QUARTERLY REPORT

Q2 2022 — Quarterly report (Form 10-Q)

Q2 2022PDF · 98 pages877 KB
UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One)
☑ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended June 30, 2022
OR
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from ___________________ to ___________________
Commission 	Registrant; State of Incorporation; 	I.R.S. Employer
File Number 	Address; and Telephone Number 	Identification No.
333-21011 	FIRSTENERGY CORP. 	34-1843785
(An Ohio Corporation)
76 South Main Street
Akron OH 44308
Telephone (800) 736-3402
SECURITIES REGISTERED PURSUANT TO SECTION 12(b) OF THE ACT:
Title of Each Class 	Trading Symbol 	Name of Each Exchange on Which Registered
Common Stock, $0.10 par value 	FE 	New York Stock Exchange
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during
the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for
the past 90 days.
Yes ☑ 	No 	☐
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of
Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Yes ☑ 	No 	☐
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging
growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of
the Exchange Act.
Large Accelerated Filer 	☑
Accelerated Filer 	☐
Non-accelerated Filer 	☐
Smaller Reporting Company 	☐
Emerging Growth Company 	☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or
revised financial accounting standard provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes ☐ 	No ☑
Indicate the number of shares outstanding of each of the issuer’s classes of common stock, as of the latest practicable date:
OUTSTANDING
CLASS 	AS OF JUNE 30, 2022
Common Stock, $0.10 par value 	571,395,285
FirstEnergy Website and Other Social Media Sites and Applications
FirstEnergy’s Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, amendments to those reports, and all other
documents filed with or furnished to the SEC pursuant to Section 13(a) of the Securities Exchange Act of 1934 are made available free of charge on or through
the “Investors” page of FirstEnergy’s website at www.firstenergycorp.com. These documents are also available to the public from commercial document retrieval
services and the website maintained by the SEC at www.sec.gov.
These SEC filings are posted on the website as soon as reasonably practicable after they are electronically filed with or furnished to the SEC. Additionally,

-- 1 of 98 --

FirstEnergy routinely posts additional important information, including press releases, investor presentations, investor factbook, and notices of upcoming events
under the “Investors” section of FirstEnergy’s website and recognizes FirstEnergy’s website as a channel of distribution to reach public investors and as a means
of disclosing material non-public information for complying with disclosure obligations under Regulation FD. Investors may be notified of postings to the website
by signing up for email alerts and Rich Site Summary feeds on the “Investors” page of FirstEnergy’s website. FirstEnergy also uses Twitter® and Facebook® as
additional channels of distribution to reach public investors and as a supplemental means of disclosing material non-public information for complying with its
disclosure obligations under Regulation FD. Information contained on FirstEnergy’s website, Twitter® handle or Facebook® page, and any corresponding
applications of those sites, shall not be deemed incorporated into, or to be part of, this report.

-- 2 of 98 --

Forward-Looking Statements: This Form 10-Q includes forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995
based on information currently available to management. Such statements are subject to certain risks and uncertainties and readers are cautioned not to place
undue reliance on these forward-looking statements. These statements include declarations regarding management's intents, beliefs and current expectations.
These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” "forecast," "target," "will," "intend," “believe,” "project,"
“estimate," "plan" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that
may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by
such forward-looking statements, which may include the following (see Glossary of Terms for definitions of capitalized terms):
• The potential liabilities, increased costs and unanticipated developments resulting from government investigations and agreements, including those
associated with compliance with or failure to comply with the DPA.
• The risks and uncertainties associated with government investigations and audits regarding HB 6 and related matters, including potential adverse
impacts on federal or state regulatory matters, including, but not limited to, matters relating to rates.
• The risks and uncertainties associated with litigation, arbitration, mediation, and similar proceedings, particularly regarding HB 6 related matters,
including risks associated with obtaining court approval of the settlement agreement in the derivative shareholder lawsuits.
• Changes in national and regional economic conditions, including recession and inflationary pressure, affecting us and/or our customers and those
vendors with which we do business.
• Weather conditions, such as temperature variations and severe weather conditions, or other natural disasters affecting future operating results and
associated regulatory actions or outcomes in response to such conditions.
• Legislative and regulatory developments, including, but not limited to, matters related to rates, compliance and enforcement activity, cybersecurity, and
climate change.
• The ability to accomplish or realize anticipated benefits from our FE Forward initiative and our other strategic and financial goals, including, but not
limited to, overcoming current uncertainties and challenges associated with the ongoing government investigations, executing our transmission and
distribution investment plans, greenhouse gas reduction goals, controlling costs, improving our credit metrics, growing earnings and strengthening our
balance sheet.
• Changing market conditions affecting the measurement of certain liabilities and the value of assets held in our pension trusts may negatively impact our
results of operations, and may also cause us to make contributions to our pension sooner or in amounts that are larger than currently anticipated.
• The risks associated with cyber-attacks and other disruptions to our, or our vendors’, information technology system, which may compromise our
operations, and data security breaches of sensitive data, intellectual property and proprietary or personally identifiable information.
• Mitigating exposure for remedial activities associated with retired and formerly owned electric generation assets.
• The ability to access the public securities and other capital and credit markets in accordance with our financial plans, the cost of such capital and
overall condition of the capital and credit markets affecting us, including the increasing number of financial institutions evaluating the impact of climate
change on their investment decisions.
• The extent and duration of the COVID-19 pandemic and the related impacts to our business, operations and financial condition resulting from the
outbreak of COVID-19 including, but not limited to, disruption of businesses in our territories, supply chain disruptions, additional costs, workforce
impacts and governmental and regulatory responses to the pandemic, such as the moratoriums on utility disconnections and workforce vaccination
mandates imposed at varying points throughout the pandemic.
• Actions that may be taken by credit rating agencies that could negatively affect either our access to or terms of financing or our financial condition and
liquidity.
• Changes in assumptions regarding factors such as economic conditions within our territories, the reliability of our transmission and distribution system,
or the availability of capital or other resources supporting identified transmission and distribution investment opportunities.
• Changes in customers’ demand for power, including, but not limited to, economic conditions, the impact of climate change, or energy efficiency and
peak demand reduction mandates.
• The potential of non-compliance with debt covenants in our credit facilities.
• The ability to comply with applicable reliability standards and energy efficiency and peak demand reduction mandates.
• Changes to environmental laws and regulations, including, but not limited to, those related to climate change.
• Labor disruptions by our unionized workforce.
• Changes to significant accounting policies.
• Any changes in tax laws or regulations, or adverse tax audit results or rulings.
• The risks and other factors discussed from time to time in our SEC filings.
Dividends declared from time to time on our common stock during any period may in the aggregate vary from prior periods due to circumstances considered by
the FE Board at the time of the actual declarations. A security rating is not a recommendation to buy or hold securities and is subject to revision or withdrawal at
any time by the assigning rating agency. Each rating should be evaluated independently of any other rating.
These forward-looking statements are also qualified by, and should be read together with, the risk factors included in FirstEnergy’s filings with the SEC,
including, but not limited to, the most recent Annual Report on Form 10-K, this Form 10-Q and

-- 3 of 98 --

any subsequent Quarterly Reports on Form 10-Q and Current Reports on Form 8-K. The foregoing review of factors also should not be construed as exhaustive.
New factors emerge from time to time, and it is not possible for management to predict all such factors, nor assess the impact of any such factor on
FirstEnergy’s business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-
looking statements. FirstEnergy expressly disclaims any obligation to update or revise, except as required by law, any forward-looking statements contained
herein or in the information incorporated by reference as a result of new information, future events or otherwise.

-- 4 of 98 --

TABLE OF CONTENTS
Page
Part I. Financial Information
Glossary of Terms 	ii
Item 1. Financial Statements
FirstEnergy Corp.
Consolidated Statements of Income 	1
Consolidated Statements of Comprehensive Income 	2
Consolidated Balance Sheets 	3
Consolidated Statements of Equity 	4
Consolidated Statements of Cash Flows 	5
Notes To Consolidated Financial Statements 	6
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations 	32
Item 3. Quantitative and Qualitative Disclosures About Market Risk 	74
Item 4. Controls and Procedures 	74
Part II. Other Information
Item 1. Legal Proceedings 	74
Item 1A. Risk Factors 	74
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds 	75
Item 3. Defaults Upon Senior Securities 	75
Item 4. Mine Safety Disclosures 	75
Item 5. Other Information 	75
Item 6. Exhibits 	76
i

-- 5 of 98 --

GLOSSARY OF TERMS
The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries:
AE Supply 	Allegheny Energy Supply Company, LLC, an unregulated generation subsidiary
AGC 	Allegheny Generating Company, a generation subsidiary of MP
ATSI 	American Transmission Systems, Incorporated, a subsidiary of FET, which owns and operates transmission facilities
CEI 	The Cleveland Electric Illuminating Company, an Ohio electric utility operating subsidiary
FE 	FirstEnergy Corp., a public utility holding company
FELHC, Inc. 	FirstEnergy License Holding Company
FENOC 	Energy Harbor Nuclear Corp. (formerly known as FirstEnergy Nuclear Operating Company), a subsidiary of EH, which operates NG’s nuclear
generating facilities
FES 	Energy Harbor LLC. (formerly known as FirstEnergy Solutions Corp.), a subsidiary of EH, which provides energy-related products and services
FES Debtors 	FES, FENOC, FG, NG, FE Aircraft Leasing Corp., Norton Energy Storage LLC, and FGMUC
FESC 	FirstEnergy Service Company, which provides legal, financial, and other corporate support services
FET 	FirstEnergy Transmission, LLC, the parent company of ATSI, MAIT and TrAIL, and has a joint venture in PATH
FEV 	FirstEnergy Ventures Corp., which invests in certain unregulated enterprises and business ventures
FG 	Energy Harbor Generation LLC (formerly known as FirstEnergy Generation, LLC), a subsidiary of EH, which owns and operates fossil
generating facilities
FGMUC 	FirstEnergy Generation Mansfield Unit 1 Corp., a subsidiary of FG
FirstEnergy 	FirstEnergy Corp., together with its consolidated subsidiaries
Global Holding 	Global Mining Holding Company, LLC, a joint venture between FEV, WMB Marketing Ventures, LLC and Pinesdale LLC
GPU 	GPU, Inc., former parent of JCP&L, ME and PN, that merged with FE on November 7, 2001
JCP&L 	Jersey Central Power & Light Company, a New Jersey electric utility operating subsidiary
KATCo 	Keystone Appalachian Transmission Company, a former subsidiary of FET which, in May 2022, became a subsidiary of FE
MAIT 	Mid-Atlantic Interstate Transmission, LLC, a subsidiary of FET, which owns and operates transmission facilities
ME 	Metropolitan Edison Company, a Pennsylvania electric utility operating subsidiary
MP 	Monongahela Power Company, a West Virginia electric utility operating subsidiary
NG 	Energy Harbor Nuclear Generation LLC (formerly known as FirstEnergy Nuclear Generation, LLC), a subsidiary of EH, which owns nuclear
generating facilities
OE 	Ohio Edison Company, an Ohio electric utility operating subsidiary
Ohio Companies 	CEI, OE and TE
PATH 	Potomac-Appalachian Transmission Highline, LLC, a joint venture between FE and a subsidiary of AEP
PATH-Allegheny 	PATH Allegheny Transmission Company, LLC
PATH-WV 	PATH West Virginia Transmission Company, LLC
PE 	The Potomac Edison Company, a Maryland and West Virginia electric utility operating subsidiary
Penn 	Pennsylvania Power Company, a Pennsylvania electric utility operating subsidiary of OE
Pennsylvania Companies 	ME, PN, Penn and WP
PN 	Pennsylvania Electric Company, a Pennsylvania electric utility operating subsidiary
Signal Peak 	Signal Peak Energy, LLC, an indirect subsidiary of Global Holding that owns mining operations near Roundup, Montana
TE 	The Toledo Edison Company, an Ohio electric utility operating subsidiary
TrAIL 	Trans-Allegheny Interstate Line Company, a subsidiary of FET, which owns and operates transmission facilities
Transmission Companies 	ATSI, MAIT and TrAIL
Utilities 	OE, CEI, TE, Penn, JCP&L, ME, PN, MP, PE, and WP
WP 	West Penn Power Company, a Pennsylvania electric utility operating subsidiary
ii

-- 6 of 98 --

The following abbreviations and acronyms may be used to identify frequently used terms in this report:
2021 Credit Facilities 	Collectively, the six separate senior unsecured five-year
syndicated revolving credit facilities entered into by FE, FET,
the Utilities, and the Transmission Companies, on October
18, 2021
DSIC 	Distribution System Improvement Charge
2023 Notes 	FE’s 4.25% Notes, Series B, due 2023 	DSP 	Default Service Plan
2031 Notes 	FE’s 7.375% Notes, Series C, due 2031 	EDC 	Electric Distribution Company
2047 Notes 	FE’s 4.85% Notes, Series C, due 2047 	EDCP 	Executive Deferred Compensation Plan
ACE 	Affordable Clean Energy 	EE&C 	Energy Efficiency and Conservation
ADIT 	Accumulated Deferred Income Taxes 	EEI 	Edison Electric Institute
AEP 	American Electric Power Company, Inc. 	EGS 	Electric Generation Supplier
AEPSC 	American Electric Power Service Corporation 	EGU 	Electric Generation Units
AFS 	Available-for-sale 	EH 	Energy Harbor Corp.
AFUDC 	Allowance for Funds Used During Construction 	ELG 	Effluent Limitation Guidelines
AMI 	Advance Metering Infrastructure 	EmPOWER Maryland EmPOWER Maryland Energy Efficiency Act
AOCI 	Accumulated Other Comprehensive Income (Loss) 	ENEC 	Expanded Net Energy Cost
ARO 	Asset Retirement Obligation 	EPA 	United States Environmental Protection Agency
ARP 	Alternative Revenue Program 	EPS 	Earnings per Share
ASC 	Accounting Standard Codification 	ERO 	Electric Reliability Organization
ASU 	Accounting Standards Update 	ESG 	Environmental, Social, Corporate Governance
BGS 	Basic Generation Service 	ESP IV 	Electric Security Plan IV
Brookfield 	North American Transmission Company II LLC, a controlled
investment vehicle entity of Brookfield Infrastructure Partners Exchange Act 	Securities and Exchange Act of 1934, as amended
Brookfield Guarantors 	Brookfield Super-Core Infrastructure Partners L.P., Brookfield
Super-Core Infrastructure Partners (NUS) L.P., and
Brookfield Super-Core Infrastructure Partners (ER) SCSp
Facebook® 	Facebook is a registered trademark of Facebook, Inc.
CAA 	Clean Air Act 	FASB 	Financial Accounting Standards Board
CCR 	Coal Combustion Residuals 	FCA 	Financial Conduct Authority
CERCLA 	Comprehensive Environmental Response, Compensation,
and Liability Act of 1980
FE Board 	FE Board of Directors
CFR 	Code of Federal Regulations 	FE Revolving Facility FE and the Utilities’ former five-year syndicated revolving
credit facility, as amended, and replaced by the 2021 Credit
Facilities on October 18, 2021
CO 	Carbon Dioxide 	FERC 	Federal Energy Regulatory Committee
COVID-19 	Coronavirus disease 	FET Board 	The Board of Directors of FET
CPP 	EPA's Clean Power Plan 	FET LLC Agreement Third Amended and Restated Limited Liability Company
Operating Agreement of FET
CSAPR 	Cross-State Air Pollution Rule 	FET P&SA 	Purchase and Sale Agreement entered into on November 6,
2021, by and between FE, FET, Brookfield and Brookfield
Guarantors
CSR 	Conservation Support Rider 	FET Revolving Facility FET and certain of its subsidiaries’ former five-year
syndicated revolving credit facility, as amended, and replaced
by the 2021 Credit Facilities on October 18, 2021
CTA 	Consolidated Tax Adjustment 	Fitch 	Fitch Ratings Service
CWA 	Clean Water Act 	FMB 	First Mortgage Bond
DCR 	Delivery Capital Recovery 	FPA 	Federal Power Act
D.C. Circuit 	United States Court of Appeals for the District of Columbia
Circuit
FTR 	Financial Transmission Right
DMR 	Distribution Modernization Rider 	GAAP 	Accounting Principles Generally Accepted in the United
States of America
DPA 	Deferred Prosecution Agreement entered into on July 21,
2021 between FE and S.D. Ohio
GHG 	Greenhouse Gases
2
iii

-- 7 of 98 --

HB 6 	House Bill 6, as passed by Ohio's 133rd General Assembly 	PPA 	Purchase Power Agreement
IBA 	ICE Benchmark Administration Limited 	PPUC 	Pennsylvania Public Utility Commission
IRS 	Internal Revenue Service 	PUCO 	Public Utilities Commission of Ohio
LED 	Light Emitting Diode 	RCRA 	Resource Conservation and Recovery Act
LIBOR 	London Inter-Bank Offered Rate 	Recoupment Policy FirstEnergy Executive Compensation Recoupment Policy
LOC 	Letter of Credit 	Regulation FD 	Regulation Fair Disclosure promulgated by the SEC
LTIIPs 	Long-Term Infrastructure Improvement Plans 	RFC 	ReliabilityFirst Corporation
MDPSC 	Maryland Public Service Commission 	RFP 	Request for Proposal
MGP 	Manufactured Gas Plants 	RGGI 	Regional Greenhouse Gas Initiative
MISO 	Midcontinent Independent System Operator, Inc. 	ROE 	Return on Equity
Moody’s 	Moody’s Investors Service, Inc. 	RTO 	Regional Transmission Organization
MW 	Megawatt 	SBC 	Societal Benefits Charge
MWH 	Megawatt-hour 	S.D. Ohio 	Southern District of Ohio
NAAQS 	National Ambient Air Quality Standards 	SEC 	United States Securities and Exchange Commission
NCI 	Noncontrolling Interest 	SEET 	Significantly Excessive Earnings Test
N.D. Ohio 	Northern District of Ohio 	SF 	Sulfur hexafluoride
NERC 	North American Electric Reliability Corporation 	SIP 	State Implementation Plan(s) Under the Clean Air Act
NJBPU 	New Jersey Board of Public Utilities 	SLC 	Special Litigation Committee of the FE Board
NJ Rate Counsel 	New Jersey Division of Rate Counsel 	SO2 	Sulfur Dioxide
NOx 	Nitrogen Oxide 	SOFR 	Secured Overnight Financing Rate
NUG 	Non-Utility Generation 	SOS 	Standard Offer Service
NYPSC 	New York State Public Service Commission 	SREC 	Solar Renewable Energy Credit
OAG 	Ohio Attorney General 	SSO 	Standard Service Offer
OCA 	Office of Consumer Advocate 	S&P 	Standard & Poor’s Ratings Service
OCC 	Ohio Consumers' Counsel 	Tax Act 	Tax Cuts and Jobs Act adopted December 22, 2017
ODSA 	Ohio Development Service Agency 	TMI-1 	Three Mile Island Unit 1
Ohio Stipulation 	Stipulation and Recommendation, dated November 1, 2021,
entered into by and among the Ohio Companies, the OCC,
PUCO Staff, and
several other signatories 	TO 	Transmission Owner
OPEB 	Other Post-Employment Benefits 	Twitter® 	Twitter is a registered trademark of Twitter, Inc.
OPIC 	Other Paid-in Capital 	VAR 	Volt-Amps Reactive, the measuring unit for reactive power
OVEC 	Ohio Valley Electric Corporation 	VIE 	Variable Interest Entity
PJM 	PJM Interconnection, LLC 	VSCC 	Virginia State Corporation Commission
PJM Tariff 	PJM Open Access Transmission Tariff 	WVPSC 	Public Service Commission of West Virginia
POLR 	Provider of Last Resort
6
iv

-- 8 of 98 --

PART I. FINANCIAL INFORMATION
ITEM I. 	Financial Statements
FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF INCOME
(Unaudited)
For the Three Months Ended June
30, 	For the Six Months Ended June 30,
(In millions, except per share amounts) 	2022 	2021 	2022 	2021
REVENUES:
Distribution services and retail generation 	$ 	2,170 $ 	2,096 $ 	4,567 $ 	4,332
Transmission 	440 	411 	891 	812
Other 	208 	115 	349 	204
Total revenues 	2,818 	2,622 	5,807 	5,348
OPERATING EXPENSES:
Fuel 	190 	112 	330 	230
Purchased power 	802 	614 	1,677 	1,332
Other operating expenses 	896 	718 	1,716 	1,470
Provision for depreciation 	348 	323 	688 	646
Amortization (deferral) of regulatory assets, net 	(129) 	49 	(166) 	141
General taxes 	264 	264 	556 	537
DPA penalty (Note 8) 	— 	230 	— 	230
Gain on sale of Yards Creek (Note 9) 	— 	— 	— 	(109)
Total operating expenses 	2,371 	2,310 	4,801 	4,477
OPERATING INCOME 	447 	312 	1,006 	871
OTHER INCOME (EXPENSE):
Debt redemption costs (Note 6) 	(118) 	— 	(156) 	—
Miscellaneous income, net 	160 	108 	266 	243
Interest expense 	(265) 	(287) 	(540) 	(572)
Capitalized financing costs 	17 	21 	36 	34
Total other expense 	(206) 	(158) 	(394) 	(295)
INCOME BEFORE INCOME TAXES 	241 	154 	612 	576
INCOME TAXES 	49 	96 	132 	183
NET INCOME 	$ 	192 $ 	58 $ 	480 $ 	393
Income attributable to noncontrolling interest 	5 	— 	5 	—
EARNINGS ATTRIBUTABLE TO FIRSTENERGY CORP. 	$ 	187 $ 	58 $ 	475 $ 	393
EARNINGS PER SHARE ATTRIBUTABLE TO FIRSTENERGY CORP.
(Note 3):
Basic 	$ 	0.33 $ 	0.11 $ 	0.83 $ 	0.72
Diluted 	$ 	0.33 $ 	0.11 $ 	0.83 $ 	0.72
WEIGHTED AVERAGE NUMBER OF COMMON SHARES OUTSTANDING:
Basic 	571 	544 	571 	544
Diluted 	572 	545 	572 	545
Includes excise and gross receipts tax collections of $91 million and $85 million during the three months ended June 30, 2022 and 2021, respectively, and $194 million and
$180 million during the six months ended June 30, 2022 and 2021, respectively.
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
(1)
(1)
1

-- 9 of 98 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
(Unaudited)
For the Three Months Ended
June 30, For the Six Months Ended June
30,
(In millions) 	2022 	2021 	2022 	2021
NET INCOME 	$ 	192 $ 	58 $ 	480 $ 	393
OTHER COMPREHENSIVE INCOME (LOSS):
Pension and OPEB prior service costs 	(2) 	(4) 	(4) 	(7)
Amortized losses on derivative hedges 	8 	1 	8 	1
Other comprehensive income (loss) 	6 	(3) 	4 	(6)
Income taxes (benefits) on other comprehensive income (loss) 	2 	(1) 	1 	(2)
Other comprehensive income (loss), net of tax 	4 	(2) 	3 	(4)
COMPREHENSIVE INCOME 	$ 	196 $ 	56 $ 	483 $ 	389
Comprehensive income attributable to noncontrolling interest 	5 	— 	5 	—
COMPREHENSIVE INCOME ATTRIBUTABLE TO FIRSTENERGY CORP. 	$ 	191 $ 	56 $ 	478 $ 	389
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
2

-- 10 of 98 --

FIRSTENERGY CORP.
CONSOLIDATED BALANCE SHEETS
(Unaudited)
(In millions, except share amounts) June 30,
2022 December 31,
2021
ASSETS
CURRENT ASSETS:
Cash and cash equivalents 	$ 	478 $ 	1,462
Restricted cash 	54 	49
Receivables-
Customers 	1,274 	1,192
Less — Allowance for uncollectible customer receivables 	134 	159
1,140 	1,033
Other, net of allowance for uncollectible accounts of $11 in 2022 and $10 in 2021 	248 	246
Materials and supplies, at average cost 	304 	260
Prepaid taxes and other 	315 	187
2,539 	3,237
PROPERTY, PLANT AND EQUIPMENT:
In service 	46,818 	46,002
Less — Accumulated provision for depreciation 	13,035 	12,672
33,783 	33,330
Construction work in progress 	1,584 	1,414
35,367 	34,744
INVESTMENTS AND OTHER NONCURRENT ASSETS:
Goodwill 	5,618 	5,618
Investments (Note 6) 	626 	655
Regulatory assets 	99 	71
Other 	871 	1,107
7,214 	7,451
$ 	45,120 $ 	45,432
LIABILITIES AND CAPITALIZATION
CURRENT LIABILITIES:
Currently payable long-term debt 	$ 	353 $ 	1,606
Accounts payable 	1,182 	943
Accrued interest 	255 	283
Accrued taxes 	631 	647
Accrued compensation and benefits 	276 	313
Dividends payable 	— 	222
Other 	673 	402
3,370 	4,416
CAPITALIZATION:
Common stockholders’ equity-
Common stock, $0.10 par value, authorized 700,000,000 shares - 571,395,285 and 570,261,104 shares outstanding as of
June 30, 2022 and December 31, 2021, respectively 	57 	57
Other paid-in capital 	11,943 	10,238
Accumulated other comprehensive loss 	(12) 	(15)
Accumulated deficit 	(1,130) 	(1,605)
Total common stockholders’ equity 	10,858 	8,675
Noncontrolling interest 	456 	—
Total equity 	11,314 	8,675
Long-term debt and other long-term obligations 	20,763 	22,248
32,077 	30,923
NONCURRENT LIABILITIES:
Accumulated deferred income taxes 	3,623 	3,437
Retirement benefits 	2,556 	2,669
Regulatory liabilities 	1,925 	2,124
Other 	1,569 	1,863
9,673 	10,093
COMMITMENTS, GUARANTEES AND CONTINGENCIES (Note 8)
$ 	45,120 $ 	45,432
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
3

-- 11 of 98 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF EQUITY
(Unaudited)
Six Months Ended June 30, 2022
Common Stock
OPIC 	AOCI
Accumulated
Deficit
Total Common
Stockholders’
Equity 	NCI 	Total Equity	(In millions) 	Shares 	Amount
Balance, January 1, 2022 	570 $ 	57 $ 10,238 $ (15) $ 	(1,605) $ 	8,675 $ 	— $ 	8,675
Net income 	288 	288 	288
Other comprehensive loss, net of tax 	(1) 	(1) 	(1)
Stock Investment Plan and share-based benefit
plans 	1 	20 	20 	20
Cash dividends declared on common stock
($0.39 per share in March) 	(223) 	(223) 	(223)
Other 	(4) 	(4) 	(4)
Balance, March 31, 2022 	571 	57 	10,031 	(16) 	(1,317) 	8,755 	— 	8,755
Net income 	187 	187 	5 	192
Other comprehensive income, net of tax 	4 	4 	4
Stock Investment Plan and share-based
benefit plans 	25 	25 	25
FET minority interest sale, net of transaction
costs (Note 1) 	1,887 	1,887 	451 	2,338
Balance, June 30, 2022 	571 $ 	57 $ 11,943 $ (12) $ 	(1,130) $ 	10,858 $ 	456 $ 	11,314
Six Months Ended June 30, 2021
Common Stock
OPIC 	AOCI Accumulated
Deficit
Total Common
Stockholders’
Equity 	NCI 	Total Equity	(In millions) 	Shares 	Amount
Balance, January 1, 2021 	543 $ 	54 $ 10,076 $ (5) $ 	(2,888) $ 	7,237 $ 	— $ 	7,237
Net income 	335 	335 	335
Other comprehensive loss, net of tax 	(2) 	(2) 	(2)
Share-based benefit plans 	1 	2 	2 	2
Cash dividends declared on common stock
($0.39 per share in March) 	(212) 	(212) 	(212)
Balance, March 31, 2021 	544 	54 	9,866 	(7) 	(2,553) 	7,360 	— 	7,360
Net income 	58 	58 	58
Other comprehensive loss, net of tax 	(2) 	(2) 	(2)
Stock Investment Plan and share-based benefit
plans 	14 	14 	14
Balance, June 30, 2021 	544 $ 	54 $ 9,880 $ (9) $ 	(2,495) $ 	7,430 $ 	— $ 	7,430
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
4

-- 12 of 98 --

FIRSTENERGY CORP.
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited)
For the Six Months Ended June 30,
(In millions) 	2022 	2021
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income 	$ 	480 $ 	393
Adjustments to reconcile net income to net cash from operating activities-
Depreciation and amortization 	694 	831
Deferred income taxes and investment tax credits, net 	123 	176
Retirement benefits, net of payments 	(188) 	(209)
Transmission revenue collections, net 	23 	81
Gain on sale of Yards Creek 	— 	(109)
Changes in current assets and liabilities-
Receivables 	(109) 	121
Materials and supplies 	(44) 	43
Prepaid taxes and other current assets 	(121) 	(114)
Accounts payable 	239 	127
DPA penalty 	— 	230
Accrued taxes 	(16) 	(112)
Accrued interest 	(28) 	11
Accrued compensation and benefits 	(85) 	(98)
Other current liabilities 	(5) 	(27)
Collateral, net 	262 	(5)
Other 	58 	8
Net cash provided from operating activities 	1,283 	1,347
CASH FLOWS FROM FINANCING ACTIVITIES:
New financing-
Long-term debt 	— 	1,500
Redemptions and repayments-
Long-term debt 	(2,745) 	(33)
Short-term borrowings, net 	— 	(1,700)
Discounts (premiums) on debt issuances and redemptions, net 	(139) 	29
Proceeds from FET minority interest sale, net of transaction costs 	2,348 	—
Common stock dividend payments 	(445) 	(424)
Other 	— 	(34)
Net cash used for financing activities 	(981) 	(662)
CASH FLOWS FROM INVESTING ACTIVITIES:
Property additions 	(1,147) 	(1,226)
Proceeds from sale of Yards Creek 	— 	155
Sales of investment securities held in trusts 	16 	13
Purchases of investment securities held in trusts 	(22) 	(19)
Asset removal costs 	(97) 	(111)
Other 	(31) 	14
Net cash used for investing activities 	(1,281) 	(1,174)
Net change in cash, cash equivalents, and restricted cash 	(979) 	(489)
Cash, cash equivalents, and restricted cash at beginning of period 	1,511 	1,801
Cash, cash equivalents, and restricted cash at end of period 	$ 	532 $ 	1,312
The accompanying Notes to Consolidated Financial Statements are an integral part of these financial statements.
5

-- 13 of 98 --

FIRSTENERGY CORP.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)
Note
Number Page
Number
1 	Organization and Basis of Presentation 	7
2 	Revenue 	9
3 	Earnings Per Share 	12
4 	Pension and Other Post-Employment Benefits 	13
5 	Income Taxes 	13
6 	Fair Value Measurements 	14
7 	Regulatory Matters 	17
8 	Commitments, Guarantees and Contingencies 	24
9 	Segment Information 	29
6

-- 14 of 98 --

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Unaudited)
1. ORGANIZATION AND BASIS OF PRESENTATION
Unless otherwise indicated, defined terms and abbreviations used herein have the meanings set forth in the accompanying Glossary of Terms.
FE was incorporated under Ohio law in 1996. FE’s principal business is the holding, directly or indirectly, of all of the outstanding equity of its principal
subsidiaries: OE, CEI, TE, Penn (a wholly owned subsidiary of OE), JCP&L, ME, PN, FESC, MP, AGC (a wholly owned subsidiary of MP), PE, WP, and FET and
its principal subsidiaries (ATSI, MAIT and TrAIL). In addition, FE holds all of the outstanding equity of other direct subsidiaries including: AE Supply, FirstEnergy
Properties, Inc., FEV, FELHC, Inc., Allegheny Ventures, Inc., and Suvon, LLC, doing business as both FirstEnergy Home and FirstEnergy Advisors.
FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity. FirstEnergy’s ten utility operating companies
comprise one of the nation’s largest investor-owned electric systems, based on serving over six million customers in the Midwest and Mid-Atlantic regions.
FirstEnergy’s transmission operations include approximately 24,000 miles of lines and two regional transmission operation centers. AGC and MP control 3,580
MWs of total capacity.
PN, as lessee of the property of its subsidiary, the Waverly Electric Light & Power Company, serves approximately 4,000 customers in the Waverly, New York
vicinity. On February 10, 2021, PN entered into an agreement to transfer its customers and the related assets in Waverly, New York to Tri-County Rural Electric
Cooperative; the completion of such transfer is subject to several closing conditions including regulatory approval, which closing conditions are not expected to
be satisfied prior to August 10, 2022, the date on which the parties can terminate the agreement.
These interim financial statements have been prepared pursuant to the rules and regulations of the SEC for Quarterly Reports on Form 10-Q. Certain
information and disclosures normally included in financial statements and notes prepared in accordance with GAAP have been condensed or omitted pursuant to
such rules and regulations. These interim financial statements should be read in conjunction with the financial statements and notes included in the Annual
Report on Form 10-K for the year ended December 31, 2021.
FE and its subsidiaries follow GAAP and comply with the related regulations, orders, policies and practices prescribed by the SEC, FERC, and, as applicable,
the PUCO, the PPUC, the MDPSC, the NYPSC, the WVPSC, the VSCC and the NJBPU. The accompanying interim financial statements are unaudited, but
reflect all adjustments, consisting of normal recurring adjustments, that, in the opinion of management, are necessary for a fair statement of the financial
statements. The preparation of financial statements in conformity with GAAP requires management to make periodic estimates and assumptions that affect the
reported amounts of assets, liabilities, revenues and expenses and disclosure of contingent assets and liabilities. Actual results could differ from these estimates.
The reported results of operations are not necessarily indicative of results of operations for any future period. FE and its subsidiaries have evaluated events and
transactions for potential recognition or disclosure through the date the financial statements were issued.
FE and its subsidiaries consolidate all majority-owned subsidiaries over which they exercise control and, when applicable, entities for which they have a
controlling financial interest. Intercompany transactions and balances are eliminated in consolidation as appropriate and permitted pursuant to GAAP. FE and its
subsidiaries consolidate a VIE when it is determined that it is the primary beneficiary. Investments in affiliates over which FE and its subsidiaries have the ability
to exercise significant influence, but do not have a controlling financial interest, follow the equity method of accounting. Under the equity method, the interest in
the entity is reported as an investment in the Consolidated Balance Sheets and the percentage of FE’s ownership share of the entity’s earnings is reported in the
Consolidated Statements of Income and Comprehensive Income.
Certain prior year amounts have been reclassified to conform to the current year presentation.
Capitalized Financing Costs
For the three months ended June 30, 2022 and 2021, capitalized financing costs on FirstEnergy’s Consolidated Statements of Income include $11 million and
$14 million, respectively, of allowance for equity funds used during construction and $6 million and $7 million, respectively, of capitalized interest. For the six
months ended June 30, 2022 and 2021, capitalized financing costs on FirstEnergy’s Consolidated Statements of Income include $24 million and $21 million,
respectively, of allowance for equity funds used during construction and $12 million and $13 million, respectively, of capitalized interest.
COVID-19
FirstEnergy is continuously evaluating the COVID-19 global pandemic and taking steps to mitigate known risks. FirstEnergy provides a critical and essential
service to its customers and the health and safety of its employees and customers is its first priority. FirstEnergy continues to provide flexibility for approximately
7,000 of its 12,400 employees to work from home. Pandemic safety and cleaning protocols were implemented for those workers who have continued to report to
a FirstEnergy work location during the pandemic, ensuring FirstEnergy employees can report directly to job sites and work with the same small group of
7

-- 15 of 98 --

employees every day. FirstEnergy continues to assess its work from home policies to allow for a flexible workplace to continue for its employees after the
pandemic.
FirstEnergy continues to effectively manage operations during the pandemic in order to provide critical service to customers. FirstEnergy has experienced supply
chain challenges during the COVID-19 pandemic. Lead times have increased across numerous material categories, with some as much as doubling from
previous times. Some key suppliers have struggled with labor shortages and raw material availability, which along with increasing inflationary pressure, have
increased the costs of certain materials, equipment and contractors. FirstEnergy has taken steps to mitigate these risks and does not currently expect service
disruptions or any material impact on its capital spending plan. However, the situation remains fluid and future impacts to FirstEnergy that are presently unknown
or unanticipated may occur.
Customer Receivables
Receivables from customers include distribution services and retail generation sales to residential, commercial and industrial customers of the Utilities. The
allowance for uncollectible customer receivables is based on historical loss information comprised of a rolling 36-month average net write-off percentage of
revenues, in conjunction with a qualitative assessment of elements that impact the collectability of receivables to determine if allowances for uncollectible
accounts should be further adjusted in accordance with the accounting guidance for credit losses.
FirstEnergy reviews its allowance for uncollectible customer receivables utilizing a quantitative and qualitative assessment. Management contemplates available
current information such as changes in economic factors, regulatory matters, industry trends, customer credit factors, amount of receivable balances that are
past-due, payment options and programs available to customers, and the methods that the Utilities are able to utilize to ensure payment. This analysis includes
consideration of the outbreak of COVID-19 and the impact on customer receivable balances outstanding and write-offs since the pandemic began. During 2022,
various regulatory actions including extensions on moratoriums, certain restrictions on disconnections, and extended installment plan offerings continue to
impact the level of past due balances in certain states. However, certain states have resumed normal collections activity and arrears levels have declined
towards pre-pandemic levels. As a result of this analysis, FirstEnergy recognized a $25 million decrease to its allowance for uncollectible customer receivables
during the first quarter of 2022, of which $15 million was applied to existing deferred regulatory assets. There was no material change as a result of this analysis
during the second quarter of 2022. Additionally, as a result of these pandemic-related moratoriums and certain customer installment or extended payment plans
offered, the allowance for uncollectible accounts on receivables in 2022 continue to be elevated due to the extension of when certain write-offs would have
otherwise occurred.
Receivables from customers also include PJM receivables resulting from transmission and wholesale sales. FirstEnergy’s uncollectible risk on PJM receivables
is minimal due to the nature of PJM’s settlement process whereby members of PJM legally agree to share the cost of defaults and as a result there is no
allowance for doubtful accounts.
Activity in the allowance for uncollectible accounts on customer receivables for the six months ended June 30, 2022 and for the year ended December 31, 2021
are as follows:
(In millions)
Balance, January 1, 2021 	$ 	164
Charged to income 	54
Charged to other accounts 	42
Write-offs 	(101)
Balance, December 31, 2021 	$ 	159
Charged to income 	13
Charged to other accounts 	48
Write-offs 	(86)
Balance, June 30, 2022 	$ 	134
Approximately $12 million of which was deferred for future recovery in the twelve months ended December 31, 2021.
Represents recoveries and reinstatements of accounts written off for uncollectible accounts.
Approximately $(5) million of which was deferred for future refund to customers in the six months ended June 30, 2022.
Sale of Minority Interest in FirstEnergy Transmission, LLC
On November 6, 2021, FirstEnergy, along with FET, entered into the FET P&SA, with Brookfield and Brookfield Guarantors, pursuant to which FET agreed to
issue and sell to Brookfield at the closing, and Brookfield agreed to purchase from FET, certain newly issued membership interests of FET, such that Brookfield
will own 19.9% of the issued and outstanding membership interests of FET, for a purchase price of $2.375 billion. The transaction closed on May 31, 2022. The
difference between the cash consideration received, net of transaction costs of approximately $37 million, and the carrying value of the noncontrolling interest of
$451 million was recorded as an increase to OPIC. KATCo, which was a subsidiary of FET, became a wholly owned subsidiary of FE prior to the closing of the
transaction and remains in the Regulated Transmission segment.
(1)
(2)
(3)
(2)
(1)
(2)
(3)
8

-- 16 of 98 --

Pursuant to the terms of the FET P&SA, on May 31, 2022, Brookfield, FET and FE entered into the FET LLC Agreement. The FET LLC Agreement, among other
things, provides for the governance, exit, capital and distribution, and other arrangements for FET from and following the closing. Under the FET LLC
Agreement, Brookfield is entitled to appoint a number of directors to the FET Board, in approximate proportion to Brookfield’s ownership percentage in FET
(rounded to the next whole number). The FET Board now consists of five directors, one appointed by Brookfield and four appointed by FE. The FET LLC
Agreement contains certain investor protections, including, among other things, requiring Brookfield's approval for FET and its subsidiaries to take certain major
actions. Under the terms of the FET LLC Agreement, for so long as Brookfield holds a 9.9% interest in FET, Brookfield’s consent is required for FET or any of its
subsidiaries to incur indebtedness (other than the refinancing of existing indebtedness on commercially reasonable terms reflecting then-current credit market
conditions) that would reasonably be expected to result in FET’s consolidated Debt-to-Capital Ratio (as defined in the FET LLC Agreement) equaling or
exceeding (i) prior to the fifth anniversary of the effective date, 65%, and (ii) thereafter, 70%.
New Accounting Pronouncements
Recently Issued Pronouncements - The following new authoritative accounting guidance issued by the FASB has not yet been adopted. Unless otherwise
indicated, FirstEnergy is currently assessing the impact such guidance may have on its financial statements and disclosures, as well as the potential to early
adopt where applicable. FirstEnergy has assessed other FASB issuances of new standards not described below based upon the current expectation that such
new standards will not significantly impact FirstEnergy's financial reporting.
ASU 2022-03, "Fair Value Measurements of Equity Securities Subject to Contractual Sale Restrictions " (Issued in June 2022): ASU 2022-03 clarifies current
guidance in Topic 820, Fair Value Measurement, when measuring the fair value of an equity security subject to contractual restrictions that prohibit the sale of an
equity security, and introduces new disclosure requirements for those equity securities subject to contractual restrictions. For FirstEnergy, the guidance will be
effective for fiscal years, and interim periods within those fiscal years, beginning after December 15, 2023, with early adoption permitted.
2. REVENUE
FirstEnergy accounts for revenues from contracts with customers under ASC 606, “Revenue from Contracts with Customers.” Revenue from leases, financial
instruments, other contractual rights or obligations and other revenues that are not from contracts with customers are outside the scope of the standard and
accounted for under other existing GAAP.
FirstEnergy has elected to exclude sales taxes and other similar taxes collected on behalf of third parties from revenue as prescribed in the standard. As a result,
tax collections and remittances are excluded from recognition in the income statement and instead recorded through the balance sheet. Excise and gross
receipts taxes that are assessed on FirstEnergy are not subject to the election and are included in revenue. FirstEnergy has elected the optional invoice practical
expedient for most of its revenues and utilizes the optional short-term contract exemption for transmission revenues due to the annual establishment of revenue
requirements, which eliminates the need to provide certain revenue disclosures regarding unsatisfied performance obligations.
FirstEnergy’s revenues are primarily derived from electric service provided by the Utilities and Transmission Companies.
The following represents a disaggregation of revenue from contracts with customers for the three and six months ended June 30, 2022 and 2021:
For the Three Months Ended June 30, 2022
Revenues by Type of Service
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling Adjustments Total
(In millions)
Distribution services 	$ 	1,216 $ 	— $ 	(28) $ 	1,188
Retail generation 	999 	— 	(17) 	982
Wholesale sales 	159 	— 	8 	167
Transmission 	— 	440 	— 	440
Other 	29 	— 	— 	29
Total revenues from contracts with customers 	$ 	2,403 $ 	440 $ 	(37) $ 	2,806
Other revenue unrelated to contracts with customers 	23 	1 	(12) 	12
Total revenues 	$ 	2,426 $ 	441 $ 	(49) $ 	2,818
Includes eliminations and reconciling adjustments of inter-segment revenues.
(1)
(1)
9

-- 17 of 98 --

For the Three Months Ended June 30, 2021
Revenues by Type of Service
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling Adjustments Total
(In millions)
Distribution services 	$ 	1,304 $ 	— $ 	(26) $ 	1,278
Retail generation 	831 	— 	(13) 	818
Wholesale sales 	74 	— 	3 	77
Transmission 	— 	411 	— 	411
Other 	26 	— 	— 	26
Total revenues from contracts with customers 	$ 	2,235 $ 	411 $ 	(36) $ 	2,610
Other revenue unrelated to contracts with customers 	23 	8 	(19) 	12
Total revenues 	$ 	2,258 $ 	419 $ 	(55) $ 	2,622
Includes eliminations and reconciling adjustments of inter-segment revenues.
For the Six Months Ended June 30, 2022
Revenues by Type of Service
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling Adjustments Total
(In millions)
Distribution services 	$ 	2,564 $ 	— $ 	(56) $ 	2,508
Retail generation 	2,093 	— 	(34) 	2,059
Wholesale sales 	249 	— 	14 	263
Transmission 	— 	891 	— 	891
Other 	55 	— 	— 	55
Total revenues from contracts with customers 	$ 	4,961 $ 	891 $ 	(76) $ 	5,776
Other revenue unrelated to contracts with customers 	54 	3 	(26) 	31
Total revenues 	$ 	5,015 $ 	894 $ 	(102) $ 	5,807
Includes eliminations and reconciling adjustments of inter-segment revenues.
For the Six Months Ended June 30, 2021
Revenues by Type of Service
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling Adjustments Total
(In millions)
Distribution services 	$ 	2,643 $ 	— $ 	(52) $ 	2,591
Retail generation 	1,766 	— 	(25) 	1,741
Wholesale sales 	143 	— 	7 	150
Transmission 	— 	812 	— 	812
Other 	59 	— 	— 	59
Total revenues from contracts with customers 	$ 	4,611 $ 	812 $ 	(70) $ 	5,353
ARP 	(27) 	— 	(27)
Other revenue unrelated to contracts with customers 	44 	12 	(34) 	22
Total revenues 	$ 	4,628 $ 	824 $ 	(104) $ 	5,348
Includes eliminations and reconciling adjustments of inter-segment revenues.
Reflects amount the Ohio Companies refunded to customers that was previously collected under decoupling mechanisms, with interest. See Note 7, “Regulatory Matters,” for
further discussion on Ohio decoupling rates.
(1)
(1)
(1)
(1)
(1)
(2)
(1)
(2)
10

-- 18 of 98 --

Other revenue unrelated to contracts with customers includes revenue from late payment charges of $9 million for both the three months ended June 30, 2022
and 2021, respectively. Other revenue unrelated to contracts with customers also includes revenue from derivatives of $2 million for both the three months
ended June 30, 2022 and 2021, respectively.
Other revenue unrelated to contracts with customers includes revenue from late payment charges of $19 million and $18 million for the six months ended
June 30, 2022 and 2021, respectively. Other revenue unrelated to contracts with customers also includes revenue from derivatives of $11 million and $2 million
for the six months ended June 30, 2022 and 2021, respectively.
Regulated Distribution
The Regulated Distribution segment distributes electricity through FirstEnergy’s ten utility operating companies and also controls 3,580 MWs of regulated
electric generation capacity located primarily in West Virginia and Virginia. Each of the Utilities earns revenue from state-regulated rate tariffs under which it
provides distribution services to residential, commercial and industrial customers in its service territory. The Utilities are obligated under the regulated construct
to deliver power to customers reliably, as it is needed, which creates an implied monthly contract with the end-use customer. See Note 7, “Regulatory Matters,”
for additional information on rate recovery mechanisms. Distribution and electric revenues are recognized over time as electricity is distributed and delivered to
the customer and the customers consume the electricity immediately as delivery occurs.
Retail generation sales relate to POLR, SOS, SSO and default service requirements in Ohio, Pennsylvania, New Jersey and Maryland, as well as generation
sales in West Virginia that are regulated by the WVPSC. Certain of the Utilities have default service obligations to provide power to non-shopping customers who
have elected to continue to receive service under regulated retail tariffs. The volume of these sales varies depending on the level of shopping that occurs. Supply
plans vary by state and by service territory. Default service for the Ohio Companies, Pennsylvania Companies, JCP&L and PE’s Maryland jurisdiction are
provided through a competitive procurement process approved by each state’s respective commission. Retail generation revenues are recognized over time as
electricity is delivered and consumed immediately by the customer.
The following table represents a disaggregation of the Regulated Distribution segment revenue from contracts with distribution service and retail generation
customers for the three and six months ended June 30, 2022 and 2021, by class:
For the Three Months Ended June 30, 	For the Six Months Ended June 30,
Revenues by Customer Class 	2022 	2021 	2022 	2021
(In millions)
Residential 	$ 	1,310 $ 	1,287 $ 	2,852 $ 	2,744
Commercial 	575 	562 	1,172 	1,103
Industrial 	312 	268 	595 	526
Other 	18 	18 	38 	36
Total Revenues 	$ 	2,215 $ 	2,135 $ 	4,657 $ 	4,409
Wholesale sales primarily consist of generation and capacity sales into the PJM market from FirstEnergy’s regulated electric generation capacity and NUGs.
Certain of the Utilities may also purchase power in the PJM markets to supply power to their customers. Generally, these power sales from generation and
purchases to serve load are netted hourly and reported as either revenues or purchased power on the Consolidated Statements of Income based on whether the
entity was a net seller or buyer each hour. Capacity revenues are recognized ratably over the PJM planning year at prices cleared in the annual PJM Reliability
Pricing Model Base Residual Auction and Incremental Auctions. Capacity purchases and sales through PJM capacity auctions are reported within revenues on
the Consolidated Statements of Income. Certain capacity income (bonuses) and charges (penalties) related to the availability of units that have cleared in the
auctions are unknown and not recorded in revenue until, and unless, they occur.
The Utilities’ distribution customers are metered on a cycle basis. An estimate of unbilled revenues is calculated to recognize electric service provided from the
last meter reading through the end of the month. This estimate includes many factors, among which are historical customer usage, load profiles, estimated
weather impacts, customer shopping activity and prices in effect for each class of customer. In each accounting period, the Utilities accrue the estimated unbilled
amount as revenue and reverse the related prior period estimate. Customer payments vary by state but are generally due within 30 days.
ASC 606 excludes industry-specific accounting guidance for recognizing revenue from ARPs as these programs represent contracts between the utility and its
regulators, as opposed to customers. Therefore, revenues from these programs are not within the scope of ASC 606 and regulated utilities are permitted to
continue to recognize such revenues in accordance with existing practice but are presented separately from revenue arising from contracts with customers.
FirstEnergy had ARPs in Ohio and has reflected refunds of decoupling revenue owed to customers as reductions to ARPs in 2021. Please see Note 7,
“Regulatory Matters,” for further discussion on decoupling revenues in Ohio.
11

-- 19 of 98 --

Regulated Transmission
The Regulated Transmission segment provides transmission infrastructure owned and operated by the Transmission Companies and certain of FirstEnergy's
utilities (JCP&L, MP, PE and WP) to transmit electricity from generation sources to distribution facilities. The segment's revenues are derived from forward-
looking formula rates. See Note 7, “Regulatory Matters,” for additional information.
Forward-looking formula rates recover costs that the regulatory agencies determine are permitted to be recovered and provide a return on transmission capital
investment. Under forward-looking formula rates, the revenue requirement is updated annually based on a projected rate base and projected costs, which is
subject to an annual true-up based on actual costs. Revenues and cash receipts for the stand-ready obligation of providing transmission service are recognized
ratably over time.
The following table represents a disaggregation of revenue from contracts with regulated transmission customers for the three and six months ended June 30,
2022 and 2021, by transmission owner:
For the Three Months Ended June 30, 	For the Six Months Ended June 30,
Transmission Owner 	2022 	2021 	2022 	2021
(In millions)
ATSI 	$ 	217 $ 	193 $ 	434 $ 	398
TrAIL 	64 	57 	127 	117
MAIT 	77 	80 	156 	147
JCP&L 	46 	46 	106 	85
MP, PE and WP 	36 	35 	68 	65
Total Revenues 	$ 	440 $ 	411 $ 	891 $ 	812
3. EARNINGS PER SHARE
EPS is calculated by dividing earnings attributable to FE by the weighted average number of common shares outstanding.
Basic EPS is computed using the weighted average number of common shares outstanding during the relevant period as the denominator. The denominator for
diluted EPS of common stock reflects the weighted average of common shares outstanding plus the potential additional common shares that could result if
dilutive securities and other agreements to issue common stock were exercised.
Diluted EPS reflects the dilutive effect of potential common shares from share-based awards. The dilutive effect of outstanding share-based awards was
computed using the treasury stock method, which assumes any proceeds that could be obtained upon the exercise of the award would be used to purchase
common stock at the average market price for the period.
The following table reconciles basic and diluted EPS attributable to FE:
For the Three Months Ended
June 30,
For the Six Months Ended June
30,
Reconciliation of Basic and Diluted EPS 	2022 	2021 	2022 	2021
(In millions, except per share amounts)
Earnings attributable to FE 	$ 	187 $ 	58 $ 	475 $ 	393
Share count information:
Weighted average number of basic shares outstanding 	571 	544 	571 	544
Assumed exercise of dilutive stock options and awards 	1 	1 	1 	1
Weighted average number of diluted shares outstanding 	$ 	572 $ 	545 $ 	572 $ 	545
EPS Attributable to FE:
Basic EPS 	$ 	0.33 $ 	0.11 $ 	0.83 $ 	0.72
Diluted EPS 	$ 	0.33 $ 	0.11 $ 	0.83 $ 	0.72
For the three and six months ended June 30, 2022 and 2021, no shares from stock options and awards were excluded from the calculation of diluted shares
outstanding, as their inclusion would have been antidilutive.
12

-- 20 of 98 --

4. PENSION AND OTHER POST-EMPLOYMENT BENEFITS
The components of FirstEnergy’s net periodic benefit costs (credits) for pension and OPEB were as follows:
Components of Net Periodic Benefit Costs (Credits) 	Pension 	OPEB
For the Three Months Ended June 30, 	2022 	2021 	2022 	2021
(In millions)
Service costs 	$ 	46 $ 	48 $ 	1 $ 	1
Interest costs 	68 	57 	2 	2
Expected return on plan assets 	(164) 	(163) 	(10) 	(7)
Amortization of prior service costs (credits) 	— 	1 	(2) 	(5)
Net periodic benefit credits 	$ 	(50) $ 	(57) $ 	(9) $ 	(9)
Net periodic benefit credits, net of amounts capitalized 	$ 	(72) $ 	(85) $ 	(10) $ 	(10)
The income tax benefits associated with pension and OPEB prior service costs amortized out of AOCI were $1 million for the three months ended June 30, 2021.
Components of Net Periodic Benefit Costs (Credits) 	Pension 	OPEB
For the Six Months Ended June 30, 	2022 	2021 	2022 	2021
(In millions)
Service costs 	$ 	92 	97 	2 	2
Interest costs 	136 	113 	5 	5
Expected return on plan assets 	(328) 	(326) 	(20) 	(17)
Amortization or prior service costs (credits) 	1 	2 	(5) 	(9)
Net periodic benefit credits 	$ 	(99) $ 	(114) $ 	(18) $ 	(19)
Net periodic benefit credits, net of amounts capitalized 	$ 	(141) $ 	(163) $ 	(19) $ 	(20)
The income tax benefits associated with the pension and OPEB prior service costs amortized out of AOCI were $1 million and $2 million for the six months ended June 30, 2022
and 2021, respectively.
On March 11, 2021, President Biden signed into law the American Rescue Plan Act of 2021, which among other things, extended shortfall amortization periods
and modification of the interest rate stabilization rules for single-employer plans thereby impacting funding requirements. As a result, FirstEnergy does not
currently expect to have a required contribution to the pension plan based on various assumptions, including annual expected rate of returns for assets of 7.5%.
However, FirstEnergy may elect to contribute to the pension plan voluntarily.
Service costs, net of capitalization, are reported within Other operating expenses on FirstEnergy’s Consolidated Statements of Income. Non-service costs, other
than the pension and OPEB mark-to-market adjustment, which is separately shown, are reported within Miscellaneous income, net, within Other Income
(Expense) on FirstEnergy’s Consolidated Statements of Income.
5. INCOME TAXES
FirstEnergy’s interim effective tax rates reflect the estimated annual effective tax rates for 2022 and 2021. These tax rates are affected by estimated annual
permanent items, such as AFUDC equity and other flow-through items, as well as discrete items that may occur in any given period but are not consistent from
period to period.
FirstEnergy’s effective tax rate for the three months ended June 30, 2022 and 2021, was 20.3% and 62.3%, respectively. The decrease in effective tax rate was
primarily due to the non-deductibility of the DPA monetary penalty and the remeasurement of West Virginia deferred income taxes resulting from a state tax law
change, as well as additional benefits in 2022 from flow-through items and amortization of excess deferred taxes.
FirstEnergy’s effective tax rate for the six months ended June 30, 2022 and 2021, was 21.6% and 31.8%, respectively. The decrease in effective tax rate was
primarily due to the non-deductibility of the DPA monetary penalty and remeasurement of West Virginia deferred income taxes resulting from a state law change,
as well as additional benefits in 2022 from flow-through items and amortization of excess deferred taxes, partially offset by a $14 million net tax benefit for
federal tax credits claimed in 2021.
In February 2022, the IRS completed its examination of FirstEnergy’s 2020 federal income tax return and issued a Full Acceptance Letter with no adjustment to
FirstEnergy’s taxable income.
(1)
(1)
(1)
(1)
13

-- 21 of 98 --

There was no material change to FirstEnergy’s reserve for uncertain tax positions for the six months ended June 30, 2022, and it remains reasonably possible
that approximately $31 million of unrecognized tax benefits may be resolved in the next twelve months as a result of settlements with taxing authorities or the
statute of limitations expiring, of which $24 million would ultimately affect FirstEnergy’s effective tax rate.
On July 8, 2022, Pennsylvania’s governor signed into law a reduction to the corporate net income tax rate to be phased in over nine years from the current
9.99% to 4.99% by 2031. FirstEnergy is currently evaluating the impacts of the law change for its subsidiaries that do business in Pennsylvania.
6. FAIR VALUE MEASUREMENTS
RECURRING FAIR VALUE MEASUREMENTS
Authoritative accounting guidance establishes a fair value hierarchy that prioritizes the inputs used to measure fair value. This hierarchy gives the highest priority
to Level 1 measurements and the lowest priority to Level 3 measurements. The three levels of the fair value hierarchy and a description of the valuation
techniques are as follows:
Level 1 	- Quoted prices for identical instruments in active market.
Level 2 	- Quoted prices for similar instruments in active market.
- Quoted prices for identical or similar instruments in markets that are not active.
- Model-derived valuations for which all significant inputs are observable market data.
Models are primarily industry-standard models that consider various assumptions, including quoted forward prices for commodities, time value,
volatility factors and current market and contractual prices for the underlying instruments, as well as other relevant economic measures.
Level 3 	- Valuation inputs are unobservable and significant to the fair value measurement.
FirstEnergy produces a long-term power and capacity price forecast annually with periodic updates as market conditions change. When
underlying prices are not observable, prices from the long-term price forecast are used to measure fair value.
FTRs are financial instruments that entitle the holder to a stream of revenues (or charges) based on the hourly day-ahead congestion price
differences across transmission paths. FTRs are acquired by FirstEnergy in the annual, monthly and long-term PJM auctions and are initially
recorded using the auction clearing price less cost. After initial recognition, FTRs’ carrying values are periodically adjusted to fair value using a
mark-to-model methodology, which approximates market. The primary inputs into the model, which are generally less observable than objective
sources, are the most recent PJM auction clearing prices and the FTRs’ remaining hours. The model calculates the fair value by multiplying the
most recent auction clearing price by the remaining FTR hours less the prorated FTR cost. Significant increases or decreases in inputs in
isolation may have resulted in a higher or lower fair value measurement.
FirstEnergy primarily applies the market approach for recurring fair value measurements using the best information available. Accordingly, FirstEnergy
maximizes the use of observable inputs and minimizes the use of unobservable inputs. There were no changes in valuation methodologies used as of June 30,
2022, from those used as of December 31, 2021. The determination of the fair value measures takes into consideration various factors, including but not limited
to, nonperformance risk, counterparty credit risk and the impact of credit enhancements (such as cash deposits, LOCs and priority interests). The impact of
these forms of risk was not significant to the fair value measurements.
14

-- 22 of 98 --

The following tables set forth the recurring assets and liabilities that are accounted for at fair value by level within the fair value hierarchy:
June 30, 2022 	December 31, 2021
Level 1 	Level 2 	Level 3 	Total 	Level 1 	Level 2 	Level 3 	Total
Assets 	(In millions)
Derivative assets FTRs 	$ 	— $ 	— $ 	12 $ 	12 $ 	— $ 	— $ 	9 $ 	9
Equity securities 	2 	— 	— 	2 	2 	— 	— 	2
U.S. state debt securities 	— 	263 	— 	263 	— 	273 	— 	273
Cash, cash equivalents and restricted cash 	532 	— 	— 	532 	1,511 	— 	— 	1,511
Other 	— 	38 	— 	38 	— 	42 	— 	42
Total assets 	$ 	534 $ 	301 $ 	12 $ 	847 $ 1,513 $ 	315 $ 	9 $ 	1,837
Liabilities
Derivative liabilities FTRs 	$ 	— $ 	— $ 	(5) $ 	(5) $ 	— $ 	— $ 	(1) $ 	(1)
Total liabilities 	$ 	— $ 	— $ 	(5) $ 	(5) $ 	— $ 	— $ 	(1) $ 	(1)
Net assets 	$ 	534 $ 	301 $ 	7 $ 	842 $ 1,513 $ 	315 $ 	8 $ 	1,836
Contracts are subject to regulatory accounting treatment and changes in market values do not impact earnings.
Restricted cash of $54 million and $49 million as of June 30, 2022 and December 31, 2021, respectively, primarily relates to cash collected from MP, PE and the Ohio
Companies’ customers that is specifically used to service debt of their respective securitization or funding companies.
Primarily consists of short-term investments.
Level 3 Quantitative Information
The following table provides quantitative information for FTRs contracts that are classified as Level 3 in the fair value hierarchy for the period ended June 30,
2022:
Fair Value, Net (In
millions)
Valuation
Technique 	Significant Input 	Range 	Weighted Average 	Units
FTRs 	$ 	7 	Model 	RTO auction clearing prices 	$ 1.40 to $ 5.80 	$2.90 	Dollars/MWH
INVESTMENTS
All temporary cash investments purchased with an initial maturity of three months or less are reported as cash equivalents on the Consolidated Balance Sheets
at cost, which approximates their fair market value. Investments other than cash and cash equivalents include equity securities, AFS debt securities and other
investments. FirstEnergy has no debt securities held for trading purposes.
Generally, unrealized gains and losses on equity securities are recognized in income whereas unrealized gains and losses on AFS debt securities are
recognized in AOCI. However, the spent nuclear fuel disposal trusts of JCP&L are subject to regulatory accounting with all gains and losses on equity and AFS
debt securities offset against regulatory assets.
Spent Nuclear Fuel Disposal Trusts
JCP&L holds debt securities within the spent nuclear fuel disposal trust, which are classified as AFS securities, recognized at fair market value. The trust is
intended for funding spent nuclear fuel disposal fees to the United States Department of Energy associated with the previously owned Oyster Creek and TMI-1
nuclear power plants.
The following table summarizes the amortized cost basis, unrealized gains, unrealized losses and fair values of investments held in spent nuclear fuel disposal
trusts as of June 30, 2022, and December 31, 2021:
June 30, 2022 	December 31, 2021
Cost Basis
Unrealized
Gains
Unrealized
Losses 	Fair Value 	Cost Basis
Unrealized
Gains
Unrealized
Losses 	Fair Value
(In millions)
Debt securities 	$ 	289 $ 	— $ 	(26) $ 	263 $ 	280 $ 	2 $ 	(9) $ 	273
Excludes short-term cash investments of $6 million.
Excludes short-term cash investments of $11 million.
(1)
(2)
(3)
(1)
(1)
(2)
(3)
(1) 	(2)
(1)
(2)
15

-- 23 of 98 --

Proceeds from the sale of investments in AFS debt securities, realized gains and losses on those sales and interest and dividend income for the three and six
months ended June 30, 2022 and 2021, were as follows:
For the Three Months Ended June
30,
For the Six Months Ended June
30,
2022 	2021 	2022 	2021
(In millions)
Sale proceeds 	$ 	10 $ 	8 $ 	16 $ 	13
Realized gains 	1 	— 	1 	—
Realized losses 	(1) 	(1) 	(2) 	(1)
Interest and dividend income 	3 	2 	6 	5
Other Investments
Other investments include employee benefit trusts, which are primarily invested in corporate-owned life insurance policies and equity method investments. Other
investments were $357 million and $371 million as of June 30, 2022, and December 31, 2021, respectively, and are excluded from the amounts reported above.
For the three months ended June 30, 2022 and 2021, pre-tax income (expense) related to corporate-owned life insurance policies were $(16) million and
$6 million, respectively, and $(22) million and $8 million for the six months ended June 30, 2022 and 2021, respectively. Corporate-owned life insurance policies
are valued using the cash surrender value and any changes in value during the period are recognized as income or expense.
FEV holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations
with coal sales primarily focused on international markets. FEV is not the primary beneficiary of the joint venture. FEV's ownership interest is subject to the
equity method of accounting. As of June 30, 2022 and December 31, 2021, the carrying value of the equity method investment was $65 million and $59 million,
respectively. FEV’s pre-tax equity earnings in Global Holding are included in Corporate/Other for segment reporting and within Miscellaneous income, net on the
Consolidated Statements of Income, and were $64 million and $4 million for the three months ended June 30, 2022 and 2021, respectively, and $76 million and
$4 million for the six months ended June 30, 2022 and 2021, respectively. During the second quarter of 2022, FEV received cash dividends from Global Holding
totaling $70 million, which were classified with Cash from Operating Activities on the Consolidated Statements of Cash Flow.
LONG-TERM DEBT AND OTHER LONG-TERM OBLIGATIONS
All borrowings with initial maturities of less than one year are defined as short-term financial instruments under GAAP and are reported as Short-term borrowings
on the Consolidated Balance Sheets at cost. Since these borrowings are short-term in nature, FirstEnergy believes that their costs approximate their fair market
value. The following table provides the approximate fair value and related carrying amounts of long-term debt, which excludes finance lease obligations and net
unamortized debt issuance costs, unamortized fair value adjustments, premiums and discounts as of June 30, 2022 and December 31, 2021:
June 30, 2022 	December 31, 2021
(In millions)
Carrying value 	$ 	21,201 $ 	23,946
Fair value 	$ 	20,048 $ 	27,043
The fair values of long-term debt and other long-term obligations reflect the present value of the cash outflows relating to those securities based on the current
call price, the yield to maturity or the yield to call, as deemed appropriate at the end of each respective period. The yields assumed were based on securities with
similar characteristics offered by corporations with credit ratings similar to those of FirstEnergy. FirstEnergy classified short-term borrowings, long-term debt and
other long-term obligations as Level 2 in the fair value hierarchy as of June 30, 2022, and December 31, 2021.
In December 2021, FE provided notice of redemption for all remaining $850 million of its 2023 Notes, which was completed on January 20, 2022, with a make-
whole premium of approximately $38 million ($30 million after-tax).
On January 27, 2022, TE instructed its indenture trustee to provide notice of partial redemption for $25 million of TE’s 2.65% Senior Secured Notes, due 2028,
for partial redemption which occurred on February 11, 2022.
On February 11, 2022, CEI instructed its indenture trustee to provide notice of redemption for all remaining $150 million of CEI’s 2.77% Senior Notes, Series A,
due 2034, for redemption which occurred on March 14, 2022.
On April 15, 2022, WP redeemed $100 million of its 3.34% FMBs that became due.
16

-- 24 of 98 --

On April 22, 2022, Penn agreed to sell $150 million of new 3.79% FMBs due December 1, 2032. The sales are expected to settle on November 29, 2022.
Proceeds are expected to be used to repay short-term borrowings.
On May 23, 2022, notice of redemption was provided for all remaining $500 million of FE's 2.85% Notes, due July 15, 2022, which was completed on June 22,
2022.
On May 25, 2022, FE commenced an offer to purchase for cash a portion of its 2031 Notes and 2047 Notes, which had $1.5 billion and $1 billion principal
amounts outstanding, respectively. Approximately $715 million principal amount of FE’s 2031 Notes and $284 million principal amount of FE’s 2047 Notes were
redeemed on June 15, 2022 for approximately $1.1 billion, including a tender premium of approximately $101 million ($80 million after-tax). In addition, FE
recognized approximately $7 million ($5 million after-tax) of deferred cash flow hedge losses and $10 million ($8 million after-tax) in other unamortized debt
costs and fees associated with the FE debt redemptions.
On June 30, 2022, Penn redeemed $100 million of its 6.09% FMBs that became due.
7. REGULATORY MATTERS
STATE REGULATION
Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in
Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York
by the NYPSC. The transmission operations of PE in Virginia, ATSI in Ohio, and the Transmission Companies in Pennsylvania are subject to certain regulations
of the VSCC, PUCO and PPUC, respectively. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if
not acceptable to the utility. Further, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission facilities, depending on
the state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission facility.
MARYLAND
PE operates under MDPSC approved base rates that were effective as of March 23, 2019. PE also provides SOS pursuant to a combination of settlement
agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths
through periodic auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have
expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS. PE expects to file a
new base rate case in early 2023, consistent with the MDPSC’s order issued on March 22, 2019.
The EmPOWER Maryland program requires each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal
of 2% annual savings, for the duration of the 2021-2023 EmPOWER Maryland program cycles to the extent the MDPSC determines that cost-effective programs
and services are available. PE's approved 2021-2023 EmPOWER Maryland plan continues and expands upon prior years' programs for a projected total
investment of approximately $148 million over the three-year period. PE recovers program investments with a return through an annually reconciled surcharge,
with most costs subject to recovery over a five-year period with a return on the unamortized balance. Maryland law only allows for the utility to recover lost
distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date, such recovery has not
been sought or obtained by PE.
NEW JERSEY
JCP&L operates under NJBPU approved rates that took effect as of January 1, 2021, and were effective for customers as of November 1, 2021. JCP&L provides
BGS for retail customers who do not choose a third-party EGS and for customers of third-party EGSs that fail to provide the contracted service. All New Jersey
EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.
JCP&L has instituted energy efficiency and peak demand reduction programs in accordance with the New Jersey Clean Energy Act as approved by the NJBPU
in April 2021. The NJBPU approved plans include recovery of lost revenues resulting from the programs and a three-year plan including total program costs of
$203 million, of which $158 million of investment is recovered over a ten-year amortization period with a return as well as operations and maintenance expenses
and financing costs of $45 million recovered on an annual basis.
In December 2017, the NJBPU issued proposed rules to modify its current CTA policy in base rate cases to: (i) calculate savings using a five-year look back from
the beginning of the test year; (ii) allocate savings with 75% retained by the company and 25% allocated to customers; and (iii) exclude transmission assets of
electric distribution companies in the savings calculation. On January 17, 2019, the NJBPU approved the proposed CTA rules with no changes. On May 17,
2019, the NJ Rate Counsel filed an appeal with the Appellate Division of the Superior Court of New Jersey and on June 7, 2021, the Superior Court issued an
order reversing the NJBPU’s CTA rules and remanded the case back to the NJBPU. Specifically, the Court’s ruling requires
17

-- 25 of 98 --

100% of the CTA savings to be credited to customers in lieu of the NJBPU’s current policy requiring 25%. On December 6, 2021, the NJBPU issued proposed
amended rules modifying its current CTA policy in base rate cases consistent with the Superior Court’s June 7, 2021 order. Comments were filed on March 3,
2022. Once the proposed rules are final, they will be applied on a prospective basis in a future base rate case, however, it is not expected to have a material
adverse effect on FirstEnergy’s results or financial condition.
On October 28, 2020, the NJBPU approved a stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for distribution base rate
increase. The settlement provided for a $94 million annual base distribution revenues increase for JCP&L based on an ROE of 9.6%, which became effective for
customers on November 1, 2021. The settlement additionally provided that JCP&L would be subject to a management audit, which began in May 2021 and is
currently ongoing. FirstEnergy is unable to predict the outcome of the management audit.
On September 14, 2021, JCP&L submitted a supplemental filing with the NJBPU to revise a previously filed AMI Program, which proposed the deployment of
approximately 1.2 million advanced meters. Under the revised AMI Program, during the first six years of the AMI Program from 2022 through 2027, JCP&L
estimates costs of $494 million, consisting of capital investments of approximately $390 million, incremental operations and maintenance expenses of
approximately $73 million and cost of removal of $31 million. On February 8, 2022, JCP&L filed with the NJBPU a stipulation entered into with the NJBPU staff,
NJ Rate Counsel and others, that, pending NJBPU approval, would affirm the terms of the revised AMI Program. The Stipulation, which was approved by NJBPU
order on February 23, 2022, also provides that the revised AMI Program-related capital costs, the legacy meter stranded costs, and the operations and
maintenance expense will be deferred and placed in regulatory assets, with such amounts sought to be recovered in the JCP&L’s subsequent base rate cases.
On July 2, 2020, the NJBPU issued an order allowing New Jersey utilities to track and create a regulatory asset for future recovery of all prudently incurred
incremental costs arising from the COVID-19 pandemic beginning March 9, 2020 and continuing until the New Jersey Governor issues an order stating that the
COVID-19 pandemic is no longer in effect. New Jersey utilities can request recovery of such regulatory asset in a stand-alone COVID-19 regulatory asset filing
or future base rate case. On October 28, 2020, the NJBPU issued an order expanding the scope of the proceeding to examine all pandemic issues, including
recovery of the COVID-19 regulatory assets, by way of a generic proceeding. Through various executive orders issued by the New Jersey Governor, the
moratorium period was extended to December 31, 2021. On December 21, 2021, the moratorium on residential disconnections for certain entities providing
utility service was extended until March 15, 2022. The moratorium on residential disconnections was not extended for investor-owned electric utilities such as
JCP&L, but does require that investor-owned electric public utilities offer qualifying residential customers deferred payment arrangements meeting certain
minimum criteria prior to disconnecting service. Additionally, while the moratorium on residential disconnections for certain entities providing electric service was
not extended after March 15, 2022, new legislation was enacted on March 25, 2022, prohibiting utilities from disconnecting electric service to customers that
have applied for utility bill assistance before June 15, 2022 until such time as the state agency administering the assistance program makes a decision on the
application and further requiring that all utilities offer a deferred payment arrangement meeting certain minimum criteria after the state agency’s decision on the
application has been made.
Pursuant to an NJBPU order requiring all New Jersey electric distribution companies to file electric vehicle programs, JCP&L filed its program on March 1, 2021.
JCP&L’s proposed electric vehicle program consisted of six sub-programs, including a consumer education and outreach initiative that would begin on January
1, 2022, and continue over a four-year period. On May 2, 2022, JCP&L filed with the NJBPU a stipulation entered into with the NJBPU staff, NJ Rate Counsel
and others that provided a total budget of approximately $40 million for JCP&L’s electric vehicle program, including investments of approximately $29 million and
operations and maintenance expenses of approximately $11 million. Electric vehicle related capital and operations and maintenance costs shall be deferred and
placed in separate regulatory assets for recovery in JCP&L’s next base rate case. The stipulation was approved without modification by the NJBPU on June 8,
2022.
OHIO
The Ohio Companies operate under PUCO-approved base distribution rates that became effective in 2009. The Ohio Companies currently operate under ESP
IV, effective June 1, 2016 and continuing through May 31, 2024, that continues the supply of power to non-shopping customers at a market-based price set
through an auction process. ESP IV also continues the Rider DCR, which supports continued investment related to the distribution system for the benefit of
customers, with increased revenue caps of $20 million per year from June 1, 2019 through May 31, 2022; and $15 million per year from June 1, 2022 through
May 31, 2024. In addition, ESP IV includes: (1) continuation of a base distribution rate freeze through May 31, 2024; (2) a goal across FirstEnergy to reduce CO
emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $51 million to: (a) fund energy conservation programs, economic development and
job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service territories to assist low-income
customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio.
On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to open an
investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or
violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On December 30, 2020, in response to the OCC's motion, the PUCO reopened
the DMR audit docket,
2
18

-- 26 of 98 --

and directed PUCO staff to solicit a third-party auditor and conduct a full review of the DMR to ensure funds collected from customers through the DMR were
only used for the purposes established in ESP IV. On June 2, 2021, the PUCO selected an auditor and the auditor filed the final audit report on January 14,
2022, which made certain findings and recommendations. The report found that spending of DMR revenues was not required to be tracked, and that DMR
revenues, like all rider revenues, are placed into the regulated money pool as a matter of routine, where the funds lose their identity. Therefore, the report could
not suggest that DMR funds were used definitively for direct or indirect support for grid modernization. The report also concluded that there was no documented
evidence that ties revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR funds to support the
passage of HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio Companies adopt formal
dividend policies. Final comments and responses were filed by parties in April and May 2022, respectively.
On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the
subsequent referendum effort, and directing the Ohio Companies to show cause, demonstrating that the costs of any political or charitable spending in support of
HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers. The Ohio Companies initially filed
a response stating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or
indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a supplemental response explaining that, in light of the facts set forth in the
DPA and the findings of the Rider DCR audit report further discussed below, political or charitable spending in support of HB 6, or the subsequent referendum
effort, affected pole attachment rates paid by approximately $15 thousand. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an
independent external audit to investigate FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and
oversee the auditor. In November and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental
responses to the PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show
cause demonstration submitted by the Ohio Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6 or the
subsequent referendum effort was not included, directly or indirectly, in any rates or charges paid by ratepayers. The auditor’s final report is due by December
16, 2022.
In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on November 4,
2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement made on October 29, 2020,
as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates with corporate separation laws and the Ohio
Companies’ corporate separation plan. The additional audit is for the period from November 2016 through October 2020. The final audit report was filed on
September 13, 2021. The audit report makes no findings of major non-compliance with Ohio corporate separation requirements, minor non-compliance with
eight requirements, and findings of compliance with 23 requirements. Parties filed comments and reply comments on the audit report, and a PUCO attorney
examiner is expected to schedule an evidentiary hearing.
In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related
charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-
related charges the Ohio Companies collect. Instead, the Ohio Companies are further required by HB 6 to remit all the OVEC-related charges they collect to
non-FE Ohio electric distribution utilities. The Ohio Companies contested the motions, which are pending before the PUCO.
On November 1, 2021, the Ohio Companies, together with the OCC, PUCO Staff, and several other signatories, entered into an Ohio Stipulation with the intent
of resolving the ongoing energy efficiency rider audits, various SEET proceedings, including the Ohio Companies’ 2017 SEET proceeding, and the Ohio
Companies’ quadrennial ESP review, each of which was pending before the PUCO. Specifically, the Ohio Stipulation provides that the Ohio Companies’ current
ESP IV passes the required statutory test for their prospective SEET review as part of the Quadrennial Review of ESP IV, and except for limited circumstances,
the signatory parties have agreed not to challenge the Ohio Companies’ SEET return on equity calculation methodology for their 2021-2024 SEET proceedings.
The Ohio Stipulation additionally affirms that: (i) the Ohio Companies’ ESP IV shall continue through its previously authorized term of May 31, 2024; and (ii) the
Ohio Companies will file their next base rate case in May 2024, and further, no signatory party will seek to adjust the Ohio Companies’ base distribution rates
before that time, except in limited circumstances. The Ohio Companies further agreed to refund $96 million to customers in connection with the 2017-2019 SEET
cases, and to provide $210 million in future rate reductions for all customers, including $80 million in 2022, $60 million in 2023, $45 million in 2024, and $25
million in 2025. The PUCO approved the 2017-2019 SEET refunds and 2022 rate reductions on December 1, 2021, and refunds began in December 2021.
Future rate reductions are recognized as a reduction to regulated distribution segment’s revenue in the Consolidated Statements of Income as they are provided
to the Ohio Companies’ customers.
In connection with an ongoing annual audit of the Ohio Companies’ Rider DCR for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K for the year
ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a review of certain
transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether funds collected from customers
were used to pay the vendors, and if so, whether or not the funds associated with those payments should be returned to customers through Rider DCR or
through
19

-- 27 of 98 --

an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase of the audit, and the parties submitted comments and reply
comments on this audit report in October 2021. Additionally, on September 29, 2021, the PUCO expanded the scope of the audit in this proceeding to determine
if the costs of the naming rights for FirstEnergy Stadium have been recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its
final report, in which the auditor concluded that the FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15,
2021, the PUCO further expanded the scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’
ESP IV settlement proceedings, but stayed its expansion of the audit until otherwise ordered by the PUCO.
On May 16, 2022, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2021, which
demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings.
On July 15, 2022, the Ohio Companies filed an application with the PUCO for approval of phase two of their distribution grid modernization plan that would,
among other things, provide for the installation of an additional 700,000 smart meters, distribution automation equipment on 240 distribution circuits, voltage
regulating equipment on 220 distribution circuits, and other investments and pilot programs in related technologies designed to provide enhanced customer
benefits. The Ohio Companies propose that phase two will be implemented over a four-year budget period with estimated capital investments of $626 million and
operations and maintenance expenses of $144 million over the deployment period. Under the proposal, costs of phase two of the grid modernization plan would
be recovered through the Ohio Companies’ AMI rider, pursuant to the terms and conditions approved in ESP IV.
See Note 8, “Commitments, Guarantees and Contingencies” below for additional details on the government investigations and subsequent litigation surrounding
the investigation of HB 6.
PENNSYLVANIA
The Pennsylvania Companies operate under rates approved by the PPUC, effective as of January 27, 2017. On November 18, 2021, the PPUC issued orders to
each of the Pennsylvania Companies directing they operate under DSPs for the June 1, 2019 through May 31, 2023 delivery period, which DSPs provide for the
competitive procurement of generation supply for customers who do not receive service from an alternative EGS. Under the 2019-2023 DSPs, supply will be
provided by wholesale suppliers through a mix of 3, 12 and 24-month energy contracts, as well as two RFPs for 2-year SREC contracts for ME, PN and Penn.
On December 14, 2021, the Pennsylvania Companies filed proposed DSPs for provision of generation for the June 1, 2023 through May 31, 2027 delivery
period, to be sourced through competitive procurements for customers who do not receive service from an alternative EGS. An evidentiary hearing was held on
April 13, 2022, and on April 20, 2022, the parties filed a partial settlement with the PPUC resolving certain of the issues in the proceeding and setting aside the
remainder of the issues to be resolved through briefing. On June 29, 2022, the PPUC recommended approval of the settlement without modification and granted
the Pennsylvania Companies’ position on the remaining issues that had been reserved for briefing. Final PPUC approval is expected by September 2022. Under
the 2023-2027 DSPs, supply is proposed to be provided through a mix of 12 and 24-month energy contracts, as well as long-term solar PPAs.
In March 2018, the PPUC approved adjusted customer rates of the Pennsylvania Companies to reflect the net impact of the Tax Act. As a result, the
Pennsylvania Companies established riders that, beginning July 1, 2018, refunded to customers tax savings attributable to the Tax Act as compared to the
amounts established in their most recent base rate proceedings on a current and going forward basis. The amounts recorded as savings for the total period of
January 1 through June 30, 2018, were tracked and were to be addressed for treatment in a future proceeding. On May 17, 2021, the Pennsylvania Companies
filed petitions with the PPUC proposing to refund the net savings for the January through June 2018 period to customers beginning January 1, 2022. On
November 18, 2021, the PPUC approved the Pennsylvania Companies' proposed refunds, but also revised a previous methodology for calculating the net tax
savings, which resulted in additional tax savings attributable to the Tax Act to be refunded to customers and directed the Pennsylvania Companies to file new
petitions to propose the timing and methodology to provide these additional refunds to customers. The Pennsylvania Companies recalculated the net impact for
2018 through 2021 under the revised PPUC methodology in comparison to amounts already refunded to customers under the existing riders, which resulted in
an additional $61 million in savings, with interest, to be provided to customers. As a result, FirstEnergy recognized a pre-tax charge of $61 million in the fourth
quarter of 2021, associated with the additional refund and based on the November 2021 PPUC order and methodology. The Pennsylvania Companies filed
petitions to propose the timing and methodology of the refund of these amounts on February 17, 2022. The Pennsylvania Companies’ petitions and the proposed
refunds addressed within were approved by the PPUC on June 16, 2022 without modification, effective July 1, 2022, and are expected to be refunded by the end
of the year.
Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, Pennsylvania EDCs implement energy efficiency and peak demand reduction programs. On June
18, 2020, the PPUC entered a Final Implementation Order for a Phase IV EE&C Plan, operating from June 2021 through May 2026. The Final Implementation
Order set demand reduction targets, relative to 2007 to 2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for WP;
and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWH for ME, 3.0%
MWH
20

-- 28 of 98 --

for PN, 2.7% MWH for Penn, and 2.4% MWH for WP. The Pennsylvania Companies’ Phase IV plans were approved by PPUC without modification on March 25,
2021.
Pennsylvania EDCs are permitted to seek PPUC approval of an LTIIP for infrastructure improvements and costs related to highway relocation projects, after
which a DSIC may be approved to recover LTIIP costs. On January 16, 2020, the PPUC approved the Pennsylvania Companies’ LTIIPs for the five-year period
beginning January 1, 2020 and ending December 31, 2024 for a total capital investment of approximately $572 million for certain infrastructure improvement
initiatives. On June 25, 2021, the Pennsylvania OCA filed a complaint against Penn’s quarterly DSIC rate, disputing the recoverability of the Companies’
automated distribution management system investment under the DSIC mechanism. On January 26, 2022, the parties filed a joint petition for settlement that
resolves all issues in this matter, which was approved by the PPUC without modification on April 14, 2022.
Following the Pennsylvania Companies’ 2016 base rate proceedings, the PPUC ruled in a separate proceeding related to the DSIC mechanisms that the
Pennsylvania Companies were not required to reflect federal and state income tax deductions related to DSIC-eligible property in DSIC rates. The decision was
appealed to the Pennsylvania Supreme Court and in July 2021 the court upheld the Pennsylvania Commonwealth Court’s reversal of the PPUC’s decision and
remanded the matter back to the PPUC for determination as to how DSIC calculations shall account for ADIT and state taxes. The matter awaits further action by
the PPUC. The adverse ruling by the Pennsylvania Supreme Court is not expected to result in a material impact to FirstEnergy.
WEST VIRGINIA
MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates that
became effective in February 2015. MP and PE recover net power supply costs, including fuel costs, purchased power costs and related expenses, net of
related market sales revenue through the ENEC. MP’s and PE’s ENEC rate is updated annually.
On December 30, 2020, MP and PE filed with the WVPSC a determination of the rate impact of the Tax Act with respect to ADIT. The filing proposed an annual
revenue reduction of $2.6 million, effective January 1, 2022, with reconciliation and any resulting adjustments incorporated into annual ENEC proceedings. On
August 12, 2021, a unanimous settlement was reached with all the parties agreeing to a $7.7 million rate reduction beginning January 1, 2022, with a true-up in
the ENEC proceeding each year. On November 30, 2021, the WVPSC approved the settlement on all terms, except for the proposed effective date of the rate
reduction, which was held in abeyance until further notice.
On August 27, 2021, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates of $19.6 million beginning January 1,
2022, which represented a 1.5% increase to the rates currently in effect. WVPSC issued an order on December 29, 2021, granting the requested $19.6 million
increase in ENEC rates. Among other things, the order requires MP and PE to refund to its large industrial customers their respective portion of the $7.7 million
rate reduction discussed above and also requires MP and PE to negotiate a PPA for its capacity shortfall and a reasonable reserve margin if certain conditions
are met. By order dated March 2, 2022, the WVPSC reopened the case to determine whether rates should be increased to recover growing ENEC under-
recoveries. On May 17, 2022, the WVPSC issued an order approving an interim rate increase of $94 million, effective for customer rates on May 18, 2022,
subject to a prudence review during MP and PE’s 2022 ENEC case.
On December 3, 2021 and on December 27, 2021, the WVPSC approved settlements granting MP and PE a $16 million increase in rates effective January 1,
2022, and permitting the continuation of the vegetation management program and surcharge for another two years. WVPSC additionally ordered MP and PE to
perform equipment inspections within a reasonable time after vegetation management occurs on a circuit.
On November 22, 2021, MP and PE filed with the WVPSC their plan to construct 50 MWs of solar generation at five sites in West Virginia. The plan includes a
tariff to offer solar power to West Virginia customers and cost recovery for MP and PE from other customers through a surcharge for any solar investment not
fully subscribed by their customers. A hearing was held in mid-March 2022 and on April 21, 2022, the WVPSC issued an order approving, effective May 1, 2022,
the requested tariff and requiring MP and PE to subscribe at least 85% of the planned 50 MWs before commencing construction. MP and PE must seek
separate approval from the WVPSC to recover any solar generation costs in excess of the approved tariff. The first solar generation site is expected to be in-
service by the end of 2023 and all construction completed at the other sites no later than the end of 2025 at a total investment cost of approximately $100
million.
On December 17, 2021, MP and PE filed with the WVPSC for approval of environmental compliance projects at the Ft. Martin and Harrison Power Stations to
comply with the EPA’s ELG and operate these plants beyond 2028. The request includes a surcharge to recover the expected $142 million capital investment
and $3 million in annual operation and maintenance expense. A hearing has been set in August 2022, with a ruling from the WVPSC expected in the fall of 2022.
If approved, construction would be expected to be completed by the end of 2025. See Note 8, “Commitments, Guarantees and Contingencies - Environmental
Matters - Clean Water Act" below, for additional details on the EPA's ELG.
21

-- 29 of 98 --

FERC REGULATORY MATTERS
Under the FPA, FERC regulates rates for interstate wholesale sales and transmission of electric power, regulatory accounting and reporting under the Uniform
System of Accounts, and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and rates, the
Utilities, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE, WP and the Transmission
Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP, PE, WP and the
Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under the PJM
Tariff.
FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates
upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Utilities and AE Supply each
have been authorized by FERC to sell wholesale power in interstate commerce at market-based rates and have a market-based rate tariff on file with FERC,
although in the case of the Utilities major wholesale purchases remain subject to review and regulation by the relevant state commissions.
Federally enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements
on the Utilities, AE Supply, and the Transmission Companies. NERC is the ERO designated by FERC to establish and enforce these reliability standards,
although NERC has delegated day-to-day implementation and enforcement of these reliability standards to six regional entities, including RFC. All of the facilities
that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise
monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and
enforced by RFC.
FirstEnergy believes that it is in material compliance with all currently effective and enforceable reliability standards. Nevertheless, in the course of operating its
extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the
reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the
specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to
refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability
standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities, that could have
a material adverse effect on its financial condition, results of operations, and cash flows.
FERC Audit
FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s
compliance with certain accounting and reporting requirements under various FERC regulations. On February 4, 2022, FERC filed the final audit report for the
period of January 1, 2015 through September 30, 2021, which included several findings and recommendations. FirstEnergy has accepted the findings and
recommendations of the final audit report. The audit report included a finding and related recommendation that FirstEnergy may have used an inappropriate
methodology for allocation of certain costs to regulatory capital accounts under certain FERC regulations and reporting. As such, FirstEnergy is currently
performing an analysis of these costs and how it impacted certain wholesale transmission customer rates. FirstEnergy is unable to predict or estimate the final
outcome of this analysis and audit, however, it could result in refunds, with interest, to certain wholesale transmission customers and/or write-offs of previously
capitalized costs if they are determined to be nonrecoverable.
ATSI Transmission Formula Rate
On May 1, 2020, ATSI filed amendments to its formula rate to recover regulatory assets for certain costs that ATSI incurred as a result of its 2011 move from
MISO to PJM, certain costs allocated to ATSI by FERC for transmission projects that were constructed by other MISO transmission owners, and certain costs for
transmission-related vegetation management programs. A portion of these costs would have been charged to the Ohio Companies. Additionally, ATSI proposed
certain income tax-related adjustments and certain tariff changes addressing the revenue credit components of the formula rate template. On June 30, 2020,
FERC issued an initial order accepting the tariff amendments subject to refund and setting the matter for hearing and settlement proceedings. ATSI and the
parties to the FERC proceeding subsequently were able to reach settlement, and on October 14, 2021, filed the settlement with FERC. As a result of the filed
settlement, FirstEnergy recognized a $21 million pre-tax charge during the third quarter of 2021, which reflects the difference between amounts originally
recorded as regulatory assets and amounts which will ultimately be recovered as a result of the pending settlement. From a segment perspective, during the
third quarter of 2021, the Regulated Transmission segment recorded a pre-tax charge of $48 million and the Regulated Distribution segment recognized a $27
million reduction to a reserve previously recorded in 2010. In addition, the settlement provides for partial recovery of future incurred costs allocated to ATSI by
MISO for the above-referenced transmission projects that were constructed by other MISO transmission owners, which is not expected to have a material impact
on FirstEnergy or ATSI. The uncontested settlement was approved by FERC on March 24, 2022 without modification. ATSI’s compliance filing to implement the
terms of the settlement was accepted by FERC without modification on June 23, 2022.
22

-- 30 of 98 --

FERC Actions on the Tax Act
On March 15, 2018, FERC initiated proceedings on the question of how to address possible changes to ADIT and bonus depreciation as a result of the Tax Act.
Such possible changes could impact FERC-jurisdictional rates, including transmission rates. On November 21, 2019, FERC issued a final rule (Order No. 864).
Order No. 864 requires utilities with transmission formula rates to update their formula rate templates to include mechanisms to: (i) deduct any excess ADIT from
or add any deficient ADIT to their rate base; (ii) raise or lower their income tax allowances by any amortized excess or deficient ADIT; and (iii) incorporate a new
permanent worksheet into their rates that will annually track information related to excess or deficient ADIT. Per FERC directives, ATSI submitted its compliance
filing on May 1, 2020. MAIT submitted its compliance filing on June 1, 2020. On November 18, 2021, FERC issued an order that: (i) accepted ATSI’s proposed
tariff amendments to its rate base adjustment mechanism, effective January 27, 2020; (ii) directed ATSI to make a further compliance filing by January 17, 2022;
and (iii) set the amount of ATSI’s recorded ADIT balances as of December 31, 2017, for hearing and settlement procedures. ATSI submitted the compliance
filing, and is participating in settlement negotiations. On December 3, 2021, FERC issued an order that (i) accepted MAIT’s proposed tariff amendments to its
rate base adjustment mechanism, effective January 27, 2020; (ii) directed MAIT to make a further compliance filing by February 1, 2022; and (iii) set the amount
of MAIT’s recorded ADIT balances as of December 31, 2017 for hearing and settlement procedures. MAIT submitted the compliance filing, and is participating in
settlement negotiations. On May 15, 2020, TrAIL submitted its compliance filing and on June 1, 2020, PATH submitted its required compliance filing. On May 4,
2021, FERC staff requested additional information about PATH’s proposed rate base adjustment mechanism, and PATH submitted the requested information on
June 3, 2021. On July 12, 2021, FERC staff requested additional information about TrAIL’s proposed rate base adjustment mechanism. TrAIL filed its response
on August 6, 2021. On March 31, 2022, FERC issued an order, ruling that TrAIL’s compliance filing partially complied with the requirements of Order No. 864 and
directing TrAIL to submit a further compliance filing to address certain additional items that according to FERC will further enhance transparency. TrAIL submitted
the compliance filing on May 31, 2022. On April 27, 2022, FERC issued an order on PATH’s compliance filing, ruling that it partially complied with the
requirements of Order No. 864 and directing PATH to submit a further compliance filing to address certain additional items. PATH submitted the compliance filing
on June 27, 2022. MP, WP and PE (as holders of a “stated” transmission rate when Order No. 864 issued) are addressing these requirements in the
transmission formula rates amendments that were filed on October 29, 2020, and which have been accepted by FERC effective January 1, 2021, subject to
refund, pending further hearing and settlement procedures. MP, WP and PE are engaged in settlement negotiations with the parties to the transmission formula
rate amendments proceeding.
ATSI ROE – Ohio Consumers Counsel v. ATSI, et al.
On February 24, 2022, the OCC filed a complaint with FERC against ATSI, AEP’s Ohio affiliates and AEPSC, and Duke Energy Ohio, LLC asserting that FERC
should reduce the ROE utilized in the utilities’ transmission formula rates by eliminating the 50 basis point adder associated with RTO membership, effective
February 24, 2022. The OCC contends that this result is required because Ohio law mandates that transmission owning utilities join an RTO and that the 50
basis point adder is applicable only where RTO membership is voluntary. ATSI disagrees with the OCC’s characterization and set forth its reasons for such
disagreement in a combined motion to dismiss and answer that was filed with FERC on March 31, 2022. On that same date, AEP and Duke filed separate
motions to dismiss and answers to the OCC complaint, and several other parties filed comments. ATSI filed a response to certain intervenors’ filings on April 28,
2022. FirstEnergy is unable to predict the outcome of this proceeding, but it is not expected to have a material impact.
Transmission ROE Methodology
On March 20, 2020, FERC initiated a rulemaking proceeding on the transmission rate incentives provisions of Section 219 of the 2005 Energy Policy Act.
FirstEnergy submitted comments through EEI and as part of a consortium of PJM Transmission Owners. In a supplemental rulemaking proceeding that was
initiated on April 15, 2021, FERC requested comments on, among other things, whether to require utilities that have been members of an RTO for three years or
more and that have been collecting an “RTO membership” ROE incentive adder to file tariff updates that would terminate collection of the incentive adder. Initial
comments on the proposed rule were filed on June 25, 2021, and reply comments were filed on July 26, 2021. The rulemaking remains pending before FERC.
FirstEnergy is a member of PJM and its transmission subsidiaries could be affected by the supplemental proposed rule. FirstEnergy participated in comments on
the supplemental rulemaking that were submitted by a group of PJM transmission owners and by various industry trade groups. If there were to be any changes
to FirstEnergy transmission incentive ROE, such changes will be applied on a prospective basis.
Allegheny Power Zone Transmission Formula Rate Filings
On October 29, 2020, MP, PE and WP filed tariff amendments with FERC to implement a forward-looking formula transmission rate, to be effective January 1,
2021. In addition, on October 30, 2020, KATCo filed a proposed new tariff to establish a forward-looking formula rate and requested that the new rate become
effective January 1, 2021. In its filing, KATCo explained that while it currently owns no transmission assets, it may build new transmission facilities in the
Allegheny zone, and that it may seek required state and federal authorizations to acquire transmission assets from PE and WP by January 1, 2022. These
transmission rate filings were accepted for filing by FERC on December 31, 2020, effective January 1, 2021, subject to refund, pending further hearing and
settlement procedures and were consolidated into a single proceeding. MP, PE and WP, and KATCo
23

-- 31 of 98 --

are engaged in settlement negotiations with the other parties to the formula rate proceedings.
8. COMMITMENTS, GUARANTEES AND CONTINGENCIES
GUARANTEES AND OTHER ASSURANCES
FirstEnergy has various financial and performance guarantees and indemnifications, which are issued in the normal course of business. These contracts include
performance guarantees, stand-by letters of credit, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate
commercial transactions with third parties by enhancing the value of the transaction to the third party.
As of June 30, 2022, outstanding guarantees and other assurances aggregated approximately $1.1 billion, consisting of parental guarantees on behalf of its
consolidated subsidiaries ($595 million) and other assurances ($457 million).
COLLATERAL AND CONTINGENT-RELATED FEATURES
In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity,
energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted
in the form of cash or credit support with thresholds contingent upon FE’s or its subsidiaries’ credit rating from each of the major credit rating agencies. The
collateral and credit support requirements vary by contract and by counterparty.
As of June 30, 2022, $53 million of collateral has been posted by FE or its subsidiaries and is included in Prepaid taxes and other current assets on
FirstEnergy’s Consolidated Balance Sheets. FE or its subsidiaries are holding $360 million of cash collateral as of June 30, 2022, from certain generation
suppliers, primarily due to the rise in power prices, and such amount is included in Other current liabilities on FirstEnergy’s Consolidated Balance Sheets.
These credit-risk-related contingent features stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent
contractual collateral obligations as of June 30, 2022:
Potential Collateral Obligations
Utilities and
Transmission
Companies FE 	Total
(In millions)
Contractual Obligations for Additional Collateral
Upon Further Downgrade 	$ 	52 $ 	— $ 	52
Surety Bonds (Collateralized Amount) 	57 	249 	306
Total Exposure from Contractual Obligations 	$ 	109 $ 	249 $ 	358
Surety Bonds are not tied to a credit rating. Surety Bonds’ impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond
except with the respect to $39 million of surety bond obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days
to cure.
ENVIRONMENTAL MATTERS
Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality, hazardous and solid waste disposal, and other environmental
matters. While FirstEnergy’s environmental policies and procedures are designed to achieve compliance with applicable environmental laws and regulations,
such laws and regulations are subject to periodic review and potential revision by the implementing agencies. FirstEnergy cannot predict the timing or ultimate
outcome of any of these reviews or how any future actions taken as a result thereof may materially impact its business, results of operations, cash flows and
financial condition.
Clean Air Act
FirstEnergy complies with SO and NOx emission reduction requirements under the CAA and SIP(s) by burning lower-sulfur fuel, utilizing combustion controls
and post-combustion controls and/or using emission allowances.
CSAPR requires reductions of NOx and SO emissions in two phases (2015 and 2017), ultimately capping SO emissions in affected states to 2.4 million tons
annually and NOx emissions to 1.2 million tons annually. CSAPR allows trading of NOx and SO emission allowances between power plants located in the same
state and interstate trading of NOx and SO emission allowances with some restrictions. On July 28, 2015, the D.C. Circuit ordered the EPA to reconsider the
CSAPR caps on NOx and SO emissions from power plants in 13 states, including West Virginia. This followed the 2014 U.S. Supreme Court ruling generally
upholding the EPA’s regulatory approach under CSAPR but questioning whether the EPA required upwind states to reduce emissions by more than their
contribution to air pollution in downwind states. The EPA issued a CSAPR Update on
(1)
(1)
2
2 	2
2
2
2
24

-- 32 of 98 --

September 7, 2016, reducing summertime NOx emissions from power plants in 22 states in the eastern U.S., including West Virginia, beginning in 2017. Various
states and other stakeholders appealed the CSAPR Update to the D.C. Circuit in November and December 2016. On September 13, 2019, the D.C. Circuit
remanded the CSAPR Update to the EPA citing that the rule did not eliminate upwind states’ significant contributions to downwind states’ air quality attainment
requirements within applicable attainment deadlines.
Also in March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NOx emissions from nine states (including West Virginia)
significantly contribute to New York’s inability to attain the ozone NAAQS. The petition sought suitable emission rate limits for large stationary sources that are
allegedly affecting New York’s air quality within the three years allowed by CAA Section 126. On September 20, 2019, the EPA denied New York’s CAA Section
126 petition. On October 29, 2019, the State of New York appealed the denial of its petition to the D.C. Circuit. On July 14, 2020, the D.C. Circuit reversed and
remanded the New York petition to the EPA for further consideration. On March 15, 2021, the EPA issued a revised CSAPR Update that addresses, among other
things, the remands of the prior CSAPR Update and the New York Section 126 petition. In December 2021, MP purchased NOx emissions allowances to comply
with 2021 ozone season requirements. On April 6, 2022, the EPA published proposed rules seeking to impose further significant reductions in EGU NO
emissions in 25 states, including West Virginia. The EPA held a virtual public hearing regarding the proposed rules on April 21, 2022, and MP and PE submitted
written comments on June 21, 2022. Depending on the outcome of any appeals and how the EPA and the states ultimately implement the revised CSAPR
Update, the future cost of compliance may materially impact FirstEnergy’s operations, cash flows and financial condition.
Climate Change
There are several initiatives to reduce GHG emissions at the state, federal and international level. Certain northeastern states are participating in the RGGI and
western states led by California, have implemented programs, primarily cap and trade mechanisms, to control emissions of certain GHGs. Additional policies
reducing GHG emissions, such as demand reduction programs, renewable portfolio standards and renewable subsidies have been implemented across the
nation.
In September 2016, the U.S. joined in adopting the agreement reached on December 12, 2015, at the United Nations Framework Convention on Climate
Change meetings in Paris to reduce GHGs. The Paris Agreement’s non-binding obligations to limit global warming to below two degrees Celsius became
effective on November 4, 2016. On June 1, 2017, the Trump Administration announced that the U.S. would cease all participation in the Paris Agreement. On
January 20, 2021, President Biden signed an executive order re-adopting the agreement on behalf of the U.S. In November 2020, FirstEnergy published its
Climate Story which includes its climate position and strategy, as well as a new comprehensive and ambitious GHG emission goal. FirstEnergy pledged to
achieve carbon neutrality by 2050 and set an interim goal for a 30% reduction in GHGs within FirstEnergy’s direct operational control by 2030, based on 2019
levels. Future resource plans to achieve carbon reductions, including any determination of retirement dates of the regulated coal-fired generation, will be
developed by working collaboratively with regulators in West Virginia. Determination of the useful life of the regulated coal-fired generation could result in
changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale, impairment, or regulatory disallowances. If MP is
unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial condition, results of operations, and cash flow.
Furthermore, FirstEnergy cannot currently estimate the financial impact of climate change policies, although potential legislative or regulatory programs
restricting CO emissions, or litigation alleging damages from GHG emissions, could require material capital and other expenditures or result in changes to its
operations.
In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for GHGs under the Clean Air Act,” concluding that
concentrations of several key GHGs constitute an “endangerment” and may be regulated as “air pollutants” under the CAA and mandated measurement and
reporting of GHG emissions from certain sources, including electric generating plants. Subsequently, the EPA released its final CPP regulations in August 2015
to reduce CO emissions from existing fossil fuel-fired EGUs and finalized separate regulations imposing CO emission limits for new, modified, and
reconstructed fossil fuel-fired EGUs. Numerous states and private parties filed appeals and motions to stay the CPP with the D.C. Circuit in October 2015. On
February 9, 2016, the U.S. Supreme Court stayed the rule during the pendency of the challenges to the D.C. Circuit and U.S. Supreme Court. On March 28,
2017, an executive order, entitled “Promoting Energy Independence and Economic Growth,” instructed the EPA to review the CPP and related rules addressing
GHG emissions and suspend, revise or rescind the rules if appropriate. On June 19, 2019, the EPA repealed the CPP and replaced it with the ACE rule that
established guidelines for states to develop standards of performance to address GHG emissions from existing coal-fired generation. On January 19, 2021, the
D.C. Circuit vacated and remanded the ACE rule declaring that the EPA was “arbitrary and capricious” in its rule making and, as such, the ACE rule is no longer
in effect and all actions thus far taken by states to implement the federally mandated rule are now null and void. Vacating the ACE Rule had the unintended
effect of reinstating the CPP because the repeal of the CPP was a provision within the ACE Rule. The D.C. Circuit decision was appealed by several states and
interested parties, including West Virginia, arguing that the EPA did not have the authorization under Section 111(d) of the Clean Air Act to require “generation
shifting” as a way to limit GHGs. On June 30, 2022, the U.S. Supreme Court held that the EPA’s regulation of GHGs under Section 111(d) of the Clean Air Act
was not authorized by Congress and remanded the Rule to the EPA for further reconsideration.
x
2
2 	2
25

-- 33 of 98 --

Clean Water Act
Various water quality regulations, the majority of which are the result of the federal CWA and its amendments, apply to FirstEnergy’s facilities. In addition, the
states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.
On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic,
mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations
were to phase-in as permits are renewed on a five-year cycle from 2018 to 2023. However, on April 13, 2017, the EPA granted a Petition for Reconsideration and
on September 18, 2017, the EPA postponed certain compliance deadlines for two years. On August 31, 2020, the EPA issued a final rule revising the effluent
limits for discharges from wet scrubber systems, retaining the zero-discharge standard for ash transport water, (with some limited discharge allowances), and
extending the deadline for compliance to December 31, 2025 for both. In addition, the EPA allows for less stringent limits for sub-categories of generating units
based on capacity utilization, flow volume from the scrubber system, and unit retirement date. The EPA is reconsidering the ELG rule with a publicly announced
target of issuing a proposed revised rule in the Fall of 2022 and a final rule by the Spring of 2023. In the interim, the rule issued on August 31, 2020, remains in
effect. Depending on the outcome of appeals and how final rules are ultimately implemented, the compliance with these standards, could require additional
capital expenditures or changes in operations at Ft. Martin and Harrison power stations from what was filed with the WVPSC in December 2021 that seeks
approval of environmental compliance projects to comply with the EPA’s 2020 ELG Rule.
Regulation of Waste Disposal
Federal and state hazardous waste regulations have been promulgated as a result of the RCRA, as amended, and the Toxic Substances Control Act. Certain
CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the need for future regulation.
In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity
design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to
assure the safe disposal of CCRs from electric generating plants. On September 13, 2017, the EPA announced that it would reconsider certain provisions of the
final regulations. On July 29, 2020, the EPA published a final rule again revising the date that certain CCR impoundments must cease accepting waste and
initiate closure to April 11, 2021. The final rule also allows for an extension of the closure deadline based on meeting proscribed site-specific criteria. On
November 30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the closure date of McElroy's Run CCR
impoundment facility until 2024, which request is pending technical review by the EPA. AE Supply continues to operate McElroy’s Run as a disposal facility for
FG’s Pleasants Power Station.
FE or its subsidiaries have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the CERCLA. Allegations of
disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that
all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are considered probable have been
recognized on the Consolidated Balance Sheets as of June 30, 2022, based on estimates of the total costs of cleanup, FirstEnergy’s proportionate responsibility
for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $103 million have been accrued through June 30, 2022,
of which, approximately $65 million are for environmental remediation of former MGP and gas holder facilities in New Jersey, which are being recovered by
JCP&L through a non-bypassable SBC. FE or its subsidiaries could be found potentially responsible for additional amounts or additional sites, but the loss or
range of losses cannot be determined or reasonably estimated at this time.
OTHER LEGAL PROCEEDINGS
United States v. Larry Householder, et al.
On July 21, 2020, a complaint and supporting affidavit containing federal criminal allegations were unsealed against the now former Ohio House Speaker Larry
Householder and other individuals and entities allegedly affiliated with Mr. Householder. Also, on July 21, 2020, and in connection with the investigation,
FirstEnergy received subpoenas for records from the U.S. Attorney’s Office for the S.D. Ohio. FirstEnergy was not aware of the criminal allegations, affidavit or
subpoenas before July 21, 2020.
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves this matter. Under the DPA, FE
has agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The DPA requires that
FirstEnergy, among other obligations: (i) continue to cooperate with the U.S. Attorney’s Office in all matters relating to the conduct described in the DPA and
other conduct under investigation by the U.S. government; (ii) pay a criminal monetary penalty totaling $230 million within sixty days, which shall consist of (x)
$115 million paid by FE to the United States Treasury and (y) $115 million paid by FE to the ODSA to fund certain assistance programs, as determined by the
ODSA, for the benefit of low-income Ohio electric utility customers; (iii) publish a list of all payments made in 2021 to either 501(c)(4) entities or to entities known
by FirstEnergy to be operating for the benefit of a public
26

-- 34 of 98 --

official, either directly or indirectly, and update the same on a quarterly basis during the term of the DPA; (iv) issue a public statement, as dictated in the DPA,
regarding FE’s use of 501(c)(4) entities; and (v) continue to implement and review its compliance and ethics program, internal controls, policies and procedures
designed, implemented and enforced to prevent and detect violations of the U.S. laws throughout its operations, and to take certain related remedial measures.
The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers nor will FirstEnergy seek any tax deduction related to such
payment. The entire amount of the monetary penalty was recognized as expense in the second quarter of 2021 and paid in the third quarter of 2021. Under the
terms of the DPA, the criminal information will be dismissed after FirstEnergy fully complies with its obligations under the DPA.
Legal Proceedings Relating to United States v. Larry Householder, et al.
On August 10, 2020, the SEC, through its Division of Enforcement, issued an order directing an investigation of possible securities laws violations by FE, and on
September 1, 2020, issued subpoenas to FE and certain FE officers. On April 28, 2021, and July 11, 2022, the SEC issued additional subpoenas to FE. While no
contingency has been reflected in its consolidated financial statements, FE believes that it is probable that it will incur a loss in connection with the resolution of
the SEC investigation. Given the ongoing nature and complexity of the review, inquiries and investigations, FE cannot yet reasonably estimate a loss or range of
loss that may arise from the resolution of the SEC investigation.
In addition to the subpoenas referenced above under “—United States v. Larry Householder, et. al.” and the SEC investigation, certain FE stockholders and
FirstEnergy customers filed several lawsuits against FirstEnergy and certain current and former directors, officers and other employees, and the complaints in
each of these suits is related to allegations in the complaint and supporting affidavit relating to HB 6 and the now former Ohio House Speaker Larry Householder
and other individuals and entities allegedly affiliated with Mr. Householder. The plaintiffs in each of the below cases seek, among other things, to recover an
unspecified amount of damages (unless otherwise noted). Unless otherwise indicated, no contingency has been reflected in FirstEnergy’s consolidated financial
statements with respect to these lawsuits as a loss is neither probable, nor is a loss or range of a loss reasonably estimable.
• In re FirstEnergy Corp. Securities Litigation (Federal District Court, S.D. Ohio); on July 28, 2020 and August 21, 2020, purported stockholders of FE
filed putative class action lawsuits alleging violations of the federal securities laws. Those actions have been consolidated and a lead plaintiff, the Los
Angeles County Employees Retirement Association, has been appointed by the court. A consolidated complaint was filed on February 26, 2021. The
consolidated complaint alleges, on behalf of a proposed class of persons who purchased FE securities between February 21, 2017 and July 21, 2020,
that FE and certain current or former FE officers violated Sections 10(b) and 20(a) of the Exchange Act by issuing misrepresentations or omissions
concerning FE’s business and results of operations. The consolidated complaint also alleges that FE, certain current or former FE officers and directors,
and a group of underwriters violated Sections 11, 12(a)(2) and 15 of the Securities Act of 1933 as a result of alleged misrepresentations or omissions in
connection with offerings of senior notes by FE in February and June 2020. FE believes that it is probable that it will incur a loss in connection with the
resolution of this lawsuit. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• MFS Series Trust I, et al. v. FirstEnergy Corp., et al. and Brighthouse Funds II – MFS Value Portfolio, et al. v. FirstEnergy Corp., et al. (Federal District
Court, S.D. Ohio) on December 17, 2021 and February 21, 2022, purported stockholders of FE filed complaints against FE, certain current and former
officers, and certain current and former officers of EH. The complaints allege that the defendants violated Sections 10(b) and 20(a) of the Exchange Act
by issuing alleged misrepresentations or omissions regarding FE’s business and its results of operations, and seek the same relief as the In re
FirstEnergy Corp. Securities Litigation described above. FE believes that it is probable that it will incur losses in connection with the resolution of these
lawsuits. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• State of Ohio ex rel. Dave Yost, Ohio Attorney General v. FirstEnergy Corp., et al. and City of Cincinnati and City of Columbus v. FirstEnergy Corp.
(Common Pleas Court, Franklin County, OH, all actions have been consolidated); on September 23, 2020 and October 27, 2020, the OAG and the
cities of Cincinnati and Columbus, respectively, filed complaints against several parties including FE (the OAG also named FES as a defendant), each
alleging civil violations of the Ohio Corrupt Activity Act in connection with the passage of HB 6. On January 13, 2021, the OAG filed a motion for a
temporary restraining order and preliminary injunction against FirstEnergy seeking to enjoin FirstEnergy from collecting the Ohio Companies'
decoupling rider. On January 31, 2021, FE reached a partial settlement with the OAG and the cities of Cincinnati and Columbus with respect to the
temporary restraining order and preliminary injunction request and related issues. In connection with the partial settlement, the Ohio Companies filed an
application on February 1, 2021, with the PUCO to set their respective decoupling riders (CSR) to zero. On February 2, 2021, the PUCO approved the
application of the Ohio Companies setting the rider to zero and no additional customer bills will include new decoupling rider charges after February 8,
2021. The cases are stayed pending final resolution of the United States v. Larry Householder, et al. criminal proceeding described above, although on
August 13, 2021, new defendants were added to the complaint, including two former officers of FirstEnergy. On November 9, 2021, the OAG filed a
motion to lift the agreed-upon stay, which FE opposed on November 19, 2021; the motion remains pending. On December 2, 2021, the cities and FE
entered a stipulated dismissal with prejudice of the cities’ suit.
• Smith v. FirstEnergy Corp. et al., Buldas v. FirstEnergy Corp. et al., and Hudock and Cameo Countertops, Inc. v. FirstEnergy Corp. et al. (Federal
District Court, S.D. Ohio, all actions have been consolidated); on July 27, 2020, July
27

-- 35 of 98 --

31, 2020, and August 5, 2020, respectively, purported customers of FE filed putative class action lawsuits against FE and FESC, as well as certain
current and former FE officers, alleging civil Racketeer Influenced and Corrupt Organizations Act violations and related state law claims. FE agreed to a
class settlement to resolve these claims on April 11, 2022. In the fourth quarter of 2021, FirstEnergy recognized a pre-tax reserve of $37.5 million in the
aggregate with respect to these lawsuits and the Emmons lawsuit below. On June 22, 2022, the court preliminarily approved the class settlement and
scheduled the final fairness hearing for November 9, 2022.
• Emmons v. FirstEnergy Corp. et al. (Common Pleas Court, Cuyahoga County, OH); on August 4, 2020, a purported customer of FirstEnergy filed a
putative class action lawsuit against FE, FESC, the Ohio Companies, along with FES, alleging several causes of action, including negligence and/or
gross negligence, breach of contract, unjust enrichment, and unfair or deceptive consumer acts or practices. FE agreed to a class settlement to resolve
these claims on April 11, 2022. In the fourth quarter of 2021, FirstEnergy recognized a pre-tax reserve of $37.5 million in the aggregate with respect to
this lawsuit and the lawsuits above consolidated with Smith in the S.D. Ohio alleging, among other things, civil violations of the Racketeer Influenced
and Corrupt Organizations Act. On June 22, 2022, the court preliminarily approved the class settlement and scheduled the final fairness hearing for
November 9, 2022.
On February 9, 2022, FE, acting through the SLC, agreed to a settlement term sheet to resolve the following shareholder derivative lawsuits relating to HB 6 and
the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder that were filed in the S.D.
Ohio, the N.D. Ohio, and the Ohio Court of Common Pleas, Summit County:
• Gendrich v. Anderson, et al. and Sloan v. Anderson, et al. (Common Pleas Court, Summit County, OH, all actions have been consolidated); on July 26,
2020 and July 31, 2020, respectively, purported stockholders of FE filed shareholder derivative action lawsuits against certain FE directors and officers,
alleging, among other things, breaches of fiduciary duty.
• Miller v. Anderson, et al. (Federal District Court, N.D. Ohio); Bloom, et al. v. Anderson, et al.; Employees Retirement System of the City of St. Louis v.
Jones, et al.; Electrical Workers Pension Fund, Local 103, I.B.E.W. v. Anderson et al.; Massachusetts Laborers Pension Fund v. Anderson et al.; The
City of Philadelphia Board of Pensions and Retirement v. Anderson et al.; Atherton v. Dowling et al.; Behar v. Anderson, et al. (Federal District Court,
S.D. Ohio, all actions have been consolidated); beginning on August 7, 2020, purported stockholders of FE filed shareholder derivative actions alleging
the FE Board and officers breached their fiduciary duties and committed violations of Section 14(a) of the Exchange Act.
On March 11, 2022, the parties executed a stipulation and agreement of settlement, and filed a motion the same day requesting preliminary settlement approval
in the S.D. Ohio. The settlement agreement, if approved, will fully resolve the shareholder derivative lawsuits above and stipulates a series of corporate
governance enhancements, that has resulted or is expected to result in the following:
• Six members of the FE Board, Messrs. Michael J. Anderson, Donald T. Misheff, Thomas N. Mitchell, Christopher D. Pappas and Luis A. Reyes, and Ms.
Julia L. Johnson did not stand for re-election at FE’s 2022 annual shareholder meeting;
• A special FE Board committee of at least three recently appointed independent directors was formed to initiate a review process of the current senior
executive team. On June 15, 2022, the FE Board appointed Ms. Lisa Winston Hicks and Messrs. Paul Kaleta, Sean T. Klimczak, Jesse A. Lynn, Andrew
Teno, and Melvin D. Williams to serve on that committee. After completing its review, which is expected to conclude not later than mid-September 2022,
the committee will make recommendations to the full FE Board, which retains the authority to make final determinations regarding any such
recommendations;
• The FE Board will oversee FE’s lobbying and political activities, including periodically reviewing and approving political and lobbying action plans
prepared by management;
• An FE Board committee of recently appointed independent directors will oversee the implementation and third-party audits of the FE Board-approved
action plans with respect to political and lobbying activities;
• FE will implement enhanced disclosure to shareholders of political and lobbying activities, including enhanced disclosure in its annual proxy statement;
and
• FE will further align financial incentives of senior executives to proactive compliance with legal and ethical obligations.
The settlement also includes a payment to FE of $180 million, to be paid by insurance after court approval, less any court-ordered attorney’s fees awarded to
plaintiffs. On May 9, 2022, the S.D. Ohio preliminarily approved the settlement and scheduled a final settlement approval hearing for August 4, 2022. Separately,
on June 2, 2022, the N.D. Ohio entered an order to show cause why the court should not appoint new plaintiffs’ counsel, and thereafter, on June 10, 2022, the
parties filed jointly a motion to dismiss the matter without prejudice, which the N.D. Ohio denied on July 5, 2022.
In letters dated January 26, and February 22, 2021, staff of FERC's Division of Investigations notified FirstEnergy that the Division is conducting an investigation
of FirstEnergy’s lobbying and governmental affairs activities concerning HB 6, and staff directed FirstEnergy to preserve and maintain all documents and
information related to the same as such have been developed as part of an ongoing non-public audit being conducted by FERC's Division of Audits and
Accounting. While no contingency has been reflected in the consolidated financial statements, FirstEnergy believes that it is probable that it will incur a loss in
28

-- 36 of 98 --

connection with the resolution of the FERC investigation. Given the ongoing nature and complexity of the review, inquiries and investigations, FirstEnergy cannot
yet reasonably estimate a loss or range of loss that may arise from the resolution of the FERC investigation.
FE terminated Charles E. Jones as its chief executive officer effective October 29, 2020. As a result of Mr. Jones’ termination, and due to the determination of a
committee of independent members of the FE Board that Mr. Jones violated certain FirstEnergy policies and its code of conduct, all grants, awards and
compensation under FirstEnergy’s short-term incentive compensation program and long-term incentive compensation program with respect to Mr. Jones that
were outstanding on the date of termination were forfeited. In November 2021, after a determination by the Compensation Committee of the FE Board that a
demand for recoupment was warranted pursuant to the Recoupment Policy, FE made a recoupment demand to Mr. Jones of compensation previously paid to
Mr. Jones totaling approximately $56 million, the maximum amount permissible under the Recoupment Policy. As such, any amounts payable to Mr. Jones under
the EDCP will be set off against FE’s recoupment demand. There can be no assurance that the efforts to seek recoupment from Mr. Jones will be successful and
the approximately $56 million recoupment demand has not been recognized in FirstEnergy’s financial statements as of June 30, 2022.
The outcome of any of these lawsuits, governmental investigations and audit is uncertain and could have a material adverse effect on FE’s or its subsidiaries’
reputation, business, financial condition, results of operations, liquidity, and cash flows.
Other Legal Matters
There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending
against FE or its subsidiaries. The loss or range of loss in these matters is not expected to be material to FE or its subsidiaries. The other potentially material
items not otherwise discussed above are described under Note 7, “Regulatory Matters.”
FirstEnergy accrues legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of
such costs. In cases where FirstEnergy determines that it is not probable, but reasonably possible that it has a material obligation, it discloses such obligations
and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that FE or its subsidiaries have legal liability or are otherwise
made subject to liability based on any of the matters referenced above, it could have a material adverse effect on FE’s or its subsidiaries’ financial condition,
results of operations, and cash flows.
9. SEGMENT INFORMATION
FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments, Regulated
Distribution and Regulated Transmission. FirstEnergy evaluates segment performance based on Earnings attributable to FE.
The Regulated Distribution segment distributes electricity through FirstEnergy’s ten utility operating companies, serving approximately six million customers
within 65,000 square miles of Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York, and purchases power for its POLR, SOS, SSO and
default service requirements in Ohio, Pennsylvania, New Jersey and Maryland. This segment also controls 3,580 MWs of regulated electric generation capacity
located primarily in West Virginia and Virginia. The segment’s results reflect the costs of securing and delivering electric generation from transmission facilities to
customers, including the deferral and amortization of certain related costs.
On April 6, 2020, JCP&L signed an asset purchase agreement with Yards Creek Energy, LLC, a subsidiary of LS Power to sell its 50% interest in the Yards
Creek pumped-storage hydro generation facility. With the receipt of all required regulatory approvals, the transaction was consummated on March 5, 2021 and
resulted in a $109 million gain within the Regulated Distribution segment in the first quarter of 2021. The gain from the transaction was applied against and
reduced JCP&L’s existing regulatory asset for previously deferred storm costs and, as a result, was offset by expense in the “Amortization (deferral) of regulatory
assets, net”, line on the Consolidated Statements of Income, resulting in no earnings impact to FirstEnergy or JCP&L.
The Regulated Transmission segment provides transmission infrastructure owned and operated by the Transmission Companies and certain of FirstEnergy’s
utilities (JCP&L, MP, PE and WP) to transmit electricity from generation sources to distribution facilities. The segment’s revenues are primarily derived from
forward-looking formula rates. Under forward-looking formula rates, the revenue requirement is updated annually based on a projected rate base and projected
costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the
delivery of electricity on FirstEnergy’s transmission facilities. On November 6, 2021, FirstEnergy, along with FET, entered into the FET P&SA, with Brookfield and
Brookfield Guarantors pursuant to which FET agreed to issue and sell to Brookfield at the closing, and Brookfield agreed to purchase from FET, certain newly
issued membership interests of FET, such that Brookfield will own 19.9% of the issued and outstanding membership interests of FET, for a purchase price of
$2.375 billion. The transaction closed on May 31, 2022. KATCo, which was a subsidiary of FET, became a wholly owned subsidiary of FE prior to the closing of
the transaction and remains in the Regulated Transmission segment.
29

-- 37 of 98 --

Corporate/Other reflects corporate support and other costs not charged or attributable to the Utilities or Transmission Companies, including FE’s retained
Pension and OPEB assets and liabilities of the FES Debtors, interest expense on FE’s holding company debt and other investments or businesses that do not
constitute an operating segment. Reconciling adjustments for the elimination of inter-segment transactions are shown separately in the following table of
Segment Financial Information. As of June 30, 2022, 67 MWs of electric generating capacity, representing AE Supply’s OVEC capacity entitlement, was also
included in Corporate/Other for segment reporting. As of June 30, 2022, Corporate/Other had approximately $5.5 billion of FE holding company debt.
30

-- 38 of 98 --

Financial information for FirstEnergy’s business segments and reconciliations to consolidated amounts is presented below.
Segment Financial Information
Regulated
Distribution
Regulated
Transmission
Corporate/
Other
Reconciling
Adjustments
FirstEnergy
Consolidated
For the Three Months Ended 	(In millions)
June 30, 2022
External revenues 	$ 	2,370 $ 	440 $ 	8 $ 	— $ 	2,818
Internal revenues 	56 	1 	— 	(57) 	—
Total revenues 	$ 	2,426 $ 	441 $ 	8 $ 	(57) $ 	2,818
Depreciation 	242 	87 	1 	18 	348
Deferral of regulatory assets, net 	(127) 	(2) 	— 	— 	(129)
Miscellaneous income (expense), net 	94 	7 	65 	(6) 	160
Interest expense 	128 	55 	88 	(6) 	265
Income taxes (benefits) 	52 	39 	(42) 	— 	49
Net income (loss) 	202 	128 	(138) 	— 	192
Income attributable to noncontrolling interest 	— 	5 	— 	— 	5
Earnings attributable to FE 	202 	123 	(138) 	— 	187
Property additions 	$ 	356 $ 	267 $ 	4 $ 	— $ 	627
June 30, 2021
External revenues 	$ 	2,208 $ 	411 $ 	3 $ 	— $ 	2,622
Internal revenues 	50 	8 	— 	(58) 	—
Total revenues 	$ 	2,258 $ 	419 $ 	3 $ 	(58) $ 	2,622
Depreciation 	229 	77 	1 	16 	323
Amortization of regulatory assets, net 	43 	6 	— 	— 	49
DPA penalty 	— 	— 	230 	— 	230
Miscellaneous income (expense), net 	88 	11 	14 	(5) 	108
Interest expense 	131 	63 	98 	(5) 	287
Income taxes (benefits) 	71 	37 	(12) 	— 	96
Net income (loss) 	274 	116 	(332) 	— 	58
Property additions 	$ 	346 $ 	257 $ 	19 $ 	— $ 	622
For the Six Months Ended
June 30, 2022
External revenues 	$ 	4,902 $ 	891 $ 	14 $ 	— $ 	5,807
Internal revenues 	113 	3 	— 	(116) 	—
Total revenues 	$ 	5,015 $ 	894 $ 	14 $ 	(116) $ 	5,807
Depreciation 	477 	173 	3 	35 	688
Deferral of regulatory assets, net 	(165) 	(1) 	— 	— 	(166)
Miscellaneous income (expense), net 	179 	13 	82 	(8) 	266
Interest expense 	257 	114 	177 	(8) 	540
Income taxes (benefits) 	121 	80 	(69) 	— 	132
Net income (loss) 	467 	253 	(240) 	— 	480
Income attributable to noncontrolling interest 	— 	5 	— 	— 	5
Earnings attributable to FE 	467 	248 	(240) 	— 	475
Property additions 	$ 	673 $ 	464 $ 	10 $ 	— $ 	1,147
June 30, 2021
External revenues 	$ 	4,529 $ 	812 $ 	7 $ 	— $ 	5,348
Internal revenues 	99 	12 	— 	(111) 	—
Total revenues 	$ 	4,628 $ 	824 $ 	7 $ 	(111) $ 	5,348
Depreciation 	455 	158 	2 	31 	646
Amortization of regulatory assets, net 	130 	11 	— 	— 	141
DPA penalty 	— 	— 	230 	— 	230
Miscellaneous income (expense), net 	195 	22 	36 	(10) 	243
Interest expense 	259 	124 	199 	(10) 	572
Income taxes (benefits) 	153 	70 	(40) 	— 	183
Net income (loss) 	587 	225 	(419) 	— 	393
Property additions 	$ 	667 $ 	530 $ 	29 $ 	— $ 	1,226
As of June 30, 2022
Total assets 	$ 	31,133 $ 	13,303 $ 	684 $ 	— $ 	45,120
Total goodwill 	$ 	5,004 $ 	614 $ 	— $ 	— $ 	5,618
As of December 31, 2021
Total assets 	$ 	30,812 $ 	13,237 $ 	1,383 $ 	— $ 	45,432
Total goodwill 	$ 	5,004 $ 	614 $ 	— $ 	— $ 	5,618

-- 39 of 98 --

31

-- 40 of 98 --

ITEM 2. 	Management’s Discussion and Analysis of Financial Condition and Results of Operations
FIRSTENERGY CORP.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF
FINANCIAL CONDITION AND RESULTS OF OPERATIONS
FIRSTENERGY’S BUSINESS
FE and its subsidiaries are principally involved in the transmission, distribution and generation of electricity through its reportable segments, Regulated
Distribution and Regulated Transmission.
The Regulated Distribution segment distributes electricity through FirstEnergy’s ten utility operating companies, serving approximately six million customers
within 65,000 square miles of Ohio, Pennsylvania, West Virginia, Maryland, New Jersey and New York, and purchases power for its POLR, SOS, SSO and
default service requirements in Ohio, Pennsylvania, New Jersey and Maryland. This segment also controls 3,580 MWs of regulated electric generation capacity
located primarily in West Virginia and Virginia. The segment’s results reflect the costs of securing and delivering electric generation from transmission facilities to
customers, including the deferral and amortization of certain related costs.
The Regulated Transmission segment provides transmission infrastructure owned and operated by the Transmission Companies and certain of FirstEnergy’s
utilities (JCP&L, MP, PE and WP) to transmit electricity from generation sources to distribution facilities. The segment’s revenues are primarily derived from
forward-looking formula rates. Under forward-looking formula rates, the revenue requirement is updated annually based on a projected rate base and projected
costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the
delivery of electricity on FirstEnergy’s transmission facilities. On November 6, 2021, FirstEnergy, along with FET, entered into the FET P&SA, with Brookfield and
Brookfield Guarantors pursuant to which FET agreed to issue and sell to Brookfield at the closing, and Brookfield agreed to purchase from FET, certain newly
issued membership interests of FET, such that Brookfield will own 19.9% of the issued and outstanding membership interests of FET, for a purchase price of
$2.375 billion. The transaction closed on May 31, 2022.
Corporate/Other reflects corporate support and other costs not charged or attributable to the Utilities or Transmission Companies, including FE’s retained
Pension and OPEB assets and liabilities of the FES Debtors, interest expense on FE’s holding company debt and other investments or businesses that do not
constitute an operating segment. Additionally, reconciling adjustments for the elimination of inter-segment transactions are included in Corporate/Other. As of
June 30, 2022, 67 MWs of electric generating capacity, representing AE Supply’s OVEC capacity entitlement, was also included in Corporate/Other for segment
reporting. As of June 30, 2022, Corporate/Other had approximately $5.5 billion of FE holding company debt.
32

-- 41 of 98 --

EXECUTIVE SUMMARY
FirstEnergy is a forward-thinking, electric utility centered on integrity, powered by a diverse team of employees, committed to making customers’ lives brighter,
the environment better and our communities stronger.
FirstEnergy's core values encompass what matters most to the company. They guide the decisions we make and the actions we take. FirstEnergy's core values
should inspire our actions today and shine a light on who we aspire to be in the future.
FirstEnergy Core Values:
• Integrity: We always act ethically with honesty, humility and accountability.
• Safety: We keep ourselves and others safe.
• Diversity, Equity and Inclusion: We embrace differences, ensure every employee is treated fairly and create a culture where everyone feels they
belong.
• Performance Excellence: We pursue excellence and seek opportunities for growth, innovation and continuous improvement.
• Stewardship: We positively impact our customers, communities and other stakeholders, and strive to protect the environment.
Employees are encouraged and expected to have conversations with their leaders and peers about the core values and FirstEnergy's commitment to building a
culture centered on integrity.
At FirstEnergy, we are dedicated to staying true to our mission and core values. We understand the impact our company can make in the world around us, which
means pursuing initiatives and goals that align with our foundational principles, support our ESG and strategic priorities, and positively impact our stakeholders.
To solidify our role as an industry leader, we have developed a long-term strategy with priorities that are centered on our mission statement. These priorities
reflect a strong foundation with an unrelenting customer focus that emphasizes modern experiences, new growth and affordable energy bills, and is leading and
enabling the energy transition to a clean, resilient and secure electric grid.
We are proud of the steps we have already taken to demonstrate our commitment to our strategy and look forward to improving our performance and executing
on these strategic priorities.
FirstEnergy's Business
As a fully regulated electric utility, FirstEnergy is focused on stable and predictable earnings and cash flow from its Regulated Distribution and Regulated
Transmission businesses that deliver enhanced customer service and reliability.
FirstEnergy's Regulated Distribution business is comprised of a geographically and regulatory diverse collection of electric utilities delivering customer-focused
sustainable growth. This business operates in a territory of 65,000 square miles, across the Midwest & Mid-Atlantic regions, one of the largest contiguous
territories in the United States, and allows the Utilities to be uniquely positioned for growth through investments that strengthen the grid and enable the clean
energy transition, with approximately $9 billion in investment plans (or 53% of the total FirstEnergy investment plan) from 2021 to 2025. Through its investment
plan, Regulated Distribution has improved reliability and added operating flexibility to the distribution infrastructure, which provide benefits to the customers and
communities those Utilities serve.
In addition to our investments to rebuild critical infrastructure and improve reliability, current and future distribution investment opportunities that support our ESG
and strategic priorities include:
• Advanced Metering Infrastructure – install smart meters and related infrastructure;
• Grid Modernization Investments that support distribution automation and voltage and var optimization;
• Installation of electric vehicle charging stations;
• Connected LED Streetlights – strategic goal to convert 100% of streetlights owned by the Utilities to smart LEDs by 2030;
• Alternative Generation that lowers our carbon footprint;
• Information Systems – enhance our core information infrastructure of our distribution systems; and
• Supporting economic development to attract new business.
FirstEnergy's Regulated Transmission business is a premier, high quality transmission business, with approximately 24,000 miles of transmission lines in
operation and one of the largest transmission systems in PJM. The Transmission Companies and certain
33

-- 42 of 98 --

of FirstEnergy's utilities (JCP&L, MP, PE and WP) are focused on "Energizing the Future" with investments that support clean energy, improve grid reliability and
resiliency and support a carbon neutral future. "Energizing the Future" is the centerpiece of FirstEnergy’s regulated investment strategy with all investments
recovered under FERC-regulated forward-looking formula rates, and approximately $8 billion in investment plans (or 45% of the total FirstEnergy investment
plan) from 2021 to 2025. FirstEnergy believes there are incremental investment opportunities for its existing transmission infrastructure of over $20 billion
beyond those identified through 2025, which are expected to strengthen grid and cyber-security and make the transmission system more reliable, robust, secure
and resistant to extreme weather events, with improved operational flexibility.
In addition to our Energizing the Future investments, current and future transmission investment opportunities that support our ESG and strategic priorities
include:
• Transmission Asset Health Center: real-time monitoring to reduce outages and lower expenses;
• Integrating digital technology to enhance equipment monitoring and lower costs;
• Exploring real-time technologies: emerging technologies to enhance data collection; and
• Making smart investments to modernize the grid to integrate future renewables.
On November 6, 2021, FirstEnergy, along with FET, entered into the FET P&SA with Brookfield and the Brookfield Guarantors, pursuant to which FET agreed to
issue and sell to Brookfield at the closing, and Brookfield agreed to purchase from FET, certain newly issued membership interests of FET, such that Brookfield
will own 19.9% of the issued and outstanding membership interests of FET, for a purchase price of $2.375 billion. The transaction closed on May 31, 2022.
On December 13, 2021, FE privately issued to BIP Securities II-B L.P., an affiliate of Blackstone Infrastructure Partners L.P., 25,588,535 shares of FE’s common
stock, par value $0.10 per share, at a price of $39.08 per share, representing an investment of $1.0 billion. On April 21, 2022, FERC approved the Blackstone
representative’s ability to participate as a voting member of the FE Board. Sean T. Klimczak, the Blackstone Infrastructure Partners-selected representative, was
elected to the FE Board at the 2022 annual shareholders’ meeting.
On October 18, 2021, FE, FET, the Utilities, and the Transmission Companies entered into six separate senior unsecured five-year syndicated revolving credit
facilities. These new credit facilities provide substantial liquidity to support the Regulated Distribution and Regulated Transmission businesses, and each of the
operating companies within the businesses. See “Capital Resources and Liquidity" below for additional details.
Together, these transactions enhance FirstEnergy’s credit profile, provide funding for the strategic investments discussed above, and address all of FirstEnergy’s
equity plans, with the exception of annual issuances of up to $100 million under regular dividend reinvestment plans and employee benefit stock investment
plans, through at least 2025. Also, as with the recently completed FET transaction, premium valuations of our businesses could provide FirstEnergy future
optionality to further strengthen the balance sheet and enhance shareholder value.
FE Forward
FirstEnergy is also working to transform how it conducts business and serves its customers to achieve value potential in a sustainable way and help FirstEnergy
achieve its strategic priorities. In February 2021, FirstEnergy announced a new initiative to build upon FirstEnergy’s strong operations and business
fundamentals and deliver immediate value and resilience, with substantial working capital improvements and capital efficiencies reaching full impact by 2024.
Called "FE Forward," the initiative plays a critical first step in FirstEnergy’s transformation journey as it looks to enhance the organization, focus on performance
excellence, and refocus the investment strategy through a range of opportunities.
By 2024, FE Forward is projected to generate approximately $380 million in annualized capital expenditure efficiencies, as well as approximately $250 million in
working capital improvements by 2023. This program includes an estimated $150 million of costs to achieve through 2023, which are expected to be self-funded
through these efficiencies. FirstEnergy plans to redeploy the capital expenditure efficiencies in a more diverse capital program that over the long-term continues
to support our strategy as discussed above, and using 2022 as baseline operating expenses are projected to naturally decline 1% annually allowing for strategic
flexibility and customer affordability. FE Forward is not a downsizing effort and there will not be any involuntary employee reductions in connection with this
program. FirstEnergy expects that FE Forward will be a significant catalyst to augment its growth potential by taking a more strategic approach to operating
expenditures and reinvesting in a more diverse capital program that over the long-term continues to support a smarter and cleaner electric grid, and maintain
affordable customer bills. Specifically, FirstEnergy currently expects to redeploy these capital efficiencies into several projects, including, grid modernization,
energy efficiency programs, smart meter and electric vehicle charging, and solar generation investments. FirstEnergy is additionally evaluating the legal,
financial, operational and branding benefits of consolidating the Ohio Companies and Pennsylvania Companies into single entities per state. As part of these
efforts, FirstEnergy will evaluate the appropriate cadence to initiate rates cases on a state-by-state basis to best support FirstEnergy’s customer-focused
strategic priorities.
34

-- 43 of 98 --

35

-- 44 of 98 --

For the Years Ended December 31,
FE Forward Expected Capital Expenditure Efficiencies
and Working Capital Improvements
2021
Actual
2022
Forecast
2023
Forecast
2024
Forecast
2025
Forecast 	Total
(In millions)
Gross Capital Expenditure Efficiencies 	$ 	210 $ 	280 $ 	380 $ 	380 $ 	380 $ 	1,630
Cost to Achieve (+/- 10%) 	(40) 	(80) 	(30) 	— 	— 	(150)
Net Capital Expenditure Efficiencies 	$ 	170 $ 	200 $ 	350 $ 	380 $ 	380 $ 	1,480
Working Capital Improvements 	130 	120 	— 	— 	— 	250
Total Cash Flow Improvements 	$ 	300 $ 	320 $ 	350 $ 	380 $ 	380 $ 	1,730
Climate Story
Our long-term strategy reiterates and supports our position that climate change is among the most important issues of our time and our commitment to doing our
part to ensure a bright and sustainable future for the communities we serve. As part of our Climate Strategy, we are focused on enabling our customers to thrive
in a reduced carbon future. This includes transmission and distribution investments discussed above, investments in solar generation and supporting clean
energy options, our efforts towards electrifying the economy, and driving energy efficiency.
Additionally, we plan to reduce our company-wide GHG emissions within our direct operational control (Scope 1) by 30% by 2030 (from our 2019 baseline), as
we work toward carbon neutrality by 2050. Key steps in reducing our emissions and improving the efficiency of our operations include:
• Replacing Aging Equipment: We are responsibly replacing aging equipment on our transmission system that contains SF , a greenhouse gas
commonly used in electric utility equipment;
• Electrifying our Vehicle Fleet: We are targeting 30% electrification of our light-duty and aerial truck fleet by 2030 and 100% electrification by 2050. To
reach our electrification goal, we’ve committed to 100% electric or hybrid vehicle purchases for our light-duty and aerial truck fleet moving forward,
beginning with the first hybrid electric vehicle additions to the fleet in 2021;
• Using Generation Efficiencies and Flexibility: We are utilizing operational flexibilities, such as heat rate improvements through equipment upgrades,
operational monitoring systems, and auxiliary power reductions at our generation facilities that will enable us to reach our interim 2030 goal of a 30%
GHG reduction from 2019 levels, while continuing to provide customers with safe and reliable electricity; and
• Transitioning Away from Coal Generation: We expect to thoughtfully transition away from our regulated coal generation fleet no later than 2050, and in
April 2022, FirstEnergy received approval to construct 50 MWs of solar generation in West Virginia. Also in 2021, FirstEnergy filed plans with the
WVPSC to comply with EPA ELG rules that would keep MP’s generation plants responsibly operating beyond 2028, however, FirstEnergy intends to
begin a broad stakeholder dialogue regarding planned operational end dates of 2035 and 2040 for Ft. Martin and Harrison, respectively.
Future resource plans to achieve carbon reductions, including potential changes in operations or any determination of retirement dates of the regulated coal-fired
generating facilities, will be developed by working collaboratively with regulators in West Virginia. Determination of the useful life of the regulated coal-fired
generating facilities could result in changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale, impairment or
regulatory disallowances. If MP is unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial condition, results
of operations, and cash flow.
HB 6 and Related Investigations
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the U.S. Attorney’s Office
investigation into FirstEnergy relating to FirstEnergy’s lobbying and governmental affairs activities concerning HB 6 related to the federal criminal allegations
made in July 2020, against former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. Among
other things, the DPA required FE to pay a monetary penalty of $230 million, which FE paid in the third quarter of 2021. Under the DPA, FE agreed to the filing of
a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The $230 million payment will neither be recovered in
rates or charged to FirstEnergy customers nor will FirstEnergy seek any tax deduction related to such payment. The criminal information will be dismissed after
FirstEnergy fully complies with its obligations under the DPA.
The OAG, certain FE shareholders and FE customers filed several lawsuits against FirstEnergy and certain current and former directors, officers and other
employees, each relating to the allegations against the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated
with Mr. Householder. On February 9, 2022, FE, acting through the SLC, agreed to a settlement term sheet to resolve multiple shareholder derivative lawsuits
that were filed in the S.D. Ohio, the N.D. Ohio, and the Ohio Court of Common Pleas, Summit County. On March 11, 2022, the parties executed a stipulation and
6
36

-- 45 of 98 --

agreement of settlement, and filed a motion the same day requesting preliminary settlement approval in the S.D. Ohio. The settlement agreement, if approved,
will fully resolve these shareholder derivative lawsuits and includes a series of corporate governance enhancements, that has resulted or is expected to result in
the following:
• Six members of the FE Board, Messrs. Michael J. Anderson, Donald T. Misheff, Thomas N. Mitchell, Christopher D. Pappas and Luis A. Reyes, and Ms.
Julia L. Johnson did not stand for re-election at FE’s 2022 annual shareholder meeting;
• A special FE Board committee of at least three recently appointed independent directors was formed to initiate a review process of the current senior
executive team. On June 15, 2022, the FE Board appointed Ms. Lisa Winston Hicks and Messrs. Paul Kaleta, Sean T. Klimczak, Jesse A. Lynn, Andrew
Teno, and Melvin D. Williams to serve on that committee. After completing its review, which is expected to conclude not later than mid-September 2022,
the committee will make recommendations to the full FE Board, which retains the authority to make final determinations regarding any such
recommendations;
• The FE Board will oversee FE’s lobbying and political activities, including periodically reviewing and approving political and lobbying action plans
prepared by management;
• An FE Board committee of recently appointed independent directors will oversee the implementation and third-party audits of the FE Board-approved
action plans with respect to political and lobbying activities;
• FE will implement enhanced disclosure to shareholders of political and lobbying activities, including enhanced disclosure in its annual proxy statement;
and
• FE will further align financial incentives of senior executives to proactive compliance with legal and ethical obligations.
The settlement also includes a payment to FE of $180 million, to be paid by insurance after court approval, less any court-ordered attorney’s fees awarded to
plaintiffs.
In addition, on August 10, 2020, the SEC, through its Division of Enforcement, issued an order directing an investigation of possible securities laws violations by
FE, and on September 1, 2020, issued subpoenas to FE and certain FE officers. Subsequently, on April 28, 2021, and July 11, 2022, the SEC issued additional
subpoenas to FE. Further, in letters dated January 26, and February 22, 2021, staff of FERC's Division of Investigations notified FirstEnergy that it is
investigating FirstEnergy’s lobbying and governmental affairs activities concerning HB 6.
FirstEnergy has taken numerous steps to address challenges posed by the HB 6 investigations and improve its compliance culture, including the refreshment of
the FE Board, the hiring of key senior executives committed to supporting transparency and integrity, and strengthening and enhancing FirstEnergy’s compliance
culture through several initiatives. Although the outcome of the HB 6 investigations and state regulatory audits remain unknown, FirstEnergy has also taken
several proactive steps to reduce regulatory uncertainty affecting the Ohio Companies.
FE terminated Charles E. Jones as its chief executive officer effective October 29, 2020. As a result of Mr. Jones’ termination, and due to the determination of a
committee of independent members of the FE Board that Mr. Jones violated certain FirstEnergy policies and its code of conduct, all grants, awards and
compensation under FirstEnergy’s short-term incentive compensation program and long-term incentive compensation program with respect to Mr. Jones that
were outstanding on the date of termination were forfeited. In November 2021, after a determination by the Compensation Committee of the FE Board that a
demand for recoupment was warranted pursuant to the Recoupment Policy, FE made a recoupment demand to Mr. Jones of compensation previously paid to
Mr. Jones totaling approximately $56 million, the maximum amount permissible under the Recoupment Policy. As such, any amounts payable to Mr. Jones under
the EDCP will be set off against FE’s recoupment demand. There can be no assurance that the efforts to seek recoupment from Mr. Jones will be successful and
the approximately $56 million recoupment demand has not been recognized in FirstEnergy’s financial statements as of June 30, 2022.
Despite the many disruptions FirstEnergy is currently facing, the leadership team remains committed and focused on executing its strategy and running the
business. See “Outlook - Other Legal Proceedings” below for additional details on the government investigations, the DPA, and subsequent litigation surrounding
the investigation of HB 6. See also “Outlook - State Regulation - Ohio” below for details on the PUCO proceeding reviewing political and charitable spending and
legislative activity in response to the investigation of HB 6. The outcome of the government investigations, PUCO proceedings, legislative activity, and any of
these lawsuits is uncertain and could have a material adverse effect on FirstEnergy’s financial condition, results of operations, and cash flows.
37

-- 46 of 98 --

FINANCIAL OVERVIEW AND RESULTS OF OPERATIONS
(In millions) 	For the Three Months Ended June 30, 	For the Six Months Ended June 30,
2022 	2021 	Change 	2022 	2021 	Change
Revenues 	$ 	2,818 $ 	2,622 $ 	196 	7 % $ 	5,807 $ 	5,348 $ 	459 	9 %
Operating expenses 	2,371 	2,310 	61 	3 % 	4,801 	4,477 	324 	7 %
Operating income 	447 	312 	135 	43 % 	1,006 	871 	135 	15 %
Other expenses, net 	(206) 	(158) 	(48) 	(30)% 	(394) 	(295) 	(99) 	(34)%
Income before income taxes 	241 	154 	87 	56 % 	612 	576 	36 	6 %
Income taxes 	49 	96 	(47) 	(49)% 	132 	183 	(51) 	(28)%
Net income 	$ 	192 $ 	58 $ 	134 	231 % $ 	480 $ 	393 $ 	87 	22 %
Income attributable to noncontrolling interest 	5 	— 	5 	NM 	5 	— 	5 	NM
Earnings attributable to FE 	$ 	187 $ 	58 $ 	129 	222 % $ 	475 $ 	393 $ 	82 	21 %
* NM = not meaningful
The financial results discussed below include revenues and expenses from transactions among FirstEnergy’s business segments. A reconciliation of segment
financial results is provided in Note 9, “Segment Information,” of the Notes to Consolidated Financial Statements.
38

-- 47 of 98 --

Summary of Results of Operations — Second Quarter 2022 Compared with Second Quarter 2021
Financial results for FirstEnergy’s business segments in the second quarter of 2022 and 2021 were as follows:
Second Quarter 2022 Financial Results Regulated
Distribution Regulated
Transmission
Corporate/Other and
Reconciling
Adjustments FirstEnergy
Consolidated
(In millions)
Revenues:
Electric 	$ 	2,374 $ 	440 $ 	(37) $ 	2,777
Other 	52 	1 	(12) 	41
Total Revenues 	2,426 	441 	(49) 	2,818
Operating Expenses:
Fuel 	190 	— 	— 	190
Purchased power 	797 	— 	5 	802
Other operating expenses 	850 	91 	(45) 	896
Provision for depreciation 	242 	87 	19 	348
Deferral of regulatory assets, net 	(127) 	(2) 	— 	(129)
General taxes 	192 	61 	11 	264
Total Operating Expenses 	2,144 	237 	(10) 	2,371
Operating Income (Loss) 	282 	204 	(39) 	447
Other Income (Expense):
Debt redemption costs 	— 	— 	(118) 	(118)
Miscellaneous income, net 	94 	7 	59 	160
Interest expense 	(128) 	(55) 	(82) 	(265)
Capitalized financing costs 	6 	11 	— 	17
Total Other Expense 	(28) 	(37) 	(141) 	(206)
Income (Loss) Before Income Taxes (Benefits) 	254 	167 	(180) 	241
Income taxes (benefits) 	52 	39 	(42) 	49
Net Income (Loss) 	$ 	202 $ 	128 $ 	(138) $ 	192
Income attributable to noncontrolling interest 	— 	5 	— 	5
Earnings (Loss) Attributable to FE 	$ 	202 $ 	123 $ 	(138) $ 	187
39

-- 48 of 98 --

Second Quarter 2021 Financial Results Regulated
Distribution Regulated
Transmission
Corporate/Other and
Reconciling
Adjustments FirstEnergy
Consolidated
(In millions)
Revenues:
Electric 	$ 	2,209 $ 	411 $ 	(36) $ 	2,584
Other 	49 	8 	(19) 	38
Total Revenues 	2,258 	419 	(55) 	2,622
Operating Expenses:
Fuel 	112 	— 	— 	112
Purchased power 	609 	— 	5 	614
Other operating expenses 	696 	79 	(57) 	718
Provision for depreciation 	229 	77 	17 	323
Amortization of regulatory assets, net 	43 	6 	— 	49
General taxes 	192 	62 	10 	264
DPA penalty 	— 	— 	230 	230
Total Operating Expenses 	1,881 	224 	205 	2,310
Operating Income (Loss) 	377 	195 	(260) 	312
Other Income (Expense):
Miscellaneous income, net 	88 	11 	9 	108
Interest expense 	(131) 	(63) 	(93) 	(287)
Capitalized financing costs 	11 	10 	— 	21
Total Other Expense 	(32) 	(42) 	(84) 	(158)
Income (Loss) Before Income Taxes (Benefits) 	345 	153 	(344) 	154
Income taxes (benefits) 	71 	37 	(12) 	96
Net Income (Loss) 	$ 	274 $ 	116 $ 	(332) $ 	58
40

-- 49 of 98 --

Changes Between Second Quarter 2022 and Second
Quarter 2021 Financial Results
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling
Adjustments
FirstEnergy
Consolidated
(In millions)
Revenues:
Electric 	$ 	165 $ 	29 $ 	(1) $ 	193
Other 	3 	(7) 	7 	3
Total Revenues 	168 	22 	6 	196
Operating Expenses:
Fuel 	78 	— 	— 	78
Purchased power 	188 	— 	— 	188
Other operating expenses 	154 	12 	12 	178
Provision for depreciation 	13 	10 	2 	25
Amortization (deferral) of regulatory assets, net 	(170) 	(8) 	— 	(178)
General taxes 	— 	(1) 	1 	—
DPA penalty 	— 	— 	(230) 	(230)
Total Operating Expenses 	263 	13 	(215) 	61
Operating Income (Loss) 	(95) 	9 	221 	135
Other Income (Expense):
Debt redemption costs 	— 	— 	(118) 	(118)
Miscellaneous income, net 	6 	(4) 	50 	52
Interest expense 	3 	8 	11 	22
Capitalized financing costs 	(5) 	1 	— 	(4)
Total Other Expense 	4 	5 	(57) 	(48)
Income (Loss) Before Income Taxes (Benefits) 	(91) 	14 	164 	87
Income taxes (benefits) 	(19) 	2 	(30) 	(47)
Net Income (Loss) 	$ 	(72) $ 	12 $ 	194 $ 	134
Income attributable to noncontrolling interest 	— 	5 	— 	5
Earnings (Loss) Attributable to FE 	$ 	(72) $ 	7 $ 	194 $ 	129
41

-- 50 of 98 --

Regulated Distribution — Second Quarter 2022 Compared with Second Quarter 2021
Regulated Distribution’s net income decreased $72 million in the second quarter of 2022, as compared to the same period of 2021, primarily resulting from
higher other operating expenses, customer rate credits associated with the PUCO-approved Ohio Stipulation, higher pension and OPEB expenses, and lower
residential customers usage and demand, partially offset by earnings benefits from capital investment programs in Ohio, Pennsylvania, and New Jersey.
Revenues —
The $168 million increase in total revenues resulted from the following sources:
For the Three Months Ended June 30,
Revenues by Type of Service 	2022 	2021 Increase
(Decrease)
(In millions)
Distribution 	$ 	1,216 $ 	1,304 $ 	(88)
Generation sales:
Retail 	999 	831 	168
Wholesale 	159 	74 	85
Total generation sales 	1,158 	905 	253
Other 	52 	49 	3
Total Revenues 	$ 	2,426 $ 	2,258 $ 	168
Distribution revenues decreased $88 million in the second quarter of 2022, as compared to the same period of 2021, primarily resulting from customer rate
credits associated with the PUCO-approved Ohio Stipulation, lower recovery of transmission expenses, which has no material impact to earnings, and lower
weather-related usage and customer demand, partially offset by higher rates associated with riders in Ohio, Pennsylvania, and New Jersey for the recovery of
certain capital investment programs.
Distribution services by customer class are summarized in the following table:
For the Three Months Ended June 30,
(In thousands) 	Actual 	Weather-Adjusted
Electric Distribution MWH Deliveries 	2022 	2021
Increase
(Decrease) 	2022 	2021
Increase
(Decrease)
Residential 	12,146 	12,347 	(1.6)% 	11,796 	11,861 	(0.6)%
Commercial 	8,716 	8,590 	1.5 % 	8,627 	8,466 	1.9 %
Industrial 	13,711 	13,384 	2.4 % 	13,711 	13,384 	2.4 %
Total Electric Distribution MWH Deliveries 	34,573 	34,321 	0.7 % 	34,134 	33,711 	1.3 %
Includes street lighting.
Residential and commercial distribution deliveries were impacted by lower weather-related customer usage. Cooling degree days were 6% below 2021 and 15%
above normal. Heating degree days were 6% below 2021 and 4% below normal. Increases in industrial deliveries were primarily from the steel, auto, and other
manufacturing sectors.
Compared to pre-pandemic levels in 2019, weather-adjusted residential and industrial distribution deliveries in the second quarter of 2022 increased by 6.9%
and 0.8%, respectively, while commercial deliveries decreased by 5.8%.
(1)
(1)
42

-- 51 of 98 --

The following table summarizes the price and volume factors contributing to the $253 million increase in generation revenues for the second quarter of 2022, as
compared to the same period of 2021:
Source of Change in Generation Revenues 	Increase
(In millions)
Retail:
Change in sales volumes 	$ 	50
Change in prices 	118
168
Wholesale:
Change in sales volumes 	12
Change in prices 	68
Capacity revenue 	5
85
Change in Generation Revenues 	$ 	253
The increase in retail generation sales volumes was primarily due to decreased customer shopping in New Jersey, Ohio and Pennsylvania. Total generation
provided by alternative suppliers as a percentage of total MWH deliveries in the second quarter of 2022, as compared to the same period of 2021, decreased to
45% from 48% in New Jersey, 84% from 86% in Ohio, and to 62% from 65% in Pennsylvania. The increase in retail generation prices primarily resulted from
higher non-shopping generation auction rates in Pennsylvania. Retail generation sales, excluding those in West Virginia, have no material impact to earnings.
Wholesale generation revenues increased $85 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to an increase in
spot market energy prices, increased volumes due to higher generation output and higher capacity revenues. The difference between current wholesale
generation revenues and certain energy costs incurred are deferred for future recovery or refund, with no material impact to earnings.
Operating Expenses —
Total operating expenses increased $263 million, primarily due to the following:
• Fuel expense increased $78 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to higher unit costs and
increased generation output. Due to the ENEC, fuel expense has no material impact on current earnings.
• Purchased power costs, which have no material impact on current earnings, increased $188 million in the second quarter of 2022, as compared to the
same period of 2021, primarily due to higher market prices and increased volumes as described above.
Source of Change in Purchased Power 	Increase
(In millions)
Purchases
Change due to unit costs 	$ 	135
Change due to volumes 	46
181
Capacity expense 	7
Change in Purchased Power Costs 	$ 	188
43

-- 52 of 98 --

• Other operating expenses increased $154 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to the following:
• Higher network transmission expenses of $14 million. These costs are deferred for future recovery, resulting in no material impact on current
period earnings.
• Higher expenses of $24 million resulting from lower capitalization of vegetation management costs.
• Higher expenses of $13 million resulting from lower capitalization of corporate support costs.
• Higher storm expenses of $17 million, which were deferred for future recovery, resulting in no material impact on current period earnings.
• Higher vegetation management in West Virginia, energy efficiency and other state mandated program costs of $37 million, which are deferred
for future recovery, resulting in no material impact on earnings.
• Higher other operating and maintenance expenses of $32 million, primarily associated with higher regulated generation planned outage spend,
and material and contractor spend.
• Higher uncollectible expenses of $17 million, primarily in Pennsylvania, West Virginia and Maryland, of which $3 million was deferred for future
recovery.
• Depreciation expense increased $13 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to a higher asset
base.
• Amortization of regulatory assets, net decreased $170 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to:
• $93 million decrease due to generation and transmission related deferrals primarily as a result of lower recovery of transmission related
expenses,
• $22 million decrease due to customer refunds associated with the Ohio Stipulation,
• $19 million decrease due to higher deferred storm expenses,
• $16 million decrease due to lower amortization of uncollectible expenses as a result of a return to pre-pandemic levels, and
• $20 million related to net decreases in other amortizations.
Other Expenses —
Other expense decreased $4 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to lower other miscellaneous
expenses, partially offset by higher pension and OPEB non-service costs and lower capitalized interest.
Income Taxes —
Regulated Distribution’s effective tax rate was 20.5% and 20.6% for the three months ended June 30, 2022 and 2021, respectively.
Regulated Transmission — Second Quarter 2022 Compared with Second Quarter 2021
Regulated Transmission’s net income increased $12 million in the second quarter of 2022, as compared to the same period of 2021 primarily due to a higher rate
base.
Revenues —
Total revenues increased $22 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to the recovery of incremental
operating expenses and a higher rate base.
44

-- 53 of 98 --

The following table shows revenues by transmission asset owner:
For the Three Months Ended
June 30, Increase
(Decrease)	Revenues by Transmission Asset Owner 	2022 	2021
(In millions)
ATSI 	$ 	217 $ 	198 $ 	19
TrAIL 	65 	59 	6
MAIT 	77 	81 	(4)
JCP&L 	46 	46 	—
MP, PE and WP 	36 	35 	1
Total Revenues 	$ 	441 $ 	419 $ 	22
Operating Expenses —
Total operating expenses increased $13 million in the second quarter of 2022, as compared to the same period of 2021, primarily due to higher operation and
maintenance expense and depreciation due to a higher asset base, partially offset by lower amortization of regulatory assets. Nearly all operating expenses are
recovered through formula rates, resulting in no material impact on current period earnings.
Other Expenses —
Total other expense decreased $5 million in the three months ended June 30, 2022 as compared to the same period of 2021, primarily due to lower interest on
borrowings under the revolving credit facilities.
Income Taxes —
Regulated Transmission’s effective tax rate was 23.4% and 24.2% for the three months ended June 30, 2022 and 2021, respectively.
Corporate / Other — Second Quarter 2022 Compared with Second Quarter 2021
Financial results at Corporate/Other resulted in a $194 million decrease in net loss in the second quarter of 2022, as compared to the same period of 2021,
primarily due to the absence of the DPA penalty in 2021, higher net investment income on certain equity method and other investments and lower interest
expense, partially offset by expenses associated with FE’s redemption of its 2031 Notes and 2047 Notes. See below for additional details of the FE note
redemptions.
45

-- 54 of 98 --

Summary of Results of Operations — First Six Months of 2022 Compared with First Six Months of 2021
Financial results for FirstEnergy’s business segments in the first six months of 2022 and 2021 were as follows:
First Six Months 2022 Financial Results
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling Adjustments
FirstEnergy
Consolidated
(In millions)
Revenues:
Electric 	$ 	4,906 $ 	891 $ 	(76) $ 	5,721
Other 	109 	3 	(26) 	86
Total Revenues 	5,015 	894 	(102) 	5,807
Operating Expenses:
Fuel 	330 	— 	— 	330
Purchased power 	1,667 	— 	10 	1,677
Other operating expenses 	1,648 	181 	(113) 	1,716
Provision for depreciation 	477 	173 	38 	688
Deferral of regulatory assets, net 	(165) 	(1) 	— 	(166)
General taxes 	407 	127 	22 	556
Total Operating Expenses 	4,364 	480 	(43) 	4,801
Operating Income (Loss) 	651 	414 	(59) 	1,006
Other Income (Expense):
Debt redemption costs 	— 	— 	(156) 	(156)
Miscellaneous income, net 	179 	13 	74 	266
Interest expense 	(257) 	(114) 	(169) 	(540)
Capitalized financing costs 	15 	20 	1 	36
Total Other Expense 	(63) 	(81) 	(250) 	(394)
Income (Loss) Before Income Taxes (Benefits) 	588 	333 	(309) 	612
Income taxes (benefits) 	121 	80 	(69) 	132
Net Income (Loss) 	$ 	467 $ 	253 $ 	(240) $ 	480
Income attributable to noncontrolling interest 	— 	5 	— 	5
Earnings (Loss) Attributable to FE 	$ 	467 $ 	248 $ 	(240) $ 	475
46

-- 55 of 98 --

First Six Months 2021 Financial Results
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling
Adjustments
FirstEnergy
Consolidated
(In millions)
Revenues:
Electric 	$ 	4,525 $ 	812 $ 	(70) $ 	5,267
Other 	103 	12 	(34) 	81
Total Revenues 	4,628 	824 	(104) 	5,348
Operating Expenses:
Fuel 	230 	— 	— 	230
Purchased power 	1,323 	— 	9 	1,332
Other operating expenses 	1,424 	146 	(100) 	1,470
Provision for depreciation 	455 	158 	33 	646
Amortization of regulatory assets, net 	130 	11 	— 	141
General taxes 	393 	124 	20 	537
DPA penalty 	— 	— 	230 	230
Gain on sale of Yards Creek 	(109) 	— 	— 	(109)
Total Operating Expenses 	3,846 	439 	192 	4,477
Operating Income (Loss) 	782 	385 	(296) 	871
Other Income (Expense):
Miscellaneous income, net 	195 	22 	26 	243
Interest expense 	(259) 	(124) 	(189) 	(572)
Capitalized financing costs 	22 	12 	— 	34
Total Other Expense 	(42) 	(90) 	(163) 	(295)
Income (Loss) Before Income Taxes (Benefits) 	740 	295 	(459) 	576
Income taxes (benefits) 	153 	70 	(40) 	183
Net Income (Loss) 	$ 	587 $ 	225 $ 	(419) $ 	393
47

-- 56 of 98 --

Changes Between First Six Months 2022 and First Six
Months 2021 Financial Results
Regulated
Distribution
Regulated
Transmission
Corporate/Other and
Reconciling
Adjustments
FirstEnergy
Consolidated
(In millions)
Revenues:
Electric 	$ 	381 $ 	79 $ 	(6) $ 	454
Other 	6 	(9) 	8 	5
Total Revenues 	387 	70 	2 	459
Operating Expenses:
Fuel 	100 	— 	— 	100
Purchased power 	344 	— 	1 	345
Other operating expenses 	224 	35 	(13) 	246
Provision for depreciation 	22 	15 	5 	42
Amortization (deferral) of regulatory assets, net 	(295) 	(12) 	— 	(307)
General taxes 	14 	3 	2 	19
DPA penalty 	— 	— 	(230) 	(230)
Gain on sale of Yards Creek 	109 	— 	— 	109
Total Operating Expenses 	518 	41 	(235) 	324
Operating Income (Loss) 	(131) 	29 	237 	135
Other Income (Expense):
Debt redemption costs 	— 	— 	(156) 	(156)
Miscellaneous income, net 	(16) 	(9) 	48 	23
Interest expense 	2 	10 	20 	32
Capitalized financing costs 	(7) 	8 	1 	2
Total Other Expense 	(21) 	9 	(87) 	(99)
Income (Loss) Before Income Taxes (Benefits) 	(152) 	38 	150 	36
Income taxes (benefits) 	(32) 	10 	(29) 	(51)
Net Income (Loss) 	$ 	(120) $ 	28 $ 	179 $ 	87
Income attributable to noncontrolling interest 	— 	5 	— 	5
Earnings (Loss) Attributable to FE 	$ 	(120) $ 	23 $ 	179 $ 	82
48

-- 57 of 98 --

Regulated Distribution — First Six Months of 2022 Compared with First Six Months of 2021
Regulated Distribution’s net income decreased $120 million in the first six months of 2022, as compared to the same period of 2021, primarily resulting from
higher other operating expenses, customer rate credits associated with the PUCO-approved Ohio Stipulation, and higher pension and OPEB expenses, partially
offset by higher weather-related demand and rider revenues from capital investment programs, as well as the absence of a $27 million refund for previously
collected decoupling revenues in Ohio, with interest.
Revenues —
The $387 million increase in total revenues resulted from the following sources:
For the Six Months Ended June 30,
Revenues by Type of Service 	2022 	2021 	Increase (Decrease)
(In millions)
Distribution services 	$ 	2,564 $ 	2,616 $ 	(52)
Generation sales:
Retail 	2,093 	1,766 	327
Wholesale 	249 	143 	106
Total generation sales 	2,342 	1,909 	433
Other 	109 	103 	6
Total Revenues 	$ 	5,015 $ 	4,628 $ 	387
Includes $(27) million of ARP revenues for the six months ended June 30, 2021, which is related to the Ohio Companies refund to customers that was previously collected under
decoupling mechanisms, with interest. See “Outlook,” below for further discussion on Ohio decoupling rates.
Distribution services revenues decreased $52 million in the first six months 2022, as compared to the same period of 2021, primarily resulting from customer
rate credits associated with the PUCO-approved Ohio Stipulation, partially offset by the absence of a $27 million refund for previously collected decoupling
revenues in Ohio with interest, higher weather-related usage and higher rates associated with riders in Ohio, Pennsylvania and New Jersey for the recovery of
certain capital investment programs.
Distribution services by customer class are summarized in the following table:
For the Six Months Ended June 30,
(In thousands) 	Actual 	Weather-Adjusted
Electric Distribution MWH Deliveries 	2022 	2021 	Increase 	2022 	2021
Increase
(Decrease)
Residential 	27,359 	27,237 	0.4 % 	26,966 	27,258 	(1.1)%
Commercial 	18,007 	17,221 	4.6 % 	17,892 	17,318 	3.3 %
Industrial 	27,294 	26,641 	2.5 % 	27,294 	26,641 	2.5 %
Total Electric Distribution MWH Deliveries 	72,660 	71,099 	2.2 % 	72,152 	71,217 	1.3 %
Includes street lighting.
Residential and commercial distribution deliveries were impacted by higher weather-related customer usage. Heating degree days were 2% above 2021 and 2%
below normal. Cooling degree days were 6% below 2021 and 14% above normal. Increases in industrial deliveries were primarily from the steel, auto, and other
manufacturing sectors.
Compared to pre-pandemic levels in 2019, weather-adjusted residential distribution deliveries for the six months ended June 30, 2022 increased 2.5%, while
commercial and industrial deliveries decreased 4.9% and 0.9%, respectively.
(1)
(1)
(1)
(1)
49

-- 58 of 98 --

The following table summarizes the price and volume factors contributing to the $433 million increase in generation revenues for the first six months of 2022, as
compared to the same period of 2021:
Source of Change in Generation Revenues 	Increase
(In millions)
Retail:
Change in sales volumes 	$ 	111
Change in prices 	216
327
Wholesale:
Change in prices 	81
Capacity revenue 	25
106
Change in Generation Revenues 	$ 	433
The increase in retail generation sales volumes was primarily due to higher weather-related usage and decreased customer shopping in New Jersey, Ohio and
Pennsylvania. Total generation provided by alternative suppliers as a percentage of total MWH deliveries in the first six months of 2022, as compared to the
same period of 2021, decreased to 45% from 47% in New Jersey, 84% from 86% in Ohio, and to 61% from 63% in Pennsylvania. The increase in retail
generation prices primarily resulted from higher non-shopping generation auction rates in Pennsylvania. Retail generation sales, excluding those in West
Virginia, have no material impact to earnings.
Wholesale generation revenues increased $106 million in the first six months of 2022, as compared to the same period in 2021, primarily due to an increase in
spot market energy prices and higher capacity revenues. The difference between current wholesale generation revenues and certain energy costs incurred are
deferred for future recovery or refund, with no material impact to earnings.
Operating Expenses —
Total operating expenses increased $518 million, primarily due to the following:
• Fuel costs increased $100 million during the first six months of 2022, as compared to the same period of 2021, primarily due to higher unit costs and
increased generation output. Due to the ENEC, fuel expense has no material impact on current earnings.
• Purchased power costs, which have no material impact on current earnings, increased $344 million during the first six months of 2022, as compared to
the same period of 2021, primarily due to higher market prices, increased volumes as described above and increased capacity expenses.
Source of Change in Purchased Power 	Increase
(In millions)
Purchases:
Change due to unit costs 	$ 	220
Change due to volumes 	90
310
Capacity 	34
Change in Purchased Power Costs 	$ 	344
50

-- 59 of 98 --

• Other operating expenses increased $224 million in the first six months of 2022, as compared to the same period of 2021, primarily due to:
• Higher network transmission expenses of $42 million. These costs are deferred for future recovery, resulting in no material impact on current
period earnings.
• Higher expenses of $46 million resulting from lower capitalization of vegetation management costs.
• Higher expenses of $26 million resulting from lower capitalization of corporate support costs.
• Higher storm expenses of $22 million, of which $20 million was deferred for future recovery, resulting in no material impact on current period
earnings.
• Higher vegetation management in West Virginia, energy efficiency and other state mandated program costs of $32 million, which are deferred
for future recovery, resulting in no material impact on earnings.
• Higher other operating and maintenance expenses of $49 million, primarily associated with higher regulated generation planned outage spend,
material and contractor spend, and employee benefits.
• Higher uncollectible expenses of $7 million.
• Depreciation expense increased $22 million in the first six months of 2022, as compared to the same period of 2021, primarily due to a higher asset
base.
• Amortization of regulatory assets, net decreased $295 million in the first six months of 2022, as compared to the same period of 2021, primarily due to:
• $109 million decrease due to the absence of the reduction of the New Jersey storm cost regulatory asset as a result of the Yards Creek sale,
• $78 million decrease due to generation and transmission related deferrals primarily as a result of higher purchased power and fuel costs
related to the ENEC and lower recovery of transmission related expenses,
• $56 million decrease due to customer refunds associated with the Ohio Stipulation,
• $31 million decrease due to lower amortization of uncollectible expenses as a result of a return to pre-pandemic levels, and
• $21 million related to net decreases in other amortizations.
• General taxes increased $14 million in the first six months of 2022, as compared to the same period of 2021, primarily due to higher Ohio property and
Pennsylvania gross receipt taxes, partially offset by lower West Virginia Business and Occupation taxes.
• The absence of the gain on sale of the Yards Creek Generating Facility of $109 million which was netted against the New Jersey storm deferral, as
described above, resulting in no impact to earnings.
Other Expense —
Other expense increased $21 million in the first six months of 2022, as compared to the same period of 2021, primarily due to higher pension and OPEB non-
service costs, higher capitalized interest, partially offset by lower interest on borrowings under the revolving credit facilities and other miscellaneous expenses.
Income Taxes —
Regulated Distribution’s effective tax rate was 20.6% and 20.7% for the six months ended June 30, 2022 and 2021, respectively.
Regulated Transmission — First Six Months of 2022 Compared with First Six Months of 2021
Regulated Transmission’s net income increased $28 million in the first six months of 2022, as compared to the same period of 2021, primarily due to a higher
rate base and lower financing costs.
Revenues —
Total revenues increased $70 million, primarily due to the recovery of incremental operating expenses and a higher rate base.
51

-- 60 of 98 --

The following table shows revenues by transmission asset owner:
For the Six Months Ended June
30,
Revenues by Transmission Asset Owner 	2022 	2021 	Increase
(In millions)
ATSI 	$ 	434 $ 	404 $ 	30
TrAIL 	130 	121 	9
MAIT 	156 	149 	7
JCP&L 	106 	85 	21
MP, PE and WP 	68 	65 	3
Total Revenues 	$ 	894 $ 	824 $ 	70
Operating Expenses —
Total operating expenses increased $41 million in the first six months of 2022, as compared to the same period of 2021, primarily due to higher operation and
maintenance costs and increased property taxes and depreciation due to a higher asset base, partially offset by lower amortization of regulatory assets. Nearly
all operating expenses are recovered through formula rates, resulting in no material impact on current period earnings.
Other Expense —
Total other expense decreased $9 million in the first six months of 2022, as compared to the same period of 2021, primarily due to lower interest on borrowings
under the revolving credit facilities and higher capitalized financing cost.
Income Taxes —
Regulated Transmission’s effective tax rate was 24.0% and 23.7% for the six months ended June 30, 2022 and 2021, respectively.
Corporate / Other — First Six Months of 2022 Compared with First Six Months of 2021
Financial results at Corporate/Other resulted in a $179 million decrease in net loss in the first six months of 2022, as compared to the same period of 2021,
primarily due to the absence of the DPA penalty in 2021, higher net investment income on certain equity method and other investments and lower interest
expense, partially offset by expenses associated with FE’s redemption of its 2023 Notes, 2031 Notes and 2047 Notes. See below for additional details of the FE
note redemptions.
52

-- 61 of 98 --

REGULATORY ASSETS AND LIABILITIES
Regulatory assets represent incurred costs that have been deferred because of their probable future recovery from customers through regulated rates.
Regulatory liabilities represent amounts that are expected to be credited to customers through future regulated rates or amounts collected from customers for
costs not yet incurred. FirstEnergy, the Utilities and the Transmission Companies net their regulatory assets and liabilities based on federal and state
jurisdictions.
Management assesses the probability of recovery of regulatory assets, and settlement of regulatory liabilities, at each balance sheet date and whenever new
events occur. Factors that may affect probability relate to changes in the regulatory environment, issuance of a regulatory commission order or passage of new
legislation. Upon material changes to these factors, where applicable, FirstEnergy will record new regulatory assets and liabilities and will assess whether it is
probable that currently recorded regulatory assets and liabilities will be recovered or settled in future rates.
The following table provides information about the composition of net regulatory assets and liabilities as of June 30, 2022, and December 31, 2021, and the
changes during the six months ended June 30, 2022:
Net Regulatory Assets (Liabilities) by Source June 30,
2022 December 31,
2021 	Change
(In millions)
Customer payables for future income taxes 	$ 	(2,269) $ 	(2,345) $ 	76
Spent nuclear fuel disposal costs 	(85) 	(101) 	16
Asset removal costs 	(668) 	(646) 	(22)
Deferred transmission costs 	(22) 	(3) 	(19)
Deferred generation costs 	195 	118 	77
Deferred distribution costs 	122 	49 	73
Storm-related costs 	684 	660 	24
Uncollectible and COVID-19 related costs 	61 	56 	5
Energy efficiency program costs 	62 	47 	15
New Jersey societal benefit costs 	101 	109 	(8)
Regulatory transition costs 	(18) 	(18) 	—
Vegetation management costs 	49 	33 	16
Other 	(38) 	(12) 	(26)
Net Regulatory Liabilities included on the Consolidated Balance Sheets 	$ 	(1,826) $ 	(2,053) $ 	227
The following is a description of the regulatory assets and liabilities described above:
Customer payables for future income taxes - Reflects amounts to be recovered or refunded through future rates to pay income taxes that become
payable when rate revenue is provided to recover items such as AFUDC-equity and depreciation of property, plant and equipment for which deferred
income taxes were not recognized for ratemaking purposes, including amounts attributable to tax rate changes such as the Tax Act. These amounts are
being amortized over the period in which the related deferred tax assets reverse, which is generally over the expected life of the underlying asset.
Spent nuclear fuel disposal costs - Reflects amounts collected from customers, and the investment income, losses and changes in fair value of the
trusts for spent nuclear fuel disposal costs related to the former nuclear generating facilities, Oyster Creek and TMI-1.
Asset removal costs - Primarily represents the rates charged to customers that include a provision for the cost of future activities to remove assets,
including obligations for which an ARO has been recognized, that are expected to be incurred at the time of retirement.
Deferred transmission costs - Reflects differences between revenues earned based on actual costs for the formula-rate Transmission Companies
and the amounts billed, which amounts are recorded as a regulatory asset or liability and recovered or refunded, respectively, in subsequent periods.
Also included is the recovery of non-market based costs or fees charged to certain of the Utilities by various regulatory bodies including FERC and
RTOs, which can include PJM charges and credits for service including, but not limited to, procuring transmission services and transmission
enhancement.
53

-- 62 of 98 --

Deferred generation costs - Primarily relates to regulatory assets associated with the securitized recovery of certain fuel and purchased power
regulatory assets at the Ohio Companies (amortized through 2034) as well as the ENEC at MP and PE. MP and PE recover net power supply costs,
including fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. The ENEC rate is updated
annually.
Deferred distribution costs - Primarily relates to the Ohio Companies’ deferral of certain expenses resulting from distribution and reliability related
expenditures, including interest (amortized through 2036) and remaining refunds owed to customers associated with the PUCO-approved Ohio
Stipulation.
Storm-related costs - Relates to the deferral of storm costs, which vary by jurisdiction. Approximately $201 million and $148 million are currently being
recovered through rates as of June 30, 2022 and December 31, 2021, respectively.
Uncollectible and COVID-19 related costs - Includes the deferral of costs arising from COVID-19, including uncollectible expenses under new and
existing orders prior to the pandemic.
Energy efficiency program costs - Relates to the recovery of costs in excess of revenues associated with energy efficiency programs including New
Jersey energy efficiency and renewable energy programs, the Pennsylvania Companies’ EE&C programs, the Ohio Companies’ Demand Side
Management and Energy Efficiency Rider, and PE’s EmPOWER Maryland Surcharge. Investments in certain of these energy efficiency programs earn
a long-term return.
New Jersey societal benefit costs - Primarily relates to regulatory assets associated with MGP remediation, universal service and lifeline funds, and
consumer education in New Jersey.
Regulatory transition costs - Includes the recovery of PN above-market NUG costs; and JCP&L costs associated with BGS, capacity and ancillary
services, net of revenues from the sale of the committed supply in the wholesale market.
Vegetation management costs - Relates to regulatory assets in New Jersey and West Virginia associated with the recovery of certain distribution
vegetation management costs as well as MAIT vegetation management costs (amortized through 2024).
The following table provides information about the composition of net regulatory assets that do not earn a current return as of June 30, 2022 and December 31,
2021, of which approximately $373 million and $228 million, respectively, are currently being recovered through rates over varying periods, through 2068,
depending on the nature of the deferral and the jurisdiction.
Regulatory Assets by Source Not Earning a Current Return June 30,
2022 December 31,
2021 	Change
(In millions)
Deferred transmission costs 	$ 	9 $ 	13 $ 	(4)
Deferred generation costs 	135 	50 	85
Storm-related costs 	574 	549 	25
COVID-19 related costs 	68 	65 	3
Regulatory transition costs 	11 	13 	(2)
Vegetation management costs 	37 	31 	6
Other 	21 	11 	10
Regulatory Assets Not Earning a Current Return 	$ 	855 $ 	732 $ 	123
54

-- 63 of 98 --

CAPITAL RESOURCES AND LIQUIDITY
FirstEnergy’s business is capital intensive, requiring significant resources to fund operating expenses, construction and other investment expenditures,
scheduled debt maturities and interest payments, dividend payments, and potential contributions to its pension plan.
FE and its distribution and transmission subsidiaries expect their existing sources of liquidity to remain sufficient to meet their respective anticipated obligations.
In addition to internal sources to fund liquidity and capital requirements for the remainder of 2022 and beyond, FE and its distribution and transmission
subsidiaries expect to rely on external sources of funds. Short-term cash requirements not met by cash provided from operations are generally satisfied through
short-term borrowings. Long-term cash needs may be met through the issuance of long-term debt by FE and certain of its distribution and transmission
subsidiaries to, among other things, fund capital expenditures and other capital-like investments, and refinance short-term and maturing long-term debt, subject
to market conditions and other factors.
In alignment with FirstEnergy’s strategy to invest in its Regulated Distribution and Regulated Transmission segments as a fully regulated company, FirstEnergy is
focused on maintaining balance sheet strength and flexibility. Specifically, at the regulated businesses, regulatory authority has been obtained for various
regulated distribution and transmission subsidiaries to issue and/or refinance debt.
Any financing plans by FE or any of its consolidated subsidiaries, including the issuance of equity and debt, and the refinancing of short-term and maturing long-
term debt are subject to market conditions and other factors. No assurance can be given that any such issuances, financing or refinancing, as the case may be,
will be completed as anticipated or at all. Any delay in the completion of financing plans could require FE or any of its consolidated subsidiaries to utilize short-
term borrowing capacity, which could impact available liquidity. In addition, FE and its consolidated subsidiaries expect to continually evaluate any planned
financings, which may result in changes from time to time.
On November 6, 2021, FirstEnergy, along with FET, entered into the FET P&SA with Brookfield and the Brookfield Guarantors, pursuant to which FET agreed to
issue and sell to Brookfield at the closing, and Brookfield agreed to purchase from FET, certain newly issued membership interests of FET, such that Brookfield
will own 19.9% of the issued and outstanding membership interests of FET, for a purchase price of $2.375 billion. The transaction closed on May 31, 2022.
On December 13, 2021, FE privately issued to BIP Securities II-B L.P., an affiliate of Blackstone Infrastructure Partners L.P., 25,588,535 shares of FE’s common
stock, par value $0.10 per share, at a price of $39.08 per share, representing an investment of $1.0 billion. On April 21, 2022, FERC approved the Blackstone
representative’s ability to participate as a voting member of the FE Board. Sean T. Klimczak, the Blackstone Infrastructure Partners-selected representative, was
elected to the FE Board at the 2022 annual shareholders’ meeting.
On October 18, 2021, FE, FET, the Utilities, and the Transmission Companies entered into six separate senior unsecured five-year syndicated revolving credit
facilities. These new credit facilities provide substantial liquidity to support the Regulated Distribution and Regulated Transmission businesses, and each of the
operating companies within the businesses.
Together, these transactions enhance FirstEnergy’s credit profile, provide funding for the strategic investments discussed above, and address all of FirstEnergy’s
equity plans, with the exception of annual issuances of up to $100 million under regular dividend reinvestment plans and employee benefit stock investment
plans, through at least 2025. Also, as with the recently completed FET transaction, premium valuations of our businesses could provide FirstEnergy future
optionality to further strengthen the balance sheet and enhance shareholder value.
FirstEnergy is continuously evaluating the COVID-19 global pandemic and taking steps to mitigate known risks. FirstEnergy provides a critical and essential
service to its customers and the health and safety of its employees and customers is its first priority. FirstEnergy continues to provide flexibility for approximately
7,000 of its 12,400 employees to work from home. Pandemic safety and cleaning protocols were implemented for those workers who have continued to report to
a FirstEnergy work location during the pandemic, ensuring FirstEnergy employees can report directly to job sites and work with the same small group of
employees every day. FirstEnergy continues to assess its work from home policies to allow for a flexible workplace to continue for its employees after the
pandemic.
FirstEnergy continues to effectively manage operations during the pandemic in order to provide critical service to customers. FirstEnergy has experienced supply
chain challenges during the COVID-19 pandemic. Lead times have increased across numerous material categories, with some as much as doubling from
previous times. Some key suppliers have struggled with labor shortages and raw material availability, which along with increasing inflationary pressure, have
increased the costs of certain materials, equipment and contractors. FirstEnergy has taken steps to mitigate these risks and does not currently expect service
disruptions or any material impact on its capital spending plan. However, the situation remains fluid and future impacts to FirstEnergy that are presently unknown
or unanticipated may occur.
As of June 30, 2022, FirstEnergy’s net deficit in working capital (current assets less current liabilities) was primarily due to accounts payable, current portions of
long-term debt, and accrued interest, taxes, and compensation and benefits. FirstEnergy believes its cash from operations and available liquidity will be sufficient
to meet its current working capital needs.
55

-- 64 of 98 --

Short-Term Borrowings / Revolving Credit Facilities
On October 18, 2021, FE, FET, the Utilities, and the Transmission Companies entered into the 2021 Credit Facilities, which were six separate senior unsecured
five-year syndicated revolving credit facilities with JPMorgan Chase Bank, N.A., Mizuho Bank, Ltd. and PNC Bank, National Association that replace the FE
Revolving Facility and the FET Revolving Facility, and provide for aggregate commitments of $4.5 billion. The 2021 Credit Facilities are available until October
18, 2026, as follows:
• FE and FET, $1.0 billion revolving credit facility;
• Ohio Companies, $800 million revolving credit facility;
• Pennsylvania Companies, $950 million revolving credit facility;
• JCP&L, $500 million revolving credit facility;
• MP and PE, $400 million revolving credit facility; and
• Transmission Companies, $850 million credit facility.
Under the 2021 Credit Facilities, an aggregate amount of $4.5 billion is available to be borrowed, repaid and reborrowed, subject to each borrower’s respective
sublimit under the respective facilities. These new credit facilities provide substantial liquidity to support the Regulated Distribution and Regulated Transmission
businesses, and each of the operating companies within the businesses.
Borrowings under the 2021 Credit Facilities may be used for working capital and other general corporate purposes. Generally, borrowings under each of the
credit facilities are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment termination date,
as the same may be extended. Each of the 2021 Credit Facilities contain financial covenants requiring each borrower, with the exception of FE, to maintain a
consolidated debt-to-total-capitalization ratio (as defined under each of the 2021 Credit Facilities) of no more than 65%, and 75% for FET, measured at the end
of each fiscal quarter. FE is required under its 2021 Credit Facility to maintain a consolidated interest coverage ratio of not less than 2.50 times, measured at the
end of each fiscal quarter for the last four fiscal quarters beginning with the quarter ending December 31, 2021.
FirstEnergy’s 2021 Credit Facilities bear interest at fluctuating interest rates, primarily based on LIBOR. LIBOR tends to fluctuate based on general interest rates,
rates set by the U.S. Federal Reserve and other central banks, the supply of and demand for credit in the London interbank market and general economic
conditions. FirstEnergy has not hedged its interest rate exposure with respect to its floating rate debt. Accordingly, FirstEnergy’s interest expense for any
particular period will fluctuate based on LIBOR and other variable interest rates. On July 27, 2017, the FCA (the authority that regulates LIBOR) announced that
it intends to stop compelling banks to submit rates for the calculation of LIBOR after 2021. Subsequently, on March 5, 2021, IBA (the entity that calculates and
publishes LIBOR) and FCA made public statements regarding the future cessation of LIBOR. IBA permanently ceased publication for 1-week and 2-month
LIBOR settings and all settings for non-U.S. dollar LIBOR on December 31, 2021. According to the FCA, IBA will permanently cease to publish overnight, 1-
month, 3-month, 6-month and 12-month LIBOR settings on June 30, 2023. IBA did not identify any successor administrator in its announcement. It is unclear
whether new methods of calculating LIBOR will be established such that it continues to exist after such end dates, and there is considerable uncertainty
regarding the publication or representativeness of LIBOR beyond such end dates. The U.S. Federal Reserve, in conjunction with the Alternative Reference
Rates Committee, is seeking to replace U.S. dollar LIBOR with a newly created index, SOFR, calculated based on repurchase agreements backed by treasury
securities. FirstEnergy’s 2021 Credit Facilities provide a mechanism to automatically transition to a SOFR-based benchmark when all U.S. dollar LIBOR settings
are no longer provided or are no longer representative. In addition, FirstEnergy’s 2021 Credit Facilities provide an option for the applicable borrower and lender
to jointly elect to transition early to a SOFR-based benchmark, or in certain circumstances, an alternative benchmark replacement. It is not possible to predict the
effect of these changes, other reforms or the establishment of alternative reference rates in the United Kingdom, the United States or elsewhere. To the extent
these interest rates increase, interest expense will increase. If sources of capital for us are reduced, capital costs could increase materially. Restricted access to
capital markets and/or increased borrowing costs could have an adverse effect on FirstEnergy’s results of operations, cash flows, financial condition and liquidity.
56

-- 65 of 98 --

FirstEnergy had no outstanding short-term borrowings as of June 30, 2022 and December 31, 2021. FirstEnergy’s available liquidity from external sources as of
July 25, 2022, was as follows:
Revolving Credit Facility 	Maturity 	Commitment 	Available Liquidity
(In millions)
FE and FET 	October 2026 $ 	1,000 $ 	847
Ohio Companies 	October 2026 	800 	800
Pennsylvania Companies 	October 2026 	950 	950
JCP&L 	October 2026 	500 	499
MP and PE 	October 2026 	400 	400
Transmission Companies 	October 2026 	850 	850
Subtotal $ 	4,500 $ 	4,346
Cash and cash equivalents 	— 	196
Total $ 	4,500 $ 	4,542
The following table summarizes the limitations on short-term indebtedness applicable to each borrower under current regulatory approvals and applicable
statutory and/or charter limitations as of June 30, 2022:
Individual Borrower
Regulatory and
Other Short-Term Debt
Limitations
(In millions)
FE and FET 	N/A
OE, CEI, JCP&L, ME, MP, and ATSI 	$ 	500
TE, PN, and WP 	300
PE and Penn 	150
TrAIL and MAIT 	400
Includes amounts which may be borrowed under the regulated companies’ money pool.
Subject to each borrower’s sublimit, the amounts noted below are available for the issuance of LOCs (subject to borrowings drawn under the 2021 Credit
Facilities) expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under each
of the 2021 Credit Facilities and against the applicable borrower’s borrowing sublimit. As of June 30, 2022, FirstEnergy had $4 million in outstanding LOCs.
Revolving Credit Facility 	LOC Availability
(In millions)
FE and FET 	$ 	100
Ohio Companies 	150
Pennsylvania Companies 	200
JCP&L 	100
MP and PE 	100
Transmission Companies 	200
The 2021 Credit Facilities do not contain provisions that restrict the ability to borrow or accelerate payment of outstanding advances in the event of any change
in credit ratings of the borrowers. Pricing is defined in “pricing grids,” whereby the cost of funds borrowed under the 2021 Credit Facilities are related to the credit
ratings of the company borrowing the funds. Additionally, borrowings under each of the 2021 Credit Facilities are subject to the usual and customary provisions
for acceleration upon the occurrence of events of default, including a cross-default for other indebtedness in excess of $100 million.
As of June 30, 2022, the borrowers were in compliance with the applicable interest coverage and debt-to-total-capitalization ratio covenants in each case as
defined under the 2021 Credit Facilities.
(1)
(1)
(1)
(1)
(1)
57

-- 66 of 98 --

FirstEnergy Money Pools
FirstEnergy’s utility operating subsidiary companies also have the ability to borrow from each other and FE to meet their short-term working capital requirements.
Similar but separate arrangements exist among FirstEnergy’s unregulated companies with AE Supply, FE, FET, FEV and certain other unregulated subsidiaries.
FESC administers these money pools and tracks surplus funds of FE and the respective regulated and unregulated subsidiaries, as the case may be, as well as
proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must repay the principal amount of the loan, together
with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from their respective pool and is
based on the average cost of funds available through the pool. The average interest rate for borrowings through the second quarter of 2022 was 0.92% per
annum for the regulated companies’ money pool and 0.99% per annum for the unregulated companies’ money pool.
Long-Term Debt Capacity
FE’s and its subsidiaries’ access to capital markets and costs of financing are influenced by the credit ratings of their securities. The following table displays FE’s
and its subsidiaries’ credit ratings as of July 22, 2022:
Corporate Credit Rating 	Senior Secured 	Senior Unsecured 	Outlook/CreditWatch
Issuer 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch 	S&P 	Moody’s 	Fitch
FE 	BBB- 	Ba1 	BBB- 	— 	— 	— 	BB+ 	Ba1 	BBB- 	S 	P 	S
AGC 	BB+ 	Baa2 	BBB 	— 	— 	— 	— 	— 	— 	S 	S 	S
ATSI 	BBB 	A3 	BBB 	— 	— 	— 	BBB 	A3 	BBB+ 	S 	S 	S
CEI 	BBB 	Baa2 	BBB 	A- 	A3 	A- 	BBB 	Baa2 	BBB+ 	S 	N 	S
FET 	BBB- 	Baa2 	BBB- 	— 	— 	— 	BB+ 	Baa2 	BBB- 	S 	S 	S
JCP&L 	BBB 	A3 	BBB 	— 	— 	— 	BBB 	A3 	BBB+ 	S 	S 	S
ME 	BBB 	A3 	BBB 	— 	— 	— 	BBB 	A3 	BBB+ 	S 	S 	S
MAIT 	BBB 	A3 	BBB 	— 	— 	— 	BBB 	A3 	BBB+ 	S 	S 	S
MP 	BBB 	Baa2 	BBB 	A- 	A3 	A- 	BBB 	Baa2 	— 	S 	S 	S
OE 	BBB 	A3 	BBB 	A- 	A1 	A- 	BBB 	A3 	BBB+ 	S 	S 	S
PN 	BBB 	Baa1 	BBB 	— 	— 	— 	BBB 	Baa1 	BBB+ 	S 	S 	S
Penn 	BBB 	A3 	BBB 	A- 	A1 	— 	— 	— 	— 	S 	S 	S
PE 	BBB 	Baa2 	BBB 	A- 	A3 	A- 	— 	— 	— 	S 	S 	S
TE 	BBB 	Baa1 	BBB 	A- 	A2 	A- 	— 	— 	— 	S 	N 	S
TrAIL 	BBB 	A3 	BBB 	— 	— 	— 	BBB 	A3 	BBB+ 	S 	S 	S
WP 	BBB 	A3 	BBB 	A- 	A1 	A- 	— 	— 	— 	S 	S 	S
S = Stable, P = Positive, N = Negative
On July 22, 2022, Fitch issued a one notch upgrade to all applicable ratings for FE and its subsidiaries and revised the outlook to stable.
The applicable undrawn and drawn margin on the 2021 Credit Facilities are subject to ratings based pricing grids. The applicable fee paid on the undrawn
commitments under the 2021 Credit Facilities are based on each borrower’s senior unsecured non-credit enhanced debt ratings as determined by S&P and
Moody’s. The fee paid on actual borrowings are determined based on each borrower’s senior unsecured non-credit enhanced debt ratings as determined by
S&P and Moody’s.
The interest rates payable on approximately $2.2 billion in FE’s senior unsecured notes are subject to adjustments from time to time if the ratings on the notes
from any one or more of S&P, Moody’s and Fitch decreases to a rating set forth in the applicable governing documents. Generally a one-notch downgrade by the
applicable rating agency may result in a 25 basis points coupon rate increase beginning at BB, Ba1, and BB+ for S&P, Moody’s and Fitch, respectively, to the
extent such rating is applicable to the series of outstanding senior unsecured notes, during the next interest period, subject to an aggregate cap of 2% from
issuance interest rate.
Debt capacity is subject to the consolidated interest coverage ratio in the 2021 Credit Facilities. As of June 30, 2022, FirstEnergy could incur approximately $800
million of incremental interest expense or incur a $2.0 billion reduction to the consolidated interest coverage earnings numerator, as defined under the covenant,
and FE would remain within the limitations of the financial covenant requirements by the 2021 Credit Facilities.
(1)
(1)
58

-- 67 of 98 --

Cash Requirements and Commitments
FirstEnergy has certain obligations and commitments to make future payments under contracts. For an in-depth discussion of FirstEnergy’s cash requirements
and commitments, see “Capital Resources and Liquidity - Cash Requirements and Commitments " in Item 7, "Management's Discussion and Analysis of
Financial Condition and Results of Operations" within FirstEnergy’s Form 10-K for the year ended December 31, 2021 (filed on February 16, 2022).
Changes in Cash Position
As of June 30, 2022, FirstEnergy had $478 million of cash and cash equivalents and $54 million of restricted cash compared to approximately $1.5 billion of
cash and cash equivalents and $49 million of restricted cash as of December 31, 2021, on the Consolidated Balance Sheets.
Cash Flows From Operating Activities
FirstEnergy’s most significant sources of cash are derived from electric service provided by its distribution and transmission operating subsidiaries. The most
significant use of cash from operating activities is buying electricity to serve non-shopping customers and paying fuel suppliers, employees, tax authorities,
lenders and others for a wide range of materials and services.
In the first six months of 2022, cash provided from operating activities was $1,283 million compared to $1,347 million in the same period of 2021. The decrease
in cash provided from operating activities is primarily due to rate refunds and rate credits provided to Ohio customers during the first half of 2022 under the
PUCO-approved Ohio Stipulation, higher operating expenses from lower capitalization of certain vegetation management and corporate support costs, and the
absence of accounts receivable working capital improvements in the first half of 2021, when collection activity improved since the start of the pandemic.
Accounts receivable working capital was also impacted by higher generation prices charged to customers and higher customer usage and demands. These
decreases in cash flow from operating activities are partially offset by cash flow generated from regulated capital investments made since the second quarter of
2021, higher cash collateral receipts primarily from certain generation suppliers that serve shopping customers due to the rise in power prices, higher cash
dividend distributions received by FEV from its equity investment in Global Holding and improvements in accounts payable working capital from the
implementation of certain FE Forward initiatives.
Cash Flows From Financing Activities
In the first six months of 2022 and 2021, cash used for financing activities was $981 million and $662 million, respectively. The following table summarizes
financing activities for the first six months of 2022 and 2021:
For the Six Months Ended June 30,
Financing Activities 	2022 	2021
(In millions)
New Issues:
Unsecured notes 	$ 	— $ 	1,150
Senior secured notes 	— 	150
FMBs 	— 	200
$ 	— $ 	1,500
Redemptions / Repayments:
Unsecured notes 	$ 	(2,499) $ 	—
FMBs 	(200) 	—
Senior secured notes 	(46) 	(33)
$ 	(2,745) $ 	(33)
Proceeds from FET minority interest sale, net of transaction costs 	$ 	2,348 $ 	—
Discounts (premiums) on debt issuances and redemptions, net 	$ 	(139) $ 	29
Short-term borrowings redemptions, net 	$ 	— $ 	(1,700)
Common stock dividend payments 	$ 	(445) $ 	(424)
Other 	$ 	— $ 	(34)
59

-- 68 of 98 --

In December 2021, FE provided notice of redemption for all remaining $850 million of its 2023 Notes, which was completed on January 20, 2022, with a make-
whole premium of approximately $38 million ($30 million after-tax).
On January 27, 2022, TE instructed its indenture trustee to provide notice of partial redemption for $25 million of TE’s 2.65% Senior Secured Notes, due 2028,
for partial redemption which occurred on February 11, 2022.
On February 11, 2022, CEI instructed its indenture trustee to provide notice of redemption for all remaining $150 million of CEI’s 2.77% Senior Notes, Series A,
due 2034, for redemption which occurred on March 14, 2022.
On April 15, 2022, WP redeemed $100 million of its 3.34% FMBs that became due.
On April 22, 2022, Penn agreed to sell $150 million of new 3.79% FMBs due December 1, 2032. The sales are expected to settle on November 29, 2022.
Proceeds are expected to be used to repay short-term borrowings.
On May 23, 2022, notice of redemption was provided for all remaining $500 million of FE's 2.85% Notes, due July 15, 2022, which was completed on June 22,
2022.
On May 25, 2022, FE commenced an offer to purchase for cash a portion of its 2031 Notes and 2047 Notes, which had $1.5 billion and $1 billion principal
amounts outstanding, respectively. Approximately $715 million principal amount of FE’s 2031 Notes and $284 million principal amount of FE’s 2047 Notes were
redeemed on June 15, 2022 for approximately $1.1 billion, including a tender premium of approximately $101 million ($80 million after-tax). In addition, FE
recognized approximately $7 million ($5 million after-tax) of deferred cash flow hedge losses and $10 million ($8 million after-tax) in other unamortized debt
costs and fees associated with the FE debt redemptions.
On June 30, 2022, Penn redeemed $100 million of its 6.09% FMBs that became due.
FE or its affiliates may, from time to time, seek to retire or purchase outstanding debt through open-market purchases, privately negotiated transactions or
otherwise. Such repurchases, if any, will be upon such terms and at such prices as FE or its affiliates may determine, and will depend on prevailing market
conditions, liquidity requirements, contractual restrictions and other factors.
Cash Flows From Investing Activities
Cash used for investing activities in the first six months of 2022 principally represented cash used for property additions. The following table summarizes
investing activities for the first six months of 2022 and 2021:
For the Six Months Ended June 30, 	Increase
Cash Used for Investing Activities 	2022 	2021 	(Decrease)
(In millions)
Property Additions:
Regulated Distribution 	$ 	673 $ 	667 $ 	6
Regulated Transmission 	464 	530 	(66)
Corporate / Other 	10 	29 	(19)
Proceeds from sale of Yards Creek 	— 	(155) 	155
Asset removal costs 	97 	111 	(14)
Other 	37 	(8) 	45
$ 	1,281 $ 	1,174 $ 	107
Cash used for investing activities for the first six months of 2022 increased $107 million, compared to the same period of 2021, primarily due to the absence of
proceeds from the sale of Yards Creek received in the first quarter of 2021, partially offset by lower property additions.
60

-- 69 of 98 --

GUARANTEES AND OTHER ASSURANCES
FirstEnergy has various financial and performance guarantees and indemnifications, which are issued in the normal course of business. These contracts include
performance guarantees, stand-by letters of credit, debt guarantees, surety bonds and indemnifications. FirstEnergy enters into these arrangements to facilitate
commercial transactions with third parties by enhancing the value of the transaction to the third party. The maximum potential amount of future payments
FirstEnergy and its subsidiaries could be required to make under these guarantees as of June 30, 2022, was approximately $1.1 billion, as summarized below:
Guarantees and Other Assurances Maximum
Exposure
(In millions)
FE’s Guarantees on Behalf of its Consolidated Subsidiaries
Deferred compensation arrangements 	$ 	513
Vehicle leases 	75
Other 	7
595
FE’s Guarantees on Other Assurances
Surety Bonds 	321
Deferred compensation arrangements 	132
LOCs 	4
457
Total Guarantees and Other Assurances 	$ 	1,052
Collateral and Contingent-Related Features
In the normal course of business, FE and its subsidiaries may enter into physical or financially settled contracts for the sale and purchase of electric capacity,
energy, fuel and emission allowances. Certain agreements contain provisions that require FE or its subsidiaries to post collateral. This collateral may be posted
in the form of cash or credit support with thresholds contingent upon FE’s or its subsidiaries’ credit rating from each of the major credit rating agencies. The
collateral and credit support requirements vary by contract and by counterparty.
As of June 30, 2022, $53 million of collateral has been posted by FE or its subsidiaries and is included in Prepaid taxes and other current assets on
FirstEnergy’s Consolidated Balance Sheets. FE or its subsidiaries are holding $360 million of cash collateral as of June 30, 2022, from certain generation
suppliers, primarily due to the rise in power prices, and such amount is included in Other current liabilities on FirstEnergy’s Consolidated Balance Sheets.
These credit-risk-related contingent features stipulate that if the subsidiary were to be downgraded or lose its investment grade credit rating (based on its senior
unsecured debt rating), it would be required to provide additional collateral. The following table discloses the potential additional credit rating contingent
contractual collateral obligations as of June 30, 2022:
Potential Collateral Obligations
Utilities and
Transmission
Companies 	FE 	Total
(In millions)
Contractual Obligations for Additional Collateral
Upon further downgrade 	$ 	52 $ 	— $ 	52
Surety Bonds (collateralized amount) 	57 	249 	306
Total Exposure from Contractual Obligations 	$ 	109 $ 	249 $ 	358
Surety bonds are not tied to a credit rating. Surety Bonds’ impact assumes maximum contractual obligations, which is ordinarily 100% of the face amount of the surety bond
except with respect to $39 million of surety bond obligations for which the collateral obligation is capped at 60% of the face amount, and typical obligations require 30 days to
cure.
MARKET RISK INFORMATION
FirstEnergy uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations.
FirstEnergy’s Enterprise Risk Management Committee, comprised of members of senior management, provides general oversight for risk management activities
throughout FirstEnergy.
(1)
(1)
61

-- 70 of 98 --

Commodity Price Risk
FirstEnergy has limited exposure to financial risks resulting from fluctuating commodity prices, such as prices for electricity, coal and energy transmission.
FirstEnergy’s Risk Management Department and Enterprise Risk Management Committee are responsible for promoting the effective design and implementation
of sound risk management programs and overseeing compliance with corporate risk management policies and established risk management practice.
The valuation of derivative contracts is based on observable market information. As of June 30, 2022, FirstEnergy has a net asset of $7 million in non-hedge
derivative contracts that are related to FTRs at certain of the Utilities. FTRs are subject to regulatory accounting and do not impact earnings.
Equity Price Risk
As of June 30, 2022, the FirstEnergy pension plan assets were allocated approximately as follows: 33% in equity securities, 19% in fixed income securities, 12%
in alternatives, 12% in real estate, 14% in private debt/equity, 6% in derivatives and 4% in cash and short-term securities. Due to the American Rescue Plan Act
of 2021, under current assumptions, including an expected annual return on assets of 7.5%, FirstEnergy does not currently expect to have a required
contribution to the pension plan. However, a decline in the value of pension plan assets could result in additional funding requirements and FirstEnergy may
elect to contribute to the pension plan voluntarily. As of June 30, 2022, FirstEnergy’s OPEB plan assets were allocated approximately as follows: 46% in equity
securities, 51% in fixed income securities and 3% in cash and short-term securities. See Note 4, “Pension and Other Post-Employment Benefits,” of the Notes to
Consolidated Financial Statements for additional details on FirstEnergy’s pension and OPEB plans.
In the six months ended June 30, 2022, FirstEnergy’s pension and OPEB plan assets have lost approximately 15.1% and 13.9%, respectively, as compared to
an annual expected return on plan assets of 7.5%.
Interest Rate Risk
FirstEnergy recognizes net actuarial gains or losses for its pension and OPEB plans in the fourth quarter of each year and whenever a plan is determined to
qualify for a remeasurement. A primary factor contributing to these actuarial gains and losses are changes in the discount rates used to value pension and OPEB
obligations as of the measurement date and the difference between expected and actual returns on the plans’ assets. FirstEnergy utilizes a spot rate approach in
the estimation of the components of benefit cost by applying specific spot rates along the full yield curve to the relevant projected cash flows. As of June 30,
2022, the spot rate was 4.79% and 4.70% for pension and OPEB obligations, respectively, as compared to 3.02% and 2.84% as of December 31, 2021,
respectively.
At this time, FirstEnergy is unable to determine or project the mark-to-market adjustment that may be recorded as of December 31, 2022.
CREDIT RISK
Credit risk is the risk that FirstEnergy would incur a loss as a result of nonperformance by counterparties of their contractual obligations. FirstEnergy maintains
credit policies and procedures with respect to counterparty credit (including requirement that counterparties maintain specified credit ratings) and require other
assurances in the form of credit support or collateral in certain circumstance in order to limit counterparty credit risk. FirstEnergy has concentrations of suppliers
and customers among electric utilities, financial institutions and energy marketing and trading companies. These concentrations may impact FirstEnergy’s overall
exposure to credit risk, positively or negatively, as counterparties may be similarly affected by changes in economic, regulatory or other conditions. In the event
an energy supplier of the Ohio Companies, Pennsylvania Companies, JCP&L or PE defaults on its obligation, the affected company would be required to seek
replacement power in the market. In general, subject to regulatory review or other processes, it is expected that appropriate incremental costs incurred by these
entities would be recoverable from customers through applicable rate mechanisms, thereby mitigating the financial risk for these entities. FirstEnergy’s credit
policies to manage credit risk include the use of an established credit approval process, daily credit mitigation provisions, such as margin, prepayment or
collateral requirements. FirstEnergy and its subsidiaries may request additional credit assurance, in certain circumstances, in the event that the counterparties’
credit ratings fall below investment grade, their tangible net worth falls below specified percentages or their exposures exceed an established credit limit.
OUTLOOK
STATE REGULATION
Each of the Utilities' retail rates, conditions of service, issuance of securities and other matters are subject to regulation in the states in which it operates - in
Maryland by the MDPSC, in New Jersey by the NJBPU, in Ohio by the PUCO, in Pennsylvania by the PPUC, in West Virginia by the WVPSC and in New York
by the NYPSC. The transmission operations of PE in Virginia, ATSI in Ohio, and the Transmission Companies in Pennsylvania are subject to certain regulations
of the VSCC, PUCO and PPUC, respectively. In addition, under Ohio law, municipalities may regulate rates of a public utility, subject to appeal to the PUCO if
not
62

-- 71 of 98 --

acceptable to the utility. Further, if any of the FirstEnergy affiliates were to engage in the construction of significant new transmission facilities, depending on the
state, they may be required to obtain state regulatory authorization to site, construct and operate the new transmission facility.
MARYLAND
PE operates under MDPSC approved base rates that were effective as of March 23, 2019. PE also provides SOS pursuant to a combination of settlement
agreements, MDPSC orders and regulations, and statutory provisions. SOS supply is competitively procured in the form of rolling contracts of varying lengths
through periodic auctions that are overseen by the MDPSC and a third-party monitor. Although settlements with respect to SOS supply for PE customers have
expired, service continues in the same manner until changed by order of the MDPSC. PE recovers its costs plus a return for providing SOS. PE expects to file a
new base rate case in early 2023, consistent with the MDPSC’s order issued on March 22, 2019.
The EmPOWER Maryland program requires each electric utility to file a plan to reduce electric consumption and demand 0.2% per year, up to the ultimate goal
of 2% annual savings, for the duration of the 2021-2023 EmPOWER Maryland program cycles to the extent the MDPSC determines that cost-effective programs
and services are available. PE's approved 2021-2023 EmPOWER Maryland plan continues and expands upon prior years' programs for a projected total
investment of approximately $148 million over the three-year period. PE recovers program investments with a return through an annually reconciled surcharge,
with most costs subject to recovery over a five-year period with a return on the unamortized balance. Maryland law only allows for the utility to recover lost
distribution revenue attributable to energy efficiency or demand reduction programs through a base rate case proceeding, and to date, such recovery has not
been sought or obtained by PE.
NEW JERSEY
JCP&L operates under NJBPU approved rates that took effect as of January 1, 2021, and were effective for customers as of November 1, 2021. JCP&L provides
BGS for retail customers who do not choose a third-party EGS and for customers of third-party EGSs that fail to provide the contracted service. All New Jersey
EDCs participate in this competitive BGS procurement process and recover BGS costs directly from customers as a charge separate from base rates.
JCP&L has instituted energy efficiency and peak demand reduction programs in accordance with the New Jersey Clean Energy Act as approved by the NJBPU
in April 2021. The NJBPU approved plans include recovery of lost revenues resulting from the programs and a three-year plan including total program costs of
$203 million, of which $158 million of investment is recovered over a ten-year amortization period with a return as well as operations and maintenance expenses
and financing costs of $45 million recovered on an annual basis.
In December 2017, the NJBPU issued proposed rules to modify its current CTA policy in base rate cases to: (i) calculate savings using a five-year look back from
the beginning of the test year; (ii) allocate savings with 75% retained by the company and 25% allocated to customers; and (iii) exclude transmission assets of
electric distribution companies in the savings calculation. On January 17, 2019, the NJBPU approved the proposed CTA rules with no changes. On May 17,
2019, the NJ Rate Counsel filed an appeal with the Appellate Division of the Superior Court of New Jersey and on June 7, 2021, the Superior Court issued an
order reversing the NJBPU’s CTA rules and remanded the case back to the NJBPU. Specifically, the Court’s ruling requires 100% of the CTA savings to be
credited to customers in lieu of the NJBPU’s current policy requiring 25%. On December 6, 2021, the NJBPU issued proposed amended rules modifying its
current CTA policy in base rate cases consistent with the Superior Court’s June 7, 2021 order. Comments were filed on March 3, 2022. Once the proposed rules
are final, they will be applied on a prospective basis in a future base rate case, however, it is not expected to have a material adverse effect on FirstEnergy’s
results or financial condition.
On October 28, 2020, the NJBPU approved a stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for distribution base rate
increase. The settlement provided for a $94 million annual base distribution revenues increase for JCP&L based on an ROE of 9.6%, which became effective for
customers on November 1, 2021. The settlement additionally provided that JCP&L would be subject to a management audit, which began in May 2021 and is
currently ongoing. FirstEnergy is unable to predict the outcome of the management audit.
On September 14, 2021, JCP&L submitted a supplemental filing with the NJBPU to revise a previously filed AMI Program, which proposed the deployment of
approximately 1.2 million advanced meters. Under the revised AMI Program, during the first six years of the AMI Program from 2022 through 2027, JCP&L
estimates costs of $494 million, consisting of capital investments of approximately $390 million, incremental operations and maintenance expenses of
approximately $73 million and cost of removal of $31 million. On February 8, 2022, JCP&L filed with the NJBPU a stipulation entered into with the NJBPU staff,
NJ Rate Counsel and others, that, pending NJBPU approval, would affirm the terms of the revised AMI Program. The Stipulation, which was approved by NJBPU
order on February 23, 2022, also provides that the revised AMI Program-related capital costs, the legacy meter stranded costs, and the operations and
maintenance expense will be deferred and placed in regulatory assets, with such amounts sought to be recovered in the JCP&L’s subsequent base rate cases.
On July 2, 2020, the NJBPU issued an order allowing New Jersey utilities to track and create a regulatory asset for future recovery of all prudently incurred
incremental costs arising from the COVID-19 pandemic beginning March 9, 2020 and
63

-- 72 of 98 --

continuing until the New Jersey Governor issues an order stating that the COVID-19 pandemic is no longer in effect. New Jersey utilities can request recovery of
such regulatory asset in a stand-alone COVID-19 regulatory asset filing or future base rate case. On October 28, 2020, the NJBPU issued an order expanding
the scope of the proceeding to examine all pandemic issues, including recovery of the COVID-19 regulatory assets, by way of a generic proceeding. Through
various executive orders issued by the New Jersey Governor, the moratorium period was extended to December 31, 2021. On December 21, 2021, the
moratorium on residential disconnections for certain entities providing utility service was extended until March 15, 2022. The moratorium on residential
disconnections was not extended for investor-owned electric utilities such as JCP&L, but does require that investor-owned electric public utilities offer qualifying
residential customers deferred payment arrangements meeting certain minimum criteria prior to disconnecting service. Additionally, while the moratorium on
residential disconnections for certain entities providing electric service was not extended after March 15, 2022, new legislation was enacted on March 25, 2022,
prohibiting utilities from disconnecting electric service to customers that have applied for utility bill assistance before June 15, 2022 until such time as the state
agency administering the assistance program makes a decision on the application and further requiring that all utilities offer a deferred payment arrangement
meeting certain minimum criteria after the state agency’s decision on the application has been made.
Pursuant to an NJBPU order requiring all New Jersey electric distribution companies to file electric vehicle programs, JCP&L filed its program on March 1, 2021.
JCP&L’s proposed electric vehicle program consisted of six sub-programs, including a consumer education and outreach initiative that would begin on January
1, 2022, and continue over a four-year period. On May 2, 2022, JCP&L filed with the NJBPU a stipulation entered into with the NJBPU staff, NJ Rate Counsel
and others that provided a total budget of approximately $40 million for JCP&L’s electric vehicle program, including investments of approximately $29 million and
operations and maintenance expenses of approximately $11 million. Electric vehicle related capital and operations and maintenance costs shall be deferred and
placed in separate regulatory assets for recovery in JCP&L’s next base rate case. The stipulation was approved without modification by the NJBPU on June 8,
2022.
OHIO
The Ohio Companies operate under PUCO-approved base distribution rates that became effective in 2009. The Ohio Companies currently operate under ESP
IV, effective June 1, 2016 and continuing through May 31, 2024, that continues the supply of power to non-shopping customers at a market-based price set
through an auction process. ESP IV also continues the Rider DCR, which supports continued investment related to the distribution system for the benefit of
customers, with increased revenue caps of $20 million per year from June 1, 2019 through May 31, 2022; and $15 million per year from June 1, 2022 through
May 31, 2024. In addition, ESP IV includes: (1) continuation of a base distribution rate freeze through May 31, 2024; (2) a goal across FirstEnergy to reduce CO
emissions by 90% below 2005 levels by 2045; and (3) contributions, totaling $51 million to: (a) fund energy conservation programs, economic development and
job retention in the Ohio Companies’ service territories; (b) establish a fuel-fund in each of the Ohio Companies’ service territories to assist low-income
customers; and (c) establish a Customer Advisory Council to ensure preservation and growth of the competitive market in Ohio.
On September 8, 2020, the OCC filed motions in the Ohio Companies’ corporate separation audit and DMR audit dockets, requesting the PUCO to open an
investigation and management audit, hire an independent auditor, and require FirstEnergy to show it did not improperly use money collected from consumers or
violate any utility regulatory laws, rules or orders in its activities regarding HB 6. On December 30, 2020, in response to the OCC's motion, the PUCO reopened
the DMR audit docket, and directed PUCO staff to solicit a third-party auditor and conduct a full review of the DMR to ensure funds collected from customers
through the DMR were only used for the purposes established in ESP IV. On June 2, 2021, the PUCO selected an auditor and the auditor filed the final audit
report on January 14, 2022, which made certain findings and recommendations. The report found that spending of DMR revenues was not required to be
tracked, and that DMR revenues, like all rider revenues, are placed into the regulated money pool as a matter of routine, where the funds lose their identity.
Therefore, the report could not suggest that DMR funds were used definitively for direct or indirect support for grid modernization. The report also concluded that
there was no documented evidence that ties revenues from the DMR to lobbying for the passage of HB 6, but also could not rule out with certainty uses of DMR
funds to support the passage of HB 6. The report further recommended that the regulated companies' money pool be audited more frequently and the Ohio
Companies adopt formal dividend policies. Final comments and responses were filed by parties in April and May 2022, respectively.
On September 15, 2020, the PUCO opened a new proceeding to review the political and charitable spending by the Ohio Companies in support of HB 6 and the
subsequent referendum effort, and directing the Ohio Companies to show cause, demonstrating that the costs of any political or charitable spending in support of
HB 6, or the subsequent referendum effort, were not included, directly or indirectly, in any rates or charges paid by customers. The Ohio Companies initially filed
a response stating that the costs of any political or charitable spending in support of HB 6, or the subsequent referendum effort, were not included, directly or
indirectly, in any rates or charges paid by customers, but on August 6, 2021, filed a supplemental response explaining that, in light of the facts set forth in the
DPA and the findings of the Rider DCR audit report further discussed below, political or charitable spending in support of HB 6, or the subsequent referendum
effort, affected pole attachment rates paid by approximately $15 thousand. On October 26, 2021, the OCC filed a motion requesting the PUCO to order an
independent external audit to investigate FE’s political and charitable spending related to HB 6, and to appoint an independent review panel to retain and
oversee the auditor. In November and December 2021, parties filed comments and reply comments regarding the Ohio Companies’ original and supplemental
responses to the PUCO’s September 15, 2020, show cause directive. On May 4, 2022, the PUCO selected a third-party auditor to determine whether the show
cause demonstration submitted by the Ohio
2
64

-- 73 of 98 --

Companies is sufficient to ensure that the cost of any political or charitable spending in support of HB 6 or the subsequent referendum effort was not included,
directly or indirectly, in any rates or charges paid by ratepayers. The auditor’s final report is due by December 16, 2022.
In connection with an ongoing audit of the Ohio Companies’ policies and procedures relating to the code of conduct rules between affiliates, on November 4,
2020, the PUCO initiated an additional corporate separation audit as a result of the FirstEnergy leadership transition announcement made on October 29, 2020,
as further discussed below. The additional audit is to ensure compliance by the Ohio Companies and their affiliates with corporate separation laws and the Ohio
Companies’ corporate separation plan. The additional audit is for the period from November 2016 through October 2020. The final audit report was filed on
September 13, 2021. The audit report makes no findings of major non-compliance with Ohio corporate separation requirements, minor non-compliance with
eight requirements, and findings of compliance with 23 requirements. Parties filed comments and reply comments on the audit report, and a PUCO attorney
examiner is expected to schedule an evidentiary hearing.
In the fourth quarter of 2020, motions were filed with the PUCO requesting that the PUCO amend the Ohio Companies’ riders for collecting the OVEC-related
charges required by HB 6 to provide for refunds in the event such provisions of HB 6 are repealed. Neither the Ohio Companies nor FE benefit from the OVEC-
related charges the Ohio Companies collect. Instead, the Ohio Companies are further required by HB 6 to remit all the OVEC-related charges they collect to
non-FE Ohio electric distribution utilities. The Ohio Companies contested the motions, which are pending before the PUCO.
On November 1, 2021, the Ohio Companies, together with the OCC, PUCO Staff, and several other signatories, entered into an Ohio Stipulation with the intent
of resolving the ongoing energy efficiency rider audits, various SEET proceedings, including the Ohio Companies’ 2017 SEET proceeding, and the Ohio
Companies’ quadrennial ESP review, each of which was pending before the PUCO. Specifically, the Ohio Stipulation provides that the Ohio Companies’ current
ESP IV passes the required statutory test for their prospective SEET review as part of the Quadrennial Review of ESP IV, and except for limited circumstances,
the signatory parties have agreed not to challenge the Ohio Companies’ SEET return on equity calculation methodology for their 2021-2024 SEET proceedings.
The Ohio Stipulation additionally affirms that: (i) the Ohio Companies’ ESP IV shall continue through its previously authorized term of May 31, 2024; and (ii) the
Ohio Companies will file their next base rate case in May 2024, and further, no signatory party will seek to adjust the Ohio Companies’ base distribution rates
before that time, except in limited circumstances. The Ohio Companies further agreed to refund $96 million to customers in connection with the 2017-2019 SEET
cases, and to provide $210 million in future rate reductions for all customers, including $80 million in 2022, $60 million in 2023, $45 million in 2024, and $25
million in 2025. The PUCO approved the 2017-2019 SEET refunds and 2022 rate reductions on December 1, 2021, and refunds began in December 2021.
Future rate reductions are recognized as a reduction to regulated distribution segment’s revenue in the Consolidated Statements of Income as they are provided
to the Ohio Companies’ customers.
In connection with an ongoing annual audit of the Ohio Companies’ Rider DCR for 2020, and as a result of disclosures in FirstEnergy’s Form 10-K for the year
ended December 31, 2020 (filed on February 18, 2021), the PUCO expanded the scope of the audit on March 10, 2021, to include a review of certain
transactions that were either improperly classified, misallocated, or lacked supporting documentation, and to determine whether funds collected from customers
were used to pay the vendors, and if so, whether or not the funds associated with those payments should be returned to customers through Rider DCR or
through an alternative proceeding. On August 3, 2021, the auditor filed its final report on this phase of the audit, and the parties submitted comments and reply
comments on this audit report in October 2021. Additionally, on September 29, 2021, the PUCO expanded the scope of the audit in this proceeding to determine
if the costs of the naming rights for FirstEnergy Stadium have been recovered from the Ohio Companies’ customers. On November 19, 2021, the auditor filed its
final report, in which the auditor concluded that the FirstEnergy Stadium naming rights expenses were not recovered from Ohio customers. On December 15,
2021, the PUCO further expanded the scope of the audit to include an investigation into an apparent nondisclosure of a side agreement in the Ohio Companies’
ESP IV settlement proceedings, but stayed its expansion of the audit until otherwise ordered by the PUCO.
On May 16, 2022, the Ohio Companies filed their application for determination of the existence of SEET under ESP IV for calendar year 2021, which
demonstrated that each of the individual Ohio Companies did not have significantly excessive earnings.
On July 15, 2022, the Ohio Companies filed an application with the PUCO for approval of phase two of their distribution grid modernization plan that would,
among other things, provide for the installation of an additional 700,000 smart meters, distribution automation equipment on 240 distribution circuits, voltage
regulating equipment on 220 distribution circuits, and other investments and pilot programs in related technologies designed to provide enhanced customer
benefits. The Ohio Companies propose that phase two will be implemented over a four-year budget period with estimated capital investments of $626 million and
operations and maintenance expenses of $144 million over the deployment period. Under the proposal, costs of phase two of the grid modernization plan would
be recovered through the Ohio Companies’ AMI rider, pursuant to the terms and conditions approved in ESP IV.
See below for additional details on the government investigations and subsequent litigation surrounding the investigation of HB 6.
65

-- 74 of 98 --

PENNSYLVANIA
The Pennsylvania Companies operate under rates approved by the PPUC, effective as of January 27, 2017. On November 18, 2021, the PPUC issued orders to
each of the Pennsylvania Companies directing they operate under DSPs for the June 1, 2019 through May 31, 2023 delivery period, which DSPs provide for the
competitive procurement of generation supply for customers who do not receive service from an alternative EGS. Under the 2019-2023 DSPs, supply will be
provided by wholesale suppliers through a mix of 3, 12 and 24-month energy contracts, as well as two RFPs for 2-year SREC contracts for ME, PN and Penn.
On December 14, 2021, the Pennsylvania Companies filed proposed DSPs for provision of generation for the June 1, 2023 through May 31, 2027 delivery
period, to be sourced through competitive procurements for customers who do not receive service from an alternative EGS. An evidentiary hearing was held on
April 13, 2022, and on April 20, 2022, the parties filed a partial settlement with the PPUC resolving certain of the issues in the proceeding and setting aside the
remainder of the issues to be resolved through briefing. On June 29, 2022, the PPUC recommended approval of the settlement without modification and granted
the Pennsylvania Companies’ position on the remaining issues that had been reserved for briefing. Final PPUC approval is expected by September 2022. Under
the 2023-2027 DSPs, supply is proposed to be provided through a mix of 12 and 24-month energy contracts, as well as long-term solar PPAs.
In March 2018, the PPUC approved adjusted customer rates of the Pennsylvania Companies to reflect the net impact of the Tax Act. As a result, the
Pennsylvania Companies established riders that, beginning July 1, 2018, refunded to customers tax savings attributable to the Tax Act as compared to the
amounts established in their most recent base rate proceedings on a current and going forward basis. The amounts recorded as savings for the total period of
January 1 through June 30, 2018, were tracked and were to be addressed for treatment in a future proceeding. On May 17, 2021, the Pennsylvania Companies
filed petitions with the PPUC proposing to refund the net savings for the January through June 2018 period to customers beginning January 1, 2022. On
November 18, 2021, the PPUC approved the Pennsylvania Companies' proposed refunds, but also revised a previous methodology for calculating the net tax
savings, which resulted in additional tax savings attributable to the Tax Act to be refunded to customers and directed the Pennsylvania Companies to file new
petitions to propose the timing and methodology to provide these additional refunds to customers. The Pennsylvania Companies recalculated the net impact for
2018 through 2021 under the revised PPUC methodology in comparison to amounts already refunded to customers under the existing riders, which resulted in
an additional $61 million in savings, with interest, to be provided to customers. As a result, FirstEnergy recognized a pre-tax charge of $61 million in the fourth
quarter of 2021, associated with the additional refund and based on the November 2021 PPUC order and methodology. The Pennsylvania Companies filed
petitions to propose the timing and methodology of the refund of these amounts on February 17, 2022. The Pennsylvania Companies’ petitions and the proposed
refunds addressed within were approved by the PPUC on June 16, 2022 without modification, effective July 1, 2022, and are expected to be refunded by the end
of the year.
Pursuant to Pennsylvania Act 129 of 2008 and PPUC orders, Pennsylvania EDCs implement energy efficiency and peak demand reduction programs. On June
18, 2020, the PPUC entered a Final Implementation Order for a Phase IV EE&C Plan, operating from June 2021 through May 2026. The Final Implementation
Order set demand reduction targets, relative to 2007 to 2008 peak demands, at 2.9% MW for ME, 3.3% MW for PN, 2.0% MW for Penn, and 2.5% MW for WP;
and energy consumption reduction targets, as a percentage of the Pennsylvania Companies’ historic 2009 to 2010 reference load at 3.1% MWH for ME, 3.0%
MWH for PN, 2.7% MWH for Penn, and 2.4% MWH for WP. The Pennsylvania Companies’ Phase IV plans were approved by PPUC without modification on
March 25, 2021.
Pennsylvania EDCs are permitted to seek PPUC approval of an LTIIP for infrastructure improvements and costs related to highway relocation projects, after
which a DSIC may be approved to recover LTIIP costs. On January 16, 2020, the PPUC approved the Pennsylvania Companies’ LTIIPs for the five-year period
beginning January 1, 2020 and ending December 31, 2024 for a total capital investment of approximately $572 million for certain infrastructure improvement
initiatives. On June 25, 2021, the Pennsylvania OCA filed a complaint against Penn’s quarterly DSIC rate, disputing the recoverability of the Companies’
automated distribution management system investment under the DSIC mechanism. On January 26, 2022, the parties filed a joint petition for settlement that
resolves all issues in this matter, which was approved by the PPUC without modification on April 14, 2022.
Following the Pennsylvania Companies’ 2016 base rate proceedings, the PPUC ruled in a separate proceeding related to the DSIC mechanisms that the
Pennsylvania Companies were not required to reflect federal and state income tax deductions related to DSIC-eligible property in DSIC rates. The decision was
appealed to the Pennsylvania Supreme Court and in July 2021 the court upheld the Pennsylvania Commonwealth Court’s reversal of the PPUC’s decision and
remanded the matter back to the PPUC for determination as to how DSIC calculations shall account for ADIT and state taxes. The matter awaits further action by
the PPUC. The adverse ruling by the Pennsylvania Supreme Court is not expected to result in a material impact to FirstEnergy.
WEST VIRGINIA
MP and PE provide electric service to all customers through traditional cost-based, regulated utility ratemaking and operate under WVPSC-approved rates that
became effective in February 2015. MP and PE recover net power supply costs, including
66

-- 75 of 98 --

fuel costs, purchased power costs and related expenses, net of related market sales revenue through the ENEC. MP’s and PE’s ENEC rate is updated annually.
On December 30, 2020, MP and PE filed with the WVPSC a determination of the rate impact of the Tax Act with respect to ADIT. The filing proposed an annual
revenue reduction of $2.6 million, effective January 1, 2022, with reconciliation and any resulting adjustments incorporated into annual ENEC proceedings. On
August 12, 2021, a unanimous settlement was reached with all the parties agreeing to a $7.7 million rate reduction beginning January 1, 2022, with a true-up in
the ENEC proceeding each year. On November 30, 2021, the WVPSC approved the settlement on all terms, except for the proposed effective date of the rate
reduction, which was held in abeyance until further notice.
On August 27, 2021, MP and PE filed with the WVPSC their annual ENEC case requesting an increase in ENEC rates of $19.6 million beginning January 1,
2022, which represented a 1.5% increase to the rates currently in effect. WVPSC issued an order on December 29, 2021, granting the requested $19.6 million
increase in ENEC rates. Among other things, the order requires MP and PE to refund to its large industrial customers their respective portion of the $7.7 million
rate reduction discussed above and also requires MP and PE to negotiate a PPA for its capacity shortfall and a reasonable reserve margin if certain conditions
are met. By order dated March 2, 2022, the WVPSC reopened the case to determine whether rates should be increased to recover growing ENEC under-
recoveries. On May 17, 2022, the WVPSC issued an order approving an interim rate increase of $94 million, effective for customer rates on May 18, 2022,
subject to a prudence review during MP and PE’s 2022 ENEC case.
On December 3, 2021 and on December 27, 2021, the WVPSC approved settlements granting MP and PE a $16 million increase in rates effective January 1,
2022, and permitting the continuation of the vegetation management program and surcharge for another two years. WVPSC additionally ordered MP and PE to
perform equipment inspections within a reasonable time after vegetation management occurs on a circuit.
On November 22, 2021, MP and PE filed with the WVPSC their plan to construct 50 MWs of solar generation at five sites in West Virginia. The plan includes a
tariff to offer solar power to West Virginia customers and cost recovery for MP and PE from other customers through a surcharge for any solar investment not
fully subscribed by their customers. A hearing was held in mid-March 2022 and on April 21, 2022, the WVPSC issued an order approving, effective May 1, 2022,
the requested tariff and requiring MP and PE to subscribe at least 85% of the planned 50 MWs before commencing construction. MP and PE must seek
separate approval from the WVPSC to recover any solar generation costs in excess of the approved tariff. The first solar generation site is expected to be in-
service by the end of 2023 and all construction completed at the other sites no later than the end of 2025 at a total investment cost of approximately $100
million.
On December 17, 2021, MP and PE filed with the WVPSC for approval of environmental compliance projects at the Ft. Martin and Harrison Power Stations to
comply with the EPA’s ELG and operate these plants beyond 2028. The request includes a surcharge to recover the expected $142 million capital investment
and $3 million in annual operation and maintenance expense. A hearing has been set in August 2022, with a ruling from the WVPSC expected in the fall of 2022.
If approved, construction would be expected to be completed by the end of 2025. See “Outlook - Environmental Matters - Clean Water Act" below, for additional
details on the EPA's ELG.
FERC REGULATORY MATTERS
Under the FPA, FERC regulates rates for interstate wholesale sales and transmission of electric power, regulatory accounting and reporting under the Uniform
System of Accounts, and other matters, including construction and operation of hydroelectric projects. With respect to their wholesale services and rates, the
Utilities, AE Supply and the Transmission Companies are subject to regulation by FERC. FERC regulations require JCP&L, MP, PE, WP and the Transmission
Companies to provide open access transmission service at FERC-approved rates, terms and conditions. Transmission facilities of JCP&L, MP, PE, WP and the
Transmission Companies are subject to functional control by PJM and transmission service using their transmission facilities is provided by PJM under the PJM
Tariff.
FERC regulates the sale of power for resale in interstate commerce in part by granting authority to public utilities to sell wholesale power at market-based rates
upon showing that the seller cannot exert market power in generation or transmission or erect barriers to entry into markets. The Utilities and AE Supply each
have been authorized by FERC to sell wholesale power in interstate commerce at market-based rates and have a market-based rate tariff on file with FERC,
although in the case of the Utilities major wholesale purchases remain subject to review and regulation by the relevant state commissions.
Federally enforceable mandatory reliability standards apply to the bulk electric system and impose certain operating, record-keeping and reporting requirements
on the Utilities, AE Supply, and the Transmission Companies. NERC is the ERO designated by FERC to establish and enforce these reliability standards,
although NERC has delegated day-to-day implementation and enforcement of these reliability standards to six regional entities, including RFC. All of the facilities
that FirstEnergy operates are located within the RFC region. FirstEnergy actively participates in the NERC and RFC stakeholder processes, and otherwise
monitors and manages its companies in response to the ongoing development, implementation and enforcement of the reliability standards implemented and
enforced by RFC.
67

-- 76 of 98 --

FirstEnergy believes that it is in material compliance with all currently effective and enforceable reliability standards. Nevertheless, in the course of operating its
extensive electric utility systems and facilities, FirstEnergy occasionally learns of isolated facts or circumstances that could be interpreted as excursions from the
reliability standards. If and when such occurrences are found, FirstEnergy develops information about the occurrence and develops a remedial response to the
specific circumstances, including in appropriate cases “self-reporting” an occurrence to RFC. Moreover, it is clear that NERC, RFC and FERC will continue to
refine existing reliability standards as well as to develop and adopt new reliability standards. Any inability on FirstEnergy’s part to comply with the reliability
standards for its bulk electric system could result in the imposition of financial penalties, or obligations to upgrade or build transmission facilities, that could have
a material adverse effect on its financial condition, results of operations, and cash flows.
FERC Audit
FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s
compliance with certain accounting and reporting requirements under various FERC regulations. On February 4, 2022, FERC filed the final audit report for the
period of January 1, 2015 through September 30, 2021, which included several findings and recommendations. FirstEnergy has accepted the findings and
recommendations of the final audit report. The audit report included a finding and related recommendation that FirstEnergy may have used an inappropriate
methodology for allocation of certain costs to regulatory capital accounts under certain FERC regulations and reporting. As such, FirstEnergy is currently
performing an analysis of these costs and how it impacted certain wholesale transmission customer rates. FirstEnergy is unable to predict or estimate the final
outcome of this analysis and audit, however, it could result in refunds, with interest, to certain wholesale transmission customers and/or write-offs of previously
capitalized costs if they are determined to be nonrecoverable.
ATSI Transmission Formula Rate
On May 1, 2020, ATSI filed amendments to its formula rate to recover regulatory assets for certain costs that ATSI incurred as a result of its 2011 move from
MISO to PJM, certain costs allocated to ATSI by FERC for transmission projects that were constructed by other MISO transmission owners, and certain costs for
transmission-related vegetation management programs. A portion of these costs would have been charged to the Ohio Companies. Additionally, ATSI proposed
certain income tax-related adjustments and certain tariff changes addressing the revenue credit components of the formula rate template. On June 30, 2020,
FERC issued an initial order accepting the tariff amendments subject to refund and setting the matter for hearing and settlement proceedings. ATSI and the
parties to the FERC proceeding subsequently were able to reach settlement, and on October 14, 2021, filed the settlement with FERC. As a result of the filed
settlement, FirstEnergy recognized a $21 million pre-tax charge during the third quarter of 2021, which reflects the difference between amounts originally
recorded as regulatory assets and amounts which will ultimately be recovered as a result of the pending settlement. From a segment perspective, during the
third quarter of 2021, the Regulated Transmission segment recorded a pre-tax charge of $48 million and the Regulated Distribution segment recognized a $27
million reduction to a reserve previously recorded in 2010. In addition, the settlement provides for partial recovery of future incurred costs allocated to ATSI by
MISO for the above-referenced transmission projects that were constructed by other MISO transmission owners, which is not expected to have a material impact
on FirstEnergy or ATSI. The uncontested settlement was approved by FERC on March 24, 2022 without modification. ATSI’s compliance filing to implement the
terms of the settlement was accepted by FERC without modification on June 23, 2022.
FERC Actions on the Tax Act
On March 15, 2018, FERC initiated proceedings on the question of how to address possible changes to ADIT and bonus depreciation as a result of the Tax Act.
Such possible changes could impact FERC-jurisdictional rates, including transmission rates. On November 21, 2019, FERC issued a final rule (Order No. 864).
Order No. 864 requires utilities with transmission formula rates to update their formula rate templates to include mechanisms to: (i) deduct any excess ADIT from
or add any deficient ADIT to their rate base; (ii) raise or lower their income tax allowances by any amortized excess or deficient ADIT; and (iii) incorporate a new
permanent worksheet into their rates that will annually track information related to excess or deficient ADIT. Per FERC directives, ATSI submitted its compliance
filing on May 1, 2020. MAIT submitted its compliance filing on June 1, 2020. On November 18, 2021, FERC issued an order that: (i) accepted ATSI’s proposed
tariff amendments to its rate base adjustment mechanism, effective January 27, 2020; (ii) directed ATSI to make a further compliance filing by January 17, 2022;
and (iii) set the amount of ATSI’s recorded ADIT balances as of December 31, 2017, for hearing and settlement procedures. ATSI submitted the compliance
filing, and is participating in settlement negotiations. On December 3, 2021, FERC issued an order that (i) accepted MAIT’s proposed tariff amendments to its
rate base adjustment mechanism, effective January 27, 2020; (ii) directed MAIT to make a further compliance filing by February 1, 2022; and (iii) set the amount
of MAIT’s recorded ADIT balances as of December 31, 2017 for hearing and settlement procedures. MAIT submitted the compliance filing, and is participating in
settlement negotiations. On May 15, 2020, TrAIL submitted its compliance filing and on June 1, 2020, PATH submitted its required compliance filing. On May 4,
2021, FERC staff requested additional information about PATH’s proposed rate base adjustment mechanism, and PATH submitted the requested information on
June 3, 2021. On July 12, 2021, FERC staff requested additional information about TrAIL’s proposed rate base adjustment mechanism. TrAIL filed its response
on August 6, 2021. On March 31, 2022, FERC issued an order, ruling that TrAIL’s compliance filing partially complied with the requirements of Order No. 864 and
directing TrAIL to submit a further compliance filing to address certain additional items that according to FERC will further enhance transparency. TrAIL submitted
the compliance filing on May 31, 2022. On April 27, 2022, FERC issued
68

-- 77 of 98 --

an order on PATH’s compliance filing, ruling that it partially complied with the requirements of Order No. 864 and directing PATH to submit a further compliance
filing to address certain additional items. PATH submitted the compliance filing on June 27, 2022. MP, WP and PE (as holders of a “stated” transmission rate
when Order No. 864 issued) are addressing these requirements in the transmission formula rates amendments that were filed on October 29, 2020, and which
have been accepted by FERC effective January 1, 2021, subject to refund, pending further hearing and settlement procedures. MP, WP and PE are engaged in
settlement negotiations with the parties to the transmission formula rate amendments proceeding.
ATSI ROE – Ohio Consumers Counsel v. ATSI, et al.
On February 24, 2022, the OCC filed a complaint with FERC against ATSI, AEP’s Ohio affiliates and AEPSC, and Duke Energy Ohio, LLC asserting that FERC
should reduce the ROE utilized in the utilities’ transmission formula rates by eliminating the 50 basis point adder associated with RTO membership, effective
February 24, 2022. The OCC contends that this result is required because Ohio law mandates that transmission owning utilities join an RTO and that the 50
basis point adder is applicable only where RTO membership is voluntary. ATSI disagrees with the OCC’s characterization and set forth its reasons for such
disagreement in a combined motion to dismiss and answer that was filed with FERC on March 31, 2022. On that same date, AEP and Duke filed separate
motions to dismiss and answers to the OCC complaint, and several other parties filed comments. ATSI filed a response to certain intervenors’ filings on April 28,
2022. FirstEnergy is unable to predict the outcome of this proceeding, but it is not expected to have a material impact.
Transmission ROE Methodology
On March 20, 2020, FERC initiated a rulemaking proceeding on the transmission rate incentives provisions of Section 219 of the 2005 Energy Policy Act.
FirstEnergy submitted comments through EEI and as part of a consortium of PJM Transmission Owners. In a supplemental rulemaking proceeding that was
initiated on April 15, 2021, FERC requested comments on, among other things, whether to require utilities that have been members of an RTO for three years or
more and that have been collecting an “RTO membership” ROE incentive adder to file tariff updates that would terminate collection of the incentive adder. Initial
comments on the proposed rule were filed on June 25, 2021, and reply comments were filed on July 26, 2021. The rulemaking remains pending before FERC.
FirstEnergy is a member of PJM and its transmission subsidiaries could be affected by the supplemental proposed rule. FirstEnergy participated in comments on
the supplemental rulemaking that were submitted by a group of PJM transmission owners and by various industry trade groups. If there were to be any changes
to FirstEnergy transmission incentive ROE, such changes will be applied on a prospective basis.
Allegheny Power Zone Transmission Formula Rate Filings
On October 29, 2020, MP, PE and WP filed tariff amendments with FERC to implement a forward-looking formula transmission rate, to be effective January 1,
2021. In addition, on October 30, 2020, KATCo filed a proposed new tariff to establish a forward-looking formula rate and requested that the new rate become
effective January 1, 2021. In its filing, KATCo explained that while it currently owns no transmission assets, it may build new transmission facilities in the
Allegheny zone, and that it may seek required state and federal authorizations to acquire transmission assets from PE and WP by January 1, 2022. These
transmission rate filings were accepted for filing by FERC on December 31, 2020, effective January 1, 2021, subject to refund, pending further hearing and
settlement procedures and were consolidated into a single proceeding. MP, PE and WP, and KATCo are engaged in settlement negotiations with the other
parties to the formula rate proceedings.
ENVIRONMENTAL MATTERS
Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality, hazardous and solid waste disposal, and other environmental
matters. While FirstEnergy’s environmental policies and procedures are designed to achieve compliance with applicable environmental laws and regulations,
such laws and regulations are subject to periodic review and potential revision by the implementing agencies. FirstEnergy cannot predict the timing or ultimate
outcome of any of these reviews or how any future actions taken as a result thereof may materially impact its business, results of operations, cash flows and
financial condition.
Clean Air Act
FirstEnergy complies with SO and NOx emission reduction requirements under the CAA and SIP(s) by burning lower-sulfur fuel, utilizing combustion controls
and post-combustion controls and/or using emission allowances.
2
69

-- 78 of 98 --

CSAPR requires reductions of NOx and SO emissions in two phases (2015 and 2017), ultimately capping SO emissions in affected states to 2.4 million tons
annually and NOx emissions to 1.2 million tons annually. CSAPR allows trading of NOx and SO emission allowances between power plants located in the same
state and interstate trading of NOx and SO emission allowances with some restrictions. On July 28, 2015, the D.C. Circuit ordered the EPA to reconsider the
CSAPR caps on NOx and SO emissions from power plants in 13 states, including West Virginia. This followed the 2014 U.S. Supreme Court ruling generally
upholding the EPA’s regulatory approach under CSAPR but questioning whether the EPA required upwind states to reduce emissions by more than their
contribution to air pollution in downwind states. The EPA issued a CSAPR Update on September 7, 2016, reducing summertime NOx emissions from power
plants in 22 states in the eastern U.S., including West Virginia, beginning in 2017. Various states and other stakeholders appealed the CSAPR Update to the
D.C. Circuit in November and December 2016. On September 13, 2019, the D.C. Circuit remanded the CSAPR Update to the EPA citing that the rule did not
eliminate upwind states’ significant contributions to downwind states’ air quality attainment requirements within applicable attainment deadlines.
Also in March 2018, the State of New York filed a CAA Section 126 petition with the EPA alleging that NOx emissions from nine states (including West Virginia)
significantly contribute to New York’s inability to attain the ozone NAAQS. The petition sought suitable emission rate limits for large stationary sources that are
allegedly affecting New York’s air quality within the three years allowed by CAA Section 126. On September 20, 2019, the EPA denied New York’s CAA Section
126 petition. On October 29, 2019, the State of New York appealed the denial of its petition to the D.C. Circuit. On July 14, 2020, the D.C. Circuit reversed and
remanded the New York petition to the EPA for further consideration. On March 15, 2021, the EPA issued a revised CSAPR Update that addresses, among other
things, the remands of the prior CSAPR Update and the New York Section 126 petition. In December 2021, MP purchased NOx emissions allowances to comply
with 2021 ozone season requirements. On April 6, 2022, the EPA published proposed rules seeking to impose further significant reductions in EGU NO
emissions in 25 states, including West Virginia. The EPA held a virtual public hearing regarding the proposed rules on April 21, 2022, and MP and PE submitted
written comments on June 21, 2022. Depending on the outcome of any appeals and how the EPA and the states ultimately implement the revised CSAPR
Update, the future cost of compliance may materially impact FirstEnergy’s operations, cash flows and financial condition.
Climate Change
There are several initiatives to reduce GHG emissions at the state, federal and international level. Certain northeastern states are participating in the RGGI and
western states led by California, have implemented programs, primarily cap and trade mechanisms, to control emissions of certain GHGs. Additional policies
reducing GHG emissions, such as demand reduction programs, renewable portfolio standards and renewable subsidies have been implemented across the
nation.
In September 2016, the U.S. joined in adopting the agreement reached on December 12, 2015, at the United Nations Framework Convention on Climate
Change meetings in Paris to reduce GHGs. The Paris Agreement’s non-binding obligations to limit global warming to below two degrees Celsius became
effective on November 4, 2016. On June 1, 2017, the Trump Administration announced that the U.S. would cease all participation in the Paris Agreement. On
January 20, 2021, President Biden signed an executive order re-adopting the agreement on behalf of the U.S. In November 2020, FirstEnergy published its
Climate Story which includes its climate position and strategy, as well as a new comprehensive and ambitious GHG emission goal. FirstEnergy pledged to
achieve carbon neutrality by 2050 and set an interim goal for a 30% reduction in GHGs within FirstEnergy’s direct operational control by 2030, based on 2019
levels. Future resource plans to achieve carbon reductions, including any determination of retirement dates of the regulated coal-fired generation, will be
developed by working collaboratively with regulators in West Virginia. Determination of the useful life of the regulated coal-fired generation could result in
changes in depreciation, and/or continued collection of net plant in rates after retirement, securitization, sale, impairment, or regulatory disallowances. If MP is
unable to recover these costs, it could have a material adverse effect on FirstEnergy’s and/or MP’s financial condition, results of operations, and cash flow.
Furthermore, FirstEnergy cannot currently estimate the financial impact of climate change policies, although potential legislative or regulatory programs
restricting CO emissions, or litigation alleging damages from GHG emissions, could require material capital and other expenditures or result in changes to its
operations.
2 	2
2
2
2
x
2
70

-- 79 of 98 --

In December 2009, the EPA released its final “Endangerment and Cause or Contribute Findings for GHGs under the Clean Air Act,” concluding that
concentrations of several key GHGs constitute an “endangerment” and may be regulated as “air pollutants” under the CAA and mandated measurement and
reporting of GHG emissions from certain sources, including electric generating plants. Subsequently, the EPA released its final CPP regulations in August 2015
to reduce CO emissions from existing fossil fuel-fired EGUs and finalized separate regulations imposing CO emission limits for new, modified, and
reconstructed fossil fuel-fired EGUs. Numerous states and private parties filed appeals and motions to stay the CPP with the D.C. Circuit in October 2015. On
February 9, 2016, the U.S. Supreme Court stayed the rule during the pendency of the challenges to the D.C. Circuit and U.S. Supreme Court. On March 28,
2017, an executive order, entitled “Promoting Energy Independence and Economic Growth,” instructed the EPA to review the CPP and related rules addressing
GHG emissions and suspend, revise or rescind the rules if appropriate. On June 19, 2019, the EPA repealed the CPP and replaced it with the ACE rule that
established guidelines for states to develop standards of performance to address GHG emissions from existing coal-fired generation. On January 19, 2021, the
D.C. Circuit vacated and remanded the ACE rule declaring that the EPA was “arbitrary and capricious” in its rule making and, as such, the ACE rule is no longer
in effect and all actions thus far taken by states to implement the federally mandated rule are now null and void. Vacating the ACE Rule had the unintended
effect of reinstating the CPP because the repeal of the CPP was a provision within the ACE Rule. The D.C. Circuit decision was appealed by several states and
interested parties, including West Virginia, arguing that the EPA did not have the authorization under Section 111(d) of the Clean Air Act to require “generation
shifting” as a way to limit GHGs. On June 30, 2022, the U.S. Supreme Court held that the EPA’s regulation of GHGs under Section 111(d) of the Clean Air Act
was not authorized by Congress and remanded the Rule to the EPA for further reconsideration.
Clean Water Act
Various water quality regulations, the majority of which are the result of the federal CWA and its amendments, apply to FirstEnergy’s facilities. In addition, the
states in which FirstEnergy operates have water quality standards applicable to FirstEnergy’s operations.
On September 30, 2015, the EPA finalized new, more stringent effluent limits for the Steam Electric Power Generating category (40 CFR Part 423) for arsenic,
mercury, selenium and nitrogen for wastewater from wet scrubber systems and zero discharge of pollutants in ash transport water. The treatment obligations
were to phase-in as permits are renewed on a five-year cycle from 2018 to 2023. However, on April 13, 2017, the EPA granted a Petition for Reconsideration and
on September 18, 2017, the EPA postponed certain compliance deadlines for two years. On August 31, 2020, the EPA issued a final rule revising the effluent
limits for discharges from wet scrubber systems, retaining the zero-discharge standard for ash transport water, (with some limited discharge allowances), and
extending the deadline for compliance to December 31, 2025 for both. In addition, the EPA allows for less stringent limits for sub-categories of generating units
based on capacity utilization, flow volume from the scrubber system, and unit retirement date. The EPA is reconsidering the ELG rule with a publicly announced
target of issuing a proposed revised rule in the Fall of 2022 and a final rule by the Spring of 2023. In the interim, the rule issued on August 31, 2020, remains in
effect. Depending on the outcome of appeals and how final rules are ultimately implemented, the compliance with these standards, could require additional
capital expenditures or changes in operations at Ft. Martin and Harrison power stations from what was filed with the WVPSC in December 2021 that seeks
approval of environmental compliance projects to comply with the EPA’s 2020 ELG Rule.
Regulation of Waste Disposal
Federal and state hazardous waste regulations have been promulgated as a result of the RCRA, as amended, and the Toxic Substances Control Act. Certain
CCRs, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA’s evaluation of the need for future regulation.
In April 2015, the EPA finalized regulations for the disposal of CCRs (non-hazardous), establishing national standards for landfill design, structural integrity
design and assessment criteria for surface impoundments, groundwater monitoring and protection procedures and other operational and reporting procedures to
assure the safe disposal of CCRs from electric generating plants. On September 13, 2017, the EPA announced that it would reconsider certain provisions of the
final regulations. On July 29, 2020, the EPA published a final rule again revising the date that certain CCR impoundments must cease accepting waste and
initiate closure to April 11, 2021. The final rule also allows for an extension of the closure deadline based on meeting proscribed site-specific criteria. On
November 30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the closure date of McElroy's Run CCR
impoundment facility until 2024, which request is pending technical review by the EPA. AE Supply continues to operate McElroy’s Run as a disposal facility for
FG’s Pleasants Power Station.
2 	2
71

-- 80 of 98 --

FE or its subsidiaries have been named as potentially responsible parties at waste disposal sites, which may require cleanup under the CERCLA. Allegations of
disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that
all potentially responsible parties for a particular site may be liable on a joint and several basis. Environmental liabilities that are considered probable have been
recognized on the Consolidated Balance Sheets as of June 30, 2022, based on estimates of the total costs of cleanup, FirstEnergy’s proportionate responsibility
for such costs and the financial ability of other unaffiliated entities to pay. Total liabilities of approximately $103 million have been accrued through June 30, 2022,
of which, approximately $65 million are for environmental remediation of former MGP and gas holder facilities in New Jersey, which are being recovered by
JCP&L through a non-bypassable SBC. FE or its subsidiaries could be found potentially responsible for additional amounts or additional sites, but the loss or
range of losses cannot be determined or reasonably estimated at this time.
OTHER LEGAL PROCEEDINGS
United States v. Larry Householder, et al.
On July 21, 2020, a complaint and supporting affidavit containing federal criminal allegations were unsealed against the now former Ohio House Speaker Larry
Householder and other individuals and entities allegedly affiliated with Mr. Householder. Also, on July 21, 2020, and in connection with the investigation,
FirstEnergy received subpoenas for records from the U.S. Attorney’s Office for the S.D. Ohio. FirstEnergy was not aware of the criminal allegations, affidavit or
subpoenas before July 21, 2020.
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves this matter. Under the DPA, FE
has agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The DPA requires that
FirstEnergy, among other obligations: (i) continue to cooperate with the U.S. Attorney’s Office in all matters relating to the conduct described in the DPA and
other conduct under investigation by the U.S. government; (ii) pay a criminal monetary penalty totaling $230 million within sixty days, which shall consist of (x)
$115 million paid by FE to the United States Treasury and (y) $115 million paid by FE to the ODSA to fund certain assistance programs, as determined by the
ODSA, for the benefit of low-income Ohio electric utility customers; (iii) publish a list of all payments made in 2021 to either 501(c)(4) entities or to entities known
by FirstEnergy to be operating for the benefit of a public official, either directly or indirectly, and update the same on a quarterly basis during the term of the DPA;
(iv) issue a public statement, as dictated in the DPA, regarding FE’s use of 501(c)(4) entities; and (v) continue to implement and review its compliance and ethics
program, internal controls, policies and procedures designed, implemented and enforced to prevent and detect violations of the U.S. laws throughout its
operations, and to take certain related remedial measures. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers nor
will FirstEnergy seek any tax deduction related to such payment. The entire amount of the monetary penalty was recognized as expense in the second quarter of
2021 and paid in the third quarter of 2021. Under the terms of the DPA, the criminal information will be dismissed after FirstEnergy fully complies with its
obligations under the DPA.
Legal Proceedings Relating to United States v. Larry Householder, et al.
On August 10, 2020, the SEC, through its Division of Enforcement, issued an order directing an investigation of possible securities laws violations by FE, and on
September 1, 2020, issued subpoenas to FE and certain FE officers. On April 28, 2021, and July 11, 2022, the SEC issued additional subpoenas to FE. While no
contingency has been reflected in its consolidated financial statements, FE believes that it is probable that it will incur a loss in connection with the resolution of
the SEC investigation. Given the ongoing nature and complexity of the review, inquiries and investigations, FE cannot yet reasonably estimate a loss or range of
loss that may arise from the resolution of the SEC investigation.
In addition to the subpoenas referenced above under “—United States v. Larry Householder, et. al.” and the SEC investigation, certain FE stockholders and
FirstEnergy customers filed several lawsuits against FirstEnergy and certain current and former directors, officers and other employees, and the complaints in
each of these suits is related to allegations in the complaint and supporting affidavit relating to HB 6 and the now former Ohio House Speaker Larry Householder
and other individuals and entities allegedly affiliated with Mr. Householder. The plaintiffs in each of the below cases seek, among other things, to recover an
unspecified amount of damages (unless otherwise noted). Unless otherwise indicated, no contingency has been reflected in FirstEnergy’s consolidated financial
statements with respect to these lawsuits as a loss is neither probable, nor is a loss or range of a loss reasonably estimable.
• In re FirstEnergy Corp. Securities Litigation (Federal District Court, S.D. Ohio); on July 28, 2020 and August 21, 2020, purported stockholders of FE
filed putative class action lawsuits alleging violations of the federal securities laws. Those actions have been consolidated and a lead plaintiff, the Los
Angeles County Employees Retirement Association, has been appointed by the court. A consolidated complaint was filed on February 26, 2021. The
consolidated complaint alleges, on behalf of a proposed class of persons who purchased FE securities between February 21, 2017 and July 21, 2020,
that FE and certain current or former FE officers violated Sections 10(b) and 20(a) of the Exchange Act by issuing misrepresentations or omissions
concerning FE’s business and results of operations. The consolidated complaint also alleges that FE, certain current or former FE officers and directors,
and a group of underwriters violated Sections 11, 12(a)(2) and 15 of the Securities Act of 1933 as a result of alleged misrepresentations or omissions in
connection with offerings of senior notes by FE in February and June 2020. FE believes that it is probable that it will incur a loss in
72

-- 81 of 98 --

connection with the resolution of this lawsuit. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or
range of loss.
• MFS Series Trust I, et al. v. FirstEnergy Corp., et al. and Brighthouse Funds II – MFS Value Portfolio, et al. v. FirstEnergy Corp., et al. (Federal District
Court, S.D. Ohio) on December 17, 2021 and February 21, 2022, purported stockholders of FE filed complaints against FE, certain current and former
officers, and certain current and former officers of EH. The complaints allege that the defendants violated Sections 10(b) and 20(a) of the Exchange Act
by issuing alleged misrepresentations or omissions regarding FE’s business and its results of operations, and seek the same relief as the In re
FirstEnergy Corp. Securities Litigation described above. FE believes that it is probable that it will incur losses in connection with the resolution of these
lawsuits. Given the ongoing nature and complexity of such litigation, FE cannot yet reasonably estimate a loss or range of loss.
• State of Ohio ex rel. Dave Yost, Ohio Attorney General v. FirstEnergy Corp., et al. and City of Cincinnati and City of Columbus v. FirstEnergy Corp.
(Common Pleas Court, Franklin County, OH, all actions have been consolidated); on September 23, 2020 and October 27, 2020, the OAG and the
cities of Cincinnati and Columbus, respectively, filed complaints against several parties including FE (the OAG also named FES as a defendant), each
alleging civil violations of the Ohio Corrupt Activity Act in connection with the passage of HB 6. On January 13, 2021, the OAG filed a motion for a
temporary restraining order and preliminary injunction against FirstEnergy seeking to enjoin FirstEnergy from collecting the Ohio Companies'
decoupling rider. On January 31, 2021, FE reached a partial settlement with the OAG and the cities of Cincinnati and Columbus with respect to the
temporary restraining order and preliminary injunction request and related issues. In connection with the partial settlement, the Ohio Companies filed an
application on February 1, 2021, with the PUCO to set their respective decoupling riders (CSR) to zero. On February 2, 2021, the PUCO approved the
application of the Ohio Companies setting the rider to zero and no additional customer bills will include new decoupling rider charges after February 8,
2021. The cases are stayed pending final resolution of the United States v. Larry Householder, et al. criminal proceeding described above, although on
August 13, 2021, new defendants were added to the complaint, including two former officers of FirstEnergy. On November 9, 2021, the OAG filed a
motion to lift the agreed-upon stay, which FE opposed on November 19, 2021; the motion remains pending. On December 2, 2021, the cities and FE
entered a stipulated dismissal with prejudice of the cities’ suit.
• Smith v. FirstEnergy Corp. et al., Buldas v. FirstEnergy Corp. et al., and Hudock and Cameo Countertops, Inc. v. FirstEnergy Corp. et al. (Federal
District Court, S.D. Ohio, all actions have been consolidated); on July 27, 2020, July 31, 2020, and August 5, 2020, respectively, purported customers of
FE filed putative class action lawsuits against FE and FESC, as well as certain current and former FE officers, alleging civil Racketeer Influenced and
Corrupt Organizations Act violations and related state law claims. FE agreed to a class settlement to resolve these claims on April 11, 2022. In the
fourth quarter of 2021, FirstEnergy recognized a pre-tax reserve of $37.5 million in the aggregate with respect to these lawsuits and the Emmons
lawsuit below. On June 22, 2022, the court preliminarily approved the class settlement and scheduled the final fairness hearing for November 9, 2022.
• Emmons v. FirstEnergy Corp. et al. (Common Pleas Court, Cuyahoga County, OH); on August 4, 2020, a purported customer of FirstEnergy filed a
putative class action lawsuit against FE, FESC, the Ohio Companies, along with FES, alleging several causes of action, including negligence and/or
gross negligence, breach of contract, unjust enrichment, and unfair or deceptive consumer acts or practices. FE agreed to a class settlement to resolve
these claims on April 11, 2022. In the fourth quarter of 2021, FirstEnergy recognized a pre-tax reserve of $37.5 million in the aggregate with respect to
this lawsuit and the lawsuits above consolidated with Smith in the S.D. Ohio alleging, among other things, civil violations of the Racketeer Influenced
and Corrupt Organizations Act. On June 22, 2022, the court preliminarily approved the class settlement and scheduled the final fairness hearing for
November 9, 2022.
On February 9, 2022, FE, acting through the SLC, agreed to a settlement term sheet to resolve the following shareholder derivative lawsuits relating to HB 6 and
the now former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder that were filed in the S.D.
Ohio, the N.D. Ohio, and the Ohio Court of Common Pleas, Summit County:
• Gendrich v. Anderson, et al. and Sloan v. Anderson, et al. (Common Pleas Court, Summit County, OH, all actions have been consolidated); on July 26,
2020 and July 31, 2020, respectively, purported stockholders of FE filed shareholder derivative action lawsuits against certain FE directors and officers,
alleging, among other things, breaches of fiduciary duty.
• Miller v. Anderson, et al. (Federal District Court, N.D. Ohio); Bloom, et al. v. Anderson, et al.; Employees Retirement System of the City of St. Louis v.
Jones, et al.; Electrical Workers Pension Fund, Local 103, I.B.E.W. v. Anderson et al.; Massachusetts Laborers Pension Fund v. Anderson et al.; The
City of Philadelphia Board of Pensions and Retirement v. Anderson et al.; Atherton v. Dowling et al.; Behar v. Anderson, et al. (Federal District Court,
S.D. Ohio, all actions have been consolidated); beginning on August 7, 2020, purported stockholders of FE filed shareholder derivative actions alleging
the FE Board and officers breached their fiduciary duties and committed violations of Section 14(a) of the Exchange Act.
On March 11, 2022, the parties executed a stipulation and agreement of settlement, and filed a motion the same day requesting preliminary settlement approval
in the S.D. Ohio. The settlement agreement, if approved, will fully resolve the shareholder derivative lawsuits above and stipulates a series of corporate
governance enhancements, that has resulted or is expected to result in the following:
73

-- 82 of 98 --

• Six members of the FE Board, Messrs. Michael J. Anderson, Donald T. Misheff, Thomas N. Mitchell, Christopher D. Pappas and Luis A. Reyes, and Ms.
Julia L. Johnson did not stand for re-election at FE’s 2022 annual shareholder meeting;
• A special FE Board committee of at least three recently appointed independent directors was formed to initiate a review process of the current senior
executive team. On June 15, 2022, the FE Board appointed Ms. Lisa Winston Hicks and Messrs. Paul Kaleta, Sean T. Klimczak, Jesse A. Lynn, Andrew
Teno, and Melvin D. Williams to serve on that committee. After completing its review, which is expected to conclude not later than mid-September 2022,
the committee will make recommendations to the full FE Board, which retains the authority to make final determinations regarding any such
recommendations;
• The FE Board will oversee FE’s lobbying and political activities, including periodically reviewing and approving political and lobbying action plans
prepared by management;
• An FE Board committee of recently appointed independent directors will oversee the implementation and third-party audits of the FE Board-approved
action plans with respect to political and lobbying activities;
• FE will implement enhanced disclosure to shareholders of political and lobbying activities, including enhanced disclosure in its annual proxy statement;
and
• FE will further align financial incentives of senior executives to proactive compliance with legal and ethical obligations.
The settlement also includes a payment to FE of $180 million, to be paid by insurance after court approval, less any court-ordered attorney’s fees awarded to
plaintiffs. On May 9, 2022, the S.D. Ohio preliminarily approved the settlement and scheduled a final settlement approval hearing for August 4, 2022. Separately,
on June 2, 2022, the N.D. Ohio entered an order to show cause why the court should not appoint new plaintiffs’ counsel, and thereafter, on June 10, 2022, the
parties filed jointly a motion to dismiss the matter without prejudice, which the N.D. Ohio denied on July 5, 2022.
In letters dated January 26, and February 22, 2021, staff of FERC's Division of Investigations notified FirstEnergy that the Division is conducting an investigation
of FirstEnergy’s lobbying and governmental affairs activities concerning HB 6, and staff directed FirstEnergy to preserve and maintain all documents and
information related to the same as such have been developed as part of an ongoing non-public audit being conducted by FERC's Division of Audits and
Accounting. While no contingency has been reflected in the consolidated financial statements, FirstEnergy believes that it is probable that it will incur a loss in
connection with the resolution of the FERC investigation. Given the ongoing nature and complexity of the review, inquiries and investigations, FirstEnergy cannot
yet reasonably estimate a loss or range of loss that may arise from the resolution of the FERC investigation.
FE terminated Charles E. Jones as its chief executive officer effective October 29, 2020. As a result of Mr. Jones’ termination, and due to the determination of a
committee of independent members of the FE Board that Mr. Jones violated certain FirstEnergy policies and its code of conduct, all grants, awards and
compensation under FirstEnergy’s short-term incentive compensation program and long-term incentive compensation program with respect to Mr. Jones that
were outstanding on the date of termination were forfeited. In November 2021, after a determination by the Compensation Committee of the FE Board that a
demand for recoupment was warranted pursuant to the Recoupment Policy, FE made a recoupment demand to Mr. Jones of compensation previously paid to
Mr. Jones totaling approximately $56 million, the maximum amount permissible under the Recoupment Policy. As such, any amounts payable to Mr. Jones under
the EDCP will be set off against FE’s recoupment demand. There can be no assurance that the efforts to seek recoupment from Mr. Jones will be successful and
the approximately $56 million recoupment demand has not been recognized in FirstEnergy’s financial statements as of June 30, 2022.
The outcome of any of these lawsuits, governmental investigations and audit is uncertain and could have a material adverse effect on FE’s or its subsidiaries’
reputation, business, financial condition, results of operations, liquidity, and cash flows.
Other Legal Matters
There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending
against FE or its subsidiaries. The loss or range of loss in these matters is not expected to be material to FE or its subsidiaries. The other potentially material
items not otherwise discussed above are described under Note 7, “Regulatory Matters.”
FirstEnergy accrues legal liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of
such costs. In cases where FirstEnergy determines that it is not probable, but reasonably possible that it has a material obligation, it discloses such obligations
and the possible loss or range of loss if such estimate can be made. If it were ultimately determined that FE or its subsidiaries have legal liability or are otherwise
made subject to liability based on any of the matters referenced above, it could have a material adverse effect on FE’s or its subsidiaries’ financial condition,
results of operations, and cash flows.
NEW ACCOUNTING PRONOUNCEMENTS
See Note 1, "Organization and Basis of Presentation," for a discussion of new accounting pronouncements.
74

-- 83 of 98 --

ITEM 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
See “FirstEnergy Corp. Management’s Discussion and Analysis of Financial Condition and Results of Operations — Market Risk Information” in Item 2 above.
ITEM 4. CONTROLS AND PROCEDURES
(a) Evaluation of Disclosure Controls and Procedures
The management of FirstEnergy, with the participation of the Chief Executive Officer and Chief Financial Officer, have reviewed and evaluated the effectiveness
of its disclosure controls and procedures, as defined under the Exchange Act, in Rules 13a-15(e) and 15d-15(e), as of the end of the period covered by this
report. Based on that evaluation, the Chief Executive Officer and Chief Financial Officer of FirstEnergy have concluded that its disclosure controls and
procedures were effective as of the end of the period covered by this report.
(b) Changes in Internal Control over Financial Reporting
During the quarter ended June 30, 2022, there were no changes in internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the
Exchange Act) that have materially affected, or are reasonably likely to materially affect, FirstEnergy’s internal control over financial reporting.
PART II. OTHER INFORMATION
ITEM 1. 	LEGAL PROCEEDINGS
Information required for Part II, Item 1 is incorporated by reference to the discussions in Note 7, “Regulatory Matters,” and Note 8, “Commitments, Guarantees
and Contingencies,” of the Notes to Consolidated Financial Statements in Part I, Item 1 of this Form 10-Q.
ITEM 1A. RISK FACTORS
You should carefully consider the risk factors discussed in "Item 1A. Risk Factors" in FirstEnergy’s Annual Report on Form 10-K for the year ended December
31, 2021, which could materially affect FirstEnergy’s business, financial condition or future results.
The information set forth in this report, including without limitation, the risk factors presented below, updates and should be read in conjunction with, the risk
factors and information disclosed in FirstEnergy’s Annual Report on Form 10-K for the year ended December 31, 2021.
We Have Coal-Fired Generation Capacity and a Minority Investment in a Coal Mine, Which Exposes Us to Risk from Regulations Relating to Coal, GHGs and
CCRs and Could Lead to Increased Costs or the Need to Spend Significant Resources to Defend Allegations of Violation
Historically, coal-fired generation has greater exposure to the costs of complying with federal, state and local environmental statutes, rules and regulations
relating to air emissions, including GHGs and CCR disposal, than other types of electric generation facilities. These legal requirements and any future initiatives
could impose substantial additional costs and, in the case of GHG requirements, could raise uncertainty about the future viability of fossil fuels, particularly coal,
as an energy source for new and existing electric generation facilities and could require our coal-fired generation to curtail generation or cease to generate.
Failure to comply with any such existing or future legal requirements may also result in the assessment of fines and penalties. Significant resources also may be
expended to defend against allegations of violations of any such requirements.
In addition, FEV holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation
operations with coal sales predominantly in international markets. The viability of our investment depends upon several factors beyond our control, including, but
not limited to: Global Holding’s ability to renew and maintain governmental permits and approvals and remain in compliance with federal, state, and local safety
and environmental statutes, rules, and regulations affecting the coal mining industry. Failure to renew and maintain necessary permits and approvals, and to
comply with any such statutes, rules and regulations, may impair Global Holding’s operations and ability to generate cash flows necessary to pay future
dividends.
Our Results of Operations and Financial Condition May be Adversely Affected by Certain Risks Related to our Minority Interest in a Coal Mine
FEV holds a 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations
with coal sales predominantly in international markets. In the second quarter of 2022, FEV received its first dividend after more than ten years of equity
ownership in the joint venture. Global Holding’s ability to pay future dividends depends upon several factors beyond our control, including, but not limited to: the
market price of coal, the availability
75

-- 84 of 98 --

and reliability of transportation facilities and other systems, and Global Holding’s ability to renew and maintain governmental permits and approvals and remain
in compliance with safety and environmental regulations affecting the coal mining industry.
The price for Signal Peak’s coal depends upon factors beyond our control, including: overall global economic conditions, the effect of worldwide energy
consumption, including the impact of technological advances on energy consumption; international developments impacting the supply of coal; international
developments impacting the supply of oil & gas; and the impact of domestic and foreign governmental laws and regulations, including environmental and climate
change regulations. Any adverse change in these factors could result in weaker demand and lower prices for Global Holding’s products, and, as a result, could
impact Global Holding’s ability to pay future dividends.
Signal Peak operates a single underground coal mine in south-central Montana and must obtain numerous governmental permits and approvals that impose
strict conditions and obligations relating to, among other things, various environmental and safety matters in connection with its mining and coal transportation
operations. The rules applicable to these permits and approvals are complex and can change over time. Regulatory authorities exercise considerable discretion
in the timing and scope of permit issuance. In addition, the public has the right to comment on permit applications and otherwise participate in the permitting
process, including through court intervention. Global Holding is currently a party to litigation that is challenging the validity of its permit to expand its Signal
Peak’s mine into adjacent leased federal coal reserves. After receiving initial approval in 2015 from the Department of Interior’s Office of Surface Mining to
expand the mine, environmental non-governmental organizations filed suit in the United States District Court for the District of Montana the same year
challenging the Department of Interior’s environmental assessment, which was a finding of no significant impact, and the expansion approval. The District Court
affirmed the Department of Interior’s conclusions and the environmental non-governmental organizations appealed to the U.S. Court of Appeals for the Ninth
Circuit. In April 2022, the Ninth Circuit Court reversed the District Court’s ruling affirming the expansion approval. Global Holding has petitioned for a rehearing
en banc. Limitations on Global Holding’s ability to conduct its mining operations due to the inability to obtain or renew necessary permits or similar approvals
could materially reduce or even halt production at the mine resulting in an adverse effect on our balance sheet, results of operations and cash flow.
ITEM 2. 	UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS
None.
ITEM 3. 	DEFAULTS UPON SENIOR SECURITIES
None.
ITEM 4. 	MINE SAFETY DISCLOSURES
Not applicable.
ITEM 5. 	OTHER INFORMATION
None.
76

-- 85 of 98 --

ITEM 6. 	EXHIBITS
Exhibit Number 	Description
3.1 Third Amended and Restated Code of Regulations (incorporated by reference to FE’s Form 8-K filed May 23, 2022, Exhibit 3.1, File No. 333-21011)
10.1 Amended and Restated Limited Liability Company Operating Agreement of FirstEnergy Transmission, LLC (incorporated by reference to FE’s Form 8-K
filed May 31, 2022, Exhibit 10.1, File No. 333-21011)
(A) (B) 	10.2 Stock-Based Performance-Adjusted Restricted Stock Unit Award Agreement to John W. Somerhalder II
(A) 	31.1 Certification of chief executive officer, as adopted pursuant to Rule 13a-14(a)
(A) 	31.2 Certification of chief financial officer, as adopted pursuant to Rule 13a-14(a)
(A) 	32 Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350
101 The following materials from the Quarterly Report on Form 10-Q of FirstEnergy Corp. for the period ended June 30, 2022, formatted in iXBRL (Inline
Extensible Business Reporting Language): (i) Consolidated Statements of Income, (ii) Consolidated Statements of Comprehensive Income,
(iii) Consolidated Balance Sheets, (iv) Consolidated Statements of Cash Flows, (v) related notes to these financial statements and (vi) document and
entity information
104 Cover Page Interactive Data File (the cover page XBRL tags are embedded within the Inline XBRL document contained in Exhibit 101)
(A) Provided herein in electronic format as an exhibit.
(B) Management contract or compensatory plan contract or arrangement filed pursuant to Item 601 of Regulation S-K.
Pursuant to paragraph (b)(4)(iii)(A) of Item 601 of Regulation S-K, FirstEnergy has not filed as an exhibit to this Form 10-Q any instrument with respect to long-
term debt if the respective total amount of securities authorized thereunder does not exceed 10% of its respective total assets, but hereby agrees to furnish to
the SEC on request any such documents.
77

-- 86 of 98 --

SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned,
thereunto duly authorized.
July 26, 2022
FIRSTENERGY CORP.
Registrant
/s/ Jason J. Lisowski
Jason J. Lisowski
Vice President, Controller
and Chief Accounting Officer

-- 87 of 98 --

Exhibit 10.2
FIRSTENERGY CORP.
2022 Performance-Adjusted Restricted Stock Unit Award Agreement
THIS 2022 PERFORMANCE-ADJUSTED RESTRICTED STOCK UNIT AWARD AGREEMENT (the “Agreement”),
effective as of May 17, 2022 (the “Grant Date”), is entered into by and between the Company and Mr. John W. Somerhalder II (the
“Grantee”).
1. 	Definitions. Unless otherwise specified in this Agreement, capitalized terms shall have the meanings attributed to them under
the FirstEnergy Corp. 2020 Incentive Compensation Plan (the “Plan”).
2. 	Grant of Restricted Stock Units. As of the Grant Date, the Company has granted to the Grantee 4,395 (the “Target Number”)
Restricted Stock Units (the “Restricted Stock Units” or “RSUs”), a percentage of which Target Number will vest and become
payable in accordance with the terms and conditions of this Agreement. The Target Number shall be adjusted with respect to
Dividend Equivalents as provided in Section 8 below. Each RSU that becomes vested and payable hereunder represents the right of
the Grantee to receive one Share subject to the terms and conditions of this Agreement. The RSUs are granted in accordance with,
and subject to, all the terms, conditions and restrictions of the Plan, which is hereby incorporated by reference in its entirety. The
Grantee irrevocably agrees to, and accepts, the terms, conditions and restrictions of the Plan and this Agreement on the Grantee’s
own behalf and on behalf of any heirs, successors and assigns.
3. 	Restrictions on RSUs. Except as otherwise provided herein, the Grantee cannot sell, transfer, assign, hypothecate or
otherwise dispose of the RSUs or pledge any RSU as collateral for a loan, other than by will or by the laws of descent and
distribution. In no event may any RSU or this Award be transferred for value. In addition, the RSUs, and any payments made with
respect to the RSUs, will be subject to such other restrictions as the Committee deems necessary or appropriate, including, without
limitation, the Company’s Executive Compensation Recoupment Policy, as may be amended from time to time, to the extent
applicable.
4. 	Vesting and Settlement of RSUs.
(a) Vesting. Except as otherwise provided in Sections 6 and 7 below, if and to the extent the performance goals set forth on
Exhibit A attached to this Agreement (the “Performance Goals”) are achieved during the performance period set forth on
Exhibit A (the “Performance Period”), a percentage of the Target Number of RSUs will vest as of the last day of such
Performance Period (the “Vesting Date”). The number of RSUs that shall vest as of the Vesting Date will range from 0%
to 200% of the Target Number, as determined by the Committee by the extent to which the Performance Goals are
achieved. The Grantee will have no rights to the Shares underlying the RSUs until the RSUs have vested and been settled
(each RSU that vests pursuant to this Section 4 or Sections 6 and 7 below, a “Vested RSU”). Prior to

-- 88 of 98 --

settlement, each RSU (whether or not a Vested RSU) represents an unfunded and unsecured obligation of the Company.
(b) Settlement. Except as otherwise provided in Sections 6, 7 and 11 below, the Company shall settle each Vested RSU by
delivering one Share per Vested RSU to the Grantee on March 1, 2025 (or as soon as administratively practicable
thereafter but in any event within the short-term deferral period specified in Treasury Regulation § 1.409A-1(b)(4)). The
Company will round up fractional RSUs, if any, to the next whole number.
5. 	Forfeiture. Except as otherwise provided in Sections 6 and 7, the Grantee will forfeit his interest in the RSUs to the extent the
Performance Goals are not achieved during the Performance Period.
6. 	Certain Events. Notwithstanding any provision in this Agreement to the contrary and in each case subject to Section 6(c)
below:
(a) Death. If, prior to December 31, 2024, the Grantee dies, then the Target Number of RSUs shall become Vested RSUs. The
Company shall settle any RSUs that become Vested RSUs under this Section 6(a) by delivering to the Grantee’s estate
one Share for each Vested RSU as soon as administratively practicable after the date of the Grantee’s death, but in any
event, by March 15th of the year following the year in which the Grantee’s death occurred.
(b) Disability. If , prior to December 31, 2024, the Grantee’s service to the Company is terminated by the Company due to
the Grantee’s disability (as determined in the sole discretion of the Committee), then the Target Number of RSUs shall
become Vested RSUs. The Company shall settle any RSUs that become Vested RSUs under this Section 6(b) by
delivering to the Grantee one Share for each Vested RSU as soon as administratively practicable after the date of the
Grantee’s termination due to disability, but in any event by March 15 of the year following the year in which such
termination occurs).
(c) Release Requirement. Notwithstanding any provision herein to the contrary, except as otherwise determined by the
Company, in order for the Grantee to receive Shares pursuant to the settlement of Vested RSUs under Section 6(a) or (b)
above, the Grantee (or the representative of his or her estate) must execute and deliver to the Company a general release
and waiver of claims against the Company, its Subsidiaries and their directors, officers, employees, shareholders and
other affiliates in a form that is satisfactory to the Company (the “Release”). The Release must become effective and
irrevocable under applicable law no later than 60 days following the date of the Grantee’s death or termination of
employment, as applicable.
2

-- 89 of 98 --

7. 	Change in Control. If a Change in Control occurs prior to December 31, 2024, the RSUs shall generally become subject to
the terms and conditions of Article 16 of the Plan; provided that if the RSUs subject to this Agreement are not replaced with a
Replacement Award, then the Target Number of RSUs shall become Vested RSUs as of the date of the Change in Control and shall
be settled no later than 60 days after the Change in Control in the manner set forth in Article 16 of the Plan.
8. 	Dividend Equivalents. Until the date on which the RSUs are settled for Shares, and pursuant to the terms and conditions of
this Agreement, the Grantee will be credited (in the manner described in the following sentences) on the books and records of the
Company with an amount per each RSU equal to the amount per share of any cash dividends declared by the Board of Directors of
the Company with a record date on or after the Grant Date on the outstanding Shares (such amount, a “Dividend Equivalent”). Such
Dividend Equivalents will be credited in the form of an additional number of RSUs and the Target Number of RSUs shall be
adjusted by each additional RSU credited to the Grantee pursuant to the Dividend Equivalents. The additional number of RSUs will
be equal to the aggregate amount of Dividend Equivalents credited under this Agreement on the respective dividend payment date
divided by the average of the high and low prices per Share on the respective dividend payment date. The RSUs attributable to the
Dividend Equivalents will be either settled or forfeited, as appropriate, under the same terms and conditions that apply to the other
RSUs under this Award Agreement, including the achievement of the Performance Goals and any action taken by the Committee.
9. 	[RESERVED].
10. 	Delivery of Shares. Upon settlement of any RSUs under this Agreement, the Company will deliver to the Grantee (or his or
her estate) the Shares to which the Grantee is entitled free and clear of any restrictions (except any restrictions under applicable
securities laws or otherwise imposed under the Plan or Section 3 hereof).
11. 	Withholding. Upon settlement of the RSUs, the Company shall withhold a number of Shares (or amount of cash, if
applicable) in an amount sufficient to satisfy all federal, state, and local taxes to be withheld in connection with the settlement of
RSUs under this Agreement.
12. 	No Shareholder Rights. The Grantee shall have no shareholder rights (or rights as a beneficial owner), including no voting
rights, with respect to any RSU or the Share underlying the RSU unless and until the Grantee receives the Share upon settlement of
the RSU.
13. 	Recoupment. If the Grantee is or has been deemed to be, or becomes, an “insider” for purposes of Section 16 of the
Exchange Act, this Agreement will be administered in compliance with Section 10D of the Exchange Act, any applicable rules or
regulations promulgated by the Securities and Exchange Commission or any national securities exchange or national securities
association on which the Shares may be traded, and subject to the Company’s Executive Compensation Recoupment Policy, as
amended from time to time, or any other Company policy adopted pursuant to such law, rules, or regulations and this Agreement
may be amended to further such purpose without the consent of the Grantee.
3

-- 90 of 98 --

14. 	Termination of Agreement. This Agreement will terminate on the earliest of: (a) the date the RSUs are settled pursuant to the
terms of this Agreement; or (b) if no RSUs have become Vested RSUs as of the Vesting Date, the Vesting Date. Any terms or
conditions of this Agreement that the Company determines are reasonably necessary to effectuate its purposes shall survive the
termination of this Agreement.
15. 	Miscellaneous Provisions.
(a) 	(a) Adjustments. In the event of a corporate event or transaction described in Section 4.5 of the Plan, this Award and
the RSUs granted hereunder shall be subject to mandatory adjustment as described in Section 4.5 of the Plan.
(b) 	Successors and Legal Representatives. This Agreement will bind and inure to the benefit of the Company and the
Grantee, and their respective successors, assigns and legal representatives.
(c) 	Integration. This Agreement, together with the Plan, constitutes the entire agreement between the Grantee and the
Company with respect to the subject matter hereof. Any waiver of any term, condition or breach thereof will not be a waiver of any
other term or condition or of the same term or condition for the future, or of any subsequent breach. To the extent a conflict exists
between the terms of this Agreement and the provisions of the Plan, the provisions of the Plan shall govern, except with respect to
the Committee’s authority to adjust downward the number of RSUs that vest under this Agreement, as provided under Section 15(h)
below.
(d) 	Notice. Any notice relating to this grant must be in writing, which may include an electronic writing.
(e) 	No Employment Right Created. Nothing in this Agreement will be construed to confer upon the Grantee the right to
continue in the employment or service of the Company or any of its Subsidiaries, or to be employed or serve in any particular
position therewith, or affect any right which the Company or any of its Subsidiaries may have to terminate the Grantee’s
employment or service with or without cause.
(f) 	Severability. In the event of the invalidity of any part or provision of this Agreement, such invalidity will not affect
the enforceability of any other part or provision of this Agreement.
(g) 	Section Headings. The section headings of this Agreement are for convenience of reference only and are not intended
to define, extend or limit the contents of the sections.
(h) 	Amendment. The terms and conditions of this Agreement may be modified by the Committee:
(i) in any case permitted by the terms of the Plan or this Agreement;
4

-- 91 of 98 --

(ii) except with respect to an adjustment made pursuant to the last paragraph of this Section 15(h), with the written
consent of the Grantee; or
(iii) without the consent of the Grantee if the amendment is either not materially adverse to the interests of the Grantee or
is necessary or appropriate in the view of the Committee to conform with, or to take into account, applicable law,
including either exemption from or compliance with any applicable tax law.
Notwithstanding any provision in this Agreement or the Plan to the contrary, the Committee shall retain the discretion to adjust the
number of RSUs that vest under this Agreement without the Grantee’s consent, notwithstanding the Company’s actual performance
against the Performance Goals, either on a formula or discretionary basis or a combination of the two, as the Committee determines
in its sole discretion.
(i) 	Plan Administration. The Plan is administered by the Committee, which has full and exclusive discretionary power to
interpret, implement, construe and adopt rules, forms and guidelines for administering the Plan and this Agreement. All actions,
interpretations and determinations made by the Committee, the Board of Directors, or any of their delegates as to the provisions of
this Agreement and the Plan shall be final, conclusive, and binding on all persons and the Grantee agrees to be bound by such
actions, interpretations and determinations.
(j) 	Governing Law. Except as may otherwise be provided in the Plan, this Agreement will be governed by, construed and
enforced in accordance with the internal laws of the State of Ohio, without giving effect to its principles of conflict of laws. By
accepting this Award, the Grantee agrees to the exclusive jurisdiction and venue of the courts of the United States District Court for
the Northern District of Ohio or the Summit County (Ohio) Court of Common Pleas to adjudicate any and all claims brought with
respect to this Agreement.
(k) 	Internal Revenue Code Section 409A. Notwithstanding anything in the Plan or this Agreement to the contrary, the
Award of RSUs granted hereunder is intended to meet any applicable requirements for compliance under, or exemption from, Code
Section 409A and this Agreement shall be construed and administered accordingly. However, notwithstanding anything in this
Agreement to the contrary, the Company makes no representations or warranties as to the tax effects of payments made to the
Grantee (or the Grantee’s estate) pursuant to this Agreement, and any and all tax consequences incident to such shall solely be the
responsibility of the Grantee (or the Grantee’s estate).
(l) 	Data Privacy. In order to implement, administer and manage the Grantee’s participation in the Plan, the Company and
its affiliates may hold certain personal information about the Grantee, including, but not limited to, the Grantee’s name, home
address and telephone number, date of birth, social security number or other identification number, salary, nationality, job title, any
Shares or directorships held in the Company or any affiliate, details of all Awards or any other entitlement to Shares awarded,
canceled, exercised, vested, unvested or outstanding in the Grantee’s favor, for the exclusive purpose of implementing, administering
and managing the Plan (collectively, the “Personal Data”).
5

-- 92 of 98 --

The Grantee hereby explicitly and unambiguously consents to the collection, use and transfer, in electronic or other form, of the
Grantee’s Personal Data as described above, as applicable, to the Company and its affiliates for the sole purpose of administering the
Plan. The Grantee understands that Personal Data may be transferred to third parties assisting in the implementation, administration
and management of the Plan, that these recipients may be located in the United States or elsewhere, and that the recipient’s country
may have different data privacy laws and protections than the United States or the Grantee’s state of residence. The Grantee
understands that he or she may request a list with the names and addresses of any potential recipients of the Personal Data by
contacting the Executive Compensation group of Human Resources. The Grantee authorizes the recipients to receive, possess, use,
retain and transfer the Personal Data, in electronic or other form, for the purposes of implementing, administering and managing the
Grantee’s participation in the Plan, including any requisite transfer of such Personal Data as may be required to a broker or other
third party with whom the Grantee may elect to deposit any Shares received upon vesting of the RSUs. The Grantee understands that
Personal Data will be held only as long as is necessary to implement, administer and manage the Grantee’s participation in the Plan
and to comply with Securities and Exchange Commission and/or NYSE reporting obligations, any other applicable law or regulation
and any applicable document retention policies of the Company. The Grantee understands that he or she may, at any time, view
Personal Data, request additional information about the storage and processing of Personal Data, require any necessary amendments
to Personal Data or refuse or withdraw the consents herein, without cost, by contacting in writing the Executive Compensation group
of Human Resources. The Grantee understands that refusal or withdrawal of consent may affect the Grantee’s ability to participate in
the Plan or to realize benefits from the RSUs. For more information on the consequences of the Grantee’s refusal to consent or
withdrawal of consent, the Grantee understands that he or she may contact the Executive Compensation group of Human Resources.
(m) 	Signatures and Electronic Delivery. This Agreement may be executed electronically and in counterparts, each of
which shall be deemed to be an original, and when taken together shall constitute one binding agreement. The Company may, in its
sole discretion, deliver any documents related to current or future participation in the Plan by electronic means. The Grantee hereby
consents to receive such documents by electronic delivery and agrees to participate in the Plan through an on-line or electronic
system established and maintained by the Company or another third party designated by the Company.
[SIGNATURE ON FOLLOWING PAGE]
6

-- 93 of 98 --

The Grantee acknowledges receipt of this Agreement and accepts and agrees with the terms and conditions stated above.
May 17, 2022 	/s/ John W. Somerhalder II
(Date) 	(Signature of the Grantee)
7

-- 94 of 98 --

EXHIBIT A
Performance Goals
Performance Period
The Performance Period for this Agreement is January 1, 2022 through December 31, 2024.
Performance Goals
The Performance Goals for the Performance Period are based on:
Financial KPI 	Threshold 	Target 	Stretch
Cumulative Operating Earnings per Share
(EPS) – weighted 65%
Relative Total Shareholder Return (TSR) – weighted 35%:
Measures total return of a Share to an investor, evaluating the overall performance of the Company over 2022 through 2024 against
the market. The Company’s return will be compared relative to peers in the S&P 500 Utilities Index. The peer companies in the S&P
500 Utilities Index at the beginning of the performance period (December 2021) will be used for comparison purposes excluding
companies removed due to merger and acquisition activity, bankruptcy, etc. during the Performance Period.
• A continuous function will be used between the 25th and 85th percentile, up to a maximum of 200% payout; and
• Includes cap or “governor” such that if TSR is negative over the 3-year period, then award opportunity will be capped at
100% potential payout.
The TSR calculations will use the average of the average high/low stock prices for December 2021 and the average of the average
high/low stock prices for December 2024 and assumes all dividends will be reinvested.
Below threshold performance achievement produces a payout of 0%, Threshold performance achievement payout begins at 25% of
target, Target performance achievement payout is at 100% of target and Stretch performance achievement is capped at a maximum
of 200% of target. Straight-line interpolation is used for values in between Threshold and Stretch.
Notwithstanding any other provision of this Agreement, in addition to any other rights of the Committee under the Plan (as defined in the Agreement), the
Committee may, in any evaluation of the Company’s level of achievement with respect to the Performance Goals, include or exclude any of the following
events that occur during the Performance Period: (a) asset write-downs; (b) litigation or claim judgments or settlements; (c) the effect of changes in tax laws,
accounting principles or other laws or provisions affecting reported results; (d) any reorganization and restructuring programs; (e) extraordinary nonrecurring
items; (f) acquisitions or divestitures and/or (g) foreign exchange gains and losses.
1
1

-- 95 of 98 --

EXHIBIT 31.1
Certification
I, Steven E. Strah, certify that:
1. I have reviewed this report on Form 10-Q of FirstEnergy Corp.;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a) designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b) designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
c) evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d) disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a) all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: July 26, 2022
/s/ Steven E. Strah
Steven E. Strah
President and
Chief Executive Officer
8

-- 96 of 98 --

EXHIBIT 31.2
Certification
I, K. Jon Taylor, certify that:
1. I have reviewed this report on Form 10-Q of FirstEnergy Corp.;
2. Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the
statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this
report;
3. Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the
financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;
4. The registrant’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in
Exchange Act Rules 13a-15(e) and 15d-15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a-15(f) and 15d-15(f))
for the registrant and have:
a) designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision,
to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those
entities, particularly during the period in which this report is being prepared;
b) designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our
supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for
external purposes in accordance with generally accepted accounting principles;
c) evaluated the effectiveness of the registrant’s disclosure controls and procedures and presented in this report our conclusions about the
effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and
d) disclosed in this report any change in the registrant’s internal control over financial reporting that occurred during the registrant’s most recent
fiscal quarter (the registrant’s fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to
materially affect, the registrant’s internal control over financial reporting; and
5. The registrant’s other certifying officer and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the
registrant’s auditors and the audit committee of the registrant’s board of directors (or persons performing the equivalent functions):
a) all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably
likely to adversely affect the registrant’s ability to record, process, summarize and report financial information; and
b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant’s internal control
over financial reporting.
Date: July 26, 2022
/s/ K. Jon Taylor
K. Jon Taylor
Senior Vice President, Chief Financial Officer and Strategy

-- 97 of 98 --

EXHIBIT 32
CERTIFICATION PURSUANT TO
18 U.S.C. SECTION 1350
In connection with the Report of FirstEnergy Corp. (“Company”) on Form 10-Q for the period ended June 30, 2022 as filed with the Securities and Exchange
Commission on the date hereof (the “Report”), each undersigned officer of the Company does hereby certify, pursuant to 18 U.S.C. § 1350, as adopted pursuant
to § 906 of the Sarbanes-Oxley Act of 2002, that to the best of his knowledge:
(1) The Report fully complies with the requirements of section 13(a) or 15(d) of the Securities Exchange Act of 1934; and
(2) The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.
/s/ Steven E. Strah
Steven E. Strah
President and
Chief Executive Officer
/s/ K. Jon Taylor
K. Jon Taylor
Senior Vice President, Chief Financial Officer and Strategy
Date: July 26, 2022

-- 98 of 98 --