PRESENTATION

Q2 2025 — Presentation

Q2 2025PDF · 23 pages1.4 MB
© 2025 Cleveland-Cliffs Inc. All Rights Reserved.
CLEVELAND-CLIFFS INC.
Second-Quarter 2025 Earnings Presentation
July 21, 2025

-- 1 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	2
This presentation contains statements that constitute "forward-looking statements" within the meaning of the federal securities laws. All statements other than historical facts, including, without limitation, statements
regarding our current expectations, estimates and projections about our industry or our businesses, are forward-looking statements. We caution investors that any forward-looking statements are subject to risks and
uncertainties that may cause actual results and future trends to differ materially from those matters expressed in or implied by such forward-looking statements. Investors are cautioned not to place undue reliance on
forward-looking statements. Among the risks and uncertainties that could cause actual results to differ from those described in forward-looking statements are the following: continued volatility of steel, scrap metal and
iron ore market prices, which directly and indirectly impact the prices of the products that we sell to our customers; uncertainties associated with the highly competitive and cyclical steel industry and our reliance on the
demand for steel from the automotive industry; potential weaknesses and uncertainties in global economic conditions, excess global steelmaking capacity and production, prevalence of steel imports, reduced market
demand and oversupply of iron ore; severe financial hardship, bankruptcy, temporary or permanent shutdowns or operational challenges of one or more of our major customers, key suppliers or contractors, which,
among other adverse effects, could disrupt our operations or lead to reduced demand for our products, increased difficulty collecting receivables, and customers and/or suppliers asserting force majeure or other reasons
for not performing their contractual obligations to us; risks related to U.S. government actions and other countries' reactions with respect to Section 232 of the Trade Expansion Act of 1962 (as amended by the Trade Act
of 1974), the United States-Mexico-Canada Agreement and/or other trade agreements, tariffs, treaties or policies, as well as the uncertainty of obtaining and maintaining effective antidumping and countervailing duty
orders to counteract the harmful effects of unfairly traded imports; impacts of existing and changing governmental regulation, including actual and potential environmental regulations relating to climate change and
carbon emissions, and related costs and liabilities, including failure to receive or maintain required operating and environmental permits, approvals, modifications or other authorizations of, or from, any governmental or
regulatory authority and costs related to implementing improvements to ensure compliance with regulatory changes, including potential financial assurance requirements, and reclamation and remediation obligations;
potential impacts to the environment or exposure to hazardous substances resulting from our operations; our ability to maintain adequate liquidity, our level of indebtedness and the availability of capital could limit our
financial flexibility and cash flow necessary to fund working capital, planned capital expenditures, acquisitions, and other general corporate purposes or ongoing needs of our business, or to repurchase our common
shares; our ability to reduce our indebtedness or return capital to shareholders within the currently expected timeframes or at all; adverse changes in credit ratings, interest rates, foreign currency rates and tax laws;
challenges to successfully implementing our business strategy to achieve operating results in line with our guidance; the outcome of, and costs incurred in connection with, lawsuits, claims, arbitrations or governmental
proceedings relating to commercial and business disputes, antitrust claims, environmental matters, government investigations, occupational or personal injury claims, property-related matters, labor and employment
matters, or suits involving legacy operations and other matters; supply chain disruptions or changes in the cost, quality or availability of energy sources, including electricity, natural gas and diesel fuel, critical raw
materials and supplies, including iron ore, industrial gases, graphite electrodes, scrap metal, chrome, zinc, other alloys, coke and metallurgical coal, and critical manufacturing equipment and spare parts; problems or
disruptions associated with transporting products to our customers, moving manufacturing inputs or products internally among our facilities, or suppliers transporting raw materials to us; the risk that the cost or time to
implement a strategic or sustaining capital project may prove to be greater than originally anticipated; our ability to consummate any public or private acquisition or divestiture transactions and to realize any or all of the
anticipated benefits or estimated future synergies, as well as to successfully integrate any acquired businesses into our existing businesses; uncertainties associated with natural or human-caused disasters, adverse
weather conditions, unanticipated geological conditions, critical equipment failures, infectious disease outbreaks, tailings dam failures and other unexpected events; cybersecurity incidents relating to, disruptions in, or
failures of, information technology systems that are managed by us or third parties that host or have access to our data or systems, including the loss, theft or corruption of our or third parties' sensitive or essential
business or personal information and the inability to access or control systems; liabilities and costs arising in connection with any business decisions to temporarily or indefinitely idle or permanently close an operating
facility or mine, which could adversely impact the carrying value of associated assets, trigger contractual liabilities or termination costs, and give rise to impairment charges or closure and reclamation obligations, as well
as uncertainties associated with restarting any previously idled operating facility or mine; our ability to realize the anticipated synergies or other expected benefits of the acquisition of Stelco, as well as the impact of
additional liabilities and obligations incurred in connection with the Stelco acquisition; our level of self-insurance and our ability to obtain sufficient third-party insurance to adequately cover potential adverse events and
business risks; uncertainties associated with our ability to meet customers' and suppliers' decarbonization goals and reduce our greenhouse gas emissions in alignment with our own announced targets; challenges to
maintaining our social license to operate with our stakeholders, including the impacts of our operations on local communities, reputational impacts of operating in a carbon-intensive industry that produces greenhouse
gas emissions, and our ability to foster a consistent operational and safety track record; our actual economic mineral reserves or reductions in current mineral reserve estimates, and any title defect or loss of any lease,
license, option, easement or other possessory interest for any mining property; our ability to maintain satisfactory labor relations with unions and employees; unanticipated or higher costs associated with pension and
other post-employment benefit obligations resulting from changes in the value of plan assets or contribution increases required for unfunded obligations; uncertain availability or cost of skilled workers to fill critical
operational positions and potential labor shortages caused by experienced employee attrition or otherwise, as well as our ability to attract, hire, develop and retain key personnel; and potential significant deficiencies or
material weaknesses in our internal control over financial reporting.
For additional factors affecting the business of Cliffs, refer to Part I, Item 1A. Risk Factors of our Annual Report on Form 10-K for the year ended December 31, 2024, and other filings with the U.S. Securities and
Exchange Commission.
FORWARD-LOOKING STATEMENTS

-- 2 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	3
Revenues
$4.9 Billion
Record Steel
Shipments
4.3 Million
(net tons)
SECOND-QUARTER 2025
1Reconciliation for Adjusted EBITDA can be found on last page of
presentation and earnings release published July 21, 2025
© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	3
Adj. EBITDA1
$97 Million
Liquidity
$2.7 Billion
Expect to see continued
improvement in Adj. EBITDA
from Q2 to Q3
Record quarterly steel shipments
Q2 ASP benefited from higher
pricing that began in late Q1
Released over $200 million in
inventory working capital
Q2 costs better than expected
Lower SG&A and capital
expenditure outlook

-- 3 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	4 Note: Based on Q2 2025 Steelmaking Results – Product Mix includes steel products shipments
Highlights
27%
Coated
15%
Cold-Rolled
3%
Stainless & Electrical
5%
Plate
10%
Slab, Rail, Other
Product
Mix
(Shipments)
End
Market
Mix
(Revenue)
26%
Direct
Automotive
30%
Distributors &
Converters
31%
Infrastructure &
Manufacturing
13%
Steel Producers
© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	4
40%
Hot-Rolled
Q2 2025 END MARKET AND PRODUCT OVERVIEW
(primarily
galvanized)
▪ Steel shipments increased by 150,000 tons from the prior quarter
▪ Regaining automotive market share
▪ Optimized footprint with no expected impact to flat-rolled volume
▪ Selling price increased by $35/t due to higher index pricing, partially offset by lower slab pricing

-- 4 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	5
RECORD QUARTERLY STEEL SHIPMENTS
4.1
4.2 4.2
3.4
3.6 3.6 3.6
3.8
4.1
4.2
4.1
4.0
3.9 4.0
3.8 3.8
4.1
4.3
Q1 21 Q2 21 Q3 21 Q4 21 Q1 22 Q2 22 Q3 22 Q4 22 Q1 23 Q2 23 Q3 23 Q4 23 Q1 24 Q2 24 Q3 24 Q4 24 Q1 25 Q2 25
In million net tons

-- 5 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	6
SUMMARY OF ASSET OPTIMIZATION
Flat-Rolled
Optimization
Riverdale: Full idle of compact strip mill
facility primarily due to uncompetitive cost
structure
Conshohocken: Full idle of plate
finishing facility primarily as a result of
continued underperformance
Steelton: Full idle of rail facility primarily
as a result of excess rail imports and
continued underperformance
~$165 million in
expected annual savings
~$145 million in
expected annual savings
▪ Announced that Dearborn blast furnace, BOF steel shop and caster
would be idled
▪ Announced full idle of Minorca mine and partial idle of Hibbing mine
▪ Will continue to work down pellet inventory built in 2024
▪ No impact expected to flat-rolled steel output
Repositioning Away
from Non-Core Assets
~$90 million
Expected Annual
Savings
~$45 million
~$30 million
Operational Changes

-- 6 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	7
TRADE AND TARIFFS
Canada 6,557 Exempt 25% Tariff 50% Tariff
Brazil 4,498 Quota 25% Tariff 50% Tariff
Mexico 3,517 Exempt 25% Tariff 50% Tariff
South Korea 2,809 Quota 25% Tariff 50% Tariff
Vietnam 1,363 25% Tariff 25% Tariff 50% Tariff
Japan 1,180 Quota 25% Tariff 50% Tariff
Germany 1,074 Quota 25% Tariff 50% Tariff
Taiwan 1,011 25% Tariff 25% Tariff 50% Tariff
Netherlands 614 Quota 25% Tariff 50% Tariff
China 508 25% Tariff 25% Tariff 50% Tariff
Trump Administration’s Continued Focus on Strengthening Domestic Steel
Jan. 20, 2025
Status
Top 10 Importing
Countries
2024
Imports
(Thousand Net Tons)
CurrentMar. 12, 2025
Status
Source: AISI

-- 7 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	8
819
671
857 865 865
717
750 755
711 724
619
712
770
564
620
437
554
EFFECTIVENESS OF TARIFFS FOR STEEL
Total Flat-Rolled Imports
(HRC, CRC, Coated)
Thousand Net Tons
Source: USITC, AISI
2024 Avg.
755K
Section 232 tariffs
reinstated
Imports as a Percent of Finished
Steel Market Share
25%
24%
21%
20% 20%
Jan-25 Feb-25 Mar-25 Apr-25 May-25

-- 8 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	9
EFFECTIVENESS OF TARIFFS FOR AUTO
Source: USITC
Total U.S. Light Vehicle Imports by Month
2024 Avg.
699K
▪ Imports of light
vehicles from Japan
and South Korea
down >30% YTD
▪ U.S. light vehicle
production
estimates recently
revised upward
▪ Average age of a
vehicle remains at
all-time high
Thousand Light Vehicles
734 729 718
741
713
679 684
666 680
723
691
627
645
590
769
477
572
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25
Post Auto Tariffs

-- 9 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	10
EFFECTIVENESS OF TARIFFS FOR AUTO
Source: USITC. Wards Auto
U.S. Light Vehicle Sales Originating Outside of
USMCA Region
(Daily Sales Rate)
14.6
13.2
12.4
11.5
Mar-25 Apr-25 May-25 Jun-25
25% Auto tariffs announced
Thousand Units
Total U.S. Light Vehicle Imports
~3.6
~3.0
May 2024 YTD May 2025 YTD
Down ~16%
YTD
Million Light Vehicles

-- 10 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	11
THE U.S. NEEDS MORE AUTO PRODUCTION
183
134
80
66
49 49 46
33 32 31 31
Slovakia Czech
Republic
South
Korea
Japan Spain Germany Hungary Canada Mexico Portugal United
States
Light Vehicle Production Per Capita (Per 1,000 People)
A healthy automotive industry is vital to national security
Expect demand for domestically produced vehicles to increase
as a result of 25% tariffs on automobiles
Domestic automotive industry has underutilized capacity
Source: International Organization of Motor Vehicles Manufacturers

-- 11 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	12
STEEL TARIFFS SUPPORT U.S. HRC PRICE
Importance of Steel Tariffs
▪ The United States steel industry has long
been undermined by excessive imports
▪ Tariffs play a crucial role in protecting the U.S.
economy, national security and industrial
base from violators of free trade
▪ Steel tariffs support demand for domestically
produced steel
▪ Foreign steel producers often take advantage
of government subsidies, currency
manipulation and weak environmental
regulations
▪ Higher HRC price provides significant
opportunity to generate free cash flow and
reinvest in facilities
▪ Ensures ability to have thriving steel industry
that supports domestic jobs
Marginal Import Ton Sets the Price
of Steel in U.S.
$500
$250
$150 $900
Export HRC
Cost
Section 232
50% Tariff
Shipping, Port
Fees, Insurance,
Etc.
Total Landed Cost
in U.S.
Source: CLF Estimates
Per Net Ton

-- 12 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	13
United States, 39%
Rest of the World, 21%
China, 8%
South Korea, 8%
Turkey, 6%
Brazil, 5%
Taiwan, 3%
United Arab
Emirates, 3%
Germany, 3% Argentina, 2% Japan, 2%
~13.2
~15.3 ~2.1
Production
Volume
Apparent
Consumption
Net Imports
CANADA NEEDS TRADE RESTRICTIONS AS WELL
2024 Canadian Steel Industry
Source: International Trade Administration
Million Net Tons
2024 Canadian Steel Imports by Country
Percent of Imports by Country

-- 13 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	14
DOMESTIC STEEL DEMAND EXPECTED TO INCREASE
Source: BloombergNEF
Domestic Steel Consumption Domestic Steel Import Share
28%
22%
17% 17%
18% 18%
2024 2025E 2026E 2027E 2028E 2029E
103
105
107
110
112
116
2024 2025E 2026E 2027E 2028E 2029E
Imports as a percent of
domestic consumption expected
to decline
Million Net Tons
Domestic consumption
expected to grow
Imports as a percent of consumption

-- 14 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	15
$400
$500
$600
$700
$800
$900
$1,000
ONEROUS THIRD-PARTY STEEL SLAB CONTRACT
Onerous Slab Contract Set To Expire In Less Than Five Months
▪ Contract expires December 9,
2025
▪ Represents ~1.5 million net
tons annually
▪ Directly linked to Brazilian slab
export price, which has been
negatively impacted by tariffs
▪ Brazilian slab price has fallen
while U.S. HRC has risen –
typically these are correlated
▪ Significant opportunity to shift
sales to products with higher
profit margins once contract
expires
HRC vs. Slab
(price per net ton)
HRC
~$910
Slab
~$430
Source: Fastmarkets as of 7/9/25

-- 15 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	16
COSHOCTON WORKS NEW BRIGHT ANNEAL LINE
New $150 Million State-of-the-Art Vertical Stainless Bright Anneal Line
• Project groundbreaking occurred July 2021 and commissioning began May 2025
• Produces stainless steel for high-end automotive and critical appliance applications
• Uses 100% hydrogen atmosphere, replacing conventional acid-based processing
• Improves efficiency and production capabilities
• Replaces two older vertical annealing lines

-- 16 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	17
$2.1
billion
WELL-POSITIONED BALANCE SHEET
Leverage
Target
(Net debt / TTM Adj.
EBITDA)
2.5x
Secured Note Capacity
Commitment to
utilize 100% of
cash flow
towards debt
repayment
Secured Note
Capacity
$3.2
billion
Liquidity
$2.7
billion
Four-Year Note Maturities
$685
2025 2026 2027 2028
Dollars in Millions
Total Secured
Note Capacity
$3.2
billion
15% of Consolidated Net
Tangible Assets
Secured Ratio Basket $1.1
billion

-- 17 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	18
SUCCESSFUL WORKING CAPITAL MANAGEMENT
Released ~$100 million in
working capital
Highlights
Q1 to Q2 Quarter-Over-Quarter
Change
Working Capital
Management
Raw Materials (Pellets, Coke, etc.)
▪ Successfully releasing working
capital through inventory
management
▪ Working through excess pellet
inventory built at end of 2024 after
recent idles
▪ Expect to further release working
capital in second half of 2025
▪ Use of Stelco coke within legacy
footprint
▪ Future inventory benefit from coke
contracts that expired in June
2025
Released ~$100 million in
working capital
Finished Steel

-- 18 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	19
Substantial Drop in Total Capital Expenditures
LOWER 2025 CAPEX BUDGET
$893
$1,093
$791 $800
$600
2021 Pro Forma 2022 Pro Forma 2023 Pro Forma 2024 Pro Forma 2025 Guidance
$ in millions
Note: All years inclusive of Stelco

-- 19 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	20
SIGNIFICANT COST REDUCTIONS
Steel Unit Costs Expected To Be Down ~$160 Per Ton In Three Years
~$30/t
Decrease
~$80/t
Decrease
Expected 2025
Unit Cost Per
Ton of Steel
Highlights	Cost Savings
2024
Unit Cost Per
Ton of Steel
2023
Unit Cost Per
Ton of Steel
~$50/t
Decrease
Optimization of integrated
footprint and reduction of fixed
costs
Reduced overhead and
improved efficiencies
Idling of high-cost, loss-making
assets
Expect to further benefit from
Stelco’s low-cost structure and
asset optimization

-- 20 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	21
UPDATED 2025 OUTLOOK
2025 Capital Outlay and
Expenses
February
2025 Guide
Capital Expenditures
Depreciation, Depletion and
Amortization
Selling, General and
Administrative Expenses
Cash Pension and OPEB
Payments and Contributions
~$700 million
~$625 million
~$1.1 billion
~$150 million
May
2025 Guide
~$625 million
~$600 million
~$1.1 billion
~$150 million
July
2025 Guide
~$600 million
~$575 million
~$1.2 billion
~$150 million
2025 Unit Cost Per
Ton of Steel
~$40 per net
ton decrease
~$50 per net
ton decrease
~$50 per net
ton decrease

-- 21 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.	22
CLEVELAND-CLIFFS’ ADJUSTED EBITDA
RECONCILIATION Three Months Ended
($ in millions) June 30,
2025
March 31,
2025
December 31,
2024
September 30,
2024
June 30,
2024
Net income (loss) ($470) ($483) ($434) ($230) $9
Less:
Interest expense, net (149) (140) (135) (102) (69)
Income tax benefit 148 147 136 76 15
Depreciation, depletion and amortization (393) (282) (258) (235) (228)
Total EBITDA ($76) ($208) ($177) $31 $291
Less:
EBITDA from noncontrolling interests $20 $18 $20 $20 $15
Idled facilities charges (204) (44) 2 (2) (40)
Arbitration decision - - - (71) -
Changes in fair value of derivatives, net (15) (9) (34) (7) -
Currency exchange 48 (2) (20) - -
Loss on extinguishment of debt - - - - (6)
Severance (19) (1) (4) (10) (1)
Other, net (3) 4 (60) (23) -
Total Adjusted EBITDA $97 ($174) ($81) $124 $323

-- 22 of 23 --

© 2025 Cleveland-Cliffs Inc. All Rights Reserved.

-- 23 of 23 --