TRANSCRIPT

Q4 2025 — Transcript

Q4 2025PDF · 13 pages151 KB
InComm Conferencing 	Page 1 of 13 	www.incommconferencing.com
Cleveland-Cliffs
Fourth-Quarter and Full-Year 2025 Earnings Conference Call
February 9, 2026
Presenters
Lourenco Goncalves - Chairman, President, and Chief Executive Officer
Celso Goncalves - Executive Vice President and Chief Financial Officer
Q&A Participants
Carlos de Alba - Morgan Stanley
Nick Giles - B. Riley Securities
Lawson Winder - Bank of America
Alex Hacking - Citi
Albert Realini - Jefferies
Operator
Good morning, ladies and gentlemen. I'm your conference facilitator today, Kevin, and I'd like
to 	welcome 	everyone 	to 	Cleveland-Cliffs 	Fourth-Quarter 	and 	Full-Year 	2025 	Earnings
Conference Call. All lines have been placed on mute to prevent any background noise. After the
speakers’ remarks there will be a question-and-answer session. The company reminds you that
certain comments made on today's call will include predictive statements that are intended to
be made as forward-looking within the safe harbor protections of the Private Securities
Litigation Reform Act of 1995. Although the company believes that its forward-looking
statements are based on reasonable assumptions, such statements are subject to risks and
uncertainties that could cause actual results to differ materially. Important factors that could
cause results to differ materially are set forth in reports on Form 10-K and 10-Q and news
releases filed with the SEC which are available on the company's website. Today's conference
call is also available and being broadcast on clevelandcliffs.com. At the conclusion of the call, it
will be archived on the website and available for replay. The company will also discuss results
excluding certain special items. Reconciliation for Regulation G purposes can be found in the
earnings release which was published this morning. At this time, I'd like to introduce Lourenco
Goncalvez, Chairman, President, and Chief Executive Officer.
Lourenco Goncalves
Thank you, Kevin, and good morning, everyone. After several years of no real actions taken to
reverse the systematic destruction of the American industrial bases, we finally saw in 2025 a
federal 	administration that 	values 	the 	importance 	of 	preserving 	and 	growing 	American
manufacturing. That said, in 2025, throughout the entire year, we were still exposed to a lot of
steel imports, poisoning our domestic market, creating a demand gap that negatively impacted
our steel shipments and asset utilization. In response to these challenging conditions, we made
difficult decisions on shutting down assets that were dragging us down. Also, in 2025, we
terminated our index-based slab supply contract with ArcelorMittal. The contract became very

-- 1 of 13 --

InComm Conferencing 	Page 2 of 13 	www.incommconferencing.com
onerous in its final year when the Brazilian slab price index unnaturally separated from the U.S.
finished steel prices.
The factors that weighed on our performance in 2025 were well-known and addressable. As we
entered 2026, these problems have either been resolved or are clearly improving. We have
already secured more business from our automotive clients, and that will show throughout
2026 as the OEMs reshore production back to the United States. Also very important, at the
end of 2025, the Canadian government has finally made a move to restrict importing steel into
Canada, and that has created positive momentum in 2026 for our Canadian subsidiary Stelco.
Our robust order book is the best confirmation that the business environment has already
started to improve. Section 232 tariffs at 50% are, of course, a leading driver of this impact. We
are seeing the benefit of melted-and-poured requirements in driving demand for domestically
produced steel. A lot of the new galvanizing capacity in the U.S. has come online and taking
share from imports, reducing the amount of hot-rolled availability in the marketplace. We have
been able to use the melting capacity previously allocated through orders of low-margin slabs
to 	fill 	orders 	of 	higher-margin 	flat-rolled 	products. 	That 	said, 	due 	to 	melted 	import
requirements, we anticipate continued demand for our domestically produced slabs. We
remain open to being a domestic slab supplier to those in need of domestic slabs as long as we
can agree on a pricing construct that makes sense.
With all this positive influence, the spot steel price is sitting at a two-year high. Layering in the
recent cold weather stretch across the Midwest, scrap prices and electricity prices have
continued to grind higher, which has increased the cost structure of the mini-mills to a greater
level than our own. This has given us a cost advantage as we generate a lot of our own power
and use much less scrap. Even with our sizeable fixed price automotive footprint, because of
our vertically integrated nature and the also significant size of our non-automotive customer
base, Cliffs' profitability is more impacted by spot steel prices than any other company in our
industry. Said another way, when hot-rolled coil prices rally, we at Cleveland-Cliffs benefit.
Automotive is still our core end market, and when domestic production levels of cars, trucks,
and SUVs remain weak for an extended period, the impact on us is unavoidable. Vehicle
production in the United States was down in 2025 for the third consecutive year. But with this
new era of policy-driven reshoring, the return to pre-COVID levels of vehicle production in the
United States is inevitable. Throughout 2025, we geared up for this inevitability by signing
multiyear fixed price contracts with all major OEM customers. These agreements increased our
market share and secured high-margin business that will flow through in 2026. We have the
installed capacity available right now. Cliffs does not need to build new plants. Unfortunately,
the transition to Cliffs steel from the previous suppliers is not instantaneous. It takes some time
before we see the full impact of these changeovers, but we will see it in 2026. The expected
combination of these market share gains with an increased domestic production of vehicles will
be a massive gain for our throughput, efficiency, costs, and ultimately profits. One more time,
differently from our competitors currently building new steel plants or announcing plans to

-- 2 of 13 --

InComm Conferencing 	Page 3 of 13 	www.incommconferencing.com
build steel plants, Cleveland-Cliffs has production capacity available right now. Again, Cliffs does
not need to build plants to be ready in 2028, 2029, or 2030. The incremental volume demanded
by the automotive industry can and will be absorbed by our existing footprint. That volume
carries attractive incremental margins, and thanks to our multi-year fixed price contracts with
all major automotive OEMs, there will be no pressure on the price of cars to consumers in the
U.S. that could even remotely be attributed to the price of Cliffs steel.
Another example of the progress we continue to demonstrate in automotive is our successful
replacement of aluminum with steel using aluminum-forming equipment. Our Cliffs steel is now
stamped into exposed automotive components, using existing forming equipment on a
production scale basis. This Cleveland-Cliffs development demonstrates that the changeover
from aluminum to steel can be easily done without requiring new tooling or capital investment
from the customer. That significantly lowers the barrier to adoption and expands the
addressable market for our Cliffs steel products, particularly as the aluminum supply chain has
suffered severe disruption with a succession of fire events, clearly exposing its weakness. More
than ever before, Cleveland-Cliffs is seeing a clear path to replace aluminum with made in
U.S.A. steel in major applications. We operate in a market that companies from around the
world are spending billions of dollars to enter. We are already here. We already have the
assets. We already have the workforce. As manufacturing activity in the United States
continues to recover, Cleveland-Cliffs is the best positioned to benefit without requiring
massive capital investments.
I want to drill down on another factor that impacted our 2025 performance, and that was the
change in dynamics in the Canadian steel market. For the last several years, even under the
previous tariff regime, pricing in the Canadian market moved in tandem with the U.S. market.
We acquired Stelco on November 1, 2024, four days before President Trump's election, and
immediately took Stelco out of the U.S. market, redirecting Stelco's output 100% to the
Canadian market. This was not driven by policy change but rather our conviction on what's in
the best interest for our shareholders and our employees on both sides of the border. Even the
all-surprising change in Canada relations with the U.S. should not have affected this strategy at
all, but that's not how it played out. All of a sudden, Canada became a dumping ground for
producers trying to avoid U.S. tariffs, and downstream Canadian manufacturing was negatively
impacted, as well. Canadian pricing decoupled from U.S. pricing. Until recently, the Canadian
government insisted on doing nothing about this unsustainable situation, preferring to watch
its steel industry flounder for the sake of globalism. After raising the alarm louder and louder,
we finally saw the Canadian government come around late in the fourth quarter of 2025. While
still insufficient and limited in scope, the restrictions implemented were at least able to stop
the bleeding. As a result, we have seen Canadian pricing and shipments improved in the last
month. Prior to our acquisition, Stelco was a low-price exporter into the U.S. and the highly
disruptive one by the way. When you look at the big picture, what our acquisition has done to
transform and improve the U.S. marketplace more than justifies and supports a return on our
$2.5 billion purchase price of Stelco.

-- 3 of 13 --

InComm Conferencing 	Page 4 of 13 	www.incommconferencing.com
In the fourth quarter, we revealed that our memorandum of understanding partner was
POSCO, Korea's largest steelmaker and the world's third largest steelmaker outside of China.
The partnership with Cliffs will allow POSCO to support and grow its established U.S. customer
base 	while 	ensuring 	that 	its 	products 	meet 	U.S. 	country-of-origin 	melted 	and 	poured
requirements.
Our collaboration represents a model of how allies can deepen industrial cooperation under fair
and transparent trade principles, and it aligns with U.S. policy goals to strengthen domestic
industry and attract foreign investment. POSCO continues to conduct due diligence as part of
our recently announced strategic partnership. Both parties are focused on structuring a
transaction that is highly accretive and strategically compelling for each company. The duration
of these negotiations reflects the seriousness and potential scale of the opportunity. We are
targeting signing a definitive agreement in the first half of 2026. This remains the number one
strategic priority for both Cleveland-Cliffs and POSCO, and engagement between the teams is
active and ongoing. Our MoU is non-binding, and we will only move forward on ratifying our
partnership if the collaboration is accretive to Cliffs’ shareholders.
I would like to conclude my remarks congratulating our employees for our remarkable safety
record. In 2025, we achieved the lowest total recordable incident rate since Cleveland-Cliffs
became a steel producer six years ago. Our TRIR including contractors -- which is unusual in our
industry. We include contractors. Our TRIR was 0.8 per 200,000 hours worked. That represents
a 43% improvement compared with 2021, which was our first full year operating as an
integrated steelmaker. This is a direct outcome of how we manage and operate in contrast with
how the predecessors used to do with the same people and the same plants. Safety
performance at this level requires discipline, consistency, and leadership at every site. We have
room for improvement, but the amount of progress we have seen in safety results since
forming this new iteration of Cliffs six years ago is truly remarkable. I will now turn it over to our
CFO, Celso Goncalves, for his remarks.
Celso Goncalves
Hey. Good morning. Total shipments in Q4 were 3.8 million tons, which was slightly lower than
Q3 due to heavier-than-usual seasonal impacts. Looking forward, Q1 shipment levels should
improve back to the 4 million ton level again, driven by improved demand and less
maintenance time at our mills. My expectation for full year 2026 shipment level is in the 16.5
million to 17 million ton range, an improvement from 2025 as we run our mills at higher
utilizations.
Q4 price realization of $993 per net ton fell by around $40 per net ton as the lagging indices on
spot prices declined. Automotive volume fell, and slab prices became even more disconnected.
Since these factors are largely behind us, I expect a substantial improvement in realized prices
starting in Q1 of 2026, an increase of approximately $60 per ton from Q4 of 2025. As pricing
continues to grind higher and assuming this trend continues, we will likely see even further
increases in this price as the year progresses.

-- 4 of 13 --

InComm Conferencing 	Page 5 of 13 	www.incommconferencing.com
On the operations side, 2025 represented our third straight year of unit cost reductions with
another $40 per ton reduced last year. The much-needed rationalization of our footprint and
reduction of around 3,300 employees last year was a big part of that. We have further
momentum heading into 2026 as we locked in coal contracts that generate over $100 million of
savings year-over-year and an expectation of much higher utilizations both in melt and in our
finishing operations. Combining this with some partial offsets in utilities and labor costs, we
expect unit cost to decline again for a fourth straight year, down another $10 per ton in 2026.
On an apples-to-apples basis with 2025, the reduction is even greater as we are also selling a
richer mix this year without slabs, making the year-over-year reduction even more impressive.
With that said, for the first quarter of 2026, the recent spike in utilities costs and change in mix
will likely push costs up temporarily before normalizing into Q2. As a reminder, we generally
hedge 50% of our natural gas exposure looking forward one year.
On cash flow, we had a record low year in 2025 in capital expenditures as a steel company with
only $561 million spent. 2026 total CapEx is projected to be around $700 million, reflecting
more normalized maintenance capital as well as some prework and a coke plant upgrade ahead
of the Burns Harbor Furnace C reline plan for 2027. Annual pension and OPEB cash obligations
continue to decline. With the HRC curve where it is and automotive volumes ultimately
returning, I expect to return back to healthy cash flow generation in 2026, all of which will be
used to pay down debt.
Asset sale processes continue, and they should bring us more cash proceeds throughout the
year. We have already closed the sale of FPT Florida, and we are under contract to sell several
idled properties with agreements in principle for the majority of the rest. My expectation of the
$425 million in total proceeds from these sales remains intact. Some of the larger asset sale
processes remain in a holding pattern while the POSCO talks remain ongoing, but we have
several options out there that we are evaluating.
One major success we had in 2025 was balance sheet management, particularly in the fourth
quarter. From a pure dollar perspective, our leverage remains too elevated for my liking, but
the shape and format of our debt structure gives us incredible runway and flexibility. After the
refinancings that we completed in 2025, our nearest bond maturity is now in 2029, and all of
our outstanding bonds are unsecured. Our ABL draw is the lowest it has been since the Stelco
acquisition, and our total liquidity to end 2025 was $3.3 billion.
The focus this year is on generating EBITDA and cash flow. I feel much better about where we
are today versus where we were 12 months ago. Looking ahead, our order book is solid,
demand is improving, lead times are going out, prices are rising, costs are still coming down,
tariffs are in place, the slab contract is gone, manufacturing is coming back, unemployment is
low, rate cuts are here, tax refunds are coming, Stelco is contributing, autos are looking to
replace aluminum with steel, POSCO is collaborating, our employees are incentivized, and our

-- 5 of 13 --

InComm Conferencing 	Page 6 of 13 	www.incommconferencing.com
operations and commercial teams are working together towards the same goal to maximize
profitability in 2026. With that, I'll turn the call back over to Lourenco for his closing remarks.
Lourenco Goncalves
Thank you, Celso. 2025 was about fixing what needed to be fixed, making tough but necessary
decisions, and positioning Cleveland-Cliffs for sustainable performance in a fundamentally
improved market. Those actions are now largely behind us. As we move through 2026, we are
operating with a linear footprint, a stronger order book, improving price realization, declining
unit costs, and a clear line of sight to higher utilization and cash generation. With that, I'll turn it
over to Kevin for the Q&A.
Operator
Thank you. We’ll now be conducting a question-and-answer session. If you’d like to be placed in
the question queue, please press star one on your telephone keypad. A confirmation tone will
indicate your line is in the question queue. You may press star two if you’d like to remove your
question from the queue. For participants using speaker equipment, it may be necessary to pick
up your handset before pressing star one. One moment please, while we poll for questions.
Our first question today is coming from Carlos De Alba from Morgan Stanley. Your line is now
live.
Carlos de Alba
Yeah. Good morning, Lourenco, Celso. Thank you. My first question is on the benefit that you
expect on the cancellation of the slab contract this year. Given the running prices that we have
seen, can you maybe update us as to how much EBITDA more or less or any other form of
benefit that you expect to see from these contracts expiring? And then maybe we can -- just on
CapEx beyond 2026, given the relining that you expect in 2027, how much should we pencil in
give or take for CapEx in 2027?
Lourenco Goncalves
Yeah. Good morning, Carlos. I will answer the question on the slabs, and I will let Celso talk
about the CapEx one. As far as these slabs, when we sold -- I'm sorry, when we acquired
ArcelorMittal U.S.A. from ArcelorMittal, we had that slab contract, the last item that we had to
negotiate. And it was more about duration than pricing formula because pricing formula was
based on the international price of slabs and referencing the Brazilian slab prices just because
Brazil was by far the largest exporter of slabs at the time. So -- and for four of the five years, the
contract worked. And then in the fifth year, magically, the separation between the price of
slabs and the price of hot band, turned that contract into a disaster. And we tried to negotiate
the contract, but we were unsuccessful because short-term gains for them were more
important than the long-term relationship. So, I'm fine with that. So, I ate. I took it like a big
boy, and now they don't have our slabs anymore. So, good luck on running their business here
in the United States without having melted and poured slabs made in Cleveland-Cliffs, not
made in somewhere else. Somewhere else does not know what they are doing. We know what

-- 6 of 13 --

InComm Conferencing 	Page 7 of 13 	www.incommconferencing.com
we are doing. So, they don't have these slabs anymore. And if I can put a number on the -- the
gain, the EBITDA number by itself is to the order of $500 million just by replacing these slabs
with higher margin. That's a very high-level number and should be even more than that. But
$500 million is a good number to start thinking about the gain of not having and that's just a
benefit on us, not the fact that competition for automotive business became automatically
weaker when you don't make our slabs available to our competitor. I'll let Celso answer the
other one on CapEx.
Carlos de Alba
Sorry. Maybe before we move to Celso, quick question on when should we expect to see the
beginning of this around $500 million improvement in EBITDA? Already in Q1, or is it more Q2?
Lourenco Goncalves
Yeah. Look, we are already selling the material in Q1, yes. So -- but of course, you know how
these things work. The cost flow through inventory, and you're going to see more impact in Q2
than in Q1 and then more impact in Q3 than in Q2. But that's our projection for the year.
Celso Goncalves
Yeah, Carlos. If you think about it right, the HRC price is $970 or so, and the slab price was like
$485. So, it's a pretty immediate improvement in terms of revenue at the current price. It's like
a $700 million improvement in revenue at current market prices, and then you consider, call it,
$150 million increase in conversion cost to roll the slabs. That's the way to think about it on a
full year basis for 2026.
Carlos de Alba
Great. Thank you.
Celso Goncalves
Yeah. And then as it relates to CapEx, as I mentioned, 2025 was a record low at $565. We had
dramatically reduced spend at Stelco. We had CapEx avoidance related to idled facilities and
asset optimization and things like that. 2026 will be more normalized at $700 million. Call it,
more normalized maintenance spend and some prework and pre-spend related to the Burns
Harbor reline in 2027. And then beyond '27, it goes to, call it, $900 million in '27 and then back
down to $700 million in 2028. And the only reason that '27 goes to $900 million is largely
because of that Blast Furnace reline at Burns Harbor.
Carlos de Alba
Perfect. Thank you very much.
Celso Goncalves
Thank you.

-- 7 of 13 --

InComm Conferencing 	Page 8 of 13 	www.incommconferencing.com
Operator
Thank you. Next question is coming from Nick Giles from B. Riley Securities. Your line is now
live.
Nick Giles
Thank you, operator. Good morning, Lourenco and Celso. Lourenco, you outlined the capacity
you have today and attract incremental margins on what I heard is uncontracted volumes. So,
you've layered in some multiyear agreements, but I was wondering if you could give us a sense
for how much open capacity that is, what could still be contracted, and similar to Carlos’
questions, just any sensitivity from an EBITDA perspective.
Lourenco Goncalves
Yeah. Look, we have downstream capacity in pretty much every single location that we operate.
Just to give you an idea, let me take a simple example. Single-line, galvanizing line we have in
Columbus, Ohio. That was one of the first assets that were -- got in the -- were -- got the
attention for POSCO. We run that line at less than 300,000 tons a year. That line has a capacity
of 450,000 tons a year. We can produce all kinds of exposed parts over there. But we don’t run
at full capacity because the OEMs don’t produce cars in the United States as much as they
should. They produce in Mexico. They import from Korea. They import from other places, and
that’s what kind of kills our automotive business. And it has been abundantly clear since day
one of the Trump administration, the directive is to produce cars in the United States, not
importing cars from Korea and putting a stamp of an American OEM on top of that. It’s still a
Korean car. It’s not an American car. It’s not generating American jobs. So, that’s what kills our
capacity utilization. We need this made in the USA automotive production in order to utilize our
capacity. What I just explained with numbers for Columbus, Ohio. I can do the same thing for
Rockport, Indiana, for other downstream facilities like what we call New Carlisle, Indiana, the
used to call Tek and Kote under previous ownership. We have a lot of capacity to deploy and it’s
a matter of just moving from commodity type, which by the way now is extremely profitable, to
a more specialized type of steel that it’s typical Cleveland-Cliffs type of capability or forte in
terms of the technology. By the way, we have the technology. We are a well-known and well-
recognized supplier of automotive steel in the international scale. And we knew that all along.
Now we have the agreement of POSCO on that. So, there is nothing that we need to learn from
POSCO to how to do stuff. We know how to do stuff. We just don’t have the orders. But now
we’re going to have it.
Nick Giles
I really appreciate all that detail. My second question was really just around the outlook
particularly here in 1Q. HRC has obviously risen dramatically. So, can you just help us set
expectations around ASP and costs and maybe just volumes, as well? Thanks.
Lourenco Goncalves
Yeah. I'll have Celso handle that for you, Nick.

-- 8 of 13 --

InComm Conferencing 	Page 9 of 13 	www.incommconferencing.com
Celso Goncalves
Yeah. Hey, Nick. Let me give you guys some general guidance for Q1 and the rest of 2026. So,
for Q1, shipments should return back to that 4 million-ton mark, and that's largely driven by
improved demand both in the U.S. and Canada. Q1 auto shipments are expected to improve
back to the, call it, Q3 of '25 levels or better. As I mentioned, ASP is expected to be up $60 a ton
in Q1. All that pricing that negatively impacted Q4 is now positive for Q1. The monthly lag, the
quarter lags, and the spot pricing are all up. Canadian pricing is also improving. We talked about
the end of the slab contract, and the automotive volumes increasing is also a benefit. The way
that we calculate that ASP has changed slightly, so let me give you guys the new kind of
guidelines for that given the expiration of the slab contract and the increased automotive
volume. The way to think about it going forward is around 35% to 40% is on a fixed full year
price with resets throughout the year obviously. And then 25% of the volumes are on a CRU
month lag. 10% is on a CRU quarter lag. And then the balance, call it, 25% to 30% is the spot
and other, including the Stelco volumes. So, that's the way to think about ASP going forward.
Costs in Q1 will likely be up around $20 a ton before normalizing into Q2. But as I mentioned
earlier, on a full year basis, the cost from '25 to '26 on a full year basis is expected to decline
$10 per ton with -- further even with adjustments for richer mix and the expiration of the slab
contract. So, on an apples-to-apples basis, the cost will be down even more but should be down
around $10 per ton with the current construct. I think with that, you should have everything
you need for -- to get a sense for Q1 and the full year 2026.
Nick Giles
I think so. I appreciate the details as always. And continued best of luck.
Lourenco Goncalves
Thank you, Nick.
Operator
Thank you. Next question is coming from Lawson Winder from Bank of America. Your line is
now live.
Lawson Winder
Hi. Yeah. Thank you very much, operator. And good morning, Lourenco and Celso. Nice to hear
from you and thank you for the update. If I could ask on POSCO. Like, I think there's no question
that it is serious and potentially transformational for Cliffs. I was just curious. You made the
remark that POSCO is still continuing their due diligence. Has Cleveland-Cliffs completed its due
diligence on POSCO?
Lourenco Goncalves
Look -- yes. That's correct, number one. Number two, keep in mind, Lawson, they came to us.
We did not look for them. So, that's a very important point to consider. So, that shows that we
feel like they need us probably much more than we need them. That's my view. That said, we
are proud of our negotiation and our conversation and our potential partnership. One thing to

-- 9 of 13 --

InComm Conferencing 	Page 10 of 13 	www.incommconferencing.com
keep in mind, our Cleveland-Cliffs Board of Directors will not approve any deal that's not
accretive to our shareholders. So, that's what we're working on. Forming a partnership with
POSCO is our number one strategic priority at this point. And based on what they say to us,
that's the same thing for POSCO. We believe that we would be able to provide to POSCO the
ability to meet U.S. trade and origin requirements particularly melted and poured into the
United States in the short term, what they need -- absolutely need, they will not be able to sell
here without complying with that requirement. That thing is not going to change. It's clear at
this point. And this is a market that everybody wants to be in, and we are the only possibility for
any company that is outside of the border of the United States to be inside the border of the
United States. So, POSCO is in the pole position, in a very comfortable position to have a
partnership with us. We absolutely love working with them, and they seem to like work with us.
Now it's a matter of finalizing an agreement that's accretive to both Cliffs and POSCO, what
should not be difficult to accomplish.
Lawson Winder
Thank you, Lourenco. That was very helpful. If I could ask one following question just on the
aluminum opportunity. I mean, I think it's really intriguing. Could you maybe frame that up for
us in terms of the size of the opportunity to take share from aluminum in terms of tonnages?
And then what would be the timeline to achieve those tonnages?
Lourenco Goncalves
Yeah. Look, this was the type of thing that we have been -- have been asking for an opportunity
to prove ourselves to our clients, and for some reason, they were committed to keep the status
quo in place until they are no longer because it's not just the ones that use massive amounts of
aluminum. That's obvious. That's absolutely obvious. We can't rely on supply chain of aluminum
that is very weak in the United States, and they proved that by having a succession of fires in
the same plant in a space of 40 days or 45 days. And also, truly dependent from aluminum
produced abroad knowing that Canada is another country. Like they like to say, we are not a
51st state. Yes, we agree with that. It's outside of the border of the United States. It's another
country. Yes. So, that's why they are subject to Section 232 and will continue to be because
they are another country. So, aluminum from Canada is not a strategic solution for the supply
chain. And then we proved our point that stamping aluminum or stamping steel for the type of
steel that we, Cleveland-Cliffs, produce is the same thing. And we prove that at this point with
three different OEMs, and they know what they need to do, and we are ready for them. Timing
is on their control, not my control. We are ready. We proved that. We are getting orders at a
production scale basis. And this should only be growing. And the potential of the size of
aluminum utilized. The best-selling vehicle in the United States has a lot of aluminum in the
outside. We are starting to produce parts for that vehicle. So, I can tell you without triggering
any problems with my clients.
Lawson Winder
That’s very helpful. Thank you very much.

-- 10 of 13 --

InComm Conferencing 	Page 11 of 13 	www.incommconferencing.com
Lourenco Goncalves
Thank you.
Operator
Thank you. next questions coming from Alex Hacking from Citi. Your line is now live.
Alex Hacking
Yeah. Thanks. Morning. Can you maybe quantify how big of a drag on earnings Stelco has been
for the past few quarters and, therefore, kind of by proxy, how much potential upside there is
as Canadian markets turn around? And just for context, we're looking at a Canadian publicly
traded peer that's guiding to losing over $250 a ton of EBITDA in 4Q. I assume Stelco is doing
better than that. But yeah, anything you could do to help quantify that. Thank you.
Celso Goncalves
Yeah. Hey, Alex. It's Celso. We don't break down EBITDA by mill, but obviously, Stelco was
disappointing in 2025 as you can imagine. But the good news is that they're a contributor now.
We've seen a lot of improvement recently that will lead to significant EBITDA increase in 2026.
And if you think of the big picture on a net basis, even though they haven't been contributing to
the bottom line, it has kind of changed the dynamics of the market and has helped our U.S.
business. And that's only going to be amplified here as HRC pricing in the U.S. has found some
footing at a higher level. So, you can't really think of Stelco as a standalone. We're happy with
the asset. We're happy with the people. They have -- we have great people that work for us at
Stelco, but you have to think of the business as a whole. And going forward, they're going to be
a much bigger contributor to the big picture.
Lourenco Goncalves
Yeah. Alex, Lourenco here. Let me add a little bit more on the Stelco comparison with a
competitor. The competitor had the same business model as Stelco, selling to the United
States. And we bought Stelco to do one thing that the competitor is never willing to do,
changing their business model to sell into Canada. And we did. Like I said in my prepared
remarks, a few days before Trump -- President Trump was elected. Let alone, President Trump
was in office, and let alone, President Trump implementing Section 232 tariffs in April. So, we
did that in November. So, we were way ahead of the game in terms of how to reposition Stelco.
Another thing that we took from Stelco that we did not have before is made in Canada coke in
our coke battery over there, which is a USMCA-compliant feedstock. So, that was a benefit for
us, and that benefit will continue to be in place. The other thing is that if we had not had all the
imports from the United States being redirected to Canada and have the Canadian board
accepting that as normal course of business we would have had a completely different 2025. It
took us almost one entire year to convince the Canadian government that was completely
unsustainable situation. And we finally -- they finally made a move, a move that was a lot
smaller than the move that we would like them to make, but that was enough for us to see a
completely different dynamics in the domestic market in Canada. So, the comparison between
Stelco and the competitor, it's not a good comparison. Got to be Stelco for Cliffs, and Stelco for

-- 11 of 13 --

InComm Conferencing 	Page 12 of 13 	www.incommconferencing.com
Cliffs going forward. And Stelco for Cliffs in 2025 was not as good as we envisioned basically
because domestic Canadian prices went down due to the avalanche of imports into Canada.
That has been put on hold. That has changed, and we will have a completely different 2026
because of that.
Alex Hacking
Thanks for the color. I guess just following up, how much better can 2026 look? Like, on the
price side, where do you think Canadian prices should be with a new tariff policy versus where
they are today? I don't know if you can comment on that at all. Thank you.
Lourenco Goncalves
Yeah. Like Celso said, we don't break down Stelco results into our results, so we do not disclose
that. But it's easy to see that based on how bad 2025 was and used the competitors as they
referenced for that specific point, you'll see that they will be night and day. So, they will be a
contributor, and they will be a significant contributor to Cliffs’ results.
Alex Hacking
Thank you.
Lourenco Goncalves
You’re welcome.
Operator
Thank you. Next question today is coming from Albert Realini from Jefferies. Your line is now
live.
Albert Realini
Hey. Good morning, Lourenco, Celso. Thank you for taking my question. So, just, Celso, I think
you kind of alluded to it a bit, but the $425 million in total proceeds that are potentially under
contract, closure and agreement, I think you had said that doesn't include some of the larger
scale assets. And I think you had mentioned that those would be on hold until anything with
POSCO were to be finalized. So, I guess what I'm asking is that total amount of proceeds from
the asset sales could be a lot higher, and then timing would be until anything with POSCO
would be finalized. Is that -- my understanding correct?
Celso Goncalves
Yeah. So -- hey, Albert. So, the $425 million, that's the totality of all of kind of our idled plants
that we're marketing. And there's interest across the board for all of them. We've received $60
million so far, but we're in discussions to sell the rest, and that would add up to the $425.
Beyond that, we have the larger assets that we could sell that there's been some interest
around specifically Toledo HBI and FPT assets. So, that would be in addition to the $425. Now,
we put these larger asset sales on hold given POSCO's interest in our business. They're looking
across our entire footprint. So, we don't want to jeopardize the POSCO opportunity, which is

-- 12 of 13 --

InComm Conferencing 	Page 13 of 13 	www.incommconferencing.com
much bigger. But for whatever reason, if the POSCO opportunity were to not materialize, we
could pick up where we left off on the larger asset sales, and we've had some meaningful
interest in those, as well. So, that would be in addition to the $425. You're correct.
Albert Realini
Understood. Thank you.
Lourenco Goncalves
Albert, just a slight correction. Celso said in the discussion, some of the discussions are already
signed contracts. So, we are beyond a little -- a little beyond the just discussions. We have
contracts in place, and it's a matter of going between a binding contract and a sale agreement
that -- at closing. So, it's -- these transactions are real. It's a matter of time for closing. So, like
we have done so far, we do want that already close.
Albert Realini
Got it. Thanks for the clarity.
Lourenco Goncalves
Thank you.
Operator
Thank you. We've reached end of our question-and-answer session. I'd like to turn the floor
back over for any further or closing comments.
Lourenco Goncalves
Thank you very much, and you guys have -- enjoy 2026 as much as Cleveland-Cliffs will. I
appreciate your interest in our company. Thanks a lot. Bye now.
Operator
Thank you. That does conclude today's teleconference webcast. You may disconnect your line
at this time and have a wonderful day. We thank you for your participation today.

-- 13 of 13 --