PRESENTATION

Q1 2023 — Presentation

Q1 2023PDF · 31 pages5.2 MB
fcx.com
FCX Conference Call
1st Quarter 2023 Results
April 21, 2023

-- 1 of 31 --

Cautionary Statement
This presentation contains forward-looking statements in which FCX discusses its potential future performance. Forward-looking statements are all statements other than statements of historical facts, such as plans, projections, or
expectations relating to business outlook, strategy, goals or targets; global market conditions; ore grades and milling rates; production and sales volumes; unit net cash costs and operating costs; capital expenditures; operating plans; cash flows;
liquidity; PT-FI’s financing, construction and completion of additional domestic smelting capacity in Indonesia in accordance with the terms of its special mining license (IUPK); extension of PT-FI’s IUPK beyond 2041 and export permit beyond June
10, 2023; FCX’s commitment to deliver responsibly produced copper and molybdenum, including plans to implement, validate and maintain validation of its operating sites under specific frameworks; execution of FCX’s energy and climate
strategies and the underlying assumptions and estimated impacts on FCX’s business related thereto; achievement of 2030 climate targets and 2050 net zero aspiration; improvements in operating procedures and technology innovations;
exploration efforts and results; development and production activities, rates and costs; future organic growth opportunities; tax rates; export quotas; the impact of copper, gold and molybdenum price changes; the impact of deferred intercompany
profits on earnings; mineral reserve and mineral resource estimates; final resolution of settlements associated with ongoing legal proceedings; debt repurchases; and the ongoing implementation of FCX’s financial policy and future returns to
shareholders, including dividend payments (base or variable) and share repurchases. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “targets,” “intends,” “likely,” “will,” “should,” “could,” “to be,”
“potential,” “assumptions,” “guidance,” “aspirations,” “future,” “commitments,” “pursues,” “initiatives,” “objectives,” “opportunities,” “strategy” and any similar expressions are intended to identify those assertions as forward-looking statements. The
declaration and payment of dividends (base or variable), and timing and amount of any share repurchases is at the discretion of the Board of Directors (Board) and management, respectively, and is subject to a number of factors, including
maintaining FCX’s net debt target, capital availability, FCX’s financial results, cash requirements, global economic conditions, changes in laws, contractual restrictions and other factors deemed relevant by the Board or management, as applicable.
The share repurchase program may be modified, increased, suspended or terminated at any time at the Board’s discretion.
FCX cautions readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, expected, projected or assumed in the forward-looking statements. Important
factors that can cause FCX’s actual results to differ materially from those anticipated in the forward-looking statements include, but are not limited to, supply of and demand for, and prices of the commodities FCX produces, primarily copper; price
and availability of consumables and components FCX purchases as well as constraints on supply and logistics, and transportation services; changes in FCX’s cash requirements, financial position, financing or investment plans; changes in general
market, economic, regulatory or industry conditions; reductions in liquidity and access to capital; changes in tax laws and regulations, including the impact of the Inflation Reduction Act; any major public health crisis; political and social risks,
including the potential effects of violence in Indonesia, civil unrest in Peru, and relations with local communities and Indigenous Peoples; operational risks inherent in mining, with higher inherent risks in underground mining; mine sequencing;
changes in mine plans or operational modifications, delays, deferrals or cancellations; production rates; timing of shipments; results of technical, economic or feasibility studies; potential inventory adjustments; potential impairment of long-lived
mining assets; PT-FI’s ability to export and sell copper concentrate and anode slimes; satisfaction of requirements in accordance with PT-FI’s IUPK to extend mining rights from 2031 through 2041; the Indonesia government’s approval of a
deferred schedule for completion of additional domestic smelting capacity in Indonesia; discussions relating to the extension of PT-FI’s IUPK beyond 2041; cybersecurity incidents; labor relations, including labor-related work stoppages and costs;
compliance with applicable environmental, health and safety laws and regulations; weather- and climate-related risks; environmental risks, including availability of secure water supplies, and litigation results; FCX’s ability to comply with its
responsible production commitments under specific frameworks and any changes to such frameworks and other factors described in more detail under the heading “Risk Factors” in FCX’s Annual Report on Form 10-K for the year ended December
31, 2022, filed with the U.S. Securities and Exchange Commission (SEC).
Investors are cautioned that many of the assumptions upon which FCX’s forward-looking statements are based are likely to change after the date the forward-looking statements are made, including for example commodity prices, which FCX
cannot control, and production volumes and costs or technological solutions and innovation, some aspects of which FCX may not be able to control. Further, FCX may make changes to its business plans that could affect its results. FCX cautions
investors that it undertakes no obligation to update any forward-looking statements, which speak only as of the date made, notwithstanding any changes in its assumptions, changes in business plans, actual experience or other changes.
Estimates of mineral reserves and mineral resources are subject to considerable uncertainty. Such estimates are, to a large extent, based on metal prices for the commodities we produce and interpretations of geologic data, which may not
necessarily be indicative of future results or quantities ultimately recovered. This presentation includes forward-looking statements regarding mineral resources not included in proven and probable mineral reserves. A mineral resource, which
includes measured, indicated and inferred mineral resources, is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic
extraction. Such a deposit cannot qualify as recoverable proven and probable mineral reserves until legal and economic feasibility are confirmed based upon a comprehensive evaluation of development and operating costs, grades, recoveries and
other material modifying factors. This presentation also includes forward-looking statements regarding mineral potential, which includes exploration targets and mineral resources but will not qualify as mineral reserves until comprehensive
engineering studies establish legal and economic feasibility. Significant additional evaluation is required and no assurance can be given that the potential quantities of metal will be produced. Accordingly, no assurances can be given that estimated
mineral resources or estimated mineral potential not included in mineral reserves will become proven and probable mineral reserves.
This presentation also contains financial measures such as unit net cash costs per pound of copper and molybdenum, net debt and adjusted EBITDA (earnings before interest, taxes, depreciation and amortization), which are not recognized
under U.S. generally accepted accounting principles (GAAP). As required by SEC Regulation G, FCX’s calculation and reconciliation of unit net cash costs per pound of copper and net debt to amounts reported in FCX’s consolidated financial
statements are in the supplemental schedules of FCX’s 1Q23 press release, which is available on FCX’s website, fcx.com. A reconciliation of amounts reported in FCX’s consolidated financial statements to adjusted EBITDA is included on slide 30.
For forward-looking non-GAAP measures FCX is unable to provide a reconciliation to the most comparable GAAP financial measure because the information needed to reconcile these measures is dependent upon future events, many of
which are outside of management’s control as described above. Additionally, estimating such GAAP measures and providing a meaningful reconciliation consistent with FCX’s accounting policies for future periods is extremely difficult and requires
a level of precision that is unavailable for these future periods and cannot be accomplished without unreasonable effort. Forward-looking non-GAAP measures are estimated consistent with the relevant definitions and assumptions.
2
Regarding Forward-Looking Statements

-- 2 of 31 --

3
2022 Reports
2022 Sustainability Report Highlights
• Premier global leader in copper industry
• Large-scale, long-lived reserves
• Attractive portfolio of organic growth opportunities
• Strongly positioned with favorable market outlook
• Focused on delivering long-term value to all stakeholders
• Accelerate the Future, Responsibly
• Leading responsible copper producer
• 22nd year of reporting on sustainability progress
• Achieved Copper Mark at all 12 copper producing sites globally
2022 Annual Report Highlights

-- 3 of 31 --

Unit Net Cash Costs (Credits)
$1.76/lb $(0.08)/lb
Consolidated Indonesia
In line with January Guidance 4
1Q 2023 Highlights
Operating Cash Flow
$1.1 bn
Net of $0.5 bn in working capital uses
Net Debt
$1.3 bn (3)
Excluding net debt for smelter projects
(2) A reconciliation of amounts reported in FCX’s consolidated
financial statements to Adjusted EBITDA is included on slide 30.
(3) Net debt equals consolidated debt less consolidated cash. Excludes
$1.5 bn in net debt associated with the Indonesia smelter projects.	See Cautionary Statement.
Copper
Production Sales Price Realization
965 832 (1)
$4.11
mm lbs mm lbs per lb
Gold
405 270 (1)
$1,949
k ozs k ozs per oz
Molybdenum
21 19 $30
mm lbs mm lbs per lb
(1) Impacted by Grasberg weather event and transition to new tolling
agreement.
Increasing sales volumes
expected in balance of the year
Adjusted EBITDA
$2.2 bn (2)

-- 4 of 31 --

1Q23 Execution Under Challenging Circumstances
5
Grasberg Weather Event
in February
• Major rain event triggered landslides
in mill area at Grasberg
• Safe execution of cleanup; restored
full operations in March
• No significant property damage
106
84
139
January February March
U.S. Labor Shortages,
Extreme Weather Events &
Equipment Availability Issues
81 77 87
January February March
• Disruptions to supply chains
and transportation routes
• Maintained operations with
focus on safety and security
• Situation improved in March
Peruvian Civil Unrest
118
98
116
January February March
• Centralized effort to support
maintenance and reliability
• Enhanced skill training
• Technology & automation initiatives
• Leach initiatives helped offset shortfalls
mm lbs
PT-FI Copper Production Cerro Verde Copper Production U.S. Copper Production
65%
13%
18%

-- 5 of 31 --

6
Copper – The Metal of Electrification
2022 2035
Copper Demand Forecast (1)
(mm tonnes)
~25
~50
• Intensity of copper use in electrification is rising
• Low carbon technologies driving massive growth in
metals demand
• Renewables growth from 10% to 60% of power under
2050 net zero (2)
Strongly Positioned to Support Growing Demand
• Established franchises in Americas and Indonesia
• Track record for sustainable resource development
• Experienced team
South
America
28%
North America
44%
Indonesia
28%
South
America
26%
North America
53%
Indonesia
21%
Copper Resources (3)
235 bn lbs
(1) Source: S&P Global copper study published in July 2022
(2) Source: International Monetary Fund
(3) As of 12/31/22. Copper reserves (recoverable metal) based on long-term average prices of $3.00/lb for copper; copper resources (contained metal) based on long-term average copper price of $3.50/lb. Mineral resources
are not included in mineral reserves and will not qualify as mineral reserves until comprehensive engineering studies establish legal and economic feasibility. Accordingly, no assurance can be given that the estimated
mineral resources will become proven and probable mineral reserves. See Cautionary Statement.
Looming supply
gap expected
Prices will need to
rise to incentivize
new supplies
Copper Reserves (3)
111 bn lbs

-- 6 of 31 --

Molybdenum Market Commentary
• FCX 1Q23 production 21mm lbs: 63% by-product / 37% primary
• S&P Platts Metals Week Daily molybdenum dealer oxide price
o Averaged $32.78/lb in 1Q23 vs. $19.08/lb in 1Q22
o Price on April 20, 2023: $21.50/lb
• Positive long-term market fundamentals
• Consumption expected to increase in key industries, including
automotive, aerospace, energy and renewables
• Supplies are limited
World’s Largest Molybdenum Producer
$0
$10
$20
$30
$40
$50
Jan-20 Jan-21 Jan-22 Jan-23
$/lb Mo
Molybdenum Price ($/lb Mo)
Source: S&P Platts Metals Week Daily Dealer Oxide
Annual Sensitivities(1)
(US$ in mms)
Operating Cash Flow	EBITDA
$ 400 $375
(1) Based on 2024e/2025e annual average. e = estimate. See Cautionary Statement.
0 20 40 60 80 100	(mm lbs)
Source: Wood Mackenzie April 2023
+/-$5.00/lb
7

-- 7 of 31 --

8
Operational Initiatives
Heat – Proven Enhancer
• Covers installed on over 30% (42mm ft2)
of leach areas
• Mechanization improving installation
execution
Leach “Everywhere”
• Targeted drilling to improve flow
• Injecting solution to lower stockpile
sections
• Sensors measuring conditions
• Extended side slope leaching
Analytics
• Providing valuable insights
• Optimizing acid concentration
• Testing response to application rates
Further Innovation
to Build Scale
30%
50%
20%
Turning Up the Heat
• Evaluating heated injections using
renewable sources
• Cover expansion
Additives
• Pursuing internal & third-party
technology
• Transition from lab to large-scale testing
• AI-driven evaluation accelerating
development
Air Injection/Oxidation
• Sulfide leaching dependent on oxygen
• Evaluating new uses of existing
technology
South
America
16%
Other
North
America
34%
Morenci
50%
Copper in Leach
Stockpiles Unrecoverable
by Traditional Leach
Methods
38 bn lbs Contained*
* Copper from historical placements beyond
assumed recovery estimates and is not
included in mineral reserves or mineral
resources.
Significant
Potential
Leach Initiatives Gaining Traction
See Cautionary Statement.
~200 mm lbs per annum run
rate targeted by YE 2023
R&D stage – Potential to build
scale to ~800 mm lbs per annum

-- 8 of 31 --

Safford / Lone Star Sulfides
~50 bn lbs
Mineral Potential (1)
Other U.S. Brownfield
Opportunities
~100 bn lbs
Mineral Potential (1)
Grasberg Extension of
Operating Rights Beyond 2041
opens significant
development potential
Organic Development Pipeline
Near-Term Long-Term Potential	Medium-Term
Potential Step Change in
Leaching Technology
~600 mm lbs*
Bagdad 2X Expansion
~200 mm lbs*
El Abra Expansion
~650 mm lbs*
Kucing Liar
~550 mm lbs & 560 k ozs*
Leach Initiatives
~200 mm lbs*
North America
Staffing & Asset
Efficiency
~200 mm lbs*
* Annual production estimates
(1) Estimated mineral potential includes exploration targets and mineral resources but will not qualify as mineral reserves until comprehensive engineering studies establish legal and economic feasibility.
Significant additional evaluation is required and no assurance can be given that the potential quantities of metal will be produced. Accordingly, no assurance can be given that estimated mineral
potential not included in mineral reserves will become proven and probable mineral reserves.
See Cautionary Statement. 9

-- 9 of 31 --

Annual Sales Profile
NOTE: Consolidated copper sales include 1.3 bn lbs in 2023e, 1.4 bn lbs in 2024e and 1.36 bn lbs in 2025e
for noncontrolling interests; excludes purchased copper.
0.0
1.0
2.0
3.0
4.0
5.0
2023e* 2024e* 2025e
4.1 4.2 4.2
0
1
2
2023e* 2024e* 2025e
1.8 1.8 1.6
0
25
50
75
100
2023e 2024e 2025e
79 85 90
* Estimates assume deferrals of ~110 mm lbs of copper and ~140k ozs of gold in 2023 related to production deferred in inventory until final sale associated with PT-FI’s tolling arrangement with PT Smelting
(effective January 2023) and ~100 mm lbs of copper and ~110k ozs of gold in 2024 related to PT-FI’s Manyar smelter (expected to commence in 2024).
e = estimate. See Cautionary Statement.
NOTE: Consolidated gold sales include 836k ozs in 2023e, 922k ozs in 2024e and 820k ozs
in 2025e for noncontrolling interests.
(billion lbs)
Copper
Sales
(million lbs)
Moly
Sales
Gold
Sales
(million ozs)
April 2023 Estimate
10

-- 10 of 31 --

Reconciliation of 2023e Unit Net Cash Cost Guidance
e = estimate. See Cautionary Statement.
11
2023e Site Production
Costs Breakdown
Materials
and
Supplies
34%
Labor
28%
Energy
21%
Other
12%(5)
Acid
5%
January 2023e
Guidance (1) Impacts
April 2023e
Guidance (2)
Site Production & Delivery $2.29 +7¢ (3) $2.36
By-product Credits (1.04) -10¢ (1.14)
Treatment Charges 0.22 0.23
Royalties & Export Duties(4) 0.13 -3¢ 0.10
Unit Net Cash Costs $1.60 $1.55
($ and ¢ per pound of copper)
(1) January 2023e guidance based on $4.00/lb of copper, $1,900/oz of gold and $20/lb of molybdenum for 2023e.
(2) April 2023e guidance based on $4.00/lb of copper, $2,000/oz of gold and $18/lb of molybdenum for 2Q23e – 4Q23e.
(3) Primarily reflects lower copper volumes.
(4) In March 2023, PT-FI was relieved of export duties based on smelter construction progress.
(5) Support costs, taxes/fees, social costs & other.

-- 11 of 31 --

NOTE: EBITDA equals operating income plus depreciation, depletion and amortization. e = estimate. See Cautionary Statement.
(1) U.S. Dollar Exchange Rates: 800 Chilean peso, 15,500 Indonesian rupiah, $0.66 Australian dollar, $1.06 Euro, 3.75 Peruvian Nuevo Sol base case assumption. Each +10% equals a
10% strengthening of the U.S. dollar; a strengthening of the U.S. dollar against forecasted expenditures in these foreign currencies equates to a cost benefit of noted amounts.
$0
$4
$8
$12
$16
Cu $4.00/lb Cu $4.50/lb Cu $5.00/lb
Average
’24e/’25e
$0
$3
$6
$9
$12
Cu $4.00/lb Cu $4.50/lb Cu $5.00/lb
Average
’24e/’25e
($ in bns except copper, gold and molybdenum prices)
Operating
Cash Flow
Excludes working
capital changes
EBITDA
EBITDA and Cash Flow at Various Copper Prices
Sensitivities Average ’24e/’25e
(US$ in mms)
EBITDA
Operating Cash Flow
Copper +/-$0.10/lb $335
Molybdenum +/-$1.00/lb $ 75
Gold +/-$50/oz $ 55
Currencies (1) +/-10% $165
Diesel +/-10% $ 75
Copper +/-$0.10/lb $425
Molybdenum +/-$1.00/lb $ 80
Gold +/-$50/oz $ 80
Currencies(1) +/-10% $230
Diesel +/-10% $100
Assuming $2,000/oz gold, $18/lb molybdenum
12

-- 12 of 31 --

2022 2023e 2024e
Consolidated Capital Expenditures
Major
Projects
(1) See slide 29; Indonesia smelter projects are being funded with net proceeds from PT-FI’s April 2022 senior notes offering and availability under its revolving credit facility.
(2) Major projects include CAPEX associated with Grasberg underground development and supporting mill and power capital costs ($1.1 bn in 2023e and $0.5 bn in 2024e).
For details of discretionary spending see slide 28.
NOTE: Amounts include capitalized interest. Discretionary CAPEX and smelter spending will be excluded from the free cash flow (as defined on slide 15) calculation for purposes
of the performance-based payout framework. e= estimate. See Cautionary Statement.
Other
$1.0
($ in bns)
$1.7(2)
$2.5(2)
$2.7
$1.3(2)
$1.1
$3.5
$1.5
$0.8(2)
Planned
Discretionary
Planned
Discretionary
$1.0$1.1
$3.3
$1.4
Planned
Discretionary
Other Other
Excluding Indonesia Smelter Projects CAPEX (1)
13

-- 13 of 31 --

14
Indonesia Manyar Smelter Project Update
New Greenfield Smelter is ~60% Complete with Commissioning Expected in 2024
NOTE: See slide 29 for additional details.
Smelter Project Site
View Northwest to Southeast
Desalination Plant
Refinery
Smelter
Stack Installation
Steam Dryers Substation

-- 14 of 31 --

Financial Policy: Performance-Based Payout Framework
(1) Net debt equals consolidated debt less consolidated cash. Excludes $1.5 bn in net debt associated with the Indonesia smelter projects.
(2) Available cash flows generated after planned capital spending (excluding Indonesia smelter projects funded with debt and discretionary CAPEX) and distributions to noncontrolling interests.
(3) FCX has acquired 47.9 mm shares of its common stock for a total cost of $1.8 bn ($38.35 avg. cost per share) under program since November 2021.
See Cautionary Statement.
Board will review structure of performance-based payout framework at least annually
15
• Positioned for future growth
• New projects in progress: Kucing Liar | Lone Star oxide expansion | Grasberg Mill
recovery project | Atlantic Copper CirCular
• Organic project pipeline: Leach initiatives | Bagdad 2X | Lone Star sulfide expansions |
El Abra expansion
Advance Organic
Growth
Opportunities
Provide Cash
Returns
to Stockholders
• ~50% free cash flow(2) to be returned to shareholders
• $0.60/share in dividends expected for 2023, incl. $0.30/share base & $0.30/share variable
• $3.2 bn(3) available under share repurchase program as of 4/20/23
Maintain
Strong
Balance Sheet
• Net Debt/Adjusted EBITDA less than 1x as of 3/31/23
• $3 - $4 bn Net Debt target (excluding net debt for new smelter capacity in Indonesia)
• Net Debt of $1.3 bn(1) as of 3/31/23

-- 15 of 31 --

16
Responsible
producer of scale
Embedded
growth options
Long-lived
reserves
Experienced
management team
Cash returns
to shareholders
Strong balance
sheet

-- 16 of 31 --



-- 17 of 31 --

Reference Slides

-- 18 of 31 --

Recognition for Responsible Production
• Assurance framework developed to demonstrate the copper industry’s
responsible production practices
• Producers participating in the Copper Mark are committed to adhering to
internationally recognized responsible operating practices
• Copper Mark governed by independent board including NGO participation
and multi-stakeholder advisory council
• Framework covers 32 issue areas across 5 ESG categories developed by
the Responsible Minerals Initiative’s Risk Readiness Assessment
• The Copper Mark recently extended its framework to other base metals
including molybdenum (“the Molybdenum Mark”)
• FCX has achieved the Copper Mark at all 12 of its copper producing sites
and has achieved the Molybdenum Mark at its two primary molybdenum
mines and four copper mines that produce by-product molybdenum
• Requires third-party assurance of site performance and independent Copper
Mark validation every three years
STATUS BY SITE:
AWARDED
Atlantic Copper smelter &
refinery (Spain)
Bagdad mine (AZ)*
Cerro Verde mine (Peru)*
Chino mine (NM)
Climax mine (CO)**
El Abra mine (Chile)
El Paso refinery & rod mill
(TX)
Henderson mine (CO)**
Miami smelter, mine
& rod mill (AZ)
Morenci mine (AZ)*
PT-FI mine (Indonesia)
Safford mine (AZ)
Sierrita mine (AZ)*
Tyrone mine (NM)
LETTER OF COMMITMENT
Fort Madison (IA)
Rotterdam (Netherlands)
Stowmarket (United Kingdom)
Note: Status as of 04/20/2023
* Denotes Molybdenum Mark awarded for by-product production
** Denotes Molybdenum Mark for primary production
See Cautionary Statement.
The Copper Mark & Molybdenum Mark
19

-- 19 of 31 --

20
2022 ESG Highlights
$177
million
invested in our
communities
6 sites
awarded Molybdenum
Mark, including 4 in
2022 and 2 in early 2023
GHG emissions reduction
targets established for
Atlantic Copper and our
primary molybdenum sites*
2030
HRIA
completed human rights
impact assessment for
all 5 Arizona sites
Global Tailings
Standard
progressed implementation at
applicable tailings storage
facilities in the Americas
total water use
efficiency achieved
89%
WHC
15 of our sites certified gold
by Wildlife Habitat Council
for our biodiversity programs
99%
of our employees are
from the countries
where we operate
12 sites
Accelerating the Future, Responsibly.
* In addition to the 2030 intensity reduction targets established for our Americas copper business in 2020 and PT-FI in 2021
** At year-end 2022, 36.4% of FCX’s Board of Directors was women and following the appointment of Kathleen L. Quirk to the Board in February 2023, we currently have 41.7% women representation on our Board.
Top 100 JUST companies in the U.S. by JUST
Capital rankings
2023 S&P Global Sustainability
Yearbook Member
100 Best Corporate Citizens in the U.S. in 2022 by
3BL Media in partnership with Institutional
Shareholder Services
Points of Light 2022 The Civic 50 list,
recognizing the 50 most community-
minded companies in the U.S.
awarded Copper Mark,
including 4 in 2022 and
1 in early 2023
41.7%
of our Board of Directors
is represented by
women**

-- 20 of 31 --

Financial Highlights
Copper
Consolidated Volumes, excluding purchases (mm lbs) 832 1,024
Average Realization (per lb) $ 4.11 $ 4.66
Site Production & Delivery Costs (per lb) $ 2.57 $ 2.03
Unit Net Cash Costs (per lb) $ 1.76 $ 1.33
Gold
Consolidated Volumes (000’s ozs) 270 409
Average Realization (per oz) $1,949 $1,920
Molybdenum
Consolidated Volumes (mm lbs) 19 19
Average Realization (per lb) $30.32 $19.30
1Q23
(1) Beginning on 1/1/2023, PT-FI's commercial arrangement with PT Smelting converted from a concentrate sales agreement to a tolling arrangement, which resulted in a
change in timing of sales. As a result, ~110 mm lbs of copper and 110k ozs of gold from PT-FI’s 1Q23 production is deferred in inventory and will be sold in future periods.
(2) Includes working capital and other uses of $0.5 bn for 1Q23 and $0.8 bn for 1Q22.
(3) Includes $3.0 bn in senior notes issued by PT-FI in April 2022.
(4) Includes $1.5 bn from PT-FI senior notes offering that is expected to be used to finance the Indonesia smelter projects.
Revenues $ 5.4 $ 6.6
Net Income Attributable to Common Stock $ 0.7 $ 1.5
Diluted Net Income Per Share $ 0.46 $ 1.04
Operating Cash Flows $ 1.1 $ 1.7
Capital Expenditures $ 1.1 $ 0.7
Total Debt $ 9.6 $ 9.6
Consolidated Cash and Cash Equivalents $ 6.9 $ 8.3
(2)
(in billions, except per share amounts)
Sales Data
Financial Results
1Q22
21
(3)
(4)
(1)
(1)

-- 21 of 31 --

1Q 2023 Mining Operating Summary
(1) Includes 6 mm lbs from South America.
(2) Silver sales totaled 1.0 mm ozs.
(3) Beginning on 1/1/2023, PT-FI's commercial arrangement with PT Smelting converted from a concentrate sales agreement to a tolling arrangement, which resulted in a
change in timing of sales. As a result, ~110 mm lbs of copper and 110k ozs of gold from PT-FI’s 1Q23 production is deferred in inventory and will be sold in future periods.
Silver sales totaled 0.9 mm ozs.
NOTE: For a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in FCX’s consolidated financial statements,
refer to “Product Revenues and Production Costs” in the supplemental schedules of FCX’s 1Q23 press release, which is available on FCX’s website.
Site Production & Delivery, excl. adjs. $2.91 $2.54 $2.01 $2.57
By-product Credits (0.59) (0.53) (2.84) (1.10)
Treatment Charges 0.13 0.18 0.37 0.20
Royalties & Export Duties - 0.01 0.38 0.09
Unit Net Cash Costs (Credits) $2.45 $2.20 $(0.08) $1.76
North South
America America Indonesia Consolidated	(per lb of Cu)	1Q23 Unit Net Cash Costs (Credits)
North America
19	21 (1)
Mo
mm lbs
332	332
Production Sales
Cu
mm lbs
Indonesia (3)
198
329
266
402
South America
304 302
by Region
Au
000 ozs
Production and Sales From Mines for 1Q23
22
Production Sales Production Sales Production Sales	Production Sales
(2)

-- 22 of 31 --

23
(1)
(1) Includes molybdenum produced in South America.
(2) Includes gold produced in North America.
(3) Estimates assume average prices of $2,000/oz for gold and $18/lb for molybdenum for 2Q23e - 4Q23e. Quarterly unit costs will vary significantly with
quarterly metal sales volumes.
(4) Production costs include profit sharing in South America and severance taxes in North America.
1,222
79
1,382 1,453
1.8 (2)
North America Indonesia	South America
by Region	2023e Sales
Mo
mm lbs
Cu
mm lbs
Au
mm ozs
(per lb of Cu)
Site Production & Delivery (4) $2.91 $2.54 $1.70 $2.36
By-product Credits (0.40) (0.37) (2.48) (1.14)
Treatment Charges 0.11 0.18 0.37 0.23
Royalties & Export Duties - 0.01 0.26 0.10
Unit Net Cash Costs (Credits) $2.62 $2.36 $(0.15) $1.55
2023e Unit Net Cash Costs (3) North South
America America Indonesia Consolidated
Cu
mm lbs
Cu
mm lbs
e = estimate. See Cautionary Statement.
2023e Operational Data

-- 23 of 31 --

$0
$2
$4
$6
$8
2023 2024 2025 2026 2027 2028 Thereafter
Strong Balance Sheet and Liquidity
(US$ bns)
$6.5
5.25%,
4.25%,
4.625%,
5.40% &
5.45%
Sr. Notes
and
FMC
Sr. Notes
3.875%
Sr. Notes
$0.7
4.55%
Sr. Notes
FCX Revolver $ -
FCX/FMC Senior Notes 6.6
PT-FI Senior Notes 3.0
Total Debt $ 9.6
Consolidated Cash and Cash Eq. $ 6.9
Net Debt (1) $ 2.8
Net Debt/Adjusted EBITDA(2) 0.3x
$ -
at 3/31/23	Total Debt & Cash
$ -
$ 1.4
(1) Includes $1.5 bn of net debt associated with the Indonesia smelter projects.
(2) Trailing 12-months.
(3) For purposes of this schedule, maturities of uncommitted lines of credit and other short-term lines are included in FCX’s revolver balance, which matures in 2027.
See Cautionary Statement.
(3)
5.00% Sr. Notes
& FMC Sr. Notes
4.763%
PT-FI Sr. Notes
5.315%
& 6.2%
PT-FI Sr. Notes
Significant liquidity
▪ $6.9 bn in consolidated cash and cash equiv.
▪ $3.0 bn in availability under FCX credit facility
▪ $1.3 bn in availability under PT-FI credit facility
▪ $350 mm in availability under Cerro Verde
credit facility
4.55%
Sr. Notes
4.125%, 4.375%
Sr. Notes
$1.0
Attractive Debt Maturity Profile
24
$ -
In March 2023, FCX repaid its 3.875% Senior Notes totaling ~$1 bn at maturity.

-- 24 of 31 --

2023e Outlook
Sales
Outlook
Unit Net Cash
Cost of Copper
Operating
Cash Flows (1,2)
Capital
Expenditures
(1) Assumes average prices of $2,000/oz gold and $18/lb molybdenum for 2Q23e – 4Q23e.
(2) Each $100/oz change in gold would have an approximate $140 mm impact and each $2/lb change in molybdenum would have an approximate $90 mm impact.
(3) Including $0.3 billion of working capital and other sources.
(4) Indonesia smelter projects are being funded with net proceeds from PT-FI’s senior notes offering and availability under its revolving credit facility.
(5) Major projects CAPEX includes $1.3 bn for planned projects and $1.1 bn of discretionary projects.
e = estimate. See Cautionary Statement.
• Copper: 4.1 billion lbs
• Gold: 1.8 million ozs
• Molybdenum: 79
million lbs
• ~$7 billion(3) @ $4.00/lb
copper for 2Q23e –
4Q23e
• Each 10¢/lb change
in copper in 2Q23e –
4Q23e = $315 mm impact
• Site prod. & delivery
o 2023e: $2.36/lb
o 2Q23e: $2.35/lb
• After by-product credits (1)
o 2023e: $1.55/lb
o 2Q23e: $1.51/lb
• $3.5 billion (excluding
smelter projects(4))
o $2.4 billion for major
projects(5)
o $1.1 billion for other mining
25

-- 25 of 31 --

NOTE: Consolidated copper sales include 243 mm lbs in 1Q23, 364 mm lbs in 2Q23e, 340 mm lbs in
3Q23e and 371 mm lbs in 4Q23e for noncontrolling interests; excludes purchased copper.
0
200
400
600
800
1000
1200
1Q23* 2Q23e 3Q23e 4Q23e
832
1,065 1,045
1,115
0
150
300
450
600
1Q23* 2Q23e 3Q23e 4Q23e
270
500 450
535
0
5
10
15
20
25
1Q23 2Q23e 3Q23e 4Q23e
19 20 20 20
NOTE: Consolidated gold sales include 74k ozs in 1Q23, 256k ozs in 2Q23e, 231k ozs in
3Q23e and 275k ozs in 4Q23e for noncontrolling interests.
(million lbs)
Copper
Sales
(million lbs)
Moly
Sales
Gold
Sales
(thousand ozs)
2023e Quarterly Sales
* Beginning January 1, 2023, PT-FI's commercial arrangement with PT Smelting converted to a tolling arrangement. In 1Q23, ~110 mm lbs of copper and ~110k ozs of gold from PT-FI’s production was deferred
in inventory and will be sold in future periods.
e = estimate. See Cautionary Statement. 26

-- 26 of 31 --

Metal Production, 2022 – 2027e
NOTE: Amounts are projections. Timing of annual production will depend on a number of factors, including operational performance and other factors. FCX's economic
interest in PT-FI approximated 81.27% through 2022 and beginning January 1, 2023, FCX’s economic interest in PT-FI is 48.76%. PT-FI expects to defer production in
inventory until final sale under its new tolling arrangement with PT Smelting (effective January 2023) and upon commencement of its Manyar smelter (expected in 2024).This
is not expected to result in a significant change in PT-FI's economics but will impact the timing of PT-FI's sales.
e = estimate. See Cautionary Statement.
1.6 1.6 1.7 1.6 1.6 1.6
1.8 1.9 1.9
1.6
1.3 1.3
2022 2023e 2024e 2025e 2026e 2027e
Cu
bn
lbs
Au
mm
ozs
Total: 8.1 billion lbs copper
Annual Average: ~1.6 billion lbs
2023e – 2027eCopper
Total: 8.0 million ozs gold
Annual Average: ~1.6 million ozs
2023e – 2027eGold
PT-FI Mine Plan
27

-- 27 of 31 --

Discretionary Capital Projects*
● Commenced long-term mine development activities
in 2022
● Approximate 10-year development timeframe
● Sustain large-scale, low-cost Cu/Au production
● Capital investment: ~$400 mm/yr average
(~$415 mm in 2023e)
● 6.8 bn lbs copper & 6.5 mm ozs gold
o ~ 550 mm lbs & 560K ozs per annum
Kucing Liar
● Recycle electronic material
● Capital investment: ~$330 mm (~$140 mm in 2023e)
● Expect to commission in 2024e; full rates in 2025e
● ~$60 mm per annum in incremental EBITDA
Atlantic Copper CirCular
Lone Star Oxide Expansion
● Low capital intensity investment
● Capital investment: ~$300 mm (~$120 mm in 2023e)
● Increase stacking rate: 95k t/d to 120k t/d
● Targeting ~300 mm lbs of copper/annum in 2023e
o +50 mm lbs/yr of incremental production
Grasberg Mill Recovery Project
● Installing new copper cleaner circuit
● Improved Cu concentrate grades/metal recoveries
● Capital investment: ~$470 mm (~$230 mm in 2023e)
● Targeted completion: 1H24e
● +60 mm lbs/yr & +40K ozs/yr of incremental Cu/Au
*These discretionary projects and the Indonesia smelter projects will be excluded from the free cash flow calculation (defined on slide 15) for purposes of the performance-based payout framework.
e = estimate. See Cautionary Statement. 28
● Planning expansion to double concentrator capacity
● Conducting feasibility study; expected completion 2H23
● Early works: ~$285 mm (~$190 mm in 2023e)
Bagdad 2X Expansion

-- 28 of 31 --

Oxygen
Plant
Smelter
Refinery
Acid
Plant
Admin
Expansion Project
General Layout
Refinery
Expansion
Oxygen
Plant
Acid
Plant Water Tank	Cooling
Pond
Desal
(1) Based on target price of $2.8 bn for construction contract (excludes capitalized interest, owner’s costs and commissioning) and $0.2 bn for investment in new desalinization plant for the smelter.
Indonesia Downstream Processing Activities
Precious Metals Refinery (PMR)
• To be constructed to process gold and
silver from Manyar smelter and PT
Smelting
• Construction is in progress with
commission expected during 2024
• Cost estimate: ~$400 mm
Greenfield Smelter (Manyar)
• 1.7 mm mt of annual concentrate capacity
• Designed to be world’s largest single line flash
smelter/convertor facility
• ~60% complete
• Project expected to be commissioned in 2024
• Cost estimate: ~$3.0 bn (1)
• 30% increase to existing smelter to add
300,000 mt of annual concentrate capacity
• Completed commercial arrangements in 4Q21
• Target completion of YE 2023, ~70% complete
• Cost estimate: ~$250 mm
PT Smelting Expansion
29	e = estimate. See Cautionary Statement.
(2) Manyar smelter project expected to be funded with net proceeds from PT-FI’s senior notes offering and availability under its revolving credit facility. Capital spending on the Manyar smelter will be debt financed and will not be
deducted from cash available for returns to FCX shareholders. Estimates exclude capitalized interest, owner’s costs and commissioning.
Preliminary Estimate of Spending on Manyar Smelter & PMR
(shared 51% PT Inalum/49% FCX)(2)
$0.2
$0.8
$1.6
$0.8
2021 2022 2023e 2024e
($ in bns) Refinery Plant Extension

-- 29 of 31 --

Adjusted EBITDA Reconciliation
(1) Includes net adjustments to environmental obligations and litigation reserves ($56 mm in 1Q23 and $122 mm for the twelve months ended 3/31/2023) and asset impairments and
contract cancellation costs ($20 mm in 1Q23 and $28 mm for the twelve months ended 3/31/2023). The twelve months ended 3/31/2023 also include adjustments to reclamation
liabilities at PT-FI ($116 mm).
(2) Adjusted EBITDA is a non-GAAP financial measure that is frequently used by securities analysts, investors, lenders and others to evaluate companies’ performance, including, among
other things, profitability before the effect of financing and similar decisions. Because securities analysts, investors, lenders and others use Adjusted EBITDA, management believes that
our presentation of Adjusted EBITDA affords them greater transparency in assessing our financial performance. Adjusted EBITDA should not be considered as a substitute for measures
of financial performance prepared in accordance with GAAP. Adjusted EBITDA may not necessarily be comparable to similarly titled measures reported by other companies, as different
companies calculate such measures differently.
($ in mm) 12 mos ended
1Q23 3/31/2023
Net income attributable to common stock $663 $2,604
Interest expense, net 151 584
Income tax provision 499 1,942
Depreciation, depletion and amortization 399 1,929
Net gain on sales of assets - (2)
Accretion and stock-based compensation 85 210
Other net charges (1) 80 290
Gain on early extinguishment of debt - (31)
Other income, net (88) (264)
Net income attributable to noncontrolling interests 386 1,020
Equity in affiliated companies’ net earnings (10) (26)
FCX Adjusted EBITDA (2) $2,165 $8,256
30

-- 30 of 31 --



-- 31 of 31 --