SUPPLEMENT
Q3 2024 — Regional Operating Statistics
Q3 2024PDF · 31 pages210 KB
Newmont Third Quarter 2024 Operating Statistics
DENVER, October 23, 2024
Newmont has developed gold equivalent ounces ("GEO") metrics to provide a comparable basis for analysis and understanding
of our operations and performance related to copper, silver, lead, and zinc. Gold equivalent ounces are calculated as pounds or
ounces produced or sold multiplied by the ratio of the other metals’ price to the gold price using Gold ($1,400/oz.), Copper
($3.50/lb.), Silver ($20.00/oz.), Lead ($1.00/lb.), and Zinc ($1.20/lb.) pricing for 2024 and 2023.
Per unit measures may not recalculate due to rounding.
PRODUCTION VOLUMES Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Gold ounces produced (thousands):
CC&V 38 45 101 134
Musselwhite 52 48 155 130
Porcupine 67 64 219 190
Éléonore 54 50 171 164
Red Chris (1)(2) 9 — 24 —
Brucejack (1) 89 — 186 —
Peñasquito (3) 63 — 172 123
Merian 58 83 195 219
Cerro Negro 60 71 160 186
Yanacocha 93 87 262 208
Boddington 137 181 426 589
Tanami 102 123 291 312
Cadia (1) 115 — 354 —
Telfer (1)(7) 6 — 51 —
Lihir (1) 129 — 451 —
Ahafo 213 133 587 398
Akyem 47 75 163 195
Nevada Gold Mines (4) 242 300 759 848
Total Consolidated Newmont 1,574 1,260 4,727 3,696
Merian (25%) (15) (21) (49) (55)
Pueblo Viejo (5) 66 52 173 163
Fruta Del Norte (1)(6) 43 — 99 —
Total Attributable Newmont 1,668 1,291 4,950 3,804
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 1
-- 1 of 31 --
PRODUCTION VOLUMES Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Other metals produced:
Red Chris copper tonnes (thousands) (1)(2) 6 — 17 —
Boddington copper tonnes (thousands) 9 10 28 34
Cadia copper tonnes (thousands) (1) 21 — 64 —
Telfer copper tonnes (thousands) (1)(7) 1 — 2 —
Total copper tonnes (thousands) 37 10 111 34
Peñasquito silver ounces (millions) (3) 7 — 24 14
Peñasquito lead tonnes (thousands) (3) 19 — 67 39
Peñasquito zinc tonnes (thousands) (3) 58 — 181 82
(1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023.
(4) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method.
(5) Newmont has a 40% interest in Pueblo Viejo, which is accounted for as an equity method investment.
(6) Newmont has a 31.9% interest in Lundin Gold, who wholly owns and operates the Fruta del Norte mine, which is accounted for as an equity method
investment on a quarter lag.
(7) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily
ceased placing new tailings on the facility. Production resumed at the end of the third quarter. In September 2024, the Company entered into a
binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 2
-- 2 of 31 --
SALES VOLUMES Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Gold ounces sold (thousands):
CC&V 38 46 100 135
Musselwhite 50 47 155 132
Porcupine 70 61 218 189
Éléonore 52 46 171 165
Red Chris (1)(2) 8 — 24 —
Brucejack (1) 101 — 181 —
Peñasquito (3) 56 (1) 164 103
Merian 64 83 199 219
Cerro Negro 60 65 161 176
Yanacocha 89 85 257 204
Boddington 124 186 402 588
Tanami 100 123 290 312
Cadia (1) 113 — 350 —
Telfer (1)(5) 5 — 64 —
Lihir (1) 127 — 457 —
Ahafo 221 137 585 401
Akyem 46 71 169 198
Nevada Gold Mines (4) 244 301 763 847
Total Consolidated Newmont 1,568 1,250 4,710 3,669
Merian (25%) (17) (21) (50) (55)
Total Attributable Newmont 1,551 1,229 4,660 3,614
Other metals sold:
Red Chris copper tonnes (thousands) (1)(2) 6 — 18 —
Boddington copper tonnes (thousands) 8 11 26 34
Cadia copper tonnes (thousands) (1) 21 — 64 —
Telfer copper tonnes (thousands) (1)(5) — — 2 —
Total copper tonnes (thousands) 35 11 110 34
Peñasquito silver ounces (millions) (3) 6 — 24 12
Peñasquito lead tonnes (thousands) (3) 17 — 66 33
Peñasquito zinc tonnes (thousands) (3) 61 (1) 174 85
(1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023.
(4) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method.
(5) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily
ceased placing new tailings on the facility. Production resumed at the end of the third quarter. In September 2024, the Company entered into a
binding agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 3
-- 3 of 31 --
COSTS APPLICABLE TO SALES (1)(2) Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Gold
Costs Applicable to Sales ($/ounce)
CC&V $ 1,416 $ 1,253 $ 1,391 $ 1,165
Musselwhite $ 993 $ 1,045 $ 1,050 $ 1,230
Porcupine $ 1,114 $ 1,189 $ 1,076 $ 1,160
Éléonore $ 1,344 $ 1,338 $ 1,398 $ 1,280
Red Chris (3) $ 2,228 $ — $ 1,411 $ —
Brucejack (3) $ 970 $ — $ 1,302 $ —
Peñasquito (4) $ 985 N.M. $ 888 $ 1,196
Merian $ 1,795 $ 1,261 $ 1,504 $ 1,231
Cerro Negro $ 1,535 $ 1,216 $ 1,393 $ 1,317
Yanacocha $ 1,072 $ 1,057 $ 1,015 $ 1,102
Boddington $ 1,098 $ 848 $ 1,043 $ 821
Tanami $ 979 $ 655 $ 968 $ 783
Cadia (3) $ 723 $ — $ 664 $ —
Telfer (3)(5) N.M. $ — $ 2,996 $ —
Lihir (3) $ 1,619 $ — $ 1,179 $ —
Ahafo $ 867 $ 969 $ 900 $ 957
Akyem $ 2,051 $ 1,032 $ 1,491 $ 958
Nevada Gold Mines $ 1,311 $ 992 $ 1,234 $ 1,049
Total Newmont - Gold $ 1,207 $ 1,019 $ 1,138 $ 1,033
Co-product GEO
Costs Applicable to Sales ($/GEO)
Red Chris (3) $ 2,231 $ — $ 1,372 $ —
Peñasquito (4) $ 990 N.M. $ 905 $ 1,183
Boddington $ 1,017 $ 816 $ 994 $ 797
Cadia (3) $ 685 $ — $ 609 $ —
Telfer (3)(5) N.M. $ — $ 2,795 $ —
Total Newmont - Co-product GEO $ 1,015 $ 1,636 $ 887 $ 1,056
Co-product by metal
Costs Applicable to Sales ($/unit)
Red Chris - copper ($/tonne) (3) $ 12,296 $ — $ 7,564 $ —
Boddington - copper ($/tonne) $ 5,605 $ 4,497 $ 5,481 $ 4,392
Cadia - copper ($/tonne) (3) $ 3,774 $ — $ 3,358 $ —
Telfer - copper ($/tonne) (3)(5) N.M. $ — $ 15,404 $ —
Total Copper CAS ($/tonne) $ 5,748 $ 4,497 $ 4,768 $ 4,392
Peñasquito - silver ($/oz) (4) $ 13 N.M. $ 12 $ 16
Peñasquito - lead ($/tonne) (4) $ 1,555 N.M. $ 1,343 $ 1,905
Peñasquito - zinc ($/tonne) (4) $ 1,944 N.M. $ 1,858 $ 2,287
(1) Costs applicable to sales (CAS) per unit, included at the consolidated and site level, are non-GAAP metrics and should not be considered in isolation or
as a substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s
website or filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov.
(2) Consolidated CAS excludes Depreciation and amortization and Reclamation and remediation.
(3) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(4) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are
not meaningful ("N.M.").
(5) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily
ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary suspension of
production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding agreement to sell the assets of
the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 4
-- 4 of 31 --
ALL-IN SUSTAINING COSTS (1) Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Gold
All-In Sustaining Costs ($/ounce)
CC&V $ 1,712 $ 1,819 $ 1,715 $ 1,603
Musselwhite $ 1,574 $ 1,715 $ 1,570 $ 1,869
Porcupine $ 1,451 $ 1,644 $ 1,422 $ 1,545
Éléonore $ 1,924 $ 2,107 $ 1,914 $ 1,855
Red Chris (2) $ 2,633 $ — $ 1,882 $ —
Brucejack (2) $ 1,197 $ — $ 1,642 $ —
Peñasquito (3) $ 1,224 N.M. $ 1,112 $ 1,569
Merian $ 2,153 $ 1,652 $ 1,926 $ 1,580
Cerro Negro $ 1,878 $ 1,438 $ 1,725 $ 1,556
Yanacocha $ 1,285 $ 1,187 $ 1,207 $ 1,290
Boddington $ 1,398 $ 1,123 $ 1,289 $ 1,039
Tanami $ 1,334 $ 890 $ 1,256 $ 1,066
Cadia (2) $ 1,078 $ — $ 1,044 $ —
Telfer (2)(4) N.M. $ — $ 3,823 $ —
Lihir (2) $ 1,883 $ — $ 1,416 $ —
Ahafo $ 1,043 $ 1,208 $ 1,057 $ 1,269
Akyem $ 2,230 $ 1,332 $ 1,716 $ 1,260
Nevada Gold Mines $ 1,675 $ 1,307 $ 1,645 $ 1,364
Total Newmont $ 1,611 $ 1,426 $ 1,537 $ 1,425
Co-product GEO
All-In Sustaining Costs ($/GEO)
Red Chris (2) $ 2,714 $ — $ 1,885 $ —
Peñasquito $ 1,286 N.M. $ 1,175 $ 1,648
Boddington $ 1,168 $ 1,108 $ 1,166 $ 1,033
Cadia (2) $ 880 $ — $ 977 $ —
Telfer (2)(4) N.M. $ — $ 3,811 $ —
Total Newmont $ 1,338 $ 2,422 $ 1,225 $ 1,511
Co-product by metal
All-In Sustaining Costs ($/unit)
Red Chris - copper ($/tonne) (2) $ 14,960 $ — $ 10,390 $ —
Boddington - copper ($/tonne) $ 6,436 $ 6,105 $ 6,424 $ 5,696
Cadia - copper ($/tonne) (2) $ 4,849 $ — $ 5,386 $ —
Telfer - copper ($/tonne) (2)(4) N.M. $ — $ 21,007 $ —
Total Copper AISC ($/tonne) $ 7,423 $ 6,501 $ 6,818 $ 6,029
Peñasquito - silver ($/oz) (3) $ 17 N.M. $ 15 $ 22
Peñasquito - lead ($/tonne) (3) $ 1,879 N.M. $ 1,626 $ 2,463
Peñasquito - zinc ($/tonne) (3) $ 2,614 N.M. $ 2,493 $ 3,358
(1) All-in sustaining costs (AISC) per unit, included at the consolidated and site level, is a non-GAAP metric and should not be considered in isolation or as a
substitute for measures of performance prepared in accordance with GAAP. For reconciliation of non-GAAP metrics, please see Newmont’s website or
filings, available at https://www.newmont.com/about/document-library/ or http://www.sec.gov.
(2) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(3) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound metrics are
not meaningful ("N.M.").
(4) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily
ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary suspension of
production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding agreement to sell the assets of
the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 5
-- 5 of 31 --
CAPITAL EXPENDITURES Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Consolidated Capital Expenditures
($ millions)
CC&V $ 7 $ 21 $ 20 $ 44
Musselwhite 27 29 74 74
Porcupine 64 37 159 95
Éléonore 27 29 77 74
Red Chris (1)(2) 41 — 125 —
Brucejack (1) 17 — 52 —
Peñasquito 32 9 90 81
Merian 14 26 64 61
Cerro Negro 58 44 135 118
Yanacocha 21 81 54 209
Boddington 34 54 91 128
Tanami 108 98 298 287
Cadia (1) 155 — 400 —
Telfer (1) 15 — 39 —
Lihir (1) 44 — 139 —
Ahafo 102 73 273 240
Akyem 4 9 20 31
Nevada Gold Mines (3) 103 132 347 339
Corporate and other 7 10 15 37
Accrual basis $ 880 $ 652 $ 2,472 $ 1,818
Decrease (increase) in non-cash adjustments (3) (48) 55 (72)
Cash basis $ 877 $ 604 $ 2,527 $ 1,746
(1) Sites acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Newmont has a 38.5% interest in Nevada Gold Mines, which is accounted for using the proportionate consolidation method.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 6
-- 6 of 31 --
CC&V
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 4,866 6,783 15,972 19,960
Open pit waste 4,212 3,372 10,949 8,910
Total open pit 9,078 10,155 26,921 28,870
Tons milled/processed (000 tonnes):
Leach 5,077 6,671 16,041 19,666
Average ore grade (g/tonne):
Leach 0.440 0.473 0.445 0.442
Gold ounces produced (thousands):
Consolidated/Attributable 38 45 101 134
Gold ounces sold (thousands):
Consolidated/Attributable 38 46 100 135
Gold production costs ($ millions):
Costs applicable to sales (1) $ 54 $ 57 $ 139 $ 157
Depreciation and amortization $ 3 $ 6 $ 10 $ 19
Reclamation accretion $ 3 $ 3 $ 8 $ 8
Gold production costs ($/ounce):
Direct mining and production costs $ 1,471 $ 1,325 $ 1,670 $ 1,305
By-product credits (11) (2) (17) (8)
Royalties and production taxes 117 154 133 116
Inventory change, write-downs, and other (161) (224) (395) (248)
Costs applicable to sales ($/ounce) (1) $ 1,416 $ 1,253 $ 1,391 $ 1,165
Depreciation and amortization $ 85 $ 126 $ 99 $ 142
Reclamation accretion $ 73 $ 56 $ 82 $ 56
All-in sustaining costs ($/ounce) $ 1,712 $ 1,819 $ 1,715 $ 1,603
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 7
-- 7 of 31 --
MUSSELWHITE
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Total underground ore (000 tonnes) 261 244 780 758
Tons milled/processed (000 tonnes):
Mill 260 246 779 760
Average ore grade (g/tonne):
Mill 6.716 6.345 6.487 5.554
Average mill recovery rate 96.6 % 96.0 % 96.3 % 95.7 %
Gold ounces produced (thousands):
Consolidated/Attributable 52 48 155 130
Gold ounces sold (thousands):
Consolidated/Attributable 50 47 155 132
Gold production costs ($ millions):
Costs applicable to sales (1) $ 50 $ 50 $ 163 $ 163
Depreciation and amortization $ — $ 21 $ 18 $ 58
Reclamation accretion $ 1 $ — $ 3 $ 2
Gold production costs ($/ounce):
Direct mining and production costs $ 1,019 $ 985 $ 1,000 $ 1,166
By-product credits (3) (2) (3) (2)
Royalties and production taxes 61 46 55 54
Inventory change, write-downs, and other (84) 16 (2) 12
Costs applicable to sales ($/ounce) (1) $ 993 $ 1,045 $ 1,050 $ 1,230
Depreciation and amortization $ — $ 441 $ 119 $ 439
Reclamation accretion $ 17 $ 17 $ 16 $ 18
All-in sustaining costs ($/ounce) $ 1,574 $ 1,715 $ 1,570 $ 1,869
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 8
-- 8 of 31 --
PORCUPINE
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 3 526 482 2,161
Open pit waste — 981 663 3,692
Total open pit 3 1,507 1,145 5,853
Total underground ore (000 tonnes) 200 205 648 625
Tons milled/processed (000 tonnes):
Mill 721 793 2,183 2,176
Average ore grade milled (g/tonne):
Mill 2.982 2.838 3.322 2.939
Average mill recovery rate 92.7 % 90.5 % 93.2 % 91.5 %
Gold ounces produced (thousands):
Consolidated/Attributable 67 64 219 190
Gold ounces sold (thousands):
Consolidated/Attributable 70 61 218 189
Gold production costs ($ millions):
Costs applicable to sales (1) $ 78 $ 73 $ 235 $ 220
Depreciation and amortization $ 2 $ 29 $ 34 $ 85
Reclamation accretion $ 2 $ 2 $ 7 $ 6
Gold production costs ($/ounce):
Direct mining and production costs $ 931 $ 1,161 $ 976 $ 1,224
By-product credits (9) (4) (6) (4)
Royalties and production taxes 51 25 38 25
Inventory change, write-downs, and other 141 7 68 (85)
Costs applicable to sales ($/ounce) (1) $ 1,114 $ 1,189 $ 1,076 $ 1,160
Depreciation and amortization $ 31 $ 473 $ 158 $ 447
Reclamation accretion $ 33 $ 34 $ 32 $ 33
All-in sustaining costs ($/ounce) $ 1,451 $ 1,644 $ 1,422 $ 1,545
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 9
-- 9 of 31 --
ÉLÉONORE
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Total underground ore (000 tonnes) 423 382 1,345 1,181
Tons milled/processed (000 tonnes):
Mill 408 393 1,330 1,185
Average ore grade (g/tonne):
Mill 4.741 4.569 4.492 4.776
Average mill recovery rate 91.8 % 91.3 % 91.2 % 91.0 %
Gold ounces produced (thousands):
Consolidated/Attributable 54 50 171 164
Gold ounces sold (thousands):
Consolidated/Attributable 52 46 171 165
Gold production costs ($ millions):
Costs applicable to sales (1) $ 70 $ 63 $ 239 $ 212
Depreciation and amortization $ — $ 22 $ 21 $ 73
Reclamation accretion $ 1 $ — $ 3 $ 2
Gold production costs ($/ounce):
Direct mining and production costs $ 1,384 $ 1,369 $ 1,377 $ 1,251
By-product credits (3) (2) (2) (2)
Royalties and production taxes 55 42 53 44
Inventory change, write-downs, and other (92) (71) (30) (13)
Costs applicable to sales ($/ounce) (1) $ 1,344 $ 1,338 $ 1,398 $ 1,280
Depreciation and amortization $ — $ 478 $ 125 $ 441
Reclamation accretion $ 18 $ 16 $ 16 $ 14
All-in sustaining costs ($/ounce) $ 1,924 $ 2,107 $ 1,914 $ 1,855
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 10
-- 10 of 31 --
RED CHRIS - GOLD (1)(2)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 2,847 — 7,895 —
Open pit waste 1,758 — 7,023 —
Total open pit 4,605 — 14,918 —
Tonnes milled/processed (000 tonnes):
Mill 1,397 — 4,610 —
Average ore grade (g/tonne):
Mill 0.365 — 0.309 —
Average mill recovery rate 57.3 % — % 54.3 % — %
Gold ounces produced (thousands):
Consolidated/Attributable 9 — 24 —
Gold ounces sold (thousands):
Consolidated/Attributable 8 — 24 —
Gold production costs ($ millions):
Costs applicable to sales (3) $ 21 $ — $ 35 $ —
Depreciation and amortization $ 7 $ — $ 11 $ —
Reclamation accretion $ — $ — $ — $ —
Gold production costs ($/ounce):
Direct mining and production costs $ 1,493 $ — $ 1,397 $ —
By-product credits (3) — (5) —
Royalties and production taxes 33 — 33 —
Inventory change, write-downs, and other 705 — (14) —
Costs applicable to sales ($/ounce) (3) $ 2,228 $ — $ 1,411 $ —
Depreciation and amortization $ 723 $ — $ 436 $ —
Reclamation accretion $ 12 $ — $ 12 $ —
All-in sustaining costs ($/ounce) $ 2,633 $ — $ 1,882 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 11
-- 11 of 31 --
RED CHRIS - COPPER (1)(2)
Three Months Ended March 31, Three Months Ended March 31,
2024 2023 2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 2,847 — 7,895 —
Open pit waste 1,758 — 7,023 —
Total open pit 4,605 — 14,918 —
Tonnes milled/processed (000 tonnes):
Mill 1,397 — 4,610 —
Average ore grade:
Mill 0.50 % — % 0.47 % — %
Average mill recovery rate 85.6 % — % 83.2 % — %
Copper tonnes produced (thousands):
Consolidated/Attributable 6 — 17 —
Copper tonnes sold (thousands):
Consolidated/Attributable 6 — 18 —
Co-product GEO produced (thousands):
Consolidated/Attributable 32 — 95 —
Co-product GEO sold (thousands):
Consolidated/Attributable 31 — 98 —
Co-product production costs ($ millions):
Costs applicable to sales (3) $ 71 $ — $ 135 $ —
Depreciation and amortization $ 22 $ — $ 41 $ —
Reclamation accretion $ — $ — $ 1 $ —
Copper production costs ($/tonne):
Direct mining and production costs $ 8,241 — $ 7,751 $ —
By-product credits (16) — (27) —
Royalties and production taxes 180 — 185 —
Inventory change, write-downs, and other 3,891 — (345) —
Costs applicable to sales ($/tonne) (3) $ 12,296 — $ 7,564 $ —
Depreciation and amortization $ 3,991 — $ 2,323 $ —
Reclamation accretion $ 68 — $ 68 $ —
All-in sustaining costs ($/tonne) $ 14,960 $ — $ 10,390 $ —
Copper production costs ($/GEO):
Direct mining and production costs $ 1,495 $ — $ 1,407 $ —
By-product credits (3) — (5) —
Royalties and production taxes 33 — 33 —
Inventory change, write-downs, and other 706 — (63) —
Costs applicable to sales ($/GEO) (3) $ 2,231 $ — $ 1,372 $ —
Depreciation and amortization $ 724 $ — $ 421 $ —
Reclamation accretion $ 12 $ — $ 12 $ —
All-in sustaining costs ($/GEO) $ 2,714 $ — $ 1,885 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Newmont has a 70% interest in Red Chris, which is accounted for using the proportionate consolidation method.
(3) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 12
-- 12 of 31 --
BRUCEJACK (1)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Total underground ore (000 tonnes) 284 — 789 —
Tonnes milled/processed (000 tonnes):
Mill 278 — 773 —
Average ore grade (g/tonne):
Mill 10.104 — 7.808 —
Average mill recovery rate 97.1 % — % 96.7 % — %
Gold ounces produced (thousands):
Consolidated/Attributable 89 — 186 —
Gold ounces sold (thousands):
Consolidated/Attributable 101 — 181 —
Gold production costs ($ millions):
Costs applicable to sales (2) $ 98 $ — $ 236 $ —
Depreciation and amortization $ 70 $ — $ 141 $ —
Reclamation accretion $ 1 $ — $ 2 $ —
Gold production costs ($/ounce):
Direct mining and production costs $ 817 $ — $ 1,345 $ —
By-product credits (36) — (34) —
Royalties and production taxes 31 — 30 —
Inventory change, write-downs, and other 158 — (39) —
Costs applicable to sales ($/ounce) (2) $ 970 $ — $ 1,302 $ —
Depreciation and amortization $ 689 $ — $ 777 $ —
Reclamation accretion $ 5 $ — $ 9 $ —
All-in sustaining costs ($/ounce) $ 1,197 $ — $ 1,642 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 13
-- 13 of 31 --
PEÑASQUITO - GOLD
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,498 — 30,300 13,825
Open pit waste 23,265 — 77,051 58,470
Total open pit 33,763 — 107,351 72,295
Tons milled/processed (000 tonnes):
Mill 7,483 — 23,963 15,806
Average ore grade (g/tonne):
Mill 0.520 — 0.459 0.450
Average mill recovery rate 58.0 % — % 56.2 % 59.8 %
Gold ounces produced (thousands):
Consolidated/Attributable (1) 63 — 172 123
Gold ounces sold (thousands):
Consolidated/Attributable (1) 56 (1) 164 103
Gold production costs ($ millions):
Costs applicable to sales (2) $ 54 $ 16 $ 145 $ 123
Depreciation and amortization $ 22 $ 12 $ 59 $ 47
Reclamation accretion $ 1 $ 1 $ 3 $ 3
Gold production costs ($/ounce):
Direct mining and production costs (1) $ 1,079 N.M. $ 905 $ 1,296
By-product credits (1) (8) N.M. (8) (6)
Royalties and production taxes (1) 42 N.M. 38 34
Inventory change, write-downs, and other (1) (128) N.M. (47) (128)
Costs applicable to sales ($/ounce) (1)(2) $ 985 N.M. $ 888 $ 1,196
Depreciation and amortization (1) $ 396 N.M. $ 363 $ 458
Reclamation accretion (1)
$ 20 N.M. $ 17 $ 29
All-in sustaining costs ($/ounce) (1)
$ 1,224 N.M. $ 1,112 $ 1,569
(1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound
metrics are not meaningful ("N.M.").
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 14
-- 14 of 31 --
PEÑASQUITO - SILVER
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,498 — 30,300 13,825
Open pit waste 23,265 — 77,051 58,470
Total open pit 33,763 — 107,351 72,295
Tons milled/processed (000 tonnes):
Mill 7,483 — 23,963 15,806
Average ore grade (g/tonne):
Mill 37.350 — 42.820 37.030
Average mill recovery rate 79.5 % — % 81.1 % 81.2 %
Silver ounces produced (millions):
Consolidated/Attributable (1) 7 — 24 14
Silver ounces sold (millions):
Consolidated/Attributable (1) 6 — 24 12
Co-product production costs ($ millions):
Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456
Depreciation and amortization $ 85 $ 41 $ 267 $ 173
Reclamation accretion $ 4 $ 3 $ 12 $ 10
Silver production costs ($/ounce):
Direct mining and production costs (1) $ 14 N.M. $ 11 $ 17
By-product credits (1) — N.M. — —
Royalties and production taxes (1)
1 N.M. 1 —
Inventory change, write-downs, and other (1)
(2) N.M. — (1)
Costs applicable to sales ($/ounce) (1)(2) $ 13 N.M. $ 12 $ 16
Depreciation and amortization (1) $ 5 N.M. $ 5 $ 6
Reclamation accretion (1) $ — N.M. $ — $ —
All-in sustaining costs ($/ounce) (1)
$ 17 N.M. $ 15 $ 22
(1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound
metrics are not meaningful ("N.M.").
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 15
-- 15 of 31 --
PEÑASQUITO - ZINC
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,498 — 30,300 13,825
Open pit waste 23,265 — 77,051 58,470
Total open pit 33,763 — 107,351 72,295
Tons milled/processed (000 tonnes):
Mill 7,483 — 23,963 15,806
Average ore grade:
Mill 1.12 % — % 1.09 % 0.78 %
Average mill recovery rate 83.8 % — % 82.4 % 79.7 %
Zinc tonnes produced (thousands):
Consolidated/Attributable (1) 58 — 181 82
Zinc tonnes sold (thousands):
Consolidated/Attributable (1) 61 (1) 174 85
Co-product production costs ($ millions):
Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456
Depreciation and amortization $ 85 $ 41 $ 267 $ 173
Reclamation accretion $ 4 $ 3 $ 12 $ 10
Zinc production costs ($/tonne):
Direct mining and production costs (1) $ 1,933 N.M. $ 1,901 $ 2,155
By-product credits (1) (12) N.M. (15) (10)
Royalties and production taxes (1) 66 N.M. 71 53
Inventory change, write-downs, and other (1) (43) N.M. (99) 89
Costs applicable to sales ($/tonne) (1)(2) $ 1,944 N.M. $ 1,858 $ 2,287
Depreciation and amortization (1) $ 714 N.M. $ 659 $ 821
Reclamation accretion (1)
$ 31 N.M. $ 31 $ 46
All-in sustaining costs ($/tonne) (1)
$ 2,614 N.M. $ 2,493 $ 3,358
(1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound
metrics are not meaningful ("N.M.").
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 16
-- 16 of 31 --
PEÑASQUITO - LEAD
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,498 — 30,300 13,825
Open pit waste 23,265 — 77,051 58,470
Total open pit 33,763 — 107,351 72,295
Tons milled/processed (000 tonnes):
Mill 7,483 — 23,963 15,806
Average ore grade:
Mill 0.36 % — % 0.40 % 0.37 %
Average mill recovery rate 76.7 % — % 74.5 % 70.7 %
Lead tonnes produced (thousands):
Consolidated/Attributable (1) 19 — 67 39
Lead tonnes sold (thousands):
Consolidated/Attributable (1) 17 — 66 33
Co-product production costs ($ millions):
Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456
Depreciation and amortization $ 85 $ 41 $ 267 $ 173
Reclamation accretion $ 4 $ 3 $ 12 $ 10
Lead production costs ($/tonne):
Direct mining and production costs (1) $ 1,735 N.M. $ 1,353 $ 2,029
By-product credits (1) (13) N.M. (12) (10)
Royalties and production taxes (1) 68 N.M. 57 55
Inventory change, write-downs, and other (1) (235) N.M. (55) (169)
Costs applicable to sales ($/tonne) (1)(2) $ 1,555 N.M. $ 1,343 $ 1,905
Depreciation and amortization (1) $ 636 N.M. $ 557 $ 758
Reclamation accretion (1)
$ 32 N.M. $ 26 $ 48
All-in sustaining costs ($/tonne) (1) $ 1,879 N.M. $ 1,626 $ 2,463
(1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound
metrics are not meaningful ("N.M.").
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 17
-- 17 of 31 --
PEÑASQUITO - CO-PRODUCT GEO
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 10,498 — 30,300 13,825
Open pit waste 23,265 — 77,051 58,470
Total open pit 33,763 — 107,351 72,295
Tons milled/processed (000 tonnes):
Mill 7,483 — 23,963 15,806
Average ore grade milled:
Silver (g/tonne) 37.350 — 42.820 37.030
Zinc 1.12 % — % 1.09 % 0.78 %
Lead 0.36 % — % 0.40 % 0.37 %
Average mill recovery rate:
Silver 79.5 % — % 81.1 % 81.2 %
Zinc 83.8 % — % 82.4 % 79.7 %
Lead 76.7 % — % 74.5 % 70.7 %
Co-product GEO produced (thousands):
Consolidated/Attributable (1) 229 — 785 413
Co-product GEO sold (thousands):
Consolidated/Attributable (1) 222 (2) 766 385
Co-product production costs ($ millions):
Costs applicable to sales (2) $ 219 $ 48 $ 692 $ 456
Depreciation and amortization $ 85 $ 41 $ 267 $ 173
Reclamation accretion $ 4 $ 3 $ 12 $ 10
Co-product production costs ($/GEO):
Direct mining and production costs (1) $ 1,037 N.M. $ 917 $ 1,196
By-product credits (1) (7) N.M. (8) (6)
Royalties and production taxes (1) 38 N.M. 37 31
Inventory change, write-downs, and other (1) (78) N.M. (41) (38)
Costs applicable to sales ($/GEO) (1)(2) $ 990 N.M. $ 905 $ 1,183
Depreciation and amortization (1) $ 382 N.M. $ 348 $ 449
Reclamation accretion (1)
$ 18 N.M. $ 16 $ 27
All-in sustaining costs ($/GEO) (1) $ 1,286 N.M. $ 1,175 $ 1,648
(1) Due to the Peñasquito labor strike, Peñasquito had no production during the third quarter of 2023. Consequently, price per ounce/pound
metrics are not meaningful ("N.M.").
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 18
-- 18 of 31 --
MERIAN
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 2,740 2,929 8,227 6,422
Open pit waste 9,951 9,047 30,473 21,736
Total open pit 12,691 11,976 38,700 28,158
Tons milled/processed (000 tonnes):
Mill 3,231 3,680 10,714 10,381
Average ore grade (g/tonne):
Mill 0.605 0.775 0.596 0.746
Average mill recovery rate 94.3 % 90.5 % 92.6 % 91.6 %
Gold ounces produced (thousands):
Consolidated 58 83 195 219
Attributable 43 62 146 164
Gold ounces sold (thousands):
Consolidated 64 83 199 219
Attributable 47 62 149 164
Gold production costs ($ millions):
Costs applicable to sales (1) $ 113 $ 104 $ 299 $ 269
Depreciation and amortization $ 24 $ 23 $ 63 $ 56
Reclamation accretion $ 1 $ 1 $ 3 $ 2
Gold production costs ($/ounce):
Direct mining and production costs $ 1,437 $ 1,010 $ 1,341 $ 1,168
By-product credits (1) — (1) (1)
Royalties and production taxes 151 116 138 115
Inventory change, write-downs, and other 208 135 26 (51)
Costs applicable to sales ($/ounce) (1) $ 1,795 $ 1,261 $ 1,504 $ 1,231
Depreciation and amortization $ 374 $ 279 $ 315 $ 258
Reclamation accretion $ 17 $ 9 $ 16 $ 10
All-in sustaining costs ($/ounce) $ 2,153 $ 1,652 $ 1,926 $ 1,580
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 19
-- 19 of 31 --
CERRO NEGRO (1)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Total underground ore (000 tonnes) 239 276 579 823
Tons milled/processed (000 tonnes):
Mill 239 264 578 827
Average ore grade (g/tonne):
Mill 8.351 9.339 9.067 7.589
Average mill recovery rate 93.8 % 91.5 % 94.2 % 92.5 %
Gold ounces produced (thousands):
Consolidated/Attributable 60 71 160 186
Gold ounces sold (thousands):
Consolidated/Attributable 60 65 161 176
Gold production costs ($ millions):
Costs applicable to sales (1) $ 91 $ 79 $ 224 $ 232
Depreciation and amortization $ 31 $ 34 $ 83 $ 99
Reclamation accretion $ 1 $ 1 $ 3 $ 3
Gold production costs ($/ounce):
Direct mining and production costs $ 1,472 $ 1,273 $ 1,436 $ 1,361
By-product credits (118) (90) (111) (111)
Royalties and production taxes 122 93 115 92
Inventory change, write-downs, and other 59 (60) (47) (25)
Costs applicable to sales ($/ounce) (1) $ 1,535 $ 1,216 $ 1,393 $ 1,317
Depreciation and amortization $ 532 $ 529 $ 519 $ 564
Reclamation accretion $ 19 $ 14 $ 21 $ 16
All-in sustaining costs ($/ounce) $ 1,878 $ 1,438 $ 1,725 $ 1,556
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 20
-- 20 of 31 --
YANACOCHA
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 8,613 6,390 17,566 15,532
Open pit waste 6,806 10,652 26,723 32,082
Total open pit 15,419 17,042 44,289 47,614
Tons milled/processed (000 tonnes):
Leach 8,613 6,390 17,566 15,532
Average ore grade (g/tonne):
Leach 0.397 0.417 0.383 0.460
Gold ounces produced (thousands):
Consolidated/Attributable 93 87 262 208
Gold ounces sold (thousands):
Consolidated/Attributable 89 85 257 204
Gold production costs ($ millions):
Costs applicable to sales (1) $ 96 $ 90 $ 261 $ 225
Depreciation and amortization $ 23 $ 27 $ 74 $ 65
Reclamation accretion $ 2 $ 1 $ 6 $ 4
Gold production costs ($/ounce):
Direct mining and production costs $ 1,100 $ 910 $ 943 $ 1,106
By-product credits (21) (14) (18) (14)
Royalties and production taxes 75 57 69 58
Inventory change, write-downs, and other (82) 104 21 (48)
Costs applicable to sales ($/ounce) (1) $ 1,072 $ 1,057 $ 1,015 $ 1,102
Depreciation and amortization $ 255 $ 314 $ 289 $ 318
Reclamation accretion $ 21 $ 16 $ 22 $ 20
All-in sustaining costs ($/ounce) $ 1,285 $ 1,187 $ 1,207 $ 1,290
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 21
-- 21 of 31 --
BODDINGTON - GOLD
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 6,307 8,206 18,777 24,993
Open pit waste 7,997 7,189 30,443 20,411
Total open pit 14,304 15,395 49,220 45,404
Tons milled/processed (000 tonnes):
Mill 8,439 9,097 25,412 27,848
Average ore grade (g/tonne):
Mill 0.600 0.728 0.616 0.776
Average mill recovery rate 84.8 % 84.8 % 85.4 % 85.5 %
Gold ounces produced (thousands):
Consolidated/Attributable 137 181 426 589
Gold ounces sold (thousands):
Consolidated/Attributable 124 186 402 588
Gold production costs ($ millions):
Costs applicable to sales (1) $ 136 $ 157 $ 419 $ 483
Depreciation and amortization $ 25 $ 28 $ 77 $ 83
Reclamation accretion $ 2 $ 3 $ 7 $ 7
Gold production costs ($/ounce):
Direct mining and production costs $ 1,192 $ 795 $ 1,132 $ 775
By-product credits (26) (18) (23) (17)
Royalties and production taxes 65 52 60 49
Inventory change, write-downs, and other (133) 19 (126) 14
Costs applicable to sales ($/ounce) (1) $ 1,098 $ 848 $ 1,043 $ 821
Depreciation and amortization $ 203 $ 147 $ 191 $ 141
Reclamation accretion $ 19 $ 12 $ 17 $ 11
All-in sustaining costs ($/ounce) $ 1,398 $ 1,123 $ 1,289 $ 1,039
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 22
-- 22 of 31 --
BODDINGTON - COPPER
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 6,307 8,206 18,777 24,993
Open pit waste 7,997 7,189 30,443 20,411
Total open pit 14,304 15,395 49,220 45,404
Tons milled/processed (000 tonnes):
Mill 8,439 9,097 25,412 27,848
Average ore grade:
Mill 0.13 % 0.14 % 0.14 % 0.16 %
Average mill recovery rate 82.6 % 84.1 % 83.5 % 84.1 %
Copper tonnes produced (thousands):
Consolidated/Attributable 9 10 28 34
Copper tonnes sold (thousands):
Consolidated/Attributable 8 11 26 34
Co-product GEO produced (thousands):
Consolidated/Attributable 48 58 152 189
Co-product GEO sold (thousands):
Consolidated/Attributable 43 61 141 190
Co-product production costs ($ millions):
Costs applicable to sales (1) $ 44 $ 50 $ 141 $ 151
Depreciation and amortization $ 9 $ 8 $ 27 $ 26
Reclamation accretion $ 1 $ 1 $ 3 $ 2
Copper production costs ($/tonne):
Direct mining and production costs $ 6,265 $ 4,058 $ 6,016 $ 4,028
By-product credits (142) (94) (130) (92)
Royalties and production taxes 439 384 434 375
Inventory change, write-downs, and other (957) 149 (839) 81
Costs applicable to sales ($/tonne) (1) $ 5,605 $ 4,497 $ 5,481 $ 4,392
Depreciation and amortization $ 1,085 $ 794 $ 1,043 $ 772
Reclamation accretion $ 106 $ 64 $ 98 $ 62
All-in sustaining costs ($/tonne) $ 6,436 $ 6,105 $ 6,424 $ 5,696
Copper production costs ($/GEO):
Direct mining and production costs $ 1,137 $ 736 $ 1,091 $ 731
By-product credits (26) (17) (24) (17)
Royalties and production taxes 80 70 79 68
Inventory change, write-downs, and other (174) 27 (152) 15
Costs applicable to sales ($/GEO) (1) $ 1,017 $ 816 $ 994 $ 797
Depreciation and amortization $ 197 $ 144 $ 189 $ 140
Reclamation accretion $ 19 $ 12 $ 18 $ 11
All-in sustaining costs ($/GEO) $ 1,168 $ 1,108 $ 1,166 $ 1,033
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 23
-- 23 of 31 --
TANAMI
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Total underground ore (000 tonnes) 595 643 1,790 1,778
Tons milled/processed (000 tonnes):
Mill 590 701 1,760 1,752
Average ore grade (g/tonne):
Mill 5.458 5.566 5.201 5.644
Average mill recovery rate 98.2 % 98.0 % 98.4 % 98.2 %
Gold ounces produced (thousands):
Consolidated/Attributable 102 123 291 312
Gold ounces sold (thousands):
Consolidated/Attributable 100 123 290 312
Gold production costs ($ millions):
Costs applicable to sales (1) $ 98 $ 81 $ 281 $ 244
Depreciation and amortization $ 30 $ 30 $ 88 $ 80
Reclamation accretion $ 1 $ — $ 2 $ 1
Gold production costs ($/ounce):
Direct mining and production costs $ 944 $ 559 $ 934 $ 737
By-product credits (2) (2) (2) (2)
Royalties and production taxes 65 50 60 50
Inventory change, write-downs, and other (28) 48 (24) (2)
Costs applicable to sales ($/ounce) (1) $ 979 $ 655 $ 968 $ 783
Depreciation and amortization $ 299 $ 243 $ 303 $ 257
Reclamation accretion $ 5 $ 4 $ 5 $ 4
All-in sustaining costs ($/ounce) $ 1,334 $ 890 $ 1,256 $ 1,066
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 24
-- 24 of 31 --
CADIA - GOLD (1)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Total underground ore (000 tonnes): 7,996 — 22,420 —
Tonnes milled/processed (000 tonnes):
Mill 7,559 — 21,915 —
Average ore grade (g/tonne):
Mill 0.613 — 0.645 —
Average mill recovery rate 79.5 % — % 79.8 % — %
Gold ounces produced (thousands):
Consolidated/Attributable 115 — 354 —
Gold ounces sold (thousands):
Consolidated/Attributable 113 — 350 —
Gold production costs ($ millions):
Costs applicable to sales (2) $ 80 $ — $ 231 $ —
Depreciation and amortization $ 30 $ — $ 91 $ —
Reclamation accretion $ — $ — $ 1 $ —
Gold production costs ($/ounce):
Direct mining and production costs $ 757 $ — $ 669 $ —
By-product credits (80) — (93) —
Royalties and production taxes 84 — 80 —
Inventory change, write-downs, and other (38) — 8 —
Costs applicable to sales ($/ounce) (2) $ 723 $ — $ 664 $ —
Depreciation and amortization $ 271 $ — $ 261 $ —
Reclamation accretion $ 3 $ — $ 3 $ —
All-in sustaining costs ($/ounce) $ 1,078 $ — $ 1,044 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 25
-- 25 of 31 --
CADIA - COPPER (1)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Total underground ore (000 tonnes): 7,996 — 22,420 —
Tonnes milled/processed (000 tonnes):
Mill 7,559 — 21,915 —
Average ore grade:
Mill 0.36 % — % 0.36 % — %
Average mill recovery rate 84.4 % — % 84.5 % — %
Copper tonnes produced (thousands):
Consolidated/Attributable 21 — 64 —
Copper tonnes sold (thousands):
Consolidated/Attributable 21 — 64 —
Co-product GEO produced (thousands):
Consolidated/Attributable 120 — 355 —
Co-product GEO sold (thousands):
Consolidated/Attributable 116 — 351 —
Co-product production costs ($ millions):
Costs applicable to sales (2) $ 80 $ — $ 214 $ —
Depreciation and amortization $ 31 $ — $ 91 $ —
Reclamation accretion $ — $ — $ 1 $ —
Copper production costs ($/tonne):
Direct mining and production costs $ 4,098 $ — $ 3,509 $ —
By-product credits (444) — (511) —
Royalties and production taxes 353 — 324 —
Inventory change, write-downs, and other (233) — 36 —
Costs applicable to sales ($/tonne) (2) $ 3,774 $ — $ 3,358 $ —
Depreciation and amortization $ 1,497 $ — $ 1,433 $ —
Reclamation accretion $ 18 $ — $ 17 $ —
All-in sustaining costs ($/tonne) $ 4,849 $ — $ 5,386 $ —
Copper production costs ($/GEO):
Direct mining and production costs $ 743 $ — $ 636 $ —
By-product credits (80) — (93) —
Royalties and production taxes 64 — 59 —
Inventory change, write-downs, and other (42) — 7 —
Costs applicable to sales ($/GEO) (2) $ 685 $ — $ 609 $ —
Depreciation and amortization $ 272 $ — $ 260 $ —
Reclamation accretion $ 3 $ — $ 3 $ —
All-in sustaining costs ($/GEO) $ 880 $ — $ 977 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 26
-- 26 of 31 --
TELFER - GOLD (1)(2)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 3,012 — 10,416 —
Open pit waste 2,770 — 11,335 —
Total open pit 5,782 — 21,751 —
Total underground ore (000 tonnes): 134 — 541 —
Tonnes milled/processed (000 tonnes):
Mill 293 — 1,969 —
Average ore grade (g/tonne):
Mill 0.560 — 0.849 —
Average mill recovery rate 90.0 % — % 92.4 % — %
Gold ounces produced (thousands):
Consolidated/Attributable 6 — 51 —
Gold ounces sold (thousands):
Consolidated/Attributable 5 — 64 —
Gold production costs ($ millions):
Costs applicable to sales (3) $ 39 $ — $ 192 $ —
Depreciation and amortization $ 1 $ — $ 13 $ —
Reclamation accretion $ 5 $ — $ 9 $ —
Gold production costs ($/ounce): (2)
Direct mining and production costs N.M. $ — $ 5,034 $ —
By-product credits N.M. — (9) —
Royalties and production taxes N.M. — 57 —
Inventory change, write-downs, and other N.M. — (2,086) —
Costs applicable to sales ($/ounce) (3) N.M. $ — $ 2,996 $ —
Depreciation and amortization N.M. $ — $ 212 $ —
Reclamation accretion N.M. $ — $ 145 $ —
All-in sustaining costs ($/ounce) N.M. $ — $ 3,823 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we
temporarily ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary
suspension of production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding
agreement to sell the assets of the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024.
(3) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 27
-- 27 of 31 --
TELFER - COPPER (1)(2)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tonnes mined (000 tonnes):
Open pit ore 3,012 — 10,416 —
Open pit waste 2,770 — 11,335 —
Total open pit 5,782 — 21,751 —
Total underground ore (000 tonnes): 134 — 541 —
Tonnes milled/processed (000 tonnes):
Mill 293 — 1,969 —
Average ore grade:
Mill 0.11 % — % 0.12 % — %
Average mill recovery rate 63.2 % — % 73.8 % — %
Copper tonnes produced (thousands):
Consolidated/Attributable 1 — 2 —
Copper tonnes sold (thousands):
Consolidated/Attributable — — 2 —
Co-product GEO produced (thousands):
Consolidated/Attributable 1 — 9 —
Co-product GEO sold (thousands):
Consolidated/Attributable — — 11 —
Co-product production costs ($ millions):
Costs applicable to sales (2) $ 4 $ — $ 31 $ —
Depreciation and amortization $ — $ — $ 3 $ —
Reclamation accretion $ 1 $ — $ 1 $ —
Copper production costs ($/tonne):
Direct mining and production costs N.M. $ — $ 24,374 $ —
By-product credits N.M. — (41) —
Royalties and production taxes N.M. — 342 —
Inventory change, write-downs, and other N.M. — (9,271) —
Costs applicable to sales ($/tonne) (2) N.M. $ — $ 15,404 $ —
Depreciation and amortization N.M. $ — $ 1,248 $ —
Reclamation accretion N.M. $ — $ 693 $ —
All-in sustaining costs ($/tonne) N.M. $ — $ 21,007 $ —
Copper production costs ($/GEO):
Direct mining and production costs N.M. $ — $ 4,422 $ —
By-product credits N.M. — (7) —
Royalties and production taxes N.M. — 62 —
Inventory change, write-downs, and other N.M. — (1,682) —
Costs applicable to sales ($/GEO) (2) N.M. $ — $ 2,795 $ —
Depreciation and amortization N.M. $ — $ 226 $ —
Reclamation accretion N.M. $ — $ 126 $ —
All-in sustaining costs ($/GEO) N.M. $ — $ 3,811 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) During the second quarter, seepage points were detected on the outer wall and around the tailings storage facility at Telfer and we temporarily
ceased placing new tailings on the facility. Production resumed at the end of the third quarter, but as a result of the temporary suspension of
production, per ounce metrics are not meaningful ("N.M."). In September 2024, the Company entered into a binding agreement to sell the assets of
the Telfer reportable segment. The sale is expected to close in the fourth quarter of 2024.
(3) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 28
-- 28 of 31 --
LIHIR (1)
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 3,079 — 8,828 —
Open pit waste 4,862 — 17,732 —
Total open pit 7,941 — 26,560 —
Tonnes milled/processed (000 tonnes):
Mill 2,551 — 8,082 —
Average ore grade (g/tonne):
Mill 1.997 — 2.241 —
Average mill recovery rate 73.6 % — % 76.0 % — %
Gold ounces produced (thousands):
Consolidated/Attributable 129 — 451 —
Gold ounces sold (thousands):
Consolidated/Attributable 127 — 457 —
Gold production costs ($ millions):
Costs applicable to sales (2) $ 206 $ — $ 539 $ —
Depreciation and amortization $ 37 $ — $ 115 $ —
Reclamation accretion $ 1 $ — $ 3 $ —
Gold production costs ($/ounce):
Direct mining and production costs $ 2,233 $ — $ 1,579 $ —
By-product credits (2) — (1) —
Royalties and production taxes 61 — 56 —
Inventory change, write-downs, and other (673) — (455) —
Costs applicable to sales ($/ounce) (2) $ 1,619 $ — $ 1,179 $ —
Depreciation and amortization $ 292 $ — $ 252 $ —
Reclamation accretion $ 9 $ — $ 8 $ —
All-in sustaining costs ($/ounce) $ 1,883 $ — $ 1,416 $ —
(1) Site acquired through the Newcrest transaction; results have been included from the date of acquisition on November 6, 2023.
(2) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 29
-- 29 of 31 --
AHAFO
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 2,288 2,010 5,224 4,353
Open pit waste 4,492 5,082 14,194 16,016
Total open pit 6,780 7,092 19,418 20,369
Total underground ore (000 tonnes): 635 556 1,906 1,718
Tons milled/processed (000 tonnes):
Mill 2,370 1,573 7,098 6,149
Average ore grade (g/tonne):
Mill 3.045 2.748 2.778 2.174
Average mill recovery rate 94.1 % 94.4 % 94.0 % 93.6 %
Gold ounces produced (thousands):
Consolidated/Attributable 213 133 587 398
Gold ounces sold (thousands):
Consolidated/Attributable 221 137 585 401
Gold production costs ($ millions):
Costs applicable to sales (1) $ 192 $ 133 $ 527 $ 384
Depreciation and amortization $ 55 $ 47 $ 161 $ 128
Reclamation accretion $ 2 $ 2 $ 5 $ 5
Gold production costs ($/ounce):
Direct mining and production costs $ 589 $ 849 $ 655 $ 872
By-product credits (2) (1) (2) (2)
Royalties and production taxes 211 146 189 136
Inventory change, write-downs, and other 69 (25) 58 (49)
Costs applicable to sales ($/ounce) (1) $ 867 $ 969 $ 900 $ 957
Depreciation and amortization $ 249 $ 338 $ 275 $ 319
Reclamation accretion $ 8 $ 12 $ 9 $ 12
All-in sustaining costs ($/ounce) $ 1,043 $ 1,208 $ 1,057 $ 1,269
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 30
-- 30 of 31 --
AKYEM
Three Months Ended September 30, Nine Months Ended September 30,
2024 2023 2024 2023
Open pit tons mined (000 tonnes):
Open pit ore 145 1,088 698 2,376
Open pit waste 6,860 4,601 17,261 17,193
Total open pit 7,005 5,689 17,959 19,569
Tons milled/processed (000 tonnes):
Mill 2,135 1,896 6,120 5,678
Average ore grade milled (g/tonne):
Mill 0.742 1.394 0.921 1.165
Average mill recovery rate 90.1 % 89.4 % 89.1 % 89.2 %
Gold ounces produced (thousands):
Consolidated/Attributable 47 75 163 195
Gold ounces sold (thousands):
Consolidated/Attributable 46 71 169 198
Gold production costs ($ millions):
Costs applicable to sales (1) $ 95 $ 72 $ 252 $ 189
Depreciation and amortization $ 10 $ 31 $ 51 $ 86
Reclamation accretion $ 3 $ 3 $ 10 $ 9
Gold production costs ($/ounce):
Direct mining and production costs $ 1,304 $ 848 $ 1,038 $ 914
By-product credits (8) (3) (7) (6)
Royalties and production taxes 490 121 327 111
Inventory change, write-downs, and other 265 66 133 (61)
Costs applicable to sales ($/ounce) (1) $ 2,051 $ 1,032 $ 1,491 $ 958
Depreciation and amortization $ 214 $ 438 $ 300 $ 433
Reclamation accretion $ 75 $ 42 $ 62 $ 45
All-in sustaining costs ($/ounce) $ 2,230 $ 1,332 $ 1,716 $ 1,260
(1) Excludes Depreciation and amortization and Reclamation and remediation.
NEWMONT THIRD QUARTER 2024 | OPERATING STATISTICS 31
-- 31 of 31 --