SUPPLEMENT

Q1 2024 — Regional Operating Statistics

Q1 2024PDF · 30 pages161 KB
Operating Statistics (1)(2)
Three Months Ended March 31,
2024 2023
Gold ounces produced (thousands):
CC&V 28 48
Musselwhite 49 41
Porcupine 61 66
Éléonore 56 66
Red Chris (3)(4) 6 —
Brucejack (3) 37 —
Peñasquito 45 85
Merian 76 82
Cerro Negro 81 67
Yanacocha 91 56
Boddington 142 199
Tanami 90 63
Cadia (3) 122 —
Telfer (3) 31 —
Lihir (3) 181 —
Ahafo 190 128
Akyem 69 71
Nevada Gold Mines (5) 264 261
Total Consolidated Newmont 1,619 1,233
Merian (25%) (19) (20)
Pueblo Viejo (6) 54 60
Fruta Del Norte (3)(7) 21 —
Total Attributable Newmont 1,675 1,273
Other metals produced:
Red Chris copper tonnes (thousands) (3)(4) 5 —
Boddington copper tonnes (thousands) 9 12
Cadia copper tonnes (thousands) (3) 21 —
Telfer copper tonnes (thousands) (3) 1 —
Total copper tonnes (thousands) 36 12
Peñasquito silver ounces (millions) 9 7
Peñasquito lead tonnes (thousands) 28 19
Peñasquito zinc tonnes (thousands) 58 46
(1) Gold equivalent ounces (GEOs) are calculated as pounds or ounces produced or sold multiplied by the ratio of the other metals’ price to the gold price
using Gold ($1,400/oz.), Copper ($3.50/lb.), Silver ($20.00/oz.), Lead ($1.00/lb.) and Zinc ($1.20/lb.) pricing for 2024 and 2023.
(2) Per unit measures may not recalculate due to rounding.
(3) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(4) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(5) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method.
(6) Newmont has a 40% interest in Pueblo Viejo, which is accounted for as an equity method investment.
(7) Newmont has a 31.9% interest in Lundin Gold, who wholly owns and operates the Fruta del Norte mine, which is accounted for as an equity method
investment on a quarter lag.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 1

-- 1 of 30 --

Three Months Ended March 31,
2024 2023
Gold ounces sold (thousands):
CC&V 29 48
Musselwhite 49 44
Porcupine 61 65
Éléonore 56 68
Red Chris (1)(2) 7 —
Brucejack (1) 34 —
Peñasquito 44 56
Merian 74 83
Cerro Negro 74 61
Yanacocha 90 53
Boddington 142 198
Tanami 91 65
Cadia (1) 114 —
Telfer (1) 26 —
Lihir (1) 182 —
Ahafo 184 131
Akyem 75 78
Nevada Gold Mines (3) 267 258
Total Consolidated Newmont 1,599 1,208
Merian (25%) (18) (20)
Total Attributable Newmont 1,581 1,188
Other metals sold:
Red Chris copper tonnes (thousands) (1)(2) 6 —
Boddington copper tonnes (thousands) 9 12
Cadia copper tonnes (thousands) (1) 20 —
Telfer copper tonnes (thousands) (1) 1 —
Total copper tonnes (thousands) 36 12
Peñasquito silver ounces (millions) 10 6
Peñasquito lead tonnes (thousands) 29 17
Peñasquito zinc tonnes (thousands) 61 45
(1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 2

-- 2 of 30 --

CAS (1)(2)
Three Months Ended March 31,
2024 2023
Gold
Costs Applicable to Sales ($/ounce)
CC&V $ 1,394 $ 1,062
Musselwhite $ 1,175 $ 1,313
Porcupine $ 1,042 $ 1,071
Éléonore $ 1,441 $ 1,095
Red Chris (3) $ 940 $ —
Brucejack (3) $ 2,175 $ —
Peñasquito $ 853 $ 1,199
Merian $ 1,221 $ 1,028
Cerro Negro $ 861 $ 1,146
Yanacocha $ 972 $ 1,067
Boddington $ 1,016 $ 841
Tanami $ 902 $ 936
Cadia (3) $ 648 $ —
Telfer (3) $ 2,632 $ —
Lihir (3) $ 936 $ —
Ahafo $ 865 $ 992
Akyem $ 1,006 $ 810
Nevada Gold Mines $ 1,177 $ 1,109
Total Newmont - Gold $ 1,057 $ 1,025
Co-product GEO
Costs Applicable to Sales ($/GEO)
Red Chris (3) $ 1,011 $ —
Peñasquito $ 843 $ 954
Boddington $ 942 $ 809
Cadia (3) $ 594 $ —
Telfer (3) $ 2,882 $ —
Total Newmont - Co-product GEO $ 829 $ 918
Co-product by metal
Costs Applicable to Sales ($/unit)
Red Chris - copper ($/tonne) (3) $ 5,571 $ —
Boddington - copper ($/tonne) $ 5,192 $ 4,461
Cadia - copper ($/tonne) (3) $ 3,271 $ —
Telfer - copper ($/tonne) (3) $ 15,885 $ —
Total Copper CAS ($/tonne) $ 4,452 $ 4,461
Peñasquito - silver ($/oz) $ 11 $ 13
Peñasquito - lead ($/tonne) $ 1,215 $ 1,325
Peñasquito - zinc ($/tonne) $ 1,764 $ 1,900
(1) Costs applicable to sales (CAS) per unit, included at the consolidated and site level, are non-GAAP metrics and should not be considered in
isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please
see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov.
(2) Consolidated CAS excludes Depreciation and amortization and Reclamation and remediation.
(3) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 3

-- 3 of 30 --

AISC (1)
Three Months Ended March 31,
2024 2023
Gold
All-In Sustaining Costs ($/ounce)
CC&V $ 1,735 $ 1,375
Musselwhite $ 1,766 $ 1,681
Porcupine $ 1,470 $ 1,412
Éléonore $ 1,920 $ 1,420
Red Chris (2) $ 1,277 $ —
Brucejack (2) $ 2,580 $ —
Peñasquito $ 1,079 $ 1,539
Merian $ 1,530 $ 1,235
Cerro Negro $ 1,120 $ 1,379
Yanacocha $ 1,123 $ 1,332
Boddington $ 1,242 $ 1,035
Tanami $ 1,149 $ 1,219
Cadia (2) $ 989 $ —
Telfer (2) $ 3,017 $ —
Lihir (2) $ 1,256 $ —
Ahafo $ 1,010 $ 1,366
Akyem $ 1,254 $ 1,067
Nevada Gold Mines $ 1,576 $ 1,405
Total Newmont $ 1,439 $ 1,376
Co-product GEO
All-In Sustaining Costs ($/GEO)
Red Chris (2) $ 1,400 $ —
Peñasquito $ 1,102 $ 1,351
Boddington $ 1,081 $ 1,019
Cadia (2) $ 1,027 $ —
Telfer (2) $ 3,745 $ —
Total Newmont $ 1,148 $ 1,322
Co-product by metal
All-In Sustaining Costs ($/unit)
Red Chris - copper ($/tonne) (2) $ 7,718 $ —
Boddington - copper ($/tonne) $ 5,959 $ 5,616
Cadia - copper ($/tonne) (2) $ 5,659 $ —
Telfer - copper ($/tonne) (2) $ 20,643 $ —
Total Copper AISC ($/tonne) $ 6,392 $ 5,921
Peñasquito - silver ($/oz) $ 15 $ 18
Peñasquito - lead ($/tonne) $ 1,500 $ 1,699
Peñasquito - zinc ($/tonne) $ 2,368 $ 2,856
(1) All-in sustaining costs (AISC) per unit, included at the consolidated and site level, is a non-GAAP metric and should not be considered in
isolation or as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please
see Newmont’s website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov.
(2) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 4

-- 4 of 30 --

CAPITAL EXPENDITURES
Three Months Ended March 31,
2024 2023
Consolidated Capital Expenditures
($ millions)
CC&V $ 5 $ 10
Musselwhite 26 14
Porcupine 40 22
Éléonore 21 14
Red Chris (1)(2) 35 —
Brucejack (1) 16 —
Peñasquito 32 35
Merian 18 14
Cerro Negro 46 35
Yanacocha 24 63
Boddington 28 37
Tanami 85 74
Cadia (1) 111 —
Telfer (1) 10 —
Lihir (1) 55 —
Ahafo 90 90
Akyem 9 10
Nevada Gold Mines (3) 118 84
Corporate and other 4 6
Accrual basis $ 773 $ 508
Decrease (increase) in non-cash adjustments 77 18
Cash basis $ 850 $ 526
(1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 5

-- 5 of 30 --

CC&V
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 5,388 5,790
Open pit waste 3,423 3,500
Total open pit 8,811 9,290
Tons milled/processed (000 tonnes):
Leach 5,286 5,755
Average ore grade (g/tonne):
Leach 0.460 0.416
Gold produced (koz):
Consolidated/Attributable 28 48
Gold sold (koz):
Consolidated/Attributable 29 48
Gold production costs ($M):
Costs applicable to sales (1) $ 40 $ 51
Depreciation and amortization $ 3 $ 7
Reclamation accretion $ 3 $ 2
Gold production costs (per oz sold):
Direct mining and production costs $ 1,883 $ 1,179
By-product credits (8) (13)
Royalties and production taxes 136 87
Inventory change, write-downs, and other (617) (191)
Costs applicable to sales (per oz sold) (1) $ 1,394 $ 1,062
Depreciation and amortization $ 119 $ 153
Reclamation accretion $ 95 $ 52
All-in sustaining costs (per oz sold) $ 1,735 $ 1,375
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 6

-- 6 of 30 --

MUSSELWHITE
Three Months Ended March 31,
2024 2023
Total underground ore (000 tonnes) 255 253
Tons milled/processed (000 tonnes):
Mill 255 254
Average ore grade (g/tonne):
Mill 6.129 5.337
Average mill recovery rate 95.7 % 95.5 %
Gold produced (koz):
Consolidated/Attributable 49 41
Gold sold (koz):
Consolidated/Attributable 49 44
Gold production costs ($M):
Costs applicable to sales (1) $ 57 $ 58
Depreciation and amortization $ 18 $ 19
Reclamation accretion $ 1 $ 1
Gold production costs (per oz sold):
Direct mining and production costs $ 1,094 $ 1,275
By-product credits (3) (2)
Royalties and production taxes 42 44
Inventory change, write-downs, and other 42 (4)
Costs applicable to sales (per oz sold) (1) $ 1,175 $ 1,313
Depreciation and amortization $ 367 $ 429
Reclamation accretion $ 17 $ 18
All-in sustaining costs (per oz sold) $ 1,766 $ 1,681
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 7

-- 7 of 30 --

PORCUPINE
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 243 860
Open pit waste 324 1,460
Total open pit 567 2,320
Total underground ore (000 tonnes) 221 221
Tons milled/processed (000 tonnes):
Mill 698 664
Average ore grade milled (g/tonne):
Mill 2.925 3.281
Average mill recovery rate 91.5 % 91.9 %
Gold produced (koz):
Consolidated/Attributable 61 66
Gold sold (koz):
Consolidated/Attributable 61 65
Gold production costs ($M):
Costs applicable to sales (1) $ 63 $ 70
Depreciation and amortization $ 23 $ 29
Reclamation accretion $ 2 $ 2
Gold production costs (per oz sold):
Direct mining and production costs $ 1,198 $ 1,185
By-product credits (4) (4)
Royalties and production taxes 45 23
Inventory change, write-downs, and other (197) (132)
Costs applicable to sales (per oz sold) (1) $ 1,042 $ 1,071
Depreciation and amortization $ 378 $ 454
Reclamation accretion $ 38 $ 32
All-in sustaining costs (per oz sold) $ 1,470 $ 1,412
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 8

-- 8 of 30 --

ÉLÉONORE
Three Months Ended March 31,
2024 2023
Total underground ore (000 tonnes) 461 450
Tons milled/processed (000 tonnes):
Mill 460 450
Average ore grade (g/tonne):
Mill 4.286 5.059
Average mill recovery rate 90.9 % 90.7 %
Gold produced (koz):
Consolidated/Attributable 56 66
Gold sold (koz):
Consolidated/Attributable 56 68
Gold production costs ($M):
Costs applicable to sales (1) $ 80 $ 75
Depreciation and amortization $ 19 $ 27
Reclamation accretion $ 1 $ 1
Gold production costs (per oz sold):
Direct mining and production costs $ 1,474 $ 1,049
By-product credits (2) (1)
Royalties and production taxes 50 43
Inventory change, write-downs, and other (81) 4
Costs applicable to sales (per oz sold) (1) $ 1,441 $ 1,095
Depreciation and amortization $ 348 $ 392
Reclamation accretion $ 17 $ 11
All-in sustaining costs (per oz sold) $ 1,920 $ 1,420
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 9

-- 9 of 30 --

RED CHRIS - GOLD (1)(2)
Three Months Ended March 31,
2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 2,608 —
Open pit waste 2,977 —
Total open pit 5,585 —
Tonnes milled/processed (000 tonnes):
Mill 1,470 —
Average ore grade (g/tonne):
Mill 0.263 —
Average mill recovery rate 53.6 % — %
Gold produced (koz):
Consolidated/Attributable 6 —
Gold sold (koz):
Consolidated/Attributable 7 —
Gold production costs ($M):
Costs applicable to sales (3) $ 7 $ —
Depreciation and amortization $ 2 $ —
Reclamation accretion $ — $ —
Gold production costs (per oz sold):
Direct mining and production costs $ 1,428 $ —
By-product credits (4) —
Royalties and production taxes 28 —
Inventory change, write-downs, and other (512) —
Costs applicable to sales (per oz sold) (3) $ 940 $ —
Depreciation and amortization $ 244 $ —
Reclamation accretion $ 12 $ —
All-in sustaining costs (per oz sold) $ 1,277 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 10

-- 10 of 30 --

RED CHRIS - COPPER (1)(2)
Three Months Ended March 31,
2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 2,608 —
Open pit waste 2,977 —
Total open pit 5,585 —
Tonnes milled/processed (000 tonnes):
Mill 1,470 —
Average ore grade:
Mill 0.43 % — %
Average mill recovery rate 83.4 % — %
Copper produced (ktonne):
Consolidated/Attributable 5 —
Copper sold (ktonne):
Consolidated/Attributable 6 —
Co-product GEO produced (k):
Consolidated/Attributable 28 —
Co-product GEO sold (k):
Consolidated/Attributable 31 —
Co-product production costs ($M):
Costs applicable to sales (3) $ 31 $ —
Depreciation and amortization $ 8 $ —
Reclamation accretion $ — $ —
Copper production costs (per tonne sold):
Direct mining and production costs $ 8,463 $ —
By-product credits (22) —
Royalties and production taxes 166 —
Inventory change, write-downs, and other (3,036) —
Costs applicable to sales (per tonne sold) (3) $ 5,571 $ —
Depreciation and amortization $ 1,444 $ —
Reclamation accretion $ 74 $ —
All-in sustaining costs (per tonne sold) $ 7,718 $ —
Copper production costs (per GEO sold):
Direct mining and production costs $ 1,536 $ —
By-product credits (4) —
Royalties and production taxes 30 —
Inventory change, write-downs, and other (551) —
Costs applicable to sales (per GEO sold) (3) $ 1,011 $ —
Depreciation and amortization $ 262 $ —
Reclamation accretion $ 13 $ —
All-in sustaining costs (per GEO sold) $ 1,400 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 11

-- 11 of 30 --

BRUCEJACK (1)
Three Months Ended March 31,
2024 2023
Total underground ore (000 tonnes) 231 —
Tonnes milled/processed (000 tonnes):
Mill 221 —
Average ore grade (g/tonne):
Mill 5.512 —
Average mill recovery rate 95.9 % — %
Gold produced (koz):
Consolidated/Attributable 37 —
Gold sold (koz):
Consolidated/Attributable 34 —
Gold production costs ($M):
Costs applicable to sales (2) $ 74 $ —
Depreciation and amortization $ 35 $ —
Reclamation accretion $ 1 $ —
Gold production costs (per oz sold):
Direct mining and production costs $ 2,284 $ —
By-product credits (26) —
Royalties and production taxes 32 —
Inventory change, write-downs, and other (115) —
Costs applicable to sales (per oz sold) (2) $ 2,175 $ —
Depreciation and amortization $ 1,045 $ —
Reclamation accretion $ 15 $ —
All-in sustaining costs (per oz sold) $ 2,580 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 12

-- 12 of 30 --

PEÑASQUITO - GOLD
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,695 9,926
Open pit waste 26,879 33,858
Total open pit 37,574 43,784
Tons milled/processed (000 tonnes):
Mill 7,882 9,283
Average ore grade (g/tonne):
Mill 0.384 0.501
Average mill recovery rate 53.4 % 62.7 %
Gold produced (koz):
Consolidated/Attributable 45 85
Gold sold (koz):
Consolidated/Attributable 44 56
Gold production costs ($M):
Costs applicable to sales (1) $ 38 $ 67
Depreciation and amortization $ 15 $ 20
Reclamation accretion $ 1 $ 1
Gold production costs (per oz sold):
Direct mining and production costs $ 832 $ 1,437
By-product credits (9) (7)
Royalties and production taxes 33 42
Inventory change, write-downs, and other (3) (273)
Costs applicable to sales (per oz sold) (1) $ 853 $ 1,199
Depreciation and amortization $ 334 $ 367
Reclamation accretion $ 16 $ 22
All-in sustaining costs (per oz sold) $ 1,079 $ 1,539
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 13

-- 13 of 30 --

PEÑASQUITO - SILVER
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,695 9,926
Open pit waste 26,879 33,858
Total open pit 37,574 43,784
Tons milled/processed (000 tonnes):
Mill 7,882 9,283
Average ore grade (g/tonne):
Mill 50.590 34.120
Average mill recovery rate 82.5 % 81.6 %
Silver produced (Moz):
Consolidated/Attributable 9 7
Silver sold (Moz):
Consolidated/Attributable 10 6
Co-product production costs ($M):
Costs applicable to sales (1) $ 255 $ 190
Depreciation and amortization $ 94 $ 56
Reclamation accretion $ 4 $ 3
Silver production costs (per oz sold):
Direct mining and production costs $ 11 $ 16
By-product credits — —
Royalties and production taxes — —
Inventory change, write-downs, and other — (3)
Costs applicable to sales (per oz sold) (1) $ 11 $ 13
Depreciation and amortization $ 4 $ 4
Reclamation accretion $ — $ —
All-in sustaining costs (per oz sold) $ 15 $ 18
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 14

-- 14 of 30 --

PEÑASQUITO - ZINC
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,695 9,926
Open pit waste 26,879 33,858
Total open pit 37,574 43,784
Tons milled/processed (000 tonnes):
Mill 7,882 9,283
Average ore grade:
Mill 1.05 % 0.76 %
Average mill recovery rate 82.4 % 79.7 %
Zinc produced (ktonne):
Consolidated/Attributable 58 46
Zinc sold (ktonne):
Consolidated/Attributable 61 45
Co-product production costs ($M):
Costs applicable to sales (1) $ 255 $ 190
Depreciation and amortization $ 94 $ 56
Reclamation accretion $ 4 $ 3
Zinc production costs (per tonne sold):
Direct mining and production costs $ 1,668 $ 2,018
By-product credits (16) (9)
Royalties and production taxes 57 54
Inventory change, write-downs, and other 55 (163)
Costs applicable to sales (per tonne sold) (1) $ 1,764 $ 1,900
Depreciation and amortization $ 586 $ 530
Reclamation accretion $ 27 $ 28
All-in sustaining costs (per tonne sold) $ 2,368 $ 2,856
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 15

-- 15 of 30 --

PEÑASQUITO - LEAD
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,695 9,926
Open pit waste 26,879 33,858
Total open pit 37,574 43,784
Tons milled/processed (000 tonnes):
Mill 7,882 9,283
Average ore grade:
Mill 0.51 % 0.31 %
Average mill recovery rate 73.7 % 70.0 %
Lead produced (ktonne):
Consolidated/Attributable 28 19
Lead sold (ktonne):
Consolidated/Attributable 29 17
Co-product production costs ($M):
Costs applicable to sales (1) $ 255 $ 190
Depreciation and amortization $ 94 $ 56
Reclamation accretion $ 4 $ 3
Lead production costs (per tonne sold):
Direct mining and production costs $ 1,191 $ 1,664
By-product credits (13) (8)
Royalties and production taxes 48 49
Inventory change, write-downs, and other (11) (380)
Costs applicable to sales (per tonne sold) (1) $ 1,215 $ 1,325
Depreciation and amortization $ 487 $ 406
Reclamation accretion $ 23 $ 26
All-in sustaining costs (per tonne sold) $ 1,500 $ 1,699
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 16

-- 16 of 30 --

PEÑASQUITO - CO-PRODUCT GEO
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,695 9,926
Open pit waste 26,879 33,858
Total open pit 37,574 43,784
Tons milled/processed (000 tonnes):
Mill 7,882 9,283
Average ore grade milled:
Silver (g/tonne) 50.590 34.120
Zinc 1.05 % 0.76 %
Lead 0.51 % 0.31 %
Average mill recovery rate:
Silver 82.5 % 81.6 %
Zinc 82.4 % 79.7 %
Lead 73.7 % 70.0 %
Co-product GEO produced (k):
Consolidated/Attributable 288 224
Co-product GEO sold (k):
Consolidated/Attributable 303 199
Co-product production costs ($M):
Costs applicable to sales (1) $ 255 $ 190
Depreciation and amortization $ 94 $ 56
Reclamation accretion $ 4 $ 3
Co-product production costs (per GEO sold):
Direct mining and production costs $ 813 $ 1,099
By-product credits (8) (5)
Royalties and production taxes 30 31
Inventory change, write-downs, and other 8 (171)
Costs applicable to sales (per GEO sold) (1) $ 843 $ 954
Depreciation and amortization $ 311 $ 280
Reclamation accretion $ 14 $ 16
All-in sustaining costs (per GEO sold) $ 1,102 $ 1,351
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 17

-- 17 of 30 --

MERIAN
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 3,005 1,747
Open pit waste 11,776 5,989
Total open pit 14,781 7,736
Tons milled/processed (000 tonnes):
Mill 3,820 3,396
Average ore grade (g/tonne):
Mill 0.644 0.766
Average mill recovery rate 91.8 % 93.0 %
Gold produced (koz):
Consolidated 76 82
Attributable 57 62
Gold sold (koz):
Consolidated 74 83
Attributable 56 63
Gold production costs ($M):
Costs applicable to sales (1) $ 90 $ 85
Depreciation and amortization $ 19 $ 18
Reclamation accretion $ 1 $ 1
Gold production costs (per oz sold):
Direct mining and production costs $ 1,148 $ 978
By-product credits (1) (1)
Royalties and production taxes 125 113
Inventory change, write-downs, and other (51) (62)
Costs applicable to sales (per oz sold) (1) $ 1,221 $ 1,028
Depreciation and amortization $ 263 $ 212
Reclamation accretion $ 15 $ 9
All-in sustaining costs (per oz sold) $ 1,530 $ 1,235
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 18

-- 18 of 30 --

CERRO NEGRO
Three Months Ended March 31,
2024 2023
Total underground ore (000 tonnes) 267 293
Tons milled/processed (000 tonnes):
Mill 264 298
Average ore grade (g/tonne):
Mill 9.900 7.523
Average mill recovery rate 95.0 % 93.5 %
Gold produced (koz):
Consolidated/Attributable 81 67
Gold sold (koz):
Consolidated/Attributable 74 61
Gold production costs ($M):
Costs applicable to sales (1) $ 63 $ 70
Depreciation and amortization $ 30 $ 31
Reclamation accretion $ 1 $ 1
Gold production costs (per oz sold):
Direct mining and production costs $ 952 $ 1,259
By-product credits (90) (135)
Royalties and production taxes 107 90
Inventory change, write-downs, and other (108) (68)
Costs applicable to sales (per oz sold) (1) $ 861 $ 1,146
Depreciation and amortization $ 400 $ 507
Reclamation accretion $ 15 $ 15
All-in sustaining costs (per oz sold) $ 1,120 $ 1,379
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 19

-- 19 of 30 --

YANACOCHA
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 3,500 4,857
Open pit waste 9,065 9,703
Total open pit 12,565 14,560
Tons milled/processed (000 tonnes):
Leach 3,500 4,857
Average ore grade (g/tonne):
Leach 0.540 0.610
Gold produced (koz):
Consolidated/Attributable 91 56
Gold sold (koz):
Consolidated/Attributable 90 53
Gold production costs ($M):
Costs applicable to sales (1) $ 88 $ 56
Depreciation and amortization $ 28 $ 16
Reclamation accretion $ 2 $ 1
Gold production costs (per oz sold):
Direct mining and production costs $ 741 $ 1,324
By-product credits (11) (15)
Royalties and production taxes 62 59
Inventory change, write-downs, and other 180 (301)
Costs applicable to sales (per oz sold) (1) $ 972 $ 1,067
Depreciation and amortization $ 308 $ 295
Reclamation accretion $ 21 $ 26
All-in sustaining costs (per oz sold) $ 1,123 $ 1,332
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 20

-- 20 of 30 --

BODDINGTON - GOLD
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 6,054 8,239
Open pit waste 11,769 6,266
Total open pit 17,823 14,505
Tons milled/processed (000 tonnes):
Mill 8,420 9,143
Average ore grade (g/tonne):
Mill 0.614 0.794
Average mill recovery rate 85.9 % 86.5 %
Gold produced (koz):
Consolidated/Attributable 142 199
Gold sold (koz):
Consolidated/Attributable 142 198
Gold production costs ($M):
Costs applicable to sales (1) $ 144 $ 167
Depreciation and amortization $ 26 $ 28
Reclamation accretion $ 2 $ 2
Gold production costs (per oz sold):
Direct mining and production costs $ 1,112 $ 809
By-product credits (19) (17)
Royalties and production taxes 52 46
Inventory change, write-downs, and other (129) 3
Costs applicable to sales (per oz sold) (1) $ 1,016 $ 841
Depreciation and amortization $ 181 $ 141
Reclamation accretion $ 17 $ 11
All-in sustaining costs (per oz sold) $ 1,242 $ 1,035
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 21

-- 21 of 30 --

BODDINGTON - COPPER
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 6,054 8,239
Open pit waste 11,769 6,266
Total open pit 17,823 14,505
Tons milled/processed (000 tonnes):
Mill 8,420 9,143
Average ore grade:
Mill 0.13 % 0.16 %
Average mill recovery rate 83.5 % 82.8 %
Copper produced (ktonne):
Consolidated/Attributable 9 12
Copper sold (ktonne):
Consolidated/Attributable 9 12
Co-product GEO produced (k):
Consolidated/Attributable 49 64
Co-product GEO sold (k):
Consolidated/Attributable 51 66
Co-product production costs ($M):
Costs applicable to sales (1) $ 48 $ 53
Depreciation and amortization $ 9 $ 9
Reclamation accretion $ 1 $ 1
Copper production costs (per tonne sold):
Direct mining and production costs $ 5,659 $ 4,116
By-product credits (101) (90)
Royalties and production taxes 363 416
Inventory change, write-downs, and other (729) 19
Costs applicable to sales (per tonne sold) (1) $ 5,192 $ 4,461
Depreciation and amortization $ 967 $ 761
Reclamation accretion $ 89 $ 60
All-in sustaining costs (per tonne sold) $ 5,959 $ 5,616
Copper production costs (per GEO sold):
Direct mining and production costs $ 1,026 $ 746
By-product credits (18) (16)
Royalties and production taxes 66 75
Inventory change, write-downs, and other (132) 4
Costs applicable to sales (per GEO sold) (1) $ 942 $ 809
Depreciation and amortization $ 175 $ 138
Reclamation accretion $ 16 $ 11
All-in sustaining costs (per GEO sold) $ 1,081 $ 1,019
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 22

-- 22 of 30 --

TANAMI
Three Months Ended March 31,
2024 2023
Total underground ore (000 tonnes) 632 554
Tons milled/processed (000 tonnes):
Mill 528 389
Average ore grade (g/tonne):
Mill 5.273 5.274
Average mill recovery rate 98.7 % 98.0 %
Gold produced (koz):
Consolidated/Attributable 90 63
Gold sold (koz):
Consolidated/Attributable 91 65
Gold production costs ($M):
Costs applicable to sales (1) $ 82 $ 61
Depreciation and amortization $ 25 $ 19
Reclamation accretion $ 1 $ —
Gold production costs (per oz sold):
Direct mining and production costs $ 987 $ 1,185
By-product credits (2) (2)
Royalties and production taxes 53 50
Inventory change, write-downs, and other (136) (297)
Costs applicable to sales (per oz sold) (1) $ 902 $ 936
Depreciation and amortization $ 276 $ 294
Reclamation accretion $ 6 $ 7
All-in sustaining costs (per oz sold) $ 1,149 $ 1,219
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 23

-- 23 of 30 --

CADIA - GOLD (1)
Three Months Ended March 31,
2024 2023
Total underground ore (000 tonnes): 7,154 —
Tonnes milled/processed (000 tonnes):
Mill 7,157 —
Average ore grade (g/tonne):
Mill 0.678 —
Average mill recovery rate 79.8 % — %
Gold produced (koz):
Consolidated/Attributable 122 —
Gold sold (koz):
Consolidated/Attributable 114 —
Gold production costs ($M):
Costs applicable to sales (2) $ 74 $ —
Depreciation and amortization $ 28 $ —
Reclamation accretion $ — $ —
Gold production costs (per oz sold):
Direct mining and production costs $ 647 $ —
By-product credits (103) —
Royalties and production taxes 74 —
Inventory change, write-downs, and other 30 —
Costs applicable to sales (per oz sold) (2) $ 648 $ —
Depreciation and amortization $ 246 $ —
Reclamation accretion $ 3 $ —
All-in sustaining costs (per oz sold) $ 989 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 24

-- 24 of 30 --

CADIA - COPPER (1)
Three Months Ended March 31,
2024 2023
Total underground ore (000 tonnes): 7,154 —
Tonnes milled/processed (000 tonnes):
Mill 7,157 —
Average ore grade:
Mill 0.37 % — %
Average mill recovery rate 84.6 % — %
Copper produced (ktonne):
Consolidated/Attributable 21 —
Copper sold (ktonne):
Consolidated/Attributable 20 —
Co-product GEO produced (k):
Consolidated/Attributable 118 —
Co-product GEO sold (k):
Consolidated/Attributable 112 —
Co-product production costs ($M):
Costs applicable to sales (2) $ 67 $ —
Depreciation and amortization $ 27 $ —
Reclamation accretion $ — $ —
Copper production costs (per tonne sold):
Direct mining and production costs $ 3,345 $ —
By-product credits (559) —
Royalties and production taxes 307 —
Inventory change, write-downs, and other 178 —
Costs applicable to sales (per tonne sold) (2) $ 3,271 $ —
Depreciation and amortization $ 1,332 $ —
Reclamation accretion $ 18 $ —
All-in sustaining costs (per tonne sold) $ 5,659 $ —
Copper production costs (per GEO sold):
Direct mining and production costs $ 607 $ —
By-product credits (101) —
Royalties and production taxes 56 —
Inventory change, write-downs, and other 32 —
Costs applicable to sales (per GEO sold) (2) $ 594 $ —
Depreciation and amortization $ 242 $ —
Reclamation accretion $ 3 $ —
All-in sustaining costs (per GEO sold) $ 1,027 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 25

-- 25 of 30 --

TELFER - GOLD (1)
Three Months Ended March 31,
2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 3,268 —
Open pit waste 4,997 —
Total open pit 8,265 —
Total underground ore (000 tonnes): 238 —
Tonnes milled/processed (000 tonnes):
Mill 1,375 —
Average ore grade (g/tonne):
Mill 0.892 —
Average mill recovery rate 87.9 % — %
Gold produced (koz):
Consolidated/Attributable 31 —
Gold sold (koz):
Consolidated/Attributable 26 —
Gold production costs ($M):
Costs applicable to sales (2) $ 70 $ —
Depreciation and amortization $ 8 $ —
Reclamation accretion $ 2 $ —
Gold production costs (per oz sold):
Direct mining and production costs $ 3,975 $ —
By-product credits (7) —
Royalties and production taxes 54 —
Inventory change, write-downs, and other (1,390) —
Costs applicable to sales (per oz sold) (2) $ 2,632 $ —
Depreciation and amortization $ 303 $ —
Reclamation accretion $ 83 $ —
All-in sustaining costs (per oz sold) $ 3,017 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 26

-- 26 of 30 --

TELFER - COPPER (1)
Three Months Ended March 31,
2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 3,268 —
Open pit waste 4,997 —
Total open pit 8,265 —
Total underground ore (000 tonnes): 238 —
Tonnes milled/processed (000 tonnes):
Mill 1,375 —
Average ore grade:
Mill 0.11 % — %
Average mill recovery rate 78.2 % — %
Copper produced (ktonne):
Consolidated/Attributable 1 —
Copper sold (ktonne):
Consolidated/Attributable 1 —
Co-product GEO produced (k):
Consolidated/Attributable 6 —
Co-product GEO sold (k):
Consolidated/Attributable 5 —
Co-product production costs ($M):
Costs applicable to sales (2) $ 15 $ —
Depreciation and amortization $ 2 $ —
Reclamation accretion $ — $ —
Copper production costs (per tonne sold):
Direct mining and production costs $ 22,727 $ —
By-product credits (41) —
Royalties and production taxes 318 —
Inventory change, write-downs, and other (7,119) —
Costs applicable to sales (per tonne sold) (2) $ 15,885 $ —
Depreciation and amortization $ 1,951 $ —
Reclamation accretion $ 476 $ —
All-in sustaining costs (per tonne sold) $ 20,643 $ —
Copper production costs (per GEO sold):
Direct mining and production costs $ 4,124 $ —
By-product credits (8) —
Royalties and production taxes 58 —
Inventory change, write-downs, and other (1,292) —
Costs applicable to sales (per GEO sold) (2) $ 2,882 $ —
Depreciation and amortization $ 354 $ —
Reclamation accretion $ 86 $ —
All-in sustaining costs (per GEO sold) $ 3,745 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 27

-- 27 of 30 --

LIHIR (1)
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 2,555 —
Open pit waste 6,955 —
Total open pit 9,510 —
Tonnes milled/processed (000 tonnes):
Mill 2,871 —
Average ore grade (g/tonne):
Mill 2.500 —
Average mill recovery rate 75.6 % — %
Gold produced (koz):
Consolidated/Attributable 181 —
Gold sold (koz):
Consolidated/Attributable 182 —
Gold production costs ($M):
Costs applicable to sales (2) $ 171 $ —
Depreciation and amortization $ 35 $ —
Reclamation accretion $ 1 $ —
Gold production costs (per oz sold):
Direct mining and production costs $ 1,211 $ —
By-product credits (1) —
Royalties and production taxes 51 —
Inventory change, write-downs, and other (325) —
Costs applicable to sales (per oz sold) (2) $ 936 $ —
Depreciation and amortization $ 193 $ —
Reclamation accretion $ 6 $ —
All-in sustaining costs (per oz sold) $ 1,256 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 28

-- 28 of 30 --

AHAFO
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 1,375 665
Open pit waste 5,273 6,302
Total open pit 6,648 6,967
Total underground ore (000 tonnes): 636 587
Tons milled/processed (000 tonnes):
Mill 2,510 2,505
Average ore grade (g/tonne):
Mill 2.573 1.742
Average mill recovery rate 93.8 % 92.5 %
Gold produced (koz):
Consolidated/Attributable 190 128
Gold sold (koz):
Consolidated/Attributable 184 131
Gold production costs ($M):
Costs applicable to sales (1) $ 159 $ 130
Depreciation and amortization $ 51 $ 39
Reclamation accretion $ 2 $ 2
Gold production costs (per oz sold):
Direct mining and production costs $ 678 $ 920
By-product credits (2) (2)
Royalties and production taxes 154 120
Inventory change, write-downs, and other 35 (46)
Costs applicable to sales (per oz sold) (1) $ 865 $ 992
Depreciation and amortization $ 278 $ 301
Reclamation accretion $ 10 $ 13
All-in sustaining costs (per oz sold) $ 1,010 $ 1,366
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 29

-- 29 of 30 --

AKYEM
Three Months Ended March 31,
2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 494 988
Open pit waste 4,284 6,942
Total open pit 4,778 7,930
Tons milled/processed (000 tonnes):
Mill 1,874 1,883
Average ore grade milled (g/tonne):
Mill 1.285 1.288
Average mill recovery rate 87.9 % 88.7 %
Gold produced (koz):
Consolidated/Attributable 69 71
Gold sold (koz):
Consolidated/Attributable 75 78
Gold production costs ($M):
Costs applicable to sales (1) $ 76 $ 63
Depreciation and amortization $ 30 $ 29
Reclamation accretion $ 3 $ 3
Gold production costs (per oz sold):
Direct mining and production costs $ 774 $ 822
By-product credits (6) (9)
Royalties and production taxes 128 99
Inventory change, write-downs, and other 110 (102)
Costs applicable to sales (per oz sold) (1) $ 1,006 $ 810
Depreciation and amortization $ 396 $ 370
Reclamation accretion $ 46 $ 38
All-in sustaining costs (per oz sold) $ 1,254 $ 1,067
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT FIRST QUARTER 2024 | OPERATING STATISTICS 30

-- 30 of 30 --