PRESENTATION

Q4 2025 — Presentation

Q4 2025PDF · 40 pages8.7 MB
fcx.com
FCX Conference Call
4th Quarter and
Year Ended 2025 Results
January 22, 2026

-- 1 of 40 --

Cautionary Statement
This presentation contains forward-looking statements in which FCX discusses its potential future performance, operations and projects. Forward-looking statements are all statements other than statements of historical facts, such as plans,
projections or expectations relating to business outlook, strategy, goals or targets; repair and remediation efforts, and phased restart and ramp-up of production and downstream processing following the mud rush incident at PT Freeport Indonesia’s
(PTFI) Grasberg Block Cave (GBC) underground mine and the anticipated impact on FCX’s business, production, sales, results of operations and operating plans, and recoveries under insurance policies; global market conditions, including trade
policies; ore grades and milling rates; production and sales volumes; higher variability between PTFI production and sales; unit net cash costs (credits) and operating costs; capital expenditures; operating plans, including mine sequencing; cash
flows; liquidity; potential extension of PTFI’s special mining business license (IUPK) beyond 2041; timing of shipments of inventoried production; FCX’s sustainability-related commitments and targets; FCX’s overarching commitment to deliver
responsibly produced copper and molybdenum, including plans to implement, validate and maintain validation of its operating sites under specific frameworks; achievement of FCX’s 2030 climate targets and its 2050 net zero aspiration;
improvements in operating procedures and technology innovations and applications; exploration efforts and results; development and production activities, rates and costs; future organic growth opportunities; tax rates; the impact of copper, gold
and molybdenum price changes; the impact of deferred intercompany profits on earnings; mineral reserve and mineral resource estimates; final resolution of settlements associated with ongoing legal and environmental proceedings; debt
repurchases; and the ongoing implementation of FCX’s financial policy and future returns to shareholders, including dividend payments (base or variable) and share repurchases. The words “anticipates,” “may,” “can,” “plans,” “believes,” “estimates,”
“expects,” “projects,” “targets,” “intends,” “likely,” “will,” “should,” “could,” “to be,” “potential,” “assumptions,” “guidance,” “aspirations,” “future,” “commitments,” “pursues,” “initiatives,” “objectives,” “opportunities,” “strategy” and any similar expressions
are intended to identify those assertions as forward-looking statements. The declaration and payment of dividends (base or variable), and timing and amount of any share repurchases are at the discretion of the Board of Directors (Board) and
management, respectively, and are subject to a number of factors, including not exceeding FCX’s net debt target, capital availability, FCX’s financial results, cash requirements, global economic conditions, changes in laws, contractual restrictions
and other factors deemed relevant by the Board or management, as applicable. The share repurchase program may be modified, increased, suspended or terminated at any time at the Board’s discretion.
FCX cautions readers that forward-looking statements are not guarantees of future performance and actual results may differ materially from those anticipated, expected, projected or assumed in the forward-looking statements. Important
factors that can cause FCX’s actual results to differ materially from those anticipated in the forward-looking statements include, but are not limited to, supply of and demand for, and prices of the commodities FCX produces, primarily copper and
gold; changes in export duties and tariff rates; production rates; timing of shipments and sales; PTFI’s ability to repair mud rush incident-related damage, implement enhanced operating procedures, safely restart, phase-in ramp-up and achieve full
operating rates of production and downstream processing on the expected timeline and optimize production plans; recover amounts under insurance policies; resolve force majeure declarations and maintain relationships with commercial
counterparties; price and availability of consumables and components FCX purchases as well as constraints on supply and logistics, and transportation services; changes in cash requirements, financial position, financing or investment plans;
changes in general market, economic, geopolitical, regulatory or industry conditions, including market volatility regarding trade policies and tariff uncertainty; reductions in liquidity and access to capital; changes in tax laws and regulations; political
and social risks, including the potential effects of violence in Indonesia, civil unrest in Peru, and relations with local communities and Indigenous Peoples; operational risks inherent in mining, with higher inherent risks in underground mining; mine
sequencing; changes in mine plans or operational modifications, delays, deferrals or cancellations, including the ability to smelt and refine or inventory; results of technical, economic or feasibility studies; potential inventory adjustments; potential
impairment of long-lived mining assets; satisfaction of requirements in accordance with PTFI’s IUPK to extend mining rights from 2031 through 2041; process relating to the extension of PTFI’s IUPK beyond 2041; cybersecurity risks; any major
public health crisis; labor relations, including labor-related work stoppages and increased costs; compliance with applicable environmental, health and safety laws and regulations; weather- and climate-related risks; environmental risks, including
availability of secure water supplies; impacts, expenses or results from litigation or investigations; tailings management; FCX’s ability to comply with its responsible production commitments under specific frameworks and any changes to such
frameworks and other factors described in more detail under the heading “Risk Factors” in FCX’s Annual Report on Form 10-K for the year ended December 31, 2024, and in FCX’s Current Report on Form 8-K dated November 18, 2025, each filed
with the U.S. Securities and Exchange Commission.
Investors are cautioned that many of the assumptions upon which FCX’s forward-looking statements are based are likely to change after the date the forward-looking statements are made, including for example commodity prices, which FCX
cannot control, and production volumes and costs or technological solutions and innovations, some aspects of which FCX may not be able to control. Further, FCX may make changes to its business plans that could affect its results. FCX
undertakes no obligation to update any forward-looking statements, which are as of the date made, notwithstanding any changes in its assumptions, changes in business plans, actual experience or other changes.
Estimates of mineral reserves and mineral resources are subject to considerable uncertainty. Such estimates are, to a large extent, based on metal prices for the commodities we produce and interpretations of geologic data, which may not
necessarily be indicative of future results or quantities ultimately recovered. This presentation also includes forward-looking statements regarding mineral resources not included in proven and probable mineral reserves. A mineral resource, which
includes measured, indicated and inferred mineral resources, is a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic
extraction. Such a deposit cannot qualify as recoverable proven and probable mineral reserves until legal and economic feasibility are confirmed based upon a comprehensive evaluation of development and operating costs, grades, recoveries and
other material modifying factors. This presentation also includes forward-looking statements regarding mineral potential, which includes exploration targets and mineral resources but will not qualify as mineral reserves until comprehensive
engineering studies establish legal and economic feasibility. Significant additional evaluation is required and no assurance can be given that the potential quantities of metal will be produced. Accordingly, no assurance can be given that estimated
mineral resources or mineral potential will become proven and probable mineral reserves.
This presentation also contains measures such as unit net cash costs (credits) per pound of copper and molybdenum, net debt and Adjusted EBITDA (earnings before interest, taxes, depreciation, amortization and accretion), which are not
recognized under U.S. generally accepted accounting principles (GAAP). FCX’s calculation and reconciliation of unit net cash costs (credits) per pound of copper and molybdenum and net debt to amounts reported in FCX’s consolidated financial
statements are in the supplemental schedules of FCX’s 4Q25 press release, which is available on FCX’s website, fcx.com. A reconciliation of amounts reported in FCX’s consolidated financial statements to Adjusted EBITDA is included on slide 39.
For forward-looking unit net cash costs (credits) per pound of copper and molybdenum measures, FCX is unable to provide a reconciliation to the most comparable GAAP measure without unreasonable effort because estimating such GAAP
measures and providing a meaningful reconciliation is extremely difficult and requires a level of precision that is unavailable for these future periods, and the information needed to reconcile these measures is dependent upon future events, many of
which are outside of FCX’s control as described above. Forward-looking non-GAAP measures are estimated consistent with the relevant definitions and assumptions. 2

-- 2 of 40 --

Unit Net Cash Costs
$1.65
per lb
3
2025 Highlights
Operating Cash Flow
$5.6 bn
Net of $1.3 bn in working capital uses
Capital Expenditures
$3.9 bn
Excluding $0.6 bn to complete PTFI
downstream processing facilities
Copper
Production Sales Price Realization
3.4 3.6 $4.75
bn lbs bn lbs per lb
Gold
1.0 1.1 $3,423
mm ozs mm ozs per oz
Molybdenum
92 83 $22.63
mm lbs mm lbs per lb
(1) A reconciliation of amounts reported in FCX’s consolidated financial
statements to Adjusted EBITDA is included on slide 39.
(2) Net debt equals consolidated debt less consolidated cash.
NOTE: Refer to non-GAAP disclosure on slide 2.
Adjusted EBITDA (1)
$9.9 bn
Net Debt (2)
$2.3 bn
Excluding $3.2 bn for PTFI downstream
processing facilities

-- 3 of 40 --

Pursuing Value For All Stakeholders
2026 Focus Areas
4
Leach Initiative
Targeting 300 mm lbs
(+40% YoY) in 2026
and further define
path to ~800 mm lbs
per annum by 2030.
Innovation
Deploy technologies
to strengthen
long-term cost
competitiveness in the
Americas and unlock
significant value.
Future Growth
Advance major growth
options in long-lived
copper districts at
Bagdad, El Abra and
Safford/Lone Star.
Execution
Deliver on operating
plans across all sites
and safely and
sustainably restore
Grasberg mining and
smelting operations.

-- 4 of 40 --

Copper Commentary
$2.00
$2.50
$3.00
$3.50
$4.00
$4.50
$5.00
$5.50
$6.00
$6.50
0
250,000
500,000
750,000
1,000,000
1,250,000
1,500,000
1,750,000
2,000,000
2,250,000
Jan-20 Jan-21 Jan-22 Jan-23 Jan-24 Jan-25 Jan-26
LME Copper
Settlement Price
Inventories
(metric tons)
Cu Price
($/lb)
Global Copper Exchange Inventories
Includes LME, COMEX and Shanghai exchanges
Source: Bloomberg as of 1/21/26
Copper added to USGS List of
Critical Minerals in November 2025
2025 Low High
LME $3.87 $5.68
COMEX $3.99 $5.80
Copper	̶	 Metal of Electrification
Over 65% of the world’s copper is used in
applications that deliver electricity*
Infrastructure
• Backbone of construction, urbanization and energy
infrastructure
• Possesses best electrical and thermal conductivity
of any industrial metal
Technology
• Demand expected to benefit from advances in AI,
communications and expanding connectivity
Transportation
• Essential material component of electric vehicles / hybrids
• Used in electric motors, batteries, inverters, wiring and
charging stations
* internationalcopper.org 5

-- 5 of 40 --

S&P Global Copper Study Published in January 2026
Copper in the Age of AI: Challenges of Electrification
6
Key takeaways from independent study led by
Dan Yergin, Vice Chairman, S&P Global
• “Accelerating pace of electrification” is projected to drive
copper demand to 42 million metric tons by 2040, a 50%
increase from current levels.
• Four Key Sectors Driving Unprecedented Demand
o Core economic demand – “Dr. Copper”
o Energy transition and addition
o The explosive growth of AI and data centers
o Defense modernization
• Across all four vectors, growth in electricity relies heavily on
copper as its essential conductor.

-- 6 of 40 --

7
S&P Global – Copper Consumption Growth to be Driven
by Energy Transition, AI and Data Centers & Defense
2024
68% 32%
Energy
Transition,
AI and Data
Centers &
Defense
45%
2040e
Source: S&P Global, January 2026
27.6 mt of Consumption 42.3 mt of Consumption
Core
Economic
Uses
55%
Compound Annual
Growth Rate of
Copper Consumption
Core Economic Uses 1.6%
Energy Transition 4.6%
AI and Data Centers 5.7%
Defense 7.1%
Total Global Demand 2.9%

-- 7 of 40 --

4Q25 Highlights
8
• Strong execution
– Copper and gold sales higher than October 2025 estimate
– Unit net cash costs favorable to October 2025 estimate
• Restarted operations from unaffected Deep MLZ and
Big Gossan mines in late October 2025
• Activities on track to commence phased restart of the
Grasberg Block Cave (GBC) underground mine in 2Q26
• U.S. copper mining operating income improved
~3.5x vs. 4Q24
• Progressing organic copper growth projects
• Strong financial position
• Favorable market fundamentals and long-term outlook
for copper
October
Key Stats Actual Estimate
Copper Sales (mm lbs) 709 635
Gold Sales (k ozs) 80 60
Unit Net Cash Costs ($/lb) $2.22 $2.47
Copper Realization Gold Realization
$5.33/lb $4,078/oz
Operating
Cash
Flow CAPEX
$1.0 (3)
$0.7 (2)
4Q25 Cash Flows
($ bns)
(1) A reconciliation of amounts reported in FCX’s consolidated financial statements
to Adjusted EBITDA is included on slide 39.
(2) Net of working capital and other uses of $0.8 bn.
(3) Includes $0.6 bn for major projects.
NOTE: Refer to non-GAAP disclosure on slide 2.
$2.0 (1)
Adjusted
EBITDA

-- 8 of 40 --

Operations Update
• Copper production +5% year-over-year
• Ongoing focus on increasing volumes/
reducing costs
• Targeting increase from innovative leach
initiative: 300 mm lbs in 2026
o Commenced large-scale testing of
internally developed additive
o Lab tests of additional internally developed
additives showing encouraging results
• Technology opportunities in focus
o Completed conversion of Bagdad
autonomous haulage
o New initiative advancing to use technology
for greater efficiencies and cost reduction
• Cerro Verde mill exceeded 400k t/d
in 2025
• 2026e copper sales expected to be
similar to 2025
• Pursuing innovative leach opportunities
at El Abra; heat trials expected in 2026
• During 2025, added ~17.5 bn lbs of
recoverable proven and probable
copper reserves associated with
potential mill project at El Abra
• Completed investigations and
progressed plans to support a safe,
sustainable restart of underground
operations
• Operations at the unaffected DMLZ
and Big Gossan underground mines
resumed in late Oct. 2025
• A phased restart of GBC Production
Blocks 2 and 3 is planned for 2Q26
• PT Smelting restarted operations in
late December 2025; operating at
reduced rates until GBC restarts
NOTE: Refer to non-GAAP disclosure on slide 2. 9
United States South America Indonesia
Cu Sales: 342 mm lbs
Unit Net Cash Costs: $2.93/lb
Cu Sales: 255 mm lbs
Unit Net Cash Costs: $2.57/lb
Cu Sales: 112 mm lbs
Au Sales: 75 k ozs
Unit Net Cash Credits: 74¢/lb*
* Excludes idle facility costs and direct recovery expenses
associated with mud rush incident at PTFI.

-- 9 of 40 --

Grasberg Block Cave
10
▪ Mud clean-up on various levels of GBC
▪ Install plugs in Mid-Access Drift (MAD)
▪ Repair & install infrastructure services
▪ Planned restart in April; ramp-up to 100K t/d by 2H26
▪ Additional clean-up & plug installations
▪ Complete chute repairs
▪ Planned restart in mid-2027
▪ Potential restart by YE 2027
▪ Strengthen cave management plans
▪ Mud inrush control initiatives, including mud
removal options (see slide 31)
▪ Emerging Cave Imaging Technology (muons)
Planned Restart Overview
Plan View
Grasberg Pit
Grasberg
Block Cave
Kucing Liar	
N
Future PBs 	PB3
PB2N
PB2S
PB1
PB1N
PB1C
PB1S	
P23
P34
DP20S
• PB 2/3 Restart
• PB 1S Restart
• PB 1C Restart
• Risk Management

-- 10 of 40 --

GBC Recovery Update
11
Clean-up Mucking
of Extraction &
Service Levels
Infrastructure
(Extraction & Service Levels)
Updated Cave
Management Plan
PB2/3 Start-up
Mid-Access
Drift Plugs
(P23, P24 & P25)
PB 2/3 Restart
~97% complete
(2.7 km out of 2.8 km
required for PB 2/3 Restart)
• Infrastructure repairs commenced
• Expected completion by end of 1Q26
Advanced and
under review
On-schedule
for 2Q26
Major Milestones
Plan View
Extraction Level
Plan View
Service Level
Inrush Source
(P23, DP20S)
MAD Plugs
(installed)
Outline of PB2/3
Restart Scope
Outline of PB1
Restart Scope
Outline of PB2/3
Restart Scope
Future
Plugs
Future
Plugs
Outline of PB1
Restart Scope
Legend
Confirmed Spill
Completed Clean-up
Required Scope
PB 2/3 Restart
PB1 Restart
• Initial rough plugs poured & cured
• Engineered plugs poured with cure
expected by end of 1Q26

-- 11 of 40 --

12
Long-Lived Reserve Base
Copper (bn lbs) 112.3 165.1
Gold (mm ozs) 20.6 61.5
Molybdenum (bn lbs) 3.5 5.0
Mineral
Reserves (1)
(recoverable)
Incremental
Mineral
Resources (2)
(contained)
(2) Includes measured, indicated and inferred mineral resources. Estimates of consolidated mineral resources (contained
metal) were assessed using a long-term average copper price of $3.75/lb, gold price of $1,700/oz and molybdenum
price of $17/lb. Mineral resources are not included in mineral reserves and will not qualify as mineral reserves until
comprehensive engineering studies establish legal and economic feasibility. Accordingly, no assurance can be given
that the estimated mineral resources will become proven and probable mineral reserves.
(1) Preliminary estimate of recoverable proven and probable consolidated mineral reserves using long-term average
prices of $3.25/lb for copper, $1,600/oz for gold and $14/lb for molybdenum; FCX’s net equity interest in copper
mineral reserves totaled 78.6 bn lbs as of 12/31/2025. Includes ~17.5 bn lbs of recoverable copper associated with
a potential mill project at El Abra.
Consolidated
As of 12/31/2025 South
America
40%
United States
38%
Indonesia
22%
South
America
18%
United States
55%
Indonesia
27%
Copper Reserves (1) By Region
Copper Resources (2) By Region

-- 12 of 40 --

FCX Project Pipeline Update
13
El Abra
Expansion
Chile
Safford/Lone Star
Expansions
Arizona
Grasberg
District
Indonesia
Bagdad
Expansion
Arizona
New Leach
Technologies
Americas
• Achieved run rate of
~240 mm lbs/yr in 2025
• Targeting increase to
~300 – 400 mm lbs/yr
in 2026/2027
• Driving innovation
toward ~800 mm lbs/yr
by 2030
• 200 – 250 mm
incremental lbs/yr
• Derisking in progress
with autonomous
conversion, tailings
infrastructure investment
and housing
• Retesting economics for
potential investment
decision in 2026
• 3-4 yr construction
• Substantial resource
• Advancing pre-feasibility
study with expected
completion in 2026
• Targeting incremental
addition of 300 – 400 mm
lbs/yr beginning in 2030s
• Kucing Liar project in
development, 130k t/d
expansion
- Ramp-up anticipated to
commence in 2030 timeframe
- 750 mm lbs Cu & 735k oz
Au per annum at full rate to
sustain large-scale production
• Extension of mining rights
beyond 2041 would create
opportunities for future growth
• Preparing EIS, targeting
submission in 1H26
• ~3-yr permitting process
• ~4-yr construction
• Potential start-up in 2033
timeframe
• +700 mm lbs/yr incremental
<$1 billion Incremental investment
~$3.5 billion (under review)
Incentive Price: ~$4/lb
Developing estimate ~$4 billion remaining
for Kucing Liar
~$1.1 billion incurred
to date
~$7.5 billion (under review)
Excludes $2 billion for
extension of leach operations
Incentive Price: <$4/lb
ANTICIPATED CAPITAL INVESTMENT

-- 13 of 40 --

14
America’s Copper Champion
$3.11
$2.50
2024 2027e Target
~
Annual Copper Production
(bns of lbs)
Targeting ~20%
Decrease
Potential for ~60%
Increase
~2
1.25
U.S. Base
Production Base
Leach Initiatives
Bagdad 2X
U.S. Unit Net Cash Costs,
After By-Product Credits ($/lb)
Driving Value Through Innovative Growth & Cost Reduction
NOTE: Refer to non-GAAP disclosure on slide 2. e = estimate.
2024 2030e Target

-- 14 of 40 --

Annual Sales Profile
January 2026 Estimate
15
NOTE: Consolidated copper sales include 1.11 bn lbs in 2025, 0.96 bn lbs in 2026e, 1.26 bn lbs in 2027e
and 1.33 bn lbs in 2028e for noncontrolling interests; excludes purchased copper. Timing of annual sales
will depend on a number of factors including operational performance; the timing of the phased restart and
ramp up GBC underground mine at PTFI, which is currently expected to begin in 2Q26; weather-related
conditions; and other factors. Additionally, 2026e assumes deferrals of ~100 mm lbs of copper related to
inventory held at PTFI’s smelting operations.
e = estimate.
NOTE: Consolidated gold sales include 538k ozs in 2025e, 410k ozs in 2026e, 615k ozs in
2027e and 666 ozs in 2028e for noncontrolling interests. Timing of annual sales will depend
on a number of factors including operational performance; the timing of the phased restart
and ramp up GBC underground mine at PTFI, which is currently expected to begin in 2Q26;
weather-related conditions; and other factors. Additionally, 2026e assumes deferrals of
~100k ozs of gold related to inventory held at PTFI’s smelting operations.
(million lbs)
Moly
Sales
(billion lbs)
Copper
Sales
0
1
2
3
4
5
2025 2026e 2027e 2028e
3.6
3.4
4.1 4.2
0
25
50
75
100
2025 2026e 2027e 2028e
83 90 90 95
0
1
2
2025 2026e 2027e 2028e
1.07
0.8
1.2 1.3
Gold
Sales
(million ozs)

-- 15 of 40 --

$0
$4
$8
$12
$16
$20
Cu $4.00/lb Cu $5.00/lb Cu $6.00/lb
’27e/’28e Avg
EBITDA and Cash Flow at Various Copper Prices
Assuming $4,000/oz gold, $20/lb molybdenum
16
NOTE: Refer to non-GAAP disclosure on slide 2. These illustrations exclude potential insurance proceeds associated with the Grasberg mud rush incident. PTFI is seeking recovery of
damages under its property and business interruption insurance policies, which cover up to $1.0 bn in losses (subject to a limit of $0.7 bn on underground incidents), after a $0.5 bn
deductible. 2026e EBITDA also excludes idle facility costs and direct recovery expenses associated with the mud rush incident at PTFI. e = estimate.
(1) U.S. Dollar Exchange Rates: 918 Chilean peso, 16,000 Indonesian rupiah, $0.66 Australian dollar, $1.17 euro, 3.34 Peruvian sol base case assumption. Each +10% equals a 10%
strengthening of the U.S. dollar; a strengthening of the U.S. dollar against forecasted expenditures in these foreign currencies equates to a cost benefit of noted amounts.
($ in bns except copper, gold and molybdenum prices)
Operating
Cash Flow
Excludes working
capital changes
EBITDA
Sensitivities Average ’27e/’28e
(US$ in mms)
EBITDA
Operating Cash Flow
Copper +/-$0.10/lb $335
Molybdenum +/-$1.00/lb $ 80
Gold +/-$100/oz $ 80
Currencies (1) +/-10% $170
Diesel +/-10% $ 55
Copper +/-$0.10/lb $415
Molybdenum +/-$1.00/lb $ 85
Gold +/-$100/oz $120
Currencies (1) +/-10% $240
Diesel +/-10% $ 80
’26e
$0
$4
$8
$12
$16
$20
Cu $4.00/lb Cu $5.00/lb Cu $6.00/lb
’27e/’28e Avg
’26e

-- 16 of 40 --

Consolidated Capital Expenditures
2025 2026e 2027e
Major
Projects
(1) Excludes $0.6 bn in CAPEX for PTFI’s downstream processing facilities.
(2) Planned projects primarily include CAPEX associated with Grasberg underground development, supporting mill and power capital costs and a portion of spending on the new gas-fired combined cycle facility.
NOTE: Amounts include capitalized interest. Discretionary CAPEX will be excluded from the available cash flow calculation for purposes of the performance-based payout framework. e= estimate.
$1.6
$0.9 Planned (2)
Discretionary
$1.4
$3.9
OtherOther
$1.6
Planned (2)
Discretionary
$4.5
Other
$1.3
$1.4
$1.6
$4.3
53%
37%
10%
Grasberg Energy
Transition & Other
Atlantic Copper
CirCular
2027e
Projected Discretionary Spending
by Project
2026e
($ in bns)
17
42%
45%
13%
(1)
Planned (2)
Discretionary
$1.2
$1.7
Kucing
Liar
Bagdad
Early
Works

-- 17 of 40 --

Financial Policy: Performance-Based Payout Framework
~50% available cash flow(1) for shareholder returns
18
(1) Available cash flow equals available cash flows generated after planned capital spending (excluding PTFI’s new downstream processing facilities funded with debt and discretionary CAPEX) and distributions to noncontrolling interests.
(2) Net debt equals consolidated debt less consolidated cash and cash equivalents. Net debt for 12/31/25 excludes $3.2 bn of debt associated with PTFI’s new downstream processing facilities.
(3) FCX has acquired 52 mm shares of its common stock for a total cost of $2 bn ($38.51 avg. cost per share) under its share repurchase program since November 2021, including 2.9 mm shares for a total of $107 mm in 2025.
NOTE: Refer to non-GAAP disclosure on slide 2.
Board reviews structure of performance-based payout framework at least annually
Maintaining Strong
Balance Sheet
6/30/2021 12/31/2025
$2.3
$3.4
Net Debt,
excluding
Indonesia
downstream
projects
($ in bns)
Providing Cash Returns
to Shareholders
$5.7 bn Distributed
Since 6/30/21
35%
Share
Repurchases(3)
Variable
Dividend
Base
Dividend
34%
31%
Advancing Organic
Growth Opportunities
• Positioned for future growth
• Organic project pipeline
– Leach innovation initiatives
– Kucing Liar/Grasberg District
– Bagdad 2X
– El Abra expansion
– Safford/Lone Star sulfide
expansions
(2)
• Strong credit metrics
• Investment Grade rated by S&P,
Moody’s and Fitch
• Net debt, excluding downstream
projects, below $3-4 bn threshold

-- 18 of 40 --

19
Freeport – Store of Value
19
Significant
Gold
Producer
Organic
Growth
Pipeline
Leadership
Position in
Critical Metal
Large
Scale
Producer
Strong Global
Leader with
Valuable U.S.
Franchise

-- 19 of 40 --

20
Reference Slides

-- 20 of 40 --

Financial Highlights
21
Copper
Consolidated Volumes, excluding purchases (mm lbs) 709 3,574
Average Realization (per lb) $ 5.33 $ 4.75
Site Production & Delivery Costs (per lb) $ 3.05 $ 2.75
Unit Net Cash Costs (per lb) $ 2.22 $ 1.65
Gold
Consolidated Volumes (000’s ozs) 80 1,066
Average Realization (per oz) $4,078 $3,423
Molybdenum
Consolidated Volumes (mm lbs) 22 83
Average Realization (per lb) $23.77 $22.63
4Q25
(1) Excludes idle facility costs and direct recovery expenses associated with mud rush incident at PTFI.
(2) Net of working capital and other uses of $0.8 bn for 4Q25 and $1.3 bn for 2025.
(3) Includes $3.2 bn of debt associated with PTFI’s downstream processing facilities.
NOTE: Refer to non-GAAP disclosure on slide 2.
Revenues $ 5.6 $ 25.9
Net Income Attributable to Common Stock $ 0.4 $ 2.2
Diluted Net Income Per Share $ 0.28 $ 1.52
Operating Cash Flows $ 0.7 $ 5.6
Capital Expenditures $ 1.0 $ 4.5
Total Debt $ 9.4 $ 9.4
Cash and Cash Equivalents $ 3.8 $ 3.8
(in billions, except per share amounts)
| Sales Data
| Financial Results
2025
(3)
(1)
(2)
(1)

-- 21 of 40 --

Strong Balance Sheet and Liquidity
Attractive Debt Maturity Profile
22
$0
$2
$4
$6
$8
2026 2027 2028 2029 2030 2031 Thereafter
(US$ bns)
$4.8
5.40% &
5.45%
Sr. Notes
and
FMC
Sr. Notes
PTFI Revolver $ 0.3
FCX/FMC Senior Notes/Other 6.1
PTFI Senior Notes 3.0
Total Debt $ 9.4
Cons. Cash and Cash Equivalents $ 3.8
Net Debt (1) $ 5.6
Net Debt/Adjusted EBITDA(2) 0.6x
$ -
at 12/31/25	Total Debt & Cash
$1.8
(3)
5.00% Sr. Notes
& FMC Sr. Notes
4.763%
PTFI Sr. Notes
5.315%
& 6.2%
PTFI Sr. Notes
Significant liquidity
▪ $3.8 bn in consolidated cash and cash equiv.
▪ $3.0 bn in availability under FCX credit facility
▪ $1.5 bn in availability under PTFI credit facility
▪ $350 mm in availability under Cerro Verde
credit facility
4.125% & 4.375%
Sr. Notes
$1.2
$0.5
5.25% Sr. Notes
4.25% & 4.625%
Sr. Notes
$1.0
PTFI Revolver
(1) Includes $3.2 bn of debt associated with PTFI’s downstream processing facilities.
(2) Trailing 12-months.
(3) For purposes of this schedule, maturities of uncommitted lines of credit and other short-term lines are included in FCX’s revolver balance, which matures in 2027.
NOTE: Refer to non-GAAP disclosure on slide 2.
Atlantic Copper $0.1

-- 22 of 40 --

4Q25 Mining Operating Summary
23
(1) Includes 5 mm lbs in 4Q25 and 4Q24 from South America.
(2) Silver sales totaled 0.8 mm ozs in 4Q25 and 0.9 mm ozs in 4Q24.
(3) Silver sales totaled 0.9 mm ozs in 4Q25 and 1.4 mm ozs in 4Q24.
(4) Excludes idle facility costs and direct recovery expenses associated with the mud rush incident at PTFI.
NOTE: Refer to non-GAAP disclosure on slide 2.
Site Production & Delivery, excl. adjs. $3.51 $3.02 $1.72 $3.05
By-product Credits (0.68) (0.54) (3.28) (1.04)
Treatment Charges 0.10 0.08 0.45 0.15
Royalties - 0.01 0.37 0.06
Unit Net Cash Costs (Credits) $2.93 $2.57 $(0.74) $2.22
United South
States America Indonesia Consolidated	(per lb of Cu)	4Q25 Unit Net Cash Costs (Credits)
United States
18
22 (1)
318	342
4Q25 4Q24
Indonesia
376
112
343
75
South America
255 298
Sales From Mines for 4Q25 by Region
4Q25 4Q24 4Q25 4Q24 4Q25 4Q24	4Q25 4Q24
(2)
(1)
Au
000’s ozs
Mo
mm lbs
Cu
mm lbs
(4) (4)
(3)

-- 23 of 40 --

2026e Outlook
24
(1) Excludes $0.9 bn in 2026e and $0.4 bn in 1Q26e for projected idle facility costs and direct recovery expenses associated with the mud rush incident at PTFI.
(2) Assumes average prices of $4,000/oz gold and $20/lb molybdenum for 2026e.
(3) For 2026 each $100/oz change in gold is estimated to have an approximate $75 mm impact and each $2/lb change in molybdenum is estimated to have an approximate $160 mm impact.
(4) Major projects CAPEX includes $1.4 bn for planned projects and $1.6 bn of discretionary projects.
NOTE: Projected copper and gold sales and unit net cash costs are dependent on operational performance; the timing of the phased restart and ramp up of the GBC underground mine at PTFI,
which is currently expected to begin in 2Q26; weather-related conditions; timing of shipments and other factors.
e = estimate. Refer to non-GAAP disclosure on slide 2.
• Copper: 3.4 billion lbs
• Gold: 0.8 million ozs
• Molybdenum: 90 million lbs
• Site prod. & delivery(1)
o 2026e: $2.86/lb
o 1Q26e: $3.23/lb
• After by-product credits(1,2)
o 2026e: $1.75/lb
o 1Q26e: $2.60/lb
• $4.3 billion
o $3.0 billion for major
projects(4)
o $1.3 billion for other
projects
• ~$8 billion @ $5.00/lb
copper for 2026e
• Each 10¢/lb change
in copper for 2026e = $330
million impact
• ~$11 billion @ recent
prices of $5.75/lb copper,
$4,700/oz gold and $23/lb
molybdenum for 2026e
Sales
Outlook
Unit Net Cash
Cost of Copper
Operating
Cash Flows (2,3)
Capital
Expenditures

-- 24 of 40 --

2025
2026e
2025 and 2026e Sales by Region
25
(1) Includes molybdenum produced in South America.
(2) Includes gold produced in United States.
e = estimate.
(1)
1,073
83
1,296 1,205
1.07
United States Indonesia	South America
Au
mm ozs
Mo
mm lbs
Cu
mm lbs
(1)
1,080
90
1,400
900
0.8
Au
mm ozs
Mo
mm lbs
Cu
mm lbs
(2)

-- 25 of 40 --

2025
2025 and 2026e
Unit Production Costs by Region
26
(per lb of Cu)
United South
States America Indonesia Consolidated
Unit Production Costs / (Credits)
e = estimate.
(per lb of Cu)
(1) Production costs include profit sharing in South America and severance taxes in United States.
(2) Excludes idle facility costs and direct recovery expenses associated with the mud rush incident at PTFI.
(3) Indonesia includes 28¢/lb and consolidated includes 9¢/lb for export duties at PTFI.
(4) Estimates assume average prices of $4,000 oz gold and $20/lb molybdenum for 2026e. Quarterly unit costs will vary significantly with quarterly metal sales volumes.
NOTE: Refer to non-GAAP disclosure on slide 2.
2026e
Cash Unit Costs
Site Production & Delivery (1) $3.51 $2.82 $1.86 $2.75
By-product Credits (0.59) (0.47) (3.17) (1.42)
Treatment Charges 0.13 0.07 0.19 0.13
Royalties & Export Duties 0.00 0.01 0.57 0.19
Unit Net Cash Costs / (Credits) $3.05 $2.43 $(0.55) $1.65
Cash Unit Costs (4)
Site Production & Delivery (1) $3.41 $3.00 $1.83 $2.86
By-product Credits (0.56) (0.47) (3.72) (1.38)
Treatment Charges 0.11 0.04 0.43 0.18
Royalties - 0.01 0.33 0.09
Unit Net Cash Costs / (Credits) $2.96 $2.58 $(1.13) $1.75
(2) (2)
(3) (3)
(2) (2)

-- 26 of 40 --

2026e Quarterly Sales
27	e = estimate.
(million lbs)
Moly
Sales
(million lbs)
Copper
Sales
Gold
Sales
(000’s ozs)
0
100
200
300
400
1Q26e 2Q26e 3Q26e 4Q26e
60
140
290 310
0
200
400
600
800
1000
1200
1Q26e 2Q26e 3Q26e 4Q26e
640
740
980 1,020
0
5
10
15
20
25
1Q26e 2Q26e 3Q26e 4Q26e
22 23 22 23
NOTE: Consolidated copper sales include 145 mm lbs in 1Q26e, 190 mm lbs in 2Q26e, 303 mm lbs in
3Q26e and 317 mm lbs in 4Q26e for noncontrolling interests; excludes purchased copper.
Estimates are dependent on operational performance; the timing of the phased restart and ramp
up of the GBC underground mine at PTFI, which is currently expected to begin in 2Q26; weather-
related conditions; timing of shipments and other factors.
NOTE: Consolidated gold sales include 30k ozs in 1Q26e, 72k ozs in 2Q26e, 149k ozs in
3Q26e and 159k ozs in 4Q26e for noncontrolling interests. Estimates are dependent
on operational performance; the timing of the phased restart and ramp up of the
GBC underground mine at PTFI, which is currently expected to begin in 2Q26;
weather-related conditions; timing of shipments and other factors.

-- 27 of 40 --

Grasberg Minerals District Mine Plan
Metal Production, 2025 – 2030e
28
1.0 1.0
1.5
1.7 1.7 1.7
0.9 0.9
1.2
1.4 1.3 1.2
2025 2026e 2027e 2028e 2029e 2030e
| Copper 2026e – 2030e
Total: 7.6 billion lbs copper
Annual Average: ~1.5 billion lbs | Gold 2026e – 2030e
Total: 6.0 million ozs gold
Annual Average: ~1.2 million ozs
Cu
bn lbs
Au
mm ozs
NOTE: Timing of annual production will depend on a number of factors including operational performance; the timing of the phased restart and ramp up of the mining and smelting operations at PTFI
following the September 2025 mud rush incident; weather-related conditions; and other factors. 2026e production expected to exceed sales and assumes deferrals of ~100 mm lbs of copper and
~100k ozs of gold related to inventory held at PTFI’s smelting operations. FCX’s economic interest in PTFI is 48.76%.
e = estimate.

-- 28 of 40 --

Grasberg Block Cave
29
Drawbell Drilling
Undercut Ring
Drilling	Cave Muckpile
Air Gap
Undercut Level
2850m Elevation
Extraction Level
2830m Elevation
Service Level
2810m Elevation
Rail Haulage Level
2760m Elevation
Orepass
Chute
Gallery	Ore Train
Slot Raise
Grizzly
& Rock Breaker
Drawpoints
Loading Chute
Drawbell
Development Diagram • Undercut Level – initiates cave by
removing rock beneath mining
block
• Extraction Level – active mining
where broken rock gravitates
through drawbells to drawpoints
• Service Level – hosts ore passes,
ventilation systems and other
support infrastructure
• Haulage Level – transports ore to
primary crushers via rail systems
• Drainage Level* – handles water
discharge & dewatering operations
Mining Levels
Development Overview
* Drainage level (not shown at left) is located 50 meters below Haulage Level at 2710 m elevation

-- 29 of 40 --

Mud Rush Incident
30
• Mud Rush Statistics
✓ 9 km of drifts (out of a total of 180 km in the mine)
✓ 800,000 mt of wet mud material (360,000 m3)
• Major Equipment & Infrastructure Damaged
✓ LHD Loaders 11 77
✓ Locomotives 1 15
✓ Ore Railcars 10 170
✓ Fixed Rockbreakers 4 45
✓ Installed Rail (km) 1.27 17.24
✓ Ore Chutes 16 69
4Q25 included $73 million of asset impairments, including
assets damaged ($42 million for chute galleries and $18
million for fixed & mobile equipment)
Total GBC
Fleet	Damaged
Damaged Areas
Jumbo Drill	2 LHD Loaders
Chute Gallery 21

-- 30 of 40 --

Risk Management
31
Sandvik DU311 Drill
Remove Flowable Material
With In-pit Pumping
Conventional up-hole Coring
for Slurry Pond Drainage
Soft Zone
Grasberg Pit
Water-Driven In-the-Hole
Hammer Drill
Pit Bottom
Drill Holes
Pit Bottom
Drainage Gallery
Grasberg Pit
Plan View
~3 km of new drift development
to drill & drain pit bottom
Larger Diameter (5”) &
Fast drilling (~200 meters/day)
Small Diameter (<3”) &
Slow drilling (~10 meters/day)
Mud Removal Options for Former Open Pit
New Drift
Grasberg Pit
GBC
Pit Bottom
Drilling Today Target to drill in 2H26 Target pumping in 2027 Initiate drainage in 2027
Pit bottom pumping via cable-
deployed pump barge

-- 31 of 40 --

Background on Production Block 1C
32
• PB1C is located approximately 300 meters beneath
the low spot of the former Grasberg surface mine
• Largely composed of a low strength, clay rich,
geological domain termed “Softzone”
• PB1C was designed with relatively narrow geometry
(three panels wide) as an extension of an established
Production Block (PB1S) which commenced
production in 2019
• Production in PB1C started in 2022 from two panels
with the third panel (Panel 23) commencing
production in October 2024
• Incident occurred through the formation of an
undetected pathway along the cave boundary
connecting a panel in PB1C to mud accumulation
at the surface 32
* % of total year-end 2025 reserves
** Pre-incident YTD through August 2025
Statistics PB1C PB1S GBC
Drawpoints 70 174 940
PTFI Cu Au Cu Au
% of Reserves* 2% 3% 3% 5%
% of Production** 7% 7% 8% 10%
Grasberg Block Cave
Plan View
Future PBs PB3
PB2N
PB2S
PB1
PB1N
PB1C
PB1S
P23
P34
N
(Panel 23)

-- 32 of 40 --

PTFI 2041 Extension Update
• Government regulations provide life-of-mine extension rights,
subject to meeting requirements for domestic ownership and
downstream integration
• Application for extension may be submitted at any time prior to
the current IUPK expiration (PTFI expiration in 2041)
• Extension would enable continuity of large-scale operations for
the benefit of all stakeholders
• PTFI is preparing extension application; expected to be
submitted during 2026
o PTFI expects to pursue additional exploration, conduct studies for future
additional development and expand its social programs
• FCX expects to maintain its ownership interest of ~49% through
2041 and would hold an ~37% interest after 2041
o Existing governance agreements expected to continue over the life of the
resource
33

-- 33 of 40 --

Freeport	̶	 America’s Copper Champion
34
• Strong U.S. franchise
• Long-standing history in U.S. dating back to late 1800s
• Dominant U.S. copper producer
o Operations account for ~70% of total U.S. refined production
o Integrated producer with smelter, refineries and rod mills
• Proven track record of trust with communities
• One of the largest U.S. copper resource positions
• Uniquely positioned to increase U.S. copper production
o Innovative leach opportunities
o Portfolio of brownfield expansion opportunities
• Employs over 32,000 workers in the U.S. (including over
18,000 contractors)
• U.S. represents 41% (2026e) of FCX’s copper sales, 38% of
reserves and 55% of copper resources (YE 2025)
Upstream copper mines with SX/EW facilities
Downstream smelting and refining facilities
EL PASO
Copper Refinery and Rod Mill
CHINO
TYRONE
MORENCI
BAGDAD
SAFFORD/LONE STAR
SIERRITA
MIAMI
Mine, Copper Rod Plant & Smelter
Fully integrated operations in Southwest U.S.
ARIZONA NEW
MEXICO
TEXAS

-- 34 of 40 --

Americas Leach Innovation Initiatives
Low Cost, High Value
35
* Copper from historical placements beyond assumed recovery estimates and is not included in mineral reserves or mineral resources. Refer to slide 2.
South
America
16%
Other U.S.
34%
Morenci
50%
Significant Potential
~42 bn lbs Contained *
Leach
Everywhere
~15%
Heat
~50%
Additives
~35%
~600 mm lbs/annum
Incremental Production Target
| Targeting Copper in Stockpiles Unrecoverable by
Traditional Leach Methods with Precision Operating Techniques
50
144
214 240
300
800
2022 2023 2024 YE 2025 2026e By 2030e
Scaling the Opportunity
(mm lbs) ~
~
e = estimate.
Run Rate

-- 35 of 40 --

Bagdad 2X Expansion Update
36
• Operation located in northwest Arizona
• Reserve life exceeds 80 years
• Potential expansion to double concentrator capacity
• Completed conversion of haul truck fleet to autonomous haulage in 2025
• Completed technical and economic studies in late 2023
– Expected to expand concentrator capacity by ~100 - 120k t/d
– Project capital approximates $3.5 billion (continues to be reviewed)
– Economics indicate incentive copper price of ~$4.00/lb
– Expected to add incremental production of 200 - 250 mm lbs/yr of copper and
~10 mm lbs/yr of molybdenum
– Construction timeline: 3 - 4 years
• Advancing activities for expanded tailings infrastructure to enhance
project optionality
• Retesting economics for potential investment decision in 2026

-- 36 of 40 --

Discretionary Capital Projects*
37
• Mine development in progress; expansion to 130,000 t/d
• Sustain large-scale, low-cost Cu & Au production
• Capital investment: ~$0.5 bn/yr average (~$0.6 bn in
2026e) through 2033
• 8 bn lbs copper & 8 mm ozs gold through 2041
• 750 mm lbs & 735k ozs per annum at full rates
• Initial production expected to commence ramp-up in
2030 timeframe
• Recycle electronic material
• Capital investment incurred to date: ~$350 mm;
~$210 mm remaining to be spent in 2026e
• Expect to commence production in 2H26e
• ~$70 mm per annum in incremental EBITDA
*These discretionary projects and PTFI’s new downstream processing facilities will be excluded from the available cash flow calculation (defined on slide 18) for purposes of the performance-based payout framework.
NOTE: Refer to non-GAAP disclosure on slide 2. e = estimate.
• Potential expansion to double concentrator capacity
• Completed feasibility study in late 2023; retesting
economics (see slide 36)
• 2026e CAPEX:
• ~$520 mm to expand tailings infrastructure
• ~$150 mm for early works
Bagdad 2X Expansion
• Advancing plans to transition existing energy source from
coal to natural gas
• Project deferred approximately 18 months after mud rush
• CAPEX of ~$115 mm in 2027e net of avoided coal cost
Atlantic Copper
CirCular
Kucing Liar
Grasberg Energy Transition
to Natural Gas

-- 37 of 40 --

The Copper Mark
Recognition for Responsible Production
38
• The Copper Mark is an assurance framework developed
to demonstrate the copper industry’s responsible production practices
• FCX has achieved, and is committed to maintaining, the Copper Mark
and Molybdenum Mark at all operating sites globally, as applicable
• Producers participating in the Copper Mark and Molybdenum Mark are
committed to adhering to internationally recognized responsible
operating practices; the framework currently includes 33 issue areas
across 5 ESG categories
• Requires third-party assurance of site performance and independent
Copper Mark validation every three years
• The Copper Mark 2.0 assurance process in progress
• The Copper Mark is governed by an independent board including
NGO participation and multi-stakeholder advisory council
FCX AWARDED SITES
Atlantic Copper smelter
& refinery (Spain)
Bagdad mine (AZ)
Cerro Verde mine (Peru)
Chino mine (NM)
Climax mine (CO)
El Abra mine (Chile)
El Paso refinery
& rod mill (TX)
Fort Madison (IA)
Henderson mine (CO)
Miami smelter, mine
& rod mill (AZ)
Morenci mine (AZ)
PTFI mine (Indonesia)
Rotterdam (Netherlands)
Safford mine (AZ)
Sierrita mine (AZ)
Stowmarket (UK)
Tyrone mine (NM)
Note: FCX’s copper producing sites that produce by-product
molybdenum have received both the Copper Mark and the
Molybdenum Mark.

-- 38 of 40 --

Adjusted EBITDA Reconciliation
39
($ in mm) 4Q25 2025 2024
Net income attributable to common stock $406 $2,204 $1,889
Interest expense, net 110 369 319
Income tax provision 202 2,221 2,523
Depreciation, depletion and amortization 485 2,244 2,241
Net gain on sales of assets - (16) -
Accretion and stock-based compensation 64 274 238
Other net charges (1) 672 922 691
Other income, net (65) (223) (362)
Net income attributable to noncontrolling interests 159 1,948 2,510
Equity in affiliated companies’ net earnings (1) (1) (15)
Adjusted EBITDA (2) $2,032 $9,942 $10,034
(1) Primarily includes net charges for idle facility costs and direct recovery expenses associated with the September 2025 mud rush incident at PTFI ($454 mm 4Q25 and $625 mm for
the 12 months ended 12/31/2025); oil and gas charges ($102 mm in 4Q25, $118 mm for the 12 months ended 12/31/2025 and $222 mm for the 12 months ended 12/31/2024); fixed
asset impairments/write-offs at PTFI ($73 mm in 4Q25 and $81 mm for the 12 months ended 12/31/2025); and remediation costs related to the fire incident at PTFI’s smelter that
were not offset by recovery under its construction insurance program ($9 mm in 4Q25 and $65 mm for the 12 months ended 12/31/2025). The 12 months ended 12/31/2024 also
included adjustments to mining reclamation liabilities ($163 mm); nonrecurring labor-contract charges at Cerro Verde ($97 mm); metals inventory adjustments ($91 mm); and
adjustments to environmental obligations and related litigation reserves ($75 mm).
(2) Adjusted EBITDA is a non-GAAP financial measure that is frequently used by securities analysts, investors, lenders and others to evaluate companies’ performance, including,
among other things, profitability before the effect of financing and similar decisions. Because securities analysts, investors, lenders and others use Adjusted EBITDA, management
believes that our presentation of Adjusted EBITDA affords them greater transparency in assessing our financial performance. Adjusted EBITDA should not be considered as a
substitute for measures of financial performance prepared in accordance with GAAP. Adjusted EBITDA may not necessarily be comparable to similarly titled measures reported by
other companies, as different companies calculate such measures differently.

-- 39 of 40 --

40

-- 40 of 40 --