TRANSCRIPT

Q3 2023 — Transcript

Q3 2023PDF · 22 pages227 KB
Alcoa Corporation
Third Quarter 2023 Earnings Presentation and
Conference Call
Wednesday, October 18, 2023, 5:00 PM
Eastern
CORPORATE PARTICIPANTS
William Oplinger – President and Chief Executive Officer
Molly Beerman – Executive Vice President and Chief Financial Officer
James Dwyer – Vice President, Investor Relations and Pension Investments
OTHER PARTICIPANTS
Lawson Winder – Analyst, BofA Securities
Lucas Pipes – Analyst, B. Riley Securities, Inc.
Michael Dudas – Analyst, Vertical Research Partners LLC
Bill Peterson – Analyst, JPMorgan Securities LLC
John Tumazos – Analyst, John Tumazos Very Independent Research LLC
Alexander Hacking – Analyst, Citigroup Global Markets, Inc.
Timna Tanners – Analyst, Wolfe Research LLC
Carlos de Alba – Analyst, Morgan Stanley & Co. LLC
Christopher LaFemina – Analyst, Jefferies LLC

-- 1 of 22 --

1
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
PRESENTATION
Operator Good afternoon, and welcome to the Alcoa Corporation Third Quarter 2023
Earnings Presentation and Conference Call. All participants will be in a
listen-only mode.
Should you need assistance, please signal a conference specialist by
pressing the star key followed by zero. After today’s presentation, there will
be an opportunity to ask questions. To ask a question, you may press star
then one on your phone. To withdraw your question, please press star then
two. Please note, this event is being recorded.
I would now like to turn the conference over to James Dwyer, Vice
President of Investor Relations. Please go ahead.
James Dwyer Thank you, and good day everyone. I’m joined today by William Oplinger,
Alcoa Corporation President and Chief Executive Officer, and Molly
Beerman, Executive Vice President and Chief Financial Officer. We will
take your questions after comments by Bill and Molly.
As a reminder, today’s discussion will contain forward looking statements
relating to future events and expectations that are subject to various
assumptions and caveats. Factors that may cause the Company's actual
results to differ materially from these statements are included in today’s
presentation and in our SEC filings.
In addition, we have included some non-GAAP financial measures in this
presentation. For historical non-GAAP financial measures, reconciliations
to the most directly comparable GAAP financial measures can be found in
the appendix to today’s presentation. We have not presented quantitative
reconciliations of certain forward-looking non-GAAP financial measures for
reasons noted on this slide. Any reference in our discussion today to
EBITDA means Adjusted EBITDA.
Finally, as previously announced, the earnings press release and slide
presentation are available on our website.
With that, here’s Bill.
William Oplinger Thank you, Jim. And thanks to everyone for joining our conference call
today.
Before we get started, I want to acknowledge the important contributions
from our former CEO, Roy Harvey. Roy played a key role in our evolution
into a stronger and more resilient business, and he was pivotal in our 2016
launch as a pure play upstream aluminum company. He led the company
through some difficult market environments, including Covid, and his
commitment to making Alcoa successful never wavered. He is serving as
a strategic advisor to me for the remainder of the year, and I appreciate his
counsel.

-- 2 of 22 --

2
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
I’ve interacted with many of you over my 23 years with Alcoa Inc. and Alcoa
Corp., both in my CFO and COO roles, and I’m glad to be with you again
today. In my first few weeks in this role, I’ve met with employees,
customers, and industry participants.
Several questions keep coming up in those conversations, such as: What
are our priorities? And what are Alcoa’s key challenges?
First, to address the constant in our company… our values. At Alcoa, we
act with integrity, operate with excellence, care for people and lead with
courage. These aren’t statements that simply live on a plaque. These are
the values we expect every Alcoan to live daily.
I am proud to lead a company guided by strong values. Our relentless
focus on the safety of our employees, contractors and visitors to our sites
will continue, as will our efforts toward our sustainability targets.
As I step into the CEO role, I want to make it clear that I have ambition for
this company. That ambition manifests as an expectation of excellence in
everything we do, from EH&S, operations, maintenance, and commercial
excellence. Alcoa has an impressive history of innovation and leadership
in the industry, and we plan to further build on that and strengthen our
market connections.
We will be action oriented, and make decisions guided by our values,
sound business principles, and with a focus on creating value for our
stockholders.
We’ve made good progress this year. Across our system, we have
improved stability, and we intend to build on that operational momentum.
So, for the near term, the focus will be:
Gaining approvals for bauxite mining in Western Australia. This is our top
priority. We are making progress. We have the right team in place for
success, and we understand the improvements that our stakeholders are
expecting.
We will be driving for further operational improvements in Brazil. The
ongoing startup at the Alumar smelter in Sao Luis hasn’t gone as planned.
We now have conditions in place for a successful restart from here forward.
Next, we will be focusing on productivity across our system, with every site
focused on margin improvements through operational productivity going
into 2024.
And, we have action plans in place to improve the financial results of certain
locations in the system that have been underperforming. Each operation
is working to become more globally competitive.
In the long term, we remain bullish on aluminum as the material of choice.
Megatrends continue to drive increased aluminum usage globally, from

-- 3 of 22 --

3
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
further EV penetration, to the substantial future demand in solar
installations.
Alcoa is uniquely positioned in the aluminum industry for a world focused
on carbon emissions and other sustainability issues, which we are
addressing from three vectors… primary metal production with our joint
venture ELYSISTM, post-consumer scrap usage with our ASTRAEATM
technology, and carbon and residue emissions with our Refinery of the
Future initiative.
So before I address the 3rd quarter results, let me reemphasize … We are
laser focused on improving the short term, and we are working on
developing unmatched, industry-leading technology for the long term.
Let’s begin with safety. I am disappointed that we had one serious injury
with life-altering implications, in the third quarter. A worker at our Juruti
bauxite mine lost portions of two fingers while performing maintenance on
a bulldozer.
While this event is unacceptable, overall we are making progress on
preventing fatalities and serious injuries. So far this year, our Total
Recordable Injury Rate has improved by 16 percent, and Days Away and
Restricted Time Injury, or DART rate, is 27 percent better on a year-over-
year basis. Also, we are increasing the number of on-site field verifications
for leaders to evaluate the effectiveness of critical safety controls and
coach workers on safety improvements.
Now, moving to the financials: We reported an adjusted net loss for the
third quarter of $1.14 per share, and $70 million in adjusted EBITDA
excluding special items, driven by lower average realized prices for both
alumina and aluminum. Improvements in both raw material and production
costs did not fully offset the impact from lower realized pricing in both of
our segments.
We ended the quarter with a strong balance sheet and a cash balance of
$926 million.
We’ve made meaningful progress on our approvals for bauxite mining in
Australia during the quarter and have more visibility on the timeline for
decisions from the government and regulators. I’ll address this more fully
later.
In our operations, our Quebec smelter system set production records in the
quarter, and we’re investing there to increase our casting capabilities for
value-add products.
From a commercial perspective, we also continue to be encouraged by the
reception from customers for our Sustana line of low-carbon products,
which includes EcoLum metal and EcoSource alumina.
And while demand in some key end markets remains soft, there are signals
for a rebound in 2024. We’ll talk more about that macroeconomic view of

-- 4 of 22 --

4
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
our market in a moment. But first, let me turn it over now to our CFO. Molly,
please go ahead.
Molly Beerman Thank you, Bill.
Revenue was down 3% to $2.6 billion, as higher shipments only partially
offset lower realized prices for both alumina and aluminum. The net loss
attributable to Alcoa increased $66 million to $168 million, and the loss per
share increased from $0.57 to $0.94.
On an adjusted basis, the net loss attributable to Alcoa increased $140
million to $202 million. The difference in net loss is primarily related to the
reversal of a valuation allowance on deferred tax assets in Iceland.
Adjusted EBITDA declined $67 million to $70 million, as part of the
decrease in revenue was offset by lower costs.
Let’s look at the key drivers of EBITDA…
Third quarter 2023 Adjusted EBITDA declined $67 million to $70 million, as
lower metal and alumina realized prices were only partially offset by lower
raw materials, energy, and production costs.
Alumina segment EBITDA increased $20 million sequentially. Lower raw
material costs (primarily caustic soda) and lower production costs in Brazil
and Spain more than offset lower alumina index prices.
We also saw the benefit of lower raw materials and production costs in the
Aluminum segment, as well as energy improvements, but not enough to
overcome the impact of lower metal prices.
Other costs outside the segments were unfavorable $56 million; they reflect
unfavorable Intersegment eliminations, higher Transformation demolition
costs, and higher Other corporate costs.
Here’s a deeper dive on raw material costs…
This year we have seen substantial improvement in our segment EBITDA
due to lower prices for our key raw materials. Market prices for caustic
soda, calcined petroleum coke, and coal tar pitch continued to decline in
the quarter, and are expected to improve further.
Companywide, we have seen an $86 million EBITDA improvement over
the first nine months: $32 million in the Alumina segment and $55 million
in the Aluminum segment. These lower raw materials market prices work
through our financials on a lagged basis, so we expect further improvement
in the fourth quarter.
Let’s now move to other key financial metrics…
Our key financial metrics are consistent with our earnings results. Year to
date return on equity is negative 8.7%. Our third quarter dividend added
$18 million to stockholder capital returns, which total $54 million year to

-- 5 of 22 --

5
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
date. Free cash flow less net NCI contributions was negative $36 million in
the quarter, increasing proportional adjusted net debt by $0.1 billion and
decreasing the cash balance by a similar amount.
Year to date, capital expenditures and cash income taxes remained our
largest uses of cash. In the third quarter, Days working capital improved 5
days to 50 days on lower inventories. The improved working capital
performance provided a significant source of cash in the third quarter,
entirely offsetting the previous year to date working capital cash use.
The working capital improvement is evident on the next slide…
The cash balance declined $64 million in the quarter. The largest source
of cash was a working capital reduction of $183 million, primarily from lower
inventories, followed by EBITDA of $70 million and net noncontrolling
interest contributions of $40 million. We expect working capital to be a
source of cash in the fourth quarter.
Capital expenditures were the largest use of cash at $145 million, as capex
typically increases as we move through the year. Notable this quarter were
settlement payments of $75 million to former workers at two smelters that
Alcoa previously owned in Spain, as well as environmental and ARO
spending of $52 million.
Let’s turn to the outlook for the final quarter of 2023…
Our full year outlook has one favorable adjustment:
We expect Other corporate expense to improve $10 million to $120 million.
At the segment level:
In Alumina, we expect an improvement of approximately $50 million due to
lower raw material prices, better production costs, and higher volumes,
partially offset by approximately $10 million in higher energy costs. In
addition, we expect impacts related to lower bauxite grades in Australia to
be consistent with the prior two quarters.
In the Aluminum segment, we expect unfavorable energy impacts of
approximately $30 million mainly due to CO2 compensation changes in
Norway. Additionally, we expect $35 million in raw material price
improvements to be offset by unfavorable product mix and higher
production costs. Finally, alumina costs in the Aluminum segment are
expected to be favorable by $5 million.
Below EBITDA, note that the third quarter Other expenses included one-
time negative impacts of $35 million, primarily foreign currency losses, and
we expect the fourth quarter operational tax to range between $10 million
to $20 million.
Now I’ll turn it back to Bill…

-- 6 of 22 --

6
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
William Oplinger Thank you, Molly. Next, I’d like to recap some key items from our global
operations.
Each of the three smelters in Quebec – Deschambault, Baie Comeau and
ABI in Bécancour – have set year-to-date production records for tonnes per
day. When totaled together, they’ve performed the best since our 2016
separation.
This week, one of those smelters, ABI, announced a planned investment
to further improve its casting capabilities for a broader array of alloys for
value add products. The new equipment should enable us to deliver
products with additional sizes, smoother surfaces, and better dimensional
control for the automotive and packaging markets.
We are also focused on operational improvements from assets across our
global system, driven by productivity enhancements. We took our first
action last month at our Kwinana refinery in Western Australia with a
restructuring plan that is intended to improve that facility and save $10
million annually with more improvements under consideration.
In Brazil, we’re employing a deliberate and methodical approach to the
Alumar smelter restart, which is now operating at approximately 65 percent
of the site’s total capacity, and has restored stability to the pots that have
been restarted.
Finally, we are committed to conformance with the Global Industry
Standard on Tailings Management. Alcoa has voluntarily disclosed
information from all of our global tailings, and we’ve worked with the
International Council on Mining and Metals, or ICMM, to improve the
industry’s management of tailings. This has been a significant undertaking,
and we worked diligently, including with third-party reviewers, to provide
additional information about impoundments with the highest classification
ratings before an August deadline set for ICMM members.
Now, let’s turn to an update on our mining approvals in Western Australia.
Our teams have continued to work with relevant state government
departments to advance our annual approvals for bauxite mining at the
Huntly and Willowdale mines.
Securing an approval is an absolute priority for our company, and we are
working toward a final resolution in the fourth quarter. We have submitted
a revised Mine Management Program, or MMP, for the period 2023 to
2027. This updated MMP is now being reviewed by regulators.
We believe this revised plan meets evolving stakeholder needs, as it
includes numerous enhancements designed to specifically address
expectations of the government. It includes additional controls for the
protection of drinking water, including increased distances from reservoirs,
and addresses biodiversity concerns through a plan to accelerate
rehabilitation.

-- 7 of 22 --

7
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
Separately, let me briefly discuss the Western Australian Environmental
Protection Authority process. In August, the agency completed a public
consultation period on whether it should assess all or part of the current
and next MMPs. The WA EPA has indicated that it expects to decide on
this before the end of the year.
We have demonstrated our commitment to transitioning to a more
modernized approvals framework for new major mine regions. That’s why
we proactively began a formal assessment in 2020 from the WA EPA for
our two new major regions for the Huntly mine – Myara North and
Holyoake.
But this will take some time. The assessment for Myara North and
Holyoake is ongoing, and we do not expect the first bauxite ore from these
new regions any earlier than 2027. We do expect the bauxite grade from
these regions to be more consistent with the higher grades we previously
experienced at the existing Myara Central. However, until then, we expect
similar bauxite quality as compared to recent grades.
As Molly described, we are actively working to mitigate the financial
impacts of these lower grades while also looking for opportunities to
optimize productivity.
Next, let’s move to some highlights from a commercial perspective and
discuss some demand trends.
First, customers are increasing demand for our Sustana line of products.
The Sustana line is a small, but growing, proportion of our overall sales
volume.
Sales of EcoLum, our low-carbon aluminum, are strong in Europe and
orders are being placed in North America, too. Overall, we expect our
annual global sales volume for EcoLum to increase approximately 60
percent for 2023, when compared to last year.
Also, in the third quarter, we made our first sale of the non-metallurgical
variety of EcoSource, our low-carbon alumina brand. Earlier this year, we
started offering non-metallurgical varieties, in addition to existing smelter
grade EcoSource. Alcoa is one of the world’s largest producers of non-
metallurgical alumina, which is used in everything from refractories,
sandpaper, and water treatment processes across the world.
Our Sustana line has the aluminum industry’s most comprehensive
portfolio due to the range of products we offer, from alumina to metal.
Meanwhile, we also have customers coming to us due to our history of alloy
development.
Last month, we were recognized for the second year in a row with an award
from the North American Die-Casting Association for an Alcoa-developed
alloy used in megacastings for electric vehicles. We are selling and
licensing alloys that can be used to make these one-piece, high-pressure

-- 8 of 22 --

8
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
die castings. With our alloys, OEMs can get a one-piece casting, rather
than many separate pieces, creating greater efficiency.
On the cost side, our energy team signed a new nine-year power
agreement in August that will cover 50 percent of Portland’s smelter
capacity, starting in July of 2026. We continue to pursue options for the
smelter’s remaining electricity requirements with a strong focus on
renewable energy.
The global alumina and aluminum markets are both balanced to a slight
surplus. At the same time, aluminum inventories, in terms of days of
consumption, remain at historically low levels, positioning the market well
for when demand improves.
In 2024, there is uncertainty in the markets due to a range of geopolitical
and macroeconomic factors. One of the biggest questions revolves around
demand outside of China. Our base view is for continued growth in
transportation and recovery in the packaging and in the building and
construction sectors.
Within transportation, the automotive market typically drives the major
trends. At this point, most of the Covid-related automotive supply chain
disruptions have resolved. While uncertainty remains due to labor actions
in the United States, we anticipate year-on-year growth in tonnes of
aluminum, as automotive production continues to ramp up to 2019 levels.
In packaging, downstream inventory levels have largely normalized, and
we expect demand increasing.
In building and construction, high interest rates have negatively affected
that sector in the last year, particularly in North America and Europe. A
relative recovery in building and construction is expected next year,
compared to 2023. This is based on analyst projections for slowing inflation
and stabilizing interest rates, which should provide a better foundation for
increased year-over-year activity, although the pace of that improvement
remains uncertain and reliant on economic conditions.
In closing, we are encouraged by the positive operational momentum in the
third quarter, which included better year-on-year safety results and intend
to build on that performance.
Our company’s primary operational objective is to gain approvals for
bauxite mining in Western Australia. We believe we’re on the right path with
an updated mine plan that has enhanced commitments meant to address
the government’s expectations. And importantly, we now have line of sight
to decision timing, which is expected before the end of the year.
Across our global operations, we are focused on improvement. We will
work to increase productivity, reduce and control costs, and manage our
working capital.

-- 9 of 22 --

9
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
We also are continuing work on our future-focused, breakthrough
technology programs, which have the potential to further differentiate our
company.
And finally, while some end-use sectors for aluminum are softer now, we
remain bullish on the long-term fundamentals for our markets. I am not
alone in this view. I attended LME week, where the prevailing view was that
aluminum is poised for long-term growth.
Alcoa is well positioned for this future. We have the distinct advantage of
being active in all aspects of upstream aluminum production, and I’m
excited about our prospects and the work ahead.
With that, Molly and I are ready to take your questions.
Operator We will now begin the question-and-answer session.
[Operator Instructions]
Our first question is from Lawson Winder with Bank of America Securities.
Please go ahead.
Lawson Winder Hello. Thank you, operator. Good evening, Bill and Molly. Bill,
congratulations on your new role.
William Oplinger Thanks, Lawson.
Lawson Winder Yeah, it's very nice to hear from you today. I just wanted to ask about
Kwinana. And just with the lower grades now expected to continue through
2027 at the earliest, is there a point at which a complete shutdown could
become a high probability risk?
William Oplinger So at Kwinana, we're essentially looking at all options. And in the near term,
as you see, we've announced a restructuring that takes some cost out. In
addition to that, we're looking at a variety of different levers to be pulled to
drive cost down and improve profitability there. But ultimately, as with any
marginal asset, and Kwinana is a marginal asset at this point, we'll consider
options on the table, including curtailment and closure.
Lawson Winder Okay. That's very clear. And then in a similar vein, Alcoa has had this goal
of reducing its cost to first quartile level globally. With you now in the lead
seat, what are your thoughts on that goal in terms of timing and
achievability? Thank you.
William Oplinger Thanks, Lawson. I think, first of all, if you step back and look at where CRU
has us today on the cost curve, we are still first quartile bauxite mining, first
quartile refining, and second quartile smelting. The current situation in
Western Australia puts pressure on the refining segment, so that could
move us into the second quartile.
But to answer your question very specifically, you see in the presentation
that we did today, we highlighted productivity and competitiveness a couple

-- 10 of 22 --

10
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
of times in the presentation. We have launched a program across the
company to enhance competitiveness plant by plant. And so we're
essentially going after that. I think there's opportunities even in our best
plants, and we highlighted the great success that we've had in Québec so
far this year. I still think there's opportunities to make those plants more
competitive, take cost out and more productive. So, we'll continue to strive
for those targets.
Lawson Winder Okay. Thank you very much. I'll get back in the queue.
William Oplinger Thanks, Lawson.
Operator The next question is from Lucas Pipes with B. Riley Securities. Please go
ahead.
Lucas Pipes Thank you so much, operator. Bill, I'd like to add my congratulations. Thank
you also for taking my question. And I wanted to pick up with the last
question left off on the competitiveness. Can you maybe add a little bit more
detail on what dials you can tweak? Is there capital needed to modernize
plants? Is it streamlining some of the labor relationships? Is it energy? If
you could maybe just peel the onion a little bit further, would really
appreciate your perspective. Thank you.
William Oplinger Yes, sure. So we'll peel the onion back a little bit. And the plants are at
varying stages of where they sit on this effort. Probably the earliest one to
undertake it was Kwinana, given some of the difficulties that we're having
at Kwinana. We're looking at Kwinana from two perspectives. The first is
an overall profitability perspective where we were looking at, are there
additional markets that we can address, because Kwinana has NMA
capability, or non-metallurgical alumina capability. Are there opportunities
for pricing improvements for specific products?
But then on the costs side, it's about labor productivity and maintenance
productivity. So really getting down, not to use a pun, but to get down to
the nuts and bolts of trying to determine are we effective on the
maintenance side and can we significantly improve our wrench time? So
that was the work that's being done at Kwinana. We've subsequently
launched what we're calling a workforce blueprint exercise, and it started
in some of our best facilities up in Québec. And you say, why start in some
of your best facilities? Because I think if we can get gains in places like
Québec that are really, really performing well, we can probably get better
gains in other parts of the system. So that is actually going through and
looking at the labor that we have and the amount of time it takes to do
specific tasks, and a very scientific comparison of the people that we have
in each plant and whether there's opportunities across the system to
streamline and take cost out.
Lucas Pipes Thank you very much for that color. I want to follow up on Western Australia
and a couple quick questions there. First, I think the company had
previously guided to I think 2024 at the earliest in terms of a transition back
to higher grades, now 2027. Could you remind us what changed? Why
three more years? And then if there is a kind of formal assessment at the

-- 11 of 22 --

11
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
EPA level in Western Australia, could that change the timeline? Would
appreciate your thoughts on that. Thank you.
William Oplinger Sure. So if we address kind of the suite of questions that you have, I think
we made good progress in the third quarter on this issue. We have been
working with the government, and we've been working with the agencies in
the government to get our annual mine approvals process. We've
submitted what's called a revised Mine Management Program for 2023 to
2027, with the enhancements that we talked about in the presentation. And
essentially where that gets us to is that we expect that decisions will be
taken this quarter both on the mine plan approvals and the EPA
assessment process. So I think it's a big step forward for the company. We
should have some clarity this quarter.
Now to address your question about what changed between our prior
guidance and today's guidance, if you go back and look at our prior
guidance, we were very careful to note that there was not great clarity
beyond 12 and 18 months. So we were essentially saying, hey, we're
expecting the lower grades for a 12 to 18 month period. Since that time,
with the concessions that we have made in the MMP process, we now have
better clarity. We've been able to work those concessions through the mine
plans and the mine models, and we've developed the detailed plans for the
most economic ways to mine the areas that we believe are likely to be
assessable under the approvals. And even with our best thoughts as far as
mining and blending plans, we can't get back to the historical grades that
we've seen prior time. However, as we transition to Myara North, we
believe that the geological sampling in those new regions will support the
better grades. That transition will occur we expect in the 2027 timeframe. I
hope that addresses your question.
Lucas Pipes That is very helpful. There are more questions there, but I'll jump back in
queue. Thank you so much and best of luck.
William Oplinger Okay, thanks.
Operator The next question is from Michael Dudas with Vertical Research. Please
go ahead.
Michael S. Dudas Good afternoon, Jim, Bill, Molly.
William Oplinger Hi, Michael.
Molly Beerman Hi, Michael.
James Dwyer Hi, Mike.
Michael Dudas Bill, could you share some thoughts, since you were promoted to the Chief
Operating Officer earlier this year, I guess maybe six or seven months in
that job. And what did you find out after moving from the finance chair about
the company, and I'm assuming some of these implementations were your
ideas, and then how you can translate that as now CEO to allow Alcoa to
capture more of the anticipated cost reductions and likely hopefully pricing

-- 12 of 22 --

12
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
improvements that should run through the business in a more normalized
environment over the next couple of years?
William Oplinger So, what I found out when I transitioned from a long stint as the CFO, 10
years as the CFO, into what turned out to be a short stint in the COO role,
was a couple of things. First of all, I was happy to find that we have great
people in operations. We have people who have long tenure, 20, 30 years
with the company that have tremendous institutional knowledge. But we've
also brought in a lot of newer people who see things new ways and do
things new ways. So I was really pleased to get to see that. And just as an
aside, I loved my COO role for eight months.
The other thing that I learned though is that there was a tremendous
amount of opportunity out there, and people were really wanting to do
things differently, wanting to aggressively address some things. And so I
thought there was tremendous amount of opportunity. So, if I transition to
some thoughts around the CEO role, just to be clear, and I'm sure this
question maybe was embedded in your original question or will be asked
later on, the strategy and direction of the company is largely unchanged.
We know where we're going from a strategic perspective. The thing that
I'm trying to drive as CEO and you see this changing over the last year or
so, is really a cultural change. That cultural change is making decisions at
a faster pace. It's having a performance orientation in everything we do.
And really an expectation of excellence in everything we do. And I hit upon
this in my prepared remarks, whether it's operations, maintenance, finance,
an expectation of really being excellent.
If we then couple that with what I think are the inherent advantages of
Alcoa, so some of the inherent advantages of our company, we're present
in all aspects of the value chain. We're a pure play aluminum company.
We're not spending time on other parts of battery minerals. We are focused
exclusively on being successful in aluminum. We have a global presence.
And back to that first part of the question, I think we have unmatched
technical expertise still in this company. We haven't really shown it the last
couple of years on the operations side, but I think it's there and we're
starting to show it now.
So when I combine all of that, I translate that into an ambition for the
company that we want to reestablish ourselves as the premier aluminum
company in the world. And I think we can do that. And not to go on too long,
Michael, I'm really excited and really happy to be in the role that I'm in.
Michael Dudas Appreciate those observations. Looking out, how quickly do you think you
can implement the culture and kind of get best practices throughout the
organization and productivity enhancements to show meaningful results or
achieve those goals? Is it a three month, six month, a year? Is it something
that… how urgent do you see that process even though the overall strategy
did not change?
William Oplinger Right. So, Rome wasn't built in a day. We're not going to change the culture
of this company in a day, a week, a quarter. However, look at the bridge
that Molly showed. We saw production cost improvements for the first time

-- 13 of 22 --

13
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
in a long time in the third quarter. And just so you understand how that
bridge works, that's largely because we were able to make the tonnes. And
so we were able to make the tonnes in the third quarter. And the guidance
that she gave was a pretty strong guidance with the exception of the carbon
change from the Norwegian government, which is totally outside of our
control.
So, I think we're seeing some of that change today already and I think you'll
see more in the future. And everybody I talked to within Alcoa hears the
story of performance culture. We're trying to drive a performance culture.
And it's all about having expectations of excellence and driving those
expectations of excellence. And I think we've seen that on the Ops side to
some extent. We set records in Québec. We're getting better stability in
places like Brazil in the restart, much, significantly better, stability in
operational performance in our Western Australia assets, even though they
have worse bauxite quality. So I think we're seeing it now and hopefully
accelerates into the future.
Michael Dudas Excellent, Bill. Thank you.
Operator The next question is from Bill Peterson with JPMorgan. Please go ahead.
Bill Peterson Yeah, hi. Good afternoon. Thanks for taking the questions, and Bill, good
luck in the new role.
William Oplinger Thanks, Bill.
Bill Peterson So, wanted to take a step back to maybe more macro supply/demand. So,
you just said you were just at LME… I guess, what is the latest you're
seeing in terms of supply/demand balance I guess in the context of restarts
in Yunnan, relatively weak macro backdrop. And then I guess maybe on
the end market demand side, where are you seeing most resilience? And
then what remains the most muted, and any sort of color between regions?
William Oplinger So, 2023 is going to go down as a pretty tough year for the aluminum
industry. In 2023 we see a slight surplus on the aluminum side. On alumina,
it's fairly balanced. And so, on the aluminum side, we see about an 800,000
tonne surplus in 2023. The reason for that is demand in rest of world
actually contracted in 2023. So some of the big demand drivers in the rest
of world that we've seen this year are really a significant reduction in
building and construction, actually a reduction of demand in packaging of
all places, ever so slight. And so, across the board, we're seeing some
weakness in the end markets.
Now you referenced my trip to the LME Week. Pretty resoundingly what we
hear amongst all the industry players is that 2023 and maybe going into
2024 can still be difficult times for aluminum, but it's just a matter of time
where aluminum has significantly better market environment. The reason
why we see that is that demand continues to grow, starting to see even in
2024 a rebound in places like building and construction.

-- 14 of 22 --

14
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
Some of the destocking that we saw occur in can sheet is now over. So we
should see a rebound in demand there. And we fundamentally believe that
the Chinese cap on supply will be maintained at the 45 million metric
tonnes. And we can address why we believe that. But over time, we see
that the market fundamentals for the metal itself are really driven by some
of the macro trends over the longer period of time, with EVs and solar
should be significantly better than they are today. But with that said, it's
been a pretty tough year on demand in aluminum.
Bill Peterson That's great color. I may have missed it, but I believe last quarter there was
an update about San Ciprián discussing the plant's phased restart to start
at the beginning of 2024 with full restart by October 2025. And then
obviously trying to basically capture and set the PPAs in motion. But can
you give us an update there? Again, I may have missed that, but I didn't
see that in the prepared remarks.
William Oplinger Yeah. So let me give you an update. We continue to work toward really
achieving long-term economic viability of the site in Spain. And in the case
of the smelter, that allows for a restart in 2024. However, as, you know,
basically the question that you just asked, we're starting – we see
significant challenges that need to be overcome for that site to be viable,
including soft demand for the value-add products, that site makes slab and
billet, low aluminum prices in this – in the case of Europe high power costs
and delay in permitting, and construction of some of the alternative power
supplies that we have been looking at. We hope to overcome these
challenges to allow for a progressive restart through the end of 2025. But
it's been and it remains very difficult. So, that's the situation in Spain.
Bill Peterson Okay. Thanks again and best wishes here moving forward.
William Oplinger Thank you.
Operator The next question is from John Tumazos with John Tumazos [Very]
Independent Research. Please go ahead.
John Tumazos Thank you very much for taking my question. Comparing to the
containerboard market today, International Paper announced they were
shutting 900,000 tonnes or about 2.5% of US supply. In the world aluminum
market, obviously, China is 59% of output, and some of the other continents
don't have very much production left. The bigger other regions are Russia
which is hydro, Canada which is hydro, India which is coal, and the Persian
Gulf which is gas. Do you think it's possible to have a 2.5% supply reduction
event in the world aluminum industry the way it's structured today?
William Oplinger John, that's a hard question. And give me just a second to formulate an
answer.
John Tumazos Sure. I'm sorry to compare. There's never been a 10% non-recessionary
fall in the containerboard industry before. It took that industry a long time
to get a grip on it.
William Oplinger Right.

-- 15 of 22 --

15
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
John Tumazos And aluminum isn't down 10%, it's just not growing the way it would be
normal.
William Oplinger Right. So let me give you – and you and I have known each other a long
time and we've both been around this industry for a long time. So let me
give you a qualitative historical perspective. This industry has not had a
problem on the demand side, with the exception of the Global Financial
Crisis, where we saw demand fall off and then inventories build. This year
we've seen demand fall off and yet inventories have not been built
significantly. So, inventories, and whether they're on the LME or on the
market or off-market inventories, remain historically pretty low.
As we look forward, we see a rebound of demand going into 2024, and
really see strong demand trends that are driven by the megatrends going
out into the future. The question has historically been, will the Chinese
maintain the 45 million metric tonne cap. We are seeing indications that we
believe that they will maintain that cap. If they do maintain that cap and
demand continues to grow, that should assist the fundamentals of the
industry.
As far as a significant, and to address your question, 2.5% cut in supply,
the areas around the world where supply is under pressure, specifically is
in Europe. And we know that there are some plants that have hedged, that
those hedges will be rolling off over time. We have our own challenged
plants in Europe. And so it will remain to be seen whether the industry takes
a 2.5% cut out or not.
John Tumazos Thank you. We're all looking for demand, Bill.
William Oplinger Yeah, thanks. Thanks, John. It was good to talk with you.
John Tumazos Thank you.
Operator The next question is from Alex Hacking with Citi. Please go ahead.
Alexander Hacking Yeah, thanks, Jim, Bill and Molly. And let me add my congratulations, Bill,
on the new role.
William Oplinger Thanks, Alex.
Alexander Hacking Just following up on WA, right. So, it seems like we're in the low grades
now until 2027. As we think about the mine moves north, that are going to
stop producing or mining in 2027, what are the major risk factors around
that? How should we think about that? And how should we think about the
timeline? Because if you're going to be mining in 2027, I assume you need
infrastructure, pre-stripping, all kinds of things that are going to need to be
done ahead of that. So I guess...
William Oplinger Right.
Alexander Hacking ...how should we think about the risk in timelines? Thanks.

-- 16 of 22 --

16
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
William Oplinger So Molly and I are going to team up on this one a little bit. The permitting
process that we have undertaken for the Myara North move is what's called
a Part IV permitting process. It is a modernized, recognized, permitting
process within Western Australia for starting a new mine site, and it
requires a lot of information. And so, we made that choice going back, I
think it was in 2020, to move to that modernized process for Myara North.
We made that choice because we recognized that the customized process
that we have currently really needed to be modernized and our
stakeholders wanted the more modernized process. So, the risk that I see
is around that permitting process.
Now, we're doing everything that we can to mitigate that risk. And when we
get closer to that time period, we will have line of sight. I can tell you we
are very energized around reducing the time between when we get that
permit to go and when we open up the mine face. And given the fact that
we've had some delays in permitting, we're really trying to focus our efforts
on making sure that we minimize that time between getting the permit and
actually getting bauxite out of the ground. So, Molly, anything you want to
add to that?
Molly Beerman No, I'll just add, as far as our guidance on the about $45 million impact that
we're currently seeing in the quarter, we have plans to continue to mitigate
that number. You saw the first action announced this quarter with
Kwinana's severance program there. So that will save $10 million [per
year]. And it's just the first bit of announcement. But we will keep moving
through and finding productivity enhancements or portfolio changes to work
that number down.
Alexander Hacking Hi. Thanks, that's helpful. I guess when you talk about the permits obviously
being the key risk, if I remember correctly, there are some potential issues
with proximity to local communities. Are there other major permitting
hurdles that you could foresee? I know this is a very kind of generic
question, but any more color would be helpful. Thanks.
William Oplinger Not forecasting any issues around the Part IV process per se, but let me
give you color around some of the concessions that we've made in the
current process, the current MMP process, which we anticipate to be
decided by the end of this year, we've added additional controls for
protection of drinking water. We have agreed on distances from mining – a
certain distance from some of the key reservoirs, and we've agreed to
accelerating, rehabilitation and to increase the biodiversity in the near term
on the rehab. So those are the three areas that we have been discussing
with the stakeholders and to try to get the current mine approvals through
the process.
Alexander Hacking Okay. Thanks. And then just a quick follow-up on Alumar, if I may. I think
the message last quarter there was you had fixed the conveyor issues and
above 60%. Has something else gone wrong in the last quarter or are you
still on track from where you were then? Thanks.
William Oplinger Something big happened in Brazil in the quarter. There was a massive
power outage. And if you follow our competitor there, Alunorte had the

-- 17 of 22 --

17
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
same issue, Albras had the same issue. We lost power for close to 3.5
hours in the smelter at Alumar. And that has knock-on impacts, not only on
the smelter but on the refinery too.
Now, thank goodness, we had good stability. We had recovered stability
going into that. We were able to get through that power outage. And what
happens in a power outage in a smelter is that you stress the pots, bringing
them back online. And we lost a few pots. I think we probably lost close to
a dozen pots, bringing the plant back online from that power outage. So
that was a setback. That really is out of our control. It impacted something
like two-thirds of the country in Brazil. And so, it was a setback for the plant.
They've recovered. They have a daily action plan. It's a daily go/no-go on
restarting pots and increasing amperage. And as we said in the prepared
remarks, we're at about 65% today.
Alexander Hacking Okay. That's super helpful. Thank you.
Operator The next question is from Timna Tanners with Wolfe Research. Please go
ahead.
Timna Tanners Yeah. Hey, good afternoon. I thought I would pivot a little bit if I could,
talking a little bit about some of your strategic initiatives and cash flows, if I
could. So, first off, I just wanted to ask, I know you talked about advances
in EcoLum and EcoSource, but can you elaborate a bit on the premium that
you're garnering there?
William Oplinger So the premiums are consistent with the premiums that you see quoted on
various sources. So, it depends on the product, but the premiums are
anywhere between $10 and $30 a tonne.
Timna Tanners Okay. That's helpful. Thanks. And then if we look at your cash balance, I
know in the past you've said that you wanted to keep it at or above $1
billion, and it crept below that, I know it's not a perfect number. But if we
look at the cash resources and the use year-to-date, there's not a lot of free
cash flow at these commodity prices, even with the third quarter's strong
working capital release.
And then we had from your Investor Day, a great amount of initiatives that
you are progressing on. I know you referred to them in the beginning as
well like ASTRAEA, Refinery of the Future, et cetera. And I'm just
wondering how do we reconcile, again, this commodity price environment
with some of those initiatives and some of the cash needs to source those.
So the CapEx requirements going forward, are they compatible with this
earnings environment or how are you thinking about that?
Molly Beerman Okay. Thanks, Timna. First of all, thanks for asking me a question. So, let
me just say, on our cash position now, we're at $926 million. We still have
access to significant liquidities. We have our undrawn revolving credit
agreement. We have our ancillary credit line. So those are available to us
as needed. As you know, we've taken action in the past working capital
programs to monetize that. We can take more aggressive actions on cost
control and portfolio actions. But for us, if I look at kind of the short-term

-- 18 of 22 --

18
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
cash preservation, it really is focusing on our operations that are consuming
more cash than generating. So that is the focus Bill mentioned earlier, we
have key sites that we are working to improve. So that's the near term on
the cash management.
On our CapEx, you can even see from this year, instead of adding to our
CapEx project list and filling the queue to spend the whole budget, we
ended up staying just with the capital plans that were already on the
agenda. As they slowed spending, which typically happens, we allowed
that just to happen, and so we saved some money on the CapEx. We can
do that again with the programs that are in the next queue. And if you look
out to our breakthrough technologies, each of those has to meet a certain
criteria before they're going to receive funding. Most of those now are
pointing towards funding in 2025 and later. So we still have time for those
and working through that financing and funding.
Timna Tanners Got it. So, put bluntly then, if the commodity price stays at these levels, no
concerns in terms of proceeding with some of those initiatives, ELYSIS,
ASTRAEA, Refinery of the Future et cetera. But if we start to get into 2025
and didn't see much aluminum price improvement, then it might be needing
to rethink some of those capital outlays. Is that a fair conclusion?
Molly Beerman Yes, that's fair, Timna.
Timna Tanners Okay, great. Thank you for the help.
Operator The next question is from Carlos De Alba with Morgan Stanley. Please go
ahead.
Carlos de Alba Yeah, thank you very much. Congratulations, Bill. Just on – ...
William Oplinger Thanks, Carlos.
Carlos de Alba ...coming back to Western Australia. So I just want to understand if you
know what might be potentially the implications of the EPA deciding to do
a formal assessment of your MMPs and mining plans. Would that result
primarily on just a longer approval process, maybe more detailed analysis
and requirements, or will also result in higher cost, maybe above and –
well, not beyond the $45 million that you have, but that would prevent the
$45 million to completely come back to zero once you are getting to the
2027 mining plan or those areas in 2027 with better bauxite quality.
William Oplinger So, Carlos, you can imagine we completely understand what the process
is, at least from a legal and a technical perspective going forward. I really
hate to speculate on what an assessment would look like, what an
assessment would cover. And until we had better insight into the EPA's
decision making process around what they would actually be assessing,
it's really hard to answer that question. We're moving forward on the path
to, you know, over the next 75 days to ensure that our permits get approved
through the process. And that's the focus. If we find ourselves in an
assessment part of the process, we'll have to determine what is assessed
and what the impact will be at that point. And we'll let you know.

-- 19 of 22 --

19
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
Carlos de Alba All right. Okay. And before I ask a question on smelting, just a clarification,
maybe, Molly, I thought you have guided to around $55 million impact in
the third quarter because of the bauxite issues, increasing from $45 million
in the second quarter. So you did better than that, right? And just to make
sure that that is based on the initiatives and the efforts you are doing to
control these costs?
Molly Beerman Yeah, Carlos, it's actually three things. We did draw on stockpiles that had
slightly better quality than we expected during the third quarter. We also
see the refineries operating very well with the lower bauxite quality. And
then third, you're right, the mitigation efforts are just starting to drive down
cost.
Carlos de Alba All right. Thank you, Molly. And then finally, is there any update or any
comment that you can provide on the situation of your European smelters?
I mean, Lista remains with a third of the capacity shut down. I don't know if
there is any renegotiation or upcoming renegotiations of contracts for
energy in Lista or Mosjøen or the smelter in Iceland that is relevant given
where prices are today?
William Oplinger So, let's look at them independently. Mosjøen is very well positioned and
has a good energy source. It is probably one of our most profitable plants
in the system. So Mosjøen is in good shape. However, this new carbon
legislation that is potential that could be passed into law in December, I
think we've noted the fact that we could have up to $24 million negative in
the fourth quarter associated with Mosjøen and Lista based on that new
carbon legislation. That type of a change in legislation makes it really
difficult to make long-term decisions around investments in places like
Norway. So it's one of the disappointing things that I continue to see out of
the Norwegian budgeting system that really makes it hard to determine that
you're going to put a lot of capital into an environment where there's not a
good structure around carbon or at least a predictable structure around
carbon.
In the case of Lista, Lista is slightly different. No plans at this point to
potentially restart that idle capacity. Lista, given its size, given its age, given
its cost structure, is under a lot of pressure. And so, revert back to my
comments from earlier in the presentation, Lista is an area that we're
looking at, it's very similar to Kwinana, every opportunity to try to make that
plant more competitive, and we need to, given some of the headwinds it's
facing, especially on the carbon side.
Carlos de Alba All right, great. And Iceland, especially you have also a good contract there,
and no changes in the short-term, right?
William Oplinger We have a long-term power contract in Iceland. There is a repricing
mechanism that comes up later in the decade, but that's later in, I would
say, in the 2027/2028 timeframe.
Carlos de Alba Thank you very much, Bill.
Christopher LaFemina Thanks. Hey, Bill. Congratulations on the new role and good luck.

-- 20 of 22 --

20
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
William Oplinger Thank you.
Christopher LaFemina So just a question on the WA mining situation. So if the EPA does an
assessment on the 2022 five-year plan, which is I guess the one that you're
operating under right now, can you continue to mine? So I understand the
point about low grades until 2027 when you move up to Myara and
Holyoake. But before that is there a risk that they would basically not allow
you to mine, because they're reviewing the plan that you're currently
operating at or do you have confidence that you'd be able to continue to
mine under the existing plan?
William Oplinger Well, I think that there are a variety of different outcomes that could occur
if they go to a full assessment. But again, as I answered to Carlos, let's see
what gets assessed and we will react accordingly. We're confident that we
are doing all the right things to avoid either having an assessment or not
getting our mine permits approved. So we're doing all the right things. We
have line of sight to have an answer this quarter, we believe. And
depending on that outcome, we will take the right actions.
Christopher LaFemina And does the decision that the EPA makes as to whether they'll do an
assessment get impacted by the concessions that you're offering to make
now or do they just base it on what the existing plan basically allows you to
do?
William Oplinger I don't know the answer to that one. So we would need to revert back to
you. I'm not certain of that.
Christopher LaFemina Okay. All right. Thank you very much. Good luck.
William Oplinger Thanks.
Operator And our final question today is a follow up from Lucas Pipes with B. Riley
Securities. Please go ahead.
Lucas Pipes Thank you very much, operator. Thank you very much for taking my follow-
up question. Western Australia, again, the $45 million, order of magnitude,
what sort of savings could you be looking at? I think you noted $10 million
[per year] at Kwinana. That would take it down to $43 million or so per
quarter going forward. Order of magnitude, how much more could you be
looking at? Thank you very much.
Molly Beerman Lucas, I don't have a number. Again, these are efforts that we're going to
continue to work through. And as they are restructuring our programs that
need to be announced, we'll certainly do that. Otherwise, you'll simply see
the additional savings work into our outlook as we progress through time.
But I can you we have dedicated teams on it. They're working very
aggressively to identify savings. We've got a great pipeline of opportunities.
So I do believe we will have meaningful mitigation to share. But I don't have
a number for you today.
Lucas Pipes I appreciate that. Again, best of luck. Thank you.

-- 21 of 22 --

21
Alcoa Corporation
Wednesday, October 18, 2023, 5:00 PM Eastern
Operator This concludes our question-and-answer session. I would like to turn the
conference back over to Mr. Oplinger for closing remarks.
William Oplinger Thanks for your questions and interest in our company. As you can hear
from my comments, it's a true honor to lead this company as we position
for long-term success. I really believe with disciplined focus, and you've
heard a lot of our talk around this disciplined focus today, we'll build an
even stronger company for the future. I look forward to talking to many of
you in the fourth quarter results in January. And until then, be safe.
Operator The conference is now concluded. Thank you for attending today's
presentation. You may now disconnect.