QUARTERLY REPORT

Q1 2024 — Quarterly report (Form 10-Q)

Q1 2024PDF · 106 pages966 KB
UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One)
☑ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended March 31, 2024
OR
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ___________________ to ___________________
Commission 	Registrant; State of Incorporation; 	I.R.S. Employer
File Number 	Address; and Telephone Number 	Identification No.
333-21011 	FIRSTENERGY CORP. 	34-1843785
(An Ohio Corporation)
76 South Main Street
Akron OH 44308
Telephone (800) 736-3402
SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:
Title of Each Class 	Trading Symbol 	Name of Each Exchange on Which Registered
Common Stock, $0.10 par value 	FE 	New York Stock Exchange
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during
the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for
the past 90 days.
Yes ☑ 	No 	☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of
Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Yes ☑ 	No 	☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an
emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in
Rule 12b-2 of the Exchange Act.
Large Accelerated Filer 	☑
Accelerated Filer 	☐
Non-accelerated Filer 	☐
Smaller Reporting Company 	☐
Emerging Growth Company 	☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or
revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes ☐ 	No ☑
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:
OUTSTANDING
CLASS 	As of March 31, 2024
Common Stock, $0.10 par value 	575,516,472
FirstEnergy Website and Other Social Media Sites and Applications
FirstEnergy’s Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, amendments to those reports, and all other
documents filed with or furnished to the SEC pursuant to Section 13(a) of the Exchange Act are made available free of charge on or through the “Investors” page
of FirstEnergy’s website at www.firstenergycorp.com. These documents are also available to the public from commercial document retrieval services and the
website maintained by the SEC at www.sec.gov.
These SEC filings are posted on FirstEnergy’s website as soon as reasonably practicable after they are electronically filed with or furnished to the SEC.

-- 1 of 106 --

Additionally, FirstEnergy routinely posts additional important information, including press releases, investor presentations, investor factbooks, regulatory activity
updates, and notices of upcoming events under the “Investors” section of FirstEnergy’s website and recognizes FirstEnergy’s website as a channel of distribution
to reach public investors and as a means of disclosing (including initially or exclusively) material non-public information for complying with disclosure obligations
under Regulation FD. Investors may be notified of postings to the website by signing up for email alerts and Rich Site Summary feeds on the “Investors” page of
FirstEnergy’s website. FirstEnergy also uses X (the social networking site formerly known as Twitter®), LinkedIn®, YouTube® and Facebook® as additional
channels of distribution to reach public investors and as a supplemental means of disclosing material non-public information for complying with its disclosure
obligations under Regulation FD. Information contained on FirstEnergy’s website, X (the social networking site formerly known as Twitter®) handle, LinkedIn®
profile, YouTube® channel or Facebook® page, and any corresponding applications of those sites, shall not be deemed incorporated into, or to be part of, this
report.

-- 2 of 106 --

Forward-Looking Statements: This Form 10-Q includes forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995
based on information currently available to management. Such statements are subject to certain risks and uncertainties and readers are cautioned not to place
undue reliance on these forward-looking statements. These statements include declarations regarding management's intents, beliefs and current expectations.
These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” "forecast," "target," "will," "intend," “believe,” "project,"
“estimate," "plan" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that
may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by
such forward-looking statements, which may include the following (see Glossary of Terms for definitions of capitalized terms):
• The potential liabilities, increased costs and unanticipated developments resulting from government investigations and agreements, including those
associated with compliance with or failure to comply with the DPA.
• The risks and uncertainties associated with government investigations and audits regarding HB 6 and related matters, including potential adverse
impacts on federal or state regulatory matters, including, but not limited to, matters relating to rates.
• The risks and uncertainties associated with litigation, arbitration, mediation and similar proceedings, particularly regarding HB 6 related matters,
including risks associated with obtaining dismissal of the derivative shareholder lawsuits.
• Changes in national and regional economic conditions, including recession, volatile interest rates, inflationary pressure, supply chain disruptions, higher
fuel costs, and workforce impacts, affecting us and/or our customers and those vendors with which we do business.
• Variations in weather, such as mild seasonal weather variations and severe weather conditions (including events caused, or exacerbated, by climate
change, such as wildfires, hurricanes, flooding, droughts, high wind events and extreme heat events) and other natural disasters affecting future
operating results and associated regulatory actions or outcomes in response to such conditions.
• Legislative and regulatory developments, including, but not limited to, matters related to rates, compliance and enforcement activity, cyber security, and
climate change.
• The risks associated with physical attacks, such as acts of war, terrorism, sabotage or other acts of violence, and cyber-attacks and other disruptions to
our, or our vendors’, information technology system, which may compromise our operations, and data security breaches of sensitive data, intellectual
property and proprietary or personally identifiable information.
• The ability to meet our goals relating to EESG opportunities, improvements, and efficiencies, including our GHG reduction goals.
• The ability to accomplish or realize anticipated benefits through establishing a culture of continuous improvement and our other strategic and financial
goals, including, but not limited to, overcoming current uncertainties and challenges associated with the ongoing government investigations, executing
Energize365, our transmission and distribution investment plan, executing on our rate filing strategy, controlling costs, improving credit metrics,
maintaining investment grade ratings, and growing earnings.
• Changing market conditions affecting the measurement of certain liabilities and the value of assets held in our pension trusts may negatively impact our
forecasted growth rate, results of operations, and may also cause us to make contributions to our pension sooner or in amounts that are larger than
currently anticipated.
• Mitigating exposure for remedial activities associated with retired and formerly owned electric generation assets.
• Changes to environmental laws and regulations, including, but not limited to, those related to climate change.
• Changes in customers’ demand for power, including, but not limited to, economic conditions, the impact of climate change, emerging technology,
particularly with respect to electrification, energy storage and distributed sources of generation.
• The ability to access the public securities and other capital and credit markets in accordance with our financial plans, the cost of such capital and
overall condition of the capital and credit markets affecting us, including the increasing number of financial institutions evaluating the impact of climate
change on their investment decisions.
• Future actions taken by credit rating agencies that could negatively affect either our access to or terms of financing or our financial condition and
liquidity.
• Changes in assumptions regarding factors such as economic conditions within our territories, the reliability of our transmission and distribution system,
or the availability of capital or other resources supporting identified transmission and distribution investment opportunities.
• The potential of non-compliance with debt covenants in our credit facilities.
• The ability to comply with applicable reliability standards and energy efficiency and peak demand reduction mandates.
• Human capital management challenges, including among other things, attracting and retaining appropriately trained and qualified employees and labor
disruptions by our unionized workforce.
• Changes to significant accounting policies.
• Any changes in tax laws or regulations, including, but not limited to, the IRA of 2022, or adverse tax audit results or rulings.
• The risks and other factors discussed from time to time in our SEC filings.
Dividends declared from time to time on our common stock during any period may in the aggregate vary from prior periods due to circumstances considered by
the FE Board at the time of the actual declarations. A security rating is not a recommendation to buy or hold securities and is subject to revision or withdrawal at
any time by the assigning rating agency. Each rating should be evaluated independently of any other rating.

-- 3 of 106 --

Forward-looking and other statements in this Quarterly Report on Form 10-Q regarding our Climate Strategy, including our GHG emission reduction goals, are
not an indication that these statements are necessarily material to investors or required to be disclosed in our filings with the SEC. In addition, historical, current
and forward-looking statements regarding climate matters, including GHG emissions, may be based on standards for measuring progress that are still
developing, internal controls and processes that continue to evolve and assumptions that are subject to change in the future.

-- 4 of 106 --

TABLE OF CONTENTS
Page
Part I. Financial Information
Glossary of Terms 	ii
Item 1. Financial Statements
FirstEnergy Corp.
Consolidated Statements of Income 	1
Consolidated Statements of Comprehensive Income 	2
Consolidated Balance Sheets 	3
Consolidated Statements of Equity 	4
Consolidated Statements of Cash Flows 	5
Notes To Consolidated Financial Statements 	6
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations 	34
Item 3. Quantitative and Qualitative Disclosures About Market Risk 	68
Item 4. Controls and Procedures 	68
Part II. Other Information
Item 1. Legal Proceedings 	68
Item 1A. Risk Factors 	69
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds 	69
Item 3. Defaults Upon Senior Securities 	69
Item 4. Mine Safety Disclosures 	69
Item 5. Other Information 	69
Item 6. Exhibits 	70
i

-- 5 of 106 --

GLOSSARY OF TERMS
The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries:
AE Supply 	Allegheny Energy Supply Company, LLC, an unregulated generation subsidiary of FE
AGC 	Allegheny Generating Company, a generation subsidiary of MP
ATSI 	American Transmission Systems, Incorporated, a transmission subsidiary of FET
CEI 	The Cleveland Electric Illuminating Company, an Ohio electric utility subsidiary of FE
FE 	FirstEnergy Corp., a public utility holding company
FENOC 	Energy Harbor Nuclear Corp. (formerly known as FirstEnergy Nuclear Operating Company), a subsidiary of EH, which operates EH’s nuclear
generating facilities
FE PA 	FirstEnergy Pennsylvania Electric Company, a Pennsylvania electric utility subsidiary of FirstEnergy Pennsylvania Holding Company LLC, a
wholly owned subsidiary of FE
FES 	Energy Harbor LLC (formerly known as FirstEnergy Solutions Corp.), a subsidiary of EH, which provides energy-related products and services
FESC 	FirstEnergy Service Company, which provides legal, financial, and other corporate support services
FET 	FirstEnergy Transmission, LLC a consolidated VIE of FE, and the parent company of ATSI, MAIT and TrAIL, and having a joint venture in PATH
FEV 	FirstEnergy Ventures Corp., which invests in certain unregulated enterprises and business ventures
FirstEnergy 	FirstEnergy Corp., together with its consolidated subsidiaries
Global Holding 	Global Mining Holding Company, LLC, a joint venture between FEV, WMB Marketing Ventures, LLC and Pinesdale LLC
JCP&L 	Jersey Central Power & Light Company, a New Jersey electric utility subsidiary of FE
KATCo 	Keystone Appalachian Transmission Company, a transmission subsidiary of FE
MAIT 	Mid-Atlantic Interstate Transmission, LLC, a transmission subsidiary of FET
ME 	Metropolitan Edison Company, a former Pennsylvania electric utility subsidiary of FE, which merged with and into FE PA on January 1, 2024
MP 	Monongahela Power Company, a West Virginia electric utility subsidiary of FE
OE 	Ohio Edison Company, an Ohio electric utility subsidiary of FE
Ohio Companies 	CEI, OE and TE
PATH 	Potomac-Appalachian Transmission Highline, LLC, a joint venture between FE and a subsidiary of AEP
PATH-Allegheny 	PATH Allegheny Transmission Company, LLC
PATH-WV 	PATH West Virginia Transmission Company, LLC
PE 	The Potomac Edison Company, a Maryland and West Virginia electric utility subsidiary of FE
Penn 	Pennsylvania Power Company, a former Pennsylvania electric utility subsidiary of OE, which merged with and into FE PA on January 1, 2024
Pennsylvania Companies 	ME, PN, Penn and WP, each of which merged with and into FE PA on January 1, 2024
PN 	Pennsylvania Electric Company, a former Pennsylvania electric utility subsidiary of FE, which merged with and into FE PA on January 1, 2024
Signal Peak 	Signal Peak Energy, LLC, an indirect subsidiary of Global Holding that owns mining operations near Roundup, Montana
TE 	The Toledo Edison Company, an Ohio electric utility subsidiary of FE
TrAIL 	Trans-Allegheny Interstate Line Company, a transmission subsidiary of FET
Transmission Companies 	ATSI, KATCo, MAIT and TrAIL
Utilities 	OE, CEI, TE, FE PA, JCP&L, MP, and PE
WP 	West Penn Power Company, a former Pennsylvania electric utility subsidiary of FE, which merged with and into FE PA on January 1, 2024
ii

-- 6 of 106 --

The following abbreviations and acronyms may be used to identify frequently used terms in this report:
2021 Credit Facilities 	Collectively, the six separate senior unsecured five-year syndicated revolving credit facilities entered into by FE, the Utilities and the
Transmission Companies, on October 18, 2021, as amended through October 20, 2023
2023 Credit Facilities 	Collectively, the FET Revolving Facility and KATCo Revolving Facility
2026 Convertible Notes 	FE’s 4.00% convertible senior notes, due 2026
A&R FET LLC Agreement 	Fourth Amended and Restated Limited Liability Company Agreement of FET
ACE 	Affordable Clean Energy
AEP 	American Electric Power Company, Inc.
AFS 	Available-for-sale
AFSI 	Adjusted Financial Statement Income
AFUDC 	Allowance for Funds Used During Construction
AMI 	Advanced Metering Infrastructure
AMT 	Alternative Minimum Tax
AOCI 	Accumulated Other Comprehensive Income (Loss)
ASC 	Accounting Standards Codification
ASU 	Accounting Standards Update
BGS 	Basic Generation Service
Brookfield 	North American Transmission Company II L.P., a controlled investment vehicle entity of Brookfield Infrastructure Partners
Brookfield Guarantors 	Brookfield Super-Core Infrastructure Partners L.P., Brookfield Super-Core Infrastructure Partners (NUS) L.P., and Brookfield Super-Core
Infrastructure Partners (ER) SCSp
CAA 	Clean Air Act
CCR 	Coal Combustion Residual
CERCLA 	Comprehensive Environmental Response, Compensation, and Liability Act of 1980
CFIUS 	Committee on Foreign Investments in the United States
CFR 	Code of Federal Regulations
CO 	Carbon Dioxide
COVID-19 	Coronavirus disease
CPP 	EPA's Clean Power Plan
CSAPR 	Cross-State Air Pollution Rule
D.C. Circuit 	United States Court of Appeals for the District of Columbia Circuit
DCR 	Delivery Capital Recovery
DMR 	Distribution Modernization Rider
DPA 	Deferred Prosecution Agreement entered into on July 21, 2021 between FE and the U.S. Attorney’s Office for the S.D. Ohio
DSIC 	Distribution System Improvement Charge
EDC 	Electric Distribution Company
EDIS 	Electric Distribution Investment Surcharge
EE&C 	Energy Efficiency and Conservation
EESG 	Employee, Environmental, Social, and Corporate Governance
EGS 	Electric Generation Supplier
EGU 	Electric Generation Unit
EH 	Energy Harbor Corp.
ELG 	Effluent Limitation Guideline
EmPOWER Maryland 	EmPOWER Maryland Energy Efficiency Act
ENEC 	Expanded Net Energy Cost
Energize365 	FirstEnergy's Transmission and Distribution Infrastructure Investment Program
EnergizeNJ 	JCP&L's second Infrastructure Investment Program
EPA 	United States Environmental Protection Agency
EPS 	Earnings Per Share
2
iii

-- 7 of 106 --

ESP IV 	Electric Security Plan IV
ESP V 	Electric Security Plan V
Exchange Act 	Securities and Exchange Act of 1934, as amended
FASB 	Financial Accounting Standards Board
FE Board 	FE Board of Directors
FE Revolving Facility 	FE and the Utilities’ former five-year syndicated revolving credit facility, as amended, and replaced by the 2021 Credit Facilities on October 18,
2021
FERC 	Federal Energy Regulatory Commission
FET Board 	FET Board of Directors
FET Equity Interest Sale 	Sale of an additional 30% equity interest in FET that closed on March 25, 2024, such that Brookfield’s interest in FET increased from 19.9% to
49.9%
FET P&SA I 	Purchase and Sale Agreement entered into on November 6, 2021, by and between FE, FET, Brookfield and the Brookfield Guarantors
FET P&SA II 	Purchase and Sale Agreement entered into on February 2, 2023, by and between FE, FET, Brookfield, and the Brookfield Guarantors
FET Revolving Facility 	FET’s five-year syndicated revolving credit facility, dated as of October 20, 2023
FIP 	Federal Implementation Plan(s) under the CAA
Fitch 	Fitch Ratings Service
FMB 	First Mortgage Bond
FTR 	Financial Transmission Right
GAAP 	Generally Accepted Accounting Principles in the United States of America
GHG 	Greenhouse Gas
HB 6 	House Bill 6, as passed by Ohio's 133rd General Assembly
IRA of 2022 	Inflation Reduction Act of 2022
IRS 	Internal Revenue Service
KATCo Revolving Facility 	KATCo’s four-year syndicated revolving credit facility, dated as of October 20, 2023
LOC 	Letter of Credit
LTIIP 	Long-Term Infrastructure Improvement Plan
MDPSC 	Maryland Public Service Commission
MGP 	Manufactured Gas Plants
Moody’s 	Moody’s Investors Service, Inc.
MW 	Megawatt
MWh 	Megawatt-hour
NCI 	Noncontrolling Interest
N.D. Ohio 	Federal District Court, Northern District of Ohio
NERC 	North American Electric Reliability Corporation
NJBPU 	New Jersey Board of Public Utilities
NOL 	Net Operating Loss
NOx 	Nitrogen Oxide
NYPSC 	New York State Public Service Commission
OAG 	Ohio Attorney General
OCC 	Ohio Consumers' Counsel
ODSA 	Ohio Development Service Agency
Ohio Stipulation 	Stipulation and Recommendation, dated November 1, 2021, entered into by and among the Ohio Companies, the OCC, PUCO Staff, and
several other signatories
OOCIC 	Ohio Organized Crime Investigations Commission, which is composed of members of the Ohio law enforcement community and is chaired by
the OAG
OPEB 	Other Post-Employment Benefits
OPIC 	Other Paid-In Capital
OVEC 	Ohio Valley Electric Corporation
PA Consolidation 	Consolidation of the Pennsylvania Companies, effective January 1, 2024
PEER 	FirstEnergy’s Program for Enhanced Employee Retirement
iv

-- 8 of 106 --

PJM 	PJM Interconnection, LLC, an RTO
PJM Tariff 	PJM Open Access Transmission Tariff
PPA 	Purchase Power Agreement
PPUC 	Pennsylvania Public Utility Commission
PUCO 	Public Utilities Commission of Ohio
Regulation FD 	Regulation Fair Disclosure promulgated by the SEC
RFC 	ReliabilityFirst Corporation
ROE 	Return on Equity
RTO 	Regional Transmission Organization
S.D. Ohio 	Federal District Court, Southern District of Ohio
SEC 	United States Securities and Exchange Commission
SEET 	Significantly Excessive Earnings Test
SIP 	State Implementation Plan(s) under the CAA
SLC 	Special Litigation Committee of the FE Board
SO 	Sulfur Dioxide
SOFR 	Secured Overnight Financing Rate
SOS 	Standard Offer Service
SPE 	Special Purpose Entity
S&P 	Standard & Poor’s Ratings Service
Tax Act 	Tax Cuts and Jobs Act adopted December 22, 2017
VIE 	Variable Interest Entity
VSCC 	Virginia State Corporation Commission
WVPSC 	Public Service Commission of West Virginia
2
v

-- 9 of 106 --

PART I. FINANCIAL INFORMATION
ITEM I. 	Financial Statements
FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF INCOME
(Unaudited)
For the Three Months Ended March
31,
(In millions, except per share amounts) 	2024 	2023
REVENUES:
Distribution services and retail generation 	$ 	2,695 $ 	2,680
Transmission 	515 	460
Other 	77 	91
Total revenues 	3,287 	3,231
OPERATING EXPENSES:
Fuel 	105 	133
Purchased power 	1,036 	1,124
Other operating expenses 	1,006 	846
Provision for depreciation 	381 	361
Deferral of regulatory assets, net 	(164) 	(80)
General taxes 	311 	296
Total operating expenses 	2,675 	2,680
OPERATING INCOME 	612 	551
OTHER INCOME (EXPENSE):
Equity method investment earnings (Note 1) 	21 	56
Miscellaneous income, net 	44 	35
Interest expense 	(305) 	(263)
Capitalized financing costs 	30 	21
Total other expense 	(210) 	(151)
INCOME BEFORE INCOME TAXES 	402 	400
INCOME TAXES 	135 	90
NET INCOME 	$ 	267 $ 	310
Income attributable to noncontrolling interest 	14 	18
EARNINGS ATTRIBUTABLE TO FIRSTENERGY CORP. 	$ 	253 $ 	292
EARNINGS PER SHARE ATTRIBUTABLE TO FIRSTENERGY CORP. (Note 3):
Basic 	$ 	0.44 $ 	0.51
Diluted 	$ 	0.44 $ 	0.51
WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING:
Basic 	574 	572
Diluted 	576 	573
Includes excise and gross receipts tax collections of $115 million and $109 million during the three months ended March 31, 2024 and 2023, respectively.
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
(1)
(1)
1

-- 10 of 106 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
(Unaudited)
For the Three Months Ended
March 31,
(In millions) 	2024 	2023
NET INCOME 	$ 	267 $ 	310
OTHER COMPREHENSIVE LOSS:
Pension and OPEB prior service costs 	— 	(2)
Other comprehensive loss 	— 	(2)
Income tax benefits on other comprehensive loss 	— 	(1)
Other comprehensive loss, net of tax 	— 	(1)
COMPREHENSIVE INCOME 	$ 	267 $ 	309
Income attributable to noncontrolling interest 	14 	18
COMPREHENSIVE INCOME ATTRIBUTABLE TO FIRSTENERGY CORP. 	$ 	253 $ 	291
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
2

-- 11 of 106 --

FIRSTENERGY CORP.
CONSOLIDATED BALANCE SHEETS
(Unaudited)
(In millions, except share amounts) March 31,
2024 December 31,
2023
ASSETS
CURRENT ASSETS:
Cash and cash equivalents 	$ 	888 $ 	137
Restricted cash 	27 	42
Receivables-
Customers 	1,418 	1,382
Less — Allowance for uncollectible customer receivables 	53 	64
1,365 	1,318
Other, net of allowance for uncollectible accounts of $14 in 2024 and $15 in 2023 	304 	266
Note receivable - Brookfield due 2024 (Note 1) 	450 	—
Materials and supplies, at average cost 	538 	512
Prepaid taxes and other 	491 	293
4,063 	2,568
PROPERTY, PLANT AND EQUIPMENT:
In service 	50,634 	50,107
Less — Accumulated provision for depreciation 	13,991 	13,811
36,643 	36,296
Construction work in progress 	2,161 	2,116
38,804 	38,412
INVESTMENTS AND OTHER NONCURRENT ASSETS:
Goodwill 	5,618 	5,618
Investments (Note 6) 	688 	663
Regulatory assets 	333 	369
Other 	1,043 	1,137
Note receivable - Brookfield due 2025 (Note 1) 	750 	—
8,432 	7,787
TOTAL ASSETS 	$ 	51,299 $ 	48,767
LIABILITIES AND EQUITY
CURRENT LIABILITIES:
Currently payable long-term debt 	$ 	2,613 $ 	1,250
Short-term borrowings 	250 	775
Accounts payable 	1,383 	1,362
Accrued interest 	305 	292
Accrued taxes 	823 	700
Accrued compensation and benefits 	199 	304
Customer deposits 	228 	227
Dividends payable 	245 	235
Other 	227 	241
6,273 	5,386
NONCURRENT LIABILITIES:
Long-term debt and other long-term obligations 	21,652 	22,885
Accumulated deferred income taxes 	5,288 	4,530
Retirement benefits 	1,663 	1,663
Regulatory liabilities 	964 	1,214
Other 	1,846 	2,173
31,413 	32,465
TOTAL LIABILITIES 	37,686 	37,851
EQUITY:
Common stockholders’ equity-
Common stock, $0.10 par value, authorized 700,000,000 shares - 575,516,472 and 574,335,396 shares outstanding as of
March 31, 2024 and December 31, 2023, respectively. 	57 	57
Other paid-in capital 	12,357 	10,494
Accumulated other comprehensive loss 	(17) 	(17)
Accumulated deficit 	— 	(97)
Total common stockholders’ equity 	12,397 	10,437
Noncontrolling interest 	1,216 	479
TOTAL EQUITY 	13,613 	10,916
COMMITMENTS, GUARANTEES AND CONTINGENCIES (Note 9)
TOTAL LIABILITIES AND EQUITY 	$ 	51,299 $ 	48,767

-- 12 of 106 --

The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
3

-- 13 of 106 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF EQUITY
(Unaudited)
Three Months Ended March 31, 2024
Common stock
OPIC 	AOCI
Accumulated
deficit
Total Common
Stockholders’
Equity 	NCI 	Total Equity	(In millions) 	Shares 	Amount
Balance, January 1, 2024 	574 $ 	57 $ 10,494 $ (17) $ 	(97) $ 	10,437 $ 	479 $ 	10,916
Net income 	— 	— 	— 	— 	253 	253 	14 	267
Stock investment plan and share-based benefit
plans 	2 	— 	9 	— 	— 	9 	— 	9
Cash dividends declared on common stock
($0.425 per share in March) 	— 	— 	(88) 	— 	(156) 	(244) 	— 	(244)
FET Equity Interest Sale (Note 1) 	— 	— 	1,942 	— 	— 	1,942 	731 	2,673
Noncontrolling interest distributions declared 	— 	— 	— 	— 	— 	— 	(8) 	(8)
Balance, March 31, 2024 	576 $ 	57 $ 12,357 $ (17) $ 	— $ 	12,397 $ 	1,216 $ 	13,613
Three Months Ended March 31, 2023
Common stock
OPIC 	AOCI
Accumulated
deficit
Total Common
Stockholders’
Equity 	NCI 	Total Equity	(In millions) 	Shares 	Amount
Balance, January 1, 2023 	572 $ 	57 $ 11,322 $ (14) $ 	(1,199) $ 	10,166 $ 	477 $ 	10,643
Net income 	— 	— 	— 	— 	292 	292 	18 	310
Other comprehensive loss, net of tax 	— 	— 	— 	(1) 	— 	(1) 	— 	(1)
Stock investment plan and share-based benefit
plans 	1 	— 	19 	— 	— 	19 	— 	19
Cash dividends declared on common stock
($0.39 per share in March) 	— 	— 	(223) 	— 	— 	(223) 	— 	(223)
Noncontrolling interest distributions declared 	— 	— 	— 	— 	— 	— 	(17) 	(17)
Balance, March 31, 2023 	573 $ 	57 $ 11,118 $ (15) $ 	(907) $ 	10,253 $ 	478 $ 	10,731
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
4

-- 14 of 106 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited)
For the Three Months Ended March 31,
(In millions) 	2024 	2023
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	$ 	267 $ 	310
Adjustments to reconcile net income to net cash from operating activities-
Depreciation, amortization and impairments 	276 	287
Deferred income taxes and investment tax credits, net 	112 	32
Employee benefit costs, net 	(17) 	(2)
Transmission revenue collections, net 	48 	(10)
Changes in current assets and liabilities-
Receivables 	(85) 	55
Materials and supplies 	(26) 	(36)
Prepaid taxes and other current assets 	(172) 	(118)
Accounts payable 	(1) 	(265)
Accrued taxes 	(176) 	(103)
Accrued interest 	13 	9
Accrued compensation and benefits 	(178) 	(121)
Other current liabilities 	(18) 	8
Collateral, net 	(25) 	(144)
Employee benefit plan funding and related payments 	(20) 	(18)
Other 	(38) 	4
Net cash used for operating activities 	(40) 	(112)
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital investments 	(790) 	(649)
Sales of investment securities held in trusts 	13 	1
Purchases of investment securities held in trusts 	(16) 	(4)
Asset removal costs 	(78) 	(60)
Other 	1 	(4)
Net cash used for investing activities 	(870) 	(716)
CASH FLOWS FROM FINANCING ACTIVITIES:
New financing-
Long-term debt 	150 	950
Short-term borrowings, net 	— 	450
Redemptions and repayments-
Long-term debt 	(23) 	(321)
Short-term borrowings, net 	(525) 	—
Proceeds from FET Equity Interest Sale (Note 1) 	2,300 	—
Noncontrolling interest cash distributions 	(8) 	(17)
Common stock dividend payments 	(235) 	(223)
Other 	(13) 	(11)
Net cash provided from financing activities 	1,646 	828
Net change in cash, cash equivalents, and restricted cash 	736 	—
Cash, cash equivalents, and restricted cash at beginning of period 	179 	206
Cash, cash equivalents, and restricted cash at end of period 	$ 	915 $ 	206
SUPPLEMENTAL CASH FLOW INFORMATION:
Significant non-cash transactions:
Accrued capital investments 	$ 	224 $ 	155
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
5

-- 15 of 106 --

FIRSTENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)
Note
Number
Page
Number
1 	Organization and Basis of Presentation 	7
2 	Revenue 	10
3 	Earnings Per Share 	11
4 	Pension and Other Post-Employment Benefits 	12
5 	Income Taxes 	13
6 	Fair Value Measurements 	14
7 	Variable Interest Entities 	16
8 	Regulatory Matters 	18
9 	Commitments, Guarantees and Contingencies 	25
10 	Segment Information 	31
6

-- 16 of 106 --

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Unaudited)
1. ORGANIZATION AND BASIS OF PRESENTATION
Unless otherwise indicated, defined terms and abbreviations used herein have the meanings set forth in the accompanying Glossary of Terms.
FE was incorporated under Ohio law in 1996. FE’s principal business is the holding, directly or indirectly, of all of the outstanding equity of its principal
subsidiaries as of March 31, 2024: OE, CEI, TE, FE PA, JCP&L, FESC, MP, AGC (a wholly owned subsidiary of MP), PE and KATCo. Additionally, FET is a
consolidated VIE of FE, and is the parent company of ATSI, MAIT, PATH and TrAIL. In addition, FE holds all of the outstanding equity of other direct subsidiaries
including FEV, which currently holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal
transportation operations.
On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, including OE subsidiary, Penn, making FE PA a new, single operating
entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. FE PA, as of January 1, 2024, is FE’s only regulated distribution
utility in Pennsylvania encompassing the operations previously conducted individually by the Pennsylvania Companies and FE PA serves an area with a
population of approximately 4.5 million and operates under the rate districts of the former Pennsylvania Companies. FirstEnergy is also evaluating the legal,
financial, operational and branding benefits of consolidating the Ohio Companies into a single Ohio utility company.
Also on January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo, and PN and ME contributed their respective Class B
equity interests of MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership interest in FET. So long as FE holds the
FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.
FESC provides legal, financial and other corporate support services at cost, in accordance with its cost allocation manual, to affiliated FirstEnergy companies.
FE does not bill directly or allocate any of its costs to any subsidiary company. Costs are charged to FE's subsidiaries for services received from FESC either
through direct billing or through an allocation process. Allocated costs are for services that are provided on behalf of more than one company and are allocated
using formulas developed by FESC. Intercompany transactions are generally settled under commercial terms within thirty days.
FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity. FirstEnergy’s utility operating companies comprise
one of the nation’s largest investor-owned electric systems, serving over 6 million customers in the Midwest and Mid-Atlantic regions. FirstEnergy’s transmission
operations include more than 24,000 miles of lines and two regional transmission operation centers. AGC and MP control 3,599 MWs net maximum capacity.
These interim financial statements have been prepared pursuant to the rules and regulations of the SEC for Quarterly Reports on Form 10-Q. Certain
information and disclosures normally included in financial statements and notes prepared in accordance with GAAP have been condensed or omitted pursuant to
such rules and regulations. These interim financial statements should be read in conjunction with the financial statements and notes included in the Annual
Report on Form 10-K for the year ended December 31, 2023.
FE and its subsidiaries follow GAAP and comply with the related regulations, orders, policies and practices prescribed by the SEC, FERC, and, as applicable,
the PUCO, the PPUC, the MDPSC, the NYPSC, the WVPSC, the VSCC and the NJBPU. The accompanying interim financial statements are unaudited, but
reflect all adjustments, consisting of normal recurring adjustments, that, in the opinion of management, are necessary for a fair statement of the financial
statements. The preparation of financial statements in conformity with GAAP requires management to make periodic estimates and assumptions that affect the
reported amounts of assets, liabilities, revenues and expenses and disclosure of contingent assets and liabilities. Actual results could differ from these estimates.
The reported results of operations are not necessarily indicative of results of operations for any future period. FE and its subsidiaries have evaluated events and
transactions for potential recognition or disclosure through the date the financial statements were issued.
FE and its subsidiaries consolidate all majority-owned subsidiaries over which they exercise control and, when applicable, entities for which they have a
controlling financial interest. Intercompany transactions and balances are eliminated in consolidation as appropriate and permitted pursuant to GAAP. FE and its
subsidiaries consolidate a variable interest entity when it is determined that it is the primary beneficiary. Investments in affiliates over which FE and its
subsidiaries have the ability to exercise significant influence, but do not have a controlling financial interest, follow the equity method of accounting. Under the
equity method, the interest in the entity is reported as an investment in the Consolidated Balance Sheets and the percentage of FE’s ownership share of the
entity’s earnings is reported in the Consolidated Statements of Income and Comprehensive Income.
Certain prior year amounts have been reclassified to conform to the current year presentation. During the first quarter of 2024, FirstEnergy’s segment reporting
structure was modified to increase transparency for leadership and investors, simplify the presentation to corresponding legal entities, and align FirstEnergy’s
earnings, cash flows and balance sheets at the business unit level. The modification to the segments resulted in a reallocation of goodwill between the segments
based on the relative fair
7

-- 17 of 106 --

value of the reporting units, as described further below. Disclosures for FirstEnergy's reportable operating segments for 2023 have been reclassified to conform
to the current presentation reflecting the new reportable segments. In addition, on January 1, 2024, WP transferred certain of its Pennsylvania-based
transmission assets to KATCo and for comparability, prior year results in the Stand-Alone Transmission segment reflect the earnings and results of those WP
transmission assets.
Economic Conditions
Post-pandemic economic conditions have increased supply chain lead times across numerous material categories, with some as much as tripling from pre-
pandemic lead times. Several key suppliers have struggled with labor shortages and raw material availability, which along with inflationary pressure that appears
to be moderating, have increased costs and decreased the availability of certain materials, equipment and contractors. FirstEnergy has taken steps to mitigate
these risks and does not currently expect service disruptions or any material impact on its capital spending plan. However, the situation remains fluid and a
prolonged continuation or further increase in supply chain disruptions could have an adverse effect on FirstEnergy’s results of operations, cash flow and financial
condition.
FET Noncontrolling Interest
FirstEnergy presents Brookfield’s ownership portion of FET’s net income and net assets as NCI. NCI is included as a component of equity on FirstEnergy’s
Consolidated Balance Sheets.
On May 31, 2022, Brookfield acquired 19.9% of the issued and outstanding membership interests of FET. On February 2, 2023, FE, along with FET, entered into
the FET P&SA II with Brookfield and the Brookfield Guarantors, pursuant to which FE agreed to sell to Brookfield at the closing, and Brookfield agreed to
purchase from FE, an incremental 30% equity interest in FET for a purchase price of $3.5 billion. The FET Equity Interest Sale closed on March 25, 2024 and
FET continues to be consolidated in FirstEnergy’s financial statements. The purchase price was paid in part by the issuance of two promissory notes at closing
having an aggregate principal amount of $1.2 billion with: (i) one promissory note having an aggregate principal amount of $750 million, at an interest rate of
5.75% per annum, with a maturity date of September 25, 2025 and (ii) one promissory note having an aggregate principal amount of $450 million, at an interest
rate of 7.75% per annum, with a maturity date of December 31, 2024. Both notes are expected to be repaid in 2024. The remaining $2.3 billion of the purchase
price was paid in cash at closing. Brookfield Corporation has guaranteed the full amount of the promissory notes. As a result of the consummation of the
transaction, Brookfield’s interest in FET increased from 19.9% to 49.9%, while FE retained the remaining 50.1% ownership interests of FET. The difference
between the purchase price, net of transaction costs and deferred taxes of approximately $30 million and $797 million, respectively, and the carrying value of the
NCI of $731 million, was recorded as an increase to OPIC by $1,942 million during the first quarter of 2024.
Pursuant to the terms of the FET P&SA II, in connection with the closing, Brookfield, FET and FE entered into the A&R FET LLC Agreement, which amended
and restated in its entirety the Third Amended and Restate Limited Liability Company Agreement of FET. The A&R FET LLC Agreement, among other things,
provides for the governance, exit, capital and distribution, and other arrangements for FET from and following the closing. Under the A&R FET LLC Agreement,
as of the closing, the FET Board consists of five directors, two of whom are appointed by Brookfield and three of whom are appointed by FE.
Capitalized Financing Costs
For the three months ended March 31, 2024 and 2023, capitalized financing costs on FirstEnergy’s Consolidated Statements of Income include $13 million and
$8 million, respectively, of allowance for equity funds used during construction and $17 million and $13 million, respectively, of capitalized interest.
Equity Method Investments
Investments over which FE and its subsidiaries have the ability to exercise significant influence, but do not have a controlling financial interest, follow the equity
method of accounting. Under the equity method, the interest in the entity is reported as an Investment on the Consolidated Balance Sheets. The percentage of
FE's ownership share of the entity’s earnings is reported in the Consolidated Statements of Income and Comprehensive Income and reflected in “Other Income
(Expense)”.
Equity method investments included within "Investments" on the Consolidated Balance Sheets were approximately $126 million and $104 million as of March 31,
2024 and December 31, 2023, respectively.
Global Holding - FEV currently holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal
transportation operations with coal sales primarily focused on international markets. FEV is not the primary beneficiary of the joint venture, as it does not have
control over the significant activities affecting the joint venture’s economic performance. FEV's ownership interest is subject to the equity method of accounting.
For the three months ended March 31, 2024 and 2023, pre-tax income related to FEV’s ownership in Global Holding was $21 million and $54 million,
respectively. FEV’s pre-tax equity earnings and investment in Global Holding are included in Corporate/Other for segment reporting.
8

-- 18 of 106 --

As of March 31, 2024, and December 31, 2023, the carrying value of the equity method investment was $87 million and $66 million, respectively. During the
three months ended March 31, 2023, FEV received cash dividends from Global Holding of $60 million, which were classified with “Cash from Operating
Activities” on the Consolidated Statements of Cash Flows.
PATH WV - PATH, a proposed transmission line from West Virginia through Virginia into Maryland, which PJM cancelled in 2012, is a series limited liability
company that is comprised of multiple series, each of which has separate rights, powers and duties regarding specified property and the series profits and
losses associated with such property. A subsidiary of FE owns 100% of the Allegheny Series (PATH-Allegheny) and 50% of the West Virginia Series (PATH-WV),
which is a joint venture with a subsidiary of AEP. FirstEnergy is not the primary beneficiary of PATH-WV, as it does not have control over the significant activities
affecting the economics of PATH-WV. FirstEnergy's ownership interest in PATH-WV is subject to the equity method of accounting. As of March 31, 2024 and
December 31, 2023, the carrying value of the equity method investment was $17 million.
Goodwill
In accordance with GAAP, the modification to the segments in the first quarter of 2024 resulted in a transfer of goodwill between the segments based on the
relative fair value of the reporting units, and as such, the segment goodwill balances do not necessarily represent the goodwill balances of the specific legal
entities within the segments. The external segment reporting is consistent with the internal financial reports used by FirstEnergy's Chief Executive Officer (its
chief operating decision maker) to regularly assess performance of the business and allocate resources.
The fair values of the reporting units were calculated using a discounted cash flow analysis. Key assumptions incorporated in the discounted cash flow analysis
included discount rates, growth rates, projected operating income, changes in working capital, projected capital expenditures, and terminal multiples. The
discounted cash flow analysis was also utilized to complete an impairment assessment before and after the segment change, with no impairment of goodwill
indicated.
FirstEnergy's reporting units are consistent with its reportable segments and consist of Distribution, Integrated and Stand-Alone Transmission. The following
table presents goodwill by reporting unit as of March 31, 2024:
(In millions)
Distribution
Segment
Integrated
Segment
Stand-Alone
Transmission Segment
FirstEnergy
Consolidated
Goodwill 	$ 	3,222 $ 	1,953 $ 	443 $ 	5,618
New Accounting Pronouncements
Recently Issued Pronouncements - FirstEnergy is currently assessing the impact of new authoritative accounting guidance issued by the FASB that has not
yet been adopted and the impact it will have on its financial statements and disclosures, as well as the potential to early adopt where applicable. The current
expectation is that such new standards will not significantly impact FirstEnergy's financial reporting.
Recently Adopted Pronouncements - ASU 2022-03, "Fair Value Measurements of Equity Securities Subject to Contractual Sale Restrictions " (Issued in June
2022): ASU 2022-03 clarifies current guidance in Topic 820, Fair Value Measurement, when measuring the fair value of an equity security subject to contractual
restrictions that prohibit the sale of an equity security, and introduces new disclosure requirements for those equity securities subject to contractual restrictions.
FirstEnergy adopted ASU 2022-03 on January 1, 2024 with no material impact to its financial statements.
9

-- 19 of 106 --

2. REVENUE
The following represents a disaggregation of revenue from contracts with customers for the three months ended March 31, 2024 and 2023:
Three Months Ended March 31,
(In millions) 	2024 	2023
Distribution
Retail generation and distribution services
Residential 	$ 	1,184 $ 	1,171
Commercial 	374 	377
Industrial 	146 	212
Other 	20 	17
Wholesale 	1 	2
Other revenue from contracts with customers 	21 	19
Total revenues from contracts with customers 	1,746 	1,798
Other revenue unrelated to contracts with customers 	21 	19
Total Distribution 	$ 	1,767 $ 	1,817
Integrated
Retail generation and distribution services
Residential 	$ 	574 $ 	506
Commercial 	252 	256
Industrial 	138 	135
Other 	7 	6
Wholesale 	30 	45
Transmission 	81 	64
Other revenue from contracts with customers 	5 	6
Total revenues from contracts with customers 	1,087 	1,018
Other revenue unrelated to contracts with customers 	8 	10
Total Integrated 	$ 	1,095 $ 	1,028
Stand-Alone Transmission
ATSI 	$ 	243 $ 	226
TrAIL 	67 	66
MAIT 	104 	89
KATCo 	20 	15
Total revenues from contracts with customers 	434 	396
Other revenue unrelated to contracts with customers 	4 	4
Total Stand-Alone Transmission 	$ 	438 $ 	400
Corporate/Other and Reconciling Adjustments
Wholesale 	$ 	3 $ 	2
Other revenue unrelated to contracts with customers 	(16) 	(16)
Total Corporate/Other and Reconciling 	$ 	(13) $ 	(14)
FirstEnergy Total Revenues 	$ 	3,287 $ 	3,231
Includes eliminations and reconciling adjustments of inter-segment revenues.
(1)
(1)
(1)
10

-- 20 of 106 --

Customer Receivables
Receivables from contracts with customers include distribution services and retail generation sales to residential, commercial and industrial customers of the
Utilities. Billed and unbilled customer receivables as of March 31, 2024, and December 31, 2023, are included below:
Customer Receivables 	March 31, 2024 	December 31, 2023
(In millions)
Billed 	$ 	833 $ 	717
Unbilled 	585 	665
1,418 	1,382
Less: Uncollectible Reserve 	53 	64
Total Customer Receivables 	$ 	1,365 $ 	1,318
The allowance for uncollectible customer receivables is based on historical loss information comprised of a rolling 36-month average net write-off percentage of
revenues, in conjunction with a qualitative assessment of elements that impact the collectability of receivables to determine if allowances for uncollectible
customer receivables should be further adjusted in accordance with the accounting guidance for credit losses.
FirstEnergy reviews its allowance for uncollectible customer receivables utilizing a quantitative and qualitative assessment. Management contemplates available
current information such as changes in economic factors, regulatory matters, industry trends, customer credit factors, amount of receivable balances that are
past-due, payment options and programs available to customers, and the methods that the Utilities are able to utilize to ensure payment. FirstEnergy’s
uncollectible risk on PJM receivables, resulting from transmission and wholesale sales, is minimal due to the nature of PJM’s settlement process and as a result
there is no current allowance for doubtful accounts.
Activity in the allowance for uncollectible accounts on customer receivables for the three months ended March 31, 2024, and for the year ended December 31,
2023 are as follows:
(In millions)
Balance, January 1, 2023 	$ 	137
Provision for expected credit losses 	8
Charged to other accounts 	34
Write-offs 	(115)
Balance, December 31, 2023 	$ 	64
Provision for expected credit losses 	12
Charged to other accounts 	9
Write-offs 	(32)
Balance, March 31, 2024 	$ 	53
Approximately $3 million and $15 million of which was deferred for future refund in the three months ended March 31, 2024 and the year ended December 31, 2023, respectively.
Represents recoveries and reinstatements of accounts written off for uncollectible accounts.
3. EARNINGS PER SHARE
EPS is calculated by dividing earnings attributable to FE by the weighted average number of common shares outstanding.
Basic EPS is computed using the weighted average number of common shares outstanding during the relevant period as the denominator. The denominator for
diluted EPS of common stock reflects the weighted average of common shares outstanding plus the potential additional common shares that could result if
dilutive securities and other agreements to issue common stock were exercised.
Diluted EPS reflects the dilutive effect of potential common shares from share-based awards and convertible securities. The dilutive effect of outstanding share-
based awards was computed using the treasury stock method, which assumes any proceeds that could be obtained upon the exercise of the award would be
used to purchase common stock at the average market price for the period. The dilutive effect of the 2026 Convertible Notes is computed using the if-converted
method.
(1)
(2)
(1)
(2)
(1)
(2)
11

-- 21 of 106 --

The following table reconciles basic and diluted EPS attributable to FE:
For the Three Months Ended
March 31,
Reconciliation of Basic and Diluted EPS 	2024 	2023
(In millions, except per share amounts)
Earnings attributable to FE 	$ 	253 $ 	292
Share count information:
Weighted average number of basic shares outstanding 	574 	572
Assumed exercise of dilutive awards 	2 	1
Weighted average number of diluted shares outstanding 	576 	573
EPS attributable to FE:
Basic EPS 	$ 	0.44 $ 	0.51
Diluted EPS 	$ 	0.44 $ 	0.51
For the three months ended March 31, 2024 and 2023, no shares from awards were excluded from the calculation of diluted shares outstanding, as their
inclusion would have been antidilutive.
The dilutive effect of the 2026 Convertible Notes is limited to the conversion obligation in excess of the aggregate principal amount of the 2026 Convertible Notes
being converted. For the three months ended March 31, 2024, there was no dilutive effect resulting from the 2026 Convertible Notes as the average market price
of FE shares of common stock was below the initial conversion price of $46.81 per share.
4. PENSION AND OTHER POST-EMPLOYMENT BENEFITS
The components of FirstEnergy’s net periodic benefit costs (credits) for pension and OPEB were as follows:
Components of Net Periodic Benefit Costs (Credits) 	Pension 	OPEB
For the Three Months Ended March 31, 	2024 	2023 	2024 	2023
(In millions)
Service costs 	$ 	35 $ 	34 $ 	1 $ 	1
Interest costs 	99 	109 	5 	5
Expected return on plan assets 	(133) 	(128) 	(8) 	(8)
Amortization of prior service costs (credits) 	1 	— 	(1) 	(2)
Net periodic benefit costs (credits) 	$ 	2 $ 	15 $ 	(3) $ 	(4)
Net periodic benefit costs (credits), net of amounts capitalized 	$ 	(15) $ 	(3) $ 	(4) $ 	(4)
The income tax benefits associated with pension and OPEB prior service costs amortized out of AOCI were $1 million for the three months ended March 31, 2023.
Cash flows from operating activities for the three months ended March 31, 2024 and 2023, includes approximately $20 million and $18 million, respectively, of
employee benefit plan funding and related payments. These payments are primarily related to short-term benefit payment liabilities owed to retirees under plan
obligations in the respective periods.
On May 12, 2023, FirstEnergy made a $750 million voluntary cash contribution to the qualified pension plan, which was funded by FE. FirstEnergy does not
currently expect to have a required contribution to the pension plan until 2028, which based on various assumptions, including an expected rate of return on
assets of 8.0%, is expected to be approximately $260 million. However, FirstEnergy may elect to contribute to the pension plan voluntarily.
Service costs, net of capitalization, are reported within Other operating expenses on FirstEnergy’s Consolidated Statements of Income. Non-service costs, other
than the pension and OPEB mark-to-market adjustment, which is separately shown, are reported within “Miscellaneous income, net”, within “Other Income
(Expense)” on FirstEnergy’s Consolidated Statements of Income.
(1)
(1)
12

-- 22 of 106 --

5. INCOME TAXES
FirstEnergy’s interim effective tax rates reflect the estimated annual effective tax rates for 2024 and 2023. These tax rates are affected by estimated annual
permanent items, such as AFUDC equity and other flow-through items, as well as certain discrete items. The following tables reconcile the effective tax rate to
the federal income tax statutory rate for the three months ended March 31, 2024 and 2023:
For the Three Months Ended March
31,
2024 	2023
(In millions)
Income before income taxes 	$ 	402 	$ 	400
Federal income tax expense at statutory rate (21%) 	$ 	84 	$ 	84
Increases (reductions) in tax expense resulting from:
State and municipal income taxes, net of federal tax benefit 	23 	14
AFUDC equity and other flow-through 	(7) 	(5)
Deferred taxes related to sale of equity interest in FET, net 	7 	—
Excess deferred tax amortization due to the Tax Act 	(13) 	(16)
Valuation allowances 	39 	9
Other, net 	2 	4
Total income taxes 	$ 	135 	$ 	90
Effective income tax rate 	33.6 % 	22.5 %
On August 16, 2022, President Biden signed into law the IRA of 2022, which, among other things, imposes a new 15% corporate AMT based on AFSI applicable
to corporations with a three-year average AFSI over $1 billion. The AMT is effective for the 2023 tax year and, if applicable, corporations must pay the greater of
the regular corporate income tax or the AMT. Although NOL carryforwards created through the regular corporate income tax system cannot be used to reduce
the AMT, financial statement net operating losses can be used to reduce AFSI and the amount of AMT owed. The IRA of 2022 as enacted requires the U.S.
Treasury to provide regulations and other guidance necessary to administer the AMT, including further defining allowable adjustments to determine AFSI, which
directly impacts the amount of AMT to be paid. Based on interim guidance issued by the U.S. Treasury during 2022 and 2023, FirstEnergy continues to believe
that it is more likely than not it will be subject to the AMT beginning with 2023. Accordingly, FirstEnergy made a first quarter estimated payment of AMT of
approximately $49 million in April 2023, however, made no additional payments in 2023 based on various factors, including additional guidance from the U.S.
Treasury that eliminated the requirement of corporations to include AMT in quarterly estimated tax payments. Until final U.S. Treasury regulations are issued, the
amount of AMT FirstEnergy pays could be significantly different than current estimates or it may not be a payer at all. The regulatory treatment of the impacts of
this legislation may also be subject to regulation by FERC and/or applicable state regulatory authorities. Any adverse development in this legislation, including
guidance from the U.S. Treasury and/or the IRS or unfavorable regulatory treatment, could negatively impact FirstEnergy’s cash flows, results of operations and
financial condition.
As discussed above, on March 25, 2024, FirstEnergy closed on the sale of an additional 30% interest in FET, realizing an approximate $7.3 billion tax gain from
the combined sale of 49.9% of the membership interests in FET for the consideration received and recapture of negative tax basis in FET. In the first quarter of
2024, FirstEnergy recognized a net tax charge of approximately $46 million, comprised of updates to estimated deferred tax liability for the deferred gain from
the 19.9% sale of FET in May 2022, deferred tax liability related to its ongoing investment in FET, and valuation allowance associated with the expected
utilization of certain state NOL carryforwards impacted by the sale and the PA Consolidation. During the first quarter of 2024, FirstEnergy also recognized a
reduction to OPIC of approximately $797 million for federal and state income tax associated with the tax gain from closing on the 30% interest sale. As of
December 31, 2023, FirstEnergy had approximately $8.1 billion of gross federal NOL carryforwards which will be used to offset a majority of the tax gain from the
FET Equity Interest Sale and expected taxable income in 2024, however due to certain limitations on utilization enacted in the Tax Act, a portion of the NOL will
carry into 2025 and possibly beyond. As a result of the additional 30% sale, FET and its subsidiaries deconsolidated from FirstEnergy’s consolidated federal
income tax group and now constitute their own consolidated federal income tax group subject to their own income tax allocation agreement.
13

-- 23 of 106 --

6. FAIR VALUE MEASUREMENTS
RECURRING FAIR VALUE MEASUREMENTS
Authoritative accounting guidance establishes a fair value hierarchy that prioritizes the inputs used to measure fair value. This hierarchy gives the highest priority
to Level 1 measurements and the lowest priority to Level 3 measurements. The three levels of the fair value hierarchy and a description of the valuation
techniques are as follows:
Level 1 	- Quoted prices for identical instruments in active market.
Level 2 	- Quoted prices for similar instruments in active market.
- Quoted prices for identical or similar instruments in markets that are not active.
- Model-derived valuations for which all significant inputs are observable market data.
Models are primarily industry-standard models that consider various assumptions, including quoted forward prices for commodities, time value,
volatility factors and current market and contractual prices for the underlying instruments, as well as other relevant economic measures.
Level 3 	- Valuation inputs are unobservable and significant to the fair value measurement.
FirstEnergy produces a long-term power and capacity price forecast annually with periodic updates as market conditions change. When
underlying prices are not observable, prices from the long-term price forecast are used to measure fair value.
FTRs are financial instruments that entitle the holder to a stream of revenues (or charges) based on the hourly day-ahead congestion price
differences across transmission paths. FTRs are acquired by FirstEnergy in the annual, monthly and long-term PJM auctions and are initially
recorded using the auction clearing price less cost. After initial recognition, FTRs’ carrying values are periodically adjusted to fair value using a
mark-to-model methodology, which approximates market. The primary inputs into the model, which are generally less observable than objective
sources, are the most recent PJM auction clearing prices and the FTRs’ remaining hours. The model calculates the fair value by multiplying the
most recent auction clearing price by the remaining FTR hours less the prorated FTR cost. Significant increases or decreases in inputs in
isolation may have resulted in a higher or lower fair value measurement.
FirstEnergy primarily applies the market approach for recurring fair value measurements using the best information available. Accordingly, FirstEnergy
maximizes the use of observable inputs and minimizes the use of unobservable inputs. There were no changes in valuation methodologies used as of March 31,
2024, from those used as of December 31, 2023. The determination of the fair value measures takes into consideration various factors, including but not limited
to, nonperformance risk, counterparty credit risk and the impact of credit enhancements (such as cash deposits, LOCs and priority interests). The impact of
these forms of risk was not significant to the fair value measurements.
The following table sets forth the recurring assets and liabilities that are accounted for at fair value by level within the fair value hierarchy:
March 31, 2024 	December 31, 2023
Level 1 	Level 2 	Level 3 	Total 	Level 1 	Level 2 	Level 3 	Total
Assets 	(In millions)
Derivative assets FTRs 	$ 	— $ 	— $ 	— $ 	— $ 	— $ 	— $ 	4 $ 	4
Equity securities 	2 	— 	— 	2 	2 	— 	— 	2
U.S. state and municipal debt securities 	— 	274 	— 	274 	— 	275 	— 	275
Cash, cash equivalents and restricted cash 	915 	— 	— 	915 	179 	— 	— 	179
Other 	— 	46 	— 	46 	— 	40 	— 	40
Total assets 	$ 	917 $ 	320 $ 	— $ 	1,237 $ 	181 $ 	315 $ 	4 $ 	500
Liabilities
Derivative liabilities FTRs 	$ 	— $ 	— $ 	(1) $ 	(1) $ 	— $ 	— $ 	(1) $ 	(1)
Total liabilities 	$ 	— $ 	— $ 	(1) $ 	(1) $ 	— $ 	— $ 	(1) $ 	(1)
Net assets (liabilities) 	$ 	917 $ 	320 $ 	(1) $ 	1,236 $ 	181 $ 	315 $ 	3 $ 	499
Contracts are subject to regulatory accounting treatment and changes in market values do not impact earnings.
Restricted cash of $27 million and $42 million as of March 31, 2024 and December 31, 2023, respectively, primarily relates to cash collected from MP, PE and the Ohio
Companies’ customers that is specifically used to service debt of their respective securitization or funding companies.
Primarily consists of short-term investments.
(1)
(2)
(3)
(1)
(1)
(2)
(3)
14

-- 24 of 106 --

INVESTMENTS
All temporary cash investments purchased with an initial maturity of three months or less are reported as cash equivalents on the Consolidated Balance Sheets
at cost, which approximates their fair market value. Investments other than cash and cash equivalents include equity securities, AFS debt securities and other
investments. FirstEnergy has no debt securities held for trading purposes.
Generally, unrealized gains and losses on equity securities are recognized in income whereas unrealized gains and losses on AFS debt securities are
recognized in AOCI. However, the spent nuclear fuel disposal trusts of JCP&L are subject to regulatory accounting with all gains and losses on equity and AFS
debt securities offset against regulatory assets.
Spent Nuclear Fuel Disposal Trusts
JCP&L holds debt securities within the spent nuclear fuel disposal trust, which are classified as AFS securities, recognized at fair market value. The trust is
intended for funding spent nuclear fuel disposal fees to the United States Department of Energy associated with the previously owned Oyster Creek and Three
Mile Island Unit 1 nuclear power plants.
The following table summarizes the amortized cost basis, unrealized gains, unrealized losses and fair values of investments held in spent nuclear fuel disposal
trusts as of March 31, 2024, and December 31, 2023:
March 31, 2024 	December 31, 2023
Cost Basis
Unrealized
Gains
Unrealized
Losses 	Fair Value 	Cost Basis
Unrealized
Gains
Unrealized
Losses 	Fair Value
(In millions)
Debt securities 	$ 	303 $ 	— $ 	(29) $ 	274 $ 	301 $ 	1 $ 	(27) $ 	275
Excludes short-term cash investments of $6 million as of March 31, 2024 and December 31, 2023.
Proceeds from the sale of investments in AFS debt securities, realized gains and losses on those sales and interest and dividend income for the three months
ended March 31, 2024 and 2023, were as follows:
For the Three Months Ended
March 31,
2024 	2023
(In millions)
Sale proceeds 	$ 	13 $ 	1
Realized gains 	— 	—
Realized losses 	(1) 	(1)
Interest and dividend income 	3 	3
Other Investments
Other investments include employee benefit trusts, which are primarily invested in corporate-owned life insurance policies, and equity method investments.
Earnings and losses associated with corporate-owned life insurance policies are reflected in “Miscellaneous income, net” on FirstEnergy’s Consolidated
Statements of Income. The total carrying value of other investments were $408 million and $382 million as of March 31, 2024, and December 31, 2023,
respectively, and are excluded from the amounts reported above. See Note 1, "Organization and Basis of Presentation," for additional information on
FirstEnergy's equity method investments.
Pre-tax income related to corporate-owned life insurance policies was $9 million and $7 million for the three months ended March 31, 2024 and 2023,
respectively. Corporate-owned life insurance policies are valued using the cash surrender value and any changes in value during the period are recognized as
income or expense.
(1) 	(1)
(1)
15

-- 25 of 106 --

LONG-TERM DEBT AND OTHER LONG-TERM OBLIGATIONS
All borrowings with initial maturities of less than one year are defined as short-term financial instruments under GAAP and are reported as Short-term borrowings
on the Consolidated Balance Sheets at cost. Since these borrowings are short-term in nature, FirstEnergy believes that their costs approximate their fair market
value. The following table provides the approximate fair value and related carrying amounts of long-term debt, which excludes finance lease obligations and net
unamortized debt issuance costs, unamortized fair value adjustments, premiums and discounts as of March 31, 2024 and December 31, 2023:
March 31, 2024 	December 31, 2023
(In millions)
Carrying value 	$ 	24,381 $ 	24,254
Fair value 	$ 	22,904 $ 	23,003
The fair values of long-term debt and other long-term obligations reflect the present value of the cash outflows relating to those securities based on the current
call price, the yield to maturity or the yield to call, as deemed appropriate at the end of each respective period. The yields assumed were based on securities with
similar characteristics offered by corporations with credit ratings similar to those of FirstEnergy. FirstEnergy classified short-term borrowings, long-term debt and
other long-term obligations as Level 2 in the fair value hierarchy as of March 31, 2024, and December 31, 2023.
FirstEnergy had the following issuances and redemptions during the three months ended March 31, 2024:
Company 	Type 	Issuance Date
Interest
Rate 	Maturity
Amount
(In millions) 	Description
Issuance
ATSI 	Senior
Unsecured Note 	March, 2024 	5.63% 	2034 	$150 	Proceeds were used to repay short-term borrowings, to finance capital
expenditures and for other general corporate purposes.
In March 2024, notice of redemption was provided for all remaining $463 million of FE’s 7.375% Notes, due 2031, which was completed on April 15, 2024, with a
make-whole premium of approximately $80 million. Due to the redemption, the $463 million remaining notes are included within currently payable long-term debt
on the Consolidated Balance Sheets as of March 31, 2024.
On April 1, 2024, JCP&L redeemed its $500 million 4.70% unsecured notes that became due.
On April 15, 2024, MP redeemed its $400 million 4.10% FMBs that became due.
On April 18, 2024, MAIT agreed to sell $250 million of new 5.94% Unsecured Notes due May 1, 2031. The sale is expected to settle on May 2, 2024. Proceeds
are expected to be used to repay short-term borrowings, to finance capital expenditures and for other general corporate purposes.
7. VARIABLE INTEREST ENTITIES
FirstEnergy performs qualitative analyses to determine whether a variable interest qualifies FirstEnergy as the primary beneficiary (a controlling financial
interest) of a VIE. An enterprise has a controlling financial interest if it has both: (i) the power to direct the activities of a VIE that most significantly impact the
entity’s economic performance; and (ii) the obligation to absorb losses of the entity that could potentially be significant to the VIE or the right to receive benefits
from the entity that could potentially be significant to the VIE. FirstEnergy consolidates a VIE when it is determined that it is the primary beneficiary.
In order to evaluate contracts for consolidation treatment and entities for which FirstEnergy has an interest, FirstEnergy aggregates variable interests into
categories based on similar risk characteristics and significance.
Consolidated VIEs
Total assets on the FirstEnergy consolidated balance sheets include approximately $11,156 million and $11,024 million of consolidated VIE assets, as of
March 31, 2024 and December 31, 2023, respectively, that can only be used to settle the liabilities of the applicable VIE. Total liabilities include approximately
$8,184 million and $7,835 million as of March 31, 2024 and December 31, 2023, respectively, of consolidated VIE liabilities for which the VIE's creditors do not
have recourse to FirstEnergy.
16

-- 26 of 106 --

VIEs in which FirstEnergy is the primary beneficiary consist of the following (included in FirstEnergy’s consolidated financial statements):
Securitization Companies
• Ohio Securitization Companies - In June 2013, the SPEs formed by the Ohio Companies issued approximately $445 million of pass-through trust
certificates supported by phase-in recovery bonds to securitize the recovery of certain all-electric customer heating discounts, fuel and purchased
power regulatory assets. The phase-in recovery bonds are payable only from, and secured by, phase in recovery property owned by the SPEs. The
bondholder has no recourse to the general credit of FirstEnergy or any of the Ohio Companies. Each of the Ohio Companies, as servicer of its
respective SPE, manages and administers the phase in recovery property including the billing, collection and remittance of usage-based charges
payable by retail electric customers. The SPEs are considered VIEs and each one is consolidated into its applicable utility. As of March 31, 2024 and
December 31, 2023, $183 million and $191 million of the phase-in recovery bonds were outstanding, respectively.
• MP and PE Environmental Funding Companies - The consolidated financial statements of FirstEnergy include environmental control bonds issued by
two bankruptcy remote, special purpose limited liability companies that are indirect subsidiaries of MP and PE. Proceeds from the bonds were used to
construct environmental control facilities. Principal and interest owed on the environmental control bonds is secured by, and payable solely from, the
proceeds of the environmental control charges. Creditors of FirstEnergy, other than the limited liability company SPEs, have no recourse to any assets
or revenues of the special purpose limited liability companies. As of March 31, 2024 and December 31, 2023, $203 million and $218 million of
environmental control bonds were outstanding, respectively.
Restricted cash included on the FirstEnergy Consolidated Balance Sheets of $25 million and $40 million as of March 31, 2024 and December 31, 2023,
respectively, relates to cash collected from MP, PE and the Ohio Companies' customers that is specifically used to service debt of their respective funding
companies.
FET
FET is a holding company that owns equity interests in ATSI, MAIT, TrAIL and PATH. As further discussed above, on February 2, 2023, FE entered into an
agreement with Brookfield to sell an incremental 30% equity interest in FET, which closed on March 25, 2024. As of March 31, 2024, FE’s equity ownership in
FET is 50.1% and Brookfield’s is 49.9%. FirstEnergy has concluded that FET is a VIE and that FE is the primary beneficiary because FE has exposure to the
economics of FET and the power to direct significant activities of FET through the FESC services agreement, which represents a separate variable interest.
Although Brookfield was granted incremental consent rights upon the closing of the FET Equity Interest Sale, Brookfield will not have unilateral control over any
activities that most significantly impact FET’s economic performance. However, FE will continue to retain power over the activities that most significantly impact
FET’s economic performance through its incremental decision making rights under the existing FESC services agreement, through which executive
management and workforce services are provided to FET. As a result, FE is the primary beneficiary of FET and FET will continue to be consolidated in
FirstEnergy’s financial statements.
The following shows the carrying amounts and classification of the FET assets and liabilities included in the consolidated financial statements as of March 31,
2024 and December 31, 2023. Amounts exclude intercompany balances which were eliminated in consolidation. The assets of FET can only be used to settle its
obligations, and creditors of FET do not have recourse to the general credit of FirstEnergy.
Assets March 31,
2024 December 31,
2023
(In millions)
Cash and cash equivalents 	$ 	77 $ 	76
Receivables 	117 	88
Materials and supplies, at average cost 	1 	1
Prepaid taxes and other 	24 	23
Total current assets 	219 	188
Property, plant and equipment, net 	10,426 	10,227
Goodwill 	224 	224
Investments 	19 	19
Regulatory assets 	9 	16
Other 	234 	310
Total noncurrent assets 	10,912 	10,796
TOTAL ASSETS 	$ 	11,131 $ 	10,984
17

-- 27 of 106 --

Liabilities
March 31,
2024
December 31,
2023
(In millions)
Currently payable long-term debt 	600 	—
Short-term borrowings 	250 	—
Accounts payable 	— 	2
Accrued interest 	61 	63
Accrued taxes 	276 	262
Other 	7 	14
Total current liabilities 	1,194 	341
Long-term debt and other long-term obligations 	4,825 	5,275
Accumulated deferred income taxes 	1,289 	1,218
Regulatory liabilities 	342 	307
Other 	148 	285
Total noncurrent liabilities 	6,604 	7,085
TOTAL LIABILITIES 	$ 	7,798 $ 	7,426
Unconsolidated VIEs
FirstEnergy is not the primary beneficiary of its equity method investments in Global Holding and PATH WV, as further discussed above, or its PPAs.
FirstEnergy evaluated its PPAs and determined that certain Non-Utility Generation entities may be VIEs to the extent that they own a plant that sells substantially
all of its output to the applicable utilities and the contract price for power is correlated with the plant’s variable costs of production. As of March 31, 2024,
FirstEnergy maintains four long-term PPAs with Non-Utility Generation entities that were entered into pursuant to the Public Utility Regulatory Policies Act of
1978. FirstEnergy was not involved in the creation of, and has no equity or debt invested in, any of these entities. FirstEnergy has determined that, it does not
have a variable interest, or the entities do not meet the criteria to be considered a VIE.
Because FirstEnergy has no equity or debt interests in the Non-Utility Generation entities, its maximum exposure to loss relates primarily to the above-market
costs incurred for power, which are expected to be recovered from customers.
8. REGULATORY MATTERS
STATE REGULATION
Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in
Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York
by the NYPSC. The transmission operations of PE and TrAIL in Virginia, ATSI in Ohio, the Transmission Companies in Pennsylvania, PE and MP in West
Virginia, and PE in Maryland are subject to certain regulations of the VSCC, PUCO, PPUC, WVPSC, and MDPSC, respectively. In addition, under Ohio law,
municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates were
to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization to
site, construct and operate the new transmission facility.
MARYLAND
PE operates under MDPSC approved base rates that were effective as of October 19, 2023, and that were subsequently modified by an MDPSC order dated
January 3, 2024, which became effective as of March 1, 2024. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC orders and
regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are
overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the
same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS.
The EmPOWER Maryland program requires each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal
of 2% annual savings. PE recovers program investments with a return through an annually reconciled surcharge, with most costs subject to recovery over a five-
year period with a return on the unamortized balance. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency
or demand reduction programs through a base rate case proceeding. On August 1, 2023, PE filed its proposed plan for the 2024-2026 cycle as required by the
MDPSC. Consistent with a December 29, 2022, order by the MDPSC phasing out the ability of Maryland utilities to earn a return on EmPOWER investments, PE
will be required to expense 33% of its EmPOWER program costs in 2024, 67% in 2025 and 100% in 2026. Notwithstanding the order to phase out PE’s ability to
earn a return on its EmPOWER investments, all previously unamortized costs for prior cycles will continue to earn a return and be collected by the end of 2029,
consistent with the plan PE submitted on January 11, 2023. In the 2024-2026 order issued on December 29, 2023, the period to pay down the
18

-- 28 of 106 --

amortized balances was extended through the end of 2031. Additionally at the direction of the MDPSC, PE together with other Maryland utilities are required to
address GHG reductions in addition to energy efficiency. In compliance with the MDPSC directive, PE submitted three scenarios with projected costs over a
three-year cycle of $310 million, $354 million, and $510 million, respectively. The MDPSC conducted hearings on the proposed plans for all Maryland utilities on
November 6-8, 2023. On December 29, 2023, the MDPSC issued an order approving the $310 million scenario for most programs, with some modifications. On
February 21, 2024, the MDPSC approved PE’s tariff to recover costs in 2024 but directed PE to analyze alternative amortization methods for possible use in
later years.
NEW JERSEY
JCP&L operates under NJBPU approved rates that took effect as of February 15, 2024, and will become effective for customers as of June 1, 2024. JCP&L
provides BGS for retail customers who do not choose a third-party EGS and for customers of third- party EGSs that fail to provide the contracted service. All
New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base
rates.
The base rate increase, which was approved by the NJBPU on February 14, 2024, took effect on February 15, 2024, and is effective for customers on June 1,
2024. Until those new rates became effective for customers, JCP&L is amortizing an existing regulatory liability totaling approximately $18 million to offset the
base rate increase that otherwise would have occurred in this period. Under the base rate case settlement agreement, JCP&L also agreed to a two-phase
reliability improvement plan to enhance the reliability related to 18 high-priority circuits, the first phase of which began on February 14, 2024, and represents an
approximate investment of $95 million. Additionally, JCP&L recognized a $53 million pre-tax charge in the first quarter 2024 at the Integrated segment within
“Other operating expenses” on the FirstEnergy Consolidated Statements of Income, associated with certain corporate support costs recorded to capital accounts
from the FERC Audit that were determined, as a result of the settlement agreement, to be disallowed from future recovery.
JCP&L has implemented energy efficiency and peak demand reduction programs in accordance with the New Jersey Clean Energy Act as approved by the
NJBPU in April 2021. The NJBPU approved plans include recovery of lost revenues resulting from the programs and a three-year plan (July 2021-June 2024)
including total program costs of $203 million, of which $160 million of investment is recovered over a ten-year amortization period with a return as well as $43
million in operations and maintenance expenses and financing costs recovered on an annual basis. On December 5, 2023, JCP&L filed a petition with the
NJBPU for a six-month extension of EE&C Plan I, which was originally scheduled to end on June 30, 2024, but would end on December 31, 2024, with the
extension. The proposed budget for the extension period would add approximately $69 million to the original program cost. Under the proposal, JCP&L would
recover the costs of the extension period and the revenue impact of sales losses resulting therefrom through two separate tariff riders. On December 1, 2023,
JCP&L filed a related petition with the NJBPU requesting approval of its EE&C Plan II, which covers the January 1, 2025 through June 30, 2027 period and has
a proposed budget of approximately $964 million. EE&C Plan II consists of a portfolio of ten energy efficiency programs, one peak demand reduction program
and one building decarbonization program. Under the proposal, JCP&L would recover its EE&C Plan II revenue requirements and lost revenues from reduced
electricity sales associated with EE&C Plan II. Evidentiary hearings are scheduled to begin August 19, 2024, with a final NJBPU decision and order required no
later than October 15, 2024.
The settlement of the distribution rate case in 2020, provided among other things, that JCP&L would be subject to a management audit, which began in May
2021. On April 12, 2023, the NJBPU accepted the final management audit report for filing purposes and ordered that interested stakeholders file comments on
the report by May 22, 2023, which deadline was extended until July 31, 2023. JCP&L filed its comments on July 31, 2023. The parties have filed responses.
On September 17, 2021, in connection with Mid-Atlantic Offshore Development, LLC, a transmission company jointly owned by Shell New Energies US and EDF
Renewables North America, JCP&L submitted a proposal to the NJBPU and PJM to build transmission infrastructure connecting offshore wind-generated
electricity to the New Jersey power grid. On October 26, 2022, the JCP&L proposal was accepted, in part, in an order issued by NJBPU. The proposal, as
accepted, included approximately $723 million in investments for JCP&L to both build new and upgrade existing transmission infrastructure. JCP&L’s proposal
projects an investment ROE of 10.2% and includes the option for JCP&L to acquire up to a 20% equity stake in Mid-Atlantic Offshore Development, LLC. The
resulting rates associated with the project are expected to be shared among the ratepayers of all New Jersey electric utilities. On April 17, 2023, JCP&L applied
for the FERC “abandonment” transmission rates incentive, which would provide for recovery of 100% of the cancelled prudent project costs that are incurred
after the incentive is approved, and 50% of the costs incurred prior to that date, in the event that some or all of the project is cancelled for reasons beyond
JCP&L’s control. FERC staff subsequently requested additional information on JCP&L’s application, which JCP&L provided. On August 21, 2023, FERC
approved JCP&L’s application, effective August 22, 2023. On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two
offshore wind projects in New Jersey—Ocean Wind 1 and 2—having a combined planned capacity of 2,248 MWs. At this time, Orsted’s announcement does not
affect JCP&L’s awarded projects and JCP&L is moving forward with preconstruction activities for the planned transmission infrastructure. Construction is
expected to begin in 2025.
Consistent with the commitments made in its proposal to the NJBPU, JCP&L formally submitted in November 2023 the first part of its application to the United
States Department of Energy to finance a portion of the project using low-interest rate loans
19

-- 29 of 106 --

available under the United States Department of Energy’s Energy Infrastructure Reinvestment Program of the IRA of 2022. JCP&L submitted the second part of
its two-part application on March 13, 2024.
On April 3, 2024, Mid-Atlantic Offshore Development, LLC submitted a bid application for the NJBPU Prebuild Infrastructure Solicitation to the NJBPU which
outlines its proposal to construct infrastructure connecting the identified landing point for offshore wind generation off the coast of New Jersey with the high-
voltage electric grid at Larrabee Collector Station. JCP&L is described in the application as a joint developer with Mid-Atlantic Offshore Development, LLC,
subject to the execution of a joint development agreement by the parties. Mid-Atlantic Offshore Development, LLC will be the party responsible for the project.
On November 9, 2023, JCP&L filed a petition for approval of its second EnergizeNJ with the NJBPU that would, among other things, support grid modernization,
system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. JCP&L proposes EnergizeNJ will be
implemented over a five-year budget period with estimated costs of approximately $935 million over the deployment period, of which, $906 million is capital
investments and $29 million is operating and maintenance expenses. Under the proposal, the costs of EnergizeNJ would be recovered through JCP&L’s base
rates via annual and semi-annual base rate adjustment filings. Public hearings have been requested but are not yet scheduled. JCP&L has requested that the
NJBPU issue a final decision and order no later than May 22, 2024, based on a June 1, 2024, commencement date for EnergizeNJ. JCP&L anticipates filing
amendments to the EnergizeNJ program after receipt of approval from the NJBPU of the base rate case stipulation that was filed on February 2, 2024. On
February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate
increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of
the base rate case settlement, to include the second phase of its reliability improvement plan that is expected to address any remaining high-priority circuits not
addressed in the first phase. EnergizeNJ, as amended, if approved will result in the investment of approximately $930.5 million of total estimated costs over five
years.
OHIO
The Ohio Companies operate under PUCO-approved base distribution rates that became effective in 2009. The Ohio Companies currently operate under ESP
IV, which continues through May 31, 2024, that provides for the supply of power to non-shopping customers at a market-based price set through an auction
process. ESP IV also continues the Rider DCR, which supports continued investment related to the distribution system for the benefit of customers, with revenue
caps of $15 million per year through May 31, 2024. In addition, ESP IV includes: (1) continuation of a base distribution rate freeze through May 31, 2024; (2) a
goal across FirstEnergy to reduce CO emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $51 million to: (a) fund energy conservation
programs, economic development and job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service
territories to assist low-income customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio.
On April 5, 2023, the Ohio Companies filed an application with the PUCO for approval of ESP V, for an eight-year term beginning June 1, 2024, and continuing
through May 31, 2032. ESP V proposes to continue providing power to non-shopping customers at market-based prices set through an auction process, with
process enhancements designed to reduce costs to customers. ESP V also proposes to continue riders supporting investment in the Ohio Companies’
distribution system, including Rider DCR with annual revenue cap increases of $15 million to $21 million per year, based on reliability performance, and Rider
AMI for recovery of approved grid modernization investments. ESP V proposes new riders to support continued maintenance of the distribution system, including
vegetation management and storm restoration operating expense. In addition, ESP V proposes four-year energy efficiency and peak demand reduction
programs for residential and commercial customers, with cost recovery spread over eight years. ESP V further includes a commitment to spend $52 million in
total over the eight-year term, without recovery from customers, on initiatives to assist low-income customers, education and incentives to help ensure
customers have good experiences with electric vehicles. Hearings commenced on November 7, 2023 and concluded on December 6, 2023. On December 6,
2023, certain intervenors filed a motion requesting a limited stay of the Ohio Companies’ proposal to continue Rider DCR. The Ohio Companies contested the
motion, which is pending.
On May 16, 2022, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2021, which
demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. This matter remains pending before the PUCO.
On July 15, 2022, the Ohio Companies filed an application with the PUCO for approval of phase two of their distribution grid modernization plan that would,
among other things, provide for the installation of an additional 700 thousand smart meters, distribution automation equipment on approximately 240 distribution
circuits, voltage regulating equipment on approximately 220 distribution circuits, and other investments and pilot programs in related technologies designed to
provide enhanced customer benefits. The Ohio Companies propose that phase two will be implemented over a four-year budget period with estimated capital
investments of approximately $626 million and operations and maintenance expenses of approximately $144 million over the deployment period. Under the
proposal, costs of phase two of the grid modernization plan would be recovered through the Ohio Companies’ AMI rider, pursuant to the terms and conditions
approved in ESP IV. On April 12, 2024, the Ohio Companies and certain of the parties filed a stipulation that modified the Ohio Companies’ application for phase
two of its grid modernization plan. The stipulation, which is subject to PUCO approval, provides for the deployment of smart meters to the balance of the Ohio
Companies’ customers or approximately 1.4 million meters. Phase two of the distribution grid modernization plan, as modified by
2
20

-- 30 of 106 --

the stipulation would be completed over a four-year budget period with estimated capital investments of approximately $421 million. On April 16, 2024, the
PUCO scheduled the stipulation hearing for June 5, 2024.
On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to open an
investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or
violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On December 30, 2020, in response to the OCC's motion, the PUCO reopened
the DMR audit docket, and directed PUCO staff to solicit a third-party auditor and conduct a full review of the DMR to ensure funds collected from customers
through the DMR were only used for the purposes established in ESP IV. On June 2, 2021, the PUCO selected an auditor, and the auditor filed the final audit
report on January 14, 2022, which made certain findings and recommendations. The report found that spending of DMR revenues was not required to be
tracked, and that DMR revenues, like all rider revenues, are placed into the regulated money pool as a matter of routine, where the funds lose their identity.
Therefore, the report could not suggest that DMR funds were used definitively for direct or indirect support for grid modernization. The report also concluded that
there was no documented evidence that ties revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR
funds to support the passage of HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio
Companies adopt formal dividend policies. Final comments and responses were filed by parties during the second quarter of 2022. The proceeding was stayed
in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and
was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the expanded Rider DCR audit proceeding
described below and set a procedural schedule, which was vacated on March 15, 2024. A new procedural schedule will be set at a May 21, 2024 prehearing
conference.
On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the
subsequent referendum effort, and directing the Ohio Companies to show cause, demonstrating that the costs of any political or charitable spending in support of
HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers. The Ohio Companies initially filed
a response stating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or
indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a supplemental response explaining that, in light of the facts set forth in the
DPA and the findings of the Rider DCR audit report further discussed below, political or charitable spending in support of HB 6, or the subsequent referendum
effort, affected pole attachment rates paid by approximately $15 thousand. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an
independent external audit to investigate FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and
oversee the auditor. In November and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental
responses to the PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show
cause demonstration submitted by the Ohio Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6 or the
subsequent referendum effort was not included, directly or indirectly, in any rates or charges paid by ratepayers. The proceeding was stayed in its entirety,
including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on
February 26, 2024. On February 26, 2024, the Attorney Examiner directed the third-party auditor to file its report by August 28, 2024.
In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on November 4,
2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement made on October 29, 2020,
as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates with corporate separation laws and the Ohio
Companies’ corporate separation plan. The additional audit is for the period from November 2016 through October 2020. The final audit report was filed on
September 13, 2021. The audit report makes no findings of major non-compliance with Ohio corporate separation requirements, minor non-compliance with
eight requirements, and findings of compliance with 23 requirements. Parties filed comments and reply comments on the audit report. The proceeding was
stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022
and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner set a procedural schedule, which was vacated on March 15, 2024. A new
procedural schedule will be set at an April 25, 2024 prehearing conference.
In connection with an ongoing annual audit of the Ohio Companies’ Rider DCR for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K for the year
ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a review of certain
transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether funds collected from customers
were used to pay the vendors, and if so, whether or not the funds associated with those payments should be returned to customers through Rider DCR or
through an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase of the audit, and the parties submitted comments and reply
comments on this audit report in October 2021. Additionally, on September 29, 2021, the PUCO expanded the scope of the audit in this proceeding to determine
if the costs of the naming rights for FirstEnergy Stadium have been recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its
final report, in which the auditor concluded that the FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15,
2021, the PUCO further expanded the scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’
ESP IV settlement proceedings, but stayed its expansion of the audit until otherwise ordered
21

-- 31 of 106 --

by the PUCO. The proceeding was stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern
District of Ohio beginning in August 2022 and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with
the Rider DMR audit proceeding described above, further lifted the stay of the portion of the investigation relating to an apparent nondisclosure of a side
agreement, and set a procedural schedule, which was vacated on March 15, 2024. A new procedural schedule will be set at a May 21, 2024 prehearing
conference.
On March 1, 2024, the Attorney Examiner issued an Entry in all four PUCO investigations that, among other things, precluded taking or offering the testimony of
Charles E. Jones, Michael J. Dowling, or Samuel Randazzo through deposition or other means, or requiring these individuals to produce documents, in any
PUCO proceeding, until otherwise ordered.
On September 22, 2023, OCC filed an application for rehearing challenging the PUCO’s August 23, 2023, order to stay the pending HB 6 related matters above,
which the PUCO denied on October 18, 2023. On November 17, 2023, OCC filed an application for rehearing challenging the October 18, 2023 entry to the
extent the PUCO decided not to stay pending proceedings regarding ESP V as well as phases one and two of the Ohio Companies’ distribution grid
modernization plans. On November 27, 2023, the Ohio Companies filed a memorandum contra OCC’s application for rehearing.
In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related
charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-
related charges the Ohio Companies collect. Instead, the Ohio Companies are further required by HB 6 to remit all the OVEC-related charges they collect to
non-FE Ohio electric distribution utilities. The Ohio Companies contested the motions, which are pending before the PUCO.
On May 15, 2023, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2022, which
demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. This matter remains pending before the PUCO.
See Note 9, “Commitments, Guarantees and Contingencies” below for additional details on the government investigations and subsequent litigation surrounding
the investigation of HB 6.
PENNSYLVANIA
The Pennsylvania Companies operated under rates approved by the PPUC, effective as of January 27, 2017. On January 1, 2024, each of the Pennsylvania
Companies merged with and into FE PA. As a result of the PA Consolidation, FE PA will have five rate districts in Pennsylvania – four that correspond to the
territories previously serviced by ME, PN, Penn, and WP and one rate district that corresponds to WP’s service provided to The Pennsylvania State University.
The rate districts created by the PA Consolidation will not reach full rate unity until the earlier of 2033 or the conclusion of three base rate cases filed after
January 1, 2025.
Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, the Pennsylvania Companies implemented energy efficiency and peak demand reduction
programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for
WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWh for ME,
3.0% MWh for PN, 2.7% MWh for Penn, and 2.4% MWh for WP. The fourth phase of FE PA’s energy efficiency and peak demand reduction program, which runs
for the five-year period beginning June 1, 2021 through May 31, 2026, was approved by the PPUC on June 18, 2020, providing through cost recovery of
approximately $390 million to be recovered through Energy Efficiency and Conservation Phase IV Riders for each FE PA rate district.
Pennsylvania EDCs are permitted to seek PPUC approval of an LTIIP for infrastructure improvements and costs related to highway relocation projects, after
which a DSIC may be approved to recover LTIIP costs. On January 16, 2020, the PPUC approved the Pennsylvania Companies’ LTIIPs for the five-year period
beginning January 1, 2020 and ending December 31, 2024 for a total capital investment of approximately $572 million for certain infrastructure improvement
initiatives. FE PA expects to seek approval for the next phase of its LTIIP program by the end of the third quarter of 2024.
Following the Pennsylvania Companies’ 2016 base rate proceedings, the PPUC ruled in a separate proceeding related to the DSIC mechanisms that the
Pennsylvania Companies were not required to reflect federal and state income tax deductions related to DSIC-eligible property in DSIC rates. The decision was
appealed to the Pennsylvania Supreme Court and in July 2021 the court upheld the Pennsylvania Commonwealth Court’s reversal of the PPUC’s decision and
remanded the matter back to the PPUC for determination as to how DSIC calculations shall account for accumulated deferred income taxes and state taxes. The
PPUC issued the order as directed.
On May 5, 2023, FirstEnergy and Brookfield submitted applications to FERC and to the PPUC to facilitate the FET Equity Interest Sale. On May 12, 2023, the
parties also filed an application with the VSCC, which was approved on June 20, 2023. On August 14, 2023, FERC issued an order approving the FET Equity
Interest Sale. On November 24, 2023, CFIUS notified FET, Brookfield and the Abu Dhabi Investment Authority, as an indirect investor in FET through Brookfield,
that it had determined that there were no unresolved national security issues and its review of the transaction was concluded. On November 29, 2023, the
22

-- 32 of 106 --

parties filed a settlement agreement recommending that the PPUC approve the transaction subject to the terms of the settlement, which includes among other
things, a number of ring-fencing provisions and a commitment to improve transmission reliability over the next five years. The settlement was approved by the
PPUC on March 14, 2024. The transaction closed on March 25, 2024.
On April 2, 2024, FE PA filed a base rate case with the PPUC, based on a projected 2025 annual test year. The rate case requests a net increase in base
distribution revenues of approximately $502 million with a return on equity of 11.3% and capital structure of 46.2% debt and 53.8% equity, and reflects a roll-in of
several current riders such as DSIC, Tax Act and smart meter. The increase represents an overall net average rate increase in FE PA rates by approximately
7.7%, and a 10.5% average residential rate increase. Key components of the base rate case filing include a proposal to change pension and OPEB recovery to
the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the
amount of pension and OPEB expense requested in the proceeding and the actual annual amount each year using this method. Additionally, FE PA requests
recovery of certain incurred costs, including the impact of major storms, COVID-19, a program to convert streetlights to LEDs, and others. The PPUC issued an
order on April 25, 2024, deferring, by operation of law, the June 1, 2024 statutory effective date to January 1, 2025. A pre-hearing conference is scheduled for
May 2, 2024. A PPUC decision is expected in December 2024, with new rates becoming effective in January 2025.
WEST VIRGINIA
MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates. MP
and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the
ENEC. MP’s and PE’s ENEC rate is updated annually.
On August 31, 2023, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates of $167.5 million beginning January 1,
2024, which represents a 9.9% increase in overall rates. This increase, which was driven primarily by higher fuel expenses, includes the approximate $92 million
carried over from the 2022 ENEC proceeding and a portion of the approximately $267 million under recovery balance at the end of the review period (July 1,
2022 to June 30, 2023). The remaining $75.6 million of the under recovery balance not recovered in 2024 will be deferred for collection during 2025, with an
annual carrying charge of 4%. A hearing was held on November 30, 2023, at which time a joint stipulation for settlement that was agreed to by all but one party
was presented to the WVPSC. The settlement provides for a net $55.4 million increase in ENEC rates beginning March 27, 2024 with the net deferred ENEC
balance of approximately $255 million to be recovered through 2026. There will be no 2024 ENEC case unless MP and PE over or under recover more than $50
million than the 2024 ENEC balance and a party elects to invoke a case filing. An order was issued on March 26, 2024 approving the settlement without
modification and rates became effective on March 27, 2024.
On April 21, 2022, the WVPSC issued an order approving, effective May 1, 2022, a tariff to offer solar power to West Virginia customers and requiring MP and
PE to subscribe at least 85% of the planned 50 MWs of solar generation before seeking final tariff approval. MP and PE must seek separate approval from the
WVPSC to recover any solar generation costs in excess of the approved tariff. On April 24, 2023, MP and PE sought final tariff approval from the WVPSC for
three of the five solar sites, representing 30 MWs of generation, and requested approval of a surcharge to recover any costs above the final approved tariff. The
first solar generation site went into service in January 2024 and construction of the remaining four sites are expected to be completed no later than the end of
2025 at a total investment cost of approximately $110 million. On August 23, 2023, the WVPSC approved the customer surcharge and granted approval to
construct three of the five solar sites. The surcharge went into effect January 1, 2024.
On January 13, 2023, MP and PE filed a request with the WVPSC seeking approval of new depreciation rates for existing and future capital assets. Specifically,
MP and PE are seeking to increase depreciation expense by approximately $76 million per year, primarily for regulated generation-related assets. Any
depreciation rates approved by the WVPSC would not become effective until new base rates were established. On August 22, 2023, a unanimous settlement of
the case was filed recommending a $33 million per year increase in depreciation expense, effective April 1, 2024. An order from the WVPSC was issued on
March 26, 2024 approving the settlement without modification and became effective on March 27, 2024.
On May 31, 2023, MP and PE filed a base rate case with the WVPSC requesting a total revenue increase of approximately $207 million utilizing a test year of
2022 with adjustments plus a request to establish a regulatory asset (or liability) to recover (or refund) in a subsequent base rate case the net differences
between the amount of pension and OPEB expense requested in the proceeding (based on average expense from 2018 to 2022) and the actual annual amount
each year using the delayed recognition method. Among other things, the increase includes the approximate $76 million requested in a depreciation case filed
on January 13, 2023 and described above, and amounts to support a new low-income customer advocacy program, storm restoration work and service reliability
investments. On January 23, 2024, MP, PE and various parties filed a joint settlement agreement with the WVPSC, which recommended a base rate increase of
$105 million, inclusive of the $33 million increase in depreciation expense. Additionally, the settlement includes a new low-income customer advocacy program, a
pilot program for service reliability investments and recovery of costs related to storm restoration, retired generation assets and COVID-19. The settlement did
not include the request to establish a regulatory asset (or liability) for recover (or refund) associated with pension and OPEB expense, however, it did not
preclude MP and PE from pursuing that in a future separate proceeding. On February 16, 2024, interested parties filed a settlement on the net energy metering
credit for consideration by the WVPSC. An order was
23

-- 33 of 106 --

issued on March 26, 2024 approving the $105 million increase and accepting the settlement with slight non-material modifications with new rates going into
effect on March 27, 2024. Additionally, due to the order including approval by the WVPSC to recover certain costs associated with retired generation assets, MP
recognized a $60 million pre-tax benefit in the first quarter of 2024 to establish a regulatory asset.
FERC REGULATORY MATTERS
Under the Federal Power Act, FERC regulates rates for interstate wholesale sales and transmission of electric power, regulatory accounting and reporting under
the Uniform System of Accounts, and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and
rates, the Utilities, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE and the
Transmission Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP, PE
and the Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under
the PJM Tariff. On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo.
FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates
upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Utilities and AE Supply each
have the necessary authorization from FERC to sell their wholesale power, if any, in interstate commerce at market-based rates, although in the case of the
Utilities major wholesale purchases remain subject to review and regulation by the relevant state commissions.
Federally enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements
on the Utilities, AE Supply, and the Transmission Companies. NERC is the Electric Reliability Organization designated by FERC to establish and enforce these
reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to six regional entities, including
RFC. All of the facilities that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder
processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability
standards implemented and enforced by RFC.
FirstEnergy believes that it is in material compliance with all currently effective and enforceable reliability standards. Nevertheless, in the course of operating its
extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the
reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the
specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to
refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability
standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities, that could have
a material adverse effect on its financial condition, results of operations, and cash flows.
FERC Audit
FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s
compliance with certain accounting and reporting requirements under various FERC regulations. On February 4, 2022, FERC filed the final audit report for the
period of January 1, 2015 through September 30, 2021, which included several findings and recommendations that FirstEnergy has accepted. The audit report
included a finding and related recommendation on FirstEnergy’s methodology for allocation of certain corporate support costs to regulatory capital accounts
under certain FERC regulations and reporting. Effective in the first quarter of 2022 and in response to the finding, FirstEnergy had implemented a new
methodology for the allocation of these corporate support costs to regulatory capital accounts for its regulated distribution and transmission companies on a
prospective basis. With the assistance of an independent outside firm, FirstEnergy completed an analysis during the third quarter of 2022 of these costs and how
it impacted certain FERC-jurisdictional wholesale transmission customer rates for the audit period of 2015 through 2021. As a result of this analysis, FirstEnergy
recorded in the third quarter of 2022 approximately $45 million ($34 million after-tax) in expected customer refunds, plus interest, due to its wholesale
transmission customers and reclassified approximately $195 million of certain transmission capital assets to operating expenses for the audit period, of which
$90 million ($67 million after-tax) are not expected to be recoverable and impacted FirstEnergy’s earnings since they relate to costs capitalized during stated
transmission rate time periods. FirstEnergy is currently recovering approximately $105 million of costs reclassified to operating expenses in its transmission
formula rate revenue requirements, of which $39 million of costs have been recovered as of March 31, 2024. On December 8, 2023, FERC audit staff issued a
letter advising that two unresolved audit matters, primarily related to FirstEnergy’s plan to recover the reclassified operating expenses in formula transmission
rates, were being referred to other offices within FERC for further review. These reclassifications also resulted in a reduction to the Regulated Transmission
segment’s rate base by approximately $160 million, which is not expected to materially impact FirstEnergy or the segment’s future earnings. The expected
wholesale transmission customer refunds were recognized as a reduction to revenue, and the amount of reclassified transmission capital assets that are not
expected to be recoverable were recognized within “Other operating expenses” at the Regulated Transmission segment and on FirstEnergy’s Consolidated
Statements of Income. Furthermore, FirstEnergy’s Utilities are in the
24

-- 34 of 106 --

process of addressing the outcomes of the FERC Audit with the applicable state commissions and proceedings, which includes seeking continued rate base
treatment of approximately $200 million of certain corporate support costs allocated to distribution capital assets in Ohio and Pennsylvania. If FirstEnergy is
unable to recover these transmission or distribution costs, it could result in future charges and/or adjustments and have an adverse impact on FirstEnergy’s
financial condition.
ATSI ROE – Ohio Consumers Counsel v. ATSI, et al.
On February 24, 2022, the OCC filed a complaint with FERC against ATSI, AEP’s Ohio affiliates and American Electric Power Service Corporation, and Duke
Energy Ohio, LLC asserting that FERC should reduce the ROE utilized in the utilities’ transmission formula rates by eliminating the 50 basis point adder
associated with RTO membership, effective February 24, 2022. The OCC contends that this result is required because Ohio law mandates that transmission
owning utilities join an RTO and that the 50 basis point adder is applicable only where RTO membership is voluntary. On December 15, 2022, FERC denied the
complaint as to ATSI and Duke, but granted it as to AEP. AEP and OCC appealed FERC’s orders to the Sixth Circuit and the case remains pending. FirstEnergy
is unable to predict the outcome of this proceeding, but it is not expected to have a material impact.
Transmission ROE Methodology
A proposed rulemaking proceeding concerning transmission rate incentives provisions of Section 219 of the 2005 Energy Policy Act was initiated in March of
2020 remains pending before FERC. Among other things, the rulemaking explored whether utilities should collect an “RTO membership” ROE incentive adder for
more than three years. FirstEnergy is a member of PJM and its transmission subsidiaries could be affected by the proposed rulemaking. FirstEnergy participated
in comments on the supplemental rulemaking that were submitted by a group of PJM transmission owners and by various industry trade groups. If there were to
be any changes to FirstEnergy's transmission incentive ROE, such changes will be applied on a prospective basis.
Transmission Planning Supplemental Projects: Ohio Consumers Counsel v ATSI, et al.
On September 27, 2023, the OCC filed a complaint against ATSI, PJM and other transmission utilities in Ohio alleging that the PJM Tariff and operating
agreement are unjust, unreasonable, and unduly discriminatory because they include no provisions to ensure PJM’s review and approval for the planning, need,
prudence and cost-effectiveness of the PJM Tariff Attachment M-3 “Supplemental Projects.” Supplemental Projects are projects that are planned and constructed
to address local needs on the transmission system. The OCC demands that FERC: (i) require PJM to review supplemental projects for need, prudence and cost-
effectiveness; (ii) appoint an independent transmission monitor to assist PJM in such review; and (iii) require that Supplemental Projects go into rate base only
through a “stated rate” procedure whereby prior FERC approval would be needed for projects with costs that exceed an established threshold. ATSI and the
other transmission utilities in Ohio and PJM filed comments and the complaint is pending before FERC.
9. COMMITMENTS, GUARANTEES AND CONTINGENCIES
GUARANTEES AND OTHER ASSURANCES
FirstEnergy has various financial and performance guarantees and indemnifications, which are issued in the normal course of business. These contracts include
performance guarantees, stand-by LOCs, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate
commercial transactions with third parties by enhancing the value of the transaction to the third party.
As of March 31, 2024, outstanding guarantees and other assurances aggregated $820 million, consisting of parental guarantees on behalf of its consolidated
subsidiaries ($520 million) and other assurances ($300 million).
COLLATERAL AND CONTINGENT-RELATED FEATURES
In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity,
energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted
in the form of cash or credit support with thresholds contingent upon FE’s or its subsidiaries’ credit rating from each of the major credit rating agencies. The
collateral and credit support requirements vary by contract and by counterparty.
As of March 31, 2024, $119 million of net cash collateral has been posted by FE or its subsidiaries and is included in “Prepaid taxes and other current assets” on
FirstEnergy’s Consolidated Balance Sheets. FE or its subsidiaries are holding $33 million of net cash collateral as of March 31, 2024, from certain generation
suppliers, and such amount is included in “Other current liabilities” on FirstEnergy’s Consolidated Balance Sheets.
25

-- 35 of 106 --

These credit-risk-related contingent features stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent
contractual collateral obligations as of March 31, 2024:
Potential Collateral Obligations
Utilities and
Transmission
Companies 	FE 	Total
(In millions)
Contractual obligations for additional collateral
Upon further downgrade 	$ 	63 $ 	— $ 	63
Surety bonds (collateralized amount) 	87 	79 	166
Total Exposure from Contractual Obligations 	$ 	150 $ 	79 $ 	229
Surety Bonds are not tied to a credit rating. Surety Bonds’ impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond
except with respect to $39 million of surety bond obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days to cure.
ENVIRONMENTAL MATTERS
Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality, hazardous and solid waste disposal, and other environmental
matters. While FirstEnergy’s environmental policies and procedures are designed to achieve compliance with applicable environmental laws and regulations,
such laws and regulations are subject to periodic review and potential revision by the implementing agencies. FirstEnergy cannot predict the timing or ultimate
outcome of any of these reviews or how any future actions taken as a result thereof may materially impact its business, results of operations, cash flows and
financial condition.
Clean Air Act
FirstEnergy complies with SO and NOx emission reduction requirements under the CAA and SIP by burning lower-sulfur fuel, utilizing combustion controls and
post-combustion controls and/or using emission allowances.
CSAPR requires reductions of NOx and SO emissions in two phases (2015 and 2017), ultimately capping SO emissions in affected states to 2.4 million tons
annually and NOx emissions to 1.2 million tons annually. CSAPR allows trading of NOx and SO emission allowances between power plants located in the same
state and interstate trading of NOx and SO emission allowances with some restrictions. On July 28, 2015, the D.C. Circuit ordered the EPA to reconsider the
CSAPR caps on NOx and SO emissions from power plants in 13 states, including West Virginia. This followed the 2014 U.S. Supreme Court ruling generally
upholding the EPA’s regulatory approach under CSAPR but questioning whether the EPA required upwind states to reduce emissions by more than their
contribution to air pollution in downwind states. The EPA issued a CSAPR Update on September 7, 2016, reducing summertime NOx emissions from power
plants in 22 states in the eastern U.S., including West Virginia, beginning in 2017. Various states and other stakeholders appealed the CSAPR Update to the
D.C. Circuit in November and December 2016. On September 13, 2019, the D.C. Circuit remanded the CSAPR Update to the EPA citing that the rule did not
eliminate upwind states’ significant contributions to downwind states’ air quality attainment requirements within applicable attainment deadlines.
Also in March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NOx emissions from nine states (including West Virginia)
significantly contribute to New York’s inability to attain the ozone National Ambient Air Quality Standards. The petition sought suitable emission rate limits for
large stationary sources that are allegedly affecting New York’s air quality within the three years allowed by CAA Section 126. On September 20, 2019, the EPA
denied New York’s CAA Section 126 petition. On October 29, 2019, the State of New York appealed the denial of its petition to the D.C. Circuit. On July 14, 2020,
the D.C. Circuit reversed and remanded the New York petition to the EPA for further consideration. On March 15, 2021, the EPA issued a revised CSAPR Update
that addressed, among other things, the remands of the prior CSAPR Update and the New York Section 126 petition. In December 2021, MP purchased NOx
emissions allowances to comply with 2021 ozone season requirements. On April 6, 2022, the EPA published proposed rules seeking to impose further significant
reductions in EGU NOx emissions in 25 upwind states, including West Virginia, with the stated purpose of allowing downwind states to attain or maintain
compliance with the 2015 ozone National Ambient Air Quality Standards. On February 13, 2023, the EPA disapproved 21 SIPs, which was a prerequisite for the
EPA to issue a final Good Neighbor Plan or FIP. On June 5, 2023, the EPA issued the final Good Neighbor Plan with an effective date 60 days thereafter. Certain
states, including West Virginia, have appealed the disapprovals of their respective SIPs, and some of those states have obtained stays of those disapprovals
precluding the Good Neighbor Plan from taking effect in those states. On August 10, 2023, the 4th Circuit granted West Virginia an interim stay of the
disapproval of its SIP and on January 10, 2024, after a hearing held on October 27, 2023, granted a full stay which precludes the Good Neighbor Plan from
going into effect in West Virginia. In addition to West Virginia, certain other states, and certain trade organizations, including the Midwest Ozone Group of which
FE is a member, have separately appealed and filed motions to stay the Good Neighbor Plan itself at the D.C. Circuit. On September 25, 2023, the D.C. Circuit
denied the motions to stay the Good
(1)
(1)
2
2 	2
2
2
2
26

-- 36 of 106 --

Neighbor Plan. On October 13, 2023, the aggrieved parties filed an Emergency Application for an Immediate Stay of the Good Neighbor Plan with the U.S.
Supreme Court, which remains pending. Oral argument was heard on February 21, 2024.
Climate Change
In March 2024, the SEC issued final rules to require public companies to disclose certain climate-related information in registration statements and annual
reports filed with the SEC. As adopted, the final climate disclosure rules mandate the disclosure of climate-related risks and the material impacts that severe
weather events and other natural conditions have had, or are reasonably likely to have, on FirstEnergy, as well as disclosures related to management and FE
Board oversight of such risks. In April 2024, the SEC voluntarily stayed the final climate disclosure rules pending resolution of legal challenges. FirstEnergy
currently is assessing the impact of the final climate disclosure rules on its business. There are several initiatives to reduce GHG emissions at the state, federal
and international level. Certain northeastern states are participating in the Regional Greenhouse Gas Initiative and western states led by California, have
implemented programs, primarily cap and trade mechanisms, to control emissions of certain GHGs. Additional policies reducing GHG emissions, such as
demand reduction programs, renewable portfolio standards and renewable subsidies have been implemented across the nation.
FirstEnergy has pledged to achieve carbon neutrality by 2050 in GHGs within FirstEnergy’s direct operational control (Scope 1). With respect to our coal-fired
plants in West Virginia, we have identified that the end of the useful life date is 2035 for Fort Martin and 2040 for Harrison. Determination of the useful life of the
regulated coal-fired generation could result in changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale,
impairment, or regulatory disallowances. If MP is unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial
condition, results of operations, and cash flow. Furthermore, FirstEnergy cannot currently estimate the financial impact of climate change policies, although
potential legislative or regulatory programs restricting CO emissions, or litigation alleging damages from GHG emissions, could require material capital and
other expenditures or result in changes to its operations.
In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for GHGs under the Clean Air Act,” concluding that
concentrations of several key GHGs constitute an “endangerment” and may be regulated as “air pollutants” under the CAA and mandated measurement and
reporting of GHG emissions from certain sources, including electric generating plants. Subsequently, the EPA released its final CPP regulations in August 2015
to reduce CO2 emissions from existing fossil fuel-fired EGUs and finalized separate regulations imposing CO2 emission limits for new, modified, and
reconstructed fossil fuel-fired EGUs. Numerous states and private parties filed appeals and motions to stay the CPP with the D.C. Circuit in October 2015. On
February 9, 2016, the U.S. Supreme Court stayed the rule during the pendency of the challenges to the D.C. Circuit and U.S. Supreme Court. On March 28,
2017, an executive order, entitled “Promoting Energy Independence and Economic Growth,” instructed the EPA to review the CPP and related rules addressing
GHG emissions and suspend, revise or rescind the rules if appropriate. On June 19, 2019, the EPA repealed the CPP and replaced it with the ACE rule that
established guidelines for states to develop standards of performance to address GHG emissions from existing coal-fired generation. On January 19, 2021, the
D.C. Circuit vacated and remanded the ACE rule declaring that the EPA was “arbitrary and capricious” in its rule making and, as such, the ACE rule is no longer
in effect and all actions thus far taken by states to implement the federally mandated rule are now null and void. Vacating the ACE rule had the unintended effect
of reinstating the CPP because the repeal of the CPP was a provision within the ACE rule. The D.C. Circuit decision was appealed by several states and
interested parties, including West Virginia, arguing that the EPA did not have the authorization under Section 111(d) of the CAA to require “generation shifting” as
a way to limit GHGs. On June 30, 2022, the U.S. Supreme Court in West Virginia v. Environmental Protection Agency held that the method the EPA used to
regulate GHGs (generation shifting) under Section 111(d) of the CAA (the CPP) was not authorized by Congress and remanded the rule to the EPA for further
reconsideration. In response, on May 23, 2023, the EPA published a proposed rule pursuant to CAA Section 111 (b) and (d) in line with the decision in West
Virginia v. Environmental Protection Agency intended to reduce power sector GHG emissions (primarily CO2 emissions) from fossil fuel based EGUs. The rule,
which proposed stringent emissions limitations based on fuel type and unit retirement date, was issued as final by the EPA on April 25, 2024. FirstEnergy is
currently assessing the impact of the final rule. Depending on the outcome of any appeals, compliance with these standards could require additional capital
expenditures or changes in operation at the Ft. Martin and Harrison power stations.
Clean Water Act
Various water quality regulations, the majority of which are the result of the federal Clean Water Act and its amendments, apply to FirstEnergy’s facilities. In
addition, the states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.
On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic,
mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations
were to phase-in as permits are renewed on a five-year cycle from 2018 to 2023. However, on April 13, 2017, the EPA granted a Petition for Reconsideration and
on September 18, 2017, the EPA postponed certain compliance deadlines for two years. On August 31, 2020, the EPA issued a final rule revising the effluent
limits for discharges from wet scrubber systems, retaining the zero-discharge standard for ash transport water, (with some limited discharge allowances), and
extending the deadline for compliance to December 31, 2025 for both. In addition, the EPA allows for less stringent limits for sub-categories of generating units
based on capacity utilization, flow volume from the scrubber system,
2
27

-- 37 of 106 --

and unit retirement date. On March 29, 2023, the EPA published proposed revised ELGs applicable to coal-fired power plants that include more stringent effluent
limitations for wet scrubber systems and ash transport water, and new limits on landfill leachate. The rule was issued as final by the EPA on April 25, 2024 and
depending on the outcome of appeals and how final revised rules are ultimately implemented, compliance with these standards could require additional capital
expenditures or changes in operation at closed and active landfills, and at the Ft. Martin and Harrison power stations from what was approved by the WVPSC in
September 2022 to comply with the 2020 ELG rule. FirstEnergy is currently assessing the impact of the final rule.
Regulation of Waste Disposal
Federal and state hazardous waste regulations have been promulgated as a result of the Resource Conservation and Recovery Act, as amended, and the Toxic
Substances Control Act. Certain CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the
need for future regulation.
In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity
design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to
assure the safe disposal of CCRs from electric generating plants. On September 13, 2017, the EPA announced that it would reconsider certain provisions of the
final regulations. On July 29, 2020, the EPA published a final rule again revising the date that certain CCR impoundments must cease accepting waste and
initiate closure to April 11, 2021. The final rule allowed for an extension of the closure deadline based on meeting identified site-specific criteria. On November
30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR
impoundment facility to October 2024, which request is pending technical review by the EPA. AE Supply continues to operate McElroy’s Run as a disposal
facility for Pleasants Power Station and continues to evaluate closure options. Also, on April 25, 2024, the EPA issued rules as final addressing, for the first time,
certain legacy CCR disposal sites. FirstEnergy is currently assessing the impact of the final rule.
FE or its subsidiaries have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the CERCLA. Allegations of
disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that
all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are considered probable have been
recognized on FirstEnergy’s Consolidated Balance Sheets as of March 31, 2024, based on estimates of the total costs of cleanup, FirstEnergy’s proportionate
responsibility for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $97 million have been accrued through
March 31, 2024, of which approximately $70 million are for environmental remediation of former MGP and gas holder facilities in New Jersey, which are being
recovered by JCP&L through a non-bypassable societal benefits charge. FE or its subsidiaries could be found potentially responsible for additional amounts or
additional sites, but the loss or range of losses cannot be determined or reasonably estimated at this time.
OTHER LEGAL PROCEEDINGS
United States v. Larry Householder, et al.
On July 21, 2020, a complaint and supporting affidavit containing federal criminal allegations were unsealed against the now former Ohio House Speaker Larry
Householder and other individuals and entities allegedly affiliated with Mr. Householder. In March 2023, a jury found Mr. Householder and his co-defendant,
Matthew Borges, guilty and in June 2023, the two were sentenced to prison for 20 and 5 years, respectively. Messrs. Householder and Borges have appealed
their sentences. Also, on July 21, 2020, and in connection with the DOJ’s investigation, FirstEnergy received subpoenas for records from the U.S. Attorney’s
Office for the Southern District Ohio. FirstEnergy was not aware of the criminal allegations, affidavit or subpoenas before July 21, 2020.
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves this matter. Under the DPA, FE
has agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The DPA requires that
FirstEnergy, among other obligations: (i) continue to cooperate with the U.S. Attorney’s Office in all matters relating to the conduct described in the DPA and
other conduct under investigation by the U.S. government; (ii) pay a criminal monetary penalty totaling $230 million within sixty days, which shall consist of (x)
$115 million paid by FE to the United States Treasury and (y) $115 million paid by FE to the ODSA to fund certain assistance programs, as determined by the
ODSA, for the benefit of low-income Ohio electric utility customers; (iii) publish a list of all payments made in 2021 to either 501(c)(4) entities or to entities known
by FirstEnergy to be operating for the benefit of a public official, either directly or indirectly, and update the same on a quarterly basis during the term of the DPA;
(iv) issue a public statement, as dictated in the DPA, regarding FE’s use of 501(c)(4) entities; and (v) continue to implement and review its compliance and ethics
program, internal controls, policies and procedures designed, implemented and enforced to prevent and detect violations of the U.S. laws throughout its
operations, and to take certain related remedial measures. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor
will FirstEnergy seek any tax deduction related to such payment. The entire amount of the monetary penalty was recognized as expense in the second quarter of
2021 and paid in the third quarter of 2021. Under the terms of the DPA, the criminal information will be dismissed after FirstEnergy fully complies with its
obligations under the DPA.
28

-- 38 of 106 --

Legal Proceedings Relating to United States v. Larry Householder, et al.
On August 10, 2020, the SEC, through its Division of Enforcement, issued an order directing an investigation of possible securities laws violations by FE, and on
September 1, 2020, issued subpoenas to FE and certain FE officers. On April 28, 2021, July 11, 2022, and May 25, 2023, the SEC issued additional subpoenas
to FE, with which FE has complied. While no contingency has been reflected in its consolidated financial statements, FE believes that it is probable that it will
incur a loss in connection with the resolution of the SEC investigation. Given the ongoing nature and complexity of the investigation, FE cannot yet reasonably
estimate a loss or range of loss that may arise from the resolution of the SEC investigation.
On June 29, 2023, the OOCIC served FE a subpoena, seeking information relating to the conduct described in the DPA. FirstEnergy was not aware of the
OOCIC’s investigation prior to receiving the subpoena and understands that the OOCIC’s investigation is also focused on the conduct described in the DPA,
other than with respect to the March 25, 2024, felony indictment of Mr. Householder brought in Cuyahoga County, Ohio. FirstEnergy is cooperating with the
OOCIC in its investigation. On February 12, 2024, and in connection with the OOCIC’s ongoing investigation, an indictment by a grand jury of Summit County,
Ohio was unsealed against the former chairman of the PUCO, Samuel Randazzo, and two former FirstEnergy senior officers, Charles E. Jones, and Michael J.
Dowling, charging each of them with several felony counts, including bribery, telecommunications fraud, money laundering and aggravated theft, related to
payments described in the DPA. FirstEnergy continues to both cooperate with the OOCIC in its investigation and discuss an appropriate resolution of the
investigation with respect to FE. While no contingency has been reflected in FirstEnergy’s consolidated financial statements, FE believes that it is reasonably
possible that it will incur a loss in connection with the resolution of the OOCIC investigation. Given the ongoing nature of the discussions, while FE cannot yet
reasonably estimate a loss or range of loss that may arise from any resolution of the OOCIC investigation with respect to FE, any such payment by FE
associated with an OOCIC resolution is not expected to be material.
In addition to the subpoenas referenced above under “United States v. Larry Householder, et. al.” and the SEC investigation, certain FE stockholders and
FirstEnergy customers filed several lawsuits against FirstEnergy and certain current and former directors, officers and other employees, and the complaints in
each of these suits is related to allegations in the complaint and supporting affidavit relating to HB 6 and the now former Ohio House Speaker Larry Householder
and other individuals and entities allegedly affiliated with Mr. Householder. The plaintiffs in each of the below cases seek, among other things, to recover an
unspecified amount of damages (unless otherwise noted). Unless otherwise indicated, no contingency has been reflected in FirstEnergy’s consolidated financial
statements with respect to these lawsuits as a loss is neither probable, nor is a loss or range of a loss reasonably estimable.
• In re FirstEnergy Corp. Securities Litigation (S.D. Ohio); on July 28, 2020 and August 21, 2020, purported stockholders of FE filed putative class action
lawsuits alleging violations of the federal securities laws. Those actions have been consolidated and a lead plaintiff, the Los Angeles County Employees
Retirement Association, has been appointed by the court. A consolidated complaint was filed on February 26, 2021. The consolidated complaint alleges,
on behalf of a proposed class of persons who purchased FE securities between February 21, 2017 and July 21, 2020, that FE and certain current or
former FE officers violated Sections 10(b) and 20(a) of the Exchange Act by issuing misrepresentations or omissions concerning FE’s business and
results of operations. The consolidated complaint also alleges that FE, certain current or former FE officers and directors, and a group of underwriters
violated Sections 11, 12(a)(2) and 15 of the Securities Act of 1933 as a result of alleged misrepresentations or omissions in connection with offerings of
senior notes by FE in February and June 2020. On March 30, 2023, the court granted plaintiffs’ motion for class certification. On April 14, 2023, FE filed
a petition in the U.S. Court of Appeals for the Sixth Circuit seeking to appeal that order, which the Sixth Circuit granted on November 16, 2023. On
November 30, 2023, FE filed a motion with the S.D. Ohio to stay all proceedings pending the circuit court appeal. All discovery is stayed during the
pendency of the district court motion. FE believes that it is probable that it will incur a loss in connection with the resolution of this lawsuit. Given the
ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• MFS Series Trust I, et al. v. FirstEnergy Corp., et al. and Brighthouse Funds II – MFS Value Portfolio, et al. v. FirstEnergy Corp., et al. (S.D. Ohio) on
December 17, 2021 and February 21, 2022, purported stockholders of FE filed complaints against FE, certain current and former officers, and certain
current and former officers of EH. The complaints allege that the defendants violated Sections 10(b) and 20(a) of the Exchange Act by issuing alleged
misrepresentations or omissions regarding FE’s business and its results of operations, and seek the same relief as the In re FirstEnergy Corp.
Securities Litigation described above. All discovery is stayed during the pendency of the district court motion in In re FirstEnergy Corp. Securities
Litigation described above. FE believes that it is probable that it will incur losses in connection with the resolution of these lawsuits. Given the ongoing
nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• State of Ohio ex rel. Dave Yost, Ohio Attorney General v. FirstEnergy Corp., et al. and City of Cincinnati and City of Columbus v. FirstEnergy Corp.
(Common Pleas Court, Franklin County, OH, all actions have been consolidated); on September 23, 2020 and October 27, 2020, the OAG and the
cities of Cincinnati and Columbus, respectively, filed complaints against several parties including FE, each alleging civil violations of the Ohio Corrupt
Activity Act and related claims in connection with the passage of HB 6. On January 13, 2021, the OAG filed a motion for a temporary restraining order
and preliminary injunction against FirstEnergy seeking to enjoin FirstEnergy from collecting the Ohio Companies' decoupling rider. On January 31,
2021, FE reached a partial settlement with the OAG and the cities of Cincinnati and
29

-- 39 of 106 --

Columbus with respect to the temporary restraining order and preliminary injunction request and related issues. In connection with the partial
settlement, the Ohio Companies filed an application on February 1, 2021, with the PUCO to set their respective decoupling riders (Conservation
Support Rider) to zero. On February 2, 2021, the PUCO approved the application of the Ohio Companies setting the rider to zero, and no additional
customer bills will include new decoupling rider charges after February 8, 2021. On August 13, 2021, new defendants were added to the complaint,
including two former officers of FirstEnergy. On December 2, 2021, the cities and FE entered a stipulated dismissal with prejudice of the cities’ suit. This
matter was stayed through a criminal trial in United States v. Larry Householder, et al. described above, but resumed pursuant to an order, dated March
15, 2023. On July 31, 2023, FE and other defendants filed motions to dismiss in part the OAG’s amended complaint, which the OAG opposed. On
February 16, 2024, the OAG moved to stay discovery in the case in light of the February 9, 2024, indictments against defendants in this action, which
the court granted on March 14, 2024. In connection with the ongoing OOCIC resolution discussions, FE is also discussing an appropriate settlement of
this civil action with the OAG. As such, FE believes it is reasonably possible that it will incur a loss in connection with this civil action. Given the ongoing
nature of these discussions, FE cannot yet reasonably estimate a loss or range of loss from any possible settlement of this civil action, however, any
such settlement payment by FE is not expected to be material.
On February 9, 2022, FE, acting through the SLC, agreed to a settlement term sheet to resolve the following shareholder derivative lawsuits relating to HB 6 and
the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder that were filed in the S.D.
Ohio, the N.D. Ohio, and the Ohio Court of Common Pleas, Summit County:
• Gendrich v. Anderson, et al. and Sloan v. Anderson, et al. (Common Pleas Court, Summit County, Ohio, all actions have been consolidated); on July 26,
2020 and July 31, 2020, respectively, purported stockholders of FE filed shareholder derivative action lawsuits against certain current and former FE
directors and officers, alleging, among other things, breaches of fiduciary duty.
• Miller v. Anderson, et al. (N.D. Ohio); Bloom, et al. v. Anderson, et al.; Employees Retirement System of the City of St. Louis v. Jones, et al.; Electrical
Workers Pension Fund, Local 103, I.B.E.W. v. Anderson et al.; Massachusetts Laborers Pension Fund v. Anderson et al.; The City of Philadelphia
Board of Pensions and Retirement v. Anderson et al.; Atherton v. Dowling et al.; Behar v. Anderson, et al. (S.D. Ohio, all actions have been
consolidated); beginning on August 7, 2020, purported stockholders of FE filed shareholder derivative actions alleging the FE Board and officers
breached their fiduciary duties and committed violations of Section 14(a) of the Exchange Act.
On March 11, 2022, the parties executed a stipulation and agreement of settlement, and filed a motion the same day requesting preliminary settlement approval
in the S.D. Ohio, which the S.D. Ohio granted on May 9, 2022. Subsequently, following a hearing on August 4, 2022, the S.D. Ohio granted final approval of the
settlement on August 23, 2022.
The settlement includes a series of corporate governance enhancements and a payment to FE of $180 million, to be paid by insurance after the judgment has
become final, less approximately $36 million in court-ordered attorney’s fees awarded to plaintiffs. On September 20, 2022, a purported FE stockholder filed a
motion for reconsideration of the S.D. Ohio’s final settlement approval. The parties filed oppositions to that motion on October 11, 2022, and the S.D. Ohio
denied that motion on May 22, 2023. On June 15, 2023, the purported FE stockholder filed an appeal in the U.S. Court of Appeals for the Sixth Circuit. On
February 16, 2024, the U.S. Court of Appeals for the Sixth Circuit affirmed the district court’s final settlement approval. Once all appeal options are exhausted the
judgment will become final. The settlement agreement is expected to resolve fully these shareholder derivative lawsuits.
On June 2, 2022, the N.D. Ohio entered an order to show cause why the court should not appoint new plaintiffs’ counsel, and thereafter, on June 10, 2022, the
parties filed a joint motion to dismiss the matter without prejudice, which the N.D. Ohio denied on July 5, 2022. On August 15, 2022, the N.D. Ohio issued an
order stating its intention to appoint one group of applicants as new plaintiffs’ counsel, and on August 22, 2022, the N.D. Ohio ordered that any objections to the
appointment be submitted by August 26, 2022. The parties filed their objections by that deadline, and on September 2, 2022, the applicants responded to those
objections. In the meantime, on August 25, 2022, a purported FE stockholder represented by the applicants filed a motion to intervene, attaching a proposed
complaint-in-intervention purporting to assert claims that the FE Board and officers breached their fiduciary duties and committed violations of Section 14(a) of
the Exchange Act as well as a claim against a third party for professional negligence and malpractice. The parties filed oppositions to that motion to intervene on
September 8, 2022, and the proposed intervenor's reply in support of his motion to intervene was filed on September 22, 2022. On August 24, 2022, the parties
filed a joint motion to dismiss the action pending in the N.D. Ohio based upon and in light of the approval of the settlement by the S.D. Ohio. On August 30,
2022, the parties filed a joint motion to dismiss the state court action, which the court granted on September 2, 2022. On September 29, 2023, the N.D. Ohio
issued a stay of the case pending the appeal in the U.S. Court of Appeals for the Sixth Circuit. On April 12, 2024, the N.D. Ohio acknowledged the completion of
the appeal and instructed the parties to file any further argument or information they wish to be considered by the N.D. Ohio no later than April 25, 2024.
In letters dated January 26, and February 22, 2021, staff of FERC's Division of Investigations notified FirstEnergy that the Division was conducting an
investigation of FirstEnergy’s lobbying and governmental affairs activities concerning HB 6, and staff directed FirstEnergy to preserve and maintain all
documents and information related to the same as such have been developed
30

-- 40 of 106 --

as part of an ongoing non-public audit being conducted by FERC's Division of Audits and Accounting. On December 30, 2022, FERC approved a Stipulation and
Consent Agreement that resolves the investigation. The agreement includes a FirstEnergy admission of violating FERC’s “duty of candor” rule and related laws,
and obligates FirstEnergy to pay a civil penalty of $3.86 million, and to submit two annual compliance monitoring reports to FERC’s Office of Enforcement
regarding improvements to FirstEnergy’s compliance programs. FE paid the civil penalty on January 4, 2023 and it will not be recovered from customers. The
first annual compliance monitoring report was submitted in December 2023.
The outcome of any of these lawsuits, governmental investigations and audit is uncertain and could have a material adverse effect on FE’s or its subsidiaries’
reputation, business, financial condition, results of operations, liquidity, and cash flows.
Other Legal Matters
There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending
against FE or its subsidiaries. The loss or range of loss in these matters is not expected to be material to FE or its subsidiaries. The other potentially material
items not otherwise discussed above are described under Note 8, “Regulatory Matters.”
FirstEnergy accrues legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of
such costs. In cases where FirstEnergy determines that it is not probable, but reasonably possible that it has a material obligation, it discloses such obligations
and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that FE or its subsidiaries have legal liability or are otherwise
made subject to liability based on any of the matters referenced above, it could have a material adverse effect on FE’s or its subsidiaries’ financial condition,
results of operations, and cash flows.
10. SEGMENT INFORMATION
On January 1, 2024, FirstEnergy changed its reportable segments to include the following and continues to evaluate segment performance based on earnings
attributable to FE:
• Distribution Segment, which consists of the Ohio Companies and FE PA;
• Integrated Segment, which consists of MP, PE and JCP&L; and
• Stand-Alone Transmission Segment, which consists of FE's ownership in FET and KATCo.
FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution,
Integrated and Stand-Alone Transmission.
The segment reporting structure was modified to increase transparency for leadership and investors, simplify the presentation to corresponding legal entities,
and align FirstEnergy’s earnings, cash flows and balance sheets at the business unit level. In accordance with GAAP, the modification to the segments in the first
quarter of 2024 resulted in a transfer of goodwill between the segments based on the relative fair value of the reporting units, and as such, the segment goodwill
balances do not necessarily represent the goodwill balances of the specific legal entities within the segments. The external segment reporting is consistent with
the internal financial reports used by FirstEnergy's Chief Executive Officer (its chief operating decision maker) to regularly assess performance of the business
and allocate resources. Disclosures for FirstEnergy's reportable operating segments for 2023 have been reclassified to conform to the current presentation
reflecting the new reportable segments.
The Distribution segment, which consists of the Ohio Companies and FE PA, representing $10.9 billion in 2023 rate base, distributes electricity through
FirstEnergy’s utility operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.2 million customers in Ohio and
Pennsylvania across its distribution footprint and purchases power for its provider of last resort, SOS, standard service offer and default service requirements.
The segment’s results reflect the costs of securing and delivering electric generation from transmission facilities to customers, including the deferral and
amortization of certain costs.
The Integrated segment includes the distribution and transmission operations under JCP&L, MP and PE, as well as MP’s regulated generation operations,
representing $8.7 billion in 2023 rate base. The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and
Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and
operates 3,599 MWs of regulated net maximum capacity located primarily in West Virginia and Virginia. The segment will also include MP and PE’s 50 MWs of
solar generation at five sites in West Virginia once complete. The first solar generation site, located in Maidsville, West Virginia, was completed and placed in-
service on January 8, 2024, representing 19 MWs of net maximum capacity. Construction of the remaining four sites is expected to be completed no later than
the end of 2025. The remaining four sites are expected to provide 31 MWs of net maximum capacity.
The Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $7.7 billion in 2023 rate base, includes
transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived
from forward-looking formula rates, pursuant to which the revenue
31

-- 41 of 106 --

requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs.
The segment’s results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities. KATCo, which was a
subsidiary of FET, became a wholly owned subsidiary of FE prior to the closing of the FET P&SA I and remains in the Stand-Alone Transmission segment. On
January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo and for comparability, prior year results in the Stand-Alone
Transmission segment reflects the earnings and results of those WP transmission assets.
Corporate/Other reflects corporate support and other costs not charged or attributable to the Utilities or Transmission Companies, including FE’s retained
pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or businesses that do not
constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. Reconciling adjustments for the elimination of inter-
segment transactions are shown separately in the following table of Segment Financial Information. Also included in Corporate/Other for segment reporting is 67
MWs of net maximum capacity, representing AE Supply’s OVEC capacity entitlement. As of March 31, 2024, Corporate/Other had approximately $6.5 billion of
FE’s holding company debt.
32

-- 42 of 106 --

Financial information for FirstEnergy’s reportable segments and reconciliations to consolidated amounts is presented below:
(In millions)
For the Three Months Ended 	Distribution 	Integrated Stand-Alone
Transmission Total Reportable
Segments Corporate/
Other Reconciling
Adjustments FirstEnergy
Consolidated
March 31, 2024
External revenues 	$ 	1,756 $ 	1,094 $ 	434 $ 	3,284 $ 	3 $ 	— $ 	3,287
Internal revenues 	11 	1 	4 	16 	— 	(16) 	—
Total revenues 	$ 	1,767 $ 	1,095 $ 	438 $ 	3,300 $ 	3 $ 	(16) $ 	3,287
Depreciation 	161 	122 	81 	364 	17 	— 	381
Amortization (deferral) of regulatory
assets, net 	(88) 	(78) 	2 	(164) 	— 	— 	(164)
Equity method investment earnings 	— 	— 	— 	— 	21 	— 	21
Interest expense 	116 	71 	65 	252 	117 	(64) 	305
Income taxes (benefits) 	41 	35 	60 	136 	(1) 	— 	135
Earnings (losses) attributable to FE 	$ 	165 $ 	82 $ 	84 $ 	331 $ 	(78) $ 	— $ 	253
Cash Flows from Investing Activities:
Capital investments 	$ 	215 $ 	313 $ 	258 $ 	786 $ 	4 $ 	— $ 	790
March 31, 2023
External revenues 	$ 	1,807 $ 	1,026 $ 	396 $ 	3,229 $ 	2 $ 	— $ 	3,231
Internal revenues 	10 	2 	4 	16 	— 	(16) 	—
Total revenues 	$ 	1,817 $ 	1,028 $ 	400 $ 	3,245 $ 	2 $ 	(16) $ 	3,231
Depreciation 	153 	113 	75 	341 	20 	— 	361
Amortization (deferral) of regulatory
assets, net 	(41) 	(40) 	1 	(80) 	— 	— 	(80)
Equity method investment earnings 	— 	— 	— 	— 	56 	— 	56
Interest expense 	94 	59 	58 	211 	77 	(25) 	263
Income taxes (benefits) 	44 	20 	33 	97 	(7) 	— 	90
Earnings (losses) attributable to FE 	$ 	186 $ 	70 $ 	96 $ 	352 $ 	(60) $ 	— $ 	292
Cash Flows from Investing Activities:
Capital investments 	$ 	193 $ 	237 $ 	212 $ 	642 $ 	7 $ 	— $ 	649
As of March 31, 2024
Total assets 	$ 	20,144 $ 	17,627 $ 	12,389 $ 	50,160 $ 	4,398 $ 	(3,259) $ 	51,299
Total goodwill 	$ 	3,222 $ 	1,953 $ 	443 $ 	5,618 $ 	— $ 	— $ 	5,618
As of December 31, 2023
Total assets 	$ 	19,235 $ 	17,466 $ 	12,142 $ 	48,843 $ 	2,372 $ 	(2,448) $ 	48,767
Total goodwill 	$ 	3,222 $ 	1,953 $ 	443 $ 	5,618 $ 	— $ 	— $ 	5,618
In accordance with GAAP, the modification to the segments in the first quarter of 2024, as discussed above, resulted in a transfer of goodwill between the segments based on the
relative fair value of the reporting units, and as such, the segment goodwill balances do not necessarily represent the goodwill balances of the specific legal entities within the
segments.
(1)
(1)
(1)
33

-- 43 of 106 --

ITEM 2. 	Management’s Discussion and Analysis of Financial Condition and Results of Operations
FIRSTENERGY CORP.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF
FINANCIAL CONDITION AND RESULTS OF OPERATIONS
EXECUTIVE SUMMARY AND RECENT DEVELOPMENTS
Company Overview
FirstEnergy is dedicated to integrity, safety, reliability and operational excellence and is principally involved in the transmission, distribution and generation of
electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission. Its electric distribution companies form one of the nation's
largest investor-owned electric systems, serving over six million customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York.
FirstEnergy’s transmission subsidiaries operate more than 24,000 miles of transmission lines that connect the Midwest and Mid-Atlantic regions and two regional
transmission operation centers. AGC and MP control 3,599 MWs net maximum capacity.
PA Consolidation
On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, including OE subsidiary, Penn, making FE PA a new, single operating
entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. FE PA, as of January 1, 2024, is FE’s only regulated distribution
utility in Pennsylvania encompassing the operations previously conducted individually by the Pennsylvania Companies and FE PA serves an area with a
population of approximately 4.5 million and operates under the rate districts of the former Pennsylvania Companies. FirstEnergy is also evaluating the legal,
financial, operational and branding benefits of consolidating the Ohio Companies into a single Ohio utility company.
Also on January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo, and PN and ME contributed their respective Class B
equity interests of MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership interest in FET. So long as FE holds the
FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.
Segment Change
As further discussed above, in 2024, FirstEnergy changed its reportable segments to include the following:
The Distribution segment, which consists of the Ohio Companies and FE PA, representing $10.9 billion in 2023 rate base, distributes electricity through
FirstEnergy’s utility operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.2 million customers in Ohio and
Pennsylvania across its distribution footprint and purchases power for its provider of last resort, SOS, standard service offer and default service requirements.
The segment’s results reflect the costs of securing and delivering electric generation from transmission facilities to customers, including the deferral and
amortization of certain costs.
The Integrated segment includes the distribution and transmission operations under JCP&L, MP and PE, as well as MP’s regulated generation operations,
representing $8.7 billion in 2023 rate base. The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and
Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and
operates 3,599 MWs of regulated net maximum capacity located primarily in West Virginia and Virginia. The segment will also include MP and PE’s 50 MWs of
solar generation at five sites in West Virginia once complete. The first solar generation site, located in Maidsville, West Virginia, was completed and placed in-
service on January 8, 2024, representing 19 MWs of net maximum capacity. Construction of the remaining four sites is expected to be completed no later than
the end of 2025. The remaining four sites are expected to provide 31 MWs of net maximum capacity.
The Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $7.7 billion in 2023 rate base, includes
transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived
from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which is
subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the delivery of
electricity on FirstEnergy’s transmission facilities.
Corporate/Other reflects corporate support and other costs not charged or attributable to the Utilities or Transmission Companies, including FE’s retained
pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or businesses that do not
constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. Additionally, reconciling adjustments for the
elimination of inter-segment transactions are included in Corporate/Other. Also included in Corporate/Other for segment reporting is 67 MWs of net
34

-- 44 of 106 --

maximum capacity, representing AE Supply’s OVEC capacity entitlement. As of March 31, 2024, Corporate/Other had approximately $6.5 billion of FE’s holding
company debt.
FirstEnergy believes that this segment reporting serves to provide:
• Greater transparency into our business unit performance;
• Alignment with our cash flow, credit metrics, balance sheet and earnings to the companies comprising each segment;
• Simplification of our segment reporting so that each entire entity resides within a segment; and
• Consistency with peers.
FET Equity Interest Sale
On February 2, 2023, FE, along with FET, entered into the FET P&SA II with Brookfield and the Brookfield Guarantors, pursuant to which FE agreed to sell to
Brookfield at the closing, and Brookfield agreed to purchase from FE, an incremental 30% equity interest in FET for a purchase price of $3.5 billion. The FET
Equity Interest Sale closed on March 25, 2024 and FET continues to be consolidated in FirstEnergy’s financial statements. The purchase price was paid in part
by the issuance of two promissory notes at closing having an aggregate principal amount of $1.2 billion with: (i) one promissory note having an aggregate
principal amount of $750 million, at an interest rate of 5.75% per annum, with a maturity date of September 25, 2025 and (ii) one promissory note having an
aggregate principal amount of $450 million, at an interest rate of 7.75% per annum, with a maturity date of December 31, 2024. Both notes are expected to be
repaid in 2024. The remaining $2.3 billion of the purchase price was paid in cash at closing. Brookfield Corporation has guaranteed the full amount of the
promissory notes. As a result of the consummation of the transaction, Brookfield’s interest in FET increased from 19.9% to 49.9%, while FE retained the
remaining 50.1% ownership interests of FET.
FIRSTENERGY’S CONSOLIDATED RESULTS OF OPERATIONS
First Three Months of 2024 Compared with First Three Months of 2023
(In millions) 	For the Three Months Ended March 31,
2024 	2023 	Change
Revenues 	$ 	3,287 $ 	3,231 $ 	56 	2 %
Operating expenses 	2,675 	2,680 	(5) 	— %
Other expenses, net 	(210) 	(151) 	(59) 	(39)%
Income taxes 	135 	90 	45 	50 %
Income attributable to noncontrolling interest 	14 	18 	(4) 	(22)%
Earnings attributable to FE 	$ 	253 $ 	292 $ 	(39) 	(13)%
Earnings attributable to FE was $253 million or $0.44 per share (basic and diluted) in the first quarter of 2024 compared to $292 million or $0.51 per share (basic
and diluted) in the first quarter of 2023, a decrease of $39 million primarily due to the following:
• Lower weather-adjusted customer usage and demand;
• Higher net discrete income tax charges related to the PA Consolidation and updates to deferred taxes on the sale of equity interest in FET in the first
quarter of 2024, partially offset by discrete benefits primarily associated with state NOL utilization;
• A charge at JCP&L in the first quarter 2024 associated with the disallowance of certain corporate support costs as a result of the NJBPU-approved
settlement agreement;
• Lower earnings related to FEV’s equity method investment in Global Holding;
• Higher other operating expenses related to planned vegetation management, uncollectible expense, and non-deferred storm expense; and
• Higher interest expense associated with new long-term debt issuances, and higher revolver borrowings and interest rates.
These decreases were partially offset by the following:
• Increased earnings as a result of regulated distribution and transmission capital investments that increased rate base;
• Higher customer usage, primarily due to less mild weather temperatures;
• The implementation of base rate case settlements during the first quarter of 2024 in Maryland, New Jersey and West Virginia;
• A credit in the first quarter of 2024 associated with the WVPSC base rate case settlement approval that allowed for the recovery of certain retired
generation stations costs;
• Higher pension and OPEB non-service credits; and
• The absence of expenses associated with the cancellation of a sponsorship agreement in the first quarter of 2023.
35

-- 45 of 106 --

Distribution services by customer class are summarized in the following table:
For the Three Months Ended March 31,
(In thousands) 	Actual 	Weather-Adjusted
Electric Distribution MWh Deliveries 	2024 	2023
Increase
(Decrease) 	2024 	2023
Increase
(Decrease)
Residential 	14,087 	13,941 	1.0 % 	15,428 	15,982 	(3.5)%
Commercial 	8,614 	8,632 	(0.2)% 	8,968 	9,403 	(4.6)%
Industrial 	13,925 	13,511 	3.1 % 	13,925 	13,511 	3.1 %
Total Electric Distribution MWh Deliveries 	36,626 	36,084 	1.5 % 	38,321 	38,896 	(1.5)%
Includes street lighting.
Residential and commercial distribution deliveries were impacted by higher customer usage as a result of the weather. Heating degree days in the first three
months of 2024 were 5% above the same period of 2023 but 14% below normal.
The financial results discussed below in Segment Results of Operations include revenues and expenses from transactions among FirstEnergy’s business
segments. A reconciliation of segment financial results is provided in Note 10, “Segment Information,” of the Notes to Consolidated Financial Statements.
Our Strategy
Powered by its employees and guided by its experienced leadership team and engaged FE Board, FirstEnergy is accelerating its transformation into a premier
utility. The FE Board and FirstEnergy’s executive management team are aligned behind a business model grounded in investing, operating, recovering costs and
financing our regulated utility operations. This business model aims to create a “virtuous cycle” that in turn serves to improve reliability and the customer
experience, grow rate base, engage employees, improve returns and maintain a strong balance sheet. Along with an unwavering commitment to ethics and
integrity, performance excellence and continuous improvement, FirstEnergy anticipates that strong execution of this model will help achieve its strategic
objectives and deliver value to its investors.
With a diversified asset mix, improved balance sheet and a strong affordability position, FirstEnergy is well positioned to significantly enhance the customer
experience and provide value to its investors.
Invest
FirstEnergy invests in its regulated operations to improve reliability and the customer experience, and in its people to attract, retain and develop talented, diverse
and engaged employees to carry out its mission. It aims to do so through Energize365.
A robust plan for customer-focused growth, Energize365 is the centerpiece of FirstEnergy’s regulated distribution and transmission capital investment strategy
that aims to utilize all investments to support our EESG and strategic priorities including clean energy, improving grid reliability and resiliency, and supports the
clean energy transition. Through the Energize365 program, FirstEnergy expects to spend approximately $26 billion in system-wide capital investments from
2024 through 2028. FirstEnergy expects that these investments will comprise the Distribution segment (29%), the Integrated segment (39%), and the Stand-
Alone Transmission segment (32%), focusing on the following:
• Energy Transition: FirstEnergy expects to make Distribution and Transmission investments in order to support improvements in grid reliability and
resiliency and support interconnection of renewable sources, including:
▪ Clean Energy: West Virginia solar generation, energy efficiency, electric vehicle infrastructure and energy storage; and
▪ Grid Modernization: Programs to drive system resiliency through automation technology and communication, including Ohio's phases
one and two of the Ohio Companies’ distribution grid modernization plans, Pennsylvania's LTIIP, New Jersey's EnergizeNJ, and
implementing advanced metering infrastructure.
▪ Transmission:
• Operational Flexibility Projects that build capacity and support the evolving grid such as interconnection of New Jersey
offshore wind and data center load;
• Enhance system performance by implementing new designs and technologies to reduce load at risk; and
• Upgrade system conditions that enhance reliability.
• Infrastructure Renewal: Base distribution projects to address aging infrastructure
• Generation Maintenance: Projects to maintain operations of fossil fuel plants and remain compliant with environmental regulations through the end of
their useful life
(1)
(1)
36

-- 46 of 106 --

• FirstEnergy believes there is a continued long-term pipeline of investment opportunities for its existing distribution and transmission infrastructure
beyond those identified through 2028, which are expected to strengthen grid and cyber security and make the transmission system more reliable,
robust, secure and resistant to extreme weather events, with improved operational flexibility.
• Revitalizing its leadership team. FirstEnergy recently announced the hiring of John Combs as its Senior Vice President of Shared Services and
FirstEnergy continues to make progress in filling several key executive positions in an organization that will be structured to allow greater execution at
the business unit level.
Operate
FirstEnergy will continue to engage its skilled, trained, talented and diverse team of employees to effectively implement its investment plans, seek opportunities
for continuous improvement as it delivers safe, reliable and affordable electricity to our customers, and deliver value to its investors. It aims to do so through the
following:
• Enhancing the focus on the customer. FirstEnergy is shifting more decision-making and accountability for our operations closer to our customers,
regulators and employees doing the work. FirstEnergy’s new operating structure is organized by: Ohio, Pennsylvania, New Jersey, West
Virginia/Maryland and FirstEnergy’s standalone Transmission properties. This structure will foster better execution at the business unit level.
• Embracing a continuous improvement mindset. FirstEnergy faced numerous financial headwinds in 2023, including weather and the impact of market
conditions on its pension plan. Through a determined effort by its employees, FirstEnergy focused on the things within its control: managing costs,
enhancing the customer experience and seeking opportunities for continuous improvement.
Recover
FirstEnergy is working to establish a track record of strong execution. Operating effectively leads to strong, predictable results and enhances credibility with our
stakeholders. In turn, FirstEnergy builds supportive relationships with regulators, customers and intervenors in an effort to drive positive rate outcomes that
support recovery of its investments.
In order to achieve important regulatory milestones, FirstEnergy has an active regulatory calendar to support its regulated growth strategy and address the
critical investments that support reliability and a smarter and cleaner electric grid. This includes the following:
• On January 13, 2023, MP and PE filed a request with the WVPSC seeking approval of new depreciation rates for existing and future capital assets. On
August 22, 2023, the parties filed a unanimous settlement of the case recommending a $33 million annual increase in depreciation expense, effective
April 1, 2024. An order was issued on March 26, 2024 approving the settlement without modification.
• On March 16, 2023, JCP&L filed a base rate case in New Jersey, requesting a $185 million increase in base distribution revenues to support
investments to strengthen the energy grid, enhance the customer experience and provide assistance to low-income and senior citizen customers.
February 1, 2024, JCP&L, joined by various parties, filed a stipulated settlement with the NJBPU resolving JCP&L’s request for a distribution base rate
increase. The settlement, which was approved by the NJBPU on February 14, 2024, provides for an $85 million annual base distribution revenue
increase for JCP&L, which will become effective for customers on June 1, 2024.
• On April 5, 2023, the Ohio Companies sought approval from the PUCO for its ESP V. The proposed plan would maintain an eight-year term beginning
June 1, 2024, and seeks to continue riders recovering costs associated with distribution infrastructure investments and approved grid modernization
investments. ESP V additionally proposes new riders that would support reliability, and includes provisions supporting affordability and enhancing the
customer experience.
• On April 2, 2024, FE PA filed a base rate case with the PPUC seeking a net increase in base distribution revenues of approximately $502 million with a
return on equity of 11.3% and capital structure of 46.2% debt and 53.8% equity, and reflects a roll-in of several current riders such as DSIC, Tax Act,
and smart meter. Additionally, FE PA requests recovery of certain incurred costs, including the impact of major storms, COVID-19, a program to convert
streetlights to LEDs, and others. A PPUC decision is expected in December 2024, with new rates becoming effective in January 2025. FE PA also plans
to request approval for the continuation of its LTIIP program by the end of the third quarter of 2024.
• On April 12, 2024, the Ohio Companies and certain of the parties filed a stipulation that modified the Ohio Companies’ application for phase two of its
grid modernization plan. The stipulation, which is subject to PUCO approval, provides for the deployment of smart meters to the balance of the Ohio
Companies’ customers or approximately 1.4 million meters. Phase two of the distribution grid modernization plan, as modified by the stipulation would
be completed over a four-year budget period with estimated capital investments of approximately $421 million. On April 16, 2024, the PUCO scheduled
the stipulation hearing for June 5, 2024.
37

-- 47 of 106 --

• The Ohio Companies plan to file a base rate case in the second quarter of 2024.
Finance
With sound capital allocation, enhanced reliability and better regulatory outcomes, FirstEnergy represents a compelling investment and expects to finance the
business at a lower cost of capital, allowing it to begin the virtuous cycle all over again at “Invest.”
FirstEnergy aims to do this through a strengthened financial position. Since 2021, FirstEnergy has raised $7 billion in equity capital and issued $1.5 billion in
convertible notes in May 2023 to significantly improve its balance sheet. The strength of FirstEnergy’s balance sheet supports its plan to fund Energize365
investments through organic internal cash flows and utility debt rather than incremental equity. FirstEnergy has also de-levered risk associated with its pension
plan and optimized its financing plan to retain flexibility in an uncertain interest rate environment.
FirstEnergy also expects to continue returning value to shareholders. In March 2024, the FE Board declared a $0.015 per share increase to the quarterly
common stock dividend payable June 1, 2024, to $0.425 per share, which represents an approximate 6% increase compared to dividends declared in 2023.
Modest dividend growth is expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend
payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings growth, credit
metrics and other business conditions.
Climate Strategy
Our commitment to climate is a significant component of our company’s overarching strategy, especially our desire to help enable the transition to a clean energy
future. Executing our Climate Strategy requires addressing, among other things: emerging federal and state decarbonization goals; physical risks of climate
change; industry trends and technology advancements; and customer expectations for cleaner energy, increased usage control, and more sustainable
alternatives in transportation, manufacturing and industrial processes. Through our investment plan, we aim to enhance the resiliency, reliability and security of
the electric system and support the integration of renewables, electric vehicles, grid modernization improvements and other emerging technologies.
As part of our Climate Strategy, we are committed to addressing company-wide emissions within our direct operational control, also known as Scope 1
emissions, across our transmission, distribution and regulated generation operations. Today, with the climate, our business, and our stakeholders in mind, our
Climate Strategy is two-fold:
• Reduce our company’s Scope 1 GHG emissions and achieve carbon neutrality by 2050; and
• Support broader GHG reductions in our region by helping to enable the energy transition to a low-carbon future.
Currently, emissions from our West Virginia power stations – Fort Martin and Harrison – serve as the primary source of our Scope 1 emissions – representing
approximately 99% of our overall GHG emissions as of December 31, 2023 – and greatly outnumber the emissions from our transmission and distribution
operations. We have publicly stated through various filings with the WVPSC that the end of useful life date is 2035 for Fort Martin and 2040 for Harrison. These
dates are based on our assessment of when it is projected to no longer be cost effective and beneficial to customers to make the capital investments needed to
keep these facilities operating effectively and in compliance with evolving environmental regulations. FirstEnergy is currently assessing the impact of the final
EPA rules issued on April 25, 2024, on these projected dates. In 2025, FirstEnergy will submit an Integrated Resource Plan to the WVPSC that will include our
analysis of market conditions and identify how we believe we can best fulfill our obligation to supply our generation customers with reliable and cost-effective
energy through 2040 (a requirement every five years in the state of West Virginia).
In the near-term, we continue our focus on GHG reduction in our transmission and distribution businesses. These emissions are within our control, pervasive in
every state across our footprint, and aligned with our long-term, forward-looking transmission and distribution strategy to enable the energy transition.
In addition to moving beyond our two West Virginia power stations, key steps in working toward carbon neutrality by 2050 include:
• Reducing sulfur hexafluoride emissions: We're working to repair or replace, as appropriate, transmission breakers that leak sulfur hexafluoride, which is
a gas commonly used by energy companies as an electrical insulating material and arc extinguisher in high-voltage circuit breakers and switchgear. If
escaped to the atmosphere, it acts as a potent GHG with a global warming potential significantly greater than CO ; and
• Electrifying our vehicle fleet: We’re targeting 30% electrification of our light-duty and aerial truck fleet by 2030 and 100% electrification by 2050. To
reach our electrification goal, we’re striving for 100% electric or hybrid vehicle purchases for our light-duty and aerial truck fleet moving forward.
Determination of the useful life of the regulated coal-fired generating facilities could result in changes in depreciation, and/or continued collection of net plant in
rates after retirement, securitization, sale, impairment or regulatory disallowances. If MP is
2
38

-- 48 of 106 --

unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial condition, results of operations and cash flow.
HB 6 and Related Investigations
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the U.S. Attorney’s Office
investigation into FirstEnergy relating to FirstEnergy’s lobbying and governmental affairs activities concerning HB 6 related to the federal criminal allegations
made in July 2020, against former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. Among
other things under the DPA, FE paid a $230 million monetary penalty in 2021 and agreed to the filing of a criminal information charging FE with one count of
conspiracy to commit honest services wire fraud. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will
FirstEnergy seek any tax deduction related to such payment. The criminal information will be dismissed after FirstEnergy fully complies with its obligations under
the DPA, which is expected to be July 2024.
The OAG, certain FE shareholders and FE customers filed several lawsuits against FirstEnergy and certain current and former directors, officers and other
employees, each relating to the allegations against the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated
with Mr. Householder. On February 9, 2022, FE, acting through the SLC, agreed to a settlement term sheet to resolve multiple shareholder derivative lawsuits
that were filed in the S.D. Ohio, the N.D. Ohio, and the Ohio Court of Common Pleas, Summit County. On March 11, 2022, the parties executed a stipulation and
agreement of settlement, and filed a motion the same day requesting preliminary settlement approval in the S.D. Ohio, which was granted on May 9, 2022. On
August 23, 2022, the S.D. Ohio granted final approval of the settlement. On September 20, 2022, a purported FE stockholder filed a motion for reconsideration
of the S.D. Ohio’s final settlement approval. The parties filed oppositions to that motion on October 11, 2022, and the S.D. Ohio denied that motion on May 22,
2023. On June 15, 2023, the purported FE stockholder filed an appeal in the U.S. Court of Appeals for the Sixth Circuit. The N.D. Ohio issued a stay of the case
pending the appeal in the U.S. Court of Appeals for the Sixth Circuit. On February 16, 2024, the U.S. Court of Appeals for the Sixth Circuit affirmed the district
court’s final settlement approval. On April 12, 2024, the N.D. Ohio acknowledged the completion of the appeal and instructed the parties to file any further
argument or information they wish to be considered by the N.D. Ohio no later than April 25, 2024. Once all appeal options are exhausted the judgment will
become final. The settlement agreement is expected to fully resolve these shareholder derivative lawsuits.
The settlement includes a series of corporate governance enhancements and a payment to FE of $180 million, to be paid by insurance after the judgment has
become final, less approximately $36 million in court-ordered attorney’s fees awarded to plaintiffs.
In addition, on August 10, 2020, the SEC, through its Division of Enforcement, issued an order directing an investigation of possible securities laws violations by
FE, and on September 1, 2020, issued subpoenas to FE and certain FE officers. Subsequently, on April 28, 2021, July 11, 2022, and May 25, 2023, the SEC
issued additional subpoenas to FE. While no contingency has been reflected in its consolidated financial statements, FE believes that it is probable that it will
incur a loss in connection with the resolution of the SEC investigation. Given the ongoing nature and complexity of the review, inquiries and investigations, FE
cannot yet reasonably estimate a loss or range of loss that may arise from the resolution of the SEC investigation Further, in letters dated January 26, and
February 22, 2021, staff of FERC's Division of Investigations notified FirstEnergy that it was investigating FirstEnergy’s lobbying and governmental affairs
activities concerning HB 6. On December 30, 2022, FERC approved a Stipulation and Consent Agreement that resolves the investigation. The agreement
obligates FE to pay a civil penalty of $3.86 million, which was paid in January 2023, and to submit two annual compliance monitoring reports to FERC’s Office of
Enforcement regarding improvements to FirstEnergy’s compliance programs. The first compliance monitoring report was submitted in December 2023.
On June 29, 2023, the OOCIC served FE a subpoena, seeking information relating to the conduct described in the DPA. FirstEnergy was not aware of the
OOCIC’s investigation prior to receiving the subpoena and understands that the OOCIC’s investigation is also focused on the conduct described in the DPA,
other than with respect to the March 25, 2024, felony indictment of Mr. Householder brought in Cuyahoga County, Ohio. FirstEnergy is cooperating with the
OOCIC in its investigation. On February 12, 2024, and in connection with the OOCIC’s ongoing investigation, an indictment by a grand jury of Summit County,
Ohio was unsealed against the former chairman of the PUCO, Samuel Randazzo, and two former FirstEnergy senior officers, Charles E. Jones, and Michael J.
Dowling, charging each of them with several felony counts, including bribery, telecommunications fraud, money laundering and aggravated theft, related to
payments described in the DPA. FirstEnergy continues to both cooperate with the OOCIC in its investigation and discuss an appropriate resolution of the
investigation with respect to FE. While no contingency has been reflected in FirstEnergy’s consolidated financial statements, FE believes that it is reasonably
possible that it will incur a loss in connection with the resolution of the OOCIC investigation. Given the ongoing nature of the discussions, while FE cannot yet
reasonably estimate a loss or range of loss that may arise from any resolution of the OOCIC investigation with respect to FE, any such payment by FE
associated with an OOCIC resolution is not expected to be material.
FirstEnergy has taken numerous steps to address challenges posed by the HB 6 investigations and improve its compliance culture, including the refreshment of
the FE Board, the hiring of key senior executives committed to supporting transparency and integrity, and strengthening and enhancing FirstEnergy’s compliance
culture through several initiatives; however, the outcomes of the unresolved HB 6 investigations and state regulatory audits remain unknown.
39

-- 49 of 106 --

Despite the many disruptions FirstEnergy has faced, and continues to currently face, the leadership team remains committed and focused on executing its
strategy and running the business. See “Outlook - Other Legal Proceedings” below for additional details on the government investigations, the DPA, and
subsequent litigation surrounding the investigation of HB 6. See also “Outlook - State Regulation - Ohio” below for details on the PUCO proceeding reviewing
political and charitable spending and legislative activity in response to the investigation of HB 6. The outcome of the government investigations, PUCO
proceedings, legislative activity, and any of these lawsuits is uncertain and could have a material adverse effect on FirstEnergy’s financial condition, results of
operations and cash flows.
40

-- 50 of 106 --

SEGMENT RESULTS OF OPERATIONS
Summary of Results of Operations — First Three Months of 2024 Compared with First Three Months of 2023
Financial results for FirstEnergy’s business segments in the first three months of 2024 and 2023 were as follows:
First Three Months 2024 Financial Results
(In millions) 	Distribution 	Integrated Stand-Alone
Transmission
Corporate/Other and
Reconciling
Adjustments FirstEnergy
Consolidated
Revenues:
Electric 	$ 	1,725 $ 	1,082 $ 	434 $ 	3 $ 	3,244
Other 	42 	13 	4 	(16) 	43
Total Revenues 	1,767 	1,095 	438 	(13) 	3,287
Operating Expenses:
Fuel 	— 	105 	— 	— 	105
Purchased power 	642 	389 	— 	5 	1,036
Other operating expenses 	587 	354 	76 	(11) 	1,006
Provision for depreciation 	161 	122 	81 	17 	381
Amortization (deferral) of regulatory assets, net 	(88) 	(78) 	2 	— 	(164)
General taxes 	192 	38 	69 	12 	311
Total Operating Expenses 	1,494 	930 	228 	23 	2,675
Other Income (Expense):
Equity method investment earnings 	— 	— 	— 	21 	21
Miscellaneous income, net 	44 	12 	— 	(12) 	44
Interest expense 	(116) 	(71) 	(65) 	(53) 	(305)
Capitalized financing costs 	5 	11 	13 	1 	30
Total Other Expense 	(67) 	(48) 	(52) 	(43) 	(210)
Income taxes (benefits) 	41 	35 	60 	(1) 	135
Income attributable to noncontrolling interest 	— 	— 	14 	— 	14
Earnings (Loss) Attributable to FE 	$ 	165 $ 	82 $ 	84 $ 	(78) $ 	253
First Three Months 2023 Financial Results
(In millions) 	Distribution 	Integrated Stand-Alone
Transmission
Corporate/Other and
Reconciling
Adjustments FirstEnergy
Consolidated
Revenues:
Electric 	$ 	1,779 $ 	1,012 $ 	396 $ 	2 $ 	3,189
Other 	38 	16 	4 	(16) 	42
Total Revenues 	1,817 	1,028 	400 	(14) 	3,231
Operating Expenses:
Fuel 	— 	133 	— 	— 	133
Purchased power 	717 	402 	— 	5 	1,124
Other operating expenses 	503 	260 	71 	12 	846
Provision for depreciation 	153 	113 	75 	20 	361
Amortization (deferral) of regulatory assets, net 	(41) 	(40) 	1 	— 	(80)
General taxes 	188 	34 	63 	11 	296
Total Operating Expenses 	1,520 	902 	210 	48 	2,680
Other Income (Expense):
Equity method investment earnings 	— 	— 	— 	56 	56
Miscellaneous income, net 	22 	16 	6 	(9) 	35
Interest expense 	(94) 	(59) 	(58) 	(52) 	(263)
Capitalized financing costs 	5 	7 	9 	— 	21
Total Other Expense 	(67) 	(36) 	(43) 	(5) 	(151)
Income taxes (benefits) 	44 	20 	33 	(7) 	90
Income attributable to noncontrolling interest 	— 	— 	18 	— 	18
Earnings (Loss) Attributable to FE 	$ 	186 $ 	70 $ 	96 $ 	(60) $ 	292
41

-- 51 of 106 --

Changes Between First Three Months 2024 and First
Three Months 2023 Financial Results
(In millions) 	Distribution 	Integrated
Stand-Alone
Transmission
Corporate/Other and
Reconciling
Adjustments
FirstEnergy
Consolidated
Revenues:
Electric 	$ 	(54) $ 	70 $ 	38 $ 	1 $ 	55
Other 	4 	(3) 	— 	— 	1
Total Revenues 	(50) 	67 	38 	1 	56
Operating Expenses:
Fuel 	— 	(28) 	— 	— 	(28)
Purchased power 	(75) 	(13) 	— 	— 	(88)
Other operating expenses 	84 	94 	5 	(23) 	160
Provision for depreciation 	8 	9 	6 	(3) 	20
Amortization (deferral) of regulatory assets, net 	(47) 	(38) 	1 	— 	(84)
General taxes 	4 	4 	6 	1 	15
Total Operating Expenses 	(26) 	28 	18 	(25) 	(5)
Other Income (Expense):
Equity method investment earnings 	— 	— 	— 	(35) 	(35)
Miscellaneous income, net 	22 	(4) 	(6) 	(3) 	9
Interest expense 	(22) 	(12) 	(7) 	(1) 	(42)
Capitalized financing costs 	— 	4 	4 	1 	9
Total Other Expense 	— 	(12) 	(9) 	(38) 	(59)
Income taxes (benefits) 	(3) 	15 	27 	6 	45
Income attributable to noncontrolling interest 	— 	— 	(4) 	— 	(4)
Earnings (Loss) Attributable to FE 	$ 	(21) $ 	12 $ 	(12) $ 	(18) $ 	(39)
42

-- 52 of 106 --

Distribution Segment — First Three Months of 2024 Compared with First Three Months of 2023
Distribution’s earnings attributable to FE decreased $21 million in the first three months of 2024, as compared to the same period of 2023, primarily resulting
from lower weather-adjusted customer usage and demand, and higher other operating expenses, partially offset by higher customer usage as a result of the
weather and higher revenues from regulated investment programs.
Revenues —
Distribution’s total revenues decreased by $50 million as a result of the following sources:
For the Three Months Ended March 31,
Revenues by Type of Service 	2024 	2023
Increase
(Decrease)
(In millions)
Distribution services 	$ 	1,020 $ 	968 $ 	52
Generation sales:
Retail 	704 	809 	(105)
Wholesale 	1 	2 	(1)
Total generation sales 	705 	811 	(106)
Other 	42 	38 	4
Total Revenues 	$ 	1,767 $ 	1,817 $ 	(50)
Distribution services revenues increased $52 million in the first three months of 2024, as compared to the same period of 2023, primarily resulting from higher
rider revenues associated with investment programs, higher customer usage as a result of the weather, lower customer refunds and credits associated with the
PUCO-approved Ohio Stipulation and other rider rate adjustments at FE PA, which have no material impact to current period earnings, partially offset by lower
weather-adjusted customer usage and demand.
Generation sales revenues decreased $106 million in the first three months of 2024, as compared to the same period in 2023, primarily due to lower retail
generation sales as a result of increased customer shopping in Ohio, partially offset by higher non-shopping generation auction rates. Total generation provided
by alternative suppliers as a percentage of total MWh deliveries in the first three months of 2024, as compared to the same period of 2023, increased to 89%
from 58% in Ohio. Retail generation sales have no material impact to earnings.
Operating Expenses —
Total operating expenses decreased $26 million, primarily due to the following:
• Purchased power costs, which have no material impact on current period earnings, decreased $75 million during the first three months of 2024, as
compared to the same period of 2023, primarily due to decreased generation sales volumes of $221 million as described above and decreased
capacity expenses of $4 million, partially offset by higher unit costs of $150 million.
• Other operating expenses increased $84 million in the first three months of 2024, as compared to the same period of 2023, primarily due to:
◦ Higher network transmission expenses of $35 million, which are deferred for future recovery, resulting in no material impact on current period
earnings;
◦ Higher storm expenses of $23 million, which were deferred for future recovery, resulting in no material impact on current period earnings;
◦ Higher planned vegetation management expenses of $13 million;
◦ 	Higher energy efficiency and other state mandated program costs of $5 million, which were deferred for future recovery, resulting in no
material impact on current period earnings; and
◦ Higher uncollectible expenses of $8 million, of which $3 million was deferred for future recovery.
• Depreciation expense increased $8 million in the first three months of 2024, as compared to the same period of 2023, primarily due to a higher asset
base.
• Deferral of regulatory assets increased $47 million in the first three months of 2024, as compared to the same period of 2023, primarily due to:
◦ $57 million net increase due to higher generation and transmission related deferrals; and
◦ $26 million increase due to higher deferral of storm related expenses;
partially offset by:
◦ $19 million related to net decreases in other deferrals; and
◦ $17 million decrease due to lower deferral of certain Tax Act savings to Pennsylvania customers.
• General taxes increased $4 million in the first three months of 2024, as compared to the same period of 2023, primarily due to higher gross receipts
taxes.
Other Expense —
Other expense was flat in the first three months of 2024, as compared to the same period of 2023, primarily due to higher net interest expense associated with
new long-term issuances and higher short-term borrowings being offset by higher interest income on investments in the regulated money pool.
Income Taxes —

-- 53 of 106 --

Distribution’s effective tax rate was 19.9% and 19.1% for the three months ended March 31, 2024 and 2023, respectively.
Integrated Segment — First Three Months of 2024 Compared with First Three Months of 2023
Integrated’s earnings attributable to FE increased $12 million in the first three months of 2024, as compared to the same period of 2023, primarily from the
implementation of base rate case settlements, higher customer usage as a result of weather, higher revenues from regulated investment programs, partially
offset by lower weather-adjusted customer usage and demand, higher other operating expenses and a higher effective tax rate due to discrete tax charges
discussed below.
Revenues —
Integrated’s total revenues increased $67 million as a result of the following sources:
For the Three Months Ended March 31,
Revenues by Type of Service 	2024 	2023
Increase
(Decrease)
(In millions)
Distribution services 	339 	334 $ 	5
Generation sales:
Retail 	632 	569 	63
Wholesale 	30 	45 	(15)
Total generation sales 	662 	614 	48
Transmission revenues:
JCP&L 	52 	43 	9
MP & PE 	29 	21 	8
Total Transmission Asset Owner Revenues 	81 	64 	17
Other 	13 	16 	(3)
Total Revenues 	$ 	1,095 $ 	1,028 $ 	67
Distribution services revenues increased $5 million in the first three months of 2024, as compared to the same period of 2023, primarily resulting from higher
customer usage as a result of the weather, higher revenues from the rate case settlement in Maryland, and higher rider revenues associated with certain
investment programs, partially offset by lower weather-adjusted customer usage and demand.
Generation sales revenues increased $48 million in the first three months of 2024, as compared to the same period of 2023. primarily due to higher retail
revenues, partially offset by lower wholesale revenues.
• Retail generation sales increased $63 million in the first three months of 2024, as compared to the same period in 2023 primarily due to higher
customer usage as a result of the weather and higher non-shopping generation auction rates. Retail generation sales, other than those in West Virginia,
have no material impact to earnings.
• Wholesale generation revenues decreased $15 million in the first three months of 2024, as compared to the same period in 2023, primarily due to lower
capacity revenues and sales volumes, partially offset by higher market prices. The difference between current wholesale generation revenues and
certain energy costs incurred is deferred for future recovery or refund, with no material impact to current period earnings.
Transmission revenues increased $17 million in the first three months of 2024, as compared to the same period of 2023, primarily due to higher rate base from
regulated investment programs and higher transmission operating expenses.
Operating Expenses —
Total operating expenses increased $28 million, primarily due to the following:
• Fuel costs decreased $28 million during the first three months of 2024, as compared to the same period of 2023, primarily due to lower unit costs and
generation output. Due to the ENEC, fuel expense has no material impact on current period earnings.
• Purchased power costs, which have no material impact on current period earnings, decreased $13 million during the first three months of 2024, as
compared to the same period of 2023, primarily due to lower capacity expenses.
• Other operating expenses increased $94 million in the first three months of 2024, as compared to the same period of 2023.
• Distribution related other operating expenses increased $91 million primarily due to:
◦ A $53 million pre-tax charge at JCP&L in the first quarter 2024 associated with certain corporate support costs recorded to capital
accounts from the FERC Audit that were determined, as a result of the settlement agreement, to be disallowed from future recovery;
◦ Higher storm expenses of $25 million, of which $18 million was deferred for future recovery;
◦ Higher network transmission expenses of $10 million, which were deferred for future recovery, resulting in no material impact on
current period earnings;
◦ Higher planned vegetation management costs of $4 million, which were deferred for future recovery resulting in no material impact on
current period earnings;
◦ Higher other operating and maintenance expenses of $4 million, primarily due to regulated generation outage spend; and
◦ Lower uncollectible expenses of $5 million, which were deferred for future recovery, resulting in no material impact on current period
earnings.

-- 54 of 106 --

• Transmission related other operating expenses increased $3 million primarily due to:
◦ 	Higher operating and maintenance expenses. Nearly all transmission related operating expenses are recovered through formula
rates, resulting in no material impact on current period earnings.
• Depreciation expense increased $9 million in the first three months of 2024, as compared to the same period of 2023, primarily due to a higher asset
base.
• Deferral of regulatory assets increased $38 million in the first three months of 2024, as compared to the same period of 2023, primarily due to:
• $60 million increase due to the approval in the first quarter of 2024 to recover costs of certain retired generation stations by the WVPSC;
• $23 million increase due to higher deferral of storm related expenses;
• $19 million related to net increases in other deferrals; and
• $4 million increase due to higher energy efficiency related deferrals;
partially offset by:
• $63 million net decrease due to lower generation and transmission related deferrals; and
• $5 million decrease due to higher vegetation related amortizations.
• General taxes increased $4 million in the first three months of 2024, as compared to the same period of 2023, primarily due to higher gross receipts
taxes.
Other Expense —
Other expense increased $12 million in the first three months of 2024, as compared to the same period of 2023, primarily due to higher net interest expense
associated with new long-term issuances, higher short-term borrowings, and higher nonrecoverable charges.
Income Taxes —
Integrated’s effective tax rate was 29.9% and 22.2% for the three months ended March 31, 2024 and 2023, respectively, the increase was primarily due to an
update to a valuation allowance associated with the expected utilization of certain state NOL carryforwards related to the sale of equity interest in FET.
Stand-Alone Transmission Segment — First Three Months of 2024 Compared with First Three Months of 2023
Stand-Alone Transmission’s earnings attributable to FE decreased $12 million in the first three months of 2024, as compared to the same period of 2023,
primarily due to a discrete tax charge associated with the FET Equity Interest Sale and higher short-term borrowings and interest rates, partially offset by
increased earnings as a result of regulated capital investments that increased rate base.
Revenues —
Stand-Alone Transmission’s total revenues increased $38 million, primarily due to a higher rate base and recovery of higher transmission operating expenses.
The following table shows revenues by transmission asset owner:
For the Three Months Ended March 31,
Revenues by Transmission Asset Owner 	2024 	2023 	Increase
(In millions)
ATSI 	245 	228 $ 	17
TrAIL 	68 	67 	1
MAIT 	105 	90 	15
KATCo 	20 	15 	5
Total Revenues 	$ 	438 $ 	400 $ 	38
Operating Expenses —
Total operating expenses increased $18 million in the first three months of 2024, as compared to the same period of 2023, primarily due to higher depreciation
and property tax expenses from a higher asset base, as well as higher operating and maintenance expenses. Nearly all operating expenses are recovered
through formula rates, resulting in no material impact on current period earnings.
Other Expense —
Total other expense increased $9 million in the first three months of 2024, as compared to the same period of 2023, primarily due to higher short-term
borrowings and net interest expense due to the new debt issuances.
Income Taxes —
Stand-Alone Transmission’s effective tax rate was 38.0% and 22.4% for the three months ended March 31, 2024 and 2023, respectively. The increase in the
effective tax rate is primarily due to a discrete tax charge related to updates to deferred taxes on the sale of equity interest in FET in the first quarter of 2024.
43

-- 55 of 106 --

Corporate / Other — First Three Months of 2024 Compared with First Three Months of 2023
Financial results at Corporate/Other resulted in an $18 million increase in losses attributable to FE in the first three months of 2024, as compared to the same
period of 2023, primarily due to:
• $21 million (after-tax) of lower other operating expenses related to the absence of expenses associated with the cancellation of a sponsorship
agreement during the first quarter of 2023; and
• $8 million (after-tax) related to lower pension and OPEB service and non-service costs;
partially offset by:
• $26 million (after-tax) of lower investment earnings related to FEV’s equity method investment in Global Holding;
• $13 million (after-tax) of higher net interest expense associated with the 2026 Convertible Notes issuance in May 2023, and higher revolver borrowings
and interest rate, partially offset by favorable money pool investments; and
• Higher net discrete income tax charges related to the PA Consolidation, partially offset by income tax benefits related to updates to deferred taxes on
the sale of equity interest in FET in the first quarter of 2024 and other discrete benefits primarily associated with state NOL utilization.
REGULATORY ASSETS AND LIABILITIES
Regulatory assets represent incurred costs that have been deferred because of their probable future recovery from customers through regulated rates.
Regulatory liabilities represent amounts that are expected to be credited to customers through future regulated rates or amounts collected from customers for
costs not yet incurred. FirstEnergy, the Utilities and the Transmission Companies net their regulatory assets and liabilities based on federal and state
jurisdictions.
Management assesses the probability of recovery of regulatory assets, and settlement of regulatory liabilities, at each balance sheet date and whenever new
events occur. Factors that may affect probability relate to changes in the regulatory environment, issuance of a regulatory commission order or passage of new
legislation. Upon material changes to these factors, where applicable, FirstEnergy will record new regulatory assets and liabilities and will assess whether it is
probable that currently recorded regulatory assets and liabilities will be recovered or settled in future rates.
The following table provides information about the composition of net regulatory assets and liabilities as of March 31, 2024, and December 31, 2023, and the
changes during the three months ended March 31, 2024:
Net Regulatory Assets (Liabilities) by Source
March 31,
2024
December 31,
2023 	Change
(In millions)
Customer payables for future income taxes 	$ 	(2,358) $ 	(2,382) $ 	24
Spent nuclear fuel disposal costs 	(78) 	(83) 	5
Asset removal costs 	(661) 	(652) 	(9)
Deferred transmission costs 	282 	286 	(4)
Deferred generation costs 	631 	572 	59
Deferred distribution costs 	291 	247 	44
Storm-related costs 	867 	799 	68
Energy efficiency program costs 	221 	198 	23
New Jersey societal benefit costs 	76 	79 	(3)
Vegetation management costs 	101 	102 	(1)
Other 	(3) 	(11) 	8
Net Regulatory Liabilities included on the Consolidated Balance Sheets 	$ 	(631) $ 	(845) $ 	214
The following is a description of the regulatory assets and liabilities described above:
Customer payables for future income taxes - Reflects amounts to be recovered or refunded through future rates to pay income taxes that become
payable when rate revenue is provided to recover items such as AFUDC equity and depreciation of property, plant and equipment for which deferred
income taxes were not recognized for ratemaking purposes, including amounts attributable to federal and state tax rate changes such as the Tax Act
and Pennsylvania House Bill 1342. These amounts are being amortized over the period in which the related deferred tax assets reverse, which is
generally over the expected life of the underlying asset.
44

-- 56 of 106 --

Spent nuclear fuel disposal costs - Reflects amounts collected from customers, and the investment income, losses and changes in fair value of the
trusts for spent nuclear fuel disposal costs related to former nuclear generating facilities, Oyster Creek and Three Mile Island Unit 1.
Asset removal costs - Primarily represents the rates charged to customers that include a provision for the cost of future activities to remove assets,
including obligations for which an asset retirement obligation has been recognized, that are expected to be incurred at the time of retirement.
Deferred transmission costs - Reflects differences between revenues earned based on actual costs for the formula-rate Transmission Companies
and the amounts billed, including amounts expected to be refunded to, or recoverable from, wholesale transmission customers resulting from the FERC
Audit, as further described below, which amounts are recorded as a regulatory asset or liability and recovered or refunded, respectively, in subsequent
periods. Also included is the recovery of non-market based costs or fees charged to certain of the Utilities by various regulatory bodies including FERC
and RTOs, which can include PJM charges and credits for service including, but not limited to, procuring transmission services and transmission
enhancement.
Deferred generation costs - Primarily relates to regulatory assets associated with the securitized recovery of certain fuel and purchased power
regulatory assets at the Ohio Companies (amortized through 2034) as well as the ENEC at MP and PE. MP and PE recover net power supply costs,
including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. Generally, the ENEC rate is
updated annually. Also included is a regulatory asset related to approval by the WVPSC in March 2024 to recover costs associated with certain retired
generation plants in West Virginia (amortized through 2029).
Deferred distribution costs - Relates to the Ohio Companies' deferral of certain distribution-related expenses, including interest (amortized through
2034), AMI costs in New Jersey, and other distribution-related costs being recovered in West Virginia.
Storm-related costs - Relates to the deferral of storm costs, which vary by jurisdiction. Approximately $329 million and $254 million are currently being
recovered through rates as of March 31, 2024 and December 31, 2023, respectively.
Energy efficiency program costs - Relates to the recovery of costs in excess of revenues associated with energy efficiency programs including, New
Jersey energy efficiency and renewable energy programs, FE PA’s Energy Efficiency and Conservation programs, the Ohio Companies' Demand Side
Management and Energy Efficiency Rider, and PE's EmPOWER Maryland Surcharge. Investments in certain of these energy efficiency programs earn
a long-term return.
New Jersey societal benefit costs - Primarily relates to regulatory assets associated with MGP remediation, universal service and lifeline funds, and
the New Jersey Clean Energy Program.
Vegetation management costs - Relates to regulatory assets associated with the recovery of certain distribution vegetation management costs in New
Jersey and West Virginia as well as certain transmission vegetation management costs at MAIT, ATSI, KATCo and PE (amortized through 2024, 2030
and 2036, respectively).
The following table provides information about the composition of net regulatory assets that do not earn a current return as of March 31, 2024 and December 31,
2023, of which approximately $692 million and $371 million, respectively, are currently being recovered through rates over varying periods, through 2068,
depending on the nature of the deferral and the jurisdiction:
Regulatory Assets by Source Not Earning a Current Return March 31,
2024 December 31,
2023 	Change
(In millions)
Deferred transmission costs 	$ 	5 $ 	6 $ 	(1)
Deferred generation costs 	334 	432 	(98)
Deferred distribution costs 	128 	68 	60
Storm-related costs 	638 	602 	36
Vegetation management costs 	14 	21 	(7)
Other 	71 	68 	3
Regulatory Assets Not Earning a Current Return 	$ 	1,190 $ 	1,197 $ 	(7)
45

-- 57 of 106 --

CAPITAL RESOURCES AND LIQUIDITY
FirstEnergy’s business is capital intensive, requiring significant resources to fund operating expenses, construction and other investment expenditures,
scheduled debt maturities and interest payments, dividend payments and potential contributions to its pension plan.
FE and its subsidiaries expect their existing sources of liquidity to remain sufficient to meet their respective anticipated obligations. In addition to internal sources
to fund liquidity and capital requirements for 2024 and beyond, FE and its subsidiaries expect to rely on external sources of funds. Short-term cash requirements
not met by cash provided from operations are generally satisfied through short-term borrowings. Long-term cash needs may be met through the issuance of
long-term debt by FE and certain of its subsidiaries to, among other things, fund capital expenditures and other capital-like investments, and refinance short-term
and maturing long-term debt, subject to market conditions and other factors. FE may utilize instruments other than senior notes to fund its liquidity and capital
requirements, including hybrid securities.
In alignment with FirstEnergy’s strategy to invest in its segments as a fully regulated company, FirstEnergy is focused on maintaining balance sheet strength and
flexibility. Specifically, at the regulated businesses, regulatory authority has been obtained for various regulated subsidiaries to issue and/or refinance debt.
Any financing plans by FE or any of its consolidated subsidiaries, including the issuance of equity and debt, and the refinancing of short-term and maturing long-
term debt are subject to market conditions and other factors. No assurance can be given that any such issuances, financing or refinancing, as the case may be,
will be completed as anticipated or at all. Any delay in the completion of financing plans could require FE or any of its consolidated subsidiaries to utilize short-
term borrowing capacity, which could impact available liquidity. In addition, FE and its consolidated subsidiaries expect to continually evaluate any planned
financings, which may result in changes from time to time.
On February 2, 2023, FE, along with FET, entered into the FET P&SA II with Brookfield and the Brookfield Guarantors, pursuant to which FE agreed to sell to
Brookfield at the closing, and Brookfield agreed to purchase from FE, an incremental 30% equity interest in FET for a purchase price of $3.5 billion. The FET
Equity Interest Sale closed on March 25, 2024 and FET continues to be consolidated in FirstEnergy’s financial statements. The purchase price was paid in part
by the issuance of two promissory notes at closing having an aggregate principal amount of $1.2 billion with: (i) one promissory note having an aggregate
principal amount of $750 million, at an interest rate of 5.75% per annum, with a maturity date of September 25, 2025 and (ii) one promissory note having an
aggregate principal amount of $450 million, at an interest rate of 7.75% per annum, with a maturity date of December 31, 2024. Both notes are expected to be
repaid in 2024. The remaining $2.3 billion of the purchase price was paid in cash at closing. Brookfield Corporation has guaranteed the full amount of the
promissory notes. As a result of the consummation of the transaction, Brookfield’s interest in FET increased from 19.9% to 49.9%, while FE retained the
remaining 50.1% ownership interests of FET.
On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, including OE subsidiary, Penn, making FE PA a new, single operating
entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. FE PA, as of January 1, 2024, is FE’s only regulated distribution
utility in Pennsylvania encompassing the operations previously conducted individually by the Pennsylvania Companies and FE PA serves an area with a
population of approximately 4.5 million and operates under the rate districts of the former Pennsylvania Companies. FirstEnergy is also evaluating the legal,
financial, operational and branding benefits of consolidating the Ohio Companies into a single Ohio utility company.
Also on January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo, and PN and ME contributed their respective Class B
equity interests of MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership interest in FET. So long as FE holds the
FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.
Post-pandemic economic conditions have increased supply chain lead times across numerous material categories, with some as much as tripling from pre-
pandemic lead times. Several key suppliers have struggled with labor shortages and raw material availability, which along with inflationary pressure that appears
to be moderating, have increased costs and decreased the availability of certain materials, equipment and contractors. FirstEnergy has taken steps to mitigate
these risks and does not currently expect service disruptions or any material impact on its capital spending plan. However, the situation remains fluid and a
prolonged continuation or further increase in supply chain disruptions could have an adverse effect on FirstEnergy’s results of operations, cash flow and financial
condition.
In December 2023, FirstEnergy, executed a lift-out transaction with Banner Life Insurance Company and Reinsurance Group of America that transferred
approximately $683 million of plan assets and $719 million of plan obligations, associated with approximately 1,900 former FES and FENOC employees, who
will assume future and full responsibility to fund and administer their benefit payments. There was no change to the pension benefits for any participants as a
result of the transfer. The transaction was funded by pension plan assets and resulted in a pre-tax gain of approximately $36 million, which was included in the
fourth quarter 2023 pension mark-to-market charge. FirstEnergy expects that the transaction further de-risked potential volatility with the pension plan assets
and liabilities, and FirstEnergy will continue to evaluate other lift-outs in the future based on market and other conditions.
46

-- 58 of 106 --

As of March 31, 2024, FirstEnergy’s net deficit in working capital (current assets less current liabilities) was primarily due to current portion of long-term debt,
accounts payable, short-term borrowings and accrued interest, taxes, and compensation and benefits. FirstEnergy believes its cash from operations and
available liquidity will be sufficient to meet its current working capital needs. See further discussion on cash from operations below.
Short-Term Borrowings / Revolving Credit Facilities
On October 18, 2021, FE, FET, the Utilities, and the Transmission Companies entered into the 2021 Credit Facilities, which were six separate senior unsecured
five-year syndicated revolving credit facilities with JPMorgan Chase Bank, N.A., Mizuho Bank, Ltd. and PNC Bank, National Association that replaced the FE
Revolving Facility and the FET Revolving Facility, and provide for aggregate commitments of $4.5 billion. Under the 2021 Credit Facilities, an aggregate amount
of $4.5 billion is available to be borrowed, repaid and reborrowed, subject to each borrower’s respective sublimit under the respective facilities. These credit
facilities provide substantial liquidity to support the Regulated businesses, and each of the operating companies within the businesses.
On October 20, 2023, FE and certain of its subsidiaries entered into the amendments to each of the 2021 Credit Facilities to, among other things; (i) amend the
FE Revolving Facility to release FET as a borrower and (ii) extend the maturity date of the 2021 Credit Facilities for an additional one-year period, from October
18, 2026 to October 18, 2027. Also, on October 20, 2023, each of FET and KATCo entered into the 2023 Credit Facilities. In connection with PA Consolidation,
the Pennsylvania Companies' rights and obligations under their revolving credit facility were assumed by FE PA on January 1, 2024.
Under the FET Revolving Facility, $1.0 billion is available to be borrowed, repaid and reborrowed until October 20, 2028. Under the KATCo Revolving Facility, (i)
$150 million is available to be borrowed, repaid and reborrowed until October 20, 2027, (ii) borrowings will mature on the earlier of 364 days from the date of
borrowing or the commitment termination date, as the same may be extended; upon KATCo demonstrating to the administrative agent authorization to borrow
amounts maturing more than 364 days from the date of borrowing, its borrowings will mature on the latest commitment termination date. KATCo may not draw
on the KATCo Credit Facility until the satisfaction of certain conditions, including the availability of first quarter financial statements, which are expected to be
completed during the second quarter of 2024.
The 2021 Credit Facilities and 2023 Credit Facilities are as follows:
• FE, $1.0 billion revolving credit facility;
• FET, $1.0 billion revolving credit facility;
• Ohio Companies, $800 million revolving credit facility;
• FE PA, $950 million revolving credit facility;
• JCP&L, $500 million revolving credit facility;
• MP and PE, $400 million revolving credit facility;
• Transmission Companies, $850 million revolving credit facility; and
• KATCo, $150 million revolving credit facility.
Borrowings under the 2021 Credit Facilities and 2023 Credit Facilities may be used for working capital and other general corporate purposes. Generally,
borrowings under each of the credit facilities are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the
commitment termination date, as the same may be extended. Each of the 2021 Credit Facilities and 2023 Credit Facilities contain financial covenants requiring
each borrower, with the exception of FE, to maintain a consolidated debt-to-total-capitalization ratio (as defined under each of the 2021 Credit Facilities and 2023
Credit Facilities) of no more than 65%, and 75% for FET, measured at the end of each fiscal quarter. FE is required under its 2021 Credit Facility to maintain a
consolidated interest coverage ratio of not less than 2.50 times, measured at the end of each fiscal quarter for the last four fiscal quarters beginning with the
quarter ending December 31, 2021.
FirstEnergy’s 2021 Credit Facilities and 2023 Credit Facilities bear interest at fluctuating interest rates, primarily based on SOFR, including term SOFR and daily
simple SOFR. FirstEnergy has not hedged its interest rate exposure with respect to its floating rate debt. Accordingly, FirstEnergy’s interest expense for any
particular period will fluctuate based on SOFR and other variable interest rates. The high interest rate environment has caused the rate and interest expense on
borrowings under the various FirstEnergy credit facilities to be significantly higher. Restricted access to capital markets and/or increased borrowing costs could
have an adverse effect on FirstEnergy’s results of operations, cash flows, financial condition and liquidity.
47

-- 59 of 106 --

FirstEnergy had $250 million and $775 million of outstanding short-term borrowings as of March 31, 2024 and December 31, 2023, respectively. FirstEnergy’s
available liquidity from external sources as of April 22, 2024, was as follows:
Revolving Credit Facility 	Maturity 	Commitment 	Available Liquidity
(In millions)
FE 	October 2027 $ 	1,000 $ 	717
FET 	October 2028 	1,000 	750
Ohio Companies 	October 2027 	800 	300
FE PA 	October 2027 	950 	950
JCP&L 	October 2027 	500 	499
MP and PE 	October 2027 	400 	400
Transmission Companies 	October 2027 	850 	850
KATCo 	October 2027 	150 	150
Subtotal $ 	5,650 $ 	4,616
Cash and cash equivalents 	— 	110
Total $ 	5,650 $ 	4,726
KATCo may not draw on the KATCo Credit Facility until the satisfaction of certain conditions, including the availability of first quarter financial statements, which are expected to be
completed during the second quarter of 2024.
The following table summarizes the limitations on short-term indebtedness applicable to each borrower under current regulatory approvals and applicable
statutory and/or charter limitations as of March 31, 2024:
Individual Borrower
Regulatory Debt
Limitations
Credit Facility
Limitations
Debt-to-Total-
Capitalization Ratio
(In millions)
FE 	N/A 	$ 	1,000 	N/A
ATSI 	$ 	500 	350 	41.1 %
CEI 	500 	300 	48.3 %
FET 	N/A 	1,000 	64.5 %
FE PA 	1,250 	950 	51.2 %
JCP&L 	1,000 	500 	37.9 %
KATCo 	200 	150 	N/A
MAIT 	400 	350 	39.8 %
MP 	500 	250 	54.4 %
OE 	500 	300 	55.9 %
PE 	150 	150 	50.8 %
TE 	300 	200 	48.1 %
TrAIL 	400 	150 	39.2 %
Includes amounts which may be borrowed under the regulated companies’ money pool.
FE is not required to maintain a debt-to-total-capitalization ratio under the 2021 Credit Facilities and 2023 Credit Facilities. However, FE is required to maintain a consolidated
interest coverage ratio of not less than 2.50 times, measured at the end of each fiscal quarter for the last four fiscal quarters beginning with the quarter ending December 31,
2021. FE's interest coverage ratio as of March 31, 2024 was 4.21.
KATCo may not draw on the KATCo Credit Facility until the satisfaction of certain conditions, including the availability of first quarter financial statements, which are expected to be
completed during the second quarter of 2024.
(1)
(1)
(2)
(1)
(1)
(1)
(1) 	(3)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
(3)
48

-- 60 of 106 --

Subject to each borrower’s sublimit, the amounts noted below are available for the issuance of LOCs (subject to borrowings drawn under the 2021 Credit
Facilities and 2023 Credit Facilities) expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total
commitments available under each of the 2021 Credit Facilities and 2023 Credit Facilities and against the applicable borrower’s borrowing sublimit. As of
March 31, 2024, FirstEnergy had $4 million in outstanding LOCs.
Revolving Credit Facility 	LOC Availability as of
March 31, 2024
(In millions)
FE 	$ 	100
FET 	100
Ohio Companies 	150
FE PA 	200
JCP&L 	100
MP and PE 	100
Transmission Companies 	200
KATCo 	35
KATCo may not draw on the KATCo Credit Facility until the satisfaction of certain conditions, including the availability of first quarter financial statements, which are expected to be
completed during the second quarter of 2024.
The 2021 Credit Facilities and 2023 Credit Facilities do not contain provisions that restrict the ability to borrow or accelerate payment of outstanding advances in
the event of any change in credit ratings of the borrowers. Pricing is defined in “pricing grids,” whereby the cost of funds borrowed under the 2021 Credit
Facilities and the 2023 Credit Facilities are related to the credit ratings of the company borrowing the funds. Additionally, borrowings under each of the 2021
Credit Facilities and 2023 Credit Facilities are subject to the usual and customary provisions for acceleration upon the occurrence of events of default, including
a cross-default for other indebtedness in excess of $100 million.
As of March 31, 2024, the borrowers were in compliance with the applicable interest coverage and debt-to-total-capitalization ratio covenants in each case as
defined under the 2021 Credit Facilities and 2023 Credit Facilities.
FirstEnergy Money Pools
FirstEnergy’s utility operating subsidiary companies also have the ability to borrow from each other and FE to meet their short-term working capital requirements.
Similar but separate arrangements exist among FirstEnergy’s unregulated companies with AE Supply, FE, FET, FEV and certain other unregulated subsidiaries.
FESC administers these money pools and tracks surplus funds of FE and the respective regulated and unregulated subsidiaries, as the case may be, as well as
proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must repay the principal amount of the loan, together
with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from their respective pool and is
based on the average cost of funds available through the pool. The high interest rate environment has caused the rate and interest expense on borrowings
under the various FirstEnergy credit facilities to be significantly higher.
Average Interest Rates 	Regulated Companies’ Money Pool 	Unregulated Companies’ Money Pool
2024 	2023 	2024 	2023
For the Three Months Ended March 31, 	6.32 % 	5.84 % 	7.08 % 	5.19 %
(1)
(1)
49

-- 61 of 106 --

Long-Term Debt Capacity
FE’s and its subsidiaries’ access to capital markets and costs of financing are influenced by the credit ratings of their securities. The following table displays FE’s
and its subsidiaries’ credit ratings as of April 23, 2024:
Corporate Credit Rating 	Senior Secured 	Senior Unsecured 	Outlook/Credit/Watch
Issuer 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch
FE 	BBB 	Baa3 	BBB- 	— 	— 	— 	BBB- 	Baa3 	BBB- 	P 	S 	S
Distribution:
CEI 	BBB 	Baa3 	BBB 	A- 	Baa1 	A- 	BBB 	Baa3 	BBB+ 	P 	S 	S
OE 	BBB+ 	A3 	BBB 	A 	A1 	A- 	BBB+ 	A3 	BBB+ 	P 	S 	S
TE 	BBB+ 	Baa2 	BBB 	A 	A3 	A- 	— 	— 	— 	P 	S 	S
FE PA 	BBB+ 	A3 	BBB 	A 	A1 	A- 	BBB+ 	A3 	BBB+ 	P 	S 	S
Integrated:
JCP&L 	BBB 	A3 	BBB 	— 	— 	— 	BBB 	A3 	BBB+ 	P 	S 	S
MP 	BBB 	Baa2 	BBB 	A- 	A3 	A- 	BBB 	Baa2 	— 	S 	S 	S
AGC 	BBB- 	Baa2 	BBB 	— 	— 	— 	— 	— 	— 	S 	S 	S
PE 	BBB 	Baa2 	BBB 	A- 	A3 	A- 	— 	— 	— 	S 	S 	S
Transmission:
FET 	BBB 	Baa2 	BBB- 	— 	— 	— 	BBB- 	Baa2 	BBB- 	P 	S 	S
ATSI 	BBB+ 	A3 	BBB 	— 	— 	— 	BBB+ 	A3 	BBB+ 	P 	S 	S
MAIT 	BBB+ 	A3 	BBB 	— 	— 	— 	BBB+ 	A3 	BBB+ 	P 	S 	S
TrAIL 	BBB+ 	A3 	BBB 	— 	— 	— 	BBB+ 	A3 	BBB+ 	P 	S 	S
KATCo 	— 	A3 	BBB 	— 	— 	— 	— 	— 	— 	— 	S 	S
S = Stable, P = Positive
On March 28, 2024, Moody’s upgraded FE’s corporate credit ratings from Ba1 to Baa3.
On April 23, 2024, S&P issued one-notch upgrades of FE and several subsidiaries.
The applicable undrawn and drawn margin on the 2021 Credit Facilities and 2023 Credit Facilities are subject to ratings-based pricing grids. The applicable fee
paid on the undrawn commitments under the 2021 Credit Facilities and 2023 Credit Facilities are based on each borrower’s senior unsecured non-credit
enhanced debt ratings as determined by S&P and Moody’s. The fees paid on actual borrowings are determined based on each borrower’s senior unsecured
non-credit enhanced debt ratings as determined by S&P and Moody’s.
The interest rates payable on approximately $2.1 billion in FE’s senior unsecured notes are subject to adjustments from time to time if the ratings on the notes
from any one or more of S&P, Moody’s and Fitch decreases to a rating set forth in the applicable governing documents. Generally, a one-notch downgrade by
the applicable rating agency may result in a 25 basis point coupon rate increase beginning at BB, Ba1, and BB+ for S&P, Moody’s and Fitch, respectively, to the
extent such rating is applicable to the series of outstanding senior unsecured notes, during the next interest period, subject to an aggregate cap of 2% from
issuance interest rate.
Debt capacity is subject to the consolidated interest coverage ratio in the 2021 Credit Facilities. As of March 31, 2024, FirstEnergy could incur approximately
$800 million of incremental interest expense or incur a $2.0 billion reduction to the consolidated interest coverage earnings numerator, as defined under the
covenant, and FE would remain within the limitations of the financial covenant requirements of the 2021 Credit Facilities.
Cash Requirements and Commitments
FirstEnergy has certain obligations and commitments to make future payments under contracts. For an in-depth discussion of FirstEnergy’s cash requirements
and commitments, see “Capital Resources and Liquidity - Cash Requirements and Commitments" in Item 7, "Management's Discussion and Analysis of
Financial Condition and Results of Operations" within FirstEnergy’s Form 10-K for the year ended December 31, 2023 (filed on February 13, 2024).
(1)
(1)
50

-- 62 of 106 --

Changes in Cash Position
As of March 31, 2024, FirstEnergy had $888 million of cash and cash equivalents and $27 million of restricted cash as compared to $137 million of cash and
cash equivalents and $42 million of restricted cash as of December 31, 2023, on the Consolidated Balance Sheets.
The following table summarizes the major classes of cash flow items:
For the Three Months Ended
March 31,
(In millions) 	2024 	2023
Net cash used for operating activities 	$ 	(40) $ 	(112)
Net cash used for investing activities 	(870) 	(716)
Net cash provided from financing activities 	1,646 	828
Net change in cash, cash equivalents, and restricted cash 	736 	—
Cash, cash equivalents, and restricted cash at beginning of period 	179 	206
Cash, cash equivalents, and restricted cash at end of period 	$ 	915 $ 	206
Cash Flows From Operating Activities
FirstEnergy’s most significant sources of cash are derived from electric service provided by its operating subsidiaries. The most significant use of cash from
operating activities is buying electricity to serve non-shopping customers, return of cash collateral associated with certain generation suppliers that serve
shopping customers, pension contributions and paying fuel suppliers, employees, tax authorities, lenders and others for a wide range of materials and services.
Cash used for operating activities was $40 million and $112 million in the first three months of 2024 and 2023, respectively. Cash flows from operating activities
were a net outflow in the first quarter of 2024, primarily due to working capital, including prepaid and accrued tax payments associated with Pennsylvania gross
receipts tax payments and timing of property tax payments. Compared to the same period of 2023, the decrease in cash used for operating activities is primarily
due to:
Lower payments, primarily on generation energy purchases for certain customers, net of related customer receivable receipts;
The decrease in return of cash collateral to certain generation suppliers that serve shopping customers that was previously received as a result of
changes in power prices;
Higher net transmission revenue collection based on the timing of formula rate collections; and
Higher returns from distribution, integrated, and transmission capital investments;
The decrease in cash used for operating activities was partially offset by:
Lower dividend distribution received by FEV from its equity investments in Global Holding; and
Higher payments associated with Pennsylvania gross receipts taxes.
•
•
•
•
•
•
51

-- 63 of 106 --

Cash Flows From Investing Activities
Cash used for investing activities in the first three months of 2024 principally represented cash used for capital investments. The following table summarizes
investing activities for the first three months of 2024 and 2023:
For the Three Months Ended March 31,
Cash Used for Investing Activities 	2024 	2023 Increase
(Decrease)
(In millions)
Capital investments:
Distribution Segment 	$ 	215 $ 	193 $ 	22
Integrated Segment 	313 	237 	76
Stand-Alone Transmission Segment 	258 	212 	46
Corporate / Other Segment 	4 	7 	(3)
Asset removal costs 	78 	60 	18
Other 	2 	7 	(5)
$ 	870 $ 	716 $ 	154
Cash used for investing activities for the first three months of 2024 increased $154 million, compared to the same period of 2023, primarily due to capital
investments.
Cash Flows From Financing Activities
In the first three months of 2024 and 2023, cash provided from financing activities was $1,646 million and $828 million, respectively. The following table
summarizes financing activities for the first three months of 2024 and 2023:
For the Three Months Ended March
31,
Financing Activities 	2024 	2023
(In millions)
New Issues:
Unsecured notes 	$ 	150 $ 	900
FMBs 	— 	50
$ 	150 $ 	950
Redemptions / Repayments:
Unsecured notes 	$ 	— $ 	(300)
Senior secured notes 	(23) 	(21)
$ 	(23) $ 	(321)
Proceeds from FET Equity Interest Sale 	$ 	2,300 $ 	—
Noncontrolling interest cash distributions 	(8) 	(17)
Short-term borrowings, net 	(525) 	450
Common stock dividend payments 	(235) 	(223)
Other 	(13) 	(11)
$ 	1,646 $ 	828
FirstEnergy had the following issuances and redemptions during the three months ended March 31, 2024:
Company 	Type 	Issuance Date
Interest
Rate 	Maturity
Amount
(In millions) 	Description
Issuance
ATSI
Senior
Unsecured
Note
March, 2024 	5.63% 	2034 	$150 	Proceeds were used to repay short-term borrowings, to finance capital
expenditures and for other general corporate purposes.
52

-- 64 of 106 --

In March 2024, notice of redemption was provided for all remaining $463 million of FE’s 7.375% Notes, due 2031, which was completed on April 15, 2024, with a
make-whole premium of approximately $80 million. Due to the redemption, the $463 million remaining notes are included within currently payable long-term debt
on the Consolidated Balance Sheets as of March 31, 2024.
On April 1, 2024, JCP&L redeemed its $500 million 4.70% unsecured notes that became due.
On April 15, 2024, MP redeemed its $400 million 4.10% FMBs that became due.
On April 18, 2024, MAIT agreed to sell $250 million of new 5.94% Unsecured Notes due May 1, 2034. The sale is expected to settle on May 2, 2024. Proceeds
are expected to be used to repay short-term borrowings, to finance capital expenditures and for other general corporate purposes.
FE or its affiliates may, from time to time, seek to retire or purchase outstanding debt through open-market purchases, privately negotiated transactions or
otherwise. Such repurchases, if any, will be upon such terms and at such prices as FE or its affiliates may determine, and will depend on prevailing market
conditions, liquidity requirements, contractual restrictions and other factors.
GUARANTEES AND OTHER ASSURANCES
FirstEnergy has various financial and performance guarantees and indemnifications, which are issued in the normal course of business. These contracts include
performance guarantees, stand-by LOCs, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate
commercial transactions with third parties by enhancing the value of the transaction to the third party. The maximum potential amount of future payments FE and
its subsidiaries could be required to make under these guarantees as of March 31, 2024, was $820 million, as summarized below:
Guarantees and Other Assurances Maximum
Exposure
(In millions)
FE’s Guarantees on Behalf of its Consolidated Subsidiaries
Deferred compensation arrangements 	$ 	430
Vehicle leases 	75
Other 	15
520
FE’s Guarantees on Other Assurances
Surety Bonds 	182
Deferred compensation arrangements 	114
LOCs 	4
300
Total Guarantees and Other Assurances 	$ 	820
During the third quarter of 2023, FE was required by PJM to issue a guarantee to cover non-performance until FE PA is able to provide audited financial statements to PJM, which
is expected to occur in early 2025. The guarantee is expected to be immaterial to FE.
During the second quarter of 2023, FE was released from its $169 million surety bond to the Pennsylvania Department of Environmental Protection related to the Little Blue Run
Disposal Impoundment.
Collateral and Contingent-Related Features
In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity,
energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted
in the form of cash or credit support with thresholds contingent upon FE’s or its subsidiaries’ credit rating from each of the major credit rating agencies. The
collateral and credit support requirements vary by contract and by counterparty.
As of March 31, 2024, $119 million of net cash collateral has been posted by FE or its subsidiaries and is included in “Prepaid taxes and other current assets” on
FirstEnergy’s Consolidated Balance Sheets. FE or its subsidiaries are holding $33 million of net cash collateral as of March 31, 2024, from certain generation
suppliers, and such amount is included in “Other current liabilities” on FirstEnergy’s Consolidated Balance Sheets.
(1)
(2)
(1)
(2)
53

-- 65 of 106 --

These credit-risk-related contingent features stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent
contractual collateral obligations as of March 31, 2024:
Potential Collateral Obligations
Utilities and
Transmission
Companies 	FE 	Total
(In millions)
Contractual obligations for additional collateral
Upon further downgrade 	$ 	63 $ 	— $ 	63
Surety bonds (collateralized amount) 	87 	79 	166
Total Exposure from Contractual Obligations 	$ 	150 $ 	79 $ 	229
Surety bonds are not tied to a credit rating. Surety bonds’ impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond
except with respect to $39 million of surety bond obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days to cure.
MARKET RISK INFORMATION
FirstEnergy uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations.
FirstEnergy’s Enterprise Risk Management Committee, comprised of members of senior management, provides general oversight for risk management activities
throughout FirstEnergy.
Commodity Price Risk
FirstEnergy has limited exposure to financial risks resulting from fluctuating commodity prices, such as prices for electricity, coal and energy transmission.
FirstEnergy’s Risk Management Department and Enterprise Risk Management Committee are responsible for promoting the effective design and implementation
of sound risk management programs and overseeing compliance with corporate risk management policies and established risk management practice.
The valuation of derivative contracts is based on observable market information. As of March 31, 2024, FirstEnergy has a net liability of $1 million in non-hedge
derivative contracts that are related to FTRs at certain of the Utilities. FTRs are subject to regulatory accounting and do not impact earnings. See Note 6, “Fair
Value Measurements,” of the Notes to Consolidated Financial Statements for additional details on FirstEnergy’s FTRs.
Equity Price Risk
As of March 31, 2024, the FirstEnergy pension plan assets were allocated approximately as follows: 30% in equity securities, 22% in fixed income securities, 7%
in alternatives, 11% in real estate, 19% in private debt/equity, 5% in derivatives and 6% in cash and short-term securities. As discussed above, FirstEnergy made
a $750 million voluntary cash contribution to the qualified pension plan on May 12, 2023. FirstEnergy does not currently expect to have a required contribution to
the pension plan until 2028, which based on various assumptions, including an expected rate of return on assets of 8.0%, is expected to be approximately
$260 million. However, FirstEnergy may elect to contribute to the pension plan voluntarily.
As of March 31, 2024, FirstEnergy’s OPEB plan assets were allocated approximately as follows: 51% in equity securities, 43% in fixed income securities and 6%
in cash and short-term securities. See Note 4, “Pension and Other Post-Employment Benefits,” of the Notes to Consolidated Financial Statements for additional
details on FirstEnergy’s pension and OPEB plans.
In the three months ended March 31, 2024, FirstEnergy’s OPEB plan assets have gained approximately 4.9% as compared to an annualized expected return on
plan assets of 7.0%. In the three months ended March 31, 2024, FirstEnergy’s pension plan assets have lost approximately 0.1% as compared to an annualized
expected return on plan assets of 8.0%.
Interest Rate Risk
FirstEnergy recognizes net actuarial gains or losses for its pension and OPEB plans in the fourth quarter of each fiscal year and whenever a plan is determined
to qualify for a remeasurement. A primary factor contributing to these actuarial gains and losses are changes in the discount rates used to value pension and
OPEB obligations as of the measurement date and the difference between expected and actual returns on the plans’ assets.
The remaining components of pension and OPEB expense, primarily service costs, interest cost on obligations, expected return on plan assets and amortization
of prior service costs, are set at the beginning of the calendar year (unless a remeasurement is triggered) and are recorded on a monthly basis. Changes in
asset performance and discount rates will not impact these pension costs for 2024, unless an additional remeasurement were to be triggered during the year,
however, future years could be impacted by changes in the market.
(1)
(1)
54

-- 66 of 106 --

FirstEnergy utilizes a spot rate approach in the estimation of the components of benefit cost by applying specific spot rates along the full yield curve to the
relevant projected cash flows. As of March 31, 2024, the spot rate was 5.28% and 5.22% for pension and OPEB obligations, respectively, as compared to 5.05%
and 4.97% as of December 31, 2023, respectively.
The final discount rate and return or loss on plan assets as of the year-end remeasurement date is difficult to predict based on the currently volatile equity
markets and interest rate environment. As a result, FirstEnergy is unable to determine or meaningfully project the mark-to-market adjustment, or estimate a
reasonable range of adjustment, that will be recorded as of December 31, 2024.
FirstEnergy’s 2021 Credit Facilities and 2023 Credit Facilities bear interest at fluctuating interest rates, primarily based on SOFR, including term SOFR and daily
simple SOFR. FirstEnergy has not hedged its interest rate exposure with respect to its floating rate debt. Accordingly, FirstEnergy’s interest expense for any
particular period will fluctuate based on SOFR and other variable interest rates. The high interest rate environment has caused the rate and interest expense on
borrowings under the various FirstEnergy credit facilities to be significantly higher.
Economic Conditions
Post-pandemic economic conditions have increased supply chain lead times across numerous material categories, with some as much as tripling from pre-
pandemic lead times. Several key suppliers have struggled with labor shortages and raw material availability, which along with inflationary pressure that appears
to be moderating, have increased costs and decreased the availability of certain materials, equipment and contractors. FirstEnergy has taken steps to mitigate
these risks and does not currently expect service disruptions or any material impact on its capital spending plan. However, the situation remains fluid and a
prolonged continuation or further increase in supply chain disruptions could have an adverse effect on FirstEnergy’s results of operations, cash flow and financial
condition.
CREDIT RISK
Credit risk is the risk that FirstEnergy would incur a loss as a result of nonperformance by counterparties of their contractual obligations. FirstEnergy maintains
credit policies and procedures with respect to counterparty credit (including a requirement that counterparties maintain specified credit ratings) and requires
other assurances in the form of credit support or collateral in certain circumstance in order to limit counterparty credit risk. FirstEnergy has concentrations of
suppliers and customers among electric utilities, financial institutions and energy marketing and trading companies. These concentrations may impact
FirstEnergy’s overall exposure to credit risk, positively or negatively, as counterparties may be similarly affected by changes in economic, regulatory or other
conditions. In the event an energy supplier of the Ohio Companies, FE PA, JCP&L or PE defaults on its obligation, the affected company would be required to
seek replacement power in the market. In general, subject to regulatory review or other processes, it is expected that appropriate incremental costs incurred by
these entities would be recoverable from customers through applicable rate mechanisms, thereby mitigating the financial risk for these entities. FirstEnergy’s
credit policies to manage credit risk include the use of an established credit approval process, daily credit mitigation provisions, such as margin, prepayment or
collateral requirements. FirstEnergy and its subsidiaries may request additional credit assurance, in certain circumstances, in the event that the counterparties’
credit ratings fall below investment grade, their tangible net worth falls below specified percentages or their exposures exceed an established credit limit.
OUTLOOK
INCOME TAXES
On August 16, 2022, President Biden signed into law the IRA of 2022, which, among other things, imposes a new 15% corporate AMT based on AFSI applicable
to corporations with a three-year average AFSI over $1 billion. The AMT is effective for the 2023 tax year and, if applicable, corporations must pay the greater of
the regular corporate income tax or the AMT. Although NOL carryforwards created through the regular corporate income tax system cannot be used to reduce
the AMT, financial statement net operating losses can be used to reduce AFSI and the amount of AMT owed. The IRA of 2022 as enacted requires the U.S.
Treasury to provide regulations and other guidance necessary to administer the AMT, including further defining allowable adjustments to determine AFSI, which
directly impacts the amount of AMT to be paid. Based on interim guidance issued by the U.S. Treasury during 2022 and 2023, FirstEnergy continues to believe
that it is more likely than not it will be subject to the AMT beginning with 2023. Accordingly, FirstEnergy made a first quarter estimated payment of AMT of
approximately $49 million in April 2023, however, made no additional payments in 2023 based on various factors, including additional guidance from the U.S.
Treasury that eliminated the requirement of corporations to include AMT in quarterly estimated tax payments. Until final U.S. Treasury regulations are issued, the
amount of AMT FirstEnergy pays could be significantly different than current estimates or it may not be a payer at all. The regulatory treatment of the impacts of
this legislation may also be subject to regulation by FERC and/or applicable state regulatory authorities. Any adverse development in this legislation, including
guidance from the U.S. Treasury and/or the IRS or unfavorable regulatory treatment, could negatively impact FirstEnergy’s cash flows, results of operations and
financial condition.
55

-- 67 of 106 --

As discussed above, on March 25, 2024, FirstEnergy closed on the sale of an additional 30% interest in FET, realizing an approximate $7.3 billion tax gain from
the combined sale of 49.9% of the membership interests in FET for the consideration received and recapture of negative tax basis in FET. In the first quarter of
2024, FirstEnergy recognized a net tax charge of approximately $46 million, comprised of updates to estimated deferred tax liability for the deferred gain from
the 19.9% sale of FET in May 2022, deferred tax liability related to its ongoing investment in FET, and valuation allowance associated with the expected
utilization of certain state NOL carryforwards impacted by the sale and the PA Consolidation. During the first quarter of 2024, FirstEnergy also recognized a
reduction to OPIC of approximately $797 million for federal and state income tax associated with the tax gain from closing on the 30% interest sale. As of
December 31, 2023, FirstEnergy had approximately $8.1 billion of gross federal NOL carryforwards which will be used to offset a majority of the tax gain from the
FET Equity Interest Sale and expected taxable income in 2024, however due to certain limitations on utilization enacted in the Tax Act, a portion of the NOL will
carry into 2025 and possibly beyond. As a result of the additional 30% sale, FET and its subsidiaries deconsolidated from FirstEnergy’s consolidated federal
income tax group and now constitute their own consolidated federal income tax group subject to their own income tax allocation agreement.
STATE REGULATION
Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in
Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York
by the NYPSC. The transmission operations of PE and TrAIL in Virginia, ATSI in Ohio, the Transmission Companies in Pennsylvania, PE and MP in West
Virginia, and PE in Maryland are subject to certain regulations of the VSCC, PUCO, PPUC, WVPSC, and MDPSC, respectively. In addition, under Ohio law,
municipalities may regulate rates of a public utility, subject to appeal to the PUCO if not acceptable to the utility. Further, if any of the FirstEnergy affiliates were
to engage in the construction of significant new transmission facilities, depending on the state, they may be required to obtain state regulatory authorization to
site, construct and operate the new transmission facility.
MARYLAND
PE operates under MDPSC approved base rates that were effective as of October 19, 2023, and that were subsequently modified by an MDPSC order dated
January 3, 2024, which became effective as of March 1, 2024. PE also provides SOS pursuant to a combination of settlement agreements, MDPSC orders and
regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths through periodic auctions that are
overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have expired, service continues in the
same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS.
The EmPOWER Maryland program requires each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal
of 2% annual savings. PE recovers program investments with a return through an annually reconciled surcharge, with most costs subject to recovery over a five-
year period with a return on the unamortized balance. Maryland law only allows for the utility to recover lost distribution revenue attributable to energy efficiency
or demand reduction programs through a base rate case proceeding. On August 1, 2023, PE filed its proposed plan for the 2024-2026 cycle as required by the
MDPSC. Consistent with a December 29, 2022, order by the MDPSC phasing out the ability of Maryland utilities to earn a return on EmPOWER investments, PE
will be required to expense 33% of its EmPOWER program costs in 2024, 67% in 2025 and 100% in 2026. Notwithstanding the order to phase out PE’s ability to
earn a return on its EmPOWER investments, all previously unamortized costs for prior cycles will continue to earn a return and be collected by the end of 2029,
consistent with the plan PE submitted on January 11, 2023. In the 2024-2026 order issued on December 29, 2023, the period to pay down the amortized
balances was extended through the end of 2031. Additionally at the direction of the MDPSC, PE together with other Maryland utilities are required to address
GHG reductions in addition to energy efficiency. In compliance with the MDPSC directive, PE submitted three scenarios with projected costs over a three-year
cycle of $310 million, $354 million, and $510 million, respectively. The MDPSC conducted hearings on the proposed plans for all Maryland utilities on November
6-8, 2023. On December 29, 2023, the MDPSC issued an order approving the $310 million scenario for most programs, with some modifications. On February
21, 2024, the MDPSC approved PE’s tariff to recover costs in 2024 but directed PE to analyze alternative amortization methods for possible use in later years.
NEW JERSEY
JCP&L operates under NJBPU approved rates that took effect as of February 15, 2024, and will become effective for customers as of June 1, 2024. JCP&L
provides BGS for retail customers who do not choose a third-party EGS and for customers of third- party EGSs that fail to provide the contracted service. All
New Jersey EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base
rates.
The base rate increase, which was approved by the NJBPU on February 14, 2024, took effect on February 15, 2024, and is effective for customers on June 1,
2024. Until those new rates became effective for customers, JCP&L is amortizing an existing regulatory liability totaling approximately $18 million to offset the
base rate increase that otherwise would have occurred in this period. Under the base rate case settlement agreement, JCP&L also agreed to a two-phase
reliability improvement plan to enhance the reliability related to 18 high-priority circuits, the first phase of which began on February 14, 2024, and represents an
approximate investment of $95 million. Additionally, JCP&L recognized a $53 million pre-tax charge in the first quarter 2024 at
56

-- 68 of 106 --

the Integrated segment within “Other operating expenses” on the FirstEnergy Consolidated Statements of Income, associated with certain corporate support
costs recorded to capital accounts from the FERC Audit that were determined, as a result of the settlement agreement, to be disallowed from future recovery.
JCP&L has implemented energy efficiency and peak demand reduction programs in accordance with the New Jersey Clean Energy Act as approved by the
NJBPU in April 2021. The NJBPU approved plans include recovery of lost revenues resulting from the programs and a three-year plan (July 2021-June 2024)
including total program costs of $203 million, of which $160 million of investment is recovered over a ten-year amortization period with a return as well as $43
million in operations and maintenance expenses and financing costs recovered on an annual basis. On December 5, 2023, JCP&L filed a petition with the
NJBPU for a six-month extension of EE&C Plan I, which was originally scheduled to end on June 30, 2024, but would end on December 31, 2024, with the
extension. The proposed budget for the extension period would add approximately $69 million to the original program cost. Under the proposal, JCP&L would
recover the costs of the extension period and the revenue impact of sales losses resulting therefrom through two separate tariff riders. On December 1, 2023,
JCP&L filed a related petition with the NJBPU requesting approval of its EE&C Plan II, which covers the January 1, 2025 through June 30, 2027 period and has
a proposed budget of approximately $964 million. EE&C Plan II consists of a portfolio of ten energy efficiency programs, one peak demand reduction program
and one building decarbonization program. Under the proposal, JCP&L would recover its EE&C Plan II revenue requirements and lost revenues from reduced
electricity sales associated with EE&C Plan II. Evidentiary hearings are scheduled to begin August 19, 2024, with a final NJBPU decision and order required no
later than October 15, 2024.
The settlement of the distribution rate case in 2020, provided among other things, that JCP&L would be subject to a management audit, which began in May
2021. On April 12, 2023, the NJBPU accepted the final management audit report for filing purposes and ordered that interested stakeholders file comments on
the report by May 22, 2023, which deadline was extended until July 31, 2023. JCP&L filed its comments on July 31, 2023. The parties have filed responses.
On September 17, 2021, in connection with Mid-Atlantic Offshore Development, LLC, a transmission company jointly owned by Shell New Energies US and EDF
Renewables North America, JCP&L submitted a proposal to the NJBPU and PJM to build transmission infrastructure connecting offshore wind-generated
electricity to the New Jersey power grid. On October 26, 2022, the JCP&L proposal was accepted, in part, in an order issued by NJBPU. The proposal, as
accepted, included approximately $723 million in investments for JCP&L to both build new and upgrade existing transmission infrastructure. JCP&L’s proposal
projects an investment ROE of 10.2% and includes the option for JCP&L to acquire up to a 20% equity stake in Mid-Atlantic Offshore Development, LLC. The
resulting rates associated with the project are expected to be shared among the ratepayers of all New Jersey electric utilities. On April 17, 2023, JCP&L applied
for the FERC “abandonment” transmission rates incentive, which would provide for recovery of 100% of the cancelled prudent project costs that are incurred
after the incentive is approved, and 50% of the costs incurred prior to that date, in the event that some or all of the project is cancelled for reasons beyond
JCP&L’s control. FERC staff subsequently requested additional information on JCP&L’s application, which JCP&L provided. On August 21, 2023, FERC
approved JCP&L’s application, effective August 22, 2023. On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two
offshore wind projects in New Jersey—Ocean Wind 1 and 2—having a combined planned capacity of 2,248 MWs. At this time, Orsted’s announcement does not
affect JCP&L’s awarded projects and JCP&L is moving forward with preconstruction activities for the planned transmission infrastructure. Construction is
expected to begin in 2025.
Consistent with the commitments made in its proposal to the NJBPU, JCP&L formally submitted in November 2023 the first part of its application to the United
States Department of Energy to finance a portion of the project using low-interest rate loans available under the United States Department of Energy’s Energy
Infrastructure Reinvestment Program of the IRA of 2022. JCP&L submitted the second part of its two-part application on March 13, 2024.
On April 3, 2024, Mid-Atlantic Offshore Development, LLC submitted a bid application for the NJBPU Prebuild Infrastructure Solicitation to the NJBPU which
outlines its proposal to construct infrastructure connecting the identified landing point for offshore wind generation off the coast of New Jersey with the high-
voltage electric grid at Larrabee Collector Station. JCP&L is described in the application as a joint developer with Mid-Atlantic Offshore Development, LLC,
subject to the execution of a joint development agreement by the parties. Mid-Atlantic Offshore Development, LLC will be the party responsible for the project.
On November 9, 2023, JCP&L filed a petition for approval of its second EnergizeNJ with the NJBPU that would, among other things, support grid modernization,
system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. JCP&L proposes EnergizeNJ will be
implemented over a five-year budget period with estimated costs of approximately $935 million over the deployment period, of which, $906 million is capital
investments and $29 million is operating and maintenance expenses. Under the proposal, the costs of EnergizeNJ would be recovered through JCP&L’s base
rates via annual and semi-annual base rate adjustment filings. Public hearings have been requested but are not yet scheduled. JCP&L has requested that the
NJBPU issue a final decision and order no later than May 22, 2024, based on a June 1, 2024, commencement date for EnergizeNJ. JCP&L anticipates filing
amendments to the EnergizeNJ program after receipt of approval from the NJBPU of the base rate case stipulation that was filed on February 2, 2024. On
February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate
increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of
the base rate case settlement, to include the second phase of its reliability improvement plan that is
57

-- 69 of 106 --

expected to address any remaining high-priority circuits not addressed in the first phase. EnergizeNJ, as amended, if approved will result in the investment of
approximately $930.5 million of total estimated costs over five years.
OHIO
The Ohio Companies operate under PUCO-approved base distribution rates that became effective in 2009. The Ohio Companies currently operate under ESP
IV, which continues through May 31, 2024, that provides for the supply of power to non-shopping customers at a market-based price set through an auction
process. ESP IV also continues the Rider DCR, which supports continued investment related to the distribution system for the benefit of customers, with revenue
caps of $15 million per year through May 31, 2024. In addition, ESP IV includes: (1) continuation of a base distribution rate freeze through May 31, 2024; (2) a
goal across FirstEnergy to reduce CO emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $51 million to: (a) fund energy conservation
programs, economic development and job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service
territories to assist low-income customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio.
On April 5, 2023, the Ohio Companies filed an application with the PUCO for approval of ESP V, for an eight-year term beginning June 1, 2024, and continuing
through May 31, 2032. ESP V proposes to continue providing power to non-shopping customers at market-based prices set through an auction process, with
process enhancements designed to reduce costs to customers. ESP V also proposes to continue riders supporting investment in the Ohio Companies’
distribution system, including Rider DCR with annual revenue cap increases of $15 million to $21 million per year, based on reliability performance, and Rider
AMI for recovery of approved grid modernization investments. ESP V proposes new riders to support continued maintenance of the distribution system, including
vegetation management and storm restoration operating expense. In addition, ESP V proposes four-year energy efficiency and peak demand reduction
programs for residential and commercial customers, with cost recovery spread over eight years. ESP V further includes a commitment to spend $52 million in
total over the eight-year term, without recovery from customers, on initiatives to assist low-income customers, education and incentives to help ensure
customers have good experiences with electric vehicles. Hearings commenced on November 7, 2023 and concluded on December 6, 2023. On December 6,
2023, certain intervenors filed a motion requesting a limited stay of the Ohio Companies’ proposal to continue Rider DCR. The Ohio Companies contested the
motion, which is pending.
On May 16, 2022, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2021, which
demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. This matter remains pending before the PUCO.
On July 15, 2022, the Ohio Companies filed an application with the PUCO for approval of phase two of their distribution grid modernization plan that would,
among other things, provide for the installation of an additional 700 thousand smart meters, distribution automation equipment on approximately 240 distribution
circuits, voltage regulating equipment on approximately 220 distribution circuits, and other investments and pilot programs in related technologies designed to
provide enhanced customer benefits. The Ohio Companies propose that phase two will be implemented over a four-year budget period with estimated capital
investments of approximately $626 million and operations and maintenance expenses of approximately $144 million over the deployment period. Under the
proposal, costs of phase two of the grid modernization plan would be recovered through the Ohio Companies’ AMI rider, pursuant to the terms and conditions
approved in ESP IV. On April 12, 2024, the Ohio Companies and certain of the parties filed a stipulation that modified the Ohio Companies’ application for phase
two of its grid modernization plan. The stipulation, which is subject to PUCO approval, provides for the deployment of smart meters to the balance of the Ohio
Companies’ customers or approximately 1.4 million meters. Phase two of the distribution grid modernization plan, as modified by the stipulation would be
completed over a four-year budget period with estimated capital investments of approximately $421 million. On April 16, 2024, the PUCO scheduled the
stipulation hearing for June 5, 2024.
On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to open an
investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or
violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On December 30, 2020, in response to the OCC's motion, the PUCO reopened
the DMR audit docket, and directed PUCO staff to solicit a third-party auditor and conduct a full review of the DMR to ensure funds collected from customers
through the DMR were only used for the purposes established in ESP IV. On June 2, 2021, the PUCO selected an auditor, and the auditor filed the final audit
report on January 14, 2022, which made certain findings and recommendations. The report found that spending of DMR revenues was not required to be
tracked, and that DMR revenues, like all rider revenues, are placed into the regulated money pool as a matter of routine, where the funds lose their identity.
Therefore, the report could not suggest that DMR funds were used definitively for direct or indirect support for grid modernization. The report also concluded that
there was no documented evidence that ties revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR
funds to support the passage of HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio
Companies adopt formal dividend policies. Final comments and responses were filed by parties during the second quarter of 2022. The proceeding was stayed
in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and
was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the expanded Rider DCR audit proceeding
described below and set a procedural schedule, which was vacated on March 15, 2024. A new procedural schedule will be set at a May 21, 2024 prehearing
conference.
2
58

-- 70 of 106 --

On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the
subsequent referendum effort, and directing the Ohio Companies to show cause, demonstrating that the costs of any political or charitable spending in support of
HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers. The Ohio Companies initially filed
a response stating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or
indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a supplemental response explaining that, in light of the facts set forth in the
DPA and the findings of the Rider DCR audit report further discussed below, political or charitable spending in support of HB 6, or the subsequent referendum
effort, affected pole attachment rates paid by approximately $15 thousand. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an
independent external audit to investigate FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and
oversee the auditor. In November and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental
responses to the PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show
cause demonstration submitted by the Ohio Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6 or the
subsequent referendum effort was not included, directly or indirectly, in any rates or charges paid by ratepayers. The proceeding was stayed in its entirety,
including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on
February 26, 2024. On February 26, 2024, the Attorney Examiner directed the third-party auditor to file its report by August 28, 2024.
In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on November 4,
2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement made on October 29, 2020,
as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates with corporate separation laws and the Ohio
Companies’ corporate separation plan. The additional audit is for the period from November 2016 through October 2020. The final audit report was filed on
September 13, 2021. The audit report makes no findings of major non-compliance with Ohio corporate separation requirements, minor non-compliance with
eight requirements, and findings of compliance with 23 requirements. Parties filed comments and reply comments on the audit report. The proceeding was
stayed in its entirety, including discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022
and was lifted on February 26, 2024. On February 26, 2024, the Attorney Examiner set a procedural schedule, which was vacated on March 15, 2024. A new
procedural schedule will be set at an April 25, 2024 prehearing conference.
In connection with an ongoing annual audit of the Ohio Companies’ Rider DCR for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K for the year
ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a review of certain
transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether funds collected from customers
were used to pay the vendors, and if so, whether or not the funds associated with those payments should be returned to customers through Rider DCR or
through an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase of the audit, and the parties submitted comments and reply
comments on this audit report in October 2021. Additionally, on September 29, 2021, the PUCO expanded the scope of the audit in this proceeding to determine
if the costs of the naming rights for FirstEnergy Stadium have been recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its
final report, in which the auditor concluded that the FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15,
2021, the PUCO further expanded the scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’
ESP IV settlement proceedings, but stayed its expansion of the audit until otherwise ordered by the PUCO. The proceeding was stayed in its entirety, including
discovery and motions, continuously at the request of the U.S. Attorney for the Southern District of Ohio beginning in August 2022 and was lifted on February 26,
2024. On February 26, 2024, the Attorney Examiner consolidated this proceeding with the Rider DMR audit proceeding described above, further lifted the stay of
the portion of the investigation relating to an apparent nondisclosure of a side agreement, and set a procedural schedule, which was vacated on March 15, 2024.
A new procedural schedule will be set at a May 21, 2024 prehearing conference.
On March 1, 2024, the Attorney Examiner issued an Entry in all four PUCO investigations that, among other things, precluded taking or offering the testimony of
Charles E. Jones, Michael J. Dowling, or Samuel Randazzo through deposition or other means, or requiring these individuals to produce documents, in any
PUCO proceeding, until otherwise ordered.
On September 22, 2023, OCC filed an application for rehearing challenging the PUCO’s August 23, 2023, order to stay the pending HB 6 related matters above,
which the PUCO denied on October 18, 2023. On November 17, 2023, OCC filed an application for rehearing challenging the October 18, 2023 entry to the
extent the PUCO decided not to stay pending proceedings regarding ESP V as well as phases one and two of the Ohio Companies’ distribution grid
modernization plans. On November 27, 2023, the Ohio Companies filed a memorandum contra OCC’s application for rehearing.
In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related
charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-
related charges the Ohio Companies collect. Instead, the Ohio Companies are further required by HB 6 to remit all the OVEC-related charges they collect to
non-FE Ohio electric distribution utilities. The Ohio Companies contested the motions, which are pending before the PUCO.
59

-- 71 of 106 --

On May 15, 2023, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2022, which
demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings. This matter remains pending before the PUCO.
See below for additional details on the government investigations and subsequent litigation surrounding the investigation of HB 6.
PENNSYLVANIA
The Pennsylvania Companies operated under rates approved by the PPUC, effective as of January 27, 2017. On January 1, 2024, each of the Pennsylvania
Companies merged with and into FE PA. As a result of the PA Consolidation, FE PA will have five rate districts in Pennsylvania – four that correspond to the
territories previously serviced by ME, PN, Penn, and WP and one rate district that corresponds to WP’s service provided to The Pennsylvania State University.
The rate districts created by the PA Consolidation will not reach full rate unity until the earlier of 2033 or the conclusion of three base rate cases filed after
January 1, 2025.
Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, the Pennsylvania Companies implemented energy efficiency and peak demand reduction
programs with demand reduction targets, relative to 2007-2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for
WP; and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWh for ME,
3.0% MWh for PN, 2.7% MWh for Penn, and 2.4% MWh for WP. The fourth phase of FE PA’s energy efficiency and peak demand reduction program, which runs
for the five-year period beginning June 1, 2021 through May 31, 2026, was approved by the PPUC on June 18, 2020, providing through cost recovery of
approximately $390 million to be recovered through Energy Efficiency and Conservation Phase IV Riders for each FE PA rate district.
Pennsylvania EDCs are permitted to seek PPUC approval of an LTIIP for infrastructure improvements and costs related to highway relocation projects, after
which a DSIC may be approved to recover LTIIP costs. On January 16, 2020, the PPUC approved the Pennsylvania Companies’ LTIIPs for the five-year period
beginning January 1, 2020 and ending December 31, 2024 for a total capital investment of approximately $572 million for certain infrastructure improvement
initiatives. FE PA expects to seek approval for the next phase of its LTIIP program by the end of the third quarter of 2024.
Following the Pennsylvania Companies’ 2016 base rate proceedings, the PPUC ruled in a separate proceeding related to the DSIC mechanisms that the
Pennsylvania Companies were not required to reflect federal and state income tax deductions related to DSIC-eligible property in DSIC rates. The decision was
appealed to the Pennsylvania Supreme Court and in July 2021 the court upheld the Pennsylvania Commonwealth Court’s reversal of the PPUC’s decision and
remanded the matter back to the PPUC for determination as to how DSIC calculations shall account for accumulated deferred income taxes and state taxes. The
PPUC issued the order as directed.
On May 5, 2023, FirstEnergy and Brookfield submitted applications to FERC and to the PPUC to facilitate the FET Equity Interest Sale. On May 12, 2023, the
parties also filed an application with the VSCC, which was approved on June 20, 2023. On August 14, 2023, FERC issued an order approving the FET Equity
Interest Sale. On November 24, 2023, CFIUS notified FET, Brookfield and the Abu Dhabi Investment Authority, as an indirect investor in FET through Brookfield,
that it had determined that there were no unresolved national security issues and its review of the transaction was concluded. On November 29, 2023, the
parties filed a settlement agreement recommending that the PPUC approve the transaction subject to the terms of the settlement, which includes among other
things, a number of ring-fencing provisions and a commitment to improve transmission reliability over the next five years. The settlement was approved by the
PPUC on March 14, 2024. The transaction closed on March 25, 2024.
On April 2, 2024, FE PA filed a base rate case with the PPUC, based on a projected 2025 annual test year. The rate case requests a net increase in base
distribution revenues of approximately $502 million with a return on equity of 11.3% and capital structure of 46.2% debt and 53.8% equity, and reflects a roll-in of
several current riders such as DSIC, Tax Act and smart meter. The increase represents an overall net average rate increase in FE PA rates by approximately
7.7%, and a 10.5% average residential rate increase. Key components of the base rate case filing include a proposal to change pension and OPEB recovery to
the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the
amount of pension and OPEB expense requested in the proceeding and the actual annual amount each year using this method. Additionally, FE PA requests
recovery of certain incurred costs, including the impact of major storms, COVID-19, a program to convert streetlights to LEDs, and others. The PPUC issued an
order on April 25, 2024, deferring, by operation of law, the June 1, 2024 statutory effective date to January 1, 2025. A pre-hearing conference is scheduled for
May 2, 2024. A PPUC decision is expected in December 2024, with new rates becoming effective in January 2025.
WEST VIRGINIA
MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates. MP
and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the
ENEC. MP’s and PE’s ENEC rate is updated annually.
60

-- 72 of 106 --

On August 31, 2023, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates of $167.5 million beginning January 1,
2024, which represents a 9.9% increase in overall rates. This increase, which was driven primarily by higher fuel expenses, includes the approximate $92 million
carried over from the 2022 ENEC proceeding and a portion of the approximately $267 million under recovery balance at the end of the review period (July 1,
2022 to June 30, 2023). The remaining $75.6 million of the under recovery balance not recovered in 2024 will be deferred for collection during 2025, with an
annual carrying charge of 4%. A hearing was held on November 30, 2023, at which time a joint stipulation for settlement that was agreed to by all but one party
was presented to the WVPSC. The settlement provides for a net $55.4 million increase in ENEC rates beginning March 27, 2024 with the net deferred ENEC
balance of approximately $255 million to be recovered through 2026. There will be no 2024 ENEC case unless MP and PE over or under recover more than $50
million than the 2024 ENEC balance and a party elects to invoke a case filing. An order was issued on March 26, 2024 approving the settlement without
modification and rates became effective on March 27, 2024.
On April 21, 2022, the WVPSC issued an order approving, effective May 1, 2022, a tariff to offer solar power to West Virginia customers and requiring MP and
PE to subscribe at least 85% of the planned 50 MWs of solar generation before seeking final tariff approval. MP and PE must seek separate approval from the
WVPSC to recover any solar generation costs in excess of the approved tariff. On April 24, 2023, MP and PE sought final tariff approval from the WVPSC for
three of the five solar sites, representing 30 MWs of generation, and requested approval of a surcharge to recover any costs above the final approved tariff. The
first solar generation site went into service in January 2024 and construction of the remaining four sites are expected to be completed no later than the end of
2025 at a total investment cost of approximately $110 million. On August 23, 2023, the WVPSC approved the customer surcharge and granted approval to
construct three of the five solar sites. The surcharge went into effect January 1, 2024.
On January 13, 2023, MP and PE filed a request with the WVPSC seeking approval of new depreciation rates for existing and future capital assets. Specifically,
MP and PE are seeking to increase depreciation expense by approximately $76 million per year, primarily for regulated generation-related assets. Any
depreciation rates approved by the WVPSC would not become effective until new base rates were established. On August 22, 2023, a unanimous settlement of
the case was filed recommending a $33 million per year increase in depreciation expense, effective April 1, 2024. An order from the WVPSC was issued on
March 26, 2024 approving the settlement without modification and became effective on March 27, 2024.
On May 31, 2023, MP and PE filed a base rate case with the WVPSC requesting a total revenue increase of approximately $207 million utilizing a test year of
2022 with adjustments plus a request to establish a regulatory asset (or liability) to recover (or refund) in a subsequent base rate case the net differences
between the amount of pension and OPEB expense requested in the proceeding (based on average expense from 2018 to 2022) and the actual annual amount
each year using the delayed recognition method. Among other things, the increase includes the approximate $76 million requested in a depreciation case filed
on January 13, 2023 and described above, and amounts to support a new low-income customer advocacy program, storm restoration work and service reliability
investments. On January 23, 2024, MP, PE and various parties filed a joint settlement agreement with the WVPSC, which recommended a base rate increase of
$105 million, inclusive of the $33 million increase in depreciation expense. Additionally, the settlement includes a new low-income customer advocacy program, a
pilot program for service reliability investments and recovery of costs related to storm restoration, retired generation assets and COVID-19. The settlement did
not include the request to establish a regulatory asset (or liability) for recover (or refund) associated with pension and OPEB expense, however, it did not
preclude MP and PE from pursuing that in a future separate proceeding. On February 16, 2024, interested parties filed a settlement on the net energy metering
credit for consideration by the WVPSC. An order was issued on March 26, 2024 approving the $105 million increase and accepting the settlement with slight
non-material modifications with new rates going into effect on March 27, 2024. Additionally, due to the order including approval by the WVPSC to recover certain
costs associated with retired generation assets, MP recognized a $60 million pre-tax benefit in the first quarter of 2024 to establish a regulatory asset.
FERC REGULATORY MATTERS
Under the Federal Power Act, FERC regulates rates for interstate wholesale sales and transmission of electric power, regulatory accounting and reporting under
the Uniform System of Accounts, and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and
rates, the Utilities, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE and the
Transmission Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP, PE
and the Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under
the PJM Tariff. On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo.
FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates
upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Utilities and AE Supply each
have the necessary authorization from FERC to sell their
61

-- 73 of 106 --

wholesale power, if any, in interstate commerce at market-based rates, although in the case of the Utilities major wholesale purchases remain subject to review
and regulation by the relevant state commissions.
Federally enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements
on the Utilities, AE Supply, and the Transmission Companies. NERC is the Electric Reliability Organization designated by FERC to establish and enforce these
reliability standards, although NERC has delegated day-to-day implementation and enforcement of these reliability standards to six regional entities, including
RFC. All of the facilities that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder
processes, and otherwise monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability
standards implemented and enforced by RFC.
FirstEnergy believes that it is in material compliance with all currently effective and enforceable reliability standards. Nevertheless, in the course of operating its
extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the
reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the
specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to
refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability
standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities, that could have
a material adverse effect on its financial condition, results of operations, and cash flows.
FERC Audit
FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s
compliance with certain accounting and reporting requirements under various FERC regulations. On February 4, 2022, FERC filed the final audit report for the
period of January 1, 2015 through September 30, 2021, which included several findings and recommendations that FirstEnergy has accepted. The audit report
included a finding and related recommendation on FirstEnergy’s methodology for allocation of certain corporate support costs to regulatory capital accounts
under certain FERC regulations and reporting. Effective in the first quarter of 2022 and in response to the finding, FirstEnergy had implemented a new
methodology for the allocation of these corporate support costs to regulatory capital accounts for its regulated distribution and transmission companies on a
prospective basis. With the assistance of an independent outside firm, FirstEnergy completed an analysis during the third quarter of 2022 of these costs and how
it impacted certain FERC-jurisdictional wholesale transmission customer rates for the audit period of 2015 through 2021. As a result of this analysis, FirstEnergy
recorded in the third quarter of 2022 approximately $45 million ($34 million after-tax) in expected customer refunds, plus interest, due to its wholesale
transmission customers and reclassified approximately $195 million of certain transmission capital assets to operating expenses for the audit period, of which
$90 million ($67 million after-tax) are not expected to be recoverable and impacted FirstEnergy’s earnings since they relate to costs capitalized during stated
transmission rate time periods. FirstEnergy is currently recovering approximately $105 million of costs reclassified to operating expenses in its transmission
formula rate revenue requirements, of which $39 million of costs have been recovered as of March 31, 2024. On December 8, 2023, FERC audit staff issued a
letter advising that two unresolved audit matters, primarily related to FirstEnergy’s plan to recover the reclassified operating expenses in formula transmission
rates, were being referred to other offices within FERC for further review. These reclassifications also resulted in a reduction to the Regulated Transmission
segment’s rate base by approximately $160 million, which is not expected to materially impact FirstEnergy or the segment’s future earnings. The expected
wholesale transmission customer refunds were recognized as a reduction to revenue, and the amount of reclassified transmission capital assets that are not
expected to be recoverable were recognized within “Other operating expenses” at the Regulated Transmission segment and on FirstEnergy’s Consolidated
Statements of Income. Furthermore, FirstEnergy’s Utilities are in the process of addressing the outcomes of the FERC Audit with the applicable state
commissions and proceedings, which includes seeking continued rate base treatment of approximately $200 million of certain corporate support costs allocated
to distribution capital assets in Ohio and Pennsylvania. If FirstEnergy is unable to recover these transmission or distribution costs, it could result in future
charges and/or adjustments and have an adverse impact on FirstEnergy’s financial condition.
ATSI ROE – Ohio Consumers Counsel v. ATSI, et al.
On February 24, 2022, the OCC filed a complaint with FERC against ATSI, AEP’s Ohio affiliates and American Electric Power Service Corporation, and Duke
Energy Ohio, LLC asserting that FERC should reduce the ROE utilized in the utilities’ transmission formula rates by eliminating the 50 basis point adder
associated with RTO membership, effective February 24, 2022. The OCC contends that this result is required because Ohio law mandates that transmission
owning utilities join an RTO and that the 50 basis point adder is applicable only where RTO membership is voluntary. On December 15, 2022, FERC denied the
complaint as to ATSI and Duke, but granted it as to AEP. AEP and OCC appealed FERC’s orders to the Sixth Circuit and the case remains pending. FirstEnergy
is unable to predict the outcome of this proceeding, but it is not expected to have a material impact.
62

-- 74 of 106 --

Transmission ROE Methodology
A proposed rulemaking proceeding concerning transmission rate incentives provisions of Section 219 of the 2005 Energy Policy Act was initiated in March of
2020 remains pending before FERC. Among other things, the rulemaking explored whether utilities should collect an “RTO membership” ROE incentive adder for
more than three years. FirstEnergy is a member of PJM and its transmission subsidiaries could be affected by the proposed rulemaking. FirstEnergy participated
in comments on the supplemental rulemaking that were submitted by a group of PJM transmission owners and by various industry trade groups. If there were to
be any changes to FirstEnergy's transmission incentive ROE, such changes will be applied on a prospective basis.
Transmission Planning Supplemental Projects: Ohio Consumers Counsel v ATSI, et al.
On September 27, 2023, the OCC filed a complaint against ATSI, PJM and other transmission utilities in Ohio alleging that the PJM Tariff and operating
agreement are unjust, unreasonable, and unduly discriminatory because they include no provisions to ensure PJM’s review and approval for the planning, need,
prudence and cost-effectiveness of the PJM Tariff Attachment M-3 “Supplemental Projects.” Supplemental Projects are projects that are planned and constructed
to address local needs on the transmission system. The OCC demands that FERC: (i) require PJM to review supplemental projects for need, prudence and cost-
effectiveness; (ii) appoint an independent transmission monitor to assist PJM in such review; and (iii) require that Supplemental Projects go into rate base only
through a “stated rate” procedure whereby prior FERC approval would be needed for projects with costs that exceed an established threshold. ATSI and the
other transmission utilities in Ohio and PJM filed comments and the complaint is pending before FERC.
ENVIRONMENTAL MATTERS
Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality, hazardous and solid waste disposal, and other environmental
matters. While FirstEnergy’s environmental policies and procedures are designed to achieve compliance with applicable environmental laws and regulations,
such laws and regulations are subject to periodic review and potential revision by the implementing agencies. FirstEnergy cannot predict the timing or ultimate
outcome of any of these reviews or how any future actions taken as a result thereof may materially impact its business, results of operations, cash flows and
financial condition.
Clean Air Act
FirstEnergy complies with SO and NOx emission reduction requirements under the CAA and SIP by burning lower-sulfur fuel, utilizing combustion controls and
post-combustion controls and/or using emission allowances.
CSAPR requires reductions of NOx and SO emissions in two phases (2015 and 2017), ultimately capping SO emissions in affected states to 2.4 million tons
annually and NOx emissions to 1.2 million tons annually. CSAPR allows trading of NOx and SO emission allowances between power plants located in the same
state and interstate trading of NOx and SO emission allowances with some restrictions. On July 28, 2015, the D.C. Circuit ordered the EPA to reconsider the
CSAPR caps on NOx and SO emissions from power plants in 13 states, including West Virginia. This followed the 2014 U.S. Supreme Court ruling generally
upholding the EPA’s regulatory approach under CSAPR but questioning whether the EPA required upwind states to reduce emissions by more than their
contribution to air pollution in downwind states. The EPA issued a CSAPR Update on September 7, 2016, reducing summertime NOx emissions from power
plants in 22 states in the eastern U.S., including West Virginia, beginning in 2017. Various states and other stakeholders appealed the CSAPR Update to the
D.C. Circuit in November and December 2016. On September 13, 2019, the D.C. Circuit remanded the CSAPR Update to the EPA citing that the rule did not
eliminate upwind states’ significant contributions to downwind states’ air quality attainment requirements within applicable attainment deadlines.
Also in March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NOx emissions from nine states (including West Virginia)
significantly contribute to New York’s inability to attain the ozone National Ambient Air Quality Standards. The petition sought suitable emission rate limits for
large stationary sources that are allegedly affecting New York’s air quality within the three years allowed by CAA Section 126. On September 20, 2019, the EPA
denied New York’s CAA Section 126 petition. On October 29, 2019, the State of New York appealed the denial of its petition to the D.C. Circuit. On July 14, 2020,
the D.C. Circuit reversed and remanded the New York petition to the EPA for further consideration. On March 15, 2021, the EPA issued a revised CSAPR Update
that addressed, among other things, the remands of the prior CSAPR Update and the New York Section 126 petition. In December 2021, MP purchased NOx
emissions allowances to comply with 2021 ozone season requirements. On April 6, 2022, the EPA published proposed rules seeking to impose further significant
reductions in EGU NOx emissions in 25 upwind states, including West Virginia, with the stated purpose of allowing downwind states to attain or maintain
compliance with the 2015 ozone National Ambient Air Quality Standards. On February 13, 2023, the EPA disapproved 21 SIPs, which was a prerequisite for the
EPA to issue a final Good Neighbor Plan or FIP. On June 5, 2023, the EPA issued the final Good Neighbor Plan with an effective date 60 days thereafter. Certain
states, including West Virginia, have appealed the disapprovals of their respective SIPs, and some of those states have obtained stays of those disapprovals
precluding the Good Neighbor Plan from taking effect in those states. On August 10, 2023, the 4th Circuit granted West Virginia an interim stay of the
disapproval of its SIP and on January 10, 2024, after a hearing held on October 27, 2023, granted a full stay which precludes the Good Neighbor Plan from
going into effect in West Virginia. In addition to West Virginia, certain other states, and certain trade
2
2 	2
2
2
2
63

-- 75 of 106 --

organizations, including the Midwest Ozone Group of which FE is a member, have separately appealed and filed motions to stay the Good Neighbor Plan itself
at the D.C. Circuit. On September 25, 2023, the D.C. Circuit denied the motions to stay the Good Neighbor Plan. On October 13, 2023, the aggrieved parties
filed an Emergency Application for an Immediate Stay of the Good Neighbor Plan with the U.S. Supreme Court, which remains pending. Oral argument was
heard on February 21, 2024.
Climate Change
In March 2024, the SEC issued final rules to require public companies to disclose certain climate-related information in registration statements and annual
reports filed with the SEC. As adopted, the final climate disclosure rules mandate the disclosure of climate-related risks and the material impacts that severe
weather events and other natural conditions have had, or are reasonably likely to have, on FirstEnergy, as well as disclosures related to management and FE
Board oversight of such risks. In April 2024, the SEC voluntarily stayed the final climate disclosure rules pending resolution of legal challenges. FirstEnergy
currently is assessing the impact of the final climate disclosure rules on its business. There are several initiatives to reduce GHG emissions at the state, federal
and international level. Certain northeastern states are participating in the Regional Greenhouse Gas Initiative and western states led by California, have
implemented programs, primarily cap and trade mechanisms, to control emissions of certain GHGs. Additional policies reducing GHG emissions, such as
demand reduction programs, renewable portfolio standards and renewable subsidies have been implemented across the nation.
FirstEnergy has pledged to achieve carbon neutrality by 2050 in GHGs within FirstEnergy’s direct operational control (Scope 1). With respect to our coal-fired
plants in West Virginia, we have identified that the end of the useful life date is 2035 for Fort Martin and 2040 for Harrison. Determination of the useful life of the
regulated coal-fired generation could result in changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale,
impairment, or regulatory disallowances. If MP is unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial
condition, results of operations, and cash flow. Furthermore, FirstEnergy cannot currently estimate the financial impact of climate change policies, although
potential legislative or regulatory programs restricting CO emissions, or litigation alleging damages from GHG emissions, could require material capital and
other expenditures or result in changes to its operations.
In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for GHGs under the Clean Air Act,” concluding that
concentrations of several key GHGs constitute an “endangerment” and may be regulated as “air pollutants” under the CAA and mandated measurement and
reporting of GHG emissions from certain sources, including electric generating plants. Subsequently, the EPA released its final CPP regulations in August 2015
to reduce CO2 emissions from existing fossil fuel-fired EGUs and finalized separate regulations imposing CO2 emission limits for new, modified, and
reconstructed fossil fuel-fired EGUs. Numerous states and private parties filed appeals and motions to stay the CPP with the D.C. Circuit in October 2015. On
February 9, 2016, the U.S. Supreme Court stayed the rule during the pendency of the challenges to the D.C. Circuit and U.S. Supreme Court. On March 28,
2017, an executive order, entitled “Promoting Energy Independence and Economic Growth,” instructed the EPA to review the CPP and related rules addressing
GHG emissions and suspend, revise or rescind the rules if appropriate. On June 19, 2019, the EPA repealed the CPP and replaced it with the ACE rule that
established guidelines for states to develop standards of performance to address GHG emissions from existing coal-fired generation. On January 19, 2021, the
D.C. Circuit vacated and remanded the ACE rule declaring that the EPA was “arbitrary and capricious” in its rule making and, as such, the ACE rule is no longer
in effect and all actions thus far taken by states to implement the federally mandated rule are now null and void. Vacating the ACE rule had the unintended effect
of reinstating the CPP because the repeal of the CPP was a provision within the ACE rule. The D.C. Circuit decision was appealed by several states and
interested parties, including West Virginia, arguing that the EPA did not have the authorization under Section 111(d) of the CAA to require “generation shifting” as
a way to limit GHGs. On June 30, 2022, the U.S. Supreme Court in West Virginia v. Environmental Protection Agency held that the method the EPA used to
regulate GHGs (generation shifting) under Section 111(d) of the CAA (the CPP) was not authorized by Congress and remanded the rule to the EPA for further
reconsideration. In response, on May 23, 2023, the EPA published a proposed rule pursuant to CAA Section 111 (b) and (d) in line with the decision in West
Virginia v. Environmental Protection Agency intended to reduce power sector GHG emissions (primarily CO2 emissions) from fossil fuel based EGUs. The rule,
which proposed stringent emissions limitations based on fuel type and unit retirement date, was issued as final by the EPA on April 25, 2024. FirstEnergy is
currently assessing the impact of the final rule. Depending on the outcome of any appeals, compliance with these standards could require additional capital
expenditures or changes in operation at the Ft. Martin and Harrison power stations.
Clean Water Act
Various water quality regulations, the majority of which are the result of the federal Clean Water Act and its amendments, apply to FirstEnergy’s facilities. In
addition, the states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.
On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic,
mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations
were to phase-in as permits are renewed on a five-year cycle from 2018 to 2023. However, on April 13, 2017, the EPA granted a Petition for Reconsideration and
on September 18, 2017, the EPA postponed certain compliance deadlines for two years. On August 31, 2020, the EPA issued a final rule revising the effluent
limits for discharges from wet scrubber systems, retaining the zero-discharge standard for ash transport water, (with some limited
2
64

-- 76 of 106 --

discharge allowances), and extending the deadline for compliance to December 31, 2025 for both. In addition, the EPA allows for less stringent limits for sub-
categories of generating units based on capacity utilization, flow volume from the scrubber system, and unit retirement date. On March 29, 2023, the EPA
published proposed revised ELGs applicable to coal-fired power plants that include more stringent effluent limitations for wet scrubber systems and ash transport
water, and new limits on landfill leachate. The rule was issued as final by the EPA on April 25, 2024 and depending on the outcome of appeals and how final
revised rules are ultimately implemented, compliance with these standards could require additional capital expenditures or changes in operation at closed and
active landfills, and at the Ft. Martin and Harrison power stations from what was approved by the WVPSC in September 2022 to comply with the 2020 ELG rule.
FirstEnergy is currently assessing the impact of the final rule.
Regulation of Waste Disposal
Federal and state hazardous waste regulations have been promulgated as a result of the Resource Conservation and Recovery Act, as amended, and the Toxic
Substances Control Act. Certain CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the
need for future regulation.
In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity
design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to
assure the safe disposal of CCRs from electric generating plants. On September 13, 2017, the EPA announced that it would reconsider certain provisions of the
final regulations. On July 29, 2020, the EPA published a final rule again revising the date that certain CCR impoundments must cease accepting waste and
initiate closure to April 11, 2021. The final rule allowed for an extension of the closure deadline based on meeting identified site-specific criteria. On November
30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR
impoundment facility to October 2024, which request is pending technical review by the EPA. AE Supply continues to operate McElroy’s Run as a disposal
facility for Pleasants Power Station and continues to evaluate closure options. Also, on April 25, 2024, the EPA issued rules as final addressing, for the first time,
certain legacy CCR disposal sites. FirstEnergy is currently assessing the impact of the final rule.
FE or its subsidiaries have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the CERCLA. Allegations of
disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that
all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are considered probable have been
recognized on FirstEnergy’s Consolidated Balance Sheets as of March 31, 2024, based on estimates of the total costs of cleanup, FirstEnergy’s proportionate
responsibility for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $97 million have been accrued through
March 31, 2024, of which approximately $70 million are for environmental remediation of former MGP and gas holder facilities in New Jersey, which are being
recovered by JCP&L through a non-bypassable societal benefits charge. FE or its subsidiaries could be found potentially responsible for additional amounts or
additional sites, but the loss or range of losses cannot be determined or reasonably estimated at this time.
OTHER LEGAL PROCEEDINGS
United States v. Larry Householder, et al.
On July 21, 2020, a complaint and supporting affidavit containing federal criminal allegations were unsealed against the now former Ohio House Speaker Larry
Householder and other individuals and entities allegedly affiliated with Mr. Householder. In March 2023, a jury found Mr. Householder and his co-defendant,
Matthew Borges, guilty and in June 2023, the two were sentenced to prison for 20 and 5 years, respectively. Messrs. Householder and Borges have appealed
their sentences. Also, on July 21, 2020, and in connection with the DOJ’s investigation, FirstEnergy received subpoenas for records from the U.S. Attorney’s
Office for the Southern District Ohio. FirstEnergy was not aware of the criminal allegations, affidavit or subpoenas before July 21, 2020.
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves this matter. Under the DPA, FE
has agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The DPA requires that
FirstEnergy, among other obligations: (i) continue to cooperate with the U.S. Attorney’s Office in all matters relating to the conduct described in the DPA and
other conduct under investigation by the U.S. government; (ii) pay a criminal monetary penalty totaling $230 million within sixty days, which shall consist of (x)
$115 million paid by FE to the United States Treasury and (y) $115 million paid by FE to the ODSA to fund certain assistance programs, as determined by the
ODSA, for the benefit of low-income Ohio electric utility customers; (iii) publish a list of all payments made in 2021 to either 501(c)(4) entities or to entities known
by FirstEnergy to be operating for the benefit of a public official, either directly or indirectly, and update the same on a quarterly basis during the term of the DPA;
(iv) issue a public statement, as dictated in the DPA, regarding FE’s use of 501(c)(4) entities; and (v) continue to implement and review its compliance and ethics
program, internal controls, policies and procedures designed, implemented and enforced to prevent and detect violations of the U.S. laws throughout its
operations, and to take certain related remedial measures. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor
will FirstEnergy seek any tax deduction related to such payment. The entire amount of the monetary penalty was recognized as expense in the second quarter of
2021
65

-- 77 of 106 --

and paid in the third quarter of 2021. Under the terms of the DPA, the criminal information will be dismissed after FirstEnergy fully complies with its obligations
under the DPA.
Legal Proceedings Relating to United States v. Larry Householder, et al.
On August 10, 2020, the SEC, through its Division of Enforcement, issued an order directing an investigation of possible securities laws violations by FE, and on
September 1, 2020, issued subpoenas to FE and certain FE officers. On April 28, 2021, July 11, 2022, and May 25, 2023, the SEC issued additional subpoenas
to FE, with which FE has complied. While no contingency has been reflected in its consolidated financial statements, FE believes that it is probable that it will
incur a loss in connection with the resolution of the SEC investigation. Given the ongoing nature and complexity of the investigation, FE cannot yet reasonably
estimate a loss or range of loss that may arise from the resolution of the SEC investigation.
On June 29, 2023, the OOCIC served FE a subpoena, seeking information relating to the conduct described in the DPA. FirstEnergy was not aware of the
OOCIC’s investigation prior to receiving the subpoena and understands that the OOCIC’s investigation is also focused on the conduct described in the DPA,
other than with respect to the March 25, 2024, felony indictment of Mr. Householder brought in Cuyahoga County, Ohio. FirstEnergy is cooperating with the
OOCIC in its investigation. On February 12, 2024, and in connection with the OOCIC’s ongoing investigation, an indictment by a grand jury of Summit County,
Ohio was unsealed against the former chairman of the PUCO, Samuel Randazzo, and two former FirstEnergy senior officers, Charles E. Jones, and Michael J.
Dowling, charging each of them with several felony counts, including bribery, telecommunications fraud, money laundering and aggravated theft, related to
payments described in the DPA. FirstEnergy continues to both cooperate with the OOCIC in its investigation and discuss an appropriate resolution of the
investigation with respect to FE. While no contingency has been reflected in FirstEnergy’s consolidated financial statements, FE believes that it is reasonably
possible that it will incur a loss in connection with the resolution of the OOCIC investigation. Given the ongoing nature of the discussions, while FE cannot yet
reasonably estimate a loss or range of loss that may arise from any resolution of the OOCIC investigation with respect to FE, any such payment by FE
associated with an OOCIC resolution is not expected to be material.
In addition to the subpoenas referenced above under “United States v. Larry Householder, et. al.” and the SEC investigation, certain FE stockholders and
FirstEnergy customers filed several lawsuits against FirstEnergy and certain current and former directors, officers and other employees, and the complaints in
each of these suits is related to allegations in the complaint and supporting affidavit relating to HB 6 and the now former Ohio House Speaker Larry Householder
and other individuals and entities allegedly affiliated with Mr. Householder. The plaintiffs in each of the below cases seek, among other things, to recover an
unspecified amount of damages (unless otherwise noted). Unless otherwise indicated, no contingency has been reflected in FirstEnergy’s consolidated financial
statements with respect to these lawsuits as a loss is neither probable, nor is a loss or range of a loss reasonably estimable.
• In re FirstEnergy Corp. Securities Litigation (S.D. Ohio); on July 28, 2020 and August 21, 2020, purported stockholders of FE filed putative class action
lawsuits alleging violations of the federal securities laws. Those actions have been consolidated and a lead plaintiff, the Los Angeles County Employees
Retirement Association, has been appointed by the court. A consolidated complaint was filed on February 26, 2021. The consolidated complaint alleges,
on behalf of a proposed class of persons who purchased FE securities between February 21, 2017 and July 21, 2020, that FE and certain current or
former FE officers violated Sections 10(b) and 20(a) of the Exchange Act by issuing misrepresentations or omissions concerning FE’s business and
results of operations. The consolidated complaint also alleges that FE, certain current or former FE officers and directors, and a group of underwriters
violated Sections 11, 12(a)(2) and 15 of the Securities Act of 1933 as a result of alleged misrepresentations or omissions in connection with offerings of
senior notes by FE in February and June 2020. On March 30, 2023, the court granted plaintiffs’ motion for class certification. On April 14, 2023, FE filed
a petition in the U.S. Court of Appeals for the Sixth Circuit seeking to appeal that order, which the Sixth Circuit granted on November 16, 2023. On
November 30, 2023, FE filed a motion with the S.D. Ohio to stay all proceedings pending the circuit court appeal. All discovery is stayed during the
pendency of the district court motion. FE believes that it is probable that it will incur a loss in connection with the resolution of this lawsuit. Given the
ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• MFS Series Trust I, et al. v. FirstEnergy Corp., et al. and Brighthouse Funds II – MFS Value Portfolio, et al. v. FirstEnergy Corp., et al. (S.D. Ohio) on
December 17, 2021 and February 21, 2022, purported stockholders of FE filed complaints against FE, certain current and former officers, and certain
current and former officers of EH. The complaints allege that the defendants violated Sections 10(b) and 20(a) of the Exchange Act by issuing alleged
misrepresentations or omissions regarding FE’s business and its results of operations, and seek the same relief as the In re FirstEnergy Corp.
Securities Litigation described above. All discovery is stayed during the pendency of the district court motion in In re FirstEnergy Corp. Securities
Litigation described above. FE believes that it is probable that it will incur losses in connection with the resolution of these lawsuits. Given the ongoing
nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• State of Ohio ex rel. Dave Yost, Ohio Attorney General v. FirstEnergy Corp., et al. and City of Cincinnati and City of Columbus v. FirstEnergy Corp.
(Common Pleas Court, Franklin County, OH, all actions have been consolidated); on September 23, 2020 and October 27, 2020, the OAG and the
cities of Cincinnati and Columbus, respectively, filed complaints against several parties including FE, each alleging civil violations of the Ohio Corrupt
Activity Act and related
66

-- 78 of 106 --

claims in connection with the passage of HB 6. On January 13, 2021, the OAG filed a motion for a temporary restraining order and preliminary
injunction against FirstEnergy seeking to enjoin FirstEnergy from collecting the Ohio Companies' decoupling rider. On January 31, 2021, FE reached a
partial settlement with the OAG and the cities of Cincinnati and Columbus with respect to the temporary restraining order and preliminary injunction
request and related issues. In connection with the partial settlement, the Ohio Companies filed an application on February 1, 2021, with the PUCO to
set their respective decoupling riders (Conservation Support Rider) to zero. On February 2, 2021, the PUCO approved the application of the Ohio
Companies setting the rider to zero, and no additional customer bills will include new decoupling rider charges after February 8, 2021. On August 13,
2021, new defendants were added to the complaint, including two former officers of FirstEnergy. On December 2, 2021, the cities and FE entered a
stipulated dismissal with prejudice of the cities’ suit. This matter was stayed through a criminal trial in United States v. Larry Householder, et al.
described above, but resumed pursuant to an order, dated March 15, 2023. On July 31, 2023, FE and other defendants filed motions to dismiss in part
the OAG’s amended complaint, which the OAG opposed. On February 16, 2024, the OAG moved to stay discovery in the case in light of the February
9, 2024, indictments against defendants in this action, which the court granted on March 14, 2024. In connection with the ongoing OOCIC resolution
discussions, FE is also discussing an appropriate settlement of this civil action with the OAG. As such, FE believes it is reasonably possible that it will
incur a loss in connection with this civil action. Given the ongoing nature of these discussions, FE cannot yet reasonably estimate a loss or range of
loss from any possible settlement of this civil action, however, any such settlement payment by FE is not expected to be material.
On February 9, 2022, FE, acting through the SLC, agreed to a settlement term sheet to resolve the following shareholder derivative lawsuits relating to HB 6 and
the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder that were filed in the S.D.
Ohio, the N.D. Ohio, and the Ohio Court of Common Pleas, Summit County:
• Gendrich v. Anderson, et al. and Sloan v. Anderson, et al. (Common Pleas Court, Summit County, Ohio, all actions have been consolidated); on July 26,
2020 and July 31, 2020, respectively, purported stockholders of FE filed shareholder derivative action lawsuits against certain current and former FE
directors and officers, alleging, among other things, breaches of fiduciary duty.
• Miller v. Anderson, et al. (N.D. Ohio); Bloom, et al. v. Anderson, et al.; Employees Retirement System of the City of St. Louis v. Jones, et al.; Electrical
Workers Pension Fund, Local 103, I.B.E.W. v. Anderson et al.; Massachusetts Laborers Pension Fund v. Anderson et al.; The City of Philadelphia
Board of Pensions and Retirement v. Anderson et al.; Atherton v. Dowling et al.; Behar v. Anderson, et al. (S.D. Ohio, all actions have been
consolidated); beginning on August 7, 2020, purported stockholders of FE filed shareholder derivative actions alleging the FE Board and officers
breached their fiduciary duties and committed violations of Section 14(a) of the Exchange Act.
On March 11, 2022, the parties executed a stipulation and agreement of settlement, and filed a motion the same day requesting preliminary settlement approval
in the S.D. Ohio, which the S.D. Ohio granted on May 9, 2022. Subsequently, following a hearing on August 4, 2022, the S.D. Ohio granted final approval of the
settlement on August 23, 2022.
The settlement includes a series of corporate governance enhancements and a payment to FE of $180 million, to be paid by insurance after the judgment has
become final, less approximately $36 million in court-ordered attorney’s fees awarded to plaintiffs. On September 20, 2022, a purported FE stockholder filed a
motion for reconsideration of the S.D. Ohio’s final settlement approval. The parties filed oppositions to that motion on October 11, 2022, and the S.D. Ohio
denied that motion on May 22, 2023. On June 15, 2023, the purported FE stockholder filed an appeal in the U.S. Court of Appeals for the Sixth Circuit. On
February 16, 2024, the U.S. Court of Appeals for the Sixth Circuit affirmed the district court’s final settlement approval. Once all appeal options are exhausted the
judgment will become final. The settlement agreement is expected to resolve fully these shareholder derivative lawsuits.
On June 2, 2022, the N.D. Ohio entered an order to show cause why the court should not appoint new plaintiffs’ counsel, and thereafter, on June 10, 2022, the
parties filed a joint motion to dismiss the matter without prejudice, which the N.D. Ohio denied on July 5, 2022. On August 15, 2022, the N.D. Ohio issued an
order stating its intention to appoint one group of applicants as new plaintiffs’ counsel, and on August 22, 2022, the N.D. Ohio ordered that any objections to the
appointment be submitted by August 26, 2022. The parties filed their objections by that deadline, and on September 2, 2022, the applicants responded to those
objections. In the meantime, on August 25, 2022, a purported FE stockholder represented by the applicants filed a motion to intervene, attaching a proposed
complaint-in-intervention purporting to assert claims that the FE Board and officers breached their fiduciary duties and committed violations of Section 14(a) of
the Exchange Act as well as a claim against a third party for professional negligence and malpractice. The parties filed oppositions to that motion to intervene on
September 8, 2022, and the proposed intervenor's reply in support of his motion to intervene was filed on September 22, 2022. On August 24, 2022, the parties
filed a joint motion to dismiss the action pending in the N.D. Ohio based upon and in light of the approval of the settlement by the S.D. Ohio. On August 30,
2022, the parties filed a joint motion to dismiss the state court action, which the court granted on September 2, 2022. On September 29, 2023, the N.D. Ohio
issued a stay of the case pending the appeal in the U.S. Court of Appeals for the Sixth Circuit. On April 12, 2024, the N.D. Ohio acknowledged the completion of
the appeal and instructed the parties to file any further argument or information they wish to be considered by the N.D. Ohio no later than April 25, 2024.
67

-- 79 of 106 --

In letters dated January 26, and February 22, 2021, staff of FERC's Division of Investigations notified FirstEnergy that the Division was conducting an
investigation of FirstEnergy’s lobbying and governmental affairs activities concerning HB 6, and staff directed FirstEnergy to preserve and maintain all
documents and information related to the same as such have been developed as part of an ongoing non-public audit being conducted by FERC's Division of
Audits and Accounting. On December 30, 2022, FERC approved a Stipulation and Consent Agreement that resolves the investigation. The agreement includes a
FirstEnergy admission of violating FERC’s “duty of candor” rule and related laws, and obligates FirstEnergy to pay a civil penalty of $3.86 million, and to submit
two annual compliance monitoring reports to FERC’s Office of Enforcement regarding improvements to FirstEnergy’s compliance programs. FE paid the civil
penalty on January 4, 2023 and it will not be recovered from customers. The first annual compliance monitoring report was submitted in December 2023.
The outcome of any of these lawsuits, governmental investigations and audit is uncertain and could have a material adverse effect on FE’s or its subsidiaries’
reputation, business, financial condition, results of operations, liquidity, and cash flows.
Other Legal Matters
There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending
against FE or its subsidiaries. The loss or range of loss in these matters is not expected to be material to FE or its subsidiaries. The other potentially material
items not otherwise discussed above are described under Note 8, “Regulatory Matters.”
FirstEnergy accrues legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of
such costs. In cases where FirstEnergy determines that it is not probable, but reasonably possible that it has a material obligation, it discloses such obligations
and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that FE or its subsidiaries have legal liability or are otherwise
made subject to liability based on any of the matters referenced above, it could have a material adverse effect on FE’s or its subsidiaries’ financial condition,
results of operations, and cash flows.
NEW ACCOUNTING PRONOUNCEMENTS
See Note 1, "Organization and Basis of Presentation," for a discussion of new accounting pronouncements.
ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
See “FirstEnergy Corp. Management’s Discussion and Analysis of Financial Condition and Results of Operations — Market Risk Information” in Item 2 above.
ITEM 4. CONTROLS AND PROCEDURES
(a) Evaluation of Disclosure Controls and Procedures
The management of FirstEnergy, with the participation of the Chief Executive Officer and Chief Financial Officer, have reviewed and evaluated the effectiveness
of its disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act) as of the end of the period covered by this
report. Based on that evaluation, the Chief Executive Officer and Chief Financial Officer of FirstEnergy have concluded that its disclosure controls and
procedures were effective as of the end of the period covered by this report.
(b) Changes in Internal Control over Financial Reporting
During the quarter ended March 31, 2024, there were no changes in internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under
the Exchange Act) that have materially affected, or are reasonably likely to materially affect, FirstEnergy’s internal control over financial reporting.
PART II. OTHER INFORMATION
ITEM 1. 	LEGAL PROCEEDINGS
Information required for Part II, Item 1 is incorporated by reference to the discussions in Note 8, “Regulatory Matters,” and Note 9, “Commitments, Guarantees
and Contingencies,” of the Notes to Consolidated Financial Statements in Part I, Item 1 of this Form 10-Q.
68

-- 80 of 106 --

ITEM 1A. RISK FACTORS
You should carefully consider the risk factors discussed in "Item 1A. Risk Factors" in FirstEnergy’s Annual Report on Form 10-K for the year ended December
31, 2023, which could materially affect FirstEnergy’s business, financial condition or future results. The information set forth in this report, including without
limitation, the risk factor presented below, updates and should be read in conjunction with, the risk factors and information disclosed in FirstEnergy’s Annual
Report on Form 10-K for the year ended December 31, 2023.
The Physical Risks Associated with Climate Change May Have an Adverse Impact on Our Business Operations, Financial Condition and Cash Flows.
Physical risks of climate change such as flooding, wildfires, rising sea levels, and other related phenomena, resulting from more frequent or more extreme
weather events and changes in temperature and precipitation patterns associated with climate change, could affect some, or all, of our operations.Frequent or
extreme weather events could disrupt our operations and/or be destructive, which could result in increased costs, including supply chain costs. An extreme
weather event within the Utilities’ and Transmission Companies’ service areas could also directly affect their capital assets, such as downed wires, poles, or
damage to other operating equipment, resulting in service disruptions to customers and possibly creating hazardous conditions. Further, as extreme weather
conditions increase system stress, we may incur costs relating to additional system backup or service interruptions, and in some instances, we may be unable to
recover such costs. For all of these reasons, these physical risks could have an adverse financial impact on our business operations, financial condition and
cash flows.
Climate change poses other financial risks as well. To the extent weather conditions are affected by climate change, customers’ energy use could increase or
decrease depending on the duration and magnitude of the changes. Increased energy use due to weather changes may require us to invest in additional system
assets and purchase additional power. Additionally, decreased energy use due to weather changes may affect our financial condition through decreased
revenues, margins or earnings.
ITEM 2. 	UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
None.
ITEM 3. 	DEFAULTS UPON SENIOR SECURITIES
None.
ITEM 4. 	MINE SAFETY DISCLOSURES
Not applicable.
ITEM 5. 	OTHER INFORMATION
Trading Arrangements
During the quarter ended March 31, 2024, no director or officer (as defined in Rule 16a-1(f) promulgated under the Exchange Act) of FE adopted or terminated a
“Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” (as each term is defined in Item 408 of Regulation S-K).
69

-- 81 of 106 --

ITEM 6. 	EXHIBITS
Exhibit Number Description
10.1 Fourth Amended and Restated Limited Liability Company Agreement of FirstEnergy Transmission, LLC, dated March 25, 2024 (incorporated by reference to
FE’s Form 8-K filed March 25, 2024, Exhibit 10.1, File No. 333-21011)
(A) (B) 	10.2 Form of 2024-2026 Cash-Based Performance-Adjusted Restricted Stock Unit Award Agreement
(A) (B) 	10.3 Form of 2024-2026 Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement
(A) 	31.1 Certification of chief executive officer, as adopted pursuant to Rule 13a-14(a)
(A) 	31.2 Certification of chief financial officer, as adopted pursuant to Rule 13a-14(a)
(A) 	32 Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350
101 The following materials from the Quarterly Report on Form 10-Q of FirstEnergy Corp. for the period ended March 31, 2024, formatted in iXBRL (Inline
Extensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income, (iii) Consolidated
Balance Sheets, (iv) Consolidated Statements of Cash Flows, (v) related notes to these financial statements and (vi) document and entity information
104 Cover Page Interactive Data File (the cover page XBRL tags are embedded within the Inline XBRL document contained in Exhibit 101)
(A) Provided herein in electronic format as an exhibit.
(B) Management contract or compensatory plan contract or arrangement filed pursuant to Item 601 of Regulation S-K.
Pursuant to paragraph (b)(4)(iii)(A) of Item 601 of Regulation S-K, FirstEnergy has not filed as an exhibit to this Form 10-Q any instrument with respect to long-
term debt if the respective total amount of securities authorized thereunder does not exceed 10% of its respective total assets, but hereby agrees to furnish to
the SEC on request any such documents.
70

-- 82 of 106 --

SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned,
thereunto duly authorized.
April 25, 2024
FIRSTENERGY CORP.
Registrant
/s/ Jason J. Lisowski
Jason J. Lisowski
Vice President, Controller and Chief Accounting Officer
71

-- 83 of 106 --

Exhibit 10.2
(Cash-Based Agreement)
FIRSTENERGY CORP.
2020 Incentive Compensation Plan
2024-2026 Performance-Adjusted Restricted Stock Unit Award Agreement
THIS 2024-2026 PERFORMANCE-ADJUSTED RESTRICTED STOCK UNIT AWARD AGREEMENT (the
“Agreement”), effective as of #GrantDate#, 2024 (the “Grant Date”), is entered into by and between the Company and
#ParticipantName# (the “Grantee”) in accordance with the terms of the FirstEnergy Corp. 2020 Incentive Compensation Plan (the
“Plan”).
1. 	Definitions. Unless otherwise specified in this Agreement, capitalized terms shall have the meanings attributed to them under
the Plan. For purposes of this Agreement, “Retirement” shall mean the Grantee’s termination of employment (except due to death or
by the Company for Cause) on or after attaining age fifty-five (55) and after providing at least five (5) years of service to the
Company or any Subsidiary or affiliate or any predecessor thereof; and
2. 	Grant of Restricted Stock Units. As of the Grant Date, the Company has granted to the Grantee #QuantityGranted# (the
“Target Number”) Restricted Stock Units (the “Restricted Stock Units” or “RSUs”), a percentage of which Target Number will vest
and become payable in accordance with the terms and conditions of this Agreement. The Target Number shall be adjusted with
respect to Dividend Equivalents as provided in Section 8 below. Each RSU that becomes vested and payable hereunder represents
the right of the Grantee to receive the cash value of one Share subject to the terms and conditions of this Agreement. The RSUs are
granted in accordance with, and subject to, all the terms, conditions and restrictions of the Plan, which is hereby incorporated by
reference in its entirety. The Grantee irrevocably agrees to, and accepts, the terms, conditions and restrictions of the Plan and this
Agreement on the Grantee’s own behalf and on behalf of any heirs, successors and assigns.
3. 	Restrictions on RSUs. Except as otherwise provided herein, the Grantee cannot sell, transfer, assign, hypothecate or
otherwise dispose of the RSUs or pledge any RSU as collateral for a loan, other than by will or by the laws of descent and
distribution. In no event may any RSU or this Award be transferred for value. In addition, the RSUs, and any payments made with
respect to the RSUs, will be subject to such other restrictions as the Committee deems necessary or appropriate, including, without
limitation, the Company’s Second Amended and Restated Executive Compensation Recoupment Policy and the Compensation
Clawback Policy, each as may be amended (or succeeded) from time to time, to the extent applicable.
4. 	Vesting and Settlement of RSUs.
(a) Vesting. Except as otherwise provided in Sections 6 and 7 below, if and to the extent the performance goals set forth on
Exhibit A attached to this Agreement (the “Performance Goals”) are achieved during the performance period set forth on

-- 84 of 106 --

Exhibit A (the “Performance Period”), a percentage of the Target Number of RSUs will vest on March 1, 2027 (the
“Vesting Date”), as long as the Grantee remains continuously employed by the Company or a Subsidiary until such
Vesting Date. The number of RSUs that shall vest will range from 0% to 200% of the Target Number, based on the extent
to which the Performance Goals are achieved, as determined by the Committee in its sole discretion. The Grantee will
have no rights to any payment with respect to the RSUs until the RSUs have vested (each RSU that vests pursuant to this
Section 4 or Sections 6 and 7 below, a “Vested RSU”). Prior to settlement, each RSU (whether or not a Vested RSU)
represents an unfunded and unsecured obligation of the Company.
(b) Settlement. Except as otherwise provided in Sections 6, 7 and 10 below, the Company shall settle each Vested RSU by
making a cash payment equal to the Fair Market Value of one Share per Vested RSU to the Grantee as soon as
administratively practicable (and no later than 60 days) after the Vesting Date. With respect to any Vested RSU, the Fair
Market Value of one Share shall be determined as of the Vesting Date, except as provided in Section 6. Notwithstanding
the foregoing or any provision in Sections 6 or 7 to the contrary, if the Grantee elects to defer the settlement of the RSUs
pursuant to the Company’s Executive Deferred Compensation Plan (or any other non-qualified deferred compensation
plan providing for the ability to defer settlement of the RSUs), then the time, form and medium of payment with respect
to any deferred RSUs shall be made pursuant to the terms and conditions of the Executive Deferred Compensation Plan
(or similar non-qualified deferred compensation plan, as applicable).
5. 	Forfeiture. Except as otherwise provided in Sections 6 and 7, the Grantee will forfeit the Grantee’s interest in the RSUs to the
extent the Performance Goals are not achieved during the Performance Period, as determined by the Committee in its sole discretion,
or if the Grantee terminates the Grantee’s employment with the Company and its Subsidiaries prior to the Vesting Date.
6. 	Certain Events. Notwithstanding any provision in this Agreement to the contrary and in each case subject to Section 6(g)
below:
(a) Death. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee dies, a prorated number of
RSUs shall become Vested RSUs. For purposes of this Section 6(a), the number of RSUs that shall become Vested RSUs
due to the Grantee’s death shall be equal to (i) the Target Number of RSUs multiplied by (ii) a fraction (not greater than
one), where the numerator is the number of full calendar months the Grantee remained employed after the Grant Date and
the denominator is 36. The Company shall settle any RSUs that become Vested RSUs under this Section 6(a) by paying
the Grantee’s estate a cash amount equal to the Fair Market Value of one Share for each Vested RSU as soon as
administratively practicable after the date of the Grantee’s death, but in any event by March 15th of the calendar year
following the calendar year in which the Grantee’s death occurred in order to qualify as exempt
2

-- 85 of 106 --

from Section 409A of the Code under Treasury Regulation § 1.409A-1(b)(4). For purposes of this Section 6(a), the Fair
Market Value shall be determined as of the date of the Grantee’s death.
(b) Disability. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee’s employment is
terminated due to the Grantee’s Disability, then, after the end of the Performance Period, a Prorated Number of RSUs
shall become Vested RSUs (as determined in Section 6(f) below). The Company shall settle any RSUs that become
Vested RSUs under this Section 6(b) by paying the Grantee a cash amount equal to the Fair Market Value of one Share
for each Vested RSU as soon as administratively practicable after the Vesting Date, , but in any event by March 15th of
the calendar year following the calendar year in which the Performance Period ends in order to qualify as exempt from
Section 409A of the Code under Treasury Regulation § 1.409A-1(b)(4).
(c) Termination without Cause. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee’s
employment is terminated by the Company and its Subsidiaries without Cause, then, after the end of the Performance
Period, a Prorated Number of RSUs shall become Vested RSUs (as determined in Section 6(f) below). The Company
shall settle any RSUs that become Vested RSUs under this Section 6(c) by paying the Grantee a cash amount equal to the
Fair Market Value of one Share for each Vested RSU as soon as administratively practicable after the Vesting Date, , but
in any event by March 15th of the calendar year following the calendar year in which the Performance Period ends in
order to qualify as exempt from Section 409A of the Code under Treasury Regulation § 1.409A-1(b)(4).
(d) Retirement. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee’s employment is
terminated due to the Grantee’s Retirement, then, after the end of the Performance Period, a Prorated Number of RSUs
shall become Vested RSUs (as determined in Section 6(f) below). The Company shall settle any RSUs that become
Vested RSUs under this Section 6(d) by paying the Grantee a cash amount equal to the Fair Market Value of one Share
for each Vested RSU as soon as administratively practicable after the Vesting Date, , but in any event by March 15th of
the calendar year following the calendar year in which the Performance Period ends in order to qualify as exempt from
Section 409A of the Code under Treasury Regulation § 1.409A-1(b)(4).
(e) Change in Position. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee is transferred to a
position with the Company or a Subsidiary that is not an executive position eligible for an award such as this Award,
then, after the end of the Performance Period, a Prorated Number of RSUs shall become Vested RSUs (as determined in
Section 6(f) below). The Company shall settle any RSUs that become Vested RSUs under this Section 6(e) by paying the
Grantee a cash amount equal to the Fair Market Value of one Share for each Vested RSU as soon as administratively
practicable after the Vesting Date, , but in any event
3

-- 86 of 106 --

by March 15th of the calendar year following the calendar year in which the Performance Period ends in order to qualify
as exempt from Section 409A of the Code under Treasury Regulation § 1.409A-1(b)(4).
(f) Prorated Vesting. The Prorated Number of RSUs described in Section 6(b), (c), (d) or (e) above (the “Prorated Number”)
shall be determined as follows:
The Prorated Number = X multiplied by (Y/Z), where
X = the number of RSUs that would have become Vested RSUs based on actual performance against the
Performance Goals if the Grantee had remained employed (and in an eligible executive position) until the
Vesting Date;
Y = the number of full calendar months the Grantee remained employed (and in an eligible executive position)
after the Grant Date; and
Z = 36.
(g) Release Requirement. Notwithstanding any provision herein to the contrary, except as otherwise determined by the
Company, in order for the Grantee to receive payment pursuant to the settlement of Vested RSUs under Section 6(a), (b),
(c), (d) or (e) above, the Grantee (or the representative of the Grantee’s estate) must execute and deliver to the Company a
general release and waiver of claims against the Company, its Subsidiaries and their directors, officers, employees,
shareholders and other affiliates in a form that is satisfactory to the Company (the “Release”). The Release must become
effective and irrevocable under applicable law no later than 60 days following the date of the Grantee’s death, termination
of employment or transfer of position, as applicable.
1. 	Change in Control. If a Change in Control occurs, the RSUs shall generally become subject to the terms and conditions of
Article 16 of the Plan; provided that if the RSUs subject to this Agreement are not replaced with a Replacement Award, then a
prorated number of the RSUs (as determined by the formula in the following sentence) shall become Vested RSUs as of the date of
the Change in Control and shall be settled no later than 60 days after the Change in Control in the manner set forth in Article 16 of
the Plan. For purposes of this Section 7, the prorated number of RSUs that may become Vested RSUs upon a Change in Control shall
be equal to the Target Number of RSUs granted hereunder times a fraction (not greater than one), in which the numerator is the
number of full months completed from the Grant Date to the date of the consummation of the Change in Control and the
denominator is 36.
2. 	Dividend Equivalents. Until the date on which the RSUs are settled for cash, and pursuant to the terms and conditions of this
Agreement, the Grantee will be credited (in the manner described in the following sentences) on the books and records of the
Company with an amount per each RSU equal to the amount per share of any cash dividends declared by the Board
4

-- 87 of 106 --

of Directors of the Company with a record date on or after the Grant Date on the outstanding Shares (such amount, a “Dividend
Equivalent”). Such Dividend Equivalents will be credited in the form of an additional number of RSUs and the Target Number of
RSUs shall be adjusted by each additional RSU credited to the Grantee pursuant to the Dividend Equivalents. The additional number
of RSUs will be equal to the aggregate amount of Dividend Equivalents credited under this Agreement on the respective dividend
payment date divided by the average of the high and low prices per Share on the respective dividend payment date. The RSUs
attributable to the Dividend Equivalents will be either settled or forfeited, as appropriate, under the same terms and conditions that
apply to the other RSUs under this Award Agreement, including the achievement of the Performance Goals and any action taken by
the Committee. For the avoidance of doubt, if the Grantee defers settlement of any portion of the RSUs pursuant to the Executive
Deferred Compensation Plan, then, during the deferral period, the Grantee’s stock account under the Executive Deferred
Compensation Plan shall continue to be credited with Dividend Equivalents pursuant to this Section 8 until such deferred RSUs are
settled for Shares or cash, as applicable, under the terms of the Executive Deferred Compensation Plan.
3. 	Continuous Employment. So long as the Grantee continues to be an employee of the Company or any of its Subsidiaries, the
Grantee shall not be considered to have experienced a termination of employment because of: (a) any temporary leave of absence
approved in writing by the Company or such Subsidiary; or (b) any change of duties or position (including transfer from one
Subsidiary to another); provided, however, that, in the case of any change of duties or position that results in the Grantee no longer
being an executive of the Company or a Subsidiary, the terms of Section 6(e) shall apply.
4. 	Withholding. Upon settlement of the RSUs, the Company shall withhold an amount sufficient to satisfy all federal, state, and
local taxes to be withheld in connection with the settlement of RSUs under this Agreement.
5. 	No Shareholder Rights. The Grantee shall have no shareholder rights (or rights as a beneficial owner), including no voting
rights, with respect to any RSU or the Share underlying the RSU at any time.
6. 	Recoupment. If the Grantee is or has been deemed to be, or becomes, an “insider” for purposes of Section 16 of the
Exchange Act, this Agreement will be administered in compliance with Section 10D of the Exchange Act, any applicable rules or
regulations promulgated by the Securities and Exchange Commission or any national securities exchange or national securities
association on which the Shares may be traded, and subject to the Company’s Executive Compensation Recoupment and Clawback
Policies, as amended (or succeeded) from time to time, or any other Company policy adopted pursuant to such law, rules, or
regulations and this Agreement may be amended to further such purpose without the consent of the Grantee.
7. 	Termination of Agreement. This Agreement will terminate on the earliest of: (a) the date of the Grantee’s termination of
employment with the Company, except if such termination of employment is due to death, Disability, Retirement, or a termination
by the Company without Cause; (b) the date the RSUs are settled pursuant to the terms of this Agreement; or (c) if no RSUs have
become Vested RSUs as of the Vesting Date, the Vesting Date. Any terms or
5

-- 88 of 106 --

conditions of this Agreement that the Company determines are reasonably necessary to effectuate its purposes shall survive the
termination of this Agreement.
8. 	Miscellaneous Provisions.
(a) 	Adjustments. In the event of a corporate event or transaction described in Section 4.5 of the Plan, this Award and the
RSUs granted hereunder shall be subject to mandatory adjustment as described in Section 4.5 of the Plan.
(b) 	Successors and Legal Representatives. This Agreement will bind and inure to the benefit of the Company and the
Grantee, and their respective successors, assigns and legal representatives.
(c) 	Integration. This Agreement, together with the Plan, constitutes the entire agreement between the Grantee and the
Company with respect to the subject matter hereof. Any waiver of any term, condition or breach thereof will not be a waiver of any
other term or condition or of the same term or condition for the future, or of any subsequent breach. To the extent a conflict exists
between the terms of this Agreement and the provisions of the Plan, the provisions of the Plan shall govern, except with respect to
the Committee’s authority to adjust downward the number of RSUs that vest under this Agreement, as provided under Section 14(h)
below.
(d) 	Notice. Any notice relating to this grant must be in writing, which may include an electronic writing.
(e) 	No Employment Right Created. Nothing in this Agreement will be construed to confer upon the Grantee the right to
continue in the employment or service of the Company or any of its Subsidiaries, or to be employed or serve in any particular
position therewith, or affect any right which the Company or any of its Subsidiaries may have to terminate the Grantee’s
employment or service with or without cause.
(f) 	Severability. In the event of the invalidity of any part or provision of this Agreement, such invalidity will not affect
the enforceability of any other part or provision of this Agreement.
(g) 	Section Headings. The section headings of this Agreement are for convenience of reference only and are not intended
to define, extend or limit the contents of the sections.
(h) 	Amendment. The terms and conditions of this Agreement may be modified by the Committee:
(i) in any case permitted by the terms of the Plan or this Agreement;
(ii) except with respect to an adjustment made pursuant to the last paragraph of this Section 14(h), with the written
consent of the Grantee; or
6

-- 89 of 106 --

(iii) without the consent of the Grantee if the amendment is either not materially adverse to the interests of the Grantee or
is necessary or appropriate in the view of the Committee to conform with, or to take into account, applicable law,
including either exemption from or compliance with any applicable tax law.
Notwithstanding any provision in this Agreement or the Plan to the contrary, the Committee shall retain the discretion to adjust the
number of RSUs that vest under this Agreement without the Grantee’s consent, notwithstanding the Company’s actual performance
against the Performance Goals, either on a formula or discretionary basis or a combination of the two, as the Committee determines
in its sole discretion.
(i) 	Plan Administration. The Plan is administered by the Committee, which has full and exclusive discretionary power to
interpret, implement, construe and adopt rules, forms and guidelines for administering the Plan and this Agreement. All actions,
interpretations and determinations made by the Committee, the Board of Directors, or any of their delegates as to the provisions of
this Agreement and the Plan shall be final, conclusive, and binding on all persons and the Grantee agrees to be bound by such
actions, interpretations and determinations.
(j) 	Governing Law. Except as may otherwise be provided in the Plan, this Agreement will be governed by, construed and
enforced in accordance with the internal laws of the State of Ohio, without giving effect to its principles of conflict of laws. By
accepting this Award, the Grantee agrees to the exclusive jurisdiction and venue of the courts of the United States District Court for
the Northern District of Ohio or the Summit County (Ohio) Court of Common Pleas to adjudicate any and all claims brought with
respect to this Agreement.
(k) 	Internal Revenue Code Section 409A. Notwithstanding anything in the Plan or this Agreement to the contrary, the
Award of RSUs granted hereunder is intended to meet any applicable requirements for compliance under, or exemption from
(specifically, the short-term deferral exception under Treasury Regulation § 1.409A-1(b)(4), Code Section 409A and this Agreement
shall be construed and administered accordingly. However, notwithstanding anything in this Agreement to the contrary, the Company
makes no representations or warranties as to the tax effects of payments made to the Grantee (or the Grantee’s estate) pursuant to this
Agreement, and any and all tax consequences incident to such shall solely be the responsibility of the Grantee (or the Grantee’s
estate).
(l) 	Data Privacy.
In order to implement, administer and manage the Grantee’s participation in the Plan, the Company and its affiliates may hold
certain personal information about the Grantee, including, but not limited to, the Grantee’s name, home address and telephone
number, date of birth, social security number or other identification number, salary, nationality, job title, any Shares or directorships
held in the Company or any affiliate, details of all Awards or any other entitlement to Shares awarded, canceled, exercised, vested,
unvested or outstanding in the Grantee’s favor, for the exclusive purpose of implementing, administering and managing the Plan
(collectively, the “Personal Data”).
7

-- 90 of 106 --

The Grantee hereby explicitly and unambiguously consents to the collection, use and transfer, in electronic or other form, of the
Grantee’s Personal Data as described above, as applicable, to the Company and its affiliates for the sole purpose of administering the
Plan. The Grantee understands that Personal Data may be transferred to third parties assisting in the implementation, administration
and management of the Plan, that these recipients may be located in the United States or elsewhere, and that the recipient’s country
may have different data privacy laws and protections than the United States or the Grantee’s state of residence. The Grantee
understands that the Grantee may request a list with the names and addresses of any potential recipients of the Personal Data by
contacting the Executive Compensation group of Human Resources. The Grantee authorizes the recipients to receive, possess, use,
retain and transfer the Personal Data, in electronic or other form, for the purposes of implementing, administering and managing the
Grantee’s participation in the Plan, including any requisite transfer of such Personal Data as may be required to a broker or other
third party with whom the Grantee may elect to deposit any Shares received upon vesting of the RSUs. The Grantee understands that
Personal Data will be held only as long as is necessary to implement, administer and manage the Grantee’s participation in the Plan
and to comply with Securities and Exchange Commission and/or NYSE reporting obligations, any other applicable law or regulation
and any applicable document retention policies of the Company. The Grantee understands that the Grantee may, at any time, view
Personal Data, request additional information about the storage and processing of Personal Data, require any necessary amendments
to Personal Data or refuse or withdraw the consents herein, without cost, by contacting in writing the Executive Compensation group
of Human Resources. The Grantee understands that refusal or withdrawal of consent may affect the Grantee’s ability to participate in
the Plan or to realize benefits from the RSUs. For more information on the consequences of the Grantee’s refusal to consent or
withdrawal of consent, the Grantee understands that the Grantee may contact the Executive Compensation group of Human
Resources.
(m) 	Signatures and Electronic Delivery. This Agreement may be executed electronically and in counterparts, each of
which shall be deemed to be an original, and when taken together shall constitute one binding agreement. The Company may, in its
sole discretion, deliver any documents related to current or future participation in the Plan by electronic means. The Grantee hereby
consents to receive such documents by electronic delivery and agrees to participate in the Plan through an on-line or electronic
system established and maintained by the Company or another third party designated by the Company.
[SIGNATURE ON FOLLOWING PAGE]
8

-- 91 of 106 --

The Grantee acknowledges receipt of this Agreement and accepts and agrees with the terms and conditions stated above.
#AcceptanceDate# 	____#Signature#______
(Date) 	(Signature of the Grantee)
9

-- 92 of 106 --

EXHIBIT A
Performance Goals
Performance Period
The Performance Period for this Agreement is January 1, 2024 through December 31, 2026.
Performance Goals
The Performance Goals, as approved by the Committee, for the Performance Period are based on:
Notwithstanding any other provision of this Agreement, in addition to any other rights of the Committee under the Plan (as defined in the Agreement), the
Committee may, in any evaluation of the Company’s level of achievement with respect to the Performance Goals, include or exclude any of the following
events that occur during the Performance Period: (a) asset write-downs; (b) litigation or claim judgments or settlements; (c) the effect of changes in tax laws,
accounting principles or other laws or provisions affecting reported results; (d) any reorganization and restructuring programs; (e) extraordinary nonrecurring
items; (f) acquisitions or divestitures and/or (g) foreign exchange gains and losses.
1
1

-- 93 of 106 --

Exhibit 10.3
(Stock-Based Agreement)
FIRSTENERGY CORP.
2020 Incentive Compensation Plan
2024-2026 Performance-Adjusted Restricted Stock Unit Award Agreement
THIS 2024-2026 PERFORMANCE-ADJUSTED RESTRICTED STOCK UNIT AWARD AGREEMENT (the
“Agreement”), effective as of #GrantDate#, 2024 (the “Grant Date”), is entered into by and between the Company and
#ParticipantName# (the “Grantee”) in accordance with the terms of the FirstEnergy Corp. 2020 Incentive Compensation Plan (the
“Plan”).
1. 	Definitions. Unless otherwise specified in this Agreement, capitalized terms shall have the meanings attributed to them under
the Plan. For purposes of this Agreement, “Retirement” shall mean the Grantee’s termination of employment (except due to death or
by the Company for Cause) on or after attaining age 55 and after providing at least five years of service to the Company or any
Subsidiary or affiliate or any predecessor thereof.
2. 	Grant of Restricted Stock Units. As of the Grant Date, the Company has granted to the Grantee #QuantityGranted# (the
“Target Number”) Restricted Stock Units (the “Restricted Stock Units” or “RSUs”), a percentage of which Target Number will vest
and become payable in accordance with the terms and conditions of this Agreement. The Target Number shall be adjusted with
respect to Dividend Equivalents as provided in Section 8 below. Each RSU that becomes vested and payable hereunder represents
the right of the Grantee to receive one Share subject to the terms and conditions of this Agreement. The RSUs are granted in
accordance with, and subject to, all the terms, conditions and restrictions of the Plan, which is hereby incorporated by reference in its
entirety. The Grantee irrevocably agrees to, and accepts, the terms, conditions and restrictions of the Plan and this Agreement on the
Grantee’s own behalf and on behalf of any heirs, successors and assigns.
3. 	Restrictions on RSUs. Except as otherwise provided herein, the Grantee cannot sell, transfer, assign, hypothecate or
otherwise dispose of the RSUs or pledge any RSU as collateral for a loan, other than by will or by the laws of descent and
distribution. In no event may any RSU or this Award be transferred for value. In addition, the RSUs, and any payments made with
respect to the RSUs, will be subject to such other restrictions as the Committee deems necessary or appropriate, including, without
limitation, the Company’s Second Amended and Restated Executive Compensation Recoupment Policy and the Compensation
Clawback Policy, each as may be amended (or succeeded) from time to time, to the extent applicable.
4. 	Vesting and Settlement of RSUs.
(a) Vesting. Except as otherwise provided in Sections 6 and 7 below, if and to the extent the performance goals set forth on
Exhibit A attached to this Agreement (the “Performance Goals”) are achieved during the performance period set forth on
10
DB1/ 143575255.1

-- 94 of 106 --

Exhibit A (the “Performance Period”), a percentage of the Target Number of RSUs will vest on March 1, 2027 (the
“Vesting Date”), as long as the Grantee remains continuously employed by the Company or a Subsidiary until such
Vesting Date. The number of RSUs that shall vest will range from 0% to 200% of the Target Number, based on the extent
to which the Performance Goals are achieved, as determined by the Committee in its sole discretion. The Grantee will
have no rights to the Shares underlying the RSUs until the RSUs have vested and been settled (each RSU that vests
pursuant to this Section 4 or Sections 6 and 7 below, a “Vested RSU”). Prior to settlement, each RSU (whether or not a
Vested RSU) represents an unfunded and unsecured obligation of the Company.
(b) Settlement. Except as otherwise provided in Sections 6, 7 and 11 below, the Company shall settle each Vested RSU by
delivering one Share per Vested RSU to the Grantee as soon as administratively practicable (and no later than 60 days)
after the Vesting Date. Notwithstanding the foregoing or any provision in Sections 6 or 7 to the contrary, if the Grantee
elects to defer the settlement of the RSUs pursuant to the Company’s Executive Deferred Compensation Plan (or any
other non-qualified deferred compensation plan providing for the ability to defer settlement of the RSUs), then the time,
form and medium of payment with respect to any deferred RSUs shall be made pursuant to the terms and conditions of
the Executive Deferred Compensation Plan (or similar non-qualified deferred compensation plan, as applicable).
Fractional RSUs, if any, will be settled in cash.
5. 	Forfeiture. Except as otherwise provided in Sections 6 and 7, the Grantee will forfeit the Grantee’s interest in the RSUs to the
extent the Performance Goals are not achieved during the Performance Period, as determined by the Committee in its sole discretion,
or if the Grantee terminates the Grantee’s employment with the Company and its Subsidiaries prior to the Vesting Date.
6. 	Certain Events. Notwithstanding any provision in this Agreement to the contrary and in each case subject to Section 6(g)
below:
(a) Death. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee dies, a prorated number of
RSUs shall become Vested RSUs. For purposes of this Section 6(a), the number of RSUs that shall become Vested RSUs
due to the Grantee’s death shall be equal to (i) the Target Number of RSUs multiplied by (ii) a fraction (not greater than
one), where the numerator is the number of full calendar months the Grantee remained employed after the Grant Date and
the denominator is 36. The Company shall settle any RSUs that become Vested RSUs under this Section 6(a) by
delivering to the Grantee’s estate one Share for each Vested RSU as soon as administratively practicable after the date of
the Grantee’s death, but in any event by March 15th of the calendar year following the calendar year in which the
Grantee’s death occurred in order to qualify as exempt from Section 409A of the Code under Treasury Regulation
§ 1.409A-1(b)(4).
2
DB1/ 143575255.1

-- 95 of 106 --

(b) Disability. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee’s employment is
terminated due to the Grantee’s Disability, then, after the end of the Performance Period, a Prorated Number of RSUs
shall become Vested RSUs (as determined in Section 6(f) below). The Company shall settle any RSUs that become
Vested RSUs under this Section 6(b) by delivering to the Grantee one Share for each Vested RSU as soon as
administratively practicable after the Vesting Date, but in any event by March 15th of the calendar year following the
calendar year in which the Performance Period ends in order to qualify as exempt from Section 409A of the Code under
Treasury Regulation § 1.409A-1(b)(4).
(c) Termination without Cause. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee’s
employment is terminated by the Company and its Subsidiaries without Cause, then, after the end of the Performance
Period, a Prorated Number of RSUs shall become Vested RSUs (as determined in Section 6(f) below). The Company
shall settle any RSUs that become Vested RSUs under this Section 6(c) by delivering to the Grantee one Share for each
Vested RSU as soon as administratively practicable after the Vesting Date, but in any event by March 15th of the calendar
year following the calendar year in which the Performance Period ends in order to qualify as exempt from Section 409A
of the Code under Treasury Regulation § 1.409A-1(b)(4).
(d) Retirement. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee’s employment is
terminated due to the Grantee’s Retirement, then, after the end of the Performance Period, a Prorated Number of RSUs
shall become Vested RSUs (as determined in Section 6(f) below). The Company shall settle any RSUs that become
Vested RSUs under this Section 6(d) by delivering to the Grantee one Share for each Vested RSU as soon as
administratively practicable after the Vesting Date, but in any event by March 15th of the calendar year following the
calendar year in which the Performance Period ends in order to qualify as exempt from Section 409A of the Code under
Treasury Regulation § 1.409A-1(b)(4).
(e) Change in Position. If, at least one month after the Grant Date but prior to the Vesting Date, the Grantee is transferred to a
position with the Company or a Subsidiary that is not an executive position eligible for an award such as this Award,
then, after the end of the Performance Period, a Prorated Number of RSUs shall become Vested RSUs (as determined in
Section 6(f) below). The Company shall settle any RSUs that become Vested RSUs under this Section 6(e) by delivering
to the Grantee one Share for each Vested RSU as soon as administratively practicable after the Vesting Date, but in any
event by March 15th of the calendar year following the calendar year in which the Performance Period ends in order to
qualify as exempt from Section 409A of the Code under Treasury Regulation § 1.409A-1(b)(4).
(f) Prorated Vesting. The Prorated Number of RSUs described in Section 6(b), (c), (d) or (e) above (the “Prorated Number”)
shall be determined as follows:
3
DB1/ 143575255.1

-- 96 of 106 --

The Prorated Number = X multiplied by (Y/Z), where
X = the number of RSUs that would have become Vested RSUs based on actual performance against the
Performance Goals if the Grantee had remained employed (and in an eligible executive position) until the
Vesting Date;
Y = the number of full calendar months the Grantee remained employed (and in an eligible executive position)
after the Grant Date; and
Z = 36.
(g) Release Requirement. Notwithstanding any provision herein to the contrary, except as otherwise determined by the
Company, in order for the Grantee to receive Shares pursuant to the settlement of Vested RSUs under Section 6(a), (b),
(c), (d) or (e) above, the Grantee (or the representative of the Grantee’s estate) must execute and deliver to the Company a
general release and waiver of claims against the Company, its Subsidiaries and their directors, officers, employees,
shareholders and other affiliates in a form that is satisfactory to the Company (the “Release”). The Release must become
effective and irrevocable under applicable law no later than 60 days following the date of the Grantee’s death, termination
of employment or transfer of position, as applicable.
1. 	Change in Control. If a Change in Control occurs, the RSUs shall generally become subject to the terms and conditions of
Article 16 of the Plan; provided that if the RSUs subject to this Agreement are not replaced with a Replacement Award, then a
prorated number of the RSUs (as determined by the formula in the following sentence) shall become Vested RSUs as of the date of
the Change in Control and shall be settled no later than 60 days after the Change in Control in the manner set forth in Article 16 of
the Plan. For purposes of this Section 7, the prorated number of RSUs that may become Vested RSUs upon a Change in Control shall
be equal to the Target Number of RSUs granted hereunder times a fraction (not greater than one), in which the numerator is the
number of full months completed from the Grant Date to the date of the consummation of the Change in Control and the
denominator is 36.
2. 	Dividend Equivalents. Until the date on which the RSUs are settled for Shares (or cash in the case of RSUs deferred under
the Company’s Executive Deferred Compensation Plan), and pursuant to the terms and conditions of this Agreement, the Grantee
will be credited (in the manner described in the following sentences) on the books and records of the Company with an amount per
each RSU equal to the amount per share of any cash dividends declared by the Board of Directors of the Company with a record date
on or after the Grant Date on the outstanding Shares (such amount, a “Dividend Equivalent”). Such Dividend Equivalents will be
credited in the form of an additional number of RSUs and the Target Number of RSUs shall be adjusted by each additional RSU
credited to the Grantee pursuant to the Dividend Equivalents. The additional number of RSUs will be equal to the aggregate amount
of Dividend Equivalents credited under this Agreement on the respective dividend payment date divided by the average of
4
DB1/ 143575255.1

-- 97 of 106 --

the high and low prices per Share on the respective dividend payment date. The RSUs attributable to the Dividend Equivalents will
be either settled or forfeited, as appropriate, under the same terms and conditions that apply to the other RSUs under this Award
Agreement, including the achievement of the Performance Goals and any action taken by the Committee. For the avoidance of
doubt, if the Grantee defers settlement of any portion of the RSUs pursuant to the Executive Deferred Compensation Plan, then,
during the deferral period, the Grantee’s stock account under the Executive Deferred Compensation Plan shall continue to be
credited with Dividend Equivalents pursuant to this Section 8 until such deferred RSUs are settled for Shares or cash, as applicable,
under the terms of the Executive Deferred Compensation Plan.
3. 	Continuous Employment. So long as the Grantee continues to be an employee of the Company or any of its Subsidiaries, the
Grantee shall not be considered to have experienced a termination of employment because of: (a) any temporary leave of absence
approved in writing by the Company or such Subsidiary; or (b) any change of duties or position (including transfer from one
Subsidiary to another); provided, however, that, in the case of any change of duties or position that results in the Grantee no longer
being an executive of the Company or a Subsidiary, the terms of Section 6(e) shall apply.
4. 	Delivery of Shares. Upon settlement of any RSUs under this Agreement, the Company will deliver to the Grantee (or the
Grantee’s estate) the Shares to which the Grantee is entitled free and clear of any restrictions (except any restrictions under
applicable securities laws or otherwise imposed under the Plan or Section 3 hereof).
5. 	Withholding. Upon settlement of the RSUs, the Company shall withhold a number of Shares (or amount of cash, if
applicable) in an amount sufficient to satisfy all federal, state, and local taxes to be withheld in connection with the settlement of
RSUs under this Agreement.
6. 	No Shareholder Rights. The Grantee shall have no shareholder rights (or rights as a beneficial owner), including no voting
rights, with respect to any RSU or the Share underlying the RSU unless and until the Grantee receives the Share upon settlement of
the RSU.
7. 	Recoupment. If the Grantee is or has been deemed to be, or becomes, an “insider” for purposes of Section 16 of the
Exchange Act, this Agreement will be administered in compliance with Section 10D of the Exchange Act, any applicable rules or
regulations promulgated by the Securities and Exchange Commission or any national securities exchange or national securities
association on which the Shares may be traded, and subject to the Company’s Executive Compensation Recoupment Policies, as
amended (or succeeded) from time to time, or any other Company policy adopted pursuant to such law, rules, or regulations and this
Agreement may be amended to further such purpose without the consent of the Grantee.
8. 	Termination of Agreement. This Agreement will terminate on the earliest of: (a) the date of the Grantee’s termination of
employment with the Company, except if such termination of employment is due to death, Disability, Retirement, or a termination
by the Company without Cause; (b) the date the RSUs are settled pursuant to the terms of this Agreement; or (c) if no RSUs have
become Vested RSUs as of the Vesting Date, the Vesting Date. Any terms or
5
DB1/ 143575255.1

-- 98 of 106 --

conditions of this Agreement that the Company determines are reasonably necessary to effectuate its purposes shall survive the
termination of this Agreement.
9. 	Miscellaneous Provisions.
(a) 	Adjustments. In the event of a corporate event or transaction described in Section 4.5 of the Plan, this Award and the
RSUs granted hereunder shall be subject to mandatory adjustment as described in Section 4.5 of the Plan.
(b) 	Successors and Legal Representatives. This Agreement will bind and inure to the benefit of the Company and the
Grantee, and their respective successors, assigns and legal representatives.
(c) 	Integration. This Agreement, together with the Plan, constitutes the entire agreement between the Grantee and the
Company with respect to the subject matter hereof. Any waiver of any term, condition or breach thereof will not be a waiver of any
other term or condition or of the same term or condition for the future, or of any subsequent breach. To the extent a conflict exists
between the terms of this Agreement and the provisions of the Plan, the provisions of the Plan shall govern, except with respect to
the Committee’s authority to adjust downward the number of RSUs that vest under this Agreement, as provided under Section 15(h)
below.
(d) 	Notice. Any notice relating to this grant must be in writing, which may include an electronic writing.
(e) 	No Employment Right Created. Nothing in this Agreement will be construed to confer upon the Grantee the right to
continue in the employment or service of the Company or any of its Subsidiaries, or to be employed or serve in any particular
position therewith or affect any right which the Company or any of its Subsidiaries may have to terminate the Grantee’s employment
or service with or without cause.
(f) 	Severability. In the event of the invalidity of any part or provision of this Agreement, such invalidity will not affect
the enforceability of any other part or provision of this Agreement.
(g) 	Section Headings. The section headings of this Agreement are for convenience of reference only and are not intended
to define, extend or limit the contents of the sections.
(h) 	Amendment. The terms and conditions of this Agreement may be modified by the Committee:
(i) in any case permitted by the terms of the Plan or this Agreement;
(ii) except with respect to an adjustment made pursuant to the last paragraph of this Section 15(h), with the written
consent of the Grantee; or
6
DB1/ 143575255.1

-- 99 of 106 --

(iii) without the consent of the Grantee if the amendment is either not materially adverse to the interests of the Grantee or
is necessary or appropriate in the view of the Committee to conform with, or to take into account, applicable law,
including either exemption from or compliance with any applicable tax law.
Notwithstanding any provision in this Agreement or the Plan to the contrary, the Committee shall retain the discretion to adjust the
number of RSUs that vest under this Agreement without the Grantee’s consent, notwithstanding the Company’s actual performance
against the Performance Goals, either on a formula or discretionary basis or a combination of the two, as the Committee determines
in its sole discretion.
(i) 	Plan Administration. The Plan is administered by the Committee, which has full and exclusive discretionary power to
interpret, implement, construe and adopt rules, forms and guidelines for administering the Plan and this Agreement. All actions,
interpretations and determinations made by the Committee, the Board of Directors, or any of their delegates as to the provisions of
this Agreement and the Plan shall be final, conclusive, and binding on all persons and the Grantee agrees to be bound by such
actions, interpretations and determinations.
(j) 	Governing Law. Except as may otherwise be provided in the Plan, this Agreement will be governed by, construed and
enforced in accordance with the internal laws of the State of Ohio, without giving effect to its principles of conflict of laws. By
accepting this Award, the Grantee agrees to the exclusive jurisdiction and venue of the courts of the United States District Court for
the Northern District of Ohio or the Summit County (Ohio) Court of Common Pleas to adjudicate any and all claims brought with
respect to this Agreement.
(k) 	Internal Revenue Code Section 409A. Notwithstanding anything in the Plan or this Agreement to the contrary, the
Award of RSUs granted hereunder is intended to meet any applicable requirements for compliance under, or exemption from
(specifically, the short-term deferral exception under Treasury Regulation § 1.409A-1(b)(4)), Code Section 409A and this Agreement
shall be construed and administered accordingly. However, notwithstanding anything in this Agreement to the contrary, the Company
makes no representations or warranties as to the tax effects of payments made to the Grantee (or the Grantee’s estate) pursuant to this
Agreement, and any and all tax consequences incident to such shall solely be the responsibility of the Grantee (or the Grantee’s
estate).
(l) 	Data Privacy. In order to implement, administer and manage the Grantee’s participation in the Plan, the Company and
its affiliates may hold certain personal information about the Grantee, including, but not limited to, the Grantee’s name, home
address and telephone number, date of birth, social security number or other identification number, salary, nationality, job title, any
Shares or directorships held in the Company or any affiliate, details of all Awards or any other entitlement to Shares awarded,
canceled, exercised, vested, unvested or outstanding in the Grantee’s favor, for the exclusive purpose of implementing, administering
and managing the Plan (collectively, the “Personal Data”).
The Grantee hereby explicitly and unambiguously consents to the collection, use and transfer, in electronic or other form, of the
Grantee’s Personal Data as described above, as
7
DB1/ 143575255.1

-- 100 of 106 --

applicable, to the Company and its affiliates for the sole purpose of administering the Plan. The Grantee understands that Personal
Data may be transferred to third parties assisting in the implementation, administration and management of the Plan, that these
recipients may be located in the United States or elsewhere, and that the recipient’s country may have different data privacy laws and
protections than the United States or the Grantee’s state of residence. The Grantee understands that the Grantee may request a list
with the names and addresses of any potential recipients of the Personal Data by contacting the Executive Compensation group of
Human Resources. The Grantee authorizes the recipients to receive, possess, use, retain and transfer the Personal Data, in electronic
or other form, for the purposes of implementing, administering and managing the Grantee’s participation in the Plan, including any
requisite transfer of such Personal Data as may be required to a broker or other third party with whom the Grantee may elect to
deposit any Shares received upon vesting of the RSUs. The Grantee understands that Personal Data will be held only as long as is
necessary to implement, administer and manage the Grantee’s participation in the Plan and to comply with Securities and Exchange
Commission and/or NYSE reporting obligations, any other applicable law or regulation and any applicable document retention
policies of the Company. The Grantee understands that the Grantee may, at any time, view Personal Data, request additional
information about the storage and processing of Personal Data, require any necessary amendments to Personal Data or refuse or
withdraw the consents herein, without cost, by contacting in writing the Executive Compensation group of Human Resources. The
Grantee understands that refusal or withdrawal of consent may affect the Grantee’s ability to participate in the Plan or to realize
benefits from the RSUs. For more information on the consequences of the Grantee’s refusal to consent or withdrawal of consent, the
Grantee understands that the Grantee may contact the Executive Compensation group of Human Resources.
(m) 	Signatures and Electronic Delivery. This Agreement may be executed electronically and in counterparts, each of
which shall be deemed to be an original, and when taken together shall constitute one binding agreement. The Company may, in its
sole discretion, deliver any documents related to current or future participation in the Plan by electronic means. The Grantee hereby
consents to receive such documents by electronic delivery and agrees to participate in the Plan through an on-line or electronic
system established and maintained by the Company or another third party designated by the Company.
[SIGNATURE ON FOLLOWING PAGE]
8
DB1/ 143575255.1

-- 101 of 106 --

The Grantee acknowledges receipt of this Agreement and accepts and agrees with the terms and conditions stated above.
#AcceptanceDate# 	____#Signature#______
(Date) 	(Signature of the Grantee)
9
DB1/ 143575255.1

-- 102 of 106 --

EXHIBIT A
Performance Goals
Performance Period
The Performance Period for this Agreement is January 1, 2024 through December 31, 2026.
Performance Goals
The Performance Goals, as approved by the Committee, for the Performance Period are based on:
Notwithstanding any other provision of this Agreement, in addition to any other rights of the Committee under the Plan (as defined in the Agreement), the
Committee may, in any evaluation of the Company’s level of achievement with respect to the Performance Goals, include or exclude any of the following
events that occur during the Performance Period: (a) asset write-downs; (b) litigation or claim judgments or settlements; (c) the effect of changes in tax laws,
accounting principles or other laws or provisions affecting reported results; (d) any reorganization and restructuring programs; (e) extraordinary nonrecurring
items; (f) acquisitions or divestitures and/or (g) foreign exchange gains and losses.
1
1
10
DB1/ 143575255.1

-- 103 of 106 --

EXHIBIT 31.1
Certification
I, Brian X. Tierney, certify that:
1. I have reviewed this report on Form 10-Q of FirstEnergy Corp.;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a) designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b) designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
c) evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d) disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a) all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: April 25, 2024
/s/ Brian X. Tierney
Brian X. Tierney
President and Chief Executive Officer

-- 104 of 106 --

EXHIBIT 31.2
Certification
I, K. Jon Taylor, certify that:
1. I have reviewed this report on Form 10-Q of FirstEnergy Corp.;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a) designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b) designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
c) evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d) disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a) all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: April 25, 2024
/s/ K. Jon Taylor
K. Jon Taylor
Senior Vice President, Chief Financial Officer and Strategy

-- 105 of 106 --

EXHIBIT 32
CERTIFICATION PURSUANT TO
18 U.S.C. SECTION 1350
In connection with the Report of FirstEnergy Corp. (“Company”) on Form 10-Q for the period ended March 31, 2024 as filed with the Securities and Exchange
Commission on the date hereof (the “Report”), each undersigned officer of the Company does hereby certify, pursuant to 18 U.S.C. § 1350, as adopted pursuant
to § 906 of the Sarbanes-Oxley Act of 2002, that to the best of his knowledge:
(1) The Report fully complies with the requirements of section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
(2) The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.
/s/ Brian X. Tierney
Brian X. Tierney
President and Chief Executive Officer
/s/ K. Jon Taylor
K. Jon Taylor
Senior Vice President, Chief Financial Officer and Strategy
Date: April 25, 2024

-- 106 of 106 --