UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-K
(Mark One)
☑ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the FISCAL YEAR ended December 31, 2025
OR
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ___________________ to ___________________
Commission 	Registrants; 	I.R.S. Employer
File Number 	Address and Telephone Number 	States of Incorporation 	Identification No.
333-21011 	FIRSTENERGY CORP. 	Ohio 	34-1843785
341 White Pond Drive
Akron 	OH 44320
Telephone 	(800) 	736-3402
1-3141 	JERSEY CENTRAL POWER & LIGHT COMPANY 	New Jersey 	21-0485010
300 Madison Avenue
Morristown 	NJ 07962
Telephone 	(800) 	736-3402
SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:
Title of Each Class 	Trading Symbol 	Name of Each Exchange on Which Registered
Common Stock, $0.10 par value per share 	FE 	New York Stock Exchange
SECURITIES REGISTERED PURSUANT TO SECTION 12(g) OF THE ACT:
None.
Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.
FirstEnergy Corp. 	Yes ☐ 	No 	☑
Jersey Central Power & Light Company 	Yes ☐ 	No 	☑
Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
FirstEnergy Corp. 	Yes ☐ 	No 	☑
Jersey Central Power & Light Company 	Yes ☐ 	No 	☑
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during
the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for
the past 90 days.
FirstEnergy Corp. 	Yes ☑ 	No 	☐
Jersey Central Power & Light Company 	Yes ☑ 	No 	☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of
Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
FirstEnergy Corp. 	Yes ☑ 	No 	☐
Jersey Central Power & Light Company 	Yes ☑ 	No 	☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an
emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and "emerging growth company" in
Rule 12b-2 of the Exchange Act.

-- 1 of 203 --

Large Accelerated Filer 	☑ FirstEnergy Corp.
Accelerated Filer 	☐
Non-accelerated Filer 	☑ Jersey Central Power & Light Company
Smaller Reporting Company 	☐
Emerging Growth Company 	☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or
revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
FirstEnergy Corp. 	☐
Jersey Central Power & Light Company 	☐
Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control
over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its
audit report.
FirstEnergy Corp. 	☑
Jersey Central Power & Light Company 	☐
If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing
reflect the correction of an error to previously issued financial statements.
FirstEnergy Corp. 	☐
Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by
any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b).
FirstEnergy Corp. 	☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).
FirstEnergy Corp. 	Yes ☐ 	No ☑
Jersey Central Power & Light Company 	Yes ☐ 	No ☑
State the aggregate market value of the voting and non-voting common equity held by non-affiliates computed by reference to the price at which the common
equity was last sold, or the average bid and asked price of such common equity, as of the last business day of the registrant’s most recently completed second
fiscal quarter.
$23,208,851,454 as of June 30, 2025
Indicate the number of shares outstanding of each of the registrant’s classes of common stock, as of the latest practicable date:
Registrants 	CLASS 	AS OF JANUARY 31, 2026
FirstEnergy Corp. 	Common Stock, $0.10 par value 	577,932,879
Jersey Central Power & Light Company 	Common Stock, $10 par value 	13,628,447, all held by FirstEnergy Corp.
This combined Form 10-K is separately filed by FirstEnergy Corp. and Jersey Central Power & Light Company. Information contained herein relating to any
individual registrant is filed by such registrant on its own behalf. Jersey Central Power & Light Company makes no representation as to information relating to
FirstEnergy Corp.
Jersey Central Power & Light Company meets the conditions set forth in General Instruction I(1)(a) and (b) of Form 10-K and is therefore filing this Form 10-K
with the reduced disclosure format specified in General Instruction I(2) to Form 10-K.
Documents Incorporated By Reference
PART OF FORM 10-K INTO WHICH
DOCUMENT 	DOCUMENT IS INCORPORATED
Portions of the Definitive Proxy Statement for the 2026 Annual Meeting of Shareholders of FirstEnergy Corp.
to be held May 20, 2026. 	Part III

-- 2 of 203 --

TABLE OF CONTENTS
Page
Glossary of Terms 	iii
Part I
Item 1. Business 	1
The Companies 	1
Utility Regulation 	3
Capital Requirements 	4
Supply Plan 	4
System Demand 	5
Regional Reliability 	5
Competition 	5
Seasonality 	5
Human Capital 	6
Information About Our Executive Officers 	8
FirstEnergy Website and Other Social Media Sites and Applications 	9
Item 1A. Risk Factors 	10
Item 1B. Unresolved Staff Comments 	24
Item 1C. Cybersecurity 	24
Item 2. Properties 	26
Item 3. Legal Proceedings 	27
Item 4. Mine Safety Disclosures 	27
Part II 	28
Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities 	28
Item 6. [Reserved] 	29
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations 	29
FirstEnergy Corp. Management's Discussion and Analysis of Financial Condition and Results of Operations 	31
Jersey Central Power & Light Company Management’s Narrative Discussion and Analysis of Results of Operations 	80
Item 7A. Quantitative and Qualitative Disclosures About Market Risk 	85
Item 8. Financial Statements and Supplementary Data 	85
Reports of Independent Registered Public Accounting Firm 	86
FirstEnergy Corp.
Consolidated Statements of Income 	90
Consolidated Statements of Comprehensive Income 	91
Consolidated Balance Sheets 	92
Consolidated Statements of Stockholders' Equity 	94
Consolidated Statements of Cash Flows 	95
Jersey Central Power & Light Company
Statements of Income and Comprehensive Income 	96
Balance Sheets 	97
Statements of Stockholder's Equity 	98
Statements of Cash Flows 	99
Combined Notes To Financial Statements of the Registrants 	100
Item 9. Changes In and Disagreements with Accountants on Accounting and Financial Disclosure 	171
Item 9A. Controls and Procedures 	171
Item 9B. Other Information 	171
Item 9C. Disclosure Regarding Foreign Jurisdictions That Prevent Inspections 	171
i

-- 3 of 203 --

Part III 	171
Item 10. Directors, Executive Officers and Corporate Governance 	171
Item 11. Executive Compensation 	172
Item 12. Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters 	172
Item 13. Certain Relationships and Related Transactions, and Director Independence 	172
Item 14. Principal Accountant Fees and Services 	173
Part IV 	173
Item 15. Exhibit and Financial Statement Schedules 	173
Item 16. Form 10-K Summary 	179
ii

-- 4 of 203 --

GLOSSARY OF TERMS
The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries, including Jersey Central
Power & Light Company:
AE Supply 	Allegheny Energy Supply Company, LLC, a wholly owned unregulated generation subsidiary of FE
AGC 	Allegheny Generating Company, a wholly owned generation subsidiary of MP
ATSI 	American Transmission Systems, Incorporated, a wholly owned transmission subsidiary of FET
CEI 	The Cleveland Electric Illuminating Company, a wholly owned Ohio electric power company subsidiary of FE
Electric Companies 	OE, CEI, TE, FE PA, JCP&L, MP and PE
FE 	FirstEnergy Corp., a public electric power holding company
FE PA 	FirstEnergy Pennsylvania Electric Company, a wholly owned Pennsylvania electric power company subsidiary of FirstEnergy Pennsylvania
Holding Company LLC, a wholly owned subsidiary of FE
FESC 	FirstEnergy Service Company, which provides legal, financial and other corporate support services
FET 	FirstEnergy Transmission, LLC a consolidated VIE of FE, and the parent company of ATSI, MAIT and TrAIL, and having a joint venture in PATH
and Valley Link
FEV 	FirstEnergy Ventures Corp., which invests in certain unregulated enterprises and business ventures
FirstEnergy 	FirstEnergy Corp., together with its consolidated subsidiaries
Global Holding 	Global Mining Holding Company, LLC, a joint venture between FEV, WMB Marketing Ventures, LLC and Pinesdale LLC
Grid Growth 	Grid Growth Ventures, LLC, a holding company formed by FET and Transource on September 29, 2025
Grid Growth EHV 	Grid Growth EHV Holdings, LLC, a subsidiary of Grid Growth
Grid Growth Subsidiaries 	The six subsidiaries of Grid Growth: (i) Grid Growth EHV Holdings, LLC; (ii) Grid Growth Ohio, LLC; (iii) Grid Growth West Virginia, LLC; (iv) Grid
Growth Virginia, LLC; (v) Grid Growth Ohio EHV, LLC; and (vi) Grid Growth Virginia Development, Inc. - that will develop, construct, own,
operate and maintain those transmission projects awarded by PJM
JCP&L 	Jersey Central Power & Light Company, a wholly owned New Jersey electric power company subsidiary of FE
KATCo 	Keystone Appalachian Transmission Company, a wholly owned transmission subsidiary of FE
MAIT 	Mid-Atlantic Interstate Transmission, LLC, a wholly owned transmission subsidiary of FET
ME 	Metropolitan Edison Company, a former wholly owned Pennsylvania electric power company subsidiary of FE, which merged with and into FE PA
on January 1, 2024
MP 	Monongahela Power Company, a wholly owned West Virginia electric power company subsidiary of FE
OE 	Ohio Edison Company, a wholly owned Ohio electric power company subsidiary of FE
Ohio Companies 	CEI, OE and TE
PATH 	Potomac-Appalachian Transmission Highline, LLC, a joint venture between FE and a subsidiary of AEP
PATH-Allegheny 	PATH Allegheny Transmission Company, LLC
PATH-WV 	PATH West Virginia Transmission Company, LLC
PE 	The Potomac Edison Company, a wholly owned Maryland and West Virginia electric power company subsidiary of FE
Penn 	Pennsylvania Power Company, a former wholly owned Pennsylvania electric power company subsidiary of OE, which merged with and into FE PA
on January 1, 2024
Pennsylvania Companies 	ME, PN, Penn and WP, each of which merged with and into FE PA on January 1, 2024
PN 	Pennsylvania Electric Company, a former wholly owned Pennsylvania electric power company subsidiary of FE, which merged with and into FE
PA on January 1, 2024
Registrants 	FE and JCP&L
Signal Peak 	Signal Peak Energy, LLC, an indirect subsidiary of Global Holding that owns mining operations near Roundup, Montana
TE 	The Toledo Edison Company, a wholly owned Ohio electric power company subsidiary of FE
TrAIL 	Trans-Allegheny Interstate Line Company, a wholly owned transmission subsidiary of FET
Transmission Companies 	ATSI, MAIT, TrAIL and KATCo
Valley Link 	Valley Link Transmission Company, LLC, a holding company formed by FET, DominionHV and Transource on November 24, 2024
Valley Link Subsidiaries 	The five subsidiaries of Valley Link: (i) Valley Link Transmission Maryland, LLC; (ii) Valley Link Transmission, Ohio, LLC; (iii) Valley Link
Transmission Virginia, LLC; (iv) Valley Link Transmission Virginia Development, Inc.; and (v) Valley Link Transmission West Virginia, LLC - that
will develop, construct, own, operate and maintain those transmission projects awarded by PJM
WP 	West Penn Power Company, a former wholly owned Pennsylvania electric power company subsidiary of FE, which merged with and into FE PA
on January 1, 2024
iii

-- 5 of 203 --

The following abbreviations and acronyms may be used to identify frequently used terms in this report:
2026 Convertible Notes 	FE's 4.00% convertible senior notes, due 2026
2029 Convertible Notes 	FE’s 3.625% convertible senior notes, due 2029
2031 Convertible Notes 	FE’s 3.875% convertible senior notes, due 2031
A&R FET LLC
Agreement Fourth Amended and Restated Limited Liability Company Operating Agreement of FET
ACE 	Affordable Clean Energy
AEP 	American Electric Power Company, Inc.
AFS 	Available-for-sale
AFUDC 	Allowance for Funds Used During Construction
Amended Credit Facilities 	Collectively, the eight separate senior unsecured syndicated revolving credit facilities entered into by FE, FET, the Electric Companies, and the
Transmission Companies, each as amended from time to time, most recently on October 27, 2025
AMI 	Advanced Metering Infrastructure
AMT 	Alternative Minimum Tax
AOCI 	Accumulated Other Comprehensive Income (Loss)
ARO 	Asset Retirement Obligation
ARP 	Alternative Revenue Program
ASC 	Accounting Standards Codification
ASU 	Accounting Standards Update
BGS 	Basic Generation Service
Brookfield 	North American Transmission Company II L.P., a controlled investment vehicle entity of Brookfield Super-Core Infrastructure Partners
Brookfield Guarantors 	Brookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core Infrastructure Partners (NUS) L.P., and Brookfield Super-Core
Infrastructure Partners (ER) SCSp
CAA 	Clean Air Act
CCR 	Coal Combustion Residual
CERCLA 	Comprehensive Environmental Response, Compensation, and Liability Act of 1980
CFR 	Code of Federal Regulations
CISO 	Chief Information Security Officer
CO 	Carbon Dioxide
CODM 	Chief Operating Decision Maker
COVID-19 	Coronavirus disease
CPCN 	Certificate of Public Convenience and Necessity
CPP 	EPA's Clean Power Plan
CSAPR 	Cross-State Air Pollution Rule
CWIP 	Construction Work in Progress
D.C. Circuit 	U.S. Court of Appeals for the District of Columbia Circuit
DCPD 	FE Deferred Compensation Plan for Outside Directors
DCR 	Delivery Capital Recovery
DMR 	Distribution Modernization Rider
DOE 	U.S. Department of Energy
DominionHV 	Dominion High Voltage Mid-Atlantic, Inc., an affiliate of VEPCO
DPA 	Deferred Prosecution Agreement entered into on July 21, 2021 between FE and the U.S. Attorney’s Office for the S.D. Ohio
DSP 	Default Service Plan
EDC 	Electric Distribution Company
EDCP 	FE Amended and Restated Executive Deferred Compensation Plan
EEI 	The Edison Electric Institute
EGS 	Electric Generation Supplier
EGU 	Electric Generation Unit
2
iv

-- 6 of 203 --

ELG 	Effluent Limitation Guidelines
EmPOWER Maryland 	EmPOWER Maryland Energy Efficiency Act
ENEC 	Expanded Net Energy Cost
Energize365 	FirstEnergy's Transmission and Distribution Infrastructure Investment Program
EnergizeNJ 	JCP&L's second Infrastructure Investment Program
EPA 	U.S. Environmental Protection Agency
EPS 	Earnings per Share
ESP 	Electric Security Plan
Exchange Act 	Securities and Exchange Act of 1934, as amended
FASB 	Financial Accounting Standards Board
FE Board 	The Board of Directors of FE
FERC 	Federal Energy Regulatory Commission
FET Equity Interest Sale 	Sale of an additional 30% membership interest of FET, such that Brookfield owns 49.9% of FET
FET P&SA II 	Purchase and Sale Agreement entered into on February 2, 2023, by and between FE, FET, Brookfield, and the Brookfield Guarantors
FIP 	Federal Implementation Plan
Fitch 	Fitch Ratings Service
FMB 	First Mortgage Bond
FTR 	Financial Transmission Right
GAAP 	Generally Accepted Accounting Principles in the United States
GHG 	Greenhouse Gas
Grid Growth Operating
Agreement Amended and Restated Operating Agreement of Grid Growth, dated as of February 13, 2026
HB 15 	House Bill 15, as passed by Ohio's 136th General Assembly
HB 6 	House Bill 6, as passed by Ohio's 133rd General Assembly
ICP 2015 	FirstEnergy Corp. 2015 Incentive Compensation Plan
ICP 2020 	FirstEnergy Corp. 2020 Incentive Compensation Plan
ISC2 	International Information System Security Certification Consortium
IRA of 2022 	Inflation Reduction Act of 2022
IRS 	Internal Revenue Service
kV 	Kilovolt
kWh 	Kilowatt-hour
LOC 	Letter of Credit
LTIIP 	Long-Term Infrastructure Improvement Plan
MDPSC 	Maryland Public Service Commission
MGP 	Manufactured Gas Plants
Moody’s 	Moody’s Investors Service, Inc.
MW 	Megawatt
MWh 	Megawatt-hour
NAV 	Net Asset Value
NCI 	Noncontrolling Interest
NERC 	North American Electric Reliability Corporation
NJBPU 	New Jersey Board of Public Utilities
NOL 	Net Operating Loss
NO 	Nitrogen Oxide
NSR 	New Source Review
NUG 	Non-Utility Generation
NYPSC 	New York State Public Service Commission
OAG 	Ohio Attorney General
OBBBA 	One Big Beautiful Bill Act of 2025, as signed into law on July 4, 2025
x
v

-- 7 of 203 --

OCC 	Ohio Consumers' Counsel
ODSA 	Ohio Development Service Agency
Ohio Stipulation 	Stipulation and Recommendation, dated November 1, 2021, entered into by and among the Ohio Companies, the OCC, PUCO staff, and several
other signatories
OPEB 	Other Postemployment Benefits
OPIC 	Other paid-in capital
OVEC 	Ohio Valley Electric Corporation
PA Consolidation 	Consolidation of the Pennsylvania Companies on January 1, 2024
PEER 	FirstEnergy's Program for Enhanced Employee Retirement, as announced in 2023
PJM 	PJM Interconnection, LLC, an RTO serving the PJM Region
PJM Region 	The territory that PJM coordinates the movement of electricity through, including all or parts of Delaware, Illinois, Indiana, Kentucky, Maryland,
Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia and the District of Columbia.
PJM Tariff 	PJM Open Access Transmission Tariff
PP&E 	Property, Plant and Equipment
PPUC 	Pennsylvania Public Utility Commission
PUCO 	Public Utilities Commission of Ohio
Regulation FD 	Regulation Fair Disclosure promulgated by the SEC
RFC 	ReliabilityFirst Corporation
ROE 	Return on Equity
RSU 	Restricted Stock Unit
RTEP 	Regional Transmission Expansion Plan
RTO 	Regional Transmission Organization
S&P 	Standard & Poor’s Ratings Service
S&P 500 	Standard & Poor’s 500 index
S.D. Ohio 	Federal District Court, Southern District of Ohio
SEC 	U.S. Securities and Exchange Commission
Securities Act 	Securities Act of 1933, as amended
SEET 	Significantly Excessive Earnings Test
SIP 	State Implementation Plan(s) under the CAA
Sixth Circuit 	U.S. Court of Appeals for the Sixth Circuit
SO 	Sulfur Dioxide
SOFR 	Secured Overnight Financing Rate
SOS 	Standard Offer Service
SPE 	Special Purpose Entity
TCJA 	Tax Cuts and Jobs Act adopted December 22, 2017
Transource 	Transource Energy, LLC, a subsidiary of AEP
U.S. 	United States
Valley Link Operating
Agreement Amended and Restated Operating Agreement of Valley Link, dated as of February 21, 2025
VEPCO 	Virginia Electric and Power Company, a subsidiary of Dominion Energy, Inc.
VIE 	Variable Interest Entity
VSCC 	Virginia State Corporation Commission
WVPSC 	Public Service Commission of West Virginia
2
vi

-- 8 of 203 --

PART I
ITEM 1. BUSINESS
The Companies
FE and its subsidiaries are principally involved in the transmission, distribution, and generation of electricity. FirstEnergy’s electric operating companies comprise
one of the nation’s largest investor-owned electric systems, serving over six million customers in the Midwest and Mid-Atlantic regions. FirstEnergy’s
transmission operations include more than 24,000 miles of transmission lines and two regional transmission operation centers, and MP and AGC control 3,610
MWs of total generation capacity.
Regulated Electric Company Operating Subsidiaries
The Electric Companies’ combined service areas encompass approximately 65,000 square miles in Ohio, Pennsylvania, West Virginia, Maryland, New Jersey,
and New York, providing distribution services for over six million customers in an area with a population of approximately 14 million and a total rate base of
approximately $21.3 billion as of December 31, 2025.
OE owns property and does business as an electric public utility in Ohio, providing distribution services to approximately 1.1 million customers in central and
northeastern Ohio, with a rate base of $2.0 billion as of December 31, 2025. OE has 1,013 employees and serves an area that has a population of
approximately 2.4 million.
CEI owns property and does business as an electric public utility in Ohio, providing distribution services to approximately 0.8 million customers in northeastern
Ohio, with a rate base of $1.7 billion as of December 31, 2025. CEI has 752 employees and serves an area that has a population of approximately 1.7 million.
TE owns property and does business as an electric public utility in Ohio, providing distribution services to approximately 0.3 million customers in northwestern
Ohio, with a rate base of $0.5 billion as of December 31, 2025. TE has 281 employees and serves an area that has a population of approximately 0.7 million.
FE PA owns property and does business as an electric public utility in Pennsylvania and New York, providing distribution services to approximately 2.1 million
customers in Pennsylvania and approximately 4,000 customers in Waverly, New York, with a rate base of $6.9 billion as of December 31, 2025. FE PA has 1,916
employees and serves an area that has a population of approximately 4.5 million. On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies
into FE PA, rendering FE PA a new, single operating entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. As of
January 1, 2024, FE PA is FE’s only regulated distribution power company in Pennsylvania encompassing the operations previously conducted individually by
the Pennsylvania Companies.
JCP&L owns property and does business as an electric public utility in New Jersey, providing distribution services to approximately 1.2 million customers, as well
as transmission services in northern, western, and east central New Jersey, with a combined rate base of $5.1 billion as of December 31, 2025. JCP&L has
1,165 employees and serves an area that has a population of approximately 2.8 million.
PE owns property and does business as an electric public utility in Maryland, Virginia, and West Virginia, providing distribution services to approximately 0.4
million customers in Maryland and West Virginia, as well as transmission services in Maryland, West Virginia and Virginia. PE had a combined rate base of
approximately $1.0 billion as of December 31, 2025. PE has 473 employees and serves an area that has a population of approximately 1.0 million.
MP owns property and does business as an electric public utility in West Virginia, providing distribution services to approximately 0.4 million customers, as well
as generation and transmission services in northern West Virginia, with a combined rate base of $4.1 billion as of December 31, 2025. MP has 968 employees
and serves an area with a population of approximately 0.8 million. MP is contractually obligated to provide power to PE to meet its load obligations in West
Virginia. MP owns or contractually controls 3,610 MWs of generation capacity that is supplied to its electric utility business, including 30 MWs of Solar generation
and 487 MWs of pumped-storage hydroelectric generation from its 16.25% undivided interest in the Bath County facility in Virginia through its wholly owned
subsidiary AGC.
Regulated Transmission Company Operating Subsidiaries
FET, a holding company and parent of ATSI, MAIT, and TrAIL, is a VIE of FE, which holds 50.1% of its issued and outstanding membership interests. Brookfield
owns the remaining 49.9% of the issued and outstanding membership interests of FET. Through its subsidiaries, FET owns and operates high-voltage
transmission facilities in the PJM Region and has a FirstEnergy-owned rate base of $4.9 billion. FET's subsidiaries are subject to regulation by FERC and
applicable state regulatory authorities. FET and its subsidiaries have no direct employees. Each of these companies, however, relies on employees of their
affiliates, including FESC, for the performance of necessary services. On January 1, 2024, PN and ME contributed their respective Class B equity interests of
MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership
1

-- 9 of 203 --

interest in FET. So long as FE holds the FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.
On February 21, 2025, FET, DominionHV and Transource entered into the Valley Link Operating Agreement, which established the general framework for Valley
Link and the Valley Link Subsidiaries to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to Valley Link.
This general framework includes parameters regarding the relationship among the three members, confers governance rights to its members so long as certain
ownership percentages are maintained, as described below, and defines the list of projects that Valley Link will have the right to develop. Valley Link is the owner
of the Valley Link Subsidiaries, which are organized in various states. On February 26, 2025, in response to the PJM 2024 RTEP Long-Term Proposal Window
#1, PJM awarded two electric transmission projects to Valley Link estimated to be approximately $3 billion, with FET’s share estimated to be approximately $1
billion.
On February 13, 2026, FET and Transource entered into the Grid Growth Operating Agreement, which established the general framework for FET and
Transource to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to certain of the subsidiaries of Grid
Growth, on February 12, 2026. This general framework includes parameters regarding the relationship among the two members, confers governance rights to its
members so long as certain ownership percentages are maintained and defines the list of projects that Grid Growth will have the right to develop. Grid Growth is
the sole owner of Grid Growth Ohio and owns an 80% interest in Grid Growth EHV, with Transource owning the remaining interests. On February 12, 2026, in
response to the PJM 2025 RTEP Long-Term Proposal Window #1, PJM awarded a project to Grid Growth estimated to be approximately $1 billion, with FET’s
share estimated to be approximately $448 million.
ATSI owns high-voltage transmission facilities in PJM, which consist of 7,965 circuit miles of transmission lines with nominal voltages of 345 kV, 138 kV and 69
kV in Ohio and Pennsylvania and has a FirstEnergy-owned rate base of $2.3 billion as of December 31, 2025.
MAIT owns high-voltage transmission facilities in PJM, which consist of 4,281 circuit miles of transmission lines with nominal voltages of 500 kV, 345 kV, 230 kV,
138 kV, 115 kV, 69 kV and 46 kV in Pennsylvania, and has a FirstEnergy-owned rate base of $1.9 billion as of December 31, 2025.
TrAIL owns high-voltage transmission facilities in PJM, which consists of 269 circuit miles of transmission lines with nominal voltages of 500 kV, 345 kV, 230 kV,
138 kV, including a 500 kV transmission line extending approximately 150 miles from southwestern Pennsylvania through West Virginia to a point of
interconnection with VEPCO in northern Virginia, and has a FirstEnergy-owned rate base of $0.7 billion as of December 31, 2025.
KATCo owns high-voltage transmission facilities formerly owned by WP in PJM, which consist of 1,694 circuit miles of transmission lines with nominal voltages of
500 kV, 345 kV, 230 kV, 138 kV, and 115 kV in Pennsylvania, and has a rate base of $0.5 billion as of December 31, 2025. On January 1, 2024, WP transferred
certain of its Pennsylvania-based transmission assets to KATCo.
Service Company
FESC has 4,618 employees and provides corporate support and other services, including executive administration, accounting and finance, risk management,
human resources, corporate affairs, communications, information technology, legal services and other similar services at cost, in accordance with its cost
allocation manual, to affiliated FirstEnergy companies under FESC agreements.
Segments Overview - FirstEnergy
FirstEnergy’s reportable segments are as follows, and FirstEnergy continues to evaluate segment performance based on earnings attributable to FE from
continuing operations:
• Distribution Segment, which consists of the Ohio Companies and FE PA;
• Integrated Segment, which consists of MP, PE and JCP&L; and
• Stand-Alone Transmission Segment, which consists of FE's ownership in FET and KATCo.
FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution,
Integrated and Stand-Alone Transmission.
FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, representing $11.1 billion in rate base as of December 31, 2025,
distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million
customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its default service or standard service offer requirements. The
segment’s results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs.
2

-- 10 of 203 --

FirstEnergy's Integrated segment includes the distribution and transmission operations of JCP&L, MP and PE, as well as MP’s regulated generation operations,
representing $10.2 billion in rate base as of December 31, 2025. The Integrated segment distributes electricity to approximately 2 million customers in New
Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to
transmit electricity and operates 3,610 MWs of regulated generation capacity located primarily in West Virginia and Virginia, which includes three solar
generation sites, representing 30 MWs of generation capacity. The segment’s results reflect the costs of securing and delivering electric generation to
customers, including the deferral and amortization of certain costs. Additionally, on October 1, 2025, MP and PE filed their integrated resource plan with the
WVPSC proposing, among other things, the addition of 70 MWs of solar generation by 2028, and 1,200 MWs of natural gas combined cycle generation by 2031,
which are expected to require an estimated capital investment of approximately $2.5 billion, as detailed in the filing. See Note 13., "Regulatory Matters," of the
Combined Notes to Financial Statements of the Registrants for additional details.
FirstEnergy's Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $5.4 billion in FirstEnergy-owned rate
base as of December 31, 2025, includes transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The
segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a
projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net
transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities.
FirstEnergy's Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies,
including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or
businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. On July 16, 2025, FEV sold
its entire 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations, at
book value to WMB Marketing Ventures, LLC and Pinesdale LLC for $47.5 million. Also included in Corporate/Other for segment reporting is 67 MWs of
generation capacity, representing AE Supply’s OVEC capacity entitlement. As of December 31, 2025, Corporate/Other had approximately $6.8 billion of external
FE holding company debt.
Segments Overview - JCP&L
JCP&L's reportable operating segments are comprised of the Distribution and Transmission segments.
JCP&L's Distribution segment, representing $3.7 billion in rate base as of December 31, 2025, distributes electricity to approximately 1.2 million customers in
New Jersey across its distribution footprint. The segment’s results reflect the costs of securing and delivering electric generation to customers, including the
deferral and amortization of certain costs.
JCP&L's Transmission segment, representing $1.4 billion in rate base as of December 31, 2025, includes transmission infrastructure owned and operated by
JCP&L that is used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue
requirement is updated annually based on a projected rate base and projected costs, which are subject to an annual true-up based on actual rate base and
costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on JCP&L’s transmission facilities.
Regulatory Accounting
FirstEnergy accounts for the effects of regulation through the application of regulatory accounting to the Electric Companies and the Transmission Companies as
their rates are established by third-party regulators with the authority to set binding rates that are cost-based and can be charged to and collected from
customers.
The Electric Companies and the Transmission Companies recognize, as regulatory assets and regulatory liabilities, costs that FERC and the various state utility
commissions, as applicable, have authorized for recovery from or return to customers in future periods or for which authorization is probable. Without the
probability of such authorization, costs currently recorded as regulatory assets and regulatory liabilities would have been charged or credited to income as
incurred. All regulatory assets and liabilities are expected to be recovered from or returned to customers. Based on current ratemaking procedures, the Electric
Companies and the Transmission Companies continue to collect cost-based rates for their distribution and transmission services; accordingly, it is appropriate
that the Electric Companies and the Transmission Companies continue the application of regulatory accounting to those operations. Regulatory accounting is
applied only to the parts of the business that meet the above criteria. If a portion of the business applying regulatory accounting no longer meets those
requirements, previously recorded regulatory assets and liabilities are removed from the balance sheet in accordance with GAAP.
3

-- 11 of 203 --

State Regulation and Federal Regulation
The following table summarizes the allowed ROE and the aggregate actual ROE of the Electric Companies and Transmission Companies as determined for
regulatory purposes as of and for the year ended December 31, 2025:
Actual ROE
Segment 	Entity/State 	Allowed ROE 	FirstEnergy
Stand-Alone
Transmission
FET 	9.88% - 12.7%
9.8%
KATCo 	10.45%
Integrated
Maryland 	9.5% - Distribution
10.45% - Transmission
New Jersey 	9.6% - Distribution
10.2% - Transmission
West Virginia 	9.8%
Distribution Ohio 	10.5%
Pennsylvania 	Settled
Reflects a 0.5% reduction to the 10.38% approved ROE due to the January 2025 Sixth Circuit ruling eliminating the 50 basis point adder associated with RTO membership (see
"Outlook - FERC Regulatory Matters - Transmission ROE Incentive" in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for
additional information and discussion.
On November 19, 2025, the PUCO issued an order in the Ohio Companies’ base rate case that authorized an ROE of 9.63%. New rates reflecting this order were not yet in effect
as of December 31, 2025.
Commission-approved settlement agreements did not disclose allowed ROE rates, however, 10.05% represents current PAPUC benchmark ROE used for DSIC purposes.
See "Outlook - State Regulation" in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information
and discussion.
See "Outlook - FERC Regulatory Matters" in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional
information and discussion.
Environmental Matters
See "Outlook - Environmental Matters" in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional
information and discussion.
Capital Requirements
The Registrants' businesses are capital intensive, requiring significant resources to fund operating expenses, construction and other investment expenditures,
scheduled debt maturities and interest payments, dividend payments and potential contributions to its pension plan. See "Capital Resources and Liquidity" in
Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional information and discussion.
Supply Plan
Supply Chain
While supply lead times have not fully returned to levels prior to the COVID-19 pandemic, FirstEnergy continues to monitor the situation in light of demand
increases across the industry, including due to data center usage, and the imposition of tariffs and retaliatory tariffs that have been, and may be, imposed by the
U.S. government in response. FirstEnergy continues to implement mitigation strategies to address supply constraints and does not expect any corresponding
service disruptions or any material impact on its capital investment plan. However, the situation remains fluid, and a prolonged continuation or further increase in
demand, or the continuation of uncertain or adverse macroeconomic conditions, including inflationary pressures and new or increased existing tariffs, could lead
to an increase in supply chain disruptions that could, in turn, have an adverse effect on the Registrants’ results of operations, cash flow and financial condition.
Default Service
Certain of the Electric Companies have default service obligations to provide power to non-shopping customers who have elected to continue to receive service
under regulated retail tariffs. These default service plans vary by state and service territory, and volume of sales can vary depending on the level of shopping that
occurs. JCP&L’s default service, or BGS supply, is secured through a statewide competitive procurement process approved by the NJBPU. Default service for
the Ohio Companies, FE PA and PE's Maryland jurisdiction are provided through a competitive procurement process approved by the PUCO (under the current
ESP), PPUC (under the Default Service Plan) and MDPSC (under the SOS), respectively. If any supplier fails to deliver
(1)
(2)
(3)
(1)
(2)
(3)
4

-- 12 of 203 --

power to any one of those Electric Companies’ service areas, the Utility serving that area may need to procure the required power in the market in their role as
the default load serving entity. West Virginia electric generation continues to be regulated by the WVPSC.
Fuel Supply
MP has coal contracts with various terms to purchase approximately seven tons of coal for the year 2026, which, along with its 2025 year-end inventory levels,
accounts for all of its forecasted 2026 coal requirements. MP has the ability to acquire additional tonnage through options available in its current contracts, as
well as purchases through the spot market. The contracts expire at various times through 2030. This contracted coal is produced primarily from mines located in
Pennsylvania and West Virginia. In order to meet emission requirements, MP holds contracts for a variety of reagents expiring at various times through 2031, as
well as the ability to purchase additional reagents through the spot market. Additionally, MP is granted emission allowances by the EPA and purchases additional
allowances as needed to meet emission requirements. See "Outlook - Environmental Matters" in Item 7., "Management's Discussion and Analysis of Financial
Condition and Results of Operations" for additional information pertaining to the impact of increased environmental regulations on fuel supply.
System Demand
The maximum hourly demand in 2025, 2024 and 2023 for each of the Electric Companies was:
For the Years Ended December 31,
System Demand 	2025 	2024 	2023
(In MWs)
CEI 	4,031 	3,971 	3,868
FE PA 	10,505 	10,404 	10,058
JCP&L 	6,076 	6,184 	5,731
MP 	2,187 	2,096 	2,051
OE 	5,744 	5,582 	5,192
PE 	3,692 	3,860 	3,103
TE 	2,004 	2,074 	2,220
Regional Reliability
All of the Registrants' facilities are located within the PJM Region and operate under the reliability oversight of a regional entity known as RFC. This regional
entity operates under the oversight of NERC in accordance with a delegation agreement approved by FERC.
Competition
Within FirstEnergy’s Electric Companies' distribution business, including JCP&L, there generally is no competition for electric distribution service in the Electric
Companies’ respective service territories in Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York. Additionally, pursuant to FERC’s Order No.
1000 and subject to state and local siting and permitting approvals, non-incumbent developers can compete for certain PJM transmission projects in the service
territories of certain of FirstEnergy’s Electric Companies' providing transmission services, including JCP&L, and the Transmission Companies. This has resulted
in additional competition to build transmission facilities in the respective service territories while also allowing the opportunity to seek to build facilities in non-
incumbent service territories.
Seasonality
The sale of electric power is generally a seasonal business, and weather patterns can have, and have in the past had, a material impact on FirstEnergy’s Electric
Companies' operating results, including JCP&L. Demand for electricity in their service territories historically peaks during the summer and winter months.
Accordingly, the Registrants' annual results of operations and liquidity position may depend disproportionately on its operating performance during the summer
and winter. Mild weather conditions may result in lower power sales, and consequently, lower revenue, earnings and cash flow.
5

-- 13 of 203 --

Human Capital
FirstEnergy focuses on a number of human capital resources, measures and objectives in managing its business, including through striving to achieve its core
values.
FirstEnergy believes that creating a sense of belonging among our employees positions the company to deliver better service to customers, strengthen
operational performance, and help create a work environment where employees feel valued and respected. FirstEnergy remains focused advancing a culture of
belonging for employees.
During 2025, FirstEnergy continued to promote these values by:
• Refreshing our organizational values and defining the behaviors that bring them to life, which reinforces a culture of performance, inclusion, and
engagement and aligns with our evolving business strategy;
• Sharing the results of our most recent employee engagement survey designed to capture our employees’ perspectives on their work experience and
develop actionable plans, reinforcing transparency and ownership at every level, ensuring that feedback translates into meaningful change and
strengthens our culture; and
• Supporting multiple employee business resource groups to further support our values through networking, mentoring, coaching, recruiting, development
and community outreach. There are currently nine employee business resource groups across 21 chapters, which are open to all employees.
Safety
FirstEnergy employees have the power and responsibility to keep each other safe and eliminate life-changing events, which are injuries that have life-changing
impacts or fatal results. Safety metrics, such as injuries that result in days away or restricted time and life-changing events, are regularly monitored, internally
reported, and included in FirstEnergy’s annual incentive compensation program applicable to all employees to reinforce that a safe work environment is crucial to
FirstEnergy’s success.
FirstEnergy continues to focus on mitigating life-changing event exposure to strengthen FirstEnergy’s safety-first culture and drive safer decisions from an
engaged workforce who puts safety first. FirstEnergy is focused on identifying high energy risks and ensuring direct controls are in place. Leaders and
employees receive safety training and reinforcement of energy-based safety concepts that are designed to improve job site hazard identification, communication
and mitigation to ultimately prevent life changing events.
Employee Development
FirstEnergy’s employees are empowered to take ownership of their careers with increased transparency into FirstEnergy’s internal and external hiring process
and availability of tools and processes that support career management, talent reviews, succession planning and leadership selection. FirstEnergy is committed
to preparing its high-performing workforce for the future and helping employees reach their full potential, which includes developing employee skills and
competencies and preparing aspiring, emerging and experienced leaders for future leadership responsibilities.
Understanding FirstEnergy’s rapidly changing industry and strategy is key to its employees’ ability to support FirstEnergy’s mission and meet its customers’
evolving needs. Key FirstEnergy development programs, which apply to eligible employees, include:
• Talent management, which includes a commitment to transparency in career management and development opportunities, consistent with
FirstEnergy’s core values;
• A mentoring program that gives employees the opportunity to select a mentor from within the organization to promote enhanced learning, teamwork
and collaboration;
• Educational opportunities through FirstEnergy’s "Educate to Elevate" program, providing access to post-secondary education and a path to both
associate’s and bachelor’s degrees for employees; and launching an educational series, to deepen business literacy, strengthen engagement, and
empowers employees to better understand the business and connect their roles to organizational success; and
• Workforce development programs that include an apprentice line worker program designed to attract technical entry-level talent to FirstEnergy.
Compensation and Benefits
FirstEnergy’s total rewards program is designed to attract, motivate, retain and reward employees for their role in the success of FirstEnergy. The base pay
program is designed to balance an employee’s value to FirstEnergy in a manner that is commensurate with comparable jobs at peer companies. FirstEnergy
aims to ensure that its internal policies and processes support pay equity.
The annual incentive compensation program is designed to align compensation with the achievement of near-term corporate and business unit objectives, as
well as outstanding individual performance. Additionally, FirstEnergy’s long-term incentive
6

-- 14 of 203 --

compensation program is designed to reward eligible leaders for FirstEnergy’s achievement of longer-term goals intended to drive shareholder value and growth.
In addition to base pay and incentive compensation plans, FirstEnergy offers a comprehensive benefits program, including healthcare, dental, prescription,
vision, a 401(k) savings plan and a defined benefit pension plan to eligible employees.
Employees and Collective Bargaining Agreements
As of December 31, 2025, FirstEnergy had 11,186 employees, all of whom were located in the United States as follows:
Total
Employees
Bargaining
Unit
Employees
FESC 	4,618 	471
CEI 	752 	535
FE PA 	1,916 	1,462
JCP&L 	1,165 	911
MP 	968 	393
OE 	1,013 	647
PE 	473 	241
TE 	281 	227
Total 	11,186 	4,887
As of December 31, 2025, the International Brotherhood of Electrical Workers, the Utility Workers Union of America and the Office and Professional Employees
International Union collectively represented approximately 44% of FirstEnergy’s employees. There are currently 15 collective bargaining agreements between
FE’s subsidiaries and its unions, which have multi-year contracts. In 2025, FE’s subsidiaries reached a new collective bargaining agreement with the
International Brotherhood of Electrical Workers Local 459.
7

-- 15 of 203 --

Information About FirstEnergy's Executive Officers (as of February 18, 2026)
FirstEnergy
Name 	Age 	Positions Held During Past Five Years 	Dates
Brian X. Tierney 	58 	Chairman, President and Chief Executive Officer (A) 	2025-Present
President and Chief Executive Officer (A) 	2023-2024
President and Chief Executive Officer (B) 	2023-Present
Blackstone Infrastructure Partners, Senior Managing Director 	2021-2023
AEP, Executive Vice President - Strategy 	*-2021
Hyun Park 	64 	Senior Vice President and Chief Legal Officer (A) (B) 	2021-Present
Senior Vice President and General Counsel (C) (D) 	2021-2022
LimNexus, Partner and General Counsel 	*-2021
Jason J. Lisowski 	44 	Vice President, Controller and Chief Accounting Officer (A) (B) 	*-Present
Vice President and Controller (C) (E) 	*-Present
K. Jon Taylor 	52 	Senior Vice President, Chief Financial Officer and Strategy (A) (B) 	2021-Present
Senior Vice President and Chief Financial Officer (C) (E) 	*-2024
Senior Vice President and Chief Financial Officer (A) (B) 	*-2021
Toby L. Thomas 	54 	Chief Operating Officer (A) (B) 	2023-Present
AEP, Senior Vice President 	2021-2023
Indiana Michigan Power, President and Chief Operating Officer 	*-2021
A. Wade Smith 	61 	President, FirstEnergy Utilities (A) (B) 	2023-Present
Puget Sound Energy, Inc., Executive Vice President and Chief Operating Officer 	2022-2023
Pacific Gas & Electric, Senior Vice President 	2021-2022
AEP, Senior Vice President 	*-2021
* Indicates position held at least since January 1, 2021
(A) Denotes position held at FE
(B) Denotes position held at FESC
(C) Denotes position held at the Ohio Companies, the Pennsylvania Companies , MP, PE, FET, ATSI, MAIT, TrAIL and KATCo.
(D) Denotes position held at AGC
(E) Denotes position held at FE PA
On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, making it a new, single operating entity. Upon consolidation, executive officers of the Pennsylvania Companies were
named as executive officers of FE PA.
(1)
(1)
(1)
8

-- 16 of 203 --

FirstEnergy Website and Other Social Media Sites and Applications
The Registrants' Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, amendments to those reports, and all other
documents filed with or furnished to the SEC pursuant to Section 13(a) of the Exchange Act are made available free of charge on FirstEnergy’s website at
investors.firstenergycorp.com. These documents are also available to the public from commercial document retrieval services and the website maintained by the
SEC at www.sec.gov.
FirstEnergy has adopted, and posted on its website at www.firstenergycorp.com/responsibility, a Code of Conduct, The Power of Integrity, which applies to all
employees, including FirstEnergy’s Chief Executive Officer, Chief Financial Officer and Chief Accounting Officer. The Code of Conduct is available, without
charge, upon written request to the Corporate Secretary, FirstEnergy Corp., 341 White Pond Drive, Akron, Ohio 44320-1119. Within the time period required by
the SEC, FirstEnergy will post on its website any substantive amendment to the Code of Conduct and any waiver applicable to an FE director or FE executive
officer.
These SEC filings are posted on the website as soon as reasonably practicable after they are electronically filed with or furnished to the SEC. Additionally,
FirstEnergy routinely posts additional important information, including press releases, investor presentations, investor factbooks and notices of upcoming events
under the "Investors" section of FirstEnergy’s website and recognizes FirstEnergy’s website as a channel of distribution to reach public investors and as a means
of disclosing (including initially or exclusively) material non-public information for complying with disclosure obligations under Regulation FD. Investors may be
notified of postings to the website by signing up for email alerts and Rich Site Summary feeds on the “Investors” page of FirstEnergy’s website. FirstEnergy also
uses X (the social networking site formerly known as Twitter®), LinkedIn®, YouTube® and Facebook® as additional channels of distribution to reach public
investors and as a supplemental means of disclosing material non-public information for complying with its disclosure obligations under Regulation FD.
Information contained on FirstEnergy’s website, X (the social networking site formerly known as Twitter®) handle, LinkedIn® profile, YouTube® channel or
Facebook® page, and any corresponding applications of those sites, shall not be deemed incorporated into, or to be part of, this report.
9

-- 17 of 203 --

ITEM 1A. RISK FACTORS
We operate in a business environment that involves significant risks, many of which are beyond the Registrants’ control. The Registrants regularly evaluate the
most significant risks of their businesses and review those risks with their respective boards of directors and, if appropriate, committees of those boards of
directors. The following risk factors and all other information contained in this report should be considered carefully when evaluating the Registrants, and unless
a risk factor expressly excludes a Registrant or the context requires otherwise, references to “we,” “us,” and “our” refer to both Registrants. These risk factors
could affect our financial results and cause such results to differ materially from those expressed in any forward-looking statements made by or on behalf of us.
Below, we have identified risks we consider material. The risks that we face are not limited to those in this section. There may be additional risks and
uncertainties (either currently unknown or not currently believed to be material) that could adversely affect our business, financial condition, results of operations,
liquidity or cash flows. Although the risks are organized by headings, and each risk is discussed separately, many are interrelated. These risk factors should be
read in conjunction with Item 1., "Business,” Item 7., "Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and in other
sections of this Form 10-K that include forward-looking and other statements involving risks and uncertainties that could impact our business, financial condition,
results of operations, liquidity or cash flows.
Risks Associated with Damage to Our Reputation and Securities Class-Action Litigation
Securities class-action litigation against us could have a material adverse effect on our reputation, business, financial condition, results of operations, our ability
to access capital, liquidity or cash flows.
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the previously disclosed U.S.
Attorney’s Office investigation into us relating to our lobbying and governmental affairs activities concerning HB 6. Under the DPA, we paid a $230 million
monetary penalty in 2021 and agreed to the filing of a criminal information charging FirstEnergy with one count of conspiracy to commit honest services wire
fraud.
As of July 22, 2024, we successfully completed the obligations required within the three-year term of the DPA. Under the DPA, and until the conclusion of any
related investigation, criminal prosecution and civil proceeding brought by the U.S. Attorney’s Office, we have an obligation to continue (i) publishing quarterly a
list of all payments to 501(c)(4) entities and all payments to entities known by us to be operating for the benefit of a public official, either directly or indirectly; (ii)
not making any statements that contradict the DPA; (iii) notifying the U.S. Attorney’s Office for the S.D. Ohio of any changes in FirstEnergy’s corporate form; and
(iv) cooperating with the U.S. Attorney’s Office for the S.D. Ohio. In accordance with the DPA, these obligations will continue until the completion of any related
investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office related to the conduct set forth in the DPA’s statement of facts,
including the January 17, 2025 indictment against two former FirstEnergy senior officers, described in “Outlook—Other Legal Proceeding – United States v. Larry
Householder, et al.,” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations". Within 30 days of those matters
concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s Office will dismiss the criminal information. On February 26,
2025, the U.S. Attorney’s Office filed a status report confirming these commitments.
If we are found to have breached the terms of the DPA, the U.S. Attorney’s Office may elect to prosecute, or bring a civil action against, us for conduct alleged in
the DPA or known to the government, which could result in fines or penalties and could have a material adverse impact on our reputation or relationships with
regulatory and legislative authorities, customers and other stakeholders, as well as our consolidated financial statements. Failure to comply with the DPA,
including alleged failures to comply with anti-corruption and anti-bribery laws, may also result in a breach of certain covenants contained in our credit
agreements and could result in an event of default under such agreements, and we would not be able to access our credit facilities for additional borrowings and
letters of credit during the existence of any such default.
Following the announcement by the U.S. Attorney’s Office for the S.D. Ohio of the investigation surrounding HB 6 in July 2020, certain of FE’s stockholders and
customers filed several lawsuits against us and certain current and former directors, officers and other employees, including the federal securities class action
litigation In re FirstEnergy Corp. Securities Litigation (Federal District Court, S.D. Ohio). We believe that it is probable that FE will incur a loss in connection with
the resolution of In re FirstEnergy Corp. Securities Litigation. Given the ongoing nature and complexity of such litigation, we cannot yet reasonably estimate a
loss or range of loss that may arise from its resolution. However, if it is resolved against us substantial monetary damages could result and our reputation,
business, financial condition, results of operations, liquidity or cash flows may be materially adversely affected.
This securities class-action litigation could divert management’s focus and have resulted in, and could continue to result in, substantial expenses, and the
commitment of substantial corporate resources. The outcome, duration, scope, result or related costs of the securities class action litigation In re: FirstEnergy
Corp. Securities Litigation discussed above, are inherently uncertain. Therefore, any of these risks could impact us significantly beyond expectations. See Note
14, "Commitments, Guarantees and Contingencies,” of the Combined Notes to Financial Statements of the Registrants and “Management’s Discussion and
Analysis of Financial Condition and Results of Operations—Critical Accounting Policies and Estimates.”
10

-- 18 of 203 --

These matters are likely to continue to have an adverse impact on the trading prices of our securities, which could be material. See Note 14., “Commitments,
Guarantees and Contingencies,” of the Combined Notes to Financial Statements of the Registrants, for additional details on the government investigations and
subsequent litigation surrounding HB 6.
Damage to our reputation may arise from numerous sources making us vulnerable to negative customer perception, adverse regulatory outcomes, or other
consequences, which could materially adversely affect our business, results of operations and financial condition.
Our reputation is important towards maintaining new and ongoing positive relationships with customers, regulators, investors, and other stakeholders. Damage
to our reputation could materially adversely affect our business, results of operations and financial condition. Such damage may arise from numerous sources
further discussed generally within these risk factors. Any damage to our reputation, either generally or as a result of, among other things, changes in our service
reliability, our rate affordability or negative outcomes in the ongoing matters relating to HB 6, may lead to negative customer perception, which may make it
difficult for us to compete successfully for new opportunities, or could adversely impact our ability to launch new sophisticated technology-driven solutions to
meet our customer expectations. A damaged reputation could further result in FERC, the state public utility commissions, and other regulatory and legislative
authorities being less likely to view us in a favorable light and could negatively impact the rates we charge customers or otherwise cause us to be susceptible to
unfavorable legislative and regulatory outcomes, as well as increased regulatory oversight and more stringent legislative or regulatory requirements.
Risks Associated with the Execution of Our Strategic Initiatives and the Regulation of Our Distribution and Transmission Businesses
If our cost saving initiatives do not achieve the expected benefits, there could be negative impacts to FirstEnergy's business, results of operations and financial
condition.
FirstEnergy is engaged in an ongoing effort to create a culture of continuous improvement to strategically reduce our operating expenditures and continually
reinvest in a more diverse capital program in support of our long-term strategy. FirstEnergy leverages opportunities to reduce costs – such as filling only critical
positions, implementing our facility optimization plans, deploying advanced technology, including but not limited to artificial intelligence, and exploring other
additional, sustainable opportunities, such as reducing contractor spend. There can be no assurance that implementation of our continuous improvement culture
will allow us to realize the anticipated benefits to our business, results of operations and financial condition in a timely manner, if at all.
Our ability to achieve the continued benefits from our cost saving initiatives is subject to many estimates and assumptions as well as our ability to hire, recruit
and retain an appropriately qualified workforce and implement a culture of continuous improvement. FirstEnergy could experience unexpected delays and
business disruptions resulting from supporting these initiatives, decreased productivity, and higher than anticipated costs, any of which may impair our ability to
reduce operating expenditures and to achieve anticipated results or otherwise harm FirstEnergy's business, results of operations and financial condition.
Our ability to grow our distribution and transmission businesses is subject to numerous risks and events, many of which are outside of our control.
The success of our growth strategy will depend, in part, on the successful growth of revenue resulting from our transmission investments in line with our
expectations. Factors that may affect our revenue growth may include: (1) FERC’s timely approval of rates to recover such investments; (2) whether investments
are included in PJM's RTEP; (3) FERC's evolving policies with respect to incentive rates for transmission investment assets, the calculation of the base ROE
component of transmission rates, and the interconnection of AI data centers and transmission network upgrades supporting such large loads; (4) FERC’s
potentially-evolving policies regarding whether certain classes of network transmission upgrade costs can be capitalized as part of transmission rates and
whether such costs will be direct charged to the connecting customer; (5) consideration and potential impact of the objections of those who oppose such
investments and their recovery; and (6) timely development, construction, and operation of the new facilities.
Our ability to capitalize on investment opportunities available to our distribution business depends, in part, on any future distribution rate cases or other filings
seeking cost recovery for distribution system enhancements in the states where our Electric Companies operate, including maintaining the affordability of the
rates charged to customers. Any denial of, or delay in, the approval of any future distribution or transmission rate requests could restrict us from fully recovering
our cost of service, may impose risks on the distribution and transmission operations, and could have a material adverse effect on our regulatory strategy, results
of operations and financial condition.
State rate regulation may delay or deny full recovery of costs and impose risks on our operations. Any denial of or delay in cost recovery could have an adverse
effect on our business, results of operations, liquidity, cash flows and financial condition.
The retail rates for each of the Electric Companies are set by each of its respective regulatory agency for utilities in the state in which it operates - in Maryland by
the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the
11

-- 19 of 203 --

PPUC, in West Virginia by the WVPSC and in New York by the NYPSC – through traditional, cost-based regulated utility ratemaking. As a result, any of the
Electric Companies may not be permitted to recover its costs and, even if it is able to do so, there may be a significant delay between the time it incurs such
costs and the time it is allowed to recover them. Factors that may affect outcomes in the distribution rate cases include, but are not limited to: (i) the value of
plant in service; (ii) authorized rate of return; (iii) capital structure (including hypothetical capital structures); (iv) depreciation rates; (v) the allocation of shared
costs, including consolidated deferred income taxes and income taxes payable across the Electric Companies; (vi) regulatory approval of rate recovery
mechanisms for capital investment spending programs; and (vii) the accuracy of forecasts used for ratemaking purposes in "future test year" cases. Evolving
legislation and executive actions related to our rates enacted by individual states, such as Ohio Senate Bill 2 of 2025 and Executive Order No. 2 of 2026 issued
by the New Jersey governor on January 20, 2026, may also affect outcomes in distribution rate cases or could create uncertainty around our rate strategy.
FirstEnergy can provide no assurance that any base rate request filed by any of the Electric Companies will be granted in whole or in part. Any denial of, or delay
in, any base rate request could restrict the applicable utility from fully recovering its costs of service, may impose risks on its operations, and may negatively
impact such Electric Company’s results of operations, cash flows and financial condition. In addition, to the extent that any of the Electric Companies seek an
increase in rates, third-party pressure may be exerted on the applicable legislators and regulators to take steps to control rate increases, including through some
form of rate increase moderation, reduction or freeze. Any related public discourse and debate, including with respect to the HB 6 litigation, can increase
uncertainty associated with the regulatory process, the level of rates and revenues that are ultimately obtained, and the ability of the Electric Company to recover
costs. Such uncertainty may restrict operational flexibility and resources, reduce liquidity and increase financing costs.
Federal rate regulation may delay or deny full recovery of costs and impose risks on our operations. Any denial or reduction of, or delay in cost recovery could
have an adverse effect on our business, results of operations, cash flows and financial condition.
FERC policy currently permits recovery of prudently incurred costs associated with cost-of-service-based wholesale power rates and the expansion and updating
of transmission infrastructure within its jurisdiction. FERC’s policies on recovery of transmission costs continue to evolve, evidenced by ongoing proceedings to
determine an appropriate ROE methodology to determine transmission ROEs, to determine whether FERC’s existing policies on transmission rate incentives
should be revised, and to determine whether certain classes of network transmission upgrade costs can be recovered in transmission rates and whether such
costs will be direct charged to the connecting customer. If FERC were to adopt a different policy regarding recovery of transmission costs or if there is any
resulting delay in cost recovery, our strategy of investing in transmission could be adversely affected. If FERC were to lower the rate of return it has authorized
for FirstEnergy's cost-based wholesale power rates or transmission investments and facilities, it could reduce future earnings and cash flows, and adversely
impact our financial condition.
FERC, at the instruction of the U.S. Secretary of Energy, is also considering whether to develop regulations intended to speed interconnection of AI data centers
and “hybrid” data center/electric generation facilities (collectively, “large loads”) to the transmission system. Final regulations, if any, from FERC are expected in
the second quarter of 2026. To the extent the new regulations promulgated by FERC do not permit transmission utilities to fully recover costs associated with
transmission network upgrades required to serve new large loads, our strategy of investing in transmission could be adversely affected.
External pressures beyond our control may increase customer rates and, when combined with state and federal regulatory action to mitigate bill impacts, may
impair our ability to earn a fair and equitable return on our investments and execute our strategy.
PJM’s recent capacity auctions have been subject to a “price collar” that has resulted from all-time high generation capacity prices in recent auction outcomes.
These all-time high capacity prices ultimately are passed through in retail rates and can result in material increases in retail customers’ monthly electric utility
bills. On January 16, 2026, the PJM board along with various federal and state officials, expressed interest in extending the price collar through mid-2030.
In addition, the parties to the Statement of Principles suggested that PJM should conduct a “backstop” auction to procure additional generation capacity, with the
costs to be allocated first to “new” data centers and second to existing PJM loads. If the PJM capacity auctions continue to clear at the auction cap, and if PJM
conducts a “backstop” capacity auction that clears at a high price point, customer resistance to the resulting market driven increases on the generation portion of
their bills could lead to increased pressure for state and federal utility regulators to limit the needed capital investment in transmission and distribution systems
required for safe, reliable and resilient service to customers, which may impair our ability to earn a fair and equitable return on our investments and execute our
strategy.
Our investments in transmission and distribution infrastructure modernization, reliability improvements, environmental compliance and storm hardening may
increase customer bills over time and the resulting higher electric bills, when combined with the external pressures discussed above, may place pressure on
residential customers’ affordability, particularly in portions of our service territory with lower median household income or high energy burdens and/or amongst
those customers who have already seen significant retail bill increases. State and federal regulators may also adopt or modify policies intended to mitigate
customer bill impacts – including disallowance or delayed recovery of certain capital investments or operating expenses, mandated bill assistance programs,
changes to rate design, or restrictions on rate increases. Customer concerns regarding affordability may result in increased regulatory scrutiny, constraints on
the size and timing of rate increases, expanded bill
12

-- 20 of 203 --

mitigation requirements, or disallowances, any of which could adversely affect our ability to recover costs or earn our authorized return on equity. In addition,
sustained increases in customer bills may lead to reduced electricity usage through conservation, energy efficiency, or distributed generation, which could limit
future load growth and revenues.
Regulatory agencies may also require utilities to offset portions of rising costs related to grid modernization, resilience investments, environmental compliance,
or rapidly evolving market conditions if they determine that such costs would unduly affect customer affordability. Any such actions could limit or delay our ability
to recover costs or investments, earn a fair and equitable return, or maintain expected cash flows and could have an adverse effect on our businesses, financial
condition, results of operations and cash flows.
Complex and changing federal, state and local government regulations and actions, including those associated with rates, could have a negative impact on our
business, financial condition, results of operations and cash flows.
We are subject to comprehensive regulation by various federal, state and local regulatory agencies that significantly influence our operating environment.
Changes in, or reinterpretations of, existing laws or regulations, or the imposition of new laws or regulations, by federal executive orders or otherwise, have in
the past and could in the future require us to incur additional costs, which could be substantial, or change the way we conduct our business, and therefore could
have a material adverse impact on our results of operations and financial condition.
We could be subject to higher costs and/or penalties related to mandatory reliability standards set by NERC, FERC, and RFC or changes in the rules of
organized markets, which could have an adverse effect on our financial condition.
Our operations are subjected to audit by FERC, NERC and RFC, which may conduct routine or special audits and issue requests designed to ensure
compliance with applicable rules, regulations, policies and procedures. Among other rules, regulations, policies and procedures, owners, operators, and users of
the bulk electric system are subject to mandatory reliability standards promulgated by NERC and approved by FERC. The standards are based on the functions
that need to be performed to ensure that the bulk electric system operates reliably. NERC, RFC and FERC continue to refine existing reliability standards as well
as develop and adopt new reliability standards. The reliability standards address operation, planning, and security of the bulk electricity system, including
requirements with respect to real-time transmission operations, emergency operations, vegetation management, critical infrastructure protection, and personnel
training. Compliance with modified or new reliability standards may subject us to higher operating costs and/or increased capital expenditure. If we were found
not to be in compliance with one or more of the mandatory reliability standards, we and/or our subsidiaries could be subject to sanctions, including substantial
monetary penalties. For example, FERC has the authority under the FPA to impose penalties up to and including $1.5 million per day, subject thereafter to
annual adjustments for inflation, for failure to comply with these mandatory reliability standards. Potential non-monetary sanctions include imposing limitations on
the violator’s activities or operations.
In addition, PJM may direct our transmission-owning affiliates to build new transmission facilities to meet PJM's reliability requirements or to provide new or
expanded transmission service under the PJM Tariff.
We may be allocated a portion of the cost of transmission facilities built by others due to changes in RTO transmission rate design. We may be required to
expand our transmission system according to decisions made by an RTO rather than our own internal planning processes. Various proposals and proceedings
before FERC may cause transmission rates to change from time to time. In addition, RTOs have been developing rules associated with the allocation and
methodology of assigning costs associated with improved transmission reliability, reduced transmission congestion and firm transmission rights that may have a
financial impact on us.
As a member of PJM, which is an RTO, we are subject to certain additional risks, including those associated with the allocation among members of losses
caused by unreimbursed defaults of other participants in PJM’s market, as well as those associated with complaint cases filed against PJM that may seek
refunds of revenues previously earned by its members.
Risks Related to Our Business Operations
Demand for electricity within our service territory could exceed supply capacity, resulting in negative impacts to FirstEnergy’s reputation, results and financial
condition, particularly if our systems are not performing as anticipated.
Recent industry projections reflect the potential for significant growth in energy demand over the next decade. This could be exacerbated if additional generation
resources are not available to meet increased demand in the future. For example, data centers have substantially larger load requirements than typical
residential or commercial users. New data centers or increase in demand for existing data centers located in our service territories could increase load
requirements substantially over the next several years, thereby increasing the aggregate load obligations of the Electric Companies. A need to serve the load
obligations of these data centers, which could be up to 16,985 MWs through 2035, has the potential to adversely impact our business, results of operations,
financial condition, or cash flows. At the same time, our planning could be adversely affected if electricity usage by data centers is ultimately lower than
projected, which could reduce anticipated load growth.
13

-- 21 of 203 --

We continue to evaluate the potential impacts of the development, construction, and operation of new data centers in our service territories and will continue to
evaluate potential mitigants to these risks. FirstEnergy cannot predict whether the data centers under consideration will ever commence operations or the size of
the load obligations of those that do become operational.
Competitive market forces or adverse regulatory actions may require FirstEnergy to purchase capacity and energy from the market or build additional resources
to meet customers’ energy needs in an expedited manner. If that occurs, we may see opposition to recovery of these additional costs and could experience a lag
between when costs are incurred and when regulators permit recovery in rates. These situations could have negative impacts on results of operations and cash
flows.
Furthermore, in the event of electricity shortages, our ability to maintain service reliability may be compromised, which could adversely affect our financial
performance, customer satisfaction, and compliance with regulatory requirements.
The hazardous activities associated with generation and distribution of electricity could adversely impact our results of operations and financial condition.
Power generation involves hazardous activities, including acquiring, transporting and unloading fuel, operating large pieces of rotating equipment and delivering
electricity to transmission and distribution systems. In addition to naturally occurring risks, such as earthquakes, floods, lightning, wildfire, hurricanes and wind,
other hazards, such as fire, explosion, electrocution, collapse and machinery failure, are inherent risks in our operations which may occur as a result of
inadequate internal processes, technological flaws, human error or actions of third parties or other external events. The identification, control and management
of these risks depend upon adequate development and training of personnel and on operational procedures, preventative maintenance plans, and specific
programs supported by quality control systems, which may not prevent the occurrence and impact of these risks.
The hazards described above, along with other safety hazards associated with our operations, can cause significant personal injury or loss of life, severe
damage to and destruction of PP&E, contamination of, or damage to, the environment and suspension of operations. The occurrence of any one of these events
may result in our being named as a defendant in lawsuits asserting claims for substantial damages, environmental cleanup costs, personal injury and fines
and/or penalties.
Our business is affected by variations in weather and severe weather conditions.
Weather conditions directly influence the demand for electric power. Demand for power generally peaks during the summer and winter months, with market
prices also typically peaking at that time. Overall operating results may fluctuate based on weather conditions. In addition, we have historically sold less power,
and consequently received less revenue, when seasonal weather conditions are milder.
In addition, severe weather, such as tornadoes, hurricanes, ice or snowstorms, droughts, high winds or other natural disasters, may cause outages and property
damage that may require us to incur additional costs that are generally not insured and that may not be recoverable from customers. The effect of the failure of
our facilities to operate as planned under these conditions would be particularly burdensome during a peak demand period and could have an adverse effect on
our financial condition and results of operations, which adverse effects could be further exacerbated by an increased frequency of such severe weather events.
Cyber-attacks, data security breaches and other disruptions to our information technology systems, or those of third parties we are connected to or do business
with, could compromise our business operations, critical and proprietary information and employee and customer data, which could have a material adverse
effect on our business, results of operations, financial condition and reputation.
We rely on complex information technology systems to operate our generation, transmission and distribution networks and to store sensitive business, employee
and customer data. Increasingly sophisticated cyber-attacks, ransomware, and other security breaches—whether targeting us or third parties with whom we do
business—could disrupt operations, compromise confidential information, and result in significant financial, legal, and reputational harm. Cybersecurity threats,
including those that exploit advances in technologies such as artificial intelligence, continue to grow in frequency and sophistication, and the security controls we
implement may not fully prevent or detect all such threats or incidents. Emerging artificial intelligence technologies may be used to develop new hacking tools,
obscure malicious activities, exploit vulnerabilities, and increase the difficulty of detecting threats. Despite ongoing investments in cybersecurity, we cannot
guarantee prevention or timely detection of all threats, which continue to evolve and may be amplified by interconnected systems. A successful attack or breach
could lead to service interruptions, regulatory penalties, litigation, remediation costs, and loss of customer trust. Any such cyber incident could result in significant
lost revenue, the inability to conduct critical business functions and serve customers for a significant period of time, the loss of confidential, sensitive and
proprietary information, including but not limited to personal information of our customers, employees, suppliers, vendors and other third parties, the use of
significant management resources, legal claims or proceedings, regulatory penalties, significant remediation costs, increased regulation, increased capital costs,
increased insurance costs, increased protection costs for enhanced cybersecurity systems or personnel, and/or damage to our reputation, all of which could
materially adversely affect our business, results of operations, financial condition and reputation.
14

-- 22 of 203 --

Our insurance coverage may not provide protection against all significant losses and our ability to obtain insurance coverage, as well as the terms of any
available insurance coverage could be materially adversely affected by international, national, state or local events and company-specific events, as well as the
financial condition of insurers.
If we cannot or do not obtain adequate insurance coverage, we may be required to pay costs associated with adverse future events. Through a combination of
third-party and self-insurance, we have a comprehensive insurance program in place to provide coverage for various types of risks, including severe weather or
other natural disasters, war, terrorism, cyber incidents, liability claims against us, or a combination of other significant unforeseen events that could impact our
operations. However, insurance coverage may not continue to be available or may not be available at rates or on terms similar to those presently available to us.
Our ability to obtain insurance and the terms of any available insurance coverage could be materially adversely affected by the financial condition of insurers, the
impacts of actual or perceived climate-related events, as well as international, national, state, local or company-specific events.
There may be some instances in which we are not fully insured against all significant losses. A loss for which we are not fully insured could have a material
adverse effect on our business, financial condition, results of operations and prospects.
Macroeconomic conditions that are beyond our control, such as government fiscal policy, tariffs, recessions, inflation and interest rate pressures, may negatively
impact our financial condition, results of operations, liquidity, and cash flows.
Economic conditions, including those that may arise from government fiscal policy, tariffs, recessions, inflationary and interest rate pressures, may impact the
demand for electricity and, therefore, any decline in economic conditions could lead to declines in the demand for electricity, which would reduce our revenues.
Prices for equipment, materials, supplies, employee labor contractor services, together with the cost of variable-rate debt, have increased in recent years and
could continue to increase in 2026 and beyond. Inflation and broader economic conditions have continued to drive up the price of the cost of essential
components used in the construction of transmission infrastructure, such as electrical equipment, steel and aluminum, and we may experience supply chain
disruptions and long lead times for critical equipment. Long-term inflationary pressures may result in such prices continuing to increase more quickly than
expected. Inflation increases costs for labor, materials and services, and we may be unable to secure these resources on economically acceptable terms or
offset such costs with increased revenues, operating efficiencies, or cost savings, which may adversely impact our financial condition, results of operations,
liquidity, and cash flows.
We have near-term exposure to interest rates from outstanding short-term indebtedness indexed to variable interest rates, and we have exposure to future
interest rates to the extent we seek to raise long-term debt in the capital markets to meet maturing debt obligations and fund construction or other investment
opportunities. Past disruptions in capital and credit markets, as well as the U.S. Federal Reserve's interest rate policies, have resulted in volatile interest rates on
new publicly issued debt securities and increased costs for variable interest rate debt securities. Disruptions in capital and credit markets, or the Federal
Reserve Board's interest rate policies, could result in volatile interest rates on new publicly issued debt securities and increase our financing costs and adversely
affect our results of operations, cash flows and liquidity. Also, interest rates could change as a result of economic or other events that are beyond the control of
our risk management processes. As a result, we cannot always predict the impact that our risk management decisions may have if actual events lead to greater
losses or costs than our risk management positions were intended to hedge. Significant and sustained increases in market interest rates could materially
increase our financing costs and negatively impact our reported results of operations, cash flows and liquidity.
Supply chain disruptions could have an adverse effect on our results of operations, cash flow and financial condition.
We have in the past and may in the future experience supply chain challenges due to economic conditions that developed during the COVID-19 pandemic and
have continued in the years since, with order lead times increasing across numerous material categories. The situation is fluid and a prolonged continuation or
further increase in supply chain disruptions could have an adverse effect on FirstEnergy’s results of operations, cash flow and financial condition. Our operations
and corporate strategy may also be adversely affected by supply chain disruptions and inflation, including shortages and delays in key materials, equipment and
contractor services. Such disruptions could be exacerbated by unstable or uncertain macroeconomic conditions, including inflationary pressures. Any significant
disruption or increased costs arising from these pressures on our suppliers may inhibit our access to, or require us to spend more money to source, certain
products or that we use in our operations.
Furthermore, change or uncertainty in U.S. policies or the policies of other countries and regions in which our suppliers do business, including any changes or
uncertainty with respect to U.S. or international trade policies or tariffs, could also disrupt our key suppliers’ operations. The presidential administration took
action in 2025 to impose substantial new or increased tariffs. Any widespread imposition of new or increased tariffs could have an adverse effect on our results
of operations, cash flow and financial condition. New or increased tariffs could also negatively affect U.S. national or regional economies, which also could
negatively impact our business and results of operations. The supply chain of goods and services we rely on could be impacted by sanctions, tariffs,
manufacturing labor shortages and domestic and international shipping constraints, which could increase our costs and delay delivery of critical materials.
We are subject to financial performance risks from regional and general economic cycles as well as data centers and heavy industries such as shale gas,
automotive, chemical and steel.
15

-- 23 of 203 --

Our business follows economic cycles. The regional economy in which the Electric Companies operate is influenced by conditions in industries in our business
territories, e.g., data centers, shale gas, automotive, chemical, steel and other heavy industries, and as these conditions and resultant demand of those
industries for electricity generation changes, our revenues will be impacted.
Additionally, the operations of the Electric Companies are affected by the economic conditions in their respective service territories and those conditions could
negatively impact the rate of delinquent customer accounts and our collections of accounts receivable, which could adversely impact our financial condition,
results of operations and cash flows.
FirstEnergy is subject to risks arising from the operation of its electric generation facilities and transmission and distribution equipment which could reduce
revenues, increase expenses and have a material adverse effect on our business, financial condition and results of operations.
Operation of transmission and distribution facilities, and in the case of MP, electric generation facilities, involves risk, including the risk of potential breakdown or
failure of equipment or processes due to aging infrastructure, fuel supply or transportation disruptions, accidents, labor disputes or work stoppages by
employees, human error in operations or maintenance, acts of terrorism or sabotage, cyber-attacks, construction delays or cost overruns, shortages of or delays
in obtaining equipment, material and labor, operational restrictions resulting from environmental requirements and governmental interventions, and operational
performance below expected levels. In addition, weather-related incidents and other natural disasters can disrupt generation, transmission and distribution
delivery systems. Because our transmission facilities are interconnected with those of third parties, the operation of our facilities could be adversely affected by
unexpected or uncontrollable events occurring on the systems of such third parties.
Capital investments and construction projects may not be completed within forecasted budget, schedule or scope parameters or could be canceled which could
adversely affect our business and results of operations.
FirstEnergy’s Energize365 business plan calls for extensive capital investments totaling approximately $36 billion from 2026 through 2030. We may be exposed
to the risk of substantial price increases in, or the adequacy or availability of, the costs of labor and materials used in construction, nonperformance of equipment
and increased costs due to inflation, interest rates or other macroeconomic forces, delays, including delays relating to the procurement of permits or approvals,
adverse weather or environmental matters. We engage numerous contractors and enter into a large number of construction agreements to acquire the
necessary materials and/or obtain the required construction-related services. As a result, we are also exposed to the risk that these contractors and other
counterparties could breach their obligations to us. Such risk could include our contractors’ inabilities to procure sufficient skilled labor as well as potential work
stoppages by that labor force. Should the counterparties to these arrangements fail to perform, we may be forced to enter into alternative arrangements at then-
current market prices that may exceed our contractual prices, with resulting delays in those and other projects. Although our agreements are designed to
mitigate the consequences of a potential default by the counterparty, our actual exposure may be greater than these mitigation provisions. Also, because we
enter into construction agreements for the necessary materials and to obtain the required construction related services, any cancellation by FirstEnergy of a
construction agreement could result in significant termination payments or penalties. Any delays, increased costs or losses, or cancellation of a construction
project could adversely affect our business and results of operations, particularly if we are not permitted to recover any such costs in rates.
Physical acts of war, terrorism, sabotage or other attacks on any of our facilities or other infrastructure could have an adverse effect on our business, results of
operations, cash flows and financial condition.
As a result of the continued threat of physical acts of war, terrorism, sabotage or other attacks in the United States, our electric generation, fuel storage,
transmission and distribution facilities and other infrastructure, including electric generation facilities, transformer and high voltage lines and substations, or the
facilities or other infrastructure of an interconnected company, could be direct targets of, or indirect casualties of, an act of war, terrorism, sabotage or other
attack, which could result in disruption of our ability to generate, purchase, transmit or distribute electricity for a significant period of time, otherwise disrupt our
customer operations and/or result in incidents that could result in harmful effects on the environment and human health, including loss of life. Any such disruption
or incident could result in a significant decrease in revenue, significant additional capital and operating costs, including costs to implement additional security
systems or personnel to purchase electricity and to replace or repair our assets over and above any available insurance reimbursement, higher insurance
deductibles, higher premiums and more restrictive insurance policies, legal claims or proceedings, greater regulation with higher attendant costs, generally, and
significant damage to our reputation, which could have a material adverse effect on our business, results of operations, cash flows and financial condition.
Failure to provide safe and reliable service and equipment could result in serious injury or loss of life that may harm our business reputation and adversely affect
our operating results.
Our employees, contractors and the general public may be exposed to dangerous environments due to the nature of our operations. Failure to provide safe and
reliable service and equipment due to various factors, including cyber or physical attacks, equipment failure, accidents, human error, weather or natural
disasters, could result in serious injury or loss of life that may harm
16

-- 24 of 203 --

our business reputation and adversely affect our operating results through reduced revenues, increased capital and operating costs, litigation or the imposition of
penalties/fines or other adverse regulatory outcomes.
The outcome of litigation, arbitration, mediation, and similar proceedings involving our business, or that of one or more of our operating subsidiaries, is
unpredictable. An adverse decision in any material proceeding could have a material adverse effect on our financial condition and results of operations.
We are involved in a number of litigation, arbitration, mediation, and similar proceedings, including with respect to asbestos claims. These and other matters may
divert financial and management resources that would otherwise be used to benefit our operations. Further, no assurances can be given that the resolution of
these matters will be favorable to us. If certain matters were ultimately resolved unfavorably to us, our results of operations and financial condition could be
materially adversely impacted. See Note 14., “Commitments, Guaranties and Contingencies,” of the Combined Notes to Financial Statements of the Registrants.
In addition, we are sometimes subject to investigations and inquiries by various state and federal regulators due to the heavily regulated nature of our industry.
Any material inquiry or investigation could potentially result in an adverse ruling against us, which could have a material adverse impact on our financial
condition and operating results.
We face certain human resource risks associated with potential labor disruptions and/or with the availability of trained and qualified labor to meet our future
staffing requirements.
We are continually challenged to find ways to balance the retention of our aging skilled workforce while recruiting new talent to mitigate losses in critical
knowledge and skills due to retirements. Workforce demographic issues challenge employers nationwide and are of particular concern to the electric utility
industry. Our costs, including costs for contractors to replace employees and productivity costs, may rise. Failure to hire and adequately train replacement
employees, including the transfer of significant internal historical knowledge and expertise to the new employees, may adversely affect our ability to manage and
operate our business. If we are unable to successfully recruit and retain an appropriately qualified workforce, our results of operations could be negatively
affected.
Additionally, a significant number of our physical workforce are represented by unions. We cannot provide assurances that the company will be completely free
of labor disruptions such as work stoppages, work slowdowns, union organizing campaigns, strikes, lockouts or that any labor disruption will be favorably
resolved. Mitigating these risks could require additional financial commitments and the failure to prevent labor disruptions and retain and/or attract trained and
qualified labor could have an adverse effect on our business.
Significant increases in our operation and maintenance expenses, including our health care and pension costs, could adversely affect our future earnings and
liquidity.
We continually focus on limiting and reducing where possible, our operation and maintenance expenses. However, we expect to continue to face increased cost
pressures related to operation and maintenance expenses, including in the areas of health care and pension costs. We have experienced health care cost
inflation in recent years, and we expect our cash outlay for health care costs, including prescription drug coverage, to continue to increase despite measures that
we have taken requiring employees and retirees to bear a higher portion of the costs of their health care benefits. The measurement of our expected future
health care and pension obligations and costs is highly dependent on a variety of assumptions, many of which relate to factors beyond our control. These
assumptions include investment returns, interest rates, discount rates, health care cost trends, benefit design changes, salary increases, the demographics of
plan participants and regulatory requirements. See Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations—Critical
Accounting Estimates—Pension and OPEB Accounting.” While we anticipate that our operation and maintenance expenses will continue to increase, if actual
results differ materially from our assumptions, our costs could be significantly higher than expected which could adversely affect our results of operations,
financial condition and liquidity.
Advances in and widespread adoption of distributed generation and regulatory policies may make our facilities significantly less competitive and adversely affect
our results of operations.
Traditionally, electricity is generated at large, central generation facilities distributed by our systems. This method results in economies of scale and lower unit
costs than newer generation technologies such as fuel cells, microturbines, windmills and photovoltaic solar cells. It is possible that advances in newer
generation technologies will make newer generation technologies more cost-effective, or that legislation addressing climate change at the federal or state level
together with changes in regulatory policy will create incentives or benefits that otherwise make these newer generation technologies even more competitive with
central station electricity production. To the extent that newer generation technologies are connected directly to load, bypassing the transmission and distribution
systems, potential impacts could include decreased transmission and distribution revenues, stranded assets and increased uncertainty in load forecasting and
integrated resource planning and could adversely affect our business and results of operations.
17

-- 25 of 203 --

Energy companies are subject to adverse publicity that makes them vulnerable to negative regulatory and legislative outcomes, which could have an adverse
impact on our business.
Energy companies, including the Electric Companies and Transmission Companies, have been the subject of criticism on matters including the affordability and
reliability of our distribution or transmission services and systems and the speed with which they are able to respond to power outages, such as those caused by
storm damage. Adverse publicity of this nature, as well as negative publicity associated with the operation of coal-fired generation or proceedings seeking
regulatory recoveries may cause less favorable legislative and regulatory outcomes and damage our reputation, which could have an adverse impact on our
business and financial condition.
Our results of operations could be adversely affected by events beyond our control, such as natural disasters, public health crises, government shutdowns, trade
wars, recessions, political crises, negative global climate patterns, mine subsidence, or other catastrophic events.
Our operations, or those of our vendors or suppliers, could be negatively impacted by various events beyond our control, including, but not limited to: natural
disasters, such as hurricanes, tornadoes, floods, earthquakes, wildfires, extreme cold weather events and other adverse weather conditions; public health crises,
such as pandemics and epidemics; prolonged government or regulator furloughs or shutdowns; trade wars; recessions; political crises, such as terrorist attacks,
war, labor unrest, and other political instability; negative global climate patterns, especially in water stressed regions; surface subsidence from underground
mining impacting our facilities; or other catastrophic events, such as fires or other disasters occurring at our distribution facilities or our service providers’
facilities, whether occurring in the United States or internationally. These events could disrupt the operations of our corporate offices and our supply chain and
those of our vendors and service providers, as well as disrupting our infrastructure and that of third parties with whom we are connected. To the extent any of
these events occur, our operations and financial results could be adversely affected.
Risks Associated with Climate Change, GHG Emissions and Other Environmental Matters
Our aspirations and disclosures related to climate matters expose us to risks that could adversely affect our reputation and performance.
FirstEnergy published statements concerning its climate-related goals and aspirations. FirstEnergy is targeting Scope 1 carbon neutrality by 2050, which
includes emissions, sulfur hexafluoride leaks from transmission and distribution equipment, and its mobile fleet (i.e., vehicles). These statements reflect
FirstEnergy’s aspirations and are not guarantees that FirstEnergy will be able to achieve them. FirstEnergy’s failure to adequately update, accomplish or
accurately track and report on these goals on a timely basis, or at all, could adversely affect its and its subsidiaries’ reputation, financial performance and growth,
and expose us to increased scrutiny from the investment community, special interest groups and enforcement authorities, including at the state and local levels.
Conversely, certain “anti-environmental, social and governance” sentiment among some individuals and government institutions pose the risk that we may face
increasing scrutiny, reputational risk, or lawsuits from these parties.
FirstEnergy’s ability to achieve its GHG reduction objective is subject to its ability to make operational changes and is conditioned upon numerous risks, many of
which are outside of its control. Examples of such risks include the evolving regulatory requirements in the jurisdictions in which it and its subsidiaries operate,
including the interpretation of such regulations, potential changes to such laws and regulations, the prevalence of certain standards or disclosures, the evolving
laws applicable to climate-related and other environmental matters, and the availability of funds to invest in initiatives in times where FirstEnergy is seeking to
reduce costs.
Standards for tracking and reporting of climate and other environmental matters continue to evolve. FirstEnergy’s selection of voluntary disclosure frameworks
and standards, and the interpretation or application of those frameworks and standards, may change from time to time or differ from those of others.
Methodologies for reporting this data may be updated and previously reported data may be adjusted to reflect improvement in availability and quality of third-
party data, changing assumptions, changes in the nature and scope of our operations and other changes in circumstances. FirstEnergy’s processes and controls
for reporting these matters across its operations and supply chain are evolving along with multiple disparate standards for identifying, measuring, and reporting
these metrics, including climate-related disclosures that are or may be required by the SEC, state legislatures, or other regulators, and such standards may
change over time, which could result in significant revisions to FirstEnergy’s current goals, reported progress in achieving such goals, or ability to achieve such
goals in the future. If FirstEnergy’s practices do not meet evolving investor or other stakeholder expectations and standards, then the reputations of FirstEnergy
and its subsidiaries, including ours, or their attractiveness as an investment, or status as a business partner, acquiror, service provider or employer could be
negatively impacted.
MP has coal-fired generation capacity, which exposes it to risk from regulations relating to coal, GHGs and CCRs, which could lead to increased costs or the
need to spend significant resources to defend allegations of violation. (Applies to FE)
MP owns and maintains coal-fired electric generation facilities located in West Virginia. Historically, coal-fired generation has greater exposure to the costs of
complying with federal, state and local environmental statutes, rules and regulations relating to air emissions, including GHGs and CCR disposal, than other
types of electric generation facilities. To the extent that changes in
18

-- 26 of 203 --

government policies limit or restrict the usage of coal as a source of fuel in generating electricity or alternate fuels, such as natural gas, or displace coal on a
competitive basis, FE's business and results of operations could be adversely affected. These legal requirements and any future initiatives could impose
substantial additional costs and, in the case of GHG requirements, could raise uncertainty about the future viability of fossil fuels, particularly coal, as an energy
source for new and existing electric generation facilities and could require MP’s coal-fired generation to curtail generation or cease to generate. Failure to comply
with any such existing or future legal requirements may also result in the assessment of fines and penalties. Significant resources also may be expended to
defend against allegations of violations of any such requirements.
We are or may be subject to environmental liabilities, including costs of remediation of environmental contamination at current or formerly owned facilities, which
could have a material adverse effect on our results of operations and financial condition.
We may be subject to liability under environmental laws for the costs of remediating environmental contamination of property now or formerly owned or operated
by us and of property contaminated by hazardous substances regardless of whether the liabilities arose before, during or after the time we owned or operated
the facilities. We are currently involved in a number of proceedings relating to sites where hazardous substances have been released and we may be subject to
additional proceedings in the future. We also have current or previous ownership interests in sites associated with the production of gas and the production and
delivery of electricity for which we may be liable for additional costs related to investigation, remediation and monitoring of these sites. Remediation activities
associated with our former MGP operations are one source of such costs, as are legacy CCR surface impoundments. See Note 14., "Commitments, Guarantees
and Contingencies,” of the Combined Notes to Financial Statements of the Registrants. Citizen groups or others may bring litigation over environmental issues
including claims of various types, such as property damage, personal injury, and citizen challenges to compliance decisions on the enforcement of environmental
requirements, such as opacity and other air quality standards, which could subject us to penalties, injunctive relief and the cost of litigation. We cannot predict
the amount and timing of all future expenditures (including the potential or magnitude of fines or penalties) related to such environmental matters, although we
expect that they could be material. In addition, there can be no assurance that any liabilities, losses or expenditures we may incur related to such environmental
liabilities or contamination will be covered under any applicable insurance policies or that the amount of insurance will be adequate.
In some cases, a third party who has acquired assets, including, but not limited to, operating and deactivated power stations from us has assumed the liability
we may otherwise have for environmental matters related to the transferred property. If the transferee fails to discharge the assumed liability or disputes its
responsibility, a regulatory authority or injured person could attempt to hold us responsible, and our remedies against the transferee may be limited by the
financial resources of the transferee.
Concerns about GHG emissions and the potential risks associated with climate change have led to increased regulation and other actions that could impact our
businesses.
Federal and various regional and state authorities regulate GHG emissions, including CO emissions and have created financial incentives to reduce them. In
2024, FirstEnergy operated businesses that had total Scope 1 GHG emissions of approximately 14 million metric tons. For existing electric generation facilities,
CO emissions data are either obtained directly from facility continuous emission monitoring systems or calculated from actual fuel heat inputs and fuel type CO
emission factors. This estimate is based on a number of projections and assumptions that may prove to be incorrect, such as the forecasted dispatch,
anticipated facility efficiency, fuel type, CO emissions rates and our subsidiaries’ achieving completion of such construction and development projects. While
actual emissions may vary substantially, the projects under construction or development when completed will increase emissions of our portfolio and therefore
could increase the risks associated with regulation of GHG emissions.
In 2010, the EPA adopted regulations pertaining to GHG emissions that require new and existing sources of GHG emissions to potentially obtain new source
review permits from the EPA prior to construction or modification. In 2016, the Supreme Court of the U.S. ruled that such permitting would only be required if
such sources also must obtain a new source review permit for increases in other regulated pollutants. For further discussion of the regulation of GHG emissions,
see Note 14., "Commitments, Guarantees and Contingencies" of the Combined Notes to Financial Statements of the Registrants for additional information and
discussion.
Furthermore, certain states have begun to pass their own laws related to GHG emissions and disclosure of such emissions. The impact of GHG regulation on
our operations will depend on a number of factors, including the degree and timing of GHG emissions reductions required under any such legislation or
regulation, the cost of emissions reduction equipment and the price and availability of offsets, the extent to which market based compliance options are
available, the extent to which our subsidiaries would be entitled to receive GHG emissions allowances without having to purchase them in an auction or on the
open market and the impact of such legislation or regulation on the ability of our subsidiaries to recover costs incurred through rate increases or otherwise. The
costs of compliance could be substantial.
Costs of compliance with environmental laws are significant, and the cost of compliance with new environmental laws, including limitations on GHG emissions
related to climate change, could adversely affect our cash flows and financial condition.
2
2 	2
2
19

-- 27 of 203 --

Our operations are subject to extensive federal, state and local environmental statutes, rules and regulations, which are continuously evolving. Compliance with
these legal requirements requires us to incur costs for, among other things, installation and operation of pollution control equipment, emissions monitoring and
fees, remediation and permitting at our facilities. These expenditures have been significant in the past and may increase in the future. We may be forced to shut
down other facilities or change their operating status, either temporarily or permanently, if we are unable to comply with these or other existing or new
environmental requirements, or if the expenditures required to comply with such requirements are unreasonable.
Moreover, new federal, state or local environmental laws or regulations including, but not limited to GHG emissions, Clean Water Act effluent limitations imposing
more stringent water discharge regulations, or other changes to existing environmental laws or regulations, or the interpretation of such regulations, may
materially increase our costs of compliance or accelerate the timing of capital expenditures or other capital-like investments. Our compliance strategy, including
but not limited to, our assumptions regarding estimated compliance costs, although reasonably based on available information, may not successfully address
future relevant standards and interpretations, including with respect to evolving federal policies that may be adopted or new regulations adopted by the states in
which we operate. If we fail to comply with environmental laws and regulations or new interpretations of longstanding requirements, even if caused by factors
beyond our control, that failure could result in the assessment of civil or criminal liability and fines. In addition, any alleged violation of environmental laws and
regulations may require us to expend significant resources to defend against any such alleged violations. Due to the uncertainty of control technologies available
to reduce GHG emissions, any legal obligation that requires substantial reductions of GHG emissions could result in substantial additional costs, adversely
affecting cash flows and profitability, and raise uncertainty about the future viability of fossil fuels, particularly coal, as an energy source for new and existing
electric generation facilities.
The EPA may conduct NSR investigations at FirstEnergy’s electric generation facilities, which could result in the imposition of fines.
FirstEnergy may be subject to risks from changing or conflicting interpretations of existing laws and regulations, including, for example, the applicability of the
EPA's NSR programs. Under the CAA, modification of FirstEnergy’s electric generation facilities in a manner that results in increased emissions could subject
FirstEnergy’s existing electric generation facilities to the far more stringent new source standards applicable to new electric generation facilities.
The EPA has historically taken the view that many companies, including many energy producers, have been modifying emissions sources in violation of NSR
standards during work considered by the companies to be routine maintenance. The EPA has previously investigated alleged violations of the NSR standards at
certain of our existing and former electric generation facilities. Regulatory requirements and enforcement priorities continue to change, but should the EPA
investigate FirstEnergy’s electric generation facilities in the future, it could, if violations were discovered, result in the imposition of fines.
We could be exposed to private rights of action relating to environmental matters seeking damages under various state and federal law theories which could
have an adverse impact on our results of operations, financial condition, cash flows and business operations.
Private individuals may seek to enforce environmental laws and regulations against us and could allege personal injury, property damages or other relief. For
example, claims have been made against certain energy companies alleging that CO emissions from electric generation facilities constitute a public nuisance
under federal and/or state common law. While the Registrants are not a party to this litigation, either Registrant, and/or one of its subsidiaries, could be named in
other actions making similar allegations. An unfavorable ruling in any such case could result in the need to make modifications to our coal-fired generation or
reduce emissions, suspend operations or pay money damages or penalties. Adverse rulings in these or other types of actions could have an adverse impact on
our results of operations, cash flows and financial condition and could significantly impact our business operations.
Transition risks associated with climate change, including those related to regulatory mandates could negatively impact our financial results.
A number of regulatory and legislative bodies, including the NJBPU and the New Jersey General Assembly, have introduced requirements and/or incentives, as
well as penalties, to reduce peak demand and energy consumption. Such conservation programs have previously resulted in and could result in further load
reduction and could adversely impact our financial results in different ways. We currently have energy efficiency riders in place in certain of our states to recover
the cost of these programs either at or near a current recovery time frame in the states where we operate.
In our regulated operations, energy conservation could negatively impact us depending on the regulatory treatment of the associated impacts and, in particular,
whether we would be permitted to recover some or all of the resulting additional costs and/or lost revenues. Should we be required to invest in, or fund,
conservation measures that result in reduced sales from effective conservation, regulatory lag in adjusting rates for the impact of these measures could have a
negative financial impact. In the past, we have been adversely impacted by reduced electric usage due in part to energy conservation efforts such as the use of
efficient lighting products such as compact fluorescent lights, halogens and light emitting diodes. We could also be adversely impacted if any future increases to
energy prices result in a decrease in customer usage. Our financial results could be adversely affected if we are unable to meet participation and/or energy
reduction targets, as they may be established and penalties are
2
20

-- 28 of 203 --

imposed. We are unable to determine what impact, if any, future conservation activities will have on our financial condition or results of operations.
Additionally, failure to meet regulatory or legislative requirements to reduce energy consumption or otherwise increase energy efficiency could result in penalties
that could adversely affect our financial results.
Financial and reputational risks associated with owning coal-fired generation may have an adverse impact on FE's business operations, financial condition and
cash flows.
As further described in Item 2., "Properties", FirstEnergy controls approximately 3,160 MWs of coal-fired generation, primarily at MP. Certain lenders and
members of the investment community have adopted policies limiting new investments in coal-fired generation. Such efforts may adversely impact FirstEnergy's
and MP's access to the capital and financial markets. Further, certain insurance companies have established policies limiting coal-related underwriting and
investment. Consequently, these policies aimed at coal-fired generation could have a material adverse impact on FirstEnergy's reputation, business operations,
financial condition, and cash flows.
The physical risks associated with climate change may have an adverse impact on our business operations, financial condition and cash flows.
Physical risks of climate change, such as flooding, wildfires, rising sea levels, and other related phenomena, resulting from more frequent or more extreme
weather events and changes in temperature and precipitation patterns associated with climate change, could affect some, or all, of our operations. Frequent or
extreme weather events could disrupt our operations and/or be destructive, which could result in increased costs, including supply chain costs. An extreme
weather event within the Electric Companies' and Transmission Companies’ service areas could also directly affect their capital assets, such as downed wires,
poles, or damage to other operating equipment, resulting in service disruptions to customers and possibly creating hazardous conditions. Further, as extreme
weather conditions increase system stress, we may incur costs relating to additional system backup or service interruptions and, in some instances, we may be
unable to recover such costs. For all of these reasons, these physical risks could have an adverse financial impact on our business operations, financial
condition and cash flows.
Climate change poses other financial risks as well. To the extent weather conditions are affected by climate change, customers’ energy use could increase or
decrease depending on the duration and magnitude of the changes. Increased energy use due to weather changes may require us to invest in additional system
assets and purchase additional power. Additionally, decreased energy use due to weather changes may affect our financial condition through decreased
revenues, margins or earnings.
Risks Associated with Markets and Financial Matters
Our results of operations and financial condition may be adversely affected by the volatility in pension and OPEB investments and obligations due to capital
market performance and other changes.
FirstEnergy recognizes in income the change in the fair value of plan assets and net actuarial gains and losses for its pension and OPEB plans. This adjustment
to income associated with the change in fair value is recognized in the fourth quarter of each year and whenever a plan is determined to qualify for a
remeasurement, which could result in greater volatility in pension and OPEB expenses and may materially impact our results of operations.
Our financial statements reflect the values of the assets held in trust to satisfy our obligations under pension and OPEB plans. Certain of the plan assets held in
these trusts do not have readily determinable market values. Changes in the estimates and assumptions inherent in the value of these assets could affect the
value of the trusts. If the value of the assets held by the trusts declines by a material amount, our funding obligation to the trusts could materially increase. These
assets are subject to market fluctuations and will yield uncertain returns, which may fall below our projected return rates. Forecasting investment earnings and
costs to pay future pension and other obligations requires significant judgment and actual results may differ significantly from current estimates. Capital market
conditions that generate investment losses or that negatively impact the discount rate and increase the present value of liabilities may increase our future
pension and OPEB expenses and further may have significant impacts on the value of the pension and other trust funds, which could require significant
additional funding and negatively impact our results of operations and financial position. See Item 7., "Management's Discussion and Analysis of Financial
Condition and Results of Operations—Critical Accounting Policies and Estimates—Pension and OPEB Accounting.”
Failure to comply with debt covenants in our credit agreements or conditions could adversely affect our ability to execute future borrowings and/or require early
repayment, and could restrict our ability to obtain additional or replacement financing on acceptable terms or at all.
FirstEnergy’s debt and credit agreements contain various financial and other covenants including a requirement for FE to maintain a consolidated interest
coverage ratio of not less than 2.50 times, measured at the end of each fiscal quarter for the last four fiscal quarters, and that each other borrower maintain a
consolidated debt-to-total-capitalization ratio of no more than 65%, and 75% for FET, measured at the end of each fiscal quarter. As of December 31, 2025, FE
was in compliance with its applicable
21

-- 29 of 203 --

consolidated interest coverage ratio and the Electric Companies, the Transmission Companies, and FET were each in compliance with their debt-to-total-
capitalization ratio covenants.
Our credit agreements contain certain negative and affirmative covenants. Our ability to comply with the covenants and restrictions contained in the credit
facilities has been and may, in the future, be affected by events related to the ongoing government investigations or otherwise, including a failure to comply with
the terms of the DPA.
A breach of any of the covenants contained in our credit agreements, including any breach related to alleged failures to comply with anti-corruption and anti-
bribery laws, could result in an event of default under such agreements, and we would not be able to access our credit facilities for additional borrowings and
letters of credit while any default exists. Upon the occurrence of such an event of default, any amounts outstanding under our credit facilities could be declared
to be immediately due and payable and all applicable commitments to extend further credit could be terminated. If indebtedness under our credit facilities is
accelerated, there can be no assurance that we will have sufficient assets to repay the indebtedness. In addition, certain events, including but not limited to any
covenant breach related to alleged failures to comply with anti-corruption and anti-bribery laws, an event of default under our credit agreements, and the
acceleration of applicable commitments under such facilities could restrict our ability to obtain additional or replacement financing on acceptable terms or at all.
The operating and financial restrictions and covenants in our credit facilities and any future financing agreements may adversely affect our ability to finance
future operations or capital needs or to engage in other business activities which in turn could have a material adverse impact on our business, cash flow,
liquidity and results of operations.
A credit rating downgrade could negatively affect our or our subsidiaries’ financing costs, ability to access capital and requirement to post collateral.
We rely on access to bank and capital markets as sources of liquidity for cash requirements not satisfied by cash from operations. Certain of FE’s subsidiaries
have in the past been subject to downgrade of credit ratings. Any future downgrades in FirstEnergy or its subsidiaries' credit ratings from the nationally
recognized credit rating agencies, particularly to levels below investment grade, could negatively affect our ability to access the bank and capital markets,
especially in a time of uncertainty in either of those markets, and may require us to post cash collateral to support outstanding commodity positions in the
wholesale market, as well as available letters of credit and other guarantees. Furthermore, additional downgrades could increase the cost of such capital by
causing us to incur higher interest rates and fees associated with such capital. Additional rating downgrades would further increase our interest expense on
certain of FirstEnergy's long-term debt obligations and would also further increase the fees we pay on our various existing credit facilities, thus increasing the
cost of our working capital. Such additional rating downgrades could also negatively impact our ability to grow our regulated businesses or execute our business
strategies by substantially increasing the cost of, or limiting access to, capital.
In addition, events related to the ongoing government investigations may expose us to higher interest rates for additional indebtedness, whether as a result of
ratings downgrades or otherwise, and could restrict our ability to obtain additional or replacement financing on acceptable terms or at all. See “Failure to comply
with debt covenants in our credit agreements or conditions could adversely affect our ability to execute future borrowings and/or require early repayment, and
could restrict our ability to obtain additional or replacement financing on acceptable terms or at all.”
In the event of volatility or unfavorable conditions in the capital and credit markets, our business, including the immediate availability and cost of short-term funds
for liquidity requirements, our ability to meet long-term commitments and the competitiveness and liquidity of energy markets may be adversely affected, which
could negatively impact our results of operations, cash flows and financial condition.
We rely on the bank and capital markets to meet both our financial commitments and short-term liquidity needs if internal funds are not available from our
operations. We also use LOCs provided by various financial institutions to support our collateral operations. We also deposit cash in short-term investments. In
the event of volatility in the capital and credit markets, our ability to access the capital markets or draw on our credit facilities and obtain cash may be adversely
affected. Our access to funds under those credit facilities is dependent on our ability of the financial institutions that are parties to the facilities to meet their
funding commitments. Those institutions may not be able to meet their funding commitments if they experience shortages of capital and liquidity or if they
experience excessive volumes of borrowing requests within a short period of time. Any delay in our ability to access those funds, even for a short period of time,
could have an adverse effect on our results of operations and financial condition.
Should there be fluctuations in the bank and capital markets as a result of uncertainty, changing or increased regulation, reduced alternatives or failures of
significant foreign or domestic financial institutions or foreign governments, our access to liquidity needed for our business could be adversely affected.
Unfavorable conditions could require us to take measures to conserve cash until the markets stabilize or until alternative credit arrangements or other funding for
our business needs can be arranged. Such measures could include deferring capital expenditures or other capital-like investments, and reducing or eliminating
future dividend payments or other discretionary uses of cash. Energy markets depend heavily on active participation by multiple counterparties, which could be
adversely affected should there be disruptions in the bank and capital markets. Reduced capital and liquidity and failures of significant institutions that participate
in the energy markets could diminish the liquidity and competitiveness of energy markets that are important to our business. Perceived weaknesses in the
competitive strength of the
22

-- 30 of 203 --

energy markets could lead to pressures for greater regulation of those markets or attempts to replace those market structures with other mechanisms for the
sale of power, including the requirement of long-term contracts, which could have a material adverse effect on our results of operations and cash flows.
Changes in local, state or federal tax laws applicable to us or adverse audit results or tax rulings, and any resulting increases in taxes and fees, may adversely
affect our results of operations, financial condition and cash flows.
We are subject to various local, state and federal taxes, including income, franchise, real estate, sales and use and employment-related taxes. We exercise
significant judgment in calculating such tax obligations, booking reserves as necessary to reflect potential adverse outcomes regarding tax positions we have
taken and utilizing tax benefits, such as carryforwards and credits. Additionally, various tax rate and fee increases may be proposed or considered in connection
with such changes in local, state or federal tax law. We cannot predict whether legislation or regulation will be introduced, the form of any legislation or
regulation, or whether any such legislation or regulation will be passed by legislatures or regulatory bodies. Any such changes, or any adverse tax audit results
or adverse tax rulings on positions taken by FE or its subsidiaries could have a negative impact on its results of operations, financial condition and cash flows.
Specifically, the IRA of 2022 imposes a corporate AMT and, if applicable, corporations must pay the greater of the regular corporate income tax or the AMT. The
IRS has issued guidance, most recently on September 30, 2025, and the U.S. Treasury has issued proposed regulations concerning the corporate AMT. While
FirstEnergy continues to believe, more likely than not, it will be subject to corporate AMT, additional IRS guidance or revised U.S. Treasury regulations, which are
expected to be issued in the future, as well as potential tax legislation or presidential executive orders, could provide certain adjustments to regulated utilities in
calculating corporate AMT, which may reduce or otherwise significantly change FirstEnergy’s AMT estimates or its conclusions as to whether it is an AMT payer.
The regulatory treatment of the IRA of 2022 may also be subject to regulation by FERC and/or applicable state regulatory authorities. Any adverse development
in the IRA of 2022, including guidance from the U.S. Treasury and/or the IRS or unfavorable regulatory treatment, could negatively impact FirstEnergy’s cash
flows, results of operations and financial condition.
FE is a holding company and relies on cash from its subsidiaries to meet its financial obligations and therefore any restrictions on the Electric Companies and
Transmission Companies’ ability to pay dividends or make cash payments to FE may adversely affect its cash flows and financial condition. (Applies to FE)
Because FE is a holding company with no operations or cash flows of its own, its ability to meet its financial obligations, including making interest and principal
payments on outstanding indebtedness and to pay dividends on its common stock, is primarily dependent on the net income and cash flows of our subsidiaries
and the ability of those subsidiaries to pay upstream dividends or to repay borrowed funds. Prior to paying such dividends, FE’s subsidiaries have regulatory
restrictions and financial obligations that must be satisfied.
For example, the Electric Companies and Transmission Companies are regulated by various state utility and federal commissions that generally possess broad
powers to ensure that the needs of utility customers are being met. Those state and federal commissions could attempt to impose restrictions on the ability of the
Electric Companies and Transmission Companies to pay dividends or otherwise restrict cash payments to FE. Any inability of its subsidiaries to pay dividends or
make cash payments to FE may adversely affect its cash flows and financial condition.
FE may also provide capital contributions or debt financing to its subsidiaries under certain circumstances, which would reduce the funds available to meet
financial obligations, including making interest and principal payments on outstanding indebtedness and to pay dividends on FE's common stock.
FE cannot assure its common shareholders that future dividend payments will be made, or if made, in what amounts they may be paid. (Applies to FE)
The FE Board will continue to regularly evaluate FE’s common stock dividend and determine whether to declare a dividend, and an appropriate amount thereof,
each quarter taking into account such factors as, among other things, FE’s earnings, cash flows, credit metrics, as well as general economic and business
conditions. FE cannot assure common shareholders that dividends will be paid in the future, or that, if paid, dividends will be at the same amount or with the
same frequency as in the past.
JCP&L may recognize impairments of recorded goodwill, which would result in write-offs of the impaired amounts and could have an adverse effect on its results
of operations. (Applies to JCP&L)
JCP&L had approximately $1.8 billion of goodwill on our balance sheet as of December 31, 2025. Goodwill is tested for impairment annually, as of July 31, or
whenever events or circumstances indicate impairment may have occurred. JCP&L is unable to predict the actual timing and amounts of any impairments in
future years, which would depend on many factors, including interest rates, sector market performance, JCP&L’s capital structure, results of future rate
proceedings, operating and capital expenditure requirements, the value of comparable acquisitions, environmental regulations and other factors. The recognition
of impairments of goodwill, which may result in write-offs of such impaired amount, could have an adverse effect on JCP&L’s results of operations.
23

-- 31 of 203 --

ITEM 1B. UNRESOLVED STAFF COMMENTS
None.
ITEM 1C. CYBERSECURITY
FirstEnergy seeks to protect its customers, employees, facilities and the ongoing reliability of the electric system. FirstEnergy works closely with state and
federal agencies and its peers in the electric utility industry to identify physical and cyber security risks, exchange information, and put safeguards in place to
comply with strict reliability and security standards. From a security standpoint, the electric utility sector is one of the most regulated industries.
As a wholly owned subsidiary of FE, JCP&L utilizes and falls under the purview of FirstEnergy’s cyber security risk management program.
Risk Management and Strategy
FirstEnergy has established a broad framework to assess, identify and manage material risks from cyber security threats. This program is established at the
executive level, with regular reporting to, and oversight by, the FE Board as described below. At the highest level, FirstEnergy’s program includes multi-layered
governance by management, the Audit Committee, the Operations and Safety Committee, and the FE Board, as described in greater detail below.
Central management and coordination of the program helps FirstEnergy to comprehensively evaluate and protect against cyber threats. FirstEnergy’s written
policies and procedures identify how cyber security measures and controls are developed, implemented, and regularly reviewed and updated. FirstEnergy aims
to align its cyber security program with national standards. For example, FirstEnergy has implemented and maintains a set of controls to manage cyber security
risk based on, and in alignment with, the National Institute of Standards and Technology Cyber Security Framework, and for Bulk Electric System assets, the
NERC Critical Infrastructure Protection standards. FirstEnergy also complies with various state laws and regulations on cyber security.
FirstEnergy’s cyber security program identifies security controls and user responsibilities for the organization to identify and manage the risk of a cyber security
incident. FirstEnergy also conducts various internal and external risk assessments each year. These include required annual compliance assessments, such as
requirements under the Sarbanes-Oxley Act and Payment Card Industry Data Security Standard compliance audits, as well as ad-hoc assessments driven by
emerging risks, changes in FirstEnergy’s environment, or benchmark/roadmap needs. Risks identified in such assessments are considered for inclusion in
FirstEnergy’s risk portfolio, or incorporated directly into the cyber security program, and are then prioritized and addressed as needed through the organization’s
written policies and procedures. The risk assessment along with risk-based analysis and judgment are used to select security controls to address risks. During
this process, the following factors, among others, are considered: likelihood and severity of risk, impact on FirstEnergy and others, such as vendors and
customers, if a risk materializes, feasibility and cost of controls, and impact of controls on operations and others. FirstEnergy also regularly evaluates the
adequacy and sufficiency of specific controls.
To further protect its information and cyber assets, FirstEnergy has required since late 2022 that applicable prospective third-party vendors complete a privacy
impact assessment, which is designed to identify potential privacy and cyber security risks for those vendors requiring access to personally identifiable
information, and based on the results, include appropriate contractual provisions to mitigate any identified risks. FirstEnergy has also evaluated its third-party
vendors onboarded prior to 2022 to identify which vendors had similar access to personally identifiable information and confirmed that such vendors also
completed a privacy impact assessment.
FirstEnergy conducts cyber security exercises and training. For example, all personnel with any form of computer system access must complete cyber security
training on a recurring basis, which educates personnel on FirstEnergy’s policies and procedures for using FirstEnergy systems, keeping FirstEnergy information
secure, and for safe, reliable operation of electric utility systems. FirstEnergy also conducts various tests of its cyber incident response plans, disaster recovery
plans and business continuity plans with key stakeholders and responders for various areas of FirstEnergy’s utility and business functions. FirstEnergy’s
management also holds executive cyber security incident tabletop exercises to train on cyber security incident response.
Additionally, FirstEnergy leverages third-party security firms in various capacities to assist with various aspects of FirstEnergy’s cyber security program, including
risk assessments, vulnerability scans, and penetration testing. FirstEnergy uses a variety of processes to address cyber security threats related to the use of
third-party technology and services, such as reviewing independent assessments of the third party’s cyber/information security controls, such as Systems and
Organization Controls 2 audits or other standards-based assessments, where appropriate. As part of FirstEnergy’s process to continuously improve its cyber and
information security programs, FirstEnergy also engages third-party subject matter experts to assess and evaluate the effectiveness of various aspects of such
programs.
24

-- 32 of 203 --

In addition to the aforementioned efforts, FirstEnergy also strongly considers cyber security risks as a part of its overall strategy and invests heavily in
sophisticated and layered security measures that use both technology and hard defenses to protect critical transmission facilities and its digital communications
networks. For example, security enhancements to FirstEnergy’s transmission infrastructure, such as enhanced cyber security monitoring and alarming are a key
component of FirstEnergy’s transmission investment program.
Despite the security measures and safeguards FirstEnergy has employed, including certain measures implemented pursuant to mandatory NERC Critical
Infrastructure Protection standards, FirstEnergy’s infrastructure may be increasingly vulnerable to such attacks as a result of the rapidly evolving and
increasingly sophisticated means by which attempts to defeat security measures and gain access to information technology systems may be made. Also,
FirstEnergy, or its vendors and service providers, may be at an increased risk of a cyber-attack and/or data security breach due to the nature of its business. Any
such cyber incident could result in significant lost revenue, the inability to conduct critical business functions and serve customers for a significant period of time,
the use of significant management resources, legal claims or proceedings, regulatory penalties, significant remediation costs, increased regulation, increased
capital costs, increased protection costs for enhanced cyber security systems or personnel, damage to FirstEnergy's reputation and/or the rendering of its
internal controls ineffective, all of which could materially adversely affect FirstEnergy's business, results of operations, financial condition and reputation.
Board Governance and Management
The FE Board has identified cyber security as a key enterprise risk and prioritizes the mitigation of this risk through FirstEnergy’s enterprise risk management
process. Responsibility for oversight of risk management generally lies with the FE Board and the FE Audit Committee has primary responsibility to oversee
enterprise risk management. To effectively manage oversight of FirstEnergy’s cyber security risk management practices, since 2022, the FE Board has
delegated oversight authority to each of FirstEnergy’s Audit and Operations and Safety Committees, respectively, as detailed in each Committees’ charters. The
Audit Committee has primary responsibility to oversee the disclosure of material cyber security incidents, as well as the general obligation to ensure the proper
risk oversight structure of cyber security as part of FirstEnergy’s overall enterprise risk management program and the internal controls applicable to cyber
security matters. The Operations and Safety Oversight Committee has primary responsibility to oversee the operational aspects of FirstEnergy’s cyber security
policies, programs, initiatives and strategies, as well as operational risk considerations related to cyber security matters. FirstEnergy’s Cyber Security Leaders
regularly provide reports at the Audit Committee, Operations and Safety Oversight Committee, and to the full FE Board. Each such Committee and the full FE
Board work collaboratively to ensure fulsome oversight with the proper focus of each respective Board body. These reports include, among other things, current
and emerging cyber security risks to FirstEnergy, incidents that were escalated to management during the prior quarter, including those that did not require
immediate escalation to the appropriate Committee and/or full FE Board, internal and external assessments of FirstEnergy’s cyber security program, and a
roadmap of projects to manage its cyber security posture.
At the executive and management level, the CISO has primary responsibility for the development, operation, and maintenance of FirstEnergy’s cyber security
program. FirstEnergy's CISO has over 30 years of cyber-experience with both large domestic and international companies, and holds an ISC2 Certified
Information Systems Security Professional certification. The CISO reports directly to FirstEnergy’s Chief Information Officer, who is responsible for all of
FirstEnergy’s digital and technology services and is FirstEnergy’s most senior information technology executive. Under the CISO’s oversight, FirstEnergy’s cyber
security team implements and provides governance and functional oversight for cyber security controls and services. Cyber security processes include
escalation of certain risks and incidents, including those that originate or occur at third parties, to the Chief Information Officer, Chief Operating Officer,
FirstEnergy's legal team, and the executive leaders as appropriate based on the severity of any such risk or incident. In addition, regular updates from the cyber
security teams, in conjunction with real-time escalation on an as-needed basis, are also used to update the risk landscape.
In the event of any significant cyber security incident, FirstEnergy’s Cyber Security Incident Response Plan provides for a severity determination by the cyber
security incident response team based on factors such as the number of assets affected, the likelihood of inappropriate data exposure, operational impact,
reliability impact, and regulatory impact. Dependent upon the severity of an incident, it is FirstEnergy’s practice to escalate the incident to the Chief Information
Officer, the Chief Risk Officer, FirstEnergy's legal team, and the FE senior leadership team, including the Chief Legal Officer, Chief Financial Officer, and Chief
Executive Officer. Such members of management then determine whether, based on various factors, the incident requires immediate escalation to the Audit
Committee and Operations and Safety Committee, or the full FE Board.
Although the risks from cyber threats have not materially affected FirstEnergy’s business strategy, results of operations, or financial condition to date,
FirstEnergy continues to closely monitor cyber risk. The FirstEnergy Cyber Security team also monitors new and emerging threats and is constantly improving
and refining its security controls to respond not only to those new and emerging threats, but also to address the security impact and requirements of new
technologies such as artificial intelligence and quantum computing. Overall, FirstEnergy has implemented tactical processes for assessing, identifying, and
managing material risks from cyber security threats to FirstEnergy including governance at the executive and board level of FirstEnergy’s cyber security
program, including FE’s risk management strategy and the controls designed to protect its operations. Additionally, FirstEnergy, through its Disclosure
Committee, has updated its disclosure controls and procedures to ensure appropriate disclosure of any material cyber security incidents. See Item 1A., "Risk
Factors" for additional information regarding FirstEnergy’s cyber security risks. Those sections of Item 1A., "Risk Factors" should be read in conjunction with this
Item 1C., "Cybersecurity".
25

-- 33 of 203 --

ITEM 2. PROPERTIES
The first mortgage indentures for the Ohio Companies, FE PA, MP and PE constitute direct first liens on substantially all of the respective physical property,
subject only to excepted encumbrances, as defined in the first mortgage indentures. The outstanding debt under the FMBs of specific FE PA predecessors (WP
and Penn) were assumed by FE PA in connection with the PA Consolidation. See Note 11., "Capitalization," of the Combined Notes to Financial Statements of
the Registrants for information concerning financing encumbrances affecting certain of the Electric Companies' properties.
FirstEnergy controls the following generation sources as of December 31, 2025, shown in the table below, and operates in the PJM Region. Except for the
OVEC participation referenced in the footnotes to the table, the Integrated segment's electric generation facilities are owned by MP.
Electric Generation Facility (Location) 	Unit 	Total Corporate /
Other 	Integrated 	Total Corporate /
Other 	Integrated
Generation Capacity (MW)
Net Generation for the year ended December 31,
2025
(Thousand MWh)
Coal-fired:
Harrison Power Station (Haywood, WV) 	1-3 	1,984 	— 	1,984 	10,755 	— 	10,755
Fort Martin Power Station (Maidsville, WV) 	1-2 	1,098 	— 	1,098 	6,131 	— 	6,131
OVEC (Cheshire, OH) (Madison, IN) 	1-11 	78 	67 	11 	391 	336 	55
3,160 	67 	3,093 	17,277 	336 	16,941
Pumped-storage Hydro:
Bath County Pumped Storage Station (Warm
Springs, VA) 	1-6 	487 	— 	487 	710 	— 	710
Solar
Fort Martin Solar (Maidsville, WV) 	19 	— 	19 	25 	— 	25
Rivesville Solar (Rivesville, WV) 	5 	— 	5 	8 	— 	8
Marlowe Solar (Marlowe, WV) 	6 	— 	6 	8 	— 	8
30 	— 	30 	41 	— 	41
Total 	3,677 	67 	3,610 	18,028 	336 	17,692
Represents AE Supply's 3.01% and MP's 0.49% entitlement based on their participation in OVEC.
Represents AGC's 16.25% undivided interest in Bath County. The station is operated by VEPCO.
Each facility is net of station use, except for Bath County, which is shown gross of pumping usage.
MP and PE are constructing 50 MWs of solar generation at five sites in West Virginia. The WVPSC approved the construction of three of the five solar sites. Two
of the five solar generation sites, Rivesville Solar and Fort Martin Solar, went into service in 2024, and the third, Marlowe Solar, went into service in April 2025,
representing a total of 30 MWs of generation capacity.
On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC, which contemplated the addition of 70 MWs of solar generation by 2028,
and 1,200 MWs of natural gas combined cycle generation by 2031 and on February 13, 2026, MP and PE filed a request for a CPCN with the WVPSC to
construct and operate the same. See “Outlook – State Regulation – West Virginia" in Item 7., "Management's Discussion and Analysis of Financial Condition and
Results of Operations" for additional details.
(3)
(1)
(2)
(1)
(2)
(3)
26

-- 34 of 203 --

As of December 31, 2025, FirstEnergy’s distribution and transmission circuit miles are located in PJM and were as follows:
Distribution
Line Miles Transmission
Line Miles
ATSI 	— 	7,965
CEI 	31,876 	—
FE PA 	82,638 	2,624
JCP&L 	24,892 	2,620
KATCo 	— 	1,694
MAIT 	— 	4,281
MP 	23,166 	2,612
OE 	54,882 	—
PE 	20,387 	2,092
TE 	15,118 	—
TrAIL 	— 	269
Total 	252,959 	24,157
Includes overhead pole line and underground conduit carrying primary, secondary and street lighting circuits.
On January 1, 2024, WP's Pennsylvania-based transmission assets of 115 kV and above were transferred to KATCo, while the remaining transmission assets continue to be held
by FE PA and are included in distribution ratemaking.
ITEM 3. LEGAL PROCEEDINGS
Reference is made to Note 13., "Regulatory Matters," and Note 14., "Commitments, Guarantees and Contingencies," of the Combined Notes to Financial
Statements of the Registrants for a description of certain legal proceedings involving the Registrants.
ITEM 4. MINE SAFETY DISCLOSURES
Not applicable.
(1)
(2)
(2)
(1)
(2)
27

-- 35 of 203 --

PART II
ITEM 5. MARKET FOR REGISTRANTS' COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY
SECURITIES
JCP&L
As of January 31, 2026, there were 13,628,447 outstanding shares of JCP&L common stock, $0.10 par value, all of which was held by FE. There is no market
for JCP&L's common stock.
FIRSTENERGY
COMMON STOCK
The common stock of FirstEnergy Corp. is listed on the New York Stock Exchange under the symbol “FE” and is traded on other registered exchanges.
HOLDERS OF COMMON STOCK
There were 49,527 holders of 577,851,052 shares of FE’s common stock as of December 31, 2025, and 49,250 holders of 577,932,879 shares of FE's common
stock as of January 31, 2026. FE has historically paid quarterly cash dividends on its common stock. Dividend payments are subject to declaration by the FE
Board, and future dividend decisions determined by the FE Board may be impacted by earnings, cash flows, credit metrics and general economic and other
business conditions. Information regarding equity available for payment of cash dividends is given in Note 11., "Capitalization," of the Combined Notes to
Financial Statements of the Registrants.
SHAREHOLDER RETURN
The following graph shows the total cumulative return from a $100 investment on December 31, 2020, in FE’s common stock compared with the total cumulative
returns of the S&P 500 Utilities Index and the S&P 500. The points on the graph represent fiscal year-end index levels based upon the last trading day in each
fiscal year.
28

-- 36 of 203 --

FirstEnergy had no transactions regarding purchases of FE common stock during the fourth quarter of 2025.
FirstEnergy does not have any publicly announced plan or program for share purchases.
ITEM 6. [RESERVED]
ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
Forward-Looking Statements: This Form 10-K includes forward-looking statements based on information currently available to the Registrants’ management and
unless the context requires otherwise, references to “we,” “us,” “our” and “FirstEnergy” refer to the Registrants collectively. Such statements are subject to
certain risks and uncertainties and readers are cautioned not to place undue reliance on these forward-looking statements. These statements include
declarations regarding management's intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms “anticipate,”
“potential,” “expect,” "forecast," "target," "will," "intend," “believe,” "project," “estimate," "plan" and similar words. Forward-looking statements involve estimates,
assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different
from any future results, performance or achievements expressed or implied by such forward-looking statements, which may include the following (see Glossary
of Terms for definitions of capitalized terms):
• The potential liabilities, increased costs and unanticipated developments resulting from government investigations and agreements, including those
associated with compliance with or failure to comply with the DPA, and settlements with the OAG's office and the SEC;
• The risks and uncertainties associated with litigation, including the securities class-action lawsuit, regulatory proceedings, arbitration, mediation and
similar proceedings;
• Changes in national and regional economic conditions, including recession, volatile interest rates, inflationary pressure, supply chain disruptions, higher
fuel costs, and workforce impacts, affecting us and/or our customers and the vendors with which we do business;
• Variations in weather, such as mild seasonal weather variations and severe weather conditions (including events caused, or exacerbated, by climate
change, such as wildfires, hurricanes, flooding, droughts, high wind events and extreme heat events) and other natural disasters, which may result in
increased storm restoration expenses or material liability and negatively affect future operating results;
• The potential liabilities and increased costs arising from regulatory actions or outcomes in response to severe weather conditions and other natural
disasters;
• Legislative and regulatory developments, and executive orders, including, but not limited to, matters related to rates, generation resource adequacy, co-
location of generation and large loads, and compliance and enforcement activity;
• The ability to access the public securities and other capital and credit markets in accordance with our financial plans, the cost of such capital and
overall condition of the capital and credit markets affecting us, including the increasing number of financial institutions evaluating the impact of climate
change on their investment decisions, and the loss of FE’s status as a well-known seasoned issuer;
• The risks associated with physical attacks, such as acts of war, terrorism, sabotage or other acts of violence, and cyber-attacks and other disruptions to
our, or our vendors’, information technology system, which may compromise our operations, and data security breaches of sensitive data, intellectual
property and proprietary or personally identifiable information;
• The ability to accomplish or realize anticipated benefits through establishing a culture of continuous improvement and our other strategic and financial
goals, including, but not limited to, executing Energize365, our transmission and distribution investment plan, executing on our rate filing strategy,
controlling costs, improving credit metrics, maintaining investment grade ratings, strengthening our balance sheet and growing earnings;
• Changing market conditions affecting the measurement of certain liabilities and the value of assets held in FirstEnergy's pension trusts may negatively
impact our forecasted growth rate, results of operations and may also cause it to make contributions to its pension sooner or in amounts that are larger
than currently anticipated;
• Changes in assumptions regarding factors such as economic conditions within our territories, the reliability of our transmission and distribution system,
our generation resource planning in West Virginia, or the availability of capital or other resources supporting identified transmission and distribution
investment opportunities;
• Human capital management challenges, including among other things, attracting and retaining appropriately trained and qualified employees, and labor
disruptions by our unionized workforce;
• Changes to environmental laws and regulations, including, but not limited to, federal and state rules related to climate change, CCRs, and potential
changes to such laws and regulations;
• Changes in customers’ demand for power, including, but not limited to, economic conditions, the impact of climate change, and emerging technology,
particularly with respect to electrification, energy storage, co-location of generation and large loads, and distributed sources of generation;
• Future actions taken by credit rating agencies that could negatively affect either our access to or terms of financing or our financial condition and
liquidity;
• The potential of non-compliance with debt covenants in our credit facilities;
• The ability to comply with applicable reliability standards and energy efficiency and peak demand reduction mandates;
29

-- 37 of 203 --

• Changes to significant accounting policies;
• Any changes in tax laws or regulations, including, but not limited to, the IRA of 2022, the OBBBA, or adverse tax audit results or rulings and potential
changes to such laws and regulations;
• The ability to meet our publicly-disclosed goals relating to climate-related matters, opportunities, improvements, and efficiencies, including FirstEnergy’s
GHG reduction goals; and
• The risks and other factors discussed from time to time in our SEC filings.
Dividends declared from time to time on FE’s common stock during any period may in the aggregate vary from prior periods due to circumstances considered by
the FE Board at the time of the actual declarations. A security rating is not a recommendation to buy or hold securities and is subject to revision or withdrawal at
any time by the assigning rating agency. Each rating should be evaluated independently of any other rating.
These forward-looking statements are also qualified by, and should be read together with, the risk factors included in (a) Item 1A., "Risk Factors", (b) Item 7.,
"Management’s Discussion and Analysis of Financial Condition and Results of Operations," and (c) other factors discussed herein and in the Registrants’ other
filings with the SEC. The foregoing review of factors also should not be construed as exhaustive. New factors emerge from time to time, and it is not possible for
management to predict all such factors, nor assess the impact of any such factor on our business or the extent to which any factor, or combination of factors,
may cause results to differ materially from those contained in any forward-looking statements. We expressly disclaim any obligation to update or revise, except
as required by law, any forward-looking statements contained herein or in the information incorporated by reference as a result of new information, future events
or otherwise.
Forward-looking and other statements in this Annual Report on Form 10-K regarding FirstEnergy’s Climate Strategy, including FirstEnergy’s GHG emission
reduction goals, are not an indication that these statements are necessarily material to investors or required to be disclosed in FE’s filings with the SEC. In
addition, historical, current and forward-looking statements regarding climate matters, including GHG emissions, may be based on standards for measuring
progress that are still developing, internal controls and processes that continue to evolve and assumptions that are subject to change in the future.
30

-- 38 of 203 --

FIRSTENERGY CORP.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF
FINANCIAL CONDITION AND RESULTS OF OPERATIONS
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-K discusses FirstEnergy's 2025 and 2024
results, and year-over-year comparisons between 2025 and 2024. Discussions of 2023 results and year-over-year comparisons between 2024 and 2023 that are
not included in this Form 10-K can be found in Item 7., “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of
FirstEnergy’s Annual Report on Form 10-K for the fiscal year ended December 31, 2024, filed with the SEC on February 27, 2025.
EXECUTIVE SUMMARY AND RECENT DEVELOPMENTS
Company Overview
FirstEnergy is dedicated to integrity, safety, reliability and operational excellence and is principally involved in the transmission, distribution and generation of
electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission. Its electric distribution companies form one of the nation's
largest investor-owned electric systems, serving over 6 million customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York.
FirstEnergy’s transmission subsidiaries operate more than 24,000 miles of transmission lines that connect the Midwest and Mid-Atlantic regions and two regional
transmission operation centers. In addition, MP and AGC control 3,610 MWs of total generation capacity.
Segment Overview
FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, representing $11.1 billion in rate base as of December 31, 2025,
distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million
customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its default service or standard service offer requirements. The
segment’s results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs.
FirstEnergy's Integrated segment includes the distribution and transmission operations of JCP&L, MP and PE, as well as MP’s regulated generation operations,
representing $10.2 billion in rate base as of December 31, 2025. The Integrated segment distributes electricity to approximately 2 million customers in New
Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to
transmit electricity and operates 3,610 MWs of regulated generation capacity located primarily in West Virginia and Virginia, which includes three solar
generation sites, representing 30 MWs of generation capacity. The segment’s results reflect the costs of securing and delivering electric generation to
customers, including the deferral and amortization of certain costs. Additionally, on October 1, 2025, MP and PE filed their integrated resource plan with the
WVPSC proposing, among other things, the addition of 70 MWs of solar generation by 2028, and 1,200 MWs of natural gas combined cycle generation by 2031,
which are expected to require an estimated capital investment of approximately $2.5 billion, as detailed in the filing. See Note 13., "Regulatory Matters," of the
Combined Notes to Financial Statements of the Registrants for additional details.
FirstEnergy's Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $5.4 billion in FirstEnergy-owned rate
base as of December 31, 2025, includes transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The
segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a
projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net
transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities.
FirstEnergy's Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies,
including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or
businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. On July 16, 2025, FEV sold
its entire 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations, at
book value to WMB Marketing Ventures, LLC and Pinesdale LLC for $47.5 million. Also included in Corporate/Other for segment reporting is 67 MWs of
generation capacity, representing AE Supply’s OVEC capacity entitlement. As of December 31, 2025, Corporate/Other had approximately $6.8 billion of external
FE holding company debt.
Recent Developments
Investment Strategy
FirstEnergy invests in its regulated operations to improve reliability and the customer experience, and in its people to attract, retain and develop talented, diverse
and engaged employees to carry out its strategy.
31

-- 39 of 203 --

FirstEnergy recently increased its customer-focused Energize365 investment plan for the 2026 to 2030 time period to $36 billion, approximately 25% higher than
the previous 2025 to 2029 five-year plan, and aims to strengthen the grid, improve reliability and support growing customer demand. Through the Energize365
program, system-wide capital investments from 2026 to 2030 are expected to comprise the Distribution segment 28%, the Integrated segment 35%, and the
Stand-Alone Transmission segment 35%, focused on the following:
• Distribution and Transmission investments to support improvements in grid reliability and resiliency and support growing customer demand, including
through:
• Programs to drive system resiliency through automation technology and communication, including the Ohio Companies’ distribution grid
modernization plans, Pennsylvania's LTIIP, New Jersey's EnergizeNJ, and implementing advanced metering infrastructure;
• Operational flexibility projects that are expected to build capacity and support the evolving grid such as projects to support increased data
center load;
• Enhancing system performance by implementing new designs and technologies to reduce load at risk;
• Upgrading system conditions that enhance reliability; and
• Transmission projects awarded through the PJM Open Window to address regional expansion projects.
• Base distribution projects to address aging infrastructure.
• Generation maintenance projects that maintain operations of fossil electric generation facilities and remain compliant with environmental regulations
through the end of their useful life.
• FirstEnergy believes there is a continued long-term pipeline of investment opportunities for its existing distribution and transmission infrastructure
beyond those opportunities identified through 2030, which are expected to strengthen the grid and cyber security and make the transmission system
more reliable, robust, secure and resistant to extreme weather events, with improved operational flexibility.
Finance
FirstEnergy aims to execute its Energize365 investment plan through a strengthened financial position. Energize365 capital investments included in the current
five-year plan are expected to be funded with a combination of organic cash flows, the issuance of debt, including hybrid securities, and the issuance of common
equity. FirstEnergy believes it has optimized its financing plan to retain flexibility in an uncertain interest rate environment. FirstEnergy has also taken steps to
reduce potential volatility risk associated with its pension plan. In January 2025, FirstEnergy executed an additional pension lift-out transaction associated with
over $652 million in pension obligations relating to its former competitive generation employees. This lift-out transaction, combined with the lift-out completed in
2023, removed approximately $1.4 billion in total pension plan assets and obligations associated with approximately 3,900 former competitive generation
employees.
Dividend Growth
FirstEnergy continues to return value to shareholders. In February 2026, the FE Board declared a $0.02 per share increase to the quarterly cash common stock
dividend to $0.465 per share payable June 1, 2026, which represents a 4.5% increase compared to dividends declared in 2025. Modest dividend growth is
expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend payments are subject to
declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings, cash flows, credit metrics and general
economic and other business conditions.
Reorganization
On March 24, 2025, FirstEnergy internally announced organizational changes that are intended to align the organization with its new business model, which is
designed to make FirstEnergy more efficient and sustainable while placing responsibility and accountability closer to customers, employees and regulators. The
changes are also consistent with FirstEnergy’s focus on operations and maintenance expense discipline. As a result, FirstEnergy recognized a pre-tax charge of
approximately $26 million ($5 million at JCP&L) in the first quarter of 2025, which is included within “Other operating expenses” on each of the Registrants'
Statements of Income and Comprehensive Income.
Signal Peak Disposition
On July 16, 2025, FEV sold its entire 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal
transportation operations, at book value to WMB Marketing Ventures, LLC and Pinesdale LLC for $47.5 million, which is classified within cash flows from
investing activities - other of FirstEnergy’s Consolidated Statements of Cash Flows.
Valley Link
On February 21, 2025, FET, DominionHV and Transource entered into the Valley Link Operating Agreement, which established the general framework for Valley
Link and the Valley Link Subsidiaries to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to Valley Link.
This general framework includes parameters regarding the
32

-- 40 of 203 --

relationship among the three members, confers governance rights to its members so long as certain ownership percentages are maintained, as described below,
and defines the list of projects that Valley Link will have the right to develop. Valley Link is the owner of the Valley Link Subsidiaries, which are organized in
various states. On February 26, 2025, in response to the PJM 2024 RTEP Long-Term Proposal Window #1, PJM awarded two electric transmission projects to
Valley Link estimated to be approximately $3 billion, with FET’s share estimated to be approximately $1 billion.
Grid Growth
On February 13, 2026, FET and Transource entered into the Grid Growth Operating Agreement, which established the general framework for FET and
Transource to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to certain of the subsidiaries of Grid
Growth, on February 12, 2026. This general framework includes parameters regarding the relationship among the two members, confers governance rights to its
members so long as certain ownership percentages are maintained and defines the list of projects that Grid Growth will have the right to develop. Grid Growth is
the sole owner of Grid Growth Ohio and owns an 80% interest in Grid Growth EHV, with Transource owning the remaining interests. On February 12, 2026, in
response to the PJM 2025 RTEP Long-Term Proposal Window #1, PJM awarded a project to Grid Growth estimated to be approximately $1 billion, with FET’s
share estimated to be approximately $448 million.
Regulatory Matters - New Jersey
On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ petition with the NJBPU that would, among other things, support grid modernization,
system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. On February 14, 2024, the NJBPU approved
the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate increase. On February 27, 2024, as part of
the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of the base rate case settlement, to remove the
high-priority circuits that are to be addressed in the first phase of its reliability improvement plan and to include the second phase of its reliability improvement
plan that is expected to further address certain high-priority circuits that require additional upgrades. On April 10, 2025, JCP&L, joined by various parties, filed a
stipulated settlement with the NJBPU resolving JCP&L’s amended EnergizeNJ petition. The settlement provides for total program costs of $339 million, including
capital investments in JCP&L’s electric distribution system of approximately $203 million, $132 million of matching capital investments and approximately $4
million of O&M expense. Pursuant to the settlement, the program began on July 1, 2025, and will continue through December 31, 2028, and JCP&L has agreed
to file a base rate case no later than January 1, 2030.
Regulatory Matters - Ohio
On April 5, 2023, the Ohio Companies sought approval from the PUCO for their ESP V. The proposed plan would maintain an eight-year term beginning June 1,
2024, and continue riders recovering costs associated with distribution infrastructure investments and approved grid modernization investments. ESP V
additionally proposed new riders that would support reliability, and included provisions supporting affordability and enhancing the customer experience. On May
15, 2024, the PUCO issued an order approving ESP V with modifications, which are described in “Outlook - State Regulation - Ohio,” in Item 7., "Management's
Discussion and Analysis of Financial Condition and Results of Operations". On June 14, 2024, the Ohio Companies filed an application for rehearing, which was
denied by operation of law as the PUCO did not rule on the applications for rehearing within 30 days of filing. Due to the risks and uncertainty resulting from the
Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a notice of their intent to withdraw
ESP V and proposed the terms under which they would resume operating under ESP IV, which was approved by the PUCO on December 18, 2024. On January
22, 2025, the PUCO approved the Ohio Companies’ ESP IV compliance tariffs with an effective date of February 1, 2025, at which point the Ohio Companies
resumed operating under ESP IV with modifications, as described in “Outlook - State Regulation - Ohio,” in Item 7., "Management's Discussion and Analysis of
Financial Condition and Results of Operations". On April 7, 2025, certain intervenors filed an appeal to the Supreme Court of Ohio challenging the Ohio
Companies’ return to ESP IV. On May 22, 2025, the Supreme Court of Ohio granted the Ohio Companies motion to intervene in the appeal as appellees. On July
7, 2025, OCC and NOAC filed their Appellants’ brief. Appellees, including the Ohio Companies, filed their briefs on August 26, 2025, to which the OCC and
NOAC replied on September 15, 2025.
On January 31, 2025, the Ohio Companies filed an application with the PUCO for ESP VI, which would have begun concurrently with the effective date of any
new base distribution rates resulting from the Ohio Companies’ 2024 base rate case and continued through May 31, 2028. On May 15, 2025, the Ohio Governor
signed HB 15, which repealed the statute authorizing ESPs in Ohio, eliminating the PUCO’s ability to authorize future ESPs such as ESP VI. On December 17,
2025, the PUCO dismissed ESP VI due to the repeal of the ESP statute pursuant to HB 15. HB 15 permits the Ohio Companies to continue ESP IV until their
final auction delivery period on May 31, 2029, at which time ESP IV must terminate.
On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. The Ohio
Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44%
debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and
AMI. Key components of the base rate case filing included a proposal to change pension and OPEB recovery to the delayed recognition method and to
implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and
33

-- 41 of 203 --

OPEB expense requested in the proceeding and the actual amount each year using this method. Additionally, the Ohio Companies requested recovery of certain
incurred costs, including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed
supporting testimony and on July 31, 2024, filed an update with an adjusted net increase of base distribution revenues of approximately $190 million and
incorporated matters in the rate case as directed by the PUCO’s ESP V order. On December 18, 2024, the PUCO issued an order approving the Ohio
Companies’ withdrawal of ESP V. On January 22, 2025, the PUCO approved the Ohio Companies’ revised ESP IV tariffs, effective February 1, 2025, at which
time the Ohio Companies resumed operating under ESP IV. On January 27, 2025, the Ohio Companies notified the PUCO of their intention to update their
application for an increase in base distribution rates to remove ESP V related provisions from the base rate case. On November 19, 2025, the PUCO issued an
order in the rate case lifting the rate freeze and approving a net increase in base distribution revenues of the Ohio Companies of approximately $34 million, with
a return on equity of 9.63% and a hypothetical capital structure of 48.8% debt and 51.2% equity for all three Ohio Companies, which reflects a roll-in of current
riders such as DCR and AMI. The PUCO authorized continuance of Rider DCR with a cap increase commensurate with capital investments through January 31,
2025, and approved the Ohio Companies’ proposal to change pension and OPEB recovery to the delayed recognition method. Additionally, the order authorizes
recovery of certain deferred costs for storm restoration, operations and maintenance, and energy efficiency. As a result of the order, the Ohio Companies
recognized a $352 million pre-tax impairment charge related to the disallowance from future recovery of certain previously capitalized amounts. On November
26, 2025, the Ohio Companies filed proposed compliance tariffs. On December 19, 2025, the Ohio Companies and other parties filed applications for rehearing
and on December 29, 2025, the Ohio Companies filed a memorandum against intervenors’ applications for rehearing. On January 7, 2026, the PUCO issued an
entry granting rehearing in order to determine whether its November 19, 2025 base rate case opinion and order should be affirmed, abrogated, or modified on
rehearing. On January 9, 2026, the Ohio Companies filed an expedited motion for ruling on the proposed compliance tariffs and on February 4, 2026, PUCO
staff issued a letter recommending that most of the Ohio Companies’ proposed compliance tariffs be approved. The Ohio Companies cannot predict the outcome
of the rehearing, but do not expect material changes to the November 2025 order.
On May 15, 2025, the Ohio Governor signed HB 15 that, in addition to eliminating ESPs, requires, among other things, triennial base rate cases and allows them
to be based on a three-year forecasted test period, expedites PUCO review and disposition of future base rate cases, imposes annual reliability reporting,
increases protections for customers shopping with third-party suppliers, requires EDUs to develop and publicly share distribution system hosting capacity maps,
and reduces certain transmission and distribution property taxes beginning with property in-serviced in 2026. The legislation became effective August 14, 2025.
On November 19, 2025, the PUCO issued a separate order which assessed approximately $250 million in monetary penalties upon the Ohio Companies in
connection with the PUCO’s ongoing HB 6 audits and investigations. On December 19, 2025, the Ohio Companies and fourteen intervenors filed with the PUCO
an unopposed stipulation and recommendation that was intended to resolve several matters pending before the PUCO to which the Ohio Companies were a
party. The stipulation and recommendation, which was adopted in its entirety by the PUCO on January 7, 2026, vacated the amounts owed pursuant to the
November 19, 2025 order regarding its HB 6 audits and investigations and instead directed the Ohio Companies to pay its customers restitution and refunds
totaling approximately $275 million, among other things. The refunds will be paid out over three billing cycles beginning in February 2026.
The Ohio Companies anticipate filing a base rate distribution case with the PUCO in the second half of 2026.
Regulatory Matters - West Virginia
On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC. To ensure that MP and PE can meet their PJM adequacy requirements,
the plan proposes, among other things, near-term market capacity purchases and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural
gas combined cycle generation by 2031. On November 26, 2025, the WVPSC issued a procedural order setting a hearing for May 2026.
On February 13, 2026, MP and PE filed a CPCN to construct and operate a 1,200 MW combined cycle gas turbine plant and 70 MWs of solar generation
capacity for an estimated capital investment totaling approximately $2.7 billion as of the date of the filing. The request also includes a surcharge designed to
recover financing costs during development and construction of the projects, as well as to transition to recovery in base rates once the projects are placed in-
service and approved through a base rate case. An order is expected from the WVPSC in the second half of 2026.
MP and PE anticipate filing a base rate distribution case with the WVPSC in the second half of 2026.
Regulatory Matters - Maryland
PE anticipates filing a base rate distribution case with the MDPSC in the second half of 2026.
34

-- 42 of 203 --

HB 6 and Related Investigations
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the U.S. Attorney’s Office
investigation into FirstEnergy relating to FirstEnergy’s lobbying and governmental affairs activities concerning HB 6 related to the federal criminal allegations
made in July 2020, against former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. Among
other things under the DPA, FE paid a $230 million monetary penalty in 2021 and agreed to the filing of a criminal information charging FE with one count of
conspiracy to commit honest services wire fraud. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will
FirstEnergy seek any tax deduction related to such payment. As of July 22, 2024, FirstEnergy had successfully completed the obligations required within the
three-year term of the DPA. Under the DPA, FirstEnergy has an obligation to continue: (i) publishing quarterly a list of all payments to 501(c)(4) entities and all
payments to entities known by FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict
the DPA; (iii) notifying the U.S. Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the
conclusion of any related investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office, including the January 17, 2025,
indictment against two former FirstEnergy senior officers, as described below in “Outlook -- Other Legal Proceedings - U.S. v. Larry Householder, et al.,” in Item
7., "Management's Discussion and Analysis of Financial Condition and Results of Operations". Within 30 days of those matters concluding, and FirstEnergy’s
successful completion of its remaining obligations, the U.S. Attorney’s Office will dismiss the criminal information.
See “Outlook - Other Legal Proceedings” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional
details regarding the DPA, and ongoing litigation surrounding the investigation of HB 6. See also “Outlook - State Regulation - Ohio” in Item 7., "Management's
Discussion and Analysis of Financial Condition and Results of Operations" for details on the now-resolved PUCO proceeding reviewing political and charitable
spending and legislative activity in response to the investigation of HB 6. The outcome of the legislative activity, and any of these lawsuits is uncertain and could
have a material adverse effect on FirstEnergy’s financial condition, results of operations and cash flows. The FirstEnergy leadership team remains committed
and focused on executing its strategy and running the business.
35

-- 43 of 203 --

FIRSTENERGY'S CONSOLIDATED RESULTS OF OPERATIONS
2025 Compared with 2024
(In millions) 	For the Years Ended December 31,
2025 	2024 	Increase (Decrease)
Revenues 	$ 	15,090 $ 	13,472 $ 	1,618 	12 %
Operating expenses 	12,884 	11,097 	1,787 	16 %
Other expenses, net 	(647) 	(871) 	224 	26 %
Income taxes 	288 	377 	(89) 	(24)%
Income attributable to noncontrolling interest 	251 	149 	102 	68 %
Earnings attributable to FE 	$ 	1,020 $ 	978 $ 	42 	4 %
Earnings attributable to FE was $1,020 million or $1.77 per basic share ($1.76 per diluted share) in 2025 compared to $978 million or $1.70 per basic and diluted
share in 2024, representing an increase of $42 million that was primarily due to the following:
• The absence of the $100 million civil penalty resulting from the SEC investigation and the $19.5 million settlement with the OAG’s office in 2024;
• The absence of $200 million (pre-tax) in charges related to changes in ARO liabilities associated with new CCR rules and the McElroy’s Run
impoundment facility in 2024 and a $49 million reduction in ARO liabilities in 2025 based on the completion of engineering studies and field analysis of
certain sites;
• 	The absence of a $53 million (pre-tax) charge at JCP&L in connection with the base rate case settlement agreement in the first quarter of 2024, as
further discussed below;
• The absence of a $32.5 million (pre-tax) contribution commitment by the Ohio Companies, as a result of the PUCO’s ESP V order in the second quarter
of 2024;
• Higher earnings associated with the implementation of base rate cases in New Jersey, West Virginia and Pennsylvania;
• Higher customer usage and demand;
• Higher revenues from regulated capital investments that increased rate base;
The absence of the $62 million (pre-tax) impairment charge related to the Akron general office in the third quarter of 2024;
• Lower debt redemptions costs of $61 million (pre-tax); and
• Higher income tax benefits primarily related to an increase in the remeasurement of excess deferred income taxes compared to 2024, and the absence
of discrete tax charges related to the FET Equity Interest Sale and PA Consolidation in the first quarter of 2024.
These factors were partially offset by the following:
• A $352 million (pre-tax) impairment charge recognized in the fourth quarter of 2025 related to disallowances in the Ohio base rate case resulting from
the PUCO-approved order;
• A $275 million (pre-tax) charge recognized in the fourth quarter of 2025 resulting from the Ohio Companies' PUCO-approved settlement that will provide
restitution and refunds to customers;
• The absence of $151 million (pre-tax) net proceeds from the shareholder derivative lawsuit settlement received in the second quarter of 2024;
• The absence of a $60 million (pre-tax) benefit associated with the approval by the WVPSC to recover costs of certain retired generation stations in the
first quarter of 2024;
• The absence of a $46 million (pre-tax) charge in the fourth quarter of 2024 from the expected elimination of the 50 basis point ROE adder associated
with ATSI’s RTO membership as a result of the Sixth Circuit ruling;
• Higher depreciation expense due to a higher asset base;
• Higher other operating expenses, primarily due to higher employee benefit costs and planned vegetation management expenses, partially offset by
increased construction support and lower maintenance work;
• Lower investment earnings of $58 million (pre-tax) primarily related to FEV’s equity method investment in Global Holding, which, as discussed above,
was sold on July 16, 2025;
• The absence of $24 million (pre-tax) of interest income related to the FET Equity Interest Sale, the purchase price of which was paid in part by the
issuance of promissory notes;
• Costs associated with organizational changes announced in March 2025;
• The dilutive effect of the FET Equity Interest Sale that closed in March 2024; and
• Lower customer credits associated with the PUCO-approved Ohio Stipulation.
Detailed segment reporting explanations are included below.
36

-- 44 of 203 --

Distribution services by customer class are summarized in the following table:
For the Years Ended December 31,
(In thousands) 	Actual 	Weather-Adjusted
Electric Distribution MWh Deliveries 	2025 	2024 Increase
(Decrease) 	2025 	2024 Increase
(Decrease)
Residential 	56,397 	54,631 	3.2 % 	55,520 	55,447 	0.1 %
Commercial 	39,734 	39,020 	1.8 % 	39,641 	39,298 	0.9 %
Industrial 	52,321 	52,951 	(1.2)% 	52,321 	52,951 	(1.2)%
Total Electric Distribution MWh Deliveries 	148,452 	146,602 	1.3 % 	147,482 	147,696 	(0.1)%
Reflects the reclassification of certain Pennsylvania customers from Industrial to Commercial. Due to the January 2024 consolidation of the Pennsylvania
Companies, certain customers are classified as Commercial effective June 1, 2024. The MWh deliveries prior to the effective date have been adjusted for
comparability.
Includes street lighting.
Actual distribution deliveries in 2025 for the residential and commercial customer classes were higher than 2024, primarily due to impacts of weather
temperatures. Cooling degree days in 2025 were 12% below 2024 and flat to normal. Heating degree days in 2025 were 19% above 2024 and 3% above
normal.
The financial results discussed below in Segment Results of Operations include revenues and expenses from transactions among FirstEnergy’s business
segments. A reconciliation of segment financial results is provided in Note 15., “Segment Information,” of the Combined Notes to Financial Statements of the
Registrants.
(1)
(2)
(1)
(2)
37

-- 45 of 203 --

Summary of Segment Results of Operations — 2025 Compared with 2024
Financial results for FirstEnergy’s business segments for the years ended December 31, 2025 and 2024, were as follows:
2025 Financial Results
(In millions) 	Distribution 	Integrated Stand-Alone
Transmission
Corporate/Other and
Reconciling
Adjustments FirstEnergy
Consolidated
Revenues:
Electric 	$ 	7,387 $ 	5,620 $ 	1,886 $ 	18 $ 	14,911
Other 	160 	63 	19 	(63) 	179
Total Revenues 	7,547 	5,683 	1,905 	(45) 	15,090
Operating Expenses:
Fuel 	— 	652 	— 	— 	652
Purchased power 	2,458 	2,105 	— 	20 	4,583
Other operating expenses 	2,479 	1,416 	328 	(101) 	4,122
Provision for depreciation 	655 	562 	369 	78 	1,664
Amortization (deferral) of regulatory assets, net 	(103) 	(12) 	6 	— 	(109)
General taxes 	849 	143 	303 	50 	1,345
Ohio settlement charges 	275 	— 	— 	— 	275
Impairment of assets 	352 	— 	— 	— 	352
Total Operating Expenses 	6,965 	4,866 	1,006 	47 	12,884
Other Income (Expense):
Debt redemption costs 	— 	— 	— 	(24) 	(24)
Miscellaneous income (expense), net 	100 	80 	20 	(44) 	156
Pension and OPEB mark-to-market adjustments 	125 	98 	23 	7 	253
Interest expense 	(399) 	(284) 	(322) 	(212) 	(1,217)
Capitalized financing costs 	29 	67 	87 	2 	185
Total Other Expense 	(145) 	(39) 	(192) 	(271) 	(647)
Income taxes (benefits) 	74 	190 	99 	(75) 	288
Income attributable to noncontrolling interest 	— 	— 	251 	— 	251
Earnings (Losses) Attributable to FE 	$ 	363 $ 	588 $ 	357 $ 	(288) $ 	1,020
2024 Financial Results
(In millions) 	Distribution 	Integrated Stand-Alone
Transmission
Corporate/Other and
Reconciling
Adjustments FirstEnergy
Consolidated
Revenues:
Electric 	$ 	6,703 $ 	4,815 $ 	1,768 $ 	9 $ 	13,295
Other 	160 	61 	19 	(63) 	177
Total Revenues 	6,863 	4,876 	1,787 	(54) 	13,472
Operating Expenses:
Fuel 	— 	464 	— 	— 	464
Purchased power 	2,219 	1,670 	— 	23 	3,912
Other operating expenses 	2,378 	1,254 	347 	65 	4,044
Provision for depreciation 	648 	521 	336 	76 	1,581
Amortization (deferral) of regulatory assets, net 	(171) 	(66) 	6 	— 	(231)
General taxes 	752 	140 	279 	41 	1,212
Impairment of assets 	30 	70 	12 	3 	115
Total Operating Expenses 	5,856 	4,053 	980 	208 	11,097
Other Income (Expense):
Debt redemption costs 	— 	— 	— 	(85) 	(85)
Equity method investment earnings, net 	— 	— 	— 	58 	58
Miscellaneous income (expense), net 	124 	54 	18 	(7) 	189
Pension and OPEB mark-to-market adjustments 	36 	26 	6 	(90) 	(22)
Interest expense 	(432) 	(262) 	(275) 	(175) 	(1,144)
Capitalized financing costs 	24 	47 	60 	2 	133
Total Other Expense 	(248) 	(135) 	(191) 	(297) 	(871)
Income taxes (benefits) 	135 	153 	173 	(84) 	377
Income attributable to noncontrolling interest 	— 	— 	149 	— 	149
Earnings (Losses) Attributable to FE 	$ 	624 $ 	535 $ 	294 $ 	(475) $ 	978
38

-- 46 of 203 --

Changes Between 2025 and 2024
Financial Results
Increase (Decrease) 	Distribution 	Integrated Stand-Alone
Transmission
Corporate/Other and
Reconciling
Adjustments FirstEnergy
Consolidated
(In millions)
Revenues:
Electric 	$ 	684 $ 	805 $ 	118 $ 	9 $ 	1,616
Other 	— 	2 	— 	— 	2
Total Revenues 	684 	807 	118 	9 	1,618
Operating Expenses:
Fuel 	— 	188 	— 	— 	188
Purchased power 	239 	435 	— 	(3) 	671
Other operating expenses 	101 	162 	(19) 	(166) 	78
Provision for depreciation 	7 	41 	33 	2 	83
Amortization (deferral) of regulatory assets, net 	68 	54 	— 	— 	122
General taxes 	97 	3 	24 	9 	133
Ohio settlement charges 	275 	— 	— 	— 	275
Impairment of assets 	322 	(70) 	(12) 	(3) 	237
Total Operating Expenses 	1,109 	813 	26 	(161) 	1,787
Other Income (Expense):
Debt redemption costs 	— 	— 	— 	61 	61
Equity method investment earnings, net 	— 	— 	— 	(58) 	(58)
Miscellaneous income (expense), net 	(24) 	26 	2 	(37) 	(33)
Pension and OPEB mark-to-market adjustments 	89 	72 	17 	97 	275
Interest expense 	33 	(22) 	(47) 	(37) 	(73)
Capitalized financing costs 	5 	20 	27 	— 	52
Total Other Expense 	103 	96 	(1) 	26 	224
Income taxes (benefits) 	(61) 	37 	(74) 	9 	(89)
Income attributable to noncontrolling interest 	— 	— 	102 	— 	102
Earnings (Losses) Attributable to FE 	$ 	(261) $ 	53 $ 	63 $ 	187 $ 	42
39

-- 47 of 203 --

Distribution Segment — 2025 Compared with 2024
Distribution segment's earnings attributable to FE decreased $261 million in 2025, as compared to 2024, primarily due to charges recognized in the fourth
quarter of 2025 resulting from the Ohio Companies' PUCO-approved settlement that will provide $275 million in restitution and refunds to customers, and $352
million in impairment charges resulting from the PUCO-approved base rate case order, partially offset by higher revenues associated with the implementation of
the Pennsylvania base rate case, higher customer usage and demand, and higher Pension and OPEB mark-to-market adjustments.
Revenues —
Distribution's total revenues increased $684 million as a result of the following sources:
For the Years Ended December 31,
Revenues by Type of Service 	2025 	2024 	Increase
(In millions)
Distribution services 	$ 	4,627 $ 	4,180 $ 	447
Generation sales:
Retail 	2,744 	2,517 	227
Wholesale 	16 	6 	10
Total generation sales 	2,760 	2,523 	237
Other 	160 	160 	—
Total Revenues 	$ 	7,547 $ 	6,863 $ 	684
Distribution services revenues increased $447 million in 2025, as compared to 2024, primarily resulting from higher customer usage due to colder weather
temperatures in the first and fourth quarters, lower customer credits associated with the PUCO-approved Ohio Stipulation, and higher revenues associated with
the implementation of the Pennsylvania base rate case, partially offset by milder weather temperatures in the second quarter that lowered customer usage and
demand. Additionally, revenues increased due to the higher recovery of transmission expenses, which have no material impact to earnings.
Generation sales revenues increased $237 million in 2025, as compared to 2024, primarily due to higher non-shopping generation auction rates, higher retail
generation sales volumes as a result of colder weather temperatures in the first and fourth quarters, and lower shopping, which increased sales volumes. Total
generation provided by alternative suppliers as a percentage of total MWh deliveries for the Ohio Companies and FE PA decreased to 89% from 90% in Ohio
and to 62% from 63% in Pennsylvania, as compared to 2024. Retail and wholesale generation sales revenue have no material impact to earnings.
Operating Expenses —
Total operating expenses increased $1,109 million, primarily due to the following:
• Purchased power costs, which have no material impact to earnings, increased $239 million in 2025, as compared to 2024, primarily due to higher
generation sales volumes and unit costs, as described above.
• Other operating expenses increased $101 million in 2025, as compared to 2024, primarily due to:
• Higher network transmission expenses of $69 million, which are deferred for future recovery, resulting in no material impact to earnings;
• Higher planned and accelerated vegetation management expenses of $54 million, primarily in Pennsylvania as approved and recovering in the
base rate case;
• Higher uncollectible expenses of $22 million, of which $15 million were deferred for future recovery;
• 	Higher energy efficiency and other state mandated program costs of $65 million, which were deferred for future recovery, resulting in no
material impact to earnings; and
• 	Higher other operating expense of $57 million, primarily due to severance and related costs associated with FirstEnergy’s organizational
changes announced in the first quarter of 2025, higher employee benefit costs, and higher material and contractor expenses, partially offset by
increased construction support and lower maintenance work.
This increase was partially offset by:
• The absence of a $32.5 million contribution commitment by the Ohio Companies, as a result of the PUCO’s ESP V order in the second quarter
of 2024;
40

-- 48 of 203 --

• The absence of a $46 million charge during the second quarter of 2024 related to changes in ARO liabilities associated with new CCR rules;
and
• Lower storm restoration expenses of $88 million in 2025 as compared to 2024, which were mostly deferred for future recovery.
• Depreciation expense increased $7 million in 2025, as compared to 2024, primarily due to a higher asset base.
• Deferral of regulatory assets decreased $68 million in 2025, as compared to 2024, primarily due to a $79 million net decrease from lower deferred
storm restoration expenses, a $21 million net decrease in generation and transmission related deferrals and a $10 million net decrease in other
deferrals, partially offset by $42 million of higher net amortization expenses resulting from recovery of previously deferred storm costs and customer
assistance programs from the implementation of the Pennsylvania base rate case in 2025.
• General taxes increased $97 million in 2025, as compared to 2024, primarily due to higher gross receipts and Ohio personal property taxes.
• Impairment of assets increased $322 million in 2025, as compared to 2024, due to a $352 million impairment charge related to disallowances in the
Ohio base rate case resulting from the PUCO-approved order, partially offset by the absence of a $30 million impairment charge related to the Akron
general office in the third quarter of 2024.
Other Expense —
Other expense decreased $103 million in 2025, as compared to 2024, primarily due to higher pension and OPEB mark-to-market adjustments and higher
capitalized interest, partially offset by lower interest income on regulated money pool investments. Additionally, interest expense decreased primarily as a result
of debt redemptions since 2024, partially offset by new debt issued in 2025.
Income Taxes —
Distribution segment's effective tax rate was 16.9% and 17.8% for 2025 and 2024, respectively. The decrease in the effective tax rate was primarily due to an
increase in the benefit from state related flow-through items, partially offset by the absence of a discrete tax benefit from a remeasurement of excess deferred
income taxes recognized in 2024.
41

-- 49 of 203 --

Integrated Segment — 2025 Compared with 2024
Integrated segment’s earnings attributable to FE increased $53 million in 2025, as compared to 2024, primarily due to the implementation of base rate cases in
New Jersey and West Virginia in 2025, higher customer usage and demand, higher revenues from regulated investment programs, and the absence of a $53
million charge at JCP&L in connection with the base rate case settlement agreement in the first quarter of 2024, as further discussed below, partially offset by
costs associated with the announced organizational changes and the absence of a benefit associated with the approval by the WVPSC to recover costs of
certain retired generation stations in the first quarter of 2024.
Revenues —
Integrated segment’s total revenues increased $807 million as a result of the following sources:
For the Years Ended December 31,
Revenues by Type of Service 	2025 	2024 	Increase
(In millions)
Distribution services 	$ 	1,698 $ 	1,600 $ 	98
Generation sales:
Retail 	3,120 	2,689 	431
Wholesale 	377 	146 	231
Total generation sales 	3,497 	2,835 	662
Transmission revenues:
JCP&L 	259 	243 	16
MP & PE 	166 	137 	29
Total transmission revenues 	425 	380 	45
Other 	63 	61 	2
Total Revenues 	$ 	5,683 $ 	4,876 $ 	807
Distribution services revenues increased $98 million in 2025, as compared to 2024, primarily resulting from higher customer usage as a result of colder weather
temperatures in the first and fourth quarters, higher revenues from the implementation of base rate cases, and higher rider revenues associated with certain
regulated investment programs, partially offset by lower customer usage as a result of the milder weather temperatures in the second and third quarters of 2025.
Additionally, revenues increased due to the higher recovery of transmission expenses, which have no material impact to earnings.
Generation sales revenues increased $662 million in 2025, as compared to 2024, primarily due to higher retail and wholesale revenues.
• Retail generation sales increased $431 million in 2025, as compared to 2024, primarily due to higher non-shopping generation auction rates and higher
volumes as a result of colder weather temperatures in the first and fourth quarters. Retail generation sales, other than those in West Virginia, have no
material impact to earnings.
• Wholesale generation revenues increased $231 million in 2025, as compared to 2024, primarily due to higher sales volumes, wholesale rates and
capacity revenues. The difference between current wholesale generation revenues and certain energy costs incurred is deferred for future recovery or
refund, with no material impact to earnings.
Transmission revenues increased $45 million in 2025, as compared to 2024, primarily due to higher rate base from regulated investment programs and higher
recovery of transmission operating expenses.
Operating Expenses —
Total operating expenses increased $813 million in 2025, as compared to 2024, primarily due to:
• Fuel costs increased $188 million in 2025, as compared to 2024, primarily due to higher unit costs and higher consumption volumes. Due to the ENEC,
fuel expense has no material impact to earnings.
• Purchased power costs, which have no material impact to earnings, increased $435 million in 2025, as compared to 2024, primarily due to higher unit
costs and capacity expenses.
42

-- 50 of 203 --

• Other operating expenses increased $162 million in 2025, as compared to 2024, primarily due to:
• Higher network transmission expenses of $50 million, which were deferred for future recovery, resulting in no material impact to earnings;
• Higher uncollectible expenses of $5 million, which were deferred for future recovery;
• 	Higher other operating expenses of $41 million, primarily due to severance and related costs associated with FirstEnergy’s organizational
changes announced in the first quarter of 2025, higher employee benefit costs and higher material and contractor spend, partially offset by
increased construction support and lower maintenance work;
• 	Higher energy efficiency and other state mandated program costs of $72 million, which were deferred for future recovery, resulting in no
material impact to earnings;
• Higher formula rate transmission operating and maintenance expenses of $5 million, which have no material impact to earnings; and
• Higher storm restoration expenses of $22 million, which were mostly deferred for future recovery.
This increase was partially offset by:
• The absence of a $33 million change in ARO liabilities associated with new CCR rules in 2024 and a reduction in 2025 based on the completion
of engineering studies and field analysis of certain sites.
• Depreciation expense increased $41 million in 2025, as compared to 2024, primarily due to a higher asset base.
• Deferral of regulatory assets decreased $54 million in 2025, as compared to 2024, primarily due to the absence of the approval in the first quarter of
2024 to recover $60 million in costs of certain retired generation stations approved by the WVPSC, a $24 million adjustment associated with smart
meter cost of removal expenses associated with the deployment of the AMI program in New Jersey, a $24 million decrease due to the absence of the
amortization of a regulatory liability related to customer refunds in 2024 and a $1 million net decrease in other deferrals, partially offset by a $33 million
net increase from higher generation and transmission related deferrals, and $22 million in higher deferral of storm related expenses including the
absence of the approval in the first quarter of 2024 to recover $11 million in previously incurred storm costs.
• Impairment of assets decreased $70 million in 2025, as compared to 2024, due to:
• The absence of a $53 million pre-tax charge at JCP&L in the first quarter of 2024 associated with certain corporate support costs recorded to
capital accounts from the FERC Audit that were determined, as a result of the base rate case settlement agreement, to be disallowed from
future recovery; and
• The absence of a $17 million impairment charge related to the Akron general office in the third quarter of 2024.
Other Expense —
Other expense decreased $96 million in 2025, as compared to 2024, primarily due the absence of certain nonrecoverable charges recognized in 2024, higher
capitalized interest and higher Pension and OPEB mark-to-market adjustments. Additionally, interest expense decreased, primarily due to lower average short-
term borrowings and debt redemptions in the fourth quarter of 2025, partially offset by new debt issuances since 2024.
Income Taxes —
Integrated segment’s effective tax rate was 24.4% and 22.2% in 2025 and 2024, respectively. The increase in the effective tax rate was primarily due to the
absence of a discrete tax benefit related to a remeasurement of excess deferred income taxes recognized in the third quarter of 2024, partially offset by the
absence of a tax charge recognized in the first quarter of 2024 related to the remeasurement of a valuation allowance for the expected utilization of certain NOL
carryforwards.
43

-- 51 of 203 --

Stand-Alone Transmission Segment — 2025 Compared with 2024
Stand-Alone Transmission’s earnings attributable to FE increased $63 million in 2025, as compared to 2024, primarily due to a discrete tax benefit related to a
remeasurement of excess deferred income taxes in the third quarter of 2025, the absence of a charge for an expected refund, with interest, in the fourth quarter
of 2024 as a result of the Sixth Circuit ruling eliminating the 50 basis point adder associated with RTO membership, the absence of a discrete tax charge related
to the FET Equity Interest Sale in the first quarter of 2024, and higher revenues from regulated capital investments that increased rate base, partially offset by
the dilutive effect of the FET Equity Interest Sale that closed in March 2024 and true-up adjustments from the annual forward looking transmission rate filings.
Revenues —
Total revenues increased $118 million in 2025, as compared to 2024, primarily due to a higher rate base, the absence of a charge for an expected refund, with
interest, in the fourth quarter of 2024 as a result of the Sixth Circuit ruling eliminating the 50 basis point adder associated with RTO membership, and higher
recovery of transmission operating expenses, partially offset by true-up adjustments from the annual forward looking transmission rate filings.
For the Years Ended December 31,
Revenues by Transmission Asset Owner 	2025 	2024 Increase
(Decrease)
(In millions)
ATSI 	$ 	1,068 $ 	990 $ 	78
TrAIL 	265 	274 	(9)
MAIT 	487 	440 	47
KATCo 	85 	85 	—
Other 	— 	(2) 	2
Total Revenues 	$ 	1,905 $ 	1,787 $ 	118
Operating Expenses —
Total operating expenses increased $26 million in 2025, as compared to 2024, primarily due to higher depreciation and property tax expenses from a higher
asset base, partially offset by lower operating and maintenance expenses and the absence of a $12 million impairment charge associated with the Akron general
office in the third quarter of 2024. Other than the impairment charge, nearly all operating expenses are recovered through formula rates.
Other Expense —
Total other expense increased $1 million in 2025, as compared to 2024, primarily due to higher interest expenses from new long-term debt issuances, partially
offset by higher capitalized financing costs, higher pension and OPEB mark-to-market adjustment, and the absence of a prior year non-recoverable charge.
Income Taxes —
Stand-Alone Transmission's effective tax rate was 14.0% and 28.1% for 2025 and 2024, respectively. The decrease in the effective tax rate was primarily due to
a discrete tax benefit related to a remeasurement of excess deferred income taxes recognized in the third quarter of 2025, and the absence of a tax charge
related to the FET Equity Interest Sale in the first quarter of 2024.
44

-- 52 of 203 --

Corporate/Other — 2025 Compared with 2024
Financial results from Corporate/Other resulted in a $187 million decrease in losses attributable to FE for 2025 compared to 2024, primarily due to:
• The absence of the $100 million civil penalty resulting from the SEC investigation and the $19.5 million settlement with the OAG's office in 2024;
• $134 million (after-tax) due to the absence of a charge related to changes in ARO liabilities associated with the new CCR rules and the McElroy's Run
CCR impoundment facility in 2024, and a reduction in ARO liabilities in 2025 based on the completion of engineering studies and field analysis of
certain sites;
• $82 million (after-tax) due to the change in the pension and OPEB mark-to-market adjustment; and
$47 million (after-tax) of lower debt redemption costs.
The decrease in losses were partially offset by:
• The absence of $116 million (after-tax) of net proceeds from the shareholder derivative lawsuit settlement received in 2024;
• $48 million (after-tax) in lower investment earnings related to FEV’s equity method investment in Global Holding, which as discussed above, was sold
on July 16, 2025;
• $27 million (after-tax) in lower pension/OPEB non-service credits primarily due to lower expected returns on plan asset credits, partially offset by lower
interest costs;
• The absence of $19 million (after-tax) of interest income related to the FET Equity Interest Sale, the purchase price of which was paid in part by the
issuance of promissory notes; and
• Lower discrete income tax benefits in 2025, partially offset by the absence of a discrete tax charge related to the PA Consolidation in the first quarter of
2024.
REGULATORY ASSETS AND LIABILITIES
Regulatory assets represent incurred costs that have been deferred because of their probable future recovery from customers through regulated rates.
Regulatory liabilities represent amounts that are expected to be credited to customers through future regulated rates or amounts collected from customers for
costs not yet incurred. The Registrants net their regulatory assets and liabilities based on federal and state jurisdictions.
Management assesses the probability of recovery of regulatory assets, and settlement of regulatory liabilities, at each balance sheet date and whenever new
events occur. Factors that may affect probability relate to changes in the regulatory environment, issuance of a regulatory commission order or passage of new
legislation. Upon material changes to these factors, where applicable, FirstEnergy will record new regulatory assets and liabilities and will assess whether it is
probable that currently recorded regulatory assets and liabilities will be recovered or settled in future rates.
FirstEnergy has regulatory assets of $829 million and $617 million, and regulatory liabilities of $1,185 million and $995 million as of December 31, 2025 and
2024, respectively. The following table provides information about the composition of FirstEnergy's net regulatory assets and liabilities as of December 31, 2025
and 2024, and the changes during the year 2025:
As of December 31,
Net Regulatory Assets (Liabilities) by Source - FirstEnergy 	2025 	2024 	Change
(In millions)
Customer payables for future income taxes 	$ 	(2,041) $ 	(2,234) $ 	193
Spent nuclear fuel disposal costs 	(76) 	(72) 	(4)
Asset removal costs 	(675) 	(681) 	6
Deferred transmission costs 	(43) 	190 	(233)
Deferred generation costs 	405 	481 	(76)
Deferred distribution costs 	466 	287 	179
Storm-related costs 	1,122 	1,015 	107
Energy efficiency program costs 	462 	349 	113
New Jersey societal benefit costs 	80 	87 	(7)
Vegetation management costs 	153 	125 	28
Ohio settlement charges 	(250) 	— 	(250)
Other 	41 	75 	(34)
Net Regulatory Liabilities included on FirstEnergy Consolidated Balance Sheets 	$ 	(356) $ 	(378) $ 	22
45

-- 53 of 203 --

The following table provides information about the composition of JCP&L's net regulatory assets and liabilities as of December 31, 2025 and 2024, and the
changes during the year 2025:
As of December 31,
Net Regulatory Assets (Liabilities) by Source - JCP&L 	2025 	2024 	Change
(In millions)
Customer payables for future income taxes 	$ 	(393) $ 	(410) $ 	17
Spent nuclear fuel disposal costs 	(76) 	(72) 	(4)
Asset removal costs 	(87) 	(101) 	14
Deferred transmission costs 	(25) 	(3) 	(22)
Deferred distribution costs 	318 	206 	112
Storm-related costs 	367 	310 	57
Energy efficiency program costs 	316 	208 	108
New Jersey societal benefit costs 	80 	87 	(7)
Other 	15 	22 	(7)
Net Regulatory Assets included on JCP&L's Balance Sheets 	$ 	515 $ 	247 $ 	268
Previously issued 2024 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the
Combined Notes to Financial Statements of the Registrants.
The following is a description of the regulatory assets and liabilities described above:
Customer payables for future income taxes - Reflects amounts to be recovered or refunded through future rates to pay income taxes that become
payable when rate revenue is provided to recover items such as AFUDC equity and depreciation of PP&E for which deferred income taxes were not
recognized for ratemaking purposes, including amounts attributable to federal and state tax rate changes such as the TCJA and Pennsylvania House
Bill 1342. These amounts are being amortized over the period in which the related deferred tax assets reverse, which is generally over the expected life
of the underlying asset.
Spent nuclear fuel disposal costs - Reflects amounts collected from customers, and the investment income, losses and changes in fair value of the
trusts for spent nuclear fuel disposal costs related to former nuclear generation facilities, Oyster Creek and Three Mile Island Unit 1.
Asset removal costs - Primarily represents the rates charged to customers that include a provision for the cost of future activities to remove assets,
including obligations for which an ARO has been recognized, that are expected to be incurred at the time of retirement.
Deferred transmission costs - Reflects differences between revenues earned based on actual costs for the formula-rate Transmission Companies
and the amounts billed. Also included is the recovery of non-market based costs or fees charged to certain of the Electric Companies by various
regulatory bodies including FERC and RTOs, which can include PJM charges and credits for service including, but not limited to, procuring transmission
services and transmission enhancement.
Deferred generation costs - Primarily relates to regulatory assets associated with the securitized recovery of certain fuel and purchased power
regulatory assets at the Ohio Companies (amortized through 2034), the Warrior Run purchase power agreement termination fee at PE (amortized
through 2029), and the ENEC at MP and PE. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related
expenses, net of related market sales revenue through the ENEC. Generally, the ENEC rate is updated annually.
Deferred distribution costs - Primarily relates to New Jersey temporary residential bill credits (amortized through February 2026), the Ohio
Companies' deferral of certain distribution-related expenses, including interest (amortized through 2034) and JCP&L's AMI program costs.
Storm-related costs - Relates to the deferral of storm costs, which vary by jurisdiction. Approximately $335 million and $73 million for FE and JCP&L,
respectively, are currently being recovered through rates as of December 31, 2025. Approximately $402 million and $41 million for FE and JCP&L,
respectively, are currently being recovered through rates as of December 31, 2024.
Energy efficiency program costs - Relates to the recovery of costs in excess of revenues associated with energy efficiency programs including New
Jersey energy efficiency and renewable energy programs, FE PA's Energy Efficiency and Conservation programs, the Ohio Companies' Demand Side
Management and Energy Efficiency Rider, and PE's EmPOWER Maryland Surcharge. Investments in certain of these energy efficiency programs earn
a long-term return.
(1)
(1)
46

-- 54 of 203 --

New Jersey societal benefit costs - Primarily relates to regulatory assets associated with MGP remediation, universal service and lifeline funds, and
the New Jersey Clean Energy program.
Vegetation management costs - Relates to regulatory assets associated with the recovery of certain distribution vegetation management costs in New
Jersey, certain distribution and transmission vegetation management costs in West Virginia, and certain transmission vegetation management costs at
ATSI (amortized through 2030) and KATCo (amortized through 2036).
Ohio settlement charges - Reflects refunds and restitution owed to customers associated with the Ohio Companies' PUCO-approved settlement
order. See Note 13., "Regulatory Matters," of the Combined Notes to Financial Statements of the Registrants for additional details.
The following table provides information about the composition of FirstEnergy's net regulatory assets that do not earn a current return as of December 31, 2025
and 2024, of which approximately $802 million and $698 million, respectively, are currently being recovered through rates over varying periods, through 2068,
depending on the nature of the deferral and the jurisdiction:
Regulatory Assets by Source Not Earning a 	As of December 31,
Current Return - FirstEnergy 	2025 	2024 	Change
(In millions)
Deferred generation costs 	$ 	280 $ 	314 $ 	(34)
Deferred distribution costs 	199 	153 	46
Storm-related costs 	844 	694 	150
Other 	102 	82 	20
FirstEnergy's Regulatory Assets Not Earning a Current Return 	$ 	1,425 $ 	1,243 $ 	182
The following table provides information about the composition of JCP&L's net regulatory assets that do not earn a current return as of December 31, 2025 and
2024, of which approximately $76 million and $45 million, respectively, are currently being recovered through rates over varying periods, through 2068,
depending on the nature of the deferral:
Regulatory Assets by Source Not Earning a 	As of December 31,
Current Return - JCP&L 	2025 	2024 	Change
(In millions)
Deferred distribution costs 	$ 	147 $ 	101 $ 	46
Storm-related costs 	367 	310 	57
Other 	24 	28 	(4)
JCP&L's Regulatory Assets Not Earning a Current Return 	$ 	538 $ 	439 $ 	99
CAPITAL RESOURCES AND LIQUIDITY
The Registrants' businesses are capital intensive, requiring significant resources to fund operating expenses, construction and other investment expenditures,
scheduled debt maturities and interest payments, dividend payments and potential contributions to its pension plan.
The Registrants expect their existing sources of liquidity to remain sufficient to meet their respective anticipated obligations. In addition to internal sources to
fund liquidity and capital requirements for 2026 and beyond, the Registrants expect to rely on external sources of funds. Short-term cash requirements not met
by cash provided from operations are generally satisfied through short-term borrowings. Long-term cash needs may be met through the issuance of long-term
debt by the Registrants, which may include hybrid securities by FE, to, among other things, fund capital expenditures and other capital-like investments and
refinance short-term and maturing long-term debt, subject to market conditions and other factors. Additionally, FE may issue its common equity to fund capital
expenditures in its 2026 through 2030 planning period averaging approximately 1% of its now current market capitalization in each year of the planning period,
subject to market conditions and other factors.
47

-- 55 of 203 --

Capital investments by business segment for FirstEnergy are included below:
FirstEnergy Business Segment 	2023 Actual 	2024 Actual
2025
Actual
Distribution 	$ 	1,020 $ 	1,285 $ 	1,620
Integrated 	1,336 	1,690 	2,081
Stand-Alone Transmission 	1,273 	1,427 	1,765
Corporate/Other 	118 	97 	90
Total - FirstEnergy 	$ 	3,747 $ 	4,499 $ 	5,556
Includes capital expenditures and capital-like investments that earn a return.
Capital investments by business segment for JCP&L are included below:
JCP&L Business Segment 	2023 Actual 	2024 Actual
2025
Actual
Distribution 	$ 	391 $ 	587 $ 	700
Transmission 	308 	371 	546
Total - JCP&L 	$ 	699 $ 	958 $ 	1,246
Includes capital expenditures and capital-like investments that earn a return.
Capital investment forecasts for the years ended 2026, 2027, 2028, 2029, and 2030 for the FirstEnergy business segments are included below:
FirstEnergy Business Segment 2026
Forecast 	2027 Forecast 	2028 Forecast 	2029 Forecast 	2030 Forecast
Distribution 	$ 	1,755 	$ 	2,230 	$ 	2,345 	$ 	1,930 	$ 	2,035
Integrated 	2,245 	2,385 	2,755 	2,545 	2,710
Stand-Alone Transmission 	1,930 	2,160 	2,415 	2,820 	3,395
Corporate/Other 	85 	135 	125 	140 	120
Total - FirstEnergy 	$ 	6,015 	$ 	6,910 	$ 	7,640 	$ 	7,435 	$ 	8,260
Includes capital expenditures and capital-like investments that earn a return.
Including Brookfield's noncontrolling interest in FET and FET's share of joint ventures.
Capital investment forecasts for the years ended 2026, 2027, 2028, 2029, and 2030 for the JCP&L business segments are included below:
JCP&L Business Segment 2026
Forecast 	2027 Forecast 	2028 Forecast 	2029 Forecast 	2030 Forecast
Distribution 	$ 	685 	$ 	705 	$ 	770 	$ 	720 	$ 	755
Transmission 	640 	590 	605 	665 	735
Total - JCP&L 	$ 	1,325 	$ 	1,295 	$ 	1,375 	$ 	1,385 	$ 	1,490
Includes capital expenditures and capital-like investments that earn a return.
In alignment with FirstEnergy’s strategy to invest in its segments as a fully regulated company, FirstEnergy is focused on maintaining balance sheet strength and
flexibility. Specifically, at the regulated businesses, regulatory authority has been obtained for various regulated subsidiaries to issue and/or refinance debt.
Any financing plans by FE or any of its consolidated subsidiaries, including the issuance of equity and debt, and the refinancing of short-term and maturing long-
term debt are subject to market conditions and other factors. No assurance can be given that any such issuances, financing or refinancing, as the case may be,
will be completed as anticipated or at all. Any delay in the completion of financing plans could require FE or any of its subsidiaries to utilize short-term borrowing
capacity, which could impact available liquidity. In addition, FE and its subsidiaries expect to continually evaluate any planned financings, which may result in
changes from time to time.
(1)
(1)
(1)
(1)
(1)
(2)
(1)
(2)
(1)
(1)
48

-- 56 of 203 --

While supply lead times have not fully returned to levels prior to the COVID-19 pandemic, FirstEnergy continues to monitor the situation in light of demand
increases across the industry, including due to data center usage, and the imposition of tariffs and retaliatory tariffs that have been, and may be, imposed by the
U.S. government in response. FirstEnergy continues to implement mitigation strategies to address supply constraints and does not expect any corresponding
service disruptions or any material impact on its capital investment plan. However, the situation remains fluid, and a prolonged continuation or further increase in
demand, or the continuation of uncertain or adverse macroeconomic conditions, including inflationary pressures and new or increased existing tariffs, could lead
to an increase in supply chain disruptions that could, in turn, have an adverse effect on the Registrants’ results of operations, cash flow and financial condition.
In January 2025, FirstEnergy executed a lift-out transaction with MetLife, that transferred approximately $640 million of plan assets and $652 million of plan
obligations, associated with approximately 2,000 former competitive generation employees, who will assume future and full responsibility to fund and administer
their benefit payments. Similar to the lift-out in 2023, there was no change to the pension benefits for any participant as a result of the transfer and the
transaction was funded by pension plan assets. FirstEnergy believes that this lift-out transaction, in addition to the lift-out in 2023, further de-risked potential
volatility with the pension plan assets and liabilities. FirstEnergy will continue to evaluate other lift-outs in the future based on market and other conditions.
As of December 31, 2025, FirstEnergy’s net deficit in working capital (current assets less current liabilities) was primarily due to accounts payable, current
portion of long-term debt, short-term borrowings and accrued interest, taxes, and compensation and benefits. FirstEnergy believes its cash from operations and
available liquidity will be sufficient to meet its current working capital needs. See further discussion on cash from operations below.
As of December 31, 2025, JCP&L’s net deficit in working capital (current assets less current liabilities) was primarily due to accounts payable, short-term
borrowings, accrued interest, and compensation and benefits. JCP&L believes its cash from operations and available liquidity will be sufficient to meet its current
working capital needs. See further discussion on cash from operations below.
Short-Term Borrowings / Revolving Credit Facilities
On October 27, 2025, FE, the Electric Companies, Transmission Companies and FET, each entered into an amended credit facility to, among other things: (i)
remove the 10 basis point credit spread adjustment from the interest rate calculation; (ii) permit a one-week interest period for any Term Benchmark Advance (as
defined under each of the Amended Credit Facilities) based upon daily simple SOFR; and (iii) extend the maturity date of each credit facility for an additional
one-year period (a) from October 20, 2028 to October 20, 2029 for the KATCo credit facility, (b) from October 20, 2029 to October 20, 2030 for the FET credit
facility and (c) from October 18, 2028 to October 18, 2029 for the remaining Amended Credit Facilities.
Borrowings under each of the Amended Credit Facilities may be used for working capital and other general corporate purposes. Generally, borrowings under
each of the credit facilities are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment
termination date, as the same may be extended. Each of the Amended Credit Facilities contain financial covenants requiring each borrower, with the exception
of FE, to maintain a consolidated debt-to-total-capitalization ratio (as defined under each of the Amended Credit Facilities) of no more than 65%, and 75% for
FET, measured at the end of each fiscal quarter. FE is required under its credit facility to maintain a consolidated interest coverage ratio of not less than 2.50
times, measured at the end of each fiscal quarter for the last four fiscal quarters.
Each of the Amended Credit Facilities bear interest at fluctuating interest rates, primarily based on SOFR, including term SOFR and daily simple SOFR.
FirstEnergy has not hedged its interest rate exposure with respect to its floating rate debt. Accordingly, FirstEnergy’s interest expense for any particular period
will fluctuate based on SOFR and other variable interest rates. Restricted access to capital markets and/or increased borrowing costs could have an adverse
effect on FirstEnergy’s results of operations, cash flows, financial condition and liquidity.
49

-- 57 of 203 --

FirstEnergy had $325 million and $550 million of outstanding short-term borrowings as of December 31, 2025 and 2024, respectively. FirstEnergy’s available
liquidity from external sources as of February 16, 2026, was as follows:
Revolving Credit Facilities 	Maturity 	Commitment 	Available Liquidity
(In millions)
FE 	October 2029 $ 	1,000 $ 	997
FET 	October 2030 	1,000 	715
Ohio Companies 	October 2029 	800 	567
FE PA 	October 2029 	950 	600
JCP&L 	October 2029 	750 	600
MP and PE 	October 2029 	400 	300
ATSI, MAIT and TrAIL 	October 2029 	850 	849
KATCo 	October 2029 	150 	150
Subtotal $ 	5,900 $ 	4,778
Cash and Cash equivalents 	— 	37
Total $ 	5,900 $ 	4,815
The following table summarizes the limitations on short-term indebtedness applicable to each borrower under current regulatory approvals and applicable
statutory and/or charter limitations as of December 31, 2025:
Individual Borrower
Regulatory Debt
Limitations
Credit Facility
Commitment
Debt-to-Total-Capitalization
Ratio
(In millions)
FE 	N/A 	$ 	1,000 	N/A
ATSI 	$ 	500 	350 	39.4 %
CEI 	750 	300 	42.1 %
FET 	N/A 	1,000 	65.8 %
FE PA 	1,250 	950 	48.0 %
JCP&L 	1,500 	750 	37.9 %
KATCo 	200 	150 	29.2 %
MAIT 	400 	350 	41.0 %
MP 	900 	250 	49.6 %
OE 	500 	300 	54.7 %
PE 	450 	150 	48.9 %
TE 	300 	200 	53.0 %
TrAIL 	400 	150 	39.8 %
Regulatory debt limitations include amounts which may be borrowed under the regulated companies’ money pool.
FE is not required to maintain a debt-to-total-capitalization ratio under its amended credit facility. However, FE is required to maintain a consolidated interest coverage ratio of not
less than 2.50 times, measured at the end of each fiscal quarter for the last four fiscal quarters beginning with the quarter ending December 31, 2021. FE's consolidated interest
coverage ratio as of December 31, 2025 was approximately 4.4 times.
Subject to each borrower’s sublimit, the amounts noted below are available for the issuance of LOCs (subject to borrowings drawn under the Amended Credit
Facilities) expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under each
of the Amended Credit Facilities and against the applicable borrower’s borrowing sublimit. As of December 31, 2025, FirstEnergy had $185 million in outstanding
LOCs, $52 million of which are issued under the Amended Credit Facilities.
(2)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
50

-- 58 of 203 --

Revolving Credit Facilities LOC Availability as of
December 31, 2025 LOC Utilized as of
December 31, 2025
(In millions)
FE 	$ 	100 $ 	3
FET 	100 	—
Ohio Companies 	150 	—
FE PA 	200 	1
JCP&L 	100 	—
MP and PE 	100 	47
ATSI, MAIT and TrAIL 	200 	1
KATCo 	35 	—
Each of the Amended Credit Facilities do not contain provisions that restrict the ability to borrow or accelerate payment of outstanding advances in the event of
any change in credit ratings of the borrowers. Pricing is defined in “pricing grids,” whereby the cost of funds borrowed under the Amended Credit Facilities are
related to the credit ratings of the company borrowing the funds. Additionally, borrowings under each of the credit facilities are subject to the usual and customary
provisions for acceleration upon the occurrence of events of default, including a cross-default for other indebtedness in excess of $100 million.
As of December 31, 2025, FE was in compliance with its applicable consolidated interest coverage ratio and the Electric Companies, the Transmission
Companies, and FET were each in compliance with their debt-to-total-capitalization ratio covenants under each of their Amended Credit Facilities.
FirstEnergy Money Pools
FirstEnergy’s regulated operating subsidiary companies also have the ability to borrow from each other and FE to meet their short-term working capital
requirements. Effective September 23, 2024, AGC and KATCo became participants in the regulated companies’ money pool. Similar but separate arrangements
exist among FirstEnergy’s unregulated companies with AE Supply, FE, FET, FEV and certain other unregulated subsidiaries. As of June 1, 2024, FET no longer
participates in the unregulated money pool. FESC administers these money pools and tracks surplus funds of FE and the respective regulated and unregulated
subsidiaries, as the case may be, as well as proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must
repay the principal amount of the loan, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company
receiving a loan from their respective pool and is based on the average cost of funds available through the pool.
Average Interest Rates 	Regulated Companies’ Money Pool 	Unregulated Companies’ Money Pool
2025 	2024 	2025 	2024
For the Years Ended December 31, 	4.51 % 	5.74 % 	4.89 % 	6.44 %
51

-- 59 of 203 --

Long-Term Debt Capacity
FE and its subsidiaries’ access to capital markets and costs of financing are influenced by the credit ratings of their securities. The following table displays FE
and its subsidiaries’ credit ratings as of February 17, 2026:
Corporate Credit Rating 	Senior Secured 	Senior Unsecured 	Outlook/Credit/Watch
Issuer 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch
FE 	BBB+ 	Baa3 	BBB 	— 	— 	— 	BBB 	Baa3 	BBB 	S 	S 	S
Distribution:
CEI 	BBB+ 	Baa3 	BBB+ 	— 	— 	— 	BBB+ 	Baa3 	A- 	S 	S 	P
OE 	A- 	A3 	BBB+ 	A 	A1 	A 	A- 	A3 	A- 	S 	S 	P
TE 	BBB+ 	Baa2 	BBB+ 	A 	A3 	A 	— 	— 	— 	S 	S 	P
FE PA 	A- 	A3 	A- 	A 	A1 	— 	A- 	A3 	A 	S 	S 	S
Integrated:
JCP&L 	BBB+ 	A3 	A- 	— 	— 	— 	BBB+ 	A3 	A 	S 	S 	S
MP 	BBB 	Baa2 	A- 	A- 	A3 	A+ 	— 	Baa2 	— 	P 	S 	S
AGC 	BBB- 	Baa2 	A- 	— 	— 	— 	— 	— 	— 	S 	S 	S
PE 	BBB 	Baa2 	BBB+ 	A- 	A3 	A 	— 	— 	— 	P 	S 	S
Stand-Alone Transmission:
FET 	A 	Baa2 	BBB+ 	— 	— 	— 	A- 	Baa2 	BBB+ 	S 	S 	S
ATSI 	A 	A3 	A 	— 	— 	— 	A 	A3 	A+ 	S 	S 	S
MAIT 	A 	A3 	A 	— 	— 	— 	A 	A3 	A+ 	S 	S 	S
TrAIL 	A 	A3 	A 	— 	— 	— 	A 	A3 	A+ 	S 	S 	S
KATCo 	— 	A3 	A- 	— 	— 	— 	— 	— 	— 	— 	S 	S
S = Stable, P = Positive
On December 23, 2025, S&P upgraded FE's corporate credit rating to BBB+ from BBB and its senior unsecured rating to BBB from BBB-, and upgraded each
subsidiaries’ corporate credit rating and senior unsecured rating, as applicable, one notch, excluding TE, MP, AGC and PE whose ratings were affirmed. S&P
also revised the outlook of FE and its subsidiaries’ to stable except for MP and PE whose outlooks were revised to positive and AGC whose outlook remained
unchanged at stable.
On September 23, 2025, Fitch upgraded FE PA’s corporate credit rating to A- from BBB+, its senior unsecured rating to A from A- and updated its ratings outlook
to stable. Additionally, Fitch affirmed the ratings and outlooks of FE and its other subsidiaries.
The applicable undrawn and drawn margin on the credit facilities are subject to ratings-based pricing grids. The applicable fee paid on the undrawn commitments
and on actual borrowings under the credit facilities are based on FE’s senior unsecured non-credit enhanced debt ratings as determined by S&P and Moody’s.
The interest rates payable on approximately $2.1 billion in FE’s senior unsecured notes are subject to adjustments from time to time if the ratings on the notes
from any one or more of S&P, Moody’s and Fitch decreases to a rating set forth in the applicable governing documents. Generally, a one-notch downgrade by
the applicable rating agency may result in a 25 basis point coupon rate increase beginning at BB, Ba1, and BB+ for S&P, Moody’s and Fitch, respectively, to the
extent such rating is applicable to the series of outstanding senior unsecured notes, during the next interest period, subject to an aggregate cap of 2% from
issuance interest rate.
Debt capacity is subject to the consolidated interest coverage ratio in FE's credit facility. As of December 31, 2025, FirstEnergy could incur approximately $0.9
billion of incremental interest expense or incur an approximate $2.4 billion reduction to the consolidated interest coverage earnings numerator, as defined under
the covenant, and FE would remain within the limitations of the financial covenant requirements of FE's credit facility.
As of December 31, 2025, JCP&L could incur approximately $6.4 billion of additional debt or incur an approximate $3.5 billion reduction to equity, as defined
under the debt to capital covenant, and JCP&L would remain within the limitations of the financial covenant requirements of JCP&L's credit facility.
(1)
(1)
52

-- 60 of 203 --

Cash Requirements and Commitments
The Registrants have certain obligations and commitments to make future payments under contracts, including contracts executed in connection with certain of
the planned construction expenditures.
As of December 31, 2025 (Undiscounted): 	Total 	2026 	2027-2028 	2029-2030 	Thereafter
FirstEnergy 	(In millions)
Long-term debt 	$ 	26,390 $ 	720 $ 	4,456 $ 	5,520 $ 	15,694
Short-term borrowings 	325 	325 	— 	— 	—
Interest on long-term debt 	10,152 	1,117 	2,041 	1,613 	5,381
Operating leases 	348 	72 	119 	72 	85
Finance leases 	11 	4 	7 	— 	—
Fuel and purchased power 	1,476 	231 	431 	400 	414
Committed investments 	6,240 	1,442 	2,836 	1,962 	—
Pension funding 	1,287 	— 	509 	441 	337
Total - FirstEnergy 	$ 	46,229 $ 	3,911 $ 	10,399 $ 	10,008 $ 	21,911
Excludes unamortized discounts and premiums, fair value accounting adjustments and finance leases.
See Note 7., "Leases," of the Combined Notes to Financial Statements of the Registrants.
Based on estimated annual amounts under contract with fixed or minimum quantities, and includes payment obligations under termination agreements.
Amounts represent committed capital expenditures and other capital-like investments that earn a return.
As of December 31, 2025 (Undiscounted): 	Total 	2026 	2027-2028 	2029-2030 	Thereafter
JCP&L 	(In millions)
Long-term debt 	$ 	3,050 $ 	— $ 	— $ 	350 $ 	2,700
Short-term borrowings 	93 	93 	— 	— 	—
Interest on long-term debt 	1,165 	143 	286 	258 	478
Operating leases 	95 	13 	24 	16 	42
Finance leases 	4 	2 	2 	— 	—
Committed investments 	2,144 	518 	1,018 	608 	—
Total - JCP&L 	$ 	6,551 $ 	769 $ 	1,330 $ 	1,232 $ 	3,220
Excludes unamortized discounts and premiums.
See Note 7., "Leases," of the Combined Notes to Financial Statements of the Registrants.
Amounts represent committed capital expenditures and other capital-like investments that earn a return.
Excluded from the tables above are estimates for the cash outlays from power purchase contracts entered into by most of the Electric Companies and under
which they procure the power supply necessary to provide generation service to their customers who do not choose an alternative supplier. Although actual
amounts will be determined by future customer behavior, consumption levels and power prices, management currently estimates these cash outlays will be
approximately $4.8 billion ($1.5 billion at JCP&L) in 2026.
The tables above also exclude AROs, reserves for litigation, injuries and damages and environmental remediation since the amount and timing of the cash
payments are uncertain. The tables also exclude accumulated deferred income taxes since cash payments for income taxes are determined based primarily on
taxable income for each applicable fiscal year and/or the application of the corporate AMT which, as further discussed below, is uncertain and subject to the
issuance of future U.S. Treasury regulations.
FirstEnergy’s pension funding policy is based on actuarial computations using the projected unit credit method. FirstEnergy does not currently expect to have a
required contribution to the pension plan until 2027, which based on various assumptions, including an expected rate of return on assets of 8.0% for 2026, is
expected to be approximately $250 million. However, FirstEnergy may elect to contribute to the pension plan voluntarily. JCP&L is not expected to make a
contribution.
(1)
(2)
(2)
(3)
(4)
(1)
(2)
(3)
(4)
(1)
(2)
(2)
(3)
(1)
(2)
(3)
53

-- 61 of 203 --

Changes in Cash Position
As of December 31, 2025, FirstEnergy had $57 million of cash and cash equivalents and $42 million of restricted cash compared to $111 million of cash and
cash equivalents and $43 million of restricted cash as of December 31, 2024, on the Consolidated Balance Sheets.
The following table summarizes the major classes of cash flow items:
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
Net cash provided from operating activities 	$ 	3,700 $ 	2,891 $ 	1,387
Net cash used for investing activities 	(5,065) 	(4,350) 	(3,652)
Net cash provided from financing activities 	1,310 	1,434 	2,238
Net change in cash, cash equivalents and restricted cash 	(55) 	(25) 	(27)
Cash, cash equivalents, and restricted cash at beginning of period 	154 	179 	206
Cash, cash equivalents, and restricted cash at end of period 	$ 	99 $ 	154 $ 	179
Cash Flows From Operating Activities
FirstEnergy’s most significant sources of cash are derived from electric service provided by its operating subsidiaries. The most significant use of cash from
operating activities is buying electricity to serve non-shopping customers, return of cash collateral associated with certain generation suppliers that serve
shopping customers, pension contributions and paying fuel suppliers, employees, tax authorities, lenders and others for a wide range of materials and services.
Net cash provided from operating activities was $3,700 million during 2025, $2,891 million during 2024, and $1,387 million during 2023. The increase in cash
from operating activities in 2025 from 2024 is primarily due to:
• Higher revenues from the implementation of base rate cases in Pennsylvania, New Jersey, and West Virginia;
• Higher return on regulated capital investment programs;
• Higher net transmission revenue collection based on the timing of formula rate collections;
• Higher customer usage and demand, primarily due to colder weather temperatures in the first and fourth quarters of 2025;
• Increased working capital due to higher accounts receivable receipts, timing of accounts payable disbursements, and lower employee benefit
payments;
• Lower federal income tax payments due to the absence of tax payments in 2024 related to the FET Equity Interest Sale; and
• Absence of the payment of the SEC civil penalty and OAG settlement in the third quarter of 2024.
The increase in cash provided from operating activities was partially offset by:
• The absence of net proceeds from the shareholder derivative lawsuit settlement in the second quarter of 2024;
• Temporary rate credits that were provided to JCP&L residential customers during the third quarter of 2025, net of recoveries, as further discussed
below;
• Lower dividend distribution received by FEV from its equity investment in Global Holding; and
• Decreased cash collateral received from suppliers due to changes in power prices.
54

-- 62 of 203 --

Cash Flows From Investing Activities
Net cash used for investing activities in 2025 principally represented cash used for capital investments. The following table summarizes net cash used for
investing activities for the years ended 2025, 2024 and 2023:
For the Years Ended December 31,
Investing Activities 	2025 	2024 	2023
(In millions)
Capital Investments:
Distribution Segment 	$ 	1,344 $ 	1,130 $ 	936
Integrated Segment 	1,842 	1,542 	1,212
Stand-Alone Transmission Segment 	1,601 	1,266 	1,093
Corporate / Other 	(82) 	92 	115
Asset removal costs 	376 	305 	274
Other 	(16) 	15 	22
$ 	5,065 $ 	4,350 $ 	3,652
Net cash used for investing activities during 2025 increased $715 million, compared to 2024, primarily due to higher planned capital investment spend.
Cash Flows From Financing Activities
Net cash provided from financing activities was $1,310 million, $1,434 million, and $2,238 million in 2025, 2024, and 2023, respectively. The following table
summarizes financing activities for the years ended 2025, 2024, and 2023.
For the Years Ended December 31,
Financing Activities 	2025 	2024 	2023
(In millions)
New Issues
Senior unsecured notes 	$ 	3,125 $ 	2,100 $ 	1,050
Unsecured convertible notes 	2,500 	— 	1,500
FMBs 	200 	— 	600
Senior secured notes 	100 	— 	—
5,925 	2,100 	3,150
Redemptions / Repayments
Unsecured convertible notes 	(1,206) 	— 	—
Senior unsecured notes 	(1,875) 	(2,013) 	(494)
FMBs 	— 	(700) 	—
Senior secured notes 	(48) 	(47) 	(43)
(3,129) 	(2,760) 	(537)
Proceeds from FET Equity Interest Sale (Note 1.) 	— 	3,500 	—
Noncontrolling interest cash distributions 	(100) 	(86) 	(72)
Short-term borrowings, net 	(225) 	(225) 	675
Common stock dividend payments 	(1,016) 	(970) 	(906)
Debt issuance and redemption costs, and other 	(145) 	(125) 	(72)
$ 	1,310 $ 	1,434 $ 	2,238
55

-- 63 of 203 --

During the year ended December 31, 2025, FirstEnergy had the following redemptions and issuances:
Company 	Type
Redemption/Issuance
Date
Interest
Rate 	Maturity
Amount
(In millions) 	Description
Redemptions
FE 	Senior Unsecured
Notes 	March, 2025 	2.05% 	2025 	$300 	FE redeemed unsecured notes that became due.
TrAIL 	Senior Unsecured
Notes 	May, 2025 	3.76% 	2025 	$75 	TrAIL redeemed unsecured notes that became due.
TrAIL 	Senior Unsecured
Notes 	June, 2025 	3.85% 	2025 	$550 	TrAIL redeemed unsecured notes that became due.
FE 	Senior Unsecured
Convertible Notes 	June, 2025 	4.00% 	2026 	$1,206 	FE repurchased approximately $1,206 million of the principal amount of its 2026 Convertible
Notes for $1,225 million, including a premium of approximately $19 million.
JCP&L 	Senior Unsecured
Notes 	October, 2025 	4.30% 	2026 	$650 	On October 16, 2025, JCP&L redeemed $650 million of 4.30% senior notes due 2026.
FE 	Senior Unsecured
Notes 	December, 2025 	1.60% 	2026 	$300 	On December 31, 2025, FE redeemed $300 million of 1.60% senior notes due 2026.
Issuances
TrAIL 	Senior Unsecured
Notes 	April, 2025 	5.00% 	2031 	$600 	Proceeds were used to redeem senior notes that came due in 2025, to refinance existing debt, for
working capital, and for other general corporate purposes.
ATSI 	Senior Unsecured
Notes 	May, 2025 	5.00% 	2030 	$225 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
OE 	Senior Unsecured
Notes 	May, 2025 	4.95% 	2029 	$300 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
MAIT 	Senior Unsecured
Notes 	June, 2025 	5.00% 	2031 	$200 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
PE 	FMBs 	June, 2025 	5.00% 	2030 	$200 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
TE 	Senior Secured
Notes 	June, 2025 	5.18% 	2030 	$100 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
FE 	Senior Unsecured
Convertible Notes 	June, 2025 	3.63% 	2029 	$1,350 	Proceeds were used to refinance existing debt, to repurchase a portion of its 2026 Convertible
Notes, and for other general corporate purposes.
FE 	Senior Unsecured
Convertible Notes 	June, 2025 	3.88% 	2031 	$1,150 	Proceeds were used to refinance existing debt, to repurchase a portion of its 2026 Convertible
Notes, and for other general corporate purposes.
FET 	Senior Unsecured
Notes 	August, 2025 	4.75% 	2033 	$450 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
JCP&L 	Senior Unsecured
Notes 	September, 2025 	4.15% 	2029 	$350
Proceeds were used to refinance existing debt, including the repayment of the remaining $650
million aggregate principal amount of JCP&L’s 4.30% senior notes due 2026, to finance capital
expenditures, and for other general corporate purposes.
JCP&L 	Senior Unsecured
Notes 	September, 2025 	4.40% 	2031 	$500
Proceeds were used to refinance existing debt, including the repayment of the remaining $650
million aggregate principal amount of JCP&L’s 4.30% senior notes due 2026, to finance capital
expenditures, and for other general corporate purposes.
JCP&L 	Senior Unsecured
Notes 	September, 2025 	5.15% 	2036 	$500 Proceeds were used to refinance existing debt, including the repayment of the remaining $650
million aggregate principal amount of JCP&L’s 4.30% senior notes due 2026, to finance capital
expenditures, and for other general corporate purposes.
FE Convertible Notes Issuance
On May 4, 2023, FE issued $1.5 billion aggregate principal amount of 2026 Convertible Notes, with a fixed interest rate of 4.00% per year, payable semiannually
in arrears on May 1 and November 1 of each year, beginning on November 1, 2023. The 2026 Convertible Notes are unsecured and unsubordinated obligations
of FE, and will mature on May 1, 2026, unless required to be converted or repurchased in accordance with their terms. FE may not elect to redeem the 2026
Convertible Notes prior to the maturity date. The 2026 Convertible Notes are included within “Long-term debt and other long-term obligations” on the FirstEnergy
Consolidated Balance Sheets. Proceeds from the issuance were approximately $1.48 billion, net of issuance costs.
Through the close of business on the second scheduled trading day immediately preceding the maturity date, holders of the 2026 Convertible Notes may convert
all or any portion of their 2026 Convertible Notes at their option at any time at the conversion rate then in effect. FE will settle conversions of the 2026
Convertible Notes, if any, by paying cash for the aggregate
56

-- 64 of 203 --

principal amount of the 2026 Convertible Notes being converted and its conversion obligation in excess of such aggregate principal amount.
The amount of consideration that a holder will receive upon conversion will be determined by reference to the volume-weighted average price of FE’s common
stock for each trading day in a 40 trading day observation period. For any conversions on or after February 1, 2026, this period would be the 40 consecutive
trading days beginning on, and including, the 41st scheduled trading day immediately preceding the maturity date.
On June 12, 2025, FE issued $1.35 billion aggregate principal amount of its 2029 Convertible Notes and $1.15 billion aggregate principal amount of its 2031
Convertible Notes.
The 2029 Convertible Notes and 2031 Convertible Notes bear interest at a rate of 3.625% per year and 3.875% per year, respectively, payable semiannually in
arrears on January 15 and July 15 of each year, beginning on January 15, 2026. The 2029 Convertible Notes and 2031 Convertible Notes are unsecured and
unsubordinated obligations of FE and will mature on January 15, 2029 and January 15, 2031, respectively, unless earlier converted or repurchased in
accordance with their terms.
The notes are included within “Long-term debt and other long-term obligations” on the FirstEnergy Consolidated Balance Sheets. Proceeds from the issuance
were approximately $2.47 billion, net of issuance costs.
Holders may convert notes at their option at any time prior to the close of business on the business day immediately preceding: (i) October 15, 2028, with
respect to the 2029 Convertible Notes, and (ii) October 15, 2030, with respect to the 2031 Convertible Notes, only under certain conditions:
• During any calendar quarter, if the last reported sale price of FE’s common stock for at least 20 trading days during the period of 30 consecutive trading
days ending on, and including, the last trading day of the immediately preceding calendar quarter is greater than or equal to 130% of the conversion
price on each applicable trading day;
• During the five consecutive business day period immediately after any 10 consecutive trading day period in which the trading price per $1,000 principal
amount of the 2029 Convertible Notes and 2031 Convertible Notes for each trading day of such 10 trading-day period was less than 98% of the product
of the last reported sale price of FE’s common stock and the conversion rate on each such trading day; or
• Upon the occurrence of certain corporate events specified in the indenture governing the 2029 Convertible Notes and 2031 Convertible Notes.
On or after October 15, 2028, in the case of the 2029 Convertible Notes, and on or after October 15, 2030, in the case of the 2031 Convertible Notes, until the
close of business on the second scheduled trading day immediately preceding the maturity date of the relevant series of notes, holders may convert all or any
portion of their notes of such series at any time, regardless of the foregoing conditions. FE will settle conversions of such notes by paying cash up to the
aggregate principal amount of the notes to be converted and paying or delivering, as the case may be, cash, shares of its common stock or a combination of
cash and shares of its common stock, at its election, in respect of the remainder, if any, of its conversion obligation in excess of the aggregate principal amount
of the notes being converted, subject to the applicable terms of the indentures.
The conversion rate for each of the series of notes will initially be 20.9275 shares of FE’s common stock per $1,000 principal amount of such notes (equivalent to
an initial conversion price of approximately $47.78 per share of FE’s common stock). The initial conversion price of such notes represents a premium of
approximately 20% over the last reported sale price of FE’s common stock on the New York Stock Exchange on June 9, 2025. The conversion rate and the
corresponding conversion price will be subject to adjustment in some events but will not be adjusted for any accrued and unpaid interest. In addition, following
certain corporate events that occur prior to the maturity date with respect to a series of notes (and, in the case of the 2031 Convertible Notes, if FE delivers a
notice of redemption with respect to the 2031 Convertible Notes), FE will, in certain circumstances, increase the conversion rate for a holder who elects to
convert its notes of such series in connection with such corporate event or redemption as applicable.
FE may not redeem the 2029 Convertible Notes prior to the maturity date of the 2029 Convertible Notes. On or after January 15, 2029 and prior to the 40th
trading day immediately before the maturity date of the 2031 Convertible Notes, FE may redeem for cash all or any of the portion of the 2031 Convertible Notes,
subject to certain partial redemption limitations and only under certain conditions.
If FE undergoes a fundamental change (as defined in the relevant indenture), subject to certain conditions, holders of the 2026 Convertible Notes, 2029
Convertible Notes and/or 2031 Convertible Notes may require FE to repurchase for cash all or any portion of their notes at a repurchase price equal to 100% of
the principal amount of the convertible notes to be repurchased, plus accrued and unpaid interest to, but excluding, the fundamental change repurchase date (as
defined in the relevant indenture). In addition, following certain corporate events that occur prior to the maturity date with respect to a series of convertible notes
(and, in the case of the 2031 Convertible Notes, if FE delivers a notice of redemption with respect to the 2031 Convertible Notes), FE will, in certain
circumstances, increase the conversion rate for a holder who elects to convert its notes of such series in connection with such corporate event or redemption, as
applicable.
57

-- 65 of 203 --

Separate from the issuance of the 2029 Convertible Notes and 2031 Convertible Notes, FE repurchased approximately $1.2 billion aggregate principal amount
of the 2026 Convertible Notes, using a portion of the proceeds from the offering of the 2029 Convertible Notes and 2031 Convertible Notes described above. FE
may, in the future, effect additional repurchases of remaining outstanding 2026 Convertible Notes.
FET Senior Notes and Registration Rights
On August 13, 2025, FET issued $450 million of senior unsecured notes due in 2033, in a private offering that included a registration rights agreement in which
FET agreed to conduct an exchange offer of these senior notes for the like principal amounts registered under the Securities Act within 366 days of closing of the
offering. On November 4, 2025, FET filed a registration statement on Form S-4 for the exchange offer with the SEC, which was declared effective on December
3, 2025. On January 21, 2026, FET completed the exchange offer of these senior notes for like principal amounts registered under the Securities Act.
JCP&L Senior Notes and Registration Rights
On December 5, 2024, JCP&L issued $700 million of senior unsecured notes due in 2035 in a private offering that included a registration rights agreement in
which JCP&L agreed to conduct an exchange offer of these senior notes for like principal amounts registered under the Securities Act. On April 1, 2025, JCP&L
filed a registration statement on Form S-4 with the SEC, which became effective on April 11, 2025.
On September 4, 2025, JCP&L issued: (i) $350 million of senior unsecured notes due in 2029; (ii) $500 million of senior unsecured notes due in 2031; and (iii)
$500 million of senior unsecured notes due in 2036, in a private offering that included a registration rights agreement in which JCP&L agreed to conduct an
exchange offer of these senior notes for the like principal amounts registered under the Securities Act within 366 days of closing of the offering.
FE or its affiliates may, from time to time, seek to retire or purchase outstanding debt through open-market purchases, privately negotiated transactions or
otherwise. Such repurchases, if any, will be upon such terms and at such prices as FE or its affiliates may determine, and will depend on prevailing market
conditions, liquidity requirements, contractual restrictions and other factors.
FIRSTENERGY - GUARANTEES AND OTHER ASSURANCES
FirstEnergy has various financial and performance guarantees and indemnifications which are issued in the normal course of business. These contracts include
performance guarantees, stand-by LOCs, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate
commercial transactions with third parties by enhancing the value of the transaction to the third party. As of December 31, 2025, outstanding guarantees and
other assurances aggregated approximately $1.1 billion, consisting of parental guarantees on behalf of its consolidated subsidiaries ($614 million) and other
assurances ($439 million).
In 2025, FET, DominionHV and Transource issued an equity support agreement to enable Valley Link to enter into a credit facility with a third party. The equity
support agreement expires once all Valley Link credit agreement obligations are satisfied or when FET has fulfilled its support obligations under the equity
support agreement. As of December 31, 2025, the fair value of FET’s support obligations relating to the Valley Link credit facility was immaterial.
Collateral and Contingent-Related Features
In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity,
energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted
in the form of cash or credit support with thresholds contingent upon FE's or its subsidiaries' credit rating from each of the major credit rating agencies. The
collateral and credit support requirements vary by contract and by counterparty.
As of December 31, 2025, $185 million of collateral, in the form of LOCs, has been posted by FE or its subsidiaries. FE or its subsidiaries are holding $33 million
of net cash collateral as of December 31, 2025, from certain generation suppliers, and such amount is included in "Other current liabilities" on FirstEnergy's
Consolidated Balance Sheets.
These credit-risk-related contingent features stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. See Note 14., "Commitments, Guarantees and Contingencies," of the Combined
Notes to Financial Statements of the Registrants for more information.
JCP&L - GUARANTEES AND OTHER ASSURANCES
JCP&L has various financial and performance guarantees and indemnifications which are issued in the normal course of business. These contracts include
stand-by LOCs and surety bonds. JCP&L enters into these arrangements to facilitate
58

-- 66 of 203 --

commercial transactions with third parties by enhancing the value of the transaction to the third party. The maximum potential amount of future payments JCP&L
could be required to make under these guarantees as of December 31, 2025, was $48 million.
Collateral and Contingent-Related Features
In the normal course of business, JCP&L may enter into physical or financially settled contracts for the sale and purchase of electric capacity, energy, fuel and
emission allowances. Certain agreements contain provisions that require JCP&L to post collateral. This collateral may be posted in the form of cash or credit
support with thresholds contingent upon JCP&L's credit rating from each of the major credit rating agencies. The collateral and credit support requirements vary
by contract and by counterparty.
JCP&L has posted $28 million of collateral in the form of LOCs as of December 31, 2025. JCP&L is holding $2 million of net cash collateral as of December 31,
2025, from certain generation suppliers, and such amount is included in "Other current liabilities" on JCP&L's Balance Sheets.
These credit-risk-related contingent features stipulate that if JCP&L were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. See Note 14., "Commitments, Guarantees and Contingencies," of the Combined
Notes to Financial Statements of the Registrants for more information.
MARKET RISK INFORMATION
FirstEnergy may use various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations.
FirstEnergy’s Enterprise Risk Management Committee, comprised of members of senior management, provides general oversight for risk management activities
throughout FirstEnergy, including market risk.
Commodity Price Risk
FirstEnergy has limited exposure to financial risks resulting from fluctuating commodity prices, including prices for electricity, coal and energy transmission.
The valuation of derivative contracts is based on observable market information. As of December 31, 2025, FirstEnergy has a net asset of $20 million in non-
hedge derivative contracts that are related to FTRs at certain of the Electric Companies. FTRs are subject to regulatory accounting and do not impact earnings.
Equity Price Risk
As of December 31, 2025, the FirstEnergy pension plan assets were allocated approximately as follows: 33% in public equity securities, 25% in fixed income
securities, 5% in hedge funds, 8% in real estate, 22% in private debt/equity and 7% in cash and short-term securities. FirstEnergy does not currently expect to
have a required contribution to the pension plan until 2027, which, based upon various assumptions, including an expected rate of return on assets of 8.0% for
2026, is expected to be approximately $250 million. However, FirstEnergy may elect to contribute to the pension plan voluntarily. JCP&L is not expected to make
a contribution.
As of December 31, 2025, FirstEnergy's OPEB plan assets were allocated approximately as follows: 57% in equity securities, 23% in fixed income securities and
20% in cash and short-term securities. See Note 4., "Pension and Other Postemployment Benefits," of the Combined Notes to Financial Statements of the
Registrants for additional details on FirstEnergy's pension and OPEB plans.
During 2025, FirstEnergy's pension plan assets have gained approximately 15.4% as compared to an annual expected return on plan assets of 8.5%, and
FirstEnergy's OPEB plan assets have gained approximately 15.7% as compared to an annual expected return on plan assets of 7.0%.
59

-- 67 of 203 --

Interest Rate Risk
The Registrants' exposure to fluctuations in market interest rates is largely mitigated as all long-term debt, with the exception of the credit facilities, has fixed
interest rates, as noted in the table below. However, the Registrants are subject to the inherent interest rate risks related to refinancing maturing debt by issuing
new debt securities.
FirstEnergy - Comparison of Carrying Value to Fair Value as of December 31, 2025
Year of Maturity or Notice
of Redemption 	2026 	2027 	2028 	2029 	2030 	There-after 	Total 	Fair Value
(In millions)
Assets:
Investments Other Than
Cash and Cash Equivalents:
Fixed Income 	$ 	— 	$ 	— 	$ 	— 	$ 	— 	$ 	— 	$ 	280 	$ 	280 	$ 	280
Average interest rate 	— % 	— % 	— % 	— % 	— % 	3.4 % 	3.4 %
Liabilities:
Long-term Debt:
Fixed rate 	$ 	720 	$ 	2,003 	$ 	2,453 	$ 	3,064 	$ 	2,456 	$ 15,694 	$ 26,390 	$ 25,756
Average interest rate 	4.5 % 	3.8 % 	3.8 % 	3.9 % 	3.8 % 	4.7 % 	4.4 %
JCP&L - Comparison of Carrying Value to Fair Value as of December 31, 2025
Year of Maturity or Notice of
Redemption 	2026 	2027 	2028 	2029 	2030 	There-after 	Total 	Fair Value
(In millions)
Assets:
Investments Other Than Cash
and Cash Equivalents:
Fixed Income 	$ 	— 	$ 	— 	$ 	— 	$ 	— 	$ 	— 	$ 	280 	$ 	280 	$ 	280
Average interest rate 	— % 	— % 	— % 	— % 	— % 	3.4 % 	3.4 %
Liabilities:
Long-term Debt:
Fixed rate 	$ 	— 	$ 	— 	$ 	— 	$ 	350 	$ 	— 	$ 	2,700 	$ 	3,050 	$ 	3,059
Average interest rate 	— % 	— % 	— % 	4.2 % 	— % 	4.8 % 	4.7 %
FirstEnergy recognizes net actuarial gains or losses for its pension and OPEB plans in the fourth quarter of each fiscal year and whenever a plan is determined
to qualify for a remeasurement. A primary factor contributing to these actuarial gains and losses are changes in the discount rates used to value pension and
OPEB obligations as of the measurement date and the difference between expected and actual returns on the plans’ assets.
The remaining components of pension and OPEB expense, primarily service costs, interest cost on obligations, expected return on plan assets and amortization
of prior service costs, are set at the beginning of the calendar year (unless a remeasurement is triggered) and are recorded on a monthly basis. Changes in
asset performance and discount rates will not impact these pension costs during the year, however, future years could be impacted by changes in the market.
FirstEnergy utilizes a spot rate approach in the estimation of the components of benefit cost by applying specific spot rates along the full yield curve to the
relevant projected cash flows. As of December 31, 2025, the spot rate was 5.59% and 5.37% for pension and OPEB obligations, respectively, as compared to
5.72% and 5.60% as of December 31, 2024, respectively.
Each of the Amended Credit Facilities bear interest at fluctuating interest rates, primarily based on SOFR, including term SOFR and daily simple SOFR.
FirstEnergy has not hedged its interest rate exposure with respect to its floating rate debt. Accordingly, FirstEnergy’s interest expense for any particular period
will fluctuate based on SOFR and other variable interest rates.
Economic Conditions
While supply lead times have not fully returned to levels prior to the COVID-19 pandemic, FirstEnergy continues to monitor the situation in light of demand
increases across the industry, including due to data center usage, and the imposition of tariffs and
60

-- 68 of 203 --

retaliatory tariffs that have been, and may be, imposed by the U.S. government in response. FirstEnergy continues to implement mitigation strategies to address
supply constraints and does not expect any corresponding service disruptions or any material impact on its capital investment plan. However, the situation
remains fluid, and a prolonged continuation or further increase in demand, or the continuation of uncertain or adverse macroeconomic conditions, including
inflationary pressures and new or increased existing tariffs, could lead to an increase in supply chain disruptions that could, in turn, have an adverse effect on the
Registrants’ results of operations, cash flow and financial condition.
CREDIT RISK
Credit risk is the risk that the Registrants would incur a loss as a result of nonperformance by counterparties of their contractual obligations. The Registrants
maintain credit policies and procedures with respect to counterparty credit (including requirements that counterparties maintain specified credit ratings) and
require other assurances in the form of credit support or collateral in certain circumstance in order to limit counterparty credit risk. The Registrants have
concentrations of suppliers and customers among electric utilities, financial institutions and energy marketing and trading companies. These concentrations may
impact the Registrants' overall exposure to credit risk, positively or negatively, as counterparties may be similarly affected by changes in economic, regulatory or
other conditions. In the event an energy supplier of the Ohio Companies, FE PA, JCP&L or PE defaults on its obligation, the affected company would be required
to seek replacement power in the market. In general, subject to regulatory review or other processes, it is expected that appropriate incremental costs incurred
by these entities would be recoverable from customers through applicable rate mechanisms, thereby mitigating the financial risk for these entities. The
Registrants’ credit policies to manage credit risk include the use of an established credit approval process and daily credit mitigation provisions, such as margin,
prepayment or collateral requirements. FirstEnergy and its subsidiaries, including JCP&L, may request additional credit assurance, in certain circumstances, in
the event that the counterparties' (i) credit ratings fall below investment grade, (ii) tangible net worth falls below specified percentages, or (iii) exposures exceed
an established credit limit.
OUTLOOK
INCOME TAXES
During 2025, FERC issued orders to a non-affiliate concluding that, based on certain previously issued IRS private letter rulings, certain NOL carryforward
deferred tax assets, as computed on a separate return basis, should be included in rate base for ratemaking purposes. FirstEnergy determined in the third
quarter of 2025 that these rulings and orders also would apply to certain of its subsidiaries, resulting in a benefit from a reduction in regulatory liabilities, reflected
as the remeasurement of excess deferred income taxes, and an increase in accumulated deferred income tax assets for ratemaking purposes, which will
increase overall rate base. FirstEnergy made the appropriate updates in its annual formula rates for the impacted subsidiaries. See Note 6., “Taxes,” of the
Combined Notes to Financial Statements of the Registrants. FirstEnergy will continue to evaluate whether regulatory filings are required in other jurisdictions to
implement similar adjustments to NOL carryforward deferred tax assets for ratemaking purposes.
On July 4, 2025, President Trump signed into law the OBBBA, which, among other things, makes permanent certain corporate tax incentives that were set to
expire in the TCJA, and terminates tax credits for most wind and solar projects placed in service after 2027. Because many of the provisions of the TCJA will be
continued under the OBBBA, and as FirstEnergy is not materially impacted by tax incentives associated with wind and solar projects, FirstEnergy does not
expect to be materially impacted by the OBBBA.
On September 30, 2025, the IRS issued additional guidance on the corporate AMT. While FirstEnergy continues to believe, more likely than not, it will be subject
to corporate AMT, additional IRS guidance or revised U.S. Treasury regulations, which are expected to be issued in the future, as well as potential tax legislation
or presidential executive orders could provide certain adjustments to regulated utilities in calculating corporate AMT, which may reduce or otherwise significantly
change FirstEnergy’s AMT estimates or its conclusions as to whether it is an AMT payer. JCP&L is party to an intercompany income tax allocation agreement
with FirstEnergy and, accordingly, may be allocated a share of any corporate AMT paid by the FirstEnergy consolidated tax group. Any adverse developments
concerning corporate AMT liability, including guidance from the U.S. Treasury and/or the IRS or unfavorable regulatory treatment by FERC and/or applicable
state regulatory authorities, could negatively impact FirstEnergy’s cash flows, results of operations and financial condition.
STATE REGULATION
Each of the Electric Companies retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it
operates - in Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and
in New York by the NYPSC. The transmission operations of PE and TrAIL in Virginia, ATSI in Ohio, the Transmission Companies in Pennsylvania, PE and MP in
West Virginia, and PE in Maryland are subject to certain regulations of the VSCC, PUCO, PPUC, WVPSC, and MDPSC, respectively. In addition, under Ohio
law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates
were to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization
to site, construct and operate the new transmission facility.
61

-- 69 of 203 --

The following table summarizes the key terms of state base rate orders in effect for the Electric Companies as of December 31, 2025:
Company
Rates Effective For
Customers
Allowed Debt/Equity Capital
Structure 	Allowed ROE
CEI 	May 2009 	51%/ 49% 	10.5%
FE PA 	January 2025 	Settled 	Settled
MP 	March 2024 	Settled 	9.8%
JCP&L 	June 2024 	48.1% / 51.9% 	9.6%
OE 	January 2009 	51% /49% 	10.5%
PE (West Virginia) 	March 2024 	Settled 	9.8%
PE (Maryland) 	October 2023 	47% / 53% 	9.5%
TE 	January 2009 	51% / 49% 	10.5%
On November 19, 2025, the PUCO issued an order in the Ohio Companies’ base rate case that authorized a capital structure of 48.8% debt and 51.2% equity, and an ROE of
9.63%. New rates reflecting this order were not yet in effect as of December 31, 2025.
Commission-approved settlement agreements did not disclose allowed debt/equity and/or ROE rates.
MARYLAND
PE operates under MDPSC-approved distribution base rates that were effective as of October 19, 2023, and that were subsequently modified by an MDPSC
order dated January 3, 2024, which became effective as of March 1, 2024. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC
orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic
auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service
continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS.
The EmPOWER Maryland program, following passage of the Climate Solutions Now Act of 2022, required annual incremental energy efficiency targets of 2%
per year from 2022 through 2024, 2.25% per year in 2025 and 2026, and 2.5% per year in 2027 and thereafter. On August 1, 2023, PE filed its proposed plan for
the 2024-2026 cycle as required by the MDPSC. Additionally, at the direction of the MDPSC, PE together with other Maryland utilities were required to address
GHG reductions in addition to energy efficiency. In compliance with the MDPSC directive, PE submitted three scenarios with projected costs over a three-year
cycle of $311 million, $354 million, and $510 million, respectively. On December 29, 2023, the MDPSC issued an order approving the $311 million scenario for
most programs, with some modifications. On August 15, 2024, PE filed a revised plan for the remainder of the 2024-2026 cycle to comply with refined GHG
reduction targets with a total budget of $314 million, which the MDPSC approved on December 27, 2024. PE recovers EmPOWER Maryland program costs with
carrying costs on unamortized balances through an annually reconciled surcharge, with certain costs subject to recovery over a five-year amortization period.
Lost distribution revenue attributable to energy efficiency or demand reduction is recovered only through base rates. Consistent with an MDPSC order dated
December 29, 2022, phasing out the unamortized balances of EmPOWER Maryland investments, PE is required to expense 67% of its EmPOWER Maryland
program costs in 2025, and 100% in 2026 and beyond. All previously unamortized costs for prior cycles are to be collected by the end of 2030, consistent with
the 2024-2026 order issued on December 29, 2023. Legislation which took effect on July 1, 2024 is expected to reduce the carrying costs on the EmPOWER
Maryland unamortized balances for PE by a total of $25 to $30 million over the period of 2024-2030. On July 31, 2024, the MDPSC issued an order
implementing revised EmPOWER Maryland surcharge rates for PE in accordance with the new law, denying PE’s request for a hearing that sought to challenge
certain portions of the law. On August 30, 2024, PE filed a petition seeking judicial review of its challenge to the law in the Circuit Court for Washington County,
Maryland. On August 6, 2025, the Circuit Court for Washington County, Maryland issued an order granting PE’s petition, finding that the legislature may not
change terms to apply retroactively to monies already expended. MDPSC and the Maryland Office of People’s Counsel have each appealed the decision. On
November 14, 2025, the Appellate Court of Maryland issued an order denying the unopposed motion of the Attorney General of Maryland to Intervene without
prejudice to the ability to file an amicus curiae brief, which the Attorney General filed on December 30, 2025. PE's response brief was filed on January 21, 2026.
NEW JERSEY
JCP&L operates under NJBPU approved rates that took effect as of February 15, 2024, and became effective for customers as of June 1, 2024. JCP&L provides
BGS for retail customers who do not choose a third-party EGS and for customers of third-party EGSs that fail to provide the contracted service. All New Jersey
EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.
The settlement of the distribution rate case in 2020, provided among other things, that JCP&L would be subject to a management audit, which began in May
2021. On April 12, 2023, the NJBPU accepted the final management audit report for filing purposes and ordered that interested stakeholders file comments on
the report by May 22, 2023, which deadline was extended until July 31, 2023. JCP&L and one other party filed comments on July 31, 2023. On July 16, 2025,
the NJBPU issued its final order,
(1)
(2) 	(2)
(2)
(1)
(2)
(1)
(1)
(2)
62

-- 70 of 203 --

directing 100 of the 105 recommendations be implemented, including certain modifications. JCP&L filed its implementation plan on September 22, 2025, and
began quarterly progress reporting in October 2025.
On September 17, 2021, in connection with Mid-Atlantic Offshore Development, LLC, a transmission company jointly owned by Shell New Energies US LLC and
EDF Renewables North America, JCP&L submitted a proposal to the NJBPU and PJM to build transmission infrastructure connecting offshore wind-generated
electricity to the New Jersey power grid. On October 26, 2022, the JCP&L proposal was accepted, in part, in an order issued by NJBPU. The proposal, as
accepted, included approximately $723 million in investments for JCP&L to both build new and upgrade existing transmission infrastructure. JCP&L’s proposal
projects an investment ROE of 10.2% and includes the option for JCP&L to acquire up to a 20% equity stake in Mid-Atlantic Offshore Development, LLC. The
resulting rates associated with the project are expected to be shared among the ratepayers of all New Jersey electric utilities. On April 17, 2023, JCP&L applied
for the FERC “abandonment” transmission rates incentive, which would provide for recovery of 100% of the cancelled prudent project costs that are incurred
after the incentive is approved, and 50% of the costs incurred prior to that date, in the event that some or all of the project is cancelled for reasons beyond
JCP&L’s control. On August 21, 2023, FERC approved JCP&L’s application, effective August 22, 2023.
On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two offshore wind projects in New Jersey—Ocean Wind 1 and
2—having a combined planned capacity of 2,248 MWs. On January 30, 2025, and February 25, 2025, Shell New Energies US LLC and EDF Renewables North
America respectively announced that each was exiting its Atlantic Shores partnership to construct wind energy off the shore of New Jersey. On June 4, 2025,
Atlantic Shores filed a petition with the NJBPU, requesting consent to terminate its 1.5 GW offshore wind project. These cancellations are not expected to
directly affect JCP&L’s awarded projects.
On May 23, 2025, JCP&L filed with the NJBPU a motion seeking declaratory guidance in view of recent offshore wind developments, including a shift in federal
energy policy toward more traditional energy resources. JCP&L requested that the NJBPU provide guidance either affirming the current project schedule or,
alternatively, authorizing JCP&L to modify the schedule. On June 9, 2025, responses to JCP&L’s motion were filed with the NJBPU, including a cross-motion by
the New Jersey Division of Rate Counsel to reopen the offshore wind transmission proceeding, which JCP&L opposed. JCP&L advised that it intended to comply
with its contractual obligations to construct the transmission project, and that its motion was limited to seeking guidance on the construction milestones. On July
28, 2025, the New Jersey Division of Rate Counsel asked the NJBPU to take judicial notice of a recent NYPSC order terminating its offshore wind transmission
infrastructure process in the interest of protecting ratepayers. On August 13, 2025, the NJBPU issued an order requesting that JCP&L delay expenditures of
certain of the transmission investment planned by JCP&L for a 2.5-year period, and directing that JCP&L work with NJBPU staff and PJM to ensure alignment as
to the work that is to be continued on the original timeline and the work that is to be delayed consistent with the order.
Consistent with the commitments made in its proposal to the NJBPU, JCP&L formally submitted in November 2023 the first part of its application to the DOE to
finance a substantial portion of the project using low-interest rate loans available under the DOE’s Energy Infrastructure Reinvestment Program of the IRA of
2022. JCP&L submitted the second part of its two-part application on March 13, 2024, which was approved on May 17, 2024. The DOE Loan Program Office
initiated a due diligence review of the application shortly thereafter. On January 16, 2025, the DOE announced a conditional commitment to JCP&L for a loan
guarantee of up to approximately $716 million for the project. On August 20, 2025, the DOE terminated its conditional commitment to JCP&L due to the DOE’s
determination that a condition precedent could not be satisfied.
On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system
resiliency and substation modernization in technologies designed to provide enhanced customer benefits. JCP&L proposes EnergizeNJ will be implemented over
a five-year budget period with estimated costs of approximately $935 million over the deployment period, of which, $906 million is capital investments and $29
million is operating and maintenance expenses. Under the proposal, the capital costs of EnergizeNJ would be recovered through JCP&L’s base rates via annual
and semi-annual base rate adjustment filings. The 2023 base rate case stipulation that was filed on February 2, 2024, necessitated amendments to the
EnergizeNJ program. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for
a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of
NJBPU approval of the base rate case settlement, to remove the high-priority circuits that are to be addressed in the first phase of its reliability improvement plan
and to include the second phase of its reliability improvement plan that is expected to further address certain high-priority circuits that require additional
upgrades. On April 10, 2025, JCP&L, joined by various parties, filed a stipulated settlement with the NJBPU resolving JCP&L’s amended EnergizeNJ petition,
which the NJBPU approved on April 23, 2025. The settlement provides for total program costs of $339 million, including capital investments in JCP&L’s electric
distribution system of approximately $203 million, $132 million of matching capital investment and approximately $4 million of O&M expense. Pursuant to the
settlement, the program began on July 1, 2025, and will continue through December 31, 2028. JCP&L has agreed to file a base rate case no later than January
1, 2030.
In February 2025, the NJBPU certified the results of its annual basic generation service auctions through which New Jersey’s four EDCs – including JCP&L –
satisfy their generation supply requirements for BGS customers for the period beginning June 1, 2025 through May 31, 2026. The certified results resulted in
significant rate increases for New Jersey EDC customers and, by order dated April 23, 2025, the NJBPU directed the four EDCs to submit proposals to mitigate
the impact of the rate increases
63

-- 71 of 203 --

that affected residential customers beginning June 1, 2025. On May 7, 2025, JCP&L filed a petition in response to the April 2025 order, modeling four potential
mitigation scenarios. On June 18, 2025, the NJBPU approved a stipulation that included JCP&L, NJBPU Staff and New Jersey Division of Rate Counsel,
pursuant to which, among other things, JCP&L agreed to apply a temporary rate credit of $30.00 to each residential electric customer’s monthly bill in July and
August 2025 that would be deferred in a regulatory asset and recovered with a charge of $10 applied to each residential bill from September 2025 through
February 2026 to recover the amounts deferred, without carry charges, subject to a final reconciliation. As of December 31, 2025, JCP&L's regulatory asset
associated with this temporary rate credit was approximately $20 million.
On August 13, 2025, the NJBPU issued an Order to Show Cause reviewing JCP&L’s 2024 Annual System Performance Report, which includes information
regarding JCP&L’s systems level of electric service reliability performance during the prior calendar year. Failure to attain NJBPU’s minimum reliability levels
may subject JCP&L to a penalty. The NJBPU order alleges JCP&L has failed to achieve minimum reliability levels for calendar years 2022, 2023, and 2024, and
directed JCP&L to file an answer demonstrating why the NJBPU should not impose certain penalties upon JCP&L for such failure, which JCP&L filed on October
10, 2025. JCP&L is unable to predict the outcome or estimate the impact of this matter.
On January 14, 2026, the NJBPU issued an order authorizing JCP&L to modify its Lost Revenue Adjustment Mechanism rate rider in its tariff. The modification
allows JCP&L to recover the revenue impact of sales losses of approximately $16 million (pre-tax) primarily resulting from the implementation of JCP&L’s Energy
Efficiency and Conservation Plan during the one-year period from July 1, 2023, through June 30, 2024. The modification was effective February 1, 2026.
OHIO
Until the rates approved in the 2024 base rate case go into effect, the Ohio Companies will continue to operate under PUCO-approved base distribution rates
that became effective in 2009. The Ohio Companies operated under ESP IV through May 31, 2024, which provided for the supply of power to non-shopping
customers at a market-based price set through an auction process. From June 1, 2024, until January 31, 2025, the Ohio Companies operated under ESP V, as
modified by the PUCO, and as further described below. On December 18, 2024, the PUCO approved the Ohio Companies’ notice to withdraw ESP V and
approved the Ohio Companies’ proposal for returning to ESP IV, with modifications. ESP IV, as modified, continues the DCR rider, which supports continued
investment related to the distribution system for the benefit of customers, with an annual revenue cap of $390 million. In addition, ESP IV, as modified, includes:
(1) continuation of a base distribution rate freeze until ESP VI becomes effective or the Ohio Companies’ obtain the PUCO’s staff agreement; (2) a goal across
FirstEnergy to reduce CO2 emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $6.39 million per year to: (a) fund energy conservation,
economic development and job retention programs in the Ohio Companies’ service territories; and (b) establish fuel-funds in each of the Ohio Companies’
service territories to assist low-income customers.
On April 5, 2023, the Ohio Companies filed an application with the PUCO for approval of ESP V, for an eight-year term beginning June 1, 2024, and continuing
through May 31, 2032. On May 15, 2024, the PUCO issued an order approving ESP V with modifications, which became effective June 1, 2024, and would have
continued through May 31, 2029. ESP V, as modified by the PUCO, provided for, among other things, the continuation of existing riders related to purchased
power, transmission and uncollectibles, the continuation of the DCR rider with proposed annual revenue cap increases until new base rates are established, the
continuation of the AMI rider, and the addition of new riders for recovery of storm and vegetation management expenses. Many of the terms and conditions were
to be reconsidered in the base rate case. The ESP V order additionally directed the Ohio Companies to file another base distribution rate case not later than May
31, 2028, contribute $32.5 million during the term of ESP V to fund low-income customer bill assistance programs and bill assistance for income-eligible senior
citizens, and to develop an electric vehicle education program to assist customers in transitioning to electric vehicles which was recognized in the second quarter
of 2024 within “Other operating expenses” at the Regulated Distribution segment and on FirstEnergy’s Consolidated Statements of Income. Due to the risks and
uncertainty resulting from the Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a
notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV. On December 18, 2024, the PUCO
approved the Ohio Companies’ notice of withdrawal. Also on December 18, 2024, the PUCO approved the Ohio Companies’ proposal for returning to ESP IV,
with modifications. Consistent with ESP IV, the PUCO authorized the Ohio Companies’ reinstatement of the DCR rider, with an annual revenue cap of $390
million, and denied the Ohio Companies’ request to continue ESP IV’s DCR rider revenue cap increases of $15 million per year. Additionally, the PUCO ordered
that storm costs deferred under ESP V since June 1, 2024, remain on the Ohio Companies’ books and subject to review in a future case. The PUCO also denied
the Ohio Companies’ request to lift the base rate freeze in ESP IV, permitting the Ohio Companies’ pending base rate case to continue, but prohibiting new rates
from going into effect until either the effective date of ESP VI, or the staff agrees that the freeze be lifted and new rates be implemented. On January 22, 2025,
the PUCO approved the Ohio Companies’ revised ESP IV tariffs, effective February 1, 2025, at which time the Ohio Companies resumed operating under ESP
IV. On April 7, 2025, certain intervenors filed an appeal to the Supreme Court of Ohio challenging the Ohio Companies’ return to ESP IV. On May 22, 2025, the
Ohio Supreme Court granted the Ohio Companies motion to intervene in the appeal. On July 7, 2025, OCC and NOAC filed their Appellants’ brief. Appellees,
including the PUCO and the Ohio Companies, filed their briefs on August 26, 2025, to which OCC and NOAC replied on September 15, 2025.
On January 31, 2025, the Ohio Companies filed an application with the PUCO for ESP VI, for a term beginning on the date new base distribution rates from the
pending base rate case go into effect, in an effort to align with the ongoing base distribution rate
64

-- 72 of 203 --

case, and continuing through May 31, 2028. ESP VI proposed to continue providing power to non-shopping customers at market-based prices set through an
auction process, and proposed to continue riders supporting investment in the Ohio Companies’ distribution system, including Rider DCR with annual reliability
performance-based revenue cap increases of $37 million to $43 million, and an AMI rider for recovery of approved grid modernization investments. ESP VI
additionally proposed riders to support continued maintenance of the distribution system, including recovery of vegetation management and storm restoration
operations and maintenance expenses. In addition, ESP VI proposed energy efficiency programs for low-income customers, and included a commitment to
spend $6.5 million annually over the ESP VI term, without recovery from customers, on initiatives to assist low-income customers, as well as education and
incentives to help ensure customers have good experiences with electric vehicles. On May 15, 2025, the Ohio Governor signed HB 15, which repealed the
statute authorizing ESPs in Ohio, effective August 14, 2025. On December 17, 2025, the PUCO dismissed the Ohio Companies’ application for ESP VI due to
the repeal of the ESP statute.
On March 14, 2025, as directed by the PUCO in its December 18, 2024, order approving the Ohio Companies’ revised ESP IV tariffs, the Ohio Companies filed
with the PUCO a request to commence their statutorily required quadrennial review of ESP IV and establish a proposed schedule. On July 10, 2025, the Ohio
Companies withdrew the request for the PUCO to establish a procedural schedule following the May 15, 2025 signing by the Ohio Governor of HB 15 ending the
statutory mandate to conduct the quadrennial review, effective August 14, 2025. The OCC filed its response to the Ohio Companies’ notice of withdrawal on July
25, 2025, to which the Ohio Companies replied on August 1, 2025. The matter remains pending before the PUCO.
On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. The Ohio
Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44%
debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and
AMI. Key components of the base rate case filing included a proposal to change pension and OPEB recovery to the delayed recognition method and to
implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense
requested in the proceeding and the actual amount each year using this method. Additionally, the Ohio Companies requested recovery of certain incurred costs,
including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed supporting testimony
and on July 31, 2024, filed an update with an adjusted net increase of base distribution revenues of approximately $190 million and incorporated matters in the
rate case as directed by the PUCO’s ESP V order. On December 18, 2024, the PUCO issued an order approving the Ohio Companies’ withdrawal of ESP V. On
January 22, 2025, the PUCO approved the Ohio Companies’ revised ESP IV tariffs, effective February 1, 2025, at which time the Ohio Companies resumed
operating under ESP IV. On January 27, 2025, the Ohio Companies notified the PUCO of their intention to update their application for an increase in base
distribution rates to remove ESP V related provisions from the base rate case. On November 19, 2025, the PUCO issued an order in the rate case lifting the rate
freeze and approving a net increase in base distribution revenues of the Ohio Companies of approximately $34 million, with a return on equity of 9.63% and a
hypothetical capital structure of 48.8% debt and 51.2% equity for all three Ohio Companies, which reflects a roll-in of current riders such as DCR and AMI. The
PUCO authorized continuance of Rider DCR with a cap increase commensurate with capital investments through January 31, 2025, and approved the Ohio
Companies’ proposal to change pension and OPEB recovery to the delayed recognition method. Additionally, the order authorizes recovery of certain deferred
costs for storm restoration, operations and maintenance, and energy efficiency programs. As a result of the order, the Ohio Companies recognized a $352 million
pre-tax impairment charge related to future recovery disallowances of certain previously capitalized amounts. On November 26, 2025, the Ohio Companies filed
proposed compliance tariffs. On December 19, 2025, the Ohio Companies and other parties filed applications for rehearing and on December 29, 2025, the Ohio
Companies filed a memorandum against intervenors’ applications for rehearing. On January 7, 2026, the PUCO issued an entry granting rehearing in order to
determine whether its November 19, 2025 base rate case opinion and order should be affirmed, abrogated, or modified on rehearing. On January 9, 2026, the
Ohio Companies filed an expedited motion for ruling on the proposed compliance tariffs and on February 4, 2026, PUCO staff issued a letter recommending that
most of the Ohio Companies’ proposed compliance tariffs be approved. The Ohio Companies cannot predict the outcome of the rehearing, but do not expect
material changes to the November 2025 order.
On May 16, 2022, May 15, 2023, and May 15, 2024, the Ohio Companies filed their SEET applications for determination of the existence of significantly
excessive earnings under ESP IV for calendar years 2021, 2022, and 2023, respectively. On May 15, 2025, the Ohio Companies filed their SEET application for
determination of the existence of significantly excessive earnings under ESPs IV and V for calendar year 2024. Each application demonstrated that each of the
individual Ohio Companies did not have significantly excessive earnings. These matters remain pending before the PUCO.
In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related
charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-
related charges the Ohio Companies collect. Instead, the Ohio Companies were further required by HB 6 to remit all the OVEC-related charges they collect to
non-FE Ohio electric distribution utilities until August 14, 2025, at which time HB 15 became effective and the Ohio Companies stopped collecting OVEC-related
charges. The Ohio Companies contested the motions, which are pending before the PUCO.
In 2020, the four proceedings below were opened by the PUCO relating to HB 6. The matters, described in full below, were resolved pursuant to the terms of an
order issued by the PUCO on January 7, 2026. The order, which adopted without
65

-- 73 of 203 --

modification the terms of the stipulation and recommendation filed with the PUCO by the Ohio Companies and fourteen intervenors on December 19, 2026,
vacated the approximately $250 million in monetary penalties assessed by the PUCO in its order issued on November 19, 2025. Instead, the January 7, 2026
PUCO order directed the Ohio Companies to pay their customers, among other things, restitution and refunds totaling approximately $275 million ($213 million
after-tax), of which, $25 million is recorded in "Other current liabilities" and approximately $250 million is recorded within "Regulatory Liabilities" on FirstEnergy's
Consolidated Balance Sheets. The refunds will be paid out over three billing cycles beginning in February 2026 and the matters are now resolved:
• On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to
open an investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money
collected from consumers or violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On December 30, 2020, in response
to the OCC's motion, the PUCO reopened the DMR audit docket, and directed PUCO staff to solicit a third-party auditor and conduct a full review
of the DMR to ensure funds collected from customers through the DMR were only used for the purposes established in ESP IV. On June 2, 2021,
the PUCO selected an auditor, and the auditor filed the final audit report on January 14, 2022, which made certain findings and recommendations.
The report found that spending of DMR revenues was not required to be tracked, and that DMR revenues, like all rider revenues, are placed into
the regulated money pool as a matter of routine, where the funds lose their identity. Therefore, the report could not suggest that DMR funds were
used definitively for direct or indirect support for grid modernization. The report also concluded that there was no documented evidence that ties
revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR funds to support the passage of
HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio Companies adopt
formal dividend policies. Final comments and responses were filed by parties during the second quarter of 2022. The proceeding was stayed in its
entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August
2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the expanded DCR
rider audit proceeding described below and on November 22, 2024, the administrative law judge ordered that the bifurcated portion of the
corporate separation audit, discussed further below, be consolidated with the already-consolidated DMR audit and expanded DCR rider audit
proceeding. Evidentiary hearings were held between June 10, 2025, and June 27, 2025. Initial and reply briefs were filed by the parties on July 21,
2025, and August 4, 2025, respectively.
• On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of
HB 6 and the subsequent referendum effort, and directed the Ohio Companies to show cause, demonstrating that the costs of any political or
charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid
by customers. The Ohio Companies initially filed a response stating that the costs of any political or charitable spending in support of HB 6, or the
subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a
supplemental response explaining that, in light of the facts set forth in the DPA and the findings of the DCR rider audit report further discussed
below, political or charitable spending in support of HB 6, or the subsequent referendum effort, affected pole attachment rates paid by
approximately $15,000. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an independent external audit to investigate
FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and oversee the auditor. In November
and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental responses to the
PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show
cause demonstration submitted by the Ohio Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6
or the subsequent referendum effort was not included, directly or indirectly, in any rates or charges paid by ratepayers. The proceeding was stayed
in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August
2022 and the stay was lifted on February 26, 2024. On September 30, 2024, the third-party auditor’s report was filed. The audit examined 53
payments totaling approximately $75 million made in support of the passage of HB 6 and subsequent referendum efforts, and concluded that less
than $5 million was allocated to the Ohio Companies. The audit report affirmed the Ohio Companies’ conclusion in its August 6, 2021 filing that a
rate impact of less than $15,000 was charged to the Ohio Companies’ pole attachment customers associated with political and charitable spending
in support of HB 6. On October 22, 2024, parties filed comments on the audit report, and on November 5, 2024, parties filed reply comments. On
September 5, 2025, the administrative law judge set a procedural schedule, but stayed it on December 29, 2025.
• In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on
November 4, 2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement
made on October 29, 2020, as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates
with corporate separation laws and the Ohio Companies’ corporate separation plan. The additional audit is for the period from November 2016
through October 2020. The final audit report was filed on September 13, 2021. The audit report
66

-- 74 of 203 --

makes no findings of major non-compliance with Ohio corporate separation requirements, minor non-compliance with eight requirements, and
findings of compliance with 23 requirements. Parties filed comments and reply comments on the audit report. The proceeding was stayed in its
entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August
2022 and the stay was lifted on February 26, 2024. On September 10, 2024, the Ohio Companies filed testimony describing their compliance with
Ohio corporate separation laws and the implementation of the recommendations made in the audit reports. On September 20, 2024, intervenors
filed testimony recommending fines for alleged violations of the Ohio corporate separation requirements. Evidentiary hearings were held on
October 9 and 10, 2024; the scope of the hearings excluded allegations involving activities related to the passage of HB 6 and the former PUCO
chairman, which were later addressed in hearings held between June 10, 2025, and June 27, 2025, as further described below. Initial and reply
briefs have been filed by the Ohio Companies, PUCO staff and the intervening parties.
• On September 3, 2024, the Ohio Companies filed an application to amend their corporate separation plan to incorporate certain recommendations
from prior audit reports, which include, but are not limited to, improving controls for non-regulated competitive employees’ physical space and
access to data, updating and implementing a process to annually review the cost allocation manual, developing state specific codes of conduct
practices, and implementing additional training related to the cost allocation manual and the state codes of conduct. On October 23, 2024, the
administrative law judge issued an entry suspending automatic approval of the amended corporate separation plan and establishing a procedural
schedule.
• In connection with an ongoing annual audit of the Ohio Companies’ DCR rider for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K
for the year ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a
review of certain transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether
funds collected from customers were used to pay the vendors, and if so, whether or not the funds associated with those payments should be
returned to customers through the DCR rider or through an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase
of the audit, and the parties submitted comments and reply comments on this audit report in October 2021. Additionally, on September 29, 2021,
the PUCO expanded the scope of the audit in this proceeding to determine if the costs of the naming rights for FirstEnergy Stadium have been
recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its final report, in which the auditor concluded that the
FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15, 2021, the PUCO further expanded the
scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’ ESP IV settlement
proceedings, but stayed its expansion of the audit until otherwise ordered by the PUCO. The proceeding was stayed in its entirety, including
discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and the stay was
lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the Rider DMR audit proceeding
described above, and further lifted the stay of the portion of the investigation relating to an apparent nondisclosure of a side agreement. On
November 22, 2024, the administrative law judge ordered that the bifurcated portion of the corporate separation audit be consolidated with the
already-consolidated DMR audit and the expanded DCR rider audit proceeding. Evidentiary hearings were held between June 10, 2025, and June
27, 2025. Initial and reply briefs were filed by the parties on July 21, 2025, and August 4, 2025, respectively.
See “Outlook - Other Legal Proceedings” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional
details on the government investigations and subsequent litigation surrounding the investigation of HB 6.
PENNSYLVANIA
FE PA has five rate districts in Pennsylvania – four that correspond to the territories previously serviced by ME, PN, Penn, and WP and one rate district that
corresponds to WP’s service provided to The Pennsylvania State University. The rate districts created by the PA Consolidation will not reach full rate unity until
the earlier of 2033 or the conclusion of three base rate cases filed after January 1, 2025. FE PA operates under rates approved by the PPUC, effective as of
January 1, 2025. FE PA operates under a DSP through the May 31, 2027 delivery period, which provides for the competitive procurement of generation supply
for customers who do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service.
Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, the Pennsylvania Companies implemented energy efficiency and peak demand reduction
programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for
WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWh for ME,
3.0% MWh for PN, 2.7% MWh for Penn, and 2.4% MWh for WP. The fourth phase of FE PA’s energy efficiency and peak demand reduction program, which runs
for the five-year period beginning June 1, 2021 through May 31, 2026, was approved by the PPUC on June 18, 2020, providing cost recovery of approximately
$390 million to be recovered through Energy Efficiency and Conservation Phase IV Riders for each FE PA rate district.
67

-- 75 of 203 --

On November 26, 2025, FE PA submitted a petition for approval of its Phase V Energy Efficiency and Conservation Plan, which includes energy efficiency and
peak demand reduction programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.01% MW, and energy consumption reduction
targets, as a percentage of FE PA’s historic 2009 to 2010 reference load, at 2.00% MWh. The proposed plan includes cost recovery of approximately $390
million to be recovered through its Phase V Energy Efficiency and Conservation Charge Rider and runs for a five-year period beginning June 1, 2026, through
May 31, 2031. Hearings were held on January 29, 2026. The parties have reached a full settlement in principle and expect to file with the PPUC a Joint Petition
for Complete Settlement on or before February 19, 2026. An order is expected from the PPUC in the first quarter of 2026.
On February 3, 2026, FE PA filed a proposed DSP for provision of generation for the June 1, 2027 through May 31, 2031 delivery period, to be sourced through
competitive procurements for customers who do not receive service from an alternative EGS. Under the 2027-2031 DSP, supply would be provided through a
mix of 12, 24, and in the case of residential customers, 60-month energy contracts, as well as spot market purchases for industrial customers. A final order is
expected from the PPUC by November 2026.
WEST VIRGINIA
MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates that
became effective March 27, 2024. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related
market sales revenue through the ENEC. MP’s and PE’s ENEC rate is typically updated annually and MP and PE filed their ENEC filing on August 29, 2025, for
rates effective January 1, 2026.
On April 21, 2022, the WVPSC issued an order approving, effective May 1, 2022, a tariff to offer solar power on a voluntary basis to West Virginia customers and
requiring MP and PE to subscribe at least 85% of the planned 50 MWs of solar generation before seeking approval for surcharge cost recovery. MP and PE
must seek separate approval from the WVPSC to recover any solar generation costs in excess of the approved solar power tariff. On April 24, 2023, MP and PE
sought approval for surcharge cost recovery from the WVPSC for three of the five solar sites, representing 30 MWs of generation. On August 23, 2023, the
WVPSC approved the customer surcharge and granted approval to construct three of the five solar sites. The surcharge went into effect January 1, 2024. Two of
the five solar generation sites went into service in 2024, with the third in April 2025. On December 4, 2024, MP and PE submitted for approval a settlement
agreement to increase its solar surcharge rate. The WVPSC approved the settlement without modification on December 27, 2024, and new rates went into effect
on January 1, 2025. In November 2025, MP and PE submitted a settlement agreement to the WVPSC seeking approval to adjust the solar surcharge rate, which
was approved without modification on January 15, 2026. Pursuant to the settlement agreement, a modest decrease in the solar surcharge rate became effective
January 15, 2026.
On August 29, 2025, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates by approximately $14 million, proposed to
be effective January 1, 2026, which represents a 0.8% increase of total revenues. The proposed increase is driven primarily by an under-recovery balance as of
June 30, 2025, and higher costs for fuel and reagents. On December 12, 2025, the parties filed a settlement agreement with the WVPSC, which was approved
in full without modification on December 23, 2025.
On August 29, 2025, MP and PE filed with the WVPSC their biennial review of their vegetation management program and surcharge. MP and PE have proposed
an approximate $3.2 million decrease in the surcharge rates due to an over-recovery balance as of June 30, 2025, and higher costs for fuel and reagents. The
WVPSC held a hearing regarding rate matters on December 15, 2025. An order from the WVPSC is expected by the end of first quarter 2026.
On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC. To ensure that MP and PE can meet their PJM adequacy requirements,
the plan proposes, among other things, near-term market capacity purchases, and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural
gas combined cycle generation by 2031. On November 26, 2025, the WVPSC issued a procedural order setting a hearing in May 2026.
On February 13, 2026, MP and PE filed a CPCN to construct and operate a 1,200 MW combined cycle gas turbine plant and 70 MWs of solar generation
capacity for an estimated capital investment totaling approximately $2.7 billion as of the date of the filing. The request also includes a surcharge designed to
recover financing costs during development and construction of the projects, as well as to transition to recovery in base rates once the projects are placed in-
service and approved through a base rate case. An order is expected from the WVPSC in the second half of 2026. See “Outlook - Environmental Matters - Clean
Water Act" in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional details on the EPA's ELG.
68

-- 76 of 203 --

FERC REGULATORY MATTERS
Under the Federal Power Act, FERC regulates rates for interstate wholesale sales and transmission of electric power, regulatory accounting and reporting under
the Uniform System of Accounts, and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and
rates, the Electric Companies, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE and
the Transmission Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP,
PE and the Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM
under the PJM Tariff.
The following table summarizes the key terms of FERC rate orders in effect for transmission customer billings for FirstEnergy's transmission owner entities as of
December 31, 2025:
Company 	Allowed Debt/Equity Capital
Structure 	Allowed ROE
ATSI 	Actual (13-month average) 	9.88%
JCP&L 	Actual (13-month average) 	10.2%
MP 	Lower of Actual (13-month average)
or 56% equity 	10.45%
PE 	Lower of Actual (13-month average)
or 56% equity 	10.45%
KATCo 	49.3% equity 	10.45%
MAIT 	Lower of Actual (13-month average)
or 60% equity 	10.3%
TrAIL 	Actual (year-end) 	12.7% / 11.7%
Reflects a 0.5% reduction to the 10.38% approved ROE due to the January 2025 Sixth Circuit ruling eliminating the 50 basis point adder associated with RTO
membership (see Transmission ROE Incentive).
On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo.
Capital structure will convert to an actual (13-month average) in January 2027.
TrAIL the Line and Black Oak Static Var Compensator.
All other projects.
FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates
upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Electric Companies and AE
Supply each have the necessary authorization from FERC to sell their wholesale power, if any, in interstate commerce at market-based rates, although in the
case of the Electric Companies major wholesale purchases remain subject to review and regulation by the relevant state commissions. The Electric Companies
and AE Supply are required to renew their respective authorizations every three years, and on December 16, 2025, the companies filed applications for the next
renewal period.
Federally enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements
on the Electric Companies, AE Supply, and the Transmission Companies. NERC is the Electric Reliability Organization designated by FERC to establish and
enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to six regional
entities, including RFC. All of the facilities that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC
stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the
reliability standards implemented and enforced by RFC.
FirstEnergy believes that it is in material compliance with all currently-effective and enforceable reliability standards. Nevertheless, in the course of operating its
extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the
reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the
specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to
refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability
standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities, that could have
a material adverse effect on its financial condition, results of operations, and cash flows.
FERC Audit
FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s
compliance with certain accounting and reporting requirements under various FERC regulations. On
(1)
(2) 	(3)
(4) 	(5)
(1)
(2)
(3)
(4)
(5)
69

-- 77 of 203 --

February 4, 2022, FERC filed the final audit report for the period of January 1, 2015, through September 30, 2021, which included several findings and
recommendations that FirstEnergy has accepted. The audit report included a finding and related recommendation on FirstEnergy’s methodology for allocation of
certain corporate support costs to regulatory capital accounts under certain FERC regulations and reporting. Effective in the first quarter of 2022 and in response
to the finding, FirstEnergy implemented a new methodology for the allocation of these corporate support costs to regulatory capital accounts for its regulated
distribution and transmission companies on a prospective basis. With the assistance of an independent outside firm, FirstEnergy completed an analysis during
the third quarter of 2022 of these costs and how it impacted certain FERC-jurisdictional wholesale transmission customer rates for the audit period of 2015
through 2021. As a result of this analysis, FirstEnergy reclassified certain transmission capital assets to operating expenses for the audit period. FirstEnergy fully
recovered approximately $105 million ($13 million at JCP&L) of these costs reclassified to operating expenses in its transmission formula rate revenue
requirements as of December 31, 2024.
On December 8, 2023, FERC audit staff issued a letter advising that two unresolved audit matters, related to FirstEnergy’s plan to recover the reclassified
operating expenses in formula transmission rates and a since terminated fuel consulting contract, were being referred to other offices within FERC for further
review. On July 5, 2024, and September 26, 2024, the FERC Office of Enforcement issued additional data requests related to the 2022 reclassification of
operating expenses, to which FirstEnergy replied. On September 10, 2024, and January 13, 2025, the FERC Office of Enforcement issued further data requests
related to the classification and recovery of a since terminated fuel consulting contract, to which FirstEnergy responded. The FERC Office of Enforcement took
no action with respect to the referred matters, and on December 23, 2025, FERC staff notified FirstEnergy that the audit is concluded.
Transmission ROE Incentive
On February 24, 2022, the OCC filed a complaint with FERC against ATSI, AEP’s Ohio affiliate and American Electric Power Service Corporation, and Duke
Energy Ohio, Inc. asserting that FERC should reduce the ROE utilized in the utilities’ transmission formula rates by eliminating the 50 basis point adder
associated with RTO membership, effective February 24, 2022. The OCC contends that this result is required because Ohio law mandates that transmission
owning utilities join an RTO and that the 50 basis point adder is applicable only where RTO membership is voluntary. On December 15, 2022, FERC denied the
complaint as to ATSI and Duke Energy Ohio, Inc., but granted it as to AEP’s Ohio affiliate. AEP’s Ohio affiliate and OCC appealed FERC’s orders to the Sixth
Circuit. On January 17, 2025, the Sixth Circuit ruled that the 50 basis point adder is available only where RTO membership is voluntary, that Ohio law requires
Ohio’s transmission utilities to be members of an RTO, and that it was unlawful for FERC to excise the adder from AEP’s Ohio affiliate rates, but not from the
Duke Energy Ohio, Inc. and ATSI rates. During 2024, as a result of the ruling, ATSI recognized a $46 million pre-tax charge, with interest, of which $42 million is
reported in “Transmission Revenues” and $4 million is reported in “Miscellaneous income, net” on the FirstEnergy Consolidated Statements of Income at the
Stand-Alone Transmission segment, to reflect the expected refund owed to transmission customers back to February 24, 2022. On June 20, 2025 and June 24,
2025, ATSI and AEP’s Ohio affiliate, respectively, applied for the Supreme Court of the U.S. to review the Sixth Circuit’s decision. On November 10, 2025, the
Supreme Court of the U.S. denied ATSI’s petition for the court to review the case. On November 13, 2025, the Sixth Circuit issued a mandate sending the case
back to FERC for further proceedings.
Transmission ROE Methodology
A proposed rulemaking proceeding concerning transmission rate incentives provisions of Section 219 of the 2005 Energy Policy Act was initiated in March of
2020 and remains pending before FERC. Among other things, the rulemaking explored whether utilities should collect an “RTO membership” ROE incentive
adder for more than three years. FirstEnergy is a member of PJM, and its transmission subsidiaries could be affected by the proposed rulemaking. FirstEnergy
participated in comments on the supplemental rulemaking that were submitted by a group of PJM transmission owners and by various industry trade groups. If
there were to be any changes to FirstEnergy's transmission incentive ROE, such changes will be applied on a prospective basis; provided however, due to the
Sixth Circuit’s ruling in the Transmission ROE Incentive matter described above, ATSI is collecting the ROE incentive adder subject to refund.
Transmission Planning Supplemental Projects
On September 27, 2023, the OCC filed a complaint against ATSI, PJM and other transmission utilities in Ohio alleging that the PJM Tariff and operating
agreement are unjust, unreasonable, and unduly discriminatory because they include no provisions to ensure PJM’s review and approval for the planning, need,
prudence and cost-effectiveness of the PJM Tariff Attachment M-3 “Supplemental Projects.” Supplemental Projects are projects that are planned and constructed
to address local needs on the transmission system. The OCC demands that FERC: (i) require PJM to review supplemental projects for need, prudence and cost-
effectiveness; (ii) appoint an independent transmission monitor to assist PJM in such review; and (iii) require that Supplemental Projects go into rate base only
through a “stated rate” procedure whereby prior FERC approval would be needed for projects with costs that exceed an established threshold. Subsequently,
intervenors expanded the scope of this proceeding to all of the transmission utilities in PJM, including JCP&L. ATSI and the other transmission utilities in Ohio
and PJM filed comments.
70

-- 78 of 203 --

Local Transmission Planning Complaint
On December 19, 2024, the Industrial Energy Consumers of America, a group representing large industrial customers, and state consumer advocates filed a
complaint at FERC that asserts that transmission owners are overbuilding “local transmission facilities” with corresponding unjustified increases in transmission
rates. The complaint demands that FERC: (i) prohibit transmission owners from planning “local transmission facilities” that are rated at 100 kV or higher; (ii)
appoint “independent transmission monitors” to conduct such planning; and (iii) condition construction of local transmission facilities on the facility having been
planned by the “independent transmission monitor.” FirstEnergy is participating in this matter through a consortium of PJM transmission owners and through
certain trade groups, including EEI. FirstEnergy, together with the PJM transmission owners, filed a motion to dismiss the complaint on March 20, 2025, which is
pending before FERC. FirstEnergy is unable to predict the outcome or estimate the impact that this complaint may have on its Transmission Companies,
however, whether this lawsuit moves forward could have a material impact on FirstEnergy and its transmission capital investment strategy.
Ghiorzi v. PJM
In December 2023, PJM assigned certain baseline RTEP projects to NextEra Energy Transmission, which subsequently informed PJM that it would not construct
the projects. On April 3, 2025, following the reassignment by PJM of certain baseline RTEP projects in Maryland and Virginia to PE, two individuals filed a
complaint at FERC challenging this outcome, which FERC denied on February 2, 2026. The complainants asserted that PJM erred in reassigning the work to PE
because such reassignment projects: (i) did not reflect the cost estimates or cost caps included in NextEra Energy Transmission’s bid; and (ii) would be
constructed with different routing than as originally proposed. FirstEnergy and PE are unable to predict the outcome or estimate the impact that this complaint
may have.
Valley Link Formula Transmission Rate
On March 14, 2025, the Valley Link joint venture filed an application for forward-looking formula transmission rates to provide for cost recovery for the portfolio of
selected projects. Among other things, the transmission rate application provides for a capital structure of 40% debt and 60% equity, and a base ROE of 10.9%
with associated templates and protocols, as well as transmission rate incentives, including the abandonment rate incentive, the CWIP rate incentive, the RTO
participation adder incentive, the hypothetical capital structure incentive, and the precommercial regulatory asset incentive. On May 14, 2025, FERC issued an
initial order that, among other things, accepted the requested abandonment rate incentive, CWIP rate incentive, RTO participation adder incentive, and
precommercial regulatory asset rate incentive, and allowed the formula rate to go into effect on May 13, 2025, as requested, subject to refund, pending further
settlement and hearing proceedings. The most recent settlement conference was held on December 9, 2025, at which the parties agreed to a procedural
schedule to govern the next phase of the settlement process. The capital structure incentive and the other open rate design matters are being addressed in the
confidential settlement negotiations.
Abandonment Transmission Rate Incentive
On February 26, 2025, PJM completed its 2024 RTEP Open Window 1 process and, among other actions, designated each of ATSI and PE to construct certain
transmission projects. On July 11, 2025, ATSI and PE filed a joint application for the abandonment incentive with FERC, which, was approved on September 9,
2025. Effective September 10, 2025, ATSI and PE each became eligible to recover 50% of the project costs incurred prior to September 10, 2025, and 100% of
the project costs incurred thereafter for any projects subsequently cancelled for reasons beyond the control of utility management.
PJM Capacity Market Reforms
On January 16, 2026, the Trump administration and the governors of all thirteen PJM states released a Statement of Principles Regarding PJM. This Statement
of Principles is designed to, among other things, increase capacity available in the PJM market. PJM is seeking input from its stakeholders on matters related to
the Statement of Principles, including: (1) proposals for a backstop capacity auction, price (cap), term, and quantity; (2) on whether to extend the existing
capacity auction price collar; and (3) accelerating large load interconnections bringing their own generation. FirstEnergy is participating in the stakeholder
processes that are described in the Statement of Principles, including by submitting a letter on January 30, 2026, in response to PJM’s request for input on the
question of whether to extend the existing capacity auction price collar. In the letter, FirstEnergy supported extending the price collar but noted that PJM may
wish to lower costs to customers by lowering the price collar through administrative or other mechanisms.
Large Load Interconnection Rulemaking
On October 23, 2025, the U.S. Secretary of Energy directed FERC to conduct a rulemaking procedure to develop regulations that would speed interconnection
to the transmission system of large loads, including “Artificial Intelligence” data centers and “hybrid” data center/electric generation facilities. The Energy
Secretary advanced 14 principles to guide this outcome, including that such large loads should be responsible for paying the costs of any network transmission
system upgrades required for interconnection of such large loads, and that these large loads should have the option for building such network transmission
upgrades. The Energy Secretary requested that FERC take final action by April 30, 2026. On October 27, 2025, FERC noticed
71

-- 79 of 203 --

the Energy Secretary’s directive for comment, and subsequently established November 21, 2025 as the deadline for initial comments and December 5, 2025 as
the deadline for reply comments. FET and its transmission affiliates, as well as over 150 other parties, filed comments on the established deadlines. FirstEnergy
is unable to predict the outcome of this rulemaking procedure. To the extent the new regulations do not permit transmission utilities to fully recover costs
associated with transmission network upgrades required to serve new large loads, our strategy of investing in transmission could be adversely affected.
ENVIRONMENTAL MATTERS
Various federal, state and local authorities regulate the Registrants with regard to air and water quality, hazardous and solid waste management and disposal,
and other environmental matters. While the Registrants’ environmental policies and procedures are designed to achieve compliance with applicable
environmental laws and regulations, such laws and regulations are subject to periodic review and potential revision by the implementing agencies. The
Registrants cannot predict the timing or ultimate outcome of any of these reviews or how any future actions taken as a result thereof may materially impact their
business, results of operations, cash flows and financial condition. In general, environmental requirements applicable to the electric power sector are becoming
increasingly prescriptive and stringent, and the EPA finalized a number of rules in 2024 that could impact the Registrants. However, the Trump administration has
issued certain executive orders and stated its intention to rescind, revise or replace some existing environmental regulations and the ultimate impact of recently
finalized rules, several of which are in litigation, and any replacement rules are uncertain.
On March 12, 2025, the EPA announced its intent to reevaluate or reconsider numerous environmental regulations, many of which apply to the Registrants. The
specific timing or outcome of this initiative remains unknown, but regular required rulemaking processes and procedures still apply, and litigation is also
anticipated to occur. The disclosures herein do not attempt to discern potential impacts of these deregulatory actions until and unless formal rulemaking or other
regulatory actions are announced and the potential impacts to operations can be discerned.
The disclosures below apply to FirstEnergy and the disclosures under “Regulation of Waste Disposal,” are also applicable to JCP&L.
Clean Air Act
FirstEnergy complies with SO and NO emission reduction requirements under the CAA and SIP by burning lower-sulfur fuel, utilizing combustion controls and
post-combustion controls and/or using emission allowances.
CSAPR requires reductions of NO and SO emissions in two phases (2015 and 2017), ultimately capping SO emissions in affected states to 2.4 million tons
annually and NO emissions to 1.2 million tons annually. CSAPR allows trading of NO and SO emission allowances between electric generation facilities
located in the same state and interstate trading of NO and SO emission allowances with some restrictions. On July 28, 2015, the D.C. Circuit ordered the EPA
to reconsider the CSAPR caps on NO and SO emissions from electric generation facilities in 13 states, including West Virginia. This followed the 2014
Supreme Court of the U.S. ruling generally upholding the EPA’s regulatory approach under CSAPR but questioning whether the EPA required upwind states to
reduce emissions by more than their contribution to air pollution in downwind states. The EPA issued a CSAPR Update on September 7, 2016, reducing
summertime NO emissions from electric generation facilities in 22 states in the eastern U.S., including West Virginia, beginning in 2017. Various states and
other stakeholders appealed the CSAPR Update to the D.C. Circuit in November and December 2016. On September 13, 2019, the D.C. Circuit remanded the
CSAPR Update to the EPA citing that the rule did not eliminate upwind states’ significant contributions to downwind states’ air quality attainment requirements
within applicable attainment deadlines.
Also in March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NO emissions from nine states (including West Virginia)
significantly contribute to New York’s inability to attain the ozone National Ambient Air Quality Standards. The petition sought suitable emission rate limits for
large stationary sources that are allegedly affecting New York’s air quality within the three years allowed by CAA Section 126. On September 20, 2019, the EPA
denied New York’s CAA Section 126 petition. On October 29, 2019, the State of New York appealed the denial of its petition to the D.C. Circuit. On July 14, 2020,
the D.C. Circuit reversed and remanded the New York petition to the EPA for further consideration. On March 15, 2021, the EPA issued a revised CSAPR Update
that addressed, among other things, the remands of the prior CSAPR Update and the New York Section 126 petition. In December 2021, MP purchased NO
emissions allowances to comply with 2021 ozone season requirements. On April 6, 2022, the EPA published proposed rules seeking to impose further significant
reductions in EGU NO emissions in 25 upwind states, including West Virginia, with the stated purpose of allowing downwind states to attain or maintain
compliance with the 2015 ozone National Ambient Air Quality Standards. On February 13, 2023, the EPA disapproved 21 SIPs, which was a prerequisite for the
EPA to issue a final Good Neighbor Plan or FIP. On June 5, 2023, the EPA issued the final Good Neighbor Plan with an effective date 60 days thereafter. Certain
states, including West Virginia, have appealed the disapprovals of their respective SIPs, and some of those states have obtained stays of those disapprovals
precluding the Good Neighbor Plan from taking effect in those states. On August 10, 2023, the 4th Circuit granted West Virginia an interim stay of the
disapproval of its SIP and on January 10, 2024, after a hearing held on October 27, 2023, granted a full stay which precludes the Good Neighbor Plan from
going into effect in West Virginia. In addition to West Virginia, certain other states, and certain trade organizations, including the Midwest Ozone Group of which
FE is a member, separately filed petitions for review and motions to
2 	x
x 	2 	2
x 	x 	2
x 	2
x 	2
x
x
x
x
72

-- 80 of 203 --

stay the Good Neighbor Plan itself at the D.C. Circuit. On September 25, 2023, the D.C. Circuit denied the motions to stay the Good Neighbor Plan. On October
13, 2023, the aggrieved parties filed an Emergency Application for an Immediate Stay of the Good Neighbor Plan with the Supreme Court of the U.S. Oral
argument was heard on February 21, 2024. On June 27, 2024, the Supreme Court of the U.S. granted a stay of the Good Neighbor Plan pending disposition of
the petition for review in the D.C. Circuit. On February 6, 2025, the EPA filed a motion at the D.C. Circuit to hold the proceedings in abeyance for 60 days to
allow the EPA time to familiarize itself with the Good Neighbor Plan and in particular, time to brief the new administration about these consolidated petitions and
the underlying Rule to allow them to decide what action, if any, is necessary. On March 10, 2025, the EPA filed a motion for remand with the D.C. Circuit
identifying issues with the Good Neighbor Plan that make reconsideration appropriate. The D.C. Circuit granted the motion for remand and cancelled oral
argument. Consistent with its March 12, 2025 announcement, the EPA intends to undertake reconsideration of the rule and complete any new rulemaking by the
fourth quarter of 2026. On January 27, 2026, the EPA proposed phase 1 of its reconsideration of the rule applicable to eight states outside of FirstEnergy’s
service area. FirstEnergy will continue to monitor any further actions by the EPA for any potential impact to its business and results of operations.
Climate Change
In recent years, certain regulators in the U.S. have focused efforts on increasing disclosures by companies related to climate change and mitigation efforts. At
the federal level, presidential administrations have held differing views on prioritizing actions to address GHG emissions and, by extension, climate change.
Those differing views have led to policy changes, creating uncertainty about environmental requirements and associated impacts.
In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for GHGs under the Clean Air Act,” known as the 2009
Endangerment Finding, concluding that concentrations of several key GHGs constitute an “endangerment” and may be regulated as “air pollutants” under the
CAA and mandated measurement and reporting of GHG emissions from certain sources, including electric generation facilities. The 2009 Endangerment Finding
is the basis of the EPA’s authority to regulate GHG emissions under the CAA.
In January 2025, Executive Order 14514 was issued and, among other deregulatory actions, directed the EPA Administrator to make recommendations on the
“legality and continuing applicability” of the EPA’s 2009 Endangerment Finding, which forms the basis for the EPA's GHG regulations. On March 12, 2025, the
EPA announced a series of planned deregulatory actions that it would be taking related to such executive order, including reconsideration of the regulations to
limit power plant GHG emissions. On July 29, 2025, the EPA announced a proposal to rescind its 2009 Endangerment Finding. On February 12, 2026, the EPA
issued a final rule rescinding its 2009 Endangerment Finding, thereby eliminating the basis for much of the EPA’s regulation of GHG emissions. However,
depending on the outcome of any appeals and any future EPA actions, compliance with the GHG emissions limits could require additional capital expenditures or
changes in operation at the Fort Martin and Harrison power stations.
On May 23, 2023, the EPA published a proposed rule pursuant to CAA Section 111 (b) and (d) in line with the decision in West Virginia v. Environmental
Protection Agency intended to reduce power sector GHG emissions (primarily CO2 emissions) from fossil fuel based EGUs. On April 25, 2024, the EPA issued a
final rule, which we refer to as the GHG rule, that imposed stringent GHG emissions limitations based on fuel type and unit retirement date. In May 2024, a
group of 25 states, including West Virginia, filed a challenge to the rule in the D.C. Circuit. Also in May 2024, other utility groups, including the Midwest Ozone
Group and Electric Generators for a Sensible Transition, both of which MP is a member, filed petitions for review of the GHG rule as well as motions to stay the
rule in the D.C. Circuit. The D.C. Circuit subsequently granted a motion from the EPA placing the litigation in abeyance until further order of the Court. On June
17, 2025, the EPA published a proposed rule to repeal the GHG rule. The EPA is expected to issue a final rule repealing all or portions of the GHG rule in
February 2026.
At the state level, there are several initiatives to reduce GHG emissions. Certain northeastern states are participating in the Regional Greenhouse Gas Initiative
and western states, including California, have implemented programs to control emissions of certain GHGs and enhance public disclosures relating to the same.
Additional policies reducing GHG emissions, such as demand reduction programs, renewable portfolio standards and renewable subsidies have been
implemented across the nation.
FirstEnergy has pledged to achieve carbon neutrality by 2050 with respect to GHGs within FirstEnergy’s direct operational control (known as Scope 1
emissions). FirstEnergy’s ability to achieve its GHG reduction goal is subject to its ability to make operational changes and is conditioned upon numerous risks,
many of which are outside of its control. With respect to FirstEnergy’s coal-fired facilities in West Virginia, which serve as the primary source of its Scope 1
emissions, it has identified that the end of the useful life date is 2035 for Fort Martin and 2040 for Harrison. MP filed its 10-year integrated resource plan with the
WVPSC on October 1, 2025, which highlighted, among other things, the need for new dispatchable generation in West Virginia. Determination of the useful life
of the regulated coal-fired generation could result in changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale,
impairment, or regulatory disallowances. If FirstEnergy is unable to recover these costs, it could have a material adverse effect on FirstEnergy’s financial
condition, results of operations, and cash flow. FirstEnergy cannot currently estimate the financial impact of climate change policies, although potential legislative
or regulatory programs restricting CO emissions, or litigation alleging damages from GHG emissions, could require material capital and other expenditures or
result in changes to its operations.
2
73

-- 81 of 203 --

FirstEnergy continues to monitor climate change policies at both the federal and state level. Based on the EPA’s final rule rescinding the 2009 Endangerment
Filing and other anticipated rulemaking, we may experience a reduction in GHG reporting and other regulatory obligations at the federal level over the near term.
Multiple lawsuits opposing the EPA’s rescission were filed after it was finalized and the legal conflict is expected to be extensive. In light of the pending legal
challenges, FirstEnergy is unable to predict the impact on its business and operations.
Clean Water Act
Various water quality regulations, the majority of which are the result of the federal Clean Water Act and its amendments, apply to FirstEnergy’s facilities. In
addition, the states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.
On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic,
mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations
were to phase-in as permits were renewed on a five-year cycle from 2018 to 2023. However, on April 13, 2017, the EPA granted a Petition for Reconsideration
and on September 18, 2017, the EPA postponed certain compliance deadlines for two years. On August 31, 2020, the EPA issued a final rule revising the
effluent limits for discharges from wet scrubber systems, retaining the zero-discharge standard for ash transport water, (with some limited discharge allowances),
and extending the deadline for compliance to December 31, 2025, for both. In addition, the EPA allows for less stringent limits for sub-categories of generating
units based on capacity utilization, flow volume from the scrubber system, and unit retirement date. On March 29, 2023, the EPA published proposed revised
ELGs applicable to coal-fired electric generation facilities that include more stringent effluent limitations for wet scrubber systems and ash transport water, and
new limits on landfill leachate. The rule was issued as final by the EPA on April 25, 2024. On May 30, 2024, the Utility Water Act Group, of which FirstEnergy is a
member, filed a Petition for Review of the 2024 ELG Rule with the U.S. Court of Appeals for the Fifth and Eighth Circuit Courts, and on June 18, 2024, the Utility
Water Group filed a motion to stay the rule pending disposition on the merits. A number of other parties have challenged the final rule in various petitions for
review across several circuits. Those petitions and motions for stay have been consolidated in the U.S. Court of Appeals for the Eighth Circuit. On October 10,
2024, the U.S. Court of Appeals for the Eighth Circuit denied the motions for stay. Depending on the outcome of appeals and the EPA’s review, compliance with
the 2024 ELG rule could require additional capital expenditures or changes in operation at closed and active landfills, and at the Ft. Martin and Harrison power
stations from what was approved by the WVPSC in September 2022 to comply with the 2020 ELG rule. On February 19, 2025, the U.S. Department of Justice
filed a motion on behalf of the EPA in the U.S. Court of Appeals for the Eighth Circuit, seeking to hold the litigation in abeyance for a period of 60 days while the
new leadership at the EPA evaluates the rule and determines how it wishes to proceed. On February 28, 2025, U.S. Court of Appeals for the Eighth Circuit
granted the EPA’s motion. On March 12, 2025, the EPA announced a series of planned deregulatory actions, including reconsideration of the 2024 ELG rule. On
December 31, 2025, the EPA published a final ELG Deadline Extensions Rule extending certain compliance deadlines included in the 2024 ELG Rule by five
years.
Regulation of Waste Disposal
Federal and state hazardous waste regulations have been promulgated as a result of the Resource Conservation and Recovery Act, as amended, and the Toxic
Substances Control Act. Certain CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the
need for future regulation.
In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity
design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to
assure the safe disposal of CCRs from electric generation facilities. On September 13, 2017, the EPA announced that it would reconsider certain provisions of
the final regulations. On July 29, 2020, the EPA published a final rule again revising the date that certain CCR impoundments must cease accepting waste and
initiate closure to April 11, 2021. The final rule allowed for an extension of the closure deadline based on meeting identified site-specific criteria. On November
30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR
impoundment facility to October 2024, which request was withdrawn by AE Supply on July 9, 2024, prior to the completion of the technical review by the EPA. As
of May 31, 2024, AE Supply ceased accepting waste at the McElroy’s Run CCR impoundment facility from Pleasants Power Station. During 2024, as a result of
the evaluation of closure options for McElroy’s Run CCR impoundment facility and the adjacent landfill, AE Supply reviewed its ARO and future expected costs to
remediate, resulting in an increase to the ARO liability of $87 million. AE Supply transferred the McElroy’s Run CCR impoundment facility and adjacent dry
landfill and related remediation obligations on March 4, 2025, pursuant to the environmental liability transfer agreement dated February 3, 2025 with a subsidiary
of IDA Power, LLC. Pursuant to the agreement, AE Supply established a $160 million escrow account that AE Supply will fund over five years and is secured by
a surety bond, which is guaranteed by FE. In connection with the transfer, AE Supply recognized a $130 million liability, based on a 4.8% weighted average
discount rate over the contract term, associated with its remaining obligation to fund the escrow account over the next five years, and derecognized the ARO,
resulting in an immaterial impact to earnings. During the twelve months ended December 31, 2025, AE Supply made $46 million of cash payments to the escrow
account.
On May 8, 2024, the EPA issued the legacy CCR rule, which finalized changes to the CCR regulations addressing inactive surface impoundments at inactive
electric utilities, known as legacy CCR surface impoundments. The rule extends 2015 CCR
74

-- 82 of 203 --

Rule requirements for groundwater monitoring and protection, operational and reporting procedures as well as closure requirements to impoundments and
landfills that were not originally included for coverage by the 2015 CCR Rule. Furthermore, the EPA’s interpretations of the EPA CCR regulations continue to
evolve through enforcement and other regulatory actions. FirstEnergy is currently assessing the potential impacts of the final rule, including a review of additional
sites to which the new rule might be applicable. On February 13, 2025, the U.S. Department of Justice filed a motion on behalf of the EPA in the D.C. Circuit,
seeking to hold the litigation, which was filed on August 8, 2024, by the Utility Solid Waste Act Group with FE as a member, in abeyance for a period of 120 days
while the new leadership at the EPA evaluates the rule and determines how it wishes to proceed, which the D.C. Circuit granted. On March 12, 2025, the EPA
announced a series of planned deregulatory actions, including reconsideration of the final legacy CCR rule. FirstEnergy continues to monitor the EPA’s actions
related to CCR regulations; however, the ultimate impact is unknown at this time and is subject to the outcome of the litigation and any future state regulatory
actions. Depending on the outcome of appeals and the EPA’s rule, compliance with the final legacy CCR rule could require remedial actions, including removal
of coal ash. See Note 9., “Asset Retirement Obligations,” of the Combined Notes to Financial Statements of the Registrants above for a description of the $139
million increase to its ARO that FirstEnergy recorded during 2024 as a result of its analysis and reduced in the fourth quarter of 2025 based on the completion of
engineering studies and field analysis of certain sites. JCP&L did not have any potential legacy CCR disposal sites that were applicable to the 2024 legacy CCR
rules. During the fourth quarter of 2025, FirstEnergy completed engineering studies and field analysis for certain of its legacy CCR disposal sites and determined
that certain of those sites did not meet criteria to be applicable to the CCR rules. As a result, during the fourth quarter of 2025, FirstEnergy recorded a $49 million
decrease to its ARO.
Certain of the FirstEnergy companies have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the
CERCLA. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however,
federal law provides that all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are
considered probable have been recognized on FirstEnergy’s Consolidated Balance Sheets as of December 31, 2025, based on estimates of the total costs of
cleanup, FirstEnergy’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $97
million have been accrued through December 31, 2025, of which approximately $70 million are for environmental remediation of former MGP and gas holder
facilities in New Jersey, which are being recovered by JCP&L through a non-bypassable societal benefits charge. FE or its subsidiaries could be found
potentially responsible for additional amounts or additional sites, but the loss or range of losses cannot be determined or reasonably estimated at this time.
OTHER LEGAL PROCEEDINGS
United States v. Larry Householder, et al.
On July 21, 2020, a complaint and supporting affidavit containing federal criminal allegations were unsealed against the now former Ohio House Speaker Larry
Householder and other individuals and entities allegedly affiliated with Mr. Householder. In March 2023, a jury found Mr. Householder and his co-defendant,
Matthew Borges, guilty and in June 2023, the two were sentenced to prison for 20 and five years, respectively. Messrs. Householder and Borges have appealed
their sentences; the Sixth Circuit recently rejected their appeal upholding their convictions. Also, on July 21, 2020, and in connection with the U.S. Attorney’s
Office’s investigation, FirstEnergy received subpoenas for records from the U.S. Attorney’s Office for the Southern District of Ohio. FirstEnergy was not aware of
the criminal allegations, affidavit or subpoenas before July 21, 2020. On January 17, 2025, the U.S. Attorney’s Office announced that a federal grand jury
charged two former FirstEnergy senior officers with one count of participating in a Racketeer Influenced and Corrupt Organizations Act conspiracy. The
allegations in the indictment are largely based on the conduct described in the DPA.
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves this matter as to FE. Under the
DPA, FE agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The DPA required that
FirstEnergy, among other obligations: (i) continue to cooperate with the U.S. Attorney’s Office in all matters relating to the conduct described in the DPA and
other conduct under investigation by the U.S. government; (ii) pay a criminal monetary penalty totaling $230 million within sixty days, consisting of (x) $115
million paid by FE to the U.S. Treasury and (y) $115 million paid by FE to the ODSA to fund certain assistance programs, as determined by the ODSA, for the
benefit of low-income Ohio electric utility customers; (iii) publish a list of all payments made in 2021 to either 501(c)(4) entities or to entities known by FirstEnergy
to be operating for the benefit of a public official, either directly or indirectly, and update the same on a quarterly basis during the term of the DPA; (iv) issue a
public statement, as dictated in the DPA, regarding FE’s use of 501(c)(4) entities; and (v) continue to implement and review its compliance and ethics program,
internal controls, policies and procedures designed, implemented and enforced to prevent and detect violations of U.S. laws throughout its operations, and to
take certain related remedial measures. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will FirstEnergy
seek any tax deduction related to such payment. The entire amount of the monetary penalty was recognized as an expense in the second quarter of 2021 and
paid in the third quarter of 2021. As of July 22, 2024, FirstEnergy had successfully completed the obligations required within the three-year term of the DPA.
Under the DPA, FirstEnergy has an obligation to continue: (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by
FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S.
Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the conclusion of any related
investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office, including the aforementioned federal indictment against two former
FirstEnergy
75

-- 83 of 203 --

senior officers. Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s Office will
dismiss the criminal information. On February 26, 2025, the U.S. Attorney’s Office filed a status report confirming these commitments.
Legal Proceedings Relating to U.S. v. Larry Householder, et al.
Certain FE stockholders and FirstEnergy customers also filed several lawsuits against FirstEnergy and certain current and former directors, officers and other
employees, and the complaints in each of these suits is related to allegations in the complaint and supporting affidavit relating to HB 6 and the now former Ohio
House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. The plaintiffs in each of the below cases seek,
among other things, to recover an unspecified amount of damages (unless otherwise noted).
• In re FirstEnergy Corp. Securities Litigation (S.D. Ohio); on July 28, 2020, and August 21, 2020, purported stockholders of FE filed putative class action
lawsuits alleging violations of the federal securities laws. Those actions have been consolidated and a lead plaintiff, the Los Angeles County Employees
Retirement Association, has been appointed by the court. A consolidated complaint was filed on February 26, 2021. The consolidated complaint alleges,
on behalf of a proposed class of persons who purchased FE securities between February 21, 2017 and July 21, 2020, that FE and certain current or
former FE officers violated Sections 10(b) and 20(a) of the Exchange Act by issuing alleged misrepresentations or omissions concerning FE’s business
and results of operations. The consolidated complaint also alleges that FE, certain current or former FE officers and directors, and a group of
underwriters violated Sections 11, 12(a)(2) and 15 of the Securities Act as a result of alleged misrepresentations or omissions in connection with
offerings of senior notes by FE in February and June 2020. On March 30, 2023, the court granted plaintiffs’ motion for class certification. On April 14,
2023, FE filed a petition in the Sixth Circuit seeking to appeal that order. On August 13, 2025, the Sixth Circuit vacated the S.D. Ohio’s order granting
class certification. On November 6, 2025, the S.D. Ohio held oral argument to further consider class certification in light of the Sixth Circuit’s decision.
FE believes that it is probable that it will incur a loss in connection with the resolution of this lawsuit. Given the ongoing nature and complexity of such
litigation, FE cannot yet reasonably estimate a loss or range of loss.
• MFS Series Trust I, et al. v. FirstEnergy Corp., et al. and Brighthouse Funds II – MFS Value Portfolio, et al. v. FirstEnergy Corp., et al. (S.D. Ohio); on
December 17, 2021 and February 21, 2022, purported stockholders of FE filed complaints against FE, certain current and former officers, and certain
then-current and former officers of Energy Harbor Corp. The complaints allege that the defendants violated Sections 10(b) and 20(a) of the Exchange
Act by issuing alleged misrepresentations or omissions regarding FE’s business and its results of operations, and seek the same relief as the In re
FirstEnergy Corp. Securities Litigation described above. FE believes that it is probable that it will incur losses in connection with the resolution of these
lawsuits. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
The outcome of any of these lawsuits is uncertain and could have a material adverse effect on FE’s or its subsidiaries’ reputation, business, financial condition,
results of operations, liquidity, and cash flows.
Other Legal Matters
There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to the Registrants’ normal business operations pending
against them or their subsidiaries. The loss or range of loss in these matters is not expected to be material to the Registrants. The other potentially material
items not otherwise discussed above are described under Note 13., “Regulatory Matters” of the Combined Notes to Financial Statements of the Registrants.
The Registrants accrue legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount
of such costs. In cases where the Registrants determine that it is not probable, but reasonably possible that they have a material obligation, they disclose such
obligations and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that the Registrants have legal liability or are
otherwise made subject to liability based on any of the matters referenced above, it could have a material adverse effect on the Registrants’ financial condition,
results of operations, and cash flows.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
The Registrants prepare financial statements in accordance with GAAP. Application of these principles often requires a high degree of judgment, estimates and
assumptions that affect financial results. The Registrants' accounting policies require significant judgment regarding estimates and assumptions underlying the
amounts included in the financial statements. Additional information regarding the application of accounting policies is included in the Combined Notes to
Financial Statements of the Registrants.
76

-- 84 of 203 --

Loss Contingencies
The Registrants are involved in a number of investigations, litigation, regulatory audits, arbitration, mediation, and similar proceedings. The Registrants regularly
assess their liabilities and contingencies in connection with asserted or potential matters and establish reserves when appropriate. In the preparation of the
financial statements, the Registrants make judgment regarding the future outcome of contingent events based on currently available information and accrue
liabilities when they conclude that it is probable that they have an obligation for such costs and can reasonably estimate the amount of such costs. In cases
where the Registrants determine that it is not probable, but reasonably possible that they have a material obligation, such obligations are disclosed and the
possible loss or range of loss if such estimate can be made. Circumstances change over time and actual results may vary significantly from estimates. See Note
13., “Regulatory Matters” and Note 14., “Commitments, Guarantees and Contingencies,” of the Combined Notes to Financial Statements of the Registrants for
additional information.
Revenue Recognition
The accounting treatment for revenue recognition is based on the nature of the underlying transaction and applicable authoritative guidance. The Registrants
account for revenue from contracts with customers under ASC 606, “Revenue from Contracts with Customers.” Revenue from financial instruments, derivatives,
late payment charges and other contractual rights or obligations and other revenues that are not from contracts with customers are outside the scope of the
standard and accounted for under other existing GAAP.
Contracts with Customers
The Registrants follow the accrual method of accounting for revenues, recognizing revenue for electricity that has been delivered to customers but not yet billed
through the end of the accounting period. The determination of electricity sales to individual customers for the Electric Companies is based on meter readings,
which occur on a systematic basis throughout the month. At the end of each month, electricity delivered to customers since the last meter reading is estimated
and a corresponding accrual for unbilled sales is recognized. The determination of unbilled sales and revenues requires management to make estimates
regarding electricity available for retail load, transmission and distribution line losses, demand by customer class, applicable billing demands, weather-related
impacts, number of days unbilled and tariff rates in effect within each customer class.
The Registrants' transmission revenues are primarily derived from forward-looking formula rates. Forward-looking formula rates recover costs that the regulatory
agencies determine are permitted to be recovered and provide a return on transmission capital investment. Under forward-looking formula rates, the revenue
requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs.
Revenues and cash receipts for the stand-ready obligation of providing transmission service are recognized ratably over time.
The Registrants have elected the optional invoice practical expedient for most of their revenues and the Registrants utilize the optional short-term contract
exemption for transmission revenues due to the annual establishment of revenue requirements, which eliminates the need to provide certain revenue
disclosures regarding unsatisfied performance obligations. See Note 2., "Revenue," of the Combined Notes to Financial Statements of the Registrants for
additional information.
Regulatory Accounting
The Registrants are subject to regulation that sets the prices (rates) they are permitted to charge customers based on costs that the regulatory agencies
determine are permitted to be recovered. At times, regulatory agencies permit the future recovery of costs that would be currently charged to expense by an
unregulated company. The ratemaking process results in the recording of regulatory assets and liabilities based on anticipated future cash inflows and outflows.
The Registrants review the probability of recovery of regulatory assets, and settlement of regulatory liabilities, at each balance sheet date and whenever new
events occur. Factors that may affect probability include changes in the regulatory environment, issuance of a regulatory commission order, or passage of new
legislation. Upon material changes to these factors, where applicable, the Registrants will record new regulatory assets or liabilities and will assess whether it is
probable that currently recorded regulatory assets and liabilities will be recovered or settled in future rates. If recovery of a regulatory asset is no longer
probable, the Registrants will write off that regulatory asset as a charge against earnings. The Registrants consider the entire regulatory asset balance as the
unit of account for the purposes of balance sheet classification rather than the next year's recovery and, as such, net regulatory assets and liabilities are
presented in the noncurrent section on the Registrants' Balance Sheets. See Note 13., "Regulatory Matters," of the Combined Notes to Financial Statements of
the Registrants for additional information.
Pension and OPEB Accounting
FirstEnergy provides qualified benefit plans (the FirstEnergy Master Pension Plan and the FirstEnergy Welfare Plan) that cover substantially all employees and
non-qualified defined benefit plans that cover certain employees, including employees of JCP&L.
77

-- 85 of 203 --

The retirement plans provide defined benefits based on years of service and compensation levels. Under the cash balance formula of the FirstEnergy Master
Pension Plan (for employees hired on or after January 1, 2014), FirstEnergy makes contributions on behalf of eligible employees based on a pay credit and an
interest credit. In addition, FirstEnergy provides a minimum amount of noncontributory life insurance to retired employees. Health care benefits, which include
certain employee contributions, deductibles and co-payments, are also available upon retirement to certain employees, their dependents and, under certain
circumstances, their survivors.
FirstEnergy’s pension and OPEB plans are neither multiemployer nor multiple-employer plans. JCP&L recognizes its allocated portion of the expected cost of
providing pension and OPEB to employees and their beneficiaries and covered dependents from the time employees are hired until they become eligible to
receive those benefits. JCP&L also recognizes its allocated portion of obligations to former or inactive employees after employment, but before retirement, for
disability-related benefits.
Discount Rate - In selecting an assumed discount rate, FirstEnergy considers currently available rates of return on high-quality fixed income investments
expected to be available during the period to maturity of the pension and OPEB obligations. FirstEnergy utilizes a full yield curve approach in the estimation of
the service and interest components of net periodic benefit costs for pension and OPEB by applying specific spot rates along the full yield curve to the relevant
projected cash flows.
Expected Return on Plan Assets - The expected return on pension and OPEB assets is based on input from investment consultants, including the trusts’ asset
allocation targets, the historical performance of risk-based and fixed income securities and other factors. The gains or losses generated as a result of the
difference between expected and actual returns on plan assets is recognized as a pension and OPEB mark-to-market adjustment in the fourth quarter of each
fiscal year and whenever a plan is determined to qualify for remeasurement. The expected return on pension and OPEB assets for 2026 is 8.0% and 7.0%,
respectively.
Mortality Rates - The mortality assumption is composed of a base table that represents the current expectation of life expectancy of the population adjusted by
an improvement scale that attempts to anticipate future improvements in life expectancy. The Pri-2012 mortality table with projection scale MP-2021, actuarially
adjusted to reflect increased mortality due to the ongoing impact of COVID-19, was utilized to determine the 2026 benefit cost and obligation as of December 31,
2025, for FirstEnergy's pension and OPEB plans. The MP-2021 scale was published in 2021 by the Society of Actuaries.
Health Care Trend Rates - Included in determining trend rate assumptions are the specific provisions of FirstEnergy’s health care plans, the demographics and
utilization rates of plan participants, actual cost increases experienced in FirstEnergy’s health care plans, and projections of future medical trend rates.
Net Periodic Benefit Costs (Credits) - In addition to service costs, interest on obligations, expected return on plan assets, and prior service costs, FirstEnergy
recognizes in net periodic benefit costs a pension and OPEB mark-to-market adjustment for the change in the fair value of plan assets and net actuarial gains
and losses annually in the fourth quarter of each fiscal year and whenever a plan is determined to qualify for a remeasurement.
The following table reflects the pre-tax portion of pension and OPEB costs that were charged (credited) to expense, including pension and OPEB mark-to-market
adjustments and special termination benefits, net of amounts capitalized, in the years ended December 31, 2025, 2024, and 2023:
Net Periodic Benefit Costs (Credits) 	2025 	2024 	2023
(In millions)
Pension 	$ 	(257) $ 	5 $ 	57
OPEB 	(40) 	(59) 	(40)
Total 	$ 	(297) $ 	(54) $ 	17
The annual pre-tax pension and OPEB mark-to-market adjustment (gains) or losses, for the years ended December 31, 2025, 2024, and 2023, were $(253)
million, $22 million and $78 million, respectively.
FirstEnergy expects its 2026 pre-tax net periodic credit, prior to amounts capitalized and excluding any potential mark-to-market adjustments, to be
approximately less than $1 million based upon the following assumptions:
Assumption 	Pension 	OPEB
Effective rate for interest on benefit obligations 	4.96 % 	4.74 %
Effective rate for service costs 	5.95 % 	6.16 %
Effective rate for interest on service costs 	5.43 % 	5.90 %
Expected return on plan assets 	8.00 % 	7.00 %
Rate of compensation increase 	4.30 % 	N/A
78

-- 86 of 203 --

The approximate effects on 2026 pension and OPEB net periodic benefit costs and the 2025 benefit obligation from changes in key assumptions are as follows:
Approximate Effect on 2026 Net Periodic Benefit Costs from Changes in Key Assumptions
Assumption 	Change 	Pension 	OPEB 	Total
(In millions)
Discount rate 	Change by 0.25% 	$ 	192 $ 	7 $ 	199
Expected return on plan assets 	Change by 0.25% 	$ 	14 $ 	2 $ 	16
Health care trend rate 	Change by 1.0% 	N/A $ 	10 $ 	10
Assumes a parallel shift in yield curve.
Approximate Effect on December 31, 2025 Benefit Obligation from Changes in Key Assumptions
Assumption 	Change 	Pension 	OPEB 	Total
(In millions)
Discount rate 	Change by 0.25% 	$ 	194 $ 	8 $ 	202
Health care trend rate 	Change by 1.0% 	N/A $ 	10 $ 	10
Assumes a parallel shift in yield curve.
See Note 4., "Pension and Other Postemployment Benefits," of the Combined Notes to Financial Statements of the Registrants for additional information.
Income Taxes
Judgment and the use of estimates are required in developing the provision for income taxes, including reserve amounts for uncertain tax positions and reporting
of tax-related assets and liabilities. The Registrants are required to make judgments regarding the interpretation of tax laws and associated regulations and the
potential tax effects of various transactions and results of operations in order to estimate their obligations to taxing authorities.
The Registrants record income taxes in accordance with the liability method of accounting. Deferred income taxes reflect the net tax effect of temporary
differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts recognized for tax purposes. Investment tax
credits, which were deferred when utilized, are being amortized over the recovery period of the related property. Deferred income tax liabilities related to
temporary tax and accounting basis differences and tax credit carryforward items are recognized at the statutory income tax rates in effect when the liabilities are
expected to be paid. Deferred tax assets are recognized based on income tax rates expected to be in effect when they are settled.
The Registrants account for uncertainty in income taxes in their financial statements using a benefit recognition model with a two-step approach, a more-likely-
than-not recognition criterion and a measurement attribute that measures the position as the largest amount of tax benefit that is greater than 50% likely of being
ultimately realized upon settlement. If it is not more likely than not that the benefit will be sustained on its technical merits, no benefit will be recorded. Uncertain
tax positions that relate only to timing of when an item is included on a tax return are considered to have met the recognition threshold. The Registrants
recognize interest expense or income related to uncertain tax positions by applying the applicable statutory interest rate to the difference between the tax
position recognized and the amount previously taken, or expected to be taken, on the tax return.
Actual income taxes could vary from estimated amounts due to the future impacts of various items, including future changes in income tax laws, or new
regulations or guidance, forecasted results of operations, failure to successfully implement tax planning strategies, as well as results of audits and examinations
of filed tax returns by taxing authorities.
See Note 6., "Taxes," of the Combined Notes to Financial Statements of the Registrants for additional information on income taxes.
NEW ACCOUNTING PRONOUNCEMENTS
See Note 1., "Organization and Basis of Presentation," of the Combined Notes to Financial Statements of the Registrants for a discussion of new accounting
pronouncements.
(1)
(1)
(1)
(1)
79

-- 87 of 203 --

JERSEY CENTRAL POWER & LIGHT COMPANY
MANAGEMENT’S NARRATIVE DISCUSSION AND
ANALYSIS OF RESULTS OF OPERATIONS
This Form 10-K discusses JCP&L's 2025 and 2024 results and year-over-year comparisons between 2025 and 2024. Discussions of 2023 results and year-over-
year comparisons between 2024 and 2023 that are not included in this Form 10-K can be found in “Management’s Discussion and Analysis of Financial
Condition and Results of Operations” in JCP&L's Form S-4 filed with the SEC on April 1, 2025.
JCP&L is a wholly owned subsidiary of FE. JCP&L conducts business in New Jersey by providing regulated electric transmission and distribution services in
northern, western and east central New Jersey. JCP&L procures electric supply to serve its BGS customers through a statewide auction process approved by
the NJBPU. JCP&L is subject to regulation by the NJBPU and FERC.
JCP&L's reportable operating segments are comprised of the Distribution and Transmission segments.
JCP&L's Distribution segment, representing $3.7 billion in rate base as of December 31, 2025, distributes electricity to approximately 1.2 million customers in
New Jersey across its distribution footprint. The segment’s results reflect the costs of securing and delivering electric generation to customers, including the
deferral and amortization of certain costs.
JCP&L's Transmission segment, representing $1.4 billion in rate base as of December 31, 2025, includes transmission infrastructure owned and operated by
JCP&L that is used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue
requirement is updated annually based on a projected rate base and projected costs, which are subject to an annual true-up based on actual rate base and
costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on JCP&L’s transmission facilities.
For additional information with respect to JCP&L, please see the information contained in FirstEnergy’s Management’s Discussion and Analysis of Financial
Condition and Results of Operations under the following subheadings, which information is incorporated by reference herein: Executive Summary and Recent
Developments, Regulatory Assets and Liabilities, Capital Resources and Liquidity, Guarantees and Other Assurances, Market Risk Information, Credit Risk,
Outlook, Critical Accounting Policies and Estimates and New Accounting Pronouncements.
As discussed, in Note 1.,"Organization and Basis of Presentation," of the Combined Notes to Financial Statements of the Registrants, during the fourth quarter of
2025, JCP&L identified an error in the recording of certain expenses for smart meter cost of removal associated with the deployment of its AMI program,
resulting in an understatement of expense on the Statements of Income and Comprehensive Income and Regulatory assets/liabilities on the Balance Sheets
since 2023. JCP&L evaluated the error, and the specific impact on each affected prior period was not material, however, as a result of the cumulative impact,
JCP&L determined it should revise previously issued financial statements to correct the error and in doing so also corrected other immaterial errors. These
adjustments have been reflected in this Form 10-K for JCP&L.
80

-- 88 of 203 --

JCP&L Summary of Results of Operations — 2025 Compared with 2024
Financial results for JCP&L's business segments for the years ended December 31, 2025 and 2024, were as follows:
2025 Financial Results 	Reconciling
(In millions) 	Distribution 	Transmission 	Adjustments 	JCP&L
Revenues 	$ 	2,554 $ 	259 $ 	(175) $ 	2,638
Operating Expenses:
Purchased power 	1,402 	— 	— 	1,402
Other operating expenses 	791 	64 	(175) 	680
Provision for depreciation 	209 	54 	— 	263
Deferral of regulatory assets, net 	(134) 	— 	— 	(134)
General taxes 	21 	2 	— 	23
Total operating expenses 	2,289 	120 	(175) 	2,234
Other Income (Expense):
Miscellaneous income (expense), net 	50 	(1) 	— 	49
Pension and OPEB mark-to-market adjustment 	51 	4 	— 	55
Interest expense - non-affiliates 	(98) 	(34) 	— 	(132)
Interest expense - affiliates 	(6) 	— 	— 	(6)
Capitalized financing costs 	13 	30 	— 	43
Total other income (expense) 	10 	(1) 	— 	9
Income taxes 	71 	36 	— 	107
Net Income 	$ 	204 $ 	102 $ 	— $ 	306
2024 Financial Results 	Reconciling
(In millions) 	Distribution 	Transmission 	Adjustments 	JCP&L
Revenues 	$ 	2,225 $ 	242 $ 	(152) $ 	2,315
Operating Expenses:
Purchased power 	1,155 	— 	— 	1,155
Other operating expenses 	745 	61 	(152) 	654
Provision for depreciation 	203 	46 	— 	249
Deferral of regulatory assets, net 	(124) 	— 	— 	(124)
General taxes 	20 	1 	— 	21
Total operating expenses 	1,999 	108 	(152) 	1,955
Other Income (Expense):
Miscellaneous income (expense), net 	44 	(10) 	— 	34
Pension and OPEB mark-to-market adjustment 	22 	2 	— 	24
Interest expense - non-affiliates 	(75) 	(22) 	— 	(97)
Interest expense - affiliates 	(20) 	— 	— 	(20)
Capitalized financing costs 	9 	19 	— 	28
Total other expense 	(20) 	(11) 	— 	(31)
Income taxes 	52 	35 	— 	87
Net Income 	$ 	154 $ 	88 $ 	— $ 	242
Previously issued 2024 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the
Combined Notes to Financial Statements of the Registrants.
(1)
(1)
81

-- 89 of 203 --

Changes Between 2025 and 2024
Financial Results 	Reconciling
Increase (Decrease) 	Distribution 	Transmission 	Adjustments 	JCP&L
(In millions)
Revenues 	$ 	329 $ 	17 $ 	(23) $ 	323
Operating Expenses:
Purchased power 	247 	— 	— 	247
Other operating expenses 	46 	3 	(23) 	26
Provision for depreciation 	6 	8 	— 	14
Deferral of regulatory assets, net 	(10) 	— 	— 	(10)
General taxes 	1 	1 	— 	2
Total operating expenses 	290 	12 	(23) 	279
Other Income (Expense):
Miscellaneous income (expense), net 	6 	9 	— 	15
Pension and OPEB mark-to-market adjustment 	29 	2 	— 	31
Interest expense - non-affiliates 	(23) 	(12) 	— 	(35)
Interest expense - affiliates 	14 	— 	— 	14
Capitalized financing costs 	4 	11 	— 	15
Total other income (expense) 	30 	10 	— 	40
Income taxes 	19 	1 	— 	20
Net Income 	$ 	50 $ 	14 $ 	— $ 	64
82

-- 90 of 203 --

JCP&L’s Distribution Segment - 2025 compared with 2024
Net income increased $50 million in 2025, as compared to 2024, primarily due to higher revenues from the implementation of the base rate case in February
2024, the absence of a $53 million charge in connection with the base rate case settlement agreement, as further discussed below, higher customer usage and
demand, higher pension and OPEB mark-to-market adjustments and higher rider revenues associated with regulated investment programs, partially offset by
higher operating expenses.
Revenues
The $329 million increase in total revenues resulted from the following sources:
For the Years Ended December 31,
Revenues by Type of Service 	2025 	2024
Increase /
(Decrease)
(In millions)
Distribution services 	$ 	1,150 $ 	1,105 $ 	45
Generation sales:
Retail 	1,380 	1,092 	288
Wholesale 	6 	6 	—
Total generation sales 	1,386 	1,098 	288
Other 	18 	22 	(4)
Total Revenues 	$ 	2,554 $ 	2,225 $ 	329
Distribution services revenue increased $45 million in 2025, as compared to 2024, primarily due to higher revenues from the implementation of the base rate
case in February 2024, higher customer usage and demand, and higher rider revenues associated with certain regulated investment programs.
Generation sales revenues increased $288 million in 2025, as compared to 2024, primarily due to higher non-shopping generation auction rates. Retail
generation sales have no material impact to earnings.
Operating Expenses
Total operating expenses increased $290 million primarily due to:
• Purchased power costs, which have no material impact to earnings, increased $247 million in 2025, as compared to 2024, primarily due to higher unit
costs.
• Other operating expenses increased $46 million in 2025, as compared to 2024, primarily due to:
• Higher uncollectible expenses of $4 million, which were deferred for future recovery;
• Higher storm restoration expenses of $14 million, which were mostly deferred for future recovery.
• Higher energy efficiency and other state mandated program costs of $39 million, which were deferred for future recovery, resulting in no
material impact to earnings; and
• Higher other operating expenses of $51 million, primarily due to severance and related costs associated with FirstEnergy’s organizational
changes announced in the first quarter of 2025, higher employee benefit costs, and higher material and contractor spend, partially offset by
increased construction support and lower maintenance work.
The increase was partially offset by:
• The absence of a $53 million pre-tax charge at JCP&L in the first quarter 2024 associated with certain corporate support costs recorded to
capital accounts from the FERC Audit that were determined, as a result of the base rate case settlement agreement, to be disallowed from
future recovery; and
• The absence of a $9 million impairment related to the Akron general office in the third quarter of 2024.
• Depreciation expense increased $6 million in 2025, as compared to 2024, primarily due to a higher asset base.
83

-- 91 of 203 --

• Deferral of regulatory assets, net increased $10 million in 2025, as compared to 2024, primarily due to a $27 million increase from higher deferral of
storm related expenses, including the absence of the approval in the first quarter of 2024 to recover $11 million in previously incurred storm costs and a
$6 million net increase in other deferrals, partially offset by a $20 million decrease due to the absence of the amortization of a regulatory liability related
to customer refunds in 2024 and a $3 million net decrease from lower generation and transmission deferrals.
Other Expenses
Total other expenses decreased $30 million in 2025, as compared to 2024, primarily due to higher pension and OPEB mark-to-market adjustments, lower
interest on short-term borrowings and higher capitalized interest, partially offset by long-term debt issuances since 2024.
Income Taxes
The Distribution segment's effective tax rate was 25.8% and 25.2% for 2025 and 2024, respectively.
JCP&L’s Transmission Segment - 2025 compared with 2024
Net income increased $14 million in 2025, as compared to 2024, primarily due to higher revenues from regulated transmission investments that increased rate
base, higher capitalized financing costs and the absence of a non-recoverable charge related to an abandoned transmission project in the second quarter 2024.
Revenues
Transmission revenue increased $17 million in 2025, as compared to 2024, primarily due to higher revenues from regulated transmission investments that
increased rate base and higher recovery of transmission operating expenses.
Operating Expenses
Total operating expenses increased $12 million in 2025, as compared to 2024, primarily due to higher depreciation, higher operating and maintenance expenses,
and higher property tax expenses from a higher asset base. Nearly all operating expenses are recovered through formula rates, resulting in no material impact
on current period earnings.
Other Expenses
Total other expenses decreased $10 million in 2025, as compared to 2024, primarily due to higher capitalized financing costs and the absence of a non-
recoverable charge related to an abandoned transmission project in the second quarter 2024, partially offset by higher interest expenses on new long-term debt
issuances.
Income Taxes
The Transmission segment's effective tax rate was 26.1% and 28.5% for 2025 and 2024, respectively. The decrease in the effective tax rate was primarily due to
an increase in the tax benefit from AFUDC equity flow-through.
84

-- 92 of 203 --

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
The information required by Item 7A. relating to market risk is set forth in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of
Operations."
ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA
The consolidated financial statements and supplementary data of FirstEnergy required in this item are set forth beginning on page 90.
The financial statements and supplementary data of JCP&L required in this item are set forth beginning on page 96.
85

-- 93 of 203 --

Report of Independent Registered Public Accounting Firm
To the Board of Directors and Stockholders of FirstEnergy Corp.
Opinions on the Financial Statements and Internal Control over Financial Reporting
We have audited the accompanying consolidated balance sheets of FirstEnergy Corp. and its subsidiaries (the "Company") as of December 31, 2025 and 2024,
and the related consolidated statements of income, of comprehensive income, of stockholders’ equity and of cash flows for each of the three years in the period
ended December 31, 2025, including the related notes (collectively referred to as the "consolidated financial statements"). We also have audited the Company's
internal control over financial reporting as of December 31, 2025, based on criteria established in Internal Control - Integrated Framework (2013) issued by the
Committee of Sponsoring Organizations of the Treadway Commission (COSO).
In our opinion, the consolidated financial statements referred to above present fairly, in all material respects, the financial position of the Company as of
December 31, 2025 and 2024, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2025 in
conformity with accounting principles generally accepted in the United States of America. Also in our opinion, the Company maintained, in all material respects,
effective internal control over financial reporting as of December 31, 2025, based on criteria established in Internal Control - Integrated Framework (2013) issued
by the COSO.
Basis for Opinions
The Company's management is responsible for these consolidated financial statements, for maintaining effective internal control over financial reporting, and for
its assessment of the effectiveness of internal control over financial reporting, included in Management’s Report on Internal Control over Financial Reporting
appearing under Item 9A. Our responsibility is to express opinions on the Company’s consolidated financial statements and on the Company's internal control
over financial reporting based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States)
(PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and
regulations of the Securities and Exchange Commission and the PCAOB.
We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audits to obtain reasonable
assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud, and whether effective internal
control over financial reporting was maintained in all material respects.
Our audits of the consolidated financial statements included performing procedures to assess the risks of material misstatement of the consolidated financial
statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis,
evidence regarding the amounts and disclosures in the consolidated financial statements. Our audits also included evaluating the accounting principles used and
significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. Our audit of internal control
over financial reporting included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, and
testing and evaluating the design and operating effectiveness of internal control based on the assessed risk. Our audits also included performing such other
procedures as we considered necessary in the circumstances. We believe that our audits provide a reasonable basis for our opinions.
Definition and Limitations of Internal Control over Financial Reporting
A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the
preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial
reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the
transactions and dispositions of the assets of the company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation
of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in
accordance with authorizations of management and directors of the company; and (iii) provide reasonable assurance regarding prevention or timely detection of
unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of
effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance
with the policies or procedures may deteriorate.
86

-- 94 of 203 --

Critical Audit Matters
The critical audit matter communicated below is a matter arising from the current period audit of the consolidated financial statements that was communicated or
required to be communicated to the audit committee and that (i) relates to accounts or disclosures that are material to the consolidated financial statements and
(ii) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on
the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the
critical audit matter or on the accounts or disclosures to which it relates.
Accounting for the Effects of Rate Regulation
As described in Note 1 to the consolidated financial statements, the Company is subject to regulation that sets the prices (rates) it is permitted to charge
customers based on costs that the regulatory agencies determine are permitted to be recovered. At times, regulatory agencies permit the future recovery of
costs that would be currently charged to expense by an unregulated company. The ratemaking process results in the recording of regulatory assets and liabilities
based on anticipated future cash inflows and outflows. Management reviews the probability of recovery of regulatory assets, and settlement of regulatory
liabilities, at each balance sheet date and whenever new events occur. Factors that may affect probability include changes in the regulatory environment,
issuance of a regulatory commission order, or passage of new legislation. Upon material changes to these factors, where applicable, management will record
new regulatory assets or liabilities and will assess whether it is probable that currently recorded regulatory assets and liabilities will be recovered or settled in
future rates. As of December 31, 2025, there were $829 million of regulatory assets and $1,185 million of regulatory liabilities.
The principal considerations for our determination that performing procedures relating to accounting for the effects of rate regulation is a critical audit matter are
a high degree of auditor effort in performing procedures and evaluating audit evidence related to the recovery of regulatory assets and the settlement of
regulatory liabilities.
Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the consolidated financial
statements. These procedures included testing the effectiveness of controls relating to the accounting for regulatory matters, including controls over the
evaluation of the recoverability and settlement of existing regulatory assets and liabilities. These procedures also included, among others, (i) obtaining the
Company’s correspondence with regulators, (ii) evaluating the reasonableness of management’s assessment regarding regulatory guidance, proceedings, and
legislation and the related accounting implications, and (iii) testing, on a sample basis, the regulatory assets and liabilities by considering the provisions outlined
in rate orders and other correspondence with regulators.
/s/ PricewaterhouseCoopers LLP
Cleveland, Ohio
February 18, 2026
We have served as the Company’s auditor since 2002.
87

-- 95 of 203 --

Report of Independent Registered Public Accounting Firm
To the Board of Directors and Stockholder of Jersey Central Power & Light Company
Opinion on the Financial Statements
We have audited the accompanying balance sheets of Jersey Central Power & Light Company (the "Company") as of December 31, 2025 and 2024, and the
related statements of income and comprehensive income, of common stockholder’s equity and of cash flows for each of the three years in the period ended
December 31, 2025, including the related notes (collectively referred to as the "financial statements"). In our opinion, the financial statements present fairly, in all
material respects, the financial position of the Company as of December 31, 2025 and 2024, and the results of its operations and its cash flows for each of the
three years in the period ended December 31, 2025 in conformity with accounting principles generally accepted in the United States of America.
Basis for Opinion
These financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on the Company’s financial
statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and
are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the
Securities and Exchange Commission and the PCAOB.
We conducted our audits of these financial statements in accordance with the standards of the PCAOB. Those standards require that we plan and perform the
audits to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud.
Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and
performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the
financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating
the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.
Critical Audit Matters
The critical audit matter communicated below is a matter arising from the current period audit of the financial statements that was communicated or required to
be communicated to the audit committee and that (i) relates to accounts or disclosures that are material to the financial statements and (ii) involved our
especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial
statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the
accounts or disclosures to which it relates.
Accounting for the Effects of Rate Regulation
As described in Note 1 to the financial statements, the Company is subject to regulation that sets the prices (rates) it is permitted to charge customers based on
costs that the regulatory agencies determine are permitted to be recovered. At times, regulatory agencies permit the future recovery of costs that would be
currently charged to expense by an unregulated company. The ratemaking process results in the recording of regulatory assets and liabilities based on
anticipated future cash inflows and outflows. Management reviews the probability of recovery of regulatory assets, and settlement of regulatory liabilities, at each
balance sheet date and whenever new events occur. Factors that may affect probability include changes in the regulatory environment, issuance of a regulatory
commission order, or passage of new legislation. Upon material changes to these factors, where applicable, management will record new regulatory assets or
liabilities and will assess whether it is probable that currently recorded regulatory assets and liabilities will be recovered or settled in future rates. As of December
31, 2025, there were $515 million of regulatory assets, net.
The principal considerations for our determination that performing procedures relating to accounting for the effects of rate regulation is a critical audit matter are
a high degree of auditor effort in performing procedures and evaluating audit evidence related to the recovery of regulatory assets and the settlement of
regulatory liabilities.
88

-- 96 of 203 --

Addressing the matter involved performing procedures and evaluating audit evidence in connection with forming our overall opinion on the financial statements.
These procedures included, among others, (i) obtaining the Company’s correspondence with regulators, (ii) evaluating the reasonableness of management’s
assessment regarding regulatory guidance, proceedings, and legislation and the related accounting implications, and (iii) testing, on a sample basis, the
regulatory assets and liabilities by considering the provisions outlined in rate orders and other correspondence with regulators.
/s/ PricewaterhouseCoopers LLP
Cleveland, Ohio
February 18, 2026
We have served as the Company’s auditor since 2002.
89

-- 97 of 203 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF INCOME
For the Years Ended December 31,
(In millions, except per share amounts) 	2025 	2024 	2023
REVENUES:
Distribution services and retail generation 	$ 	12,189 $ 	10,976 $ 	10,405
Transmission 	2,311 	2,148 	2,049
Other 	590 	348 	416
Total revenues 	15,090 	13,472 	12,870
OPERATING EXPENSES:
Fuel 	652 	464 	538
Purchased power 	4,583 	3,912 	4,108
Other operating expenses 	4,122 	4,044 	3,579
Provision for depreciation 	1,664 	1,581 	1,461
Deferral of regulatory assets, net 	(109) 	(231) 	(261)
General taxes 	1,345 	1,212 	1,164
Ohio settlement charges (Note 13.) 	275 	— 	—
Impairment of assets (Note 1.) 	352 	115 	15
Total operating expenses 	12,884 	11,097 	10,604
OPERATING INCOME 	2,206 	2,375 	2,266
OTHER INCOME (EXPENSE):
Debt redemption costs (Note 11.) 	(24) 	(85) 	(36)
Equity method investment earnings, net (Note 1.) 	— 	58 	175
Miscellaneous income, net 	156 	189 	164
Pension and OPEB mark-to-market adjustments (Note 4.) 	253 	(22) 	(78)
Interest expense 	(1,217) 	(1,144) 	(1,124)
Capitalized financing costs 	185 	133 	97
Total other expense 	(647) 	(871) 	(802)
INCOME BEFORE INCOME TAXES 	1,559 	1,504 	1,464
INCOME TAXES 	288 	377 	267
INCOME FROM CONTINUING OPERATIONS 	1,271 	1,127 	1,197
Discontinued operations (Note 1.) 	— 	— 	(21)
NET INCOME 	$ 	1,271 $ 	1,127 $ 	1,176
Income attributable to noncontrolling interest (continuing operations) 	251 	149 	74
EARNINGS ATTRIBUTABLE TO FIRSTENERGY CORP. 	$ 	1,020 $ 	978 $ 	1,102
EARNINGS ATTRIBUTABLE TO FIRSTENERGY CORP.
Earnings from continuing operations 	$ 	1,020 $ 	978 $ 	1,123
Earnings from discontinued operations 	— 	— 	(21)
EARNINGS ATTRIBUTABLE TO FIRSTENERGY CORP. 	$ 	1,020 $ 	978 $ 	1,102
EARNINGS PER SHARE ATTRIBUTABLE TO FIRSTENERGY CORP. (Note 3.)
Basic - continuing operations 	$ 	1.77 $ 	1.70 $ 	1.96
Basic - discontinued operations 	— 	— 	(0.04)
Basic 	$ 	1.77 $ 	1.70 $ 	1.92
Diluted - continuing operations 	$ 	1.76 $ 	1.70 $ 	1.96
Diluted - discontinued operations 	— 	— 	(0.04)
Diluted 	$ 	1.76 $ 	1.70 $ 	1.92
WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING:
Basic 	577 	575 	573
Diluted 	578 	577 	574
Includes excise and gross receipts tax collections of $463 million, $429 million and $420 million in 2025, 2024 and 2023, respectively.
Consists of income taxes of $21 million in 2023.
See Combined Notes to Financial Statements of the Registrants.
(1)
(2)
(1)
(2)
90

-- 98 of 203 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
NET INCOME 	$ 	1,271 $ 	1,127 $ 	1,176
OTHER COMPREHENSIVE INCOME (LOSS):
Pension and OPEB prior service costs 	— 	1 	(6)
Amortized losses on derivative hedges 	— 	3 	2
Other comprehensive income (loss) 	— 	4 	(4)
Income tax expense (benefits) on other comprehensive loss 	— 	1 	(1)
Other comprehensive income (loss), net of tax 	— 	3 	(3)
COMPREHENSIVE INCOME 	$ 	1,271 $ 	1,130 $ 	1,173
Comprehensive income attributable to noncontrolling interest 	251 	149 	74
COMPREHENSIVE INCOME ATTRIBUTABLE TO FIRSTENERGY CORP. 	$ 	1,020 $ 	981 $ 	1,099
See Combined Notes to Financial Statements of the Registrants.
91

-- 99 of 203 --

FIRSTENERGY CORP.
CONSOLIDATED BALANCE SHEETS
(In millions, except share amounts)
December 31,
2025
December 31,
2024
ASSETS
CURRENT ASSETS:
Cash and cash equivalents 	$ 	57 $ 	111
Restricted cash 	42 	43
Receivables-
Customers 	1,783 	1,585
Less — Allowance for uncollectible customer receivables 	57 	55
1,726 	1,530
Other, net of allowance for uncollectible accounts of $11 in 2025 and $6 in 2024 	295 	303
Materials and supplies, at average cost 	577 	549
Prepaid taxes and other 	282 	240
2,979 	2,776
PROPERTY, PLANT AND EQUIPMENT:
In service 	56,213 	52,896
Less — Accumulated provision for depreciation 	15,189 	14,548
41,024 	38,348
Construction work in progress 	3,389 	2,754
44,413 	41,102
INVESTMENTS AND OTHER NONCURRENT ASSETS:
Goodwill 	5,618 	5,618
Investments 	641 	652
Regulatory assets 	829 	617
Other 	1,424 	1,279
8,512 	8,166
TOTAL ASSETS 	$ 	55,904 $ 	52,044
LIABILITIES AND EQUITY
CURRENT LIABILITIES:
Currently payable long-term debt 	$ 	723 $ 	977
Short-term borrowings 	325 	550
Accounts payable 	2,002 	1,575
Accrued interest 	373 	269
Accrued taxes 	768 	727
Accrued compensation and benefits 	286 	205
Dividends payable 	257 	245
Customer deposits 	250 	233
Other 	287 	216
5,271 	4,997
NONCURRENT LIABILITIES:
Long-term debt and other long-term obligations 	25,508 	22,496
Accumulated deferred income taxes 	6,032 	5,613
Retirement benefits 	1,469 	1,698
Regulatory liabilities 	1,185 	995
Other 	2,513 	2,525
36,707 	33,327
TOTAL LIABILITIES 	41,978 	38,324
EQUITY:
Common stockholders' equity-
Common stock, $0.10 par value, authorized 700,000,000 shares - 577,851,052 and 576,612,245 shares outstanding as of
December 31, 2025 and 2024, respectively 	58 	58
Other paid-in capital 	12,431 	12,368
Accumulated other comprehensive loss 	(14) 	(14)
Retained earnings 	35 	43
Total common stockholders' equity 	12,510 	12,455
Noncontrolling interest 	1,416 	1,265
TOTAL EQUITY 	13,926 	13,720
COMMITMENTS, GUARANTEES AND CONTINGENCIES (Note 14.)
TOTAL LIABILITIES AND EQUITY 	$ 	55,904 $ 	52,044
As of December 31, 2025 and 2024, the combined assets of the VIEs were $13,269 million and $12,053 million, respectively, that can only be used to settle obligations of the
VIEs. As of December 31, 2025 and 2024, these assets include, respectively: Cash and cash equivalents of $8 million and $8 million, Restricted cash of $40 million and $40
million, Accounts receivable of $92 million and $96 million, Materials and supplies, at average cost of $1 million and $1 million, Prepaid taxes and other current assets of $41
million and $22 million, Property, plant, and equipment of $12,475 million and $11,217 million, Goodwill of $224 million and $224 million, Investments of $19 million and $19
million,
(1)
(1)
(1)

-- 100 of 203 --

92

-- 101 of 203 --

Regulatory assets of $21 million and $92 million, and Other noncurrent assets of $348 million and $334 million. The consolidated liabilities as of December 31, 2025 and 2024,
include $10,176 million and $9,147 million, respectively, of liabilities of VIEs whose creditors have no recourse to FE. As of December 31, 2025 and 2024, these liabilities include,
respectively: Currently payable long-term debt of $126 million and $674 million, Short-term borrowings of $245 million and $300 million, Accrued interest of $108 million and $76
million, Accrued taxes of $335 million and $306 million, other current liabilities of $9 million and $10 million, Long-term debt and other long-term obligations of $6,884 million and
$5,544 million, Accumulated deferred income taxes of $1,540 million and $1,411 million, Regulatory liabilities of $598 million and $526 million, and Other noncurrent liabilities of
$331 million and $300 million.
See Combined Notes to Financial Statements of the Registrants.
93

-- 102 of 203 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF STOCKHOLDERS' EQUITY
Common Stock
OPIC 	AOCI
Retained Earnings
(Accumulated
Deficit)
Total Common
Stockholders'
Equity 	Total Equity	(In millions) 	Shares 	Amount 	NCI
Balance, January 1, 2023 	572 $ 	57 $ 11,322 $ 	(14) $ 	(1,199) $ 	10,166 $ 	477 $ 	10,643
Net income 	— 	— 	— 	— 	1,102 	1,102 	74 	1,176
Other comprehensive loss, net of
tax 	— 	— 	— 	(3) 	— 	(3) 	— 	(3)
Cash dividends declared on
common stock 	— 	— 	(917) 	— 	— 	(917) 	— 	(917)
Stock Investment Plan and share-
based benefit plans 	2 	— 	89 	— 	— 	89 	— 	89
Noncontrolling interest distributions
declared 	— 	— 	— 	— 	— 	— 	(72) 	(72)
Balance, December 31, 2023 	574 $ 	57 $ 10,494 $ 	(17) $ 	(97) $ 	10,437 $ 	479 $ 	10,916
Net income 	— 	— 	— 	— 	978 	978 	149 	1,127
Other comprehensive income, net
of tax 	— 	— 	— 	3 	— 	3 	— 	3
Cash dividends declared on
common stock 	— 	— 	(141) 	— 	(838) 	(979) 	— 	(979)
Stock Investment Plan and share-
based benefit plans 	3 	1 	73 	— 	— 	74 	— 	74
FET Equity Interest Sale (Note 1.) 	— 	— 	1,934 	— 	— 	1,934 	731 	2,665
Noncontrolling interest distributions
declared 	— 	— 	— 	— 	— 	— 	(86) 	(86)
Other 	8 	8 	(8) 	—
Balance, December 31, 2024 	577 $ 	58 $ 12,368 $ 	(14) $ 	43 $ 	12,455 $ 1,265 $ 	13,720
Net income 	— 	— 	— 	1,020 	1,020 	251 	1,271
Cash dividends declared on
common stock 	— 	— 	— 	— 	(1,028) 	(1,028) 	— 	(1,028)
Stock Investment Plan and share-
based benefit plans 	1 	60 	— 	— 	60 	— 	60
Noncontrolling interest distributions
declared 	— 	— 	— 	— 	— 	(100) 	(100)
Other 	— 	— 	3 	— 	— 	3 	— 	3
Balance, December 31, 2025 	578 $ 	58 $ 12,431 $ 	(14) $ 	35 $ 	12,510 $ 1,416 $ 	13,926
Dividends declared for each share of common stock totaled: $1.78, $1.70 and $1.60, during 2025, 2024 and 2023, respectively.
See Combined Notes to Financial Statements of the Registrants.
(1)
(1)
(1)
(1)
94

-- 103 of 203 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	1,271 $ 	1,127 $ 	1,176
Adjustments to reconcile net income to net cash from operating activities-
Depreciation and amortization 	1,607 	1,446 	1,255
Impairment of assets 	352 	142 	15
Charges (credits) associated with changes in ARO (Note 9.) 	(54) 	200 	10
Employee benefit costs, net 	14 	(32) 	(9)
Pension and OPEB mark-to-market adjustments 	(253) 	22 	78
Deferred income taxes and investment tax credits, net 	219 	316 	252
Transmission revenue collections, net 	197 	113 	(180)
Pension trust contribution 	— 	— 	(750)
Loss (gain) on disposal, net of tax 	— 	— 	21
Changes in current assets and liabilities-
Receivables 	(186) 	(249) 	(13)
Materials and supplies 	(28) 	(37) 	(91)
Prepaid taxes and other current assets 	(24) 	(33) 	(43)
Accounts payable 	210 	124 	(141)
Accrued taxes 	105 	(126) 	32
Accrued interest 	104 	(23) 	38
Ohio settlement customer restitution and refunds (Note 13.) 	275 	— 	—
Other current liabilities 	4 	(141) 	41
Cash collateral, net 	4 	90 	(218)
Employee benefit plan funding and related payments 	(49) 	(59) 	(50)
Other 	(68) 	11 	(36)
Net cash provided from operating activities 	3,700 	2,891 	1,387
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital investments 	(4,705) 	(4,030) 	(3,356)
Sales of investment securities held in trusts 	102 	121 	38
Purchases of investment securities held in trusts 	(114) 	(134) 	(50)
Asset removal costs 	(376) 	(305) 	(274)
Other 	28 	(2) 	(10)
Net cash used for investing activities 	(5,065) 	(4,350) 	(3,652)
CASH FLOWS FROM FINANCING ACTIVITIES:
New financing-
Long-term debt 	5,925 	2,100 	3,150
Short-term borrowings, net 	— 	— 	675
Redemptions and repayments-
Long-term debt 	(3,129) 	(2,760) 	(537)
Short-term borrowings, net 	(225) 	(225) 	—
Proceeds from FET Equity Interest Sale (Note 1.) 	— 	3,500 	—
Noncontrolling interest cash distributions 	(100) 	(86) 	(72)
Common stock dividend payments 	(1,016) 	(970) 	(906)
Debt issuance and redemption costs, and other 	(145) 	(125) 	(72)
Net cash provided from financing activities 	1,310 	1,434 	2,238
Net change in cash, cash equivalents and restricted cash 	(55) 	(25) 	(27)
Cash, cash equivalents, and restricted cash at beginning of period 	154 	179 	206
Cash, cash equivalents, and restricted cash at end of period 	$ 	99 $ 	154 $ 	179
SUPPLEMENTAL CASH FLOW INFORMATION:
Cash paid during the year-
Interest (net of amounts capitalized) 	$ 	999 $ 	1,062 $ 	1,002
Income taxes, net of refunds 	$ 	73 $ 	161 $ 	58
Significant non-cash transactions:
Accrued capital investments 	$ 	361 $ 	315 $ 	252
McElroy Run Transfer 	$ 	99 $ 	— $ 	—
See Combined Notes to Financial Statements of the Registrants.
95

-- 104 of 203 --

JERSEY CENTRAL POWER & LIGHT COMPANY
STATEMENTS OF INCOME AND COMPREHENSIVE INCOME
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
REVENUES 	$ 	2,638 $ 	2,315 $ 	2,027
OPERATING EXPENSES:
Purchased power 	1,402 	1,155 	1,037
Other operating expenses 	680 	654 	555
Provision for depreciation 	263 	249 	231
Deferral of regulatory assets, net 	(134) 	(124) 	(67)
General taxes 	23 	21 	21
Total operating expenses 	2,234 	1,955 	1,777
OPERATING INCOME 	404 	360 	250
OTHER INCOME (EXPENSE):
Miscellaneous income, net 	49 	34 	42
Pension and OPEB mark-to-market adjustment (Note 4.) 	55 	24 	(29)
Interest expense - non-affiliates 	(132) 	(97) 	(110)
Interest expense - affiliates 	(6) 	(20) 	(14)
Capitalized financing costs 	43 	28 	19
Total other expense 	9 	(31) 	(92)
INCOME BEFORE INCOME TAXES 	413 	329 	158
INCOME TAXES 	107 	87 	33
NET INCOME 	$ 	306 $ 	242 $ 	125
OTHER COMPREHENSIVE INCOME:
Pension and OPEB prior service costs 	— 	1 	—
Other comprehensive income 	— 	1 	—
Income taxes on other comprehensive income 	— 	— 	—
Other comprehensive income, net of tax 	— 	1 	—
COMPREHENSIVE INCOME 	$ 	306 $ 	243 $ 	125
Includes affiliated operating expenses of $116 million, $118 million and $122 million in 2025, 2024 and 2023, respectively.
See Combined Notes to Financial Statements of the Registrants.
(1)
(1)
96

-- 105 of 203 --

JERSEY CENTRAL POWER & LIGHT COMPANY
BALANCE SHEETS
(In millions, except share amounts) 	December 31, 2025
December 31,
2024
ASSETS
CURRENT ASSETS:
Receivables -
Customers 	$ 	330 $ 	284
Less — Allowance for uncollectible customer receivables 	6 	6
324 	278
Affiliated companies 	22 	44
Other 	25 	28
Prepaid taxes and other 	33 	29
404 	379
PROPERTY, PLANT AND EQUIPMENT:
In service 	9,267 	8,731
Less — Accumulated provision for depreciation 	2,439 	2,439
6,828 	6,292
Construction work in progress 	880 	620
7,708 	6,912
INVESTMENTS AND OTHER NONCURRENT ASSETS:
Goodwill 	1,811 	1,811
Investments 	297 	282
Regulatory assets 	515 	247
Prepaid OPEB costs 	243 	215
Other 	131 	67
2,997 	2,622
TOTAL ASSETS 	$ 	11,109 $ 	9,913
LIABILITIES AND COMMON STOCKHOLDER’S EQUITY
CURRENT LIABILITIES:
Currently payable long-term debt 	$ 	2 $ 	1
Short-term borrowings -
Affiliated companies 	93 	22
Accounts payable -
Affiliated companies 	103 	1
Other 	175 	176
Accrued compensation and benefits 	34 	33
Customer deposits 	35 	34
Accrued taxes 	11 	21
Accrued interest 	44 	23
Other 	41 	34
538 	345
NONCURRENT LIABILITIES:
Long-term debt and other long-term obligations 	3,023 	2,339
Accumulated deferred income taxes, net 	1,348 	1,192
Nuclear fuel disposal costs 	245 	235
Retirement benefits 	32 	71
Other 	763 	764
5,411 	4,601
TOTAL LIABILITIES 	5,949 	4,946
COMMON STOCKHOLDER'S EQUITY:
Common stock, $10 par value, authorized 16,000,000 shares - 13,628,447 shares outstanding 	136 	136
Other paid-in capital 	3,530 	3,523
Accumulated other comprehensive loss 	(4) 	(4)
Retained earnings 	1,498 	1,312
TOTAL COMMON STOCKHOLDER’S EQUITY 	5,160 	4,967
COMMITMENTS, GUARANTEES AND CONTINGENCIES (NOTE 14.)
TOTAL LIABILITIES AND COMMON STOCKHOLDER’S EQUITY 	$ 	11,109 $ 	9,913

-- 106 of 203 --

See Combined Notes to Financial Statements of the Registrants.
97

-- 107 of 203 --

JERSEY CENTRAL POWER & LIGHT COMPANY
STATEMENTS OF COMMON STOCKHOLDER’S EQUITY
Common Stock
(In millions, except share amounts) Number of
Shares Carrying
Value Other Paid-
In Capital 	AOCI Retained
Earnings Total Stockholder's
Equity
Balance, January 1, 2023 	13,628,447 $ 	136 $ 	2,742 $ 	(5) $ 	1,095 $ 	3,968
Net income 	— 	— 	— 	— 	125 	125
Stock-based compensation 	— 	— 	5 	— 	— 	5
Equity contribution from parent 	— 	— 	30 	— 	— 	30
Balance, December 31, 2023 	13,628,447 $ 	136 $ 	2,777 $ 	(5) $ 	1,220 $ 	4,128
Net income 	— 	— 	— $ 	— 	242 	242
Comprehensive income 	— 	— 	— 	1 	— 	1
Stock-based compensation 	— 	— 	6 	— 	— 	6
Equity contribution from parent 	— 	— 	740 	— 	— 	740
Cash dividend declared on common stock 	— 	— 	— 	— 	(150) 	(150)
Balance, December 31, 2024 	13,628,447 $ 	136 $ 	3,523 $ 	(4) $ 	1,312 $ 	4,967
Net income 	— 	— 	— 	— 	306 	306
Stock-based compensation 	— 	— 	7 	— 	— 	7
Cash dividends declared on common stock 	— 	— 	— 	— 	(120) 	(120)
Balance, December 31, 2025 	13,628,447 $ 	136 $ 	3,530 $ 	(4) $ 	1,498 $ 	5,160
In the form of FE common equity granted to certain JCP&L employees primarily related to the 401(k) Savings Plan.
See Combined Notes to Financial Statements of the Registrants.
(1)
(1)
(1)
(1)
98

-- 108 of 203 --

JERSEY CENTRAL POWER & LIGHT COMPANY
STATEMENTS OF CASH FLOWS
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	$ 	306 $ 	242 $ 	125
Adjustments to reconcile net income to net cash from operating activities-
Depreciation, amortization, and impairments 	130 	172 	152
Transmission revenue collections, net 	21 	6 	(14)
Deferred income taxes and investment tax credits, net 	143 	230 	48
Spent nuclear fuel disposal trust income 	13 	12 	12
New Jersey temporary rate credits, net 	(20) 	— 	—
Employee benefit costs, net 	(24) 	(22) 	(27)
Pension and OPEB mark-to-market adjustment 	(55) 	(24) 	29
Changes in current assets and liabilities-
Receivables 	(21) 	(32) 	(6)
Prepaid taxes and other current assets 	— 	6 	(9)
Accounts payable 	87 	(7) 	(6)
Accrued taxes 	(10) 	17 	1
Accrued interest 	21 	(4) 	1
Other current liabilities 	4 	— 	(3)
Collateral, net 	— 	29 	(57)
Employee benefit plan funding and related payments 	— 	(7) 	(7)
Other 	(24) 	(9) 	25
Net cash provided from operating activities 	571 	609 	264
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital investments 	(1,105) 	(879) 	(633)
Sales of investment securities held in trusts 	102 	121 	38
Purchases of investment securities held in trusts 	(114) 	(134) 	(50)
Asset removal costs 	(84) 	(57) 	(45)
Other 	(3) 	— 	—
Net cash used for investing activities 	(1,204) 	(949) 	(690)
CASH FLOWS FROM FINANCING ACTIVITIES:
New financing-
Long-term debt 	1,350 	700 	—
Short-term borrowings
Affiliated companies, net 	71 	— 	197
Other, net 	— 	— 	200
Redemptions and repayments-
Long-term debt 	(650) 	(500) 	—
Short-term borrowings
Affiliated companies, net 	— 	(240) 	—
Other, net 	— 	(200) 	—
Equity contribution from parent 	— 	740 	30
Common stock dividend payments 	(120) 	(150) 	—
Other 	(18) 	(10) 	(1)
Net cash provided from financing activities 	633 	340 	426
Net change in cash, cash equivalents, and restricted cash 	— 	— 	—
Cash, cash equivalents, and restricted cash at beginning of period 	— 	— 	—
Cash, cash equivalents, and restricted cash at end of period 	$ 	— $ 	— $ 	—
SUPPLEMENTAL CASH FLOW INFORMATION:
Cash paid (received) during the year:
Interest (net of amounts capitalized) 	$ 	99 $ 	96 $ 	108
Income taxes, net of refunds 	$ 	(15) $ 	(101) $ 	(11)
Significant non-cash transactions
Accrued capital investments 	$ 	92 $ 	82 $ 	59
See Combined Notes to Financial Statements of the Registrants.
99

-- 109 of 203 --

COMBINED NOTES TO FINANCIAL STATEMENTS OF THE REGISTRANTS
Note
Number 	Registrant
Page
Number
1 	Organization and Basis of Presentation 	FirstEnergy, JCP&L 	101
2 	Revenue 	FirstEnergy, JCP&L 	111
3 	Earnings Per Share 	FirstEnergy 	115
4 	Pension and Other Postemployment Benefits 	FirstEnergy, JCP&L 	116
5 	Stock-Based Compensation Plans 	FirstEnergy, JCP&L 	117
6 	Taxes 	FirstEnergy, JCP&L 	119
7 	Leases 	FirstEnergy, JCP&L 	126
8 	Variable Interest Entities 	FirstEnergy, JCP&L 	131
9 	Asset Retirement Obligations 	FirstEnergy, JCP&L 	132
10 	Fair Value Measurements 	FirstEnergy, JCP&L 	134
11 	Capitalization 	FirstEnergy, JCP&L 	137
12 	Short-Term Borrowings and Bank Lines of Credit 	FirstEnergy, JCP&L 	142
13 	Regulatory Matters 	FirstEnergy, JCP&L 	143
14 	Commitments, Guarantees and Contingencies 	FirstEnergy, JCP&L 	154
15 	Segment Information 	FirstEnergy, JCP&L 	160
16 	Transactions with Affiliates 	JCP&L 	165
17 	Revision of Previously Issued Quarterly Financial Statements (Unaudited) 	JCP&L 	165
100

-- 110 of 203 --

Combined Notes to Financial Statements of the Registrants
1. ORGANIZATION AND BASIS OF PRESENTATION
Defined terms and abbreviations used herein have the meanings set forth in the accompanying Glossary of Terms. This is a combined set of financial statements
filed separately for FirstEnergy and JCP&L. Unless otherwise indicated, the disclosures in these notes apply to each of the Registrants. For clarification
purposes, disclosures made herein on behalf of FirstEnergy should be read to be made on behalf of JCP&L unless expressly stated otherwise.
FirstEnergy
FE was incorporated under Ohio law in 1996. FE’s principal business is the holding, directly or indirectly, of all of the outstanding equity of its principal
subsidiaries: OE, CEI, TE, FE PA, JCP&L, FESC, MP, AGC, PE and KATCo. Additionally, FET is a VIE of FE, and is the parent company of ATSI, MAIT and
TrAIL. FirstEnergy continues to evaluate the legal, financial, operational and branding benefits of consolidating the Ohio Companies into a single Ohio power
company.
FET also owns a 34% equity interest in Valley Link. On November 25, 2024, FET, DominionHV, and Transource formed Valley Link, which is the holding
company responsible for managing and executing those projects awarded by PJM, and entered into a limited liability agreement. Valley Link is the owner of the
Valley Link Subsidiaries, which are organized in various states. The Valley Link Subsidiaries comprise the entities that are expected to develop, construct, own,
operate and maintain those transmission projects awarded by PJM.
In addition, FE holds all of the outstanding equity of other direct subsidiaries including FEV, which previously held a 33-1/3% equity ownership in Global Holding,
the holding company for a joint venture in the Signal Peak mining and coal transportation operations. On July 16, 2025, FEV sold its entire 33-1/3% equity
ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations, at book value to WMB
Marketing Ventures, LLC and Pinesdale LLC for $47.5 million.
FESC provides legal, financial and other corporate support services at cost, in accordance with its cost allocation manual, to affiliated FirstEnergy companies.
FE does not bill directly or allocate any of its costs to any subsidiary company. Costs are charged to FE's subsidiaries for services received from FESC either
through direct billing or through an allocation process. Allocated costs are for services that are provided on behalf of more than one company and are allocated
using formulas developed by FESC and are generally settled under commercial terms within thirty days.
FE and its subsidiaries are principally involved in the transmission, distribution, and generation of electricity. FirstEnergy’s electric operating companies comprise
one of the nation’s largest investor-owned electric systems, serving over six million customers in the Midwest and Mid-Atlantic regions. FirstEnergy’s
transmission operations include more than 24,000 miles of transmission lines and two regional transmission operation centers, and MP and AGC control 3,610
MWs of total generation capacity.
JCP&L
JCP&L owns property and does business as an electric public utility in New Jersey, providing distribution services to approximately 1.2 million customers, as well
as transmission services in northern, western, and east central New Jersey. JCP&L serves an area that has a population of approximately 2.8 million. JCP&L
plans, operates, and maintains its transmission system in accordance with NERC reliability standards, and other applicable regulatory requirements. In addition,
JCP&L complies with the regulations, orders, policies and practices prescribed by FERC and the NJBPU.
Revision of Previously Issued Financial Statements of JCP&L
During the fourth quarter of 2025, JCP&L identified an error in the recording of certain expenses for smart meter cost of removal associated with the deployment
of its AMI program, resulting in an understatement of expense on the Statements of Income and Comprehensive Income and Regulatory assets/liabilities on the
Balance Sheets since 2023. The identified error impacted JCP&L's previously issued 2023 and 2024 annual financial statements, and interim periods in 2024
and 2025. JCP&L evaluated the error, and the specific impact on each affected prior period was not material, however, as a result of the cumulative impact,
JCP&L determined to revise previously issued financial statements to correct the error and in doing so also corrected certain other previously identified
immaterial errors, including the misclassification of certain retired assets. As such, JCP&L has revised the previously issued Statements of Income and
Comprehensive Income, Statement of Cash Flows and Statements of Common Stockholder’s Equity for the annual periods ended December 31, 2024 and 2023
in this Form 10-K as well as the Balance Sheets as of December 31, 2024 and 2023, and any applicable footnote disclosures.
A summary of the corrections to the impacted financial statement line items in JCP&L’s previously issued Statements of Income and Comprehensive Income,
Balance Sheets, Statements of Cash Flows and the Statements of Common Stockholder’s Equity for each interim affected period is presented in Note 17.,
“Revision of Previously Issued Quarterly Financial Statements (JCP&L)," of the Combined Notes to Financial Statements of the Registrants. The amounts in the
tables below summarize the adjustments to revise JCP&L previously reported audited annual financial statements. JCP&L will also revise previously reported
financial information for this error in its future filings, as applicable.
101

-- 111 of 203 --

JCP&L Annual Statements of Income and Comprehensive Income
For the Year Ended December 31, 2024 	For the Year Ended December 31, 2023
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
Deferral of regulatory assets, net 	$ 	(135) $ 	11 $ 	(124) $ 	(74) $ 	7 $ 	(67)
Other operating expenses 	656 	(2) 	654 	555 	— 	555
Total operating expenses 	1,946 	9 	1,955 	1,770 	7 	1,777
Operating income 	369 	(9) 	360 	257 	(7) 	250
Income before income taxes 	338 	(9) 	329 	165 	(7) 	158
Income taxes 	90 	(3) 	87 	35 	(2) 	33
Net income 	248 	(6) 	242 	130 	(5) 	125
Comprehensive income 	249 	(6) 	243 	130 	(5) 	125
JCP&L Annual Balance Sheets
As of December 31, 2024 	As of December 31, 2023
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
PP&E - In service 	$ 	8,697 $ 	34 $ 	8,731 $ 	8,278 $ 	10 $ 	8,288
Accumulated provision for depreciation 	2,409 	30 	2,439 	2,365 	8 	2,373
PP&E Excluding CWIP 	6,288 	4 	6,292 	5,913 	2 	5,915
Total PP&E 	6,908 	4 	6,912 	6,388 	2 	6,390
Regulatory assets/(liabilities) 	265 	(18) 	247 	(48) 	(8) 	(56)
Total investments and other noncurrent
assets 	2,640 	(18) 	2,622 	2,330 	— 	2,330
Total assets 	9,927 	(14) 	9,913 	9,100 	2 	9,102
Accumulated deferred income taxes, net 	1,196 	(4) 	1,192 	957 	(2) 	955
Total noncurrent liabilities 	4,605 	(4) 	4,601 	3,717 	6 	3,723
Total liabilities 	4,950 	(4) 	4,946 	4,968 	6 	4,974
Retained earnings 	1,322 	(10) 	1,312 	1,224 	(4) 	1,220
Total common stockholder's equity 	4,977 	(10) 	4,967 	4,132 	(4) 	4,128
JCP&L Annual Statements of Common Stockholder's Equity
For the Years Ended December 31, 2024 and 2023
(In millions) 	As Reported 	Adjustment 	As Revised
Balance, January 1, 2023 	$ 	3,967 $ 	1 $ 	3,968
Net income 	130 	(5) 	125
Balance, December 31, 2023 	4,132 	(4) 	4,128
Net income 	248 	(6) 	242
Balance, December 31, 2024 	4,977 	(10) 	4,967
102

-- 112 of 203 --

JCP&L Annual Statements of Cash Flows
For the Year Ended
December 31, 2024
For the Year Ended
December 31, 2023
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	$ 	248 $ 	(6) $ 	242 $ 	130 $ 	(5) $ 	125
Adjustments to reconcile net income to net cash
from operating activities-
Depreciation, amortization and impairments 	161 	11 	172 	145 	7 	152
Deferred income taxes and investment tax credits,
net 	233 	(3) 	230 	50 	(2) 	48
Net cash provided from operating activities 	607 	2 	609 	264 	— 	264
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital investments 	$ 	(877) $ 	(2) $ 	(879) $ 	(633) $ 	— $ 	(633)
Net cash used for investing activities 	(947) 	(2) 	(949) 	(690) 	— 	(690)
Net change in cash, cash equivalents, and restricted
cash 	$ 	— $ 	— $ 	— $ 	— $ 	— $ 	—
Basis of Presentation
The Registrants follow GAAP and comply with the related regulations, orders, policies and practices prescribed by the SEC, FERC, and, as applicable, the
PUCO, the PPUC, the MDPSC, the NYPSC, the WVPSC, the VSCC and the NJBPU. The preparation of financial statements in conformity with GAAP requires
management to make periodic estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and disclosure of
contingent assets and liabilities. Actual results could differ from these estimates. The reported results of operations are not necessarily indicative of results of
operations for any future period. The Registrants have evaluated events and transactions for potential recognition or disclosure through the date the financial
statements were issued.
The Registrants consolidate all majority-owned subsidiaries over which they exercise control and, when applicable, entities for which they have a controlling
financial interest. Intercompany transactions and balances are eliminated in consolidation as appropriate and permitted pursuant to GAAP. The Registrants
consolidate a variable interest entity when it is determined that it is the primary beneficiary. Investments in affiliates over which the Registrants have the ability to
exercise significant influence, but do not have a controlling financial interest, follow the equity method of accounting. Under the equity method, the interest in the
entity is reported as an investment on the Balance Sheets and the percentage of ownership share of the entity’s earnings is reported in the Statements of
Income.
During the second quarter of 2025, FirstEnergy identified certain corporate support operating expenses recognized in 2024 that should have been capitalized as
CWIP or PP&E. As a result, in the second quarter of 2025, FirstEnergy recognized a $21 million net increase to income before income taxes. In addition, during
the fourth quarter of 2025, JCP&L identified an error in the recording of certain expenses for smart meter cost of removal associated with the deployment of its
AMI program. As a result, FirstEnergy recognized a $24 million net decrease to income before income taxes in the fourth quarter of 2025, of which $18 million is
related to prior years. These adjustments were immaterial to FirstEnergy’s 2025 and prior period financial statements.
Certain prior year amounts have been reclassified to conform to the current year presentation.
Economic Conditions
While supply lead times have not fully returned to levels prior to the COVID-19 pandemic, FirstEnergy continues to monitor the situation in light of demand
increases across the industry, including due to data center usage, and the imposition of tariffs and retaliatory tariffs that have been, and may be, imposed by the
U.S. government in response. FirstEnergy continues to implement mitigation strategies to address supply constraints and does not expect any corresponding
service disruptions or any material impact on its capital investment plan. However, the situation remains fluid, and a prolonged continuation or further increase in
demand, or the continuation of uncertain or adverse macroeconomic conditions, including inflationary pressures and new or increased existing tariffs, could lead
to an increase in supply chain disruptions that could, in turn, have an adverse effect on the Registrants’ results of operations, cash flow and financial condition.
103

-- 113 of 203 --

The U.S. presidential administration has imposed widespread and substantial tariffs on imports, with additional tariffs to potentially be adopted in the future. The
imposition of these or any other new or increased tariffs or resultant trade wars, and uncertainties associated with the same, could have an adverse effect on the
Registrants’ results of operations, cash flow and financial condition.
Reorganization
On March 24, 2025, FirstEnergy internally announced organizational changes that are intended to align the organization with its new business model, which is
designed to make FirstEnergy more efficient and sustainable while placing responsibility and accountability closer to customers, employees and regulators. The
changes are also consistent with FirstEnergy’s focus on operations and maintenance expense discipline. As a result, FirstEnergy recognized a pre-tax charge of
approximately $26 million ($5 million at JCP&L) in the first quarter of 2025, which is included within “Other operating expenses” on each of the Registrants'
Statements of Income and Comprehensive Income.
Discontinued Operations - FirstEnergy
On February 27, 2020, certain former competitive subsidiaries of FE emerged from bankruptcy and were deconsolidated from FirstEnergy’s consolidated federal
income tax group. The bankruptcy, emergence and deconsolidation resulted in FirstEnergy recognizing certain income tax benefits and charges, which were
classified as discontinued operations. During 2023, FirstEnergy recognized a $21 million tax-effected charge to income tax expense as a result of identifying an
out of period adjustment related to the allocation of certain deferred income tax liabilities associated with such former subsidiaries and their tax return
deconsolidation in 2020. This adjustment was immaterial to the 2023 and prior period financial statements.
Discontinued operations are reflected at Corporate/Other for FirstEnergy segment reporting and within “Discontinued Operations” on the FirstEnergy
Consolidated Statements of Income and Comprehensive Income and “Loss on disposal, net of tax” on the FirstEnergy Consolidated Statements of Cash Flow.
ACCOUNTING FOR THE EFFECTS OF REGULATION
The Registrants are subject to regulation that sets the prices (rates) they are permitted to charge customers based on costs that the regulatory agencies
determine are permitted to be recovered. At times, regulatory agencies permit the future recovery of costs that would be currently charged to expense by an
unregulated company. The ratemaking process results in the recording of regulatory assets and liabilities based on anticipated future cash inflows and outflows.
The Registrants review the probability of recovery of regulatory assets, and settlement of regulatory liabilities, at each balance sheet date and whenever new
events occur. Factors that may affect probability include changes in the regulatory environment, issuance of a regulatory commission order, or passage of new
legislation. Upon material changes to these factors, where applicable, the Registrants will record new regulatory assets or liabilities and will assess whether it is
probable that currently recorded regulatory assets and liabilities will be recovered or settled in future rates. If recovery of a regulatory asset is no longer
probable, the Registrants will write off that regulatory asset as a charge against earnings. The Registrants consider the entire regulatory asset balance as the
unit of account for the purposes of balance sheet classification rather than the next years recovery and, as such, net regulatory assets and liabilities are
presented in the noncurrent section on the Registrants' Balance Sheets. See Note 13., "Regulatory Matters," of the Combined Notes to Financial Statements of
the Registrants for additional information.
104

-- 114 of 203 --

FirstEnergy has regulatory assets of $829 million and $617 million, and regulatory liabilities of $1,185 million and $995 million as of December 31, 2025 and
2024, respectively. The following table provides information about the composition of FirstEnergy's net regulatory assets and liabilities as of December 31, 2025
and 2024, and the changes during the year 2025:
As of December 31,
Net Regulatory Assets (Liabilities) by Source - FirstEnergy 	2025 	2024 	Change
(In millions)
Customer payables for future income taxes 	$ 	(2,041) $ 	(2,234) $ 	193
Spent nuclear fuel disposal costs 	(76) 	(72) 	(4)
Asset removal costs 	(675) 	(681) 	6
Deferred transmission costs 	(43) 	190 	(233)
Deferred generation costs 	405 	481 	(76)
Deferred distribution costs 	466 	287 	179
Storm-related costs 	1,122 	1,015 	107
Energy efficiency program costs 	462 	349 	113
New Jersey societal benefit costs 	80 	87 	(7)
Vegetation management 	153 	125 	28
Ohio settlement charges 	(250) 	— 	(250)
Other 	41 	75 	(34)
Net Regulatory Liabilities included on FirstEnergy's Consolidated Balance Sheets 	$ 	(356) $ 	(378) $ 	22
The following table provides information about the composition of JCP&L's net regulatory assets and liabilities as of December 31, 2025 and 2024, and the
changes during the year 2025:
As of December 31,
Net Regulatory Assets (Liabilities) by Source - JCP&L 	2025 	2024 	Change
(In millions)
Customer payables for future income taxes 	$ 	(393) $ 	(410) $ 	17
Spent nuclear fuel disposal costs 	(76) 	(72) 	(4)
Asset removal costs 	(87) 	(101) 	14
Deferred transmission costs 	(25) 	(3) 	(22)
Deferred distribution costs 	318 	206 	112
Storm-related costs 	367 	310 	57
Energy efficiency program costs 	316 	208 	108
New Jersey societal benefit costs 	80 	87 	(7)
Other 	15 	22 	(7)
Net Regulatory Assets included on JCP&L's Balance Sheets 	$ 	515 $ 	247 $ 	268
Previously issued 2024 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the
Combined Notes to Financial Statements of the Registrants.
(1)
(1)
105

-- 115 of 203 --

The following table provides information about the composition of FirstEnergy's net regulatory assets that do not earn a current return as of December 31, 2025
and 2024, of which approximately $802 million and $698 million, respectively, are currently being recovered through rates over varying periods, through 2068,
depending on the nature of the deferral and the jurisdiction:
Regulatory Assets by Source Not Earning a 	As of December 31,
Current Return - FirstEnergy 	2025 	2024 	Change
(In millions)
Deferred generation costs 	$ 	280 $ 	314 $ 	(34)
Deferred distribution costs 	199 	153 	46
Storm-related costs 	844 	694 	150
Other 	102 	82 	20
FirstEnergy Regulatory Assets Not Earning a Current Return 	$ 	1,425 $ 	1,243 $ 	182
The following table provides information about the composition of JCP&L's net regulatory assets that do not earn a current return as of December 31, 2025 and
2024, of which approximately $76 million and $45 million, respectively, are currently being recovered through rates over varying periods, through 2068,
depending on the nature of the deferral:
Regulatory Assets by Source Not Earning a 	As of December 31,
Current Return - JCP&L 	2025 	2024 	Change
(In millions)
Deferred distribution costs 	$ 	147 $ 	101 $ 	46
Storm-related costs 	367 	310 	57
Other 	24 	28 	(4)
JCP&L Regulatory Assets Not Earning a Current Return 	$ 	538 $ 	439 $ 	99
DERIVATIVES
FirstEnergy may use various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations.
FirstEnergy’s Enterprise Risk Management Committee, comprised of members of senior management, provides general oversight for risk management activities
throughout FirstEnergy, including market risk.
The Registrants account for derivative instruments on the Balance Sheets at fair value unless they meet the normal purchases and normal sales criteria.
Derivative instruments meeting the normal purchases and normal sales criteria are accounted for under the accrual method of accounting with their effects
included in earnings at the time of contract performance.
EQUITY METHOD INVESTMENTS
Investments over which the Registrants have the ability to exercise significant influence, but do not have a controlling financial interest, follow the equity method
of accounting. Under the equity method, the interest in the entity is reported in “Investments” on the Registrants Balance Sheets. The percentage of ownership
share of the entity’s earnings is reported in the Registrants Statement of Income and reflected in “Other income (expense)”. Equity method investments are
assessed for impairment annually or whenever events and changes in circumstances indicate that the carrying amount of the investment may not be
recoverable. If the decline in value is considered to be other than temporary, the investment is written down to its estimated fair value, which establishes a new
cost basis in the investment.
Equity method investments included within "Investments" on FirstEnergy's Consolidated Balance Sheets were $38 million and $84 million as of December 31,
2025 and 2024, respectively. JCP&L did not have any equity method investments as of December 31, 2025 or 2024.
Global Holdings - On July 16, 2025, FEV sold its entire 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak
mining and coal transportation operations, at book value to WMB Marketing Ventures, LLC and Pinesdale LLC for $47.5 million, which is classified in other within
“Cash from Investing Activities” of FirstEnergy’s Consolidated Statements of Cash Flows.
In previous periods, FEV was not the primary beneficiary of the joint venture, as it did not have control over the significant activities affecting the joint venture’s
economic performance. FEV's ownership interest was subject to the equity method of accounting. For the years ended December 31, 2024 and 2023, pre-tax
equity earnings, excluding impairments, related to FEV’s ownership in Global Holding was $72 million and $175 million, respectively. FEV’s pre-tax equity
earnings and investment in Global Holding are included in Corporate/Other for segment reporting. In 2024, a $13 million (pre-tax) impairment charge was
106

-- 116 of 203 --

recognized in the fourth quarter of 2024 and is included within "Equity method investment earnings, net” on the Consolidated Statements of Income and within
Corporate/Other for segment reporting.
As of December 31, 2024, the carrying value of the equity method investment was $45 million. During 2024 and 2023, FEV received cash dividends from Global
Holding totaling $80 million and $165 million, respectively, which were classified with “Cash from Operating Activities” on FirstEnergy’s Consolidated Statements
of Cash Flow.
Valley Link - On February 21, 2025, FET, DominionHV and Transource entered into the Valley Link Operating Agreement, which established the general
framework for Valley Link and the Valley Link Subsidiaries to accept, design, develop, construct, own, operate and finance those transmission projects awarded
by PJM to Valley Link. This general framework includes parameters regarding the relationship among the three members, confers governance rights to its
members so long as certain ownership percentages are maintained, as described below, and defines the list of projects that Valley Link will have the right to
develop. Valley Link is the owner of the Valley Link Subsidiaries, which are organized in various states. On February 26, 2025, in response to the PJM 2024
RTEP Long-Term Proposal Window #1, PJM awarded two electric transmission projects to Valley Link estimated to be approximately $3 billion, with FET’s share
estimated to be approximately $1 billion.
As of February 21, 2025, the relative ownership interests of the members are FET (34%), DominionHV (30%), and Transource (36%), and Valley Link will not be
consolidated with FET for financial or tax reporting purposes and expects to be accounted for under equity method accounting. As of December 31, 2025, and
2024, there were no investment balances recorded on FirstEnergy’s Consolidated Balance Sheets.
PATH WV - A subsidiary of FE owns 50% of the West Virginia Series (PATH-WV), which is a joint venture with a subsidiary of AEP. FirstEnergy is not the primary
beneficiary of PATH-WV, as it does not have control over the significant activities affecting the economics of PATH-WV. FirstEnergy's ownership interest in PATH-
WV is subject to the equity method of accounting.
In March 2024, PATH completed the process of terminating all of its FERC-jurisdictional rates and facilities, with the result that PATH no longer is a “public utility”
and no longer is subject to FERC jurisdiction. FirstEnergy and its non-affiliated joint venture partner are in the process of terminating the PATH corporate entities.
As of December 31, 2025 and 2024, the carrying value of the equity method investment was $17 million, which is expected to be recovered through a
distribution. FirstEnergy's pre-tax equity earnings in PATH-WV were immaterial for the years ended December 31, 2025, 2024 and 2023.
GOODWILL
In a business combination, the excess of the purchase price over the estimated fair value of the assets acquired and liabilities assumed is recognized as
goodwill. The Registrants evaluates goodwill for impairment annually on July 31 and more frequently if indicators of impairment arise. In evaluating goodwill for
impairment, the Registrants assess qualitative factors to determine whether it is more likely than not (that is, likelihood of more than 50%) that the fair value of a
reporting unit is less than its carrying value (including goodwill). If the Registrants conclude that it is not more likely than not that the fair value of a reporting unit
is less than its carrying value, then no further testing is required. However, if the Registrants conclude that it is more likely than not that the fair value of a
reporting unit is less than its carrying value or bypasses the qualitative assessment, then the quantitative goodwill impairment test is performed to identify a
potential goodwill impairment and measure the amount of impairment to be recognized, if any.
As of July 31, 2025, the Registrants performed a qualitative assessment of its reporting units' goodwill, assessing economic, industry and market considerations
in addition to the reporting units' overall financial performance. Key factors used in the assessment included: growth rates, interest rates, expected investments,
utility sector market performance, regulatory and legal developments, and other market considerations. It was determined that the fair values of these reporting
units were, more likely than not, greater than their carrying values and a quantitative analysis was not necessary.
FirstEnergy's reporting units are consistent with its reportable segments and consist of Distribution, Integrated and Stand-Alone Transmission. The following
table presents goodwill by reporting unit as of December 31, 2025 and 2024:
(In millions)
Distribution
Segment
Integrated
Segment
Stand-Alone
Transmission Segment
FirstEnergy
Consolidated
Goodwill 	$ 	3,222 $ 	1,953 $ 	443 $ 	5,618
JCP&L's reporting units are consistent with its reportable segments and consist of Distribution and Transmission. The following table presents goodwill by
reporting unit as of December 31, 2025 and 2024:
(In millions) Distribution
Segment Transmission
Segment 	JCP&L
Goodwill 	$ 	1,213 $ 	598 $ 	1,811
IMPAIRMENT OF LONG-LIVED ASSETS
107

-- 117 of 203 --

The Registrants evaluate long-lived assets classified as held and used for impairment when events or changes in circumstances indicate the carrying value of
the long-lived assets may not be recoverable. First, the estimated undiscounted future cash flows attributable to the assets is compared with the carrying value
of the assets. If the carrying value is greater than the undiscounted future cash flows, an impairment charge is recognized equal to the amount the carrying value
of the assets exceeds its estimated fair value.
The following impairment charges were recognized in the years ended December 31, 2025 and 2024:
• In the fourth quarter of 2025, FirstEnergy recognized a $352 million pre-tax charge, included within “Impairment of assets” on FirstEnergy’s
Consolidated Statements of Income, as a result of the November 2025 Ohio Base Rate Case order that disallowed from future recovery certain
previously capitalized amounts at the Ohio Companies. The charge was reflected at FirstEnergy’s Distribution segment. See Note 13., "Regulatory
Matters," of the Combined Notes to Financial Statements of the Registrants for additional details.
• In the first quarter of 2024, JCP&L recognized a $53 million pre-tax charge (included within “Impairment of assets” on the FirstEnergy Consolidated
Statements of Income and "Other operating expenses" on the JCP&L Statements of Income and Comprehensive Income) associated with certain
corporate support costs recorded to capital accounts from the FERC Audit that were determined, as a result of the base rate case settlement
agreement, to be disallowed from future recovery. The charge was reflected at JCP&L's Distribution segment, and FirstEnergy's Integrated segment.
• The Akron general office building was classified as held-for-sale during the third quarter of 2024. Upon classification as held-for-sale, FirstEnergy
recognized a $62 million ($9 million at JCP&L and included within "Other operating expenses") pre-tax impairment charge within “Impairment of assets”
on the FirstEnergy Consolidated Statements of Income and "Other operating expenses" on the JCP&L Statements of Income and Comprehensive
Income. Of the $62 million, $17 million is included within the Integrated segment, $31 million is included within Distribution segment, $11 million is
included within Stand-Alone Transmission segment and $3 million at Corporate/Other for FirstEnergy's segment reporting. During the third quarter of
2025, the sale of the Akron general office building was completed.
INVENTORY
Materials and supplies inventory primarily includes fuel inventory, the distribution, transmission and electric generation facility materials, net of reserve for excess
and obsolete inventory as well as emission allowances. Materials charged to inventory are at weighted average cost when purchased and expensed or
capitalized, as appropriate, when used or installed. Fuel inventory consists primarily of coal and reagents that are consumed at MP's electric generation facilities,
and is accounted for at weighted average cost when purchased and recorded to fuel expense when consumed.
Emission allowances are accounted for as inventory at cost when purchased. FirstEnergy’s emission allowance compliance obligation, principally associated
with MP's electric generation facility operations, is accrued to fuel expense at a weighted average cost based on each month’s emissions. When emission
allowances are submitted to the EPA, inventory and the compliance obligation are reduced. Due to the ENEC, fuel, emission allowances and other fuel-related
expenses have no material impact on current period earnings.
NONCONTROLLING INTEREST
FirstEnergy - FirstEnergy maintains a controlling financial interest in certain less than wholly owned subsidiaries. As a result, FirstEnergy presents the third-
party investors’ ownership portion of FirstEnergy's net income, net assets and comprehensive income as noncontrolling interest. Noncontrolling interest is
included as a component of equity on the Consolidated Balance Sheets.
On May 31, 2022, Brookfield acquired 19.9% of the issued and outstanding membership interests of FET. On February 2, 2023, FE, along with FET, entered into
the FET P&SA II with Brookfield and the Brookfield Guarantors, pursuant to which FE agreed to sell to Brookfield at the closing, and Brookfield agreed to
purchase from FE, an incremental 30% equity interest in FET for a purchase price of $3.5 billion. The FET Equity Interest Sale closed on March 25, 2024 and
FET continues to be consolidated in FirstEnergy’s financial statements. The difference between the purchase price, net of transaction costs and taxes of
approximately $32 million and $803 million, respectively, and the carrying value of the NCI of $731 million, was recorded as an increase to OPIC by $1.9 billion
during 2024. As of December 31, 2025, FE’s equity ownership in FET is 50.1% and Brookfield’s is 49.9%.
108

-- 118 of 203 --

The purchase price of the FET Equity Interest Sale was paid in part by the issuance of two promissory notes at closing having an aggregate principal amount of
$1.2 billion with: (i) one promissory note having an aggregate principal amount of $750 million, at an interest rate of 5.75% per annum, with a maturity date of
September 25, 2025 and (ii) one promissory note having an aggregate principal amount of $450 million, at an interest rate of 7.75% per annum, with a maturity
date of December 31, 2024. The remaining $2.3 billion of the purchase price was paid in cash at closing. On July 17, 2024, Brookfield paid FE approximately
$1.2 billion in full satisfaction of the promissory notes. Interest income associated with the promissory notes was $24 million for the year ended December 31,
2024 and is reported within “Miscellaneous income, net” on FirstEnergy’s Consolidated Statements of Income.
Pursuant to the terms of the FET P&SA II, in connection with the closing, Brookfield, FET and FE entered into the A&R FET LLC Agreement, which amended
and restated in its entirety the Third Amended and Restated Limited Liability Company Agreement of FET. The A&R FET LLC Agreement, among other things,
provides for the governance, exit, capital and distribution, and other arrangements for FET from and following the closing. Under the A&R FET LLC Agreement,
as of the closing, the FET Board of Directors consists of five directors, two of whom are appointed by Brookfield and three of whom are appointed by FE.
PROPERTY, PLANT AND EQUIPMENT
PP&E reflects original cost (net of any impairments recognized), including payroll and related costs such as taxes, employee benefits, administrative and general
costs, and financing costs incurred to place the assets in service. The costs of normal maintenance, repairs and minor replacements are expensed as incurred.
The Registrants' recognize liabilities for planned major maintenance projects as they are incurred.
FirstEnergy
PP&E balances by segment as of December 31, 2025 and 2024, were as follows:
December 31, 2025
Segment 	In Service Accumulated.
Depreciation 	Net Plant 	CWIP 	Total 	Useful Service Life
(In millions) 	(years)
Distribution 	$ 	21,944 $ 	(7,511) $ 	14,433 $ 	682 $ 	15,115 	5 - 80
Integrated 	18,380 	(4,154) 	14,226 	1,314 	15,540 	5 - 80
Stand-Alone Transmission 	14,759 	(2,878) 	11,881 	1,333 	13,214 	5 - 85
Corporate/Other 	1,130 	(646) 	484 	60 	544 	3 - 63
Total PP&E 	$ 	56,213 $ 	(15,189) $ 	41,024 $ 	3,389 $ 	44,413
December 31, 2024
Segment 	In Service Accumulated.
Depreciation 	Net Plant 	CWIP 	Total
Useful Service
Life
(In millions) 	(years)
Distribution 	$ 	21,245 $ 	(7,338) $ 	13,907 $ 	618 $ 	14,525 	5 - 80
Integrated 	17,080 	(3,943) 	13,137 	1,076 	14,213 	5 - 100
Stand-Alone Transmission 	13,509 	(2,660) 	10,849 	986 	11,835 	5 - 85
Corporate/Other 	1,062 	(607) 	455 	74 	529 	3 - 63
Total PP&E 	$ 	52,896 $ 	(14,548) $ 	38,348 $ 	2,754 $ 	41,102
Includes finance leases of $48 million and $46 million as of December 31, 2025 and 2024, respectively.
Includes finance lease accumulated amortization of $17 million and $14 million as of December 31, 2025 and 2024, respectively.
Integrated has approximately $2.3 billion of total regulated generation PP&E as of December 31, 2025.
FirstEnergy provides for depreciation on a straight-line basis at various rates over the estimated lives of property included in plant in service. The respective
annual composite depreciation rates for FirstEnergy were approximately 2.8%, 2.9% and 2.8% in 2025, 2024 and 2023, respectively.
For the years ended December 31, 2025, 2024 and 2023, capitalized financing costs on FirstEnergy's Consolidated Statements of Income include $108 million,
$60 million and $44 million, respectively, of allowance for equity funds used during construction and $77 million, $73 million and $53 million, respectively, of
capitalized interest.
Jointly Owned Electric Generation Facility
AGC owns an undivided 16.25% interest (487 MWs) in the 3,003 MW Bath County pumped-storage, hydroelectric station in
(1) 	(2)
(1) 	(2)
(1)
(2)
109

-- 119 of 203 --

Virginia, operated by the 60% owner, VEPCO, a non-affiliated utility. Total PP&E includes $142 million representing AGC's share in this facility as of December
31, 2025. AGC is obligated to pay its share of the costs of this jointly owned facility in the same proportion as its ownership interests using its own financing.
AGC's share of direct expenses of the joint electric generation facility is included in operating expenses on FirstEnergy's Consolidated Statements of Income.
AGC provides the generation capacity from this facility to its owner, MP, which is recovered through the ENEC.
JCP&L
PP&E by segment as of December 31, 2025 and 2024, were as follows:
December 31, 2025
Segment 	In Service
Accumulated.
Depreciation 	Net Plant 	CWIP 	Total
Useful Service
Life
(In millions) 	(years)
Distribution 	$ 	6,679 $ 	(1,925) $ 	4,754 $ 	270 $ 	5,024 	5 - 75
Transmission 	2,588 	(514) 	2,074 	610 	2,684 	5 - 80
Total PP&E 	$ 	9,267 $ 	(2,439) $ 	6,828 $ 	880 $ 	7,708
December 31, 2024
Segment 	In Service
Accumulated.
Depreciation 	Net Plant 	CWIP 	Total
Useful Service
Life
(In millions) 	(years)
Distribution 	$ 	6,438 $ 	(1,938) $ 	4,500 $ 	187 $ 	4,687 	10 - 75
Transmission 	2,293 	(501) 	1,792 	433 	2,225 	55 - 80
Total PP&E 	$ 	8,731 $ 	(2,439) $ 	6,292 $ 	620 $ 	6,912
Includes finance leases of $12 million and $11 million as of December 31, 2025 and 2024, respectively.
Includes finance lease accumulated amortization of $6 million and $5 million as of December 31, 2025 and 2024, respectively.
Previously issued 2024 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the
Combined Notes to Financial Statements of the Registrants.
JCP&L provides for depreciation on a straight-line basis at various rates over the estimated lives of property included in plant in service. Depreciation expense
was approximately 2.9%, 2.9% and 2.8% of average depreciable property in 2025, 2024 and 2023, respectively.
For the years ended December 31, 2025, 2024 and 2023, capitalized financing costs on JCP&L's Statements of Income and Comprehensive Income include
$28 million, $5 million and $5 million, respectively, of allowance for equity funds used during construction and $15 million, $23 million and $14 million,
respectively, of capitalized interest.
NEW ACCOUNTING PRONOUNCEMENTS
Recently Adopted Pronouncements - ASU 2023-09, "Income taxes (Topic 280): Improvements to Income Tax Disclosures" (Issued in December 2023): ASU
2023-09 enhances disclosures primarily related to existing rate reconciliation and income taxes paid information to help investors better assess how a
company’s operations and related tax risks and tax planning and operational opportunities affect the tax rate and prospects for future cash flows. Disclosure
requirements include a tabular reconciliation using both percentages and amounts, separated out into specific categories with certain reconciling items at or
above 5% of the statutory tax as well as by nature and/or jurisdiction. In addition, entities will be required to disclose income taxes paid (net of refunds received),
broken out between federal, state/local and foreign, and amounts paid to an individual jurisdiction when 5% or more of the total income taxes are paid to such
jurisdiction. ASU 2023-09 was effective for the Registrants beginning with this Annual Report on Form 10-K for the year ended December 31, 2025, see Note 6.,
“Taxes,” of the Combined Notes to Financial Statements of the Registrants for the applicable disclosures, which are provided for all periods presented.
Recently Issued Pronouncements - The following new authoritative accounting guidance issued by the FASB has not yet been adopted. Unless otherwise
indicated, the Registrants’ management is currently assessing the impact such guidance may have on their financial statements and disclosures, as well as the
potential to early adopt where applicable. Management has assessed other FASB issuances of new standards not described below based upon the current
expectation that such new standards will not significantly impact the Registrants’ financial statements.
ASU 2024-03, "Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures (Subtopic 220-40)" (Issued in November 2024 and
subsequently updated within ASU 2025-01): ASU 2024-03 requires disaggregated disclosure of income statement expenses for public business entities. The
ASU does not change the expense captions an entity presents on the face of the income statement; rather, it requires disaggregation of certain expense
captions into specified
(1) 	(2)
(1) 	(2)
(3)
(1)
(2)
(3)
110

-- 120 of 203 --

categories in disclosures within the footnotes to the financial statements. ASU 2024-03 is effective for the Registrants beginning with the Annual Report on Form
10-K for the year ended December 31, 2027, with early adoption permitted. The guidance is permitted to be applied prospectively, and comparative disclosures
are not required for reporting periods beginning before the effective date. Entities can elect to apply the new standard retrospectively to any or all prior periods
presented in the financial statements.
ASU 2025-06, “Intangibles—Goodwill and Other—Internal-Use Software (Subtopic 350-40): Targeted Improvements to the Accounting for Internal-Use Software"
(Issued in September 2025): ASU 2025-06 amends the existing standard that refers to various stages of a software development project to align better with
current software development methods, such as agile programming. Under the new standard, entities will start capitalizing eligible costs when (1) management
has authorized and committed to funding the software project, and (2) it is probable that the project will be completed and the software will be used to perform
the function intended. In evaluating whether it is probable the project will be completed; an entity is required to consider whether there is significant uncertainty
associated with the development activities of the software. ASU 2025-06 is effective for the Registrants beginning with the financials for the first quarter of 2028.
The guidance is permitted to be applied using a prospective, retrospective or modified transition approach. Early adoption is permitted.
ASU 2025-10, Government Grants (Topic 832): Accounting for Government Grants Received by Business Entities (Issued in December 2025): ASU 2025-10
establishes authoritative guidance for the recognition, measurement, presentation, and disclosure of government grants received by business entities. ASU
2025-10 requires that a government grant be recognized when it is probable that the entity will comply with the conditions of the grant and that the grant will be
received and permits two approaches for asset related grants: (1) the cost reduction method (reduce the carrying amount of the asset) and (2) deferred income
method (recognize income over the useful life of the asset). Income-related grants are recognized systematically in income as the related costs are incurred.
ASU 2025-10 is effective for the Registrants beginning with financials for the first quarter of 2029, with early adoption permitted. The guidance is permitted to be
applied using a modified prospective, modified retrospective or full retrospective approach.
2. REVENUE
The disclosures in this note apply to both Registrants, unless indicated otherwise.
The Registrants account for revenues from contracts with customers under ASC 606, “Revenue from Contracts with Customers.” Revenue from leases, financial
instruments, other contractual rights or obligations and other revenues that are not from contracts with customers are outside the scope of the standard and
accounted for under other existing GAAP.
The Electric Companies distribute electricity through FirstEnergy’s utility operating companies and also control 3,610 MWs of regulated electric generation
capacity located primarily in West Virginia and Virginia. Each of the Electric Companies earns revenue from state-regulated rate tariffs under which it provides
distribution services to residential, commercial and industrial customers in its service territory. The Electric Companies are obligated under the regulated
construct to deliver power to customers reliably, as it is needed, which creates an implied monthly contract with the end-use customer. See Note 13., “Regulatory
Matters,” of the Combined Notes to Financial Statements of the Registrants for additional information on rate recovery mechanisms. Distribution and electric
revenues are recognized over time as electricity is distributed and delivered to the customer and the customers consume the electricity immediately as delivery
occurs.
Retail generation sales relate to Provider of Last Resort, SOS, Standard Service Offer and default service requirements in Ohio, Pennsylvania, New Jersey and
Maryland, as well as generation sales in West Virginia that are regulated by the WVPSC. Certain of the Electric Companies have default service obligations to
provide power to non-shopping customers who have elected to continue to receive service under regulated retail tariffs. The volume of these sales varies
depending on the level of shopping that occurs. Supply plans vary by state and by service territory. Default service for the Ohio Companies, FE PA, JCP&L and
PE’s Maryland jurisdiction are provided through a competitive procurement process approved by each state’s respective commission. Retail generation revenues
are recognized over time as electricity is delivered and consumed immediately by the customer.
Wholesale sales primarily consist of generation and capacity sales into the PJM market from FirstEnergy’s regulated electric generation capacity and NUGs.
Certain of the Electric Companies may also purchase power in the PJM markets to supply power to their customers. Generally, these power sales from
generation and purchases to serve load are netted hourly and reported as either revenues or purchased power on the Consolidated Statements of Income
based on whether the entity was a net seller or buyer each hour. Capacity revenues are recognized ratably over the PJM planning year at prices cleared in the
annual PJM Reliability Pricing Model Base Residual Auction and Incremental Auctions. Capacity purchases and sales through PJM capacity auctions are
reported within revenues on the Consolidated Statements of Income. Certain capacity income (bonuses) and charges (penalties) related to the availability of
units that have cleared in the auctions are unknown and not recorded in revenue until, and unless, they occur.
The Electric Companies’ distribution customers are metered on a cycle basis. An estimate of unbilled revenues is calculated to recognize electric service
provided from the last meter reading through the end of the month. This estimate includes many factors, among which are historical customer usage, load
profiles, estimated weather impacts, customer shopping activity and prices in effect for each class of customer. In each accounting period, the Electric
Companies accrue the estimated unbilled
111

-- 121 of 203 --

amount as revenue and reverse the related prior period estimate. Customer payments vary by state but are generally due within 30 days.
ASC 606 excludes industry-specific accounting guidance for recognizing revenue from Alternative Revenue Programs as these programs represent contracts
between the utility and its regulators, as opposed to customers. Therefore, revenues from these programs are not within the scope of ASC 606 and regulated
utilities are permitted to continue to recognize such revenues in accordance with existing practice but are presented separately from revenue arising from
contracts with customers.
Transmission infrastructure owned and operated by the Transmission Companies and certain of FirstEnergy's Electric Companies (JCP&L, MP and PE)
transmits electricity from generation sources to distribution facilities. Transmission revenues are derived primarily from forward-looking formula rates. See Note
13., “Regulatory Matters,” of the Combined Notes to Financial Statements of the Registrants for additional information. Forward-looking formula rates recover
costs that the regulatory agencies determine are permitted to be recovered and provide a return on transmission capital investment. Under forward-looking
formula rates, the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on
rate base and actual costs. Revenues and cash receipts for the stand-ready obligation of providing transmission service are recognized ratably over time.
The Registrants have elected to exclude sales taxes and other similar taxes collected on behalf of third parties from revenue as prescribed in the standard. As a
result, tax collections and remittances are excluded from recognition in the income statement and instead recorded through the balance sheet. Excise and gross
receipts taxes that are assessed on the Registrants are not subject to the election and are included in revenue. The Registrants have elected the optional invoice
practical expedient for most of its revenues and utilizes the optional short-term contract exemption for transmission revenues due to the annual establishment of
revenue requirements, which eliminates the need to provide certain revenue disclosures regarding unsatisfied performance obligations.
112

-- 122 of 203 --

The following represents a disaggregation of FirstEnergy's revenue from contracts with customers for the years ended December 31, 2025, 2024 and 2023:
FirstEnergy 	For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
Distribution
Retail generation and distribution services
Residential 	$ 	4,948 $ 	4,514 $ 	4,344
Commercial 	1,699 	1,522 	1,528
Industrial 	651 	588 	726
Other 	73 	73 	72
Wholesale 	16 	6 	20
Other revenue from contracts with customers 	78 	80 	89
Total revenues from contracts with customers 	7,465 	6,783 	6,779
Other revenue unrelated to contracts with customers 	82 	80 	75
Total Distribution 	$ 	7,547 $ 	6,863 $ 	6,854
Integrated
Retail generation and distribution services
Residential 	$ 	2,877 $ 	2,528 $ 	2,137
Commercial 	1,294 	1,142 	1,023
Industrial 	615 	577 	545
Other 	32 	32 	30
Wholesale 	377 	146 	208
Transmission 	425 	380 	318
Other revenue from contracts with customers 	6 	19 	24
Total revenues from contracts with customers 	5,626 	4,824 	4,285
ARP 	— 	10 	—
Other revenue unrelated to contracts with customers 	57 	42 	35
Total Integrated 	$ 	5,683 $ 	4,876 $ 	4,320
Stand-Alone Transmission
ATSI 	$ 	1,058 $ 	980 $ 	967
TrAIL 	260 	269 	279
MAIT 	483 	436 	394
KATCo 	85 	85 	89
Other 	— 	(2) 	2
Total revenues from contracts with customers 	1,886 	1,768 	1,731
Other revenue unrelated to contracts with customers 	19 	19 	17
Total Stand-Alone Transmission 	$ 	1,905 $ 	1,787 $ 	1,748
Corporate/Other, Eliminations and Reconciling Adjustments
Wholesale 	$ 	18 $ 	9 $ 	11
Eliminations and reconciling adjustments 	(63) 	(63) 	(63)
Total Corporate/Other, Eliminations and Reconciling
Adjustments 	$ 	(45) $ 	(54) $ 	(52)
FirstEnergy Total Revenues 	$ 	15,090 $ 	13,472 $ 	12,870
Primarily includes amounts collected from customers to administer and repay securitization bonds and pole attachment revenue.
Primarily includes late payment charges and revenue from FTRs.
Related to lost distribution revenues associated with energy efficiency in New Jersey.
Includes eliminations and reconciling adjustments of inter-segment revenues.
(1)
(2)
(1)
(3)
(2)
(4)
(1)
(2)
(3)
(4)
113

-- 123 of 203 --

The following table represents a disaggregation of JCP&L's revenue from contracts with customers for the years ended December 31, 2025, 2024 and 2023:
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
Distribution
Retail generation and distribution services
Residential 	$ 	1,705 $ 	1,470 $ 	1,240
Commercial 	728 	627 	579
Industrial 	76 	70 	68
Street lighting 	21 	20 	21
Wholesale 	6 	6 	5
Other revenue from contracts with customers 	14 	18 	18
Total revenues from contracts with customers 	2,550 	2,211 	1,931
ARP 	— 	10 	—
Other revenue unrelated to contracts with customers 	4 	4 	3
Total Distribution Segment Revenue 	$ 	2,554 $ 	2,225 $ 	1,934
Transmission
Total Transmission Segment Revenue 	$ 	259 $ 	242 $ 	204
Reconciling Adjustments
Retail generation and distribution services 	$ 	(175) $ 	(152) $ 	(111)
JCP&L Total Revenues 	$ 	2,638 $ 	2,315 $ 	2,027
) Primarily includes pole attachment revenue.
Related to lost distribution revenues associated with energy efficiency in New Jersey.
Includes eliminations and reconciling adjustments of inter-segment revenues.
RECEIVABLES
Receivables from contracts with customers include retail electric sales and distribution deliveries to residential, commercial and industrial customers of the
Electric Companies. Billed and unbilled customer receivables as of December 31, 2025 and 2024, are included below.
Customer Receivables 	FirstEnergy 	JCP&L
As of December 31, 	2025 	2024 	2025 	2024
(In millions)
Billed 	$ 	939 $ 	867 	$ 	178 $ 	166
Unbilled 	844 	718 	152 	118
1,783 	1,585 	330 	284
Less: Uncollectible Reserve 	57 	55 	6 	6
Total Customer Receivables 	$ 	1,726 $ 	1,530 	$ 	324 $ 	278
Includes approximately $323 million and $284 million for FirstEnergy as of December 31, 2025 and 2024, respectively, that are past due by greater than 30 days.
The allowance for uncollectible customer receivables is based on historical loss information comprised of a rolling 36-month average net write-off percentage of
revenues, in conjunction with a qualitative assessment of elements that impact the collectability of receivables to determine if allowances for uncollectible
customer receivables should be further adjusted in accordance with the accounting guidance for credit losses.
The Registrants review allowance for uncollectible customer receivables utilizing a quantitative and qualitative assessment. Management contemplates available
current information such as changes in economic factors, regulatory matters, industry trends, customer credit factors, amount of receivable balances that are
past-due, payment options and programs available to customers, and the methods that the Electric Companies are able to utilize to ensure payment. The
Registrants’ uncollectible risk on PJM receivables, resulting from transmission and wholesale sales, is minimal due to the nature of PJM’s settlement process
(1)
(2)
(3)
(1
(2)
(3)
(1)
(1)
114

-- 124 of 203 --

and as a result there is no current allowance for doubtful accounts.
Activity in the allowance for uncollectible accounts on customer receivables for the years ended December 31, 2025, 2024 and 2023 are as follows:
Customer Receivables 	FirstEnergy 	JCP&L
(In millions)
Balance, January 1, 2023 	$ 	137 $ 	21
Provision for expected credit losses 	8 	(1)
Charged to other accounts 	34 	3
Write-offs 	(115) 	(14)
Balance, December 31, 2023 	64 	9
Provision for expected credit losses 	73 	5
Charged to other accounts 	39 	4
Write-offs 	(121) 	(12)
Balance, December 31, 2024 	55 	6
Provision for expected credit losses 	94 	8
Charged to other accounts 	37 	3
Write-offs 	(129) 	(11)
Balance, December 31, 2025 	$ 	57 $ 	6
Customer receivable amounts charged (credited) to income for FirstEnergy for the years ended December 31, 2025, 2024 and 2023, include approximately $31 million,
$17 million, and $(15) million, respectively, deferred for future recovery (refund).
Customer receivable amounts charged (credited) to income for JCP&L include approximately $8 million, $5 million and $(1) million deferred for future recovery (refund) for the
years ended December 31, 2025, 2024 and 2023 respectively.
Represents recoveries and reinstatements of accounts written off for uncollectible accounts.
Activity in the allowance for uncollectible accounts on other receivables for the years ended December 31, 2025, 2024 and 2023 are as follows:
Other Receivables 	FirstEnergy 	JCP&L
(In millions)
Balance, January 1, 2024 	$ 	11 $ 	6
Provision for expected credit losses 	7 	—
Charged to other accounts 	(1) 	—
Write-offs 	(2) 	—
Balance, December 31, 2023 	15 	6
Provision for expected credit losses 	1 	—
Charged to other accounts 	(5) 	(6)
Write-offs 	(5) 	—
Balance, December 31, 2024 	6 	—
Provision for expected credit losses 	9 	1
Charged to other accounts 	— 	—
Write-offs 	(4) 	(1)
Balance, December 31, 2025 	$ 	11 $ 	—
Represents recoveries and reinstatements of accounts written off for uncollectible accounts.
3. EARNINGS PER SHARE OF COMMON STOCK
The disclosures in this note apply to FirstEnergy only.
EPS is calculated by dividing earnings attributable to FE by the weighted average number of common shares outstanding.
Basic EPS is computed using the weighted average number of common shares outstanding during the relevant period as the denominator. The denominator for
diluted EPS of common stock reflects the weighted average of common shares outstanding plus the potential additional common shares that could result if
dilutive securities and other agreements to issue common stock were exercised.
(1)(2)
(3)
(1)(2)
(3)
(1)(2)
(3)
(1)
(2)
(3)
(1)
(1)
(1)
(1)
115

-- 125 of 203 --

Diluted EPS reflects the dilutive effect of potential common shares from share-based awards and convertible securities. The dilutive effect of outstanding share-
based awards was computed using the treasury stock method, which assumes any proceeds that could be obtained upon the exercise of the award would be
used to purchase common stock at the average market price for the period. The dilutive effect of the 2026 Convertible Notes, 2029 Convertible Notes and the
2031 Convertible Notes, as further discussed in Note 11., "Capitalization" under Long-term debt and other long-term obligations, is computed using the if-
converted method.
The following table reconciles basic and diluted EPS attributable to FE:
For the Years Ended December 31,
Reconciliation of Basic and Diluted EPS of Common Stock 	2025 	2024 	2023
(In millions, except per share amounts)
Earnings Attributable to FE - continuing operations 	$ 	1,020 $ 	978 $ 	1,123
Earnings Attributable to FE - discontinued operations, net of tax 	— 	— 	(21)
Earnings Attributable to FE 	$ 	1,020 $ 	978 $ 	1,102
Share Count information:
Weighted average number of basic shares outstanding 	577 	575 	573
Assumed exercise of dilutive share-based awards 	1 	2 	1
Weighted average number of diluted shares outstanding 	578 	577 	574
EPS Attributable to FE:
Income from continuing operations, basic 	$ 	1.77 $ 	1.70 $ 	1.96
Discontinued operations, basic 	— 	— 	(0.04)
Basic EPS 	$ 	1.77 $ 	1.70 $ 	1.92
Income from continuing operations, diluted 	$ 	1.76 $ 	1.70 $ 	1.96
Discontinued operations, diluted 	— 	— 	(0.04)
Diluted EPS 	$ 	1.76 $ 	1.70 $ 	1.92
For the years ended December 31, 2025, 2024 and 2023, there was no material amount of shares excluded from the calculation of diluted shares outstanding,
as their inclusion would be antidilutive.
The dilutive effect of the convertible notes is limited to the conversion obligation in excess of the aggregate principal amount of the convertible notes being
converted. For the years ended December 31, 2025, 2024 and 2023, there was no dilutive effect resulting from the outstanding convertible notes as the average
market price of FE shares of common stock was below the initial conversion price of $47.78 per share for the 2029 and 2031 Convertible Notes, and $46.42 per
share for the 2026 Convertible Notes. See Note 10., "Fair Value Measurements," of the Combined Notes to Financial Statements of the Registrants for additional
information on the convertible notes.
4. PENSION AND OTHER POSTEMPLOYMENT BENEFITS
The disclosures in this note apply to both Registrants, unless indicated otherwise.
FirstEnergy provides qualified benefit plans, through the FirstEnergy Master Pension Plan and the FirstEnergy Welfare Plan that cover substantially all
employees and non-qualified defined benefit plans that cover certain employees, including employees of JCP&L. FirstEnergy’s pension and OPEB plans are
neither multiemployer nor multiple-employer plans.
The pension plans provide defined benefits based on years of service and compensation levels. Under the cash-balance portion of the pension plan (for
employees hired on or after January 1, 2014), FirstEnergy credits amounts to eligible employee notional cash-balance accounts based on a pay credit and an
interest credit.
In addition, FirstEnergy provides a minimum amount of noncontributory life insurance to retired employees in addition to optional contributory insurance to a
closed group of retired employees. Health care benefits, which include certain employee contributions, deductibles and co-payments, are also available upon
retirement to certain employees, their dependents and, under certain circumstances, their survivors. The expected cost of providing pension and OPEB to
employees and their beneficiaries and covered dependents is recognized from the time employees are hired until they become eligible to receive those benefits.
FirstEnergy also has obligations to former or inactive employees after employment, but before retirement, for disability-related benefits.
FirstEnergy’s pension funding policy is based on actuarial computations using the projected unit credit method. FirstEnergy does not currently expect to have a
required contribution to the pension plan until 2027, which based on various assumptions, including an expected rate of return on assets of 8.0% for 2026, is
expected to be approximately $250 million. However, FirstEnergy may elect to contribute to the pension plan voluntarily. JCP&L is not expected to make a
contribution.
Pension and OPEB costs are affected by employee demographics (including age, compensation levels and employment periods), the level of contributions made
to the plans and earnings on plan assets. Pension and OPEB costs may also be affected by changes in key assumptions, including anticipated rates of return on
plan assets, the discount rates and health care trend rates used in determining the projected benefit obligations for pension and OPEB costs. FirstEnergy uses a
December 31 measurement date for its pension and OPEB plans or whenever a plan is determined to qualify for a remeasurement. The fair value of the plan
assets represents the actual market value as of the measurement date.
In January 2025, FirstEnergy executed a lift-out transaction with MetLife, that transferred approximately $640 million of plan assets and $652 million of plan
obligations, associated with approximately 2,000 former competitive generation employees, who will assume future and full responsibility to fund and administer
their benefit payments. Similar to the lift-out in 2023, there was no change to the pension benefits for any participant as a result of the transfer and the

-- 126 of 203 --

transaction was funded by pension plan assets. FirstEnergy believes that this lift-out transaction, in addition to the lift-out in 2023, further de-risked potential
volatility with the pension plan assets and liabilities. FirstEnergy will continue to evaluate other lift-outs in the future based on market and other conditions. Due
to the timing of the lift-out transaction and its proximity to the 2024 annual remeasurement, FirstEnergy elected a practical expedient and did not remeasure
pension plan assets and obligations when the lift-out occurred in January 2025.
FirstEnergy’s cash flows from operating activities for the years ended December 31, 2025 and 2024, include approximately $49 million (none at JCP&L) and
$59 million ($7 million at JCP&L), respectively, of employee benefit plan funding and related payments. These payments are primarily related to short-term
benefit payment liabilities owed to retirees under plan obligations in the respective periods.
Actuarial Assumptions
Pension 	OPEB
2025 	2024 	2023 	2025 	2024 	2023
Assumptions Related to Benefit Obligations:
Discount rate 	5.59 % 	5.72 % 	5.05 % 	5.37 % 	5.60 % 	4.97 %
Rate of compensation increase 	4.30 % 	4.30 % 	4.30 % 	N/A 	N/A 	N/A
Cash balance weighted average interest crediting
rate 	4.64 % 	4.37 % 	4.94 % 	N/A 	N/A 	N/A
Assumptions Related to Benefit Costs:
Effective rate for interest on benefit obligations 	5.41 % 	4.92 % 	5.10% / 4.80% 	5.28 % 	4.88 % 	5.06 %
Effective rate for service costs 	5.89 % 	5.17 % 	5.34% / 5.11% 	5.98 % 	5.23 % 	5.41 %
Effective rate for interest on service costs 	5.66 % 	5.05 % 	5.22% /4.94% 	5.88 % 	5.16 % 	5.33 %
Expected return on plan assets 	8.50 % 	8.00 % 	8.00 % 	7.00 % 	7.00 % 	7.00 %
Rate of compensation increase 	4.30 % 	4.30 % 	4.30 % 	N/A 	N/A 	N/A
Assumed Health Care Cost Trend Rates:
Health care cost trend rate assumed (pre/post-
Medicare) 	N/A 	N/A 	N/A 6.50% -
5.80% 7.00%-
6.00% 7.00%-
6.50%
Rate to which the cost trend rate is assumed to decline
(ultimate trend rate) 	N/A 	N/A 	N/A 	4.50 % 	4.50 % 	4.50 %
Year that the rate reaches the ultimate trend rate 	N/A 	N/A 	N/A 	2036 	2035 	2033
Excludes impact of pension and OPEB mark-to-market adjustments.
As a result of the interim plan remeasurement during 2023, different rates were in effect from January 1, 2023, through April 30, 2023 compared to May 1, 2023 through December
31, 2023.
Discount Rate - The discount rate is determined using currently available rates of return on high-quality fixed income investments expected to be available
during the period to maturity of the pension and OPEB obligations. FirstEnergy utilizes a spot rate approach in the estimation of the components of benefit cost
by applying specific spot rates along the full yield curve to the relevant projected cash flows. FirstEnergy utilizes an analytical tool developed by its actuary to
determine the discount rates.
Expected Return on Plan Assets - The expected return on pension and OPEB assets is based on input from investment consultants, including the trusts’ asset
allocation targets, the historical performance of risk-based and fixed income securities and other factors. The gains or losses generated as a result of the
difference between expected and actual returns on plan assets is recognized as a pension and OPEB mark-to-market adjustment in the fourth quarter of each
fiscal year and whenever a plan is determined to qualify for remeasurement.
FirstEnergy Pension and OPEB Returns 	2025 	2024 	2023
Actual gains or (losses) on plan assets - $ millions 	$ 	880 	$ 	3 	$ 	751
Actual gains or (losses) on plan assets - % 	15.4 % 	0.7 % 	11.2 %
Expected return on plan assets - $ millions 	$ 	499 	$ 	565 	$ 	601
Expected return on plan assets - %
8.50% for pension
7.00% for OPEB
8.00% for pension
7.00% for OPEB
8.00% for pension
7.00% for OPEB
Mortality Rates - During 2025, the Society of Actuaries elected not to release a new mortality improvement scale. Management, in discussions with its actuary,
determined that the Pri-2012 mortality table with projection scale MP-2021, actuarially adjusted to reflect increased mortality due to the ongoing impact of
COVID-19, was most appropriate and such was utilized to determine the obligation as of December 31, 2025, for the FirstEnergy pension and OPEB plans. This
adjustment acknowledges COVID-19 cannot be eradicated and assumes reductions in other causes will not offset future COVID-19 deaths enough to produce a
normal level of improvements.
Net Periodic Benefit Costs (Credits) - In addition to service costs, interest on obligations, expected return on plan assets, and prior service costs, FirstEnergy
recognizes in net periodic benefit costs a pension and OPEB mark-to-market adjustment for the change in the fair value of plan assets and net actuarial gains
and losses annually in the fourth quarter of each fiscal year and whenever a plan is determined to qualify for a remeasurement. Service costs, net of amounts
capitalized, are reported within "Other operating expenses" on the Registrants' Statements of Income. Non-service costs, other than the pension and OPEB
mark-to-market adjustment, which is separately shown, are reported within "Miscellaneous income, net", within "Other Income (Expense)" on the Registrants'
Statements of Income.
FirstEnergy Components of Net Periodic Benefit Costs
(Credits) for the Years Ended December 31,
Pension 	OPEB
2025 	2024 	2023 	2025 	2024 	2023
(In millions)
Service cost 	$ 	131 $ 	140 $ 	139 $ 	2 $ 	3 $ 	2
Interest cost 	374 	398 	428 	20 	20 	21
Expected return on plan assets 	(461) 	(530) 	(570) 	(38) 	(35) 	(31)
Amortization of prior service costs (credits) 	1 	2 	2 	(1) 	(1) 	(8)
(2) 	(2)
(1)
(1)
(2)
(1)

-- 127 of 203 --

Special termination benefits 	— 	— 	21 	— 	— 	8
Pension & OPEB mark-to-market adjustments 	(231) 	66 	108 	(22) 	(44) 	(30)
Net periodic benefit costs (credits) 	$ 	(186) $ 	76 $ 	128 $ 	(39) $ 	(57) $ 	(38)
Includes amounts capitalized.
Related to benefits provided in connection with the PEER.
For the years ended December 31, 2025, 2024 and 2023, approximately $(29) million, $(8) million and $36 million, respectively, of the annual pension and OPEB
mark-to-market adjustment charges (credits) were allocated to companies under forward-looking formula rates, and expected to be refunded or recovered
through formula transmission rates.
The Registrants recognize a pension and OPEB mark-to-market adjustment for the change in fair value of plan assets and net actuarial gains and losses
annually in the fourth quarter of each fiscal year and whenever a plan is determined to qualify for remeasurement.
In the fourth quarter of 2025, FirstEnergy recognized a $253 million ($55 million at JCP&L) pension and OPEB mark-to-market adjustment gain, primarily
reflecting higher than expected return on assets partially offset by a decrease in the discount rate used to measure pension benefit obligations.
FirstEnergy 	Pension 	OPEB
Obligations/Funded Status - Qualified and Non-Qualified Plans 	2025 	2024 	2025 	2024
(In millions)
Change in benefit obligation:
Benefit obligation as of January 1 	$ 	7,824 $ 	8,363 $ 	407 $ 	441
Service cost 	131 	140 	2 	3
Interest cost 	374 	398 	20 	20
Plan participants’ contributions 	— 	— 	3 	4
Medicare retiree drug subsidy 	— 	— 	— 	1
Lift-out transaction 	(652) 	— 	— 	—
Actuarial loss (gain) 	129 	(526) 	11 	(14)
Benefits paid 	(526) 	(551) 	(45) 	(48)
Benefit obligation as of December 31 	$ 	7,280 $ 	7,824 $ 	398 $ 	407
Change in fair value of plan assets:
Fair value of plan assets as of January 1 	$ 	6,296 $ 	6,879 $ 	567 $ 	516
Actual return on plan assets 	809 	(62) 	71 	65
Lift-out transaction 	(640) 	— 	— 	—
Company contributions 	28 	30 	21 	30
Plan participants’ contributions 	— 	— 	3 	4
Benefits paid 	(526) 	(551) 	(45) 	(48)
Fair value of plan assets as of December 31 	$ 	5,967 $ 	6,296 $ 	617 $ 	567
Funded Status:
Qualified plan 	$ 	(952) $ 	(1,165) $ 	— $ 	—
Non-qualified plans 	(361) 	(363) 	— 	—
Funded Status - Net asset (liability) as of December 31 	$ 	(1,313) $ 	(1,528) $ 	219 $ 	160
Accumulated benefit obligation 	$ 	7,047 $ 	7,572 $ 	— $ 	—
Amounts Recognized in AOCI:
Prior service cost (credit) 	$ 	1 $ 	2 $ 	1 $ 	1
The pension net liability is included in “Retirement benefits,” on the Consolidated Balance Sheets. The OPEB net asset is included in “Other” noncurrent assets on the
Consolidated Balance Sheets.
The following tables set forth FirstEnergy's pension financial assets that are accounted for at fair value by level within the fair value hierarchy. See Note 10., "Fair
Value Measurements," of the Combined Notes to Financial Statements of the Registrants for a description of each level of the fair value hierarchy. There were no
significant transfers between levels during 2025 and 2024.
December 31, 2025
Asset Allocation	FirstEnergy 	Level 1 	Level 2 	Level 3 	Total
(In millions)
Cash and short-term securities 	$ 	— $ 	402 $ 	— $ 	402 	7 %
Public equity 	1,976 	6 	— 	1,982 	33 %
Fixed income 	— 	1,507 	— 	1,507 	25 %
Derivatives 	(21) 	18 	— 	(3) 	— %
Total 	$ 	1,955 $ 	1,933 $ 	— $ 	3,888 	65 %
Private - equity and debt funds 	1,278 	22 %
Insurance-linked securities 	7 	— %
Hedge funds 	270 	5 %
Real estate funds 	498 	8 %
Total Investments 	$ 	5,941 	100 %
(2)
(1)
(2)
(1)
(1)
(1)
(2)
(2)
(2)
(2)

-- 128 of 203 --

Excludes $26 million as of December 31, 2025, of receivables, payables, taxes, cash collateral for derivatives and accrued income associated with financial instruments reflected
within the fair value table.
NAV used as a practical expedient to approximate fair value.
December 31, 2024
Asset Allocation	FirstEnergy 	Level 1 	Level 2 	Level 3 	Total
(In millions)
Cash and short-term securities 	$ 	— $ 	1,173 $ 	— $ 	1,173 	19 %
Public equity 	1,585 	5 	— 	1,590 	25 %
Fixed income 	— 	1,425 	— 	1,425 	23 %
Derivatives 	(95) 	37 	— 	(58) 	(1)%
Total 	$ 	1,490 $ 	2,640 $ 	— $ 	4,130 	66 %
Private - equity and debt funds 	1,273 	20 %
Insurance-linked securities 	39 	1 %
Hedge funds 	253 	4 %
Real estate funds 	554 	9 %
Total Investments 	$ 	6,249 	100 %
Excludes $47 million as of December 31, 2024, of receivables, payables, taxes and accrued income associated with financial instruments reflected within the fair value table.
NAV used as a practical expedient to approximate fair value.
Private – equity and debt funds: Private equity and private debt funds primarily include limited partnerships that invest in equity or directly originated senior
loans of high-quality middle market operating companies. Distributions are received periodically through the liquidation of underlying assets in each fund. For
most private equity and debt funds, immediate access to capital at the limited partner’s discretion is not available and such funds prevent full redemption and
return of capital until fund liquidation. The purpose of each fund is to maximize total return of capital with an emphasis on minimizing default risk. Each fund’s
NAV is made available to fund participants quarterly.
Insurance-Linked Securities funds: The insurance linked securities funds invest in securities which indirectly participate in portfolios of reinsurance and
retrocession contracts which primarily cover catastrophe property risks. Redemptions can be achieved with 90-day notices with gating factors that may apply.
The purpose of these investments is to generate attractive risk-adjusted returns that are demonstrably uncorrelated with traditional asset classes. Each fund’s
NAV is made available to fund participants monthly.
Hedge funds: The hedge funds invest in a combination of long and short equity, multi-strategy, global macro and structured credit strategies. Redemptions can
be achieved with 90-day notices with gating factors that may apply. The purpose of these investments is to deliver diversified risk-adjusted returns to traditional
asset classes. Each fund’s NAV is made available to fund participants monthly.
Real estate funds: The real estate funds primarily invest in U.S commercial real estate markets that include office, residential, retail, industrial, life science/lab
space, storage and student housing. The investment values of the real estate properties are determined on a quarterly basis by independent market appraisers
hired by the board of directors of each fund. Distributions from each fund will be received as the underlying investments of the fund are liquidated. Each
investor’s ability to withdraw capital from certain funds may be limited depending on whether a queue has been established. The purpose of each fund is to
invest in real estate and real estate related assets that generate a total return from current income and capital appreciation which exceeds the applicable fund’s
index. Each fund’s NAV is made available to fund participants quarterly.
As of December 31, 2025, and 2024, the FirstEnergy OPEB trust investments measured at fair value were as follows:
December 31, 2025 Asset
Allocation	FirstEnergy 	Level 1 	Level 2 	Level 3 	Total
(In millions)
Cash and short-term securities 	$ 	— $ 	128 $ 	— $ 	128 	20 %
Public equity 	361 	— 	— 	361 	57 %
Fixed income 	— 	141 	— 	141 	23 %
Total 	$ 	361 $ 	269 $ 	— $ 	630 	100 %
Excludes $(13) million as of December 31, 2025, of receivables, payables, taxes and accrued income associated with financial instruments reflected within the fair value table.
December 31, 2024 Asset
Allocation	FirstEnergy 	Level 1 	Level 2 	Level 3 	Total
(In millions)
Cash and short-term securities 	$ 	— $ 	112 $ 	— $ 	112 	20 %
Public equity 	314 	— 	— 	314 	55 %
Fixed income: 	— 	146 	— 	146 	25 %
Total 	$ 	314 $ 	258 $ 	— $ 	572 	100 %
Excludes $(5) million as of December 31, 2024, of receivables, payables, taxes and accrued income associated with financial instruments reflected within the fair value table.
FirstEnergy’s target asset allocations for its pension and OPEB trust portfolios as of December 31, 2025 were as follows:
Target Asset Allocations
Pension 	OPEB
Equities 	30 % 	50 %
Fixed income 	28.5 % 	50 %
(1)
(2)
(1)
(2)
(2)
(2)
(2)
(1)
(2)
(1)
(1)
(1)
(1)

-- 129 of 203 --

Alternative investments 	5 % 	— %
Real estate 	10 % 	— %
Private - equity and debt funds 	20 % 	— %
Cash and derivatives 	6.5 % 	— %
100 % 	100 %
FirstEnergy follows a total return investment approach using a mix of equities, fixed income and other available investments while taking into account the
pension plan liabilities to optimize the long-term return on plan assets for a prudent level of risk. Risk tolerance is established through careful consideration of
plan liabilities, plan funded status and corporate financial condition. The investment portfolio contains a diversified blend of equity and fixed-income investments.
Equity investments are diversified across U.S. and non-U.S. stocks, as well as growth, value, and small and large capitalization funds. Other assets such as real
estate and private equity are used to enhance long-term returns while improving portfolio diversification. Derivatives may be used to gain market exposure in an
efficient and timely manner; however, derivatives are not used to leverage the portfolio beyond the market value of the underlying investments. Investment risk is
measured and monitored on a continuing basis through periodic investment portfolio reviews, annual liability measurements and periodic asset/liability studies.
Taking into account estimated employee future service, FirstEnergy expects to make the following benefit payments from plan assets and other payments, net of
participant contribution.
OPEB
Pension Benefit
Payments 	Benefit Payments 	Subsidy Receipts
(In millions)
2026 	$ 	517 $ 	40 $ 	1
2027 	522 	39 	1
2028 	526 	38 	—
2029 	530 	37 	—
2030 	532 	35 	—
Years 2031-2035 	2,660 	155 	2
Net of participant contributions.
JCP&L
JCP&L recognizes its allocated portion of the expected cost of providing pension and OPEB to employees and their beneficiaries and covered dependents from
the time employees are hired until they become eligible to receive those benefits. JCP&L also recognizes its allocated portion of obligations to former or inactive
employees after employment, but before retirement, for disability-related benefits. In addition to the net periodic benefit costs for its current and former
employees and retirees, JCP&L is also allocated pension and OPEB net periodic benefit costs/(credits) from its affiliates, primarily FESC.
(1)
(1)
116

-- 130 of 203 --

JCP&L’s net periodic benefit costs (credits) for pension and OPEB were as follows:
Pension 	OPEB
For the Years Ended December 31, 	2025 	2024 	2023 	2025 	2024 	2023
(In millions)
JCP&L's share of net periodic benefit credits 	$ 	(37) $ 	(12) $ 	10 $ 	(28) $ 	(27) $ 	(29)
Allocated net periodic benefit costs from affiliates 	$ 	(1) $ 	6 $ 	40 $ 	1 $ 	— $ 	1
Includes amounts capitalized.
Includes JCP&L’s pension and OPEB mark-to-market adjustment gain (loss) of $45 million, $22 million and $2 million for the years ended December 31, 2025, 2024 and 2023,
respectively.
Included in these net periodic benefit costs/(credits) from its affiliates are $10 million, $2 million and $(31) million of mark-to-market adjustment gain (loss), for the years ended
December 31, 2025, 2024 and 2023, respectively.
Summary of Plan Status 	Pension 	OPEB
As of December 31, (in millions) 	2025 	2024 	2025 	2024
JCP&L's share of FirstEnergy funded status 	$ 	(29) $ 	(67) $ 	243 $ 	215
OPEB amounts include a $7 million contribution from JCP&L in 2024.
Excludes $492 million and $502 million as of December 31, 2025 and 2024, respectively, of affiliated noncurrent liabilities included within "Other" noncurrent liabilities on JCP&L's
Balance Sheets related to pension and OPEB mark-to-market costs allocated to JCP&L and amounts associated with a reallocation of OPEB assets among certain FirstEnergy
companies in 2022.
5. STOCK-BASED COMPENSATION PLANS
The disclosures in this note apply to both Registrants, unless indicated otherwise.
FirstEnergy grants, including to JCP&L employees, stock-based awards through the ICP 2020, primarily in the form of restricted stock, time-based RSUs and
performance-based RSUs. No shares are available for future grants or issuance under ICP 2015.
The ICP 2020 and ICP 2015 include shareholder authorization to each issue 10 million shares of common stock or their equivalent. Shares not issued due to
forfeitures or cancellations originally granted through the ICP 2015 may be added back to the ICP 2020. As of December 31, 2025, approximately 7.4 million
shares were available for future grants under the ICP 2020 assuming maximum performance metrics are achieved for the outstanding cycles of RSUs. Shares
granted under the ICP 2020 are issued from authorized but unissued common stock. Vesting periods for stock-based awards range from less than a year,
primarily due to the issuance of prorated awards to newly hired executives, to four years, with the majority of awards having a vesting period of three years.
FirstEnergy also issues stock through its 401(k) savings plan and DCPD.
FirstEnergy records the compensation costs for stock-based compensation awards that will be paid in stock over the vesting period based on the fair value on
the grant date. FirstEnergy accounts for forfeitures as they occur.
FirstEnergy adjusts the compensation costs for stock-based compensation awards that will be paid in cash based on changes in the fair value of the award as of
each reporting date. FirstEnergy records the actual tax benefit realized from tax deductions when awards are exercised or settled. Actual income tax benefits
realized during the years ended December 31, 2025, 2024 and 2023, were $7 million, $17 million and $6 million, respectively. The income tax effects of awards
are recognized in the income statement when the awards vest, are settled or are forfeited.
The following table reflects the pre-tax portion of stock-based compensation costs that were charged to expense, including amounts capitalized, and net of
amounts capitalized, for the years ended December 31, 2025, 2024 and 2023:
For the Years Ended December 31,
Components of Stock-based Compensation Plan Costs 	2025 	2024 	2023
(In millions)
Restricted stock units 	$ 	35 $ 	32 $ 	39
Restricted stock 	4 	7 	5
401(k) savings plan 	39 	41 	38
EDCP & DCPD 	7 	6 	1
Total stock based compensation costs 	$ 	85 $ 	86 $ 	83
Stock-based compensation costs, net of amounts capitalized 	$ 	39 $ 	43 $ 	44
(1)(2)
(1)(3)
(1)
(2)
(3)
(2)
(1)
(2)
117

-- 131 of 203 --

Income tax benefits associated with stock-based compensation plan expense were $1 million, $5 million and $6 million for the years ended December 31, 2025,
2024 and 2023, respectively.
Restricted Stock Units
For RSU awards granted prior to 2025, two-thirds of each performance-based RSU award will be paid in FE common stock and one-third will be paid in cash, if
and as earned. RSUs payable in stock provide the participant the right to receive, at the end of the period of restriction, a number of shares of common stock
equal to the number of stock units set forth in the agreement, subject to adjustment based on FirstEnergy's performance relative to financial targets applicable to
each award. The grant date fair market value of the stock portion of the RSU award is measured based on the average of the high and low prices of FE common
stock on the date of grant. The estimated grant date fair value for these awards is calculated using the Monte Carlo simulation method. RSUs include a relative
total shareholder return as a performance metric, weighted at 35%, utilizing the S&P 500 Utility Index as a comparator group and 65% based upon three year
cumulative earnings targets. In addition, outstanding awards are subject to an absolute total shareholder return, if FirstEnergy's total shareholder return is
negative for the three-year cumulative performance period, RSU awards will be capped at a payout of 100%.
RSUs payable in cash provide the participant the right to receive cash based on the number of stock units set forth in the agreement and value of the equivalent
number of shares of FE common stock as of the vesting date. The cash portion of the RSU award is considered a liability award, which is remeasured each
period based on FE's stock price and projected performance adjustments. The liability recorded for the portion of performance-based RSUs payable in cash in
the future as of December 31, 2025, was $17 million. During 2025, approximately $6 million was paid in relation to the cash portion of RSU obligations that
vested in 2025.
Beginning with RSU awards granted in 2025, RSU awards no longer are partially paid in cash and instead are paid fully in FE common stock, with 40% of the
award being time-based and 60% performance-based. The time-based RSUs vest over a three-year performance period and pays out in stock if the participant
remains employed with FirstEnergy on the vest date (generally, March 1). The performance-based RSUs maintain a relative total shareholder return as a
performance metric, weighted at 35%, utilizing the S&P 500 Utility Index as a comparator group and 65% based on three year cumulative earnings targets. The
grant date fair market value is measured based on the average of the high and low prices of FE common stock on the date of grant. The estimated grant date
fair value for these awards is also calculated using the Monte Carlo simulation method. In addition, outstanding awards are subject to an absolute total
shareholder return, if FirstEnergy's total shareholder return is negative for the three-year cumulative performance period, RSU awards will be capped at a payout
of 100%.
The vesting period for RSU awards granted in 2025, 2024 and 2023, were each approximately three years. Dividend equivalents are received on the RSUs and
are reinvested in additional RSUs and subject to the same performance conditions as the underlying award.
Restricted stock unit activity for the year ended December 31, 2025, was as follows:
Restricted Stock Unit Activity Shares
(in millions) Weighted-Average Grant Date Fair
Value (per share)
Nonvested as of January 1, 2025 	2.8 $ 	37.32
Granted in 2025 	1.1 	39.94
Forfeited in 2024 	(0.4) 	39.48
Vested in 2025 	(0.6) 	38.38
Nonvested as of December 31, 2025 	2.9 $ 	36.38
Excludes dividend equivalents of approximately 67 thousand shares earned during vesting period.
The weighted-average fair value per share of awards granted in 2025, 2024 and 2023 was $39.94, $36.79 and $38.36 per share, respectively. During the years
ended 2025, 2024 and 2023, the fair value of RSUs vested was $23 million, $55 million, and $24 million, respectively. As of December 31, 2025, there was
approximately $38 million of total unrecognized compensation cost related to nonvested share-based compensation arrangements granted for RSUs, which is
expected to be recognized over a period of approximately three years.
Restricted Stock
Certain employees may receive awards of FE restricted stock (as opposed to RSUs described above) subject to restrictions that lapse over a defined period of
time. The fair value of restricted stock is measured based on the average of the high and low prices of FE common stock on the date of grant. Dividends are
received on the restricted stock and are reinvested in additional shares of restricted stock, subject to the vesting conditions of the underlying award. Restricted
stock activity for the year ended 2025, was as follows:
(1)
(1)
118

-- 132 of 203 --

Restricted Stock Activity
Shares
(in millions)
Weighted-Average Grant Date Fair
Value (per share)
Nonvested as of January 1, 2025 	0.27 $ 	38.29
Granted in 2025 	0.06 	41.98
Forfeited in 2025 	(0.01) 	38.16
Vested in 2025 	(0.08) 	39.71
Nonvested as of December 31, 2025 	0.24 $ 	38.70
The weighted average vesting period for restricted stock granted in 2025 was 1.86 years. As of December 31, 2025, there was $3 million of total unrecognized
compensation cost related to non-vested restricted stock, which is expected to be recognized over a period of approximately 2.5 years.
401(k) Savings Plan
In each of 2025 and 2024, approximately 1 million shares of FE common stock, respectively, were issued and contributed to employee participants' accounts.
EDCP
Under the EDCP, certain employees can defer a portion of their compensation, including base salary, annual incentive awards and/or long-term incentive
awards, into unfunded accounts. Annual incentive and long-term incentive awards may be deferred in FE stock accounts, where they are tracked as units. Base
salary and annual incentive awards may be deferred into a retirement cash account which earns interest. Dividend equivalents are calculated quarterly on stock
units outstanding and are credited in the form of additional stock units. Awards deferred into a retirement stock account will convert to cash upon separation,
including retirement, death or disability, and pay out in cash as a lump sum or over a defined period of time period as elected by the participant. Interest accrues
on the cash allocated to the retirement cash account. The liability recognized for EDCP of approximately $153 million ($3 million at JCP&L) and $166 million
($3 million at JCP&L) as of December 31, 2025 and 2024, respectively, is included in “Retirement benefits,” on the Registrants' Balance Sheets.
DCPD
Under the DCPD, members of the FE Board can elect to defer all or a portion of their equity retainers to a deferred stock account and their cash retainers to
deferred stock or deferred cash accounts. The net liability recognized for DCPD of approximately $4 million as of December 31, 2025 and 2024, respectively, is
included in “Retirement benefits,” on the FirstEnergy's Balance Sheets.
6. TAXES
The disclosures in this note apply to both Registrants, unless indicated otherwise.
The Registrants record income taxes in accordance with the liability method of accounting. Deferred income taxes reflect the net tax effect of temporary
differences between the carrying amounts of assets and liabilities for financial reporting purposes and the amounts recognized for tax purposes. Investment tax
credits, which were deferred when utilized, are being amortized over the recovery period of the related property. Deferred income tax liabilities related to
temporary tax and accounting basis differences and tax credit carryforward items are recognized at the statutory income tax rates in effect when the liabilities are
expected to be paid. Deferred tax assets are recognized based on income tax rates expected to be in effect when they are settled.
FE and its subsidiaries, other than FET and its subsidiaries, are parties to an intercompany income tax allocation agreement that provides for the allocation of
consolidated tax liabilities. For periods subsequent to the closing of the FET Equity Interest Sale, FET and its subsidiaries are no longer members of the
FirstEnergy consolidated group for federal income tax purposes and, instead, file their own consolidated federal income tax return and have their own income
tax allocation agreement.
During 2025, FERC issued orders to a non-affiliate concluding that, based on certain previously issued IRS private letter rulings, certain NOL carryforward
deferred tax assets, as computed on a separate return basis, should be included in rate base for ratemaking purposes. FirstEnergy determined in the third
quarter of 2025 that these rulings and orders also would apply to certain of its subsidiaries, resulting in a benefit from a reduction in regulatory liabilities, reflected
as the remeasurement of excess deferred income taxes, and an increase in accumulated deferred income tax assets for ratemaking purposes, which will
increase overall rate base. FirstEnergy made the appropriate updates in its annual formula rates for the impacted subsidiaries. FirstEnergy will continue to
evaluate whether regulatory filings are required in other jurisdictions to implement similar adjustments to NOL carryforward deferred tax assets for ratemaking
purposes.
On July 4, 2025, President Trump signed into law the OBBBA, which, among other things, makes permanent certain corporate tax incentives that were set to
expire in the TCJA, and terminates tax credits for most wind and solar projects placed in service
119

-- 133 of 203 --

after 2027. Because many of the provisions of the TCJA will be continued under the OBBBA, and as FirstEnergy is not materially impacted by tax incentives
associated with wind and solar projects, FirstEnergy does not expect to be materially impacted by the OBBBA.
On September 30, 2025, the IRS issued additional guidance on the corporate AMT. While FirstEnergy continues to believe, more likely than not, it will be subject
to corporate AMT, additional IRS guidance or revised U.S. Treasury regulations, which are expected to be issued in the future, as well as potential tax legislation
or presidential executive orders could provide certain adjustments to regulated utilities in calculating corporate AMT, which may reduce or otherwise significantly
change FirstEnergy’s AMT estimates or its conclusions as to whether it is an AMT payer. JCP&L is party to an intercompany income tax allocation agreement
with FirstEnergy and, accordingly, may be allocated a share of any corporate AMT paid by the FirstEnergy consolidated tax group. Any adverse developments
concerning corporate AMT liability, including guidance from the U.S. Treasury and/or the IRS or unfavorable regulatory treatment by FERC and/or applicable
state regulatory authorities, could negatively impact FirstEnergy’s cash flows, results of operations and financial condition.
On March 25, 2024, FirstEnergy closed on the FET Equity Interest Sale realizing an approximate $7 billion tax gain from the combined sale of 49.9% of the
equity interests of FET for consideration received and recapture of negative tax basis in FET, a majority of such gain utilizing existing federal NOL carryforwards.
In the first quarter of 2024, FirstEnergy recognized a net tax charge of approximately $46 million, comprised of updates to estimated deferred tax liability for the
deferred gain from the 19.9% FET equity interest sale in May 2022, deferred tax liability related to its ongoing investment in FET, and valuation allowance
associated with the expected utilization of certain state NOL carryforwards impacted by the sale and the PA Consolidation, and recognized a reduction to OPIC
of approximately $803 million for federal and state income tax associated with the tax gain from closing on the FET Equity Interest Sale.
The following table provides the composite of income taxes on income from continuing operations of FirstEnergy for the years ended 2025, 2024 and 2023:
INCOME TAXES ON INCOME FROM CONTINUING OPERATIONS -
FIRSTENERGY
For the Years Ended December 31,
2025 	2024 	2023
(In millions)
Currently payable -
Federal 	$ 	58 $ 	32 $ 	14
State 	11 	29 	1
69 	61 	15
Deferred, net -
Federal 	135 	190 	279
State 	88 	130 	(24)
223 	320 	255
Investment tax credit amortization 	(4) 	(4) 	(3)
Total income taxes on income from continuing operations 	$ 	288 $ 	377 $ 	267
Excludes $21 million of federal tax expense associated with discontinued operations for the year ended December 31, 2023.
(1)
(1)
120

-- 134 of 203 --

The following table provides the composite of income taxes of JCP&L for the years ended 2025, 2024 and 2023:
JCP&L 	For the Years Ended December 31,
INCOME TAXES: 	2025 	2024 	2023
(In millions)
Currently receivable -
Federal 	$ 	(36) $ 	(143) $ 	(7)
State 	— 	— 	(8)
(36) 	(143) 	(15)
Deferred, net -
Federal 	108 	200 	34
State 	35 	30 	14
143 	230 	48
Total income taxes 	$ 	107 $ 	87 $ 	33
Previously issued 2024 and 2023 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation,"
of the Combined Notes to Financial Statements of the Registrants.
Tax rates are affected by permanent items, such as AFUDC equity and other flow-through items, as well as discrete items that may occur in any given period but
are not consistent from period to period. The following tables present a reconciliation of income tax expense at the U.S. federal statutory tax rate to the actual tax
expense from continuing operations for the years ended December 31, 2025, 2024 and 2023:
For the Year Ended December 31, 2025
(In millions) 	FirstEnergy 	JCP&L
Amount 	% 	Amount 	%
Income before income taxes 	$ 	1,559 	$ 	413
Federal statutory income tax 	$ 	327 	21.0 % $ 	87 	21.0 %
Federal
Tax credits 	(5) 	(0.3)% 	— 	— %
Nontaxable and Nondeductible
AFUDC equity income 	(23) 	(1.5)% 	(6) 	(1.4)%
AFUDC equity depreciation 	4 	0.3 % 	— 	— %
Tax related to FE's equity investment in FET 	13 	0.8 % 	— 	— %
Changes in valuation allowances 	3 	0.2 % 	— 	— %
Other
Excess deferred tax amortization 	(42) 	(2.7)% 	(1) 	(0.2)%
Remeasurement of excess deferred income taxes 	(70) 	(4.5)% 	— 	— %
Federal and state related flow-through 	(37) 	(2.4)% 	(2) 	(0.5)%
Deferred taxes associated with FET equity interest sale 	6 	0.4 % 	— 	— %
Other 	2 	0.1 % 	— 	— %
Changes in unrecognized tax benefits 	1 	0.1 % 	— 	— %
State and municipal income taxes, net of federal effect 	109 	7.0 % 	29 	7.0 %
Total income taxes 	$ 	288 	18.5 % $ 	107 	25.9 %
Valuation allowances have been established for certain state NOL carryforwards that reduce deferred tax assets to an amount that will be realized on a more-likely-than-not basis.
The net change in the total valuation allowance is included in state income tax, net of federal income tax effect, in the above tables.
Jurisdictions that make up the majority of the Registrants' respective domestic state income taxes, net of federal effect, are Pennsylvania for FirstEnergy and New Jersey for
JCP&L.
There were no amounts for the year ended December 31, 2025 at FirstEnergy or JCP&L related to cross-border tax laws, changes in laws or rates, or foreign tax effects.
(1)
(1)
(1) (2)
(3)
(1)
(2)
(3)
121

-- 135 of 203 --

For the Year Ended December 31, 2024
(In millions) 	FirstEnergy 	JCP&L
Amount 	% 	Amount 	%
Income before income taxes 	$ 	1,504 	$ 	329
Federal statutory income tax 	$ 	316 	21.0 % $ 	69 	21.0 %
Federal
Tax credits 	(6) 	(0.4)% 	— 	— %
Nontaxable and Nondeductible 	— %
AFUDC equity income 	(13) 	(0.9)% 	(1) 	(0.3)%
AFUDC equity depreciation 	1 	0.1 % 	— 	— %
Nondeductible SEC and OAG Settlements 	27 	1.8 % 	— 	— %
Tax related to FE's equity investment in FET 	16 	1.1 % 	— 	— %
Changes in valuation allowances 	1 	0.1 % 	— 	— %
Other
Excess deferred tax amortization 	(52) 	(3.5)% 	(4) 	(1.3)%
Remeasurement of excess deferred income taxes 	(43) 	(2.9)% 	— 	— %
Federal and state related flow-through 	(18) 	(1.2)% 	— 	— %
Deductions associated with certain equity investments 	(19) 	(1.3)% 	— 	— %
Deferred taxes associated with FET equity interest sale 	6 	0.4 % 	— 	— %
Other 	6 	0.4 % 	— 	— %
State and municipal income taxes, net of federal effect 	155 	10.3 % 	23 	7.0 %
Total income taxes 	$ 	377 	25.1 % $ 	87 	26.4 %
Valuation allowances have been established for certain state NOL carryforwards that reduce deferred tax assets to an amount that will be realized on a more-likely-than-not basis.
The net change in the total valuation allowance is included in state income tax, net of federal income tax effect, in the above tables.
Jurisdictions that make up the majority of the Registrants' respective domestic state income taxes, net of federal effect, are Pennsylvania and West Virginia for FirstEnergy; and
New Jersey for JCP&L.
There were no amounts for the year ended December 31, 2024 at FirstEnergy or JCP&L related to cross-border tax laws, changes in laws or rates, foreign tax effects, or changes
in unrecognized tax benefits.
Previously issued 2024 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the
Combined Notes to Financial Statements of the Registrants.
(4)
(1) (2)
(3)
(1)
(2)
(3)
(4)
122

-- 136 of 203 --

For the Year Ended December 31, 2023
(In millions ) 	FirstEnergy 	JCP&L
Amount 	% 	Amount 	%
Income from continuing operations, before income taxes 	$ 	1,464 	$ 	158
Federal statutory income tax 	$ 	307 	21.0 % $ 	33 	21.0 %
Federal
Tax credits 	(6) 	(0.4)% 	— 	— %
Nontaxable and Nondeductible
AFUDC equity income 	(9) 	(0.6)% 	(1) 	(0.6)%
AFUDC equity depreciation 	6 	0.4 % 	— 	— %
Changes in valuation allowances 	(33) 	(2.3)% 	— 	— %
Other
Excess deferred tax amortization 	(46) 	(3.1)% 	(4) 	(2.6)%
Federal and state related flow-through 	(27) 	(1.8)% 	— 	— %
Deferred taxes associated with FET equity interest sale 	58 	4.0 % 	— 	— %
Other 	9 	0.6 % 	(1) 	(0.6)%
Changes in unrecognized tax benefits 	41 	2.8 % 	(28) 	(17.8)%
State and municipal income taxes, net of federal effect 	(33) 	(2.3)% 	34 	21.5 %
Total income taxes on income from continuing operations 	$ 	267 	18.2 % $ 	33 	20.9 %
Valuation allowances have been established for certain state NOL carryforwards at FirstEnergy that reduce deferred tax assets to an amount that will be realized on a more-likely-
than-not basis. The net change in the total valuation allowance is included in state income tax, net of federal income tax effect, in the above tables.
Jurisdictions that make up the majority of the Registrants' respective domestic state income taxes, net of federal effect, are Pennsylvania and West Virginia for FirstEnergy; and
New Jersey for JCP&L.
There were no amounts for the year ended December 31, 2023 at FirstEnergy or JCP&L related to cross-border tax laws, changes in laws or rates, or foreign tax effects
Previously issued 2023 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the
Combined Notes to Financial Statements of the Registrants.
Net accumulated deferred income tax liabilities (assets) as of December 31, 2025 and 2024, are as follows:
FirstEnergy 	As of December 31,
(In millions) 	2025 	2024
Property basis differences 	$ 	6,579 $ 	6,079
Pension and OPEB 	(249) 	(322)
Regulatory asset/liability 	732 	744
Loss carryforwards and tax credits 	(920) 	(762)
Valuation allowances 	245 	240
Other 	(355) 	(366)
Net accumulated deferred income tax liability 	$ 	6,032 $ 	5,613
JCP&L 	As of December 31,
(In millions) 	2025 	2024
Property basis differences 	$ 	1,330 $ 	1,167
Pension and OPEB 	(78) 	(99)
Regulatory asset/liability 	366 	296
Loss and credit carryforwards 	(199) 	(116)
Nuclear fuel disposal costs 	(66) 	(59)
Other 	(5) 	3
Net accumulated deferred income tax liability 	$ 	1,348 $ 	1,192
Previously issued 2024 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation," of the
Combined Notes to Financial Statements of the Registrants.
(4)
(1) (2)
(1)
(2)
(3)
(4)
(1)
(1)
123

-- 137 of 203 --

FirstEnergy has recorded as deferred income tax assets the effect of federal NOLs and tax credits that will more likely than not be realized through future
operations and through the reversal of existing temporary differences. As of December 31, 2025, FirstEnergy's loss carryforwards primarily consisted of
approximately $2.2 billion ($454 million, net of tax) of federal NOL carryforwards, none of which have an expiration, but are subject to usage limitations in any
single taxable year, and $18 million of corporate AMT credit carryforwards, which have no expiration.
The table below summarizes FirstEnergy's pre-tax NOL carryforwards and their respective anticipated expirations for state and local income tax purposes of
approximately $13.7 billion ($447 million, net of tax), of which approximately $5.2 billion ($226 million, net of tax) is expected to be utilized based on current
estimates and assumptions. The ultimate utilization of these state and local NOLs may be impacted by statutory limitations on the use of NOLs imposed by state
and local tax jurisdictions, changes in statutory tax rates, and changes in business which, among other things, impact both future profitability and the manner in
which future taxable income is apportioned to various state and local tax jurisdictions.
Expiration Period (FirstEnergy) 	State 	Local
(In millions)
2026-2030 	$ 	1,658 $ 	6,161
2031-2035 	1,168 	—
2036-2040 	1,026 	—
2041-2045 	1,216 	—
Indefinite 	2,451 	—
$ 	7,519 $ 	6,161
JCP&L has recorded as deferred income tax assets the effect of NOLs and tax credits that will more likely than not be realized through future operations and
through the reversal of existing temporary differences. As of December 31, 2025, JCP&L's loss carryforwards consisted primarily of approximately $299 million
($63 million, net of tax) of federal NOL carryforwards, none of which have an expiration, but are subject to usage limitations in any single taxable year, and
approximately $1.9 billion ($135 million, net of tax) of state NOL carryforwards that are expected to be utilized based on current estimates and assumptions prior
to expiration, which will begin in 2032.
The following table summarizes the changes in valuation allowances on federal, state, and local deferred tax assets related to business interest expense
carryforwards and employee compensation deduction limitations under section 162(m), in addition to state and local NOLs discussed above for the years ended
December 31, 2025, 2024 and 2023:
FirstEnergy (In millions) 	2025 	2024 	2023
Beginning of year balance 	$ 	240 $ 	226 $ 	440
Charged to income 	5 	14 	(214)
Charged to other accounts 	— 	— 	—
Write-offs 	— 	— 	—
End of year balance 	$ 	245 $ 	240 $ 	226
The Registrants account for uncertainty in income taxes recognized in its financial statements. A recognition threshold and measurement attribute are utilized for
financial statement recognition and measurement of tax positions taken or expected to be taken on the tax return. If ultimately recognized in future years, all of
the unrecognized income tax benefits would impact the effective tax rate.
124

-- 138 of 203 --

The following table summarizes the changes (gross) in uncertain tax positions for the years ended December 31, 2025, 2024 and 2023:
(In millions) 	FirstEnergy 	JCP&L
Balance, January 1, 2023 	$ 	42 $ 	25
Prior year increases 	88 	—
Effectively settled with taxing authorities 	(24) 	(24)
Decrease for lapse in statute 	(1) 	—
Balance, December 31, 2023 	$ 	105 $ 	1
Prior year increases 	— 	—
Effectively settled with taxing authorities 	— 	—
Decrease for lapse in statute 	— 	—
Balance, December 31, 2024 	$ 	105 $ 	1
Prior years increases 	— 	—
Effectively settled with taxing authorities 	— 	—
Decrease for lapse in statute 	— 	—
Balance, December 31, 2025 	$ 	105 $ 	1
The Registrants recognize interest expense or income and penalties related to uncertain tax positions in income taxes by applying the applicable statutory
interest rate to the difference between the tax position recognized and the amount previously taken, or expected to be taken, on the tax return. The Registrants
include interest expense or income and penalties in the provision for income taxes. Due to uncertain tax positions that were effectively settled with tax authorities
during 2023, approximately $9 million in net interest was reversed at JCP&L. During 2025, the Registrants recognized an immaterial amount of interest
associated with their unrecognized tax benefits, and their respective cumulative net interest payable balance as of December 31, 2025 was also not material.
FirstEnergy's consolidated federal income tax returns for years 2022 and forward remain open to potential IRS examination. JCP&L is a party to the FirstEnergy
consolidated group for federal income taxes, and as a result, is included in FirstEnergy's consolidated federal income tax returns. FET and subsidiaries are
parties to their own consolidated federal income tax return for the period starting in 2024 subsequent to the closing of the FET Equity Interest Sale, and such
return remains open to potential IRS examination. Prior to the FET Equity Interest Sale, FET and its subsidiaries were also parties to the FirstEnergy
consolidated group for federal income taxes. FirstEnergy's state and local income tax returns remain open to potential examination in various jurisdictions from
2021 and forward. JCP&L's state income tax return in New Jersey remains open to potential examinations from 2021 and forward.
125

-- 139 of 203 --

Income taxes paid, net of refunds, for the years ended December 31, 2025, 2024 and 2023, are as follows:
For the Years Ended December 31,
FirstEnergy 	JCP&L
(In millions) 	2025 	2024 	2023 	2025 	2024 	2023
Federal payments (receipts)
Internal Revenue Service 	$ 	48 $ 	146 $ 	49 $ 	(15) $ 	(93) $ 	(11)
Total Federal 	48 	146 	49 	(15) 	(93) 	(11)
State & Municipal payments (receipts)
New Jersey 	— 	(8) 	— 	— 	(8) 	—
Pennsylvania 	21 	21 	8 	— 	— 	—
Other 	4 	2 	1 	— 	— 	—
Total State & Municipal 	25 	15 	9 	— 	(8) 	—
Total Income Taxes Paid (net of Refunds) 	$ 	73 $ 	161 $ 	58 $ 	(15) $ 	(101) $ 	(11)
General Taxes
General tax expense for the years ended December 31, 2025, 2024 and 2023, recognized in continuing operations is summarized as follows:
FirstEnergy (In millions) 	For the Years Ended December 31,
2025 	2024 	2023
kWh excise 	$ 	189 $ 	186 $ 	185
State gross receipts 	278 	247 	235
Real and personal property 	735 	642 	615
Social security and unemployment 	126 	113 	113
Other 	17 	24 	16
Total general taxes 	$ 	1,345 $ 	1,212 $ 	1,164
JCP&L (In millions) 	For the Years Ended December 31,
2025 	2024 	2023
Real and personal property 	$ 	7 $ 	6 $ 	7
Social security and unemployment 	16 	15 	14
Total general taxes 	$ 	23 $ 	21 $ 	21
7. LEASES
The disclosures in this note apply to both Registrants, unless indicated otherwise.
The Registrants primarily lease vehicles as well as building space, office equipment, and other property and equipment under cancellable and non-cancelable
leases. The Registrants do not have any material leases in which they are the lessor.
The Registrants account for leases under, "Leases (Topic 842)". Leases with an initial term of 12 months or less are recognized as lease expense on a straight-
line basis over the lease term and not recorded on the balance sheet. Most leases include one or more options to renew, with renewal terms that can extend the
lease term from 1 to 40 years, and certain leases include options to terminate. The exercise of lease renewal options is at FirstEnergy’s sole discretion. Renewal
options are included within the lease liability if they are reasonably certain based on various factors relative to the contract. Certain leases also include options to
purchase the leased property. The depreciable life of leased assets and leasehold improvements are limited by the expected lease term unless there is a
transfer of title or purchase option reasonably certain of exercise. The Registrants' lease agreements do not contain any material restrictive covenants. The
Registrants have elected a policy to not separate lease components from non-lease components for all asset classes.
For vehicles leased under certain master lease agreements, the lessor is guaranteed a residual value up to a stated percentage of the equipment cost at the end
of the lease term. If the actual fair value of the leased equipment is below the guaranteed
126

-- 140 of 203 --

residual value at the end of the lease term, the Registrants are committed to pay the difference in the actual fair value and the residual value guarantee. The
Registrants do not believe it is probable that it will be required to pay anything pertaining to the residual value guarantee, and the lease liabilities and right-of-use
assets are measured accordingly.
Finance leases for assets used in regulated operations are recognized in the Registrants' Statements of Income and Comprehensive Income such that
amortization of the right-of-use asset and interest on lease liabilities equals the expense recorded for ratemaking purposes. Finance leases for regulated and
non-regulated operations are accounted for as if the assets were owned and financed, with associated expense recognized in Interest expense and Provision for
depreciation on the Registrants' Statements of Income and Comprehensive Income, while all operating lease expenses are recognized in Other operating
expense.
The following tables represent FirstEnergy's components of lease expense for the years ended December 31, 2025, 2024 and 2023:
For the Year Ended December 31, 2025
(In millions) 	Vehicles 	Buildings 	Other 	Total
Operating lease costs 	$ 	106 $ 	2 $ 	5 $ 	113
Finance lease costs:
Amortization of right-of-use assets 	— 	1 	2 	3
Interest on lease liabilities 	— 	2 	— 	2
Total finance lease cost 	— 	3 	2 	5
Total lease cost 	$ 	106 $ 	5 $ 	7 $ 	118
Includes $45 million of short-term lease costs.
For the Year Ended December 31, 2024
(In millions) 	Vehicles 	Buildings 	Other 	Total
Operating lease costs 	$ 	82 $ 	3 $ 	6 $ 	91
Finance lease costs:
Amortization of right-of-use assets 	1 	1 	2 	4
Interest on lease liabilities 	— 	2 	— 	2
Total finance lease cost 	1 	3 	2 	6
Total lease cost 	$ 	83 $ 	6 $ 	8 $ 	97
Includes $35 million of short-term lease costs.
For the Year Ended December 31, 2023
(In millions) 	Vehicles 	Buildings 	Other 	Total
Operating lease costs 	$ 	60 $ 	5 $ 	14 $ 	79
Finance lease costs:
Amortization of right-of-use assets 	4 	2 	2 	8
Interest on lease liabilities 	— 	5 	— 	5
Total finance lease cost 	4 	7 	2 	13
Total lease cost 	$ 	64 $ 	12 $ 	16 $ 	92
Includes $27 million of short-term lease costs.
(1)
(1)
(1)
(1)
(1)
(1)
127

-- 141 of 203 --

The following table represents JCP&L's components of lease expense for the years ended December 31, 2025, 2024 and 2023:
For the Year Ended December 31,
(In millions) 	2025 	2024 	2023
Operating lease costs 	$ 	13 $ 	11 $ 	11
Finance lease costs:
Amortization of right-of-use assets 	1 	1 	1
Interest on lease liabilities 	1 	1 	1
Total finance lease cost 	2 	2 	2
Total lease cost 	$ 	15 $ 	13 $ 	13
Includes short-term lease costs of $1 million for the year ended December 31, 2025 and $2 million for the years ended December 31, 2024 and 2023.
Supplemental cash flow information related to FirstEnergy's leases was as follows:
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
Cash paid for amounts included in the measurement of lease liabilities:
Operating cash flows from operating leases 	$ 	71 $ 	60 $ 	54
Operating cash flows from finance leases 	2 	2 	3
Finance cash flows from finance leases 	2 	2 	8
Right-of-use assets obtained in exchange for lease obligations:
Operating leases 	$ 	104 $ 	69 $ 	13
Finance leases 	— 	— 	—
Supplemental cash flow information related to JCP&L's leases was as follows:
For the Years Ended December 31,
(In millions) 	2025 	2024 	2023
Cash paid for amounts included in the measurement of lease liabilities:
Operating cash flows from operating leases 	$ 	13 $ 	12 $ 	11
Operating cash flows from finance leases 	1 	1 	1
Finance cash flows from finance leases 	2 	1 	1
Right-of-use assets obtained in exchange for lease obligations:
Operating leases 	$ 	24 $ 	10 $ 	3
Finance leases 	— 	— 	—
Lease terms and discount rates for FirstEnergy were as follows:
As of December 31,
2025 	2024 	2023
Weighted-average remaining lease terms (years)
Operating leases 	6.40 	5.62 	5.93
Finance leases 	12.79 	12.38 	12.26
Weighted-average discount rate
Operating leases 	5.16 % 	5.00 % 	4.51 %
Finance leases 	16.24 % 	15.39 % 	14.73 %
When an implicit rate is not readily determinable, an incremental borrowing rate is utilized, determining the present value of lease payments. The rate is determined based on
expected term and information available at the commencement date.
(1)
(1)
(1)
(1)
128

-- 142 of 203 --

Lease terms and discount rates for JCP&L were as follows:
As of December 31,
2025 	2024 	2023
Weighted-average remaining lease terms (years)
Operating leases 	9.39 	6.00 	6.60
Finance leases 	12.15 	9.60 	10.30
Weighted-average discount rate
Operating leases 	5.83 % 	5.76 % 	5.68 %
Finance leases 	15.94 % 	16.07 % 	16.15 %
When an implicit rate is not readily determinable, an incremental borrowing rate is utilized, determining the present value of lease payments. The rate is determined based on
expected term and information available at the commencement date.
Supplemental balance sheet information related to FirstEnergy's leases was as follows:
As of December 31,
(In millions) 	Financial Statement Line Item 	2025 	2024
Assets
Operating lease 	Deferred charges and other assets $ 	276 $ 	228
Finance lease 	Property, plant and equipment 	31 	32
Total leased assets 	$ 	307 $ 	260
Liabilities
Current:
Operating 	Other current liabilities $ 	60 $ 	51
Finance 	Currently payable long-term debt 	3 	3
Noncurrent:
Operating 	Other noncurrent liabilities 	227 	192
Finance 	Long-term debt and other long-term obligations 	7 	9
Total leased liabilities 	$ 	297 $ 	255
Operating lease assets are recorded net of accumulated amortization of $217 million and $174 million as of December 31, 2025 and 2024, respectively.
Finance lease assets are recorded net of accumulated amortization of $17 million and $14 million as of December 31, 2025 and 2024, respectively.
(1)
(1)
(1)
(2)
(1)
(2)
129

-- 143 of 203 --

Supplemental balance sheet information related to JCP&L's leases was as follows:
As of December 31,
(In millions) 	Financial Statement Line Item 	2025 	2024
Assets
Operating lease 	Deferred charges and other assets $ 	58 $ 	43
Finance lease 	Property, plant and equipment 	6 	6
Total leased assets 	$ 	64 $ 	49
Liabilities
Current:
Operating 	Other current liabilities $ 	11 $ 	11
Finance 	Currently payable long-term debt 	2 	1
Noncurrent:
Operating 	Other noncurrent liabilities 	56 	43
Finance 	Long-term debt and other long-term obligations 	2 	4
Total leased liabilities 	$ 	71 $ 	59
Operating lease assets are recorded net of accumulated amortization of $36 million and $30 million as of December 31, 2025 and 2024, respectively.
Finance lease assets are recorded net of accumulated amortization of $6 million and $5 million as of December 31, 2025 and 2024, respectively.
Maturities of FirstEnergy's lease liabilities as of December 31, 2025, were as follows:
(In millions) 	Operating Leases 	Finance Leases 	Total
2026 	$ 	72 $ 	4 $ 	76
2027 	61 	3 	64
2028 	58 	4 	62
2029 	43 	— 	43
2030 	29 	— 	29
Thereafter 	85 	— 	85
Total lease payments 	348 	11 	359
Less imputed interest 	61 	1 	62
Total net present value 	$ 	287 $ 	10 $ 	297
Operating lease payments for certain leases are offset by sublease receipts of $6 million over 7 years.
Maturities of JCP&L's lease liabilities as of December 31, 2025, were as follows:
(In millions) 	Operating Leases 	Finance Leases 	Total
2026 	$ 	13 $ 	2 $ 	15
2027 	11 	2 	13
2028 	13 	— 	13
2029 	9 	— 	9
2030 	7 	— 	7
Thereafter 	42 	— 	42
Total lease payments 	95 	4 	99
Less imputed interest 	28 	— 	28
Total net present value 	$ 	67 $ 	4 $ 	71
Operating lease payments for certain leases are offset by sublease receipts of $5 million over 7 years.
(1)
(2)
(1)
(2)
(1)
(1)
(1)
(1)
130

-- 144 of 203 --

As of December 31, 2025, lease agreements for vehicles and fiber lines that have not yet commenced for FirstEnergy are $14 million, which are expected to
commence from 2026-2045 with lease terms of 5 to 20 years, and lease agreements for vehicles and fiber lines that have not yet commenced for JCP&L are $2
million, which are expected to commence in the next 18 months with lease terms of 5 to 20 years. In November 2024, JCP&L entered into a 22 year lease
agreement for a new office located in Morris Plains, New Jersey. The lease commenced on November 25, 2025, and JCP&L took possession of the space to
begin tenant improvements. The lease is classified as an operating lease, and a right-of-use asset of $16 million and a lease liability of $17 million were
recognized by the Registrants on the commencement date, which amounts are reflected in the tables above.
8. VARIABLE INTEREST ENTITIES
The disclosures in this note apply to both Registrants, unless indicated otherwise.
The Registrants perform qualitative analyses to determine whether a variable interest qualifies them as the primary beneficiary (a controlling financial interest) of
a VIE. An enterprise has a controlling financial interest if it has both: (i) the power to direct the activities of a VIE that most significantly impact the entity’s
economic performance; and (ii) the obligation to absorb losses of the entity that could potentially be significant to the VIE or the right to receive benefits from the
entity that could potentially be significant to the VIE. The Registrants consolidate a VIE when it is determined that it is the primary beneficiary. JCP&L does not
have any consolidated or unconsolidated VIE's.
In order to evaluate contracts for consolidation treatment and entities for which FirstEnergy has an interest, FirstEnergy aggregates variable interests into
categories based on similar risk characteristics and significance.
FirstEnergy - Consolidated VIEs
VIEs in which FirstEnergy is the primary beneficiary consist of the following and are included in FirstEnergy’s consolidated financial statements:
• Securitization Companies
• Ohio Securitization Companies - In June 2013, the SPEs formed by the Ohio Companies issued approximately $445 million of pass-through
trust certificates supported by phase-in recovery bonds to securitize the recovery of certain all-electric customer heating discounts, fuel and
purchased power regulatory assets. The phase-in recovery bonds are payable only from, and secured by, phase in recovery property owned
by the SPEs. The bondholder has no recourse to the general credit of FirstEnergy or any of the Ohio Companies. Each of the Ohio
Companies, as servicer of its respective SPE, manages and administers the phase in recovery property including the billing, collection and
remittance of usage-based charges payable by retail electric customers. The SPEs are considered VIEs and each one is consolidated into its
applicable utility. As of December 31, 2025 and 2024, $159 million and $175 million of the phase-in recovery bonds were outstanding,
respectively.
• MP and PE Environmental Funding Companies - The consolidated financial statements of FirstEnergy include environmental control bonds
issued by two bankruptcy remote, special purpose limited liability companies that are indirect subsidiaries of MP and PE. Proceeds from the
bonds were used to construct environmental control facilities. Principal and interest owed on the environmental control bonds is secured by,
and payable solely from, the proceeds of the environmental control charges. Creditors of FirstEnergy, other than the limited liability company
SPEs, have no recourse to any assets or revenues of the special purpose limited liability companies. As of December 31, 2025 and 2024,
$156 million and $188 million of environmental control bonds were outstanding, respectively.
• FirstEnergy's Consolidated Balance Sheets includes restricted cash of 40 million as of December 31, 2025 and 2024 which is related to cash
collected from MP, PE and the Ohio Companies' customers that is specifically used to service debt of their respective funding companies.
• FET
• FET is a holding company that owns equity interests in ATSI, MAIT, TrAIL and PATH. As further discussed above, on February 2, 2023, FE
entered into an agreement with Brookfield to sell an incremental 30% equity interest in FET, which closed on March 25, 2024. As of December
31, 2025 FE’s equity ownership in FET is 50.1% and Brookfield’s is 49.9%. FirstEnergy has concluded that FET is a VIE and that FE is the
primary beneficiary because FE has exposure to the economics of FET and the power to direct significant activities of FET through the FESC
services agreement, which represents a separate variable interest.
• Although Brookfield was granted incremental consent rights upon the closing of the FET Equity Interest Sale, Brookfield will not have unilateral
control over any activities that most significantly impact FET’s economic performance. However, FE will continue to retain power over the
activities that most significantly impact FET’s economic performance through its incremental decision making rights under the existing FESC
services
131

-- 145 of 203 --

agreement, through which executive management and workforce services are provided to FET. As a result, FE is the primary beneficiary of
FET, which will continue to be consolidated in FirstEnergy’s financial statements.
• The assets of FET can only be used to settle its obligations, and creditors of FET do not have recourse to the general credit of FirstEnergy.
FirstEnergy - Unconsolidated VIEs
FirstEnergy is not the primary beneficiary of PATH-WV, as further discussed above in Note 1., Organization and Basis of Information – Equity Method
Investments,” of the Combined Notes to Financial Statements of the Registrants. FirstEnergy was also not the primary beneficiary of its former 33-1/3% equity
ownership in Global Holding, which was sold to WMB Marketing Ventures, LLC and Pinesdale LLC in July 2025.
• Valley Link - As of December 31, 2025, Valley Link is considered a VIE. Amounts related to Valley Link are immaterial for the year ended December
31, 2025. See Note 1., "Organization and Basis of Information – Equity Method Investments,” of the Combined Notes to Financial Statements of the
Registrants for additional information related to Valley Link.
In 2025, FET, DominionHV and Transource issued an equity support agreement to enable Valley Link to enter into a credit facility with a third party. The
equity support agreement expires once all Valley Link credit agreement obligations are satisfied or when FET has fulfilled its support obligations under
the equity support agreement. As of December 31, 2025, the fair value of FET’s support obligations relating to the Valley Link credit facility was
immaterial.
9. ASSET RETIREMENT OBLIGATIONS
The disclosures in this note apply to both Registrants, unless indicated otherwise.
The Registrants recognize an ARO for their legal obligation to perform asset retirement activities associated with their long-lived assets. The ARO liability
represents an estimate of the fair value of the Registrants’ current obligation such that the ARO is accreted monthly to reflect the time value of money.
A fair value measurement inherently involves uncertainty in the amount and timing of settlement of the liability. An expected cash flow approach is used to
measure the fair value of the remediation AROs, taking into account the expected timing of settlement of the ARO based on the expected economic useful life of
associated asset and/or regulatory requirements. The fair value of an ARO is recognized in the period in which it is incurred. The associated asset retirement
costs are capitalized as part of the carrying value of the long-lived asset and are depreciated over the life of the related asset. For instances where asset
retirement costs relate to assets that have no future cash flows, the costs are recorded as an operating expense. In certain circumstances, the Registrants have
recovery of asset retirement costs and, as such, certain accretion and depreciation is offset against regulatory assets. Conditional retirement obligations
associated with tangible long-lived assets are recognized at fair value in the period in which they are incurred if a reasonable estimate can be made, even
though there may be uncertainty about timing or method of settlement. When settlement is conditional on a future event occurring, it is reflected in the
measurement of the liability, not the timing of the liability recognition.
FirstEnergy has recognized applicable legal obligations for AROs and their associated costs, including reclamation of sludge disposal ponds, closure of CCR
sites, underground and above-ground storage tanks and wastewater treatment lagoons. In addition, the Registrants have recognized conditional retirement
obligations, primarily for asbestos remediation.
132

-- 146 of 203 --

The following table summarizes the changes to the ARO balances as of December 31, 2025, and 2024.
FirstEnergy 	JCP&L
(In millions)
Balance, January 1, 2024 	$ 	209 $ 	7
Changes in timing and amount of estimated cash flows 	131 	—
Liabilities incurred 	95 	—
Liabilities settled 	(4) 	—
Accretion 	24 	1
Balance, December 31, 2024 	455 	8
Changes in timing and amount of estimated cash flows 	(51) 	—
Liabilities incurred 	1 	—
Liabilities settled 	(154) 	—
Accretion 	26 	—
Balance, December 31, 2025 	$ 	277 $ 	8
FirstEnergy amounts include the transfer of the McElroy’s Run CCR impoundment facility as well as the adjacent dry landfill and related remediation obligations to a subsidiary of
IDA Power, LLC, as further discussed below.
During 2024, as a result of the evaluation of closure options for McElroy’s Run CCR impoundment facility and the adjacent landfill, AE Supply reviewed its ARO
and future expected costs to remediate, resulting in an increase to the ARO liability of $87 million, included within "Other operating expenses" and
Corporate/Other for segment reporting. AE Supply transferred the McElroy’s Run CCR impoundment facility and adjacent dry landfill and related remediation
obligations on March 4, 2025, pursuant to the environmental liability transfer agreement dated February 3, 2025, with a subsidiary of IDA Power, LLC. Pursuant
to the agreement, AE Supply established a $160 million escrow account that AE Supply will fund over five years and is secured by a surety bond, which is
guaranteed by FE. In connection with the transfer, AE Supply recognized a $130 million liability, based on a 4.8% weighted average discount rate over the
contract term, associated with its remaining obligation to fund the escrow account over the next five years, and derecognized the ARO, resulting in an immaterial
impact to earnings. During the year ended December 31, 2025, AE Supply made $46 million of cash payments to the escrow account.
As further discussed in Note 14., “Commitments, Guarantees, and Contingencies - Regulation of Waste Disposal,” of the Combined Notes to Financial
Statements of the Registrants on May 8, 2024, the EPA finalized changes to the CCR rule addressing certain legacy CCR disposal sites that were not included in
previous CCR rules. As a result, during 2024, FirstEnergy performed a preliminary assessment of former CCR disposal sites and calculated an initial estimate
applying historical experience in remediating comparable sites. As a result, FirstEnergy recorded a $139 million increase to its ARO in 2024, of which
$113 million is included in “Other operating expenses” on the Consolidated Statements of Income and was not capitalized as an asset retirement cost since the
associated electric generation facilities are closed. Of the $113 million expensed in 2024, $16 million is included with Integrated, $46 million is included within
Distribution and $51 million at Corporate/Other for segment reporting. JCP&L did not have any legacy CCR disposal sites that were applicable to the new CCR
rule.
The ARO increase related to certain legacy CCR disposal sites represents the discounted cash flows for estimated closure costs based upon the potential
closure requirements as evaluated on a site-by-site basis. Actual costs to be incurred will be dependent upon factors that vary from site to site. The most
significant factors include the method and time frame of closure at the individual sites, which will be determined based on the groundwater monitoring and, if
applicable, EPA approval of closure plans. In determining the estimated closure costs for each site, FirstEnergy has assumed the anticipated applicable closure
method, however, alternative closure methods may be required, resulting in greater or lesser cost. As a result, the ARO liability may be adjusted as additional
information is gained through the evaluation and closure process, including further inspection of the sites, results of groundwater monitoring and changes in
interpretation of the CCR regulations which may change management assumptions, and could result in a material change to the ARO liability balance and
FirstEnergy’s results of operations.
During the fourth quarter of 2025, FirstEnergy completed engineering studies and field analysis for certain of its legacy CCR disposal sites and determined that
certain of those sites did not meet criteria to be applicable to the CCR rules. As a result, during the fourth quarter of 2025, FirstEnergy recorded a $49 million
decrease to its ARO, all of which is included in "Other operating expenses" on the Consolidated Statements of Income and was not capitalized as an asset
retirement cost since the associated electric generation facilities are closed. Of this $49 million pre-tax decrease to expense, $17 million is included at Integrated
and $32 million at Corporate/Other for FirstEnergy's segment reporting.
(1)
(1)
133

-- 147 of 203 --

10. FAIR VALUE MEASUREMENTS
The disclosures in this note apply to both Registrants, unless indicated otherwise.
RECURRING FAIR VALUE MEASUREMENTS
Authoritative accounting guidance establishes a fair value hierarchy that prioritizes the inputs used to measure fair value. This hierarchy gives the highest priority
to Level 1 measurements and the lowest priority to Level 3 measurements. The three levels of the fair value hierarchy and a description of the valuation
techniques are as follows:
Level 1 	- Quoted prices for identical instruments in active market
Level 2 	- Quoted prices for similar instruments in active market
- Quoted prices for identical or similar instruments in markets that are not active
- Model-derived valuations for which all significant inputs are observable market data
Models are primarily industry-standard models that consider various assumptions, including quoted forward prices for commodities, time value,
volatility factors and current market and contractual prices for the underlying instruments, as well as other relevant economic measures.
Level 3 	- Valuation inputs are unobservable and significant to the fair value measurement
FirstEnergy produces a long-term power and capacity price forecast annually with periodic updates as market conditions change. When
underlying prices are not observable, prices from the long-term price forecast are used to measure fair value.
FTRs are financial instruments that entitle the holder to a stream of revenues (or charges) based on the hourly day-ahead congestion price
differences across transmission paths. FTRs are acquired by FirstEnergy in the annual, monthly and long-term PJM auctions and are initially
recorded using the auction clearing price less cost. After initial recognition, FTRs' carrying values are periodically adjusted to fair value using a
mark-to-model methodology, which approximates market. The primary inputs into the model, which are generally less observable than objective
sources, are the most recent PJM auction clearing prices and the FTRs' remaining hours. The model calculates the fair value by multiplying the
most recent auction clearing price by the remaining FTR hours less the prorated FTR cost. Significant increases or decreases in inputs in
isolation may have resulted in a higher or lower fair value measurement.
The Registrants primarily apply the market approach for recurring fair value measurements using the best information available. Accordingly, the Registrants
maximize the use of observable inputs and minimizes the use of unobservable inputs. There were no changes in valuation methodologies used as of
December 31, 2025, from those used as of December 31, 2024. The determination of the fair value measures takes into consideration various factors, including
but not limited to, nonperformance risk, counterparty credit risk and the impact of credit enhancements (such as cash deposits, LOCs and priority interests). The
impact of these forms of risk was not significant to the fair value measurements.
For investments reported at NAV where there is no readily determinable fair value, a practical expedient is available that allows the NAV to approximate fair
value. Investments that use NAV as a practical expedient are excluded from the requirement to be categorized within the fair value hierarchy tables. Instead,
these investments are reported outside of the fair value hierarchy tables to assist in the reconciliation of investment balances reported in the tables to the
balance sheet. The Registrants have elected the NAV practical expedient for investments in private equity funds, insurance-linked securities, hedge funds
(absolute return) and real estate funds held within the pension plan. See Note 4., "Pension and Other Postemployment Benefits,” of the Combined Notes to
Financial Statements of the Registrants for the pension financial assets accounted for at fair value by level within the fair value hierarchy.
134

-- 148 of 203 --

The following tables set forth the recurring assets and liabilities that are accounted for at fair value by level within the fair value hierarchy:
December 31, 2025 	December 31, 2024
Level 1 	Level 2 	Level 3 	Total 	Level 1 	Level 2 	Level 3 	Total
Assets 	(In millions)
Derivative assets FTRs 	$ 	— $ 	— $ 	21 $ 	21 $ 	— $ 	— $ 	7 $ 	7
Equity securities 	2 	— 	— 	2 	2 	— 	— 	2
U.S. state debt securities 	— 	280 	— 	280 	— 	276 	— 	276
Cash, cash equivalents and restricted cash 	99 	— 	— 	99 	154 	— 	— 	154
Other 	— 	56 	— 	56 	— 	45 	— 	45
Total assets 	$ 	101 $ 	336 $ 	21 $ 	458 $ 	156 $ 	321 $ 	7 $ 	484
Liabilities
Derivative liabilities FTRs 	$ 	— $ 	— $ 	(1) $ 	(1) $ 	— $ 	— $ 	— $ 	—
Total liabilities 	$ 	— $ 	— $ 	(1) $ 	(1) $ 	— $ 	— $ 	— $ 	—
Net assets (liabilities) 	$ 	101 $ 	336 $ 	20 $ 	457 $ 	156 $ 	321 $ 	7 $ 	484
Contracts are subject to regulatory accounting treatment and changes in market values do not impact earnings.
Related to JCP&L’s investments held in the spent nuclear fuel disposal trusts, see below.
Restricted cash of $42 million and $43 million as of December 31, 2025 and 2024, respectively, primarily relates to cash collected from MP, PE and the Ohio Companies'
customers that is specifically used to service debt of their respective funding companies. See Note 11., "Capitalization,” of the Combined Notes to Financial Statements of the
Registrants for additional information.
Primarily consists of short-term investments, of which $17 million and $6 million as of December 31, 2025, and December 31, 2024, respectively, are held by JCP&L.
INVESTMENTS
All temporary cash investments purchased with an initial maturity of three months or less are reported as cash equivalents on the Consolidated Balance Sheets
at cost, which approximates their fair market value. Investments other than cash and cash equivalents include AFS debt securities and other investments. The
Registrants have no debt securities held for trading purposes.
Generally, unrealized gains and losses on equity securities are recognized in income whereas unrealized gains and losses on AFS debt securities are
recognized in AOCI. However, the JCP&L spent nuclear fuel disposal trusts are subject to regulatory accounting with all gains and losses on equity and AFS debt
securities offset against regulatory assets.
Spent Nuclear Fuel Disposal Trusts
JCP&L holds debt securities within the spent nuclear fuel disposal trust, which are classified as AFS securities, recognized at fair market value. The trust is
intended for funding spent nuclear fuel disposal fees to the United States Department of Energy associated with the previously owned Oyster Creek and Three
Mile Island Unit 1 nuclear power facilities.
The following table summarizes the amortized cost basis, unrealized gains, unrealized losses and fair values of investments held in nuclear fuel disposal trusts
as of December 31, 2025 and 2024:
December 31, 2025 	December 31, 2024
Cost Basis Unrealized
Gains Unrealized
Losses 	Fair Value 	Cost Basis Unrealized
Gains Unrealized
Losses 	Fair Value
(In millions)
Debt securities 	$ 	290 $ 	2 $ 	(12) $ 	280 $ 	299 $ 	— $ 	(23) $ 	276
Excludes short-term cash investments of $17 million as of December 31, 2025.
Excludes short-term cash investments of $6 million as of December 31, 2024.
(1)
(2)
(3)
(4)
(1)
(1)
(2)
(3)
(4)
(1) 	(2)
(1)
(2)
135

-- 149 of 203 --

Proceeds from the sale of investments in AFS debt securities, realized gains and losses on those sales and interest and dividend income for the years ended
December 31, 2025, 2024 and 2023, were as follows for the Registrants:
For the Years Ended December 31,
2025 	2024 	2023
(In millions)
Sale Proceeds 	$ 	102 $ 	121 $ 	38
Realized Gains 	1 	— 	—
Realized Losses 	(12) 	(15) 	(3)
Interest and Dividend Income 	13 	13 	12
Other Investments
Other investments include employee benefit trusts, which are primarily invested in corporate-owned life insurance policies and equity method investments.
Earnings and losses associated with corporate-owned life insurance policies and equity method investments are reflected in the “Miscellaneous Income, net” line
of FirstEnergy’s Consolidated Statements of Income. Other investments were $344 million and $370 million as of December 31, 2025 and 2024, respectively,
and are excluded from the amounts reported above. See Note 1., "Organization and Basis of Presentation," of the Combined Notes to Financial Statements of
the Registrants for additional information on FirstEnergy's equity method investments.
For the years ended December 31, 2025, 2024 and 2023, pre-tax income related to corporate-owned life insurance policies were $19 million, $16 million and
$18 million, respectively. Corporate-owned life insurance policies are valued using the cash surrender value and any changes in value during the period are
recognized as income or expense.
LONG-TERM DEBT AND OTHER LONG-TERM OBLIGATIONS
All borrowings with initial maturities of less than one year are defined as short-term financial instruments under GAAP and are reported as Short-term borrowings
on the Consolidated Balance Sheets at cost. Since these borrowings are short-term in nature, the Registrants believe that their costs approximate their fair
market value. The following table provides the approximate fair value and related carrying amounts of long-term debt, which excludes finance lease obligations
and net unamortized debt issuance costs, unamortized fair value adjustments, premiums and discounts as of December 31, 2025 and 2024:
As of December 31
FirstEnergy 	2025 	2024
(In millions)
Carrying Value 	$ 	26,390 $ 	23,594
Fair Value 	$ 	25,756 $ 	22,128
As of December 31
JCP&L 	2025 	2024
(In millions)
Carrying Value 	$ 	3,050 $ 	2,350
Fair Value 	$ 	3,059 $ 	2,284
The fair values of long-term debt and other long-term obligations reflect the present value of the cash outflows relating to those securities based on the current
call price, the yield to maturity or the yield to call, as deemed appropriate at the end of each respective period. The yields assumed were based on securities with
similar characteristics offered by corporations with credit ratings similar to those of the Registrants. The Registrants classified short-term borrowings, long-term
debt and other long-term obligations as Level 2 in the fair value hierarchy as of December 31, 2025 and 2024.
See Note 11., "Capitalization,” of the Combined Notes to Financial Statements of the Registrants for further information on long-term debt issued and redeemed
during the twelve months ended December 31, 2025.
136

-- 150 of 203 --

11. CAPITALIZATION
The disclosures in this note apply to both Registrants, unless indicated otherwise.
COMMON STOCK
Dividends
Dividends declared and paid per share of FE common stock during 2025 and 2024 were as follows:
Dividends Declared 	Dividends Paid
2025 	2024 	2025 	2024
Q1 	$ 	0.445 $ 	0.425 $ 	0.425 $ 	0.410
Q2 	— 	— 	0.445 	0.425
Q3 	0.890 	0.850 	0.445 	0.425
Q4 	0.445 	0.425 	0.445 	0.425
Total 	$ 	1.780 $ 	1.700 $ 	1.760 $ 	1.685
The amount and timing of all dividend declarations are subject to the discretion of the FE Board and its consideration of earnings, cash flows, credit metrics, as
well as general economic and business conditions. In addition to declaring dividends from retained earnings, FE can declare dividends from paid-in capital
accounts.
When FE makes distributions to shareholders, it is required to subsequently determine and report the tax characterization of those distributions for purposes of
shareholders’ income taxes. Whether a distribution is characterized as a dividend or a return of capital (and possible capital gain) depends upon an internal tax
calculation to determine earnings and profits for income tax purposes. Earnings and profits should not be confused with earnings or net income under GAAP.
Further, after FE reports the expected tax characterization of distributions it has paid, the actual characterization could vary from its expectation with the result
that holders of FE's common stock could incur different income tax liabilities than expected.
In general, distributions are characterized as dividends to the extent the amount of such distributions do not exceed FE's calculation of current or accumulated
earnings and profits. Distributions in excess of current and accumulated earnings and profits may be treated as a non-taxable return of capital. Generally, a non-
taxable return of capital will reduce an investor’s basis in FirstEnergy's stock for federal tax purposes, which will impact the calculation of gain or loss when the
stock is sold.
FE realized an approximate $7 billion tax gain in 2024 from closing the FET Equity Interest Sale, which created sufficient earnings and profits to cause
distributions made during 2024 and 2025 to be characterized as dividends for federal income tax purposes. Although FirstEnergy anticipates, based on current
projections of earnings and profits, that distributions in the next several years also may be characterized as dividends for federal income tax purposes, such
estimates can change and upon such characterization, shareholders are urged to consult their own tax advisors regarding the income tax treatment of FE's
distributions to them.
In addition to paying dividends from retained earnings, the Ohio Companies and JCP&L have authorization from FERC to pay cash dividends to FE from paid-in
capital accounts, as long as their FERC-defined equity-to-total-capitalization ratio remains above 35%. FERC also approved such authorization for TrAIL to pay
cash dividends to FET from paid in-capital accounts in December 2025. In addition, AGC has authorization from FERC to pay cash dividends to its parent, MP,
from paid-in capital accounts, as long as its FERC-defined equity-to-total-capitalization ratio remains above 45%. The governance documents, indentures,
regulatory limitations, and FET P&SA II, and various other agreements, including those relating to the long-term debt of certain FirstEnergy subsidiaries contain
provisions that could further restrict the payment of dividends on their common stock. As of December 31, 2025, none of these provisions materially restricted
FirstEnergy subsidiaries’ abilities to pay cash dividends to their respective parent company.
137

-- 151 of 203 --

Common Stock Issuance
FE issued approximately 1 million shares of common stock in 2025, 3 million shares of common stock in 2024 and 2 million shares of common stock in 2023 to
registered shareholders and its directors and the employees of its subsidiaries under its Stock Investment Plan and certain share-based benefit plans.
PREFERRED AND PREFERENCE STOCK
FirstEnergy and certain of its subsidiaries are authorized to issue preferred stock and preference stock as of December 31, 2025, as follows:
Preferred Stock 	Preference Stock
Shares
Authorized 	Par Value Shares
Authorized 	Par Value
FE 	5,000,000 $ 	100
OE 	6,000,000 $ 	100 	8,000,000 	no par
OE 	8,000,000 $ 	25
CEI 	4,000,000 	no par 	3,000,000 	no par
TE 	3,000,000 $ 	100 	5,000,000 $ 	25
TE 	12,000,000 $ 	25
JCP&L 	15,600,000 	no par
MP 	940,000 $ 	100
PE 	10,000,000 $ 	0.01
As of December 31, 2025 and 2024, there were no preferred stock or preference stock outstanding.
LONG-TERM DEBT AND OTHER LONG-TERM OBLIGATIONS
The following tables present outstanding long-term debt and finance lease obligations for FirstEnergy and JCP&L as of December 31, 2025 and 2024:
FirstEnergy 	As of December 31, 2025 	As of December 31,
Maturity Date 	Interest Rate 	2025 	2024
(In millions)
FMBs and secured notes - fixed rate 	2026-2059 	2.650% - 8.250% 	$ 	5,214 $ 	4,963
Unsecured notes - fixed rate 	2026-2050 	2.250% - 6.875% 	21,176 	18,631
Finance lease obligations 	10 	12
Unamortized debt discounts 	(20) 	(14)
Unamortized debt issuance costs 	(150) 	(122)
Unamortized fair value adjustments 	1 	3
Currently payable long-term debt 	(723) 	(977)
Total long-term debt and other long-term obligations 	$ 	25,508 $ 	22,496
JCP&L 	As of December 31, 2025 	As of December 31,
Maturity Date 	Interest Rate 	2025 	2024
(In millions)
Unsecured notes - fixed rate 	2029-2037 	2.750% - 6.400% 	$ 	3,050 $ 	2,350
Finance lease obligations 	4 	5
Unamortized debt premiums/discounts 	(7) 	(4)
Unamortized debt issuance costs 	(22) 	(11)
Currently payable long-term debt 	(2) 	(1)
Total long-term debt and other long-term obligations 	$ 	3,023 $ 	2,339
See Note 7., "Leases,” of the Combined Notes to Financial Statements of the Registrants for additional information related to finance leases.
138

-- 152 of 203 --

FirstEnergy had the following redemptions and issuances during the twelve months ended December 31, 2025:
Company 	Type
Redemption/Issuance
Date
Interest
Rate 	Maturity
Amount
(In millions) 	Description
Redemptions
FE 	Senior Unsecured
Notes 	March, 2025 	2.05% 	2025 	$300 	FE redeemed unsecured notes that became due.
TrAIL 	Senior Unsecured
Notes 	May, 2025 	3.76% 	2025 	$75 	TrAIL redeemed unsecured notes that became due.
TrAIL 	Senior Unsecured
Notes 	June, 2025 	3.85% 	2025 	$550 	TrAIL redeemed unsecured notes that became due.
FE 	Senior Unsecured
Convertible Notes 	June, 2025 	4.00% 	2026 	$1,206 	FE repurchased approximately $1,206 million of the principal amount of its 2026 Convertible
Notes for $1,225 million, including a premium of approximately $19 million.
JCP&L 	Senior Unsecured
Notes 	October, 2025 	4.30% 	2026 	$650 	On October 16, 2025, JCP&L redeemed $650 million of 4.30% senior notes due 2026.
FE 	Senior Unsecured
Notes 	December, 2025 	1.60% 	2026 	$300 	On December 31, 2025, FE redeemed $300 million of 1.60% senior notes due 2026.
Issuances
TrAIL 	Senior Unsecured
Notes 	April, 2025 	5.00% 	2031 	$600 	Proceeds were used to redeem senior notes that came due in 2025, to refinance existing debt, for
working capital, and for other general corporate purposes.
ATSI 	Senior Unsecured
Notes 	May, 2025 	5.00% 	2030 	$225 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
OE 	Senior Unsecured
Notes 	May, 2025 	4.95% 	2029 	$300 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
MAIT 	Senior Unsecured
Notes 	June, 2025 	5.00% 	2031 	$200 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
PE 	FMBs 	June, 2025 	5.00% 	2030 	$200 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
TE 	Senior Secured
Notes 	June, 2025 	5.18% 	2030 	$100 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
FE 	Senior Unsecured
Convertible Notes 	June, 2025 	3.63% 	2029 	$1,350 	Proceeds were used to refinance existing debt, to repurchase a portion of its 2026 Convertible
Notes, and for other general corporate purposes.
FE 	Senior Unsecured
Convertible Notes 	June, 2025 	3.88% 	2031 	$1,150 	Proceeds were used to refinance existing debt, to repurchase a portion of its 2026 Convertible
Notes, and for other general corporate purposes.
FET 	Senior Unsecured
Notes 	August, 2025 	4.75% 	2033 	$450 	Proceeds were used to refinance existing debt, to finance capital expenditures, for working capital,
and for other general corporate purposes.
JCP&L 	Senior Unsecured
Notes 	September, 2025 	4.15% 	2029 	$350
Proceeds were used to refinance existing debt, including the repayment of the remaining $650
million aggregate principal amount of JCP&L’s 4.30% senior notes due 2026, to finance capital
expenditures, and for other general corporate purposes.
JCP&L 	Senior Unsecured
Notes 	September, 2025 	4.40% 	2031 	$500
Proceeds were used to refinance existing debt, including the repayment of the remaining $650
million aggregate principal amount of JCP&L’s 4.30% senior notes due 2026, to finance capital
expenditures, and for other general corporate purposes.
JCP&L 	Senior Unsecured
Notes 	September, 2025 	5.15% 	2036 	$500 Proceeds were used to refinance existing debt, including the repayment of the remaining $650
million aggregate principal amount of JCP&L’s 4.30% senior notes due 2026, to finance capital
expenditures, and for other general corporate purposes.
Excludes principal payments on securitized bonds.
FE Convertible Notes Issuance
On May 4, 2023, FE issued $1.5 billion aggregate principal amount of 2026 Convertible Notes, with a fixed interest rate of 4.00% per year, payable semiannually
in arrears on May 1 and November 1 of each year, beginning on November 1, 2023. The 2026 Convertible Notes are unsecured and unsubordinated obligations
of FE, and will mature on May 1, 2026, unless required to be converted or repurchased in accordance with their terms. FE may not elect to redeem the 2026
Convertible Notes prior to the maturity date. The 2026 Convertible Notes are included within “Long-term debt and other long-term obligations” on the FirstEnergy
Consolidated Balance Sheets. Proceeds from the issuance were approximately $1.48 billion, net of issuance costs.
(1)
139

-- 153 of 203 --

Through the close of business on the second scheduled trading day immediately preceding the maturity date, holders of the 2026 Convertible Notes may convert
all or any portion of their 2026 Convertible Notes at their option at any time at the conversion rate then in effect. FE will settle conversions of the 2026
Convertible Notes, if any, by paying cash for the aggregate principal amount of the 2026 Convertible Notes being converted and its conversion obligation in
excess of such aggregate principal amount.
The amount of consideration that a holder will receive upon conversion will be determined by reference to the volume-weighted average price of FE’s common
stock for each trading day in a 40 trading day observation period. For any conversions on or after February 1, 2026, this period would be the 40 consecutive
trading days beginning on, and including, the 41st scheduled trading day immediately preceding the maturity date.
On June 12, 2025, FE issued $1.35 billion aggregate principal amount of its 2029 Convertible Notes and $1.15 billion aggregate principal amount of its 2031
Convertible Notes.
The 2029 Convertible Notes and 2031 Convertible Notes bear interest at a rate of 3.625% per year and 3.875% per year, respectively, payable semiannually in
arrears on January 15 and July 15 of each year, beginning on January 15, 2026. The 2029 Convertible Notes and 2031 Convertible Notes are unsecured and
unsubordinated obligations of FE and will mature on January 15, 2029 and January 15, 2031, respectively, unless earlier converted or repurchased in
accordance with their terms.
The notes are included within “Long-term debt and other long-term obligations” on the FirstEnergy Consolidated Balance Sheets. Proceeds from the issuance
were approximately $2.47 billion, net of issuance costs.
Holders may convert notes at their option at any time prior to the close of business on the business day immediately preceding: (i) October 15, 2028, with
respect to the 2029 Convertible Notes, and (ii) October 15, 2030, with respect to the 2031 Convertible Notes, only under certain conditions:
• During any calendar quarter, if the last reported sale price of FE’s common stock for at least 20 trading days during the period of 30 consecutive trading
days ending on, and including, the last trading day of the immediately preceding calendar quarter is greater than or equal to 130% of the conversion
price on each applicable trading day;
• During the five consecutive business day period immediately after any 10 consecutive trading day period in which the trading price per $1,000 principal
amount of the 2029 Convertible Notes and 2031 Convertible Notes for each trading day of such 10 trading-day period was less than 98% of the product
of the last reported sale price of FE’s common stock and the conversion rate on each such trading day; or
• Upon the occurrence of certain corporate events specified in the indenture governing the 2029 Convertible Notes and 2031 Convertible Notes.
On or after October 15, 2028, in the case of the 2029 Convertible Notes, and on or after October 15, 2030, in the case of the 2031 Convertible Notes, until the
close of business on the second scheduled trading day immediately preceding the maturity date of the relevant series of notes, holders may convert all or any
portion of their notes of such series at any time, regardless of the foregoing conditions. FE will settle conversions of such notes by paying cash up to the
aggregate principal amount of the notes to be converted and paying or delivering, as the case may be, cash, shares of its common stock or a combination of
cash and shares of its common stock, at its election, in respect of the remainder, if any, of its conversion obligation in excess of the aggregate principal amount
of the notes being converted, subject to the applicable terms of the indentures.
The conversion rate for each of the series of notes will initially be 20.9275 shares of FE’s common stock per $1,000 principal amount of such notes (equivalent to
an initial conversion price of approximately $47.78 per share of FE’s common stock). The initial conversion price of such notes represents a premium of
approximately 20% over the last reported sale price of FE’s common stock on the New York Stock Exchange on June 9, 2025. The conversion rate and the
corresponding conversion price will be subject to adjustment in some events but will not be adjusted for any accrued and unpaid interest. In addition, following
certain corporate events that occur prior to the maturity date with respect to a series of notes (and, in the case of the 2031 Convertible Notes, if FE delivers a
notice of redemption with respect to the 2031 Convertible Notes), FE will, in certain circumstances, increase the conversion rate for a holder who elects to
convert its notes of such series in connection with such corporate event or redemption as applicable.
FE may not redeem the 2029 Convertible Notes prior to the maturity date of the 2029 Convertible Notes. On or after January 15, 2029 and prior to the 40th
trading day immediately before the maturity date of the 2031 Convertible Notes, FE may redeem for cash all or any of the portion of the 2031 Convertible Notes,
subject to certain partial redemption limitations and only under certain conditions.
If FE undergoes a fundamental change (as defined in the relevant indenture), subject to certain conditions, holders of the 2026 Convertible Notes, 2029
Convertible Notes and/or 2031 Convertible Notes may require FE to repurchase for cash all or any portion of their notes at a repurchase price equal to 100% of
the principal amount of the convertible notes to be repurchased, plus accrued and unpaid interest to, but excluding, the fundamental change repurchase date (as
defined in the relevant indenture). In addition, following certain corporate events that occur prior to the maturity date with respect to a series of convertible notes
(and, in the case of the 2031 Convertible Notes, if FE delivers a notice of redemption with respect to the 2031
140

-- 154 of 203 --

Convertible Notes), FE will, in certain circumstances, increase the conversion rate for a holder who elects to convert its notes of such series in connection with
such corporate event or redemption, as applicable.
Separate from the issuance of the 2029 Convertible Notes and 2031 Convertible Notes, FE repurchased approximately $1.2 billion aggregate principal amount
of the 2026 Convertible Notes, using a portion of the proceeds from the offering of the 2029 Convertible Notes and 2031 Convertible Notes described above. FE
may, in the future, effect additional repurchases of remaining outstanding 2026 Convertible Notes.
FET Senior Notes and Registration Rights
On August 13, 2025, FET issued $450 million of senior unsecured notes due in 2033, in a private offering that included a registration rights agreement in which
FET agreed to conduct an exchange offer of these senior notes for the like principal amounts registered under the Securities Act within 366 days of closing of the
offering. On November 4, 2025, FET filed a registration statement on Form S-4 for the exchange offer with the SEC, which was declared effective on December
3, 2025. On January 21, 2026, FET completed the exchange offer of these senior notes for like principal amounts registered under the Securities Act.
JCP&L Senior Notes and Registration Rights
On December 5, 2024, JCP&L issued $700 million of senior unsecured notes due in 2035 in a private offering that included a registration rights agreement in
which JCP&L agreed to conduct an exchange offer of these senior notes for like principal amounts registered under the Securities Act. On April 1, 2025, JCP&L
filed a registration statement on Form S-4 with the SEC, which became effective on April 11, 2025.
On September 4, 2025, JCP&L issued: (i) $350 million of senior unsecured notes due in 2029; (ii) $500 million of senior unsecured notes due in 2031; and (iii)
$500 million of senior unsecured notes due in 2036, in a private offering that included a registration rights agreement in which JCP&L agreed to conduct an
exchange offer of these senior notes for the like principal amounts registered under the Securities Act within 366 days of closing of the offering.
Scheduled Debt Repayments
The following table presents scheduled debt repayments or debt that has been noticed for redemption for outstanding long-term debt, excluding finance leases,
fair value purchase accounting adjustments and unamortized debt discounts and premiums, for the next five years as of December 31, 2025.
FirstEnergy (In millions) 	2026 	2027 	2028 	2029 	2030
Scheduled debt repayments 	$720 	$2,003 	$2,453 	$3,064 	$2,456
JCP&L (In millions) 	2026 	2027 	2028 	2029 	2030
Scheduled debt repayments 	$— 	$— 	$— 	$350 	$—
Securitized Bonds
Environmental Control Bonds
The consolidated financial statements of FirstEnergy include environmental control bonds issued by two bankruptcy remote, special purpose limited liability
companies that are indirect subsidiaries of MP and PE. Proceeds from the bonds were used to construct environmental control facilities. Principal and interest
owed on the environmental control bonds is secured by, and payable solely from, the proceeds of the environmental control charges. Creditors of FirstEnergy,
other than the limited liability company SPEs, have no recourse to any assets or revenues of the special purpose limited liability companies. As of December 31,
2025 and 2024, $156 million and $188 million of environmental control bonds were outstanding, respectively.
Phase-In Recovery Bonds
In June 2013, the SPEs formed by the Ohio Companies issued approximately $445 million of pass-through trust certificates supported by phase-in recovery
bonds to securitize the recovery of certain all-electric customer heating discounts, fuel and purchased power regulatory assets. The phase-in recovery bonds are
payable only from, and secured by, phase in recovery property owned by the SPEs. The bondholder has no recourse to the general credit of FirstEnergy or any
of the Ohio Companies. Each of the Ohio Companies, as servicer of its respective SPE, manages and administers the phase in recovery property including the
billing, collection and remittance of usage-based charges payable by retail electric customers. The SPEs are considered VIEs and each one is consolidated into
its applicable utility. As of December 31, 2025 and 2024, $159 million and $175 million of the phase-in recovery bonds were outstanding, respectively.
141

-- 155 of 203 --

FMBs
The Ohio Companies, FE PA, MP and PE each have a first mortgage indenture under which they can issue FMBs secured by a direct first mortgage lien on
substantially all of their property and franchises, other than specifically excepted property. The outstanding debt under the FMBs of specific FE PA predecessors
(WP and Penn) were assumed by FE PA.
Debt Covenant Default Provisions
FirstEnergy has various debt covenants under certain financing arrangements, including its revolving credit facilities and term loans. The most restrictive of the
debt covenants relate to the nonpayment of interest and/or principal on such debt and the maintenance of certain financial ratios. The failure by FirstEnergy to
comply with the covenants contained in its financing arrangements could result in an event of default, which may have an adverse effect on its financial
condition. As of December 31, 2025, FirstEnergy remains in compliance with all debt covenant provisions.
Additionally, there are cross-default provisions in a number of the financing arrangements. These provisions generally trigger a default in the applicable financing
arrangement of an entity if it, or any of its significant subsidiaries, default under another financing arrangement in excess of a certain principal amount, typically
$100 million. Such defaults by any of the Electric Companies or Transmission Companies would cross-default certain FE financing arrangements containing
these provisions, and a certain FET Financing arrangement, with respect to the Transmission Companies only. Such defaults by AE Supply would not cross-
default to applicable financing arrangements of FE. Also, defaults by FE would generally not cross-default applicable financing arrangements of any of FE’s
subsidiaries. Cross-default provisions are not typically found in any of the senior notes or FMBs of FE or its subsidiaries.
12. SHORT-TERM BORROWINGS AND BANK LINES OF CREDIT
The disclosures in this note apply to both Registrants, unless indicated otherwise.
FirstEnergy had $325 million and $550 million of outstanding short-term borrowings as of December 31, 2025 and 2024, respectively.
JCP&L had $93 million and $22 million of outstanding short-term borrowings as of December 31, 2025 and 2024, respectively.
On October 27, 2025, FE, the Electric Companies, Transmission Companies and FET, each entered into an amended credit facility to, among other things: (i)
remove the 10 basis point credit spread adjustment from the interest rate calculation; (ii) permit a one-week interest period for any Term Benchmark Advance (as
defined under each of the Amended Credit Facilities) based upon daily simple SOFR; and (iii) extend the maturity date of each credit facility for an additional
one-year period (a) from October 20, 2028 to October 20, 2029 for the KATCo credit facility, (b) from October 20, 2029 to October 20, 2030 for the FET credit
facility and (c) from October 18, 2028 to October 18, 2029 for the remaining Amended Credit Facilities.
As of December 31, 2025, available liquidity under the Credit Facilities totaled approximately $5.6 billion. JCP&L's available liquidity under its credit facility as of
December 31, 2025 was $750 million.
Borrowings under each of the Amended Credit Facilities may be used for working capital and other general corporate purposes. Generally, borrowings under
each of the credit facilities are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment
termination date, as the same may be extended. Each of the Amended Credit Facilities contain financial covenants requiring each borrower, with the exception
of FE, to maintain a consolidated debt-to-total-capitalization ratio (as defined under each of the Amended Credit Facilities) of no more than 65%, and 75% for
FET, measured at the end of each fiscal quarter. FE is required under its credit facility to maintain a consolidated interest coverage ratio of not less than 2.50
times, measured at the end of each fiscal quarter for the last four fiscal quarters.
Subject to each borrower’s sublimit, certain amounts are available for the issuance of LOCs (subject to borrowings drawn under the Amended Credit Facilities)
expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under each of the
Amended Credit Facilities and against the applicable borrower’s borrowing sublimit. As of December 31, 2025, FirstEnergy had $185 million in outstanding
LOCs, $52 million of which are issued under the Amended Credit Facilities.
Each of the Amended Credit Facilities do not contain provisions that restrict the ability to borrow or accelerate payment of outstanding advances in the event of
any change in credit ratings of the borrowers. Pricing is defined in “pricing grids,” whereby the cost of funds borrowed under the Amended Credit Facilities are
related to the credit ratings of the company borrowing the funds. Additionally, borrowings under each of the credit facilities are subject to the usual and customary
provisions for acceleration upon the occurrence of events of default, including a cross-default for other indebtedness in excess of $100 million.
As of December 31, 2025, FE was in compliance with its applicable consolidated interest coverage ratio and the Electric Companies, the Transmission
Companies, and FET were each in compliance with their debt-to-total-capitalization ratio covenants under each of their Amended Credit Facilities.
142

-- 156 of 203 --

FirstEnergy Money Pools
FirstEnergy’s regulated operating subsidiary companies also have the ability to borrow from each other and FE to meet their short-term working capital
requirements. Effective September 23, 2024, AGC and KATCo became participants in the regulated companies’ money pool. Similar but separate arrangements
exist among FirstEnergy’s unregulated companies with AE Supply, FE, FET, FEV and certain other unregulated subsidiaries. As of June 1, 2024, FET no longer
participates in the unregulated money pool. FESC administers these money pools and tracks surplus funds of FE and the respective regulated and unregulated
subsidiaries, as the case may be, as well as proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must
repay the principal amount of the loan, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company
receiving a loan from their respective pool and is based on the average cost of funds available through the pool.
Average Interest Rates 	Regulated Companies’ Money Pool 	Unregulated Companies’ Money Pool
2025 	2024 	2025 	2024
For the Years Ended December 31, 	4.51 % 	5.74 % 	4.89 % 	6.44 %
Weighted Average Interest Rates
FirstEnergy - The annual weighted average interest rates on short-term borrowings through the years ended December 31, 2025 and 2024 were 5.72% and
7.10%, respectively.
JCP&L - The annual weighted average interest rates on short-term borrowings through the years ended December 31, 2025 and 2024 were 7.58% and 6.76%,
respectively.
13. REGULATORY MATTERS
The disclosures in this note apply to FirstEnergy, with the disclosures under “State Regulation”, “New Jersey”, “FERC Regulatory Matters”, “FERC Audit”,
“Transmission ROE Methodology”, “Transmission Rate Incentives”, “Transmission Planning Supplemental Projects”, and “Local Transmission Planning
Complaint” also applicable to JCP&L.
STATE REGULATION
Each of the Electric Companies retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it
operates - in Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and
in New York by the NYPSC. The transmission operations of PE and TrAIL in Virginia, ATSI in Ohio, the Transmission Companies in Pennsylvania, PE and MP in
West Virginia, and PE in Maryland are subject to certain regulations of the VSCC, PUCO, PPUC, WVPSC, and MDPSC, respectively. In addition, under Ohio
law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates
were to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization
to site, construct and operate the new transmission facility.
143

-- 157 of 203 --

The following table summarizes the key terms of state base rate orders in effect for the Electric Companies as of December 31, 2025:
Company Rates Effective For
Customers Allowed Debt/Equity Capital
Structure 	Allowed ROE
CEI 	May 2009 	51%/ 49% 	10.5%
FE PA 	January 2025 	Settled 	Settled
MP 	March 2024 	Settled 	9.8%
JCP&L 	June 2024 	48.1% / 51.9% 	9.6%
OE 	January 2009 	51% /49% 	10.5%
PE (West Virginia) 	March 2024 	Settled 	9.8%
PE (Maryland) 	October 2023 	47% / 53% 	9.5%
TE 	January 2009 	51% / 49% 	10.5%
On November 19, 2025, the PUCO issued an order in the Ohio Companies’ base rate case that authorized a capital structure of 48.8% debt and 51.2% equity,
and an ROE of 9.63%. New rates reflecting this order were not yet in effect as of December 31, 2025.
Commission-approved settlement agreements did not disclose allowed debt/equity and/or ROE rates.
MARYLAND
PE operates under MDPSC-approved distribution base rates that were effective as of October 19, 2023, and that were subsequently modified by an MDPSC
order dated January 3, 2024, which became effective as of March 1, 2024. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC
orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic
auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service
continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS.
The EmPOWER Maryland program, following passage of the Climate Solutions Now Act of 2022, required annual incremental energy efficiency targets of 2%
per year from 2022 through 2024, 2.25% per year in 2025 and 2026, and 2.5% per year in 2027 and thereafter. On August 1, 2023, PE filed its proposed plan for
the 2024-2026 cycle as required by the MDPSC. Additionally, at the direction of the MDPSC, PE together with other Maryland utilities were required to address
GHG reductions in addition to energy efficiency. In compliance with the MDPSC directive, PE submitted three scenarios with projected costs over a three-year
cycle of $311 million, $354 million, and $510 million, respectively. On December 29, 2023, the MDPSC issued an order approving the $311 million scenario for
most programs, with some modifications. On August 15, 2024, PE filed a revised plan for the remainder of the 2024-2026 cycle to comply with refined GHG
reduction targets with a total budget of $314 million, which the MDPSC approved on December 27, 2024. PE recovers EmPOWER Maryland program costs with
carrying costs on unamortized balances through an annually reconciled surcharge, with certain costs subject to recovery over a five-year amortization period.
Lost distribution revenue attributable to energy efficiency or demand reduction is recovered only through base rates. Consistent with an MDPSC order dated
December 29, 2022, phasing out the unamortized balances of EmPOWER Maryland investments, PE is required to expense 67% of its EmPOWER Maryland
program costs in 2025, and 100% in 2026 and beyond. All previously unamortized costs for prior cycles are to be collected by the end of 2030, consistent with
the 2024-2026 order issued on December 29, 2023. Legislation which took effect on July 1, 2024 is expected to reduce the carrying costs on the EmPOWER
Maryland unamortized balances for PE by a total of $25 to $30 million over the period of 2024-2030. On July 31, 2024, the MDPSC issued an order
implementing revised EmPOWER Maryland surcharge rates for PE in accordance with the new law, denying PE’s request for a hearing that sought to challenge
certain portions of the law. On August 30, 2024, PE filed a petition seeking judicial review of its challenge to the law in the Circuit Court for Washington County,
Maryland. On August 6, 2025, the Circuit Court for Washington County, Maryland issued an order granting PE’s petition, finding that the legislature may not
change terms to apply retroactively to monies already expended. MDPSC and the Maryland Office of People’s Counsel have each appealed the decision. On
November 14, 2025, the Appellate Court of Maryland issued an order denying the unopposed motion of the Attorney General of Maryland to Intervene without
prejudice to the ability to file an amicus curiae brief, which the Attorney General filed on December 30, 2025. PE's response brief was filed on January 21, 2026.
NEW JERSEY
JCP&L operates under NJBPU approved rates that took effect as of February 15, 2024, and became effective for customers as of June 1, 2024. JCP&L provides
BGS for retail customers who do not choose a third-party EGS and for customers of third-party EGSs that fail to provide the contracted service. All New Jersey
EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.
The settlement of the distribution rate case in 2020, provided among other things, that JCP&L would be subject to a management audit, which began in May
2021. On April 12, 2023, the NJBPU accepted the final management audit report for filing purposes and ordered that interested stakeholders file comments on
the report by May 22, 2023, which deadline was extended until July
(1)
(2) 	(2)
(2)
(1)
(2)
(1)
(1)
(2)
144

-- 158 of 203 --

31, 2023. JCP&L and one other party filed comments on July 31, 2023. On July 16, 2025, the NJBPU issued its final order, directing 100 of the 105
recommendations be implemented, including certain modifications. JCP&L filed its implementation plan on September 22, 2025, and began quarterly progress
reporting in October 2025.
On September 17, 2021, in connection with Mid-Atlantic Offshore Development, LLC, a transmission company jointly owned by Shell New Energies US LLC and
EDF Renewables North America, JCP&L submitted a proposal to the NJBPU and PJM to build transmission infrastructure connecting offshore wind-generated
electricity to the New Jersey power grid. On October 26, 2022, the JCP&L proposal was accepted, in part, in an order issued by NJBPU. The proposal, as
accepted, included approximately $723 million in investments for JCP&L to both build new and upgrade existing transmission infrastructure. JCP&L’s proposal
projects an investment ROE of 10.2% and includes the option for JCP&L to acquire up to a 20% equity stake in Mid-Atlantic Offshore Development, LLC. The
resulting rates associated with the project are expected to be shared among the ratepayers of all New Jersey electric utilities. On April 17, 2023, JCP&L applied
for the FERC “abandonment” transmission rates incentive, which would provide for recovery of 100% of the cancelled prudent project costs that are incurred
after the incentive is approved, and 50% of the costs incurred prior to that date, in the event that some or all of the project is cancelled for reasons beyond
JCP&L’s control. On August 21, 2023, FERC approved JCP&L’s application, effective August 22, 2023.
On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two offshore wind projects in New Jersey—Ocean Wind 1 and
2—having a combined planned capacity of 2,248 MWs. On January 30, 2025, and February 25, 2025, Shell New Energies US LLC and EDF Renewables North
America respectively announced that each was exiting its Atlantic Shores partnership to construct wind energy off the shore of New Jersey. On June 4, 2025,
Atlantic Shores filed a petition with the NJBPU, requesting consent to terminate its 1.5 GW offshore wind project. These cancellations are not expected to
directly affect JCP&L’s awarded projects.
On May 23, 2025, JCP&L filed with the NJBPU a motion seeking declaratory guidance in view of recent offshore wind developments, including a shift in federal
energy policy toward more traditional energy resources. JCP&L requested that the NJBPU provide guidance either affirming the current project schedule or,
alternatively, authorizing JCP&L to modify the schedule. On June 9, 2025, responses to JCP&L’s motion were filed with the NJBPU, including a cross-motion by
the New Jersey Division of Rate Counsel to reopen the offshore wind transmission proceeding, which JCP&L opposed. JCP&L advised that it intended to comply
with its contractual obligations to construct the transmission project, and that its motion was limited to seeking guidance on the construction milestones. On July
28, 2025, the New Jersey Division of Rate Counsel asked the NJBPU to take judicial notice of a recent NYPSC order terminating its offshore wind transmission
infrastructure process in the interest of protecting ratepayers. On August 13, 2025, the NJBPU issued an order requesting that JCP&L delay expenditures of
certain of the transmission investment planned by JCP&L for a 2.5-year period, and directing that JCP&L work with NJBPU staff and PJM to ensure alignment as
to the work that is to be continued on the original timeline and the work that is to be delayed consistent with the order.
Consistent with the commitments made in its proposal to the NJBPU, JCP&L formally submitted in November 2023 the first part of its application to the DOE to
finance a substantial portion of the project using low-interest rate loans available under the DOE’s Energy Infrastructure Reinvestment Program of the IRA of
2022. JCP&L submitted the second part of its two-part application on March 13, 2024, which was approved on May 17, 2024. The DOE Loan Program Office
initiated a due diligence review of the application shortly thereafter. On January 16, 2025, the DOE announced a conditional commitment to JCP&L for a loan
guarantee of up to approximately $716 million for the project. On August 20, 2025, the DOE terminated its conditional commitment to JCP&L due to the DOE’s
determination that a condition precedent could not be satisfied.
On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system
resiliency and substation modernization in technologies designed to provide enhanced customer benefits. JCP&L proposes EnergizeNJ will be implemented over
a five-year budget period with estimated costs of approximately $935 million over the deployment period, of which, $906 million is capital investments and $29
million is operating and maintenance expenses. Under the proposal, the capital costs of EnergizeNJ would be recovered through JCP&L’s base rates via annual
and semi-annual base rate adjustment filings. The 2023 base rate case stipulation that was filed on February 2, 2024, necessitated amendments to the
EnergizeNJ program. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for
a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of
NJBPU approval of the base rate case settlement, to remove the high-priority circuits that are to be addressed in the first phase of its reliability improvement plan
and to include the second phase of its reliability improvement plan that is expected to further address certain high-priority circuits that require additional
upgrades. On April 10, 2025, JCP&L, joined by various parties, filed a stipulated settlement with the NJBPU resolving JCP&L’s amended EnergizeNJ petition,
which the NJBPU approved on April 23, 2025. The settlement provides for total program costs of $339 million, including capital investments in JCP&L’s electric
distribution system of approximately $203 million, $132 million of matching capital investment and approximately $4 million of O&M expense. Pursuant to the
settlement, the program began on July 1, 2025, and will continue through December 31, 2028. JCP&L has agreed to file a base rate case no later than January
1, 2030.
In February 2025, the NJBPU certified the results of its annual basic generation service auctions through which New Jersey’s four EDCs – including JCP&L –
satisfy their generation supply requirements for BGS customers for the period beginning June 1, 2025 through May 31, 2026. The certified results resulted in
significant rate increases for New Jersey EDC customers and, by
145

-- 159 of 203 --

order dated April 23, 2025, the NJBPU directed the four EDCs to submit proposals to mitigate the impact of the rate increases that affected residential customers
beginning June 1, 2025. On May 7, 2025, JCP&L filed a petition in response to the April 2025 order, modeling four potential mitigation scenarios. On June 18,
2025, the NJBPU approved a stipulation that included JCP&L, NJBPU Staff and New Jersey Division of Rate Counsel, pursuant to which, among other things,
JCP&L agreed to apply a temporary rate credit of $30.00 to each residential electric customer’s monthly bill in July and August 2025 that would be deferred in a
regulatory asset and recovered with a charge of $10 applied to each residential bill from September 2025 through February 2026 to recover the amounts
deferred, without carry charges, subject to a final reconciliation. As of December 31, 2025, JCP&L's regulatory asset associated with this temporary rate credit
was approximately $20 million.
On August 13, 2025, the NJBPU issued an Order to Show Cause reviewing JCP&L’s 2024 Annual System Performance Report, which includes information
regarding JCP&L’s systems level of electric service reliability performance during the prior calendar year. Failure to attain NJBPU’s minimum reliability levels
may subject JCP&L to a penalty. The NJBPU order alleges JCP&L has failed to achieve minimum reliability levels for calendar years 2022, 2023, and 2024, and
directed JCP&L to file an answer demonstrating why the NJBPU should not impose certain penalties upon JCP&L for such failure, which JCP&L filed on October
10, 2025. JCP&L is unable to predict the outcome or estimate the impact of this matter.
On January 14, 2026, the NJBPU issued an order authorizing JCP&L to modify its Lost Revenue Adjustment Mechanism rate rider in its tariff. The modification
allows JCP&L to recover the revenue impact of sales losses of approximately $16 million (pre-tax) primarily resulting from the implementation of JCP&L’s Energy
Efficiency and Conservation Plan during the one-year period from July 1, 2023, through June 30, 2024. The modification was effective February 1, 2026.
OHIO
Until the rates approved in the 2024 base rate case go into effect, the Ohio Companies will continue to operate under PUCO-approved base distribution rates
that became effective in 2009. The Ohio Companies operated under ESP IV through May 31, 2024, which provided for the supply of power to non-shopping
customers at a market-based price set through an auction process. From June 1, 2024, until January 31, 2025, the Ohio Companies operated under ESP V, as
modified by the PUCO, and as further described below. On December 18, 2024, the PUCO approved the Ohio Companies’ notice to withdraw ESP V and
approved the Ohio Companies’ proposal for returning to ESP IV, with modifications. ESP IV, as modified, continues the DCR rider, which supports continued
investment related to the distribution system for the benefit of customers, with an annual revenue cap of $390 million. In addition, ESP IV, as modified, includes:
(1) continuation of a base distribution rate freeze until ESP VI becomes effective or the Ohio Companies’ obtain the PUCO’s staff agreement; (2) a goal across
FirstEnergy to reduce CO2 emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $6.39 million per year to: (a) fund energy conservation,
economic development and job retention programs in the Ohio Companies’ service territories; and (b) establish fuel-funds in each of the Ohio Companies’
service territories to assist low-income customers.
On April 5, 2023, the Ohio Companies filed an application with the PUCO for approval of ESP V, for an eight-year term beginning June 1, 2024, and continuing
through May 31, 2032. On May 15, 2024, the PUCO issued an order approving ESP V with modifications, which became effective June 1, 2024, and would have
continued through May 31, 2029. ESP V, as modified by the PUCO, provided for, among other things, the continuation of existing riders related to purchased
power, transmission and uncollectibles, the continuation of the DCR rider with proposed annual revenue cap increases until new base rates are established, the
continuation of the AMI rider, and the addition of new riders for recovery of storm and vegetation management expenses. Many of the terms and conditions were
to be reconsidered in the base rate case. The ESP V order additionally directed the Ohio Companies to file another base distribution rate case not later than May
31, 2028, contribute $32.5 million during the term of ESP V to fund low-income customer bill assistance programs and bill assistance for income-eligible senior
citizens, and to develop an electric vehicle education program to assist customers in transitioning to electric vehicles which was recognized in the second quarter
of 2024 within “Other operating expenses” at the Regulated Distribution segment and on FirstEnergy’s Consolidated Statements of Income. Due to the risks and
uncertainty resulting from the Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a
notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV. On December 18, 2024, the PUCO
approved the Ohio Companies’ notice of withdrawal. Also on December 18, 2024, the PUCO approved the Ohio Companies’ proposal for returning to ESP IV,
with modifications. Consistent with ESP IV, the PUCO authorized the Ohio Companies’ reinstatement of the DCR rider, with an annual revenue cap of $390
million, and denied the Ohio Companies’ request to continue ESP IV’s DCR rider revenue cap increases of $15 million per year. Additionally, the PUCO ordered
that storm costs deferred under ESP V since June 1, 2024, remain on the Ohio Companies’ books and subject to review in a future case. The PUCO also denied
the Ohio Companies’ request to lift the base rate freeze in ESP IV, permitting the Ohio Companies’ pending base rate case to continue, but prohibiting new rates
from going into effect until either the effective date of ESP VI, or the staff agrees that the freeze be lifted and new rates be implemented. On January 22, 2025,
the PUCO approved the Ohio Companies’ revised ESP IV tariffs, effective February 1, 2025, at which time the Ohio Companies resumed operating under ESP
IV. On April 7, 2025, certain intervenors filed an appeal to the Supreme Court of Ohio challenging the Ohio Companies’ return to ESP IV. On May 22, 2025, the
Ohio Supreme Court granted the Ohio Companies motion to intervene in the appeal. On July 7, 2025, OCC and NOAC filed their Appellants’ brief. Appellees,
including the PUCO and the Ohio Companies, filed their briefs on August 26, 2025, to which OCC and NOAC replied on September 15, 2025.
146

-- 160 of 203 --

On January 31, 2025, the Ohio Companies filed an application with the PUCO for ESP VI, for a term beginning on the date new base distribution rates from the
pending base rate case go into effect, in an effort to align with the ongoing base distribution rate case, and continuing through May 31, 2028. ESP VI proposed to
continue providing power to non-shopping customers at market-based prices set through an auction process, and proposed to continue riders supporting
investment in the Ohio Companies’ distribution system, including Rider DCR with annual reliability performance-based revenue cap increases of $37 million to
$43 million, and an AMI rider for recovery of approved grid modernization investments. ESP VI additionally proposed riders to support continued maintenance of
the distribution system, including recovery of vegetation management and storm restoration operations and maintenance expenses. In addition, ESP VI
proposed energy efficiency programs for low-income customers, and included a commitment to spend $6.5 million annually over the ESP VI term, without
recovery from customers, on initiatives to assist low-income customers, as well as education and incentives to help ensure customers have good experiences
with electric vehicles. On May 15, 2025, the Ohio Governor signed HB 15, which repealed the statute authorizing ESPs in Ohio, effective August 14, 2025. On
December 17, 2025, the PUCO dismissed the Ohio Companies’ application for ESP VI due to the repeal of the ESP statute.
On March 14, 2025, as directed by the PUCO in its December 18, 2024, order approving the Ohio Companies’ revised ESP IV tariffs, the Ohio Companies filed
with the PUCO a request to commence their statutorily required quadrennial review of ESP IV and establish a proposed schedule. On July 10, 2025, the Ohio
Companies withdrew the request for the PUCO to establish a procedural schedule following the May 15, 2025 signing by the Ohio Governor of HB 15 ending the
statutory mandate to conduct the quadrennial review, effective August 14, 2025. The OCC filed its response to the Ohio Companies’ notice of withdrawal on July
25, 2025, to which the Ohio Companies replied on August 1, 2025. The matter remains pending before the PUCO.
On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. The Ohio
Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44%
debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and
AMI. Key components of the base rate case filing included a proposal to change pension and OPEB recovery to the delayed recognition method and to
implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense
requested in the proceeding and the actual amount each year using this method. Additionally, the Ohio Companies requested recovery of certain incurred costs,
including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed supporting testimony
and on July 31, 2024, filed an update with an adjusted net increase of base distribution revenues of approximately $190 million and incorporated matters in the
rate case as directed by the PUCO’s ESP V order. On December 18, 2024, the PUCO issued an order approving the Ohio Companies’ withdrawal of ESP V. On
January 22, 2025, the PUCO approved the Ohio Companies’ revised ESP IV tariffs, effective February 1, 2025, at which time the Ohio Companies resumed
operating under ESP IV. On January 27, 2025, the Ohio Companies notified the PUCO of their intention to update their application for an increase in base
distribution rates to remove ESP V related provisions from the base rate case. On November 19, 2025, the PUCO issued an order in the rate case lifting the rate
freeze and approving a net increase in base distribution revenues of the Ohio Companies of approximately $34 million, with a return on equity of 9.63% and a
hypothetical capital structure of 48.8% debt and 51.2% equity for all three Ohio Companies, which reflects a roll-in of current riders such as DCR and AMI. The
PUCO authorized continuance of Rider DCR with a cap increase commensurate with capital investments through January 31, 2025, and approved the Ohio
Companies’ proposal to change pension and OPEB recovery to the delayed recognition method. Additionally, the order authorizes recovery of certain deferred
costs for storm restoration, operations and maintenance, and energy efficiency programs. As a result of the order, the Ohio Companies recognized a $352 million
pre-tax impairment charge related to future recovery disallowances of certain previously capitalized amounts. On November 26, 2025, the Ohio Companies filed
proposed compliance tariffs. On December 19, 2025, the Ohio Companies and other parties filed applications for rehearing and on December 29, 2025, the Ohio
Companies filed a memorandum against intervenors’ applications for rehearing. On January 7, 2026, the PUCO issued an entry granting rehearing in order to
determine whether its November 19, 2025 base rate case opinion and order should be affirmed, abrogated, or modified on rehearing. On January 9, 2026, the
Ohio Companies filed an expedited motion for ruling on the proposed compliance tariffs and on February 4, 2026, PUCO staff issued a letter recommending that
most of the Ohio Companies’ proposed compliance tariffs be approved. The Ohio Companies cannot predict the outcome of the rehearing, but do not expect
material changes to the November 2025 order.
On May 16, 2022, May 15, 2023, and May 15, 2024, the Ohio Companies filed their SEET applications for determination of the existence of significantly
excessive earnings under ESP IV for calendar years 2021, 2022, and 2023, respectively. On May 15, 2025, the Ohio Companies filed their SEET application for
determination of the existence of significantly excessive earnings under ESPs IV and V for calendar year 2024. Each application demonstrated that each of the
individual Ohio Companies did not have significantly excessive earnings. These matters remain pending before the PUCO.
In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related
charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-
related charges the Ohio Companies collect. Instead, the Ohio Companies were further required by HB 6 to remit all the OVEC-related charges they collect to
non-FE Ohio electric distribution utilities until August 14, 2025, at which time HB 15 became effective and the Ohio Companies stopped collecting OVEC-related
charges. The Ohio Companies contested the motions, which are pending before the PUCO.
147

-- 161 of 203 --

In 2020, the four proceedings below were opened by the PUCO relating to HB 6. The matters, described in full below, were resolved pursuant to the terms of an
order issued by the PUCO on January 7, 2026. The order, which adopted without modification the terms of the stipulation and recommendation filed with the
PUCO by the Ohio Companies and fourteen intervenors on December 19, 2026, vacated the approximately $250 million in monetary penalties assessed by the
PUCO in its order issued on November 19, 2025. Instead, the January 7, 2026 PUCO order directed the Ohio Companies to pay their customers, among other
things, restitution and refunds totaling approximately $275 million ($213 million after-tax), of which, $25 million is recorded in "Other current liabilities" and
approximately $250 million is recorded within "Regulatory Liabilities" on FirstEnergy's Consolidated Balance Sheets. The refunds will be paid out over three
billing cycles beginning in February 2026 and the matters are now resolved:
• On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to
open an investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money
collected from consumers or violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On December 30, 2020, in response
to the OCC's motion, the PUCO reopened the DMR audit docket, and directed PUCO staff to solicit a third-party auditor and conduct a full review
of the DMR to ensure funds collected from customers through the DMR were only used for the purposes established in ESP IV. On June 2, 2021,
the PUCO selected an auditor, and the auditor filed the final audit report on January 14, 2022, which made certain findings and recommendations.
The report found that spending of DMR revenues was not required to be tracked, and that DMR revenues, like all rider revenues, are placed into
the regulated money pool as a matter of routine, where the funds lose their identity. Therefore, the report could not suggest that DMR funds were
used definitively for direct or indirect support for grid modernization. The report also concluded that there was no documented evidence that ties
revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR funds to support the passage of
HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio Companies adopt
formal dividend policies. Final comments and responses were filed by parties during the second quarter of 2022. The proceeding was stayed in its
entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August
2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the expanded DCR
rider audit proceeding described below and on November 22, 2024, the administrative law judge ordered that the bifurcated portion of the
corporate separation audit, discussed further below, be consolidated with the already-consolidated DMR audit and expanded DCR rider audit
proceeding. Evidentiary hearings were held between June 10, 2025, and June 27, 2025. Initial and reply briefs were filed by the parties on July 21,
2025, and August 4, 2025, respectively.
• On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of
HB 6 and the subsequent referendum effort, and directed the Ohio Companies to show cause, demonstrating that the costs of any political or
charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid
by customers. The Ohio Companies initially filed a response stating that the costs of any political or charitable spending in support of HB 6, or the
subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a
supplemental response explaining that, in light of the facts set forth in the DPA and the findings of the DCR rider audit report further discussed
below, political or charitable spending in support of HB 6, or the subsequent referendum effort, affected pole attachment rates paid by
approximately $15,000. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an independent external audit to investigate
FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and oversee the auditor. In November
and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental responses to the
PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show
cause demonstration submitted by the Ohio Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6
or the subsequent referendum effort was not included, directly or indirectly, in any rates or charges paid by ratepayers. The proceeding was stayed
in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August
2022 and the stay was lifted on February 26, 2024. On September 30, 2024, the third-party auditor’s report was filed. The audit examined 53
payments totaling approximately $75 million made in support of the passage of HB 6 and subsequent referendum efforts, and concluded that less
than $5 million was allocated to the Ohio Companies. The audit report affirmed the Ohio Companies’ conclusion in its August 6, 2021 filing that a
rate impact of less than $15,000 was charged to the Ohio Companies’ pole attachment customers associated with political and charitable spending
in support of HB 6. On October 22, 2024, parties filed comments on the audit report, and on November 5, 2024, parties filed reply comments. On
September 5, 2025, the administrative law judge set a procedural schedule, but stayed it on December 29, 2025.
• In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on
November 4, 2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement
made on October 29, 2020, as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates
with corporate
148

-- 162 of 203 --

separation laws and the Ohio Companies’ corporate separation plan. The additional audit is for the period from November 2016 through October
2020. The final audit report was filed on September 13, 2021. The audit report makes no findings of major non-compliance with Ohio corporate
separation requirements, minor non-compliance with eight requirements, and findings of compliance with 23 requirements. Parties filed comments
and reply comments on the audit report. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of
the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and the stay was lifted on February 26, 2024. On September 10, 2024,
the Ohio Companies filed testimony describing their compliance with Ohio corporate separation laws and the implementation of the
recommendations made in the audit reports. On September 20, 2024, intervenors filed testimony recommending fines for alleged violations of the
Ohio corporate separation requirements. Evidentiary hearings were held on October 9 and 10, 2024; the scope of the hearings excluded
allegations involving activities related to the passage of HB 6 and the former PUCO chairman, which were later addressed in hearings held
between June 10, 2025, and June 27, 2025, as further described below. Initial and reply briefs have been filed by the Ohio Companies, PUCO staff
and the intervening parties.
• On September 3, 2024, the Ohio Companies filed an application to amend their corporate separation plan to incorporate certain recommendations
from prior audit reports, which include, but are not limited to, improving controls for non-regulated competitive employees’ physical space and
access to data, updating and implementing a process to annually review the cost allocation manual, developing state specific codes of conduct
practices, and implementing additional training related to the cost allocation manual and the state codes of conduct. On October 23, 2024, the
administrative law judge issued an entry suspending automatic approval of the amended corporate separation plan and establishing a procedural
schedule.
• In connection with an ongoing annual audit of the Ohio Companies’ DCR rider for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K
for the year ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a
review of certain transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether
funds collected from customers were used to pay the vendors, and if so, whether or not the funds associated with those payments should be
returned to customers through the DCR rider or through an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase
of the audit, and the parties submitted comments and reply comments on this audit report in October 2021. Additionally, on September 29, 2021,
the PUCO expanded the scope of the audit in this proceeding to determine if the costs of the naming rights for FirstEnergy Stadium have been
recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its final report, in which the auditor concluded that the
FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15, 2021, the PUCO further expanded the
scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’ ESP IV settlement
proceedings, but stayed its expansion of the audit until otherwise ordered by the PUCO. The proceeding was stayed in its entirety, including
discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and the stay was
lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the Rider DMR audit proceeding
described above, and further lifted the stay of the portion of the investigation relating to an apparent nondisclosure of a side agreement. On
November 22, 2024, the administrative law judge ordered that the bifurcated portion of the corporate separation audit be consolidated with the
already-consolidated DMR audit and the expanded DCR rider audit proceeding. Evidentiary hearings were held between June 10, 2025, and June
27, 2025. Initial and reply briefs were filed by the parties on July 21, 2025, and August 4, 2025, respectively.
See Note 14., "Commitments, Guarantees and Contingencies,” of the Combined Notes to Financial Statements of the Registrants below for additional details on
the government investigations and subsequent litigation surrounding the investigation of HB 6.
PENNSYLVANIA
FE PA has five rate districts in Pennsylvania – four that correspond to the territories previously serviced by ME, PN, Penn, and WP and one rate district that
corresponds to WP’s service provided to The Pennsylvania State University. The rate districts created by the PA Consolidation will not reach full rate unity until
the earlier of 2033 or the conclusion of three base rate cases filed after January 1, 2025. FE PA operates under rates approved by the PPUC, effective as of
January 1, 2025. FE PA operates under a DSP through the May 31, 2027 delivery period, which provides for the competitive procurement of generation supply
for customers who do not choose an alternative EGS or for customers of alternative EGSs that fail to provide the contracted service.
Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, the Pennsylvania Companies implemented energy efficiency and peak demand reduction
programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for
WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWh for ME,
3.0% MWh for PN, 2.7% MWh for Penn, and 2.4% MWh for WP. The fourth phase of FE PA’s energy efficiency and peak demand reduction program, which runs
for the five-year period beginning June 1, 2021 through May 31, 2026, was approved by the PPUC on June 18, 2020, providing cost
149

-- 163 of 203 --

recovery of approximately $390 million to be recovered through Energy Efficiency and Conservation Phase IV Riders for each FE PA rate district.
On November 26, 2025, FE PA submitted a petition for approval of its Phase V Energy Efficiency and Conservation Plan, which includes energy efficiency and
peak demand reduction programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.01% MW, and energy consumption reduction
targets, as a percentage of FE PA’s historic 2009 to 2010 reference load, at 2.00% MWh. The proposed plan includes cost recovery of approximately $390
million to be recovered through its Phase V Energy Efficiency and Conservation Charge Rider and runs for a five-year period beginning June 1, 2026, through
May 31, 2031. Hearings were held on January 29, 2026. The parties have reached a full settlement in principle and expect to file with the PPUC a Joint Petition
for Complete Settlement on or before February 19, 2026. An order is expected from the PPUC in the first quarter of 2026.
On February 3, 2026, FE PA filed a proposed DSP for provision of generation for the June 1, 2027 through May 31, 2031 delivery period, to be sourced through
competitive procurements for customers who do not receive service from an alternative EGS. Under the 2027-2031 DSP, supply would be provided through a
mix of 12, 24, and in the case of residential customers, 60-month energy contracts, as well as spot market purchases for industrial customers. A final order is
expected from the PPUC by November 2026.
WEST VIRGINIA
MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates that
became effective March 27, 2024. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related
market sales revenue through the ENEC. MP’s and PE’s ENEC rate is typically updated annually and MP and PE filed their ENEC filing on August 29, 2025, for
rates effective January 1, 2026.
On April 21, 2022, the WVPSC issued an order approving, effective May 1, 2022, a tariff to offer solar power on a voluntary basis to West Virginia customers and
requiring MP and PE to subscribe at least 85% of the planned 50 MWs of solar generation before seeking approval for surcharge cost recovery. MP and PE
must seek separate approval from the WVPSC to recover any solar generation costs in excess of the approved solar power tariff. On April 24, 2023, MP and PE
sought approval for surcharge cost recovery from the WVPSC for three of the five solar sites, representing 30 MWs of generation. On August 23, 2023, the
WVPSC approved the customer surcharge and granted approval to construct three of the five solar sites. The surcharge went into effect January 1, 2024. Two of
the five solar generation sites went into service in 2024, with the third in April 2025. On December 4, 2024, MP and PE submitted for approval a settlement
agreement to increase its solar surcharge rate. The WVPSC approved the settlement without modification on December 27, 2024, and new rates went into effect
on January 1, 2025. In November 2025, MP and PE submitted a settlement agreement to the WVPSC seeking approval to adjust the solar surcharge rate, which
was approved without modification on January 15, 2026. Pursuant to the settlement agreement, a modest decrease in the solar surcharge rate became effective
January 15, 2026.
On August 29, 2025, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates by approximately $14 million, proposed to
be effective January 1, 2026, which represents a 0.8% increase of total revenues. The proposed increase is driven primarily by an under-recovery balance as of
June 30, 2025, and higher costs for fuel and reagents. On December 12, 2025, the parties filed a settlement agreement with the WVPSC, which was approved
in full without modification on December 23, 2025.
On August 29, 2025, MP and PE filed with the WVPSC their biennial review of their vegetation management program and surcharge. MP and PE have proposed
an approximate $3.2 million decrease in the surcharge rates due to an over-recovery balance as of June 30, 2025, and higher costs for fuel and reagents. The
WVPSC held a hearing regarding rate matters on December 15, 2025. An order from the WVPSC is expected by the end of first quarter 2026.
On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC. To ensure that MP and PE can meet their PJM adequacy requirements,
the plan proposes, among other things, near-term market capacity purchases, and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural
gas combined cycle generation by 2031. On November 26, 2025, the WVPSC issued a procedural order setting a hearing in May 2026.
On February 13, 2026, MP and PE filed a CPCN to construct and operate a 1,200 MW combined cycle gas turbine plant and 70 MWs of solar generation
capacity for an estimated capital investment totaling approximately $2.7 billion as of the date of the filing. The request also includes a surcharge designed to
recover financing costs during development and construction of the projects, as well as to transition to recovery in base rates once the projects are placed in-
service and approved through a base rate case. An order is expected from the WVPSC in the second half of 2026. See Note 14, "Commitments, Guarantees
and Contingencies - Environmental Matters - Clean Water Act,” of the Combined Notes to Financial Statements of the Registrants for additional details on the
EPA's ELG.
150

-- 164 of 203 --

FERC REGULATORY MATTERS
Under the Federal Power Act, FERC regulates rates for interstate wholesale sales and transmission of electric power, regulatory accounting and reporting under
the Uniform System of Accounts, and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and
rates, the Electric Companies, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE and
the Transmission Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP,
PE and the Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM
under the PJM Tariff.
The following table summarizes the key terms of FERC rate orders in effect for transmission customer billings for FirstEnergy's transmission owner entities as of
December 31, 2025:
Company 	Allowed Debt/Equity Capital
Structure 	Allowed ROE
ATSI 	Actual (13-month average) 	9.88%
JCP&L 	Actual (13-month average) 	10.2%
MP 	Lower of Actual (13-month average)
or 56% equity 	10.45%
PE 	Lower of Actual (13-month average)
or 56% equity 	10.45%
KATCo 	49.3% equity 	10.45%
MAIT 	Lower of Actual (13-month average)
or 60% equity 	10.3%
TrAIL 	Actual (year-end) 	12.7% / 11.7%
Reflects a 0.5% reduction to the 10.38% approved ROE due to the January 2025 Sixth Circuit ruling eliminating the 50 basis point adder associated with RTO
membership (see Transmission ROE Incentive).
On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo.
Capital structure will convert to an actual (13-month average) in January 2027.
TrAIL the Line and Black Oak Static Var Compensator.
All other projects.
FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates
upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Electric Companies and AE
Supply each have the necessary authorization from FERC to sell their wholesale power, if any, in interstate commerce at market-based rates, although in the
case of the Electric Companies major wholesale purchases remain subject to review and regulation by the relevant state commissions. The Electric Companies
and AE Supply are required to renew their respective authorizations every three years, and on December 16, 2025, the companies filed applications for the next
renewal period.
Federally enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements
on the Electric Companies, AE Supply, and the Transmission Companies. NERC is the Electric Reliability Organization designated by FERC to establish and
enforce these reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to six regional
entities, including RFC. All of the facilities that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC
stakeholder processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the
reliability standards implemented and enforced by RFC.
FirstEnergy believes that it is in material compliance with all currently-effective and enforceable reliability standards. Nevertheless, in the course of operating its
extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the
reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the
specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to
refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability
standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities, that could have
a material adverse effect on its financial condition, results of operations, and cash flows.
FERC Audit
FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s
compliance with certain accounting and reporting requirements under various FERC regulations. On February 4, 2022, FERC filed the final audit report for the
period of January 1, 2015, through September 30, 2021, which included several findings and recommendations that FirstEnergy has accepted. The audit report
included a finding and related
(1)
(2) 	(3)
(4) 	(5)
(1)
(2)
(3)
(4)
(5)
151

-- 165 of 203 --

recommendation on FirstEnergy’s methodology for allocation of certain corporate support costs to regulatory capital accounts under certain FERC regulations
and reporting. Effective in the first quarter of 2022 and in response to the finding, FirstEnergy implemented a new methodology for the allocation of these
corporate support costs to regulatory capital accounts for its regulated distribution and transmission companies on a prospective basis. With the assistance of an
independent outside firm, FirstEnergy completed an analysis during the third quarter of 2022 of these costs and how it impacted certain FERC-jurisdictional
wholesale transmission customer rates for the audit period of 2015 through 2021. As a result of this analysis, FirstEnergy reclassified certain transmission capital
assets to operating expenses for the audit period. FirstEnergy fully recovered approximately $105 million ($13 million at JCP&L) of these costs reclassified to
operating expenses in its transmission formula rate revenue requirements as of December 31, 2024.
On December 8, 2023, FERC audit staff issued a letter advising that two unresolved audit matters, related to FirstEnergy’s plan to recover the reclassified
operating expenses in formula transmission rates and a since terminated fuel consulting contract, were being referred to other offices within FERC for further
review. On July 5, 2024, and September 26, 2024, the FERC Office of Enforcement issued additional data requests related to the 2022 reclassification of
operating expenses, to which FirstEnergy replied. On September 10, 2024, and January 13, 2025, the FERC Office of Enforcement issued further data requests
related to the classification and recovery of a since terminated fuel consulting contract, to which FirstEnergy responded. The FERC Office of Enforcement took
no action with respect to the referred matters, and on December 23, 2025, FERC staff notified FirstEnergy that the audit is concluded.
Transmission ROE Incentive
On February 24, 2022, the OCC filed a complaint with FERC against ATSI, AEP’s Ohio affiliate and American Electric Power Service Corporation, and Duke
Energy Ohio, Inc. asserting that FERC should reduce the ROE utilized in the utilities’ transmission formula rates by eliminating the 50 basis point adder
associated with RTO membership, effective February 24, 2022. The OCC contends that this result is required because Ohio law mandates that transmission
owning utilities join an RTO and that the 50 basis point adder is applicable only where RTO membership is voluntary. On December 15, 2022, FERC denied the
complaint as to ATSI and Duke Energy Ohio, Inc., but granted it as to AEP’s Ohio affiliate. AEP’s Ohio affiliate and OCC appealed FERC’s orders to the Sixth
Circuit. On January 17, 2025, the Sixth Circuit ruled that the 50 basis point adder is available only where RTO membership is voluntary, that Ohio law requires
Ohio’s transmission utilities to be members of an RTO, and that it was unlawful for FERC to excise the adder from AEP’s Ohio affiliate rates, but not from the
Duke Energy Ohio, Inc. and ATSI rates. During 2024, as a result of the ruling, ATSI recognized a $46 million pre-tax charge, with interest, of which $42 million is
reported in “Transmission Revenues” and $4 million is reported in “Miscellaneous income, net” on the FirstEnergy Consolidated Statements of Income at the
Stand-Alone Transmission segment, to reflect the expected refund owed to transmission customers back to February 24, 2022. On June 20, 2025 and June 24,
2025, ATSI and AEP’s Ohio affiliate, respectively, applied for the Supreme Court of the U.S. to review the Sixth Circuit’s decision. On November 10, 2025, the
Supreme Court of the U.S. denied ATSI’s petition for the court to review the case. On November 13, 2025, the Sixth Circuit issued a mandate sending the case
back to FERC for further proceedings.
Transmission ROE Methodology
A proposed rulemaking proceeding concerning transmission rate incentives provisions of Section 219 of the 2005 Energy Policy Act was initiated in March of
2020 and remains pending before FERC. Among other things, the rulemaking explored whether utilities should collect an “RTO membership” ROE incentive
adder for more than three years. FirstEnergy is a member of PJM, and its transmission subsidiaries could be affected by the proposed rulemaking. FirstEnergy
participated in comments on the supplemental rulemaking that were submitted by a group of PJM transmission owners and by various industry trade groups. If
there were to be any changes to FirstEnergy's transmission incentive ROE, such changes will be applied on a prospective basis; provided however, due to the
Sixth Circuit’s ruling in the Transmission ROE Incentive matter described above, ATSI is collecting the ROE incentive adder subject to refund.
Transmission Planning Supplemental Projects
On September 27, 2023, the OCC filed a complaint against ATSI, PJM and other transmission utilities in Ohio alleging that the PJM Tariff and operating
agreement are unjust, unreasonable, and unduly discriminatory because they include no provisions to ensure PJM’s review and approval for the planning, need,
prudence and cost-effectiveness of the PJM Tariff Attachment M-3 “Supplemental Projects.” Supplemental Projects are projects that are planned and constructed
to address local needs on the transmission system. The OCC demands that FERC: (i) require PJM to review supplemental projects for need, prudence and cost-
effectiveness; (ii) appoint an independent transmission monitor to assist PJM in such review; and (iii) require that Supplemental Projects go into rate base only
through a “stated rate” procedure whereby prior FERC approval would be needed for projects with costs that exceed an established threshold. Subsequently,
intervenors expanded the scope of this proceeding to all of the transmission utilities in PJM, including JCP&L. ATSI and the other transmission utilities in Ohio
and PJM filed comments.
Local Transmission Planning Complaint
On December 19, 2024, the Industrial Energy Consumers of America, a group representing large industrial customers, and state
152

-- 166 of 203 --

consumer advocates filed a complaint at FERC that asserts that transmission owners are overbuilding “local transmission facilities” with corresponding
unjustified increases in transmission rates. The complaint demands that FERC: (i) prohibit transmission owners from planning “local transmission facilities” that
are rated at 100 kV or higher; (ii) appoint “independent transmission monitors” to conduct such planning; and (iii) condition construction of local transmission
facilities on the facility having been planned by the “independent transmission monitor.” FirstEnergy is participating in this matter through a consortium of PJM
transmission owners and through certain trade groups, including EEI. FirstEnergy, together with the PJM transmission owners, filed a motion to dismiss the
complaint on March 20, 2025, which is pending before FERC. FirstEnergy is unable to predict the outcome or estimate the impact that this complaint may have
on its Transmission Companies, however, whether this lawsuit moves forward could have a material impact on FirstEnergy and its transmission capital
investment strategy.
Ghiorzi v. PJM
In December 2023, PJM assigned certain baseline RTEP projects to NextEra Energy Transmission, which subsequently informed PJM that it would not construct
the projects. On April 3, 2025, following the reassignment by PJM of certain baseline RTEP projects in Maryland and Virginia to PE, two individuals filed a
complaint at FERC challenging this outcome, which FERC denied on February 2, 2026. The complainants asserted that PJM erred in reassigning the work to PE
because such reassignment projects: (i) did not reflect the cost estimates or cost caps included in NextEra Energy Transmission’s bid; and (ii) would be
constructed with different routing than as originally proposed. FirstEnergy and PE are unable to predict the outcome or estimate the impact that this complaint
may have.
Valley Link Formula Transmission Rate
On March 14, 2025, the Valley Link joint venture filed an application for forward-looking formula transmission rates to provide for cost recovery for the portfolio of
selected projects. Among other things, the transmission rate application provides for a capital structure of 40% debt and 60% equity, and a base ROE of 10.9%
with associated templates and protocols, as well as transmission rate incentives, including the abandonment rate incentive, the CWIP rate incentive, the RTO
participation adder incentive, the hypothetical capital structure incentive, and the precommercial regulatory asset incentive. On May 14, 2025, FERC issued an
initial order that, among other things, accepted the requested abandonment rate incentive, CWIP rate incentive, RTO participation adder incentive, and
precommercial regulatory asset rate incentive, and allowed the formula rate to go into effect on May 13, 2025, as requested, subject to refund, pending further
settlement and hearing proceedings. The most recent settlement conference was held on December 9, 2025, at which the parties agreed to a procedural
schedule to govern the next phase of the settlement process. The capital structure incentive and the other open rate design matters are being addressed in the
confidential settlement negotiations.
Abandonment Transmission Rate Incentive
On February 26, 2025, PJM completed its 2024 RTEP Open Window 1 process and, among other actions, designated each of ATSI and PE to construct certain
transmission projects. On July 11, 2025, ATSI and PE filed a joint application for the abandonment incentive with FERC, which, was approved on September 9,
2025. Effective September 10, 2025, ATSI and PE each became eligible to recover 50% of the project costs incurred prior to September 10, 2025, and 100% of
the project costs incurred thereafter for any projects subsequently cancelled for reasons beyond the control of utility management.
PJM Capacity Market Reforms
On January 16, 2026, the Trump administration and the governors of all thirteen PJM states released a Statement of Principles Regarding PJM. This Statement
of Principles is designed to, among other things, increase capacity available in the PJM market. PJM is seeking input from its stakeholders on matters related to
the Statement of Principles, including: (1) proposals for a backstop capacity auction, price (cap), term, and quantity; (2) on whether to extend the existing
capacity auction price collar; and (3) accelerating large load interconnections bringing their own generation. FirstEnergy is participating in the stakeholder
processes that are described in the Statement of Principles, including by submitting a letter on January 30, 2026, in response to PJM’s request for input on the
question of whether to extend the existing capacity auction price collar. In the letter, FirstEnergy supported extending the price collar but noted that PJM may
wish to lower costs to customers by lowering the price collar through administrative or other mechanisms.
Large Load Interconnection Rulemaking
On October 23, 2025, the U.S. Secretary of Energy directed FERC to conduct a rulemaking procedure to develop regulations that would speed interconnection
to the transmission system of large loads, including “Artificial Intelligence” data centers and “hybrid” data center/electric generation facilities. The Energy
Secretary advanced 14 principles to guide this outcome, including that such large loads should be responsible for paying the costs of any network transmission
system upgrades required for interconnection of such large loads, and that these large loads should have the option for building such network transmission
upgrades. The Energy Secretary requested that FERC take final action by April 30, 2026. On October 27, 2025, FERC noticed the Energy Secretary’s directive
for comment, and subsequently established November 21, 2025 as the deadline for initial comments and December 5, 2025 as the deadline for reply comments.
FET and its transmission affiliates, as well as over 150 other parties, filed comments on the established deadlines. FirstEnergy is unable to predict the outcome
of this rulemaking
153

-- 167 of 203 --

procedure. To the extent the new regulations do not permit transmission utilities to fully recover costs associated with transmission network upgrades required to
serve new large loads, our strategy of investing in transmission could be adversely affected.
14. COMMITMENTS, GUARANTEES AND CONTINGENCIES
The disclosures in this note apply to both Registrants, unless indicated otherwise.
FIRSTENERGY - GUARANTEES AND OTHER ASSURANCES
FirstEnergy has various financial and performance guarantees and indemnifications which are issued in the normal course of business. These contracts include
performance guarantees, stand-by LOCs, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate
commercial transactions with third parties by enhancing the value of the transaction to the third party. The maximum potential amount of future payments
FirstEnergy and its subsidiaries could be required to make under these guarantees as of December 31, 2025, was approximately $1.1 billion, as summarized
below:
Guarantees and Other Assurances Maximum
Exposure
(In millions)
FE's Guarantees on Behalf of its Consolidated Subsidiaries
Deferred compensation arrangements 	$ 	395
Vehicle leases 	75
McElroy Run transfer 	129
Other 	15
614
FE's Guarantees on Other Assurances
Surety Bonds 	161
Deferred compensation arrangements 	93
LOCs 	185
439
Total Guarantees and Other Assurances 	$ 	1,053
In 2025, FET, DominionHV and Transource issued an equity support agreement to enable Valley Link to enter into a credit facility with a third party. The equity
support agreement expires once all Valley Link credit agreement obligations are satisfied or when FET has fulfilled its support obligations under the equity
support agreement. As of December 31, 2025, the fair value of FET’s support obligations relating to the Valley Link credit facility was immaterial.
JCP&L - GUARANTEES AND OTHER ASSURANCES
JCP&L has various financial and performance guarantees and indemnifications which are issued in the normal course of business. These contracts include
stand-by LOCs and surety bonds. JCP&L enters into these arrangements to facilitate commercial transactions with third parties by enhancing the value of the
transaction to the third party. The maximum potential amount of future payments JCP&L could be required to make under these guarantees as of December 31,
2025, was $48 million, as summarized below:
Guarantees and Other Assurances Maximum
Exposure
(In millions)
Guarantees on Other Assurances
Surety Bonds 	$ 	20
LOCs 	28
Total Guarantees and Other Assurances 	$ 	48
154

-- 168 of 203 --

FIRSTENERGY - COLLATERAL AND CONTINGENT-RELATED FEATURES
In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity,
energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted
in the form of cash or credit support with thresholds contingent upon FE's or its subsidiaries' credit rating from each of the major credit rating agencies. The
collateral and credit support requirements vary by contract and by counterparty.
As of December 31, 2025, $185 million of collateral, in the form of LOCs, has been posted by FE or its subsidiaries. FE or its subsidiaries are holding $33 million
of net cash collateral as of December 31, 2025, from certain generation suppliers, and such amount is included in "Other current liabilities" on FirstEnergy's
Consolidated Balance Sheets.
These credit-risk-related contingent features stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent
contractual collateral obligations as of December 31, 2025:
Potential Collateral Obligations Electric Companies and
Transmission Companies 	FE 	Total
(In millions)
Contractual Obligations for Additional Collateral
Upon Further Downgrade 	$ 	99 $ 	1 $ 	100
Surety Bonds (collateralized amount) 	113 	153 	266
Total Exposure from Contractual Obligations 	$ 	212 $ 	154 $ 	366
Surety Bonds are not tied to a credit rating. Surety Bonds' impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond
except with respect to $22 million of surety obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days to cure.
JCP&L - COLLATERAL AND CONTINGENT-RELATED FEATURES
In the normal course of business, JCP&L may enter into physical or financially settled contracts for the sale and purchase of electric capacity, energy, fuel and
emission allowances. Certain agreements contain provisions that require JCP&L to post collateral. This collateral may be posted in the form of cash or credit
support with thresholds contingent upon JCP&L's credit rating from each of the major credit rating agencies. The collateral and credit support requirements vary
by contract and by counterparty.
JCP&L has posted $28 million of collateral in the form of LOCs as of December 31, 2025. JCP&L is holding $2 million of net cash collateral as of December 31,
2025, from certain generation suppliers, and such amount is included in "Other current liabilities" on JCP&L's Balance Sheets.
These credit-risk-related contingent features stipulate that if JCP&L were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent
contractual collateral obligations as of December 31, 2025:
Potential Collateral Obligations 	JCP&L
(In millions)
Contractual Obligations for Additional Collateral
Upon Further Downgrade 	$ 	67
Surety Bonds (collateralized amount) 	20
Total Exposure from Contractual Obligations 	$ 	87
Surety Bonds are not tied to a credit rating. Surety Bonds' impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond
except with respect to $1 million of surety obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days to cure.
ENVIRONMENTAL MATTERS
Various federal, state and local authorities regulate the Registrants with regard to air and water quality, hazardous and solid waste management and disposal,
and other environmental matters. While the Registrants’ environmental policies and procedures are designed to achieve compliance with applicable
environmental laws and regulations, such laws and regulations are subject to periodic review and potential revision by the implementing agencies. The
Registrants cannot predict the timing or ultimate outcome of any of these reviews or how any future actions taken as a result thereof may materially impact their
(1)
(1)
(1)
(1)
155

-- 169 of 203 --

business, results of operations, cash flows and financial condition. In general, environmental requirements applicable to the electric power sector are becoming
increasingly prescriptive and stringent, and the EPA finalized a number of rules in 2024 that could impact the Registrants. However, the Trump administration has
issued certain executive orders and stated its intention to rescind, revise or replace some existing environmental regulations and the ultimate impact of recently
finalized rules, several of which are in litigation, and any replacement rules are uncertain.
On March 12, 2025, the EPA announced its intent to reevaluate or reconsider numerous environmental regulations, many of which apply to the Registrants. The
specific timing or outcome of this initiative remains unknown, but regular required rulemaking processes and procedures still apply, and litigation is also
anticipated to occur. The disclosures herein do not attempt to discern potential impacts of these deregulatory actions until and unless formal rulemaking or other
regulatory actions are announced and the potential impacts to operations can be discerned.
The disclosures below apply to FirstEnergy and the disclosures under “Regulation of Waste Disposal,” are also applicable to JCP&L.
Clean Air Act
FirstEnergy complies with SO and NO emission reduction requirements under the CAA and SIP by burning lower-sulfur fuel, utilizing combustion controls and
post-combustion controls and/or using emission allowances.
CSAPR requires reductions of NO and SO emissions in two phases (2015 and 2017), ultimately capping SO emissions in affected states to 2.4 million tons
annually and NO emissions to 1.2 million tons annually. CSAPR allows trading of NO and SO emission allowances between electric generation facilities
located in the same state and interstate trading of NO and SO emission allowances with some restrictions. On July 28, 2015, the D.C. Circuit ordered the EPA
to reconsider the CSAPR caps on NO and SO emissions from electric generation facilities in 13 states, including West Virginia. This followed the 2014
Supreme Court of the U.S. ruling generally upholding the EPA’s regulatory approach under CSAPR but questioning whether the EPA required upwind states to
reduce emissions by more than their contribution to air pollution in downwind states. The EPA issued a CSAPR Update on September 7, 2016, reducing
summertime NO emissions from electric generation facilities in 22 states in the eastern U.S., including West Virginia, beginning in 2017. Various states and
other stakeholders appealed the CSAPR Update to the D.C. Circuit in November and December 2016. On September 13, 2019, the D.C. Circuit remanded the
CSAPR Update to the EPA citing that the rule did not eliminate upwind states’ significant contributions to downwind states’ air quality attainment requirements
within applicable attainment deadlines.
Also in March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NO emissions from nine states (including West Virginia)
significantly contribute to New York’s inability to attain the ozone National Ambient Air Quality Standards. The petition sought suitable emission rate limits for
large stationary sources that are allegedly affecting New York’s air quality within the three years allowed by CAA Section 126. On September 20, 2019, the EPA
denied New York’s CAA Section 126 petition. On October 29, 2019, the State of New York appealed the denial of its petition to the D.C. Circuit. On July 14, 2020,
the D.C. Circuit reversed and remanded the New York petition to the EPA for further consideration. On March 15, 2021, the EPA issued a revised CSAPR Update
that addressed, among other things, the remands of the prior CSAPR Update and the New York Section 126 petition. In December 2021, MP purchased NO
emissions allowances to comply with 2021 ozone season requirements. On April 6, 2022, the EPA published proposed rules seeking to impose further significant
reductions in EGU NO emissions in 25 upwind states, including West Virginia, with the stated purpose of allowing downwind states to attain or maintain
compliance with the 2015 ozone National Ambient Air Quality Standards. On February 13, 2023, the EPA disapproved 21 SIPs, which was a prerequisite for the
EPA to issue a final Good Neighbor Plan or FIP. On June 5, 2023, the EPA issued the final Good Neighbor Plan with an effective date 60 days thereafter. Certain
states, including West Virginia, have appealed the disapprovals of their respective SIPs, and some of those states have obtained stays of those disapprovals
precluding the Good Neighbor Plan from taking effect in those states. On August 10, 2023, the 4th Circuit granted West Virginia an interim stay of the
disapproval of its SIP and on January 10, 2024, after a hearing held on October 27, 2023, granted a full stay which precludes the Good Neighbor Plan from
going into effect in West Virginia. In addition to West Virginia, certain other states, and certain trade organizations, including the Midwest Ozone Group of which
FE is a member, separately filed petitions for review and motions to stay the Good Neighbor Plan itself at the D.C. Circuit. On September 25, 2023, the D.C.
Circuit denied the motions to stay the Good Neighbor Plan. On October 13, 2023, the aggrieved parties filed an Emergency Application for an Immediate Stay of
the Good Neighbor Plan with the Supreme Court of the U.S. Oral argument was heard on February 21, 2024. On June 27, 2024, the Supreme Court of the U.S.
granted a stay of the Good Neighbor Plan pending disposition of the petition for review in the D.C. Circuit. On February 6, 2025, the EPA filed a motion at the
D.C. Circuit to hold the proceedings in abeyance for 60 days to allow the EPA time to familiarize itself with the Good Neighbor Plan and in particular, time to brief
the new administration about these consolidated petitions and the underlying Rule to allow them to decide what action, if any, is necessary. On March 10, 2025,
the EPA filed a motion for remand with the D.C. Circuit identifying issues with the Good Neighbor Plan that make reconsideration appropriate. The D.C. Circuit
granted the motion for remand and cancelled oral argument. Consistent with its March 12, 2025 announcement, the EPA intends to undertake reconsideration of
the rule and complete any new rulemaking by the fourth quarter of 2026. On January 27, 2026, the EPA proposed phase 1 of its reconsideration of the rule
applicable to eight states outside of FirstEnergy’s service area. FirstEnergy will continue to monitor any further actions by the EPA for any potential impact to its
business and results of operations.
2 	x
x 	2 	2
x 	x 	2
x 	2
x 	2
x
x
x
x
156

-- 170 of 203 --

Climate Change
In recent years, certain regulators in the U.S. have focused efforts on increasing disclosures by companies related to climate change and mitigation efforts. At
the federal level, presidential administrations have held differing views on prioritizing actions to address GHG emissions and, by extension, climate change.
Those differing views have led to policy changes, creating uncertainty about environmental requirements and associated impacts.
In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for GHGs under the Clean Air Act,” known as the 2009
Endangerment Finding, concluding that concentrations of several key GHGs constitute an “endangerment” and may be regulated as “air pollutants” under the
CAA and mandated measurement and reporting of GHG emissions from certain sources, including electric generation facilities. The 2009 Endangerment Finding
is the basis of the EPA’s authority to regulate GHG emissions under the CAA.
In January 2025, Executive Order 14514 was issued and, among other deregulatory actions, directed the EPA Administrator to make recommendations on the
“legality and continuing applicability” of the EPA’s 2009 Endangerment Finding, which forms the basis for the EPA's GHG regulations. On March 12, 2025, the
EPA announced a series of planned deregulatory actions that it would be taking related to such executive order, including reconsideration of the regulations to
limit power plant GHG emissions. On July 29, 2025, the EPA announced a proposal to rescind its 2009 Endangerment Finding. On February 12, 2026, the EPA
issued a final rule rescinding its 2009 Endangerment Finding, thereby eliminating the basis for much of the EPA’s regulation of GHG emissions. However,
depending on the outcome of any appeals and any future EPA actions, compliance with the GHG emissions limits could require additional capital expenditures or
changes in operation at the Fort Martin and Harrison power stations.
On May 23, 2023, the EPA published a proposed rule pursuant to CAA Section 111 (b) and (d) in line with the decision in West Virginia v. Environmental
Protection Agency intended to reduce power sector GHG emissions (primarily CO2 emissions) from fossil fuel based EGUs. On April 25, 2024, the EPA issued a
final rule, which we refer to as the GHG rule, that imposed stringent GHG emissions limitations based on fuel type and unit retirement date. In May 2024, a
group of 25 states, including West Virginia, filed a challenge to the rule in the D.C. Circuit. Also in May 2024, other utility groups, including the Midwest Ozone
Group and Electric Generators for a Sensible Transition, both of which MP is a member, filed petitions for review of the GHG rule as well as motions to stay the
rule in the D.C. Circuit. The D.C. Circuit subsequently granted a motion from the EPA placing the litigation in abeyance until further order of the Court. On June
17, 2025, the EPA published a proposed rule to repeal the GHG rule. The EPA is expected to issue a final rule repealing all or portions of the GHG rule in
February 2026.
At the state level, there are several initiatives to reduce GHG emissions. Certain northeastern states are participating in the Regional Greenhouse Gas Initiative
and western states, including California, have implemented programs to control emissions of certain GHGs and enhance public disclosures relating to the same.
Additional policies reducing GHG emissions, such as demand reduction programs, renewable portfolio standards and renewable subsidies have been
implemented across the nation.
FirstEnergy has pledged to achieve carbon neutrality by 2050 with respect to GHGs within FirstEnergy’s direct operational control (known as Scope 1
emissions). FirstEnergy’s ability to achieve its GHG reduction goal is subject to its ability to make operational changes and is conditioned upon numerous risks,
many of which are outside of its control. With respect to FirstEnergy’s coal-fired facilities in West Virginia, which serve as the primary source of its Scope 1
emissions, it has identified that the end of the useful life date is 2035 for Fort Martin and 2040 for Harrison. MP filed its 10-year integrated resource plan with the
WVPSC on October 1, 2025, which highlighted, among other things, the need for new dispatchable generation in West Virginia. Determination of the useful life
of the regulated coal-fired generation could result in changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale,
impairment, or regulatory disallowances. If FirstEnergy is unable to recover these costs, it could have a material adverse effect on FirstEnergy’s financial
condition, results of operations, and cash flow. FirstEnergy cannot currently estimate the financial impact of climate change policies, although potential legislative
or regulatory programs restricting CO emissions, or litigation alleging damages from GHG emissions, could require material capital and other expenditures or
result in changes to its operations.
FirstEnergy continues to monitor climate change policies at both the federal and state level. Based on the EPA’s final rule rescinding the 2009 Endangerment
Filing and other anticipated rulemaking, we may experience a reduction in GHG reporting and other regulatory obligations at the federal level over the near term.
Multiple lawsuits opposing the EPA’s rescission were filed after it was finalized and the legal conflict is expected to be extensive. In light of the pending legal
challenges, FirstEnergy is unable to predict the impact on its business and operations.
Clean Water Act
Various water quality regulations, the majority of which are the result of the federal Clean Water Act and its amendments, apply to FirstEnergy’s facilities. In
addition, the states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.
On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic,
mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of
2
157

-- 171 of 203 --

pollutants in ash transport water. The treatment obligations were to phase-in as permits were renewed on a five-year cycle from 2018 to 2023. However, on April
13, 2017, the EPA granted a Petition for Reconsideration and on September 18, 2017, the EPA postponed certain compliance deadlines for two years. On
August 31, 2020, the EPA issued a final rule revising the effluent limits for discharges from wet scrubber systems, retaining the zero-discharge standard for ash
transport water, (with some limited discharge allowances), and extending the deadline for compliance to December 31, 2025, for both. In addition, the EPA
allows for less stringent limits for sub-categories of generating units based on capacity utilization, flow volume from the scrubber system, and unit retirement
date. On March 29, 2023, the EPA published proposed revised ELGs applicable to coal-fired electric generation facilities that include more stringent effluent
limitations for wet scrubber systems and ash transport water, and new limits on landfill leachate. The rule was issued as final by the EPA on April 25, 2024. On
May 30, 2024, the Utility Water Act Group, of which FirstEnergy is a member, filed a Petition for Review of the 2024 ELG Rule with the U.S. Court of Appeals for
the Fifth and Eighth Circuit Courts, and on June 18, 2024, the Utility Water Group filed a motion to stay the rule pending disposition on the merits. A number of
other parties have challenged the final rule in various petitions for review across several circuits. Those petitions and motions for stay have been consolidated in
the U.S. Court of Appeals for the Eighth Circuit. On October 10, 2024, the U.S. Court of Appeals for the Eighth Circuit denied the motions for stay. Depending on
the outcome of appeals and the EPA’s review, compliance with the 2024 ELG rule could require additional capital expenditures or changes in operation at closed
and active landfills, and at the Ft. Martin and Harrison power stations from what was approved by the WVPSC in September 2022 to comply with the 2020 ELG
rule. On February 19, 2025, the U.S. Department of Justice filed a motion on behalf of the EPA in the U.S. Court of Appeals for the Eighth Circuit, seeking to hold
the litigation in abeyance for a period of 60 days while the new leadership at the EPA evaluates the rule and determines how it wishes to proceed. On February
28, 2025, U.S. Court of Appeals for the Eighth Circuit granted the EPA’s motion. On March 12, 2025, the EPA announced a series of planned deregulatory
actions, including reconsideration of the 2024 ELG rule. On December 31, 2025, the EPA published a final ELG Deadline Extensions Rule extending certain
compliance deadlines included in the 2024 ELG Rule by five years.
Regulation of Waste Disposal
Federal and state hazardous waste regulations have been promulgated as a result of the Resource Conservation and Recovery Act, as amended, and the Toxic
Substances Control Act. Certain CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the
need for future regulation.
In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity
design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to
assure the safe disposal of CCRs from electric generation facilities. On September 13, 2017, the EPA announced that it would reconsider certain provisions of
the final regulations. On July 29, 2020, the EPA published a final rule again revising the date that certain CCR impoundments must cease accepting waste and
initiate closure to April 11, 2021. The final rule allowed for an extension of the closure deadline based on meeting identified site-specific criteria. On November
30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR
impoundment facility to October 2024, which request was withdrawn by AE Supply on July 9, 2024, prior to the completion of the technical review by the EPA. As
of May 31, 2024, AE Supply ceased accepting waste at the McElroy’s Run CCR impoundment facility from Pleasants Power Station. During 2024, as a result of
the evaluation of closure options for McElroy’s Run CCR impoundment facility and the adjacent landfill, AE Supply reviewed its ARO and future expected costs to
remediate, resulting in an increase to the ARO liability of $87 million. AE Supply transferred the McElroy’s Run CCR impoundment facility and adjacent dry
landfill and related remediation obligations on March 4, 2025, pursuant to the environmental liability transfer agreement dated February 3, 2025 with a subsidiary
of IDA Power, LLC. Pursuant to the agreement, AE Supply established a $160 million escrow account that AE Supply will fund over five years and is secured by
a surety bond, which is guaranteed by FE. In connection with the transfer, AE Supply recognized a $130 million liability, based on a 4.8% weighted average
discount rate over the contract term, associated with its remaining obligation to fund the escrow account over the next five years, and derecognized the ARO,
resulting in an immaterial impact to earnings. During the twelve months ended December 31, 2025, AE Supply made $46 million of cash payments to the escrow
account.
On May 8, 2024, the EPA issued the legacy CCR rule, which finalized changes to the CCR regulations addressing inactive surface impoundments at inactive
electric utilities, known as legacy CCR surface impoundments. The rule extends 2015 CCR Rule requirements for groundwater monitoring and protection,
operational and reporting procedures as well as closure requirements to impoundments and landfills that were not originally included for coverage by the 2015
CCR Rule. Furthermore, the EPA’s interpretations of the EPA CCR regulations continue to evolve through enforcement and other regulatory actions. FirstEnergy
is currently assessing the potential impacts of the final rule, including a review of additional sites to which the new rule might be applicable. On February 13,
2025, the U.S. Department of Justice filed a motion on behalf of the EPA in the D.C. Circuit, seeking to hold the litigation, which was filed on August 8, 2024, by
the Utility Solid Waste Act Group with FE as a member, in abeyance for a period of 120 days while the new leadership at the EPA evaluates the rule and
determines how it wishes to proceed, which the D.C. Circuit granted. On March 12, 2025, the EPA announced a series of planned deregulatory actions, including
reconsideration of the final legacy CCR rule. FirstEnergy continues to monitor the EPA’s actions related to CCR regulations; however, the ultimate impact is
unknown at this time and is subject to the outcome of the litigation and any future state regulatory actions. Depending on the outcome of appeals and the EPA’s
rule, compliance with the final legacy CCR rule could require remedial actions, including removal of coal ash. See Note 9., “Asset Retirement Obligations,” of the
Combined Notes to Financial Statements of the Registrants above for a description of the $139 million increase to its ARO that FirstEnergy recorded during 2024
as a result of its analysis and reduced in the fourth quarter of 2025 based on the completion of engineering
158

-- 172 of 203 --

studies and field analysis of certain sites. JCP&L did not have any potential legacy CCR disposal sites that were applicable to the 2024 legacy CCR rules. During
the fourth quarter of 2025, FirstEnergy completed engineering studies and field analysis for certain of its legacy CCR disposal sites and determined that certain
of those sites did not meet criteria to be applicable to the CCR rules. As a result, during the fourth quarter of 2025, FirstEnergy recorded a $49 million decrease
to its ARO.
Certain of the FirstEnergy companies have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the
CERCLA. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however,
federal law provides that all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are
considered probable have been recognized on FirstEnergy’s Consolidated Balance Sheets as of December 31, 2025, based on estimates of the total costs of
cleanup, FirstEnergy’s proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $97
million have been accrued through December 31, 2025, of which approximately $70 million are for environmental remediation of former MGP and gas holder
facilities in New Jersey, which are being recovered by JCP&L through a non-bypassable societal benefits charge. FE or its subsidiaries could be found
potentially responsible for additional amounts or additional sites, but the loss or range of losses cannot be determined or reasonably estimated at this time.
OTHER LEGAL PROCEEDINGS
United States v. Larry Householder, et al.
On July 21, 2020, a complaint and supporting affidavit containing federal criminal allegations were unsealed against the now former Ohio House Speaker Larry
Householder and other individuals and entities allegedly affiliated with Mr. Householder. In March 2023, a jury found Mr. Householder and his co-defendant,
Matthew Borges, guilty and in June 2023, the two were sentenced to prison for 20 and five years, respectively. Messrs. Householder and Borges have appealed
their sentences; the Sixth Circuit recently rejected their appeal upholding their convictions. Also, on July 21, 2020, and in connection with the U.S. Attorney’s
Office’s investigation, FirstEnergy received subpoenas for records from the U.S. Attorney’s Office for the Southern District of Ohio. FirstEnergy was not aware of
the criminal allegations, affidavit or subpoenas before July 21, 2020. On January 17, 2025, the U.S. Attorney’s Office announced that a federal grand jury
charged two former FirstEnergy senior officers with one count of participating in a Racketeer Influenced and Corrupt Organizations Act conspiracy. The
allegations in the indictment are largely based on the conduct described in the DPA.
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves this matter as to FE. Under the
DPA, FE agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The DPA required that
FirstEnergy, among other obligations: (i) continue to cooperate with the U.S. Attorney’s Office in all matters relating to the conduct described in the DPA and
other conduct under investigation by the U.S. government; (ii) pay a criminal monetary penalty totaling $230 million within sixty days, consisting of (x) $115
million paid by FE to the U.S. Treasury and (y) $115 million paid by FE to the ODSA to fund certain assistance programs, as determined by the ODSA, for the
benefit of low-income Ohio electric utility customers; (iii) publish a list of all payments made in 2021 to either 501(c)(4) entities or to entities known by FirstEnergy
to be operating for the benefit of a public official, either directly or indirectly, and update the same on a quarterly basis during the term of the DPA; (iv) issue a
public statement, as dictated in the DPA, regarding FE’s use of 501(c)(4) entities; and (v) continue to implement and review its compliance and ethics program,
internal controls, policies and procedures designed, implemented and enforced to prevent and detect violations of U.S. laws throughout its operations, and to
take certain related remedial measures. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will FirstEnergy
seek any tax deduction related to such payment. The entire amount of the monetary penalty was recognized as an expense in the second quarter of 2021 and
paid in the third quarter of 2021. As of July 22, 2024, FirstEnergy had successfully completed the obligations required within the three-year term of the DPA.
Under the DPA, FirstEnergy has an obligation to continue: (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by
FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S.
Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the conclusion of any related
investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office, including the aforementioned federal indictment against two former
FirstEnergy senior officers. Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s
Office will dismiss the criminal information. On February 26, 2025, the U.S. Attorney’s Office filed a status report confirming these commitments.
Legal Proceedings Relating to U.S. v. Larry Householder, et al.
Certain FE stockholders and FirstEnergy customers also filed several lawsuits against FirstEnergy and certain current and former directors, officers and other
employees, and the complaints in each of these suits is related to allegations in the complaint and supporting affidavit relating to HB 6 and the now former Ohio
House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. The plaintiffs in each of the below cases seek,
among other things, to recover an unspecified amount of damages (unless otherwise noted).
• In re FirstEnergy Corp. Securities Litigation (S.D. Ohio); on July 28, 2020, and August 21, 2020, purported stockholders of FE filed putative class action
lawsuits alleging violations of the federal securities laws. Those actions have been
159

-- 173 of 203 --

consolidated and a lead plaintiff, the Los Angeles County Employees Retirement Association, has been appointed by the court. A consolidated
complaint was filed on February 26, 2021. The consolidated complaint alleges, on behalf of a proposed class of persons who purchased FE securities
between February 21, 2017 and July 21, 2020, that FE and certain current or former FE officers violated Sections 10(b) and 20(a) of the Exchange Act
by issuing alleged misrepresentations or omissions concerning FE’s business and results of operations. The consolidated complaint also alleges that
FE, certain current or former FE officers and directors, and a group of underwriters violated Sections 11, 12(a)(2) and 15 of the Securities Act as a result
of alleged misrepresentations or omissions in connection with offerings of senior notes by FE in February and June 2020. On March 30, 2023, the court
granted plaintiffs’ motion for class certification. On April 14, 2023, FE filed a petition in the Sixth Circuit seeking to appeal that order. On August 13,
2025, the Sixth Circuit vacated the S.D. Ohio’s order granting class certification. On November 6, 2025, the S.D. Ohio held oral argument to further
consider class certification in light of the Sixth Circuit’s decision. FE believes that it is probable that it will incur a loss in connection with the resolution of
this lawsuit. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• MFS Series Trust I, et al. v. FirstEnergy Corp., et al. and Brighthouse Funds II – MFS Value Portfolio, et al. v. FirstEnergy Corp., et al. (S.D. Ohio); on
December 17, 2021 and February 21, 2022, purported stockholders of FE filed complaints against FE, certain current and former officers, and certain
then-current and former officers of Energy Harbor Corp. The complaints allege that the defendants violated Sections 10(b) and 20(a) of the Exchange
Act by issuing alleged misrepresentations or omissions regarding FE’s business and its results of operations, and seek the same relief as the In re
FirstEnergy Corp. Securities Litigation described above. FE believes that it is probable that it will incur losses in connection with the resolution of these
lawsuits. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
The outcome of any of these lawsuits is uncertain and could have a material adverse effect on FE’s or its subsidiaries’ reputation, business, financial condition,
results of operations, liquidity, and cash flows.
Other Legal Matters
There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to the Registrants’ normal business operations pending
against them or their subsidiaries. The loss or range of loss in these matters is not expected to be material to the Registrants. The other potentially material
items not otherwise discussed above are described under Note 13., “Regulatory Matters” of the Combined Notes to Financial Statements of the Registrants.
The Registrants accrue legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount
of such costs. In cases where the Registrants determine that it is not probable, but reasonably possible that they have a material obligation, they disclose such
obligations and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that the Registrants have legal liability or are
otherwise made subject to liability based on any of the matters referenced above, it could have a material adverse effect on the Registrants’ financial condition,
results of operations, and cash flows.
15. SEGMENT INFORMATION
The disclosures in this note apply to both Registrants, unless indicated otherwise.
FirstEnergy
FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution,
Integrated and Stand-Alone Transmission. The external reportable segments are consistent with the internal financial reports used by FirstEnergy's Chairman,
President and Chief Executive Officer, its CODM, to regularly assess the performance of each segment. FirstEnergy’s CODM uses earnings attributable to FE
from continuing operations to assess performance, including considering actual versus budget variances to make operating decisions and allocate resources to
the segments.
FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, distributes electricity through FirstEnergy’s electric operating companies
in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and
purchases power for its default service or standard service offer requirements. The segment’s results reflect the costs of securing and delivering electric
generation to customers, including the deferral and amortization of certain costs.
FirstEnergy's Integrated segment includes the distribution and transmission operations of JCP&L, MP and PE, as well as MP’s regulated generation operations.
The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and Maryland across its distribution footprint;
provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,610 MWs of regulated generation
capacity located primarily in West Virginia and Virginia, which includes three solar generation sites, representing 30 MWs of generation capacity. The segment’s
results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs. Additionally, on
October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC proposing, among other things, the addition of 70 MWs of solar generation by
2028, and 1,200 MWs of natural gas combined
160

-- 174 of 203 --

cycle generation by 2031, which are expected to require an estimated capital investment of approximately $2.5 billion, as detailed in the filing. See Note 13.,
"Regulatory Matters," of the Combined Notes to Financial Statements of the Registrants for additional details.
FirstEnergy's Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, includes transmission infrastructure owned and
operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates,
pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based
on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy’s transmission
facilities.
FirstEnergy's Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies,
including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or
businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. On July 16, 2025, FEV sold
its entire 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations, at
book value to WMB Marketing Ventures, LLC and Pinesdale LLC for $47.5 million. Reconciling adjustments for the elimination of inter-segment transactions are
shown separately in the following table of Segment Financial Information. Also included in Corporate/Other for segment reporting is 67 MWs of generation
capacity, representing AE Supply’s OVEC capacity entitlement. As of December 31, 2025, Corporate/Other had approximately $6.8 billion of external FE holding
company debt.
161

-- 175 of 203 --

Financial information for FirstEnergy’s business segments and reconciliations to consolidated amounts is presented below:
(In millions)
Distribution 	Integrated Stand-Alone
Transmission Total Reportable
Segments 	Corporate/Other Reconciling
Adjustments FirstEnergy
Consolidated	For the Years Ended
December 31, 2025
External revenues 	$ 	7,508 $ 	5,678 $ 	1,886 $ 	15,072 $ 	18 $ 	— $ 	15,090
Internal revenues 	39 	5 	19 	63 	— 	(63) 	—
Total revenues 	$ 	7,547 $ 	5,683 $ 	1,905 $ 	15,135 $ 	18 $ 	(63) $ 	15,090
Other operating expenses 	2,479 	1,416 	328 	4,223 	(90) 	(11) 	4,122
Depreciation 	655 	562 	369 	1,586 	78 	— 	1,664
Amortization (deferral) of regulatory
assets, net 	(103) 	(12) 	6 	(109) 	— 	— 	(109)
Ohio settlement charges 	275 	— 	— 	275 	— 	— 	275
Equity method investment earnings,
net 	— 	— 	— 	— 	— 	— 	—
Interest expense 	399 	284 	322 	1,005 	338 	(126) 	1,217
Income taxes (benefits) 	74 	190 	99 	363 	(75) 	— 	288
Other expense (income) items 	3,680 	2,655 	424 	6,759 	3 	126 	6,888
Earnings (losses) attributable to FE
from continuing operations 	363 	588 	357 	1,308 	(288) 	— 	1,020
Cash Flows from Investing
Activities
Capital investments 	$ 	1,344 $ 	1,842 $ 	1,601 $ 	4,787 $ 	(82) $ 	— $ 	4,705
December 31, 2024
External revenues 	$ 	6,824 $ 	4,871 $ 	1,768 $ 	13,463 $ 	9 $ 	— $ 	13,472
Internal revenues 	39 	5 	19 	63 	— 	(63) 	—
Total revenues 	$ 	6,863 $ 	4,876 $ 	1,787 $ 	13,526 $ 	9 $ 	(63) $ 	13,472
Other operating expenses 	2,378 	1,254 	347 	3,979 	75 	(10) 	4,044
Depreciation 	648 	521 	336 	1,505 	76 	— 	1,581
Amortization (deferral) of regulatory
assets, net 	(171) 	(66) 	6 	(231) 	— 	— 	(231)
Equity method investment earnings,
net 	— 	— 	— 	— 	58 	— 	58
Interest expense 	432 	262 	275 	969 	360 	(185) 	1,144
Income taxes (benefits) 	135 	153 	173 	461 	(84) 	— 	377
Other expense (income) items 	2,817 	2,217 	356 	5,390 	62 	185 	5,637
Earnings (losses) attributable to FE
from continuing operations 	624 	535 	294 	1,453 	(475) 	— 	978
Cash Flows from Investing
Activities
Capital investments 	$ 	1,130 $ 	1,542 $ 	1,266 $ 	3,938 $ 	92 $ 	— $ 	4,030
December 31, 2023
External revenues 	$ 	6,813 $ 	4,315 $ 	1,731 $ 	12,859 $ 	11 $ 	— $ 	12,870
Internal revenues 	41 	5 	17 	63 	— 	(63) 	—
Total revenues 	$ 	6,854 $ 	4,320 $ 	1,748 $ 	12,922 $ 	11 $ 	(63) $ 	12,870
Other operating expenses 	2,129 	1,156 	338 	3,623 	(34) 	(10) 	3,579
Depreciation 	620 	462 	304 	1,386 	75 	— 	1,461
Amortization (deferral) of regulatory
assets, net 	(259) 	(10) 	8 	(261) 	— 	— 	(261)
Equity method investment earnings,
net 	— 	— 	— 	— 	175 	— 	175
Interest expense 	390 	257 	245 	892 	340 	(108) 	1,124
Income taxes (benefits) 	147 	37 	146 	330 	(63) 	— 	267
Other expense (income) items 	3,240 	2,118 	308 	5,666 	(22) 	108 	5,752
Earnings (losses) attributable to FE
from continuing operations 	587 	300 	399 	1,286 	(163) 	— 	1,123
Cash Flows from Investing
Activities
Capital investments 	$ 	936 $ 	1,212 $ 	1,093 $ 	3,241 $ 	115 $ 	— $ 	3,356
(1)
(1)
(1)
(1)
(2)
(1)
(1)
(1)
(1)
(2)
(1)
(1)
(1)
(1)
(2)
162

-- 176 of 203 --

Distribution 	Integrated Stand-Alone
Transmission Total Reportable
Segments 	Corporate/Other Reconciling
Adjustments FirstEnergy
Consolidated	(In millions)
As of December 31, 2025
Total Assets 	$ 	20,653 $ 	20,352 $ 	14,903 $ 	55,908 $ 	1,793 $ 	(1,797) $ 	55,904
Total Goodwill 	$ 	3,222 $ 	1,953 $ 	443 $ 	5,618 $ 	— $ 	— $ 	5,618
As of December 31, 2024
Total Assets 	$ 	19,949 $ 	18,637 $ 	13,528 $ 	52,114 $ 	1,975 $ 	(2,045) $ 	52,044
Total Goodwill 	$ 	3,222 $ 	1,953 $ 	443 $ 	5,618 $ 	— $ 	— $ 	5,618
FirstEnergy considers this line to be a significant expense.
Consists of Fuel, Purchased power, General taxes, Ohio settlement charges, Impairment of assets, Debt redemption costs, Miscellaneous income, net, Capitalized financing
costs, Pension and OPEB mark-to-market adjustments, and Income attributable to noncontrolling interest.
JCP&L
JCP&L is principally involved in the transmission and distribution of electricity through its reportable segments: Distribution and Transmission. The external
reportable segments are consistent with the internal financial reports used by JCP&L's President, its CODM, to regularly assess the performance of each
segment. JCP&L’s CODM uses net income to assess performance, including considering actual versus budget variances to make operating decisions and
allocate resources to the segments.
JCP&L’s Distribution segment distributes electricity to approximately 1.2 million customers in New Jersey across its distribution footprint and procures electric
supply to serve its BGS customers through a statewide auction process approved by the NJBPU. The segment’s results reflect the costs of securing and
delivering electric generation to customers, including the deferral and amortization of certain costs.
JCP&L’s Transmission segment includes transmission infrastructure owned and operated by JCP&L that is used to transmit electricity. The segment’s revenues
are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and
projected costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses
related to the delivery of electricity on JCP&L’s transmission facilities.
Financial information for JCP&L’s reportable segments and reconciliations are presented below:
(In millions)
For the Years Ended 	Distribution 	Transmission
Total Reportable
Segments
Reconciling
Adjustments 	JCP&L
December 31, 2025
External revenues 	$ 	2,379 $ 	259 $ 	2,638 $ 	— $ 	2,638
Internal revenues 	175 	— 	175 	(175) 	—
Total revenues 	$ 	2,554 $ 	259 $ 	2,813 $ 	(175) $ 	2,638
Other operating expenses 	791 	64 	855 	(175) 	680
Depreciation 	209 	54 	263 	— 	263
Deferral of regulatory assets, net 	(134) 	— 	(134) 	— 	(134)
Interest expense - non-affiliates 	98 	34 	132 	— 	132
Interest expense - affiliates 	6 	— 	6 	— 	6
Income taxes 	71 	36 	107 	— 	107
Other expense (income) items 	1,309 	(31) 	1,278 	— 	1,278
Net Income 	204 	102 	306 	— 	306
Cash Flows from Investing Activities:
Capital investments 	$ 	454 $ 	651 $ 	1,105 $ 	— 	1,105
(1)
(2)
(1)
(1)
(1)
(1)
(2)
163

-- 177 of 203 --

(In millions)
For the Years Ended 	Distribution 	Transmission Total Reportable
Segments Reconciling
Adjustments 	JCP&L
December 31, 2024
External revenues 	$ 	2,073 $ 	242 $ 	2,315 $ 	— $ 	2,315
Internal revenues 	152 	— 	152 	(152) 	—
Total revenues 	$ 	2,225 $ 	242 $ 	2,467 $ 	(152) $ 	2,315
Other operating expenses 	745 	61 	806 	(152) 	654
Depreciation 	203 	46 	249 	— 	249
Deferral of regulatory assets, net 	(124) 	— 	(124) 	— 	(124)
Interest expense - non-affiliates 	75 	22 	97 	— 	97
Interest expense - affiliates 	20 	— 	20 	— 	20
Income taxes 	52 	35 	87 	— 	87
Other expense (income) items 	1,100 	(10) 	1,090 	— 	1,090
Net Income 	154 	88 	242 	— 	242
Cash Flows from Investing Activities:
Capital investments 	$ 	360 $ 	519 $ 	879 $ 	— 	879
(In millions)
For the Years Ended 	Distribution 	Transmission Total Reportable
Segments Reconciling
Adjustments 	JCP&L
December 31, 2023
External revenues 	$ 	1,823 $ 	204 $ 	2,027 $ 	— $ 	2,027
Internal revenues 	111 	— 	111 	(111) 	—
Total revenues 	$ 	1,934 $ 	204 $ 	2,138 $ 	(111) $ 	2,027
Other operating expenses 	601 	65 	666 	(111) 	555
Depreciation 	190 	41 	231 	— 	231
Deferral of regulatory assets, net 	(67) 	— 	(67) 	— 	(67)
Interest expense - non-affiliates 	86 	24 	110 	— 	110
Interest expense - affiliates 	14 	— 	14 	— 	14
Income taxes 	11 	22 	33 	— 	33
Other expense (income) items 	1,036 	(10) 	1,026 	— 	1,026
Net Income 	63 	62 	125 	— 	125
Cash Flows from Investing Activities:
Capital investments 	$ 	232 $ 	401 $ 	633 $ 	— 	633
As of December 31, 2025
Total assets 	$ 	7,941 $ 	3,168 $ 	11,109 $ 	— $ 	11,109
Total goodwill 	$ 	1,213 $ 	598 $ 	1,811 $ 	— $ 	1,811
As of December 31, 2024
Total assets 	$ 	7,198 $ 	2,715 $ 	9,913 $ 	— $ 	9,913
Total goodwill 	$ 	1,213 $ 	598 $ 	1,811 $ 	— $ 	1,811
JCP&L considers this line to be a significant expense.
Consists of Purchased power, General taxes, Miscellaneous income, net, Capitalized financing costs, and Pension and OPEB mark-to-market adjustments.
Previously issued 2024 and 2023 JCP&L amounts have been revised due to the correction of immaterial errors as discussed in Note 1., "Organization and Basis of Presentation,"
of the Combined Notes to Financial Statements of the Registrants.
(3)
(1)
(1)
(1)
(1)
(2)
(3)
(1)
(1)
(1)
(1)
(2)
(3)
(1)
(2)
(3)
164

-- 178 of 203 --

16. TRANSACTIONS WITH AFFILIATES
The disclosures in this note apply to JCP&L only.
The affiliated company transactions for JCP&L for the years ended December 31, 2025, 2024 and 2023 are as follows:
For the Years Ended December 31,
2025 	2024 	2023
(In millions)
Revenues 	$ 	1 $ 	1 $ 	1
Expenses:
FESC support services 	180 	166 	174
Other affiliate support services 	13 	26 	9
Interest income 	1 	— 	—
Interest expense 	6 	20 	14
Includes amounts capitalized of $77 million, $74 million and $61 million for 2025, 2024 and 2023, respectively.
FE does not bill directly or allocate any of its costs to any subsidiary company. FESC provides corporate support and other services, including executive
administration, accounting and finance, risk management, human resources, corporate affairs, communications, information technology, legal services and other
similar services at cost, in accordance with its cost allocation manual, to affiliated FirstEnergy companies under FESC agreements. Allocated costs are for
services that are provided on behalf of more than one company, or costs that cannot be precisely identified and are allocated using formulas developed by
FESC. Intercompany transactions are generally settled under commercial terms within thirty days. JCP&L can also receive charges from and charge affiliates
other than FESC at cost.
JCP&L recognizes an allocation of the net periodic pension and OPEB costs/credits from its affiliates, primarily FESC.
Under the FirstEnergy regulated money pool, JCP&L has the ability to borrow from its regulated affiliates and FE to meet its short-term working capital
requirements. Affiliated company notes receivables and payables related to the money pool are reported as Notes receivable from affiliated companies or Short-
term borrowings - affiliated companies on the Balance Sheets. Affiliate accounts receivable and accounts payable balances relate to intercompany transactions
that have not yet settled through the FirstEnergy money pool.
JCP&L is party to an intercompany income tax allocation agreement with FirstEnergy that provides for the allocation of consolidated tax liabilities.
17. REVISION OF PREVIOUSLY ISSUED QUARTERLY FINANCIAL STATEMENTS (Unaudited)
The disclosures in this note apply to JCP&L.
As discussed in Note 1.,"Organization and Basis of Presentation," during the fourth quarter of 2025, JCP&L identified an error in the recording of certain
expenses for smart meter cost of removal associated with the deployment of its AMI program resulting in an understatement of expense on the Statements of
Income and Comprehensive Income and Regulatory assets/liabilities on the Balance Sheets since 2023. JCP&L evaluated the error, and the specific impact on
each affected prior period was not material, however, as a result of the cumulative impact, JCP&L determined to revise previously issued financial statements to
correct the error and in doing so also corrected certain other previously identified immaterial errors, including the misclassification of certain retired assets.
JCP&L will revise previously reported financial information for this error in its future filings, as applicable. A summary of the corrections to the impacted financial
statement line items to JCP&L’s previously issued unaudited quarterly Statements of Income and Comprehensive Income, Balance Sheets, Statements of Cash
Flows and the Statements of Common Stockholder’s Equity are as follows:
(1)
(1)
(1)
165

-- 179 of 203 --

JCP&L Interim Statements of Income and Comprehensive Income
For the Three Months Ended March 31, 2025 	For the Three Months Ended March 31, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
Deferral of regulatory assets, net 	$ 	(22) $ 	2 $ 	(20) $ 	(39) $ 	2 $ 	(37)
Other operating expenses 	145 	— 	145 	187 	(1) 	186
Total operating expenses 	492 	2 	494 	462 	1 	463
Operating income 	74 	(2) 	72 	4 	(1) 	3
Income before income taxes 	65 	(2) 	63 	(12) 	(1) 	(13)
Income taxes 	16 	— 	16 	(4) 	— 	(4)
Net income (loss) 	49 	(2) 	47 	(8) 	(1) 	(9)
Comprehensive income 	49 	(2) 	47 	(8) 	(1) 	(9)
For the Three Months Ended June 30, 2025 	For the Six Months Ended June 30, 2025
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
Deferral of regulatory assets, net 	$ 	(14) $ 	2 $ 	(12) $ 	(36) $ 	4 $ 	(32)
Other operating expenses 	133 	4 	137 	278 	4 	282
Total operating expenses 	493 	6 	499 	985 	8 	993
Operating income 	99 	(6) 	93 	173 	(8) 	165
Income before income taxes 	88 	(6) 	82 	153 	(8) 	145
Income taxes 	22 	(2) 	20 	38 	(2) 	36
Net income 	66 	(4) 	62 	115 	(6) 	109
Comprehensive income 	66 	(4) 	62 	115 	(6) 	109
For the Three Months Ended June 30, 2024 	For the Six Months Ended June 30, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
Deferral of regulatory assets, net 	$ 	(34) $ 	4 $ 	(30) $ 	(73) $ 	5 $ 	(68)
Other operating expenses 	158 	(1) 	157 	345 	(2) 	343
Total operating expenses 	458 	3 	461 	920 	3 	923
Operating income 	99 	(3) 	96 	103 	(3) 	100
Income before income taxes 	78 	(3) 	75 	66 	(3) 	63
Income taxes 	21 	(1) 	20 	17 	(1) 	16
Net income 	57 	(2) 	55 	49 	(2) 	47
Comprehensive income 	57 	(2) 	55 	49 	(2) 	47
For the Three Months Ended
September 30, 2025
For the Nine Months Ended
September 30, 2025
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
Amortization (deferral) of regulatory
assets, net 	$ 	11 $ 	2 $ 	13 $ 	(25) $ 	6 $ 	(19)
Other operating expenses 	158 	— 	158 	436 	4 	440
Total operating expenses 	692 	2 	694 	1,677 	10 	1,687
Operating income 	172 	(2) 	170 	345 	(10) 	335
Income before income taxes 	160 	(2) 	158 	313 	(10) 	303
Income taxes 	41 	(1) 	40 	79 	(3) 	76
Net income 	119 	(1) 	118 	234 	(7) 	227
Comprehensive income 	119 	(1) 	118 	234 	(7) 	227
166

-- 180 of 203 --

For the Three Months Ended
September 30, 2024 For the Nine Months Ended
September 30, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
Amortization (deferral) of regulatory
assets, net 	$ 	(25) $ 	2 $ 	(23) $ 	(98) $ 	8 $ 	(90)
Other operating expenses 	179 	1 	180 	524 	(1) 	523
Total operating expenses 	605 	3 	608 	1,525 	7 	1,532
Operating income 	160 	(3) 	157 	263 	(7) 	256
Income before income taxes 	150 	(3) 	147 	216 	(7) 	209
Income taxes 	41 	(1) 	40 	58 	(2) 	56
Net income 	109 	(2) 	107 	158 	(5) 	153
Comprehensive income 	109 	(2) 	107 	158 	(5) 	153
JCP&L Interim Balance Sheets
As of March 31, 2025 	As of March 31, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
PP&E - In service 	$ 	8,807 $ 	34 $ 	8,841 $ 	8,340 $ 	12 $ 	8,352
Accumulated provision for depreciation 	2,415 	30 	2,445 	2,371 	8 	2,379
PP&E Excluding CWIP 	6,392 	4 	6,396 	5,969 	4 	5,973
Total PP&E 	7,053 	4 	7,057 	6,469 	4 	6,473
Regulatory assets/(liabilities) 	292 	(20) 	272 	9 	(10) 	(1)
Total investments and other noncurrent
assets 	2,683 	(20) 	2,663 	2,353 	(9) 	2,344
Total assets 	10,073 	(16) 	10,057 	9,212 	(5) 	9,207
Accumulated deferred income taxes, net 	1,223 	(4) 	1,219 	986 	(1) 	985
Total noncurrent liabilities 	3,981 	(4) 	3,977 	3,692 	— 	3,692
Total liabilities 	5,075 	(4) 	5,071 	4,946 	— 	4,946
Retained earnings 	1,341 	(12) 	1,329 	1,216 	(5) 	1,211
Total common stockholder's equity 	4,998 	(12) 	4,986 	4,266 	(5) 	4,261
As of June 30, 2025 	As of June 30, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
PP&E - In service 	$ 	8,940 $ 	30 $ 	8,970 $ 	8,458 $ 	16 $ 	8,474
Accumulated provision for depreciation 	2,434 	30 	2,464 	2,388 	12 	2,400
PP&E Excluding CWIP 	6,506 	— 	6,506 	6,070 	4 	6,074
Total PP&E 	7,232 	— 	7,232 	6,581 	4 	6,585
Regulatory assets/(liabilities) 	354 	(23) 	331 	95 	(13) 	82
Total investments and other noncurrent
assets 	2,763 	(23) 	2,740 	2,444 	(13) 	2,431
Total assets 	10,450 	(23) 	10,427 	9,498 	(9) 	9,489
Accumulated deferred income taxes, net 	1,257 	(7) 	1,250 	1,037 	(2) 	1,035
Total noncurrent liabilities 	4,017 	(7) 	4,010 	3,742 	(2) 	3,740
Total liabilities 	5,385 	(7) 	5,378 	4,574 	(2) 	4,572
Retained earnings 	1,407 	(16) 	1,391 	1,273 	(7) 	1,266
Total common stockholder's equity 	5,065 	(16) 	5,049 	4,924 	(7) 	4,917
167

-- 181 of 203 --

As of September 30, 2025 	As of September 30, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
PP&E - In service 	$ 	9,002 $ 	55 $ 	9,057 $ 	8,521 $ 	15 $ 	8,536
Accumulated provision for depreciation 	2,380 	55 	2,435 	2,402 	12 	2,414
PP&E Excluding CWIP 	6,622 	— 	6,622 	6,119 	3 	6,122
Total PP&E 	7,460 	— 	7,460 	6,707 	3 	6,710
Regulatory assets/(liabilities) 	410 	(24) 	386 	153 	(15) 	138
Total investments and other noncurrent
assets 	2,843 	(24) 	2,819 	2,515 	(15) 	2,500
Total assets 	11,490 	(24) 	11,466 	9,611 	(12) 	9,599
Accumulated deferred income taxes, net 	1,292 	(7) 	1,285 	1,109 	(3) 	1,106
Total noncurrent liabilities 	5,380 	(7) 	5,373 	3,831 	(3) 	3,828
Total liabilities 	6,394 	(7) 	6,387 	4,576 	(3) 	4,573
Retained earnings 	1,436 	(17) 	1,419 	1,382 	(9) 	1,373
Total common stockholder's equity 	5,096 	(17) 	5,079 	5,035 	(9) 	5,026
JCP&L Interim Statements of Common Stockholder's of Equity
As of September 30, 2024
(In millions) 	As Reported 	Adjustment 	As Revised
Balance, January 1, 2024 	$ 	4,132 $ 	(4) $ 	4,128
Net loss 	(8) 	(1) 	(9)
Balance, March 31, 2024 	4,266 	(5) 	4,261
Net income 	57 	(2) 	55
Balance, June 30, 2024 	4,924 	(7) 	4,917
Net income 	109 	(2) 	107
Balance, September 30, 2024 	5,035 	(9) 	5,026
As of September 30, 2025
(In millions) 	As Reported 	Adjustment 	As Revised
Balance, January 1, 2025 	$ 	4,977 $ 	(10) $ 	4,967
Net income 	49 	(2) 	47
Balance, March 31, 2025 	4,998 	(12) 	4,986
Net income 	66 	(4) 	62
Balance, June 30, 2025 	5,065 	(16) 	5,049
Net income 	119 	(1) 	118
Balance, September 30, 2025 	5,096 	(17) 	5,079
168

-- 182 of 203 --

JCP&L Interim Statements of Cash Flows
For the Three Months Ended
March 31, 2025 For the Three Months Ended
March 31, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	$ 	49 $ 	(2) $ 	47 $ 	(8) $ 	(1) $ 	(9)
Adjustments to reconcile net income to net cash from
operating activities-
Depreciation, amortization and impairments 	43 	2 	45 	71 	2 	73
Deferred income taxes and investment tax credits, net 	23 	— 	23 	27 	— 	27
Net cash provided from operating activities 	205 	— 	205 	83 	1 	84
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital investments 	$ 	(206) $ 	— $ 	(206) $ 	(194) $ 	(1) $ 	(195)
Net cash used for investing activities 	(226) 	— 	(226) 	(215) 	(1) 	(216)
Net change in cash, cash equivalents, and restricted
cash 	$ 	— $ 	— $ 	— $ 	— $ 	— $ 	—
For the Six Months Ended
June 30, 2025
For the Six Months Ended
June 30, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	$ 	115 $ 	(6) $ 	109 $ 	49 $ 	(2) $ 	47
Adjustments to reconcile net income to net cash from
operating activities-
Depreciation, amortization and impairments 	94 	4 	98 	108 	5 	113
Deferred income taxes and investment tax credits, net 	53 	(2) 	51 	77 	(1) 	76
Net cash provided from operating activities 	326 	(4) 	322 	164 	2 	166
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital investments 	$ 	(477) $ 	4 $ 	(473) $ 	(387) $ 	(2) $ 	(389)
Net cash used for investing activities 	(527) 	4 	(523) 	(421) 	(2) 	(423)
Net change in cash, cash equivalents, and restricted
cash 	$ 	— $ 	— $ 	— $ 	— $ 	— $ 	—
169

-- 183 of 203 --

For the Nine Months Ended
September 30, 2025
For the Nine Months Ended
September 30, 2024
(In millions) 	As Reported 	Adjustment 	As Revised 	As Reported 	Adjustment 	As Revised
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	$ 	234 $ 	(7) $ 	227 $ 	158 $ 	(5) $ 	153
Adjustments to reconcile net income to net cash from
operating activities-
Depreciation, amortization and impairments 	171 	6 	177 	144 	8 	152
Deferred income taxes and investment tax credits,
net 	85 	(3) 	82 	148 	(2) 	146
Net cash provided from operating activities 	381 	(4) 	377 	427 	1 	428
CASH FLOWS FROM FINANCING ACTIVITIES:
Capital investments 	$ 	(782) $ 	4 $ 	(778) $ 	(599) $ 	(1) $ 	(600)
Net cash used for investing activities 	(877) 	4 	(873) 	(648) 	(1) 	(649)
Net change in cash, cash equivalents, and restricted
cash 	$ 	708 $ 	— $ 	708 $ 	— $ 	— $ 	—
170

-- 184 of 203 --

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE
None.
ITEM 9A. CONTROLS AND PROCEDURES
Evaluation of Disclosure Controls and Procedures
The Registrants, through the oversight of FirstEnergy's Disclosure Committee, have established disclosure controls and procedures to ensure that information is
accumulated and communicated to management, including their respective principle executive officer and principle financial officer, as appropriate to allow timely
decisions regarding required disclosure, and ensure that information required to be disclosed in the reports the Registrants file or submit under the Exchange
Act, are recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms.
The management of the Registrants, with the participation of their respective principal executive officer and principal financial officer, have established and
evaluated the effectiveness of their disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of
the period covered by this report. Based on that evaluation, the principal executive officers and principal financial officers of the Registrants have concluded that
the disclosure controls and procedures in place were effective as of the end of the period covered by this report.
Management’s Report on Internal Control over Financial Reporting
Management of FirstEnergy is responsible for establishing and maintaining adequate internal control over financial reporting as defined in Rules 13a-15(f) and
15d-15(f) under the Exchange Act. FirstEnergy’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the
reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of
effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance
with the policies or procedures may deteriorate.
Management conducted an evaluation of the effectiveness of FirstEnergy's internal control over financial reporting as of December 31, 2025, based on the
framework in "Internal Control-Integrated Framework" (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).
Based on that evaluation, management concluded that FirstEnergy's internal control over financial reporting was effective as of December 31, 2025.
The effectiveness of FirstEnergy's internal control over financial reporting as of December 31, 2025 has been audited by PricewaterhouseCoopers LLP, an
independent registered public accounting firm, as stated in their report, which is included herein.
This Annual Report does not include a report of JCP&L’s assessment regarding internal control over financial reporting due to the transition period established by
the rules of the SEC for newly public companies.
Changes in Internal Control over Financial Reporting
During the quarter ended December 31, 2025, there were no changes in internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f)
under the Exchange Act) that have materially affected, or are reasonably likely to materially affect, the Registrants’ internal control over financial reporting.
ITEM 9B. OTHER INFORMATION
Trading Arrangements
During the quarter ended December 31, 2025, no director or officer (as defined in Rule 16a-1(f) promulgated under the Exchange Act) of FE adopted or
terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” (as each term is defined in Item 408 of Regulation S-K).
ITEM 9C. DISCLOSURE REGARDING FOREIGN JURISDICTIONS THAT PREVENT INSPECTIONS
Not applicable.
PART III
ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE
171

-- 185 of 203 --

The information required by Item 10. with respect to FE is incorporated herein by reference to FirstEnergy's 2026 Statement to be filed with the SEC pursuant to
Regulation 14A under the Exchange Act. Information relating to JCP&L is omitted pursuant to General Instruction I(2) to Form 10-K.
FirstEnergy has adopted an insider trading compliance policy regarding securities transactions (the "Insider Trading Practice") that applies to its directors,
officers, employees, consultants, and contractors and our subsidiaries, as well as the company itself. FirstEnergy believes that the Insider Trading Compliance
Practice is reasonably designed to promote compliance with insider trading laws, rules and regulations with respect to the purchase, sale and/or other
dispositions of FirstEnergy’s securities, as well as the applicable rules and regulations of the New York Stock Exchange. A copy of the Insider Trading Practice is
filed as Exhibit 19 to this Annual Report on Form 10-K.
ITEM 11. EXECUTIVE COMPENSATION
The information required by Item 11. with respect to FE is incorporated herein by reference to FirstEnergy’s 2026 Proxy Statement to be filed with the SEC
pursuant to Regulation 14A under the Exchange Act. Information relating to JCP&L is omitted pursuant to General Instruction I(2) to Form 10-K.
ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
The Item 403 of Regulation S-K information required by Item 12. with respect to FE is incorporated herein by reference to FirstEnergy's 2026 Proxy Statement to
be filed with the SEC pursuant to Regulation 14A under the Exchange Act. Information relating to JCP&L is omitted pursuant to General Instruction I(2) to Form
10-K.
The following table contains information as of December 31, 2025, regarding compensation plans for which shares of FE common stock may be issued.
Plan category
Number of Securities to be
Issued Upon Exercise of
Outstanding Options,
Warrants and Rights
Weighted-Average Exercise
Price of Outstanding
Options, Warrants and
Rights
Number of Securities
Remaining Available for
Future Issuance Under
Equity Compensation Plans
(Excluding Securities
Reflected in First Column)
Equity compensation plans approved by
security holders 	4,763,785 (1)
$ 	— (2)
7,444,718 (3)
Equity compensation plans not approved
by security holders 	— 	$ 	— 	—
Total 	4,763,785 	$ 	— 	7,444,718
Includes 251,305 shares related to the DCPD that are expected to be paid in stock, 2,461,710 shares subject to outstanding awards of performance-based RSU awards and time-
based RSU awards granted under the ICP 2020 (assuming, with respect to performance-based RSU awards, payouts at a target level of performance for the 2023-2025, 2024-
2026, and 2025-2027 cycles, including dividend reinvestments thereon) as well as 2,050,770 additional shares to be paid if maximum performance metrics are achieved for the
three outstanding cycles with respect to the performance-based RSU awards.
There are no outstanding options, therefore, no consideration is required from participants for the exercise or vesting of any outstanding equity compensation awards.
Additional shares may become available due to cancellations, forfeitures, cash settlements or other similar circumstances with respect to outstanding awards.
All equity compensation plans have been approved by FE's shareholders.
ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE
The information required by Item 13. with respect to FE is incorporated herein by reference to FirstEnergy’s 2026 Proxy Statement to be filed with the SEC
pursuant to Regulation 14A under the Exchange Act. Information relating to JCP&L is omitted pursuant to General Instruction I(2) to Form 10-K.
(4)
(1)
(2)
(3)
(4)
172

-- 186 of 203 --

ITEM 14. PRINCIPAL ACCOUNTANT FEES AND SERVICES
FirstEnergy - The information called for by this Item 14. is incorporated herein by reference to FirstEnergy’s 2026 Proxy Statement to be filed with the SEC
pursuant to Regulation 14A under the Exchange Act under the caption “Matters Relating to the Independent Registered Public Accounting Firm".
JCP&L - As a wholly owned subsidiary of FE, JCP&L does not have a separate audit committee. The FE Audit Committee fulfilled the audit committee function
for JCP&L as it relates to the pre-approval of 2025 and 2024 audit and non-audit services provided by the independent registered public accounting firm. As
such, all audit and non-audit services provided by the independent auditor to JCP&L in 2025 and 2024 were pre-approved by the FE Audit Committee consistent
with its duly adopted pre-approval policies and procedures. A description of the FE Audit Committee pre-approval policies is contained in FirstEnergy's 2026
Proxy Statement which is incorporated herein by reference as described above.
Audit fees for professional services rendered by PricewaterhouseCoopers LLP were $1,212 thousand for December 31, 2025 and $1,834 thousand for
December 31, 2024, respectively. These fees are related to professional services rendered for the audit of JCP&L's annual financial statements, and for services
in connection with statutory and regulatory filings and engagements, including comfort letters for financings. The 2025 and 2024 audit fees also include
additional audit services to support the registration of JCP&L with the SEC, as well as additional professional and other services, the cost of which may
ultimately be allocated to JCP&L companies though not billed directly to them. There were no fees related to tax, audit related or other services.
PART IV
ITEM 15. EXHIBIT AND FINANCIAL STATEMENT SCHEDULES
(a) The following documents are filed as a part of this report on Form 10-K:
1. Financial Statements:
Report of Independent Registered Public Accounting Firm (PCAOB ID 238) for the Registrants is listed under Item 8., "Financial Statements and Supplementary
Data," herein.
The financial statements filed as a part of this report for the Registrants are listed under Item 8., "Financial Statements and Supplementary Data," herein.
2. Financial Statement Schedules:
Not applicable - Schedules not included are omitted because of the absence of conditions under which they are required or because the required information is
provided in the consolidated financial statements, including the notes thereto.
3. Exhibits
Exhibit
Number 	Description
FirstEnergy
3.1 	Amended and Restated Articles of Incorporation of FirstEnergy Corp. (incorporated by reference to FE’s Form 10-Q filed July 23, 2019, Exhibit 3-1, File
No. 333-21011).
3.2 	Third Amended and Restated Code of Regulations of FirstEnergy Corp., effective May 17, 2022 (incorporated by reference to FE’s Form 8-K on May 23,
2022, Exhibit 3.1, File No. 333-21011).
3.3 	Amendment to the Third Amended and Restated Code of Regulations (incorporated by reference to FE’s Form 10-Q filed August 1, 2023, Exhibit 3.1, File
No. 333-21011).
4.1 	Indenture, dated November 15, 2001, between FirstEnergy Corp. and The Bank of New York Mellon, as Trustee (incorporated by reference to FE’s Form
S-3 filed September 21, 2001, Exhibit 4(a), File No. 333-69856).
4.2 	Indenture, dated as of May 4, 2023, between FirstEnergy Corp. and The Bank of New York Mellon Trust Company, N.A., as trustee. (incorporated by
reference to FirstEnergy’s Form 8-K filed May 4, 2023, Exhibit 4.1, File No. 333-21011)
4.3 	Indenture Relating to 3.625% Convertible Senior Notes due 2029, dated as of June 12, 2025, between FirstEnergy Corp. and The Bank of New York
Mellon Trust Company, N.A., as trustee (incorporated by reference to FirstEnergy’s Form 8-K filed June 12, 2025, Exhibit 4.1, File No. 333-21011).
4.4 	Indenture Relating to 3.875% Convertible Senior Notes due 2031, dated as of June 12, 2025, between FirstEnergy Corp. and The Bank of New York
Mellon Trust Company, N.A., as trustee (incorporated by reference to FirstEnergy’s Form 8-K filed June 12, 2025, Exhibit 4.2, File No. 333-21011).
4.5 	Officer’s Certificate relating to FirstEnergy Corp.'s 2.85% Notes, Series A, due 2022, 3.90% Notes, Series B, due 2027 and 4.85% Notes, Series C, due
2047 (incorporated by reference to FE’s Form 8-K filed June 21, 2017, Exhibit 4.1, File No. 333-21011).
4.6 	Form of 3.90% Note, Series B, due 2027 (incorporated by reference to FE’s Form 8-K filed June 21, 2017, Exhibit 4.1, File No. 333-21011).
173

-- 187 of 203 --

Exhibit
Number 	Description
4.7 	Form of 4.85% Note, Series C, due 2047 (incorporated by reference to FE’s Form 8-K filed June 21, 2017, Exhibit 4.1, File No. 333-21011).
4.8 	Officer’s Certificate relating to FirstEnergy Corp.'s 2.050% Notes, Series A, due 2025, 2.650% Notes, Series B, due 2030 and 3.400% Notes, Series C,
due 2050 (incorporated by reference to FE’s Form 8-K filed February 20, 2020, Exhibit 4.1, File No. 333-21011).
4.9 	Form of 2.650% Note, Series B, due 2030 (incorporated by reference to FE’s Form 8-K filed February 20, 2020, Exhibit 4.3, File No. 333-21011).
4.10 	Form of 3.400% Note, Series C, due 2050 (incorporated by reference to FE’s Form 8-K filed February 20, 2020, Exhibit 4.4, File No. 333-21011).
4.11 	Officer’s Certificate relating to FirstEnergy Corp.'s 1.600% Notes, Series A, due 2026, 2.250% Notes, Series B, due 2030 (incorporated by reference to
FE’s Form 8-K filed June 8, 2020, Exhibit 4.1, File No. 333-21011).
4.12 	Form of 1.600% Note, Series A, due 2026 (incorporated by reference to FE’s Form 8-K filed June 8, 2020, Exhibit 4.2, File No. 333-21011).
4.13 	Form of 2.250% Note, Series B, due 2030 (incorporated by reference to FE’s Form 8-K filed June 8, 2020, Exhibit 4.3, File No. 333-21011).
4.14 	Description of Securities Registered under Section 12(b) of the Securities Exchange Act of 1934 (incorporated by reference to FE's Form 10-K filed
February 10, 2020, Exhibit 4-10, File No. 333-21011).
4.15 	Form of 4.00% Convertible Senior Notes due 2026 (included hereto in Exhibit 4.2)
4.16 Form of 3.625% Convertible Senior Notes due 2029 (included in Exhibit 4.1) (incorporated by reference to FirstEnergy’s Form 8-K filed June 12, 2025,
Exhibit 4.1, File No. 333-21011).
4.17 Form of 3.875% Convertible Senior Notes due 2031 (included in Exhibit 4.2) (incorporated by reference to FirstEnergy’s Form 8-K filed June 12, 2025,
Exhibit 4.2, File No. 333-21011).
10.1
Credit Agreement, dated as of October 18, 2021, by and among FirstEnergy Corp., FirstEnergy Transmission, LLC, the banks and other financial
institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 8-K filed October
18, 2021, Exhibit 10.1, File No. 333-21011).
10.2
Credit Agreement, dated as of October 18, 2021, by and among The Cleveland Electric Illuminating Company, Ohio Edison Company, The Toledo Edison
Company, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by
reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.2, File No. 333-21011).
10.3
Credit Agreement, dated as of October 18, 2021, by and among Metropolitan Edison Company, Pennsylvania Power Company, Pennsylvania Electric
Company, West Penn Power Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as
administrative agent (incorporated by reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.3, File No. 333-21011).
10.4
Credit Agreement, dated as of October 18, 2021, by and among American Transmission Systems, Incorporated, Mid-Atlantic Interstate Transmission,
LLC, and Trans-Allegheny Interstate Line Company, the banks and other financial institutions party thereto on the date hereof, as lenders, and PNC
Bank, National Association, as administrative agent (incorporated by reference to FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.5, File No.
333-21011).
10.5 Credit Agreement, dated as of October 18, 2021, by and among Monongahela Power Company, The Potomac Edison Company, the banks and other
financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd, as administrative agent (incorporated by reference to
FirstEnergy’s Form 8-K filed October 18, 2021, Exhibit 10.6, File No. 333-21011).
10.6 Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among FirstEnergy Corp., FirstEnergy
Transmission, LLC, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent.
(incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.1, File No. 333-21011)
10.7 Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among The Cleveland Electric Illuminating
Company, Ohio Edison Company, The Toledo Edison Company, the banks and other financial institutions party thereto, as lenders, and JPMorgan Chase
Bank, N.A., as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.2, File No. 333-21011)
10.8
Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among Metropolitan Edison Company,
Pennsylvania Power Company, Pennsylvania Electric Company, West Penn Power Company, the banks and other financial institutions party thereto on
the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed May 1, 2023,
Exhibit 10.3, File No. 333-21011)
10.9
Amendment No. 1 and Consent and Limited Waiver to Credit Agreement, dated as of April 27, 2023, by and among American Transmission Systems,
Incorporated, Mid-Atlantic Interstate Transmission, LLC, Trans-Allegheny Interstate Line Company, the banks and other financial institutions party thereto
on the date hereof, as lenders, and PNC Bank, National Association, as administrative agent. (incorporated by reference to FirstEnergy’s Form 8-K filed
May 1, 2023, Exhibit 10.4, File No. 333-21011)
10.10 Amendment No. 1 to Credit Agreement, dated as of April 27, 2023, by and among Monongahela Power Company, The Potomac Edison Company, the
banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd, as administrative agent. (incorporated by
reference to FirstEnergy’s Form 8-K filed May 1, 2023, Exhibit 10.6, File No. 333-21011)
10.11 Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among FirstEnergy Corp., the banks and
other financial institutions party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FE’s Form
10-Q filed October 26, 2023, Exhibit 10.1, File No. 333-21011).
174

-- 188 of 203 --

Exhibit
Number 	Description
10.12
Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among The Cleveland Electric
Illuminating Company, Ohio Edison Company, The Toledo Edison Company, the banks and other financial institutions party thereto, as lenders, and
JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.2, File No. 333-
21011).
10.13
Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among Metropolitan Edison Company,
Pennsylvania Power Company, Pennsylvania Electric Company, West Penn Power Company, the banks and other financial institutions party thereto on
the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October 26, 2023, Exhibit
10.3, File No. 333-21011).
10.14
Amendment No. 2 and Consent and Limited Waiver to Credit Agreement, dated as of October 20, 2023, by and among American Transmission Systems,
Incorporated, Mid-Atlantic Interstate Transmission, LLC, Trans-Allegheny Interstate Line Company, the banks and other financial institutions party thereto
on the date hereof, as lenders, and PNC Bank, National Association, as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October
26, 2023, Exhibit 10.4, File No. 333-21011).
10.15
Amendment No. 2 to Credit Agreement, dated as of October 20, 2023, by and among Monongahela Power Company, The Potomac Edison Company,
the banks and other financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd, as administrative agent. (incorporated by
reference to FE’s Form 10-Q filed October 26, 2023, Exhibit 10.6, File No. 333-21011).
10.16
Credit Agreement, dated as of October 20, 2023, by and among Keystone Appalachian Transmission Company, the banks and other financial institutions
party thereto on the date hereof, as lenders, and PNC Bank, National Association, as administrative agent. (incorporated by reference to FE’s Form 10-Q
filed October 26, 2023, Exhibit 10.7, File No. 333-21011).
10.17
Credit Agreement, dated as of October 20, 2023, by and among FirstEnergy Transmission, LLC, the banks and other financial institutions party thereto
on the date hereof, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent. (incorporated by reference to FE’s Form 10-Q filed October
26, 2023, Exhibit 10.8, File No. 333-21011).
10.18
Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among FE, as borrower, the banks and other financial institutions party thereto, as
lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.2,
File No. 333-21011).
10.19
Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among CEI, OE and TE, as borrowers, the banks and other financial institutions
party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29,
2024, Exhibit 10.3, File No. 333-21011).
10.20
Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among FE PA, as borrower, the banks and other financial institutions party thereto,
as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.4, File No.
333-21011).
10.21
Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among MP and PE, the banks and other financial institutions party thereto, as
lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.6, File No. 333-
21011).
10.22
Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, among ATSI, MAIT and TrAIL, as borrower, the banks and other financial
institutions party thereto, as lenders, and PNC Bank, National Association, as administrative agent (incorporated by reference to FE’s Form 10-Q filed
October 29, 2024, Exhibit 10.7, File No. 333-21011).
10.23
Amendment No. 1 to Credit Agreement and Consent, dated as of October 24, 2024, among FET, as borrower, the banks and other financial institutions
party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29,
2024, Exhibit 10.8, File No. 333-21011).
10.24
Amendment No. 1 to Credit Agreement, dated as of October 24, 2024, among KATCo, as borrower, the banks and other financial institutions party
thereto, as lenders, and PNC Bank, National Association, as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 29, 2024,
Exhibit 10.9, File No. 333-21011).
10.25
Amendment No. 4 to Credit Agreement, dated as of October 27, 2025, among FE, as borrower, the banks and other financial institutions party thereto, as
lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 28, 2025, Exhibit 10.5,
File No. 333-21011).
10.26
Amendment No. 4 to Credit Agreement, dated as of October 27, 2025, among CEI, OE and TE, as borrowers, the banks and other financial institutions
party thereto, as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 28,
2025, Exhibit 10.7, File No. 333-21011).
10.27
Amendment No. 4 to Credit Agreement, dated as of October 27, 2025, among FE PA, as borrower, the banks and other financial institutions party thereto,
as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 28, 2025, Exhibit 10.8, File No.
333-21011).
10.28
Amendment No. 4 to Credit Agreement, dated as of October 27, 2025, among MP and PE, as borrowers, the banks and other financial institutions party
thereto, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 28, 2025, Exhibit 10.9,
File No. 333-21011).
10.29
Amendment No. 4 to Credit Agreement, dated as of October 27, 2025, among ATSI, MAIT and TrAIL, as borrowers, the banks and other financial
institutions party thereto, as lenders, and PNC Bank, National Association, as administrative agent (incorporated by reference to FE’s Form 10-Q filed
October 28, 2025, Exhibit 10.12, File No. 333-21011).
10.30
Amendment No. 2 to Credit Agreement, dated as of October 27, 2025, among FET, as borrower, the banks and other financial institutions party thereto,
as lenders, and JPMorgan Chase Bank, N.A., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 28, 2025, Exhibit
10.11, File No. 333-21011).
10.31
Amendment No. 2 to Credit Agreement, dated as of October 27, 2025, among KATCo, as borrower, the banks and other financial institutions party
thereto, as lenders, and PNC Bank, National Association, as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 28, 2025,
Exhibit 10.10, File No. 333-21011).
10.32 	Consent Decree dated March 18, 2005 (incorporated by reference to FE’s Form 8-K filed March 18, 2005, Exhibit 10-1, File No. 333-21011).
175

-- 189 of 203 --

Exhibit
Number 	Description
10.33 	Deferred Prosecution Agreement, dated as of July 21, 2021 (incorporated by reference to FE’s Form 8-K filed July 22, 2021, Exhibit 10.1, File No. 333-
21011).
10.34 	Agreement between the Office of the Ohio Attorney General, the Office of the Summit County Prosecutor and FirstEnergy Corp. dated August 12, 2024
(incorporated by reference to FE’s Form 8-K filed August 13, 2024, Exhibit 99.2, File No. 333-21011).
10.35 	Settlement Order, dated as of September 12, 2024 (incorporated by reference to FE’s Form 8-K filed September 12, 2024, Exhibit 99.2, File No. 333-
21011).
10.36
Purchase and Sale Agreement, dated as of November 6, 2021, among the FirstEnergy Corp. and North American Transmission Company II LLC, and
Brookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core Infrastructure Partners (NUS) L.P. and Brookfield Super-Core Infrastructure
Partners (ER) SCSp, as guarantors. (incorporated by reference to FE’s Form 10-K filed February 16, 2022, Exhibit 10-10, File No. 333-21011).
10.37
Purchase and Sale Agreement, dated as of February 2, 2023, among the FirstEnergy Corp., and FirstEnergy Transmission, LLC, and North American
Transmission Company II L.P., and North American Transmission FINCO L.P., Brookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core
Infrastructure Partners (NUS) L.P. and Brookfield Super-Core Infrastructure Partners (ER) SCSp, as guarantors. (incorporated by reference to FE’s Form
10-Q filed April 27, 2023, Exhibit 10.1, File No. 333-21011).
10.38 	Fourth Amended and Restated Limited Liability Company Agreement of FirstEnergy Transmission, LLC, dated March 25, 2024 (incorporated by
reference to FE’s Form 8-K filed March 25, 2024, Exhibit 10.1, File No. 333-21011).
10.39 Common Stock Purchase Agreement, dated as of November 6, 2021, among the FirstEnergy Corp. and BIP Securities II-B L.P. (incorporated by
reference to FE’s Form S-3 filed on December 13, 2021, Exhibit 4(d), File No. 333-21011).
10.40 	(B) FirstEnergy Corp. Deferred Compensation Plan for Outside Directors, amended and restated January 1, 2005, further amended December 31, 2010
(incorporated by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-6, File No. 333-21011).
10.41 	(B) Amendment No. 1 to Deferred Compensation Plan for Outside Directors, effective as of January 1, 2012 (incorporated by reference to FE's Form 10-Q
filed May 3, 2011, Exhibit 10.7, File No. 333-21011).
10.42 	(B) Amendment No. 2 to FirstEnergy Corp. Deferred Compensation Plan for Outside Directors, effective January 21, 2014, (incorporated by reference to
FE's Form 10-K filed February 27, 2014, Exhibit 10-8, File No. 333-21011).
10.43 	(B) Amendment No. 3 to FirstEnergy Corp. Deferred Compensation Plan for Outside Directors, dated January 14, 2019 and effective as of April 1, 2018
(incorporated by reference to FE's Form 10-K filed February 19, 2019, Exhibit 10-7, File No.333-21011).
10.44 	(B) FirstEnergy Corp. Supplemental Executive Retirement Plan, amended and restated January 1, 2005, further amended December 31, 2010 (incorporated
by reference to FE's Form 10-K filed February 27, 2014, Exhibit 10-9, File No. 333-21011).
10.45 	(B) Amendment No. 1 to FirstEnergy Corp. Supplemental Executive Retirement Plan, effective January 1, 2012 (incorporated by reference to FE's Form 10-
Q filed May 3, 2011, Exhibit 10.8, File No. 333-21011).
10.46 	(B) Amendment No. 2 to FirstEnergy Corp. Supplemental Executive Retirement Plan, dated January 14, 2019 and effective as of April 1, 2018 (incorporated
by reference to FE's Form 10-K filed February 19, 2019, Exhibit 10-10, File No. 333-21011).
10.47 	(B) FirstEnergy Corp. Cash Balance Restoration Plan, effective January 1, 2014 (incorporated by reference to FE's Form 10-K filed February 27, 2014,
Exhibit 10-11, File No. 333-21011).
10.48 	(B) Retirement Plan for Outside Directors of GPU, Inc. as amended and restated as of August 8, 2000 (incorporated by reference to GPU, Inc. Form 10-K
filed March 21, 2001, Exhibit 10-N, File No. 001-06047).
10.49 	(B) Allegheny Energy, Inc. Non-Employee Director Stock Plan (incorporated by reference to FE's Form 8-K filed February 25, 2011, Exhibit 10.4, File No.
333-21011).
10.50 	(B) Allegheny Energy, Inc. Amended and Restated Revised Plan for Deferral of Compensation of Directors (incorporated by reference to FE's Form 10-K
filed February 27, 2014, Exhibit 10-29, File No. 333-21011).
10.51 	(B) Amendment No. 1 to Allegheny Energy, Inc. Amended and Restated Revised Plan for Deferral of Compensation of Directors (incorporated by reference
to FE's Form 10-K filed February 27, 2014, Exhibit 10-30, File No. 333-21011).
10.52 	(B) Form of Director and Officer Indemnification Agreement (incorporated by reference to FE’s Form 8-K filed May 16, 2018, Exhibit 10.1, File No. 333-
21011).
10.53 	(B) Guarantee, dated as of September 16, 2013 by FirstEnergy Corp. in favor of participants under the FirstEnergy Corp. Executive Deferred Compensation
Plan (incorporated by reference to FE’s Form 10-Q filed November 5, 2013, Exhibit 10.2, File No. 333-21011).
10.54 	(B) FirstEnergy Corp. Amended and Restated Executive Deferred Compensation Plan, dated July 20, 2015, and effective as of November 1, 2015
(incorporated by reference to FE's Form 8-K filed July 24, 2015, Exhibit 10.1, File No. 333-21011).
10.55 	(B) Amendment No. 1 to FirstEnergy Corp. Amended and Restated Executive Deferred Compensation Plan, dated January 14, 2019 and effective as of April
1, 2018 (incorporated by reference to FE's Form 10-K filed February 19, 2019, Exhibit 10-23, File No. 333-21011).
10.56 	(B) FirstEnergy Corp. 2017 Change in Control Severance Plan, dated as of September 15, 2015, and effective as of January 1, 2017 (incorporated by
reference to FE's Form 8-K filed September 18, 2015, Exhibit 10.1, File No. 333-21011).
10.57 	(B) Waiver of Participation in the FirstEnergy Corp. Change in Control Severance Plan, entered into by Charles E. Jones dated as of September 15, 2015
(incorporated by reference to FE's Form 8-K filed September 18, 2015, Exhibit 10.2, File No. 333-21011).
10.58 	(B) FirstEnergy Corp. 2015 Incentive Compensation Plan (incorporated by reference to FE's Definitive Proxy Statement filed April 1, 2015, Appendix A, File
No. 333-21011).
10.59 	(B) Amendment No. 1 to the FirstEnergy Corp. 2015 Incentive Compensation Plan, effective February 21, 2017 (incorporated by reference to FE's Form 10-
K filed February 21, 2017, Exhibit 10-51, File No. 333-21011).
176

-- 190 of 203 --

Exhibit
Number 	Description
10.60 	(B) Executive Severance Benefits Plan, as amended and restated as of December 20, 2016 (incorporated by reference to FE’s Form 8-K filed December 21,
2016, Exhibit 10.1, File No. 333-21011).
10.61 	(B) FirstEnergy Corp. Executive Severance Benefits Plan, as amended and restated as of January 1, 2026 (incorporated by reference to FE’s Form 8-K filed
September 29, 2025, Exhibit 10.1, File No. 333-21011).
10.62 	(B) FirstEnergy Corp. Executive Change in Control Severance Plan, as amended and restated as of January 1, 2026 (incorporated by reference to FE’s
Form 8-K filed September 29, 2025, Exhibit 10.2, File No. 333-21011).
10.63 	(B) Amendment No. 2 to FirstEnergy Corp. Amended and Restated Executive Deferred Compensation Plan, dated September 18, 2019 and effective as of
November 1, 2015 (incorporated by reference to FE's Form 10-Q filed November 4, 2019, Exhibit 10.3, File No.333-21011).
10.64 	(B) Guarantee, dated as of February 21, 2017, by FirstEnergy Corp. in favor of participants under the FirstEnergy Corp. Cash Balance Pension Restoration
Plan (incorporated by reference to FE’s Form 10-Q filed July 27, 2017, Exhibit 10.1, File No. 333-21011).
10.65 	(B) FirstEnergy Solutions Corp. Voluntary Enhanced Retirement Option, effective as of January 2, 2019 (incorporated by reference to FE’s Form 8-K filed
November 21, 2018, Exhibit 10.1, File No. 333-21011).
10.66 	(B) Form of 2020 Restricted Stock Award Agreement (incorporated by reference to FE's Form 10-Q filed April 23, 2020, Exhibit 10.3, File No.333-21011).
10.67 	(B) FirstEnergy Corp. 2020 Incentive Compensation Plan (incorporated by reference to FE's Form 8-K filed May 20, 2020, Exhibit 10.1, File No.333-21011).
10.68 	(B) Form of Restricted Stock Award Agreement (incorporated by reference to FE’s Form 10-Q filed July 22, 2021, Exhibit 10.3, File No. 333-21011).
10.69 	(B) Restricted Stock Award Agreement to John W. Somerhalder II (incorporated by reference to FE’s Form 10-Q filed July 22, 2021, Exhibit 10.5, File No.
333-21011).
10.70 	(B) Form of 2023-2025 Cash-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed
August 1, 2023, Exhibit 10.7, File No. 333-21011).
10.71 	(B) Form of 2023-2025 Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed
August 1, 2023, Exhibit 10.8, File No. 333-21011).
10.72 	(B) Form of 2024-2026 Cash-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April
25, 2024, Exhibit 10.2, File No. 333-21011).
10.73 	(B) Form of 2024-2026 Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April
25, 2024, Exhibit 10.3, File No. 333-21011).
10.74 	(B) Form of 2025-2027 Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April 30, 2025,
Exhibit 10.1, File No. 333-21011).
10.75 	(B) Form of 2025-2027 Time Based Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 10-Q filed April 30, 2025, Exhibit 10.2,
File No. 333-21011).
10.76 	(B) Form of 2020 Incentive Compensation Plan 2026 Time-Based Restricted Stock Unit Award Agreement (incorporated by reference to FE’s Form 8-K filed
September 29, 2025, Exhibit 10.3, File No. 333-21011).
10.77 	(B) Form of 2020 Incentive Compensation Plan 2026-2028 Performance-Adjusted Restricted Stock Unit Award Agreement (incorporated by reference to FE’s
Form 8-K filed September 29, 2025, Exhibit 10.4, File No. 333-21011).
10.78 	(B) Offer letter, dated March 26, 2023, between FirstEnergy Corp. and Brian X. Tierney (incorporated by reference to FE’s Form 10-Q filed April 27, 2023,
Exhibit 10.2, File No. 333-21011).
10.79 	(B) Severance Agreement and Release of Claims of Christine L. Walker (incorporated by reference to FE’s Form 10-Q filed October 29, 2024, Exhibit 10.1,
File No. 333-21011).
19 	Insider Trading Practice (incorporated by reference to FE’s Form 10-K filed February 27, 2025, Exhibit 19, File No. 333-21011).
21 	(A) List of Subsidiaries of the Registrant at December 31, 2025.
23 	(A) Consent of Independent Registered Public Accounting Firm.
31.1 	(A) Certification of chief executive officer, pursuant to Rule 13a-14(a).
31.2 	(A) Certification of chief financial officer, pursuant to Rule 13a-14(a).
32 	(A) Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. §1350.
97 	Policy relating to recovery of erroneously awarded compensation (incorporated by reference to FE’s Form 10-K filed February 13, 2024, Exhibit 97, File
No. 333-21011).
101
The following materials from the Annual Report on Form 10-K of FirstEnergy Corp. for the period ended December 31, 2025, formatted in iXBRL (Inline
Extensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income,
(iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Stockholders' Equity, (v) Consolidated Statements of Cash Flows, (vi) related notes to
these financial statements and (vii) document and entity information.
104 	Cover Page Interactive Data File (the cover page XBRL tags are embedded within the Inline XBRL document contained in Exhibit 101)
JCP&L
3.1 	Amended and Restated Certificate of Incorporation of Jersey Central Power & Light Company (incorporated by reference to JCP&L’s Form S-4 filed April
1, 2025, Exhibit 3.1, File No. 001-03141).
177

-- 191 of 203 --

Exhibit
Number 	Description
3.2 	Amended and Restated Bylaws of Jersey Central Power & Light Company (incorporated by reference to JCP&L’s Form S-4 filed April 1, 2025, Exhibit
3.2, File No. 001-03141).
4.1
Indenture, dated as of July 1,1999, by and between Jersey Central Power & Light Company and The Bank of New York Mellon Trust Company as
eventual successor to U.S. Trust Company of New York, which was the original trustee (incorporated by reference to JCP&L’s Form S-4 filed April 1,
2025, Exhibit 4.1, File No. 333-286328).
4.2
First Supplemental Indenture, dated as of October 31, 2007, by and among Jersey Central Power & Light Company and The Bank of New York, as
resigning trustee, and The Bank of New York Trust Company, N.A., as successor trustee (incorporated by reference to JCP&L’s Form S-4 filed April 1,
2025, Exhibit 4.5, File No. 333-286328).
4.3
Registration Rights Agreement, dated as of December 5, 2024, by and among Jersey Central Power & Light Company and Barclays Capital Inc., MUFG
Securities Americas Inc., PNC Capital Markets LLC and Wells Fargo Securities, LLC, as representatives of the initial purchasers of the Senior Notes due
2035 (unregistered) (incorporated by reference to JCP&L’s Form S-4 filed April 1, 2025, Exhibit 4.2, File No. 333-286328).
4.4 	Company Order, dated as of December 5, 2024 (incorporated by reference to JCP&L’s Form S-4 filed April 1, 2025, Exhibit 4.3, File No. 333-286328).
4.5 	Form of 4.150% Senior Note due 2029 (incorporated by reference to JCP&L’s Form 8-K filed September 5, 2025, Exhibit 4.3, File No. 001-03141).
4.6 	Form of 4.400% Senior Note due 2031 (incorporated by reference to JCP&L’s Form 8-K filed September 5, 2025, Exhibit 4.4, File No. 001-03141).
4.7 	Form of 5.100% Senior Note due 2035 (incorporated by reference to JCP&L’s Form 8-K filed September 5, 2025, Exhibit 4.5, File No. 001-03141).
10.1
Credit Agreement, dated as of October 18, 2021, by and among Jersey Central Power & Light Company, the banks and other financial institutions party
thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to JCP&L’s Form S-4 filed April 1,
2025, Exhibit 10.1, File No. 333-286328).
10.2
Amendment No. 1 to Credit Agreement, dated as of April 27, 2023, by and among Jersey Central Power & Light Company, the banks and other financial
institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to JCP&L’s Form S-4
filed April 1, 2025, Exhibit 10.2, File No. 333-286328).
10.3
Amendment No. 2 to Credit Agreement, dated as of October 20, 2023, by and among Jersey Central Power & Light Company, the banks and other
financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to JCP&L’s
Form S-4 filed April 1, 2025, Exhibit 10.3, File No. 333-286328).
10.4
Amendment No. 3 to Credit Agreement, dated as of October 24, 2024, by and among Jersey Central Power & Light Company, the banks and other
financial institutions party thereto on the date hereof, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to JCP&L’s
Form S-4 filed April 1, 2025, Exhibit 10.4, File No. 333-286328).
10.5
Amendment No. 4 to Credit Agreement, dated as of October 27, 2025, among JCP&L, as borrower, the banks and other financial institutions party
thereto, as lenders, and Mizuho Bank, Ltd., as administrative agent (incorporated by reference to FE’s Form 10-Q filed October 28, 2025, Exhibit 10.6,
File No. 333-21011).
10.6
Service Agreement, dated as of January 1, 2024, by and between FirstEnergy Transmission, LLC, each of the associate companies listed on the
signature pages thereto, and FirstEnergy Service Company (incorporated by reference to JCP&L’s Form S-4 filed April 1, 2025, Exhibit 10.5, File No.
333-286328).
10.7 	Second Revised, Amended and Restated Mutual Assistance Agreement, dated as of January 1, 2024, by and among certain subsidiaries of FirstEnergy
Corp. listed on the signature pages thereto (incorporated by reference to JCP&L’s Form S-4 filed April 1, 2025, Exhibit 10.6, File No. 333-286328).
10.8
Registration Rights Agreement, dated as of September 4, 2025, by and among Jersey Central Power & Light Company, J.P. Morgan Securities LLC, PNC
Capital Markets LLC, Scotia Capital (USA) Inc. and Wells Fargo Securities, LLC, as representatives of the initial purchasers of the 4.150% Senior Notes
due 2029 (incorporated by reference to JCP&L’s Form 8-K filed September 5, 2025, Exhibit 10.1, File No. 001-03141).
10.9
Registration Rights Agreement, dated as of September 4, 2025, by and among Jersey Central Power & Light Company, J.P. Morgan Securities LLC, PNC
Capital Markets LLC, Scotia Capital (USA) Inc. and Wells Fargo Securities, LLC, as representatives of the initial purchasers of the 4.400% Senior Notes
due 2031 (incorporated by reference to JCP&L’s Form 8-K filed September 5, 2025, Exhibit 10.2, File No. 001-03141).
31.1 	(A) Certification of principal executive officer, as adopted pursuant to Rule 13a-14(a)
31.2 	(A) Certification of principal financial officer, as adopted pursuant to Rule 13a-14(a)
32 	(A) Certification of principal executive officer and principal financial officer, pursuant to 18 U.S.C. Section 1350
101
The following materials from the Annual Report on Form 10-K of Jersey Central Power & Light Company for the period ended December 31, 2025,
formatted in iXBRL (Inline Extensible Business Reporting Language): (i) Statements of Income and Comprehensive Income, (ii) Balance Sheets, (iii)
Statements of Common Stockholder's Equity, (iv) Statements of Cash Flows, (v) related notes to these financial statements and (vi) document and entity
information.
104 	Cover Page Interactive Data File (the cover page XBRL tags are embedded within the Inline XBRL document contained in Exhibit 101)
(A) 	Provided herein in electronic format as an exhibit.
178

-- 192 of 203 --

Exhibit
Number 	Description
(B) 	Management contract or compensatory plan contract or arrangement filed pursuant to Item 601 of Regulation S-K.
Pursuant to paragraph (b)(4)(iii)(A) of Item 601 of Regulation S-K, FirstEnergy and JCP&L have not filed as an exhibit to this Form 10-K any instrument with
respect to long-term debt if the respective total amount of securities authorized thereunder does not exceed 10% of their respective total assets, but hereby
agree to furnish to the SEC on request any such documents.
ITEM 16. FORM 10-K SUMMARY
None.
179

-- 193 of 203 --

SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf
by the undersigned, thereunto duly authorized.
FIRSTENERGY CORP.
BY: /s/ Brian X. Tierney
Brian X. Tierney
Chairman, President and Chief Executive Officer
(Principal Executive Officer)
Date: February 18, 2026
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and
in the capacities and on the date indicated:
FIRSTENERGY CORP.
/s/ Brian X. Tierney
Brian X. Tierney
Chairman, President and Chief Executive Officer
(Principal Executive Officer)
/s/ K. Jon Taylor 	/s/ Jason J. Lisowski
K. Jon Taylor 	Jason J. Lisowski
Senior Vice President, Chief Financial Officer and Strategy 	Vice President, Controller and Chief Accounting Officer
(Principal Financial Officer) 	(Principal Accounting Officer)
/s/ Lisa Winston Hicks
Lisa Winston Hicks
Lead Independent Director
/s/ Heidi L. Boyd 	/s/ James F. O'Neil III
Heidi L. Boyd 	James F. O'Neil III
Director 	Director
/s/ Jana T. Croom 	/s/ John W. Somerhalder II
Jana T. Croom 	John W. Somerhalder II
Director 	Director
/s/ Steven J. Demetriou 	/s/ Leslie M. Turner
Steven J. Demetriou 	Leslie M. Turner
Director 	Director
/s/ Paul Kaleta 	/s/ Melvin D. Williams
Paul Kaleta 	Melvin D. Williams
Director 	Director
Date: February 18, 2026
180

-- 194 of 203 --

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf
by the undersigned, thereunto duly authorized.
JERSEY CENTRAL POWER & LIGHT COMPANY
BY: /s/ W. Douglas Mokoid
W. Douglas Mokoid
President and Director
(Principal Executive Officer)
Date: February 18, 2026
Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and
in the capacities and on the date indicated:
JERSEY CENTRAL POWER & LIGHT COMPANY
/s/ W. Douglas Mokoid
W. Douglas Mokoid
President and Director
(Principal Executive Officer)
/s/ Teresa Reed 	/s/ Lisa A. Schultz
Teresa Reed 	Lisa A. Schultz
Vice President, State Finance and Regulatory 	Controller
(Principal Financial Officer) 	(Principal Accounting Officer)
/s/ Linda Bowden
Linda Bowden
Director
/s/ John E. Harmon
John E. Harmon
Director
/s/ A. Wade Smith
A. Wade Smith
Director
/s/ Toby L. Thomas
Toby L. Thomas
Director
Date: February 18, 2026
181

-- 195 of 203 --

EXHIBIT 21
FIRSTENERGY CORP.
LIST OF SUBSIDIARIES OF THE REGISTRANT
As of
December 31, 2025
FirstEnergy Service Company - Incorporated in Ohio
FirstEnergy Pennsylvania Holding Company - Incorporated in Pennsylvania
FirstEnergy Transmission, LLC - Organized in Delaware
FirstEnergy Ventures Corp. - Incorporated in Ohio
Jersey Central Power & Light Company - Incorporated in New Jersey
Monongahela Power Company - Incorporated in Ohio
Ohio Edison Company - Incorporated in Ohio
The Cleveland Electric Illuminating Company - Incorporated in Ohio
The Potomac Edison Company - Incorporated in Maryland
The Toledo Edison Company - Incorporated in Ohio

-- 196 of 203 --

EXHIBIT 23
CONSENT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
We hereby consent to the incorporation by reference in the Registration Statements on Form S-8 (Nos. 333-238539, 333-226788, 333-222225, 333-204436,
333-202184, 333-172464, 333-165640, 333-146170, 333-101472, 333-89356, 333-72768, 333-56094, 333-81183, and 333-266813) of FirstEnergy Corp. of our
report dated February 18, 2026 relating to the financial statements and the effectiveness of internal control over financial reporting, which appears in this Form
10-K.
/s/ PricewaterhouseCoopers LLP
Cleveland, Ohio
February 18, 2026

-- 197 of 203 --

EXHIBIT 31.1
Certification
I, Brian X. Tierney, certify that:
1. I have reviewed this report on Form 10-K of FirstEnergy Corp.;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a. designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b. designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
c. evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d. disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a. all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b. any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: February 18, 2026
/s/ Brian X. Tierney
Brian X. Tierney
Chairman, President and Chief Executive Officer
(Principal Executive Officer)

-- 198 of 203 --

EXHIBIT 31.1
Certification
I, W. Douglas Mokoid, certify that:
1. I have reviewed this report on Form 10-K of Jersey Central Power & Light Company;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a. designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b. evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
c. disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a. all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b. any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: February 18, 2026
/s/ W. Douglas Mokoid
W. Douglas Mokoid
President and Director
(Principal Executive Officer)

-- 199 of 203 --

EXHIBIT 31.2
Certification
I, K. Jon Taylor, certify that:
1. I have reviewed this report on Form 10-K of FirstEnergy Corp.;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a. designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b. designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
c. evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d. disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a. all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b. any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: February 18, 2026
/s/ K. Jon Taylor
K. Jon Taylor
Senior Vice President, Chief Financial Officer and Strategy
(Principal Financial Officer)

-- 200 of 203 --

EXHIBIT 31.2
Certification
I, Teresa Reed, certify that:
1. I have reviewed this report on Form 10-K of Jersey Central Power & Light Company;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a. designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b. evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
c. disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a. all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b. any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: February 18, 2026
/s/ Teresa Reed
Teresa Reed
Vice President, State Finance and Regulatory
(Principal Financial Officer)

-- 201 of 203 --

EXHIBIT 32
CERTIFICATION PURSUANT TO
18 U.S.C. SECTION 1350
In connection with the Report of FirstEnergy Corp. (“Company”) on Form 10-K for the period ended December 31, 2025, as filed with the Securities and
Exchange Commission on the date hereof (the “Report”), each undersigned officer of the Company does hereby certify, pursuant to 18 U.S.C. § 1350, as
adopted pursuant to § 906 of the Sarbanes-Oxley Act of 2002, that to the best of his knowledge:
(1) The Report fully complies with the requirements of section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
(2) The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.
/s/ Brian X. Tierney
Brian X. Tierney
Chairman, President and Chief Executive Officer
(Principal Executive Officer)
/s/ K. Jon Taylor
K. Jon Taylor
Senior Vice President, Chief Financial Officer and Strategy
(Principal Financial Officer)
Date: February 18, 2026

-- 202 of 203 --

EXHIBIT 32
CERTIFICATION PURSUANT TO
18 U.S.C. SECTION 1350
In connection with the Report of Jersey Central Power & Light Company (“Company”) on Form 10-K for the period ended December 31, 2025, as filed with the
Securities and Exchange Commission on the date hereof (the “Report”), each undersigned officer of the Company does hereby certify, pursuant to 18 U.S.C. §
1350, as adopted pursuant to § 906 of the Sarbanes-Oxley Act of 2002, that to the best of his knowledge:
(1) The Report fully complies with the requirements of section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
(2) The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.
/s/ W. Douglas Mokoid
W. Douglas Mokoid
President and Director
(Principal Executive Officer)
/s/ Teresa Reed
Teresa Reed
Vice President, State Finance and Regulatory
(Principal Financial Officer)
Date: February 18, 2026

-- 203 of 203 --