ons feed three refineries: Kwinana, Wagerup and Pinjarra. The Huntly mine provides feed for
the Kwinana and Pinjarra refineries and the Willowdale mine provides feed for the Wagerup refinery. Ore is transported via conveyor belt from the
relevant crushers, and the ba ery limit for the mining process is the refinery gate. All three refineries are established, mature and use the conven onal
low-temperature Bayer refining processes.
The refineries are designed to accommodate long-term average bauxite and impurity grades from the mines. Internal Alcoa specifica on contracts are
established between the refineries and each of the
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202311
-- 303 of 363 --
mining opera ons and these contracts are updated annually and contemplate a five-year mine plan. These contracts set impurity targets, the key
impuri es being R.SiO2, oxalate and iron. Mineral processing tes ng is discussed in Sec on 10.0, and processing and recovery in Sec on 14.0.
The internal LOM (nominally 2045) specifica on for bauxite is based on a 27.5% A.Al2O3 cut-off grade, which has not been op mized but is supported
by the extensive opera ng history at the three refineries.
Deleterious elements are managed within contracted limits by blending at each mine, with the aim of minimizing varia on. The refineries conduct
metallurgical test work to ensure that any poten al effects of variance caused by new mining areas are understood.
Geometallurgical analysis is conducted on drill hole samples using FTIR analysis as a primary method. A subset of the samples is assayed using
conven onal analy cal procedures, with the results used for FTIR batch calibra on and quality assurance purposes. The Mineral Resource model is
coded for geometallurgical grades for available alumina and reac ve silica. This informa on is reported in the Mineral Resource es mate as well as the
Mineral Reserve es mate.
The Mineral Reserve is based on geometallurgical criteria that have been set by the refineries as suitable for producing alumina to agreed product
marke ng specifica ons.
12.8 QP Opinion
The QP considers that, because of the integrated process by which Measured and Indicated Mineral Resources translate to Mineral Reserves for Alcoa’s
Darling Range opera on, there are no foreseeable risks associated with Modifying Factors (mining, processing, metallurgical, infrastructure, economic,
marke ng, legal, environment, social, or government) that materially affect the Mineral Reserve es mate at 31 December 2022.
At the me of the review there was no adverse opera onal risk associated from the COVID-19 pandemic. The mines were opera ng at full capacity.
The opera ons are sensi ve to actual mined grade, as such lower alumina or higher reac ve silica grades remain a risk to the overall economics. Alcoa
have demonstrated through their Grade control program an effec ve control to minimizing the dilu on and mining at their forecast grades. The grade
control is par cularly important along ore-waste boundaries to maintaining expected mined grades, Alcoa demonstrate processes to handle and define
boundaries to mi gate these risks.
Haul distance is considered a risk factor due to the hauling cost making up a significant por on of the mining cost. Hauling is also directly linked to fuel
cost and maintenance, the combina on of an increased hauling distance as well as an increase in fuel cost and maintenance would result in a
significant impact on the opera onal costs. Haul distances to Reserve blocks typical increase over me un l such me there is a plant reloca on and so
there is an expected increase in hauling distance in the medium term. Alcoa manage such risks by defining when then major plant needs to be
relocated.
Alcoa may be unable to obtain or retain necessary permits, which could adversely affect its opera ons. The Darling Range opera on is subject to
extensive permi ng requirements. The requirements to obtain and/or achieve or maintain full compliance with such permits can be costly and involve
extended melines and possible delays. Alcoa strives to obtain and comply with all required permits but there can be no assurance that all such
permits can be obtained and/or always achieve or maintain full compliance with such permits.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202312
-- 304 of 363 --
13.0 MINING METHODS
13.1 General Descrip on of Opera ons
The Huntly and Willowdale mines employ conven onal open pit mining prac ces and equipment. The fleet is mixed between contract and owner-
operator, depending on the nature of the task at hand. Owner operator equipment is used for mining the bulk of the Mineral Reserve, opera ng in
areas away from those subject to environmental restric ons. Contract mining operates smaller equipment, day shi only, in environmentally (noise)
sensi ve areas and at the perimeter of the mining area.
The Huntly mine currently operates at a nominal mining capacity up to 27 Mtpa. In recent years, licenses were gained for the export of a propor on of
the bauxite produced. The Willowdale mine operates at a nominal produc on rate of 11 Mtpa.
The Darling Range opera ons currently have a nominal expected mine life un l 2045 (when ML1SA expires), although provision exists for Alcoa to apply
for a further mineral lease (Sec on 3.2). Mine Plans for 10 years of scheduling of mineraliza on classified as Mineral Resources for es ma on as
Mineral Reserves (Sec on 12.5.1). Mining units of 15 m by 15 m by 0.5 m ver cally are in use at the opera ons (Sec on 12.5.2).
Dilu on and ore loss are not reported separately to the Mineral Reserve (Sec on 12.4). Internal and edge dilu on is modelled at the mine planning
stage through the applica on of 15 m by 15 m mining blocks to the Mineral Resource model. These regularized blocks contain propor onal es mates
of ore and contaminants and are op mized through the applica on of a Lerchs-Grossman algorithm developed specifically for the opera on. This
varia on of the conven onal Lerchs-Grossman algorithm is applied ver cally, given that the shallow nature of the mineraliza on precludes
geotechnical considera ons. Blocks that do not sa sfy grade and contaminant parameters against revenue are thus excluded from the mine plan.
Mining recovery from Huntly and Willowdale are es mated to be 96% and 98%, respec vely.
Figure 3-3 shows the outlines of mined areas, Mineral Resources, and Mineral Reserves, which are collec vely taken as represen ng the final pit
outline, as currently understood. This does not account for any required extensions or addi onal licenses and assumes that all Mineral Resources and
Mineral Reserves are ul mately mined.
13.1.1 Clearing
Following defini on of Mineral Reserve blocks, vegeta on is cleared ahead of mining by the Western Australian State Forest Products Commission
(FPC), saleable mber being harvested for use. Clearing approval is sought ahead of mining allowing me for harves ng of saleable mber before
vegeta on clearing.
13.1.2 Stripping
On receipt of clearance to proceed from the FPC, Alcoa opera ons commence stripping topsoil and Secondary Overburden Removal (SOBR) using small
excavators, scrapers, and trucks. Soil is stockpiled at the site, away from the proposed pit, for rehabilita on purposes. Soil is stockpiled in windrows in
such a manner that it maintains its organic viability.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 305 of 363 --
The dieback fungus (Phytopthora spp.) is endemic in parts of the mining areas, which are flagged by Alcoa and precau ons are taken to contain the
fungus, which is lethal to the eucalyptus forest. The QP observed these precau ons, which include separa on of machinery fleets in areas where
dieback is present and washing of machinery before entry into different areas. This represents a minor short-term scheduling challenge, though it is
well managed.
13.1.3 SOBR
The SOBR process is specialized and aims to remove as much overburden and organic material from the top of the mineraliza on as possible. This
organic material reacts with NaOH in the refinery to produce oxalates, which are deleterious to the process. A er scrapers have removed the topsoil
and overburden, two small (60t class) excavators equipped with swivel buckets are used to scrape clay containing organic material from the undula ng
surface of the hardcap that sits on top of the mineraliza on. This is later used to backfill mined out areas.
Figure 13-1: SOBR (SLR, 2022)
The SOBR process is applied to those areas where hardcap has been iden fied by Resource defini on drilling, using the drillers’ logs. The hardcap is
drilled and blasted before mining with the rest of the bauxite sequence.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 306 of 363 --
In areas without hardcap, wheel tractor-scrapers of 24 m³ capacity remove soil overburden, scraping directly to the top of the mineraliza on model
surface, being controlled by GPS. This material is similarly stockpiled for rehabilita on or used as backfill in exhausted mining areas.
Figure 13-2: Topsoil Removal (Background), Blas ng of Hardcap and Marking of Ore (foreground) (SLR, 2021)
A surface miner is employed in limited areas of hardcap in the vicinity of blas ng-sensi ve infrastructure such as power lines. The surface mining is also
employed in lieu of SOBR where appropriate, for example, where there are high levels of contaminants in the hardcap. During the 2022 visit the surface
miner was not opera onal.
13.1.4 Mining
Mining progresses on 4 m benches, u lizing a contour-mining sequence, cu ng benches across the topography, working from top to bo om,
maintaining the fla est floor obtainable to a maximum gradient of 1:7. Most of the mineraliza on lies beneath a gently undula ng topography and
contour mining is minimal.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 307 of 363 --
Figure 13-3: Contour Mining (SLR, 2021)
On comple on of overburden removal, the exposed surfaces are sheeted with 0.25 m of suitable mineralized material taken from the dozed second cut
in adjacent pits. Where hardcap is present, a drill rig is mobilized, and the hardcap drilled and blasted on an appropriate pa ern to fragment the
hardcap.
Trucks haul the mined ore to fixed crushers, which crush the material to varying sizes (refer to Sec on 14.0) before conveying down the escarpment to
the refinery where it is stockpiled to give surge capacity.
No visual grade control is applied, the ore contacts being grada onal. Grade control is achieved by mining to electronic ore surfaces derived from drill
assays, control being achieved using GPS equipped equipment, the GPS being regularly calibrated.
Blending takes place at the pit face, before which the crushed ore from different pits is assessed using specialist short-term mine planning so ware and
pit produc on is scheduled to achieve the desired blend.
The QP is of the opinion that considering the style of mineraliza on, the average depth of the deposit, and the material characteris cs of the
overburden material whereby it is amenable to ripping / excava on using conven onal earth-moving equipment, the open pit mining method adopted
at Darling Range is the most appropriate method for the Mineral Reserves.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 308 of 363 --
13.2 Haul Roads and Infrastructure
13.2.1 Haul Roads
Haul roads are the limi ng factor to the mining opera ons. Major haul roads are established to each mining area, honoring the topography at the least
possible gradient. Roads are unsealed and formed by conven onal bulldozer and grader and sheeted with appropriate material. Once established, haul
road maintenance was observed to be con nuous and forms part of the opera ng cost for each mining area. Haul roads are observed by the QP to be
treated as sustaining capital in an appropriate manner.
Figure 13-4: Truck on Haul Road (SLR, 2021)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 309 of 363 --
Figure 13-5: Haul Roads with Berms (SLR, 2021)
Secondary haul roads to individual mining areas are formed in the same manner, with provision for rehabilita on once mining is complete.
The Darling Range climate is subject to wet winter months and trafficability of haul roads during these months is included in mine planning.
Redundancy during wet months is planned for, allowing well drained areas to be mined in the wet.
There are some restric ons to the establishment and opera on of haul roads, and these are incorporated into the road design and opera on:
• Water runoff from the roads is impounded in sumps and these were observed to be well formed and appropriate, being regularly
dewatered, emp ed of sediment and cleaned. This water is either re-used for dust suppression or road-forming purposes or is decanted for
release in an approved manner.
• Dieback control necessitates separa on of machinery between that which operates in dieback-prone and dieback-free areas. This presents
short-term scheduling challenges that were observed to be well controlled.
• Proximity to a major water catchment restricts the volume of hydrocarbons that may be taken into par cular areas around the catchment.
This was observed to be adhered to, with par cular road rules and scheduled delivery of approved volumes of hydrocarbons along haul
roads that are specially formed with impoundments in the event of spillage.
The QP has observed that Alcoa’s Darling Range opera ons have a well-established system for haul road design, construc on, maintenance and
regula on and that this does not present a major impediment to mining efficiency.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 310 of 363 --
13.2.2 Infrastructure
The main elements of infrastructure at Alcoa’s Darling Range mining opera ons are the loca on of crushers and conveyors to the refineries. These
crushers form hubs for the mining opera ons, connected by the primary haul roads and are scheduled to be moved every ten years or so, in
accordance with the requirements of the mining schedule and the loca on of ore as the mines progress. This crusher movement is planned well in
advance and is treated as sustaining capital expenditure.
The crushers see rela vely light duty for a mining opera on and are well maintained. Similarly, the conveyors, which operate all year round and are
covered, nega ng any poten al effect of weather.
Figure 13-6: Covered Conveyor (SLR, 2021)
Both the crushers and conveyors were observed to be in excellent condi on and subject to scheduled maintenance, including replacement of conveyor
belts.
Other ancillary equipment includes offices, ablu ons, crib-rooms, and workshops, all of which were observed to be in excellent condi on.
13.3 Geotechnical and Hydrogeology Considera ons
Mining at Alcoa’s Darling Range opera ons is very shallow, pits being an average of 4 m deep. Consequently, geotechnical considera ons are negligible
other than immaterial localized ba er failures. Similarly, the mining areas are elevated and well drained and groundwater and surface water hydrology
is not material in these areas other than the catchment, impoundment, and decanta on of runoff during the wet winter months. No drainage diversion
occurs or is necessary because the mineraliza on sits between the stream beds and the bauxite occurs above the groundwater table. Deeper bauxite
may be seasonally affected by the water table and is scheduled to be mined in summer. Backfilling of these places occurs before the rain raises the
water table.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 311 of 363 --
Contour mining (Figure 13-7) is prac ced in areas of rela vely steep topography, maintaining access ramps at less than 1:8 gradient and mining across
the contour and downwards, crea ng a flat working floor. Hydrological considera ons in these areas include management of runoff during the wet
winter months and trafficability.
Figure 13-7: Contour Mining (SLR, 2021)
Mine overburden is progressively backfilled into adjacent exhausted pits (Figure 13-8), topsoiled, landscaped (Figure 13-9), and rehabilitated by re-
establishment of na ve vegeta on (Figure 13-10), crea ng a stable post-mining landform that replicates the pre-exis ng environment.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20238
-- 312 of 363 --
Figure 13-8: Soil Being Returned for Backfilling and Landscaping the Pit (Alcoa, 2018)
Figure 13-9: Landscaped Mining Area, Prior to Replan ng of Forest (SLR, 2021)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20239
-- 313 of 363 --
Figure 13-10: Rehabilitated Pit Through Re-planta on of Na ve Vegeta on (SLR, 2021)
13.4 Mine Equipment
Mining is undertaken by 300 t and 200 t-class excavators top-loading 190 t capacity rigid-bodied mining trucks (Figure 13-11). This fleet was observed
by the QP at Huntly to be aged. The equipment has undergone rela vely light du es for a mining fleet, which prolongs its life. Sustaining capital is being
invested in equipment replacement and moderniza on at Willowdale, progressively working toward Huntly. New equipment includes 250 t-class
excavators and 190 t-class trucks.
A full list of equipment at Darling Range is provided in Table 13-1.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202310
-- 314 of 363 --
Figure 13-11: Ore Mining at Darling Range (SLR, 2021)
Table 13-1: Darling Range Opera ons Equipment List
Location Classification Type No. Units
Huntly Primary Excavator 4x CAT 336D
2x Komatsu PC3000
3x Hitachi 2600-7
Haul truck 1 8x CAT 789C (190T)
9x CAT 789D (190T)
1x Komatsu 730E (190T)
Haul truck 2 1x HD1500 (150T)
Ancillary Bulldozer / Loader 3x CAT D11R
1x CAT 992K
2x CAT 993K
2x CAT 980 Loaders
Grader 2x CAT 16M
1x CAT 24M
Scrapers 5x CAT 637G
Low Loaders 1x CAT 785C (250T)
1x CAT 777G (150T)
Water truck 3x CAT 785C
Drills 3x Atlas Copco L6 (Blast)
5x WB93 (Exploration)
Willowdale Primary Excavator 2x Hitachi ZX360
2x Komatsu PC2000
Haul truck 1 12x Komatsu 730E (190T)
Haul truck 2 1x HD1500 (150T)
Ancillary Bulldozer / Loader 3x CAT D11T
1x CAT 993K
1x CAT 992G
1x Komatsu WA320
Grader 1x CAT 16H
1x CAT 18M
Scrapers 3x CAT 637K
1x CAT 637G
1x CAT 637E
Low Loaders 1x CAT 785D (220T)
Water truck 2x CAT 777F
2x Komatsu 730E
Drills 2x Epiroc D50 (Blast)
13.4.1 Contractors
Alcoa’s prac ce in noise sensi ve areas such as the perimeter of the opera on near residents is to engage contractors. These areas operate on day shi
-- 315 of 363 --
only and a ract higher opera ng costs than the main produc on areas. The flexibility required in these areas precludes the use of the primary owner-
operator fleet and equipment is dry or wet hired or mining takes place under conven onal schedule of rates contracts.
Alcoa also engages contractors for aspects of haul road construc on services, in select areas of pit development, and during landscaping ac vi es for
rehabilita on a er mining.
This prac ce has led to the establishment of a secondary contrac ng industry around the Darling Range opera ons. Contractors are overseen by Alcoa
personnel.
13.4.2 Ancillary Equipment
Ancillary equipment at Alcoa’s Darling Range opera ons includes a fleet of bulldozers, graders and loaders that are primarily used for haul road
forma on, pit development (for the removal of overburden and blasted caprock) and ground prepara on for digging, landscaping, clean-up, and road
maintenance.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202311
-- 316 of 363 --
The SOBR process requires small excavators, ar culated trucks, scrapers, and specialist skills to grub organic-containing clay from the top of the
mineraliza on.
Figure 13-12: Blasthole Drill Working on Hardcap (SLR, 2021)
All ancillary equipment was observed to be in good and well-maintained condi ons, the condi ons being rela vely light duty in comparison to other
Western Australian mining opera ons. The current mining areas are shown in Figure 3-2.
13.5 Personnel
The main produc on mining opera ons are primarily Owner-operated using Alcoa equipment and employees. Contractors are also used for certain
ac vi es on site.
Three unions are recognized at the opera ons:
• The Australian Workers Union (AWU), which covers most of the opera ons workers
• Australian Metal Workers Union (AMWU), which covers the metal trades, being fi ers, boilermakers and mechanics
• Electrical Trades Union (ETU), which covers the electricians
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202312
-- 317 of 363 --
Lost me during strikes is generally uncommon. The Enterprise Agreements (EA) have varied ming for expira on. Currently the AWMU are nego a ng
a new agreement, the ETU EA was nego ated at the end of 2021, with a 4 year term. The AWU Agreement expires at the end of 2023.
Alcoa’s Darling Range opera ons were observed to have a stable workforce, drawn from the surrounding areas. The loca on is highly desirable in the
Western Australian mining context and skilled personnel are readily a racted to the opera ons. Primary haul roads are named a er personnel with
greater than forty years’ service and there are many of these.
The recent increase in metals prices has driven higher than usual turnover across the industry, which has impacted on the tradi onally low turnover. It
is s ll below industry standard, as the drive in, drive out nature of the work a racts many to work at Alcoa.
As of December 2022, the Huntly and Willowdale opera ons together employ a total of 887 employees consis ng of 48 technical, 77 management and
762 opera ons employees. Addi onally, 67 employees are centrally employed on the combined opera ons.
A breakdown is shown in Table 13-2 (current vacancies not accounted for).
Table 13-2: Darling Range Personnel
Loca on Classifica on No Personnel
Huntly
611
Technical 37
Management 50
Opera ons 524
Willowdale
276
Technical 11
Management 27
Opera ons 238
Central
67
Technical 18
Management 8
Opera ons 41
Total 954
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202313
-- 318 of 363 --
14.0 PROCESSING AND RECOVERY METHODS
14.1 Process Descrip on
The process plant for the Darling Range opera ons consists of two separate crushing facili es at the Huntly and Willowdale mines. Both facili es crush
the ROM and convey the crushed ore to three separate refineries.
The Willowdale opera on consists of a single stage crushing flowsheet and includes a series of conveyors to transport the crushed ore at an annual
throughput of 10 Mtpa. The ROM is discharged from trucks on a dump hopper. An apron feeder transfers the ore from the dump hopper to a vibra ng
grizzly with an aperture of 180 mm. The grizzly oversize is discharged into a single toggle jaw crusher which crushes the ore to a top size of 180 mm. A
hydraulic rock breaker is installed at the crusher to break the larger rocks that do not pass through the crusher opening. The crushed product and the
grizzly undersize are discharged on to a discharge conveyor and subsequently discharged on to an overland conveyor. The discharge conveyor is fi ed
with a tramp magnet to remove any metal that is present along with the crushed ore product. The overland conveyor, which is 9.4 km long, transports
the crushed ore to an intermediate transfer sta on. The ore is then transported by a second overland conveyor, 8.8 km long, to the transfer sta on
located at Wagerup. An apron feeder is used to transfer the crushed ore from the Wagerup transfer sta on on to a stockpile conveyor and
subsequently discharge on a stacker conveyor. The stacker conveyor discharges the ore into two separate stockpiles. The crushed ore is then reclaimed
from there for processing in the Wagerup refinery. The total capacity of the stockpiles is approximately 0.7 Mt and sufficient for three weeks of feed to
the refineries.
A simplified block flow diagram of the Willowdale opera on is shown in Figure 14-1.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 202314
-- 319 of 363 --
Figure 14-1: Simplified Block Flow Diagram of the Willowdale Opera on
The Huntly opera on consists of mul ple stages of crushing and includes a series of conveyors to transport the crushed ore to the refineries at an
annual throughput of 25 Mtpa. The primary crushing is achieved by two similar crushing circuits opera ng in a parallel configura on. The ROM is
discharged from trucks on dump hoppers. Apron feeders transfer the ore from the dump hopper to vibra ng grizzlies with an aperture of 180 mm. The
grizzly oversize frac ons are fed to jaw crushers which crush the ore to a top size of 200 mm. The crushed product and the grizzly undersize are
discharged on to discharge conveyors and transferred to the secondary crushers (sizers). The discharge conveyors are each fi ed with a tramp magnet
to remove any metal that is present in the crushed ore. Secondary crushing is achieved in sizers with the objec ve of reducing the ore par cle size to a
top size of 100 mm. The secondary crusher product is transported by three overland conveyors (opera ng in series with two intermediate transfer
sta ons in between) to a transfer sta on and randomly split into two by a spli er bin.
One frac on from the spli er bin is transferred by another overland conveyor and discharged into a stockpile conveyor via an apron feeder. The
stockpile conveyor transfers the ore and subsequently discharges onto a stacker conveyor. The stacker conveyor discharges the ore into two separate
stockpiles iden fied as Stockpile 1 and Stockpile 2. The crushed ore is then reclaimed from there for processing in the Pinjarra refinery. The second
frac on of the ore is transported by an overland conveyor to an apron feeder, to a transfer conveyor and then split again to two frac ons by a spli er
chute located at a separate transfer sta on. One of the splits from the spli er chute is des ned for Kwinana refinery and the other split is des ned for
Pinjarra refinery.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 320 of 363 --
The frac on for the Pinjarra refinery is transported by stockpile conveyor and subsequently discharged on to two sperate stockpiles (iden fied as
Stockpile 3 and Stockpile 4) via a stacker conveyor. The ore is then reclaimed from the stockpiles for processing in Pinjarra refinery along with the ore
from Stockpile 1 and Stockpile 2.
The split for Kwinana refinery is transported by a conveyor and processed by a ter ary crushing circuit consis ng of two roller crushers opera ng in
parallel configura on. The ter ary crusher product with a top size of 25 mm is transferred by a stockpile conveyor and discharged into two separate
stockpiles iden fied as Stockpile 5 and Stockpile 6 via a stacker conveyor. The crushed ore from Stockpiles 5 and Stockpile 6 is reclaimed and
transferred by a reclaim conveyor to a surge bin for subsequent loading and transport to the refinery by train. A simplified block flow diagram of the
Huntly opera on is shown in Figure 14-2.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 321 of 363 --
Figure 14-2: Simplified Block Flow Diagram of the Huntly Opera on
14.2 Primary Equipment List
The primary equipment lists of the Willowdale, and Huntly opera ons are shown in Table 14-1 and Table 14-2.
Table 14-1: Primary Equipment List (Willowdale)
Equipment Quan ty Installed Power (kW)
Apron feeder 1 264
Vibra ng grizzly 1 75
Primary Crusher 1 355
Discharge conveyor 1 132
Overland conveyor 1 2500
Overland conveyor 1 1800
Apron feeder 1 75
Stockpile conveyor 1 300
Stacker boom conveyor 1 110
Table 14-2: Primary Equipment List (Huntly)
Equipment Quan ty Installed Power (kW)
Apron feeder 1 260
Vibra ng grizzly 1 55
Primary Crusher 1 250
Discharge conveyor 1 140
Secondary crusher 1 1000
Apron feeder 1 260
Vibra ng grizzly 1 75
Primary Crusher 1 250
Discharge conveyor 1 140
Secondary crusher 1 1000
Overland conveyor 1 7500
Overland conveyor 1 5000
Overland conveyor 1 6100
Apron feeder 1 75
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 322 of 363 --
Equipment Quan ty Installed Power (kW)
Overland conveyor 1 1500
Apron feeder 1 55
Apron feeder 1 75
Overland conveyor 1 1350
Apron feeder 1 110
Stockpile conveyor 1 225
Stacker boom conveyor 1 110
Yard conveyor 1 250
Stockpile conveyor 1 150
Stacker boom conveyor 1 110
Conveyor 1 250
Apron feeder 1 75
Ter ary crusher 1 370
Apron feeder 1 75
Ter ary crusher 1 370
Stockpile conveyor 1 300
Stockpile boom conveyor 1 110
Bucket wheel reclaimer 1 264
Reclaim bridge conveyor 1 110
Transfer conveyor 1 280
Reclaim conveyor 1 280
Reclaim conveyor 1 900
14.3 Consumables and Power
The power consump on of the Huntly opera on is approximately 8,000 MWh to 9,000 MWh per month. The Willowdale power consump on is
approximately 2,000 MWh per month.
The process plant is a dry crushing opera on and therefore water is only required for dust suppression and is included as part of mine water
consump on. Water is not required as a consumable for the plant.
Other consumables of the process plant include crusher liners, screen panels and spares for feeders and conveyors. These are kept on site and replaced
as part of the rou ne maintenance schedule according to manufacturer’s guidelines.
Personnel requirements for the opera on and maintenance of the plant as described are included in Table 13-2.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 323 of 363 --
14.4 QP Opinion
The QP is of the opinion that the selected processing method and the flowsheet are suitable for Darling Range opera ons. It is important to note that
the ore head grades meet the refinery specifica ons for processing in terms of Al2O3 grades and SiO2 grades, this means the ore can be directly
shipped to the refinery for further processing without any upgrading in the mineral processing plant. The crushing circuit reduces the par cle size
suitable for conveying as well as to meet par cle size specified by the refinery.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 324 of 363 --
15.0 INFRASTRUCTURE
The infrastructure for the mining opera ons is established and opera onal. In 2021, the infrastructure hub for Willowdale was relocated 16 km
southwards from Orion (a er having been based there for 21 years) to the Larego Hub which is located about 20 km north-east of the town of Harvey.
The hub hosts administra ve offices, as well as crushing facili es and maintenance facili es. The Orion Hub site is currently being rehabilitated with
infrastructure decommissioning planned for 2024.
The mining hubs are relocated periodically as produc on moves away from the hub and thus transporta on costs increase. Alcoa plans for the Larego
Hub to be in place for approximately 20 years, though this is the 4th reloca on since the mines opened in the 1970s/80s (approximately 13 years on
average). The mining hub reloca ons are well-understood with planning and associated budge ng occurring well in advance of reloca ons; produc on
restarted seven days a er the shutdown.
An extensive haul road network, rail, and overland conveyors transport crushed bauxite from the Hub to the refineries on the coast (namely Kwinana,
Wagerup and Pinjarra). Bauxite is transferred from each mine to the refineries primarily via long distance conveyor belt, apart from the Kwinana
refinery which receives bauxite via railway. The Alumina produced by the three refineries is then shipped to external and internal smelter customers
through the Kwinana and Bunbury ports.
The infrastructure layout for the Darling Range opera ons is shown below (Figure 15-1).
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 325 of 363 --
Figure 15-1: Infrastructure Layout (Alcoa, 2022)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 326 of 363 --
15.1 Access Roads
The Darling Range is readily accessible via road from Perth and surrounding areas. The mines are near the towns of Pinjarra and Waroona. Both towns
are easily accessible via the na onal South Western Highway, a sealed single carriageway road, which starts on the southern side of Perth and
con nues for almost 400 km to the southwest corner of Western Australia.
The Huntly mining area is accessible from the South Western Highway via Del Park Road, a sealed single carriageway road which connects the town of
North Dandalup in the north with Dwellingup in the south. From Del Park Road, a further sealed road which follows the route of the bauxite conveyor
to the Pinjarra refinery provides access to the Huntly site.
The Willowdale mining area is similarly accessible from the South Western Highway via Willowdale Road, a sealed single carriageway road to the south
of Waroona.
Major haul roads have been established to each mining area. Roads are unsealed and require con nuous ongoing maintenance which was observed
during the site visit. Secondary haul roads, also unsealed, cross-cut each individual mining plateau.
15.2 Power
The Darling Range’s Pinjarra refinery receives power from the South West Interconnected System (SWIS). The refinery also has internal genera on
capacity of 100 MW from 4 steam driven turbine alternators, with steam produced by gas fired boilers and a gas turbine Heat Recovery Steam
Generator (HRSG). The refinery supplies power to the Huntly Mine by three different power supply lines (a single 33 kV and two 13.8 kV).
Willowdale Mine has a single 22 kV power supply fed from the Wagerup refinery. The Wagerup refinery is a net exporter of power to the SWIS, with
internal genera on capacity of 108 MW from three steam driven turbine alternators and one gas turbine. The steam is produced by gas fired boilers.
The power consump on of the Huntly opera on is approximately 8,000 MWh to 9,000 MWh per month. The Willowdale power consump on is
approximately 2,000 MWh per month.
15.3 Water
Water is used on the mines for dust suppression, dieback washdown, vehicle washdown, workshops, conveyor belt wash, construc on, and domes c
purposes. The water supplies for mining consist of licensed surface water sources supplemented with treated wastewater from vehicle washdowns,
stormwater runoff and maintenance workshops.
The WA mines are licensed by the Department of Water and Environmental Regula on (DWER) to draw surface water from five loca ons to meet their
water supply requirements. The Huntly mine draws water from Banksiadale Dam and Boronia Waterhole. Huntly mine also holds a license to draw
water from Pig Swamp and Marrinup, however these resources are retained as a backup water supply and have not been u lized in recent years.
Huntly mine is also permi ed to draw water from South Dandalup Dam under an agreement with the Water Corpora on. A pumpback facility from
South Dandalup Dam to Banksiadale Dam is used to raise levels in Banksiadale Dam during periods of low rainfall runoff. Willowdale Mine draws water
from Samson Dam.
Table 14-2 summarizes the license alloca on for water usage. In 2021, water abstrac on comprised approximately 74% of the total DWER license
alloca on (for those sites where abstrac on occurred). An
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 327 of 363 --
addi onal 336,105 kL was also abstracted from South Dandalup Dam under the agreement with Water Corpora on.
Table 15-1: Water Abstrac on License Volumes
Site Water source Surface Water license Annual Water En tlement
Huntly South Dandalup Dam N/A N/A
Huntly Banksiadale Dam SWL63409 500,000
Huntly Pig Swamp Waterhole SWL153635 30,000
Huntly Boronia Waterholeon Marrinup Brook SWL83356 70,000
Marrinup Nursery Lot 908 on Marrinup Brook SWL68893 45,000
Willowdale Samson Dam SWL61024 450,000
15.4 Accommoda on Camp
There are no Alcoa accommoda on facili es within the Darling Range. As described above, the Huntly and Willowdale mining areas are within
proximity to established popula on centers including Pinjarra approximately 25 km to the West of Huntly and Waroona approximately 20 km West of
Willowdale.
On site facili es includes offices, ablu ons, crib-rooms, and workshops, all of which were observed to be in excellent condi on.
15.5 Mine Waste Management
15.5.1 Tailings Disposal
No tailings are generated within the boundaries of the mining opera ons. The management of tailings generated downstream at the refineries is
beyond the boundaries of the Darling Range mining opera ons and are therefore not considered in this TRS.
15.5.2 Waste Rock Disposal
Alcoa’s Darling Range mining opera ons do not produce mine waste or “mullock” in the same manner as conven onal mining opera ons and waste
dumps are not constructed.
Overburden from Darling Range ore blocks is carefully segregated for later rehabilita on of adjacent, completed mining opera ons. Non-viable rock is
used to backfill these shallow, completed pits and the viable topsoil spread on top and contoured. Jarrah forest is then re-established through seeding
and the plan ng of nursery-raised seedlings. Water runoff from ac ve and backfilled mining areas is contained and directed toward se lement ponds,
which are later rehabilitated and seeded.
To date, some 20,000 ha of mined areas have been backfilled and reforested, which represents around 75% of the area mined since 1966, including
areas reserved for long-term infrastructure. Rehabilita on standards are described in Alcoa’s 2016 statutory Bauxite Mine Rehabilita on Comple on
Criteria. These comple on criteria have been progressively revised since incep on in the 1990s.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 328 of 363 --
16.0 MARKET STUDIES
16.1 Overview
Alcoa Corpora on is a ver cally integrated aluminum company comprising bauxite mining, alumina refining, aluminum produc on (smel ng and
cas ng), and energy genera on.
Through direct and indirect ownership, Alcoa Corpora on has 27 loca ons in nine countries around the world, situated primarily in Australia, Brazil,
Canada, Iceland, Norway, Spain, and the United States. Governmental policies, laws and regula ons, and other economic factors, including infla on
and fluctua ons in foreign currency exchange rates and interest rates, affect the results of opera ons in these countries.
There are three commodi es in the ver cally integrated system: bauxite, alumina, and aluminum, with each having their own market and related price
and impacted by their own market fundamentals. Bauxite, which contains various aluminum hydroxide minerals, is the principal raw material used to
produce alumina. Bauxite is refined using the Bayer process to produce alumina, a compound of aluminum and oxygen, which in turn is the raw
material used by smelters to produce aluminum metal.
Alcoa obtains bauxite from its own resources and processes over 85% of its combined bauxite produc on into alumina. The remainder is sold to the
third-party market. In 2022, total Alcoa produc on was 42.1 million dmt (dry metric tonne) of bauxite.
Aluminum is a commodity that is traded freely on the London Metal Exchange (LME) and priced daily. Pricing for primary aluminum products is typically
composed of three components:
(i) The published LME aluminum price for commodity grade P1020 aluminum;
(ii) The published regional premium applicable to the delivery locale; and
(iii) A nego ated product premium that accounts for factors such as shape and alloy.
Further, alumina is subject to market pricing through the Alumina Price Index (API), which is calculated by the Company based on the weighted average
of a prior month’s daily spot prices published by the following three indices: CRU Metallurgical Grade Alumina Price; Pla s Metals Daily Alumina PAX
Price; and Metal Bulle n Non-Ferrous Metals Alumina Index. As a result, the price of both aluminum and alumina is subject to significant vola lity and,
therefore, influences the opera ng results of Alcoa Corpora on.
Unlike alumina and aluminum, bauxite is not a standard commodity traded on an index. Bauxite’s grades and characteris cs vary significantly by
deposit loca on and the value of bauxite deposits for each downstream refinery could be different, based upon:
• refinery technology;
• the loca on of each refinery in rela on to the ore deposit; and
• the cost of related raw materials to each refinery.
As such, there is no widely accepted index for bauxite. Most bauxite traded on the third-party market is priced using a value-in-use methodology. The
key assump on for the value-in-use methodology is that both the (1) offered bauxite and the (2) compara ve bauxite being used in the target refinery
will generate the same refining cost. As such, using the known price for the compara ve bauxite used in the
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 329 of 363 --
target refinery, the offered bauxite price will then be derived by considering the bauxite characteris cs and quality differences between the offered and
compara ve bauxite.
16.1.1 Market Fundamentals
Bauxite is the principal ore of alumina (Al2O3), which is used to produce aluminum. Bauxite mining and alumina refining are the upstream opera ons
of primary aluminum produc on. China is the largest third-party seaborne bauxite market and accounts for more than 90% of all bauxite traded.
Bauxite is sourced primarily from Australia, Guinea, and Indonesia on the third-party market. In the long run, China is expected to con nue to be the
largest consumer of third-party bauxite with Guinea expected to be the majority supplier. Further, third-party traded bauxite is expected to be in
surplus over the next decade, with most new mining projects announced recently being located in Guinea.
Bauxite characteris cs and varia ons in quality heavily impact the selec on of refining technology and refinery opera ng cost. A market bauxite with
high impuri es could limit the customer volume an exis ng refinery could use, resul ng in a discount applied to the value-in-use price basis.
Besides quality and geography, market fundamentals, including macroeconomic trends – the prices of raw materials, like caus c soda and energy, the
prices of Alumina and Aluminum, and the cost of freight – will also play a role in bauxite prices.
16.2 Market: Darling Range
16.2.1 Opera on
The Darling Range mines are part of an integrated opera on of two mines, three refineries and two ports. Prior to 2016, produc on from the Darling
Range mines (Huntly and Willowdale) was used exclusively for consump on by the integrated refineries.
Bauxite is transferred from each mine to the refineries primarily via long distance conveyor belt, apart from the Kwinana refinery, which receives
bauxite via railway. The Alumina produced by the three refineries is then shipped to external and internal smelter customers through two ports, based
in Kwinana and Bunbury.
16.2.2 Pricing
In 2016, Darling Range entered into a 5-year third-party sales contract with a major alumina producer in China. Following the expira on of the third-
party sales contract at the end of 2021, all bauxite produc on from Huntly and Willowdale was consumed internally by the Darling Range.
The pricing mechanism of the third-party sales contract was based on a value-in-use methodology (as described in Sec on 16-1) that was anchored to
the customer’s other bauxite sources at the me of execu on, with a market adjustment factor linked to the Alumina price.
A price of $19/t has been u lized for 2022 with an es mate for economic market-based factors applied throughout the LOM.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 330 of 363 --
16.3 Contracts
All Darling Range produc on is shipped via conveyor or train to one of the Alcoa’s three Western Australia refineries.
Major opera onal contracts that are in place include, but are not limited to the following:
• Railway contract: Alcoa has a long-term contractual agreement with a third-party to deliver bauxite to one of its refineries. Pricing is based
on a fixed rate schedule, payable on volume of bauxite delivered.
• Mining contractor contract: Alcoa has a long-term contractual agreement with a third-party to operate a designated mine region. The
contractor is responsible for development, mining, hauling and rehabilita on of the designated mine pits; the contract runs a day-only
opera on. Pricing is based on a fixed rate schedule, payable on produc on tonnes.
• Rehabilita on contract: Alcoa has a long-term contractual agreement with a third-party to rehabilitate certain mined areas, ready for
closure. Pricing is based on a fixed rate schedule, payable on equipment and labor hire rates.
• Fuel contract: Alcoa has a mid-term contractual agreement with a third-party to supply diesel fuel for mining opera ons. Pricing is based on
market pricing for diesel, payable on volume consumed.
These types of contracts are typical of other similar mining opera ons.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 331 of 363 --
17.0 ENVIRONMENTAL STUDIES, PERMITTING, AND PLANS, NEGOTIATIONS, OR
AGREEMENTS WITH LOCAL INDIVIDUALS OR GROUPS
17.1 Environmental Studies
17.1.1 Exis ng Opera ons
Alcoa has established prac ces and processes for ensuring conformance to environmental requirements. Sensi ve areas are iden fied and managed
ahead of disturbance. Environmental factors are taken into account prior to infill drilling; hence, mining blocks carrying environmental risks do not
feature in the Mineral Reserves (for example, areas around granite outcrops and water courses have a buffer applied and essen ally no-go areas from a
mining perspec ve).
The environmental reviews and approvals form part of the MMPLG approvals process outlined in Sec on 3.6.
Regarding exis ng opera ons, the threat of bushfires is the only significant naturally occurring risk iden fied. Bushfires have occurred in the past, but
to date have not had a material impact on produc on.
The current plans are considered adequate and there are no other environmental, social, or permi ng risks that affect the current mine operability or
Reserve es ma on.
Approvals for the mining of future resources are being evaluated under Part IV of the Western Australian Environmental Protec on Act 1986 to ensure
appropriate considera on of environmental constraints. Environmental constraints on the resource are being applied before deposit defini on drilling
(i.e. only includes material above the water table, that does not require redirec on of surface water courses, impact heritage listed sites, etc.).
17.1.2 Future Mining Opera ons
Alcoa is modernizing its environmental approvals framework for its Huntly Bauxite Mine and Pinjarra Alumina Refinery, by referring future mining plans
for assessment under Part IV of the Western Australian Environmental Protec on Act 1986 and the Australian Environment Protec on and Biodiversity
Conserva on Act 1999 (EPBC Act). The future mining plans that have currently been referred to both state and federal departments includes:
• The transi on of Huntly Mine into the proposed Myara North and Holyoake mine regions within Alcoa’s Mining Lease ML1SA (inclusive of
bauxite for the Pinjarra Alumina Refinery and the Kwinana Alumina Refinery).
The Western Australian Environmental Protec on Authority (State) has determined that the Pinjarra Alumina Refinery Revised Proposal (Assessment
No. 2253), which includes the Huntly Bauxite Mine, will be assessed via a Public Environmental Review (PER).
Alcoa referred two separate Proposed Ac ons under the EPBC Act (Federal) for the following components:
• Huntly Bauxite Mine Transi on – Myara North and Holyoake; and
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 332 of 363 --
• Pinjarra Alumina Refinery – development of water storage ponds and associated borrow pits.
The referred ac ons have been determined as Controlled Ac ons under the EPBC Act, and as such, require formal assessment.
The resul ng Environmental Impact Assessments (EIAs) under State and Federal legisla on will inform stakeholders on long-term mine plans and
environmental management requirements and facilitate the se ng of approval condi ons.
Construc on for Myara North will be commenced pursuant to the requirements of the Ministerial Decision, which will be issued upon comple on of
the EPA assessment process indica vely forecast for comple on circa Q3 2024. Alcoa plans to commence construc on, to facilitate the transi on to
Holyoake Central, from approximately 2028 and commence opera on from approximately 2030.
Numerous baseline studies have now been completed to support approvals for future extensions to the mining footprint to the Myara North and
Holyoake regions. Baseline studies are guided by the requirements of the Western Australian Environmental Protec on Authority (EPA) and guidelines
under the EPBC Act and are well understood. Several baseline environmental studies were undertaken in 2021 and 2022 within the Myara North and
Holyoake mine development envelopes, to define the environmental values and constraints associated with:
• Flora and vegeta on
• Short-range endemic vertebrates
• Aqua c and subterranean fauna
• Phytophthora dieback
• Terrestrial fauna and black cockatoo habitat
• Surface water
• Groundwater quality and dewatering drawdown
• Air quality
• Noise
• Landscape and visual impacts
• Historical and aboriginal heritage
Addi onal environmental studies were separately undertaken to iden fy regional environmental risks associated with PFAS in surface water
catchments around the current and future Huntly and Willowdale opera ons.
17.2 Waste and Tailings Disposal, Site Monitoring, and Water Management
17.2.1 Waste and Tailings Disposal
No tailings are generated within the boundaries of the mining opera ons as bauxite processing residue is only generated at the refineries. Similarly,
Alcoa’s Darling Range mining opera ons do not produce mine waste or “mullock” in the same manner as conven onal mining opera ons and as such
waste dumps are not constructed.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 333 of 363 --
Overburden from Darling Range ore blocks is carefully segregated for later contouring and rehabilita on of adjacent, completed mining opera ons.
Caprock and other non-viable rock is used to backfill these shallow, completed pits and the viable topsoil spread on top, contoured, and revegetated.
As such, there is no requirement for the monitoring of any tailings or mine waste dumps associated within the mining opera ons as all tailings are
processed outside the mine lease boundary.
17.2.2 Site Monitoring
Alcoa’s mine sites are monitored in accordance with condi ons of Government authoriza ons and its opera onal licenses at Huntly (L6210/1991/10)
and Willowdale (L6465/1989/10). Environmental management and monitoring commitments exist for the following environmental aspects which have
been assessed as being significant and therefore require opera onal controls as a minimum. The significant environmental aspects for which
monitoring and/or management undertaken are:
• Chemical releases including loss of containment preven on and response and dangerous goods storage. All underground storage tanks have
been removed from Alcoa’s opera ons and are prohibited.
• Waste management and minimiza on.
• The management of mining within the lower rainfall zone to minimize risks of saliniza on of land and water resources.
• Surface water catchment protec on for the nearby Public Drinking Water Source Areas (PDWSAs).
• Air emissions including:
o Smoke pollu on associated with wood waste
o An ambient dust monitoring program to iden fy and quan fy fugi ve dust emissions from opera ng areas
o Ozone deple ng substances
• Hazardous materials management including asbestos, synthe c mineral fiber, polychlorinated biphenyls.
• Land including:
o Recordkeeping and Geographical Informa on System (GIS) mapping of the loca on and ming of all soil removal, landscaping,
soil return, ripping and seeding
o Rehabilita on area monitoring to ensure the number of established plants meet the comple on criteria targets associated with
species enrichment, weed outbreaks and erosion
o Dieback management, mapping and field iden fica on
o Forest and land clearing
• Flora and fauna.
• Aboriginal and European heritage.
• Environmental value of na onal parks, nature reserves and na ve forests.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 334 of 363 --
• Visual amenity.
• Noise.
Outcomes of and compliance with the management and monitoring programs are tracked within Alcoa’s Environmental Management System and
reported within the Annual Environmental Review report. Review of the most recent report, JTSI Annual Environmental Review 2021 (dated August
2022), largely reported compliance with environmental commitments and success of opera onal controls to managed environmental objec ves, with
only the following reportable incidents noted:
• Four dieback breaches at Huntly and two dieback breaches at Willowdale were reported resul ng in a downgrade to dieback status of
vegeta on. Two dieback events were the result of incorrect iden fica on of dieback lines by operators in the field, and the other events
were due to surface water flow from a dieback area to a dieback-free area. All incidences were inves gated with correc ve ac ons
addressing the root causes ac oned.
• Several surface water recordings of elevated turbidity were recorded for a period exceeding 1 hour above the repor ng criteria (25 NTU).
There were 30 turbidity events recorded at Huntly in 2021, 20 of which were confirmed to have been affected by mine site contribu ons.
The remaining ten events did not have any mine site contribu ons iden fied. There were 14 turbidity events at Willowdale recorded in
2021, two of which had iden fied mining contribu ons. Four events had non-mining related contribu ons iden fied. The remaining eight
events did not have an iden fied cause. All incidences were inves gated with correc ve ac ons addressing the root causes ac oned where
mining contribu ons were iden fied.
• Alcoa reported 105 loss of containment (LOC) events at Huntly and 49 LOC events at Willowdale in 2021. Reportable events (over 20L) were
associated with LOC of diesel fuel and hydraulic oils, PFAS-free AFFF fire suppressants, and coolants largely associated with the mobile
maintenance and opera ons fleet. In response to release events, a range of LOC reduc on ini a ves were developed to address common
failure mechanisms within equipment fleets, to reduce the frequency of recurrence.
• Alcoa voluntarily reported nine incidents under s.72 in 2021. Huntly Mine reported four PFAS-free AFFF releases and Willowdale Mine
reported five PFAS-free AFFF releases. Alcoa completed a program to remove all AFFF fire suppressant foams which contained PFAS from all
heavy vehicles (including contractor fleets) from both mine sites in 2021.
Alcoa is proac vely working with key regulatory agencies to address opera onal incidents and implement opera onal improvements to reduce releases
to the environment.
17.2.3 Water Management
Alcoa implements a comprehensive water management and monitoring program in accordance with the requirements of its surface water and
opera onal licenses. Key components of Alcoa’s water management and monitoring program include:
• Treatment of stormwater that may contain traces of hydrocarbons via a wastewater treatment system to concentra ons that meet DWER
license requirements prior to release
• Turbidity monitoring along tributaries to key catchments to prevent contaminated or turbid runoff into the drinking water supply
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 335 of 363 --
• Wastewater treatment and monitoring to meet DWER license requirements prior to release including treated water quality monitoring
prior to release and con nuous discharge volumes
• Surface water drainage management to prevent uncontrolled surface water runoff from opera ons to the surrounding forest and/or surface
water bodies
• Implementa on of the Interim PFAS Water Management Strategy
• Drainage protec on management through the implementa on of a Drainage Control Management Plan.
• Sewage management though a biological aera on treatment unit (BioMAX)
• Monitoring of cumula ve water abstrac on volumes at licensed and unlicensed surface water abstrac on points in accordance with the
Surface Water License Opera ng Strategies for Huntly and Samson Dam
• Potable water monitoring for iden fica on of possible biological or chemical contamina on
• Ecological water requirements (EWRs) have not been defined for the site however, Alcoa undertakes monitoring of the downstream
environments to ensure no unacceptable impact. This is completed via photographic monitoring for Banksiadale Dam, Pig Swamp
Waterhole, Boronia Dam and Marrinup Nursery
• Water use efficiency programs are implemented pertaining to wastewater recycling, efficient watering of haul roads, pumping and reusing
water from roadside sumps, and effec ve mining planning to reduce dust suppression requirements
• A groundwater monitoring program commenced in H2 2022 across the Darling Range opera ons to support approvals and opera onal
monitoring.
o Alcoa will con nue to expand its monitoring program, as necessary, if groundwater quality or quan ty has been iden fied as
poten ally at risk due to opera onal or mining ac vi es, or poten al exists for mining to impact offsite/private groundwater
supply quan ty or quality.
o Alcoa has a long-term groundwater research project within the Intermediate Rainfall Zone to evaluate poten al impacts of
clearing on groundwater saliniza on.
Baseline water quality monitoring has been undertaken at Myara North and Holyoake as part of the Part IV approvals process for these mining areas. It
is an cipated that groundwater monitoring will be required as part of the opera onal license for these deposits.
17.3 Project Permi ng
The environmental reviews and approvals form part of the MMPLG approvals process outlined in Sec on 3.6. Compliance with the MMPLG is
demonstrated through an annual report submi ed to the Department of Jobs, Tourism, Science and Innova on.
Opera onal ma ers at the Willowdale and Huntly mines are licensed by the Department of Water and Environmental Regula on via instruments
L6465/1989/10 and L6210/1991/10, respec vely. These licenses condi on the processing of ore and repor ng is required annually to DWER describing
the total volume of bauxite crushed and any non-compliance. The latest available repor ng at the me of wri ng is for calendar year 2021.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 336 of 363 --
Compliance with the Alcoa ISO14001 accredited EMS was audited in December 2021, with recer fica on issued in May 2022. This recer fica on is
valid un l May 2025.
There are no known requirements to post performance or reclama on bonds.
17.4 Social or Community Requirements
Alcoa has established systems and processes for maintaining its social license to operate and was admi ed to ICMM in 2019, aligning to its social
performance requirements. Related to the requirements of the MMPLG, Alcoa’s ac ons include an annual 5-year consulta on process aligned with the
5 Year Mine Plan. The consulta on process involves engaging with affected landowners. Alcoa’s consulta on extends to shires, as well as state and local
government.
Where appropriate, the mine plan accommodates community requirements, in par cular, concerns related to noise, dust, etc., and allows for buffer
zones and modified working hours.
17.4.1 Community Consulta on
Community consulta on results (both in-bound [e.g. noise complaints] and out-bound [e.g. Alcoa-ini ated engagement with stakeholder groups]) are
recorded in the Community Consulta on System (CCS). Annual targets for consulta on are set based on current and proposed mine plans. CCS
allocates and tracks follow-up ac ons.
In 2019, Alcoa engaged Ipsos to undertake stakeholder percep on research among key stakeholders and communi es to be er understand percep ons
and expecta ons of Alcoa and its opera ons in Western Australia. Three audiences were included in the benchmark wave of research: Perth
Community, Host Community and Stakeholders. Two years later in 2021, a second wave of research was conducted with a focus on two of the three
audiences from the benchmark wave: Perth Community and Host Community. A deep dive was added for two host communi es, Jarrahdale and
Dwellingup to understand community percep on in greater detail in these communi es. Results of the percep on survey were detailed in the
Reputa on Measurement and Management Wave 2 Report (Ipsos, 2022). The benchmark research in 2019 revealed that while Alcoa had been
successful in building and maintaining a strong reputa on and associated social license in Western Australia, there was a growing need for its approach
to stakeholder management to be modified in the face of evolving and increasing stakeholder expecta ons. The second wave of research in 2021 has
revealed the community issues iden fied in 2019 intensified. These changing expecta ons mirror what is being experienced by the extrac ves sector
locally and globally. A realiza on that mining is finite and a growing concern for the environment is driving host communi es to demand a newly-
defined social contract with resources companies. These issues are intensified for Alcoa given its proximity to the Perth metropolitan area, other towns
and compe ng land users and uses, as well the fact that it operates within the jarrah forest and Perth’s water catchment area.
Alcoa’s move towards formal, publicly scru nized environmental impact assessment and approval under the State and Federal acts (Sec on 3.6) for the
extrac on of future resources will provide greater transparency around Alcoa’s future opera ons that should go some way to addressing the challenges
it faces.
As described in 17.1, the threat of bushfires is a risk to opera on and the local communi es. Bushfire mi ga on and firefigh ng ac vi es within state
forest are managed by the Department of Biodiversity Conserva on and A rac ons (DBCA). Alcoa maintains fire access tracks as required by the
working arrangement with DBCA and complies with requirements of the Bushfires Act including seeking
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20235
-- 337 of 363 --
exemp ons for certain ac vi es during Total Fire Bans. Asset protec on zones are not mandated although Alcoa do maintain them around
infrastructure as per internal standards to mi gate risk.
Alcoa owned private property is maintained to local government requirements as per the requirements of the Bushfire Act.
Alcoa opera ons look to add value to the communi es where it operates and beyond. Through a drive for sustainable development and desire to
support reputable non-profit and community based organiza ons, community investment supports partnerships and ini a ves that look to long-term
community benefits.
Each year the community partnership program invests in a wide variety of community programs at the local, state and na onal level. Some of these
partnerships, including the acclaimed Three Rivers, One Estuary ini a ve are supported by Alcoa’s global Alcoa Founda on.
In addi on to community partnerships, employees are encouraged to par cipate each year in Alcoa Volunteers (volunteering as teams during work
me) and employee giving programs.
17.4.2 Social Performance Management System
Alcoa is implemen ng a Social Performance Management System (SPMS) across its global opera ons. Alcoa has conducted a gap analysis of exis ng
prac ces against best-in-class social management systems and defined a program to close these gaps, which are mostly related to developing a more
structured approach to social risk management and formalizing Alcoa’s social performance ac ons. Since 2022, Alcoa will focus on:
• Be er understanding and engaging with our communi es and stakeholder through:
o Percep on surveys
o Community and stakeholder engagement plans
o Socio-economic baselines
• Understanding and managing our risks, impacts, and opportuni es through:
o Social risk assessments
o Social investment reviews
o Social impact assessments
• Reviewing and improving exis ng processes including:
o Social records and obliga ons
o Grievances and complaints.
17.5 Mine Closure Requirements
Alcoa’s Closure Planning group for Darling Range (located within the Global Planning Team) is responsible for developing the closure planning process
as well as the subsequent Long-Term Mine Closure Plans (LTMCPs) of Alcoa’s WA Mining Opera ons (Huntly and Willowdale). Closure Strategies,
Schedules and Cost Es mates are being developed across organiza onal divisions and includes mul disciplinary inputs from Opera ons, Mid- and
Short-term Planning, Finance, Centre for Excellence, Environment and Asset Management (both Fixed and Mobile Plant).
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20236
-- 338 of 363 --
The agreed closure requirements for Darling Range centers around the return of Jarrah Forest across the site. End land uses are required to comply
with the State’s Forest Management Plan and include water catchment protec on, mber produc on and biodiversity conserva on. Closure criteria
were revised in 2015 by the MMPLG for rehabilita on works commencing in and a er 2016. These criteria do not apply to areas which commenced
rehabilita on prior to 2015 and represent a ‘step forward’ in rehabilita on prac ces at Darling Rage. The criteria are structured into the following
broad steps, with documented guidelines for acceptance, standards, and correc ve ac ve ac ons:
• Planning
• Rehabilita on Earth Works
• Early Establishment – first 5 years
• Vegeta on - 12 years and over.
As described in Sec on 15.5.2, overburden is used to backfill adjacent, completed mining opera ons and the topsoil spread on top and contoured.
Maximum slopes (angle and length) are defined in the 2015 Criteria. If topsoil has been harvested and stored for up to three months prior to use as a
rehabilita on input it is considered ‘direct-return’ and seeding may not be undertaken. If it is older than 3 months, it is considered ‘fallow’ and requires
seeding. Nursery-raised seedlings are also used in rehabilitated areas.
Current rehabilita on prac ces and closure planning have evolved posi vely since the 1990s.
Mine closure costs are described in Sec on 18.0.
17.6 Local Procurement and Hiring
The Alcoa procurement system defines “local” as the locali es of Dwellingup, Harvey, Pinjarra, Waroona, Coolup, North Dandalup, Jarrahdale and
Yarloop. Within Alcoa’s guidelines of safe, ethical, and compe ve business prac ces, they state they will:
• Invite capable local business to bid on locally supplied or manufactured goods or services.
• Give preference to local business in a compe ve situa on.
• Work with local business interest groups to iden fy and u lize local suppliers.
• Where possible, structure bids to enable local supplier par cipa on.
Alcoa also endeavors to add value to Tradi onal Owners and the local economy through the use of businesses owned by Tradi onal Owners, businesses
that employ and work with Tradi onal Owners and locally owned businesses. Alcoa will help Tradi onal Owner businesses and local businesses to do
business with Alcoa and encourage the employment of Tradi onal Owner and local labor and have made a policy commitment to:
• Invite capable local Tradi onal Owner, Aboriginal and Torres Strait Islander and Local businesses to bid on every locally supplied or
manufactured good or service.
• Give preference to Tradi onal Owner, Aboriginal and Torres Strait Islander and Local businesses in a compe ve situa on.
• Tender evalua ons shall apply a minimum weigh ng of 10 per cent for Tradi onal Owner, Aboriginal and Torres Strait Islander and Local
businesses.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20237
-- 339 of 363 --
• Work with Tradi onal Owner, Aboriginal and Torres Strait Islander and Local business interest groups to iden fy, u lize and build local
supplier capability.
• Offer reduced Payment Terms to support the growth and sustainability of Tradi onal Owner, Aboriginal and Torres Strait Islander and Local
business.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20238
-- 340 of 363 --
18.0 CAPITAL AND OPERATING COSTS
Alcoa forecasts its capital and opera ng costs es mates based on annual budgets and historical actuals over the long life of the current opera on. All
values are presented in United States Dollars ($) unless otherwise stated.
18.1 Capital Costs
The opera on is well-established, and the LOM plan does not envisage any significant change of the produc on rate over the LOM. An cipated future
major capital expenditure is related to major mine moves and sustaining the on-going opera ons.
Projected capital expenditure over the next nine years of mine life is es mated to total $603 million. Of this total, $158 million is associated with the
comple on of the mine move to the Myara North site and $241 million is es mated for the Holyoake move.
A breakdown of the major expenditure areas and other sustaining capital expenditure over the next nine years of mine life (2023 – 2031) is shown
below.
Table 18-1: LOM Sustaining Capital Costs by Area
Project Cost
$ Million Percentage of Total
Mine Moves 399 66.2%
Conveyor Belt Replacements 69 11.4%
Haul Road Improvements 55 9.1%
Other Sustaining capital 80 13.3%
Total 603 100%
Other capital costs are for replacement of conveyors, haul road improvements and other sustaining capital needed to con nue the opera ons.
Alcoa’s sustaining capital es mates for Darling Range are derived from annual budgets and historical actuals over the long life of the current opera on.
According to the American Associa on of Cost Engineers (AACE) Interna onal, these es mates would generally be classified as Class 1 or Class 2 with
an expected accuracy range of -3% to -10% to +3% to +15%.
18.2 Opera ng Costs
The main produc on mining opera ons are primarily Owner-operated using Alcoa equipment and employees. Contractors are also used for certain
ac vi es on site.
The opera ng costs are based on historical actual site cost data and, in the opinion of the QP, represent an accuracy range of -10% to +15%.
No items have been iden fied that would significantly impact opera ng costs either posi vely or nega vely over the life of mine. Minor year-to-year
varia ons should be expected based upon
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20239
-- 341 of 363 --
maintenance outages and produc on schedules. Forecast costs for 2023 and average mine opera ng costs the nine-year LOM are shown below in Table
18-2.
Table 18-2: LOM Mine Opera ng Costs by Category*
Cost Centre 2023
($/wmt)
Average LOM
($/wmt)
Percentage of Opera ng Cost
(%)
Direct Labor $3.43 $4.87 38%
Services $2.07 $1.88 15%
Other $1.45 $2.21 17%
Corporate Chargebacks for support services $0.53 $0.59 5%
Energy $0.34 $0.37 3%
Fuel $0.37 $0.67 5%
Opera ng Supplies and Spare Parts $0.44 $0.69 5%
Maintenance (fixed plant and mobile fleet $1.06 $1.67 13%
Mine Opera ng Cash Cost ($/wmt) $9.70 $12.95 100%
Off-site Costs
G & A, selling and other expenses $0.28 $0.24
R & D Corporate Chargebacks $0.03 $0.03
Total Cash Opera ng Costs $10.01 $13.21
*Due to rounding, numbers presented may not add up precisely to the totals provided.
Services costs includes contractor costs for certain mining ac vi es such as in noise sensi ve areas and for haul road construc on services, in select
areas of pit development, and during landscaping ac vi es for rehabilita on a er mining.
As of December 2022, the Huntly and Willowdale opera ons together employ a total of 887 employees consis ng of 48 technical, 77 management and
762 opera ons employees. Addi onally, 67 employees are centrally employed on the combined opera ons.
Table 18-3 summarizes the current workforce for the opera ons.
Table 18-3: Workforce Summary
Category Technical Management Opera ons Total
Huntly 37 50 524 611
Willowdale 11 27 238 276
Central 18 8 41 67
Total 66 85 803 954
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 342 of 363 --
As regards mine closure, compensa on for vegeta on clearing is paid in advance and rehabilita on is an ongoing process that is incorporated into the
mining cost (as part of Asset Re rement Obliga ons (ARO)).
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 343 of 363 --
19.0 ECONOMIC ANALYSIS
19.1 Economic Criteria
Alcoa prepares a rolling opera onal Ten-Year Mine plan for the purposes of long-term mine and business planning.
In accordance with the requirements of SK-1300, the economic analysis presented in this sec on of the TRS is based on mining the es mated Proven
and Probable Mineral Reserves, which generate a current mine life of nine years (2023 to 2031 inclusive) at an average produc on rate of 34.5 Mtpa
(dry tonnes).
It is noted that produc on is driven by refinery requirements rather than mine plan output, so annual fluctua ons in mined tonnage are constrained by
refinery demand and opera on rather than a mining schedule. Therefore, tonnages used in the model are based on forecasted refinery consump on
rather than mine plan outputs. The QP is sa sfied that this approach is standard opera ng prac ce for Alcoa and there is sufficient Proven and
Probable Reserve tonnage available to cover the extent of the 9-year model life.
In addi on, the QP recognizes that Alcoa undertakes on-going infill drilling to annually convert Mineral Resources to Reserves and based on Alcoa’s long
opera ng history at the mine, the scale of the deposits available, and the historical success of Resource to Reserve conversion, the QP sees no reason
why the life of the opera on will not be extended well beyond 2031.
The assump ons used in the analysis are current at the end of December 2022.
An un-escalated technical-economic model was prepared on an a er-tax DCF basis, the results of which are presented in this sec on.
The cashflow is presented on a 100% a ributable basis. Alcoa uses a 12.25% discount rate for DCF analysis. The QP is of the opinion that a 12.25%
discount/hurdle rate for a er-tax cash flow discoun ng of such large-scale bauxite opera ons in Western Australia is reasonable and appropriate.
Key criteria used in the analysis are discussed elsewhere throughout this TRS. General assump ons used are summarized in Table 19-1.
Table 19-1: Technical-Economic Assump ons
Descrip on Value
Start Date January 1, 2023
Mine Life based on Mineral Reserves 9 years
Average LOM Price Assump on $21.00
Total Opera ng Costs $4,330.6 million
Capital over nine years $603.2 million
Income tax $472.5 million
Discount Rate 12.25%
Discoun ng Basis End of Period
Infla on 0%
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 344 of 363 --
Descrip on Value
Corporate Income Tax Rate 30%
Table 19-2 provides a summary of the es mated mine produc on over the nine-year mine life.
Table 19-2: LOM Produc on Summary
Descrip on Units Value
Total ROM Ore Mt 327.8
Waste Mined Mt 65.6
Total Material Moved Mt 393.4
Annual Average Ore Mining Rate Mtpa 36.4
19.2 Cash Flow Analysis
The indica ve economic analysis results, presented in Table 19-3, indicate an a er-tax NPV of $463.9 million at a 12.25% discount rate and an average
bauxite price of $21.00/t, over the 9-year period.
The cashflow is presented on a 100% a ributable basis.
Capital iden fied in the economics is for sustaining opera ons and plant rebuilds as necessary.
Project economic results and es mated cash costs are summarized in Table 19-3. Annual es mates of mine produc on with associated cash flows are
provided for years 2023 to 2031.
The economic analysis was performed using the es mates presented in this TRS and confirms that the outcome is a posi ve cash flow that supports the
statement of Mineral Reserves.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 345 of 363 --
Table 19-3: LOM Indica ve Economic Results
19.3 Sensi vity Analysis
Project risks can be iden fied in both economic and non-economic terms. Key economic risks were examined by running cash flow sensi vi es. The
opera on is nominally most sensi ve to market prices (revenues) followed by opera ng costs (Figure 19-1).
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 346 of 363 --
Figure 19-1: Sensi vity Analysis (NPV)
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 347 of 363 --
20.0 ADJACENT PROPERTIES
The Darling Range has no material adjacent proper es.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 348 of 363 --
21.0 OTHER RELEVANT DATA AND INFORMATION
No addi onal informa on or explana on is necessary to make this Technical Report Summary understandable and not misleading.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 349 of 363 --
22.0 INTERPRETATION AND CONCLUSIONS
22.1 Geology and Mineral Resources
• SLR is independently declaring the 31 December 2022 Mineral Resources for the defined bauxites located within Alcoa’s Darling Range
deposits. The Mineral Resource models were prepared by Alcoa using their in-house es ma on procedures and reviewed extensively by
SLR.
• As of December 31, 2022, exclusive of Mineral Reserves, as summarized in Table 11-5 at an appropriate level of precision reflec ng
confidence, the Measured Mineral Resources are es mated to be 44.9 Mt at a grade of 31.2% available alumina (A.Al2O3) and 1.15%
reac ve silica (R.SiO2). Similarly the Indicated Mineral Resources are es mated to be 51.8 Mt at 31.4% A.Al2O3 and 1.17% R.SiO2, and the
Inferred Mineral Resources are es mated to be 140.3 Mt at 32.9% A.Al2O3 and 1.26% R.SiO2.
• Drill sampling and sample control procedures at Alcoa’s Darling Range Bauxite Opera ons are adequate and appropriate for use in the
es ma on of Mineral Resources. The defined volumes and grades of mineraliza on are not expected to be systema cally impacted (biased)
by errors in either the collar loca on or the 3D sample loca on.
• The QA/QC of sample prepara on and assaying is adequate, and the assay results are suitable for use in Mineral Resource es ma on.
• Analy cal procedures used for the Alcoa Mineral Resource comprises part of conven onal industry prac ce. FTIR is not widely used yet in
the bauxite industry but is becoming more widely accepted and applied to more opera ons. At Alcoa the method has been consistently
applied successfully for a decade and is rou nely validated by industry standard XRF and wet chemical procedures as discussed in Sec on
8.3 and 8.4. It is the opinion of the QP from the studies on FTIR repeatability discussed above that the overall precision and accuracy of the
FTIR assaying is acceptable.
• The database is adequate, and the data is appropriate for the purpose of Mineral Resource es ma on.
• The con nuous improvements in the geological modelling, es ma on techniques, and block model migra on to the 3D approach are
appropriate and constantly improve the confidence level and precision of the Mineral Resources.
• The dry bulk density data is less well controlled than other analytes, although different a empts were taken since 1980. However, based on
the different reconcilia on approaches and on the fact that the polygonal and GSM model have lower confidence level, the density values
are acceptable for the Resource es ma on.
• The condi on of Reasonable Prospects for Economic Extrac on is met by constraining the Mineral Resource model using the ArcGIS system,
by ensuring that the model defines key parameters for the refinery, and by sound reconcilia on prac ces providing feedback that the
modelling is appropriate for the purpose.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 350 of 363 --
22.2 Mining and Mineral Reserves
• As of December 31, 2022, Proven Mineral Reserves are es mated to total 145.8 Mt at 31.4% A.Al2O3 and 1.17% R.SiO2 and Probable
Mineral Reserves are es mated to total 255.8 Mt at 32.4% A.Al2O3 and 1.15% R.SiO2.
• The QP has used the December 31, Mineral Resource es mate as the basis for its Mineral Reserve es mate. The bauxite opera ons are
opera ng mining projects with a long history of produc on for which establishment capital has been repaid and for which sustaining capital
and supported opera ng costs have been observed to be applied in economic analysis. Consequently, the QP considers that support by a
Feasibility Study is demonstrated by the demonstrable history of profitable opera on and the level of technical support for the Modifying
Factors. The QP has reviewed the opera ng and planning procedures and parameters for the opera ons.
• The QP considers that the accuracy and confidence in the Mineral Reserve es mate to be appropriate for the classifica on applied, which is
supported by both the conserva ve opera onal processes and the long opera onal history.
• The QP is not aware of any risk factors associated with, or changes to, any aspects of the Modifying Factors such as mining, metallurgical,
infrastructure, permi ng, or other relevant factors that could materially affect the Mineral Reserve es mate.
22.3 Mineral Processing
• The opera ng data between 2010 to 2022 indicates that the product from the Darling Range opera ons consisted of an average A.Al2O3
grade of 33%, with R.SiO2 below the target for refinery feed.
• The QP is of the opinion that the Darling Range opera on demonstrated that ore can be effec vely crushed and supplied to a refinery for
further upgrading to produce alumina. The historical opera onal data confirmed that the ore consistently met refinery specifica ons
without any deleterious elements.
o Based on this, and addi onal informa on provided by Alcoa regarding the mine plan, it is reasonable to assume that the ore
from Darling range can be economically processed for the next 10 years.
22.4 Infrastructure
• The Darling Range mining opera ons have established and opera onal infrastructure, with mining hubs that host administra ve offices, as
well as crushing facili es and maintenance facili es.
o Hubs are relocated periodically as produc on moves away from the hub and transporta on costs increase. These reloca ons
are well-understood with planning and associated budge ng occurring well in advance of reloca ons; produc on restarted
seven days a er the shutdown.
• An extensive haul road network, rail, and overland conveyors transport crushed bauxite from the Hub to the refineries.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 351 of 363 --
o Bauxite is transferred from each mine to the refineries primarily via long distance conveyor belt, apart from the Kwinana
refinery which receives bauxite via railway.
o Alumina produced by the three refineries is then shipped to external and internal smelter customers through the Kwinana and
Bunbury ports.
• The Huntly and Willowdale mines are located near the towns of Pinjarra and Waroona respec vely. These are easily accessible via the
na onal South Western Highway, a sealed single carriageway road, spanning almost 400 km from the southern side of Perth to the
southwest corner of Western Australia.
• Major haul roads have been established to each mining area, while secondary haul roads, cross-cut each individual mining plateau. Roads
are unsealed and require con nuous maintenance.
• The Darling Range’s Pinjarra refinery receives power from the South West Interconnected System (SWIS), but also has internal genera on
capacity of 100 MW from four steam driven turbine alternators, with steam produced by gas fired boilers and a gas turbine Heat Recovery
Steam Generator (HRSG).
o The refinery supplies power to the Huntly Mine by a 33,000 volt power supply line and two 13,800 volt lines.
• The Wagerup refinery is a net exporter of power to the SWIS, with internal genera on capacity of 108 MW from three steam driven turbine
alternators and one gas turbine; steam being generated by gas fired boilers.
o The refinery supplies power to the Willowdale Mine by a single 22,000 volt power supply.
• Water is used on the mines for dust suppression, dieback washdown, vehicle washdown, workshops, conveyor belt wash, construc on, and
domes c purposes.
o The water supplies for mining consist of licensed surface water sources supplemented with treated wastewater from vehicle
washdowns, stormwater runoff and maintenance workshops.
o In 2020, water abstrac on comprised approximately 74% of the total Department of Water and Environmental Regula on
license alloca on (for those sites where abstrac on occurred). An addi onal 336,105kL was also abstracted from South
Dandalup Dam under the agreement with Water Corpora on.
• On site facili es include offices, ablu ons, crib-rooms, and workshops, however there are no Alcoa accommoda on facili es, as the Huntly
and Willowdale mining areas are close to established popula on centers.
• No tailings are generated within the boundaries of the mining opera ons. The management of tailings generated downstream at the
refineries is beyond the boundaries of the Darling Range mining opera ons and are therefore not considered in this TRS. Waste rock is used
to backfill shallow completed before covering with topsoil and refores ng.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 352 of 363 --
22.5 Environment
• Alcoa has established processes to facilitate conformance with environmental requirements, while iden fying sensi ve areas ahead of me
enables them to be managed ahead of disturbance.
• Overburden is carefully segregated for later contouring and rehabilita on of adjacent, completed mining opera ons. Caprock and other
non-viable rock is used to backfill these shallow, completed pits and the viable topsoil spread on top, contoured, and revegetated.
• Bauxite processing residue is only generated at the Refineries, with no tailings generated within the boundaries of the mining opera ons.
Absence of mine waste prevents the need for waste dump construc on and monitoring.
• Site monitoring is completed in accordance with condi ons of government authoriza ons and opera onal licenses at Huntly and
Willowdale.
• A groundwater monitoring program commenced in H2 2022 across the Darling Range opera ons to support approvals and opera onal
monitoring.
o Alcoa will con nue to expand its monitoring program, as necessary, if groundwater quality or quan ty has been iden fied as
poten ally at risk due to opera onal or mining ac vi es, or poten al exists for mining to impact offsite/private groundwater
supply quan ty or quality.
o Alcoa has a long-term groundwater research project within the Intermediate Rainfall Zone to evaluate poten al impacts of
clearing on groundwater saliniza on.
• Outcomes of and compliance with the management and monitoring programs have most recently been reported within the 2021 Annual
Environmental Review report. Consistent with the outcomes reported between 2018 and 2020:
o Review of the most recent report, published for 2021 largely reported compliance with environmental commitments and
success of opera onal controls to managed environmental objec ves.
• Baseline water quality monitoring has been undertaken at Myara North and Holyoake as part of the Part IV approvals process for these
mining areas. It is an cipated that groundwater monitoring will be required as part of the opera onal license for these deposits.
• Outcomes of and compliance with the management and monitoring programs have most recently been reported within the 2021 Annual
Environmental Review report. Consistent with the outcomes reported between 2018 and 2020:
o Review of the most recent report, published for 2021 largely reported compliance with environmental commitments and
success of opera onal controls to managed environmental objec ves.
o Only a small number of reportable environmental incidents were noted for which correc ve ac ons have been proac vely
undertaken by Alcoa.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 353 of 363 --
23.0 RECOMMENDATIONS
23.1 Geology and Mineral Resources
It is apparent to the QP that the long history of explora on, development and mining of Alcoa’s Darling Range bauxite tenements have established
sound knowledge and understanding of the geology and mineral endowment. The QP has not iden fied any fatal flaws in the current prac ces of
mapping (based on the ArcGIS system), drill sampling (based on progressive con nuous improvement), assaying (based on calibrated and validated
FTIR, with reasonable quality control), es ma on (3DBM), database management (using acQuire), the applica on of mining criteria that assure
Reasonable Prospects for Economic Extrac on (RPEEE), and the applica on of constraints establishing forestry, heritage and noise limits to the Mineral
Resource defini on. The following recommenda ons are offered as sugges ons for further improvement, aligned with Alcoa’s comprehensive approach
to research and development (seen for example in the evolu on of their drilling, sampling and assaying technologies). These recommenda ons are
priori zed in terms of their perceived value to the overall opera on:
• Con nuing to replace the GSM and polygonal areas to the 3D block modelling methodology, using a script-based semi-automated
approach, which enables more robust rapid model building. The valida on of interpola on parameters using risk-based (condi onal
simula on) techniques to quan fy confidence should be considered.
• To improve the repor ng of recoverable resources, a re-blocked block model to a minimum prac cal mining scale or single mining unit
(SMU) should be considered. Economical parameters considering more flexible costs and bauxite prices related to the Mineral Reserves can
also be implemented in the Mineral Resources workflow, aiming to op mize the bauxite mineable por on including poten al marginal
grades.
• Inves gate whether the 5% bias in the tonnage between the As Mined and sampling tower weightometers is persistent in the 3D block
models.
• Further redrilling or where viable re-assaying of pulps
• Implementa on of a mine wide reconcilia on system should be considered as a way to overcome the issue of density es ma on. This could
be integrated with the extensive produc on tracking data already available from the current fleet management system and opera onal
control system (covering the mining equipment, crushers, conveyors, sampling towers, stockpile stackers and reclaimers).
• To include volume surveys using drones and truck gantry scanning, wet mass measurement using weightometers on conveyors and
LoadRite sensors on mining equipment, and infra-red moisture determina on, mean that be er in situ dry density es ma on may become
possible if the opera on requires it for be er refinery feedstock control.
• The QP considers that twinned hole studies are of limited value and should only be implemented once the sample spli ng and prepara on
demonstrates good repeatability, using field duplicates (or the equivalent STE samples). They may be of value to inves gate specific issues
under closely supervised condi ons.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 354 of 363 --
• While the STE procedure could be retained for specific studies, in the QP’s opinion, the reintroduc on of field duplicates using appropriate
riffle spli ers under supervision should be considered.
• The QP is of the opinion that the grade characteris cs of the bauxite profile could be reproduced in the model, which enables op miza on
techniques to be used for the defini on of mining floors and boundaries, be er support for ore loss and dilu on studies, and more accurate
reconcilia on studies.
23.2 Mining and Mineral Reserves
• Currently a dilu on and mining recovery factor is applied to the final Reserves to reconcile the tonnes and grade. The QP recommends
applying dilu on and ore loss at the re-blocked model level before performing the op miza on and repor ng these values independently.
• The life-of-mine scheduling requires further refinement with regards to sequencing of the different mining areas and assigning the
scheduled years back to the OreBest model (the mining output that defines Reserves).
• The QP recommends detailed haulage analysis focusing on haulage profiles and cycle mes to provide more accurate opera ng costs.
• The QP noted the mining models were in both a 2D grid and 3D model system. Aligning all the mining models within the same 3D mining
model system will provide clarity and consistency across Darling Range project with regards to evalua on and repor ng processes.
23.3 Mineral Processing
As men oned in Sec on 22.3, the historical opera onal data for the Darling Range demonstrate that ore consistently met refinery specifica ons.
Ideally, independent verifica on of sample analysis is conducted, by a cer fied laboratory, on a structured program, in order to ensure the QA/QC
aspects of the internal analysis. Within this process a propor on of samples from each batch could be sent to the independent laboratory for analysis
and the results can be compared with the internal analysis.
The QP is apprecia ve that the mine is opera onal meaning a trade-off versus logis cs / prac cality would need to be carried out.
23.4 Infrastructure
The Darling Range mining opera ons have well established infrastructure, with mining hubs that are periodically moved to reduce transporta on
distances between mining opera ons and the hubs. The QP makes no recommenda ons regarding infrastructure.
23.5 Environment
Alcoa has established systems to facilitate adherence to environmental commitments. The QP recommends that the following ac ons are taken to
monitor previously enacted correc ve ac ons, made in response to minor environmental incidents:
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 355 of 363 --
• Addi onal monitoring should be undertaken post-implementa on of correc ve ac ons to demonstrate their effec veness, in par cular:
a. following drainage failures related to significant rainfall events, which resulted in surface water flow from dieback areas into
dieback free areas.
b. following recordings of elevated turbidity for a period exceeding the compliance criteria (25 NTU).
c. in response to incidents involving PFAS and AFFF contamina on
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 356 of 363 --
24.0 REFERENCES
Abzalov, 2016. Applied Mining Geology. Springer Interna onal, 448 pp.
Alcoa of Australia Limited, 2022. JTSI Annual Environmental Review 2021 – Alcoa WA Mining Opera ons.
Alcoa of Australia Limited, 2022. 2021 Annual DWER Licence Report, Willowdale Mine, Licence No L6465/1989/10.
Alcoa of Australia Limited, 2022. 2021 Annual DWER Licence Report, Huntly Mine, Licence No L6210/1991/10.
Alcoa of Australia Limited, 1993. Bauxite Density. Internal memorandum prepared by Alcoa, dated 10 August 1993.
Barnes, L., 2015. 1m composite twin hole report. 1m sample intervals at the primary explora on stage (60x60m). Internal report by Alcoa Australia
Limited, March.
Barnes, L., 2016. Procedure for sampling ll ex nc on. Trial for 0.5m sample homogeneity, tes ng the representa on of a ½ cup measure of 0.5m
sample intervals. Internal dra report by Alcoa Australia Limited, March.
Barnes, L., 2018a. Segrega on study. Internal dra report by Alcoa Australia Limited, February.
Barnes, L., 2018b. Sample to Ex nc on (STE) programme report 2017-2018. Internal dra report by Alcoa Australia Limited, July.
BSI, 2022. Cer ficate of Registra on – Environmental Management System – ISO 14001:2015. Cer ficate EMS 729424.
Canadian Ins tute of Mining, Metallurgy and Petroleum (CIM), 2014, CIM Defini on Standards for Mineral Resources and Mineral Reserves, adopted
by the CIM Council on May 10, 2014.
CIM, 2014. Canadian Ins tute of Mining, Metallurgy and Petroleum (CIM) Defini on Standards for Mineral Resources and Mineral Reserves. Prepared
by the CIM Standing Commi ee on Reserve Defini ons. Adopted by CIM Council on May 10, 2014
Crockford, L., 2011. 2nd split drill sample testwork in the Larego area. Internal memorandum by Alcoa Australia Limited, 26 October.
Crockford, L., 2012. 1st and 2nd split drill sample testwork in the Myara area. Internal memorandum by Alcoa Australia Limited, 10 April.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 357 of 363 --
Firman, J. B., 2006, Ancient weathering zones, pedocretes and palaeosols on the Australian Precambian shield and in adjoining sedimentary basins: a
review, Journal of the Royal Society of Western Australia, 89 (2), 57 – 82, 2006
Franklin, S., 2019. Mining Laboratory FTIR Process Descrip on (KWI). Internal Alcoa of Australia Limited document AUACDS-2047-781, reviewed 15
February.
GHD, 2021. Alcoa Huntly Mine – Holyoake Region Groundwater Modelling Report. Prepared for Alcoa of Australia Limited, 22 December 2021.
Grigg, C., 2016. Summer vaca on programme report 2015/2016. Internal report by Alcoa Australia Limited, February
Gy, P. M., 1984. Comments on bauxite sampling, Report to Alcoa No PG/3276, 27 July.
Hickman, A. H., Smurthwaite, A. J., Brown, I. M., and Davy, R., 1992, Bauxite Mineraliza on in the Darling Range, Western Australia, Geological Survey
of Western Australia, Report 33
Hodgson, S., 2015. Ore development QAQC Processes. Vaca on student – summer work program 2014/15. Internal report by Alcoa Australia Limited,
February.
Holmes, R. J., 2018. Assessment of Alcoa’s sampling and sample prepara on equipment and procedures. Report EP182329 prepared for Alcoa of
Australia Limited by CSIRO Mineral Resources, March.
Ipsos, 2022. Reputa on Measurement and Management Wave 2 Report, Alcoa of Australia – Western Australia Opera on, February.
JORC Code, 2012. Australasian Code for Repor ng of Explora on Results, Mineral Resources and Ore Reserves (The JORC Code 2012 Edi on). Prepared
by the Joint Ore Reserves Commi ee of the Australasian Ins tute of Mining and Metallurgy, Australian Ins tute of Geoscien sts and
Minerals Council of Australia (JORC), effec ve 20 December 2012.
Knight., S., Tuckwell, L. and O’Brien, S., 2016. Huntly 2016 sample plant monitoring. Report by Alcoa Australia Limited (PowerPoint file).
Lyman, G. J., 2017. Inves ga on into Pinjarra and Wagerup sample plants. Report by Downer no 15382-19-02-04-001, 18 May.
NI 43-101, 2014. Canadian Na onal Instrument 43-101, ‘Standards of Disclosure for Mineral Projects’, Form 43-101F1 and Companion Policy 43-101CP,
May.
Rennick, W., Riley, G. and Baker, G., 1992. The cons tu on heterogeneity of Huntly ore and the resul ng fundamental sampling errors using the
Pinjarra sample sta on. Internal Alcoa Report, July.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 358 of 363 --
Ramboll, 2021. Pinjarra Aluimina Refinery Revised Proposal – Health Risk Screening Assessment. Prepared for Alcoa of Australia Limited, June 2021.
Senini, P., 1993. Bauxite density. Internal report and memorandum by Alcoa Australia Limited, August 10.
Shaw, W. 1997. Valida on of Sampling and Assaying Quality for Bankable Feasibility Studies. The Resource Database Towards 2000. Wollongong, New
South Wales, Australia. 16 May. AusIMM, Melbourne. 41-49.
S-K 1300, 2018. US Securi es and Exchange Commission Regula on S-K, Subpart 229.1300, Item 1300 Disclosure by Registrants Engaged in Mining
Opera ons and Item 601 (b)(96) Technical Report Summary.
SLR, 2022. Technical Report Summary for Darling Range, Western Australia, S-K 1300 Report. Report prepared for Alcoa Interna onal Corpora on by
SLR Interna onal Corpora on, dated February 24, 2022, with an effec ve date of December 31, 2021
Snowden, 2015. Willowdale and Huntly Bauxite Opera ons Resource Es ma on. Report prepared for Alcoa of Australia Limited by Snowden Mining
Industry Consultants Pty Ltd, project number AAU5035 Resource Es ma on Review, August.
SRK, 2017. Mineral Resource Es mates for the Alcoa Darling Range Bauxite Opera ons – December 2016. Report prepared for Alcoa of Australia
Limited by SRK Consul ng (Australasia) Pty Ltd, project number AOA002, May.
SRK, 2018. Mineral Resource Es mates for the Alcoa Darling Range Bauxite Opera ons – December 2017. Report prepared for Alcoa of Australia
Limited by SRK Consul ng (Australasia) Pty Ltd, project number AOA004, March.
SRK, 2019a. Drillhole spacing study for the Alcoa Darling Range Bauxite Opera ons. Report prepared for Alcoa of Australia Limited by SRK Consul ng
(Australasia) Pty Ltd, project number AOA005, April.
SRK, 2019b. Mineral Resource Es mates for the Alcoa Darling Range Bauxite Opera ons – December 2018. Report prepared for Alcoa of Australia
Limited by SRK Consul ng (Australasia) Pty Ltd, project number AOA006, October.
SRK, 2021a. Mineral Resource Es mates for the Alcoa Darling Range Bauxite Opera ons – December 2020. Report prepared for Alcoa of Australia
Limited by SRK Consul ng (Australasia) Pty Ltd, project number AOA007, April.
SRK, 2021b. Ore Reserve es mates for the Alcoa Darling Range bauxite opera ons – December 2020. Report prepared for Alcoa of Australia Limited by
SRK Consul ng (Australasia) Pty Ltd, project number AOA007, April.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20232
-- 359 of 363 --
US Securi es and Exchange Commission, 2018: Regula on S-K, Subpart 229.1300, Item 1300 Disclosure by Registrants Engaged in Mining Opera ons
and Item 601 (b)(96) Technical Report Summary.
Xstract, 2016. Mineral Resource and Ore Reserve audit, Huntly and Willowdale Opera ons. Report prepared for Alcoa of Australia Limited by Xstract
Mining Consultants Pty Ltd, project number P2173, May.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20233
-- 360 of 363 --
25.0 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT
This report has been prepared by SLR for Alcoa. The informa on, conclusions, opinions, and es mates contained herein are based on:
• Informa on available to SLR at the me of prepara on of this report,
• Assump ons, condi ons, and qualifica ons as set forth in this report, and
• Data, reports, and other informa on supplied by Alcoa and other third party sources.
For the purpose of this report, SLR has relied on ownership informa on provided by Alcoa in a legal opinion by Paul Volich, Managing Counsel –
Australia, dated February 10, 2022, en tled Alcoa of Australia to SLR Corpora on - ML1SA in good standing. SLR has not researched property tle or
mineral rights for the Darling Range as we consider it reasonable to rely on Alcoa’s legal counsel who is responsible for maintaining this informa on.
SLR has relied on Alcoa for guidance on applicable taxes, royal es, and other government levies or interests, applicable to revenue or income from
Darling Range in the Execu ve Summary and Sec on 19. As Darling Range has been in opera on for over ten years, Alcoa has considerable experience
in this area.
The Qualified Persons have taken all appropriate steps, in their professional opinion, to ensure that the above informa on from Alcoa is sound.
Except for the purposes legislated under applicable securi es laws, any use of this report by any third party is at that party’s sole risk.
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20234
-- 361 of 363 --
26.0 DATE AND SIGNATURE PAGE
This report tled “Technical Report Summary on the Darling Range, Western Australia, S-K 1300 Report” with an effec ve date of December 31, 2022
was prepared and signed by:
SLR Consul ng Ltd
Per:
/s/ John R. Walker
John R. Walker, FGS, MIMMM, FIQ
Technical Director, Mining Advisory Europe
Dated in UK
February 23, 2023
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 362 of 363 --
Alcoa Corpora on | SLR Project No: 410.064663.00001
Technical Report Summary - February 23, 20231
-- 363 of 363 --