PRESENTATION

Q1 2026 — Presentation

Q1 2026PDF · 42 pages9.0 MB
All Operating Sites
fcx.com
FCX Conference Call
1st Quarter 2026 Results
April 23, 2026

-- 1 of 42 --

Cautionary Statement
2
This presentation contains forward-looking statements in which FCX discusses its potential future performance, operations and projects. Forward-looking statements are all statements other than statements of historical facts, such as plans,
projections or expectations relating to business outlook, strategy, goals or targets; restoration and remediation efforts, and phased restart and ramp-up of production and downstream processing following the mud rush incident at PT Freeport
Indonesia’s (PTFI) Grasberg Block Cave (GBC) underground mine and the anticipated impact on FCX’s business, production, sales, results of operations and operating plans; global market conditions, including trade policies; ore grades and milling
rates; production and sales volumes; higher variability between PTFI production and sales; unit net cash costs (credits) and operating costs; capital expenditures; operating plans, including mine sequencing; cash flows; liquidity; potential extension
of PTFI’s special mining business license (IUPK) beyond 2041; timing of shipments of inventoried production; FCX’s sustainability-related commitments and targets; FCX’s overarching commitment to deliver responsibly produced copper and
molybdenum, including plans to implement, validate and maintain validation of its operating sites under specific frameworks; achievement of FCX’s 2030 climate targets and its 2050 net zero aspiration; improvements in operating procedures and
technology innovations and applications; exploration efforts and results; development and production activities, rates and costs; future organic growth opportunities; tax rates; the impact of copper, gold and molybdenum price changes; the impact of
deferred intercompany profits on earnings; mineral reserve and mineral resource estimates; final resolution of settlements associated with ongoing legal and environmental proceedings; debt repurchases; and the ongoing implementation of FCX’s
financial policy and future returns to shareholders, including dividend payments (base or variable) and share repurchases. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “targets,” “intends,” “likely,” “will,”
“should,” “could,” “to be,” “potential,” “assumptions,” “guidance,” “aspirations,” “future,” “commitments,” “pursues,” “initiatives,” “objectives,” “opportunities,” “strategy” and any similar expressions are intended to identify those assertions as forward-
looking statements. The declaration and payment of dividends (base or variable), and timing and amount of any share repurchases are at the discretion of the Board of Directors (Board) and management, respectively, and are subject to a number
of factors, including not exceeding FCX’s net debt target, capital availability, FCX’s financial results, cash requirements, global economic conditions, changes in laws, contractual restrictions and other factors deemed relevant by the Board or
management, as applicable. The share repurchase program may be modified, increased, suspended or terminated at any time at the Board’s discretion.
FCX cautions readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, expected, projected or assumed in the forward-looking statements. Important
factors that can cause FCX’s actual results to differ materially from those anticipated in the forward-looking statements include, but are not limited to, supply of and demand for, and prices of the commodities FCX produces, primarily copper and
gold; changes in export duties and tariff rates; production rates; timing of shipments and sales; PTFI’s ability to repair mud rush incident-related damage, implement enhanced operating procedures, safely restart, with a phased ramp-up and achieve
full operating rates of production and downstream processing on the expected timeline and optimize production plans; resolve force majeure declarations and maintain relationships with commercial counterparties; price and availability of
consumables and components FCX purchases as well as constraints on supply and logistics, and transportation services; changes in cash requirements, financial position, financing or investment plans; changes in general market, economic,
geopolitical, regulatory or industry conditions, including market volatility regarding trade policies and tariff uncertainty; reductions in liquidity and access to capital; changes in tax laws and regulations; political and social risks, including the potential
effects of violence in Indonesia, civil unrest in Peru, and relations with local communities and Indigenous Peoples; operational risks inherent in mining, with higher inherent risks in underground mining; mine sequencing; changes in mine plans or
operational modifications, delays, deferrals or cancellations, including the ability to smelt and refine or inventory; results of technical, economic or feasibility studies; potential inventory adjustments; potential impairment of long-lived mining assets;
satisfaction of requirements in accordance with PTFI’s IUPK to extend mining rights from 2031 through 2041; process relating to the extension of PTFI’s IUPK beyond 2041; cybersecurity risks; any major public health crisis; labor relations, including
labor-related work stoppages and increased costs; compliance with applicable environmental, health and safety laws and regulations; weather- and climate-related risks; environmental risks, including availability of secure water supplies; impacts,
expenses or results from litigation or investigations; tailings management; FCX’s ability to comply with its responsible production commitments under specific frameworks and any changes to such frameworks and other factors described in more
detail under the heading “Risk Factors” in FCX’s Annual Report on Form 10-K for the year ended December 31, 2025, filed with the U.S. Securities and Exchange Commission.
Investors are cautioned that many of the assumptions upon which FCX’s forward-looking statements are based are likely to change after the date the forward-looking statements are made, including for example commodity prices, which FCX
cannot control, and production volumes and costs or technological solutions and innovations, some aspects of which FCX may not be able to control. Further, FCX may make changes to its business plans that could affect its results. FCX
undertakes no obligation to update any forward-looking statements, which are as of the date made, notwithstanding any changes in its assumptions, changes in business plans, actual experience or other changes.
Estimates of mineral reserves and mineral resources are subject to considerable uncertainty. Such estimates are, to a large extent, based on metal prices for the commodities we produce and interpretations of geologic data, which may not
necessarily be indicative of future results or quantities ultimately recovered. This presentation also includes forward-looking statements regarding mineral resources not included in proven and probable mineral reserves. A mineral resource, which
includes measured, indicated and inferred mineral resources, is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic
extraction. Such a deposit cannot qualify as recoverable proven and probable mineral reserves until legal and economic feasibility are confirmed based upon a comprehensive evaluation of development and operating costs, grades, recoveries and
other material modifying factors. This presentation also includes forward-looking statements regarding mineral potential, which includes exploration targets and mineral resources but will not qualify as mineral reserves until comprehensive
engineering studies establish legal and economic feasibility. Significant additional evaluation is required and no assurance can be given that the potential quantities of metal will be produced. Accordingly, no assurance can be given that estimated
mineral resources or mineral potential will become proven and probable mineral reserves.
This presentation also contains measures such as unit net cash costs (credits) per pound of copper and molybdenum, net debt and Adjusted EBITDA (earnings before interest, taxes, depreciation, amortization and accretion), which are not
recognized under U.S. generally accepted accounting principles (GAAP). FCX’s calculation and reconciliation of unit net cash costs (credits) per pound of copper and molybdenum and net debt to amounts reported in FCX’s consolidated financial
statements are in the supplemental schedules of FCX’s 1Q26 press release, which is available on FCX’s website, fcx.com. A reconciliation of amounts reported in FCX’s consolidated financial statements to Adjusted EBITDA is included on slide 32.
For forward-looking unit net cash costs (credits) per pound of copper and molybdenum measures, FCX is unable to provide a reconciliation to the most comparable GAAP measure without unreasonable effort because estimating such GAAP
measures and providing a meaningful reconciliation is extremely difficult and requires a level of precision that is unavailable for these future periods, and the information needed to reconcile these measures is dependent upon future events, many of
which are outside of FCX’s control as described above. Forward-looking non-GAAP measures are estimated consistent with the relevant definitions and assumptions.

-- 2 of 42 --

1Q26 1Q25 1Q26 1Q25
1Q26 1Q25 1Q26 1Q25
1Q26 Highlights
3
($ in bn)	Financial Highlights
(1) A reconciliation of amounts reported in FCX’s consolidated financial
statements to Adjusted EBITDA is included on slide 32.
(2) Cash provided by (used for) working capital totaled $0.1 bn in 1Q26 and
($0.3) bn in 1Q25.
(3) Includes $0.6 bn for major projects in 1Q26 and 1Q25.
NOTE: Refer to non-GAAP disclosure on slide 2.
• 1Q26 sales volumes and unit net cash costs favorable to
January estimates
• U.S. copper mining operating income up ~2.5x vs. 1Q25
• Initiated phased ramp-up of Grasberg Block Cave; ramp-up
forecast adjusted for modifications to material handling
systems
• Signed MOU with Indonesian government to extend PTFI
operating rights for the life of resource
• Advanced organic copper growth: El Abra EIS submitted for
potential major expansion; Arizona leach technology and
brownfield expansion progressing
• Returned $0.3bn to shareholders, including $0.1bn of share
repurchases*
• Strong balance sheet and favorable long-term outlook
*Share repurchases include $93 mm in 1Q26 ($54.25 avg. per share)
Operating Cash Flow (2)
$1.5
Adjusted EBITDA (1)	Revenues
$2.5
$6.2 $5.7
$1.9
$1.1
CAPEX (3)
$1.0 $1.2

-- 3 of 42 --

Pursuing Value For All Stakeholders
2026 Focus Areas
4
Leach Initiative
Targeting ~300 mm lbs
in 2026 and further
define path to ~800 mm
lbs per annum by 2030.
Innovation
Deploy technologies
to strengthen
long-term cost
competitiveness in the
Americas and unlock
significant value.
Future Growth
Advance major growth
options in long-lived
copper districts at
Bagdad, El Abra and
Safford/Lone Star.
Execution
Deliver on operating
plans across all sites
and safely and
sustainably restore
Grasberg mining and
smelting operations.

-- 4 of 42 --

Copper – Metal of Electrification
5
Technology
• Demand expected to benefit from advances in AI,
communications and expanding connectivity
* internationalcopper.org
Infrastructure
• Backbone of construction, urbanization and energy
infrastructure
• Superior electrical and thermal conductivity of any
industrial metal
Transportation
• Essential material component of electric vehicles /
hybrids
• Used in electric motors, batteries, inverters, wiring
and charging stations
Freeport is
strategically
positioned as a
leading copper
producer
* internationalcopper.org
Over 65%
of the world’s
copper is used in
applications that
deliver electricity*

-- 5 of 42 --

Operations Update
6
• Copper sales +7% vs. 1Q25
• Unit net cash costs down 6% vs. 1Q25
• Ongoing focus on increasing volumes,
improving run times
• Targeting increase from innovative
leach initiative: ~300 mm lbs in 2026
o Commenced large-scale testing of
internally developed additive
o Lab tests of additional internally developed
additives showing encouraging results
o Commenced pilot testing of heat at Morenci
with additional modular heating units
planned at scale
• New initiative advancing to use
technology for greater efficiencies and
cost reduction
• Cerro Verde effectively managed
challenges in 1Q26 associated with
severe weather and mill restrictions
• Pursuing innovative leach
opportunities at El Abra; heat
trials expected in 2H26
• Submitted environmental impact
statement for potential major
expansion and transformational
growth at El Abra
• Completed remediation and
restoration activities required for
restart of GBC Production Blocks
(PB) 2 and 3
• Ramp-up schedule adjusted to
incorporate required loading
infrastructure modifications in
haulage level
• Continue to advance activities for
future start-up of PB 1S
• Smelters operating at reduced rates
until GBC ramps up
• $0.7 bn insurance settlement (expect
proceeds in 2Q26)
NOTE: Refer to non-GAAP disclosure on slide 2.
United States South America Indonesia
Cu Sales: 327 mm lbs
Unit Net Cash Costs: $2.93/lb
Cu Sales: 248 mm lbs
Unit Net Cash Costs: $2.38/lb
Cu Sales: 82 mm lbs
Au Sales: 116 k ozs
Unit Net Cash Credits: $3.53/lb*
* Excludes idle facility and restoration costs associated with
mud rush incident at PTFI.

-- 6 of 42 --

Grasberg Update
• Remediation for opening of PB 2/3 completed on schedule
• Initial mining in PB 2/3 commenced in March
• Number of wet drawpoints in PB 2/3 increased following extended
period of inactivity
▪ Dry to Wet ratio impacts transfer of ore to automated trains at Haulage
Level
▪ Commenced required modifications to rail loading infrastructure to
achieve full ramp-up; PB 2/3 production limited over next 12 months
▪ Majority of bottlenecks to be addressed by mid-2027
• Advancing preparation for the future start-up of PB 1S and
progressed drainage & cave-management risk-mitigation strategies
• Confident in the quality of the resource, ability to operate
large-scale underground mining safely & efficiently long-term
Status as of April 2026
7
Muon Detector Installation
Completed Infrastructure
Repairs in Mid Access Drift

-- 7 of 42 --

▪ Additional clean-up & plug installations
▪ Complete chute repairs
▪ Planned restart in mid-2027
▪ Potential restart by YE 2027
Grasberg Block Cave
8
✓ Completed mud clean-up on various levels of GBC
✓ Installed plugs in Mid-Access Drift (MAD)
✓ Repaired & installed infrastructure services
✓ Initial mining commenced in March 2026
(previously expected in 2Q26)
▪ Revised Ramp-up Schedule:
Planned Restart Overview
• PB 2/3 Restart
• PB 1S Restart
• PB 1C Restart
• Risk Management
Plan View
Grasberg Pit
Grasberg
Block Cave
Kucing Liar	
N
Future PBs 	PB3
PB2N
PB2S
PB1
PB1N
PB1C
PB1S	
P23
P34
DP20S
Jan 2026 Apr 2026
Ramp-up (t/d) 100K by 2H26 60K in 2H26,
90K in 2Q27
Estimates as of
▪ Strengthen cave management plans
▪ Mud inrush controls, including mud removal options
▪ Emerging Cave Imaging Technology (muons)

-- 8 of 42 --

9
Grasberg BC Extraction Level
Increase in Wet Drawpoints in PB 2/3 since September 2025
September 2025
Number of wet drawpoints increased following extended period of inactivity
April 2026
N
Grasberg BC
Extraction Level, 2830m
183 Wet Drawpoints (~30% of total)
2.5:1 Dry:Wet Ratio
Wet Dry
Drawpoint Classification
PB1N
PB1C
PB1S
PB3
Future
PBs
Plan View
PB3
PB2S
PB2N
PB2S
PB2N
280 Wet Drawpoints (~45% of total)
1.3:1 Dry:Wet Ratio
635 Total Active
Drawpoints (DPs) in PB 2/3
Sept 2025
• 452 Dry DPs & 183 Wet DPs
1 Panel with less than 1:1
Dry:Wet Ratio
April 2026
• 355 Dry DPs & 280 Wet DPs
10 Panels with less than 1:1
Dry:Wet Ratio

-- 9 of 42 --

GBC Ore: Extraction to Haulage
Loading Infrastructure: Regular Chute & Chute Regulator
10
Chute Regulator	Regular Chute
Drawbell Drilling
Undercut Level
2850m Elevation
Extraction Level
2830m Elevation
Service Level
2810m Elevation
Rail Haulage Level
2760m Elevation
Orepass
Chute
Gallery	Ore Train
Slot Raise
Grizzly
& Rock Breaker
Drawpoints
Loading Chute
Drawbell
Extraction Level
2830m elevation 	Service Level
2810m elevation
Rail Haulage Level
2760m elevation
Mined ore from loaders is dropped down through
orepass to chute to load on railcars
GBC Ore from Extraction Level
to Loading on Haulage Level

-- 10 of 42 --

Grasberg Minerals District Mine Plan
Metal Production, 2025 – 2030e
11
1.0
0.8
1.2
1.6 1.6 1.7
0.9
0.7
1.0
1.4 1.3 1.2
2025 2026e 2027e 2028e 2029e 2030e
| Copper 2026e – 2030e
Total: 6.9 billion lbs copper
Annual Average: ~1.4 billion lbs | Gold 2026e – 2030e
Total: 5.6 million ozs gold
Annual Average: ~1.1 million ozs
Cu
bn lbs
Au
mm ozs
NOTE: Timing of annual production will depend on a number of factors including operational performance; the ramp-up of the Grasberg Block Cave underground mine; weather-related
conditions; and other factors. 2026e production expected to exceed sales and assumes deferrals of ~100 mm lbs of copper and ~50k ozs of gold related to inventory held at PTFI’s smelting
operations. FCX’s economic interest in PTFI is 48.76%.
e = estimate.

-- 11 of 42 --

Robust Project Pipeline Update
12
El Abra
Expansion
Chile
Safford/Lone Star
Expansions
Arizona
Grasberg
District
Indonesia
Bagdad
Expansion
Arizona
New Leach
Technologies
Americas
• Achieved run rate of
~240 mm lbs/yr by YE25
• Targeting increase to
~300 – 400 mm lbs/yr
in 2026/2027
• New additives combined
with heating stockpiles
showing potential for
building scale
• Driving innovation toward
~800 mm lbs/yr by 2030
• 200 – 250 mm
incremental lbs/yr
• Derisking in progress
with autonomous
conversion, tailings
infrastructure investment
and housing
• Retesting economics for
potential investment
decision in 2H26
• 3-4 yr construction
• Substantial resource
• Pre-feasibility study
expected in 2026
• Targeting incremental
addition of 300 – 400 mm
lbs/yr beginning in 2030s
• Kucing Liar project in
development, 130k t/d
expansion
- Ramp-up anticipated to
commence in 2030 timeframe
- 750 mm lbs Cu & 735k oz
Au per annum at full rate to
sustain large-scale production
• Signed MOU for life of
resource extension; targets
beyond 2041 create
opportunities for future growth
• Submitted Environmental
Impact Statement in
March 2026
• ~2-3-yr permitting process
• ~4-yr construction
• Potential start-up in 2033
timeframe
• +700 mm lbs/yr incremental
<$1 billion Incremental investment
~$3.5 billion (under review)
Incentive Price: ~$4/lb
Developing estimate ~$4 billion remaining
for Kucing Liar
~$1.3 billion incurred
to date
~$7.5 billion (under review)
Excludes $2 billion for
extension of leach operations
Incentive Price: <$4/lb
ANTICIPATED CAPITAL INVESTMENT

-- 12 of 42 --

Freeport	̶	 America’s Copper Champion
13
• Valuable U.S. franchise with long-standing history in U.S.
dating back to late 1800s
• Dominant U.S. copper producer; Operations account for
~70% of total U.S. refined production
• One of the largest U.S. copper resource positions
• Entering a period of brownfield growth
Upstream copper mines with SX/EW facilities
Downstream smelting and refining facilities
EL PASO
Copper Refinery and Rod Mill
CHINO
TYRONE
MORENCI
BAGDAD
SAFFORD/LONE STAR
SIERRITA
MIAMI
Mine, Copper Rod Plant & Smelter
Fully integrated operations in Southwest U.S.
ARIZONA NEW
MEXICO
TEXAS
Driving Value Through Innovative Growth & Cost Reduction
Annual Copper Production
Potential for ~60% Increase
(bns of lbs)
~2
1.25
U.S. Base
Production Base
Leach Initiatives
Bagdad 2X
2024 2030e Target
e = estimate

-- 13 of 42 --

Gold
Sales
(million ozs)	(billion lbs)
Copper
Sales
Annual Sales Profile
April 2026 Estimate
14
NOTE: Consolidated copper sales include 1.11 bn lbs in 2025, 0.82 bn lbs in 2026e, 1.13 bn lbs in 2027e
and 1.28 bn lbs in 2028e for noncontrolling interests; excludes purchased copper. Estimates are dependent
on operational performance; the ramp-up of the Grasberg Block Cave underground mine at PTFI; weather-
related conditions; timing of shipments and other factors. Additionally, 2026e assumes deferrals of ~100
mm lbs of copper related to inventory held at PTFI’s smelting operations.
e = estimate.
NOTE: Consolidated gold sales include 538k ozs in 2025, 330k ozs in 2026e, 512k ozs
in 2027e and 666 k ozs in 2028e for noncontrolling interests. Estimates are dependent on
operational performance; the ramp-up of the Grasberg Block Cave underground mine at
PTFI; weather-related conditions; timing of shipments and other factors. Additionally,
2026e assumes deferrals of ~50 k ozs of gold related to inventory held at PTFI’s smelting
operations.
(million lbs)
Moly
Sales
0
1
2
3
4
5
2025 2026e 2027e 2028e
3.6
3.1
3.8
4.1
0
25
50
75
100
2025 2026e 2027e 2028e
83 90 90 95
0
1
2
2025 2026e 2027e 2028e
1.07
0.65
1.0
1.3

-- 14 of 42 --

Recent Cost Pressures
• Sufficient sourcing support current operations but inflationary pressures are increasing, led by energy
• Indonesia energy cost pressures are rising faster, driven by regional supply-chain dislocations
• FCX’s diesel costs in March 2026 increased by over 80% compared with the January / February average
o Equivalent to ~$0.5 billion on an annualized basis
• Energy represented ~15% of FCX’s global direct costs (~50% diesel) in 2025
• Sulfuric acid costs have also risen, with spot prices more than doubling
o FCX has limited exposure to spot market
o FCX’s smelters provide a natural hedge for sulfuric acid
• Continuing to monitor potential impacts on other consumables
15
South America
Diesel
44%	56%
Power
Indonesia
Diesel
65%
35%
Coal &
Other
United States
100
49%
Power
2025 Energy Summary
Diesel Consumption (mm gal/yr)
Diesel
51%
90 90

-- 15 of 42 --

EBITDA and Cash Flow at Various Copper Prices
Assuming $4,500/oz gold, $25/lb molybdenum
16
NOTE: Refer to non-GAAP disclosure on slide 2. These illustrations include insurance proceeds associated with the Grasberg mud rush incident. In 1Q26, PTFI recognized a gain of
$0.7 bn for an insurance settlement associated with the September 2025 mud rush incident under its property and business interruption policies and expects to receive proceeds in 2Q26.
EBITDA also excludes idle facility and restoration costs associated with the mud rush incident at PTFI. e = estimate.
(1) U.S. Dollar Exchange Rates: 911 Chilean peso, 16,000 Indonesian rupiah, $0.70 Australian dollar, $1.16 euro, 3.43 Peruvian sol base case assumption. Each +10% equals a 10%
strengthening of the U.S. dollar; a strengthening of the U.S. dollar against forecasted expenditures in these foreign currencies equates to a cost benefit of noted amounts.
($ in bns except copper, gold and molybdenum prices)
Operating
Cash Flow
Excludes working
capital changes
EBITDA
Sensitivities Average ’27e/’28e
(US$ in mms)
EBITDA
Operating Cash Flow
Copper +/-$0.10/lb $300
Molybdenum +/-$1.00/lb $ 80
Gold +/-$100/oz $ 70
Currencies (1) +/-10% $180
Diesel +/-10% $ 80
Copper +/-$0.10/lb $390
Molybdenum +/-$1.00/lb $ 85
Gold +/-$100/oz $110
Currencies (1) +/-10% $250
Diesel +/-10% $115
$0
$5
$10
$15
$20
Cu $5.00/lb Cu $6.00/lb Cu $7.00/lb
’27e/’28e Avg
$0
$6
$12
$18
$24
Cu $5.00/lb Cu $6.00/lb Cu $7.00/lb
’27e/’28e Avg

-- 16 of 42 --

Consolidated Capital Expenditures
2025 2026e 2027e
Major
Projects
(1) Excludes $0.6 bn in CAPEX for PTFI’s downstream processing facilities.
(2) Planned projects primarily include CAPEX associated with Grasberg underground development, supporting mill and power capital costs and a portion of spending on the new gas-fired combined cycle facility.
NOTE: Amounts include capitalized interest. Discretionary CAPEX will be excluded from the available cash flow calculation for purposes of the performance-based payout framework. e= estimate.
$1.6
$0.9 Planned (2)
Discretionary
$1.4
$3.9
OtherOther
$1.6
Planned (2)
Discretionary
$4.5
Other
$1.3
$1.4
$1.6
$4.3
53%
37%
10%
Grasberg Energy
Transition & Other
Atlantic Copper
CirCular
2027e
Projected Discretionary Spending
by Project
2026e
($ in bns)
17
42% 42%
16%
(1)
Planned (2)
Discretionary
$1.2
$1.7
Kucing
Liar
Bagdad
Early
Works

-- 17 of 42 --

Financial Policy: Performance-Based Payout Framework
~50% available cash flow(1) for shareholder returns
18
(1) Available cash flow equals available cash flows generated after planned capital spending (excluding PTFI’s downstream processing facilities funded with debt and discretionary CAPEX) and distributions to noncontrolling interests.
(2) Net debt equals consolidated debt less consolidated cash and cash equivalents. Net debt at 3/31/26 excludes $3.2 bn of debt associated with PTFI’s downstream processing facilities.
(3) FCX has acquired 53.7 mm shares of its common stock for a total cost of $2.1 bn ($39.01 avg. cost per share) under its share repurchase program since November 2021, including 1.7 mm shares for a total of $93 mm ($54.25 avg.
cost per share) in 1Q26.
NOTE: Refer to non-GAAP disclosure on slide 2.
Board reviews structure of performance-based payout framework at least annually
Maintaining Strong
Balance Sheet
6/30/2021 3/31/2026
$2.4
$3.4
Net Debt,
excluding
Indonesia
downstream
projects
($ in bns)
Providing Cash Returns
to Shareholders
$6.0 bn Distributed
Since 6/30/21
35%
Share
Repurchases(3)
Variable
Dividend
Base
Dividend
34%
31%
Advancing Organic
Growth Opportunities
• Positioned for future growth
• Organic project pipeline
– Leach innovation initiatives
– Kucing Liar/Grasberg District
– Bagdad 2X
– El Abra expansion
– Safford/Lone Star sulfide
expansions
(2)
• Strong credit metrics
• Investment Grade rated by S&P,
Moody’s and Fitch
• Net debt, excluding downstream
projects, below $3-4 bn threshold

-- 18 of 42 --

Significant Gold Producer
Organic Growth Pipeline
Strong Global Leader with
Valuable U.S. Franchise
Leadership Position in
Critical Metal
Large Scale Producer
Freeport – Store of Value
19	19

-- 19 of 42 --

Reference Slides

-- 20 of 42 --

Financial Highlights
21
Copper
Consolidated Volumes, excluding purchases (mm lbs) 657 872
Average Realization (per lb) $ 5.78 $ 4.44
Site Production & Delivery Costs (per lb) $ 3.29 $ 2.59
Unit Net Cash Costs (per lb) $ 1.91 $ 2.07
Gold
Consolidated Volumes (000’s ozs) 121 128
Average Realization (per oz) $4,889 $3,072
Molybdenum
Consolidated Volumes (mm lbs) 24 20
Average Realization (per lb) $25.21 $21.67
1Q26
(1) Excludes idle facility and restoration costs associated with mud rush incident at PTFI.
(2) Cash provided by (used for) working capital totaled $0.1 bn in 1Q26 and ($0.3) bn in 1Q25.
(3) Includes $3.2 bn of debt associated with PTFI’s downstream processing facilities.
NOTE: Refer to non-GAAP disclosure on slide 2.
Revenues $ 6.2 $ 5.7
Net Income Attributable to Common Stock $ 0.9 $ 0.4
Diluted Net Income Per Share $ 0.61 $ 0.24
Operating Cash Flows $ 1.5 $ 1.1
Capital Expenditures $ 1.0 $ 1.2
Total Debt $ 9.4 $ 9.4
Cash and Cash Equivalents $ 3.7 $ 4.4
(in billions, except per share amounts)
| Sales Data
| Financial Results
1Q25
(3)
(1)
(2)
(1)

-- 21 of 42 --

Strong Balance Sheet and Liquidity
Attractive Debt Maturity Profile
22
$0
$2
$4
$6
$8
2026 2027 2028 2029 2030 2031 Thereafter
(US$ bns)
$4.8
5.40% &
5.45%
Sr. Notes
and
FMC
Sr. Notes
PTFI Revolver $ 0.3
FCX/FMC Senior Notes/Other 6.1
PTFI Senior Notes 3.0
Total Debt $ 9.4
Cons. Cash and Cash Equivalents $ 3.7
Net Debt (1) $ 5.7
Net Debt/Adjusted EBITDA(2) 0.5x
$ -
at 3/31/26	Total Debt & Cash
$1.8
(3)
5.00% Sr. Notes
& FMC Sr. Notes
4.763%
PTFI Sr. Notes
5.315%
& 6.2%
PTFI Sr. Notes
Significant liquidity
▪ $3.7 bn in consolidated cash and cash equiv.
▪ $3.0 bn in availability under FCX credit facility
▪ $1.5 bn in availability under PTFI credit facility
▪ $350 mm in availability under Cerro Verde
credit facility
4.125% & 4.375%
Sr. Notes
$1.2
$0.5
5.25% Sr. Notes
4.25% & 4.625%
Sr. Notes
$1.0
PTFI Revolver
(1) Includes $3.2 bn of debt associated with PTFI’s downstream processing facilities.
(2) Trailing 12-months.
(3) For purposes of this schedule, maturities of uncommitted lines of credit and other short-term lines are included in FCX’s revolver balance, which matures in 2027.
NOTE: Refer to non-GAAP disclosure on slide 2.
Atlantic Copper $0.1

-- 22 of 42 --

1Q26 Mining Operating Summary
23
(1) Includes 6 mm lbs in 1Q26 and 1Q25 from South America.
(2) Silver sales totaled 0.8 mm ozs in 1Q26 and 1Q25.
(3) Silver sales totaled 0.5 mm ozs in 1Q26 and 0.4 mm ozs in 1Q25.
(4) Excludes idle facility and restoration costs associated with the mud rush incident at PTFI.
(5) Treatment charges reflect costs from PTFI’s downstream operations and do not reflect market TC/RC rates. In addition, these treatment charges do not reflect the
significant offsets in revenue and by-product credits associated with incremental metals and sulfuric acid produced by PTFI’s downstream operations.
NOTE: Refer to non-GAAP disclosure on slide 2.
Site Production & Delivery, excl. adjs. $3.50 $3.15 $2.91 $3.29
By-product Credits (0.70) (0.79) (7.65) (1.60)
Treatment Charges 0.13 0.01 0.61 0.14
Royalties - 0.01 0.60 0.08
Unit Net Cash Costs (Credits) $2.93 $2.38 $(3.53) $1.91
United South
States America Indonesia Consolidated	(per lb of Cu)	1Q26 Unit Net Cash Costs (Credits)
United States
20
24 (1)
307	327
1Q26 1Q25
Indonesia
290
82
125
116
South America
248 275
Sales From Mines by Region
1Q26 1Q25 1Q26 1Q25 1Q26 1Q25	1Q26 1Q25
(2)
(1)
Au
k ozs
Mo
mm lbs
Cu
mm lbs
(4) (4)
(3)
(5)

-- 23 of 42 --

2026e Outlook
24
(1) Excludes $1.3 bn in 2026e and $0.3 bn in 2Q26e for projected idle facility and restoration costs associated with the mud rush incident at PTFI.
(2) Assumes average prices of $4,500/oz gold and $25/lb molybdenum for 2Q26e – 4Q26e.
(3) For 2Q26e – 4Q26e each $100/oz change in gold is estimated to have an approximate $50 mm impact and each $2/lb change in molybdenum is estimated to have an approximate $90 mm impact.
(4) Major projects CAPEX includes $1.4 bn for planned projects and $1.6 bn of discretionary projects.
NOTE: Projected copper and gold sales and unit net cash costs are dependent on operational performance; the ramp-up of PTFI’s Grasberg Block Cave underground mine; impacts related to the conflict
in the Middle East, including potential changes in energy costs and other consumables; weather-related conditions; timing of shipments and other factors.
e = estimate. Refer to non-GAAP disclosure on slide 2.
• Copper: 3.1 billion lbs
• Gold: 0.65 million ozs
• Molybdenum: 90 million lbs
• Site prod. & delivery(1)
o 2026e: $3.18/lb
o 2Q26e: $3.32/lb
• After by-product credits(1,2)
o 2026e: $1.95/lb
o 2Q26e: $2.24/lb
• $4.3 billion
o $3.0 billion for major
projects(4)
o $1.3 billion for other
projects
• ~$8.7 billion @ $6.00/lb
copper for 2Q26e – 4Q26e
• Each 10¢/lb change
in copper for 2Q26e – 4Q26e
= $220 million impact
Sales
Outlook
Unit Net Cash
Cost of Copper
Operating
Cash Flows (2,3)
Capital
Expenditures

-- 24 of 42 --

2026e Operational Data By Region
25
by Region	2026e Sales
(1)
1,048
90
1,367
663
650(3)
United States Indonesia(2)
South America
(per lb of Cu)
Site Production & Delivery (5) $3.60 $3.19 $2.30 $3.18
By-product Credits (0.70) (0.63) (4.50) (1.49)
Treatment Charges 0.12 0.03 0.50 0.17
Royalties - 0.01 0.40 0.09
Unit Net Cash Costs / (Credits) $3.02 $2.60 $(1.30) $1.95
2026e Unit Net Cash Costs / (Credits) (4) United South
States America Indonesia Consolidated
NOTE: Refer to non-GAAP disclosure on slide 2. e = estimate.
(7)
Au
k ozs
Mo
mm lbs
Cu
mm lbs
Cu
mm lbs
Cu
mm lbs
(1) Includes molybdenum produced in South America.
(2) Copper and gold sales estimates are dependent on operational performance; the ramp-up of PTFI’s Grasberg Block Cave underground mine; impacts related to the conflict in the Middle East, including potential
changes in energy costs and other consumables; weather-related conditions; timing of shipments and other factors.
(3) Includes gold produced in U.S.
(4) Estimates assume average prices of $4,500 oz gold and $25/lb molybdenum for 2Q26e – 4Q26e. Quarterly unit costs will vary significantly with quarterly metal sales volumes.
(5) Production costs include profit sharing in South America and severance taxes in U.S.
(6) Excludes idle facility and restoration costs associated with the mud rush incident at PTFI.
(7) Treatment charges reflect costs from PTFI’s downstream operations and do not reflect market TC/RC rates. In addition, these treatment charges do not reflect the significant offsets ($0.38/lb in 2026e) in revenue
and by-product credits associated with incremental metals and sulfuric acid produced by PTFI’s downstream operations.
(6) (6)

-- 25 of 42 --

* Support costs, taxes/fees, social costs & other
South America	United States
Labor
Energy
Acid 4%
37%
40%
12%
7%
19%
7%
Indonesia Consolidated
34%
19%
16%
31%* 36%
Materials
and
Supplies
26
2025 Site Production Costs Breakdown
Other
4%
11%
15%
33%
36%
34%
5%

-- 26 of 42 --

2026e Quarterly Sales
27	e = estimate
(million lbs)
Moly
Sales
Gold
Sales
(000’s ozs)
0
100
200
300
1Q26 2Q26e 3Q26e 4Q26e
121 140
190 200
0
5
10
15
20
25
1Q26 2Q26e 3Q26e 4Q26e
24 22 22 22
NOTE: Consolidated copper sales include 155 mm lbs in 1Q26, 181 mm lbs in 2Q26e, 226 mm lbs in
3Q26e and 256 mm lbs in 4Q26e for noncontrolling interests; excludes purchased copper.
Estimates are dependent on operational performance; the ramp-up of the Grasberg Block Cave
underground mine at PTFI; weather-related conditions; timing of shipments and other factors.
NOTE: Consolidated gold sales include 59k ozs in 1Q26, 72k ozs in 2Q26e, 97k ozs in
3Q26e and 102k ozs in 4Q26e for noncontrolling interests. Estimates are dependent
on operational performance; the ramp-up of the Grasberg Block Cave underground
mine at PTFI; weather-related conditions; timing of shipments and other factors.
(million lbs)
Copper
Sales
0
250
500
750
1000
1Q26 2Q26e 3Q26e 4Q26e
657 690
830
900

-- 27 of 42 --

Americas Leach Innovation Initiatives
Low Cost, High Value
28
* Copper from historical placements beyond assumed recovery estimates and is not included in mineral reserves or mineral resources. Refer to slide 2.
South
America
16%
Other U.S.
34%
Morenci
50%
Significant Potential
~42 bn lbs Contained *
Leach
Everywhere
~15%
Heat
~50%
Additives
~35%
~600 mm lbs/annum
Incremental Production Target
Targeting Copper in Stockpiles Unrecoverable by
Traditional Leach Methods with Precision Operating Techniques
50
144
214 240
300
800
2022 2023 2024 YE 2025 2026e By 2030e
Scaling the Opportunity
(mm lbs) ~
~
e = estimate.
Run Rate

-- 28 of 42 --

Bagdad 2X Expansion Update
29
• Operation located in northwest Arizona
• Reserve life exceeds 80 years
• Potential expansion to double concentrator capacity
• Completed conversion of haul truck fleet to autonomous haulage in 2025
• Completed technical and economic studies in late 2023
– Expected to expand concentrator capacity by ~100 - 120k t/d
– Project capital approximates $3.5 billion (continues to be reviewed)
– Economics indicate incentive copper price of ~$4.00/lb
– Expected to add incremental production of 200 - 250 mm lbs/yr of copper and
~10 mm lbs/yr of molybdenum
– Construction timeline: 3 - 4 years
• Advancing activities for expanded tailings infrastructure to enhance
project optionality
• Retesting economics for potential investment decision in 2H26

-- 29 of 42 --

Discretionary Capital Projects*
30
• Mine development in progress; expansion to
130,000 t/d
• Sustain large-scale, low-cost Cu & Au production
• Capital investment: ~$0.5 bn/yr average (~$0.6
bn in 2026e) through 2033
• 8 bn lbs copper & 8 mm ozs gold through 2041
• 750 mm lbs & 735k ozs per annum at full rates
• Initial production expected to commence ramp-up
in 2030 timeframe
*These discretionary projects and PTFI’s downstream processing facilities will be excluded from the available cash flow calculation (defined on slide 18) for purposes of the performance-based payout framework.
NOTE: Refer to non-GAAP disclosure on slide 2. e = estimate.
• Potential expansion to double concentrator capacity
• Completed feasibility study in late 2023; retesting
economics
• 2026e CAPEX:
o ~$500 mm to expand tailings infrastructure
o ~$150 mm for early works
Bagdad 2X Expansion
• Advancing plans to transition existing energy
source from coal to natural gas
• Project deferred approximately 18 months after
mud rush
• CAPEX of ~$115 mm in 2027e net of avoided
coal cost
• Recycle electronic material
• ~$250 mm remaining to be spent in 2026e
• Expect to commence production in 2H26e
• ~$80 mm per annum in projected incremental EBITDA
Atlantic Copper
CirCular
Kucing Liar
Grasberg Energy Transition to
Natural Gas

-- 30 of 42 --

The Copper Mark
Recognition for Responsible Production
31
• The Copper Mark is an assurance framework developed
to demonstrate the copper industry’s responsible production practices
• FCX has achieved, and is committed to maintaining, the Copper Mark
and Molybdenum Mark at all operating sites globally, as applicable
• Producers participating in the Copper Mark and Molybdenum Mark are
committed to adhering to internationally recognized responsible
operating practices; the framework currently includes 33 issue areas
across 5 ESG categories
• Requires third-party assurance of site performance and independent
Copper Mark validation every three years
• The Copper Mark 2.0 assurance process in progress
• The Copper Mark is governed by an independent board including
NGO participation and multi-stakeholder advisory council
FCX AWARDED SITES
Atlantic Copper smelter
& refinery (Spain)
Bagdad mine (AZ)
Cerro Verde mine (Peru)
Chino mine (NM)
Climax mine (CO)
El Abra mine (Chile)
El Paso refinery
& rod mill (TX)
Fort Madison (IA)
Henderson mine (CO)
Miami smelter, mine
& rod mill (AZ)
Morenci mine (AZ)
PTFI mine (Indonesia)
Rotterdam (Netherlands)
Safford mine (AZ)
Sierrita mine (AZ)
Stowmarket (UK)
Tyrone mine (NM)
Note: FCX’s copper producing sites that produce by-product
molybdenum have received both the Copper Mark and the
Molybdenum Mark. With the completion of PTFI’s downstream
processing facilities, we currently are working toward their initial
Copper Mark validation.

-- 31 of 42 --

Adjusted EBITDA Reconciliation
($ in mm)
12-Mo. Ended
1Q 2026 1Q 2025 3/31/2026
Net income attributable to common stock $881 $352 $2,733
Interest expense, net 114 70 413
Income tax provision 653 500 2,374
Depreciation, depletion and amortization 514 466 2,292
PTFI mud rush incident insurance settlement (699) - (699)
Net gain on sales of assets - - (16)
Stock-based compensation and accretion 110 91 293
Other net charges (1) 411 28 1,305
Other income, net (11) (58) (176)
Net income attributable to NCI 506 441 2,013
Equity in affiliated companies’ net earnings (6) (2) (5)
Adjusted EBITDA (2)
$2,473 $1,888 $10,527
(1) Primarily includes net charges for idle facility, restoration and recovery costs associated with the PTFI mud rush incident ($406 mm in 1Q26 and $1,031 mm for the 12
months ended 3/31/2026). The 12 months ended 3/31/2026 also include oil and gas charges ($115 mm); fixed asset impairments/write-offs at PTFI ($81 mm); and
remediation costs related to the October 2024 fire incident at PTFI’s smelter ($42 mm). 1Q25 primarily includes net charges associated with previously capitalized land
lease costs associated with PTFI’s downstream processing facilities ($24 mm) and remediation costs related to the October 2024 fire incident at PTFI’s smelter ($23 mm);
partly offset by adjustments to mining reclamation liabilities ($(11) mm) and environmental obligations and related litigation reserves ($(7) mm).
(2) Adjusted EBITDA is a non-GAAP financial measure that is frequently used by securities analysts, investors, lenders and others to evaluate companies’ performance,
including, among other things, profitability before the effect of financing and similar decisions. Because securities analysts, investors, lenders and others use Adjusted
EBITDA, management believes that our presentation of Adjusted EBITDA affords them greater transparency in assessing our financial performance. Adjusted EBITDA
should not be considered as a substitute for measures of financial performance prepared in accordance with GAAP. Adjusted EBITDA may not necessarily be comparable
to similarly titled measures reported by other companies, as different companies calculate such measures differently.
32

-- 32 of 42 --

Grasberg
Reference Slides

-- 33 of 42 --

Major Milestone
MOU for life of resource extension at Grasberg
• In February 2026, FCX entered into an MOU with the Indonesia government for a life
of resource extension of operating rights for PTFI in the Grasberg minerals district.
• Under the MOU, PTFI’s IUPK will be amended, subject to issuance by the Indonesia
government.
• Agreement reinforces long-term stability and continuity of large-scale operations for
the benefit of all stakeholders.
• PTFI intends to complete expeditiously its extension application reflecting the
agreed terms.
• Commitments include increased exploration, advancement of long-term development studies, expanded
community support in Papua, and continued domestic downstreaming.
• FCX will maintain a 48.76% ownership interest through 2041 and hold ~37%
beginning in 2042.
• FCX to be reimbursed for its pro-rata costs incurred using book value for investments that benefit the post-
2041 period.
• Existing governance and operating agreements will continue over the life of the resource.
34

-- 34 of 42 --

Grasberg Block Cave
Development Overview
35
Drawbell Drilling
Undercut Ring
Drilling	Cave Muckpile
Air Gap
Undercut Level
2850m Elevation
Extraction Level
2830m Elevation
Service Level
2810m Elevation
Rail Haulage Level
2760m Elevation
Orepass
Chute
Gallery	Ore Train
Slot Raise
Grizzly
& Rock Breaker
Drawpoints
Loading Chute
Drawbell
Development Diagram • Undercut Level – initiates cave by
removing rock beneath mining
block
• Extraction Level – active mining
where broken rock gravitates
through drawbells to drawpoints
• Service Level – hosts ore passes,
ventilation systems and other
support infrastructure
• Haulage Level – transports ore to
primary crushers via rail systems
• Drainage Level* – handles water
discharge & dewatering operations
Mining Levels
* Drainage level (not shown at left) is located 50 meters below Haulage Level at 2710 m elevation

-- 35 of 42 --

GBC Ore: Extraction to Haulage
36
Drawbell Drilling
Undercut Level
2850m Elevation
Extraction Level
2830m Elevation
Service Level
2810m Elevation
Rail Haulage Level
2760m Elevation
Orepass
Chute
Gallery	Ore Train
Slot Raise
Grizzly
& Rock Breaker
Drawpoints
Loading Chute
Drawbell
Extraction Level
2830m elevation Service Level
2810m elevation
Rail Haulage Level
2760m elevation
Mined ore from loaders is dropped down through
orepass to chute to load on railcars
GBC Ore from Extraction Level
to Loading on Haulage Level
PB2S
PB2N
Grasberg BC Chute Galleries
Plan View
N
CG## = Chute Gallery
Chute
PB3

-- 36 of 42 --

Loading Railcars on Haulage Level
Chute Regulators
37
Chute Regulator
Open Position Closed Position
Regular Chute
Ore from
Extraction Level
Side View
Ore from
Extraction Level
Ore
into
railcar
Open
Closed
(Flow Regulator)
Ore into
railcar
3 parts
move to
close
Flow
Regulator
Chute
Regulator
No Ore loaded
in Closed Position

-- 37 of 42 --

GBC Recovery Update
38
Clean-up Mucking
of Extraction &
Service Levels
Infrastructure
(Extraction & Service Levels)
Updated Cave
Management Plan
PB 2/3 Start-up
Mid-Access
Drift Plugs
(P23, P24 & P25)
PB 2/3 Restart
✓ 100% complete
✓ Infrastructure
repairs completed
✓ Cave Maintenance
mucking initiated in
March
Major Milestones for PB 2/3 Restart
✓ Engineered plugs
poured & cured
Plan View
Extraction Level
Plan View
Service Level
Inrush Source
(P23, DP20S)
MAD Plugs
(installed)
Outline of PB2/3
Restart Scope
Outline of PB1
Restart Scope
Outline of PB2/3
Restart Scope
Future Plug
Outline of PB1
Restart Scope
EXH6 Plugs
(installed)
EFD Plugs
(installed)
✓ Updated
Legend
Confirmed Spill
Completed Clean-up
Required Scope
PB 2/3 Restart
PB1 Restart

-- 38 of 42 --

GBC Mining Rate Ramp-up
• Initial mining commenced in March 2026
• Mining in April MTD averaged 31K t/d
• Near-term GBC production to be limited
to ~60% of capacity until ore loading
infrastructure modifications completed
• Overall PTFI Production Rates
• Bottlenecks expected to be substantially
addressed by mid-2027
39
0
20
40
60
80
100
120
140
1Q26 2Q26e 3Q26e 4Q26e 1Q27e 2H27e
GBC Mining Rate (000’s t/d)
* Chute Gallery 45 (CG45) covers installation of chute regulators on 4 chutes, impacting production from 4 panels;
CG44 covers installations of chute regulators on 9 chutes, impacting production from 9 panels
CG45 & CG44 Installations
through March 2027
Installation
of Chute
Regulators*
Projected GBC Mining Rates &
Schedule of Chute Regulator Installations
Current Status
PB 2/3 Ramp-up
Jan 2026 Apr 2026
85% in 2H26 65% in 2H26
100% by YE 2027 80% by mid-2027
~100% by YE 2027
Estimated % of Capacity as of

-- 39 of 42 --

40
External Mud Rush v. Wet Muck Management
• Wet Muck Management
• Water from the surface percolates through permeable rock & travels
into UG mine where it is managed through gravity drainage systems
• Some areas of the orebody generate fine material at the drawpoint
• When water moves down through broken rock in the cave & encounters
fine material, wet muck is possible & generally limited to volume of the
drawbell
• Freeport's design at the GBC includes the use of automation at the
Extraction and Haulage Levels to manage wet muck with autonomous
loaders, comprehensive monitoring, the use of exclusion zones and
blending strategies
• System design for automated train loading on the haulage level is being
modified to enhance flexibility to accommodate varying ore
characteristics
• External Mud Rush Event
• Large volume of flowable mud traveling downward from the surface
through vertical pathway
PTFI has safety controls & work practices to protect our
people from the risk of localized wet muck flows
Remote Loading on
Extraction Level
Remotely controlled
Rock Breakers
Autonomous
Train Haulage
Remote Train
Loading
Spillminator
(wet muck control chute)

-- 40 of 42 --

Concrete
Batch
Plant
C-pump(s)
Low-head
discharge
hose (350m)
Power line
extension
(3,000m)
Drive/Pump
House
(3685m)
East Anchor
(3650m)
Drain Hole
Surface
Manifold
Risk Management
Sandvik DU311 Drill
Remove Flowable Material
With In-pit Pumping
Conventional up-hole Coring
for Slurry Pond Drainage
Soft Zone
Grasberg Pit
Water-Driven In-the-Hole
Hammer Drill
Pit Bottom
Drill Holes
Grasberg Pit
Plan View
41
~3 km of new drift development
to drill & drain pit bottom
Larger Diameter (5”) &
Fast drilling (~200 meters/day)
Small Diameter (<3”) &
Slow drilling (~10 meters/day)
Mud Removal Options for Former Open Pit
New Drift
Grasberg Pit
GBC
Pit Bottom
Two drill holes
making water Target to drill in 2H26 Target pumping in 2027 • First blast of drifts in April
• Initiate drainage in 2027
Pit bottom pumping via cable-
deployed pump
Submersible Pump
Pit Bottom
Drainage Gallery
April 2026

-- 41 of 42 --



-- 42 of 42 --