PRESENTATION

Q4 2021 — Presentation

Q4 2021PDF · 44 pages6.4 MB
FCX Conference Call
4th Quarter 2021 Results
January 26, 2022

-- 1 of 44 --

Cautionary Statement
Regarding Forward-Looking Statements
This presentation contains forward-looking statements in which FCX discusses its potential future performance. Forward-looking statements are all statements other than statements of
historical facts, such as plans, projections, or expectations relating to business outlook, strategy, goals or targets; ore grades and milling rates; production and sales volumes; unit net cash costs;
capital expenditures; operating costs; operating plans; cash flows; liquidity; PT-FI's development, financing, construction and completion of new domestic smelting capacity in Indonesia in
accordance with the terms of its special mining license (IUPK); FCX’s commitments to deliver responsibly produced copper, including plans to implement and validate all of its operating sites
under The Copper Mark, and to comply with other disclosure frameworks; execution of FCX's energy and climate strategies and the underlying assumptions and estimated impacts on FCX’s
business related thereto; achievement of climate commitments by 2030 and 2050 net zero aspirations; improvements in operating procedures and technology innovations; exploration efforts and
results; development and production activities, rates and costs; future organic growth opportunities; tax rates; export quotas and duties; the impact of copper, gold and molybdenum price
changes; the impact of deferred intercompany profits on earnings; mineral reserve and mineral resource estimates; final resolution of settlements associated with ongoing legal proceedings; and
the ongoing implementation of FCX’s financial policy and future returns to shareholders, including dividend payments (base or variable) and share repurchases. The words “anticipates,” “may,”
“can,” “plans,” “believes,” “estimates,” “expects,” “projects,” “targets,” “intends,” “likely,” “will,” “should,” “could,” “to be,” “potential,” “assumptions,” “guidance,” “aspirations,” “future” and any
similar expressions are intended to identify those assertions as forward-looking statements. The timing and amount of any share repurchases is at the discretion of management and will depend
on a variety of factors including, but not limited to, FCX’s operating performance, cash flow and financial position, the market price of the shares and general economic and market conditions.
The share repurchase program may be modified, increased, suspended or terminated at any time at the Board’s discretion. The declaration and payment of dividends (base or variable) is also at
the discretion of the Board and will depend on FCX’s financial results, cash requirements, business prospects, global economic conditions and other factors deemed relevant by the Board.
FCX cautions readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, expected, projected or
assumed in the forward-looking statements. Important factors that can cause FCX's actual results to differ materially from those anticipated in the forward-looking statements include, but are not
limited to, changes in FCX's cash requirements, financial position, financing or investment plans; political and social risks; changes in general market, economic, tax, regulatory or industry
conditions; the ongoing COVID-19 pandemic and any future public health crisis; supply of and demand for, and prices of, copper, gold and molybdenum; mine sequencing; changes in mine
plans or operational modifications, delays, deferrals or cancellations; production rates; timing of shipments; results of technical, economic or feasibility studies; potential inventory adjustments;
potential impairment of long-lived mining assets; the potential effects of violence in Indonesia generally and in the province of Papua; the Indonesia government’s extension of PT-FI’s export
license after March 15, 2022; operational risks inherent in mining, with higher inherent risks in underground mining; satisfaction of requirements in accordance with PT-FI’s IUPK to extend
mining rights from 2031 through 2041; the Indonesia government’s approval of a deferred schedule for completion of new domestic smelting capacity in Indonesia; labor relations, including
labor-related work stoppages and costs; weather- and climate-related risks; environmental risks and litigation results; cybersecurity incidents; FCX’s ability to comply with its responsible
production commitments under specific frameworks and any changes to such frameworks and other factors described in more detail under the heading “Risk Factors” in FCX’s Annual Report on
Form 10-K for the year ended December 31, 2020, filed with the U.S. Securities and Exchange Commission (SEC).
Investors are cautioned that many of the assumptions upon which FCX’s forward-looking statements are based are likely to change after the date the forward-looking statements are made,
including for example commodity prices, which FCX cannot control, and production volumes and costs or technological solutions and innovation, some aspects of which FCX may not be able to
control. Further, FCX may make changes to its business plans that could affect its results. FCX cautions investors that it undertakes no obligation to update any forward-looking statements,
which speak only as of the date made, notwithstanding any changes in its assumptions, changes in business plans, actual experience or other changes.
This presentation also includes forward-looking statements regarding mineral resources not included in proven and probable mineral reserves. A mineral resource, which includes
measured, indicated and inferred mineral resources, is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that
there are reasonable prospects for economic extraction. Such a deposit cannot qualify as recoverable proven and probable mineral reserves until legal and economic feasibility are confirmed
based upon a comprehensive evaluation of development and operating costs, grades, recoveries and other material factors. This presentation also includes forward-looking statements
regarding mineral potential, which includes exploration targets and mineral resources but will not qualify as mineral reserves until comprehensive engineering studies establish legal and
economic feasibility. Significant additional evaluation is required and no assurance can be given that the potential quantities of metal will be produced. Accordingly, no assurances can be given
that estimated mineral resources or estimated mineral potential not included in mineral reserves will become proven and probable mineral reserves.
This presentation also contains financial measures such as unit net cash costs per pound of copper, net debt and adjusted EBITDA (earnings before interest, taxes, depreciation and
amortization), which are not recognized under U.S. generally accepted accounting principles (GAAP). As required by SEC Regulation G, FCX's calculation and reconciliation of unit net cash
costs per pound of copper and net debt to amounts reported in FCX's consolidated financial statements are in the supplemental schedules of FCX’s 4Q21 press release, which is available on
FCX's website, fcx.com. A reconciliation of adjusted EBITDA to amounts reported in FCX’s consolidated financial statements is included on slide 43.
2

-- 2 of 44 --

3
2021 Accomplishments
• Effective COVID management
• Effective supply chain
management
• Significant volume growth
• Successful ramp-up of
Grasberg underground –
MAJOR ACCOMPLISHMENT
• Advancing organic growth
initiatives
Operational
• Strong financial results and
substantial cash flow
generation
• Achieved net debt* target –
reduction of $19 bn since
year-end 2015
• Commenced performance-
based shareholder payout
framework
• Credit ratings upgraded to
Investment Grade by Moody’s
and Fitch
Financial
• Advanced climate initiatives
• Awarded The Copper Mark
for responsible production
practices at 7 sites (including
4 in 2021)
• Strengthened Board with six
new independent directors
ESG
* Net debt equals consolidated debt less consolidated cash. See Cautionary Statement.

-- 3 of 44 --

4
Strong Execution / Favorable Markets
NOTE: 2020 actuals include gold sales of 0.86 mm ozs and realized prices of $2.95/lb copper, $1,832/oz gold and $10.20/lb molybdenum.
2021 actuals include gold sales of 1.36 mm ozs and realized prices of $4.33/lb copper, $1,796/oz gold and $15.56/lb molybdenum.
(1) For a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in FCX’s consolidated financial statements,
refer to “Product Revenues and Production Costs” in the supplemental schedules of FCX’s 4Q21 press release, which is available on FCX’s website.
(2) A reconciliation of 2020 and 2021 adjusted EBITDA to amounts reported in FCX’s consolidated financial statements is included on slide 43.
(3) Net debt equals consolidated debt less consolidated cash. 2021 includes $432 mm in debt associated with the Indonesia smelter project. See Cautionary Statement.
$6.1
$1.4
($ bns)
Net Debt (3)
~$4.7 bn Lower
2020 2021
Unit Net Cash Costs (1)
~9% Lower
($ per lb)
$1.48
$1.34
2020 2021
Adjusted EBITDA (2)
~160% Higher
$4.2
$10.9
2020 2021
($ bns) ($ bns)
$3.0
$7.7
2020
Operating Cash Flows
~156% Higher
2021
3.2
3.8
2021
Copper Sales
~19% Higher
(bns)
2020

-- 4 of 44 --

5
Copper – Metal of the Future
Critical to Global Decarbonization
Source: International Copper Association
See Cautionary Statement.
Freeport is strategically positioned as a leading copper producer.
Intensity of Use Is Increasing with Decarbonization
More than 65% of the
world’s copper is used
in applications that
deliver electricity.
Electric vehicles use
up to four times more
copper than internal
combustion engines.
Copper consumption
associated with electric
vehicles and renewable
energy technologies
to grow rapidly.
Renewable energy
technologies use four to
five times more copper
than fossil fuel power
generation.

-- 5 of 44 --

6
• Responsible producer of scale
• Strong cash flows & balance sheet
• Embedded growth options
• Long-lived reserves
• Attractive capital allocation
framework
Compelling Investment Case
For Copper & Freeport
Structural DeficitsRising
Demand
Supply
Scarcity
See Cautionary Statement.
• Global economic recovery
and infrastructure
development
• New demand drivers for
clean energy
• Exceptionally low visible
exchange inventories
• Geology
• Permitting - longer lead times
• Pipeline is thin
o Project approval rate has been
slow in recent years

-- 6 of 44 --

Indonesia
30%
North America
40%
Long-Lived Reserve Base
Copper (bn lbs) 107 191
Gold (mm ozs) 27 58
Molybdenum (bn lbs) 3.4 5.9
Mineral
Reserves (1)
(recoverable)
Incremental
Mineral Resources (2)
(contained)
(2) Includes measured, indicated and inferred mineral resources. Estimate of consolidated mineral resources (contained metal) were assessed using a
long-term average copper price of $3.00/lb, gold price of $1,200/oz and molybdenum price of $12/lb. Mineral resources are not included in mineral
reserves and will not qualify as mineral reserves until comprehensive engineering studies establish legal and economic feasibility.
Accordingly, no assurance can be given that the estimated mineral resources will become proven and probable mineral reserves.
(1) Preliminary estimate of recoverable proven and probable consolidated mineral reserves using long-term average prices of $2.50/lb for copper,
$1,200/oz for gold and $10/lb for molybdenum; FCX’s net equity interest of copper mineral reserves totaled 76 bn lbs as of 12/31/2021.
Consolidated
As of 12/31/2021
South
America
30%
Copper Reserves (1) By Region
See Cautionary Statement.
7

-- 7 of 44 --

Growing Margins & Cash Flow
($ in billions)
Annual EBITDA Estimates (1)
(1) Based on January 2022 sales estimates, $1,800/oz Au and $19/lb molybdenum.
2022e EBITDA expected to exceed $13 bn assuming $4.50/lb Cu, $1,800/oz Au and $19/lb molybdenum.
Note: EBITDA equals operating income plus depreciation, depletion and amortization.
e = estimate. See Cautionary Statement.
$4.00/lb
Cu
$5.00/lb
Cu
~$12
~$16
• Volume growth
• Effective cost management
• Expanding margins
• Additional embedded growth
options in portfolio
• Laser focused on execution
• Strong track record
2021 v. 2020 2022e v. 2021
Copper ~19% ~13%
Gold ~59% ~16%
8
$10.9
$4.33/lb
Cu
2021 Actual 2023e/2024e Avg

-- 8 of 44 --

0%
25%
50%
75%
100%
4Q19 4Q20 4Q21 2022e
Successful Ramp-up of
Grasberg Underground Mines
e = estimate. See Cautionary Statement.
Note: Includes production from Grasberg Block Cave, DMLZ, DOZ and Big Gossan.
Quarterly Production Annualized
as % of Targeted Average 2021
-2023e
 2021-2023e Annual Average Target
>1.5 bn lbs Cu & 1.6 mm ozs Au
• 4Q21 annualized metal production reached ramp-up targets
• Major accomplishment – establishes Grasberg Complex as world’s
largest underground mine
9

-- 9 of 44 --

10
Significant Underground Development
Grasberg Block Cave (GBC), DMLZ & Big Gossan, 2004-2021
• Over 350 miles of tunneling
• Over 7 miles of UG Rail
(10 trains operating)
• 4 gyratory crushers operating
• 5 miles of conveyor belting constructed
• 300-person capacity service shaft
operating
• 510 drawbells opened
• 348,000 m2 undercut (~70 football fields)
• On track to achieve long-term rates in
excess of 200k t/d
Key Accomplishments
Ventilation Tunnels
AB Adits
GBC Rail Unloading Station
2008
2004
2018
as of year-end 2003
Grasberg BC
Kucing Liar
Big Gossan
DOZ
DMLZ
Grasberg Open Pit
Grasberg BC
Kucing Liar
Big Gossan
DOZ
DMLZ
Grasberg Open Pit
AB Adits
as of year-end 2021
UG development since 2004
Underground Development in
Grasberg Minerals District
See Cautionary Statement.

-- 10 of 44 --

Future Growth Embedded in Existing Asset Base
Provides Increased Leverage to Higher Copper Prices
• Focused on initiatives
to advance sulfide
leaching technologies
and to drive
continuous recovery
improvement
• Success would enable
utilization of latent
tank house capacity
with limited capital
investment
• Double concentrator
capacity
• Commencing
feasibility study,
stakeholder
engagement
• Increasing confidence
in commencing
construction in 2023
for potential 2026
start-up
See Cautionary Statement.
• Commenced
development of
underground
copper/gold reserves
• Benefits from
substantial shared
infrastructure
11
• Near-term oxide
expansions
• Increasing exploration
to define resource
• Potential long-term
sulfide investment in
concentrator
• Large sulfide resource
supports a major
expansion opportunity
• Preparations for
submitting
environmental impact
statement and
stakeholder
engagement
• Monitoring regulatory
considerations
New Leach
Technologies
Americas
Bagdad
Expansion
Arizona
Kucing Liar
Grasberg District
Indonesia
El Abra
Expansion
Chile
Lone Star
Expansions
Arizona

-- 11 of 44 --

12
• Success of oxide development advances
opportunity for scale
• Design to incorporate combined leach and
concentrate facilities – similar to Morenci
• Next steps
o Ongoing exploration to support metallurgical testing
o Scoping studies/mine planning scenarios
Lone Star Update
(1) Initially at 105k t/d with ramp-up to 120k t/d by 2024.
(2) Excludes historic Safford leach material which currently approximates 25 mm lbs/annum.
(3) Estimated mineral potential includes exploration targets and mineral resources but will not qualify as mineral reserves until comprehensive engineering studies establish legal and economic feasibility.
Significant additional evaluation is required and no assurance can be given that the potential quantities of metal will be produced. Accordingly, no assurance can be given that estimated mineral potential
not included in mineral reserves will become proven and probable mineral reserves.
e = estimate See Cautionary Statement.
Sulfides
75
96
120
Original Design 2021 Incremental
Expansion
Oxides
2020 start-up
Low capital
intensity
investment
in additional
mining and
processing
equipment
~200 mm ~250 mm (2) ~300 mm
lbs/annum
Stacking
rate
(k t/d)
2P Reserves: 4.9 billion lbs Mineral Potential: ~50 billion lbs (3)
(1)

-- 12 of 44 --

13
Advancing New Leach Technologies
Taking Leach to the Next Level
South
America
16%
Balance
North America
34%
Morenci
50%
Copper in Leach Stockpiles
Unrecoverable by
Traditional Leach Methods
38 bn lbs Contained*
* Copper from historical placements beyond
assumed recovery estimates and is not included
in mineral reserves and mineral resources.
See Cautionary Statement.
• Industry leader with long history of leach production
• Internal and external initiatives to advance sulfide
leaching technologies and to drive continuous
recovery improvement
• Data analytics providing new insights to drive
additional value
• Focused on traditional ores and ores that have been
typically considered difficult to leach, like
chalcopyrite
• Leveraging both R&D and in-field trials at existing
leach stockpiles and future opportunities to recover
copper from below mill cut-off grade material
• Success would enable utilization of latent tank house
capacity with limited capital investment
• Low carbon footprint

-- 13 of 44 --

14
World’s Premier Publicly Traded Copper Producer
Industry Leader
with Size, Scale and Durability
Copper Supported by Positive
Long-Term Fundamentals
Strong Track Record
and Commitment to Communities /
Environmental Responsibility
Growing Production
and Cash Flow Profile
Portfolio of High-Quality
Copper / Gold Assets with
Embedded Growth Options
Difficult to Replicate
Technically Proficient
Proven Capabilities
Experienced Management Team

-- 14 of 44 --

15

-- 15 of 44 --

Financial Review & Outlook
16

-- 16 of 44 --

4Q 2021 Operations Update
North America South America Indonesia
Cu Sales: 364 mm lbs Cu Sales: 286 mm lbs Cu Sales: 370 mm lbs
Au Sales: 392 k ozs
• Lone Star/Safford
o Produced 265 mm lbs in 2021 (exceeded
design)
o Proceeding with incremental expansion
to 300 mm lb/annum
• Morenci
o Leach projects in focus
• Cerro Verde - Peru
o 4Q21 mill avg: 377k mt/d
o Targeting ~400k mt/d in 2022
o Successful completion of multi-year
labor agreements
• El Abra - Chile
o Increasing operating rates to
pre-COVID-19 pandemic levels
o Expect 30% increase in 2022 production
o New leach pad is under construction
• Grasberg Underground
o 4Q21 annualized metal production
achieved post ramp-up targets
o DMLZ/GBC operating rates
‒ 4Q21 Avg: ~161k t/d; 18% above 3Q rates
o Advancing Kucing Liar development
o Advancing new SAG Mill - expected in
mid-2023
o Advancing dual-fuel power plant and
mill recovery/efficiency project
See Cautionary Statement.
17

-- 17 of 44 --

18
Indonesia Downstream Processing Update
• PT-FI committed in 2018 IUPK to construct 2 mm tpy in-country
Cu concentrate processing capacity by December 2023
o Construction of new greenfield smelter has been delayed by COVID-19
o Project expected to be completed as soon as feasible in 2024*
o PT Smelting expansion expected to be completed by end of 2023
• Capital costs shared 51% / 49% (PT Inalum/FCX)
• Smelter spend to be debt financed
• Annual debt service cost expected to be essentially offset by
phase out of export duty
Preliminary Estimate of Spending
on Greenfield Smelter and PMR
$0.2
$1.4
$1.1
$0.4
2021 2022e 2023e 2024e
($ in bns)
NOTE: Capital spending on the new smelter will be debt financed (economics shared
49% by FCX) and will not be deducted from cash available for returns to shareholders.
Excludes capitalized interest, owner’s costs and commissioning. • New greenfield smelter - Progressed site preparation activities
• PT Smelting expansion - Completed commercial arrangements
4Q Progress Report
e = estimate. See Cautionary Statement.
NOTE: See slide 40 for additional details.
* Dependent on no further COVID-19-related disruptions.

-- 18 of 44 --

Annual Sales Profile
January 2022 Estimate
(1) Consolidated copper sales include 608 mm lbs in 2020, 741 mm lbs in 2021,
847 mm lbs in 2022e, 1,479 mm lbs in 2023e and 1,409 mm lbs in 2024e for
noncontrolling interests; excludes purchased copper.
(2) Consolidated gold sales include 158k ozs in 2020, 253k ozs in 2021, 296k ozs
in 2022e, 804k ozs in 2023e and 820k ozs in 2024e for noncontrolling interests.
e = estimate. See Cautionary Statement.
0
1
2
3
4
5
2020 2021 2022e 2023e 2024e
3.2
3.8
4.3
4.5
4.2
0
1
2
2020 2021 2022e 2023e 2024e
0.9
1.4
1.6
1.8
1.6
0
25
50
75
100
2020 2021 2022e 2023e 2024e
80 82 80 80 80
(million ozs)	(billion lbs)	Copper Sales(1) Gold Sales(2)
(million lbs)	Molybdenum Sales
19

-- 19 of 44 --

20
2022e Quarterly Sales
0
200
400
600
800
1,000
1,200
1Q22e 2Q22e 3Q22e 4Q22e
970
1,075 1,125 1,130
Note: Consolidated gold sales include 71k ozs in 1Q22e, 75k ozs
in 2Q22e, 75k ozs in 3Q22e and 75k ozs in 4Q22e for noncontrolling interests.
e = estimate. See Cautionary Statement.
Note: Consolidated copper sales include 183 mm lbs in 1Q22e,
207 mm lbs in 2Q22e, 230 mm lbs in 3Q22e and 227 mm lbs in
4Q22e for noncontrolling interests; excludes purchased copper.
0
5
10
15
20
25
1Q22e 2Q22e 3Q22e 4Q22e
20 20 20 20
0
100
200
300
400
500
1Q22e 2Q22e 3Q22e 4Q22e
380 400 400 400
(million lbs)Copper Sales (thousand ozs)	Gold Sales
(million lbs)Molybdenum Sales

-- 20 of 44 --

Reconciliation of 2021 Unit Net Cash
Cost Guidance for 2022e
2021 Actual
Price Realizations
$4.33 Cu / $1,796 Au / $15.56 Mo
2022e Guidance
Price Assumptions
$4.50 Cu / $1,800 Au / $19 Mo
Energy, Acid, Labor, M&S, higher volumes*
Site Production & Delivery $1.93 +2¢ $1.95
By-product Credits (0.89) -3¢ (0.92)
Treatment Charges 0.16 No Change 0.16
Royalties & Export Duties 0.14 +2¢ 0.16
Net Unit Cash Costs $1.34 $1.35
Impacts
($ and ¢ per pound of copper)
e = estimate. See Cautionary Statement.
* Energy +5¢/lb, acid +5¢/lb, labor and outside services 5¢/lb, materials &
supplies (M&S) 3¢/lb, mostly offset by higher volumes (~16¢/lb)
21

-- 21 of 44 --

22
NOTE: EBITDA equals operating income plus depreciation, depletion and amortization. e = estimate. See Cautionary Statement.
(1) U.S. Dollar Exchange Rates: 844 Chilean peso, 14,300 Indonesian rupiah, $0.72 Australian dollar, $1.13 Euro, 4.04 Peruvian Nuevo Sol base case assumption. Each +10% equals a
10% strengthening of the U.S. dollar; a strengthening of the U.S. dollar against forecasted expenditures in these foreign currencies equates to a cost benefit of noted amounts.
$0
$5
$10
$15
$20
Cu $4.00/lb Cu $4.50/lb Cu $5.00/lb
Average
’23e/’24e
$0
$3
$6
$9
$12
$15
Cu $4.00/lb Cu $4.50/lb Cu $5.00/lb
Average
’23e/’24e
($ in bns except copper, gold and molybdenum prices)
Operating cash flow l Excludes working capital changes ($1,800/oz gold, $19/lb molybdenum)
EBITDA l ($1,800/oz gold, $19/lb molybdenum)
EBITDA and Cash Flow at Various Copper Prices
Sensitivities
Average ’23e/’24e
(US$ in mms)
EBITDA
Operating Cash Flow
Copper +/-$0.10/lb $325
Molybdenum +/-$1.00/lb $ 70
Gold +/-$50/oz $ 55
Currencies (1) +/-10% $135
Diesel +/-10% $ 50
Copper +/-$0.10/lb $430
Molybdenum +/-$1.00/lb $ 80
Gold +/-$50/oz $ 85
Currencies(1) +/-10% $190
Diesel +/-10% $ 70

-- 22 of 44 --

2021 2022e 2023e
Consolidated Capital Expenditures
Excluding Indonesia Smelter Projects CAPEX (1)
Major
Projects
(1) See slide 18; Indonesia smelter projects expected to be funded with debt financing.
(2) Net of scheduled contributions from PT Inalum for expansion capital spending that will be reflected in financing on the cash flow statement.
(3) Major projects include CAPEX associated with Grasberg underground development and supporting mill and power capital costs ($1.2 bn in 2022e and $0.6 bn in 2023e).
For detail of discretionary spending see slide 24.
NOTE: Amounts include capitalized interest. Discretionary CAPEX will be excluded from the free cash flow calculation for purposes of the performance-based payout framework.
e= estimate. See Cautionary Statement.
Other
$1.3
$1.9
$0.6
Net of Scheduled
Contributions
($ in bns)
$1.7(2)
$3.1(2)
$3.3
$1.4(3)
$1.3
$
23
$2.7
$1.3
$0.7(3)
Planned
Discretionary
Planned
Discretionary
$0.7	$0.6

-- 23 of 44 --

24
Recent New Discretionary Capital Additions*
• Commenced long-term mine development activities
• Approximate 10-year development timeframe
• Sustain large-scale, low-cost Cu/Au production
• Capital investment: ~$400 mm/yr average
(~$200 mm in 2022e)
• > 6 bn lbs copper & 5 mm ozs gold
o ~ 600 mm lbs/500K ozs per annum
• Recycle electronic material
• Commencing engineering/sourcing of material
• Capital investment: ~$320 mm (~$100 mm in 2022e)
• Expect to commission in 2024; full rates in 2025
• ~$60 mm per annum in incremental EBITDA
Kucing Liar Grasberg Mill Recovery Project
Lone Star Oxide Expansion Atlantic Copper CirCular
• Low capital intensity investment
• Capital investment: ~$250 mm (~$150 mm in 2022e)
• Increase stacking rate: 95k t/d to 120k t/d
• Targeting 300 mm lbs of copper/annum by 2023
o +50 mm lbs/yr of incremental production
• Installing new copper cleaner circuit
• Improved copper concentrate grades and metal
recoveries
• Capital investment: ~$420 mm (~$200 mm in 2022e)
• Targeted completion: 1H24e
• +60 mm lbs/yr & +40K ozs/yr of incremental metal
*These discretionary projects and the Indonesia smelter projects will be excluded from the free cash flow calculation for purposes of the performance-based payout framework.
e = estimate. See Cautionary Statement.

-- 24 of 44 --

25
Solid Balance Sheet and Credit Metrics
Net Debt /
Adjusted EBITDA (3)
$6.1
$1.4
($ bns)
Net Debt	$
1.5x 0.1x
(1) Net debt equals consolidated debt less consolidated cash and cash equivalents.
(2) Consolidated debt of $9.5 bn and consolidated cash of $8.1 bn. Debt includes $432 mm
associated with the Indonesia smelter projects.
(3) Trailing 12-months.
See Cautionary Statement.
(1)
(2)
Recent Investment Grade
upgrades by Moody’s and Fitch
12/31/2020 12/31/2021

-- 25 of 44 --

Financial Policy
(1) Net Debt not to exceed $3 - $4 bn, excluding project debt for additional smelting capacity in Indonesia.
(2) Available cash flows generated after planned capital spending (excluding Indonesia smelter projects funded with debt and discretionary CAPEX) and distributions to noncontrolling interests.
See Cautionary Statement.
Board will assess future cash returns at least annually based on performance
Strategic Objectives
Maintain strong
balance sheet (1)
Increase cash returns
to shareholders
Advance organic growth
opportunities
Commenced Performance-Based Payout Framework in November 2021
• Annual rate of $0.30 per share
• Declared and paid quarterly in
Feb / May / Aug / Nov
Variable dividend Share repurchase program
• Board authorized $3.0 bn share buyback
• $600 mm repurchased to date
(15.4 mm shares @ ~$39/share)
• Board approved $0.30/share for 2022
• Intend to pay quarterly in 2022 with
base dividend
Designed to Return up to 50% of Free Cash Flow(2) to Shareholders
Base dividend
26

-- 26 of 44 --

Increasing Shareholder Returns
Combination of dividends and repurchases designed
to achieve 50% performance-based payout
* Timing of repurchase program will be dependent on cash flows and managed to implement the
50% performance-based payout framework (see slide 26).
e = estimate. See Cautionary Statement.
$0.8 bn
Base Dividend
$0.30/share
Variable Dividend
$0.30/share
Share
Repurchases
$2.4 billion
remains available
under Board
authorization*
2021 2022e
Potential ~$3.3 bn*
FEBRUARY 2021
Reinstated common stock
dividend
JUNE 2021
Achieved net debt target
NOVEMBER 2021
Commenced share repurchase
program and announced
increase in common stock
dividends
Cash Returns Timeline
27

-- 27 of 44 --

Responsible
producer with
proven track record
Successful ramp-up
of Grasberg
underground mines
Advancing future
organic growth
opportunities
Increasing cash
returns to shareholders
Strong cash flow
generation and
balance sheet
Favorable
operational and
market outlook
Executing Clearly Defined Strategy Focused on Copper
28

-- 28 of 44 --

Reference Slides

-- 29 of 44 --

30
Our COVID-19 Response
Providing monetary and
in-kind contributions of
medical supplies and food
in areas where we operate
Active and preventive
management, through
the implementation of
global health guidelines,
including testing,
screening, tracking and
vaccine program
As a leading supplier
of copper to the global
economy, FCX
continues to meet the
needs of its customers
WE ARE IN THIS TOGETHER
Serving
Our Customers
Supporting
Our Communities
Prioritizing the Health &
Well-Being of Our
Workforce

-- 30 of 44 --

31
• We are committed to respecting the rights of all people
✓ Announced 2050 Net Zero aspiration, established new 2030 PT-FI GHG
emissions intensity reduction target
✓ Copper Mark awarded at over 50% of our global copper-producing sites,
with more to come
✓ Successfully achieved Board of Directors refreshment objectives,
enhancing diversity and expertise
✓ Investments exceeded $160 million in our global communities
✓ Completed independent, third-party Human Rights Impact Assessment
at El Abra; Arizona is underway
✓ Advanced implementation of the Global Industry Standard on Tailings
Management at Americas sites
✓ Climate, tailings management and workforce diversity and inclusion
priorities incorporated into executive annual compensation program
Responsibly produced copper is critical for the
technologies needed to enable global
decarbonization
Electrifying the Future – 2021 ESG Highlights
Note: PT-FI reduction target is in addition to the 2030 Americas GHG emissions intensity reduction target. For more information on FCX’s climate strategy, see our 2020 Climate
Report at fcx.com/sustainability. To date, seven FCX sites have been awarded The Copper Mark: Morenci, Cerro Verde, El Abra, Atlantic Copper, the Miami smelter and mine,
the El Paso refinery, and Bagdad.

-- 31 of 44 --

32
The Copper Mark
$4.00/lb Cu
〉 Assurance framework developed to demonstrate the copper industry’s responsible
production practices and contribution to the United Nations Sustainable Development Goals
〉 Producers participating in The Copper Mark are committed to adhering to internationally
recognized responsible operating practices
〉 Framework covers 32 issue areas across 5 ESG categories developed by the Responsible
Minerals Initiative’s Risk Readiness Assessment
〉 Requires third-party assurance of site performance and independent Copper Mark
validation every three years
〉 FCX is committed to achieving The Copper Mark at all of our copper producing sites
〉 The Copper Mark is currently evaluating an extension of its framework to metals that are
produced as a by-product of copper
Recognition for Responsible Production
AWARDED LETTER OF COMMITMENT PLANNED
Atlantic Copper smelter & refinery (Spain)
Bagdad mine (AZ)
Cerro Verde mine (Peru)
El Abra mine (Chile)
El Paso refinery (TX)
Miami mine & smelter (AZ)
Morenci mine (AZ)
Chino mine (NM)
Safford mine (AZ)
Sierrita mine (AZ)
Tyrone mine (NM)
PT-FI mine (Indonesia)
COPPER MARK STATUS BY SITE:
Note: Copper Mark status as of 12/15/2021

-- 32 of 44 --

Financial Highlights
Copper
Consolidated Volumes (mm lbs) 1,020 3,807
Average Realization (per lb) $ 4.42 $ 4.33
Site Production & Delivery Costs (per lb) $ 1.96 $ 1.93
Unit Net Cash Costs (per lb) $ 1.29 $ 1.34
Gold
Consolidated Volumes (000’s ozs) 395 1,360
Average Realization (per oz) $1,808 $1,796
Molybdenum
Consolidated Volumes (mm lbs) 19 82
Average Realization (per lb) $19.42 $15.56
4Q21
(1) Includes nonrecurring labor-related charges at Cerro Verde for collective labor agreements reached with its hourly employees totaling
2¢/lb of copper for 4Q21 and 2021.
(2) Includes working capital and other sources of $0.4 bn for 4Q21 and $0.8 bn for 2021.
Revenues $ 6.2 $ 22.8
Net Income Attributable to Common Stock $ 1.1 $ 4.3
Diluted Net Income Per Share $ 0.74 $ 2.90
Operating Cash Flows $ 2.3 $ 7.7
Capital Expenditures $ 0.8 $ 2.1
Total Debt $ 9.5 $ 9.5
Consolidated Cash and Cash Equivalents $ 8.1 $ 8.1
(2)
(in billions, except per share amounts)
Sales Data
Financial Results
2021
(1)
33

-- 33 of 44 --

34
4Q21 Mining Operating Summary
(1) Includes 7 mm lbs in 4Q21 and 5 mm lbs in 4Q20 from South America.
(2) Silver sales totaled 1.0 mm ozs in 4Q21 and 0.9 mm ozs in 4Q20.
(3) Silver sales totaled 1.6 mm ozs in 4Q21 and 1.3 mm ozs in 4Q20.
(4) South America includes 6¢/lb associated with nonrecurring labor-related charges at Cerro Verde for agreements reached with its hourly employees.
NOTE: For a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in FCX’s consolidated financial statements,
refer to “Product Revenues and Production Costs” in the supplemental schedules of FCX’s 4Q21 press release, which is available on FCX’s website.
Cash Unit Costs
Site Production & Delivery, excl. adjs. $2.19 $2.30 $1.47 $1.96
By-product Credits (0.39) (0.36) (2.06) (0.98)
Treatment Charges 0.10 0.13 0.24 0.16
Royalties & Export Duties - 0.01 0.43 0.15
Unit Net Cash Costs $1.90 $2.08 $0.08 $1.29
North South
America America Indonesia Consolidated	(per lb of Cu)	4Q21 Unit Production Costs
North America
21	19 (1)	(1)
Mo
mm lbs
4Q21 4Q20
320
364
4Q21 4Q20
Cu
mm lbs
Indonesia (3)
286
370
4Q21 4Q20
293
392
4Q21 4Q20
South America (2)
4Q21 4Q20
286 260
by Region
Au
000 ozs
Sales From Mines for 4Q21 & 4Q20
(4)
(4)

-- 34 of 44 --

2022e Outlook
Sales
Outlook
Unit Net Cash
Cost of Copper
Operating
Cash Flows (2)
Capital
Expenditures
(1) Assumes average prices of $1,800/oz gold and $19/lb molybdenum in 2022e.
(2) Assumes average prices of $1,800/oz gold and $19/lb molybdenum in 2022e; each $100/oz change in gold would have an approximate $100 mm impact and each $2/lb
change in molybdenum would have an approximate $110 mm impact.
(3) Net of $1.3 billion of working capital and other uses.
(4) PT Inalum scheduled contributions in 2022e approximate $0.2 bn. Major projects CAPEX includes $1.4 bn for planned projects and $0.6 bn of discretionary projects.
(5) Indonesia smelter projects are currently being funded through PT-FI's $1 bn unsecured bank credit facility.
e = estimate. See Cautionary Statement.
• Copper: 4.3 billion lbs
• Gold: 1.6 million ozs
• Molybdenum: 80 million
lbs
• ~$8 billion(3) @ $4.50/lb
copper
• Each 10¢/lb change in
copper in 2022e = $365
million impact
• Site prod. & delivery
o 2022e: $1.95/lb
o 1Q22e: $1.99/lb
• After by-product credits (1)
o 2022e: $1.35/lb
o 1Q22e: $1.35/lb
• $3.3 billion (4) (excluding
smelter(5))
o $2.0 billion for major projects
o $1.3 billion for other mining
35

-- 35 of 44 --

1,180
2021 and 2022e Sales by Region
(1) Includes molybdenum produced in South America.
(2) Includes gold produced in North America.
80 (1)
Mo
mm lbs
1,550
Cu
mm lbs
e = estimate. See Cautionary Statement.
1,570
1.58 (2)
Au
mm ozs
82 (1)
Mo
mm lbs
1,436
Cu
mm lbs
1,316
1.36 (2)
Au
mm ozs
1,055
North America Indonesia	South America
by Region	2021 Sales
North America Indonesia	South America
by Region	2022e Sales
36

-- 36 of 44 --

North South
America America Indonesia Consolidated
2021 and 2022e
Unit Production Costs by Region
(1) Production costs include profit sharing in South America and severance taxes in North America.
(2) Includes nonrecurring labor-related charges at Cerro Verde for collective labor agreements reached with its hourly employees totaling 6¢/lb of copper in South America
and 2¢/lb consolidated.
(3) Estimates assume average prices of $4.50/lb for copper, $1,800/oz for gold and $19/lb for molybdenum for 2022e.
Quarterly unit costs will vary significantly with quarterly metal sales volumes.
(per lb of Cu) North South
America America Indonesia Consolidated
Cash Unit Costs
Site Production & Delivery (1) $2.13 $2.23 $1.49 $1.93
By-product Credits (0.33) (0.32) (1.95) (0.89)
Treatment Charges 0.09 0.13 0.24 0.16
Royalties & Export Duties - 0.01 0.41 0.14
Unit Net Cash Costs $1.89 $2.05 $0.19 $1.34
2021 Unit Production Costs
e = estimate. See Cautionary Statement.
(per lb of Cu)
Cash Unit Costs (3)
Site Production & Delivery (1) $2.28 $2.26 $1.39 $1.95
By-product Credits (0.38) (0.36) (1.88) (0.92)
Treatment Charges 0.10 0.15 0.24 0.16
Royalties & Export Duties - 0.01 0.43 0.16
Unit Net Cash Costs $2.00 $2.06 $0.18 $1.35
2022e Unit Production Costs
(2)
NOTE: For a reconciliation of unit net cash costs per pound to production and delivery costs applicable to sales reported in FCX’s consolidated financial
statements, refer to “Product Revenues and Production Costs” in the supplemental schedules of FCX’s 4Q21 press release, which is available on FCX’s website.
(2)
37 37
(2)
(2)

-- 37 of 44 --

38
Grasberg - World Class Block Cave Design
9
31
71
106
123 130 135
Ramp-up Schedule
(000’s t/d of Ore)
10
29
58
68 69 73 67
5 Production Blocks
Currently Active
3 Production Blocks,
2 Currently Active
▪ Continuation of Ore Mined in Open Pit (300 meters below)
▪ 857 mm t @ 1.06% Copper & 0.71 g/t Gold
▪ YE 2021 Reserves: 17 bn lbs Copper; 13 mm ozs Gold
▪ YE 2021 Footprint: 228,000 Sq Meter (over 55 acres)
▪ Life of Mine: 725,000 Sq Meter Footprint (180 acres)
▪ Fully Autonomous Underground Rail System
▪ Annual Production @ Avg. Reserve Grade(1)
• 960 mm lbs Copper & 720,000 ozs Gold
▪ Located Below DOZ Underground Block Cave Mine
▪ 1,500 meters below surface
▪ 412 mm t @ 0.85% Copper & 0.73 g/t Gold
▪ YE 2021 Reserves: 7 bn lbs Copper; 8 mm ozs Gold
▪ YE 2021: 120,000 Sq Meter Footprint (~30 acres)
▪ Life of Mine: 450,000 Sq Meter Footprint (110 acres)
▪ Annual Production @ Avg. Reserve Grade(1)
• 465 mm lbs Copper & 540,000 ozs Gold
Grasberg Block Cave DMLZ
2019 2020 2021 2022e 2023e 2024e 2025e
Ramp-up Schedule
(000’s t/d of Ore)
(1) Access to higher ore grades expected in early years of production.
e = estimate. See Cautionary Statement.
Substantial Infrastructure in Place to Support Large-Scale Production
2019 2020 2021 2022e 2023e 2024e 2025e
Plan View
N
PB2
100 meters
PB1
PB = Production Block
2 Cave Fronts
1
2
Plan View
N
PB = Production Block
3 Cave Fronts
100 meters
PB2N
PB1S
PB1N
PB3
Current	
Cave
3	
PB2S
1 	2

-- 38 of 44 --

PT-FI Mine Plan
Metal Sales, 2020 – 2026e
NOTE: Amounts are projections. Timing of annual sales will depend on a number of factors, including operational performance, timing of shipments, and other factors. FCX's
economic interest in PT-FI approximates 81.27% through 2022 and 48.76% thereafter.
e = estimate. See Cautionary Statement.
0.8
1.3
1.6 1.65 1.65
1.5 1.5
0.84
1.3
1.6
1.8
1.6
1.4 1.4
2020 2021 2022e 2023e 2024e 2025e 2026e
Transition Year
Cu
bn
lbs
Au
mm
ozs
Total: 7.9 billion lbs copper
Annual Average: ~1.6 billion lbs
2022e – 2026eCopper
Total: 7.8 million ozs gold
Annual Average: ~1.6 million ozs
2022e – 2026eGold
39	39

-- 39 of 44 --

40
Indonesia Downstream Processing Activities
Precious Metals Refinery (PMR)
› To be constructed to process gold and silver
from new greenfield smelter and PT Smelting
› Cost estimate: $250 mm
e = estimate. See Cautionary Statement.
New Greenfield Smelter
› 1.7 mm mt of annual concentrate capacity
› Designed to be world’s largest flash
smelter/convertor facility
› Advancing groundwork/preparation
› Project expected to be completed as soon as
feasible in 2024*
› Target price: ~$2.8 bn**
* Dependent on no further COVID-19-related disruptions
** Excludes capitalized interest, owner’s costs and commissioning
› 30% increase to existing smelter to add 300,000
mt of annual concentrate capacity
› Completed commercial arrangements in 4Q21
› Target completion of YE 2023
› Cost estimate: $250 mm
PT Smelting Expansion
Gresik

-- 40 of 44 --

41
$0
$2
$4
$6
$8
2022 2023 2024 2025 2026 2027 Thereafter
FCX Debt Maturities as of 12/31/21
(US$ bns)
$6.2
4.125%,
4.375%,
5.25%,
4.25%,
4.625%,
5.40% &
5.45%
Sr. Notes
and
FMC
Sr. Notes
$0.3
$1.0
3.875%
Sr. Notes
$0.8
4.55%
Sr. Notes	CV Non-recourse
FCX Revolver $ -
Senior Notes 8.6
Cerro Verde Term Loan 0.3
PT-FI Term Loan (1) & Other 0.6
Total Debt $ 9.5
Consolidated Cash and Cash Eq. $ 8.1
Undrawn FCX Credit Facility 3.5
Total Liquidity $ 11.6
$ 0.2
at 12/31/21	Total Debt & Cash
$ 0.3
$ 0.7
(1) $557 mm was available under PT-FI's $1.0 bn, five-year, unsecured bank credit facility.
(2 ) For purposes of this schedule, maturities of uncommitted lines of credit and other short-term lines are included in FCX’s revolver balance, which matures in 2024.
(2)
5.00% Sr. Notes
& FMC Sr. Notes

-- 41 of 44 --

42	42
4Q21 Copper Realization & 1Q22e Guidance
$4.40/lb
4Q21 LME Average
Copper Price
3-Mo. Fwd Price for Copper
at the End of December
FCX 4Q21 Consolidated
Copper Price Realization
FCX 4Q21 Prior Period
Open Lb Adj.
(aka Provisional Price Adj.)
$4.42/lb
$4.42/lb
(Generally, 50/50 weight of qtrly avg and
3-mo forward price at end of period)
Revenue/EBITDA: $187 mm
Net income: $75 mm
Earnings/share: $0.05
e = estimate. See Cautionary Statement.
1Q22e
Open Pound
Guidance
• Open lbs priced at $4.42/lb on 12/31/21
• Each $0.05 change in avg copper price in
1Q22 = $12 mm impact to 2022e net income
• LME copper settled at $4.42/lb on 1/25/22

-- 42 of 44 --

43
Adjusted EBITDA Reconciliation
(1) The 2021 periods primarily includes adjustments to reclamation liabilities at PT-FI ($340 mm in 4Q21 and for 2021), net adjustments to environmental obligations ($26 mm in 4Q21 and
$41 mm for 2021) and nonrecurring labor-related charges at Cerro Verde ($18 mm in 4Q21 and $92 mm for 2021). The 2021 charges were partly offset by net credits primarily
associated with refunds of Arizona transaction privilege taxes related to purchased electricity ($27 mm) and adjustments to prior-period profit sharing at Cerro Verde ($26 mm). For
2020, other net charges primarily include a talc-related litigation accrual, partly offset by net favorable adjustments to environmental obligations ($113 mm) and costs directly associated
with the COVID-19 pandemic and revised operating plans, including employee separation costs ($226 mm).
(2) Adjusted EBITDA is a non-GAAP financial measure that is frequently used by securities analysts, investors, lenders and others to evaluate companies’ performance, including, among
other things, profitability before the effect of financing and similar decisions. Because securities analysts, investors, lenders and others use Adjusted EBITDA, management believes that
our presentation of Adjusted EBITDA affords them greater transparency in assessing our financial performance. Adjusted EBITDA should not be considered as a substitute for measures
of financial performance prepared in accordance with GAAP. Adjusted EBITDA may not necessarily be comparable to similarly titled measures reported by other companies, as different
companies calculate such measures differently.
($ in mm) 4Q21 2021 2020
Net income attributable to common stock $1,106 $4,306 $ 599
Interest expense, net 171 602 598
Income tax provision 626 2,300 944
Depreciation, depletion and amortization 568 1,998 1,528
Metals inventory adjustments 1 16 96
Net gain on sales of assets (17) (80) (473)
Accretion and stock-based compensation 38 170 192
Other net charges (1) 313 442 395
Loss on early extinguishment of debt - - 101
Other expenses (income), net 161 105 (59)
Net income attributable to noncontrolling interests 252 1,059 266
Equity in affiliated companies’ net earnings (11) (6) (12)
FCX Adjusted EBITDA (2) $3,208 $10,912 $4,175

-- 43 of 44 --



-- 44 of 44 --