TRANSCRIPT

Q1 2026 — Transcript

Q1 2026PDF · 18 pages266 KB
GE Vernova 1Q 2026
Financial Results &
Outlook
Wednesday, 22nd April 2026
Opening Remarks
Michael Lapides

-- 1 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
2
Vice President of Investor Relations, GE Vernova
Thank you. 	Welcome to GE Vernova's First Quarter 2026 Earnings Call. 	I'm joined today by
our CEO, Scott Strazik, and CFO, Ken Parks.
Our 	conference 	call 	remarks 	will 	include 	both 	GAAP 	and 	non-GAAP 	financial 	results.
Reconciliations between GAAP and non-GAAP measures can be found in today's Form 10-Q,
press release and presentation slides, all of which are available on our website.
Please note that unless otherwise specified, our year-over-year commentary or variances on
orders, revenue, adjusted and segment EBITDA and margin discussed during our prepared
remarks are on an organic basis, which includes the removal of the impact of our Prolec GE
acquisition.
In addition, we realigned the reporting of certain business units to reflect how we are
managing the company. 	Notably in Power, we integrated the Steam business primarily into
our Nuclear business. 	In Electrification, we realigned the segment into four distinct business
units to provide investors with greater visibility. 	This included revising our former Grid
Solutions and Electrification Software business units into three separate business units: Power
Transmission, Grid Systems Integration and Grid Automation & Software. 	A portion of our
Electrification Software was also moved to Gas Power.
Finally, in Wind, we simplified our reporting by integrating LM Wind into Onshore Wind.
These changes are reflected in our first quarter '26 10-Q and throughout our slide deck. 	We
have posted a financial supplement on our IR website, reflecting our realigned 2025 segment
results. And please note, there were no changes to our 2025 total company results.
We will make forward-looking statements about our performance. 	These statements are
based on how we see things today. 	While we may elect to update these forward-looking
statements at some point in the future, we do not undertake any obligation to do so. 	As
described 	in 	our 	SEC 	filings, 	actual 	results 	may 	differ 	materially 	due 	to 	risks 	and
uncertainties.
With that, I'll hand the call over to Scott.
Overview
Scott Strazik
CEO, GE Vernova
Solid Start to 2026
Thank you, Michael. 	Good morning, and welcome to GE Vernova's Q1 '26 earnings call.
We've had a solid start to '26. 	As global electrification accelerates, the structural drivers
underpinning demand for our solutions continue to strengthen. 	The growth is just starting,
and there is no company better positioned to serve and transform the global electricity
system than GE Vernova.
Since our spin, we launched with $116 billion backlog. 	We've grown this backlog to $163
billion, with an 80% increase in our equipment backlog at considerably better margins. In the
last 90 days, we've added $13 billion to our total backlog and now expect to reach $200
billion in backlog in '27 versus our previous expectation of '28.

-- 2 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
3
In Power, we delivered strong results and further margin expansion in 1Q, even with the
continuing investments in capacity expansion and SMR.
In Gas Power, we continue to see significant demand and favorable pricing trends for both
equipment and services. 	This demand is global and spans a diverse set of customers. 	We
saw continued strength in new gas turbine agreements in Q1, signing 21 gigawatts in
countries like the US, Vietnam, Mexico, Brazil and Canada to grow our total gigawatts under
contract from 83 to 100 gigawatts sequentially.
Backlog grew from 40 to 44 gigawatts and slot reservation agreements increased from 43 to
56 gigawatts. 	Approximately 80% of our total gigawatts under contract are with traditional
customers, with the remaining 20% explicitly supporting data centers.
Our momentum has continued into April. 	Quarter-to-date, we have booked more power
equipment orders in terms of value than we did in all of Q1'26. 	On pricing, we expect our
orders in the first half of '26 to be priced 10 to 20 points higher than our 4Q'25 orders on a
dollar per kW basis. We now expect to book 10 to 15 gigawatts of contracts in Q2 and to end
'26 with at least 110 gigawatts under contract.
On production capacity, we now have installed over 280 new machines in our Gas Power
factories and remain on track to reach 20 gigawatts of annualized output by 3Q.
Delivering on our growing backlog in the second half of this decade will lead to a larger and
even more profitable service book that will benefit us in the 2030s and beyond.
On the Nuclear front, let's start with our operational progress in Canada on Unit 1 of the SMR
project at OPG's Darlington site. 	With the recent regulatory approvals received by our
customer, installation will soon begin on the two million-pound basemat, a pedestal that will
serve as the reactors' foundation. This is a critical milestone and serves as a great illustration
of the progress we're making on the first SMR and construction in North America.
We also continue to make progress on our commercial pipeline in North America as well as
Europe. 	We 	are 	inspired 	and 	appreciative 	of 	the 	US 	and 	Japanese 	government's
announcement of up to $40 billion for GE Vernova Hitachi to build SMRs in the U.S. 	This
represents the best of government leadership to reindustrialize an industry that matters to
the 	world's 	future, 	and 	we 	continue 	to 	work 	hard 	to 	advance 	next 	steps 	with 	both
governments.
In parallel, we continue to work with TVA and the Nuclear Regulatory Commission, and we
expect the NRC to issue the license to construct for Clinch River in Tennessee as soon as the
second half of '26.
In Electrification, we achieved significant growth and margin expansion in Q1 as customers
work to keep pace with increasing electricity demand, grid stability needs and national
security interests. 	This is a large and growing market, where we continue to see strong
demand for our portfolio of solutions.
We'll approach $14.5 billion in revenue this year, but project an annual addressable market
by the end of the decade of approximately $300 billion based on what we offer today. 	Point
being, there remains substantial opportunity for us to grow.

-- 3 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
4
The first two months of running the Prolec business since closing the acquisition have only
reinforced the substantial opportunity ahead. I will talk more about Electrification in two
pages.
In Wind, the team is executing with discipline and is focused on the factors within our control.
After successfully completing installation of the remaining wind turbines at Dogger Bank A
and Vineyard Wind in Q1, we now have moved to the remaining commissioning activities for
both projects. We are off to a very strong start on the installation of Dogger Bank B and
continue to expect Dogger Bank B and C to take us through the better part of '27 to
complete.
In Onshore, we continue to drive a more profitable service business with double-digit margin
expansion versus the prior year for the second quarter in a row. While the US market for new
onshore equipment remains soft, we are monitoring the outcome of 232 wind and solar
tariffs, which could lead to more orders clarity in the second half of the year.
As our total company backlog builds, we remain focused on driving even stronger execution.
In Q1, we held a CEO Kaizen Week with almost 2,000 team members doing roughly 200
Kaizens with a focus on improving safety, quality, delivery and cost.
Coming out of the Kaizen Week, we see the opportunity for over $100 million in EBITDA
improvement in future years, driven from the lower cost and better quality performance. For
example, we held our first series of Kaizens at Prolec post-acquisition. In one Kaizen, we
focused on improving our subassembly process for transformer tanks, decreasing our rework
hours by nearly 70% and delivering a nearly 40% output improvement. In another, we use
lean manufacturing methods to reduce cycle times in the winding process for transformer
production.
These advances are helping us meet the growing demand for transformers as we accelerate
the ramp and capacity to grow this business. We're also deploying AI to enable our
employees, improve how we run our businesses and accelerate innovation. We entered the
year with 13 AI-based process transformations we are focused on executing, and the team is
now working to double the transformations to 26 across GEV.
If I spend a minute to try to make this real for you all with two examples. In our Gas Power
business, where we have the largest installed base of gas turbines, steam turbines and
generators of any OEM in the world, one of our real challenges is to project demand and
timing of needed investments in our customer fleets, and ensure we have the right parts and
resources available when a customer needs us.
We utilize our decades worth of data and are building AI tools to automate our ability to
match installed base demand with our planning, to deliver better performance for customers,
as well as a higher scope per outage for GEV. This is a very real customer example. But we
also see substantial opportunity with sourcing as we leverage AI to drive parts rationalization
and more intelligent bidding, while further automating manual processes like invoice
matching.
We expect to save tens of millions of dollars every year going forward with these new tools,
while freeing up tens of thousands of hours of manual work. I give these two examples to
reinforce for you that when you think about AI and GE Vernova, do not just think about AI as

-- 4 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
5
a demand driver for our equipment and solutions. 	We are running this company with a very
determined focus on meeting the demand for growing electricity for AI while simultaneously
incorporating the technology into how we work to transform our company.
GE Vernova is operating from a position of financial strength and executing our capital
allocation strategy with discipline. In Q1, we invested approximately $700 million in R&D and
CAPEX combined with R&D growing by roughly 25%, including work to commercialize new
technologies. 	We also further simplified the organization with business dispositions that
generated approximately $900 million in pretax cash. 	We also returned approximately $1.4
billion to shareholders, including the dividend, and $1.3 billion in share repurchases.
Strong 1Q’26 results
Turning to the first quarter financial results. 	We are executing well in the growing long-cycle
electric power industry. 	We booked $18 billion of orders in Q1, up 71% year-over-year. 	We
also grew revenue by 7% year-over-year with growth in both equipment and services, while
increasing our adjusted EBITDA margin by 390 basis points.
We generated $4.8 billion in free cash flow in the first quarter, meaningfully above our full
year '25 free cash flow of $3.7 billion. 	This robust performance was driven by strong orders
and slot reservations of Power and Electrification as demand continues to accelerate.
Regarding recent conflicts in the Middle East, the safety and well-being of our employees and
partners in the region remains our top priority, and we continue operations in the region
where it is safe to do so. 	We are monitoring the situation closely and have seen minimal
impact to our business and financial performance to-date.
Given the strength of our first quarter performance and confidence in our full year trajectory,
we are raising our revenue, adjusted EBITDA and free cash flow guidance for the full year of
'26, reflecting higher revenue growth in Electrification, as well as further margin expansion at
Power and Electrification.
Electrification well-positioned for growth
On the next slide, I want to spend some time on Electrification. 	This segment is the biggest
beneficiary of how we are operating GE Vernova today as one focused and integrated
company.
Electrification's growth trajectory has been significant. 	Since year-end '22, its backlog has
grown from $9 billion to $42 billion, and we expect substantially more growth moving
forward. This has being driven not just by traditional customers, but also data centers, which
accounted for approximately $2.4 billion in orders in Q1, more than the full year of '25. 	Just
to repeat that, our Q1 Electrification orders to the data centers were more than full year '25
results.
Additionally, Electrification’s backlog in North America is now nearly as large as its backlog in
Europe, following a strong Q1 and the addition of Prolec. 	This growth is underpinned by our
integrated, diverse product offerings and productivity-driven capacity expansions to fulfill
rising demand for grid infrastructure.
Let me expand on these business units for those less familiar with our Electrification segment.

-- 5 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
6
Grid Systems Integration, the largest part of Electrification's backlog, delivers integrated
solutions for large-scale electrification. 	This business sells HVDC systems and substations,
including key data center solutions, all areas which have driven significant backlog and
revenue growth as well as margin accretion.
Today, our HVDC backlog represents approximately $10 billion to be delivered in the coming
years and is located primarily in Europe, but we are seeing increasing momentum in other
regions, including Asia, where we booked another large HVDC order this quarter. 	We expect
to continue growing this portion of our backlog as we benefit from accelerating demand and
investment in new products to expand our offerings for data centers.
Power Transmission produces high and medium voltage transformers as well as switch gear
and capacitors to modernize the grid and expand global electrification. 	We continue to drive
productivity to increase volumes into this attractive market with healthy margins. 	With our
acquisition of Prolec, this business now has increased offerings, scale, and strategic flexibility
in transformers, a product category seeing robust demand and a backlog that is approaching
the size of GSI.
This includes $5 billion of backlog from Prolec, up $1 billion since we announced the
transaction at 3Q'25 earnings. 	This 25% growth in the Prolec backlog since announcing the
acquisition well illustrates the customer enthusiasm for this acquisition and the opportunity
ahead.
Power Conversion and Storage helps customers to improve grid resiliency and industrial
power stability through advanced electrical solutions, including rotating machines, power
electronics and battery systems. 	Within PCS, synchronous condensers are critical product
needed for markets experiencing increased intermittency representing a $5 billion-plus annual
market opportunity.
Overall, we see industry demand for grid resiliency products as growing low double digits
through the end of the decade.
Finally, we've combined our businesses to provide asset intelligence, monitoring and grid
software into Grid Automation and Software. 	Real synergies exist between our GridOS
software and GridBeats that can help improve how the grid thinks, learns and acts to enable
utilities to move from reactive operations to predictive, autonomous grid management.
We are also making investments in technologies that will define the next chapter of this
segment's growth. 	For example, our historical business of the data centers has been the
substation electrical equipment outside the data center, which remain the majority of our Q1
orders for this customer type. However, we also closed our first Energy Management System
or EMS order and complement with substation equipment for a data center customer in Q1.
EMS incorporates solutions from Power Conversion and Grid Automation and Software to
seamlessly integrate GEV assets with load requirements in the data center. This first order is
part of a larger project that also includes our Gas Power equipment and substation electrical
equipment. 	In dollars, EMS is a small part of this large order, but illustrates well the unique
opportunity we have as GEV to provide integrated solutions that span power generation,
electrical equipment and automation and software solutions.

-- 6 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
7
With that, I will turn the call over to Ken for more details on our Q1 performance as well as
our financial outlook.
Financial Review
Ken Parks
CFO, GE Vernova
Financial Snapshot
Thanks, Scott. 	Turning to slide six. 	We delivered a strong start to 2026 with robust orders,
growing backlog and revenues, margin expansion and significant free cash flow generation.
In the first quarter, we booked orders of $18.3 billion, a 71% increase year-over-year and a
book-to-bill ratio of approximately 2.
Equipment orders more than doubled while services orders increased 25%. 	All three
segments delivered significant orders growth. 	As Scott mentioned, our backlog expanded to
$163 	billion, a 	significant 	year-over-year and 	sequential 	increase. 	Equipment 	backlog
increased to $76 billion, up approximately $12 billion sequentially and 67% year-over-year,
driven by both Electrification, which now incorporates Prolec's backlog and Power.
Equipment backlog margin remains healthy, reflecting favorable price and our continued focus
on disciplined underwriting.
Our services backlog grew $9 billion or 12% year-over-year to $87 billion led by Power.
Revenue increased 7%, equipment revenue rose 10% year-over-year as 39% growth at
Electrification and 25% growth at Power more than offset anticipated lower Wind revenues.
Services revenue increased 4% year-over-year led by Power and Onshore Wind. 	Price
remained positive.
Adjusted EBITDA grew 87% year-over-year to $896 million, led by Electrification and Power.
Adjusted EBITDA margin expanded 390 basis points with higher price, more profitable volume
and further productivity more than offsetting inflation, including the impact of tariffs which
started in the second quarter of 2025.
We remain on track to achieve our $600 million G&A reduction target by 2028. 	We're
executing on our road map to drive simplification and reduction of data platforms through
numerous kaizens. For example, in 1Q'26, we launched a comprehensive company-wide data
lake that enables us to retire 15 legacy data platforms, which we expect will reduce costs by
approximately $15 million annually and significantly upgrade our technology to position us
well for AI-enabled solutions.
The strong adjusted EBITDA and working capital management drove $4.8 billion of free cash
flow in the first quarter. 	Working capital was a $5.3 billion cash benefit, driven primarily by
higher down payments on increased orders and slot reservations at Power, as well as higher
orders at Electrification.

-- 7 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
8
Year-over-year free cash flow increased $3.8 billion, driven by higher positive benefits from
working capital and stronger adjusted EBITDA, partially offset by higher taxes and CAPEX
investments supporting capacity expansion.
As Scott mentioned, we completed the acquisition of the remaining 50% ownership stake of
Prolec for $5.3 billion. 	We also made further progress in simplifying our portfolio. 	We
completed the sale of our manufacturing software business for approximately $600 million of
pretax proceeds. 	We also sold an additional ownership stake in our China XD grid business
and our interest in a merchant transmission facility, which together resulted in approximately
$300 million of pretax proceeds.
Collectively, we recognized $4.5 billion of gains from M&A transactions, primarily resulting
from the acquisition of Prolec, which were excluded from adjusted EBITDA.
In addition, we issued $2.6 billion of debt in 1Q and remain below 1 times gross debt to
adjusted EBITDA. 	Importantly, we are committed to maintaining a strong investment grade
balance sheet.
We ended 1Q with a healthy cash balance of approximately $10.2 billion after returning $1.4
billion of cash to shareholders through share repurchases and dividends in the quarter. We're
encouraged by our strong financial performance to start off the year. 	Our growing backlog
with healthy margin provides an excellent foundation for continued improvement in our
financial performance moving forward.
Power
Turning to Power on slide seven. 	The segment delivered another strong quarter with robust
demand, continued revenue growth and significant EBITDA margin expansion. 	Power orders
grew 59%, led by Gas Power equipment more than doubling year-over-year on higher pricing
and HA units ordered.
Power services orders increased 29%, driven by Nuclear Power given orders for upgrades as
well as continued growth at Gas Power. 	Revenue increased 10%. 	Equipment revenue
increased 	from 	higher 	volume 	and 	price, 	driven 	by 	both 	heavy-duty 	gas 	turbine 	and
aeroderivative growth at Gas Power.
We shipped a total of 25 gas turbines in the quarter, a 32% increase year-over-year.
Services revenue also increased due to growth at Nuclear Power. 	EBITDA margins expanded
500 basis points to 16.3%, mainly driven by favorable price and higher volume, more than
offsetting inflation as well as additional expenses to support capacity investments at Gas and
R&D at Nuclear.
Looking to the second quarter of 2026 at Power, as Scott mentioned, we expect continued
strong growth in Gas equipment orders. 	We also anticipate 15% to 17% revenue growth
driven by both higher equipment and services and EBITDA margin of approximately 17% to
18%, as volume, price and productivity should more than offset inflation as well as additional
expenses to support capacity and R&D investments.
Year-over-year EBITDA margin expansion should be less than 1Q’26, largely given the timing
of planned outages relative to last year.
Electrification

-- 8 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
9
Turning to Electrification on slide eight. 	We had another quarter of significant orders and
revenue growth and EBITDA margin expansion. Orders remained strong at roughly 2.5 times
revenue and increased 86% year-over-year to approximately $7.1 billion due to growing grid
equipment demand partially to support data center development.
We saw significant growth in substations, HVDC, switchgear and transformers. 	Equipment
orders growth was particularly strong in North America and Asia, both roughly tripling year-
over-year.
Electrification equipment orders continued outpacing revenue, which combined with Prolec
further increased our equipment backlog to $39 billion, up 75% or roughly $17 billion
compared to the first quarter of 2025.
Revenue increased 61% on a US GAAP basis, inclusive of Prolec, and 29% organically with
growth across all regions. 	We saw increased volume at Power Transmission, primarily from
switchgear and transformers. 	Prolec also delivered solid performance with nearly $500
million of revenue at just over 20% EBITDA margin since the acquisition that was completed
in early February.
Grid Systems Integration revenue increased due to higher substation and HVDC equipment
volumes. 	Electrification segment EBITDA more than doubled in the quarter with margin
expansion of 590 basis points to 17.8%. 	The margin expansion was led by strong volume,
productivity and favorable pricing.
Looking to the second quarter of 2026, we anticipate continued solid equipment orders with
healthy margins. 	Second quarter Electrification revenues should be between $3.3 billion and
$3.5 billion, a significant year-over-year increase. 	We also expect strong year-over-year
EBITDA margin expansion from higher volume, productivity and favorable price with a margin
rate modestly above 1Q’26 levels.
Wind
Turning to slide nine on Wind. 	We continue to focus on what we can control. 	In the first
quarter, the team delivered stronger performance in Onshore Wind services and successfully
completed installation of both the Dogger Bank A and Vineyard Wind Offshore projects. Wind
orders increased 85%, mainly due to improved Onshore equipment orders, primarily in North
America off of a low year-over-year comparison. However, for now, it's still difficult to call an
inflection point in US orders as customers still face permitting delays and tariff uncertainty.
Wind revenue decreased 25% in the quarter, given lower onshore equipment deliveries as a
result of soft orders in the first half of 2025, partially offset by higher Onshore services and
Offshore revenues.
Wind EBITDA losses were $382 million in the quarter, in line with our expectations. 	The
anticipated year-over-year increase in losses was primarily a result of lower equipment
deliveries and the impact of tariffs at Onshore Wind as well as higher contract losses at
Offshore Wind, partially offset by improved Onshore services.
For 2Q’26, we anticipate Wind revenue to decline at a mid-teens rate year-over-year due to
lower Onshore equipment deliveries. 	We expect EBITDA losses to be between $200 million
and $300 million. 	The year-over-year increase in losses is primarily the result of the lower
Onshore equipment volume, partially offset by higher services profitability.

-- 9 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
10
We continue to expect significant improvement in Wind revenue in the second half of the
year, given only 30% of our expected Onshore turbine shipments are in the first half, as
almost 70% of our 2025 equipment orders came later in the year.
Also the volume we're shipping in the first half has fewer contractual protections for tariffs,
since we signed these orders before their implementation. 	As a result, we expect EBITDA
losses in the first half to be partially offset by profitability in the second half.
Raising 2026 guidance
Moving now to slide 10 to discuss GE Vernova guidance. 	For the second quarter of 2026,
based on our expectations for the segments, as outlined, we expect continued year-over-year
revenue growth and adjusted EBITDA margin expansion. 	We also expect to deliver positive
free cash flow in 2Q'26, given our ongoing focus on aligning the timing of inflows and outflows
along with the impact of down payments, which correlate with the timing of orders.
For the full year, we're raising our guidance based on the strong 1Q results and the continued
momentum we see in our business. 	For revenue, we now expect to be in the range of $44.5
billion to $45.5 billion, up $500 million compared to our previous expectation due to
additional growth at Electrification.
We're raising adjusted EBITDA margin by 1 point at both ends of the range to 12% to 14%,
driven by Power and Electrification. 	Given the accelerating strength in orders and down
payments in addition to the higher adjusted EBITDA, we're increasing our 2026 free cash flow
guidance to between $6.5 billion and $7.5 billion, up from $5 billion to $5.5 billion. 	We're
generating significant margin expansion and cash flow this year while still investing in the
business.
Our 2026 guidance includes an approximately 30% year-over-year combined increase in R&D
and CAPEX to support innovation and growth. 	By segment for 2026, we continue to expect
16% to 18% of organic revenue growth in Power, driven by Gas Power. 	We now anticipate
Power EBITDA margins to be between 17% to 19%, up from our previous range of 16% to
18% as we continue to see the benefits of our productivity efforts.
In Electrification, we're raising our revenue expectations from $13.5 billion to $14 billion to
$14 billion to $14.5 billion as the team continues to deliver its growing more profitable
backlog. 	We continue to expect Prolec to contribute approximately $3 billion of revenue this
year. 	Given higher top line expectations, we're increasing Electrification EBITDA margin to
18% to 20%, up from 17% to 19%.
In Wind, we continue to anticipate organic revenue to be down low double digits due to
decreased Onshore equipment revenues given the softness in orders. 	We still expect EBITDA
losses to be approximately $400 million in 2026 as improvement in Onshore Wind services
and Offshore Wind offset the lower Onshore equipment volume.
We continue to expect 2026 GE Vernova adjusted EBITDA to be more second half-weighted
than 2025 with the highest revenue and EBITDA in 4Q'26. We expect higher second half Gas
Power revenue as we ship more gas turbines in the second half of the year and as we
increase annual production capacity to approximately 20 gigawatts starting in mid-year '26.
We also anticipate typical Gas services seasonality with the highest outage volume in the
fourth quarter. We continue to expect Electrification EBITDA to increase sequentially through

-- 10 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
11
the year, even while we invest in our ongoing capacity expansions and new potential
products.
As mentioned earlier, in Wind, we expect higher second half Onshore turbine shipments given
our recent orders profile and better services profitability.
At Corporate, costs are typically uneven across quarters due to compensation timing and
portfolio activity at our financial services business. 	We continue to expect full year 2026
corporate costs to be between $450 million and $500 million as we continue investing in AI,
robotics and automation to drive productivity over the medium and long term.
Overall, the combination of rising demand, combined with the consistently stronger execution,
investments into our business, and the completed acquisition of Prolec sets us up nicely going
forward.
With that, I'll turn it back to Scott.
Conclusion
Scott Strazik
CEO, GE Vernova
Wrap-up
Thanks, Ken. 	We've had a solid start to '26, but it is just that, a start. 	We see significant
opportunity to continue to improve how we serve our customers and expand our margins. 	I
shared just a few examples of this earlier in the discussion with Lean and AI. 	With over $10
billion in cash in our updated '26 guide and the team just starting to get their feet under them
with the significant opportunity ahead of us, we continue to make investments for the short,
medium and long term.
We talked earlier about Nuclear SMR and our Electrification EMS solutions for data centers as
two examples with tangible Q1 progress, but there are many more. As the opportunity for us
to serve this growing market expands, our humility and hunger to meet this moment only
becomes a larger and more important part of who we are.
This is just the beginning, and look forward to our Q&A discussion.
With that, I'll hand it over to Michael.
Michael Lapides: Before we open the line, I'd ask everyone in the queue to consider your
fellow analysts and ask just one question, so we can get to as many people as possible.
Please return to the queue if you have follow-ups.
With that, operator, please open the line.
Q&A
Mark Strouse (JP Morgan): Yes. 	Good morning, everybody. 	Scott, I wanted to start
maybe with your latest thoughts on Gas Power capacity. 	So you're talking more and more
about AI, about automation. Just curious how we should think about that compared to the 24
gigs that you're targeting over the next several years? Is AI and automation, should we think

-- 11 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
12
about that kind of measured in maybe in hundreds of megawatts? 	Is that potentially in
gigawatts?
And then kind of just your latest thoughts on the lead times that you're thinking about might
be needed before you would consider adding further physical capacity? Thank you.
Scott Strazik: Sure, Mark. 	I think if I work backwards from the question on lead times, I
mean, we're directionally at about three years lead time today. 	We're sitting in the spring of
'26, and we do still have capacity in both '29 and '30.
If I compare where we were in our January earnings call in the fourth quarter, we talked to
you then about having about 10 gigawatts of capacity remaining in 2029. 	What's happened
in the first quarter is we sold a lot of 2030 slots because the reality is we had a lot of
customers that looking at planning with EPC schedules and other dynamics needed the '30
slot more than '29. 	So what's changed is we still have about 10 gigawatts remaining
cumulatively in '29 and '30 together, whereas in the course of where we were in January
earnings, we had 10 gigawatts in total for '29.
So, we need to keep seeing where this market takes us. 	At the end of the day, in many of
the cases with these projects, the gas turbines are really not the gating item. 	When you're
talking about a three-year cycle from when a project starts, the EPC buildout, the permitting,
the fuel availability, but we'll keep working with our customers, and we're also going to learn
a lot more on the first part of your question, 280 new machines installed in our Gas factories
over the last directionally 15 months. 	We'll have added about 1,800 production workers in
the US between '25 and '26. So the largest portion of them being in our Gas Power factories.
And I do expect that we'll drive more productivity as we start to execute with those new
machines and those new production workers that we'll start to see in the third quarter of this
year. 	So quantifying that productivity opportunity, we need time. 	But as we continue to
learn how much more we can get out of the investments we've already made, we'll also learn
more about where this market takes us as we sell out of '29 and '30 and the timing of really
when the incremental gas turbines are really needed.
Julian Mitchell (Barclays): Hi. 	Good morning. 	My question really is on the Electrification
segment, where you provided some additional welcomed color this morning. 	But I guess a
couple of follow-ups. I think one would be in the Power Transmission part of it that you called
out on slide five. 	It does seem like you're very well placed and are taking a lot of market
share. We met with a number of your competitors there at Data Center World yesterday. So
maybe help us understand kind of why you think it's so well placed to continue to take more
share in that Power Transmission kind of sleeve of the segment?
Also wondered across the segment, if you could flesh out the capacity expansion plans in any
detail.
And lastly, on Prolec, any issues or major tariff mitigation needed in light of the Section 232
changes? Thank you.
Scott Strazik: Thanks, Julian. 	I would say, at the start, we don't really internally talk a lot
about taking share per se when we're thinking about where we are with the PT business. This
is really about continuing to do good business. 	And what is very clearly playing out is where
we're doing really good business is where we're attaching that electrical equipment to the

-- 12 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
13
power generation solutions. 	And that integrated solution, and that's why in the prepared
remarks, we talked a little bit about a project where we were getting the power generation,
the 	electrical 	substation 	and 	the 	EMS 	solution, 	we're 	clearly 	gaining 	momentum 	with
integration of our products. And in that regard, I expect a lot more to follow.
On capacity, we are investing in our existing factories. 	Clearly, we've got our $5.3 billion we
just spent to add three more factories in the US in Shreveport, North Carolina and Wisconsin
through Prolec in addition to factory capacity in Mexico and Brazil that allows us to serve this
market more effectively, where I would tell you a few months into the acquisition, we
continue to see more operational opportunity to get more out of those factories, just applying
Lean. 	And that's why I included in my prepared remarks a few of those examples that will
bear fruit for us.
On the tariffs, I'm going to hand it to Ken to give a little bit of incremental context.
Ken Parks: Yes. 	No, a great question. 	The reality is that the tariff landscape has continued
to move both with the changes in the country tariffs as well as the 232s. Our total number of
tariffs last year, we said was about a net $250 million impact on the company. We guided to
$250 million to $350 million net impact on the company in 2026.
The structure of those tariffs have moved around, but the absolute number is about exactly
where we thought it would be. 	To your specific question on Prolec, certainly with how the
232s have been defined, there's a little bit more impact on the Prolec numbers, whereas
we've seen lesser impact on some of the other businesses.
But I would just tell you that where we sit today, that outlook for $250 million to $350 million
is fully built in our outlook. 	We'll continue to work mitigating plans through alternate
sourcing, through also finding contractual provisions, where we have the ability to work with
our customers to pass a piece of this along. But we are managing through the landscape just
like we did last year.
Nicole DeBlase (Deutsche Bank): Thanks. Good morning guys.
Scott Strazik: Good morning.
Nicole DeBlase: I'd like to go back to Gas Power. 	So just thinking about, could we get a
little bit more color on what you're hearing through customer conversations, pipeline growth,
if the demand outlook remains as robust as ever?
And then just an update on the pricing environment as well. It was really helpful, the pricing
data point of 10 to 20 percentage points that you provided about the early part of 2026. 	I
guess what are the expectations for pricing to continue to move higher beyond that? 	Thank
you.
Scott Strazik: Nicole, I'd say through the first four months of this year now on new bidding
activity, which is probably a forward-looking indicator, we continue to be in that 10 to 20-
point growth in price on new bidding and winning activity today relative to where we were in
the backlog in the fourth quarter of last year.
You're going to start to see that cutting through in orders in the second quarter, and that's
why we had included that context on the 10 to 20-point improvement in dollars per kilowatt

-- 13 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
14
through the first half of 2026, inclusive of Q1 and Q2, which is really telling you that the
dollar per kilowatt growth is going to be very healthy in the second quarter of this year.
And from a pipeline perspective, we continue to be very actively iterating with a very diverse
set of customers to meet this moment. 	And I think it's important to contextualize that the
100 gigawatts we have on contract today is with almost 90 distinct customers in 24 different
countries.
So I give that context to just say there's a need for incremental electrons for many different
applications in many different countries, which has us continuing to work hard to figure out
how, in a very capital-efficient way, we meet this moment and serve this market, which is
exactly what we intend to do.
Ken Parks: Maybe I'll just add just one data point, because I know I think I did this last
quarter to kind of help you kind of size the pricing on the Power orders because we do
disclose to you Power orders. 	We don't specifically disclose to you Gas Power orders. 	But
because it is important to see what's happening in the pricing trends, what we show you, the
Power orders, we also give you gigawatts. 	Well, the gigawatts obviously relate to Gas Power
orders.
So it's important as you're doing the math based upon the information we provided you in the
earnings release to know how much there is to back out of those power orders that are not
Gas Power. 	And last quarter, it was about $0.5 billion related to Hydro and Nuclear. 	This
quarter, I'll give you the number, and it's a couple of hundred million dollars to back out
there.
I want to give you that because I know it's an important metric to track. 	And so if you take
those pieces of data that we just provided to you, you'll see exactly what Scott just outlined
to you, which is now we see the pricing in our orders actually look relatively consistent to
what we had in the fourth quarter, maybe up just a little bit. 	But what we're seeing is we
have the opportunity as these SRAs continue to convert that are in 10 to 20 full points above
what we have in the order book already to see incremental pricing start to flow to our
backlog.
Andy Kaplowitz (Citigroup): Good morning, everyone.
Scott Strazik: Good morning.
Andy Kaplowitz: Just focusing on your comments that Electrification focused orders on data
centers in Q1 were larger than all of '25. 	I know you said in the past, I think you've got a
$200 million to $300 million per gigawatt of entitlement and electrification for data centers. I
think you're probably already higher than that now, but maybe you can talk about your
progress on entitlement and what you see going forward?
Scott 	Strazik: 	You bet. 	I mean I think Philippe Piron, the business leader and his
management team are doing an excellent job really systematically building a string of pearls
here of incremental products from power generation through to the data center. That's where
the EMS solution is an example that we were able to cut in, in orders in the first quarter.
We've already secured a second order with that product already in April and expect more
there, which is taking our entitlement per gigawatt up.

-- 14 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
15
But we're not stopping there. 	I mean we're making progress with a stability block solution
that complements what we're doing that is MV UPS solution, a combination of medium voltage
electrical equipment with storage and software that we're gaining real traction on with end
customers. 	We've talked to you in the past about the solid-state transformer investment.
That remains on track. We'll deliver the first product to a hyper-scaler in the fall of this year,
in which they'll then have six months of testing of that product before it can play into a
potential order really in the first half of '27.
But operationally, we're making progress there. 	And the SST would be the first example
inside the data center of scope for us. 	But when you take that step back, and it's why we've
invested real money into the EMS solution, when you are doing the power generation, the
substation equipment, and you're providing a lot of the software solutions to help the
hyperscaler manage the load requirements they want with our equipment, it's giving you the
enablement to then attach more LEGO blocks or that string of pearls I'm referencing to give
them a more integrated solution.
It doesn't come at once. 	EMS, good wins here early in the year. 	The stability block with MV
UPS is something we could see incremental orders on, I would say, second half of this year if
things go our way. 	SST would be next year. 	And there's more stuff we're working on
because when you see that 25% R&D growth in the company, the largest proportion of that
R&D is in Electrification because we see real opportunities to organically invest in this
business and serve this customer need, and we're very determined to do that.
So there's a lot more to come in this business, but I continue to have more conviction with
humility that we've got a very unique shot to deliver integrated solutions over time that few
companies in the world could do.
David Arcaro (Morgan Stanley): Thanks so much. Good morning. I was wondering if you
could comment on what your progress has been and the customer appetite for framework
agreements around turbine orders, especially as you're getting booked further and further
out? And curious if there's any pricing trade-offs that might come in those conversations?
Scott Strazik: In those conversations – thank you, David. 	Conversations have generally
centered on securing long-term commitments at today's pricing through generally a five-year
period of time during the first half of the next decade that would give us volume clarity in that
period of time to continue to sustain our investments to meet this moment.
We have not closed one of those transactions to-date. 	Admittedly, we've been having these
conversations for a period of time, and what continues to happen is incremental orders, let's
call it by the drink. And that was the reference to a lot of 2030 contracts that were signed in
the course of the first quarter, including with the hyperscalers. 	It's about 20% of our 100
gigawatts are direct to the data centers. 	And the conversations continue on, call it, 30 to 35
framework agreements, but we haven't closed one to-date and are continuing to iterate both
strategically on the gas turbine content but also the attach potential with the electrical
equipment and some of the other solutions we're talking about.
And in some fashion, that expanded scope, including Electrification in some of the discussions
even further is elongating the iteration that's happening, but it is a productive iteration we're
going to keep working hard on.

-- 15 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
16
Joe Ritchie (Goldman Sachs): Hi guys. Good morning.
Scott Strazik: Good morning, Joe.
Joe Ritchie: So look, obviously, a big uptick in SRAs. 	One of your biggest competitors has
talked about not taking orders beyond 2030 because they want to make sure that the supply
chain can deliver on anything beyond 2030. 	I'm just wondering what your approach is going
to be? Are you planning on limiting any type of order intake? Just any thoughts around that
would be helpful.
Scott Strazik: We feel better and better, Joe, about our ability to meet this moment for the
long term. We continue to invest in our suppliers and our partners that are making very good
progress. I spend a substantial amount of time within that supply chain. And we do continue
to expect to take on orders for '31 and beyond.
We referenced earlier, we have about 10 gigawatts remaining of '29 and '30 capacity. 	And
generally speaking, don't find our heavy-duty gas turbines to be the gating item on a
directionally three-year cycle time right now, and we'll continue to invest to meet this
moment sustaining the demand.
Now in our case, the dynamic will be different than our competitors because our installed
base is so much larger. 	And when you have an exponentially larger installed base than the
other OEMs, we have to continue to partner with our supply chain to support a growing fleet.
I mean, we have 231 HA units cumulatively ordered right now. 	Over 100 of those haven't
been commissioned yet. 	And that number is going to grow substantially through the rest of
the year. 	That very large installed base relative to anyone else, whether we talk HA or total
gas turbines is a luxury because it provides a financial floor of demand we already have
contracted in our service book that gives us a little bit more optionality to play to win and to
serve this market, which is exactly what we're going to do.
Ken Parks: And I think that the other thing that's really important, I think as you think about
Vernova, we talk about Lean a lot and we do that not just for the words but because it is a
part of our culture. 	And so, we told you last time, we said that we were going to reach our
approximately 20 gigawatts of capacity in the middle of this year. 	And then that would step
up to 24 gigawatts in 2028. 	A couple of gigawatts from Lean, a couple of gigawatts from
some incremental capacity.
I think it's just important to think to your question about what do we do past 2030. 	Lean is
not something that we do in only events. 	It's something that we do continually and we'll
continue to add capacity at a very attractive value play by continuing to grow our Lean
initiatives. So there's the opportunity there as well, Joe.
Michael Lapides: Operator, we have time for one last question, please.
Alexander Virgo (Evercore ISI): Thanks very much for squeezing me in. 	Good morning,
gentlemen. 	I wondered if you could just clarify your comments around April in terms of the
power turbine or the turbines that you've already signed in April? And if you could just touch
on the Vietnam order for us, Scott? 	I think you also referred in your comments about
questions – some questions over availability of fuel. 	I think there's been a little bit of debate
over what is – what the complexion of that Vietnam order actually looks like with one of the

-- 16 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
17
slugs of the 4.8 gigawatts I think being questioned over whether or not they change it to
renewables. So I appreciate any color you can give us on that. Thank you.
Scott Strazik: You bet, Alexander. 	I think it's an important point to close on in the sense
that when I am iterating with our Asian customers right now and you think about LNG
opportunities in a place like Vietnam or Japan, I was with one of our largest Japanese
customers last week, you're talking about gas turbine deliveries in 2030 and beyond right
now and commissioning projects for 2032 and 2033.
For those customers, the LNG dynamic in the moment with the crisis in the Middle East,
they're not really changing their underwriting assumptions for LNG economics in 2032 today.
So we aren't seeing a change in buying behavior, I would say, in LNG-oriented markets like
that in Asia, at least to-date by any means.
Now we have talked in the past about the fact that we have commissioned our first LNG to
power project in Vietnam, 1.6 gigawatts. 	We have an incremental three projects on contract
that are more an SRA category right now that will evolve into orders over time.
Alexander, I have seen and we've been iterating with our customers on some of what you
could be citing in the press on one of the customers evaluating gas relative to a shift to
renewables. And I would just tell you, there are more projects that our customers are talking
about than what we have on contract today.
So our 4.8 gigawatts that we've cited in the past are all continuing to progress. 	Frankly,
there's more than those three projects that are being negotiated with the government in
Vietnam that is more relevant to your question. 	But we'll continue to work with our
customers in Vietnam and throughout the world on the dynamics that they're facing to get
projects done and are highly confident that we can do that.
Ken Parks: And a quick one, just to answer your first question, the clarification on April
orders was that we said that, in April, we have booked Power equipment orders a value
equivalent to what we booked in the full first quarter.
Michael Lapides: Before we wrap up, let me turn it back to Scott for closing comments.
Scott Strazik: Everybody, we appreciate you giving us the time this morning. Similar to our
Capital Markets Day in New York City in December at the end of last year, we talked a lot
about giving being an important part of the culture we're building in the company. 	In
December, we had done the STEM Toy Drive that led to 80,000-some-odd toys ultimately
contributing.
We've got a team at the New York Stock Exchange this morning announcing a $4.5 million
commitment to the Engineering of Change program that's going to touch 6,000 students over
the next four years in some important markets for us in the US and the UK. 	And I just
wanted to reinforce that and share that announcement that will be made today through our
foundation. 	It's just an important part of who we are and the company and culture we're
building.
For our customers, we continue to appreciate their trust in us. 	For our employees, I
personally thank each and every one of them for their work every day, and I'm proud of the
team that we're building. 	We need our partners and are appreciative of them. 	And for all of

-- 17 of 18 --

GE Vernova 1Q 2026 Financial Results & Outlook 	Wednesday, 22 nd April 2026
18
you, our investors, thank you for your continued commitment to Vernova and continued
interest in the company.
We're appreciative and proud of our start, but it's just that, a start. 	This is just the
beginning, and we've got substantial opportunity ahead. So thanks, everyone.

-- 18 of 18 --