QUARTERLY REPORT

Q3 2021 — Quarterly report (Form 10-Q)

Q3 2021PDF · 75 pages993 KB
United States
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark one)
☒ QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended September 30, 2021
OR
☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from to
Commission file number: 001-11307-01
Freeport-McMoRan Inc.
(Exact name of registrant as specified in its charter)
Delaware 74-2480931
(State or other jurisdiction of (I.R.S. Employer Identification No.)
incorporation or organization)
333 North Central Avenue
Phoenix AZ 85004-2189
(Address of principal executive offices) (Zip Code)
(602) 366-8100
(Registrant’s telephone number, including area code)
Securities registered pursuant to Section 12(b) of the Act:
Title of each class Trading Symbol(s) Name of each exchange on which registered
Common Stock, par value $0.10 per share FCX The New York Stock Exchange
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities
Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such
reports), and (2) has been subject to such filing requirements for the past 90 days. ☑ Yes ☐ No
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted
pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period
that the registrant was required to submit such files). ☑ Yes ☐ No
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller
reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller
reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer ☑ Accelerated filer ☐
Non-accelerated filer ☐ Smaller reporting company ☐
Emerging growth company ☐
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for
complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). ☐ Yes ☑ No
On October 29, 2021, there were issued and outstanding 1,468,473,516 shares of the registrant’s common stock, par value
$0.10 per share.

-- 1 of 75 --

Freeport-McMoRan Inc.
TABLE OF CONTENTS
Page
Part I. Financial Information 3
Item 1. Financial Statements: 3
Consolidated Balance Sheets (Unaudited) 3
Consolidated Statements of Operations (Unaudited) 4
Consolidated Statements of Comprehensive Income (Loss) (Unaudited) 5
Consolidated Statements of Cash Flows (Unaudited) 6
Consolidated Statements of Equity (Unaudited) 7
Notes to Consolidated Financial Statements (Unaudited) 9
Report of Independent Registered Public Accounting Firm 26
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations 27
Item 3. Quantitative and Qualitative Disclosures About Market Risk 71
Item 4. Controls and Procedures 71
Part II. Other Information 71
Item 1. Legal Proceedings 71
Item 1A. Risk Factors 72
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds 72
Item 4. Mine Safety Disclosures 72
Item 5. Other Information 72
Item 6. Exhibits 74
Signature S-1
2

-- 2 of 75 --

Part I. FINANCIAL INFORMATION
Item 1. Financial Statements.
Freeport-McMoRan Inc.
CONSOLIDATED BALANCE SHEETS (Unaudited)
September 30,
2021 December 31,
2020
(In millions)
ASSETS
Current assets:
Cash and cash equivalents $ 7,672 $ 3,657
Trade accounts receivable 931 892
Income and other tax receivables 591 520
Inventories:
Materials and supplies, net 1,617 1,594
Mill and leach stockpiles 1,086 1,014
Product 1,417 1,285
Other current assets 477 341
Total current assets 13,791 9,303
Property, plant, equipment and mine development costs, net 30,102 29,818
Long-term mill and leach stockpiles 1,450 1,463
Other assets 1,574 1,560
Total assets $ 46,917 $ 42,144
LIABILITIES AND EQUITY
Current liabilities:
Accounts payable and accrued liabilities $ 2,949 $ 2,708
Accrued income taxes 1,237 324
Current portion of debt 897 34
Current portion of environmental and asset retirement obligations 329 351
Dividends payable 111 —
Total current liabilities 5,523 3,417
Long-term debt, less current portion 8,768 9,677
Deferred income taxes 4,500 4,408
Environmental and asset retirement obligations, less current portion 3,688 3,705
Other liabilities 1,907 2,269
Total liabilities 24,386 23,476
Equity:
Stockholders’ equity:
Common stock 160 159
Capital in excess of par value 26,023 26,037
Accumulated deficit (8,481) (11,681)
Accumulated other comprehensive loss (572) (583)
Common stock held in treasury (3,777) (3,758)
Total stockholders’ equity 13,353 10,174
Noncontrolling interests 9,178 8,494
Total equity 22,531 18,668
Total liabilities and equity $ 46,917 $ 42,144
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
3

-- 3 of 75 --

Freeport-McMoRan Inc.
CONSOLIDATED STATEMENTS OF OPERATIONS (Unaudited)
Three Months Ended Nine Months Ended
September 30, September 30,
2021 2020 2021 2020
(In millions, except per share amounts)
Revenues $ 6,083 $ 3,851 $ 16,681 $ 9,703
Cost of sales:
Production and delivery 3,009 2,465 8,862 7,404
Depreciation, depletion and amortization 528 394 1,430 1,093
Metals inventory adjustments 14 9 15 92
Total cost of sales 3,551 2,868 10,307 8,589
Selling, general and administrative expenses 102 72 289 273
Mining exploration and research expenses 15 8 36 42
Environmental obligations and shutdown costs 13 21 51 58
Net (gain) loss on sales of assets (60) 2 (63) 13
Total costs and expenses 3,621 2,971 10,620 8,975
Operating income 2,462 880 6,061 728
Interest expense, net (138) (120) (431) (362)
Net loss on early extinguishment of debt — (59) — (100)
Other income, net 36 22 56 62
Income before income taxes and equity in affiliated
companies’ net (losses) earnings 2,360 723 5,686 328
Provision for income taxes (628) (297) (1,674) (333)
Equity in affiliated companies’ net (losses) earnings (9) 6 (5) 12
Net income 1,723 432 4,007 7
Net income attributable to noncontrolling interests (324) (103) (807) (116)
Net income (loss) attributable to common
stockholders $ 1,399 $ 329 $ 3,200 $ (109)
Net income (loss) per share attributable to common
stockholders:
Basic $ 0.95 $ 0.22 $ 2.18 $ (0.08)
Diluted $ 0.94 $ 0.22 $ 2.16 $ (0.08)
Weighted-average common shares outstanding:
Basic 1,469 1,453 1,466 1,453
Diluted 1,484 1,461 1,481 1,453
Dividends declared per share of common stock $ 0.075 $ — $ 0.225 $ —
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
4

-- 4 of 75 --

Freeport-McMoRan Inc.
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME (LOSS) (Unaudited)
Three Months Ended Nine Months Ended
September 30, September 30,
2021 2020 2021 2020
(In millions)
Net income $ 1,723 $ 432 $ 4,007 $ 7
Other comprehensive income (loss), net of taxes:
Defined benefit plans:
Actuarial losses arising during the period — (89) (1) (89)
Amortization of unrecognized amounts included in net periodic
benefit costs 4 14 12 38
Foreign exchange losses — (1) (1) (2)
Other comprehensive income (loss) 4 (76) 10 (53)
Total comprehensive income (loss) 1,727 356 4,017 (46)
Total comprehensive income attributable to noncontrolling interests (324) (103) (806) (115)
Total comprehensive income (loss) attributable to common
stockholders $ 1,403 $ 253 $ 3,211 $ (161)
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
5

-- 5 of 75 --

Freeport-McMoRan Inc.
CONSOLIDATED STATEMENTS OF CASH FLOWS (Unaudited)
Nine Months Ended
September 30,
2021 2020
(In millions)
Cash flow from operating activities:
Net income $ 4,007 $ 7
Adjustments to reconcile net income to net cash provided by operating activities:
Depreciation, depletion and amortization 1,430 1,093
Metals inventory adjustments 15 92
Net (gain) loss on sales of assets (63) 13
Stock-based compensation 79 60
Net charges for environmental and asset retirement obligations, including accretion 131 166
Payments for environmental and asset retirement obligations (184) (162)
Net charges for defined pension and postretirement plans 3 59
Pension plan contributions (75) (30)
Net loss on early extinguishment of debt — 100
Deferred income taxes 96 119
Charges for Cerro Verde royalty dispute 11 26
Payments for Cerro Verde royalty dispute (421) (119)
Other, net 39 (53)
Changes in working capital and other:
Accounts receivable (218) 132
Inventories (310) 59
Other current assets (77) (17)
Accounts payable and accrued liabilities 123 40
Accrued income taxes and timing of other tax payments 849 105
Net cash provided by operating activities 5,435 1,690
Cash flow from investing activities:
Capital expenditures:
North America copper mines (211) (398)
South America (94) (156)
Indonesia mining (904) (865)
Indonesia smelter development (79) (94)
Molybdenum mines (4) (14)
Other (52) (46)
Proceeds from sale of Freeport Cobalt 150 —
Proceeds from sales of other assets 21 146
Acquisition of minority interest in PT Smelting (33) —
Other, net (25) (6)
Net cash used in investing activities (1,231) (1,433)
Cash flow from financing activities:
Proceeds from debt 633 3,236
Repayments of debt (672) (3,105)
Cash dividends and distributions paid:
Common stock (220) (73)
Noncontrolling interests (187) —
Contributions from noncontrolling interests 135 115
Proceeds from exercised stock options 189 3
Payments for withholding of employee taxes related to stock-based awards (19) (5)
Debt financing costs and other, net (47) (51)
Net cash (used in) provided by financing activities (188) 120
Net increase in cash, cash equivalents, restricted cash and restricted cash equivalents 4,016 377
Cash, cash equivalents, restricted cash and restricted cash equivalents at beginning of year 3,903 2,278
Cash, cash equivalents, restricted cash and restricted cash equivalents at end of period $ 7,919 $ 2,655
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
6

-- 6 of 75 --

Freeport-McMoRan Inc.
CONSOLIDATED STATEMENTS OF EQUITY (Unaudited)
THREE MONTHS ENDED SEPTEMBER 30
Stockholders’ Equity
Common Stock
Accum-
ulated
Deficit
Accumu-
lated
Other
Compre-
hensive
Loss
Common Stock
Held in Treasury Total
Stock-
holders’
Equity
Number
of
Shares At Par
Value
Capital in
Excess of
Par Value
Number
of
Shares At
Cost
Non-
controlling
Interests Total
Equity
(In millions)
Balance at June 30, 2021 1,601 $ 160 $ 26,084 $ (9,880) $ (576) 133 $ (3,777) $ 12,011 $ 8,924 $ 20,935
Exercised and issued stock-based awards — — 6 — — — — 6 — 6
Stock-based compensation, including the tender of shares — — 21 — — — — 21 — 21
Dividends — — (111) — — — — (111) (94) (205)
Contributions from noncontrolling interests — — 23 — — — — 23 24 47
Net income attributable to common stockholders — — — 1,399 — — — 1,399 — 1,399
Net income attributable to noncontrolling interests — — — — — — — — 324 324
Other comprehensive income — — — — 4 — — 4 — 4
Balance at September 30, 2021 1,601 $ 160 $ 26,023 $ (8,481) $ (572) 133 $ (3,777) $ 13,353 $ 9,178 $ 22,531
Stockholders’ Equity
Common Stock
Accum-
ulated
Deficit
Accumu-
lated
Other
Compre-
hensive
Loss
Common Stock
Held in Treasury Total
Stock-
holders’
Equity
Number
of
Shares At Par
Value
Capital in
Excess of
Par Value
Number
of
Shares At
Cost
Non-
controlling
Interests Total
Equity
(In millions)
Balance at June 30, 2020 1,583 $ 158 $ 25,905 $ (12,718) $ (652) 131 $ (3,739) $ 8,954 $ 8,201 $ 17,155
Exercised and issued stock-based awards 1 — 1 — — — — 1 — 1
Stock-based compensation, including the tender of shares — — 8 — — — — 8 — 8
Change in ownership interests — — — — — — — — 1 1
Contributions from noncontrolling interests — — 20 — — — — 20 21 41
Net income attributable to common stockholders — — — 329 — — — 329 — 329
Net income attributable to noncontrolling interests — — — — — — — — 103 103
Other comprehensive loss — — — — (76) — — (76) — (76)
Balance at September 30, 2020 1,584 $ 158 $ 25,934 $ (12,389) $ (728) 131 $ (3,739) $ 9,236 $ 8,326 $ 17,562
The accompanying notes are an integral part of these consolidated financial statements.
Table of Contents
7

-- 7 of 75 --

Freeport-McMoRan Inc.
CONSOLIDATED STATEMENTS OF EQUITY (Unaudited)
NINE MONTHS ENDED SEPTEMBER 30
Stockholders’ Equity
Common Stock
Accum-
ulated
Deficit
Accumu-
lated
Other
Compre-
hensive
Loss
Common Stock
Held in Treasury Total
Stock-
holders’
Equity
Number
of
Shares At Par
Value
Capital in
Excess of
Par Value
Number
of
Shares At
Cost
Non-
controlling
Interests Total
Equity
(In millions)
Balance at December 31, 2020 1,590 $ 159 $ 26,037 $ (11,681) $ (583) 132 $ (3,758) $ 10,174 $ 8,494 $ 18,668
Exercised and issued stock-based awards 11 1 189 — — — — 190 — 190
Stock-based compensation, including the tender of shares — — 64 — — 1 (19) 45 (4) 41
Dividends — — (333) — — — — (333) (187) (520)
Contributions from noncontrolling interests — — 66 — — — — 66 69 135
Net income attributable to common stockholders — — — 3,200 — — — 3,200 — 3,200
Net income attributable to noncontrolling interests — — — — — — — — 807 807
Other comprehensive income (loss) — — — — 11 — — 11 (1) 10
Balance at September 30, 2021 1,601 $ 160 $ 26,023 $ (8,481) $ (572) 133 $ (3,777) $ 13,353 $ 9,178 $ 22,531
Stockholders’ Equity
Common Stock
Accum-
ulated
Deficit
Accumu-
lated
Other
Compre-
hensive
Loss
Common Stock
Held in Treasury Total
Stock-
holders’
Equity
Number
of
Shares At Par
Value
Capital in
Excess of
Par Value
Number
of
Shares At
Cost
Non-
controlling
Interests Total
Equity
(In millions)
Balance at December 31, 2019 1,582 $ 158 $ 25,830 $ (12,280) $ (676) 131 $ (3,734) $ 9,298 $ 8,150 $ 17,448
Exercised and issued stock-based awards 2 — 2 — — — — 2 — 2
Stock-based compensation, including the tender of shares — — 46 — — — (5) 41 1 42
Change in ownership interests — — — — — — — — 1 1
Contributions from noncontrolling interests — — 56 — — — — 56 59 115
Net loss attributable to common stockholders — — — (109) — — — (109) — (109)
Net income attributable to noncontrolling interests — — — — — — — — 116 116
Other comprehensive loss — — — — (52) — — (52) (1) (53)
Balance at September 30, 2020 1,584 $ 158 $ 25,934 $ (12,389) $ (728) 131 $ (3,739) $ 9,236 $ 8,326 $ 17,562
Table of Contents
8

-- 8 of 75 --

Freeport-McMoRan Inc.
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS (Unaudited)
NOTE 1. GENERAL INFORMATION
The accompanying unaudited consolidated financial statements have been prepared in accordance with the
instructions to Form 10-Q and do not include all information and disclosures required by generally accepted
accounting principles in the United States (U.S.). Therefore, this information should be read in conjunction with
Freeport-McMoRan Inc.’s (FCX) consolidated financial statements and notes contained in its annual report on Form
10-K for the year ended December 31, 2020 (2020 Form 10-K). The information furnished herein reflects all
adjustments that are, in the opinion of management, necessary for a fair statement of the results for the interim
periods reported. All such adjustments are, in the opinion of management, of a normal recurring nature. Operating
results for the nine-month period ended September 30, 2021, are not necessarily indicative of the results that may
be expected for the year ending December 31, 2021.
Trade Accounts Receivable Agreements. In first-quarter 2021, PT Freeport Indonesia (PT-FI) entered into
agreements to sell certain trade accounts receivables to unrelated third-party financial institutions. The agreements
were entered into in the normal course of business to fund the working capital for the additional quantity of copper to
be supplied by PT-FI to PT Smelting (PT-FI’s 39.5 percent owned copper smelter and refinery in Gresik, Indonesia -
see “Acquisition of Minority Interest in PT Smelting” below for further discussion). The balances sold under the
agreements were excluded from trade accounts receivable on the consolidated balance sheet at September 30,
2021. Receivables are considered sold when (i) they are transferred beyond the reach of PT-FI and its creditors, (ii)
the purchaser has the right to pledge or exchange the receivables, and (iii) PT-FI has no continuing involvement in
the transferred receivables. In addition, PT-FI provides no other forms of continued financial support to the
purchaser of the receivables once the receivables are sold.
Gross amounts sold under these arrangements totaled $131 million in third-quarter 2021 and $319 million for the
nine-month period ended September 30, 2021. Discounts on the sold receivables totaled less than $1 million in
third-quarter 2021 and $1 million for the nine-month period ended September 30, 2021.
Acquisition of Minority Interest in PT Smelting. On April 30, 2021, PT-FI acquired 14.5 percent of the
outstanding common stock of PT Smelting for $33 million, increasing its ownership interest from 25 percent to 39.5
percent. The remaining shares of PT Smelting continue to be owned by Mitsubishi Materials Corporation. PT-FI has
continued to account for its investment in PT Smelting using the equity method since it does not have control over
PT Smelting.
Sale of Freeport Cobalt. On September 1, 2021, FCX’s 56-percent-owned subsidiary, Koboltti Chemicals Holdings
Limited (KCHL), completed the sale of its remaining cobalt business based in Kokkola, Finland (Freeport Cobalt) to
Jervois Global Limited (Jervois) for $208 million (subject to post-closing adjustments), consisting of cash
consideration of $173 million and 7 percent of Jervois shares (valued at $35 million). At closing, Freeport Cobalt’s
assets included cash of approximately $20 million and other net assets of $125 million. FCX recorded a gain of
$60 million ($34 million to net income attributable to common stock) in third-quarter 2021. In addition, KCHL will
have the right to receive contingent consideration of up to $40 million based on the future performance of Freeport
Cobalt. Any gain related to the contingent consideration will be recognized when received.
The operating results of Freeport Cobalt are not significant to FCX’s financial statements for the year ended
December 31, 2020, or the three- and nine-month periods ended September 30, 2021.
Subsequent Events. FCX evaluated events after September 30, 2021, and through the date the consolidated
financial statements were issued, and took into account events and transactions occurring during this period
requiring recognition or disclosure in these consolidated financial statements.
Table of Contents
9

-- 9 of 75 --

NOTE 2. EARNINGS PER SHARE
FCX calculates its basic net income per share of common stock under the two-class method and calculates its
diluted net income (loss) per share of common stock using the more dilutive of the two-class method or the
treasury-stock method. Basic net income (loss) per share of common stock was computed by dividing net income
(loss) attributable to common stockholders (after deducting accumulated dividends and undistributed earnings to
participating securities) by the weighted-average shares of common stock outstanding during the period. Diluted net
income (loss) per share of common stock was calculated by including the basic weighted-average shares of
common stock outstanding adjusted for the effects of all potential dilutive shares of common stock.
Reconciliations of net income and weighted-average shares of common stock outstanding for purposes of
calculating basic and diluted net income (loss) per share follow (in millions, except per share amounts):
Three Months Ended Nine Months Ended
September 30, September 30,
2021 2020 2021 2020
Net income $ 1,723 $ 432 $ 4,007 $ 7
Net income attributable to noncontrolling interests (324) (103) (807) (116)
Undistributed earnings allocated to participating securities (4) (3) (6) (3)
Net income (loss) attributable to common stockholders $ 1,395 $ 326 $ 3,194 $ (112)
Basic weighted-average shares of common stock outstanding 1,469 1,453 1,466 1,453
Add shares issuable upon exercise or vesting of dilutive stock options and
restricted stock units (RSUs) 15 8
a
15 — a
Diluted weighted-average shares of common stock outstanding 1,484 1,461 1,481 1,453
Basic net income (loss) per share attributable to common stockholders $ 0.95 $ 0.22 $ 2.18 $ (0.08)
Diluted net income (loss) per share attributable to common stockholders $ 0.94 $ 0.22 $ 2.16 $ (0.08)
a. Excludes approximately 2 million shares in third-quarter 2020 and 13 million shares for the first nine months of 2020
associated with outstanding stock options with exercise prices less than the average market price of FCX’s common stock
and RSUs that were anti-dilutive.
Outstanding stock options with exercise prices greater than the average market price of FCX’s common stock
during the period are excluded from the computation of diluted net income (loss) per share of common stock. Stock
options for 4 million shares of common stock in third-quarter 2021, 28 million shares of common stock in third-
quarter 2020, 6 million shares of common stock for the first nine months of 2021 and 35 million shares of common
stock the first nine months of 2020 were excluded.
Table of Contents
10

-- 10 of 75 --

NOTE 3. INVENTORIES, INCLUDING LONG-TERM MILL AND LEACH STOCKPILES
The components of inventories follow (in millions):
September 30,
2021 December 31,
2020
Current inventories:
Total materials and supplies, neta $ 1,617 $ 1,594
Mill stockpiles $ 209 $ 205
Leach stockpiles 877 809
Total current mill and leach stockpiles $ 1,086 $ 1,014
Raw materials (primarily concentrate) $ 437 $ 366
Work-in-process 184 174
Finished goods 796 745
Total product $ 1,417 $ 1,285
Long-term inventories:
Mill stockpiles $ 223 $ 223
Leach stockpiles 1,227 1,240
Total long-term mill and leach stockpilesb $ 1,450 $ 1,463
a. Materials and supplies inventory was net of obsolescence reserves totaling $37 million at September 30, 2021, and $32
million at December 31, 2020.
b. Estimated metals in stockpiles not expected to be recovered within the next 12 months.
FCX recorded charges for metals inventory adjustments totaling $15 million for the first nine months of 2021
primarily related to a leach stockpile adjustment. Net realizable value inventory adjustments to decrease metals
inventory carrying values totaled $92 million for the first nine months of 2020 associated with lower market prices for
copper ($58 million) and molybdenum ($34 million). Refer to Note 9 for metals inventory adjustments by business
segment.
Morenci Stockpile Recoveries. In accordance with FCX's policy, processes and recovery rates for mill and leach
stockpiles are monitored regularly, and recovery rate estimates are adjusted periodically as additional information
becomes available and as related technology changes. Adjustments to recovery rates will typically result in a future
impact to the value of the material removed from the stockpiles at a revised weighted-average cost per pound of
recoverable copper.
Expected copper recovery rates for leach stockpiles are determined using small-scale laboratory tests, small- to
large-scale column testing (which simulates the production process), historical trends and other factors, including
mineralogy of the ore and rock type. Total copper recovery in leach stockpiles can vary significantly from a low
percentage to more than 90 percent depending on several variables, including processing methodology, processing
variables, mineralogy and particle size of the rock. For newly placed material on active stockpiles, as much as 80
percent of the total copper recovery may occur during the first year, and the remaining copper may be recovered
over many years.
Over the last three years, FCX's Morenci mine has experienced improved recoveries and following an analysis of
column testing results to date, Morenci concluded it had sufficient evidence to increase its estimated recovery rate
for certain of its leach stockpiles effective July 1, 2021. As a result of the revised recovery rate, Morenci increased
its estimated recoverable copper in leach stockpiles, net to its joint venture interest, by 191 million pounds. The
effect of this change in estimate reduced site production and delivery costs and increased net income by $52 million
($0.04 per share) in the third quarter and first nine months of 2021.
Table of Contents
11

-- 11 of 75 --

NOTE 4. INCOME TAXES
Geographic sources of FCX’s (provision for) benefit from income taxes follow (in millions):
Nine Months Ended
September 30,
2021 2020
U.S. operations $ (7) $ 56 a
International operations (1,667) b (389) c
Total $ (1,674) $ (333)
a. Includes a tax credit of $53 million associated with the reversal of a year-end 2019 tax charge related to the sale of FCX’s
interest in the lower zone of the Timok exploration project in Serbia.
b. Includes net tax benefits totaling $83 million ($66 million net of noncontrolling interest), consisting of $69 million associated
with the release of a portion of the valuation allowances recorded against PT Rio Tinto Indonesia (PT RTI), PT-FI’s wholly
owned subsidiary, net operating losses (NOLs) and $24 million primarily associated with the reversal of a tax reserve related
to the treatment of prior year contractor support costs; partly offset by a tax charge of $10 million associated with the audit of
PT-FI's 2019 tax returns.
c. Includes a tax charge of $21 million ($17 million net of noncontrolling interests) associated with establishing a tax reserve
related to the treatment of prior year contractor support costs.
FCX’s consolidated effective income tax rate was 29 percent for the first nine months of 2021 and 102 percent for
the first nine months of 2020. Because FCX's U.S. jurisdiction generated pre-tax losses for the first nine months of
2020 that did not result in a realized tax benefit, applicable accounting rules required FCX to adjust its 2020
estimated annual effective tax rate to exclude the impact of U.S. pre-tax losses. Variations in the relative proportions
of jurisdictional income result in fluctuations to FCX’s consolidated effective income tax rate.
As discussed in Note 8, Cerro Verde paid the balance of its royalty dispute liabilities during third-quarter 2021, which
resulted in a $252 million reduction of unrecognized tax benefits (including a $137 million reduction of accrued
interest and penalties), but did not have an impact on FCX’s provision for income taxes for the third quarter or nine
months ended September 30, 2021.
In connection with the negative impacts of the COVID-19 pandemic on the global economy, governments
throughout the world announced measures that are intended to provide tax and other financial relief. Such
measures include the American Rescue Plan Act of 2021, enacted on March 11, 2021, and the Coronavirus Aid,
Relief, and Economic Security Act (CARES Act), enacted on March 27, 2020. None of these measures resulted in
material impacts to FCX’s provision for income taxes for the nine months ended September 30, 2021 and 2020.
However, certain provisions of the CARES Act provided FCX with the opportunity to accelerate collections of tax
refunds, primarily those associated with the U.S. alternative minimum tax. FCX collected U.S. alternative minimum
tax credit refunds of $23 million in March 2021, $24 million in October 2020 and $221 million in July 2020. FCX
continues to evaluate income tax accounting considerations of COVID-19 measures as they develop, including any
impact on its measurement of existing deferred tax assets and deferred tax liabilities. FCX will recognize any impact
from COVID-19 related changes to tax laws in the period in which the new legislation is enacted.
As previously disclosed in our 2020 Form 10-K, PT-FI received unfavorable Indonesia Tax Court decisions in 2018
with respect to its appeal of capitalized mine development costs on its 2012 and 2014 corporate income tax returns.
PT-FI appealed those decisions to the Indonesia Supreme Court. On October 31, 2019, the Indonesia Supreme
Court communicated an unfavorable ruling regarding the treatment of mine development costs on PT-FI’s 2014 tax
return. During the fourth quarter of 2019, PT-FI met with the Indonesia Tax Office and developed a framework for
resolution of the disputed matters and progress of the framework for resolution continued in 2020 and through the
nine months ended September 30, 2021.
During October 2021, PT-FI participated in discussions with the Indonesian tax office regarding progress on the
framework for resolution of disputes arising from the audits of tax years 2012 through 2016. As a result of these
discussions and the revised positions taken by both the Indonesian tax office and PT-FI, FCX believes it can no
longer conclude a resolution of all of the disputed tax items at a more-likely-than-not threshold. Because of these
recent events, FCX continues to evaluate its uncertain tax positions and may record a material tax charge during
fourth-quarter 2021. This tax charge may be offset by a tax benefit related to the additional release of valuation
allowance associated with PT Rio Tinto net operating loss carryforwards that PT-FI may deem realizable. PT-FI will
Table of Contents
12

-- 12 of 75 --

continue to engage with the Indonesian tax office in pursuit of certain aspects of the original framework for
resolution.
NOTE 5. DEBT AND FINANCIAL POLICY
The components of debt follow (in millions):
September 30,
2021 December 31,
2020
Senior notes and debentures:
Issued by FCX $ 8,790 $ 8,783
Issued by Freeport Minerals Corporation 355 356
Cerro Verde Term Loan 325 523
PT-FI Term Loan 146 —
Other 49 49
Total debt 9,665 9,711
Less current portion of debt (897) a (34)
Long-term debt $ 8,768 $ 9,677
a. Includes $524 million for the 3.55% Senior Notes, which will be redeemed on December 1, 2021, and $325 million for the
Cerro Verde Term Loan due June 2022.
Revolving Credit Facility. At September 30, 2021, FCX had no borrowings outstanding and $8 million in letters of
credit issued under its revolving credit facility, resulting in availability of approximately $3.5 billion, of which
approximately $1.5 billion could be used for additional letters of credit. Availability under FCX’s revolving credit
facility consists of $3.28 billion maturing April 2024 and $220 million maturing April 2023.
In March 2021, FCX delivered a Covenant Reversion Notice (as defined in the third amendment to the revolving
credit facility dated June 3, 2020), which provided notification of its election to end the Covenant Increase Period (as
defined in the third amendment to the revolving credit facility dated June 3, 2020). As a result, the leverage ratio
limit reverted to 5.25x and stepped down to 3.75x beginning with the quarter ending September 30, 2021, and the
interest expense coverage ratio minimum reverted to 2.25x. Additionally, following FCX’s election to end the
Covenant Increase Period, the additional limits on priority debt and liens, and the provisions related to minimum
liquidity and restricted payments (which included restrictions on the payment of common stock dividends) are no
longer applicable. At September 30, 2021, FCX was in compliance with its revolving credit facility covenants.
PT-FI Credit Facility. In July 2021, PT-FI entered into a $1.0 billion, five-year, unsecured credit facility (consisting of
a $667 million term loan and a $333 million revolving credit facility) to fund project costs in connection with the PT
Smelting expansion and construction of a precious metals refinery (PMR), and for PT-FI’s general corporate
purposes. The term loan allows for borrowings up to $667 million within the first three years, and then the loan
amortizes in four installments, with 15 percent of the outstanding balance due in January 2025, 15 percent due in
July 2025, 35 percent due in January 2026 and the remaining 35 percent due in July 2026. The $333 million
revolving credit facility is available for drawings until June 2026. Amounts drawn under the credit facility bear
interest at the London Inter-bank Offered Rate plus a margin of 1.875% or 2.125%, as defined by the agreement.
PT-FI’s credit facility contains customary affirmative covenants and representations and also contains standard
covenants that, among other things, restrict, subject to certain exceptions, the ability of PT-FI to incur additional
indebtedness; create liens on assets; enter into sale and leaseback transactions; sell assets; and modify or amend
the shareholders agreement or related governance structure. The credit facility also contains financial ratios
governing maximum total leverage and minimum interest expense coverage and certain environmental and social
compliance requirements.
As of September 30, 2021, $158 million ($146 million net of debt issuance costs) was drawn under the PT-FI Term
Loan and no amounts were drawn under the revolving credit facility.
Senior Notes. On October 21, 2021, FCX called for redemption all of its outstanding $524 million principal amount
of 3.55% Senior Notes due 2022. The notes will be redeemed on December 1, 2021, at a redemption price equal to
100 percent of the principal amount of the notes outstanding, plus accrued and unpaid interest to, but not including,
the redemption date. Annual interest costs associated with the 3.55% Senior Notes approximate $19 million. FCX
has no other senior note maturities until March 2023.
Table of Contents
13

-- 13 of 75 --

As further discussed in the 2020 Form 10-K, in the first nine months of 2020, FCX redeemed in full or purchased a
portion of its 4.00% Senior Notes due 2021, 3.55% Senior Notes due 2022, 3.875% Senior Notes due 2023 and
4.55% Senior Notes due 2024. As a result of these transactions, FCX recorded a loss on early extinguishment of
debt of $59 million in third-quarter 2020 and $100 million for the nine months ended September 30, 2020.
Cerro Verde Term Loan. In September 2021, Cerro Verde prepaid $200 million on its term loan. The $325 million
balance of the loan is due June 2022.
Interest Expense, Net. Consolidated interest costs (before capitalization) totaled $157 million in third-quarter 2021,
$160 million in third-quarter 2020, $482 million for the first nine months of 2021 and $490 million for the first nine
months of 2020. Capitalized interest added to property, plant, equipment and mine development costs, net, totaled
$19 million in third-quarter 2021, $40 million in third-quarter 2020, $51 million for the first nine months of 2021 and
$128 million for the first nine months of 2020. The decrease in capitalized interest for the 2021 periods results from
assets placed in service as PT-FI’s underground mining operations continue to ramp up.
Financial Policy. In February 2021, FCX’s Board of Directors (Board) adopted a financial policy for the allocation of
cash flows aligned with FCX’s strategic objectives of maintaining a strong balance sheet and increasing cash
returns to shareholders while advancing opportunities for future growth. The policy includes a base dividend and a
performance-based payout framework, whereby up to 50 percent of available cash flows generated after planned
capital spending and distributions to noncontrolling interests would be allocated to shareholder returns and the
balance to debt reduction and investments in value enhancing growth projects, subject to FCX maintaining its net
debt at a level not to exceed the net debt target of $3 billion to $4 billion (excluding project debt for additional
smelting capacity in Indonesia).
In February 2021, the Board reinstated a cash dividend on FCX’s common stock (base dividend), and on November
1, 2021, the Board approved (i) a new share repurchase program authorizing repurchases of up to $3.0 billion of
FCX common stock, and (ii) a variable cash dividend on FCX’s common stock for 2022.
The timing and amount of any share repurchases will be at the discretion of management and will depend on a
variety of factors. The share repurchase program may be modified, increased, suspended or terminated at any time
at the Board’s discretion. The declaration and payment of dividends (base or variable) is also at the discretion of the
Board and will depend on FCX's financial results, cash requirements, business prospects, global economic
conditions and other factors deemed relevant by the Board.
On September 22, 2021, FCX declared a quarterly cash dividend (base dividend) of $0.075 per share
on its common stock, which was paid on November 1, 2021, to common stockholders of record as of October 15,
2021.
NOTE 6. FINANCIAL INSTRUMENTS
FCX does not purchase, hold or sell derivative financial instruments unless there is an existing asset or obligation,
or it anticipates a future activity that is likely to occur and will result in exposure to market risks, which FCX intends
to offset or mitigate. FCX does not enter into any derivative financial instruments for speculative purposes but has
entered into derivative financial instruments in limited instances to achieve specific objectives. These objectives
principally relate to managing risks associated with commodity price changes, foreign currency exchange rates and
interest rates.
Commodity Contracts. From time to time, FCX has entered into derivative contracts to hedge the market risk
associated with fluctuations in the prices of commodities it purchases and sells. Derivative financial instruments
used by FCX to manage its risks do not contain credit risk-related contingent provisions.
In April 2020, FCX entered into forward sales contracts for 150 million pounds of copper for settlement in May and
June of 2020. The forward sales provided for fixed pricing of $2.34 per pound of copper on approximately 60
percent of North America's sales volumes for May and June 2020. These contracts resulted in hedging losses
totaling $24 million in second-quarter 2020 and for the six months ended June 30, 2020. There were no remaining
forward sales contracts as of June 30, 2020.
Table of Contents
14

-- 14 of 75 --

A discussion of FCX’s other derivative contracts and programs follows:
Derivatives Designated as Hedging Instruments – Fair Value Hedges
Copper Futures and Swap Contracts. Some of FCX’s U.S. copper rod and cathode customers request a fixed
market price instead of the Commodity Exchange Inc. (COMEX) average copper price in the month of shipment.
FCX hedges this price exposure in a manner that allows it to receive the COMEX average price in the month of
shipment while the customers pay the fixed price they requested. FCX accomplishes this by entering into copper
futures or swap contracts. Hedging gains or losses from these copper futures and swap contracts are recorded in
revenues. FCX did not have any significant gains or losses resulting from hedge ineffectiveness during the nine-
month periods ended September 30, 2021 and 2020. At September 30, 2021, FCX held copper futures and swap
contracts that qualified for hedge accounting for 84 million pounds at an average contract price of $4.23 per pound,
with maturities through May 2023.
A summary of gains (losses) recognized in revenues for derivative financial instruments related to commodity
contracts that are designated and qualify as fair value hedge transactions, including the unrealized (losses) gains on
the related hedged item follows (in millions):
Three Months Ended Nine Months Ended
September 30, September 30,
2021 2020 2021 2020
Copper futures and swap contracts:
Unrealized (losses) gains:
Derivative financial instruments $ (20) $ 1 $ (28) $ 8
Hedged item – firm sales commitments 20 (1) 28 (8)
Realized gains (losses):
Matured derivative financial instruments 5 15 57 (1)
Derivatives Not Designated as Hedging Instruments
Embedded Derivatives. Certain FCX concentrate, copper cathode and gold sales contracts provide for provisional
pricing primarily based on the London Metal Exchange (LME) copper price or the COMEX copper price and the
London Bullion Market Association (London) gold price at the time of shipment as specified in the contract. FCX
receives market prices based on prices in the specified future month, which results in price fluctuations recorded in
revenues until the date of settlement. FCX records revenues and invoices customers at the time of shipment based
on then-current LME or COMEX copper prices and the London gold prices as specified in the contracts, which
results in an embedded derivative (i.e., a pricing mechanism that is finalized after the time of delivery) that is
required to be bifurcated from the host contract. The host contract is the sale of the metals contained in the
concentrate or cathode at the then-current LME or COMEX copper price, and the London gold price. FCX applies
the normal purchases and normal sales scope exception in accordance with derivatives and hedge accounting
guidance to the host contract in its concentrate or cathode sales agreements since these contracts do not allow for
net settlement and always result in physical delivery. The embedded derivative does not qualify for hedge
accounting and is adjusted to fair value through earnings each period, using the period-end LME or COMEX copper
forward prices and the adjusted London gold prices, until the date of final pricing. Similarly, FCX purchases copper
under contracts that provide for provisional pricing. Mark-to-market price fluctuations from these embedded
derivatives are recorded through the settlement date and are reflected in revenues for sales contracts and in
inventory for purchase contracts.
A summary of FCX’s embedded derivatives at September 30, 2021, follows:
Open
Positions
Average Price
Per Unit Maturities
Through	Contract Market
Embedded derivatives in provisional sales contracts:
Copper (millions of pounds) 548 $ 4.28 $ 4.05 February 2022
Gold (thousands of ounces) 196 1,790 1,738 January 2022
Embedded derivatives in provisional purchase contracts:
Copper (millions of pounds) 116 4.31 4.05 February 2022
Table of Contents
15

-- 15 of 75 --

Copper Forward Contracts. Atlantic Copper, FCX’s wholly owned smelting and refining unit in Spain, enters into
copper forward contracts designed to hedge its copper price risk whenever its physical purchases and sales pricing
periods do not match. These economic hedge transactions are intended to hedge against changes in copper prices,
with the mark-to-market hedging gains or losses recorded in production and delivery costs. At September 30, 2021,
Atlantic Copper held net copper forward purchase contracts for 9 million pounds at an average contract price of
$4.23 per pound, with maturities through November 2021.
Summary of (Losses) Gains. A summary of the realized and unrealized (losses) gains recognized in operating
income for commodity contracts that do not qualify as hedge transactions, including embedded derivatives, follows
(in millions):
Three Months Ended Nine Months Ended
September 30, September 30,
2021 2020 2021 2020
Embedded derivatives in provisional sales contracts:a
Copper $ (102) $ 94 $ 223 $ 18
Gold and other metals (9) 15 (22) 39
Copper forward contractsb 1 (7) (12) 12
a. Amounts recorded in revenues.
b. Amounts recorded in cost of sales as production and delivery costs.
Unsettled Derivative Financial Instruments
A summary of the fair values of unsettled commodity derivative financial instruments follows (in millions):
September 30,
2021 December 31,
2020
Commodity Derivative Assets:
Derivatives designated as hedging instruments:
Copper futures and swap contracts $ 2 $ 15
Derivatives not designated as hedging instruments:
Embedded derivatives in provisional sales/purchase contracts 30 169
Copper forward contracts 5 —
Total derivative assets $ 37 $ 184
Commodity Derivative Liabilities:
Derivatives designated as hedging instruments:
Copper futures and swap contracts $ 14 $ —
Derivatives not designated as hedging instruments:
Embedded derivatives in provisional sales/purchase contracts 134 21
Copper forward contracts 4 —
Total derivative liabilities $ 152 $ 21
FCX’s commodity contracts have netting arrangements with counterparties with which the right of offset exists, and
it is FCX’s policy to generally offset balances by contract on its balance sheet. FCX’s embedded derivatives on
provisional sales/purchase contracts are netted with the corresponding outstanding receivable/payable balances.
Table of Contents
16

-- 16 of 75 --

A summary of these unsettled commodity contracts that are offset in the balance sheets follows (in millions):
Assets Liabilities
September 30,
2021 December 31,
2020 September 30,
2021 December 31,
2020
Gross amounts recognized:
Embedded derivatives in provisional
sales/purchase contracts $ 30 $ 169 $ 134 $ 21
Copper derivatives 7 15 18 —
37 184 152 21
Less gross amounts of offset:
Embedded derivatives in provisional
sales/purchase contracts — 1 — 1
Copper derivatives 4 — 4 —
4 1 4 1
Net amounts presented in balance sheet:
Embedded derivatives in provisional
sales/purchase contracts 30 168 134 20
Copper derivatives 3 15 14 —
$ 33 $ 183 $ 148 $ 20
Balance sheet classification:
Trade accounts receivable $ 3 $ 168 $ 101 $ —
Other current assets 4 15 — —
Accounts payable and accrued liabilities 26 — 45 20
Other liabilities — — 2 —
$ 33 $ 183 $ 148 $ 20
Credit Risk. FCX is exposed to credit loss when financial institutions with which it has entered into derivative
transactions (commodity, foreign exchange and interest rate swaps) are unable to pay. To minimize the risk of such
losses, FCX uses counterparties that meet certain credit requirements and periodically reviews the creditworthiness
of these counterparties. As of September 30, 2021, the maximum amount of credit exposure associated with
derivative transactions was $37 million.
Other Financial Instruments. Other financial instruments include cash and cash equivalents, restricted cash,
restricted cash equivalents, accounts receivable, investment securities, legally restricted funds, accounts payable
and accrued liabilities, dividends payable and debt. The carrying value for cash and cash equivalents (which
included time deposits of $0.2 billion at September 30, 2021, and $0.3 billion at December 31, 2020), restricted
cash, restricted cash equivalents, accounts receivable, accounts payable and accrued liabilities, and dividends
payable approximates fair value because of their short-term nature and generally negligible credit losses (refer to
Note 7 for the fair values of investment securities, legally restricted funds and debt).
In addition, as of September 30, 2021, FCX has contingent consideration assets related to the sales of certain oil
and gas properties (refer to Note 7 for the related fair values).
Cash, Cash Equivalents, Restricted Cash and Restricted Cash Equivalents. The following table provides a
reconciliation of total cash, cash equivalents, restricted cash and restricted cash equivalents presented in the
consolidated statements of cash flows (in millions):
September 30,
2021 December 31,
2020
Balance sheet components:
Cash and cash equivalents $ 7,672 $ 3,657
Restricted cash and restricted cash equivalents included in:
Other current assets 114 97
Other assets 133 149
Total cash, cash equivalents, restricted cash and restricted cash equivalents presented in
the consolidated statements of cash flows $ 7,919 $ 3,903
Table of Contents
17

-- 17 of 75 --

NOTE 7. FAIR VALUE MEASUREMENT
Fair value accounting guidance includes a hierarchy that prioritizes the inputs to valuation techniques used to
measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for
identical assets or liabilities (Level 1) and the lowest priority to unobservable inputs (Level 3). FCX did not have any
significant transfers in or out of Level 3 during third-quarter 2021.
FCX’s financial instruments are recorded on the consolidated balance sheets at fair value except for contingent
consideration associated with the sale of the Deepwater Gulf of Mexico (GOM) oil and gas properties (which was
recorded under the loss recovery approach) and debt. A summary of the carrying amount and fair value of FCX’s
financial instruments (including those measured at net asset value (NAV) as a practical expedient), other than cash
and cash equivalents, restricted cash, restricted cash equivalents, accounts receivable, accounts payable and
accrued liabilities, and dividends payable (refer to Note 6) follows (in millions):
At September 30, 2021
Carrying Fair Value
Amount Total NAV Level 1 Level 2 Level 3
Assets
Investment securities:a,b
Equity securities $ 52 $ 52 $ — $ 52 $ — $ —
U.S. core fixed income fund 29 29 29 — — —
Total 81 81 29 52 — —
Legally restricted funds:a
U.S. core fixed income fund 64 64 64 — — —
Government bonds and notes 53 53 — — 53 —
Corporate bonds 42 42 — — 42 —
Government mortgage-backed securities 24 24 — — 24 —
Asset-backed securities 14 14 — — 14 —
Money market funds 8 8 — 8 — —
Collateralized mortgage-backed securities 4 4 — — 4 —
Municipal bonds 1 1 — — 1 —
Total 210 210 64 8 138 —
Derivatives:
Embedded derivatives in provisional sales/purchase
contracts in a gross asset positionc 30 30 — — 30 —
Copper forward contractsc 5 5 — 2 3 —
Copper futures and swap contractsc 2 2 — — 2 —
Total 37 37 — 2 35 —
Contingent consideration for the sale of the
Deepwater GOM oil and gas propertiesa 94 85 — — — 85
Liabilities
Derivatives:c
Embedded derivatives in provisional sales/purchase
contracts in a gross liability position 134 134 — — 134 —
Copper futures and swap contractsc 14 14 — 14 — —
Copper forward contracts 4 4 — 1 3 —
Total 152 152 — 15 137 —
Long-term debt, including current portiond 9,665 10,791 — — 10,791 —
Table of Contents
18

-- 18 of 75 --

At December 31, 2020
Carrying Fair Value
Amount Total NAV Level 1 Level 2 Level 3
Assets
Investment securities:a,b
U.S. core fixed income fund $ 29 $ 29 $ 29 $ — $ — $ —
Equity securities 7 7 — 7 — —
Total 36 36 29 7 — —
Legally restricted funds:a
U.S. core fixed income fund 65 65 65 — — —
Government bonds and notes 49 49 — — 49 —
Corporate bonds 43 43 — — 43 —
Government mortgage-backed securities 30 30 — — 30 —
Asset-backed securities 16 16 — — 16 —
Money market funds 5 5 — 5 — —
Collateralized mortgage-backed securities 4 4 — — 4 —
Municipal bonds 1 1 — — 1 —
Total 213 213 65 5 143 —
Derivatives:
Embedded derivatives in provisional sales/purchase
contracts in a gross asset positionc 169 169 — — 169 —
Copper futures and swap contractsc 15 15 — 13 2 —
Total 184 184 — 13 171 —
Contingent consideration for the sale of the
Deepwater GOM oil and gas propertiesa 108 88 — — — 88
Liabilities
Derivatives:c
Embedded derivatives in provisional sales/purchase
contracts in a gross liability position 21 21 — — 21 —
Long-term debt, including current portiond 9,711 10,994 — — 10,994 —
a. Current portion included in other current assets and long-term portion included in other assets.
b. Excludes time deposits (which approximated fair value) included in (i) other current assets of $114 million at September 30,
2021, and $97 million at December 31, 2020, and (ii) other assets of $132 million at September 30, 2021, and $148 million
at December 31, 2020, primarily associated with an assurance bond to support PT-FI’s commitment for additional domestic
smelter development in Indonesia and PT-FI’s closure and reclamation guarantees.
c. Refer to Note 6 for further discussion and balance sheet classifications.
d. Recorded at cost except for debt assumed in acquisitions, which are recorded at fair value at the respective acquisition
dates.
Valuation Techniques. The U.S. core fixed income fund is valued at NAV. The fund strategy seeks total return
consisting of income and capital appreciation primarily by investing in a broad range of investment-grade debt
securities, including U.S. government obligations, corporate bonds, mortgage-backed securities, asset-backed
securities and money market instruments. There are no restrictions on redemptions (which are usually within one
business day of notice).
Equity securities are valued at the closing price reported on the active market on which the individual securities are
traded and, as such, are classified within Level 1 of the fair value hierarchy.
Fixed income securities (government securities, corporate bonds, asset-backed securities, collateralized mortgage-
backed securities and municipal bonds) are valued using a bid-evaluation price or a mid-evaluation price. These
evaluations are based on quoted prices, if available, or models that use observable inputs and, as such, are
classified within Level 2 of the fair value hierarchy.
Money market funds are classified within Level 1 of the fair value hierarchy because they are valued using quoted
market prices in active markets.
Table of Contents
19

-- 19 of 75 --

FCX’s embedded derivatives on provisional copper concentrate, copper cathode and gold purchases and sales are
valued using quoted monthly LME or COMEX copper forward prices and the adjusted London gold prices at each
reporting date based on the month of maturity (refer to Note 6 for further discussion); however, FCX’s contracts
themselves are not traded on an exchange. As a result, these derivatives are classified within Level 2 of the fair
value hierarchy.
FCX’s derivative financial instruments for copper futures and swap contracts and copper forward contracts that are
traded on the respective exchanges are classified within Level 1 of the fair value hierarchy because they are valued
using quoted monthly COMEX or LME prices at each reporting date based on the month of maturity (refer to Note 6
for further discussion). Certain of these contracts are traded on the over-the-counter market and are classified within
Level 2 of the fair value hierarchy based on COMEX and LME forward prices.
In December 2016, FCX’s sale of its Deepwater GOM oil and gas properties included up to $150 million in
contingent consideration that was recorded at the total amount under the loss recovery approach. The contingent
consideration is being received over time as cash flows are realized from a third-party production handling
agreement for an offshore platform, with the related payments commencing in third-quarter 2018. The contingent
consideration included in (i) other current assets totaled $20 million at September 30, 2021, and $12 million at
December 31, 2020, and (ii) other assets totaled $74 million at September 30, 2021, and $96 million at
December 31, 2020. The fair value of this contingent consideration was calculated based on a discounted cash flow
model using inputs that include third-party estimates for reserves, production rates and production timing, and
discount rates. Because significant inputs are not observable in the market, the contingent consideration is
classified within Level 3 of the fair value hierarchy.
Long-term debt, including current portion, is primarily valued using available market quotes and, as such, is
classified within Level 2 of the fair value hierarchy.
The techniques described above may produce a fair value that may not be indicative of net realizable value or
reflective of future fair values. Furthermore, while FCX believes its valuation techniques are appropriate and
consistent with other market participants, the use of different techniques or assumptions to determine fair value of
certain financial instruments could result in a different fair value measurement at the reporting date. There have
been no changes in the techniques used at September 30, 2021, as compared with those techniques used at
December 31, 2020.
A summary of the changes in the fair value of FCX’s Level 3 instrument, contingent consideration for the sale of the
Deepwater GOM oil and gas properties, during the first nine months of 2021 follows (in millions):
Fair value at January 1, 2021 $ 88
Net unrealized gain related to assets still held at the end of the period 12
Settlements (15)
Fair value at September 30, 2021 $ 85
NOTE 8. CONTINGENCIES AND COMMITMENTS
Environmental
Newtown Creek. From the 1930s until 1964, Phelps Dodge Refining Corporation (PDRC), an indirect wholly owned
subsidiary of FCX, operated a copper smelter, and from the 1930s until 1984 operated a copper refinery, on the
banks of Newtown Creek (the creek), which is a 3.5-mile-long waterway that forms part of the boundary between
Brooklyn and Queens in New York City. Heavy industrialization along the banks of the creek and discharges from
the City of New York’s sewer system over more than a century resulted in significant environmental contamination of
the waterway. In 2010, U.S. Environmental Protection Agency (EPA) notified PDRC, four other companies and the
City of New York that EPA considers them to be potentially responsible parties (PRPs) under the Comprehensive
Environmental Response, Compensation, and Liability Act of 1980. The notified parties began working with EPA to
identify other PRPs. In 2010, EPA designated the creek as a Superfund site, and in 2011, PDRC and five other
parties (the Newtown Creek Group, NCG) entered an Administrative Order on Consent (AOC) to perform a remedial
investigation/feasibility study (RI/FS) to assess the nature and extent of environmental contamination in the creek
and identify potential remedial options. The parties’ RI/FS work under the AOC and their efforts to identify other
PRPs are ongoing. The final draft RI, which addressed all remaining EPA comments, was submitted in October
2021 and NCG expects EPA’s formal acceptance after their review. NCG expects to submit the draft FS in late 2025
Table of Contents
20

-- 20 of 75 --

and currently expects EPA to select a creek-wide remedy in 2026, with the actual remediation construction starting
several years later. In July 2019, the NCG entered into an AOC to conduct a Focused Feasibility Study (FFS) of the
first two miles of the creek to support an evaluation of an interim remedy for that section of the creek. In July 2021,
EPA terminated the FFS, which effectively incorporates remediation of the lower creek with the site-wide remedy.
FCX’s environmental liability balance for the creek was $313 million at September 30, 2021. The final costs of
fulfilling this remedial obligation and the allocation of costs among PRPs are uncertain and subject to change based
on the results of the RI/FS, the remedy ultimately selected by EPA and related allocation determinations. Changes
to the overall cost of this remedial obligation and the portion ultimately allocated to PDRC could be material to FCX.
Litigation
There were no significant updates to previously reported legal proceedings included in Note 12 of FCX’s 2020 Form
10-K, other than the matters discussed below.
Asbestos and Talc Claims. As previously disclosed, since approximately 1990, various FCX affiliates have been
named as defendants in a large number of lawsuits alleging personal injury from, among other things, exposure to
asbestos or talc allegedly contained in industrial products, and more recently alleging the presence of asbestos
contamination in talc-based cosmetic and personal care products. Cyprus Amax Minerals Company (CAMC), an
indirect wholly owned subsidiary of FCX, and Cyprus Mines Corporation (Cyprus Mines), a wholly owned subsidiary
of CAMC, are among the targets of such lawsuits. Cyprus Mines and subsidiaries were engaged in talc mining and
processing from 1964 until 1992 when Cyprus Mines exited its talc business. On February 13, 2019, Imerys Talc
America (Imerys), the current owner of the talc business assets and liabilities previously owned by Cyprus Mines,
filed for Chapter 11 bankruptcy protection. On December 22, 2020, Imerys filed an amended bankruptcy plan
disclosing a global settlement with Cyprus Mines and CAMC, which provides a framework for a full and
comprehensive resolution of all current and future potential liabilities arising out of the Cyprus Mines talc business,
including claims against FCX, its affiliates, Cyprus Mines and CAMC. The hearing to consider confirmation of the
Imerys bankruptcy plan previously scheduled to be held in November 2021 has been cancelled following a recent
decision by the bankruptcy judge to invalidate a substantial number of votes in favor of the plan. Consistent with the
global settlement agreement, Cyprus Mines commenced its own bankruptcy process on February 11, 2021, and
talc-related litigation against both Cyprus Mines and Cyprus Amax Minerals Company is stayed through 2021. The
global settlement is subject to, among other things, votes by claimants in both the Imerys and Cyprus Mines
bankruptcy cases as well as bankruptcy court approvals in both cases, and there can be no assurance that the
global settlement will be successfully implemented. FCX has a $130 million liability balance at September 30, 2021,
associated with the proposed settlement.
Louisiana Parishes Coastal Erosion Cases. As discussed in Note 12 of FCX's 2020 Form 10-K, certain FCX
affiliates were named as defendants, along with numerous co-defendants, in 13 cases out of a total of 42 cases filed
in Louisiana state courts by six south Louisiana parishes (Cameron, Jefferson, Plaquemines, St. Bernard, St. John
the Baptist and Vermilion), alleging that certain oil and gas exploration and production operations and sulphur
mining and production operations in coastal Louisiana contaminated and damaged coastal wetlands and caused
significant land loss along the Louisiana coast.
In 2019, affiliates of FCX reached an agreement in principle to settle all 13 cases. The maximum out-of-pocket
settlement payment will be $23.5 million with the initial payment of $15 million to be paid upon execution of the
settlement agreement.
The settlement agreement must be executed by all parties, including authorized representatives of the six south
Louisiana parishes originally plaintiffs in the suit and certain other non-plaintiff Louisiana parishes and the state of
Louisiana. The agreement in principle does not include any admission of liability by FCX or its affiliates. FCX
recorded a charge in 2019 for the initial payment of $15 million, which will be paid upon execution of the settlement
agreement. The settlement agreement has been executed by the FCX affiliates, the state of Louisiana and 8 of the
12 Louisiana parishes. FCX is continuing its efforts to finalize the settlement.
Other Matters
PT-FI and PT Smelting Export Licenses. In March 2021, PT-FI received a one-year extension of its export license
through March 15, 2022. In July 2021, PT Smelting received a six-month extension of its anodes slimes export
license, which currently expires December 30, 2021.
Table of Contents
21

-- 21 of 75 --

Cerro Verde Royalty Dispute. SUNAT (National Superintendency of Customs and Administration), the Peru national
tax authority, assessed mining royalties on ore processed by the Cerro Verde concentrator for the period December
2006 to December 2013. Cerro Verde contested each of these assessments because it believes that its 1998
stability agreement exempts from royalties all minerals extracted from its mining concession, irrespective of the
method used for processing such minerals. Since 2014, Cerro Verde has been paying the disputed assessments for
the period from December 2006 through December 2013 under installment payment programs provided under Peru
law. In third-quarter 2021, Cerro Verde paid the balance of its royalty dispute liabilities (payments totaled
$356 million in third-quarter 2021 and $421 million for the first nine months of 2021) and is proceeding with
international arbitration as previously disclosed in FCX’s 2020 Form 10-K.
Development Progress of Greenfield Smelter at East Java. On January 7, 2021, the Indonesia government levied
an administrative fine of $149 million for the period from March 30, 2020, through September 30, 2020 (additional
fines could be levied on exports after September 30, 2020), on PT-FI for failing to achieve physical development
progress on the greenfield smelter as of July 31, 2020. PT-FI responded to the Indonesia government objecting to
the fine because of events outside of its control that caused a delay in development progress for the greenfield
smelter at East Java. PT-FI believes that its communications regarding these delays during 2020 with the Indonesia
government were not properly considered before the administrative fine was levied. In June 2021, the Indonesia
government issued a ministerial decree for the calculation of an administrative fine for lack of smelter development
in light of the COVID-19 pandemic. PT-FI is continuing to discuss this matter with the Indonesia government as well
as provide additional documentation to support its position on the cause of delays in development progress on the
greenfield smelter. During the first nine months of 2021, PT-FI recorded charges totaling $16 million for a potential
settlement of the administrative fine which is expected to include a revised construction schedule for the greenfield
smelter. No additional fine is expected for the construction period after July 2020 based on the revised schedule.
The final settlement could differ from the amounts recorded.
Chiyoda Contract. In July 2021, PT-FI awarded a construction contract to Chiyoda for the construction of a new
greenfield smelter in Gresik, Indonesia with an estimated contract cost of $2.8 billion.
NOTE 9. BUSINESS SEGMENTS
FCX has organized its mining operations into four primary divisions – North America copper mines, South America
mining, Indonesia mining and Molybdenum mines – and operating segments that meet certain thresholds are
reportable segments. Separately disclosed in the following tables are FCX’s reportable segments, which include the
Morenci, Cerro Verde and Grasberg (Indonesia Mining) copper mines, the Rod & Refining operations and Atlantic
Copper Smelting & Refining.
Intersegment sales between FCX’s business segments are based on terms similar to arms-length transactions with
third parties at the time of the sale. Intersegment sales may not be reflective of the actual prices ultimately realized
because of a variety of factors, including additional processing, timing of sales to unaffiliated customers and
transportation premiums.
FCX defers recognizing profits on sales from its mines to other segments, including Atlantic Copper Smelting &
Refining, and on 39.5 percent of PT-FI’s sales to PT Smelting, until final sales to third parties occur. Quarterly
variations in ore grades, the timing of intercompany shipments and changes in product prices result in variability in
FCX’s net deferred profits and quarterly earnings.
FCX allocates certain operating costs, expenses and capital expenditures to its operating divisions and individual
segments. However, not all costs and expenses applicable to an operation are allocated. U.S. federal and state
income taxes are recorded and managed at the corporate level (included in Corporate, Other & Eliminations),
whereas foreign income taxes are recorded and managed at the applicable country level. In addition, most mining
exploration and research activities are managed on a consolidated basis, and those costs, along with some selling,
general and administrative costs, are not allocated to the operating divisions or individual segments. Accordingly,
the following Financial Information by Business Segment reflects management determinations that may not be
indicative of what the actual financial performance of each operating division or segment would be if it was an
independent entity.
Table of Contents
22

-- 22 of 75 --

Product Revenues. FCX’s revenues attributable to the products it sold for the third quarters and first nine months
of 2021 and 2020 follow (in millions):
Three Months Ended Nine Months Ended
September 30, September 30,
2021 2020 2021 2020
Copper:
Concentrate $ 2,531 $ 1,185 $ 6,316 $ 2,783
Cathode 1,463 1,085 4,232 3,046
Rod and other refined copper products 1,048 634 2,565 1,479
Purchased coppera 124 167 652 568
Gold 741 497 1,856 1,108
Molybdenum 372 189 904 626
Otherb 210 159 666 431
Adjustments to revenues:
Treatment charges (126) (95) (324) (250)
Royalty expensec (97) (56) (242) (102)
Export dutiesd (72) (23) (145) (43)
Revenues from contracts with customers 6,194 3,742 16,480 9,646
Embedded derivativese (111) 109 201 57
Total consolidated revenues $ 6,083 $ 3,851 $ 16,681 $ 9,703
a. FCX purchases copper cathode primarily for processing by its Rod & Refining operations.
b. Primarily includes revenues associated with cobalt and silver.
c. Reflects royalties on sales from PT-FI and Cerro Verde that will vary with the volume of metal sold and prices.
d. Reflects PT-FI export duties.
e. Refer to Note 6 for discussion of embedded derivatives related to FCX’s provisionally priced concentrate and cathode sales
contracts.
Table of Contents
23

-- 23 of 75 --

Financial Information by Business Segment
(In millions)
Atlantic Corporate,
North America Copper Mines South America Mining Copper Other
Cerro Indonesia Molybdenum Rod & Smelting & Elimi- FCX
Morenci Other Total Verde Other Total Mining Mines Refining & Refining nations Total
Three Months Ended September 30, 2021
Revenues:
Unaffiliated customers $ 16 $ 64 $ 80 $ 979 $ 149 $ 1,128 $ 1,961 a $ — $ 1,697 $ 783 $ 434 b $ 6,083
Intersegment 711 1,020 1,731 95 — 95 81 151 7 — (2,065) —
Production and delivery 312 592 904 533 97 630 569 70 1,701 765 (1,630) 3,009
Depreciation, depletion and amortization 40 54 94 101 10 111 280 19 1 7 16 528
Metals inventory adjustments 13 — 13 — — — — — — — 1 14
Selling, general and administrative expenses — 1 1 2 — 2 28 — — 5 66 102
Mining exploration and research expenses — 1 1 — — — — — — — 14 15
Environmental obligations and shutdown costs (1) (1) (2) — — — — — — — 15 13
Net gain on sales of assets — — — — — — — — — — (60) c (60)
Operating income (loss) 363 437 800 438 42 480 1,165 62 2 6 (53) 2,462
Interest expense, net — 1 1 6 — 6 1 — — 1 129 138
Provision for (benefit from) income taxes — — — 197 24 221 382 d — — (1) 26 628
Total assets at September 30, 2021 2,586 5,244 7,830 8,554 1,843 10,397 18,592 1,726 278 1,067 7,027 46,917
Capital expenditures 42 74 116 41 6 47 328 1 1 5 43 e 541
Three Months Ended September 30, 2020
Revenues:
Unaffiliated customers $ 4 $ 12 $ 16 $ 632 $ 108 $ 740 $ 1,023 a $ — $ 1,270 $ 536 $ 266 b $ 3,851
Intersegment 584 637 1,221 66 — 66 3 42 8 3 (1,343) —
Production and delivery 308 460 768 394 83 477 409 51 1,272 522 (1,034) 2,465
Depreciation, depletion and amortization 42 49 91 92 13 105 150 13 6 8 21 394
Metals inventory adjustments — (4) (4) — — — — 3 2 — 8 9
Selling, general and administrative expenses 1 — 1 2 — 2 25 — — 5 39 72
Mining exploration and research expenses — — — — — — — — — — 8 8
Environmental obligations and shutdown costs — (3) (3) — — — — — — — 24 21
Net loss on sales of assets — — — — — — — — — — 2 2
Operating income (loss) 237 147 384 210 12 222 442 (25) (2) 4 (145) 880
Interest expense, net — — — 21 — 21 — — — — 99 120
Provision for (benefit from) income taxes — — — 105 4 109 211 — — — (23) 297
Total assets at September 30, 2020 2,654 5,137 7,791 8,569 1,640 10,209 16,858 1,770 251 877 3,343 41,099
Capital expenditures 21 45 66 26 5 31 297 3 1 6 32 e 436
a. Includes PT-FI's sales to PT Smelting totaling $795 million in third-quarter 2021 and $506 million in third-quarter 2020.
b. Includes revenues from FCX's molybdenum sales company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North America and South America copper mines.
c. Represents the gain on the sale of FCX’s remaining cobalt business located in Kokkola, Finland (Freeport Cobalt).
d. Includes net tax benefits of $69 million associated with the release of a portion of the valuation allowances recorded against PT RTI NOLs.
e. Includes capital expenditures for the new greenfield smelter and precious metals refinery (collectively, the Indonesia smelter project) of $31 million in third-quarter 2021 and $27 million in third-quarter 2020.
Table of Contents
24

-- 24 of 75 --

(In millions)
Atlantic Corporate,
North America Copper Mines South America Mining Copper Other
Cerro Indonesia Molybdenum Rod & Smelting & Elimi- FCX
Morenci Other Total Verde Other Total Mining Mines Refining & Refining nations Total
Nine months ended September 30, 2021
Revenues:
Unaffiliated customers $ 77 $ 147 $ 224 $ 2,721 $ 512 $ 3,233 $ 5,097 a $ — $ 4,695 $ 2,264 $ 1,168 b $16,681
Intersegment 1,996 2,783 4,779 260 — 260 189 310 20 — (5,558) —
Production and delivery 932 1,646 2,578 1,463 c 306 1,769 1,552 183 4,708 2,213 (4,141) d 8,862
Depreciation, depletion and amortization 114 161 275 272 34 306 726 51 3 22 47 1,430
Metals inventory adjustments 13 — 13 — — — — 1 — — 1 15
Selling, general and administrative expenses 1 2 3 6 — 6 81 — — 17 182 289
Mining exploration and research expenses — 1 1 — — — — — — — 35 36
Environmental obligations and shutdown costs — (1) (1) — — — — — — — 52 51
Net gain on sales of assets — — — — — — — — — — (63) e (63)
Operating income (loss) 1,013 1,121 2,134 1,240 172 1,412 2,927 75 4 12 (503) 6,061
Interest expense, net — 1 1 31 — 31 8 — — 4 387 431
Provision for (benefit from) income taxes — — — 515 62 577 1,101 f — — (1) (3) 1,674
Capital expenditures 74 137 211 84 10 94 904 4 2 18 111 g 1,344
Nine months ended September 30, 2020
Revenues:
Unaffiliated customers $ 26 $ 35 $ 61 $ 1,479 $ 312 $ 1,791 $ 2,151 a $ — $ 3,491 $ 1,429 $ 780 b $ 9,703
Intersegment 1,473 1,676 3,149 156 — 156 38 171 24 16 (3,554) —
Production and delivery 1,005 1,410 2,415 1,152 297 1,449 1,130 178 3,529 1,379 (2,676) 7,404
Depreciation, depletion and amortization 129 143 272 273 42 315 375 44 14 22 51 1,093
Metals inventory adjustments 4 48 52 — 3 3 — 8 3 — 26 92
Selling, general and administrative expenses 2 1 3 5 — 5 81 — — 15 169 273
Mining exploration and research expenses — 2 2 — — — — — — — 40 42
Environmental obligations and shutdown costs — (3) (3) — — — — — 1 — 60 58
Net loss on sales of assets — — — — — — — — — — 13 13
Operating income (loss) 359 110 469 205 (30) 175 603 (59) (32) 29 (457) 728
Interest expense, net 2 — 2 69 — 69 2 — — 4 285 362
Provision for (benefit from) income taxes — — — 82 (6) 76 302 — — 1 (46) 333
Capital expenditures 92 306 398 116 40 156 865 14 5 17 118 g 1,573
a. Includes PT-FI's sales to PT Smelting totaling $2.3 billion for the first nine months of 2021 and $1.3 billion for the first nine months of 2020.
b. Includes revenues from FCX's molybdenum sales company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North America and South America
copper mines.
c. Includes nonrecurring charges totaling $74 million associated with labor-related charges at Cerro Verde for agreements reached with approximately 65 percent of its hourly employees.
d. Includes charges associated with the major maintenance turnaround at the Miami smelter totaling $87 million.
e. Includes a $60 million gain on the sale of Freeport Cobalt.
f. Includes net tax benefits of $69 million associated with the release of a portion of the valuation allowances recorded against PT RTI NOLs.
g. Includes capital expenditures for the Indonesia smelter project of $79 million for the first nine months of 2021 and $94 million for the first nine months of 2020.
Table of Contents
25

-- 25 of 75 --

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Board of Directors and Stockholders of
Freeport-McMoRan Inc.
Results of Review of Interim Financial Statements
We have reviewed the accompanying consolidated balance sheet of Freeport-McMoRan Inc. (the Company) as of
September 30, 2021, the related consolidated statements of operations, comprehensive income (loss), and equity
for the three- and nine-month periods ended September 30, 2021 and 2020, the related consolidated statements of
cash flows for the nine-month periods ended September 30, 2021 and 2020, and the related notes (collectively
referred to as the “consolidated interim financial statements”). Based on our reviews, we are not aware of any
material modifications that should be made to the consolidated interim financial statements for them to be in
conformity with U.S. generally accepted accounting principles.
We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board
(United States) (PCAOB), the consolidated balance sheet of the Company as of December 31, 2020, the related
consolidated statements of operations, comprehensive income (loss), cash flows and equity for the year then
ended, and the related notes (not presented herein); and in our report dated February 16, 2021, we expressed an
unqualified audit opinion on those consolidated financial statements. In our opinion, the information set forth in the
accompanying consolidated balance sheet as of December 31, 2020, is fairly stated, in all material respects, in
relation to the consolidated balance sheet from which it has been derived.
Basis for Review Results
These financial statements are the responsibility of the Company's management. We are a public accounting firm
registered with the PCAOB and are required to be independent with respect to the Company in accordance with the
U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission
and the PCAOB. We conducted our review in accordance with the standards of the PCAOB. A review of interim
financial statements consists principally of applying analytical procedures and making inquiries of persons
responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in
accordance with the standards of the PCAOB, the objective of which is the expression of an opinion regarding the
financial statements taken as a whole. Accordingly, we do not express such an opinion.
/s/ Ernst & Young LLP
Phoenix, Arizona
November 5, 2021
Table of Contents
26

-- 26 of 75 --

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations.
In Management’s Discussion and Analysis of Financial Condition and Results of Operations (MD&A), “we,” “us” and
“our” refer to Freeport-McMoRan Inc. (FCX) and its consolidated subsidiaries. You should read this discussion in
conjunction with our consolidated financial statements, the related MD&A and the discussion of our Business and
Properties in our annual report on Form 10-K for the year ended December 31, 2020 (2020 Form 10-K), filed with
the United States (U.S.) Securities and Exchange Commission (SEC). The results of operations reported and
summarized below are not necessarily indicative of future operating results (refer to “Cautionary Statement” for
further discussion). References to “Notes” are Notes included in our Notes to Consolidated Financial Statements
(Unaudited). Throughout MD&A, all references to income or losses per share are on a diluted basis.
OVERVIEW
We are a leading international mining company with headquarters in Phoenix, Arizona. We operate large, long-lived,
geographically diverse assets with significant proven and probable reserves of copper, gold and molybdenum. We
are one of the world’s largest publicly traded copper producers. Our portfolio of assets includes the Grasberg
minerals district in Indonesia, one of the world’s largest copper and gold deposits; and significant mining operations
in North America and South America, including the large-scale Morenci minerals district in Arizona and the Cerro
Verde operation in Peru.
We continue to monitor the impact of the COVID-19 pandemic on our business and maintain our vigilant operating
protocols to contain and mitigate the risk of spread of COVID-19 at each of our operating sites. To date, our
protocols have been effective in mitigating and preventing a major outbreak of COVID-19 at our operating sites. We
will continue to monitor, assess and update our COVID-19 response and to provide assistance to employees in
obtaining vaccinations.
Our results for the first nine months of 2021 reflect strong operating and financial performance, and cash flow
generation. We believe we are well positioned to make investments in our business while providing shareholders
with cash returns consistent with our financial policy. Refer to Note 5 and “Capital Resources and Liquidity” for
further discussion of our financial policy. We continue to execute our operating plans in a safe, efficient and
responsible manner and remain focused on building long-term value through solid management of our portfolio of
long-lived and high-quality copper assets.
As further discussed in “Operations,” highlights for our mining operations during the first nine months of 2021
include:
• Continued success with the ramp-up of underground mining at PT Freeport Indonesia (PT-FI); on track to
reach annualized metal production targets by year-end 2021.
• Strong performance from Cerro Verde's concentrator facilities with milling rates averaging 381,500 metric
tons of ore per day and rates are targeted to average approximately 400,000 metric tons of ore per day in
2022.
• Current operations at the Lone Star copper leach project, which was successfully completed in the second
half of 2020, are exceeding the initial design capacity of 200 million pounds of copper annually by
approximately 25 percent.
We are advancing climate initiatives and recently published our updated Climate Report in September 2021, which
details the work underway across our global business to reduce greenhouse gas (GHG) emissions, improve energy
efficiency, advance the use of renewable energy and enhance our resilience to future climate-related risks.
Net income (loss) attributable to common stock totaled $1.4 billion in third-quarter 2021, $0.3 billion in third-quarter
2020, $3.2 billion for the first nine months of 2021 and $(0.1) billion for the first nine months of 2020. Results for the
2021 periods, compared with the 2020 periods, reflect higher copper prices and copper and gold sales volumes,
partly offset by a higher provision for income taxes. The first nine months of 2020 also reflect charges directly
associated with the COVID-19 pandemic and revised operating plans, including employee separation costs, totaling
$178 million, losses on early extinguishment of debt totaling $100 million and metals inventory adjustments totaling
$90 million. Refer to “Consolidated Results” for further discussion.
Table of Contents
27

-- 27 of 75 --

At September 30, 2021, we had consolidated debt of $9.7 billion and consolidated cash and cash equivalents of
$7.7 billion, resulting in net debt of $2.0 billion. This represents a reduction in net debt of $4.1 billion from year-end
2020. Refer to “Net Debt” for reconciliations of debt and cash and cash equivalents to net debt.
At September 30, 2021, we had no borrowings and $3.5 billion available under our revolving credit facility. In
September 2021, we prepaid $200 million of the Cerro Verde Term Loan and in October 2021, we announced that in
December 2021 we expect to redeem our outstanding $524 million principal amount of our 3.55% Senior Notes due
2022. We have no other senior note maturities until March 2023.
In July 2021, PT-FI entered into a $1.0 billion, five-year, unsecured bank credit facility to advance projects
associated with its obligation for additional domestic smelter capacity and a precious metals refinery (PMR) in
Indonesia. As of September 30, 2021, $158 million ($146 million net of debt issuance costs) was drawn under this
facility. Refer to Note 5 and “Capital Resources and Liquidity” for further discussion.
OUTLOOK
We continue to view the long-term outlook for our business positively, supported by limitations on supplies of copper
and the requirements for copper in the world’s economy. Our financial results vary as a result of fluctuations in
market prices primarily for copper, gold and, to a lesser extent, molybdenum, as well as other factors. World market
prices for these commodities have fluctuated historically and are affected by numerous factors beyond our control.
Refer to “Markets” below and “Risk Factors” in Part I, Item 1A. of our 2020 Form 10-K for further discussion.
Because we cannot control the prices of our products, the key measures that management focuses on in operating
our business are sales volumes, unit net cash costs, operating cash flows and capital expenditures.
Consolidated Sales Volumes
Following are our projected consolidated sales volumes for the year 2021:
Copper (millions of recoverable pounds):
North America copper mines 1,455
South America mining 1,030
Indonesia mining 1,327
Total 3,812
Gold (millions of recoverable ounces) 1.3
Molybdenum (millions of recoverable pounds) 85 a
a. Projected molybdenum sales include 28 million pounds produced by our Molybdenum mines and 57 million pounds
produced by our North America and South America copper mines.
Consolidated sales volumes in fourth-quarter 2021 are expected to approximate 1.025 billion pounds of copper, 375
thousand ounces of gold and 22 million pounds of molybdenum. Projected sales volumes are dependent on
operational performance (including from underground mining at PT-FI), weather-related conditions, timing of
shipments, and other factors detailed in the “Cautionary Statement” below.
For other important factors that could cause results to differ materially from projections, refer to “Risk Factors”
contained in Part I, Item 1A. of our 2020 Form 10-K.
Consolidated Unit Net Cash Costs
Assuming average prices of $1,800 per ounce of gold and $19.00 per pound of molybdenum in fourth-quarter 2021
and achievement of current sales volume and cost estimates, consolidated unit net cash costs (net of by-product
credits) for our copper mines are expected to average $1.33 per pound of copper for the year 2021 (including $1.26
per pound of copper in fourth-quarter 2021). The impact of price changes during fourth-quarter 2021 on
consolidated unit net cash costs for the year 2021 would approximate $0.015 per pound of copper for each $100
per ounce change in the average price of gold and $0.01 per pound of copper for each $2 per pound change in the
average price of molybdenum. Quarterly unit net cash costs vary with fluctuations in sales volumes and realized
prices, primarily for gold and molybdenum.
Table of Contents
28

-- 28 of 75 --

Consolidated Operating Cash Flows
Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum
sales; production costs; income taxes; other working capital changes; and other factors. Based on current sales
volume and cost estimates, and assuming average prices of $4.50 per pound for copper, $1,800 per ounce for gold,
and $19.00 per pound for molybdenum in fourth-quarter 2021, our consolidated operating cash flows are estimated
to approximate $7.5 billion for the year 2021. Estimated consolidated operating cash flows for the year 2021 also
reflect an estimated income tax provision of $2.5 billion (refer to “Consolidated Results – Income Taxes” for further
discussion of our projected income tax rate for the year 2021). The impact of price changes during fourth-quarter
2021 on operating cash flows would approximate $100 million for each $0.10 per pound change in the average
price of copper, $25 million for each $100 per ounce change in the average price of gold and $15 million for each $2
per pound change in the average price of molybdenum.
Consolidated Capital Expenditures
Consolidated capital expenditures for the year 2021 are expected to approximate $2.3 billion ($2.0 billion excluding
capital expenditures for the new greenfield smelter and PMR (collectively, the Indonesia smelter project).
Consolidated capital expenditures for the year 2021 are expected to include $1.3 billion for major mining projects,
primarily associated with underground development activities in the Grasberg minerals district.
All costs associated with the Indonesia smelter project will be shared 49 percent by FCX and 51 percent by PT
Indonesia Asahan Aluminium (Persero) (PT Inalum, also known as MIND ID), and will be largely offset by a phase-
out of the 5 percent export duty currently paid to the Indonesia government as well as the tax deductibility of smelter
costs by PT-FI. Current capital expenditures for the Indonesia smelter project are being funded through PT-FI's $1.0
billion unsecured bank credit facility, with additional debt financing being evaluated.
Table of Contents
29

-- 29 of 75 --

MARKETS
World prices for copper, gold and molybdenum can fluctuate significantly. During the period from January 2011
through September 2021, the London Metal Exchange (LME) copper settlement price varied from a low of $1.96 per
pound in 2016 to a record high of $4.86 per pound in 2021; the London Bullion Market Association (London) PM
gold price fluctuated from a low of $1,049 per ounce in 2015 to a record high of $2,067 per ounce in 2020; and the
Metals Week Molybdenum Dealer Oxide weekly average price ranged from a low of $4.46 per pound in 2015 to a
high of $20.01 per pound in 2021. Copper, gold and molybdenum prices are affected by numerous factors beyond
our control as described further in “Risk Factors” contained in Part I, Item 1A. of our 2020 Form 10-K.
This graph presents LME copper settlement prices and the combined reported stocks of copper at the LME,
Commodity Exchange Inc., and the Shanghai Futures Exchange from January 2011 through September 2021.
During third-quarter 2021, LME copper settlement prices ranged from a low of $3.98 per pound to a high of $4.44
per pound, averaged $4.25 per pound and settled at $4.10 per pound on September 30, 2021. Copper prices were
volatile during the quarter as a result of a strong U.S. dollar and prospects for slowing economic growth globally,
and particularly in China, partly offset by falling exchange inventories and a positive long-term outlook supported by
forecasts for a continued global economic recovery and copper’s prominent role in the clean energy transition. The
LME copper settlement price was $4.52 per pound on October 29, 2021.
We believe expectations for longer-term copper demand growth remain in place. We expect future demand to be
supported by the global transition to renewable energy and other carbon-reduction initiatives, and continued
urbanization in developing countries. The historically low inventories; limited number of approved, large-scale
projects scheduled; the long lead times required to permit and build new mines; and declining ore grades at existing
operations highlight the supply challenges for copper.
Table of Contents
30

-- 30 of 75 --

This graph presents London PM gold prices from January 2011 through September 2021. During third-quarter 2021,
London PM gold prices ranged from a low of $1,723 per ounce to a high of $1,829 per ounce, averaged $1,790 per
ounce, and closed at $1,743 per ounce on September 30, 2021. While the global economic recovery has put
downward pressure on gold prices, many analysts expect gold prices to remain supported by the effects of elevated
debt levels associated with large pandemic-related stimulus efforts and historically low U.S. interest rates. The
London PM gold price was $1,769 per ounce on October 29, 2021.
Table of Contents
31

-- 31 of 75 --

This graph presents the Metals Week Molybdenum Dealer Oxide weekly average price from January 2011 through
September 2021. During third-quarter 2021, the weekly average price of molybdenum ranged from a low of $17.84
per pound to a high of $20.01 per pound, averaged $19.09 per pound, and was $18.45 per pound on September 30,
2021. Molybdenum prices have reacted to supply constraints and increased demand, as mines in both Chile and
Peru reported lower production, and logistics challenges continued globally. The Metals Week Molybdenum Dealer
Oxide weekly average price was $19.34 per pound on October 29, 2021.
Table of Contents
32

-- 32 of 75 --

CONSOLIDATED RESULTS
Three Months Ended
September 30, Nine Months Ended
September 30,
2021 2020 2021 2020
SUMMARY FINANCIAL DATA (in millions, except per share amounts)
Revenuesa,b $ 6,083 $ 3,851 $ 16,681 $ 9,703
Operating incomea $ 2,462 $ 880 $ 6,061 $ 728
Net income (loss) attributable to common stockc $ 1,399 d $ 329 e $ 3,200 d $ (109) e
Diluted net income (loss) per share of common
stock $ 0.94 $ 0.22 $ 2.16 $ (0.08)
Diluted weighted-average common shares
outstanding 1,484 1,461 1,481 1,453
Operating cash flowsf $ 1,965 $ 1,237 $ 5,435 $ 1,690
Capital expenditures $ 541 $ 436 $ 1,344 $ 1,573
At September 30:
Cash and cash equivalents $ 7,672 $ 2,403 $ 7,672 $ 2,403
Total debt, including current portion $ 9,665 $ 10,030 $ 9,665 $ 10,030
a. Refer to Note 9 for a summary of revenues and operating income by operating division.
b. Includes (unfavorable) favorable adjustments to prior period provisionally priced concentrate and cathode copper sales
totaling $(9) million ($(3) million to net income attributable to common stock or less than $0.01 per share) in third-quarter
2021, $71 million ($28 million to net income attributable to common stock or $0.02 per share) in third-quarter 2020, $169
million ($65 million to net income attributable to common stock or $0.05 per share) for the first nine months of 2021 and
$(102) million ($(42) million to net loss attributable to common stock or $(0.03) per share) for the first nine months of 2020
(refer to Note 6 for further discussion).
c. We defer recognizing profits on intercompany sales until final sales to third parties occur. Refer to “Operations – Smelting
and Refining” for a summary of net impacts from changes in these deferrals.
d. Includes net credits (charges) totaling $79 million ($0.05 per share) in third-quarter 2021 and $(16) million ($(0.01) per
share) for the first nine months of 2021. Net credits in third-quarter 2021 were primarily associated with the release of
valuation allowances at PT-FI and a gain on sale of our remaining cobalt business in Kokkola, Finland (Freeport Cobalt),
partly offset by metals inventory adjustments. The first nine months of 2021 also included net charges primarily associated
with nonrecurring labor-related charges at Cerro Verde and contested matters at PT-FI (including historical tax audits and an
administrative fine levied by the Indonesia government).
e. Includes net charges totaling $101 million ($0.07 per share) in third-quarter 2020 and $347 million ($0.24 per share) for the
first nine months of 2020, primarily associated with the COVID-19 pandemic and revised operating plans (including
employee separation costs), net losses on early extinguishment of debt and metals inventory adjustments.
f. Working capital and other sources totaled $180 million in third-quarter 2021, $178 million in third-quarter 2020, $367 million
for the first nine months of 2021 and $319 million for the first nine months of 2020.
Table of Contents
33

-- 33 of 75 --

Three Months Ended
September 30, Nine Months Ended
September 30,
2021 2020 2021 2020
SUMMARY OPERATING DATA
Copper (millions of recoverable pounds)
Production 987 844 2,810 2,342
Sales, excluding purchases 1,033 848 2,787 2,336
Average realized price per pound $ 4.20 $ 3.01 $ 4.22 $ 2.73
Site production and delivery costs per pounda $ 1.88 $ 1.77 b $ 1.92 c $ 1.92 b
Unit net cash costs per pounda $ 1.24 $ 1.32 $ 1.36 $ 1.55
Gold (thousands of recoverable ounces)
Production 374 237 976 584
Sales, excluding purchases 402 234 965 562
Average realized price per ounce $ 1,757 $ 1,902 $ 1,780 $ 1,810
Molybdenum (millions of recoverable pounds)
Production 23 19 63 57
Sales, excluding purchases 20 20 63 59
Average realized price per pound $ 18.61 $ 9.23 $ 14.36 $ 10.30
a. Reflects per pound weighted-average production and delivery costs and unit net cash costs (net of by-product credits) for all
copper mines, before net noncash and other costs. For reconciliations of per pound unit costs by operating division to
production and delivery costs applicable to sales reported in our consolidated financial statements, refer to “Product
Revenues and Production Costs.”
b. Excludes charges totaling $0.04 per pound of copper in third-quarter 2020 and $0.09 per pound of copper for the first nine
months of 2020, primarily associated with idle facility and contract cancellations costs related to the COVID-19 pandemic
and employee separation costs associated with the April 2020 revised operating plans.
c. Includes $0.03 per pound of copper associated with nonrecurring labor-related costs at Cerro Verde for agreements reached
with approximately 65 percent of its hourly employees. Refer to “Operations – South America Mining” for further discussion.
Revenues
Consolidated revenues totaled $6.1 billion in third-quarter 2021, $3.9 billion in third-quarter 2020, $16.7 billion for
the first nine months of 2021 and $9.7 billion for the first nine months of 2020. Revenues from our mining operations
primarily include the sale of copper concentrate, copper cathode, copper rod, gold in concentrate and molybdenum.
Refer to Note 9 for a summary of product revenues.
Following is a summary of changes in our consolidated revenues between periods (in millions):
Three Months Ended
September 30 Nine Months Ended
September 30
Consolidated revenues - 2020 period $ 3,851 $ 9,703
Higher sales volumes:
Copper 554 1,231
Gold 319 730
Molybdenum 1 38
Higher (lower) average realized prices:
Copper 1,229 4,152
Gold (58) (29)
Molybdenum 186 254
Adjustments for prior period provisionally priced copper sales (80) 271
Higher Atlantic Copper revenues 244 819
(Lower) higher revenues from purchased copper (43) 84
Higher treatment charges (31) (74)
Higher royalties and export duties (90) (242)
Other, including intercompany eliminations 1 (256)
Consolidated revenues - 2021 period $ 6,083 $ 16,681
Table of Contents
34

-- 34 of 75 --

Sales Volumes. Consolidated copper and gold sales volumes increased in the 2021 periods, compared to the 2020
periods, primarily reflecting the ramp-up of underground mining at PT-FI. Refer to “Operations” for further discussion
of sales volumes at our mining operations.
Realized Prices. Our consolidated revenues can vary significantly as a result of fluctuations in the market prices of
copper, gold and molybdenum. Average realized prices for third-quarter 2021, compared with third-quarter 2020,
were 40 percent higher for copper, 8 percent lower for gold and 102 percent higher for molybdenum and average
realized prices for the first nine months of 2021, compared with the first nine months of 2020, were 55 percent
higher for copper, 2 percent lower for gold and 39 percent higher for molybdenum.
Average realized copper prices include net (unfavorable) favorable adjustments to current period provisionally
priced copper sales totaling $(93) million in third-quarter 2021, $23 million in third-quarter 2020, $54 million for the
first nine months of 2021 and $120 million for the first nine months of 2020. As discussed in Note 6, substantially all
of our copper concentrate and cathode sales contracts provide final copper pricing in a specified future month
(generally one to four months from the shipment date) based primarily on quoted LME monthly average copper
prices. We record revenues and invoice customers at the time of shipment based on then-current LME prices, which
results in an embedded derivative on provisionally priced concentrate and cathode sales that is adjusted to fair
value through earnings each period, using the period-end forward prices, until final pricing on the date of settlement.
To the extent final prices are higher or lower than what was recorded on a provisional basis, an increase or
decrease to revenues is recorded each reporting period until the date of final pricing. Accordingly, in times of rising
copper prices, our revenues benefit from adjustments to the final pricing of provisionally priced sales pursuant to
contracts entered into in prior periods; in times of falling copper prices, the opposite occurs.
Prior Period Provisionally Priced Copper Sales. Net (unfavorable) favorable adjustments to prior periods’
provisionally priced copper sales (i.e., provisionally priced sales at June 30, 2021 and 2020, and December 31,
2020 and 2019) recorded in consolidated revenues totaled $(9) million in third-quarter 2021, $71 million in third-
quarter 2020, $169 million for the first nine months of 2021 and $(102) million for the first nine months of 2020.
Refer to Notes 6 and 9 for a summary of total adjustments to prior period and current period provisionally priced
sales.
At September 30, 2021, we had provisionally priced copper sales totaling 313 million pounds of copper (net of
intercompany sales and noncontrolling interests) recorded at an average of $4.05 per pound, subject to final pricing
over the next several months. We estimate that each $0.05 change in the price realized from the September 30,
2021, provisional price recorded would have an approximate $10 million effect on our 2021 net income attributable
to common stock. The LME copper price settled at $4.52 per pound on October 29, 2021.
Atlantic Copper Revenues. Atlantic Copper revenues totaled $783 million in third-quarter 2021 and $2.3 billion for
the first nine months of 2021, compared with $539 million in third-quarter 2020 and $1.4 billion for the first nine
months of 2020. Higher revenues in the 2021 periods, compared with the 2020 periods, primarily reflect higher
copper prices.
Purchased Copper. We purchase copper cathode primarily for processing by our Rod & Refining operations. The
volumes of copper purchases vary depending on cathode production from our operations and totaled 28 million
pounds in third-quarter 2021, 56 million pounds in third-quarter 2020, 149 million pounds for the first nine months of
2021 and 215 million pounds for the first nine months of 2020. The decrease in revenues associated with purchased
copper in third-quarter 2021, compared to third-quarter 2020, primarily reflects lower volumes. The increase in
revenues associated with purchased copper for the first nine months of 2021, compared to the first nine months of
2020 periods, reflects higher prices, partly offset by lower volumes.
Treatment Charges. Revenues from our concentrate sales are recorded net of treatment charges (i.e., fees paid to
smelters that are generally negotiated annually), which will vary with the sales volumes and the price of copper.
Royalties and Export Duties. Royalties are primarily on PT-FI sales and vary with the volume of metal sold and the
prices of copper and gold. PT-FI will continue to pay export duties until development progress for new domestic
smelting with an annual capacity of 2 million metric tons of concentrate exceeds 50 percent. Refer to “Operations –
Indonesia Mining” for further discussion of the current progress on a greenfield smelter in Indonesia and to Note 9
for a summary of royalty expense and export duties.
Table of Contents
35

-- 35 of 75 --

Production and Delivery Costs
Consolidated production and delivery costs totaled $3.0 billion in third-quarter 2021, $2.5 billion in third-quarter
2020, $8.9 billion for the first nine months of 2021 and $7.4 billion for the first nine months of 2020. Higher
consolidated production and delivery costs in the 2021 periods primarily reflect higher sales volumes, higher milling
and mining costs associated with the return to pre-COVID-19 operating rates and higher maintenance and input
costs. The first nine months of 2021 also include nonrecurring labor-related charges at Cerro Verde totaling $74
million for agreements reached with approximately 65 percent of its hourly employees. The first nine months of 2020
also include charges totaling $202 million associated with the COVID-19 pandemic and revised operating plans.
Site Production and Delivery Costs Per Pound. Site production and delivery costs for our copper mining operations
primarily include labor, energy and commodity-based inputs, such as sulphuric acid, reagents, liners, tires and
explosives. Consolidated site production and delivery costs (before net noncash and other costs) for our copper
mines averaged $1.88 per pound of copper in third-quarter 2021, $1.77 per pound of copper in third-quarter 2020,
$1.92 per pound of copper for both the first nine months of 2021 and 2020.
Consolidated site production and delivery costs per pound in the third quarter and first nine months of 2021 were
higher, compared with the third quarter and first nine months of 2020, primarily reflecting higher mining and milling
costs associated with the return to pre-COVID-19 operating rates and higher maintenance and input costs, partly
offset by higher sales volumes and lower leach unit production costs associated with higher recoveries.
Consolidated site production and delivery costs per pound for the first nine months of 2021 included nonrecurring
labor-related charges at Cerro Verde for agreements reached with approximately 65 percent of its hourly employees
and the first nine months of 2020 excluded charges associated with the COVID-19 pandemic and the April 2020
revised operating plans. Refer to “Operations – Unit Net Cash Costs” for further discussion of unit net cash costs
associated with our operating divisions and to “Product Revenues and Production Costs” for reconciliations of per
pound costs by operating division to production and delivery costs applicable to sales reported in our consolidated
financial statements.
Depreciation, Depletion and Amortization
Depreciation will vary under the unit-of-production (UOP) method as a result of changes in sales volumes and the
related UOP rates at our mining operations. Consolidated depreciation, depletion and amortization (DD&A) totaled
$528 million in third-quarter 2021, $394 million in third-quarter 2020, $1.4 billion for the first nine months of 2021
and $1.1 billion for the first nine months of 2020. Higher DD&A in the 2021 periods is primarily related to assets
placed in service and higher sales volumes associated with the ramp-up of underground mining at PT-FI.
Metals Inventory Adjustments
Charges for metals inventory adjustments totaled $14 million in third-quarter 2021, $9 million in third-quarter 2020,
$15 million for the first nine months of 2021 and $92 million for the first nine months of 2020. Metals inventory
adjustments in the 2021 periods were primarily related to a leach stockpile adjustment. Metals inventory
adjustments in the 2020 periods were related to volatility in copper and molybdenum prices associated with the
COVID-19 pandemic.
Net (Gain) Loss on Sale of Assets
Net (gain) loss on sales of assets totaled $(60) million in third-quarter 2021, $2 million in third-quarter 2020, $(63)
million for the first nine months of 2021 and $13 million for the first nine months of 2020. The gain on sales of assets
in the 2021 periods primarily reflects the sale of Freeport Cobalt. Refer to Note 1 for further discussion.
Interest Expense, Net
Consolidated interest costs (before capitalization) totaled $157 million in third-quarter 2021, $160 million in third-
quarter 2020, $482 million for the first nine months of 2021 and $490 million for the first nine months of 2020.
Capitalized interest varies with the level of qualifying assets associated with our development projects and average
interest rates on our borrowings, and totaled $19 million in third-quarter 2021, $40 million in third-quarter 2020, $51
million for the first nine months of 2021 and $128 million for the first nine months of 2020. The decrease in
capitalized interest in the 2021 periods, compared with the 2020 periods, is primarily related to significant assets at
PT-FI’s underground mines being placed in service. Refer to “Capital Resources and Liquidity - Investing Activities”
for discussion of capital expenditures associated with our major development projects.
Table of Contents
36

-- 36 of 75 --

Income Taxes
Following is a summary of the approximate amounts used in the calculation of our consolidated income tax
provision (in millions, except percentages):
Nine Months Ended September 30,
2021 2020
Income
(Loss)a Effective
Tax Rate
Income Tax
(Provision)
Benefit Income
(Loss)a Effective
Tax Rate
Income Tax
(Provision)
Benefit
U.S.b $ 1,324 1 % $ (7) c $ (535) 10 % $ 56 d
South America 1,425 40 % (576) 149 51 % (76)
Indonesia 2,940 37 % (1,101) e 619 49 % (302) f
Eliminations and other (3) N/A 19 95 N/A (28)
Rate adjustmentg — N/A (9) — N/A 17
Consolidated FCX $ 5,686 29 % h $ (1,674) $ 328 102 % h,i $ (333)
a. Represents income (loss) before income taxes and equity in affiliated companies’ net (losses) earnings.
b. In addition to our North America mining operations, the U.S. jurisdiction reflects corporate-level expenses, which include
interest expense associated with senior notes, general and administrative expenses, and environmental obligations and
shutdown costs.
c. Includes valuation allowance release on prior year unbenefited net operating losses (NOLs).
d. Includes tax credits of $53 million associated with the reversal of a year-end 2019 tax charge related to the sale of our
interest in the lower zone of the Timok exploration project in Serbia and $6 million associated with the removal of a valuation
allowance on deferred tax assets.
e. Includes net tax benefits totaling $83 million ($66 million net of noncontrolling interest), consisting of $69 million associated
with the release of a portion of the valuation allowances recorded against PT Rio Tinto Indonesia (PT-FI’s wholly owned
subsidiary) NOLs and $24 million primarily associated with the reversal of a tax reserve related to the treatment of prior year
contractor support costs; partly offset by a tax charge of $10 million associated with the audit of PT-FI's 2019 tax returns.
f. Includes tax charges totaling $29 million ($24 million net of noncontrolling interest), consisting of $21 million associated with
establishing a tax reserve related to the treatment of prior year contractor support costs and $8 million associated with an
unfavorable 2012 Indonesia Supreme Court ruling.
g. In accordance with applicable accounting rules, we adjust our interim provision for income taxes equal to our consolidated
tax rate.
h. Our consolidated effective income tax rate is a function of the combined effective tax rates for the jurisdictions in which we
operate.
i. Our U.S. jurisdiction generated net losses in the first nine months of 2020 that did not result in a realized tax benefit;
applicable accounting rules required us to adjust our estimated annual effective tax rate to exclude the impact of U.S. net
losses.
Assuming achievement of current sales volume and cost estimates and average fourth-quarter 2021 prices of $4.50
per pound for copper, $1,800 per ounce for gold and $19.00 per pound for molybdenum, we estimate our
consolidated effective tax rate for the year 2021 would approximate 30 percent. Changes in projected sales
volumes and average prices during 2021 would incur tax impacts at estimated effective rates of 40 percent for Peru,
38 percent for Indonesia and 0 percent for the U.S.
The net 0 percent U.S. estimated effective tax rate for the year 2021 includes approximately $190 million of
valuation allowance reversal related to an expected $900 million use of U.S. federal NOLs during 2021.
Table of Contents
37

-- 37 of 75 --

OPERATIONS
Responsible Production
2020 Climate Report. In September 2021, we published our updated Climate Report, which details the work
underway across our global business to reduce GHG emissions, improve energy efficiency, advance the use of
renewable energy and enhance our resilience to future climate-related risks. The updated Climate Report reflects
our continued progress towards alignment with the current recommendations of the Task Force on Climate-related
Financial Disclosures.
The Copper Mark. We are committed to validating all of our copper producing sites with the Copper Mark. The
Copper Mark is a robust assurance framework that demonstrates the copper industry's responsible production
practices and contribution to the United Nations Sustainable Development Goals. Participating sites must complete
an external assurance process to assess conformance with the Copper Mark’s 32 environmental, social and
governance requirements, with a goal of being awarded the Copper Mark. We have six sites which have been
certified, with five additional sites in progress.
North America Copper Mines
We operate seven open-pit copper mines in North America – Morenci, Bagdad, Safford (including Lone Star),
Sierrita and Miami in Arizona, and Chino and Tyrone in New Mexico. In addition to copper, certain of these mines
produce molybdenum concentrate, gold and silver. All of the North America mining operations are wholly owned,
except for Morenci. We record our 72 percent undivided joint venture interest in Morenci using the proportionate
consolidation method.
The North America copper mines include open-pit mining, sulfide ore concentrating, leaching and solution
extraction/electrowinning (SX/EW) operations. A majority of the copper produced at our North America copper mines
is cast into copper rod by our Rod & Refining segment. The remainder of our North America copper production is
sold as copper cathode or copper concentrate, a portion of which is shipped to Atlantic Copper (our wholly owned
smelter). Molybdenum concentrate, gold and silver are also produced by certain of our North America copper mines.
Operating and Development Activities. Our North America operating sites continue to achieve strong execution of
operating plans. Current operations at the Lone Star copper leach project, which was completed in the second half
of 2020, are exceeding the initial design capacity of 200 million pounds annually by approximately 25 percent. We
continue to advance opportunities to increase Lone Star operating rates and are evaluating a potential additional
incremental oxide expansion to increase volumes to over 300 million pounds of copper per year. The oxide project
advances the opportunity for development of the large-scale sulfide resources at Lone Star. We are increasing
exploration in the area to support metallurgical testing and mine development planning for a potential long-term
investment in a concentrator.
We have substantial resources in North America, primarily associated with existing mining operations. Evaluations
of project options for future growth are being advanced. In addition to Lone Star, we are reviewing and actively
evaluating an additional concentrator to add new capacity at our long-lived Bagdad operation, and are utilizing data
analytics and testing new applications to recover additional copper from existing leach stockpiles.
Table of Contents
38

-- 38 of 75 --

Operating Data. Following is summary consolidated operating data for the North America copper mines:
Three Months Ended
September 30, Nine Months Ended
September 30,
2021 2020 2021 2020
Operating Data, Net of Joint Venture Interests
Copper (millions of recoverable pounds)
Production 377 369 1,090 1,083
Sales, excluding purchases 375 379 1,072 1,102
Average realized price per pound $ 4.34 $ 3.01 $ 4.24 $ 2.67
Molybdenum (millions of recoverable pounds)
Productiona 9 7 26 24
100% Operating Data
Leach operations
Leach ore placed in stockpiles (metric tons per day) 579,100 692,000 656,900 708,100
Average copper ore grade (percent) 0.30 0.26 0.29 0.27
Copper production (millions of recoverable pounds) 270 286 797 786
Mill operations
Ore milled (metric tons per day) 274,300 255,200 269,000 291,500
Average ore grade (percent):
Copper 0.39 0.36 0.38 0.35
Molybdenum 0.03 0.03 0.03 0.02
Copper recovery rate (percent) 81.6 84.4 80.9 85.4
Copper production (millions of recoverable pounds) 170 155 476 509
a. Refer to “Consolidated Results” for our consolidated molybdenum sales volumes, which include sales of molybdenum
produced at the North America copper mines.
Our consolidated copper sales volumes from North America totaled 375 million pounds in third-quarter 2021, 379
million pounds in third-quarter 2020, and 1.1 billion pounds for both the first nine months of 2021 and 2020. North
America copper sales are estimated to approximate 1.46 billion pounds for the year 2021, compared with 1.4 billion
pounds for the year 2020.
Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with
information about the cash-generating capacity of our mining operations expressed on a basis relating to the
primary metal product for our respective operations. We use this measure for the same purpose and for monitoring
operating performance by our mining operations. This information differs from measures of performance determined
in accordance with U.S. generally accepted accounting principles (GAAP) and should not be considered in isolation
or as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is
presented by other metals mining companies, although our measure may not be comparable to similarly titled
measures reported by other companies.
Table of Contents
39

-- 39 of 75 --

Gross Profit per Pound of Copper and Molybdenum
The following table summarizes unit net cash costs and gross profit per pound at our North America copper mines.
Refer to “Product Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods
and a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in
our consolidated financial statements.
Three Months Ended September 30,
2021 2020
By-
Product
Method
Co-Product Method By-
Product
Method
Co-Product Method
Copper Molyb-
denuma Copper Molyb-
denuma
Revenues, excluding adjustments $ 4.34 $ 4.34 $ 16.69 $ 3.01 $ 3.01 $ 7.72
Site production and delivery, before net noncash
and other costs shown below 2.12 1.93 8.97 1.76 1.67 5.52
By-product credits (0.39) — — (0.18) — —
Treatment charges 0.09 0.09 — 0.09 0.08 —
Unit net cash costs 1.82 2.02 8.97 1.67 1.75 5.52
DD&A 0.25 0.23 0.73 0.24 0.23 0.43
Metals inventory adjustments 0.03 0.03 — (0.01) (0.01) —
Noncash and other costs, net 0.08 0.08 0.23 0.10 b 0.09 0.06
Total unit costs 2.18 2.36 9.93 2.00 2.06 6.01
Revenue adjustments, primarily for pricing
on prior period open sales (0.02) (0.02) — — — —
Gross profit per pound $ 2.14 $ 1.96 $ 6.76 $ 1.01 $ 0.95 $ 1.71
Copper sales (millions of recoverable pounds) 375 375 378 378
Molybdenum sales (millions of recoverable pounds)a 9 7
Nine months ended September 30,
2021 2020
By-
Product
Method
Co-Product Method By-
Product
Method
Co-Product Method
Copper Molyb-
denuma Copper Molyb-
denuma
Revenues, excluding adjustments $ 4.24 $ 4.24 $ 13.09 $ 2.67 $ 2.67 $ 8.57
Site production and delivery, before net noncash
and other costs shown below 2.11 1.95 7.54 1.91 1.78 7.05
By-product credits (0.32) — — (0.19) — —
Treatment charges 0.09 0.09 — 0.10 0.10 —
Unit net cash costs 1.88 2.04 7.54 1.82 1.88 7.05
DD&A 0.26 0.24 0.59 0.25 0.23 0.57
Metals inventory adjustments 0.01 0.01 — 0.05 0.04 —
Noncash and other costs, net 0.10 0.09 0.12 0.10 b 0.10 0.12
Total unit costs 2.25 2.38 8.25 2.22 2.25 7.74
Revenue adjustments, primarily for pricing
on prior period open sales 0.01 0.01 — (0.01) (0.01) —
Gross profit per pound $ 2.00 $ 1.87 $ 4.84 $ 0.44 $ 0.41 $ 0.83
Copper sales (millions of recoverable pounds) 1,072 1,072 1,100 1,100
Molybdenum sales (millions of recoverable pounds)a 26 24
a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at
market-based pricing.
b. Includes charges totaling $0.03 per pound of copper for both third-quarter 2020 and the first nine months of 2020, primarily
associated with the April 2020 revised operating plans (including employee separation costs) and the COVID-19 pandemic.
Our North America copper mines have varying cost structures because of differences in ore grades and
characteristics, processing costs, by-product credits and other factors. Average unit net cash costs (net of by-
product credits) for the North America copper mines of $1.82 per pound of copper in third-quarter 2021 and $1.88
per pound of copper for first nine months of 2021 were higher than unit net cash costs of $1.67 per pound in third-
quarter 2020 and $1.82 per pound for the first nine months of 2020, primarily reflecting higher mining and milling
costs associated with the return to pre-COVID-19 operating rates and higher maintenance and input costs, partly
offset by higher by-product credits and lower leach unit production costs associated with higher recoveries.
Table of Contents
40

-- 40 of 75 --

Because certain assets are depreciated on a straight-line basis, North America’s average unit depreciation rate may
vary with asset additions and the level of copper production and sales.
Average unit net cash costs (net of by-product credits) for our North America copper mines are expected to
approximate $1.85 per pound of copper for the year 2021, based on achievement of current sales volume and cost
estimates and assuming an average molybdenum price of $19.00 per pound in fourth-quarter 2021. North America’s
average unit net cash costs for the year 2021 would change by approximately $0.01 per pound for each $2 per
pound change in the average price of molybdenum in fourth-quarter 2021.
South America Mining
We operate two copper mines in South America – Cerro Verde in Peru (in which we own a 53.56 percent interest)
and El Abra in Chile (in which we own a 51 percent interest), which are consolidated in our financial statements.
South America mining includes open-pit mining, sulfide ore concentrating, leaching and SX/EW operations.
Production from our South America mines is sold as copper concentrate or cathode under long-term contracts. Our
South America mines also sell a portion of their copper concentrate production to Atlantic Copper. In addition to
copper, the Cerro Verde mine produces molybdenum concentrate and silver.
Cerro Verde Labor Agreement. Cerro Verde's collective labor agreement (CLA) expired on August 31, 2021, and as
of September 30, 2021, approximately 65 percent of its hourly employees have signed new CLAs. Cerro Verde
incurred nonrecurring charges for the first nine months of 2021 totaling $74 million associated with these
agreements. Negotiations for new CLAs for Cerro Verde's remaining hourly employees are ongoing and may result
in additional charges.
Operating and Development Activities. Milling rates at Cerro Verde's concentrator facilities averaged 381,500 metric
tons of ore per day for the first nine months of 2021. Subject to ongoing monitoring of COVID-19 protocols, Cerro
Verde is targeting milling rates to average approximately 400,000 metric tons of ore per day in 2022.
El Abra is increasing operating rates to pre-COVID-19 pandemic levels. Stacking rates at El Abra averaged 93,100
metric tons per day in third-quarter 2021, approximately 25 percent higher than third-quarter 2020. Increased
stacking rates are expected to result in incremental annual production of approximately 70 million pounds of copper
beginning in mid-2022, compared with 2020 levels. A new leach pad is under construction to accommodate planned
stacking rates for the next several years.
We continue to evaluate a large-scale expansion at El Abra to process additional sulfide material and to achieve
higher copper recoveries. El Abra's large sulfide resource could potentially support a major mill project similar to
facilities constructed at Cerro Verde in 2015. Technical and economic studies continue to be evaluated to determine
the optimal scope and timing for the sulfide project, and we are engaging stakeholders and preparing data required
for submission of a robust permit application. We are monitoring potential changes in government regulatory and
fiscal matters in Chile and will defer major investment decisions pending clarity on these matters.
Table of Contents
41

-- 41 of 75 --

Operating Data. Following is summary consolidated operating data for South America mining:
Three Months Ended
September 30, Nine months ended
September 30,
2021 2020 2021 2020
Copper (millions of recoverable pounds)
Production 260 253 764 716
Sales 280 250 769 716
Average realized price per pound $ 4.12 $ 3.02 $ 4.21 $ 2.79
Molybdenum (millions of recoverable pounds)
Productiona 5 6 14 14
Leach operations
Leach ore placed in stockpiles (metric tons per day) 171,600 172,400 171,900 165,600
Average copper ore grade (percent) 0.30 0.35 0.33 0.35
Copper production (millions of recoverable pounds) 62 55 188 180
Mill operations
Ore milled (metric tons per day) 380,300 351,000 381,500 317,600 b
Average ore grade (percent):
Copper 0.31 0.33 0.30 0.35
Molybdenum 0.01 0.01 0.01 0.01
Copper recovery rate (percent) 86.1 88.4 86.3 83.5
Copper production (millions of recoverable pounds) 199 198 576 536
a. Refer to “Consolidated Results” for our consolidated molybdenum sales volumes, which include sales of molybdenum
produced at Cerro Verde.
b. Cerro Verde mill operations were negatively impacted by COVID-19 restrictions.
Our consolidated copper sales volumes from South America totaled 280 million pounds in third-quarter 2021, 250
million pounds in third-quarter 2020, 769 million pounds for the first nine months of 2021 and 716 million pounds for
the first nine months of 2020. Higher copper sales volumes in third-quarter 2021, compared with third-quarter 2020,
primarily reflect timing of shipments. Higher copper sales volumes for the first nine months of 2021, compared with
the first nine months of 2020, primarily reflect continued progress to return to pre-COVID-19 operating rates.
Copper sales from South America mining are expected to approximate 1.0 billion pounds for the year 2021, slightly
higher than the year 2020.
Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with
information about the cash-generating capacity of our mining operations expressed on a basis relating to the
primary metal product for our respective operations. We use this measure for the same purpose and for monitoring
operating performance by our mining operations. This information differs from measures of performance determined
in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of
performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining
companies, although our measure may not be comparable to similarly titled measures reported by other companies.
Gross Profit per Pound of Copper
The following table summarizes unit net cash costs and gross profit per pound of copper at our South America
mining operations. Unit net cash costs per pound of copper are reflected under the by-product and co-product
methods as the South America mining operations also had sales of molybdenum and silver. Refer to “Product
Revenues and Production Costs” for an explanation of the “by-product” and “co-product” methods and a
reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in our
consolidated financial statements.
Table of Contents
42

-- 42 of 75 --

Three Months Ended September 30,
2021 2020
By-Product
Method Co-Product
Method By-Product
Method Co-Product
Method
Revenues, excluding adjustments $ 4.12 $ 4.12 $ 3.02 $ 3.02
Site production and delivery, before net noncash and
other costs shown below 2.14 a 1.96 1.84 1.73
By-product credits (0.38) — (0.17) —
Treatment charges 0.13 0.13 0.15 0.15
Royalty on metals 0.01 0.01 0.01 0.01
Unit net cash costs 1.90 2.10 1.83 1.89
DD&A 0.40 0.36 0.42 0.39
Noncash and other costs, net 0.07 0.06 0.04 b 0.04
Total unit costs 2.37 2.52 2.29 2.32
Revenue adjustments, primarily for pricing on prior
period open sales (0.03) (0.03) 0.16 0.16
Gross profit per pound $ 1.72 $ 1.57 $ 0.89 $ 0.86
Copper sales (millions of recoverable pounds) 280 280 250 250
Nine months ended September 30,
2021 2020
By-Product
Method Co-Product
Method By-Product
Method Co-Product
Method
Revenues, excluding adjustments $ 4.21 $ 4.21 $ 2.79 $ 2.79
Site production and delivery, before net noncash and
other costs shown below 2.20 a 2.04 1.83 1.72
By-product credits (0.31) — (0.15) —
Treatment charges 0.13 0.13 0.15 0.15
Royalty on metals 0.01 0.01 0.01 0.01
Unit net cash costs 2.03 2.18 1.84 1.88
DD&A 0.40 0.36 0.44 0.41
Noncash and other costs, net 0.07 0.06 0.16 b 0.15
Total unit costs 2.50 2.60 2.44 2.44
Revenue adjustments, primarily for pricing on prior
period open sales 0.13 0.13 (0.10) (0.10)
Gross profit per pound $ 1.84 $ 1.74 $ 0.25 $ 0.25
Copper sales (millions of recoverable pounds) 769 769 716 716
a. Includes $0.02 per pound of copper in third-quarter 2021 and $0.10 per pound of copper for the first nine months of 2021
associated with nonrecurring labor-related charges at Cerro Verde for agreements reached with approximately 65 percent of
its hourly employees.
b. Third-quarter 2020 includes charges totaling $0.02 per pound of copper, primarily associated with the COVID-19 pandemic
(including health and safety costs). The first nine months of 2020 includes charges totaling $0.13 per pound of copper,
primarily associated with idle facility (Cerro Verde) and contract cancellation costs related to the COVID-19 pandemic, and
employee separation costs associated with the April 2020 revised operating plans.
Our South America mines have varying cost structures because of differences in ore grades and characteristics,
processing costs, by-product credits and other factors. Average unit net cash costs (net of by-product credits) for the
South America copper mines were $1.90 per pound of copper in third-quarter 2021, $1.83 per pound of copper in
third-quarter 2020, $2.03 per pound of copper for the first nine months of 2021 and $1.84 per pound of copper for
the first nine months of 2020. Higher unit net cash costs in the 2021 periods, compared with the 2020 periods,
primarily reflect increased milling activities, profit-sharing costs and higher maintenance and input costs, partly
offset by higher sales volumes and by-product credits. The first nine months of 2021 also included nonrecurring
labor-related charges at Cerro Verde ($0.10 per pound of copper) for new CLAs as discussed above.
Table of Contents
43

-- 43 of 75 --

Revenues from Cerro Verde’s concentrate sales are recorded net of treatment charges, which will vary with Cerro
Verde’s sales volumes and the price of copper.
Because certain assets are depreciated on a straight-line basis, South America’s unit depreciation rate may vary
with asset additions and the level of copper production and sales.
Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in
prior periods. Refer to “Consolidated Results – Revenues” for further discussion of adjustments to prior period
provisionally priced copper sales.
Average unit net cash costs (net of by-product credits) for South America mining are expected to approximate $2.04
per pound of copper for the year 2021, based on current sales volume and cost estimates and assuming an
average price of $19.00 per pound of molybdenum in fourth-quarter 2021.
Indonesia Mining
PT-FI operates one of the world’s largest copper and gold mines at the Grasberg minerals district in Papua,
Indonesia. PT-FI produces copper concentrate that contains significant quantities of gold and silver. We have a
48.76 percent interest in PT-FI and manage its mining operations. As further discussed in Note 2 of our 2020 Form
10-K, under the terms of the shareholders agreement, our economic interest in PT-FI approximates 81 percent
through 2022. PT-FI’s results are consolidated in our financial statements.
PT-FI continues to operate with heightened protocols and travel restrictions designed to protect the health and
safety of its workforce and the surrounding community during the COVID-19 pandemic. These measures have
proven effective and have enabled PT-FI to operate reliably throughout the pandemic.
Substantially all of PT-FI’s copper concentrate is sold under long-term contracts. During the first nine months of
2021, 44 percent of PT-FI’s concentrate production was sold to PT Smelting (PT-FI’s 39.5-percent owned copper
smelter and refinery in Gresik, Indonesia).
Operating and Development Activities. The ramp-up of underground production at the Grasberg minerals district in
Indonesia continues to advance on schedule. Third-quarter 2021 highlights include:
• Production approximated 90 percent of the projected ultimate annualized level and is expected to reach 100
percent by year-end 2021.
• A total of 27 new drawbells were constructed at the Grasberg Block Cave and Deep Mill Level Zone (DMLZ)
underground mines, bringing cumulative open drawbells to 490.
• Combined average production from the Grasberg Block Cave and DMLZ underground mines approximated
136,200 metric tons of ore per day and PT-FI's milling rates averaged 157,400 metric tons of ore per day.
PT-FI’s milling rates averaged over 177,000 metric tons of ore per day for the month of September 2021. PT-FI
expects milling rates to average approximately 175,000 metric tons of ore per day in fourth-quarter 2021 and to
continue at that rate until additional milling facilities are installed as currently planned in 2023, which PT-FI expects
will result in mill capacity of approximately 240,000 metric tons of ore per day.
PT-FI expects to generate average annual production of 1.55 billion pounds of copper and 1.6 million ounces of gold
for the next several years at an attractive unit net cash cost, providing significant margins and cash flows. For the
year 2021, PT-FI production is expected to approximate 1.3 billion pounds of copper and 1.3 million ounces of gold,
nearly double 2020 levels.
PT-FI's estimated annual capital spending on underground mine development projects is expected to average
approximately $0.9 billion per year for 2021 and 2022, net of scheduled contributions from PT Inalum. In
accordance with applicable accounting guidance, aggregate costs (before scheduled contributions from PT Inalum),
which are expected to average $1.1 billion per year for 2021 and 2022, will be reflected as an investing activity in
our cash flow statement, and contributions from PT Inalum will be reflected as a financing activity.
Table of Contents
44

-- 44 of 75 --

Kucing Liar. PT-FI is planning to commence long-term mine development activities for its Kucing Liar deposit to
produce approximately 6 billion pounds of copper and 6 million ounces of gold over the life of the project. Refer to
our 2020 Form 10-K for further discussion of Kucing Liar. Similar to PT-FI's experience with large-scale, block-cave
mines, pre-production development activities will occur over an approximate 10-year timeframe. At full operating
rates, annual production from Kucing Liar is expected to exceed 500 million pounds of copper and 500,000 ounces
of gold, providing PT-FI with sustained long-term, large-scale and low-cost production. Capital investments for
Kucing Liar over the next 10 years are expected to average approximately $400 million per year. Kucing Liar will
benefit from substantial shared infrastructure and PT-FI's experience and long-term success in block-cave mining.
Indonesia Smelter. As discussed in Note 13 of our 2020 Form 10-K, PT-FI committed to construct additional
domestic smelting capacity totaling 2 million metric tons of concentrate per year. During 2020, PT-FI notified the
Indonesia government of schedule delays for construction of the greenfield smelter resulting from the COVID-19
pandemic and continues to review with the government a revised schedule for the project.
To fulfill its obligation for additional domestic smelter capacity in Indonesia, PT-FI is planning the following:
• Construction of a new greenfield smelter in Gresik, Indonesia with a capacity to process approximately 1.7
million metric tons of concentrate per year. In July 2021, PT-FI awarded a construction contract to Chiyoda
with an estimated cost of $2.8 billion. The smelter construction is expected to be completed as soon as
feasible in 2024, which is subject to, among other things, pandemic-related disruptions.
• Expansion of annual capacity at PT Smelting by 300,000 metric tons of concentrate, a 30 percent increase.
PT-FI is advancing agreements with the majority owner of PT Smelting to implement the expansion plans
with a target completion date of year-end 2023. PT-FI would fund the cost of the expansion, estimated to
approximate $250 million, and increase its ownership in PT Smelting to a majority ownership interest.
• Construction of a PMR to process gold and silver from the new greenfield smelter and PT Smelting at an
estimated cost of $250 million.
All costs of smelter development in Indonesia will be shared 49 percent by FCX and 51 percent by PT Inalum, and
will be largely offset by a phase-out of the 5 percent export duty currently paid to the Indonesia government as well
as the tax deductibility of smelter costs by PT-FI.
In July 2021, PT-FI entered into a $1.0 billion, five-year, unsecured bank credit facility to advance these projects. As
of September 30, 2021, $158 million ($146 million net of debt issuance costs) was drawn under this facility.
Additional debt financing is being evaluated to fund the projects. Refer to Note 5 and “Capital Resources and
Liquidity” for further discussion of the credit facility. Capital expenditures for the Indonesia smelter project totaled
$0.1 billion for the first nine months of 2021, and are expected to approximate $0.3 billion for the year 2021.
Table of Contents
45

-- 45 of 75 --

Operating Data. Following is summary consolidated operating data for Indonesia mining:
Three Months Ended
September 30, Nine months ended
September 30,
2021 2020 2021 2020
Copper (millions of recoverable pounds)
Production 350 222 956 543
Sales 378 219 946 518
Average realized price per pound $ 4.11 $ 3.00 $ 4.21 $ 2.79
Gold (thousands of recoverable ounces)
Production 371 236 968 577
Sales 399 230 957 549
Average realized price per ounce $ 1,757 $ 1,902 $ 1,780 $ 1,810
Ore extracted and milled (metric tons per day):
Grasberg Block Cave underground minea 76,500 30,800 64,300 25,700
DMLZ underground minea 59,700 29,100 53,500 25,100
Deep Ore Zone underground mineb 2,700 20,700 10,600 20,900
Big Gossan underground mine 7,400 7,100 7,500 6,600
Other 11,100 (400) 5,700 2,200
Total 157,400 87,300 141,600 80,500
Average ore grades:
Copper (percent) 1.30 1.45 1.32 1.30
Gold (grams per metric ton) 1.05 1.20 1.04 1.08
Recovery rates (percent):
Copper 90.1 92.3 90.0 92.0
Gold 78.6 79.3 77.8 78.2
a. Includes ore from development activities that result in metal production.
b. Expected to cease production by December 31, 2021.
Our consolidated copper and gold sales from PT-FI totaled 378 million pounds and 399 thousand ounces in third-
quarter 2021 and 946 million pounds and 957 thousand ounces for the first nine months of 2021, compared with
copper and gold sales of 219 million pounds and 230 thousand ounces in third-quarter 2020 and 518 million pounds
and 549 thousand ounces for the first nine months of 2020. The increase in sales volumes for the 2021 periods
primarily reflects the ramp-up of underground mining at PT-FI and the timing of shipments.
Consolidated sales volumes from PT-FI are expected to approximate 1.3 billion pounds of copper and 1.3 million
ounces of gold for the year 2021, compared with 0.8 billion pounds of copper and 0.8 million ounces of gold for the
year 2020.
Unit Net Cash Costs. Unit net cash costs per pound of copper is a measure intended to provide investors with
information about the cash-generating capacity of our mining operations expressed on a basis relating to the
primary metal product for our respective operations. We use this measure for the same purpose and for monitoring
operating performance by our mining operations. This information differs from measures of performance determined
in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of
performance determined in accordance with U.S. GAAP. This measure is presented by other metals mining
companies, although our measure may not be comparable to similarly titled measures reported by other companies.
Table of Contents
46

-- 46 of 75 --

Gross Profit per Pound of Copper and per Ounce of Gold
The following table summarizes the unit net cash costs and gross profit per pound of copper and per ounce of gold
at our Indonesia mining operations. Refer to “Product Revenues and Production Costs” for an explanation of “by-
product” and “co-product” methods and a reconciliation of unit net cash costs per pound to production and delivery
costs applicable to sales reported in our consolidated financial statements.
Three Months Ended September 30,
2021 2020
By-
Product
Method
Co-Product Method By-
Product
Method
Co-Product Method
Copper Gold Copper Gold
Revenues, excluding adjustments $ 4.11 $ 4.11 $ 1,757 $ 3.00 $ 3.00 $ 1,902
Site production and delivery, before net noncash
and other costs shown below 1.46 0.99 424 1.71 1.01 639
Gold and silver credits (1.97) — — (2.16) — —
Treatment charges 0.24 0.16 69 0.26 0.16 98
Export duties 0.19 0.13 54 0.11 0.06 40
Royalty on metals 0.25 0.18 63 0.21 0.12 79
Unit net cash costs 0.17 1.46 610 0.13 1.35 856
DD&A 0.74 0.50 215 0.68 0.40 256
Noncash and other costs, net — — — 0.11 a 0.06 40
Total unit costs 0.91 1.96 825 0.92 1.81 1,152
Revenue adjustments, primarily for pricing on prior period
open sales — — 16 0.13 0.13 49
PT Smelting intercompany loss (0.04) (0.03) (12) (0.08) (0.05) (31)
Gross profit per pound/ounce $ 3.16 $ 2.12 $ 936 $ 2.13 $ 1.27 $ 768
Copper sales (millions of recoverable pounds) 378 378 219 219
Gold sales (thousands of recoverable ounces) 399 230
Nine Months Ended September 30,
2021 2020
By-
Product
Method
Co-Product Method By-
Product
Method
Co-Product Method
Copper Gold Copper Gold
Revenues, excluding adjustments $ 4.21 $ 4.21 $ 1,780 $ 2.79 $ 2.79 $ 1,810
Site production and delivery, before net noncash
and other costs shown below 1.49 1.03 434 2.05 1.19 773
Gold and silver credits (1.91) — — (2.02) — —
Treatment charges 0.24 0.17 70 0.28 0.16 104
Export duties 0.15 0.10 45 0.08 0.05 31
Royalty on metals 0.26 0.18 66 0.18 0.10 68
Unit net cash costs 0.23 1.48 615 0.57 1.50 976
DD&A 0.76 0.52 222 0.72 0.42 273
Noncash and other costs, net 0.01 b 0.01 1 0.11 a 0.07 41
Total unit costs 1.00 2.01 838 1.40 1.99 1,290
Revenue adjustments, primarily for pricing on prior period
open sales 0.08 0.08 (5) (0.03) (0.03) 8
PT Smelting intercompany loss (0.11) (0.08) (33) (0.04) (0.02) (13)
Gross profit per pound/ounce $ 3.18 $ 2.20 $ 904 $ 1.32 $ 0.75 $ 515
Copper sales (millions of recoverable pounds) 946 946 518 518
Gold sales (thousands of recoverable ounces) 957 549
a. Includes COVID-19 related costs (including one-time incremental employee benefits and health and safety costs) totaling
$0.05 per pound of copper in third-quarter 2020 and $0.03 per pound of copper for the first nine months of 2020.
b. Includes credits of $0.03 per pound of copper associated with adjustments to prior year treatment and refining charges and
charges of $0.02 per pound of copper associated with a potential settlement of an administrative fine levied by the Indonesia
government.
Table of Contents
47

-- 47 of 75 --

Because of the fixed nature of a large portion of PT-FI's costs, unit net cash costs depend on copper and gold
volumes. PT-FI’s unit net cash costs (net of gold and silver credits) of $0.17 per pound of copper in third-quarter
2021 were higher than $0.13 per pound in third-quarter, primarily reflecting lower by-product credits and higher
export duties and royalties associated with higher copper prices, partly offset by higher volumes. PT-FI’s unit net
cash costs (net of gold and silver credits) of $0.23 per pound for the first nine months of 2021, were lower than
$0.57 per pound for the first nine months of 2020, primarily reflecting higher sales volumes, partly offset by higher
mining costs associated with the ramp-up of underground mining and higher export duties and royalties.
Treatment charges vary with the volume of metals sold and the price of copper, and royalties vary with the volume
of metals sold and the prices of copper and gold.
PT-FI’s export duties totaled $71 million in third-quarter 2021, $24 million in third-quarter 2020, $145 million for the
first nine months of 2021 and $43 million for the first nine months of 2020. PT-FI will continue to pay export duties
until development progress for additional domestic smelting capacity of 2 million metric tons of concentrate per year
exceeds 50 percent. PT-FI’s royalties totaled $94 million in third-quarter 2021, $45 million in third-quarter 2020,
$234 million for the first nine months of 2021 and $92 million for the first nine months of 2020. The increase in
export duties and royalties for the 2021 periods, compared with the 2020 periods, primarily reflect higher sales
volumes and copper prices.
Because certain assets are depreciated on a straight-line basis, PT-FI’s unit depreciation rate may vary with asset
additions and the level of copper production and sales. DD&A per pound of copper under the by-product method
was $0.74 per pound in third-quarter 2021 and $0.76 per pound for the first nine months of 2021, compared with
$0.68 per pound in third-quarter 2020 and $0.72 per pound for the first nine months of 2020. The increase in the
rate per pound of copper for the 2021 periods, compared with the 2020 periods, primarily reflects the significant
underground development assets placed into service.
Revenue adjustments primarily result from changes in prices on provisionally priced copper sales recognized in
prior periods.
PT Smelting intercompany loss represents the change in the deferral of PT-FI’s profit on sales to PT Smelting (25
percent prior to April 30, 2021, and 39.5 percent thereafter). Refer to “Smelting and Refining” below for further
discussion.
Assuming an average gold price of $1,800 per ounce in fourth-quarter 2021 and achievement of current sales
volume and cost estimates, unit net cash costs (net of gold and silver credits) for PT-FI are expected to approximate
$0.22 per pound of copper for the year 2021. The impact of prices changes during fourth-quarter 2021 on PT-FI's
unit net cash costs for the year 2021 would approximate $0.04 per pound of copper for each $100 per ounce
change in the average price of gold.
PT-FI’s projected sales volumes and unit net cash costs for the year 2021 are dependent on a number of factors,
including continued progress of the ramp-up of underground mining, operational performance, timing of shipments
and other factors detailed in the “Cautionary Statement” below.
Molybdenum Mines
We operate two wholly owned molybdenum mines in Colorado – the Henderson underground mine and the Climax
open-pit mine. The Henderson and Climax mines produce high-purity, chemical-grade molybdenum concentrate,
which is typically further processed into value-added molybdenum chemical products. The majority of the
molybdenum concentrate produced at the Henderson and Climax mines, as well as from our North America and
South America copper mines, is processed at our own conversion facilities.
Operating and Development Activities. Production from the Molybdenum mines of 9 million pounds of molybdenum
in third-quarter 2021 and 23 million pounds for the first nine months of 2021, was higher than production of 6 million
pounds of molybdenum in third-quarter 2020 and 19 million pounds for the first nine months of 2020, primarily
reflecting higher milling rates at the Climax mine as it returns to pre-COVID-19 levels. FCX may increase rates at
the Climax mine if necessary to satisfy increasing requirements for molybdenum. Refer to “Consolidated Results”
for our consolidated molybdenum operating data, which includes sales of molybdenum produced at our
Molybdenum mines and from our North America and South America copper mines. Refer to “Outlook” for projected
consolidated molybdenum sales volumes.
Table of Contents
48

-- 48 of 75 --

Unit Net Cash Costs Per Pound of Molybdenum. Unit net cash costs per pound of molybdenum is a measure
intended to provide investors with information about the cash-generating capacity of our mining operations
expressed on a basis relating to the primary metal product for our respective operations. We use this measure for
the same purpose and for monitoring operating performance by our mining operations. This information differs from
measures of performance determined in accordance with U.S. GAAP and should not be considered in isolation or
as a substitute for measures of performance determined in accordance with U.S. GAAP. This measure is presented
by other metals mining companies, although our measure may not be comparable to similarly titled measures
reported by other companies.
Average unit net cash costs for our Molybdenum mines of $8.54 per pound of molybdenum for both the third quarter
and first nine months of 2021 were lower than average unit net cash costs of $9.72 per pound in third-quarter 2020
and $9.58 per pound for the first nine months of 2020, primarily reflecting higher volumes. Based on current sales
volume and cost estimates, average unit net cash costs for the Molybdenum mines are expected to approximate
$9.10 per pound of molybdenum for the year 2021.
Refer to “Product Revenues and Production Costs” for a reconciliation of unit net cash costs per pound to
production and delivery costs applicable to sales reported in our consolidated financial statements.
Smelting and Refining
We wholly own and operate a smelter in Arizona (Miami smelter), a refinery in Texas (El Paso refinery) and a
smelter and refinery in Spain (Atlantic Copper). PT-FI has a 39.5 percent ownership interest in PT Smelting.
Treatment charges for smelting and refining copper concentrate consist of a base rate per pound of copper and per
ounce of gold and are generally fixed. Treatment charges represent a cost to our mining operations and income to
Atlantic Copper and PT Smelting. Thus, higher treatment charges benefit our smelter operations and adversely
affect our mining operations. Our North America copper mines are less significantly affected by changes in
treatment charges because these operations are largely integrated with our Miami smelter and El Paso refinery.
Through this form of downstream integration, we are assured placement of a significant portion of our concentrate
production.
Our Miami smelter processes concentrate produced by our U.S. mines and also provides acid for copper leaching
operations. During the first nine months of 2021, we incurred charges totaling $87 million associated with a major
maintenance turnaround at our Miami smelter, which were higher than original estimates as a result of extended
downtime to address additional required maintenance work, the COVID-19 pandemic and weather events. The next
major maintenance turnaround is scheduled for the first half of 2024.
Atlantic Copper smelts and refines copper concentrate and markets refined copper and precious metals in slimes.
During the first nine months of 2021, Atlantic Copper’s concentrate purchases included 33 percent from our copper
mining operations and 67 percent from third parties.
PT-FI’s contract with PT Smelting provides for PT-FI to supply 100 percent of the copper concentrate requirements
(subject to a minimum or maximum treatment charge rate) necessary for PT Smelting to produce 205,000 metric
tons of copper annually on a priority basis. PT-FI may also sell copper concentrate to PT Smelting at market rates
for quantities in excess of 205,000 metric tons of copper annually. During the first nine months of 2021, PT-FI
supplied the substantial majority of PT Smelting’s concentrate requirements. In July 2021, PT Smelting received a
six-month extension of its anodes slimes export license, which currently expires December 30, 2021.
We defer recognizing profits on sales from our mining operations to Atlantic Copper and on PT-FI’s sales to PT
Smelting (on 25 percent through April 30, 2021, and on 39.5 percent thereafter) until final sales to third parties
occur. Changes in these deferrals attributable to variability in intercompany volumes resulted in net additions
(reductions) to operating income totaling $41 million ($48 million to net income attributable to common stock) in
third-quarter 2021, $(21) million ($(21) million to net income attributable to common stock) in third-quarter 2020,
$(144) million ($(97) million to net income attributable to common stock) for the first nine months of 2021 and $(27)
million ($(20) million to net loss attributable to common stock) for the first nine months of 2020. Our net deferred
profits on our inventories at Atlantic Copper and PT Smelting to be recognized in future periods’ net income
attributable to common stock totaled $156 million at September 30, 2021. Quarterly variations in ore grades, the
timing of intercompany shipments and changes in product prices will result in variability in our net deferred profits
and quarterly earnings. Based on current estimates, in fourth-quarter 2021, we do not expect a significant change in
our net deferred profits on intercompany copper sales but project a net deferral of profits on intercompany
molybdenum sales of approximately $40 million ($30 million to net income attributable to common stock).
Table of Contents
49

-- 49 of 75 --

CAPITAL RESOURCES AND LIQUIDITY
Our consolidated operating cash flows vary with sales volumes; prices realized from copper, gold and molybdenum
sales; production costs; income taxes; other working capital changes; and other factors.
We generated significant cash flows during the first nine months of 2021, reflecting strong operating and financial
performance. With a favorable market outlook and a focus on executing our operating plans, we expect further
increases in sales volumes and cash flows in 2022 and we believe we are well positioned to provide cash returns to
shareholders consistent with our financial policy.
We believe that we have a high-quality portfolio of long-lived copper assets positioned to generate long-term value.
The ramp-up of underground mining at PT-FI continues to be successful and is advancing on schedule, with
production rates expected to reach the projected ultimate annualized levels by year-end 2021. With the success of
the Grasberg Block Cave and DMLZ underground projects, PT-FI is planning to commence long-term mine
development activities for its Kucing Liar deposit. We are also evaluating organic growth opportunities for expansion
of certain of our operations in North America and South America, including at Bagdad, Lone Star and El Abra, the
timing of which will be dependent on, among other things, market conditions.
Based on current sales volume, cost and metal price estimates discussed in “Outlook”, our projected consolidated
operating cash flows of $7.5 billion for the year 2021 significantly exceed our expected consolidated capital
expenditures of $2.3 billion (which include $0.3 billion of capital expenditures for the Indonesia smelter project) and
other cash requirements for the year, including debt repayments, common stock dividends and noncontrolling
interest distributions. We believe that our cash generating capability and financial condition, together with availability
under our revolving credit facility, will be adequate to meet our operating, investing and financing needs.
Expenditures for the Indonesia smelter project are currently being funded by PT-FI’s new $1.0 billion unsecured
bank credit facility and additional debt financing for this project is being evaluated. Refer to “Outlook” for further
discussion of projected operating cash flows and capital expenditures for 2021 and to “Debt” below and Note 5 for
further discussion of PT-FI’s credit facility.
At September 30, 2021, we had $11.2 billion in liquidity, comprised of $7.7 billion in consolidated cash and $3.5
billion of availability under our revolving credit facility.
Financial Policy. In February 2021, our Board of Directors (Board) adopted a financial policy for the allocation of
cash flows aligned with our strategic objectives of maintaining a strong balance sheet and increasing cash returns to
shareholders while advancing opportunities for future growth. The policy includes a base dividend and a
performance-based payout framework whereby up to 50 percent of available cash flows generated after planned
capital spending and distributions to noncontrolling interests would be allocated to shareholder returns and the
balance to debt reduction and investments in value enhancing growth projects, subject to maintaining the net debt
target described below.
In February 2021, the Board reinstated a cash dividend on our common stock (base dividend) at an annual rate of
$0.30 per share, and on November 1, 2021, the Board approved (i) a new share repurchase program authorizing
repurchases of up to $3.0 billion of our common stock and (ii) a variable cash dividend on common stock for 2022 at
an annual rate of $0.30 per share. The combined annual rate of the base dividend and the variable dividend is
expected to total $0.60 per share. The Board intends to declare quarterly dividends for 2022 of $0.15 per share
(including the $0.075 variable component), with the initial quarterly dividend expected to be paid on February 1,
2022. Based on current shares outstanding totaling 1.47 billion, the total common stock dividend (base and
variable) for 2022 currently expected to be paid approximates $0.9 billion. Refer to “Cautionary Statement.”
Our performance-based payout framework is designed to maintain net debt at a level not to exceed the range of $3
billion to $4 billion (excluding project debt for additional smelting capacity in Indonesia). The Board will review the
structure and the amount of the performance-based payout framework at least annually.
Table of Contents
50

-- 50 of 75 --

Cash
Following is a summary of the U.S. and international components of consolidated cash and cash equivalents
available to the parent company, net of noncontrolling interests’ share, taxes and other costs at September 30, 2021
(in billions):
Cash at domestic companies $ 5.0
Cash at international operations 2.7
Total consolidated cash and cash equivalents 7.7
Noncontrolling interests’ share (0.9)
Cash, net of noncontrolling interests’ share 6.8
Withholding taxes (0.1)
Net cash available $ 6.7
Cash held at our international operations is generally used to support our foreign operations’ capital expenditures,
operating expenses, debt repayment, working capital and other tax payments, or other cash needs. Management
believes that sufficient liquidity is available in the U.S. from cash balances and availability from our revolving credit
facility. We have not elected to permanently reinvest earnings from our foreign subsidiaries, and we have recorded
deferred tax liabilities for foreign earnings that are available to be repatriated to the U.S. From time to time, our
foreign subsidiaries distribute earnings to the U.S. through dividends that are subject to applicable withholding taxes
and noncontrolling interests’ share.
Debt
At September 30, 2021, our consolidated debt totaled $9.7 billion, with a weighted-average interest rate of 4.6
percent. We had no borrowings outstanding and $8 million in letters of credit issued under our revolving credit
facility, resulting in availability of approximately $3.5 billion.
In September 2021, Cerro Verde elected to prepay $200 million on its term loan, reducing the outstanding balance
to $325 million, which matures in June 2022.
In July 2021, PT-FI entered into a $1.0 billion, five-year, unsecured bank credit facility (consisting of a $667 million
term loan and a $333 million revolving credit facility). Amounts may be drawn under the term loan within the first
three years, and then the loan amortizes in four installments. The revolving credit facility is available for drawings
until June 2026. The facility matures in July 2026 and amounts drawn bear interest at the London Interbank Offered
Rate plus a margin of 1.875% or 2.125%, as defined by the agreement. As of September 30, 2021, $158 million
($146 million net of debt issuance costs) was drawn under the PT-FI Term Loan and no amounts were drawn under
the revolving credit facility.
On October 21, 2021, we called for redemption on December 1, 2021, all of our outstanding $524 million principal
amount of our 3.55% Senior Notes due 2022. We have no other senior note maturities until March 2023.
Refer to Note 5 for further discussion of the above items, and refer to Note 8 of our 2020 Form 10-K for additional
information regarding our debt arrangements.
Operating Activities
We reported consolidated cash provided by operating activities of $5.4 billion (including $0.4 billion of working
capital and other sources) for the first nine months of 2021 and $1.7 billion (including $0.3 billion from working
capital and other sources) for the first nine months of 2020. Higher operating cash flows for the first nine months of
2021, compared with the first nine months of 2020, primarily reflect higher copper prices and copper and gold sales
volumes.
In third-quarter 2021, Cerro Verde paid the balance of its royalty dispute liabilities (payments totaled $356 million in
third-quarter 2021 and $421 million for the first nine months of 2021). Refer to Note 8 for further discussion.
Table of Contents
51

-- 51 of 75 --

Investing Activities
Capital Expenditures. Capital expenditures, including capitalized interest, totaled $1.3 billion for the first nine months
of 2021, including approximately $0.9 billion for major mining projects primarily associated with underground
development activities in the Grasberg minerals district and $0.1 billion for the Indonesia smelter project. Capital
expenditures for the Indonesia smelter project are currently being funded by PT-FI's $1.0 billion unsecured bank
credit facility and additional debt financing for this project is being evaluated. Refer to “Outlook” for further
discussion of projected capital expenditures for the year 2021.
Capital expenditures, including capitalized interest, totaled $1.6 billion for the first nine months of 2020, including
approximately $1.0 billion for major mining projects primarily associated with underground development activities in
the Grasberg minerals district and the Lone Star copper leach project.
Proceeds from Sale of Freeport Cobalt. On September 1, 2021, we completed the sale of Freeport Cobalt to Jervois
Global Limited (Jervois) for $208 million, including net cash proceeds of $150 million and shares of Jervois. Refer to
Note 1 for further discussion.
Proceeds from Sales of Other Assets. Proceeds from sales of other assets totaled $21 million for the first nine
months of 2021 and $146 million for the first nine months of 2020. Proceeds from sales of other assets for the first
nine months of 2020 are primarily associated with the contingent consideration of $60 million from the 2016 sale of
TF Holdings Limited, the collection of $45 million related to the 2019 sale of the Timok exploration assets in Serbia,
and $31 million associated with the sale of royalty assets.
Acquisition of Minority Interest in PT Smelting. On April 30, 2021, PT-FI acquired 14.5 percent of the outstanding
common stock of PT Smelting for $33 million, increasing its ownership interest from 25 percent to 39.5 percent.
Financing Activities
Debt Transactions. Net repayments of debt totaled $39 million for the first nine months of 2021, primarily associated
with Cerro Verde’s election to prepay $200 million on its term loan at the end of September 2021, partly offset by
borrowings of $158 million under the PT-FI credit facility.
Net proceeds from debt totaled $131 million for the first nine months of 2020, primarily reflecting the issuance of
$2.8 billion of new senior notes in July 2020 and March 2020, partly offset by the use of proceeds to purchase and
redeem senior notes maturing in 2021, 2022, 2023 and 2024.
Refer to Note 5 for further discussion.
Cash Dividends and Distributions Paid. We paid cash dividends on our common stock totaling $220 million for the
first nine months of 2021 and $73 million for the first nine months of 2020.
On September 22, 2021, we declared a quarterly cash dividend of $0.075 per share on our common stock, which
was paid on November 1, 2021, to shareholders of record as of October 15, 2021. Refer to “Cautionary Statement”
and the discussion above regarding our financial policy.
Cash dividends and distributions paid to noncontrolling interests at PT-FI and Cerro Verde totaled $187 million for
the first nine months of 2021. There were no cash dividends or distributions to noncontrolling interests paid during
the first nine months of 2020. Cash dividends and distributions to noncontrolling interests vary based on the
operating results and cash requirements of our consolidated subsidiaries.
Contributions from Noncontrolling Interests. We received equity contributions totaling $135 million for the first nine
months of 2021 and $115 million for the first nine months of 2020 from PT Inalum for their share of capital spending
on PT-FI underground mine development projects and development of increased smelter capacity in Indonesia.
Stock-based awards. Following an increase in our stock price during 2021, proceeds from exercised stock options
totaled $189 million and payments for related employee taxes totaled $19 million for the first nine months of 2021.
See Note 10 in our 2020 Form 10-K for a discussion of stock-based awards.
Table of Contents
52

-- 52 of 75 --

CONTRACTUAL OBLIGATIONS
In July 2021, PT-FI awarded a contract to Chiyoda for the construction of a new greenfield smelter in Gresik,
Indonesia, with an estimated contract cost of $2.8 billion. The smelter construction is expected to be completed as
soon as feasible in 2024, which is subject to, among other things, potential pandemic-related disruptions.
Besides PT-FI’s $1.0 billion credit facility and the Chiyoda contract, there have been no other material changes in
our contractual obligations since December 31, 2020.
CONTINGENCIES
Environmental and Asset Retirement Obligations
Our current and historical operating activities are subject to stringent laws and regulations governing the protection
of the environment. We perform a comprehensive annual review of our environmental and asset retirement
obligations and also review changes in facts and circumstances associated with these obligations at least quarterly.
There have been no material changes to our environmental and asset retirement obligations since December 31,
2020. Refer to Note 8 for updates associated with our Newtown Creek environmental obligation. Updated cost
assumptions, including increases and decreases to cost estimates, changes in the anticipated scope and timing of
remediation activities, and settlement of environmental matters may result in additional revisions to certain of our
environmental obligations. We are planning a detailed review in fourth-quarter 2021 of our asset retirement
obligations in Indonesia, specifically around our historical overburden stockpiles related to previous open-pit mining
operations. Potential adjustments could be significant. Refer to Note 12 in our 2020 Form 10-K, for further
information regarding our environmental and asset retirement obligations.
Litigation and Other Contingencies
There have been no material changes to our contingencies associated with legal proceedings, environmental and
other matters since December 31, 2020. Refer to Note 12 and “Legal Proceedings” contained in Part I, Item 3. of
our 2020 Form 10-K, as updated by Note 8, for further information regarding legal proceedings, environmental and
other matters.
NEW ACCOUNTING STANDARDS
There were no significant updates to previously reported accounting standards included in Note 1 of our 2020 Form
10-K.
NET DEBT
Net debt, which we define as consolidated debt less consolidated cash and cash equivalents, is intended to provide
investors with information related to the performance-based payout framework in our financial policy, which requires
achievement of a net debt target in the range of $3 billion to $4 billion (excluding project debt for additional smelting
capacity in Indonesia). This information differs from consolidated debt determined in accordance with U.S. GAAP
and should not be considered in isolation or as a substitute for consolidated debt determined in accordance with
U.S. GAAP. Our net debt follows, which may not be comparable to similarly titled measures reported by other
companies (in millions):
September 30, 2021 December 31, 2020
Current portion of debt $ 897 $ 34
Long-term debt, less current portion 8,768 9,677
Consolidated debt 9,665 a 9,711
Less: consolidated cash and cash equivalents 7,672 3,657
Net debt $ 1,993 $ 6,054
a. Includes $146 million, net of debt issuance costs, for the PT-FI Term Loan (refer to Note 5).
Table of Contents
53

-- 53 of 75 --

PRODUCT REVENUES AND PRODUCTION COSTS
Unit net cash costs per pound of copper and molybdenum are measures intended to provide investors with
information about the cash-generating capacity of our mining operations expressed on a basis relating to the
primary metal product for the respective operations. We use this measure for the same purpose and for monitoring
operating performance by our mining operations. This information differs from measures of performance determined
in accordance with U.S. GAAP and should not be considered in isolation or as a substitute for measures of
performance determined in accordance with U.S. GAAP. These measures are presented by other metals mining
companies, although our measures may not be comparable to similarly titled measures reported by other
companies.
We present gross profit per pound of copper in the following tables using both a “by-product” method and a “co-
product” method. We use the by-product method in our presentation of gross profit per pound of copper because (i)
the majority of our revenues are copper revenues, (ii) we mine ore, which contains copper, gold, molybdenum and
other metals, (iii) it is not possible to specifically assign all of our costs to revenues from the copper, gold,
molybdenum and other metals we produce and (iv) it is the method used by our management and Board to monitor
our mining operations and to compare mining operations in certain industry publications. In the co-product method
presentations, shared costs are allocated to the different products based on their relative revenue values, which will
vary to the extent our metals sales volumes and realized prices change.
We show revenue adjustments for prior period open sales as a separate line item. Because these adjustments do
not result from current period sales, these amounts have been reflected separately from revenues on current period
sales. Noncash and other costs, which are removed from site production and delivery costs in the calculation of unit
net cash costs, consist of items such as stock-based compensation costs, long-lived asset impairments, idle facility
costs, restructuring and/or unusual charges. As discussed above, gold, molybdenum and other metal revenues at
copper mines are reflected as credits against site production and delivery costs in the by-product method. The
following schedules are presentations under both the by-product and co-product methods together with
reconciliations to amounts reported in our consolidated financial statements.
Table of Contents
54

-- 54 of 75 --

North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs
Three Months Ended September 30, 2021
(In millions) By-Product Co-Product Method
Method Copper Molybdenuma Otherb Total
Revenues, excluding adjustments $ 1,627 $ 1,627 $ 152 $ 27 $ 1,806
Site production and delivery, before net noncash
and other costs shown below 795 724 82 20 826
By-product credits (148) — — — —
Treatment charges 35 33 — 2 35
Net cash costs 682 757 82 22 861
DD&A 94 85 7 2 94
Metals inventory adjustments 13 13 — — 13
Noncash and other costs, net 30 28 2 — 30
Total costs 819 883 91 24 998
Other revenue adjustments, primarily for pricing
on prior period open sales (7) (7) — — (7)
Gross profit $ 801 $ 737 $ 61 $ 3 $ 801
Copper sales (millions of recoverable pounds) 375 375
Molybdenum sales (millions of recoverable pounds)a 9
Gross profit per pound of copper/molybdenum:
Revenues, excluding adjustments $ 4.34 $ 4.34 $ 16.69
Site production and delivery, before net noncash
and other costs shown below 2.12 1.93 8.97
By-product credits (0.39) — —
Treatment charges 0.09 0.09 —
Unit net cash costs 1.82 2.02 8.97
DD&A 0.25 0.23 0.73
Metals inventory adjustments 0.03 0.03 —
Noncash and other costs, net 0.08 0.08 0.23
Total unit costs 2.18 2.36 9.93
Other revenue adjustments, primarily for pricing
on prior period open sales (0.02) (0.02) —
Gross profit per pound $ 2.14 $ 1.96 $ 6.76
Reconciliation to Amounts Reported
Revenues Production
and Delivery DD&A
Metals
Inventory
Adjustments
Totals presented above $ 1,806 $ 826 $ 94 $ 13
Treatment charges (4) 31 — —
Noncash and other costs, net — 30 — —
Other revenue adjustments, primarily for pricing
on prior period open sales (7) — — —
Eliminations and other 16 17 — —
North America copper mines 1,811 904 94 13
Other miningc 5,903 3,735 418 —
Corporate, other & eliminations (1,631) (1,630) 16 1
As reported in our consolidated financial statements $ 6,083 $ 3,009 $ 528 $ 14
a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based
pricing.
b. Includes gold and silver product revenues and production costs.
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
55

-- 55 of 75 --

North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs
Three Months Ended September 30, 2020
(In millions) By-Product Co-Product Method
Method Copper Molybdenuma Otherb Total
Revenues, excluding adjustments $ 1,138 $ 1,138 $ 63 $ 30 $ 1,231
Site production and delivery, before net noncash
and other costs shown below 667 630 45 16 691
By-product credits (69) — — — —
Treatment charges 33 32 — 1 33
Net cash costs 631 662 45 17 724
DD&A 92 85 4 3 92
Metals inventory adjustments (4) (4) — — (4)
Noncash and other costs, net 37 c 35 — 2 37
Total costs 756 778 49 22 849
Other revenue adjustments, primarily for pricing
on prior period open sales 1 1 — — 1
Gross profit $ 383 $ 361 $ 14 $ 8 $ 383
Copper sales (millions of recoverable pounds) 378 378
Molybdenum sales (millions of recoverable pounds)a 7
Gross profit per pound of copper/molybdenum:
Revenues, excluding adjustments $ 3.01 $ 3.01 $ 7.72
Site production and delivery, before net noncash
and other costs shown below 1.76 1.67 5.52
By-product credits (0.18) — —
Treatment charges 0.09 0.08 —
Unit net cash costs 1.67 1.75 5.52
DD&A 0.24 0.23 0.43
Metals inventory adjustments (0.01) (0.01) —
Noncash and other costs, net 0.10 c 0.09 0.06
Total unit costs 2.00 2.06 6.01
Other revenue adjustments, primarily for pricing
on prior period open sales — — —
Gross profit per pound $ 1.01 $ 0.95 $ 1.71
Reconciliation to Amounts Reported
Revenues Production
and Delivery DD&A
Metals
Inventory
Adjustments
Totals presented above $ 1,231 $ 691 $ 92 $ (4)
Treatment charges (4) 29 — —
Noncash and other costs, net — 37 — —
Other revenue adjustments, primarily for pricing
on prior period open sales 1 — — —
Eliminations and other 9 11 (1) —
North America copper mines 1,237 768 91 (4)
Other miningd 3,691 2,731 282 5
Corporate, other & eliminations (1,077) (1,034) 21 8
As reported in our consolidated financial statements $ 3,851 $ 2,465 $ 394 $ 9
a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based
pricing.
b. Includes gold and silver product revenues and production costs.
c. Includes charges totaling $10 million ($0.03 per pound of copper) primarily associated with the April 2020 revised operating plans (including
employee separation costs) and the COVID-19 pandemic (including health and safety costs).
d. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
56

-- 56 of 75 --

North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs
Nine months ended September 30, 2021
(In millions) By-Product Co-Product Method
Method Copper Molybdenuma Otherb Total
Revenues, excluding adjustments $ 4,538 $ 4,538 337 93 4,968
Site production and delivery, before net noncash
and other costs shown below 2,254 2,093 194 60 2,347
By-product credits (337) — — — —
Treatment charges 98 93 — 5 98
Net cash costs 2,015 2,186 194 65 2,445
DD&A 275 254 15 6 275
Metals inventory adjustments 13 13 — — 13
Noncash and other costs, net 103 99 3 1 103
Total costs 2,406 2,552 212 72 2,836
Other revenue adjustments, primarily for pricing
on prior period open sales 7 7 — — 7
Gross profit $ 2,139 $ 1,993 $ 125 $ 21 $ 2,139
Copper sales (millions of recoverable pounds) 1,072 1,072
Molybdenum sales (millions of recoverable pounds)a 26
Gross profit per pound of copper/molybdenum:
Revenues, excluding adjustments $ 4.24 $ 4.24 $ 13.09
Site production and delivery, before net noncash
and other costs shown below 2.11 1.95 7.54
By-product credits (0.32) — —
Treatment charges 0.09 0.09 —
Unit net cash costs 1.88 2.04 7.54
DD&A 0.26 0.24 0.59
Metals inventory adjustments 0.01 0.01 —
Noncash and other costs, net 0.10 0.09 0.12
Total unit costs 2.25 2.38 8.25
Other revenue adjustments, primarily for pricing
on prior period open sales 0.01 0.01 —
Gross profit per pound $ 2.00 $ 1.87 $ 4.84
Reconciliation to Amounts Reported
Metals
Production Inventory
Revenues and Delivery DD&A Adjustments
Totals presented above $ 4,968 $ 2,347 $ 275 $ 13
Treatment charges (21) 77 — —
Noncash and other costs, net — 103 — —
Other revenue adjustments, primarily for pricing
on prior period open sales 7 — — —
Eliminations and other 49 51 — —
North America copper mines 5,003 2,578 275 13
Other miningc 16,068 10,425 1,108 1
Corporate, other & eliminations (4,390) (4,141) 47 1
As reported in our consolidated financial statements $ 16,681 $ 8,862 $ 1,430 $ 15
a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based
pricing.
b. Includes gold and silver product revenues and production costs.
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
57

-- 57 of 75 --

North America Copper Mines Product Revenues, Production Costs and Unit Net Cash Costs
Nine months ended September 30, 2020
(In millions) By-Product Co-Product Method
Method Copper Molybdenuma Otherb Total
Revenues, excluding adjustments $ 2,939 $ 2,939 210 73 3,222
Site production and delivery, before net noncash
and other costs shown below 2,106 1,963 173 44 2,180
By-product credits (209) — — — —
Treatment charges 109 105 — 4 109
Net cash costs 2,006 2,068 173 48 2,289
DD&A 272 251 14 7 272
Metals inventory adjustments 52 49 — 3 52
Noncash and other costs, net 107 c 101 3 3 107
Total costs 2,437 2,469 190 61 2,720
Other revenue adjustments, primarily for pricing
on prior period open sales (22) (22) — — (22)
Gross profit $ 480 $ 448 $ 20 $ 12 $ 480
Copper sales (millions of recoverable pounds) 1,100 1,100
Molybdenum sales (millions of recoverable pounds)a 24
Gross profit per pound of copper/molybdenum:
Revenues, excluding adjustments $ 2.67 $ 2.67 $ 8.57
Site production and delivery, before net noncash
and other costs shown below 1.91 1.78 7.05
By-product credits (0.19) — —
Treatment charges 0.10 0.10 —
Unit net cash costs 1.82 1.88 7.05
DD&A 0.25 0.23 0.57
Metals inventory adjustments 0.05 0.04 —
Noncash and other costs, net 0.10 c 0.10 0.12
Total unit costs 2.22 2.25 7.74
Other revenue adjustments, primarily for pricing
on prior period open sales (0.01) (0.01) —
Gross profit per pound $ 0.44 $ 0.41 $ 0.83
Reconciliation to Amounts Reported
Metals
Production Inventory
Revenues and Delivery DD&A Adjustments
Totals presented above $ 3,222 $ 2,180 $ 272 $ 52
Treatment charges (14) 95 — —
Noncash and other costs, net — 107 — —
Other revenue adjustments, primarily for pricing
on prior period open sales (22) — — —
Eliminations and other 24 33 — —
North America copper mines 3,210 2,415 272 52
Other miningd 9,267 7,665 770 14
Corporate, other & eliminations (2,774) (2,676) 51 26
As reported in our consolidated financial statements $ 9,703 $ 7,404 $ 1,093 $ 92
a. Reflects sales of molybdenum produced by certain of the North America copper mines to our molybdenum sales company at market-based
pricing.
b. Includes gold and silver product revenues and production costs.
c. Includes charges totaling $32 million ($0.03 per pound of copper) primarily associated with the April 2020 revised operating plans (including
employee separation costs) and the COVID-19 pandemic (including health and safety costs).
d. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
58

-- 58 of 75 --

South America Mining Product Revenues, Production Costs and Unit Net Cash Costs
Three Months Ended September 30, 2021
(In millions) By-Product Co-Product Method
Method Copper Othera Total
Revenues, excluding adjustments $ 1,153 $ 1,153 $ 120 $ 1,273
Site production and delivery, before net noncash
and other costs shown below 597 b 546 64 610
By-product credits (107) — — —
Treatment charges 38 38 — 38
Royalty on metals 3 2 1 3
Net cash costs 531 586 65 651
DD&A 112 101 11 112
Noncash and other costs, net 20 19 1 20
Total costs 663 706 77 783
Other revenue adjustments, primarily for pricing
on prior period open sales (8) (8) — (8)
Gross profit $ 482 $ 439 $ 43 $ 482
Copper sales (millions of recoverable pounds) 280 280
Gross profit per pound of copper:
Revenues, excluding adjustments $ 4.12 $ 4.12
Site production and delivery, before net noncash
and other costs shown below 2.14 b 1.96
By-product credits (0.38) —
Treatment charges 0.13 0.13
Royalty on metals 0.01 0.01
Unit net cash costs 1.90 2.10
DD&A 0.40 0.36
Noncash and other costs, net 0.07 0.06
Total unit costs 2.37 2.52
Other revenue adjustments, primarily for pricing
on prior period open sales (0.03) (0.03)
Gross profit per pound $ 1.72 $ 1.57
Reconciliation to Amounts Reported
Production
Revenues and Delivery DD&A
Totals presented above $ 1,273 $ 610 $ 112
Treatment charges (38) — —
Royalty on metals (3) — —
Noncash and other costs, net — 20 —
Other revenue adjustments, primarily for pricing
on prior period open sales (8) — —
Eliminations and other (1) — (1)
South America mining 1,223 630 111
Other miningc 6,491 4,009 401
Corporate, other & eliminations (1,631) (1,630) 16
As reported in our consolidated financial statements $ 6,083 $ 3,009 $ 528
a. Includes silver sales of 1.0 million ounces ($24.34 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro
Verde to our molybdenum sales company at market-based pricing.
b. Includes nonrecurring charges totaling $5 million ($0.02 per pound of copper) associated with labor related charges at Cerro Verde.
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
59

-- 59 of 75 --

South America Mining Product Revenues, Production Costs and Unit Net Cash Costs
Three Months Ended September 30, 2020
(In millions) By-Product Co-Product Method
Method Copper Othera Total
Revenues, excluding adjustments $ 754 $ 754 $ 53 $ 807
Site production and delivery, before net noncash
and other costs shown below 459 432 38 470
By-product credits (42) — — —
Treatment charges 40 40 — 40
Royalty on metals 1 1 — 1
Net cash costs 458 473 38 511
DD&A 105 98 7 105
Noncash and other costs, net 9 b 8 1 9
Total costs 572 579 46 625
Other revenue adjustments, primarily for pricing
on prior period open sales 41 41 — 41
Gross profit $ 223 $ 216 $ 7 $ 223
Copper sales (millions of recoverable pounds) 250 250
Gross profit per pound of copper:
Revenues, excluding adjustments $ 3.02 $ 3.02
Site production and delivery, before net noncash
and other costs shown below 1.84 1.73
By-product credits (0.17) —
Treatment charges 0.15 0.15
Royalty on metals 0.01 0.01
Unit net cash costs 1.83 1.89
DD&A 0.42 0.39
Noncash and other costs, net 0.04 b 0.04
Total unit costs 2.29 2.32
Other revenue adjustments, primarily for pricing
on prior period open sales 0.16 0.16
Gross profit per pound $ 0.89 $ 0.86
Reconciliation to Amounts Reported
Production
Revenues and Delivery DD&A
Totals presented above $ 807 $ 470 $ 105
Treatment charges (40) — —
Royalty on metals (1) — —
Noncash and other costs, net — 9 —
Other revenue adjustments, primarily for pricing
on prior period open sales 41 — —
Eliminations and other (1) (2) —
South America mining 806 477 105
Other miningc 4,122 3,022 268
Corporate, other & eliminations (1,077) (1,034) 21
As reported in our consolidated financial statements $ 3,851 $ 2,465 $ 394
a. Includes silver sales of 0.9 million ounces ($24.84 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro
Verde to our molybdenum sales company at market-based pricing.
b. Includes charges totaling $5 million ($0.02 per pound of copper), primarily associated with the COVID-19 pandemic (including health and
safety costs).
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
60

-- 60 of 75 --

South America Mining Product Revenues, Production Costs and Unit Net Cash Costs
Nine months ended September 30, 2021
(In millions) By-Product Co-Product Method
Method Copper Othera Total
Revenues, excluding adjustments $ 3,238 $ 3,238 $ 267 $ 3,505
Site production and delivery, before net noncash
and other costs shown below 1,690 b 1,568 155 1,723
By-product credits (234) — — —
Treatment charges 101 101 — 101
Royalty on metals 8 7 1 8
Net cash costs 1,565 1,676 156 1,832
DD&A 306 282 24 306
Noncash and other costs, net 49 45 4 49
Total costs 1,920 2,003 184 2,187
Other revenue adjustments, primarily for pricing
on prior period open sales 98 98 — 98
Gross profit $ 1,416 $ 1,333 $ 83 $ 1,416
Copper sales (millions of recoverable pounds) 769 769
Gross profit per pound of copper:
Revenues, excluding adjustments $ 4.21 $ 4.21
Site production and delivery, before net noncash
and other costs shown below 2.20 b 2.04
By-product credits (0.31) —
Treatment charges 0.13 0.13
Royalty on metals 0.01 0.01
Unit net cash costs 2.03 2.18
DD&A 0.40 0.36
Noncash and other costs, net 0.07 0.06
Total unit costs 2.50 2.60
Other revenue adjustments, primarily for pricing
on prior period open sales 0.13 0.13
Gross profit per pound $ 1.84 $ 1.74
Reconciliation to Amounts Reported
Production
Revenues and Delivery DD&A
Totals presented above $ 3,505 $ 1,723 $ 306
Treatment charges (101) — —
Royalty on metals (8) — —
Noncash and other costs, net — 49 —
Other revenue adjustments, primarily for pricing
on prior period open sales 98 — —
Eliminations and other (1) (3) —
South America mining 3,493 1,769 306
Other miningc 17,578 11,234 1,077
Corporate, other & eliminations (4,390) (4,141) 47
As reported in our consolidated financial statements $ 16,681 $ 8,862 $ 1,430
a. Includes silver sales of 2.7 million ounces ($25.81 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro
Verde to FCX's molybdenum sales company at market-based pricing.
b. Includes nonrecurring charges totaling $74 million ($0.10 per pound of copper) associated with labor related charges at Cerro Verde for
agreements reached with approximately 65 percent of its hourly employees.
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
61

-- 61 of 75 --

South America Mining Product Revenues, Production Costs and Unit Net Cash Costs
Nine months ended September 30, 2020
(In millions) By-Product Co-Product Method
Method Copper Othera Total
Revenues, excluding adjustments $ 1,994 $ 1,994 $ 139 $ 2,133
Site production and delivery, before net noncash
and other costs shown below 1,313 1,231 111 1,342
By-product credits (110) — — —
Treatment charges 111 111 — 111
Royalty on metals 4 4 — 4
Net cash costs 1,318 1,346 111 1,457
DD&A 316 294 22 316
Metals inventory adjustments 3 3 — 3
Noncash and other costs, net 109 b 103 6 109
Total costs 1,746 1,746 139 1,885
Other revenue adjustments, primarily for pricing
on prior period open sales (70) (70) — (70)
Gross profit $ 178 $ 178 $ — $ 178
Copper sales (millions of recoverable pounds) 716 716
Gross profit per pound of copper:
Revenues, excluding adjustments $ 2.79 $ 2.79
Site production and delivery, before net noncash
and other costs shown below 1.83 1.72
By-product credits (0.15) —
Treatment charges 0.15 0.15
Royalty on metals 0.01 0.01
Unit net cash costs 1.84 1.88
DD&A 0.44 0.41
Metals inventory adjustments — —
Noncash and other costs, net 0.16 b 0.15
Total unit costs 2.44 2.44
Other revenue adjustments, primarily for pricing
on prior period open sales (0.10) (0.10)
Gross profit per pound $ 0.25 $ 0.25
Reconciliation to Amounts Reported
Metals
Production Inventory
Revenues and Delivery DD&A Adjustments
Totals presented above $ 2,133 $ 1,342 $ 316 $ 3
Treatment charges (111) — — —
Royalty on metals (4) — — —
Noncash and other costs, net — 109 — —
Other revenue adjustments, primarily for pricing
on prior period open sales (70) — — —
Eliminations and other (1) (2) (1) —
South America mining 1,947 1,449 315 3
Other miningc 10,530 8,631 727 63
Corporate, other & eliminations (2,774) (2,676) 51 26
As reported in our consolidated financial statements $ 9,703 $ 7,404 $ 1,093 $ 92
a. Includes silver sales of 2.5 million ounces ($19.58 per ounce average realized price). Also reflects sales of molybdenum produced by Cerro
Verde to FCX's molybdenum sales company at market-based pricing.
b. Includes charges totaling $91 million ($0.13 per pound of copper) primarily associated with idle facility (Cerro Verde) and contract cancellation
costs related to the COVID-19 pandemic and employee separation costs associated with the April 2020 revised operating plans.
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
62

-- 62 of 75 --

Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs
Three Months Ended September 30, 2021
(In millions) By-Product Co-Product Method
Method Copper Gold Silvera Total
Revenues, excluding adjustments $ 1,555 $ 1,555 $ 701 $ 37 $ 2,293
Site production and delivery, before net noncash
and other costs shown below 553 375 169 9 553
Gold and silver credits (744) — — — —
Treatment charges 90 61 27 2 90
Export duties 71 48 22 1 71
Royalty on metals 94 67 25 2 94
Net cash costs 64 551 243 14 808
DD&A 280 190 86 4 280
Total costs 344 741 329 18 1,088
Other revenue adjustments, primarily for pricing
on prior period open sales (2) (2) 6 — 4
PT Smelting intercompany loss (16) (11) (5) — (16)
Gross profit $ 1,193 $ 801 $ 373 $ 19 $ 1,193
Copper sales (millions of recoverable pounds) 378 378
Gold sales (thousands of recoverable ounces) 399
Gross profit per pound of copper/per ounce of gold:
Revenues, excluding adjustments $ 4.11 $ 4.11 $ 1,757
Site production and delivery, before net noncash
and other costs shown below 1.46 0.99 424
Gold and silver credits (1.97) — —
Treatment charges 0.24 0.16 69
Export duties 0.19 0.13 54
Royalty on metals 0.25 0.18 63
Unit net cash costs 0.17 1.46 610
DD&A 0.74 0.50 215
Total unit costs 0.91 1.96 825
Other revenue adjustments, primarily for pricing
on prior period open sales — — 16
PT Smelting intercompany loss (0.04) (0.03) (12)
Gross profit per pound/ounce $ 3.16 $ 2.12 $ 936
Reconciliation to Amounts Reported
Production
Revenues and Delivery DD&A
Totals presented above $ 2,293 $ 553 $ 280
Treatment charges (90) — —
Export duties (71) — —
Royalty on metals (94) — —
Other revenue adjustments, primarily for pricing
on prior period open sales 4 — —
PT Smelting intercompany loss — 16 —
Indonesia mining 2,042 569 280
Other miningb 5,672 4,070 232
Corporate, other & eliminations (1,631) (1,630) 16
As reported in our consolidated financial statements $ 6,083 $ 3,009 $ 528
a. Includes silver sales of 1.7 million ounces ($22.22 per ounce average realized price).
b. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
63

-- 63 of 75 --

Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs
Three Months Ended September 30, 2020
(In millions) By-Product Co-Product Method
Method Copper Gold Silvera Total
Revenues, excluding adjustments $ 659 $ 659 $ 437 $ 24 $ 1,120
Site production and delivery, before net noncash
and other costs shown below 376 221 147 8 376
Gold and silver credits (474) — — — —
Treatment charges 58 34 23 1 58
Export duties 24 14 9 1 24
Royalty on metals 45 26 18 1 45
Net cash costs 29 295 197 11 503
DD&A 150 88 59 3 150
Noncash and other costs, net 24 b 14 9 1 24
Total costs 203 397 265 15 677
Other revenue adjustments, primarily for pricing
on prior period open sales 28 28 11 2 41
PT Smelting intercompany loss (17) (10) (7) — (17)
Gross profit $ 467 $ 280 $ 176 $ 11 $ 467
Copper sales (millions of recoverable pounds) 219 219
Gold sales (thousands of recoverable ounces) 230
Gross profit per pound of copper/per ounce of gold:
Revenues, excluding adjustments $ 3.00 $ 3.00 $ 1,902
Site production and delivery, before net noncash
and other costs shown below 1.71 1.01 639
Gold and silver credits (2.16) — —
Treatment charges 0.26 0.16 98
Export duties 0.11 0.06 40
Royalty on metals 0.21 0.12 79
Unit net cash costs 0.13 1.35 856
DD&A 0.68 0.40 256
Noncash and other costs, net 0.11 b 0.06 40
Total unit costs 0.92 1.81 1,152
Other revenue adjustments, primarily for pricing
on prior period open sales 0.13 0.13 49
PT Smelting intercompany loss (0.08) (0.05) (31)
Gross profit per pound/ounce $ 2.13 $ 1.27 $ 768
Reconciliation to Amounts Reported
Production
Revenues and Delivery DD&A
Totals presented above $ 1,120 $ 376 $ 150
Treatment charges (58) — —
Export duties (24) — —
Royalty on metals (53) (8) —
Noncash and other costs, net — 24 —
Other revenue adjustments, primarily for pricing
on prior period open sales 41 — —
PT Smelting intercompany loss — 17 —
Indonesia mining 1,026 409 150
Other miningc 3,902 3,090 223
Corporate, other & eliminations (1,077) (1,034) 21
As reported in our consolidated financial statements $ 3,851 $ 2,465 $ 394
a. Includes silver sales of 1.0 million ounces ($24.29 per ounce average realized price).
b. Includes COVID-19 related costs (including one-time incremental employee benefits and health and safety costs) totaling $10 million ($0.05
per pound of copper).
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
64

-- 64 of 75 --

Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs
Nine months ended September 30, 2021
(In millions) By-Product Co-Product Method
Method Copper Gold Silvera Total
Revenues, excluding adjustments $ 3,989 $ 3,989 $ 1,703 $ 104 $ 5,796
Site production and delivery, before net noncash
and other costs shown below 1,412 972 415 25 1,412
Gold and silver credits (1,803) — — — —
Treatment charges 229 158 67 4 229
Export duties 145 99 43 3 145
Royalty on metals 234 167 63 4 234
Net cash costs 217 1,396 588 36 2,020
DD&A 726 499 213 14 726
Noncash and other costs, net 3 b 2 1 — 3
Total costs 946 1,897 802 50 2,749
Other revenue adjustments, primarily for pricing
on prior period open sales 71 71 (4) — 67
PT Smelting intercompany loss (106) (73) (31) (2) (106)
Gross profit $ 3,008 $ 2,090 $ 866 $ 52 $ 3,008
Copper sales (millions of recoverable pounds) 946 946
Gold sales (thousands of recoverable ounces) 957
Gross profit per pound of copper/per ounce of gold:
Revenues, excluding adjustments $ 4.21 $ 4.21 $ 1,780
Site production and delivery, before net noncash
and other costs shown below 1.49 1.03 434
Gold and silver credits (1.91) — —
Treatment charges 0.24 0.17 70
Export duties 0.15 0.10 45
Royalty on metals 0.26 0.18 66
Unit net cash costs 0.23 1.48 615
DD&A 0.76 0.52 222
Noncash and other costs, net 0.01 b 0.01 1
Total unit costs 1.00 2.01 838
Other revenue adjustments, primarily for pricing
on prior period open sales 0.08 0.08 (5)
PT Smelting intercompany loss (0.11) (0.08) (33)
Gross profit per pound/ounce $ 3.18 $ 2.20 $ 904
Reconciliation to Amounts Reported
Production
Revenues and Delivery DD&A
Totals presented above $ 5,796 $ 1,412 $ 726
Treatment charges (229) — —
Export duties (145) — —
Royalty on metals (234) — —
Noncash and other costs, net 31 34 —
Other revenue adjustments, primarily for pricing
on prior period open sales 67 — —
PT Smelting intercompany loss — 106 —
Indonesia mining 5,286 1,552 726
Other miningc 15,785 11,451 657
Corporate, other & eliminations (4,390) (4,141) 47
As reported in our consolidated financial statements $ 16,681 $ 8,862 $ 1,430
a. Includes silver sales of 4.3 million ounces ($24.50 per ounce average realized price).
b. Includes credits of $31 million ($0.03 per pound of copper) associated with adjustments to prior year treatment and refining charges and
charges of $16 million ($0.02 per pound of copper) associated with a potential settlement of an administrative fine levied by the Indonesia
government.
c. Represents the combined total for our other segments, as presented in Note 9.
Table of Contents
65

-- 65 of 75 --

Indonesia Mining Product Revenues, Production Costs and Unit Net Cash Costs
Nine months ended September 30, 2020
(In millions) By-Product Co-Product Method
Method Copper Gold Silvera Total
Revenues, excluding adjustments $ 1,447 $ 1,447 $ 994 $ 48 $ 2,489
Site production and delivery, before net noncash
and other costs shown below 1,062 617 424 21 1,062
Gold and silver credits (1,046) — — — —
Treatment charges 143 83 57 3 143
Export duties 43 25 17 1 43
Royalty on metals 92 53 38 1 92
Net cash costs 294 778 536 26 1,340
DD&A 375 218 150 7 375
Noncash and other costs, net 56 b 33 22 1 56
Total costs 725 1,029 708 34 1,771
Other revenue adjustments, primarily for pricing
on prior period open sales (20) (20) 4 — (16)
PT Smelting intercompany loss (18) (11) (7) — (18)
Gross profit $ 684 $ 387 $ 283 $ 14 $ 684
Copper sales (millions of recoverable pounds) 518 518
Gold sales (thousands of recoverable ounces) 549
Gross profit per pound of copper/per ounce of gold:
Revenues, excluding adjustments $ 2.79 $ 2.79 $ 1,810
Site production and delivery, before net noncash
and other costs shown below 2.05 1.19 773
Gold and silver credits (2.02) — —
Treatment charges 0.28 0.16 104
Export duties 0.08 0.05 31
Royalty on metals 0.18 0.10 68
Unit net cash costs 0.57 1.50 976
DD&A 0.72 0.42 273
Noncash and other costs, net 0.11 b 0.07 41
Total unit costs 1.40 1.99 1,290
Other revenue adjustments, primarily for pricing
on prior period open sales (0.03) (0.03) 8
PT Smelting intercompany loss (0.04) (0.02) (13)
Gross profit per pound/ounce $ 1.32 $ 0.75 $ 515
Reconciliation to Amounts Reported
Production
Revenues and Delivery DD&A
Totals presented above $ 2,489 $ 1,062 $ 375
Treatment charges (143) — —
Export duties (43) — —
Royalty on metals (98) (6) —
Noncash and other costs, net — 56 —
Other revenue adjustments, primarily for pricing
on prior period open sales (16) — —
PT Smelting intercompany loss — 18 —
Indonesia mining 2,189 1,130 375
Other miningc 10,288 8,950 667
Corporate, other & eliminations (2,774) (2,676) 51
As reported in our consolidated financial statements $ 9,703 $ 7,404 $ 1,093
a. Includes silver sales of 2.3 million ounces ($20.73 per ounce average realized price).
b. Includes COVID-19 related costs (including one-time incremental employee benefits and health and safety costs) of $14 million ($0.03 per
pound of copper).
c. Represents the combined total for our segments, as presented in Note 9.
Table of Contents
66

-- 66 of 75 --

Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs
Three Months Ended September 30,
(In millions) 2021 2020
Revenues, excluding adjustmentsa $ 158 $ 47
Site production and delivery, before net noncash
and other costs shown below 67 47
Treatment charges and other 7 5
Net cash costs 74 52
DD&A 19 13
Metals inventory adjustments — 3
Noncash and other costs, net 3 4
Total costs 96 72
Gross profit (loss) $ 62 $ (25)
Molybdenum sales (millions of recoverable pounds)a 9 6
Gross profit (loss) per pound of molybdenum:
Revenues, excluding adjustmentsa $ 18.13 $ 8.83
Site production and delivery, before net noncash
and other costs shown below 7.70 8.88
Treatment charges and other 0.84 0.84
Unit net cash costs 8.54 9.72
DD&A 2.14 2.38
Metals inventory adjustments — 0.67
Noncash and other costs, net 0.30 0.54
Total unit costs 10.98 13.31
Gross profit (loss) per pound $ 7.15 $ (4.48)
Reconciliation to Amounts Reported
Metals
Production Inventory
Three Months Ended September 30, 2021 Revenues and Delivery DD&A Adjustments
Totals presented above $ 158 $ 67 $ 19 $ —
Treatment charges and other (7) — — —
Noncash and other costs, net — 3 — —
Molybdenum mines 151 70 19 —
Other miningb 7,563 4,569 493 13
Corporate, other & eliminations (1,631) (1,630) 16 1
As reported in our consolidated financial statements $ 6,083 $ 3,009 $ 528 $ 14
Three Months Ended September 30, 2020
Totals presented above $ 47 $ 47 $ 13 $ 3
Treatment charges and other (5) — — —
Noncash and other costs, net — 4 — —
Molybdenum mines 42 51 13 3
Other miningb 4,886 3,448 360 (2)
Corporate, other & eliminations (1,077) (1,034) 21 8
As reported in our consolidated financial statements $ 3,851 $ 2,465 $ 394 $ 9
a. Reflects sales of the Molybdenum mines’ production to our molybdenum sales company at market-based pricing. On a consolidated basis,
realizations are based on the actual contract terms for sales to third parties; as a result, our consolidated average realized price per pound of
molybdenum will differ from the amounts reported in this table.
b. Represents the combined total for our other segments, as presented in Note 9. Also includes amounts associated with our molybdenum sales
company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North America and South America
copper mines.
Table of Contents
67

-- 67 of 75 --

Molybdenum Mines Product Revenues, Production Costs and Unit Net Cash Costs
Nine months ended September 30,
(In millions) 2021 2020
Revenues, excluding adjustmentsa $ 329 $ 187
Site production and delivery, before net noncash
and other costs shown below 175 164
Treatment charges and other 19 16
Net cash costs 194 180
DD&A 51 44
Metals inventory adjustments 1 8
Noncash and other costs, net 8 14 b
Total costs 254 246
Gross profit (loss) $ 75 $ (59)
Molybdenum sales (millions of recoverable pounds)a 23 19
Gross profit (loss) per pound of molybdenum:
Revenues, excluding adjustmentsa $ 14.41 $ 9.92
Site production and delivery, before net noncash
and other costs shown below 7.69 8.73
Treatment charges and other 0.85 0.85
Unit net cash costs 8.54 9.58
DD&A 2.21 2.31
Metals inventory adjustments 0.04 0.44
Noncash and other costs, net 0.34 0.72 b
Total unit costs 11.13 13.05
Gross profit (loss) per pound $ 3.28 $ (3.13)
Reconciliation to Amounts Reported
Metals
Production Inventory
Nine months ended September 30, 2021 Revenues and Delivery DD&A Adjustments
Totals presented above $ 329 $ 175 $ 51 $ 1
Treatment charges and other (19) — — —
Noncash and other costs, net — 8 — —
Molybdenum mines 310 183 51 1
Other miningc 20,761 12,820 1,332 13
Corporate, other & eliminations (4,390) (4,141) 47 1
As reported in our consolidated financial statements $ 16,681 $ 8,862 $ 1,430 $ 15
Nine months ended September 30, 2020
Totals presented above $ 187 $ 164 $ 44 $ 8
Treatment charges and other (16) — — —
Noncash and other costs, net — 14 — —
Molybdenum mines 171 178 44 8
Other miningc 12,306 9,902 998 58
Corporate, other & eliminations (2,774) (2,676) 51 26
As reported in our consolidated financial statements $ 9,703 $ 7,404 $ 1,093 $ 92
a. Reflects sales of the Molybdenum mines’ production to our molybdenum sales company at market-based pricing. On a consolidated basis,
realizations are based on the actual contract terms for sales to third parties; as a result, our consolidated average realized price per pound of
molybdenum will differ from the amounts reported in this table.
b. Includes charges totaling $7 million ($0.36 per pound of molybdenum) primarily associated with contract cancellation costs related to the
COVID-19 pandemic and employee separation costs associated with April 2020 revised operating plans.
c. Represents the combined total for our other segments, as presented in Note 9. Also includes amounts associated with our molybdenum sales
company, which includes sales of molybdenum produced by the Molybdenum mines and by certain of the North America and South America
copper mines.
Table of Contents
68

-- 68 of 75 --

GUARANTOR SUMMARIZED FINANCIAL INFORMATION
All of the senior notes issued by FCX are fully and unconditionally guaranteed on a senior basis jointly and severally
by Freeport-McMoRan Oil & Gas LLC (FM O&G LLC), as guarantor, which is a 100-percent-owned subsidiary of
FCX Oil & Gas LLC (FM O&G) and FCX. The guarantee is an unsecured obligation of the guarantor and ranks
equal in right of payment with all existing and future indebtedness of FM O&G LLC, including indebtedness under
our revolving credit facility. The guarantee ranks senior in right of payment with all of FM O&G LLC’s future
subordinated obligations and is effectively subordinated in right of payment to any debt of FM O&G LLC’s
subsidiaries. The indentures provide that FM O&G LLC’s guarantee obligations may be released or terminated
upon: (i) the sale of all or substantially all of the equity interests or assets of FM O&G LLC to a third party that is not
our subsidiary or our affiliate; (ii) FM O&G LLC no longer having any obligations under any FM O&G senior notes or
any refinancing thereof and no longer being a co-borrower or guarantor of any of our obligations under the revolving
credit facility or any other senior debt or, in each case, any refinancing thereof; or (iii) the discharge of our
obligations under the indentures in accordance with their terms.
The following summarized financial data includes information regarding FCX, as issuer, FM O&G LLC, as guarantor,
and all our other non-guarantor subsidiaries at September 30, 2021, and December 31, 2020, and for the nine
months ended September 30, 2021.
FCX FM O&G LLC Non-guarantor Consolidated
Issuer Guarantor Subsidiaries Eliminations FCX
As of September 30, 2021
Current assets $ 151 $ 745 $ 13,815 $ (920) $ 13,791
Noncurrent assets 432 6 33,078 (390) 33,126
Current liabilities 717 39 5,635 (868) 5,523
Noncurrent liabilities 9,050 11,405 13,975 (15,567) 18,863
As of December 31, 2020
Current assets $ 65 $ 697 $ 9,287 $ (746) $ 9,303
Noncurrent assets 785 6 32,806 (756) 32,841
Current liabilities 187 31 3,964 (765) 3,417
Noncurrent liabilities 9,433 11,208 15,075 (15,657) 20,059
Nine Months Ended September 30, 2021
Revenues $ — $ 41 $ 16,640 $ — $ 16,681
Operating (loss) income (33) 10 6,069 15 6,061
Net income (loss) 3,200 a (133) a 4,262 (3,322) 4,007
a. Net income (loss) equals net income (loss) attributable to common stockholders because net income attributable to noncontrolling interests
is zero for issuer and guarantor.
Table of Contents
69

-- 69 of 75 --

CAUTIONARY STATEMENT
Our discussion and analysis contains forward-looking statements in which we discuss our potential future
performance. Forward-looking statements are all statements other than statements of historical facts, such as plans,
projections, or expectations relating to ore grades and milling rates; business outlook; production and sales
volumes; unit net cash costs; cash flows; capital expenditures; liquidity; operating costs; operating plans; the
implementation of our financial policy; PT-FI's ramp-up of underground mining activities and future cash flows
through 2022; PT-FI's development, financing, construction and completion of new domestic smelting capacity in
Indonesia in accordance with the terms of the special mining license (IUPK); expectations regarding negotiations
with hourly employees at Cerro Verde including completion of new CLAs; our commitments to deliver responsibly
produced copper, including plans to implement and validate all of our operating sites under specific frameworks;
execution of our energy and climate strategies and the underlying assumptions and estimated impacts on our
business related thereto; improvements in operating procedures and technology; exploration efforts and results;
development and production activities, rates and costs; tax rates; export quotas and duties; the impact of copper,
gold and molybdenum price changes; the impact of deferred intercompany profits on earnings; mineralization and
reserve estimates; execution of the settlement agreements associated with the Louisiana coastal erosion cases and
talc-related litigation; descriptions of our objectives, strategies, plans, goals or targets and future returns to
shareholders, including dividend payments (base or variable) and share repurchases. The words “anticipates,”
“may,” “can,” “plans,” “believes,” “estimates,” “expects,” “projects,” "targets," “intends,” “likely,” “will,” “should,”
“could,” “to be,” ”potential," “assumptions,” “guidance,” “future” and any similar expressions are intended to identify
those assertions as forward-looking statements. The timing and amount of any share repurchases will be at the
discretion of management and will depend on a variety of factors including, but not limited to, our operating
performance, cash flow and financial position, the market price of the shares and general economic and market
conditions. The share repurchase program may be modified, increased, suspended or terminated at any time at the
Board’s discretion. The declaration and payment of dividends (base or variable) is also at the discretion of the Board
and will depend on our financial results, cash requirements, business prospects, global economic conditions and
other factors deemed relevant by the Board.
We caution readers that forward-looking statements are not guarantees of future performance and actual results
may differ materially from those anticipated, expected, projected or assumed in the forward-looking statements.
Important factors that can cause our actual results to differ materially from those anticipated in the forward-looking
statements include, but are not limited to, changes in our credit rating; changes in our cash requirements, financial
position, financing plans or investment plans; ability to continue to maintain our net debt at a level not to exceed the
net debt target in our financial policy; changes in general market, economic, tax, regulatory or industry conditions;
the duration and scope of and uncertainties associated with the COVID-19 pandemic (including new and emerging
strains and variants of COVID-19), and the impact thereof on commodity prices, our business and any related
actions taken by governments and businesses; our ability to contain and mitigate the risk of spread or major
outbreak of COVID-19 at our operating sites, including at PT-FI’s remote operating site in Papua; supply of and
demand for, and prices of, copper, gold and molybdenum; mine sequencing; changes in mine plans or operational
modifications, delays, deferrals or cancellations; production rates; timing of shipments; results of feasibility studies;
potential inventory adjustments; potential impairment of long-lived mining assets; the potential effects of violence in
Indonesia generally and in the province of Papua; the Indonesia government's extension of PT-FI's export license
after March 15, 2022; risks associated with underground mining; satisfaction of requirements in accordance with PT-
FI's IUPK to extend mining rights from 2031 through 2041; the Indonesia government's approval of a deferred
schedule for completion of new domestic smelting capacity in Indonesia; expected results from improvements in
operating procedures and technology, including innovation initiatives; industry risks; regulatory changes; political
and social risks; labor relations, including labor-related work stoppages and costs; weather- and climate-related
risks; environmental risks; litigation results and completion of settlement agreements; cybersecurity incidents;
changes in general market, economic and industry conditions; financial condition of our customers, suppliers,
vendors, partners and affiliates; reductions in liquidity and access to capital; our ability to comply with our
responsible production commitments under specific frameworks and any changes to such frameworks; our ability to
consummate the redemption of senior notes and other factors described in more detail under the heading “Risk
Factors” contained in Part I, Item 1A. of our 2020 Form 10-K.
Investors are cautioned that many of the assumptions upon which our forward-looking statements are based are
likely to change after the date the forward-looking statements are made, including for example commodity prices,
which we cannot control, and production volumes and costs or technological solutions and innovation, some
aspects of which we may not be able to control. Further, we may make changes to our business plans that could
affect our results. We caution investors that we undertake no obligation to update any forward-looking statements,
which speak only as of the date made, notwithstanding any changes in our assumptions, changes in business
plans, actual experience or other changes.
Table of Contents
70

-- 70 of 75 --

This report on Form 10-Q also contains financial measures such as net debt and unit net cash costs per pound of
copper and molybdenum, which are not recognized under U.S. GAAP. Refer to “Operations – Unit Net Cash Costs”
for further discussion of unit net cash costs associated with our operating divisions, and to “Product Revenues and
Production Costs” for reconciliations of per pound costs by operating division to production and delivery costs
applicable to sales reported in our consolidated financial statements. Refer to “Net Debt” for reconciliations of debt
and consolidated cash and cash equivalents to net debt.
Item 3. Quantitative and Qualitative Disclosures About Market Risk.
There have been no material changes in our market risks during the nine-month period ended September 30, 2021.
For additional information on market risks, refer to “Disclosures About Market Risks” included in Part II, Items 7. and
7A. of our 2020 Form 10-K. For projected sensitivities of our operating cash flow to changes in commodity prices,
refer to “Outlook” in Part I, Item 2. of this quarterly report on Form 10-Q; for projected sensitivities of our
provisionally priced copper sales to changes in commodity prices refer to “Consolidated Results – Revenues” in
Part I, Item 2. of this quarterly report on Form 10-Q.
Item 4. Controls and Procedures.
(a) Evaluation of disclosure controls and procedures. Our chief executive officer and chief financial officer, with
the participation of management, have evaluated the effectiveness of our “disclosure controls and
procedures” (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) as of
the end of the period covered by this quarterly report on Form 10-Q. Based on their evaluation, they have
concluded that our disclosure controls and procedures were effective as of September 30, 2021.
(b) Changes in internal control over financial reporting. There has been no change in our internal control over
financial reporting that occurred during the quarter ended September 30, 2021, that has materially affected,
or is reasonably likely to materially affect, our internal control over financial reporting.
Part II. OTHER INFORMATION
Item 1. Legal Proceedings.
We are involved in numerous legal proceedings that arise in the ordinary course of our business or are associated
with environmental issues. We are also involved periodically in reviews, inquiries, investigations and other
proceedings initiated by or involving government agencies, some of which may result in adverse judgments,
settlements, fines, penalties, injunctions or other relief.
Management does not believe, based on currently available information, that the outcome of any legal proceeding
reported in Part I, Item 3. “Legal Proceedings” and Note 12 of our 2020 Form 10-K, and Note 8 herein, will have a
material adverse effect on our financial condition; although individual or cumulative outcomes could be material to
our operating results for a particular period, depending on the nature and magnitude of the outcome and the
operating results for the period.
There have been no material changes to legal proceedings previously disclosed in Part I, Item 3. “Legal
Proceedings” and Note 12 of our 2020 Form 10-K. Refer to Note 8 for updates to our talc and asbestos claims.
Table of Contents
71

-- 71 of 75 --

Item 1A. Risk Factors.
There have been no material changes to our risk factors previously disclosed in Part I, Item 1A. “Risk Factors” of
our 2020 Form 10-K.
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds.
There were no unregistered sales of equity securities during the three months ended September 30, 2021.
There were no shares of common stock purchased by us during the three months ended September 30, 2021. On
November 1, 2021, our Board approved a new share repurchase program, which does not have an expiration date,
authorizing repurchases of up to $3.0 billion of our common stock. This new share repurchase program supersedes
and replaces the share repurchase program previously authorized by our Board in July 2008.
Item 4. Mine Safety Disclosures.
The safety and health of all employees is our highest priority. Management believes that safety and health
considerations are integral to, and compatible with, all other functions in the organization and that proper safety and
health management will enhance production and reduce costs. Our approach towards the safety and health of our
workforce is to continuously improve performance through implementing robust management systems and providing
adequate training, safety incentive and occupational health programs. The information concerning mine safety
violations or other regulatory matters required by Section 1503(a) of the Dodd-Frank Wall Street Reform and
Consumer Protection Act and Item 104 of Regulation S-K is included in Exhibit 95.1 to this quarterly report on Form
10-Q.
Item 5. Other Information.
Appointment of New Independent Director
On November 1, 2021, our Board increased the size of the Board from nine to ten directors and appointed Ryan M.
Lance to serve as a director of FCX, effective immediately, and as a member of the Corporate Responsibility
Committee, effective November 2, 2021. Mr. Lance will serve as a director until our 2022 annual meeting of
stockholders and until his successor is duly elected and qualified.
The Board affirmatively determined that Mr. Lance has no material relationship with us and is independent in
accordance with the director independence standards established under our Corporate Governance Guidelines,
which comply with the New York Stock Exchange corporate governance rules, and other applicable laws, rules and
regulations. There is no arrangement or understanding between Mr. Lance and any other person pursuant to which
he was appointed as a director. There are no transactions in which Mr. Lance has an interest requiring disclosure
under Item 404(a) of Regulation S-K.
Our Board is now comprised of ten members, including nine independent directors.
Mr. Lance will be compensated in accordance with our non-management director compensation program, which is
described in our definitive proxy statement on Schedule 14A filed with the U.S. Securities and Exchange
Commission on April 22, 2021 (the 2021 Proxy Statement) under the heading “Director Compensation.” On
November 1, 2021, Mr. Lance received a pro-rata equity award of 2,500 restricted stock units (RSUs), which will
vest on the first anniversary of the grant date, or November 1, 2022.
Appointment of Chief Financial Officer
On November 2, 2021, we announced the appointment of Maree Robertson as Senior Vice President and Chief
Financial Officer, effective as of March 1, 2022 (the Effective Date). In this role, Ms. Robertson will assume
responsibility for our accounting, finance and tax functions, including financial reporting, operational accounting,
internal controls, financial planning and analysis, treasury and risk management. Ms. Robertson will report to
Kathleen L. Quirk. Ms. Quirk has served as Chief Financial Officer since 2003 and was appointed to an expanded
role of President in February 2021. Ms. Quirk will continue to serve as President.
Table of Contents
72

-- 72 of 75 --

Ms. Robertson, age 46, served as Chief Financial Officer, Energy and Minerals of Rio Tinto Group, a multinational
metals and mining company, since September 2019. Prior to joining Rio Tinto, Ms. Robertson had a 17-year career
at BHP Group, a multinational natural resources company, serving in a broad range of international finance
functions, including Vice President, Finance, Petroleum USA; Head of Finance, Conventional and Potash,
Petroleum USA; Vice President, Finance, Potash Canada; and Vice President, Finance, Minera Escondida Ltda.
Ms. Robertson joined BHP in 2002 after four years in the PricewaterhouseCoopers natural resource audit practice.
Ms. Robertson holds a Bachelor of Commerce from the University of Melbourne.
As of the Effective Date, Ms. Robertson will be paid an annual base salary of $625,000. She will be eligible to
participate in our Annual Incentive Plan with a target to be set at 125 percent of her base salary for 2022. Ms.
Robertson will also be eligible to receive long-term incentive awards with a grant date value equal to 300 percent of
her base salary granted in a form determined by the Compensation Committee, which may include performance
share units, stock options and RSUs. The Compensation Committee will have discretion each year to set these
amounts.
Upon the Effective Date, Ms. Robertson will receive sign-on incentives as compensation for certain incentives
received from her former employer expected to be forfeited upon joining us as follows: (1) a one-time grant of RSUs
that will vest ratably over three years with a grant date value of $1.25 million, with the number of RSUs to be
determined based on the 20-day trailing average stock price from the Effective Date, and (2) a one-time cash
payment of $625,000 subject to repayment or partial repayment if she resigns at any time within two years following
the Effective Date. In addition, Ms. Robertson will be eligible to participate in our Executive Change in Control
Severance Plan. Severance benefits under the plan include: (1) a lump sum cash payment equal to two times the
sum of Ms. Robertson’s base salary plus her average bonus, (2) a prorated bonus for the year of termination
calculated based on her average bonus and the number of days worked during the year of termination, and (3) 18
months of health benefit continuation.
There are no family relationships between Ms. Robertson and any director, executive officer, or person nominated
or chosen by us to become a director or executive officer of FCX. Ms. Robertson is not a party to any transaction
required to be disclosed pursuant to Item 404(a) of Regulation S-K.
For additional information regarding our executive compensation program and our Executive Change in Control
Severance Plan, see our 2021 Proxy Statement.
Table of Contents
73

-- 73 of 75 --

Item 6. Exhibits.
Filed
Exhibit with this Incorporated by Reference
Number Exhibit Title Form 10-Q Form File No. Date Filed
2.1* PT-FI Divestment Agreement dated as of September
27, 2018 among FCX, International Support LLC, PT
Freeport Indonesia, PT Indocopper Investama and PT
Indonesia Asahan Aluminium (Persero).
10-Q 001-11307-01 11/9/2018
2.2 Supplemental and Amendment Agreement to the PT-FI
Divestment Agreement, dated December 21, 2018,
among FCX, PT Freeport Indonesia, PT Indonesia
Papua Metal Dan Mineral (f/k/a PT Indocopper
Investama), PT Indonesia Asahan Aluminium (Persero)
and International Support LLC.
10-K 001-11307-01 2/15/2019
3.1 Amended and Restated Certificate of Incorporation of
FCX, effective as of June 8, 2016. 8-K 001-11307-01 6/9/2016
3.2 Amended and Restated By-Laws of FCX, effective as
of June 3, 2020. 8-K 001-11307-01 6/3/2020
15.1 Letter from Ernst & Young LLP regarding unaudited
interim financial statements. X
22.1 List of Guarantor Subsidiaries 10-K 001-11307-01 2/16/2021
31.1 Certification of Principal Executive Officer pursuant to
Rule 13a-14(a)/15d – 14(a). X
31.2 Certification of Principal Financial Officer pursuant to
Rule 13a-14(a)/15d – 14(a). X
32.1 Certification of Principal Executive Officer pursuant to
18 U.S.C. Section 1350. X
32.2 Certification of Principal Financial Officer pursuant to
18 U.S.C Section 1350. X
95.1 Mine Safety and Health Administration Safety Data. X
101.INS XBRL Instance Document- the XBRL Instance
Document does not appear in the Interactive Data File
because its XBRL tags are embedded within the Inline
XBRL document.
X
101.SCH Inline XBRL Taxonomy Extension Schema. X
101.CAL Inline XBRL Taxonomy Extension Calculation
Linkbase. X
101.DEF Inline XBRL Taxonomy Extension Definition Linkbase. X
101.LAB Inline XBRL Taxonomy Extension Label Linkbase. X
101.PRE Inline XBRL Taxonomy Extension Presentation
Linkbase. X
104 The cover page from this Quarterly Report on Form
10-Q, formatted in Inline XBRL. X
* The registrant agrees to furnish supplementally to the Securities and Exchange Commission (SEC) a copy of any omitted
schedule or exhibit upon the request of the SEC in accordance with Item 601(a)(5) of Regulation S-K.
Table of Contents
74

-- 74 of 75 --

SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to
be signed on its behalf by the undersigned thereunto duly authorized.
Freeport-McMoRan Inc.
By: /s/ C. Donald Whitmire, Jr.
C. Donald Whitmire, Jr.
Vice President and
Controller - Financial Reporting
(authorized signatory
and Principal Accounting Officer)
Date: November 5, 2021
Table of Contents
S-1

-- 75 of 75 --